1.                                    9  43  Use of Lugs tor Wiring                                                                         9  44  Terminal BIOCKS                                     aE                                        9  AB           10  46                                                                                      EAS 10  AT SWC OS cs                                                               eaae                              cates 10  48                                                                            11  4 9  Panel                                                              enced          ee eee eee 11  4 10           5    0                                    R EE Ea ARA aie                                     11                                        11  6 2                                         5                        11  Tie                                                                        eke 11  8  Automation Design        Compatibility             c ccccccccccsssssssecececsssesssseseeeeecessesesaeeeseessesseaeaeeeeseseeeees 12  9     QUTABES sore Acie Seeders ear iste eA eT es He i de ee es 12    Scope of Work    1  General Description   This specification covers the technical requirements for the upgrading of the existing Tap Changer  Controllers at Cunningham Substation and Vuda NCC Substation for the 132 33kV Transformers  each  substation has two transformers  therefore a total of four  4  transformer tap changer
2.     Tender   MR 169 2015     Design  Build  Supply  Test and Commissioning of the Tap Changer Control Upgrade for 132 33kV  Transformers at Cunningham Road and Vuda NCC Substation    The Secretary Tender Committee  Fiji Electricity Authority   Head Office   Suva   Fiji    Hard copies of the Tender bid will also be accepted after the closing date and time provided a soft copy is uploaded in  the e Tender Box and it is dispatched before the closing date and time     Tenders received after 4 00pm on the closing date of Wednesday 25    November  2015 will not be considered   Lowest bid will not necessarily be accepted as successful bid     It is the responsibility of the bidder to pay courier chargers and all other cost associated with the delivery of the hard  copy of the Tender submission     TENDER SUBMISSION CHECK LIST    The Bidders must ensure that the details and documentation mention below must  submitted as part of their tender Bid    Tender Number    Tender Name       1  Full Company Name         Attach copy of Registration Certificate     2  Director Owner s         3  Postal Address        4  Phone Contact        5  Fax Number        6  Email address        7  Office Location        8  TIN Number         Attach          of the VAT Registration Certificate     Local Bidders Only     9  Company Registration Number         Attach copy of the Business License     10  FNPF Employer Registration Number         For Local Bidders only     11  Contact Person          declare t
3.    shall be of at least 1 5mm of thickness    4 1 4 Each cable chamber shall have cable entry from the bottom  suitable removable gland  plates  of 6mm Aluminum  shall be provided for this purpose  The cable chamber shall be    provided with suitable supporting arrangement between gland plates and terminals  in the  middle    4 1 5  A horizontal wire way with screwed cover shall be provided at the top  bottom to take  inter connecting control wiring  Separate and adequate compartments shall be provided  for accommodating instruments  indicating lamps  control fuses etc  These shall be  accessible for testing and maintenance without any danger of an electrical hazard    4 1 6 All similar materials and removable parts of the panel shall be interchangeable  The panel  shall be filled with the same family of switches for various ratings with a view to ensure  uniformity of design  maintenance and replacements    4 1 7 Painting shall be done by surface coating comprising pre treatment and curing  The  surfaces shall be chemically de rusted and degreased prior to painting  White colored  paint shall be applied as the finishing paint    4 2  Wiring   4 2 1 It shall be the responsibility of the bidder to do the control wiring from controller panel to  the respective input output points of the transformer   4 2 2 It shall be the responsibility of the bidder to do all the internal control wirings of the Tap  changer control panel  Supply of all types of the cables  control  serial etc 
