Home

BGA IRDA-WELDER USER MANUAL MODEL: T-890

image

Contents

1. be oo Situp 141011 h st Ana aad VP MP ag 1 Ae iat ee es 6053 T se _ mle Wave six use the same with unsoldering high melting point lead free paste like Sn Ag3 5 Sn Cu 75 Sn Ag4 0 Cu 5 n95 5 Ag3 8 Cu0 7 Http www tech168 cn 8 IRDA WELDER T 890 USER MANUAL Wave seven use the same with soldering lead free solder in melting point like Attentions 1 According to the chips size and welding technological requirements select the right wave to unsolder the chips use tweezer or vacuum nozzle to remove the chips 2 Infrared lamp temperature wave set temperature and the rate of time can not be greater than 2 S each time setting value cannot exceed 250 seconds 3 If you want to reset to Factory Default press F1 and F5 at the same time then turn on the power switch when heard continuous buzzer 15 ok 4 There are lot kinds of solder paste every company chooses 15 also not identical Http www tei h 16 Q cn IRDA WELDER T 890 USER MANUAL For these reasons we design this product can set eight waves each wave has eight sections each section of the heating time and temperature all can alter You can reset the heating waves according to the solder required heating temperature and time
2. Foundation for wave set 1 The reflow soldering theory and the temperature wave When the PCB board goes into heat up area dry area the solvent and gas in the solder paste will evaporate At the same time the flux can wet the pad and the component tip and foot The solder paste melts caves in and covers the pad leading to the pad and component pins insulate the oxygen PCB board goes into heat preservation area PCB board and components get full preheating In case of damaging the PCB and components when it goes into the welding area and the temperature heats up quickly When PCB board goes into the welding area the temperature heats up and the solder paste melts PCB board goes into cooling area Then the liquid solder paste the soldering points solidify The reflow process is finished The temperature is the key to welding quality The actual and the setting temperature warming slope and the peak temperature should be accordant Before the temperature reaches 160 please control the heat up speed in about 1 C If heat up too quickly the PCB board and the components will be damaged and the PCB board may be out of shape On the other side the flux volatilizes too fast And it is easy to make soldering tin ball Set the peak temperature 20 40 higher than the solder paste melting point Set the reflow time 10S 60S If the peak temperature is low the reflow time is short it will affect the welding quality and serious is Ht
3. press F1 F2 buttons forward and backward to select different time press F5 button to save the grid disappear change to the previous flicker status press F4 button come to next Segment the same method to set the wave press button to save the current Wave The flicker grid Http www tech168 cn 6 IRDA WELDER T 890 USER MANUAL 5 Press F2 button the lamp starts heating up according to the setting temperature 6 Each temperature wave purposes as follows Wave one use the same with soldering the less lead paste like 85Sn 15Pb 70Sn 30Pb Wave three use the same with soldering the more lead paste like 63Sn 37Pb 60Sn 40Pb 380 a aa 4 2237 z iis ee gt Ta LES ra AVNA oe Sie 4 IRDA WELDER T 890 USER MANUAL Wave four use the same with unsoldering the more lead paste like 63Sn 37Pb 60Sn 40Pb Wave five use the same with soldering high melting point lead free paste like Sn Ag3 5 Sn Cu 75 Sn Ag4 0 Cu 5 n95 5 Ag3 8 Cu0 7 Mt Le en ees ae eee ie ag se B biij waa a _ a
4. Woes FLoOte I MISL nil 190 Bot 1208 pe 3456 7 8 time 5 2 Temperature wave selecting page Http www tech168 cn 4 IRDA WELDER T 890 USER MANUAL 4 Press F2 button the infrared lamp start to heat up as the presupposed temperature wave The preheater temp The lamp temp 5 3 the LCD screen display page 5 When the process finished return the previous page automatic If you want to stop in the process press F3 button 2 The wave selection and setting 1 Press F2 button enters to the select set page firstly set the preheating chassis preheat temperature press F3 F4 buttons up and down to select different temperature press F1 button to save When save succeed the LCD screen displays as follows The preheater temperature 2 Press F5 button to the Main Manu page press F2 button enters to the select set page the LCD screen displays as follows Http www tech168 cn 5 IRDA WELDER T 890 USER MANUAL 3 Press F2 button enters to the select set page following we provide eight different wave cycles please choose one according to your request press to confirm the wave you choose press F2 button come to the Main Manu page 4 If you want to reset the wave press F5 button when it flicker the grid you can set Press F3 F4 buttons up and down to select different temperature
5. BGA IRDA WELDER T 890 USER MANUAL BGA IRDA WELDER USER MANUAL MODEL T 890 PUHUI ELECTRIC TECHNOLOGY CO LTD http www tech168 cn IRDA WELDER T 890 USER MANUAL Features 1 This machine has the strong and perfect function selection with eight temperature waves in the memory software you can select the right temperature wave according to the solder unsolder request 2 Intelligent temperature wave heating can achieve the solder unsolder automatically 3 Three dimensional adjustable lamp body use laser light suitable for unsoldering any angle components 4 PID intelligent temperature control can avoid the IC damage due to the fast or uninterrupted warming up 5 This machine has a super hot melt system use infrared welding technology which is developed independently heat is easy to pierce and distribute evenly can suit for a variety of computer notebook play station s components especially in a Northbridge Southbridge chipset of computer 6 Friendly human machine operation interface perfect LCD display you can watch the whole repairing process very clearly 7 Ergonomic design practical and easily operated Good build quality but at the same time light weight and a small footprint allows the T 890 to be easily bench positioned transported or stored Technical parameters Complete machine power 1500W Rated voltage and frequency AC 110 230 V 60 S0Hz Infrared lamp body power 300 W Preh
