        User`s Manual - ArenaSoft Estimating
         Contents
1.                                             jn                Wu i us  Sirene   centem               rr Man Hours        door        We could also expand the lines   F5  and add Material Price List   items to the Assembly lines     Click Enter or the X to close the  Assembly Form                                                                                                                 oe copy Screens            Dewa    Pimsesien           Eres Tent  Doom Lra        The estimate line now                      imm  io      indicates 24 Man hours are   aT Tan  ti   required for this line of the  Vi Qu 1       En was res   estimate  6 doors x 4 MH  Dua EWI I   LE z each             ETT LT pm            ae           i   H     a  i Ji                      A  Example Assembly   Drywall Partition    Nested Assemblies  Since an Assembly is a mini estimate  each line of the mini estimate can have Labor Details  Material Price  st Items or be an Assembly itself  Thus you can have an assembly inside of an Assembly inside of an Assembly indefinitely   To see the details  you can just keep double clicking the unit price box to see the next level of detail           As an alternative to manually building an Assembly inside of an Assembly  we can Click copy previously built assemblies into  our Assembly  For example  in the 09200 Drywall section of the ArenaSoft Database we have a line called 3 5 8  Stud framing   and this line is an assembly that consists of studs  track  hilti shots  l
2.                 area control what is carried into the Override columns on the  screen  Enter 39 000 and    Ace Concrete  in this area        Estimate Summary             Close this screen and you  will see the    Override     column with the Sub s Name  and price filled in on the     Estimate Summary    screen   The    Override    column total  no longer matches the  estimate total column  The      Override    column is       column that is used in the project total  The Estimate Summary shows your estimate for the Concrete line    grayed out  because  those numbers have been overridden  Being able to see your estimate for comparison to the Sub s quote is of great benefit as you  may want to question the Sub further if there is a large discrepancy     op                   Let s say you get two more concrete quotes from  Subcontractors  Reopen the    Override Estimate         f6        screen  Type      3 Sub s names in the yellow  boxes and their Quotes on the next line  BT  Concrete  amp  JJ Concrete have lower quotes  but they   pan exclude sawing control joints  Fill in your own   SS Se estimates for the excluded items so that all three  columns have complete scopes of work        ite that you can type text in the boxes to record  details of the quote  The large text box above  shows the full text  Ace Concrete has the best deal  after your adjustments  Double click on the Sub s  name to transfer his column total to the upper right  boxes  Here s the bid analysis     Note 
3.            Client    Amount   SF_ BI z NG   FendorScheolntrct PROJECT Bide   Incidentals   17700000  5961 mount T                 incidentas   TESTES  4012  piece Ireitertals Remove Ccningenoes    Pistes Iud     e          a  DM hiec Fes  king TOT           Boing  Survey  Testy  Ste 11584  3              Forder NY FE   Fe Public Bid Lara Planbing    Ente      Started  1959 Finanaing  amp  ather Fire Pretection    Prowects   SF Now  57200  CM s Fee  amp  Stat           22   PLmbingt Fro P  551000  1 87   Daton   SF Rar          Coninaeney  TBS  55 iac 270000  720   Adusted   SF Total   255527 TOTAL Redde                   THR  414  Details  ens _ Unter   Cua          Dad Cede Tem    719 Un Hs Slr          Daa 2             5         KAN EAR  Kenner   pa  s  sunzmo     v    TIe 23 3818                         0502  c STRULTUHRLSTEE  18300  SUKUSF Es nir               s susci     cVenbrerereirg   233438 UB JA Jorr            901120        rg EX ips pado   hao ajs jeus     Pimbng 351000 ERG  EF              pem spun JC ZOO  RSA SF EN ponas   peo  s   suison    Telecom 25 000 2489415 _120           TEE s           r 1 DEDE AF                 z         T                                         ArenaSoft    Estimating Version 280   User s Manual Page 29    Linking to 34 Party Software             9  Updating Estimates Using References    ArenaSoft Estimating uses several different types of databases      1  When you start a new  Ee  estimate  you select the  Database References that
4.           E Press F5 to expand the lines  We click   e a  uas   m wa   ma          Copied lines 20  amp  30 from the ArenaSoft    database  Note that there is a green star  below the line number which tells you this  line is linked to the database  Also note  that there is    AS Db code which matches a  code in the database                                              pe 51 JL                                                                                      Na                           update this estimate to match changes in  D TET   the database  close this form  and click the  esr Jat           Project Info  button on the MainForm   Marra          eee SU TES RET      Click the Update Using Database button              POP oi             Cow Res EE       Because the ArenaSoft Database probably has lines that reference your TradeCity labor equipment hourly rates  your Crews  and  your Material Price List items  anytime you make changes to these tables the ArenaSoft database will automatically be updated to     match  The estimate that is currently open on the MainForm will also be updated  All other estimates will only be updated when  you use the Project Info screen and click the Update Using Database button       You can also add lines to your Database while working on an estimate  Just right click the Description box of any line in your  estimate  Select    Copy Line to Database   If the line exists in the Database it s cost will be updated  If the line does not exist 
5.          them to an different estimate   ao LIII es EC                  Page 44 ArenaSofiTM Estimating Version 2R80   User s Manual    Pull Down Menus                   Target Estimate                                                 pian     T    You can select whether you want to include the  Quantities and Takeoff  Coping includes all the  details that are part of any line in the section   such as Labor Details  Assemblies  or Material      Price List items     Section EXE                f           View Flagged Form    Flagging an item you want to come back to later  Each line of the estimate has a check box at the right hand side of the screen     aaa                        uacecun Een    You can check this box if you want  to return to this line later           Paving  amp  Surfacing         Kent                                    E                                                                        TE anton           of                            aca         io      Section   General Conditions  bates               Zane  mei                       From the    MainForm     you can click the    View  Flagged    button     This opens a screen  which lists all  the items where you had clicked the  Flagged box  and also any items                                                                                                                          which total zero  This is designed  I DU   7    to help you catch any items where            a ee you forgot to enter a unit p
6.       ARENASOFT     ESTIMATING       User   s Manual    2R80 and later                ARENASOFT             Table of Contents          Table of Contents    l  Installing Your Software     2  Getting Started   3  Key Concep   4  Crews  Trades   amp  Equipment  5  ArenaSoft Database  6    7   8    9                    RS Means Databa   Material Price List  amp  Bill of  Historical Cost Database     Materials      Updating Estimates Using References    10  Assemblies  1l  Linking to 3rd Party Software  accounting   12  Working Multi user  13      Appendix       Table of Contents   Expanded       1  Installing Your Software     A  Hardware Software Requirements   B  Installing your software    2  Getting Started  Launch ArenaSoft Estimating   On Line Help     My Company General Info   View an Existing Estimate   1  Open an Existing Estimate     2  Duplicating an Existing Estimate     E  Creating a New Estimate     Organize Your Estimate   Enter Estimate Lin    Take off Quantities   Analyze Subcontractor Quote    Enter Bottom Line Percentages  amp  Profit   Printing your Estimate      Wizard   3  Key Concepts   4  Crews  Trades   amp  Equipment  A  Setting up YOUR Labor  amp  Equipment Rates  B  Using Labor Details in your Estimate                       vos                                mauna          Page 2 ArenaSofiTM Estimating Version 2R80   User s Manual       able of Contents          5  ArenaSoft Database  A  Usinga Single ArenaSoft Database   B  Converting the Albany Data
7.      aan et Tips  button will give you specific instructions from    Space PORT Fil              Export to Other 3  Party Software    1  ArenaSoft Estimating s Export Engine        be customized to provide a    one click  export to virtually any other software  package  whether it be Scheduling software  Project Management Software  etc  In Step 2 of the Export Wizard  you can    select  CSI Section Totals Only  which will give you a more condensed set of data  If you wish to condense the data  differently you can do as discussed above        Page 40 ArenaSofiTM Estimating Version 2880   User s Manual    Linking to 3    Party Software             12  Working Multi user    1  ArenaSoft Estimating can be set up as a single user program  or on your server for Multi user offices  When used Multi user   two or more estimators can work on the same estimate at the same time  or on different estimates  Either way they share a  common database so the estimates will be consistent  Using a server is ideal because it gets backed up each night  You do  not need a dedicated server as the server can be used for other programs as well  If you have a small office  even an  estimator s PC can be used as the server for the other estimators  Multi user set up is easy and can usually be set up with a  10 minute phone call with ArenaSoft Tech Support    2  For Multi user use  each client gets a shortcut icon on their desktop that they double click to access the estimating system    3  Multi user s
8.     on EIL eis ell fr  poy be  estimate  If you only    work in one city you will     Sienai Deron       Lone       have        choice     E New Estimate       Once an estimate has been started you can update the estimate to reflect changes in the database  With the MainForm open to the  estimate  click the Project Info button to open the Project Info screen  Under the heading  Update Current Estimate Using    click the button for the type of database that was changed  You may have to click one or more of the Update buttons depending  on the databases involved  See list of databases below     If you use multiple ArenaSoft  a Databases for different cities    and multiple TradeCities for      different cities  you can change  an estimate from one city to  another by changing the  references and then clicking  one or more of the Update  buttons          update your current  estimate to reflect changes you  made in a Database  you must  be in the current estimate with  the Project Info screen open   and you must click one or  more of the  Update  buttons  as follows                     Database Button  If you made changes in the ArenaSoft Database  click the  Database  button  This updates the lines in  your estimate that are linked to the ArenaSoft Database     b  RS Means Button  If you receive new Means Data from ArenaSoft for a new year  click the Means button to update this  estimate to the new Means costs     c  TradeCities Button  If you made changes to the Labor or Equip
9.   If you wish you can include    note like this in your email message                                  ArenaSoft    Estimating Version 280   User s Manual Page 47    Emailing Estimate                          If you have trouble opening the attached document  please down load the latest version of Adobe Acrobat Reader  This is a  free program  http  www adobe com products acrobat readstep2 html       Method B  Receiver needs to be able to edit the estimate  but does not own ArenaSoft Estimating  Microsoft Excel  Method     1  Use ArenaSoft s EXCEL Wizard to save the es   spread sheets  See  Advanced Features   Wizards        imate reports into Excel Spread Sheets  Now you can email the Excel  Excel Wizard  above        Method C  Receiver needs to be able to edit the estimate  and owns ArenaSoft Estimating   Import   Export Method        1  From within ArenaSoft  Export one or more estimates by going to pull down menu Import Export and selecting  Export  Estimates   This puts the estimates into a folder called Exported Estimates which is in your C drive  Quit ArenaSoft   2  Before emailing the file in your Exported Estimates folder  it s a good idea to Zip the files 1     Most email programs will not  allow you to receive the export file unless it has been zipped  You can purchase the WinZip program from  www winzip com  Most PCs already have this program    3  Now attach the Zip file to an email              Receiving an Estimate by email   1  You received an email message an
10.  03000       Concrete and    04000 Masonry  to our estimate by clicking on these lines  click the words or numbers      2  Now let s create a Zone for our estimate  You can have one or many Zones  From the MainForm  click the             Zones   button  Type    Zone 1     Close the screen           Page 8    ArenaSofiTM Estimating Version 2R80   User s Manual    Getting Started             2  Enter Estimate Lines    Now let s enter some lines into our estimate  From the MainForm  click    View Summary     You now see the 3 Sections we  entered into this estimate  Note that the lines have no dollars  Click once on the Concrete line in the Tan colored area     2  The  Enter Estimate  screen opens  click  on  Zone 1  in the pop up menu  Let s  type the first line as  Piers   Quantity   5   Unit      each     Labor   150  and Material  150  Let s add some additional lines  without typing  Click the    AS Database      ArenaSoft Database  button                                                                        A Click copy screen opens  showing the  ArenaSoft Database  At the top of this screen  is a list of Spec Sections from the database and     03000 Concrete  is already selected  so the  bottom of the form is already showing  Concrete lines from the database  Note that  you can click any section title in the upper list  and the bottom list changes to that section  From the lower section of the screen  click on  the lines    Form footings continuous        Place  footings 
11.  03000 for Concrete  Click the  Create New Estimate  button     3  The MainForm now shows you are working on the  East Street Office Building  estimate     1  Organize Your Estimate          You organize your estimate by making Sections and Zones  Use the 2 buttons in the Setup area  of the MainForm     Sections are typically the CSI sections found in the Architect s spec book  such as Concrete   Masonry  etc  You must make at least one Zone  Zones let you divide a project into areas you  want totaled separately  Examples of Zones might be Building A and Building B  or  New  Construction  and  Renovations  or Base Bid  Alternate 1  Alternate 2           1  Let s create some Sections for our estimate  You can have one or many Sections  From the  MainForm  click the    Make Sections  button     Ga mes trom        nese fee         The green form on the left shows the Sections in this  mese mue          estimate  and the list is empty because this is a new          pm zwa  estimate  In the 2 white boxes at the top of the green  qao ASSEMBLIES form  you can type a Csi number like    03000    and   S Tg raat           Concrete  and press Return  But it s easier to click on  ce AA the Csi Sections you want in the grey list to the right of       the green form  Each time you click a line the line is  Ea Titus copied to the Green list  This is called a  Click Copy            screen and ArenaSoft uses Click Copy screens in         places     Let s add lines  02220 Building Demolition  