4.   shall be the  bidder   s responsibility    4 2 3 Panel shall be supplied with all wiring comprising of PVC insulated 1  1 KV grade  multi   strand flexible copper conductor of 2 5 Sq mm cross section    4 2 4 Wiring associated with a particular phase shall be the color of that phase  Red  Yellow  or  Blue  Wiring associated with earthing shall be with green color insulation and for neutral it  shall be with black color insulation   4 2 5 Wiring shall be neatly laid and run on insulated cleats of limited compression type  insulated straps    4 2 6 All cables shall have crimped terminations and shall be identified by means of glossy  plastic ferrules at both ends  showing the wire number as indicated in the schematic  diagrams  The ferrules shall be indelibly marked    4 2 7 The cable laid between the panel and the transformer shall be done with armored  multicore cables   4 2 8 Wiring to items mounted on hinged doors or wiring that is subject to movement shall run  in helical binding  The binding shall be securely anchored at both ends and sufficient slack  provided to prevent any strain being imposed of wiring     4 3  Use of Lugs for Wiring  4 3 1 2 5mm_ Ring Lugs shall be used for wiring to the meters  switches  indicators and  controllers   4 3 2 All lugs shall be provided for terminations with 10  spare   4 3 3 Lugs shall be insulated type     4 4  Terminal Blocks  4 4 1 Terminal blocks shall preferably be grouped according to circuit functions and each  terminal block 
5.  controllers are  required  New tap changer controllers have to be installed complete with all accessories for efficient and  trouble free operation     The required equipment shall be manufactured as per the specifications listed in this specification  document  In case of any deviation from the mentioned  the vendor shall bring into notice the same  along with its offer  In absence of such deviation  it will be presumes that equipment offered is exactly  similar to the specification     The bidder s  will be evaluated based on the features  quality  technicality and durability of the design     2  General Scope  It is the complete responsibility of the bidder to     2 1  Design   2 2  Build   2 3  Transport  Supply and Deliver   2 4  Insurance to Site   2 5  Install and Test   2 6  Provide Training   2 7  And Commission the Tap Changer Control Unit    3  Tap Changer Controller   The preferred tap changer controller shall be of Brand     Maschinenfabrik Reinhausen  MR    TAPCON  ISM or an alternative of brand DRMCC  Each transformer shall have one  1  controller of its own  The  controllers shall be custom programmed with respect to the details provided below     3 1  Cunningham Substation  3 1 1 Number of Transformers   2  3 1 2 Voltage Rating     132 33kV  3 1 3 Power Rating     40 60MVA  3 1 4 Number of taps     19  3 1 5 Tap changer Drive Mechanism Motor   3 Phase  415V  3 1 6 Tap Position Detection Provision      3 1 7 Parallel Operations     Both controllers shall be p
6.  the same tap as of the Master     4 7 1 2 3  Independent     this selection shall apply to both the transformers at the  same time to make their Tap Change according to the load on each  transformer     4 7 2 There shall be individual switch for each Transformer Controller for manual Tap Change  locally  It shall be of Spring Return Push Button  whereas the Green colored button shall be  used to raise the tap position and the Red colored button shall be used to lower the tap  position     4 8  Indication  4 8 1 There shall be 1 5Watt Orange LED Lights  for indication of Tap Position for each  Transformer  Each Transformer has 19 Taps in total  thus nineteen  19  indications   4 8 2 There shall be 1 5Watt Red LED Light  to indicate the Tap Change Process  This shall glow  till the process is going on and turn off as the Tap Position changes     4 9  Panel Protection  4 9 1 The main AC and DC incoming wires shall have appropriate MCB   s  The devices on the  panel shall also each have an appropriate MCB each   4 9 2 There shall be an earth bar mounted at the bottom of the panel which shall only connect  the earthing of all the required devices in this panel   4 9 3 All front mounted as well as internally mounted items including MCBs shall be provided  with individual identification labels  Labels shall be mounted directly below the respective  equipment and shall clearly indicate the equipment designation  Labeling shall be on  aluminum anodized plates of 1mm thickness  letter
7. a    FIJI ELECTRICITY AUTHORITY    BIDDING DOCUMENT    MR 169 2015    DESIGN  BUILD  SUPPLY  TEST and  COMMISSIONING OF THE  TAP CHANGER CONTROL UPGRADE FOR  132 33kV TRANSFORMERS AT  CUNNINGHAM ROAD AND VUDA NCC  SUBSTATION    Section 1  Instructions to Bidders    1  Scope of Bid    2  Eligible Bidders    2  Eligible Materials   Equipment and  Services    3  Qualification of the  Bidder    4  Cost of Bidding    5  Site Visit    6  Sealing and    The Fiji Electricity Authority  hereinafter referred to as  the Employer    wishes to  receive bids for full DESIGN  BUILD  SUPPLY  TEST and COMMISSION TAP CHANGER  CONTROL UPGRADE FOR 132 33kV TRANSFORMERS AT CUNNINGHAM ROAD AND  VUDA NCC SUBSTATION as defined in these bidding documents  hereinafter  referred to as  the Works       The successful bidder will be expected to complete the Works within 12 Months  from the date of commencement of the Works     This Invitation to Bid is open to bidders who have sound financial background and  have previous experience in handling such projects     Bidders shall provide such evidence of their continued eligibility satisfactory to the  Employer as the Employer shall reasonably request     Bidders shall not be under a declaration of ineligibility for corrupt or fraudulent     The materials  equipment  and services to be supplied under the Contract shall have  their origin from reputable companies from various countries and all expenditures  made under the Contract will be limited to such mate
