Home
User`s Manual CBP LPU- 40 Flotation Collar
Contents
1. 10 LPU 40 Flotation Collar User s Manual 4 Inspection It is the responsibility of the air crewman to inspect the LPU 40 flotation collar before flight operations Perform a preflight inspection prior to each flight and at intervals not to exceed 30 days If damage is found during an inspection the vest must be grounded until repaired 1 Inspect the outside of the collar for Cuts tears and abrasion damage Open seams and loose or broken stitching e Contamination damage 2 Ensure that the entire length of the slide fastener is closed and there are no missing teeth N CAUTION Do NOT OPEN THE FLOTATION COLLAR SLIDE FASTENER FOR ROUTINE INSPECTION 3 Ensure that the beaded inflation handle is attached with 3 snaps fastened 4 Ensure that the flotation collar is attached to the vest and all of the attachment snaps are fastened 5 Maintenance Maintenance of the LPU 40 flotation collar consists of cleaning service and repair The air crewman s responsibility for maintenance is limited to inspecting the outside components of the collar Service and repairs shall be completed only by an authorized service station or the manufacturer Remove the collar from the vest to wash the vest 6 Storage otore your LPU 40 Flotation Collar on a clothes hanger away from direct sunlight in a dry well ventilated place Do not store your collar near sources of heat such as a radiator or in a warm humid environment where mold or mi
2. 3 4 Send The right lobe has a cinch strap with a snap hook Remove the cover from the snap hook 3 4 Anchor strap Capewell Aerial Systems LLC Page 8 L PU 40 Flotation Collar User s Manual SC d LEE ir AN EE r E elt qr 3 5 Route the cinch strap through the loop on the left lobe and attach the snap hook to the cinch ring 3 6 Tighten the cinch strap by pulling on the free end until the flotation lobes are brought close together 3 6 Th the cinch strap Capewell Aerial Systems LLC Page 9 LPU 40 Flotation Collar User s Manual 3 7 The oral inflation tubes are on the right lobe The valve has a rubber mouth piece and a knurled locking nut Temperature changes may effect the pressure in the bladder Use oral inflation to increase or relieve pressure from the bladder Turn the knurled locking nut clockwise until it stops Push the valve in with your mouth and blow air into the bladder to increase the pressure 3 7 Oral inflation Depress the valve to release pressure from the bladder Tighten the knurled locking nut by turning it counter clockwise when you are finished 3 8 For improved angle of flotation put your arms through the straps that run down the sides of the bladder until the lobes are tight against your body 3 8 Arm placement Ke Remember Panic and fatigue cause drowning Stay calm and conserve your energy Capewell Aerial Systems LLC Page
3. AA aa S puer Mp papesgo _ __ Pe a SS i d ma N saami ul Y ajo Le deer die Une 77 HI unes ad 9410546847 qae MOUUVDSGIV MT d SCH OS Tues Gu cr sagn unns Eu l d sh N BL Ga Th deng uiv hb K Zn l JOE 7 dyo Aspe SEAT UME MYD MEIS Bz 7 CMS Cpu Bus paunan Dill uunc p E Lenz LIIS P IU e r Ki Del QE Up ei ANJE USUN Jeppe g UO OF Nd Page 19 Capewell Aerial Systems LLC L PU 40 Flotation Collar User s Manual Appendix B LPU 40 Casing Nomenclature AAA 3015 13849 JEUUBU 7y eddi lapi ad dig d r a iy a adol MW c MBA LNDHd y A E AMA MUSS f 7 ei T at k 2 zi VM Po AA Rb la qe antajn Y DW j 4 GH i f TA fo 3 o Ye wn d i u ar wa m e i 4 LA L EF o i a GDL ucyhng Lo p iY gt a del 8887 i H j 3 o d oj 1 ee 48487 SOPUEA i 1 pod V i N V yh i 2987 uangurogu Jono Wee NEN d RE NS ETA MODUIAA PES uni 2edsu K dene ajo ainje oueui ON BUISED Or fd Page 20 Capewell Aerial Systems LLC LPU 40 Flotation Collar User s Manual Appendix C Bladder Evacuation Attachment Nomenclature KASU ery mur ELIS JUL FA gf Lon mp Wan LES LOIT OOTA lr Zu le KS Ach D mmy l epla za zie tm T JAOLE pt Al EK Et ESA vg e pec GE Sr sinjge 2usuo 1LISLLILI El Yoeng jete Page
