Home

Nanni Silverwake warranty

image

Contents

1. FIRST MAINTENANCE VISIT VOUCHER At owner s expense Enemolype PR ei oe acer ee ee STAGING eee Perera ea ce ero Setar eens Opneraune house ea CS DOME ARR a ee Maintenance operations to be performed after 20 hours of operation and no more than 45 days after commissioning in accordance with maintenance table on page 16 Note After each operation check the corresponding box Refer to User Manual for general information Check cooling fluid level Drain Refill engine oil Replace oil filter Drain Refill gearbox oil Check clean gearbox filter if fitted Drain water replace fuel prefilter cartridge Replace fuel filter Clean seawater filter Check general waterproofness Check engine attachment suspension and alignment Check adjust tension of belts Check tightening of screws and clamps Check stuffing box Check top up battery electrolyte Check waste gate lever if equipped Check instrument panel indicators and alarms DeBCeUo De ee OOOOOoODd Check control unit inspect throttle gearbox and Trolling if fitted cables Connections on engine Lubrication Blue form dealer To be returned completed to NANNI INDUSTRIES White form must be kept with booklet Official stamp of approved dealer or NANNIDIESEL center Signature Signature of buyer customer kn anni alla esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79
2. RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 21 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL WINTERIZATION Whenever your NANNIDIESEL is not used over an extended period of time or at the end of its usual service season it is important to protect your en gine during that time when it is not used The following winterization procedures must be carried out to ensure that your engine is in perfect operating condition when the next season comes around We recommend that you have the following winterization procedures performed by a NANNIDIESEL approved workshop Winterization operations Ist year LY Check condition of cooling fluid U Rinse seawater cooling circuit with freshwater U Pump a mixture of 50 water and 50 antifreeze through seawater cooling circuit If your engine has to be stored over the winter period with external temperatures drop freezing we recommend to drain the seawater cooling circuit completely Close the engine air intake Drain the engine and gearbox oil and refill with new oil Release belts tension Remove the seawater pump impeller rinse with fresh water and store in dry place sheltered from light Top up the cooling fluid to its maximum level in the heat exchanger Dry the boat s bilge under the engine Spray the engine with a water repellant product OOOUUOUD Official stamp of approved dealer or NANNIDIESEL center Signature Signature of buyer customer
3. Silverwake Garantie Warranty N Warranty Silverwake nannidiesel energy in blue 970311098 ATLD DE SILVERWAKE CONTRACTUAL WARRANTY CONTENTS v Identification of product and type of warranty applicable 2 Y SILVERWAKE RECREATIONAL u nenne 3 9 V SILVERWAKE PROFESSIONAL iris 10 14 VY SILVERWAKE commissioning voucher cccccccsseesscesseeesecesseceseeesseesseeessens 15 7 Manlenaneeil ble ee ee ee e 16 Y Firstmamtenance VI VOR ee ee ee age 17 Y Maintenance SR sen ee sates EEA nEn rE EEA dee sued Enies 18 21 RO E E E R E 22 24 Z Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 SILVERWAKE ENG IND L SILVERWAKE IDENTIFICATION OF PRODUCT AND TYPE OF WARRANTY APPLICABLE Dear Customer Thank you for choosing a NANNIDIESEL marine engine Your NANNIDIESEL engine has been designed and dyno tested in our factory to ensure your entire satisfaction when cruising Please read our SILVERWAKE warranty conditions and be sure to carefully respect the operating and maintenance instructions contained in this booklet BOAT TRADENAME TYPE BOAT S NAME PEROU es ENGINE MODELS res een ER GEARBOX MODELS nn E SERIEN
4. Tension of belts Sea water pump impeller Stuffing box Battery electrolyte level Every 15 days General water proofness Tightening of screws and clamps Engine attachment suspensions and alignment Anode if fitted Instrument panel indicators and alarms Control unit inspection of accelerator gearbox and trolling cables general lubrification Calibrated heat exchanger cap Thermostat Exchanger tube stack inspection cleaning and O ring replacement Air cooler tube stack inspection cleaning and O ring replacement Gear box oil cooler tube stack cleaning Injector nozzle calibration spray Valve clearance Turbo inspection cleaning Turbo waste gate free movement and lubrication Timing belt if fitted Q gt C A C A C A C A G GC Q gt A A Q A gt gt a a gt Q Q A f C A C A C A C A C A C gt Cc A A Cras Q Q 5 Q C L C L C L C A C A C A C A Every 15 days C A Every 15 days Every 15 days Every 15 days C A C R Q C L L 1000 H or 2 years hanni energy in blue Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Internet www nannidiesel com E mail contact nannidiesel com S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 ET SILVERWAKE ENG IND L