8. early marking each one as   ORIGINAL   PROPOSAL   and    COPY PROPOSAL   etc  as appropriate     The bidder shall seal the original bids and each copy of the bids in an inner and an  outer envelope  duly marking the envelopes as  ORIGINAL  and  COPY      The inner and outer envelopes shall    be addressed to the Employer at the following address   Tuvitu Delairewa  General Manager Corporate Services  2 Marlow Street   Suva   FIJI   Phone  679 3224 185 Facsimile  679 331 1882  Email  TDelairewa  fea com fj  And  bear the following identification       Bid for  DESIGN  BUILD  SUPPLY  TEST and COMMISSIONING OF  THE TAP CHANGER CONTROL UPGRADE FOR   132 33kV  TRANSFORMERS AT CUNNINGHAM ROAD AND VUDA NCC  SUBSTATION              Tender Number  MR 169 2015     DO NOT OPEN BEFORE     26  November  2015    Bids must be received by the Employer at the address specified above no later than  Wednesday  25  November 1600 hours  Local Fiji Time      The Employer may  at its discretion  extend the deadline for submission of bids by  issuing an addendum  in which case all rights and obligations of the Employer and  the bidders previously subject to the original deadline will thereafter be subject to  the deadlines extended     Any bid received by the Employer after the deadline for submission of bids  prescribed in Clause 23 will be rejected and returned unopened to the bidder     The bidder may modify or withdraw its bid after bid submission  provided that  written notice of the modificati
9. g any innovation in design  incorporated into design incorporated into design  13 Installation of new panel and replacement of 5 00 Will require minimal tools and Will require some tools and Will require all tools and equipment from FEA    existing panel    equipment from FEA for installation    equipment from FEA for installation    for installation          14 Delivery period and timeline 5 00 Delivery period is within 18   24 Delivery period is within 24   28 Delivery period would exceed 28 weeks and  weeks        installation is within 2     weeks and installation is within 3   4   installation would also exceed 4 weeks       3 weeks weeks   15 Quality Control 5 00 Manufacturer has quality system in   Manufacturer appears to have a Manufacturer has a record of providing  accordance with international quality system in place  reasonable quality material but provides no  standards and produced evidence evidence of a quality system    of regular third party audits       Total 100        Tender Submission   Instruction to bidders      ma    To register your interest and tender a response  view    Current Tenders    at  https   www tenderlink com fea  For further information contact The Secretary Tender Committee  by e mail TDelairewa fea com fj    In additional  hard copies of the tender  one original and one copy must be deposited in the tender box located at the FEA Head  Office  2 Marlow Street  Suva  Fiji no later than 4 00pm  on Wednesday 25  November  2015  Addressed as
10. group shall have at least 10  spare terminals  Terminal blocks for control  circuit shall be greater than 650V grade with contact ratings not less than 10A     4 4 2  Not more than two wires shall be connected to any terminal block  All terminal blocks  shall be mounted on a rail and shall be at a place easy to access    4 4 3 Clip on terminals of at least 650 V grade shall be provided for the cables up to 35  mm  Preferable terminal blocks which shall      used        DIN rail Clip On Screw  Connection  product of Klemsan     4 5  Earthing   4 5 1 All the metal parts of all equipment supplied within the panel  including doors and gland  plates  other than those forming part of all electric circuit  shall be connected by means of  two independent earth conductors to copper earth bar    4 5 2 The Panel shall be provided with two brass earthing stud terminals  with suitable nuts   washers etc  for connection to ground bus    4 5 3 There shall be a single Cupper Earth Bar in the panel common for all Earth Points  This shall  be size of 10mm thickness  30mm of width and a length of at least 500mm     4 6  Labels   4 6 1 Labels shall be provided to describe the duty of or otherwise identify every Instrument  or  other item of equipment mounted internally and externally  Switch positions shall be fully  identified  Wording shall be clear  concise and unambiguous   4 6 2 Each label shall be permanently secured to the panel surface below the item to which it  refers    4 6 3 The labe
11. hat all the above information is correct     