12.  2  The Details list lets you enter an unlimited number of items  The Csi pop up displays all the Csi Sections in your  Synchronized Database  To add a Section to the Pop up list  first add the Section to your ArenaSoft Database  The  Column pop up lets you select which column  Lab  Equip  Mat  or Sub  of an estimate this cost will be Click copied into    3  The Cost Code pop up displays all the Cost Codes entered in your    Primary Cost Code  table  found under the  Accounting Scheduling pull down menu   For more information on using the Historical Costs Database  read the on line  help provided on the MainForm Global button Historical Cost Data Tab  Also See  Using the Historical Cost Database   above    4  Inflation Adjustments  Each project can be viewed with or without Inflation Adjustments  by clicking a button on the above  form  Inflation is adjusted using a different percentage for each year       enter these percentages  go to MainForm Global  button Historical Cost Data Tab and click the    Enter Inflation Rates  button  You enter a different percentage for each  year    5  Historical Project Cost reports can be printed from the MainForm Global button Historical Cost Data Tab  These reports are   useful not only when doing a detailed estimate but for Conceptual judgments of what a new project mi  past projects                                      pipe                                                                                                                    
13.  5 gal pails of spackling  etc required in a project  you can print this report  If you are  for each type of Partition in your estimate  this report looks inside your Assemblies and totals all the components of the  assembly as well    2  To view or print this report  from the MainForm  click the  Details  report button  Under the type of report  select    Bill of   Materials  Under the options there are 3 different ways of grouping your materials    a  By Project  this lists each price list item and it s total quantity for the estimate   b  By Section  this lists each price list item within one estimate section  and then goes to the next estimate section       By Zone  this lists each zone in an estimate and the does the    Est Section    report for that zone before going to the next  zone                 8  Historical Cost Database    A  Using the Historical Cost Database    1  The Historical Cost Database gives you access to your past projects costs while doing an estimate  Just like the ArenaSoft  Database  this is a Click copy form that opens on top of your estimate  This form has the added ability to either copy a line  into your estimate or just edit the unit price on the active line of your estimate    2  To Enter lines into your estimate  from the Enter Estimate form  click the    Job History    button  to open the    Click copy  Historical Costs    screen on top of your estimate  This form opens to the same Csi section you are working on and displays  all the Proje
14.  Expsirpo        2 Searching for      Estimate  From           Mamaw  Aa the MainForm  click the  Open  Estimate    buton  3 You have 2 methods of finding the  Ont  TREE    estimate  by selecting the CLIENT   or by doing a key word SEARCH   To do a Search  click the SEARCH  tab and type any word found in  either the Project Name or Client  name  ArenaSoft finds all  estimates that contains that word         Select a Client Ta   Click on the Text   gt  gt                   Coury  SA LIE       My Company General Info Form    Locking Estimates  The My             General Information  amp  Insurance Ratas  X   Company General Info screen lets                             My Company s General Info you lock all your estimates  to         gt  prevent accidental changes  Locked  wi Company Name 2 Lock All Estimates estimates can still be viewed and  My Company Street 1   600 Corporate Drive Unlock AllEstimates     Printed by any estimator  Selected  My Company Street 2   PO Box 98765 estimates can be locked or unlocked  My Company Ciy  r7  from the estimate s Project Info  My Company State       screen    My Company Zip  12217  Phone  518667777  Fac  E18 666 8888             ArenaSoft    Estimating Version 2R80   User s Manual Page 43    Forms                Estimate Summary  Form        Cost Codes  Press F5  expanded view  to assign Cost Codes for your Overridden Sections       Copy Paste Delete    button  This button  apa  Varro          karen com aarte as opens a screen which lets 
15.  If your estimate has more than one Zone  the  Override Estimate form will have an additional  box  allowing you to distribute the override amount  into each zone  If you do not distribute the  Override amount into Zones now  you can do it at  the end of the estimate from the Zone Totals Form  See the topic for using the Zone Totals form later in this manual           Page 12 ArenaSofiTM Estimating Version 2R80   User s Manual    Getting Started             Note that the Concrete line is now Grey            greg pee peer indicating it s been overridden                     ve                        d mee          Note that the Column Totals at the top of       the form Exclude the Overridden numbers   wj wa er pene               Note that if the Sub s number is much  lower than your number you should    question him to ensure his scope s OK                                                           We re now ready to view the Estimate  Totals and add our Final Adjustments like  Mark up  From the MainForm  click  View  Totals  to open the  Totals  form  Notice  how the  Totals  form displays the Tan and  crise    RE  Green Column Totals at the top  and other  PURUS UEM Final Adjustments in a list  To enter Final  ze Adjustments  type a description and enter an  ki o amount or a formula  Type    Late steel bid   mi  2000 on the 1    line  Formulas can  reference the CSI Column totals which are  displayed at the top of the form  by using the  Ist letter of the Column Name  On the 
16.  SureTrak Schedules    Cash Flow Projections with Microsoft Project  Microsoft Project or Primavera SureTrak can be used with ArenaSoft to produce  quick Cash Flow projections that owner s frequently ask for     Cost Loaded Schedules with Microsoft Project  Microsoft Project or Primavera SureTrak can be used to product cost loaded  schedules  Some projects require that Requisitions be done from a cost loaded schedule     To Export to a Scheduling Program  1  From the MainForm  go to Export Import menu and select Scheduling Program     Ste eb                                                                                                                                               rcx                  ers sortie  SA eee seen  ma TE Soom   e               us   x IE       pm a l       E                         The Tune up Table opens  Click New Table if it s blank  The Export Summary screen is set to summarize by        Section  This  is an ideal format to export to a scheduling program since will create a Task bar for each section  Concrete  Masonry  Steel  etc     You may want to use the Tune up Table to condense certain Sections into one  See Exporting to Accounting to learn how the  tools work  You will note that the Top line of the Export Summary screen may have a blank Csi No  These are the Tune up  Table lines that have a blank Csi No  They typically have an  A  in the Estimate Column indicating they came from the Final  Adjustment section of the estimate  You can group 
17.  TH                Ha  T                                                    E  55  3r  sE  3r  E  3  3r  3          EI         Potion 15 3  E5 ga 1o  wak cna sda lapad JE Cave                38025 ga oc gb oach ico           Ferien 38 825 ge      dovble lever gvb ooch vi   Fertion 3  25 ga        vb               tapa   Ein 3  78 gn Tinea bie Peri sech      ad  Panon  36 823 ga           each      ape   Parton 38 823 90 Teac dosi Teyar quh sach s pad   Fariton 3 2   qa           each sce toed   Pani 3  20 ga Toedo ble layer gon anche ned         typ Bod           api   Primi overteping ee  sj  Dana Ginss Exeror Cap ci       Abuse Rewari OE  Ee ror Wal  TB gn sis   Tcr gab yp shesinc atau   Exeror Well Tb gn sia G Vcr qui        sheng bains       ue Deore u  EU Impena venser plaster     ccal system    Flstsrvars on mel       excluding scs  Fltercel rs      met la  erc ng sue   isis 21 2  oz                                  3  cct go                            KI  EI  KI  EI  KI  EI  E   E   KI  E   s  Ei  FI  sr  s  sr  sr  KI  EI    pol                s   EJ  TH   5             37  47                                  Partition          A  and a unit of   SF  for Square Feet     Double Click the unit price box to open            assembly must have  asize  That way you  can price everything  that makes up the  arbitrary sized thing      The assembly will  divide the total cost of  the arbitrary assembly  by it s size to get the   unit prices  Let s  assume our assembly  10 LF l
18.  The above estimate does not have any Cost Codes in it so the Export  Summary is showing all the lines with Blank cost codes summarized as one line           Page 36 ArenaSofiTM Estimating Version 2R80   User s Manual    Linking to 3    Party Software             In the Tune up Table let s add a single     Step 1  Tune up Table ew ato se   atum     M the Rough Carpentry       Scroll down to the I  line in Section   06100 Rough Carpentry  that has an    M      in the Estimate Column  The  M  means    onu Ut cot this number came from the Material                         column of the Estimate                       Click anywhere on this line  Then Click  the  Find  button                              a                   The Finder screen opens displaying the     Find all lines that match yellow boxes   Click on boxes to define search  i line you clicked  To find all the lines in  Uk EAn S      aar pai the estimate that have 06100 as the CsiNo    Fost toda Pode Description on CIA and an          in the Estimate Column  Click  CI NECI jus           mate            Fra Alpert Dose on this 2 boxes to tum them yellow         T    E  ALLONS OU    0 B Click the Eind Now button     E estimate Tune up T     The Tune up Table now displays just the     Step 1  Tane up Table lines that met your criteria        camcote                           4 Click on the Cost Code box to select your  cost code  Note you could also start  typing your cost code to find the code        Click Fill Column t
19.  appears again    Tips  1        30 heavy duty stapler that will staple the upper left corner of a 1 2    thick estimate is a handy tool to           2    a  400 Hewlett Packard LaserJet network printer will print the reports at 17 pages per minute turning out    50 page  estimate in 3 minutes        2  Bill of Material Report  See below    3  Labor   Equipment Report  This report prints a summary of Man Hours by Trade  and Equipment Days for each type of  Equipment  An Option will break this down by Spec Section        4  Bill of Material Reports   a  You can view or print a Bill of Materials Report that summarizes the total quantity of each Price List Material item used  in an estimate  Thus if you want to see the total quantity of 1 2    gypsum board type X  total quantity of 17 drywall  screws  and total quantity of 5 gal pails of spackling  etc required in an estimate  you can print this report  If you  are using an Assembly for each type of Partition in your estimate  this report looks inside your Assemblies and totals  all the components of the assembly as well   b  To view or print this report  from the MainForm  click the  Details  report button  Under the type of report  select    Bill   of Materials  Under the options there are 3 different ways of grouping your materials   1  By Project  this lists each price list item and it s total quantity for the estimate  2  By Section  this lists each price list item within one es      By Zone  this lists each zone in an es  
20.  areas  Thus if you are estimating a new school  you might have a Science Wing Zone  a Phys Ed Wing  Zone  a Classroom Wing Zone  and a Bus Garage Zone  Knowing the cost of each area during design is very useful if  budget trimming needs to be done    c  Click copy screens   Click copy  screens are used throughout ArenaSoft Estimating because they are the fastest way to copy  information from one place to another  Each click also copies hidden data and advanced features such as assemblies  crew  production  cost codes  ete    d  Labor Details  Labor unit prices can be based on hourly trade rates  and different trades can be grouped into a crew with a  daily production rate  Thus    crew s cost per day   the number of units performed that day   the Cost per Unit or Unit                      ArenaSoft    Estimating Version 280   User s Manual Page 15    Key Concepts             Price  If you work in different cities  ArenaSoft Estimating lets you select the city which switches the labor rates and  updates the estimate to the new City  Both the ArenaSoft Database and the RS Means database store Crews  amp  Production  Tates so man hours can be calculated        ArenaSoft Database  This database of costs is completely customizable so you can store cost data  your way   It is the heart  of ArenaSoft Estimating because it can store both simple data as well as many advanced features  You store lines worded  your way  in the order you want to see them  and with your unit prices  If y
21.  click the Global  button  Click the    Trade Cities  button              Page 16 ArenaSofiTM Estimating Version 2880   User s Manual    Crews  Trades   amp  Equipment                A TradeCity is a list of all the Trades and their hourly  rates  and all the Equipment and Equipment daily costs   These costs vary greatly from City to City      TradeCity becomes attached  referenced  to your  ArenaSoft Database  ArenaSoft ships with one  database and one TradeCity  You may never need  more  It is simpler to maintain just a single database  and TradeCity  However  if you add a 2  ArenaSoft           Database  a 2  ArenaSoft TradeCity is automatically  mem created and attached  referenced  to the new Database     oe 1f you have more than one TradeCity you can switch       between them with the    Select a Trade City  popup                                         rae  ere    pem  Tabor ates Equipment Fates    m You can add or delete Trades  and edit their hourly    rates  By clicking the Equipment tab you can do the  same for Equipment  When you are done editing and  close this form  the ArenaSoft Database and any  estimate that is currently open on the MainForm  will be automatically updated to the new hourly rates  This update does  not effect old estimates  However  if you want to update an old estimate to reflect the new rates  you can use a button on  the Project Info screen to do so              TradeCity separates the RS Means Trades from your custom trades  The View contr