5. EX SILVERWAKE ENG IND L SILVERWAKE PROFESSIONAL I NANNI INDUSTRIES S A S warrants its products to its customers in other application than recreational use in accordance with the terms and conditions detailed below NANNI INDUSTRIES S A S warrants for a period of ONE 1 year as of the date of commissioning the NANNIDIESEL engine components listed below and recognized to be defective as concerns casting or machining defects NANNI INDUSTRIES S A S hereby undertakes to replace or repair those components listed below found to be defective These components are Engine block Timing gear case Crankshaft Connecting rods Engine flywheel Belt flywheel housing Camshaft Balancing shafts Fresh Water pump housing eae ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 EUX SILVERWAKE ENG IND L SILVERWAKE PROFESSIONAL II The specified items as described on point 1 are covered by the SILVERWAKE PROFESSIONAL contractual warranty The following points are excluded from the warranty granted by NANNI INDUSTRIES S A S to the buyer user Any modification carried out on the engines and ancillary equipment specified and installed by the boat build
6. 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL 2ND MAINTENANCE VISIT At owner s expense Engine Type ae SEHON ee Op rating h lte dun Customer 111 a nn Operations to be performed after 100 hours of operation or once yearly in accordance with maintenance table on page 16 Note After each operation check the corresponding box Refer to User Manual for general information QI Check cooling fluid level LJ Check general waterproofness LY Check engine oil level U Check stuffing box U Check gearbox oil level U Check adjust tension of belts Q Replace fuel filter Q Check tightening of screws and clamps LJ Drain water replace fuel prefilter cartridge Q Clean seawater filter Q Check top up battery electrolyte level Q Check instrument panel indicators and alarms U Replace seawater pump impeller U Check and lubricate waste gate lever if fitted U Check replace anode if fitted U Check control unit inspect throttle gearbox and Trolling if fitted cables Connections on engine Lubrication oo Signature Signature of buyer customer MAJEN ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0
7. 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Internet www nannidiesel com E mail contact nannidiesel com S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 SILVERWAKE ENG IND L
8. 5 56 22 30 79 DI Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 18 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL 3rd MAINTENANCE VISIT At owner s expense Engine INDES ee SCHE NG ee Operating ho ee Customer Namie ee Nee Re RER es ee ee Operations to be performed after 200 hours of operation or once yearly in accordance with maintenance table on page 16 Note After each operation check the corresponding box Refer to User Manual for general information Check cooling fluid level Q Check general waterproofness Drain refill engine oil LJ Check engine attachments suspensions and alignment Drain refill gearbox oil Check Adjust tension of belts Replace engine oil filter Check replace anode if fitted Check clean gearbox oil filter Check top up battery electrolyte level Replace fuel filter Check tightening of screws and clamps Drain water check fuel prefilter cartridge Check stuffing box Clean seawater filter Check and lubricate waste gate lever if fitted Replace seawater pump impeller Check instrument panel indicator and alarms Check control unit inspect throttle gearbox and Check clean replace if necessary engine air filter Trolling if fitted cables Connections on engine Lubrication Official stamp of approved dealer or NAN
9. A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 23 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL WINTERIZATION 3rd year LY Check condition of cooling fluid U Rinse seawater cooling circuit with freshwater U Pump a mixture of 50 water and 50 antifreeze through seawater cooling circuit If your engine has to be stored over the winter period with external temperatures drop freezing we recommend to drain the seawater cooling circuit completely Close the engine air intake Drain the engine and gearbox oil and refill with new oil Release belts tension Remove the seawater pump impeller rinse with fresh water and store in dry place sheltered from light Top up the cooling fluid to its maximum level in the heat exchanger Dry the boat s bilge under the engine Spray the engine with a water repellant product OOOOOUOD Official stamp of approved dealer or NANNIDIESEL center Signature Signature of buyer customer HA a HER ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 D Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 24 SILVERWAKE ENG IND L nannidiese energy in blue Z Avenue Mariotte BP 107