12. ls shall be engraved plastic  4 mm thick  with bold white letters in black  background     4 7  Switches  4 7 1 There shall be individual switch for   4 7 1 1  The control of Remote Local Automatic selection  This shall be a Three  3   position rotary cam changeover switch  Each selection have its own control  The    4 7 1 1 1  Remote   this selection shall put control the National Control Center   NCC  on control over the Tap Changer Control  whereby  NCC shall be able to  Raise or Lower the Tap position via SCADA Control remotely    4 7 1 1 2  Local     this selection shall put the hard wired switches on control  This  includes the Raise and Lower of Tap Position and putting each controller to  either Master or Follower position or both to Independent    4 7 1 1 3  Automatic Control     this selection shall place the Tap Controller to fully  control of Tap Changer according to the load on the transformer     4 7 1 2  The control of Master Follower Independent  This shall be a Three  3  position  rotary cam changeover switch  Each selection have its own control  For this  operation  any one of the controller shall be Master and the other shall be Follower  or both can be Independent  The   4 7 1 2 1  Master     this selection shall put the controller in charge of the Tap  Change     4 7 1 2 2  Follower  this selection shall work in accordance to the Master  selection  Whereas  if the Master Controller changes the Tap Position of its  Transformer  the Follower shall change to
13. more than ten  10  hours of duration  Also  the outages can only take place on a Sunday   excluding any festival celebrations namely Easter  Fiji Day  Diwali and Christmas etc                                               Criteria for Evaluation Weighting Score Range  10 8 7 4 3 0  1 Manufacturer s years of experience in 10 00 Manufacturer has more than 30 Manufacturer has less than 30 Manufacturer has less than 10 years     production years    experience years    experience experience  2 Bidders experience in Similar projects     10 00 Company has done more than 50 Company has done 20   50 projects   Company has done less than 20 projects of  Design  Build  Supply and Install projects of similar nature of similar nature similar nature  3 Number of years the offered model has been 5 00 Model has been in the market for Model has been in the market for 15   Model has been in the market for 10   15 years  in production and in the market more than 20 years   20 years  4 Number of years of experience of key 5 00 More than 10 years for most of the   Less than 10 years for most of the Less than 5 years for most of the key  personnel to be involved in project key personnel key personnel personnel  5 Manufacturer s Warranty on Tap changer 5 00 More than 4 years 2 4 years Less than 1 year  Controls  6 Type test reports on tap changer control units 5 00 Results meet and exceed the Results do not meet minimum Type test reports not submitted or not as per  requirements as per IEC standard
14. of the Works by the Contractor as prescribed by the Contract   hereinafter and in the Conditions of Contract called  the Contract Price       The notification of award will constitute the formation of the Contract     Upon the furnishing by the successful bidder of a performance security  the  Employer will promptly notify the other bidders that their bids have been  unsuccessful    At the same time that he notifies the successful bidder that its bid has been  accepted  the Employer will send the bidder the Form of Contract Agreement  provided in the bidding documents  incorporating all agreements between the  parties     Within 7 days of receipt of the Form of Agreement  the successful bidder shall sign  the Form and return it to the Employer     The Employer requires that the Contractor observe the highest standard of ethics  during the procurement and execution of such contracts  In Pursuance of this  policy  the Employer      a  defines  for the purposes of this provision  the terms set forth  below as follows      i  corrupt practice  means behavior on the part of  officials in the public or private sectors by which  they improperly and unlawfully enrich themselves  and or those close to them  or induce others to do    so  by misusing the position in which they are  placed  and it includes the offering  giving  receiving  or soliciting of anything of value to influence the  action of any such official in the procurement  process or in contract execution  and     ii     f
15. on or withdrawal is received by the Employer prior  to the deadline for submission of bids     The bidder s modification or withdrawal notice shall be prepared  sealed  marked  and delivered in accordance with the provisions of Clause 22  with the outer and  inner envelopes additionally marked  MODIFICATION  or  WITHDRAWAL   as    10  Employer s Right  to Accept any  Bid and to  Reject any or all  Bids    11  Notification of  Award    12  Signing of  Contract  Agreement    13  Corruptor  Fraudule  nt  Practices    appropriate  A withdrawal notice may also be sent by fax but must be followed by a  signed confirmation copy     No bid may be modified by the bidder after the deadline for submission of bids     Notwithstanding Clause 34  the Employer reserves the right to accept or reject any  bid  and to annul the bidding process and reject all bids  at any time prior to award  of Contract  without thereby incurring any liability to the affected bidder or bidders  or any obligation to inform the affected bidder or bidders of the grounds for the  Employer s action     Prior to expiration of the period of bid validity prescribed by the Employer  the  Employer will notify the successful bidder by fax  confirmed by registered letter   that its bid has been accepted  This letter  hereinafter and in the Conditions of  Contract called the  Letter of Acceptance   shall name the sum which the Employer  will pay the Contractor in consideration of the execution  completion and  maintenance 
