Home

STERLING 61058100-0 Installation Guide

image

Contents

1. a 5 e STERLING Ideas To Make Lite Easy NOTE cneck for any damage that may have occurred dung shipping or hanaling Report any damage immediately 1 Framing Pocket Construction See Figure 2 Pocket Dimensions CAUTION Its posible tor squeaking to develop if this base is installed over a Sub floor ather than ply wood In order to prevent this squeaking a pad such as root ing felt should be placed bet ween the base and sub flaor 2 Plumbing Installation The supply line to the tub spout and valves should be located belore the uni is instatied Locate the drain line anid Wap using dimen sions shown in Figure 2 Instalt waste and overtlow titings inv openings prowded in ihe bain tn accordance with fitting manu tachirer s nsturctions Cetermine the dive and overtlow required hy using the dimensions snows 3 Bath Installation Cut ledger stops and install as shown Move bath into the framing pocket Make sure the bath is evel and the ledger strips on ail Unree sides are in contact with the und Cut out the protector trom ihe carton and place it to the bath Optional Apron Installation White holding the apron rom the bottom slide if up into position Push the apron back to contact the floor blocks see higure 2 Wath large neag rooting nails naw end flanges to studs Attach the tie dawn chips 10 the framing studs Attach the clips with targe head roating nails deen into the studs Bele to Fi
2. area OO NOT SMOKE white using these solvents and do ot work near an open flame Soi vents should nol be allowed 10 Go down the drain or come in contact with a plastc dram grate pipe oF fittings Exercise extrome caution and KEEP OUT OF REACH OF CHILDREN These soivents can be Purchased in yout loca hardware store 6 REGULAR CLEANING Stering Plumbing Group recom mends the use of one of the follow ing cleaning products or mult purpose cleaners for reguias clean mg weekly of our VIKRELL Swicl Gloss bathing products Spic N Span Powder Top Job Mr Clean Sott Abrasive Cleanser Sater for Surfaces Comet WARNING Constant use of abrasive cleaning agents can result in surface dull ness and discoloration FOLLOW MANUFACTURER S DIRECTIONS WHEN USING CLEANING AGENTS Rust Mineral Deposits To remove tough stains rusts and mineral deposits Sterling Plumbing Group recommends the use of Bar Keeper s Friend GAUTION This product is not fo be used for regular cleaning STANDARD INSTALLATION NoTe TO AVOID LOSS OF WARRANTY THE OC OV 60 MUST BE INSTALLED ONALEDGER STRIP INSTALL 161 FROM TOP OF STRIP TO HIGHEST POINT ON SUBFLOOR TWO NAILS AT EACH STUD ARE REQUIRED LEDGERS MUST BE USED ON ALL THREE SIDES OF THE BATH NOT JUST THE BACK THE BATH S FEET MUST FIRMLY TOUCH FLOOR SHIMS SHOULD BE USED DO NOT INSTALL THE BATH OVER OPEN FLOOR JOISTS Kohler Compan
3. gure 2 Suicone sealant may pe used to finish the joint between Ihe wall and the drywall Apply sealant afler wall finish has beon applied 60 Oval Bath Swirl gloss Surface Model OC OV 60 Installation Instructions 4 island installation Prepare raming structure using dimensions as shown a Figure 3 Lower batn into tramed stricture make sure the feet are temy on the lloor ang the baths fam i 19 contact with the structure completely Attach the bath to the structure by using the le down clips Screws are not provided Reter to figuee 2 for clip position 5 INITIAL CLEANING To remove typical diet and gnme ett from construction Remove any loose debris trom the surface pnor to cleaning It possible soak bathing unit wath warm waler and mild Getergent to loosen remaining soil Drain unit It soil remains clean nyton polyethylene or polyester Bathtub Scrud applicator by 3M Company Remove nail rust with Bar Keepers Frecd Cleanser Ounng construction or remodeling things such as Tar Asphatt Paint oil base can be removed with Acetone MEK methyl Ethy Ketone Turpentine Xylene Toulene Ceramc adhesive Vinyl adhesive Saturate a clean white cotton cloth vith one of the above solvents rub the attected area lightly unt the residue disappears These solvents are highly flammable and should be used apanng y Work in a wall ventilated
4. y 444 Highland Drive Kohler Wisconsin 53044 1 888 STERLING 1 888 783 7546 SOLID IS BETTER Pub No 3 C0 13493 8 Printed in USA ISLAND INSTALLATION Tie down cu NOTE This unit has been designed for right or left hand use A front apron is also available as a separate item 7885705 6 89 20M GA

Download Pdf Manuals

image

Related Search

Related Contents

Argus Camera DC-2185 Digital Camera User Manual  catalogues/catalogue-jeux-jouets  Page 1 Page 2 SUPER KICK OFF TABLE DES MATIERES  P340 flexiprobe™ - SPX Corporation  O QUARTO DOS DRAGÕES  NetPointPro Family System Manual  Retrouvez plus d`infos dans le fichier PDF  GOLDEN LINE  i3000 - Ecosolar sa  RV-A340SE 最初にお読みください  

Copyright © All rights reserved.
Failed to retrieve file