22.  form  Thus you do not    Final Adjustments    forget a line or miss type a formula  Click the edit  button to edit this stored list for use in future     iz Desi   estimates    t rper    rper  E              res    E                     ArenaSoft    Estimating Version 280   User s Manual Page 13    Getting Started             The View Totals form lets you click on a  Grand  a   Tutap          maaga cre  Total  check box to emphasize the Grand Total  Paa Tate Fore Tele mecs     Cost at the bottom of the form  This allows you to     then add lines after the Grand Total to perhaps  compare the estimate against the Budget  or add  Architect fees that are  outside  of your Grand       Annet Form Total     iF pecans                      2  Sales Tax  To add Sales Tax into your estimate  on    Totals    screen  write a formula using the letter T or X as the taxable  amount     X  08 would multiply the taxable amount by 8   You can control what is included in    X     the taxable amount   From the Totals form  click on the    Tax  amp  Examples    Tab to see the Taxable amount  On a Taxable Job  You can add  sales tax to the entire Material column of the estimate by checking the  Mat  checkbox  This puts a Taxable check mark  next to the Material column on every line of the estimate  This also puts a taxable check mark next to Material on any new  lines you add to the estimate  On a Tax Exempt Job  You would not put a check mark in the Material check box on the  Tax  amp  Examples T
23.  line           Page 6 ArenaSofiTM Estimating Version 2880   User s Manual    Getting Started             The  Enter Estimate  screen opens for  pm                        ma Concrete  Click on  Zonel   there is only      one zone in this estimate   Now you         see the concrete estimate  You could scroll  down and click on the blank line at the   bottom of the list and enter another line into  the estimate  You can navigate to another  Section or Zone of this estimate using the   e   Section  amp  Zone pop up menus at the top of  the list  Click on the Section pop up that   says 03000 Concrete and change it to  04000 Masonry  Now you could add lines  to the Masonry Section of the estimate   Close all open forms to get back to the  MainForm                                                                                                                    5  Now let s see the estimate s bottom line adjustments  From the MainForm  click the    View Totals  button  Here s where we  can enter percentages like Sales Tax and Overhead  amp  Profit  to the total of the estimate s Sections  Close the Totals form                                         Final Adjustments     am  ee Ts   p          Our      o a      m3 CH Sree ON eee                                  2  Duplicating an Existing Estimate    1  Duplicating an Estimate  From the    MainForm    which currently is viewing the Barric County estimate  click the    Duplicate  Estimate    button  An options screen opens  Note that
24.  next zone                    nate section  and then goes to the next estimate section   mate and the does the  Est Section  report for that zone before going to the          5  Zones Report  This report is a concise summary by CSI sections of the estimate  with a column of costs for each zone  This  excellent when you have to breakout the costs for several buildings or areas within one estimate  Since the Zone report   includes any Subcontractor Quotes you entered into the Override Column  this report will not open unless you have  distributed those Quotes into zones using the View Totals Zone Totals screen        6  Historical Project Cost reports can be printed from the MainForm Global button Historical Cost Data Tab  These reports         seful not only when doing a detailed estimate but for Conceptual judgments of what a new project may cost based on your  past projects        7  Material Price List reports can be printed from MainForm Global button Material Price List tab   8  Trade Rate  Equipment Rates and Crew Costs can be printed from the MainForm Global button Trades  amp  Crews Tab     9  Custom Reports  Customized Reports  with special subtotals and any degree of sorts are easy  Just copy your estimate into  Excel using the Excel Wizard button on the MainForm  Also any screen can be moved to Excel using the Tools Analyze it  with Excel menu              Page 46 ArenaSofiTM Estimating Version 2R80   User s Manual    Pull Down Menus                D  Pull Down Menu
25.  no extra work                       ArenaSoft    Estimating Version 2R80   User s Manual Page 23    ArenaSoft Database             6  RS Means Database    If you have purchased the RS Means electronic data along with your ArenaSoft Estimating System  the data has been preinstalled  and tested by ArenaSoft for you  You may have received a demo disk with some sample Means Data included  In either case   you can add lines in your estimate from the                           c oven ue    RS Means Data    Ex EE  m   Lu a             From the  Enter Estimate                                                                                                    C   orm  you can    a    click the RS Means button to open the RS         Means Click copy screen to insert Means   CU                                        lines into your estimate   aga TL                pom  mid mdr  um          d x I                         You can quickly find the Means line you need using  iy rao i a drill down method starting with the Top pop up  menu and working your way down to the finest  7                      detail  You can also find your line by clicking the  vm      Search    Tab which lets you search for a key word or       Wir cong Fein Cline phrase     tet  SEY    2    Note that if you have set this estimate to use New Csi  Codes  then this screen will display the 6 digit codes   us If you have set the estimate to use the Old Csi Codes               this screen displays the 5 digit 16 division s
26.  norint Hist you can add it by   Te TE Tati                 ur                         tr            Dia clicking New Format  If you need     hers Spur emis tw Tefal pare fermat  Salat Gata assistance setting up    New Format            aug yim t veda srw Irt ee abd o e IM fr reas                  contact ArenaSoft Support  and we    Solel an counting Shon system Format will assit you                    Coat Meyer               toten rm Click the Tips button to see if there      peer Tnterie corr   are any specific instructions for your  kahan    _ accounting system            Frat          Click    Step 3  Create Export File                          pue  VO DER RU MS           Done  Your accounting system           import this file to set up your Job  Cost module     Wen pine on Ine previa ovt Sawan screen to contre tfr part  oot Codes va Cal oc tione wt      witout Zanes     Stop Create EXPORT File se                 1  If you just want to select various lines that  may not have common criteria  and assign them  a Cost Code  just click each line s Flag  checkbox          a    rab   santana  rr aaa       t rernm   mc M  Jor aa H Now you can use the Find  amp  Fill Column              Er TES we uer buttons as before     T the Fetes Daan al jes cen   Use the Clear all Flags to clear all check boxes        w rg                            z   x c   zT  3   x pi                      Ho  ba                               2  The Delete button will delete lines from the Tune Up Table
27.  record dimensions of things which can  later be reviewed and edited  From the Tan and Green Estimate Summary form  click the Tan area of the Concrete section   and click Zone 1  We are now back on the Enter Estimate screen for Concrete  Note the purple box around the Quantity   ld  The purple box means you can double click that box to open it  Double click the Quantity box on the    Form Walls    line  The    Enter Takeoff    screen opens for that line  Click the pop up list on the left if it s not already open  Select  click       SF Forms Dbl Vertical    from the list  That fills in the Takeoff Screen with labels and any constants that apply  The   constant     2 sides    has been entered in a constant box at the top of the screen         constant boxes are applied to all the   lines that follow  Thus every line you enter below will be multiplied by 2  to account for forms on both sides of the wall             in the dimensions of a wall to calculate it s quantity  Let s say a wall is 200 feet long           200 in the length   column  8 feet in the height column  and on the next line enter a wall that s 300 feet long  amp  4 feet high  Click the Enter    button  or press Enter on the keyboard  to close this screen  The quantity of 5600 SF of forms has been filled in for us on   the  Enter Estimate  screen  We could double click the 5600 to re open the    Enter Takeoff    screen to see if we missed a   wall  Note that the letter  T  for Takeoff appears under the 5600 to le
28.  so they will not be Exported  You might want to delete your   Profit  line  Any changes you make in the Tune Up Table  do not effect your estimate  You can even change text or  numbers and your Estimate is not effected    3  The  Group  button can be used after the    Find    button  If 4 lines are found  the Group button deletes them from the Tune Up  Table and replaces them with a single line  This is not as helpful as the       Column    button  because the history of what  the Group button does  is lost  Again  deleting or changing lines in the Tune Up Table does not effect your Estimate              Page 38 ArenaSofiTM Estimating Version 2R80   User s Manual    Linking to 3    Party Software             4  If you are not happy with your Tune Up Table  click the    New Table    button to replace the Tune Up Table with a new one   which again has 1 line for every number in your estimate    5  If you have multiple Estimates  perhaps Base Bid and Alternates were done as separate Estimates  you can add additional  estimates to your Tune Up Table by clicking  Add an Estimate   6  If you quickly want to step through your estimate and assign cost codes to all lines for each Csi number Column type  all  06100 s in Material Column   then use the  Cost Code Wizard    button  It works similarly to Steps 1 through 6  but is very  fast  Just skip lines you don t want to group  You can Jump to the Section you want by using the pop up menu              B  Export to Microsoft Project or
29.  take   off again                          The Select Labels popup has predefined labels for common takeoffs like SF Vertical or SF Horizontal  as well as special takeoffs  for things like CY Concrete  a Constant of 27 divides to get Cubic Yards from cubic feet   Tons of Steel  a Constant of 2000  divides pounds to get tons   etc  You can add your own custom Labels by clicking the Edit Labels button  The math is always the  same   4 columns multiply and 1 column divides  But you control the labeling of each column and any constant values as part of    a Label s definition                 ArenaSoft    Estimating Version 2R80   User s Manual Page 11    Getting Started             4  Analyze Subcontractor Quotes    1  Entering Subcontractor Quotes  From the MainForm  click the  View Summary  button so we can see the  Estimate   Summary   The  Estimate Summary  has Tan columns on the left and 2 Green columns on the right  The Tan columns  summarize your estimate  The Green columns let you override your estimate with a Subcontractor quote        Let s say you get a quote from a Concrete   parol                                       subcontractor for  39 000  You want to  pe cm         override your estimate with the sub s quote     Sections rines      Fe Maie From the         pagbara                   stimate Summary  screen   click in the green area of the Concrete line   Bn 2 Pus ae to open the    Override Estimate    screen                       sur                             
30.  the New Estimate Options screen will let us clear all    Quantities      which would duplicate the estimate and all of it s lines  but leaving all quantities blank    the new estimate would total 0   This is a common technique you will use for doing a new estimate that is similar to an existing estimate  For now  just  click OK  which makes a complete duplicate of the current estimate                 2  Now the MainForm says the current estimate is  Copy of Base Bid   Office Building   Click the MainForm s  Project Info   button and change the project name to  Main Street Office Building   Close the Project Info screen           ArenaSoft    Estimating Version 2R80   User s Manual Page 7    Getting Started             E  Creating a New Estimate    1  From the    MainForm   Click on  New Estimate       mem                 2  In the  New Estimate  screen  type a Project  Name    let s type  East Street Office Building    Then  press TAB to select a Client  Let s say this  estimate is for a new Client  the    ABC Company      so the Client   s name is not in the pop up menu   Click the  New  Button and create    new Client by  typing    ABC Company    in the  ClientCompanyName field  Close the    Enter  Client    screen  Fill in the other boxes on the    New  Estimate  screen  Red Text are required fields     If you select    Use New Csi Codes     you are    selecting that all Databases switch to the new 6 digit Master Format 2004 Csi codes         old system was 5 digits like 
31.  this line  of the estimate  click the    Job History  button  When the History form opens  it shows all the History lines for this Csi  Section  Now click the Cost Codes radio button and you will now see two buttons light up showing your Material Cost                    Page 28 ArenaSofiTM Estimating Version 2880   User s Manual    Historical Cost Database             Code and your Labor Cost Code for Forming Footings  Click either button shows your past projects  amp  costs just for that  cost code  either code   labor or material   Thus the body of the Historical Costs Click copy screen now shows  Labor for  Form Footings    on Job A was  2 35 sf and on Job    was 2 93 SF and on Job C was  3 38 SF  If you click the radio button  to    Edit active line  and then click the History line you want  it will edit your unit price in the estimate to reflect the job  history choice    4  Inflation  The History screen lets you toggle costs for inflation adjusted or not adjusted  See  Inflation Adjustments  below        B  Entering Projects into the Historical Cost Database    1  To enter a project into your Historical Cost Database  from the MainForm click the Global button Historical Cost Data Tab   and click the  Enter Projects  button  Click the New Project button in the yellow area and type in the data  Click the     View    button in the Details area to see more details  Click this button again to switch projects  Click a Project Name       the yellow list to see that project   
32.  type of Maintenance is  performed every time you Quit ArenaSoft  If you Quit ArenaSoft by mistake  allow   or 2 seconds before relaunching the  program  or you may get a message saying the program is in use           Maintaining your Windows Operating System  ArenaSoft recommend you subscribe to    Microsoft Update    which will download  Windows Updates that Microsoft issues  If you are getting an error message in ArenaSoft we recommend you verify your  Windows Operating system is up to date  Go to ArenaSoft HELP and to    Critical Updates      Backing up your data  It is good practice to periodically back up your data to another location  either on your hard disk or better  yet to a separate tape drive or network drive  All of your estimates and databases are contained in one file called     AseData2R80 mdb     You may have renamed this file and moved it to a server or other location  To verify the Data  name and location  go to the Tools menu Data File  To do a back up  just duplicate this file  By default the file is located  in the folder    My Computer CProgram Files ArenaSoft Estimating 280           Page 42 ArenaSofiTM Estimating Version 2R80   User s Manual    Pull Down Menus             B  Forms  ArenaSoft has many Features and this Users Manual can not cover them all  You will discover many feature as you use the  program     few features for a few selected forms are presented below   Open Estimate Form      l Update Export            c    T            Tode Update