10. AAEN ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 DI Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 22 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL WINTERIZATION 2nd year LY Check condition of cooling fluid U Rinse seawater cooling circuit with freshwater U Pump a mixture of 50 water and 50 antifreeze through seawater cooling circuit If your engine has to be stored over the winter period with external temperatures drop freezing we recommend to drain the seawater cooling circuit completely Close the engine air intake Drain the engine and gearbox oil and refill with new oil Release belts tension Remove the seawater pump impeller rinse with fresh water and store in dry place sheltered from light Top up the cooling fluid to its maximum level in the heat exchanger Dry the boat s bilge under the engine Spray the engine with a water repellant product OUOOOOOD Official stamp of approved dealer or NANNIDIESEL center Signature Signature of buyer customer STD ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 PN Internet www nannidiesel com E mail contact nannidiesel com energy in blue S
11. Battery level and voltage Q Fuel circuit fuel priming and bleeding Q Closed cooling circuit filling up and bleeding Q Engine and gearbox oil level connection s tightening and drain plugs White form Q Control unit check travel of accelerator and forward reverse cables LJ Gearbox check throttle movement controls forward reverse and trolling valve if equipped must be kept with U Instrument panel check that the indicators give correct values and check audible lighted warning alarms the booklet oo ie anni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 ET SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL MAINTENANCE TABLE SCHEDULE OF SERVICING OPERATIONS TYPE OF OPERATION C CONTROL R REPLACE A ADJUST L CLEAN Every day Ist maintenance inspection 20 H Every 100 H or once annually Every 200 H or once annually Every 400 H or every 2 years Cooling fluid level Cooling fluid Engine oil level Engine oil Engine oil filter Gearbox oil level Gearbox oil cleaning of oil filter Fuel pre filter cartridge Fuel pre filter water draining Fuel filter Sea water filter cleaning Air filter cleaning replacement
12. DD Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 SILVERWAKE ENG IND L FIRST MAINTENANCE VISIT VOUCHER At owner s expense Engine Type de ane Seral NO ee ue Operating hours cn Customer name ran nn On de tie ro use Maintenance operations to be performed after 20 hours of operation and no more than 45 days after commissioning in accordance with maintenance table on page 16 Note After each operation check the corresponding box Refer to User Manual for general information Q Check cooling fluid level LJ Check general waterproofness Q Drain Refill engine oil LJ Check engine attachment suspension and alignment U Replace oil filter LY Check adjust tension of belts Q Drain Refill gearbox oil Q Check tightening of screws and clamps Q Check clean gearbox filter if fitted Q Check stuffing box Q Drain water replace fuel prefilter cartridge Q Check top up battery electrolyte Q Replace fuel filter LJ Check waste gate lever if equipped U Clean seawater filter U Check instrument panel indicators and alarms Q Check control unit inspect throttle gearbox and Trolling if fitted cables Connections on engine Lubrication White form must be kept with the booklet oo na INT diesel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33
13. e Damages caused by use of a fuel or lubricant other than those specified Wear components such as belts filters impellers and gaskets on the raw water pump e Damages to electrical components supplied with the engine or installed by shipyards related to connections made which are not compliant with the specifications or without prior approval of NANNI INDUSTRIES S A S e Clutch damaged on gear boxes if equipped with trolling valve Also excluded from any NANNI INDUSTRIES S A S warranty and more particularly the contractual warranty e Expenses related to travel of the person ensuring after sales service within a radius exceeding 100 kilometres e Expenses related to handling boat hauling and launching telephone transportation etc e Repair of any other damage Nd anni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 D Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 EX SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL IV Conditions for application of SILVERWAKE RECREATIONAL contractual warranty The validity of the SILVERWAKE RECREATIONAL contractual warranty 1s subject to the following conditions a Light pleasure boat use with characteristics as follows Number of operating hours per year 500
