Home
GE Pedestrian Signals Installation Guide
Contents
1. GE Lighting Solutions Installation Instructions GT1 LED Pedestrian 16x18 Incandescent Look Signal Modules PS7 CFF1 46A J amp PS7 CFF1 26A J Full Hand Person Overlay Countdown Prepare Electrical Wirin BEFORE YOU BEGIN in Read these instructions completely and carefully ly Electrica Requirements e Donotuse in wet locations Ww e Follow all National Electric Codes NEC and local codes Ay WARNING AVERTISSEMENT Risk of Electric Shock Disconnect Before Servicing or installing product Risque de choc lectrique Couper l alimentation avant le d pannage ou avant l installation du produit Installation Steps Verify input voltage is within specified range on the back of the LED signal module before installation Failure to do so will cause lamp to fail Open front cover of customer supplied traffic signal housing Connect the wires to the appropriate terminal block within customer supplied signal housing Orange wire for Hand Blue Wire for Person and White wire for the neutral Close front cover of customer supplied traffic signal housing ensuring that the module gasket is tight within the housing 16 x 18 inch Overlay Countdown Risk of Electric Shock Install unit in enclosure tested to be suitable for wet locations only Back of 16 x 18 inch Pedestrian Module White Wire Voltage Rating Countdown Option Jumpers See next page Page 2 Installation Instructions co
2. nt d GT1 LED Pedestrian 16x18 Incandescent Look Signal Modules PS7 CFF1 46A J amp PS7 CFF1 26A J STEP A To Test Countdown Note Module does not need to be disconnected from terminal block 1 Remove Cap from CONNECT TO TEST 2 Connect jumper wire using appropriate screws 3 Re install Cap over jumper location To Stop Testing Countdown 1 Remove Cap from CONNECT TO TEST 2 Disconnect jumper wire and store it for future use as shown on Figure A 3 Re install Cap over jumper wire STEP B To Disable Countdown Note Module does not need to be disconnected from terminal block 1 Remove Cap from DISCONNECT TO DISABLE 2 Remove jumper wire and replace screws for future use 3 Re install Cap over jumper location To Re Enable Countdown 1 Remove Cap from DISCONNECT TO DISABLE 2 Re install jumper wire using appropriate screws as shown on Figure B 3 Re install cap over jumper wire Risk of Electric Shock Install unit in enclosure tested to be suitable for wet locations Step A only Step B Connect Jumper Disconnect Jumper wire to Test wire to Disable Countdown Countdown Fig A Fig B GE Lighting Solutions e 1 888 MY GE LED e www gelightingsolutions com 1 888 69 43 533 GE Lighting Solutions LLC is a subsidiary of the General Electric Company GT1 is a trademark of GE Lighting Solutions LLC The GE brand and logo are trademarks of the General Electric Company 2010 GE Lighting Sol
3. utions LLC Information provided is subject to change without notice All values are design or typical values when measured under laboratory conditions TRAFO59 R120110
Download Pdf Manuals
Related Search
Related Contents
Thecus 8TB 4500R 1U NAS Coban TK103 - Gps Rastrosat MIXING CONSOLE Manual de instruções P Sika® Curador E Copyright © All rights reserved.
Failed to retrieve file