16. raudulent practice  means a  misrepresentation of facts in order to influence a  procurement process or the execution of a contract  to the detriment of the Employer  and includes  collusive practice among bidders  prior to or after  bid submission  designed to establish bid prices at  artificial non competitive levels and to deprive the  Employer of the benefits of free and open  competition      b  will reject a proposal for award if it determines that the  bidder recommended for award has engaged in corrupt or  fraudulent practices in competing for the contract in  question     Furthermore  bidders shall be aware of the provision stated in Sub Clause 1 16 and  Sub Clause 15 5 of the Conditions of Contract  Part Il   Conditions of Particular  Application     Contents                     WOK                                                           7  1     General     5                                es 7  2  G   neral SCOP Gis                               a e aa E aat 7  3         Changer                                                                                     7   3 1   Cunningham 50                                                                             7  3 2           Substation                                                 adie 7  4         changer Control Panel           cccccccssssssececececsesssssseceeccssceseaeaeeesecesseseeaeseceesessseseeaeseeeeeeesseseneseeeeeens 8  AA                              8  AD                                          
17. rials  equipment  and services   At the Employer s request  bidders may be required to provide evidence of the  origin of materials  equipment  and services     To be qualified for award of Contract  bidders shall submit proposals regarding    1  Work methods   2  Work scheduling and   3  resourcing  This shall be provided in sufficient detail to confirm the bidder   s capability to  complete the works in accordance with the specifications and the time for  completion     The bidder shall bear all costs associated with the preparation and submission of its  bid and the Employer will in no case be responsible or liable for those costs     The bidder is advised to visit and examine the Site of Works and its surroundings  and obtain for itself on its own responsibility all information that may be necessary  for preparing the bid and entering into a contract for the design build and  completion of the Works  The costs of visiting the Site shall be at the bidder s own  expense  The pre bid meeting is scheduled at 10 00a m on Wednesday 28   October at Cunningham Rd Substation  Suva  Fiji and Thursday  29  October at  132kV Vuda Substation  Lautoka  Fiji     The bidder shall seal the original copy of the technical proposal  the original copy of    Marking of Bids    7  Deadline for  Submission of  Bids    8  Late Bids    9  Modification and  Withdrawal of  Bids    the price proposal and each copy of the technical proposal and each copy of the  price proposal in separate envelopes cl
18. rogrammed to operate as Master   Follower    3 2  Vuda Substation  3 2 1 Number of Transformers   2  3 2 2 Voltage Rating     132 33kV  3 2 3 Power Rating   30MVA  3 2 4 Number of taps     19    3 2 5 Tap changer Drive Mechanism Motor   3 Phase  415V   3 2 6 Tap Position Detection Provision       3 2 7 Parallel Operations     Both controllers shall be programmed to operate as Master   Follower    3 3  The controller shall    3 3 1 Communicate via SCADA DNP3 and IEC61850 Protocol   3 3 2 Communicate through Fiber Optics   3 3 3 The controller shall be programmed to interpret the Remote Manual Auto function from  the switch   This is further explained below under    Switches        3 3 4 The controller shall be programmed to interpret the Raise Lower function from the switch  to Raise or Lower the Tap Position   This is further explained below under    Switches         3 3 5 Be programmed to operate the Master Slave Protocol  There shall be a hard wired  selector switch whereby it shall determine which controller shall be put into Master and  Slave    3 3 6 Display the Tap Number  Tapped Voltage and any other necessary details    3 3 7 The controller itself shall be programmed to rise and lower the tap positions with the use  of switches     3 4  The controller shall be able to interpret the manual inputs hardwired switch inputs  These          3 4 1 A selector switch to determine the controller operation to be Manual Remote Auto   3 4 2 A selector switch to determine each cont