14. hours maximum depending on the engine type and application see details on table N 2 Usage private pleasure use Percentage of use at full load see details on table No 1 Boat type and applications see details on table No 2 Table N 1 Percentage of use at full power Use Time Power RPM Corresponding engine RPM Full load 10 100 100 4000 3800 3600 3400 3000 2800 2600 Cruising 20 75 90 3600 3420 3240 3040 2700 2520 2340 Intermediate 70 50 80 3200 3040 2880 2720 2400 2240 2080 H4 130 V6 270 N2 14 T4 165 N2 10 N4 40 4 340TDI NOTE H4 150 V6 320 N3 21 T4 180 N4 38 N4 50 N4 115 Also valid for stern drive versions H4 170 V6 350 N3 30 T4 200 H4 115 N4 60 T4 155 N4 85 x NOTE Engine oo N4 100 The propeller must be adapted to let sA the engine get the full RPM at full Ban t too large propeller i a 6 420TDI GR ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 6 SILVERWAKE ENG IND L energy in blue SILVERWAKE RECREATIONAL Table No 2 Boat type and application PLEASURE DUTY 500 hours year Engine type Power hp Boat type Ratio HP ton minimum Minimum speed Knots N2 10 10 N2 14 14 Racing sailing boats 45 N321 21 Cruising
15. seen sanieren WARRANTY SILVERWAKE RECREATIONAL SILVERWAKE PROFESSIONAL OFFICIAL STAMP AND SIGNATURE OF SALES AGENT approved NANNIDIESEL dealer NANNIDIESEL service center DATE OF COMMISSIONING 4 2 0402 een iate east ann ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 D Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 A SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL I As part of its sales policy NANNI INDUSTRIES S A S warrants its products to its Customers recreational craft applications in accordance with the terms and conditions detailed below NANNI INDUSTRIES S A S warrants for a period of THREE 2 1 years as of the date of commissioning the NANNIDIESEL engine components listed below and recognized to be defective as concerns casting or machining defects NANNI INDUSTRIES S A S hereby undertakes to replace or repair those components listed below if found to be defective These components are Engine block Timing gear case Crankshaft Connecting rods Engine flywheel Belt flywheel housing Camshaft Balancing shafts Fresh water pump housing The engine components other than those mentioned above are guaranteed for a period of TWO 2 years after the commissioning date in
16. 0 Displacement boats 6 N4 115 115 Semi planning hulls 40 16 MEDIUM DUTY 2500 hours year Engine type Power hp Boat type Ratio HP ton minimum Minimum speed Knots N4 38 37 5 Cruising sailing boats 4 5 N4 40 40 River boats 6 N4 50 50 Displacement boats 6 N4 60 60 Semi planning hulls 32 15 N4 85 85 Cruising sailing boats 4 4 N4 100 100 Displacement boats 6 N4 115 115 Semi planning hulls 40 16 MaN ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 DOWD Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 13 SILVERWAKE ENG IND L SILVERWAKE PROFESSIONAL c The engine commissioning inspection must be performed within 6 months of the date of delivery by NANNI INDUSTRIES S A S By mutual agreement the engine commissioning will only be considered effective as of reception by NANNI INDUSTRIES S A S of the online registration duly completed by the NANNI Distributor For this reason the voucher must be received by the NANNI distributor within 30 days as of inspection Any commissioning voucher which is incomplete illegible or received after the required deadline shall be considered as invalid Failure to submit the valid commissioning voucher within the required deadline will result in definitive cancellation of the contra
17. 260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 e Na dE DE A diesel Internet www nannidiesel com E mail contact nannidiesel com S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 8 SILVERWAKE ENG IND L energy in blue SILVERWAKE RECREATIONAL b The engine commissioning inspection must be performed within 6 months of the date of delivery by NANNI INDUSTRIES S A S refer to long term storage procedure detailed in the maintenance manual if the engine start up is not performed within 6 month By mutual agreement the engine commissioning will only be considered effective as of reception by NANNI INDUSTRIES S A S of the online registration dul completed by the NANNI Distributor For this reason the voucher must be received by the NANNI distributor within 30 days as of inspection Any commissioning voucher which is incomplete illegible or received after the required deadline shall be considered as invalid Failure to submit the valid commissioning voucher within the required deadline will result in definitive cancellation of the contractual warranty c A first maintenance inspection must be performed after 20 hours of use or no more than 45 days after commissioning By mutual agreement the maintenance inspection will only be considered effective as of reception by NANNI INDUSTRIES S A S of the duly completed first inspection voucher This