33.  unless you manually adjust a  line in a city by turning off Synchronization    3  Synchronizing RS Means data  If you use RS Means lines in your ArenaSoft Databases  then the same 3 rules are applied to  the RS Means lines  If your database is set to reference RS Means book values or to reference Means crews using your  custom TradeCities  then the Means lines are kept Synchronized perfectly  If your database is set to reference  RS Means  City Indexes  then the rule 43 City Index must match the Means City Index for the Synchronization to be a perfect match    3  Turning Synchronization OFF  The above rules are only a help if you don t have better data  If you want to manually enter  Costs in one database and not effect the other databases  you can turn Synchronization Off for that line                                 eS 33 The green button on    Database Entry form       umm  X nom means Synchronization is ON  Click the                      button to turn Synchronization off  Now  when you edit a line in this database  it  does not effect the other databases                                                                 If you want to see the values for one line in  the other databases  click the  S  button     The City Synchronization Screen opens   This is showing you the values for line 70 in  3 different databases  You can click a line  on this screen to switch to that database                 Because of such specialized tools  maintaining multiple databases is  almost
34. 2    line type  Labor Burden 30     and type the  formula L  30  This multiplies the  Tamban bk        be Eni iho Td estimate s Labor total by 30   Note that  i since the Tan Column Totals at the top of  the form do not include Overridden  numbers  this is an accurate computation  Click the  Insert Total  button  This gives us a subtotal  Use a  T  in a formula to  reference the previous Total line  Type  Insurance  on the next line and T  0025  The formula for adding a Bond is the letter     B     and the resulting amount will be based on your bond rate table  Bond Rates are entered in the  My Company General Info   screen   Click the    Insert Total  button again  Enter  Overhead  amp  Profit  and a formula of T  05  Note that you can even enter a  complex formula to mark up labor 30  and the rest of job 5   The formula would be L  30  T L   05  and L will be your  actual labor  not labor that has been overridden with a sub s quote                       AINT                                           Just like other screens  the  Totals  form has an  Insert Line    button  and you can move lines up or down by changing the line  number  and there s a renumber lines button  You can add as many subtotals as you need by clicking the    Insert Total  button     And like other forms there is a  Click copy List                            button  This opens a list    your commonly used  XY ERGO   Final Adjustment lines  Just    click copy    the lines  Fie t you want into the Totals
35. M Estimating Version 2R80   User s Manual    Material Price List             a better quote on 3000 psi concrete and update one of the lines in the estimate  you can click the small          button in the   upper right corner of the  Enter Estimate  Form to update the material unit price for all the lines in the current estimate that  use this Material Price List item  3000 psi concrete   This method does not change the price of 3000 psi concrete in your  Material Price List or the ArenaSoft Database    it just affects one estimate        Click copy Serene Copy Poste Delete   PintSacton   _ Inset  AS DataBase   JobHistoy   RS meone EU                                                                                            ses   03000 Cast in Place Concret     9Eq Days   TE T Hul      T 707527  Zoe  omi      Quay Uni Labor 5       E at   10 171800   amp 3    V  Cost Codes  Lab                            aao NONIE       magaan   Shon 4s               pu    cm ar  s    Oo  NU e  Cost codes  Lab   si                           Mat riiet anan RE            35 38 1  Crew 5n 23days                  Sa Mrs   Crew  Concrete  Place          Edit this price Then click the    M    to update all lines in the estimate using 3000 psi concrete    7  Using the Material Price List reduces the number of lines you need in the ArenaSoft Database  making it easier to use the  database and find the line you need  For example you can have one line in the ArenaSoft Database for    Brick veneer    st
36. Price List  items and Labor Details     Very easy to do           ArenaSoft    Estimating Version 2R80   User s Manual    Page 35    Linking to 3    Party Software             11  Linking to 3rd Party Software  accounting  scheduling        A  Export to an Accounting System     Nearly every Accounting System will import a list of Job Cost Items  their Cost Codes and their Budgets from ArenaSoft  Estimating  These Cost Codes and Budgets are then used in your accounting system to track your real costs against your budgets        accomplish this  ArenaSoft Estimating lets you export your Job Cost data as a text file which is specifically formatted to be  imported by your Accounting System     There are 3 Steps to exporting to accounting  Step 1 creates a copy of your estimate called a Tune up Table  The Tune up Table  has tools that help you condense your estimate into the lines you want in your accounting system  and you can assign any cost  codes that don t exist in the estimate  Since the Tune up Table is a copy of your estimate  changes you make to it do not effect   yourestimate  Thus you can delete your Profit line since you probably don t track that in Accounting  Step 2 is typically 2 clicks  to open the Export Engine and Select your Accounting system from the list  Step 3 is one click     Create Export File   Note that  some companies skip Step 3 and simply give the printed reports from the Tune up Table  to accounting to be manually entered        With your estimate op
37. R80 or later let s you select any printer  from the File Select Printer menu  You can even select an Adobe PDF printer to create a PDF file of any ArenaSoft  Report  Note  you must own Adobe Acrobat Writer to do make PDF files     Screen Resolution  A computer Monitor can use any of several  Screen Resolutions   This effects how big or small things  appear on screen  ArenaSoft Estimating will adjust it s screens to any screen resolution  Higher resolutions will show you  more and this can be beneficial when estimating  A common resolution that many PCs ship with today and which work  well with ArenaSoft Estimating is 1680 x 1050 or something close  With a high resolution like this  you should also select  a DPI setting of  Large Text or 120 DPI   This keeps your fonts from being too small  This is a common factory setting   However  if you wish to change your Monitor s resolution  right click your Desktop  select Properties and click the  Settings Tab  To change the Font s DPI  also click the Advanced button  ArenaSoft version 280      the 1  ArenaSoft  version to adjust it s screens and take advantage of these high resolution monitors              Automatic Maintenance  ArenaSoft Estimating performs automatic Maintenance to insure top performance at all times  The 1   time you launch ArenaSoft on Mondays or Thursdays  a message will alert you it s doing maintenance  Maintenance may  take about a minute if done on a network  Let the screen finish without interruption  Another
38. a Hotel and  a separate estimate is a Parking Garage  you can change the Zone name in the Hotel to  Hotel  and the zone name in the   Parking Garage to  Parking Garage   Now merge the estimates  You get one estimate with a Parking Garage Zone and a  Hotel Zone  Optionally  if you make the Zone names in both estimates the same  say    Zonel      when you do the merge  you get an estimate with one zone  Zonel  Another use of the Merge Wizard is when you do not have a network  and 2 or  more estimators both work on the same estimate  using different PC s  Estimator  A  can then export his estimate  copy it  to the other PC with a floppy disk  Import the estimate so that both estimates are now inside Estimator  B s copy of  ArenaSoft Estimating  Finally  from the MainForm  click the  Merge  button  This runs the Merge Wizard  which  combines 2 estimates into one    4  Excel Wizard  The Excel Wizard on the MainForm is a great tool  One click launches Excel and fills a spread sheet with any  of several reports  Once your estimate is in Excel  you can do any type of analysis or report that you require  This is so  much more flexible than systems that claim to do  custom reports  because their custom reports rarely do what you want   Another common use of the Excel Wizard occurs after you are awarded a job  Many companies prefer to give their project  manager the estimate in Excel so the PM can use the estimate to buy the job out  The PM can sort and group the estimate  any way he wa
39. ab  However  when you are entering lines in the estimate like    form concrete   you can tax the form  material by clicking the checkbox in the material column on that line of the estimate     Thus all lines of the estimate are tax  exempt  except for specific lines that you indicated are taxable in the estimate                                                                    ua I aT fg   Marking a Taxable item  ES B GC iL mal bi ona Tax Exempt Job                    oem       4  Adding Markup to Zones  The  Totals  form lets you add percentages to the end of the estimate  For an estimate that has     Zones  you can see the total of each zone by clicking the Zone Totals Tab on the Totals form  To distribute the line totals  against the various zones  you can select check boxes for 3 automatic methods of distributing to the zones  or manually  enter amounts in each zone  Manually entered amounts must total the line total  or the unbalanced amount will flash red  until itis in balance  If subs quotes were entered into the Override column during the estimate  and you did not distribute  the sub s quote into zones  then the CSI total will flash red  You can click the  Distribute Csi Sections  button to correct   the imbalance  ArenaSoft will not let you make a mistake        6  Printing your Estimat    The MainForm has 4 buttons for printing your estimate  Each of these opens an Options screen which lets you select from many  useful reports  The reports are designed for you  an
40. abor  etc  There is another line called 5 8 Gyp board  This  line is an Assembly consisting of Gyp board material  screws and labor  There is another line called Taping  This line is an  Assembly consisting of taping compound  corner bead and labor        Let s add a new line to the ArenaSoft Database which will be an Assembly for a complete partition  We will create this partition  assembly by Click copying the other 3 assemblies into this  Master  assembly  Open the ArenaSoft Database like it was       estimate    Click Open Estimate Databases Albany  Open the Drywall section Click View Summary 09200  Scroll to a blank  line at the bottom of the list              ArenaSoft    Estimating Version 2R80   User s Manual Page 33    Linking to 3    Party Software                                     ioter                                            092000               Drywall                         an Assembly                                                                               e eB BEL    Labor    Equipment  Melorial sub                                        ET                            Nu oss                Clem  DATASARES     Dataaaan  Ai RT                 Wood Windows   330 960      Window  loosen coseno Sect rds                 200 Skdghs     0   87100 Doc Hardware        87180 Detention          Hardware  080000 Gloang                Glazing                                     92707 L         loss Fiber screen Feb Ur UnhLabor Unt uip    pres  715  TW  2   TU  TH 
41. an change the Multiplication Factor and the Unit Price will change  or vise versa  Thus you never loose    sight of the original price in the Price List      PL  under the Material price indicates a Price List item was used  and a      PLO    means a Price List item was used but was overridden     PLO    stands for Price List Overridden                             Click topy Scroons Copy Poste Delete   PintSecion        8 Doista Line      AS DotEase   JobHistaw   AS Means Overridden  ats Ret                                               03000 Castin Place Concret                     WEE T      Ci Tl aem  Zone   omi S  Quanity Unit Labor Eq Mat  sub Tota      Tee  a TU      TU o a    m na I V y        Gost Codes Lab  gt   eal is    Mat     T                1                      Mat Prust          Fors ag                  mens cade                                                                  Ge Grat Fam Pde  TET            Footings  cortinucus                 2944 228 5500 Lu quur     TE  iu I     3 Li T       Cost codes Lab  J Jal E Jma          E    Mat priist              Coe      SU Ea TRE              maana case           Sten 2 3 5    60              Cow conact  Pace fva no cun           Material Price List pop up menu Multiplication Factor    3  If you have more than one ArenaSoft Database  the Material Price Li  Database City is referenced in the estimate    4  A Material Price List item can be used on any line of the estimate or any line of an assembly or sub asse
42. andard size     After using the Click copy screen to add this line to your estimate  you can press F5 to expand the view   and then use the Material Price List pop up to select the particular brick you need        B  Adding Materials to the Material Price List     1  To add lines to the Material Price List  you go to MainForm Global button Material Price List  and click the    Enter Material  Price List  button  You organize the Price List by Csi Section and then sub Categories within each Section    2  To add a Section to the Price List  click the  Add New Csi  button  and then select a Csi Section from the pop up menu  If the  Csi Section you want is not in the list  you must first add the Section to your ArenaSoft Database  Clicking the  View   Csi s Used  button restricts the pop up to    just the Csi Sections you have added to             va  ERO TSE            Ona ani        your Material Price Lis                                 peeeco     satotacongry   3  To add a Category to the Csi Section   C          Once you have selected a Csi Section  you                         can click the    Add Edit Category  button  mig t      m                      to add sub categories under this Section                         Add Manufacturer s names or other       EN TIE  mil o divisions to organize your Price List   ETET Y XA 4  To add a Material item  When you add    fence                materials in the list  you must enter a  List    Pana a TSAA       a   EI            Price  an
43. assembly or sub assembly        Rules Controling Synchronized Databases       Entering a iine into one City s database vill automatically add the same line to the other City databases  Editing a line  edits  that line in all databases  The following rules control the costs in the other databases     3     the line you type uses Trades  Equipment  or Crews  the matching linc in cach database will use the hourly rates defined  by the TradeCity referenced for that database    2  1f the inc you type uses a Material Price Lst item then the matching ine in cach database wil use the Materiel Price  defined by the Material Price List for each Database    5  Otherwise  the following City Indexes are used to enter the costs in cach database    4  You can turn off Synchronization when editing a line  so vou can manually Control the cost in each database        maintained 20  higher than City A  You could use indexes of 100 and 120 and get the same results  Thus you con use RS  Mans City indere i you wish  They typically range from 60 to 140           City Indexes tab Fa Mat Sub              cube eom col MES       fiteny  NY      Database    ER        57   57               Page 22 ArenaSofiTM Estimating Version 2880   User s Manual    ArenaSoft Database             2  To set the City Index for Rule  3  adjust it on the above form  If you make the City Index  1 for City A  and 1 2 for City      then City B will always be maintained at 20  higher than City     unless rules   or 2 apply  or