19. roller to be either Master or Follower   3 4 3 A push button under each controller to raise or lower the tap position     Tap changer Control Panel    4 1  Construction   4 1 1 The panel shall be metal enclosed  free standing type suitable for indoor installation  The  panel shall be dust and vermin proof and the enclosure shall provide a degree of  protection not less than IP 65  The height of the panel shall not be more than 2200mm  and the depth shall not exceed 800mm  The panel shall be sized large enough width wise  such that two tap changer controllers can be placed side by side  Also  the switches   indications and meters shall be properly spaced and correctly placed to avoid confusion    4 1 2 The tap changer controllers shall be flush mounted on the face of the panel  side by side   with all the necessary control underneath the controllers    4 1 3 The panel shall be fabricated and properly supported using C Channel or Angle Line metal   so the frame does not deteriorate from its shape in due time  The whole panel shall be  mounted on a base frame made out of hot dip galvanized structure  Joints of any kind in  sheet shall be seam welded  all welding slag grounded off and welding pit wiped smooth  with plumber metal  All panels and covers shall be properly fitted and made square with  frames  All the holes in the panels shall be correctly positioned  Self threading screws shall  NOT be used in any construction works  The metal sheet  for the construction of the panel
20. s   specifications IEC standards  7 Conformance to acceptable values for routine 10 00 Submits evidence that the system   Submits evidence that system will No evidence of conformance to test  tests as specified in tender will conform  amp exceed requirements   conform to most requirements requirements  8 Comprehensiveness of proposed design 10 00 All the design details are Relevant design details are Extent of consideration placed into design is  addressed as that would be addressed in terms of design as significantly less than that expected          expected in an ideal proposal  that compared to an ideal proposal    reasonable proposal  Most of the items stated  in specifications are not met   9 Tap Changer Control Panel Evaluation 10 00 Meets all the technical Meets only the basic requirements   Meets only the mandatory requirements of the  requirements as in the of the specification  Proposed specification  specification  All technical details technical data is acceptable but  match with design requirements does not match with specification  10 Maintenance Requirements for the tap 5 00 Needs maintenance every 5 years   Needs Maintenance every 3  5 Needs Maintenance every 1   2 year  changer control Unit or more years  11 Job Safety Requirements 5 00 Meets and exceeds the safety Meets most of the safety Does not meet the level of safety required  requirements requirements  12 Innovation in Design 5 00 High degree of innovation Evidence of some innovation No evidence showin
21. s are to be properly engraved   4 10  Panel Structure  There shall be provision for each cable chamber  where it shall have cable entry from both  top and bottom  suitable removable gland plates shall be provided for this purpose  The  cable chamber shall be provided with suitable supporting arrangement between gland  plate and terminals  in the middle     5  Training  The bidder shall provide rigorous hands on and theoretical training to the Engineers and technicians on  operations  troubleshooting and maintenance of the Tap changer controller unit     6  User manual for operations   The bidder shall provide a comprehensive user manual  which has complete instructions of operating  the Tap Changer Control Unit  The user manual shall be in simple straight forward English and shall be  unambiguous     7  Drawings  The bidder shall also provide ALL the single line drawings of the controls wiring done inside the panels  and the control wirings done outside the panels i e  Transformer     panel etc     8  Automation Design and Compatibility   The IEC 68150  Design of Electrical Substation Automation  standard and DNP 3 0 Protocol shall be used  to design the automation systems  The system shall be able to operate in both  however  the system  shall be taken over by DNP 3 0 protocol     All hardware in the designs shall be compatible to these protocols     9  Outages   The bidder shall propose the number of outages required to complete the entire cutover  One outage  shall not be 
    
Download Pdf Manuals
 
 
    
Related Search
 here  hereditary  heretic  hereditary angioedema  heredity  here movie  here comes the sun  heretic definition  hereditary meaning  hereinafter  heresy definition  here\u0027s johnny  hereditary movie  hereby  here comes the guide  hereditary hemochromatosis  here comes the sun lyrics  heretic movie  hereditary spherocytosis  hereditary hemorrhagic telangiectasia  herencia  here to slay  hereditary angioedema treatment  heredia costa rica  heretic game  heretic streaming 
    
Related Contents
Guía del usuario de la pantalla con rotulador interactivo SMART    Installation manual - SUNNY ISLAND 3.0M / 4.4M / 6.0H / 8.0H  User Manual - Interequip  カタログダウンロード - SHINDENGEN 新電元  La tradition à la rencontre de l`innovation  My Passport Slim User Manual    Flytech POS 460 User`s manual  MANUAL DE INSTRUCCIONES Mod. 3150    Copyright © All rights reserved. 
   Failed to retrieve file