18. NIDIESEL center Date OOOOVOOOUOUOL OOOOOOUDL MAJEN ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 DI Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 19 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL 4th MAINTENANCE VISIT At owner s expense Engine Type ae Semnal NO ee Op rating h lte dun Customer 111 a a Operations to be performed after 400 hours of operation or once yearly in accordance with maintenance table on page 16 Note After each operation check the corresponding box Refer to User Manual for general information D Replace cooling fluid Check general waterproofness Drain refill engine oil LJ Check engine attachments suspensions and alignment Check adjust tension of belts Check tightening of screws and clamps Check stuffing box Clean seawater filter Check and lubricate waste gate lever if fitted Check instrument panel indicators and alarms Disassemble clean heat exchanger reinstall with new o rings Drain refill gearbox oil Replace fuel filter Drain water check fuel prefilter cartridge Check top up battery electrolyte level Replace seawater pump impeller Check replace anode if fitted Check control unit inspec
19. STRIBUTOR Q Control unit check travel of accelerator and forward reverse cables To be returned completed after online Q Gearbox check throttle movement controls forward reverse and trolling valve if equipped registration to Q Instrument panel check that the indicators give correct values and check audible lighted warning alarms NANNI INDUSTRIES FREE ee ih anni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 ET SILVERWAKE ENG IND L SILVERWAKE COMMISSIONING VOUCHER E gine typ iard ipaa Seral NOS nee COS NO eine Gearbox Wii ae Serial Nor ana Reduction la Brand name and boat model ee een LEEREN ee Weight ee Boats name aka Registration DOM EN ana Serial N UEIN ee Customer SHAME ee ee neue Complete sed A ee ee ee ee een re ee een Zip D a re A es me FON ee SILVERWAKE RECREATIONAL WARRANTY C SILVERWAKE PROFESSIONAL WARRANTY IMPORTANT INFORMATION IDEE SPEED En emo a r RPM MAX RPM IN NEUTRAL ers RPM MAX RPM IN FORWARD GEAR eenenee RPM PRE DELIVERY CHECKS Inspection operations Note After each operation check the corresponding box Refer to user Manual for general information Q Engine alignment LJ Engine mounts Q Tension of belts Q
20. accordance with European Directive 1999 44 EC eae ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 2 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL I The following section only concerns the European Union countries In compliance with the directive 1999 44 EC of the European Parliament and of the council of 25 may 1999 published in the official journal of the European com munities L171 of 17 July 1999 the consumer code independent of the warranty granted to the product buyer user the seller is liable for all product compliance defects with respect to the contract and crippling defects as concerned by the provisions of 14 articles of the previous stated directive Extract of Directive 1999 44 EC Article 1 Scope and definitions The purpose of this Directive is the approximation of the laws regulations and administrative provisions of the Member States on certain aspects of the sale of consumer goods and associated guarantees in order to ensure a uniform minimum level of consumer protection in the context of the internal market Article 2 Conformity with the contract 1 The seller must deliver goods to the consumer which are in conformity with the contract
21. buyer user and the approved dealer prior to order NANNI INDUSTRIES S A S reserves the right with regard to the technical specifications submitted to accept or refuse to grant its SILVERWAKE PROFESSIONAL contractual warranty b The engine must be used in Light boat applications with characteristics as follows Number of operating hours per year and duty cycle LIGHT DUTY up to 1000 hours of operation per year up to 20 of the time at full load MEDIUM DUTY up to 2500 hours of operation per year up to 30 of the time at full load Usage professional use Boat type and applications see details on table No 1 nm anni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 12 SILVERWAKE ENG IND L SILVERWAKE PROFESSIONAL Table No 1 Boat type and application LIGHT DUTY 1000 hours year Engine type Power hp Boat type Ratio HP ton minimum Minimum speed Knots N2 10 10 N2 14 14 N3 21 21 Cruising sailing boats 4 5 N3 30 29 River boats 6 N4 38 37 5 Displacement boats 6 N4 40 40 Semi planning boats 32 15 N4 50 50 N4 60 60 N4 85 85 Cruising sailing boats 4 4 N4 100 10