44. base to YOUR City s co   C  Working with Multiple Databa   1  Three Rules Controlling Synchronized Databas   6  RS Means Database   7  Material Price List  amp  Bill of Materials  A  Estimating with the  Material Price Li   B  Adding Materials to the Material Price Lis  C  Bill of Material    8  Historical Cost Databa   A  Using the Historical Cost Database     B  Entering Projects into the Historical C   9  Updating Estimates Using References   10  Assemblic   A  Example Assembly   Drywall Partition      Linking to 3rd Party Software  accounting    A  Export to an Accounting System      B            20                                            t Database        Export to Microsoft Project or SureTrak Schedules     Export to Other 3  Party Software   12  Working Multi user  13  Appendix  Back ups and Maintenance    Forms                    f  2  8    Emailing Estimates          ArenaSoft    Estimating Version 2R80   User s Manual Page 3    Getting Started             1  Installing Your Software       UPGRADING  If you are Upgrading and already have ArenaSoft Estimating on your PC  then  skip this section and perform the steps in the    Installing an Upgrade    sheet that  accompanied the upgrade           MULTIUSER INSTALLATIONS  See our separate manual for Multi user or Network Installations             A  Hardware Software Requirements     Pentium Class PC with 200 Megs free hard disk space  Any Windows OS  Windows 98  NT4 0  ME  2000  XP  Vista     B  Installing your soft
45. box  This tells you the labor unit  price was calculated from Labor Details  If                              TET       dL mui zc          you try and change the labor unit price by  typing on the Enter Estimate screen  a                             mI I                 t     m            dialog box alerts you that labor details exist                mL T m    aT                and you can choose to wipe out the labor                            details and use your typing or open the  details screen so you can adjust the unit                   cost there     Using Labor Details in the estimate enables  ArenaSoft Estimating to calculate total  Man hours  amp  Equipment hours  These are                                                                    T          displayed on every line of the estimate if  your press F5 on the Enter Estimate screen                          A                                                          peer           you will widen the lines and see a summary  of labor details     You typically do not enter Labor Details on  estimate lines that you do not self perform                                   Thus these man hour totals summarize the                   Bas rT T               gem                                e  aa   a    work you self perform     Man Hours and Equipment Days are  typically display in a Blue font     Note that the Tan Total boxes at the top of  the form do NOT include numbers that  have been overridden           ArenaSoft    Es
46. continuous        Form Walls        Place  Walls   and    Form  amp  Pour Elevator Pit          La ck un Lies              Cap imo Eat    Ld  S Lt un                                                    Note that these lines are being added to                                                                      Gap sosen peregre     your estimate which you can see on the left   DELL EDU GS n           glue   t s handy to click on your estimate to bring  i            ee pue it forward while leaving the Click copy  TF                        TT screen open  so you can switch back and  SSS ee             Re   forth without loosing your place  Click on                                   the Estimate to bring it forward  Note that  man     n        7   we added 5 lines complete with unit prices   ET       without typing  All that is left is to enter  D mde md                   some quantities  Click the Quantities box  for  form footings  continuous     and type a number like 1200 SF  Now use the down arrow key on your keyboard  to navigate  down the quantity column and enter quantities as follows  Place footings   44 cy  Form Walls   4800 sf  Place Walls   88 cy  and  Elevator Pit 1 each     Note that the ArenaSoft database can store more info than you currently see  and that info is also    click copied    into your  estimate  Thus some of the lines say    L    below the Quantity box  Labor Details exist             an Assembly exists   and    PL     which means a Material Price Lis
47. cts and items you have entered into this database for this Csi section  The items can be large    conceptual     units such as    Structural Steel    on a Square Foot basis  or detailed such as    Form Footings    on a SF of form basis  It is up  to you as to the type of items you put in each Csi Section of your Historical Database    3  Find Lines based on Cost Code  If you enter cost codes into you ArenaSoft Database  you can use those codes to fine tune   your search for a   particular item in   your Historical   Cost Database      Thus  using the   ArenaSoft   Database  you                   B ctick copy Historical costs                               Copy Click copy a line  Col Cost Code ten Unit like    Porm  TT Sud BRANT                         it  Widobontrectors 1995 POC Calege Nerman Since Center Worth    ootings into        Suea MA  70  am  your estimate   YnJobContractor gt  gt  1986 Ande County  Courthouse Finirghan  The line comes in  Ta Fus STRUCTURAL STEEL a a 1418 T with your  YnJobContractor gt  gt  1989 FerdrSchoolDiti Addere  amp Rerovatere 2ecrecle   EASmih     T Sed TAON  2000    0                          standard unit  YrJobContractor gt  gt  1988 Walon Gereral Hospi  Addlrs  Renovatonsa DS                          prices    and also        05120 E Siructuss steel   RN 8105  1035  mosh bariokts  U s n GC    with your cost                                    gt       Horsa Central Schl  New Flementary Schol                      codes  With your  cursor on
48. d a price for each City in your  list of Synchronized Databases  For any City you can either enter the Price or a Multiplication Factor  Tip  When entering  a long list of items  you can fill a multiplier down the whole column by typing the first multiplier  selecting it  doing a   Copy   ctrl C  and then pasting the value down the column by alternating ctrl V and the down arrow    5  Updating your Databases  When you are done editing the Material Price List and close the form  ArenaSoft automatically   updates your ArenaSoft Databases and if an estimate is open on the MainForm  that estimate is updated as well        6  Updating the Material Price List from an Estimate  If you are working on an estimate  you can add the Material item on that  line of the estimate  to your Material Price List  Just right click the Description box on that line of the estimate  and select                ArenaSoft    Estimating Version 2R80   User s Manual Page 27    Material Price List                  Copy to Material Price List   If the item exists in the Material Price list it s cost will be updated to match the estimate  If  the line does not exist in the Material Price List it will be added     C  Bill of Materials     1  You can view or print a Bill of Materials Report that summarizes the total quantity of each Price List Material item used in       estimate  Thus if you want to see the total quantity of 1 2  gypsum board type X  total quantity of 1  drywall screws  and  total quantity of
49. d are presentation quality  With ArenaSoft Estimating  you do not need  Crystal Reports or a Programmer to design your reports  You never waste time adjusting column widths to get things to fit on a  page  The buttons on the MainForm print the entire estimate  There are also  Print  buttons on many screens that print just the  info on that screen  For example  if you are in the Concrete section of an estimate  there is a print button that just prints that one   section of the estimate  concrete      7  Wizards     The MainForm has 4       ard buttons  They are powerful tools as described below     1  Adjust Wizard  Use this Wizard to change an entire estimate  or parts of an estimate  by a percentage  You can change all the  unit prices in an entire estimate  or database  with one click  From the MainForm  click the  Adjust  button  Enter a  percentage and click    Next     If you want to adjust the entire estimate click  Finish  or select from several options to adjust              Page 14 ArenaSofiTM Estimating Version 2880   User s Manual    Getting Started             just certain sections  zones  or columns of the estimate  Example 1  you need to increase the Material column of the  Concrete Section of the Science Wing Zone by 5   Example 2  your boss wants to give the owner a copy of your  estimate but not show him your General Conditions  Overhead or profit  Just duplicate the estimate  and in the owner s  copy  delete the General Conditions Section  and the Overhead a
50. d attached to it is an estimate that has been Zipped  Click the link to save the zipped archive  file to your desktop  Quit the email program    2  Create a new folder on your desktop  right click the desktop and select New folder  Name this folder   3  Find the zipped archive file on your desktop  Double click this file to see the contents  Drag the file ins  the new folder  Exported Estimates   Close the WinZip window    4  Put the  Exported Estimates  folder in your C drive  You can trash any existing Exported E   in this location    5  You are now ready to import the estimate or estimates into ArenaSoft Estimating  Launch ArenaSoft  go to the pull down  menu Import Export and selecting    Import Estimate     This loads the estimates into ArenaSoft           xported Estimate   le the Zip window to             ates folder that may already be       Revised 1 1 2007  Copyright ArenaSoft     1998 to 2007       Page 48 ArenaSofiTM Estimating Version 2880   User s Manual    
51. ed    3  Synchronized Databases  Because your ArenaSoft database may use features such as Labor Details  Assemblies  RS Means  lines and Material Price List References  it can get to be a lot of work to maintain all these features across multiple  databases  ArenaSoft maintains multiple databases for you  as if it was a single database  If you add a line to the one  database  the line is added to the other databases according to a set of rules           1  Three Rules Controlling Synchronized Databases     1  The 3 rules for how Synchronized Databases are kept synchronized are as follows  The above screen  Global ArenaSoft  Database Tab  has a    Rules    button which displays the following form  This form explains the rules and lets you adjust the  indexes    1  if the unit price you entered in a line of a database uses Labor Details which reference a TradeCity rate table  then the  Labor costs are adjusted in the other databases using their respective TradeCity rates    2  if the unit price you entered in a line of a database uses a Material Price List item  then the Material Price list item is  copied into the other databases using the Material Price List cost for that City   3  for all other unit prices a multiplier  City Index  is used to maintain the other databases at a preset percentage difference   If an Assembly or Sub assembly is added or adjusted in one database  the assembly is copied into the other  databases and these same 3 rules apply to all the lines of the 
52. en on the MainForm  go to the pull down menu  Accounting Scheduling   amp  select Export to Accounting   The Tune up Table opens  If the table is blank  click the    New Table  button  The Export Summary screen is shown to the right  of the Tune up Table     Stop 1  Tune up Table mm mt                  4 The Tune Up  Table shows  E el on  a you each  ara          eene    Number inthe    Ee Estimate  onits  1 54         ownline  You    must assign a  Cost Code to   each number    Typically you  want to assign  the same Cost  Code to many  lines  and then    Pee Prts    cases      bei                                            E      summarize   mm   those lines into   m pon one line for that              Cost Code                   Find  amp  Fill  Column  buttons  make this easy        kn  jesse imer          mEn  a     Note that several lines at the top of the Tune up table may not have Csi Nos  The Estimate Column field displays an    A     This  means the number came from the Final A djustments section of the Estimate                       The Estimate Summary screen is displayed on the right  and shows you what will be exported to Accounting  All Tune up lines  with the same Cost Code will be summarized into one line  Cost codes may already exist in your estimate as they may have been  click copied into your estimate from the ArenaSoft Database  If they already exist the Export Summary screen would already be       showing those Cost Codes summarized as one line per code 
53. etups are wonderful on Bid Day  since more than one PC to be used during the Bid Day crunch  A great  advantage  Most ArenaSoft Estimating screens are kept current at all times  However  be aware that the  Estimate   Summary  and  Totals  forms are correct when you open them  but if you leave them open while another PC makes  changes to the estimate  the open screen is only updated every 60 seconds  To be sure the open screen is current  just click  the  Multi User Update  button    4  Laptop users can move estimates off the server and onto their laptop so they can work on the estimate while away from the  office  When they return  they can copy the estimate back onto the server  To move an estimate onto your PC  launch the  server based estimating system as you normally would  Go to the  Expor Import  pull down menu and down to    Export  Estimates   Select the estimate or estimates you want to export and click the  Export Estimates  button  Now click the  Tools menu Data File and switch to your local Data File of ArenaSoft Estimating  Finally go to the Export Import pull  down menu  Select  Import Estimates   The estimate is imported to your local PC  To move the estimate back onto the  server you do the process in reverse  It s very e                         ArenaSoft    Estimating Version 2R80   User s Manual Page 41    Forms             13  Appendix    A  Back ups and Maintenance     Selecting Printer  ArenaSoft normally prints to your Default Printer  However  Version 2
54. ference settings  Changing the setting on this screen is only valid while the screen remains open and does not change the  setting in the Project Info screen    5  All RS Means lines include Labor Details  Trade  Crew  amp  Production Rates   Thus using them in your estimate will alway  give you total Man hour figures                      ArenaSoft    Estimating Version 2880   User s Manual Page 25    Material Price List              7  Material Price List  amp  Bill of Materials       A  Estimating with the  Material Price List      1  The    Material Price List  gives you quick access to lists of Material Prices  If you work with several manufacturers  you         access their price lists while doing an estimate  A masonry contractor can have access to many sizes of brick and within  one size  many different colors and types  If you are a Plumbing  HVAC or Electrical Contractor  you can access all your  different pipe materials  pipe sizes  fittings and valves  etc    2  To Enter a Material Price List item into your estimate  press F5 to see the expanded view  and use the Material Price List Pop   up menu to select your material  When you select an item  the Price is entered as the material column s unit price and also     Multiplication Factor is entered         Text of the description box is also changed to include the Material Price List item  surrounded by     and      If you change the pop up to another item  the text inside the         will be changed to  match  You c