4. 21 Capewell Aerial Systems LLC LPU 40 Flotation Collar User s Manual Appendix D LPU 40 Bladder Folding Diagram NC SET E cep rr eae Ed Ai y l mmm ge A UT Amm A E Be att T a z ne uA HN a ap mmm Ve LPU 40 Bladder Folding Diagram d I yi f i AS i NI ml aS _ ll i E yl L a pi RE FAT 4 di M S LOBE A ER N lu T un L E gs rur n E Capewell Aerial Systems LLC Page 22 LPU 40 Flotation Collar User s Manual Appendix E LPU 40 Folding Cinch Strap Diagram ka sl GZ pr C Ir Cy nc t n Y E SIAF LPLl 40 Folding Cinch Strap Diagram FDLL 3 Capewell Aerial Systems LLC Page 23 LPU 40 Flotation Collar User s Manual Appendix F LPU 40 Spare Parts List LPU 40 Spare Parts List Item Locking Clip Safety Lower Gasket Actuator Upper Gasket Actuator Cap Nut Actuator Inflator Cartridge 28 31 gram Casing FC Bladder LPU 40 Anti Abrasion Sleeve Attaching Clip Anti Abrasion Cover Inflator Capewell Aerial Systems LLC Part Number 8452AMA BLA 006 BLA 005 BLA 003 706103 15 AMTC R1108 BLA BLA1005885 B 1005885 3 BLA 008 Page 24
5. PIECE OF EQUIPMENT OVER THE COLLAR IMPROPER USE OR NEGLIGENT CARE OF THIS EQUIPMENT CAN CAUSE SERIOUS INJURY OR DEATH Capewell Aerial Systems LLC Page 3 LPU 40 Flotation Collar User s Manual 2 Attaching the Collar to the Vest 2 1 The collar attaches to the vest with a MOLLE Strap system and has four attachment straps two on the top of the collar and two on the bottom Bottom 2 1 Attachment points 2 2 The attachment points for the top of the collar are on the back of the vest The attachment points for the bottom of the collar are on the front of the vest at chest level 2 2 Attachment points Capewell Aerial Systems LLC Page 4 LPU 40 Flotation Collar User s Manual 2 3 Attach the top of the collar to the vest first Thread the MOLLE straps on the collar through the channeled webbing on the vest and secure the Pull the Dot fasteners m A i pT ETTE hit E s rb ara M TI mom FEL E mn i Piilsi el nrn e LAA i Each strap has two Pull the Dot fasteners Ensure that all four Pull the Dot fasteners are fastened Lia TF 2 4 The bottom attachment Is threaded through four webbing straps on each side of the vest On each side of the vest weave the MOLLE strap through the first two channels on the vest and collar 2 4 Attaching the bottom Capewell Aerial Systems LLC Page 5 LPU 40 Flotation Collar User s Manual o Thread both the collar strap and t
6. over the left lobes the side with the CO actuators of the inflatable bladder towards the center of the assembly along a vertical line extending the length of the bladder This fold should be up tight against the CO actuators cylinders approximately 3 in width Continue to fold the remainder of the left lobe onto itself in accordion fashion Align the edges of the folds with either the inner vertical edge of the bladder or with the outer edge of the previous fold When completed there will be a total of three accordion type folds that are 3 wide as measured along the left extension Clamp the folds to hold them in place 7 2 3 Folding the left side Capewell Aerial Systems LLC Page 14 L PU 40 Flotation Collar User s Manual 7 2 4 Take the right lobes the side with the oral inflation tubes and make a fold toward the center of the assembly along a vertical line extending the length of the inflatable bladder This fold should be approximately 3 in width from the inner edge of the bladder Continue to fold the remainder of the right lobe onto itself in accordion fashion Align the edges of the folds with either the inner vertical edge of the bladder or with the outer edge of the previous fold When completed there will be a total of 7 2 4 Folding the right side three accordion type folds that are 3 wide as measured along the left extension Clamp the folds to hold them in place 1 2 5 Fold
7. CUETO 2 zr a jd m LIT Foch EP TERMI Fo i i Ke e ANA T xn CBP LPU 40 Flotation Collar User s Manual January 2015 Capewell Aerial Systems LLC www aerialmachineandtool com 4298 JEB Stuart Hwy Phone 276 952 2006 Meadows of Dan VA 24120 AERIAL SYSTEMS LLC FAX 276 952 2231 L PU 40 Flotation Collar User s Manual Table of Contents 1 Introduction t 3 2 Attaching the Collar to the Vest ono 4 3 infiating he Bladder emana e 7 ege 11 5 Maintenance e 11 6 6 2 0 gt n 11 7 LPU 40 Flotation Collar Repack Instructions 12 Appendix A LPU 40 Flotation Bladder Nomenclature 19 Appendix B LPU 40 Casing Nomenclature eiii 20 Appendix C Bladder Evacuation Attachment Nomenclature gt 21 Appendix D LPU 40 Bladder Folding Diagram 22 Appendix E LPU 40 Folding Cinch Strap Diagram 23 Appendix E LPU 40 Spare Parts List 24 Copyright Notice This owner s manual is copyrighted all rights reserved It may not in whole orin part be copied photocopied reproduced translated or reduced to any electronic medium or machine readable form without prior consent in writing from Capewell Aerial Systems LLC Copyright 2015 Capewell Aerial Systems LLC Capewell Aerial Systems LLC Page 2 LPU 40 Flotation Collar User s Manual The following symbols are used throughout this manual A WARNINGS indicate a procedure or situation that may result in serious injury or death if instructions are n