22. by the buyer user Also excluded from any NANNI INDUSTRIES S A S warranty and more particularly the contractual warranty Expenses related to travel of the person ensuring after sales service within a radius exceeding 100 kilometres Expenses related to handling boat hauling and launching telephone transportation operating losses etc Repair of any other damage nm anni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 D Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 14 SILVERWAKE ENG IND L SILVERWAKE PROFESSIONAL III Conditions for application of SILVERWAKE PROFESSIONAL contractual warranty The validity of the SILVERWAKE PROFESSIONAL contractual warranty is subject to the following conditions It is the entire responsibility of the approved dealer or center directly in contact with the end user to verify the appropriateness of the equipment supplied with the use planned by the end user and to ensure the equipment s compliance with the expectations expressed by the customer As a general rule the basic warranty conditions governing coverage by the SILVERWAKE PROFESSIONAL warranty are as follows a A written detailed request must be addressed to NANNI INDUSTRIES S A S by the
23. ctual warranty d A first maintenance inspection must be performed within the first 20 hours ofuse after commissioning By mutual agreement the maintenance inspection will only be considered effective as of reception by NANNI INDUSTRIES S A S of the duly completed first inspection voucher This voucher must be received within 30 days as of the inspection Any voucher which is incomplete eligible or received after the required deadline shall be considered as invalid Failure to submit the valid commissioning voucher within the required deadline will result in definitive cancellation of the contractual warranty e The maintenance and servicing visits must be performed in compliance with the table on page 16 of this booklet with signature and stamp by the approved dealer having performed each maintenance visit see page 16 This booklet showing that each of the maintenance visits has been carried out must be presented for all claims relative to the contractual warranty f Winterization is mandatory when the engine is not used for any extended period of time dealer stamp mandatory The inspection operations must be performed by a NANNIDIESEL approved dealer or shipyard agent trained on NANNI INDUSTRIES S A S products These operations are performed at the owner s expense IV Application of warranty For application of the warranty contact an approved dealer or distributor member of the NANNI INDUSTRIES S A S network Nd anni d
24. er without prior approval by NANNI INDUSTRIES S A S Damages due to incorrect non compliant installation The installation must be performed in compliance with the installation instructions given by NANNI INDUSTRIES S A S and must be carried out by a professional shipyard shipyard technician trained on NANNI INDUSTRIES S A S products approved NANNIDIESEL engine dealer Damages caused by use of parts other than original parts or those specified by NANNI INDUSTRIES S A S Engine which have suffered as a result of inadequate maintenance Damages resulting from engines serviced outside our network of approved dealers Damages due to storage exceeding 6 months or use which does not comply with the procedures detailed in the maintenance manual Damages caused by freezing or failure caused by no winterization procedures when the engine is not in service Damages caused by use of an inappropriate propeller Damages caused by use of a fuel or lubricant other than those specified Wear components such as belts filters impellers and gaskets on the raw water pump Damages to electrical components supplied with the engine or installed by shipyards related to connections made which are not compliant with the specifications or without prior approval of NANNI INDUSTRIES S A S Damage to clutch disks used with the gear boxes equipped with trolling valve Any damages resulting from a specific use not specified when ordering