55. he Adjust Wizard or line by line        3  The    MainForm    opens and you are ready to go to work           Page 4 ArenaSofiTM Estimating Version 2880   User s Manual    Getting Started             The MainForm has a  Global  area which    mem EJ let s you make system wide changes like  opening an estimate or adjusting a   ortae                        sia oo            The lower section of      MainForm is for  the  Current Estimate                        On Line Help       The HELP pull down menu has several tools to assist you   A  User Manual  B  Toggle Cursor Tool Tips  On Off  Cursor Tool Tips are short messages that show when your hold your mouse over a  button or area of a form  Use this option to tum them off if they get in your way   C  Six Steps for Estimating  This is an animated Tutorial which let s you navigate to the topic you wish to learn        ingle Click Program    This is a single click program   The only things you double click are boxes with purple borders              C  My Company General Info    1  Click the My Company General Info button if you need to adjust your Company Name  address and your performance bond  rates     D  View an Existing Estimate  1  Open an Existing Estimate    We have included a couple Sample Estimates to help you in learning ArenaSoft Estimating  These are geared for a General  Contractor but the concepts are the same for any type of Estimate  From the MainForm click    Open Estimate            ArenaSoft    Estimating Versio
56. in  the database it will be added to the database in the section you select  This works even with complex lines containing assemblies        B  Converting the Albany Database to YOUR City   s costs    Most contractors work with just a single database which they have  customized to their style of estimating and the costs for their city   ArenaSoft Estimating comes with one database for Albany  NY and          ne boro aan re ner oem Sra a ann the 1  time you launch ArenaSoft Estimating a Wizard runs and lets  otro mtra ense Sugat TUR you select your city and adjusts the ArenaSoft database to that City   Tororo cem a inerat or This adjustment was basically applying a multiplier to all lines of the           monas gee i ie                       Database and all Trade rates in the TradeCity     You can re run this wizard any time by clicking the Global button on  the MainForm and clicking the ArenaSoft Database tab  Click the  Adjust a Database button to run the wizard     Another way to start a new database which will completely replace the  Database we provided  is to use one of your estimates as the beginning  of your database  Even if the estimate has quantities in it  the   quantities will be deleted by the Wizard  Click the Global button on the MainForm  click the ArenaSoft Databases Tab  and click  the    Start new Set of Dbs  button to launch a wizard that let s you select your estimate and make it your Database              A better way to adjust your database however is 
57. it prices are calculated   Let s enter a line for 4    split face block  Enter a Quantity of 1000 SF  Now double click the labor unit price box                     UT SE                                      e TET ET           miim  ae s EP WERE Es    Dus ETT     T       ws jm d                                                             The Choose Drill Down Type screen opens  Click the Labor button because we just want to add Labor Details  We ll discuss  Assemblies later in this manual           Page 18 ArenaSofiTM Estimating Version 2880   User s Manual    Crews  Trades   amp  Equipment                                                                                LT TEST        The Labor Detail Screen opens  The popup menus at  the top of the yellow area let you select from your   Trades  Equipment and Crews  The left pop up for  Trades let s you select your custom Trades and the  right popup is the Means Trades  There are similar  popups for Equipment and Crews  Click the left  popup for Crews to display our custom crews  and  select a Masonry Crew  This fills in the Crew   Day  and Equip S Day  Now type how much production  the crew will achieve in    day  Type 200 SF day  under Crew Production  Press Tab and the form  calculates your unit labor and equipment costs at the  top of the form  Close this screen to see your unit  labor costs in the line of your estimate     Enter  4 for a material cost and your line is  done  Note that an    L    appears under the  Quantity 
58. k  boxes   and Synchronized Databases to capture all of your data and settings    12  Accounting Scheduling Menu   See    Linking to 3rd Party Software  accounting  scheduling       should you                            j    above        E  Emailing Estimates       There are 3 methods of emailing an estimate  depending on what you are trying to accomplish  A  the receiver only needs to  READ  amp  PRINT the estimate  makes a PDF file   B  the receiver needs to EDIT the estimate  but does not own ArenaSoft  Est ig  uses Excel   and C  the receiver owns a copy of ArenaSoft Estimating needs import the estimate so he has full edi  capability                 Method A  This is by far  the most popular method of emailing estimates  to owner s  Architects  Etc  The Receiver     needs to VIEW or PRINT the estimate  Adobe Acrobat Method    1  The sender needs to purchase Adobe Acrobat Writer from www Adobe com  cost is about  250   After installing this  software you can change your printer to the Acrobat Writer  Distiller  by using the File Select Printer pull down menu  Now  print any of your estimate reports as usual  Each time you print  you will be asked to select a location on your hard disk to  store the report file which will be a  PDF file  Once you have saved these reports  you can attach these PDF files to an email  and send them  Most computers already have the FREE Adobe Acrobat Reader on their PC  Even Macintosh users will be  able to receive  read and print your estimate
59. mbly  For example      line in the ArenaSoft Estimating Database could be a drywall partition  The line could be an assembly that contains many  Material Price List items such as metal studs  different types of gypsum board  drywall screws  hilti shots and all the other  components of a drywall partition  When you click copy that partition into your estimate  one click on the partition  assembly  all the components come along  Why do you care about the    nitty gritty    components of a partition  Well if  you change the price of the 1    drywall screws in your Material Price List  you can then update an estimate and all the  partition types in that estimate will change to reflect the change in the price of the 1    drywall screws  For more  information on Assemblies  see the topic     5  To update an estimate to reflect the latest prices in your Material Price List  you open the estimate and click the Project Info  button to open the Project Info screen  Click the Update using Material Price List button    6  You can also change a Material Price List item s cost on one line of an estimate and then update that item throughout the  estimate  without changing the price in the Material Price List  Let s say you enter several lines into an estimate that all  use the same Material Price List item  say 3000 psi concrete   These lines maintain a link between themselves  If you get       will change pric       depending on which ArenaSoft                            Page 26 ArenaSoftT
60. ment hourly rates in a TradeCity  click the  TradeCity   button  This updates every line of the estimate that uses this trade rate   even lines buried deep in an assembly           Page 30 ArenaSofiTM Estimating Version 2R80   User s Manual    Linking to 3    Party Software             4  Material Price List Button  If you made changes to the Material Price List  click the  Material Price List  button  This  updates every line of the estimate that uses this Material Price List item   even lines buried deep in an assembly        10  Assemblies    An Assembly is a mini estimate that calculates the unit prices on a line of the estimate  Assemblies can provide great depth and  detail behind the simple unit prices you see on any line of the estimate  They commonly are set up in the ArenaSoft Database so  they can be click copied into an estimate like any other line  Once copied into an estimate  you can edit the assembly without  effecting the database  Both Labor Details and Assemblies are entered or viewed the same way     Let s create a new Assembly  On a blank line of an estimate  type    Door  Frame  amp  Hardware     type the quantity  6 Each     amp  then  double click the unit price box  On the next screen click the Assembly button                                                                                                                        22 nasa       Paang E   pu  Ca          T 5065  D E ccn gue eel ee  nem Erose unit ere ining ac  E     omm  a  M M Tue  This o
61. mponents that make  up the Assembly  Lines within an Assembly or within it s sub assemblies can include Labor Details and Material Price  List items so that man hours and Bill of Material reports can be accurately reflected  You can save a lot of time by click   copying an assembly into your estimate  Assemblies are nestable within each other              4  Crews  Trades   amp  Equipment    Many contractors use hourly labor rates and man hours to arrive at their labor costs  ArenaSoft s intuitive Labor Details form  helps you convert your man hour costs and productivity records into a unit price like S cubic yard  Unit prices make it easy to  apply your labor costs to different quantities of work  The Labor Details form let you select the Crew  Trade or Equipment you  need  and displaying their daily cost  The daily cost is adjusted to the TradeCity that has been selected for this estimate  Each  TradeCity holds the hourly rates of all the Trades and Equipment for one City  Thus an estimate which uses Crews  Trades  amp   Equipment can be updated  based on a change in labor rates or based on a change from one city to another     A  Setting up YOUR Labor  amp  Equipment Rates    m 1  ArenaSoft Estimating ships with Labor Equipment Rate tables for  Nac WE man map eres t eerta orav Te Albany  NY  This is called a TradeCity  You can adjust this Trade  Trade  amp  Crew Set Up  Optional  City  You can have multiple TradeCit          2  Setting up YOUR TradeCity  From the MainForm 
62. n 2R80   User s Manual Page 5    Getting Started       The Select Estimate form opens     Select an You will see a list of Clients    Estimate below    Click on the Text  Click on the    Barric County    client   This displays all the estimates we   have done for this Client                 Click on the Estimate you want to  open        The    Main Form    now shows that we are working on the    Base Bid   Office Building    for Barric County  The lower right corner  of the MainForm shows the list of all estimates for this client  Click on Alternate 1 to switch estimates and then click back on  Base Bid  Click on the    View Summary    button           The Estimate Summary opens  showing a  complete estimate organized by CSI   Sections  Columns are totaled at the top   Black numbers are dollars  blue numbers    rs a                                                                                           are Man Hours and Equipment Days       PAS        The Tan columns summarize our detailed  ie xum nis estimate for a Section  The Green Columns   ES Feci Bites Tm        let us enter Sub Quotes which may Override   auge             our estimate  Our detailed estimate for  zw   3er 3r Concrete has been overridden by a quote     TE  Ene Pa Conc Tues des LIS aer from Pete s Concrete and thus the line is  H E a Grey                                 ae DUTY sume mum    Let s look at our detailed concrete estimate  Click in the Tan colored area of the    03000 Cast in Place Concrete 
63. nd Profit line  and use the  Adjust  Wizard to increase all  the lines of the estimate to match the amount you removed  The wizard will even calculate the percentage for you  Now  the estimate shows each line of the estimate as your  Sell price     Example 3  Your project includes 5 Building A s and 1  Building B  Make a Zone for 1 Building A     zone for 1 Building B  and a zone for 4 Building A s  Do your estimate for 1  Building A  Use the CopyZone button to copy that zone into the    4 Building A  zone  Now use the Adjust Wizard to  multiply the  Quantity  Column by 4    2  CopyZone Wizard  Use this wizard to copy the lines in one zone  and paste them into one or more other zones  Typically you  Click copy lines from the database into one Zone  and then use the CopyZone Wizard to copy those lines into the other  zones  Thus if you are estimating a School with a zone for each wing  you can enter all of the line items into one zone   using the Click copy screen and the database  Then use the CopyZone Wizard to copy those lines into the zones for the  other wings  Now all you need to do is take off the quantities  You already have all the lines to hold the quantities  This  makes doing an estimate with zones almost no additional work    3  Merge Wizard  Use this Wizard to combine 2 separate estimates into one  It does an intelligent merge so it does not give you  duplicate spec sections or duplicate zones  It creates sections and zones when required  Thus if one estimate is 
64. nts to with Excel  Note  You must have Microsoft Excel on your PC for this Wizard to work                          3  Key Concepts    ArenaSoft Estimating was designed to be simple to use  As you continue through this manual you will decide which features you  want to use  Some features you will grow into over time  Here are some key concepts     a  Check List approach to estimating  Whether you use all or none of the Advanced Features  ArenaSoft Estimating remains  simple to use because the ArenaSoft Database acts as a check list  Click   Click   Click  you add the spec sections you  need  Click   Click   Click  you add the lines you need within each section  It is fast and accurate because you do not  forget anything when viewing a check list  If you have built Advanced Features into the Database  they simply come along  for the ride with the same click    b  Organizing an Estimate into Sections  amp  Zones  Organizing an estimate in Csi Sections helps you to not miss any major  category of work  Thus the check list concept  Zones have 2 major uses  1  pricing Alternates  and 2  identifying the cost  of different areas of a project  For pricing Alternates  you can make one zone for    Base Bid  and then add one zone for  each Alternate  You can have an unlimited number of Sections or Zones  Zones are especially helpful to Construction  Managers  or on a negotiated project  because you can guide your client and the Architect to make decisions based on the  costs of different
65. o fill that cost code to  all lines currently displayed in the Tune   Up Table                                            That was easy  Click Clear Find to repeat  x mum 7 this process again for another cost code               1    say                                           Since we just added a cost code to 5 lines  in the Tune up Table  we can see the                        summary by clicking the Update Form  Total  42380 Step 2  EXPORT Engine button on the Export Summary Form         Note how it shows a single line for  155643044  4 222 501     06100 with both the Cost and  ansa  Rough carpentry ELE 1088 Quantities summarized                                The Quantities will only be meaningful if  all the lines in the Tune up Table had the  same Unit  like Sq Feet   You can clear  some of the Quantities in the Tune up  Table if that makes it meaningful  or just             ArenaSoft    Estimating Version 280   User s Manual Page 37    Linking to 3    Party Software             ignore the Quantity box  In most cases the Accounting System only needs dollars     When you have assigned a Cost Code to all line   manual entry  or click the  Step 2  Export Engine        the Tune up Table  you can print the reports and hand them to Accounting for  jutton on the Export Summary screen           Click on your Accounting System in  Step 2  Export Engine the list  If your Accounting System is    fet you hive assed he Tursun        and hive came the Ires  vou are redo ette Tre Tab