8. f the flotation collar Replace damaged bladder and or components as necessary 7 1 6 Installing the green safety clips Capewell Aerial Systems LLC Page 12 LPU 40 Flotation Collar User s Manual 7 1 7 It is important that all the trapped air be removed to aid in the repack of the bladder assembly and to provide for a compact and low profile collar Remove trapped air by unlocking both oral tube valves and depressing them A small electric vacuum pump used with the bladder evacuation hose adapter with dual holes P N AMTC M2026 may be used to aid in removal of the trapped air 7 1 7 Removing the air from the bladders 7 1 8 Release and lock the oral inflation tubes in the closed and locked position 7 2 Folding the Bladder Ee Refer to Appendix D for step by step illustrated drawings of Section 7 2 Folding the Bladder 1 2 1 Lay the bladder out flat on the table Position the actuators and the oral tubes facing up 7 2 1 Preparing the bladder for folding Capewell Aerial Systems LLC Page 13 LPU 40 Flotation Collar User s Manual e Small shot bags or small plastic spring clamps will aid in maintaining the folds as you work on different areas of the bladder C22 Fold the bottom of both the left and right lobes of the inflatable bladder under and along a horizontal line extending out from the bottom of the bladder attachment tabs 7 2 2 Folding the bottom of the lobes 1 2 3 Fold
9. he closing tab with the snap stud through the third channel on the vest then through the last channel on the collar 2 6 Thread only the collar strap through the last vest channel Wrap the strap around the vest channel and secure the Pull the Dot fastener Tuck the end of the closing tab underneath the collar casing 2 6 Closing the snap Capewell Aerial Systems LLC Page 6 LPU 40 Flotation Collar User s Manual 3 Inflating the Bladder 3 1 Grab the beaded handle with either hand and forcefully pull down to release it from the cover flap 3 2 Continue to pull the handle forcefully in the down and out direction apply constant pressure on the handle until the bladders begin to inflate Repeat this step if the bladder does not begin to inflate or if only one lobe inflates 3 2 Activating the CO gas Capewell Aerial Systems LLC Page 7 LPU 40 Flotation Collar User s Manual 3 9 The two lobes may be attached and anchored to your vest using the cinch ring located on the left inside bottom area of the vest Anchoring the lobes to the vest improves the angle of flotation AN CAUTION Release the cinch ring prior to over water missions AN WARNING IF YOU MUST DROP THE CINCH RING WHILE YOU ARE SUBMERGED IN WATER DO NOT UNZIP YOUR VEST TO DO SO 3 3 Exposing the cinch ring DROP THE CINCH RING BY REACHING UNDER YOUR VEST WHILE IT IS FULLY DONNED WITH THE SLIDE FASTENER UP
10. ldew can contaminate the vest Capewell Aerial Systems LLC Page 11 L PU 40 Flotation Collar User s Manual T LPU 40 Flotation Collar Repack Instructions 7 1 Preparation Repack the LPU 40 on a large flat surface big enough to accommodate the bladders when they are spread flat with no air in them Orientation references the wearer s right and left The required tools are 7 1 6 Place the actuator levers in the up and armed position Install two new CO gt cylinders Mil C 25369 29 gram Hand tighten the cylinders avoid over tightening Install a green safety clip on both of the actuators Replacement COz bottle Mil C 25369 29 gram 2 each Slide Fastener zipper for closing the Nomex case Green safety clips 2 each Optional clamps with soft rubber or plastic inserts to hold the bladder while packing Deflate the bladder by unlocking both oral tube valves Depress the valves to release the pressure While keeping the valves pressed in gently compress the bladder with your hands and arms This will force the air through the oral tubes Remove the flotation collar assembly from the vest and harness Lay the flotation collar flat on the table with the underside down Ensure that the closing zipper is fully disengaged Spread the Nomex case open and completely lay out the bladder Remove and discard spent or punctured CO cylinders Visually inspect the Nomex case inflatable bladder and components o
