1. Step by step guide to easy PART P Insulation and Continuity Testing Zer P P using the PDIT 360 Introduction The PDIT 360 is a simple and rugged instrument for use by electrical installers in testing the continuity of electric cables as well as their insulation resistance The tester is only for use on dead circuits and although fully protected against accidental connection to a live circuit it always pays to to check that the circuit is dead before working on it The safety check is fully explained in the section headed Continuity Testing The tester is equipped with a very useful hands free auto testing facility as described in the section headed Hands Free Function Do not touch the test lead tips when this test mode is in use All electrical circuits have a property called capacitance its presence being indicated by the insulation test result taking longer than usual to appear Capacitance may result in the test voltage being stored for a short time when testing insulation resistance The PDIT 360 has a facility to automatically discharge this voltage but do not disconnect the test leads until discharge is complete usually in no more than a few seconds Check the condition of the test leads and crocodile clips frequently Socket amp See replacement lead sets are inexpensive and easy to obtain The continuity function is protected against accidental connection to the mains an unlikely event as the
2. The whole process must be repeated with the crocodile clips connecting the phase red or brown and earth green yellow from opposite ends of the ring If the readings at all sockets are substantially the same for each of the two tests the absence of bridges or spiders will have been proved The exception here is sockets wired on spurs where the readings may be slightly higher If the readings increase or decrease as your tests progress round the ring there is a wiring error and more experienced advice may be needed On completing your ring circuit continuity tests do not forget to reconnect the cables as they were when you started Lighting Circuits Lighting circuits are wired using radial not ring circuits so they do not need testing for bridges or spiders However it is very important for safety reasons that switches are connected in the phase live conductor rather than in the neutral The simplest way of testing this is to make a temporary connection at the consumers unit from the phase live red or brown to earth green yellow as illustrated in Fig 11 11 Set the PDIT 360 to the continuity range and measure the resistance between each switch and earth The value is not important as long as it is low probably below 1 Q which will show that the switch is correctly installed in the phase conductor A sim ilar test should also be made between the centre contact of Edison screw lamp holders and earth to ensu
3. in the same manner The easiest way of making this connection is to unplug the crocodile clips and to use them to connect the conductors together as shown in Fig 7 Y4 Connection of phase and neutral conductors using unplugged crocodile clips for absence of bridges test meer SEH museta i jm ETa 1 lt X Ly ar I Where the wiring is carried out using twin with earth cables getting the correct conductors from opposite ends of the ring will be obvious However where the wiring consists of separate conductors in conduit greater care must be taken to ensure that conductors connected together are from opposite ends of the ring Next go to each socket on the ring in turn and remove its fixing screws so that the connections are available as shown in Fig 8 Next test the resistance from phase red or brown to neutral black or blue using the test prods in place of the crocodile clips on the test leads see Fig 9 A Socket removed for testing There may be a large number of sockets on each ring and this process will be time consuming A much faster alternative is to use the Socket amp See SS 130 Socket Adaptor that can be simply plugged in to the in situ socket to make the connections available See Fig 10 Using the new Socket and See interface eliminates the need to remove the socket from the wall saving time reducing problems of broken connections and no damage to the customers decorations
4. ger the system being tested the more cable insulations there will be connected in parallel and the lower will be the insulation resistance Thus the measured insulation resistance of a single circuit measured at its circuit breaker or fuse would be expected to be higher than that of a complete electrical installation measured at the supply intake position A NOTE This document is intended as a Guide to Insulating and Continuity Testing only and reference should be made to the PDIT 360 User Manual for full operating instructions before any tests are undertaken
5. lers delay timers electronic residual current devices RCDs etc must be disconnected before testing takes place The test voltages are high enough to give an electric shock to a person but will not be lethal because the internal impedance of the instrument limits the shock current to internationally agreed safe levels The Socket amp See PDIT 360 will automatically select the 500 V test voltage when it is first switched on and the voltage is displayed at the top of the panel In some cases such as low voltage lighting circuits the lower test voltage of 250 V is required and is selected by pressing the TEST VOLTS button when 250 V will appear in the display panel To carry out an insulation test first make sure that the supply is switched off as described under continuity testing at the beginning of this Guide Plug the crocodile clips into the tests leads and then connect them to the phase and to the neutral of the installation or the circuit to be tested Make sure that switches are off or the reading will be the resistance of the connected loads rather than the insulation resistance Keep your fingers clear of the connections and press the TEST button when the insulation resistance will be displayed See Fig 12 SEE Socket amp See Industrial www socketandsee co uk Unit 4 Century Road High Carr Business Park Newcastle Staffordshire UK ST5 7UG T 44 0 1782 567096 F 44 0 1782 567095 The lar