66. o look and work just like an estimate    so there is nothing  new to learn  Open the database like opening an estimate  From the MainForm  click  Open Estimate     select    Databases     as the client  and click on the database to open it           Now the MainForm says the current estimate is the     Albany     and the green text alerts you that you are  working on a Database  not an estimate  You can add  sections or lines like working with any estimate   Simple  In fact you add Labor Details  Assemblies      Material Price List items just like adding them to an  estimate     Click the Make Sections button     Note that there are 2 column in the database for Csi Numbers  The    old     column stores the traditional 5 digit  16 division Csi codes  The    new     column holds the 6 or more digit 50 division MasterFormat 2004 Csi  codes  You must enter both codes  When you do an estimate you chose  which system you want to use for that estimate  All the click copy  screens will adjust to your selection              Page 20 ArenaSoftTM Estimating Version 2R80   User s Manual    ArenaSoft Database             When doing      estimate  you should be aware that lines which are click copied from the Database into the estimate remain linked  to the database and thus an estimate can be updated if the database changes  Let s open the estimate we started for the         Company                                eR    Open the Concrete Section of the estimate                              
67. o view and edit your crews  Switch between crews using the Crew popup at the  top of the screen  A crew let s you combine the Trades and Equipment you defined in your TradeCity screen  The actual cost of     crew changes depending on the rates in your TradeCity  If you have only one ArenaSoft Database and only one TradeCity  then  your crew costs will be constant  However  if you have added a second TradeCity  you can switch between them using the     TradeCity popup     EU       oe            s   Es                            When you are done editing and close this form  the ArenaSoft Database and any estimate that is currently open on the MainForm   will be automatically updated to the new daily crew rates and crew definitions  This update does not effect old estimates   However  if you want to update an old estimate to reflect the new rates  you can use a button on the Project Info screen to do so     B  Using Labor Details in your Estimate    Now that we ve defined Trades  Equipment  amp  Crews  let s see how we use them in an Estimate  You can add Trades  Equipment  and Crews to any line of your estimate  However  it is more efficient to add them to the lines in your ArenaSoft Database  That  way when you Click copy lines from the Database into your estimate  the line is copied with it s Trades  Equipment  amp  Crews  already defined  This saves you time             any line of an estimate or a database  you can double click the unit price box to view or edit how the un
68. ol lets you switch between them  RS  Means Trades are those used in the Means book and listed on the back cover  Initially the Means hourly rates will match the book  but you can edit them here  When adding lines to an estimate using the Means click copy screen  you can toggle between using  the book rates or using these custom rates for Means Trades  amp  crews  When viewing  My Trades  you can add your own custom  trades and even a foreman  s name to the list        Workers Comp Preference  You can choose whether you want your labor unit prices to include Workers Comp and Payroll Tax  or not  If you do not include Workers Comp and Payroll tax in each line of the estimate then you must add a line at the bottom of  the estimate called    Labor Burden    to add this cost  The RS Means Book does not include Workers Comp and Payroll Tax in the  Labor column  Thus to see numbers that match the Means Book you must select the lower radio button  This selection is a  Company wide choice and effects all users in a Multi user setup  When adding lines to an estimate using the Means Click copy  screen  you can temporarily toggle between these settings without disturbing other users     3  Setting up YOUR Crews  Close the TradeCity screen and click on the    Crews    button                                Naa a    Protesta             ArenaSoft    Estimating Version 2R80   User s Manual Page 17    Crews  Trades  amp  Equipment                The Enter Crews screen opens  Use this screen t
69. ong x 137 high  130 SF  Enter 130 in  the    I Assembly    box                 Instead of typing in the  lines  click the  ArenaSoft Database  button     Click on the 3 lines we  want copied into our  mini estimate     Close the Click copy  Screen           Page 34 ArenaSoftTM Estimating Vei       sion 2R80   User s Manual    Linking to 3    Party Software                Ca    anay                                 The 3 lines have  been added  Note   that because we are   working in the  ArenaSoft database        as assembly is  always in the Edit       sides of this partition that is 10 long and 137 high        mode  There is       button to switch to  the View mode   We need to enter  the Quantity for  each line  Type  130  260   amp  260     Note that 260 is the  quantity of gyp  board for 1  assembly since it  occurs on both    That s it  We re done  Note the assembly costs  5 60 Sf  The    A    on each line means those lines are Assemblies and you can  double click the Unit Price area to drill down for the details like how many Hilti shots are included  Close this screen     Chekccopy Screen    doe    RSMesne       Copy Paste Dee                                                                             09200 092000 Plaster  amp  Drywall E             _ NE       Hom           d d       Paman TypeA 3 E E3   KJ Lu        jo                      You have added a line  in the ArenaSoft  Database that can be  click copied into your  estimates     Itis complete with  Material 
70. or the    odd     details    4  Now  change to Section 04000  by clicking on the Enter Estimate form to be sure it s forward  Change the Section pop up to  04000 Masonry  Click on the ArenaSoft Database screen which is still showing above the top of the estimate form  With  the database screen showing click in the upper left window to change the section to 04000 Masonry  Click on the Brick  Veneer line and on the 8  concrete block backup line  Click on the estimate form to bring it forward and enter 10 000 SF  of brick and 10 000 SF of block        Close the    Enter Estimate  screen  The                       gp   ce fo  Concrete  amp  Masonry Sections are totaled    on the    Estimate Summary    screen           Dollars are black  Man Hours and  Equipment Days are blue                                                        Page 10 ArenaSofiTM Estimating Version 2R80   User s Manual    Getting Started             3  Take off Quantities    1  In the paragraph above  we just typed in our quantities  A second method of filling in a quantity is to use an optional accessory  called a Digitizer Board  Digitizer use is covered      a separate manual  ArenaSoft is a licensed distributor of GTCO  CalComp digitizers so we can provide you with a complete system if you wish    2  A 3  method of filling in a quantity is preferred by many contractors because Digitizer Boards are expensive and they don t  document many types of quantities  This method uses the    Enter Takeoff    screen to
71. ou work in different cities  you can have a  Separate database for each city  ArenaSoft Estimating makes having multiple databases easy to maintain  See     Synchronized databases  later in this manual    f  RS Means Database  This database of costs is nationally recognized and accepted by many government agencies  Every line  includes Labor Details  ArenaSoft provides you the ability to change cities using the Means City Index or by changing the     Trade rates found on the back cover of a Means book    g  Material Price List  Using this price list in your estimate makes it easy to change the material on a line from one grade or type  to another  Thus you can change the cost of Concrete from 3000 psi to 4000 psi  It provides the basis for the Bill of   Materials report which totals the quantity of each material throughout the estimate  It let s you update all lines in an  estimate that use a material  to the latest price    h  Historical Project Costs  This database let s you insert unit prices into your estimate that are consistent with real projects you  have completed  This can be a rich source of historical information for making both conceptual as well as detailed  judgments    i  Updating Estimates  You can update an estimate s cost from one city to another  or from one year to another  by changing it s  referenced databases  TradeCity  or Means City Index    2  Assemblies  Assemblies let you derive a unit price as the total of a mini estimate which includes all the co
72. pens a blank Assembly ready           p               EO  for you to enter your mini estimate   pue  Er            EET BESET ma An assembly needs to have an    arbitrary size  That way you ll know  what quantities to use in pricing each  item in the assembly  Let s base the  assembly on 1 door  Enter a 1 in the     1 Assembly      box  Now we can  enter the lines and quantities that  comprise this assembly        Note that this assembly is in    Edit     mode  To see the Total Quantities  and Total costs for 6 doors  click the     View    button              The assembly you priced gets divided  by the arbitrary size of one assembly    This is what creates the unit Labor  Equipment  Material  amp  Sub numbers  shown at the top of the form  which will be used  for this assembly  If you based this assembly on 2 doors you would need to double the numbers in the Quantity column           ArenaSoft    Estimating Version 2R80   User s Manual Page 31    Linking to 34 Party Software                When you close the                                                                                                       Cickcopy Screens Copy Pase                                       Dowe         Assembly form the unit    LASDonbose    sbrinoy   RoMems   ma         F prices shown reflect the   08200     Wood Doors              T m data in the Assembly    Zane  Zonet  gt  Quy      labor Ei Mm       Nar factory stam  amp             Win       T    TEO jo m Note that the line has an  Ep mE 
73. py buttons    Job History    and    RS Means    which let you add lines to your  estimate from these other 2 data sources  These will be discussed later in the manual    2  The    Enter Estimate  screen always has a blank line at the bottom of the list  so you can enter an unlimited number of lines  You can INSERT a new line between lines  Click anywhere on line 20  Click the  Insert  button  To MOVE a line  just  change the line number and press tab  You can RENUMBER the lines by 10 s  Click the              button  Click the Delete  button to delete the line that has the cursor  The CopyPasteDelete button lets you copy one or more lines from this section  into another section or zone  in this estimate  or even into other estimates  The Print button prints just this section  instead  of the whole estimate  These buttons are common to many ArenaSoft Estimating screens    3  You can navigate from the Section and Zone that you are working on  to any other Section or Zone using the pop up menus  below the Click copy buttons  This makes it easy to use a click copy screen to fill in the lines for one section  then change  the estimate and the database to the next section without closing any screens  and continue clicking to enter lines into the  next section  Some estimators Click copy all the standard lines they need for an entire estimate  all sections  and then go  back and take off the quantities  While they take off their quantities  they type in any special lines they need f
74. r                under the Quantity  100 Pour Frere  amp  Hardware          Each   75000      TO BER       d e HI e   box  The    A    means an  7        EH Assembly exists on this  j d d    line  If you try to edit a                unit price on the  estimate line  a screen       opens to alert you an Assembly exists  and allows you to wipe out the assembly with your typing  or edit the Assembly     Every line in the Assembly acts like a real line of the estimate         unit price box can be double clicked so you can enter Labor  Details  Trades  Crews  Equipment   amp  Production Rates  or even another Assembly  You can also press F5 to expand the lines    and use Material Price List items     Let s edit the assembly to include Labor Details  Double click the unit price box to open the assembly                   TN Es                                                  Click Edit Assembly so we are in Edit  mode     On the Labor line  double click the  150   unit price to open the Labor Details form           Select a  Carpenter  from  the left Trade Popup  That  set s the crew S Day to   285  Type the production  rate of 2 doors per day     Click Enter or the X to close  the Labor Details form           ArenaSofiTM Estimating Version 2R80   User s Manual    Linking to 34 Party Software                 mmm   WE ET E E         Note that the Labor line of the                             Assembly now has an    L    for    a En Ea mpi        n ien Labor Details and it displays 4 
75. rice or  1 TI       quanti    TO ea   ooo  I im TO          ArenaSoft    Estimating Version 2R80   User s Manual    Page 45    Reports             C  Reports       ArenaSoft Estimating has many reports  Describing them all is beyond the scope of this manual  You will discover all the  Teports as you work with ArenaSoft Estimating  A few of the major reports are listed below        1  Cover Page  This prints a Cover Page for your estimate which includes a large area for Estimate assumptions or qualifications   This information comes from the  Project Info  button    2  Summary Report  There are 3 main options for this report       3 list the CSI Sections and their totals  as well as the Final  Adjustments lines of the Estimate  The estimate s Grand Total is displayed  If you select to see the Sub Quotes you will  see all the quotes you received for a spec section  and you can even select seeing the details comments you wrote on each  quote    3  Details Report  There are 3 main types of reports available  and each has many options    1  Section Details Report  The standard report prints out the details of each CSI Section  Some of the options will add  Takeoff info  crew info  and assembly info  There s an Option to print the Means line code           Note  The Report prints one page per section  or continuously  to save paper   If you staple the upper left corner of an  estimate  it is very easy to find the section you want by fanning the bottom of the pages where the Section