11. ot followed correctly CAUTIONS indicate any situation or technique that will result in potential N damage to the product or render the product unsafe if instructions are not followed correctly Ee NOTES are used to emphasize important points tips and reminders 1 Introduction The LPU 40 Flotation Collar is a flotation device designed to support air crewmen stranded in water The collar is attached to the air crewman s flight vest It provides a minimum of 65 pounds of flotation buoyancy and is designed to keep the user s head above the water for an extended period of time The LPU 40 is packed in a low profile casing made of fire resistant Nomex that is designed to open when the dual chambered bladder inflates A single pull beaded handle when manually pulled activates two 29 gram CO2 gas cartridges for inflation Two oral inflation tubes allow the user to manually increase decrease or maintain the air pressure in the bladder chambers Ke The capacity of the CO2 cartridges can range from 29 to 33 grams Your LPU 40 Flotation Collar is an important piece of survival equipment Proper care and maintenance will ensure your vest will accomplish the level of safety performance it is designed for It is important that you become familiar with these instructions to safely use this flotation collar AN WARNING KEEP YOUR FLOTATION COLLAR IN USABLE CONDITION IMPROPER WEAR MAY RESULT IN DAMAGE TO THE COLLAR DO NOT WEAR ANY GARMENT OR
12. parate sleeve cover Fan fold the cinch strap and pack it in the under side of bladder E Refer to Appendix E for step by step illustrated drawings of folding the cinch strap Capewell Aerial Systems LLC Page 17 LPU 40 Flotation Collar User s Manual 1529 9 Continue to tuck the bladder and close the case with the zipper until the entire bladder has been secured Tie the safety stitch and remove the zipper slider from the casing Fine tuning the folds may be required e E to obtain a proper fit 7 3 6 Closing the Nomex case L9 onap the tab fastener closed Ensure that both concealment tabs one on each extension are inside the Nomex case 1 3 8 Notice that the CO actuation lanyard forms a loop The front of the loop has grip beads and the back of the loop is flat webbing with three holes Insert the case flap into the loop of the lanyard so the beads are located on top of the case flap Align the three holes on the backside of the lanyard loop with the three snap sockets on the underside of the case flap Secure the case flap to the snap studs on the front of the case Ensure that the holes in the lanyard are around the snap sockets and the lanyard is secured between the Nomex case and the case flap 7 3 8 Closing the handle Capewell Aerial Systems LLC Page 18 LPU 40 Flotation Collar User s Manual Appendix A LPU 40 Flotation Bladder Nomenclature MISA JUOJ y or RE USUS
13. the top of the bladder next From the top of the right extension fold the bladder over and along a45 angle from the horizontal Repeat the previous step for the opposite side top left lobe 7 2 5 Folding the top Capewell Aerial Systems LLC Page 15 LPU 40 Flotation Collar User s Manual 7 2 6 Fold the top of the bladder under and along a horizontal line approximately 3 from the top of the neckline Clamp the top folds to prevent undoing 7 2 6 Folding the top 7 3 Packing the Bladder in the Nomex Case 7 3 1 Wrap the Nomex case around the bladder Fold the bladder concealment tab over the bladder add Thread size B nylon safety thread through the safety stitch eyelets Install the slide fastener on the left inner zipper cord and move the slider to the zipper retainer stop located at the bottom of the right extension 7 3 2 Installing the slide fastener e Ensure that the slider mates properly with the zipper retainer i e flat to flat Capewell Aerial Systems LLC Page 16 LPU 40 Flotation Collar User s Manual 1 3 3 Starting from the bottom of the right side tuck the first 6 inches of the folded bladder into place inside the case remove and replace clamps as necessary 7 3 4 Tie the safety stitch with a surgeon s knot plus one square knot Trim the tie 2 cm above the knot 7 3 4 Tying the safety stitch 1490 Place the cinch strap hook into the se
Download Pdf Manuals
Related Search
Related Contents
Bedienungsanleitung ハイパーなんだかなぁ Amana AGR4230BAW Installation Instructions Whitecap Pavilion & Associated Lands External User Guide Tanaka TED-260 User's Manual A1 - DDCSN FTANKxxx 42 - 390 l 音声ランク選漏岬 GUÍA DEL PROPIETARIO DE LA BARBACOA ELÉCTRICA Copyright © All rights reserved.
Failed to retrieve file