25. i esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 EUX SILVERWAKE ENG IND L SILVERWAKE COMMISSIONING VOUCHER Enemy De a ete ee SEE NO cir ee en ee CORNE re Gear DOx Cy Pe een SS CIMINO Re eme da R CUCHLONTAN Or er eee ee Brandname andbeatmeodeleee n ee cen recor cree etter ark ieee risen nee NON sean eee sete reese Weie Dian eee eee Boaksmamer ee ResisiralionbeatsN Pe ears eee Seal No HUN een Customer s namne N rere eee rer ee eye eee ere Per te Compleleseusiomers address rc ae tench umn Nie ture SAR RE renee ee ec ee PVC E rere oO A eee Clive ieee iene eae ene ean tna es COUDE a eee e SILVERWAKE RECREATIONAL WARRANTY SILVERWAKE PROFESSIONAL WARRANTY IMPORTANT INFORMATION IDBESPEEDER er ee RPM MAA IR PIVIGTINGINIE Wet RATER de RPM MAX RPM IN FORWARD GEAR RPM PRE DELIVERY CHECKS Inspection operations Note After each operation check the corresponding box Refer to user Manual for general information Q Engine alignment U Engine mounts Q Tension of belts Q Battery level and voltage Q Fuel circuit fuel priming and bleeding Q Closed cooling circuit filling up and bleeding Q Engine and gearbox oil level connection s tightening and drain plugs Blue form DI
26. ns liable against whom the final seller may pursue remedies together with the relevant actions and conditions of exercise shall be determined by national law Article 5 Time limits 1 The seller shall be held liable under Article 3 where the lack of conformity becomes apparent within two years as from delivery of the goods If under national legislation the rights laid down in Article 3 2 are subject to a limitation period that period shall not expire within a period of two years from the time of delivery 2 Members States may provide that in order to benefit from his rights the consumer must inform the seller of the lack of conformity within a period of two months from the date on which he detected such lack of conformity 3 Unless proved otherwise any lack of conformity which becomes apparent within six months of delivery of the goods shall be presumed to have existed at the time of delivery unless this presumption is incompatible with the nature of the goods or the nature of the lack of conformity Article 8 1 National law and minimum protection The rights resulting from the Directive shall be exercised without prejudice to other rights which the consumer may invoke under the national rules governing contractual or non contractual liability Z Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Internet www nannidiesel com E mail contact nannidiesel com nannidie
27. of sale 3 There shall be deemed not to be a lack of conformity for the purposes of this Article if at the time the contract was concluded the consumer was aware or could not reasonably be unaware of the lack of conformity or if the lack of conformity has its origin in materials supplied by the consumer 5 Any lack of conformity resulting from incorrect installation of the consumer goods shall be deemed to be equivalent to lack of conformity of the goods if installation forms part of the contract of sale of the goods and the goods were installed by the seller or under his responsibility This shall apply equally if the product intended to be installed by the consumer is installed by the consumer and the incorrect installation is due to a shortcoming in the installation instructions Article 3 2 Rights of the consumer In the case of a lack of conformity the consumer shall be entitled to have the goods brought into conformity free of charge by repair or replacement or to have an appropriate reduction made in the price or the contract rescinded with regard to those goods Article 4 Right of redress Where the final seller is liable to the consumer because of a lack of conformity resulting from an act or omission by the producer a previous seller in the same chain of contracts or any other intermediary the final seller shall be entitled to pursue remedies against the person or persons liable in the contractual chain the person or perso
28. sailing boats 5 N3 30 29 River boats 6 N4 38 375 Displacement boats 6 N4 40 40 Semi planning hulls 3 15 N4 50 50 N4 60 60 N4 85 85 Cruising sailing boats 4 4 N4 100 100 Displacement boats 6 N4 115 115 Semi planning hulls 40 16 Planning and Semi planning hulls ii 18 4 340TDI 130 Example 21 hp on a cruising sailing boat gt the weight max must be of 4 7 tons Contact NANNIDIESEL for all specific or unusual applications men ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 Dow Internet www nannidiesel com E mail contact nannidiesel com S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 SILVERWAKE ENG IND L energy in blue SILVERWAKE RECREATIONAL Table No 2 Boat type and application PLEASURE DUTY 500 hours year Engine type Power hp Boat type Ratio HP ton minimum Minimum speed Knots T4 165 165 T4 180 180 T4 200 200 T4 155 155 4 380TDI 175 4 390TDI 200 Planning Hulls 42 21 H4 115 115 H4 130 130 H4 150 150 H4 170 170 T6 280 273 T6 300 305 6 420TDI 320 Planning Hulls 60 21 V6 270 270 V6 320 320 V6 350 350 Example T4 200 on a planning Hull the maximum weight must be of 4 7 tons full load Contact NANNIDIESEL for all specific or unusual applications also valid for STERN DRIVE versions Z I Avenue Mariotte BP 107 33