6. new blue cables whist the earth ring will have green yellow conductors It is important that all three of these rings are continuous and that the ring circuit has no cross connections sometimes called bridges or spiders There may be more than one ring circuit fed by the consumer unit so first identify the one you wish to test The consumers unit in Figs 1 and 2 for example has ten miniature circuit breakers MCBs four of which are rated at 32 A The first one feeds the cooker whilst the other three provide protection for ring circuits Switch off all four circuit breakers and identify the one feeding the circuit you are going to test Disconnect all conductors from this circuit breaker two reds or browns two blacks or blues and two green yellows If the installation is an old one the earth conductors may be bare but enclosed in green sleeving Next connect the crocodile clips to the test leads and connect them together when pressing the TEST button at the bottom of the instrument face will measure and display the resistance of the leads typically about 0 080 This value will be constant and we will wish to discount it in all our future continuity measurements The PDIT 360 will do this automatically if we press the button labelled NULL Test Leads The measured resistance of the test leads is then stored and is subtracted from all continuity readings taken until the tester is switched off Now we turn our attenti
7. on to verifying the continuity of the rings themselves First separate the two red or brown phase or live conductors connecting each separately to one test lead crocodile clip as shown in Fig 5 Pressing the TEST button will then measure the resistance of the complete ring minus the test lead resistance that has been subtracted automatically by the tester Thus the continuity of the ring has been established Repeat the test with the crocodile clips connected to the two neutral conductors black or blue as shown in Fig 6 The results of this test should be much the same as those for the phase or live ring Finally test the earth ring by connecting the crocodile clips separately to the green yellow conductors the result here should normally be about half as much again as that for the other two rings already measured because the earth conductors have a lower cross section than those used for the live and neutral conductors s Measuring the phase live ring continuity JI Measuring the neutral ring continuity Now we must test to make sure that there are no bridges or spiders This fault can occur if two spurs taken from different places on the ring are connected together First the red or brown conductor feeding the ring in one direction must be connected to the black or blue conductor feeding in the other direction Then the other two conductors red or brown and black or blue are connected together
8. re is a built in warning system If the fuse does blow replace it with the correct type which is Type F 500mA fast blow ceramic 500 V It is located inside the battery compartment Live Circuit Warning Continuity Test LCD Display Power ON OFF including Intelligent Auto Power Off Continuity Test Lead Null Briefly Push to Insulation Test Instant Test plus Push and Hold for 2 seconds for Auto Test Hands Free Insulation Test Voltage 250V 500V The PDIT 360 requires 4 x AA cells alkaline type recommended that must be inserted with correct polarity ALWAYS REMOVE THE TEST LEADS BEFORE REPLACING THE BATTERIES Four full capacity alkaline AA cells are expected to have a life of 5000 tests at 500 V Battery life is extended because the PDIT 360 captures the test result very quickly and will automatically switch off if not used for two or three minutes Continuity Testing The purpose here is to ensure that a circuit is continuous so that current will flow in it and to measure its resistance Before using the instrument it is important to ensure that the circuit under test is not live First switch off the supply at the main isolator in the consumers unit See Fig 1 and then remove its cover See Fig 2 Next make sure that the system really is dead by switching the tester on and placing the probes carefully on the input terminals of the isolator See Fig 3 The red WARNING VOLTAGE PRESENT indicator a
9. re that the lamp screw which can be touched whilst removing the lamp is not live On completion of this test of lighting circuit continuity do not forget to remove your temporary live to earth connection at the consumer unit Insulation Resistance Testing This test is to ensure that the insulation of the electrical system is adequate No electrical insulators are perfect and as a result a small leakage current passes through them The PDIT 360 applies a direct voltage of 500 V or of 250 V across the insulation measures the leakage current and calculates the insulation resistance This resistance is usually very high and is measured in megohms MQ which are millions of ohms A direct rather than an alternating voltage must be used because due to an effect called capacitance a very small leakage current flows even in perfect insulation if the test voltage is alternating Tests are necessary between phase live and neutral between phase and earth and between neutral and earth The minimum acceptable level for insulation resistance is 0 5 M Q However this is a very low value and if the measured insulation resistance is less than 2M Q there may well be need for further investigation The high direct voltage used for insulation resistance testing can damage electronic equipment so it is important that vulnerable devices such as fluorescent fittings passive infra red detectors PIRs touch switches dimmer switches power control
10. t the top of the front panel will flash and a warning tone will be heard Next remove the probes and reposition them on the output terminals of the isolator See Fig 4 There should be no warning light or tone indicating that safe continuity testing can commence Note red light and warning tone Hands free function The PDIT 360 has a very useful hands free function allowing successive continuity measurements to be made without continually pressing the TEST button This is switched on by holding the TEST button down for three seconds when in the CONTINUITY mode A symbol appears on the display the CONT symbol flashes on and off and there is an intermittent beep tone to indicate that the hands free mode is active Take care not to touch the tips of the test probes whilst the hands free system is active The function can be switched off by pressing the ON OFF button twice when the PDIT 360 will power up in the normal INSULATION TEST mode Ring Circuit Continuity The ring circuit has become the standard method for wiring socket outlets and as the name implies is in the form of three complete rings commencing and finishing at the fuse or the circuit breaker for the circuit concerned The method of wiring is most usually with twin and earth cables The phase often called the live ring will probably consist of red conductors although in new installations they will be brown The neutral ring will consist of black or

Download Pdf Manuals

image

Related Search

Related Contents

LIT0010 rev.0  Franke FDW 410 DH 3A  File  RCCC v1.1 - SmartFPV  LWK-15M型取扱説明書 (pdf:467KB)  Calophylle - Bio Lonreco Inc.  Mode d`emploi Nord Piano 2 HP  Samsung CE1160 User Manual  Equerre d`Argent » 2010 - Médiathèque Intercommunale du Piémont    

Copyright © All rights reserved.
Failed to retrieve file