76. ronization so you can manually adjust one database without the 3  synchronization rules applying  Both of the options on this form are also available from buttons on the Enter Estimate  form    8  Update Menu  Global Adjustments  This is like clicking the Global button on the MainForm but this menu lets you open this  form even when other forms are open    9  Update Menu City Indexes  Lets you adjust the Rules when working with Synchronized Databases  See    Working with  Multiple Synchronized Databases  above    10  Export Import Menu  Export Estimates  Lets you export estimates for various purposes  You do this when upgrading to a  newer version of ArenaSoft Estimating  You also can do this if you need to move estimates from one PC to another such  as moving an estimate from the server to your local PC so you can work out of the office    a  Select Estimates Form  Drag down the list  press Control  amp  click to select odd lines  or click the    Select All    button   b  Exported estimates are stored on your    drive in    folder named    Exported Estimates   If you need to transport the  estimates to another PC you move this folder and it s contents to the C drive of the other computer   11  Export Import Menu  Import Estimates  Assuming this PC has a folder in it s C drive called    Exported Estimates     you can  select the menu    Import Estimates           Import Options Form  Choose how much info you want to import  Select Estimates  General Info   one or all the chec
77. s    The following summarizes the main pull down menus in ArenaSoft     1  File Menu Select Printer  Let s you print to any printer  or create a PDF file if you own Adobe Acrobat Writer    2  Tools Menu Analyze it with Microsoft Excel  This lets you put any form into an Excel Spreadsheet  However a much better  tool is the Excel Wizard button found on the MainForm    3  Tools Menu Create Desktop Shortcuts  This creates a shortcut icon on your desktop for ArenaSoft Estimating  delete your shortcut by mistake    4  Tools Menu  List Authorized PCs  This screen stores your PC code which permanently activates your software  It also stores  any RS Means licenses you purchased  In a multi user environment  your PC  amp  Means codes must be installed on the   erver as well as on your local PC    5  Tools Menu Special  For use by Tech Support   6  Tools Menu Options         options screen give you the ability to control whether your screens and reports display the bottom  line     SF to the dollar or to the penny  Each user can set their own preference without affecting others    7  Update Menu Synchronization Options  If you have 2 or more ArenaSoft Databases and you are working in one of those  Databases  you can control whether a form pops open after you make a change to one of the database lines  Usually its  good to      the change that s automatically made in the other databases but there may be times when you do not need to  see it  This screen also lets you turn off Auto Synch
78. t item was used  Estimators who wish to use these features will learn about them later in this  manual           ArenaSoft    Estimating Version 2R80   User s Manual Page 9    Getting Started                For now you should try pressing F5 to  widen each line so you can see some of the  info that was copied into the estimate  This       Ec NL EET                           zz Concrete m               rcc mi  e cm       T additional info generates total man hours           Wem                  vt    and other info  Press F5 again to toggle                                                                                                  ED EM LE back to the normal view    Hui                esee RUE rar EE  maan   aman ens  lt   3  Simple vs  Complex Data  ArenaSoft     a x       makes it simple to work with either simple  Se mccum ee ta ES or complex data  You might be amazed but       some of the largest contactors in the county  work with simple data like the I  line we  typed  Unit prices are typed in  or they can  be stored in the database as simple  numbers  Other contractors want to work  with more complex data such as unit prices that are based on Crews  Labor rates  Productivity  Assemblies  and Material Price  List items  These topics are covered in detail later in this manual  In either case you simply click on lines of the database and  they are copied into the estimate                                           1  The    Enter Estimate    screen  has 2 more Click co
79. t us know there is a takeoff  Once a Takeoff has   been entered you can not change the Quantity directly any more  If you try to change the quantity  you will be reminded to  open the    Enter Takeoff    screen to edit the take off or delete it  You can use the constant boxes at the top of the    Enter   Takeoff    screen to multiply your quantities by 1 05 to add 5  waste  or divide by 27 to get cubic yards of concrete  or   divide by 9 to get square yards of Carpet  Clicking the appropriate pop up label fills in these constants for you  The Take    off form is very simple to understand and use    deliberately   so you will never make a mistake  Regardless of how you  label the columns  4 columns multiply and the right column divides    letting you do any math you require        Here s a Takeoff of  Brick Veneer  The  Label used was  simply    SF Vertical      Note how you can  subtract your window  openings  The Take           Oyi   nye   aya                                                                                               Sn           emp    off screen also has  two so sso Qmm    some buttons along     0000                the bottom for                Inserting a blank line   renumber the lines by  10   and the Copy   Paste Delete button                               Fett                 Dake   E ets you copy and   paste this take off to  another line of the estimate  Thus you can copy your cmu partition take off into a line for painting in 09900 and not do the
80. them with other lines as discussed for Exporting to accounting     Another approach is to duplicate your entire estimate  then use phony cost codes throughout your Tune up Table  see exporting to  accounting  and then switch the Export Summary screen to summarize by Cost Code     Yet  another approach is to duplicate your entire estimate  then delete lines or sections from the estimate  You can use the Adjust  Wizard to get the costs back where you originally had them  Then do the Export to Scheduling     2  Once you are happy with the Export Summary screen  Click    Step 2  Export Engine    on the Export Summary screen           ArenaSoft    Estimating Version 280   User s Manual Page 39    Linking to 3    Party Software             The Export Engine screen open  Note that both Microsoft  Step 2  Export Engine  Project and Primavera Scheduling are listed as Export    ON t UE AA Formats  Select your Scheduling Program     Ganang raga a TG ar a terar ty vai 5  asserta a dos one nd e nis If your Program is not in the       st  a new format can be    TET LL         added by clicking the    New Format  button  If you need  dammam assistance with a new Format contact ArenaSoft Support                            maa Wes d                        Click the Tips button to see if there are any specific   instructions for your Scheduling Program       Sanct MEE Click  Step 3  Create Export File   This creates a file that         be imported into your scheduling program                  
81. timate that match the values in  the Means book   also See the Workers Comp discussion above     b  Use TradeCity for Labor Equipment Rates  This option allows you to select a TradeCity for each Trade  s hourly rates and  Equipment hourly rates  This is like changing the Trade rates on the back cover of a Means Book to your own trade rates   Thus every line      the Means book can reflect YOUR trade rates  If you set up several Trade Cites  the TradeCity assigned to  an estimate as a Reference  will be the Trade City used for this estimate  To set up your TradeCity rates  you do it as  described in     Setting up Trades  Equipment  and Crew Rate Tables   except be sure to select the RS Means radio button on  the Trade Rate table  to display the Means Trades found on the back cover  Initially the rates are the same as the Means   book  but you can change them     Page 24 ArenaSofiTM Estimating Version 2880   User s Manual             RS Means Database                c  RS Means City Cost Index  This option turns on Means City Cost Indexes allowing you to select your State and City  By  selecting a city  ArenaSoft Estimating adjusts the entire Means database by a multiplier  Trade Rates no longer apply when  using this method        4  One of the 3 options above are set as a Reference when you fill in the  New Estimate  form  Thus you can be assured that all  Means lines copied into your estimate will be for the correct City  Opening the Means Click copy screen displays the  re
82. timating Version 2R80   User s Manual    Page 19    ArenaSoft Database              5  ArenaSoft Database    The ArenaSoft Database of costs is completely customizable  It is the heart of ArenaSoft Estimating because it stores all of the   basic and advanced features    ready to be copied into your estimate with a click  Many Contractors only need a single ArenaSoft  Database  But if you work in several cities with different costs  you can have a separate database for each city  ArenaSoft  Estimating makes it easy to maintain multiple databases  by synchronizing the databases     A  Using a Single ArenaSoft Database    1  The database can hold an unlimited amount of data  but we often see it used with just the basic lines rather than massive  quantities of lines  For example if you customize the Concrete section of the database to only hold the lines you use all the  time  you may have only 30 lines in the section  and for any single estimate you click on only 15 of the 30 lines  Because  you do not have to search through massive quantities of lines  doing an estimate is fast  and the database acts as a check list  5o you do not forget critical lines  The lines are worded the way you want them worded and the unit prices are correct for  your city   2  When you Click copy lines into your estimate  they come in to your estimate complete with any advanced items you use  This  saves you time when estimating   3  To make it easy to work on your database  we designed the database t
83. to open it like it was an estimate and customize it section by section  line by line   You can do this over time when you get a moment free  Your investment of time in your database will pay you back many fold   If you are a specialty contractor you may want to delete all the sections you do not use and add special sections that meet your  needs  To delete a lot of sections  open the Database like an estimate  Click the Make Sections button  Click on a section in the  green list and click the Delete button  You can hold the Control button on your keyboard and select many sections at one time   Then click the Delete button once              ArenaSoft    Estimating Version 2R80   User s Manual Page 21    ArenaSoft Database             C  Working with Multiple Databases     1  If you work in multiple cities  you will want an ArenaSoft Database  for each city to properly reflect significant cost  differences  When you start a new estimate  the New Estimate form lets you select which Database and which Trade City  you want to use for this estimate    2  To Create an Additional Database  By clicking the  Add a Database  button on the above screen  a wizard runs which  duplicates your original database and lets you select a new city for this new database  Thus the new database automatically  has been adjusted by a multiplier  and a new Trade City has been created with adjusted hourly rates for Trades  amp   Equipment  Also a new Material Price List column has been created and adjust
84. ware     1  Using the ArenaSoft CD   a  Insert CD disk into your CD drive  Wait a moment for the installer program to launch automatically and follow the on  screen instructions  If the installer program does not automatically start  then do step b    b  Double click My Computer   amp  double click your CD drive  D  ARENASOFT   If the installer program does not  automatically start  then double click the file    Setup     the icon looks like a little computer   2  After installing the software  you will see a shortcut icon on your desktop which you can double click to launch ArenaSoft  Estimating     2  Getting Started  A  Launch ArenaSoft Estimating        1  Double click the desktop shortcut  Click the    30 day Demo    button to use a fully functioning copy of the software to do real  estimates and save them  The Demo also contains a sample of RS Means data  At any time during or after the 30 days you can  click the  Purchase  button  This provides a Form which can be Faxed to ArenaSoft to obtain a matching PC Code  The PC  Code will permanently activate your software and all saved estimates will be retained  Fax the form to ArenaSoft at 518 207   9601  If you need more time and your demo expires  call ArenaSoft  toll free 888 370 8806  for a code to extend the demo  period        2  A Welcome Wizard opens an lets you enter your Company Name and Adjust the ArenaSoft Database to your city by using a  City Multiplier  Later you will learn how to customize the database with t
85. you select one or  u           m       more Whole Sections of your current  Sections          umm Fe Wn Tana sini     estimate and a  Delete them  or copy them     Ed into the current estimate or copying them            into a totally different estimate        to Delete     The screen let s you select one or more entire spec  sections and Delete them or Copy them to another  Estimate  You can select whether you want to  include the quantities and takeoff details  Coping  includes all the details that are part of any line in  the section  such as Labor Details  Assemblies  or  Material Price List items                     Curent Estimate  Selec Lines  conse         Fick Destination    Generel Oona            n   Ppa ie                        Bese Ba Ones Balang Samy                     Ecce          _  fe        PEE  Cent Piace Corcrere                         Mason             Cold Fore Mall Premna Include  Taable Sans    Eri 59     onum  Architectural Wonowork adi teen    Copy with New Status                         PCM PO             SubconmactorAnabsie    aaa          Enter Estimate    Form           Copy Paste Delete    button  This button       Pamaran                      o  EG      opens a screen which lets you select one or  E                              ul more lines    to Delete them  or copy them                Tan ies   E           to another location  You        even coy                                                                E      m   ma i y            
86. ystem                This setting can be changed any time by going to the    Ign 9 MainForm and clicking the Project Info button           Tiger tense oe suse ONEN LJ       Once your lines are displayed  you will note there are  some yellow column headings on the form  The yellow columns are the columns that get copied into your estimate  Click  the yellow headings to control which columns get copied If you make all 4 columns yellow  the Sub column reduces to  just the Sub s Overhead  amp  Profit so you do not duplicate the cost when all 4 columns are copied  No paper book can give  you this kind of flexibility  Justa single click on the line you want  and it is inserted into your estimate directly below the   line where you left your cursor    Workers Comp and Payroll Tax  This form has a check box for whether you want Workers Comp and Payroll tax included in the  labor column or the Sub column  A Means paper book displays Workers Comp  amp  Payroll tax in the Sub column  not the  Labor column  See the discussion under TradeCities for a further explanation of this setting  On this screen you can  change the setting temporarily without effecting other users or this estimate  references  This option must be off to see  numbers that match the Means paper book    Cost Options  There are 3 options in the upper right corner of the Means Click copy screen which affect the rates displayed    a  Means book   no adjustments  With this option selected  you can insert lines into your es
    