29. sel energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL III The specified items as described on point 1 are covered by the SILVERWAKE RECREATIONAL contractual warranty Nevertheless the following points are excluded from the warranty granted by NANNI INDUSTRIES S A S to its customers e Any modification carried out on the engines and ancillary equipment specified and installed by the boat builder without prior approval by NANNI INDUSTRIES S A S e Damages due to incorrect non compliant installation The installation must be performed in compliance with the installation instructions gi ven by NANNI INDUSTRIES S A S and must be carried out by a professional shipyard shipyard technician trained on NANNI INDUSTRIES S A S products approved NANNIDIESEL engine dealer e Damages caused by use of parts other than original parts or those specified by NANNI INDUSTRIES S A S e Engine which have suffered as a result of inadequate maintenance e Damages resulting from engines serviced outside our network of approved dealers e Damages due to storage exceeding 6 months or use which does not comply with the procedures detailed in the maintenance manual e Damages caused by freezing or failure caused by no winterization procedures when the engine is not in service e Damages caused by use of an inappropriate propeller
30. t throttle gearbox and Trolling if fitted cables Connections on engine Lubrication oo OOOOOOUOUDL OOOOOCOD Signature Signature of buyer customer HA a HER ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 D Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638 EJ SILVERWAKE ENG IND L SILVERWAKE RECREATIONAL AND PROFESSIONAL 5th and 6t MAINTENANCE VISIT At owner s expense Engine INDES ee BS NO ao eraa e ai Operating HOTS ee Customer namie cessas ee E E E E EEr ot Operations to be performed in accordance with maintenance table on page 16 Offcial stamp of approved dealer or NANNIDIESEL center Signature Signature of buyer customer At owner s expense Engine Type nee Seral NO nc ue Operating OMS a ans Customer nae eree eS ne a nn ae D a nt ee ee Operations to be performed in accordance with maintenance table on page 16 Official stamp of approved dealer or NANNIDIESEL center Signature Signature of buyer customer HA TER ni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 PN Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000
31. voucher must be received within 30 days as of the inspection Any voucher which is incomplete eligible or received after the required deadline shall be considered as invalid Failure to submit the valid commissioning voucher within the required deadline will result in definitive cancellation of the contractual warranty d The maintenance and servicing visits must be performed in compliance with the table on page 16 of this booklet with signature and stamp by the approved dealer having performed each maintenance visit see page 16 This booklet showing that each of the maintenance visits has been carried out must be presented for all claims relative to the contractual warranty e Winterization is mandatory when the engine is not used for any extended period of time dealer stamp mandatory The inspection operations must be performed by a NANNIDIESEL approved dealer or shipyard agent trained on NANNI INDUSTRIES S A S products These operations are performed at the owner s expense V Application of warranty For application of the warranty contact an approved dealer or distributor member of the NANNI INDUSTRIES S A S network Nd anni di esel Z I Avenue Mariotte BP 107 33260 LA TESTE FRANCE Tel 33 0 5 56 22 30 60 Fax 33 0 5 56 22 30 79 PN Internet www nannidiesel com E mail contact nannidiesel com energy in blue S A S au capital social de 2 040 000 RCS Bordeaux B380 707 638 000 17 APE 291 A FR 15380707638

Download Pdf Manuals

image

Related Search

Related Contents

LCD Panel Replacement for G2100 series R808293K  Protesi scheletrata  1_2.ai - 大多喜ガス  caloventor 54kw con tablero de comandos manual de usuario  GR25 S.P.R. GR25 SNIPER    Manual Cover Pages  ニューポイントドリルBRA 再研削要領書  Scuola primaria di via Catalani  Capteurs d`oxygene - venttilateurs Puritan Bennett 840, 740  

Copyright © All rights reserved.
Failed to retrieve file