6. eating chassis power 1200 W Working bench size 320 X 330 mm Http www tech168 cn 1 IRDA WELDER T 890 USER MANUAL Description of the main parts 1 Welding table main body Lamp body hee s a Portal frame gt Focusing knob Circuit board support Preheating chassis Slide support SS j 890 Front panel panel o AOSA Http www tech168 cn 2 IRDA WELDER T 890 USER MANUAL 2 Front panel Display screen Indicator light 3 Portal frame and lamp body Moving hand wheel Lamp body adjust knob p Circuit board support Lamp connecting line Focusing knob Http www tech168 cn 3 IRDA WELDER T 890 USER MANUAL Operating instructions 1 Examination and operation 1 Place this machine on an even surface with good ventilation and no combustible items nearby Leave at least 20mm on either side because the machine will emit heat when in use Check the power supply voltage connect the machine with the power supply turn on the power switch the LCD screen will display as follows 5 1 Main manu page 2 Press F1 button about 2 seconds the preheating chassis starts to work press F1 button again to stop 3 Press F3 button enters to the PCB temperature adjusting page press F2 select different page press select the temperature wave The example shows wave 3
7. ectly preheat up according the solder ball reflow temperature reflow and weld and cool down Sealing off repair various kinds of the components like CPU and GAP socket The operation is as follow first use the aluminized paper to mantle the PCB fear heat part and the other components Then fix well the PCB board on the PCB board Http www tech168 cn 12 IRDA WELDER T 890 USER MANUAL support Then set the PCB preheat temperature between 160 and 180 and put the temperature sensor near the sealing off component Turn on the preheat plate for 3 5 minutes or more You can seal off when the component is equally heated Specially should turn on the upper infrared lamp to heat up which can seal off quickly For the double side board you can choose low temperature to preheat up the PCB board and then use the upper lamp to heat up 4 Caution and direction when sealing off repair process 1 When the chip with waterproof solid sealing compound can use sol hydrosol and other measure to sol Pay attention to control the temperature when sealing off In order to prevent the temperature sensor moves that lead to the temperature measurement isn t exact And the chip is heat for too long time and the temperature is too high leading the chip heat damaged 2 When the chip is big for example computerboard XBOX360motherboard When sealing off repair big PCB board chip for example the computer board XBOX360 motherboard and so on must c
8. ertainly carry on the whole board preheat and dry or according to the factory technological requirement also may depend on the experience to process Only then processes appropriately can prevent effectively the PCB board distortion and produces from this faulty soldered joint chip rake when sealing off repair chip 3 To the simple packaging chip please pre paste aluminized paper on the middle of the chip avoiding to heat the chip too hot to crack The aluminized paper size should be a little bigger than the chip Insure the size isn t too big or it will affect the result of welding In the sealing off repair process the infra red lamp shines In the region Http www tech168 cn 13 IRDA WELDER T 890 USER MANUAL all plastic plug in unit carries on the cover using the aluminum tin foil prevented high temperature infrared dries the distortion or the harm But it is not wraps completely 4 Clean and dry the PCB board after reflow and dry it the check it 1f it is not good can reflow again If it is still not good enough please operate the whole process again Daily maintenance 1 Clean the heating pipe of the lamp body bottom after the machine has been used for a period of time 2 Use the oil to clean the slipper of the connecting rod the guide rod polish rod etc 3 Do not cut the power off right after the work finished You need wait until the fan cools down so that to prolong the useful time Cautions 1 Be careful of
9. operating under high temperature condition 2 Pull out the power if don t use the machine for a long time Warranty The complete machine has a warranty period of 1 year from the time of purchase and lifelong service support as well as a long term factory price supply The life of the infrared lamp should be around 1000 working hours guaranteed usable for 3 months We provide online Q A and troubleshooting support and technical advice service Statement The images and screenshots In this product manual may vary slightly from the actual purchased product Http www tech168 cn 14
10. the ideal distance between the lamp holder and chip is 20 30mm Http www tech168 cn 11 IRDA WELDER T 890 USER MANUAL 3 Adjust the infrared lamp temperature sensor Put the infrared lamp temperature sensor on or around the chip Then adjust the place of PCB board preheat temperature sensor letting the sensor contacts the preheat plate well In order to let the temperature measurement exact put some flux around the chip and the head of sensor At the same time the BGA pad will be in good condition Can effectively prevent the pad be adhered and prevent the pad has tin burr 3 Sealing off repair process The general sealing off process fasten the PCB board adjust it and the place of lamp make the infrared lamp laser aim at the chip and adjust the height of the lamp place the infrared lamp temperature sensor put some flux set the temperature of preheat plate Then choose the temperature wave of the lamp turn on the preheat plate and infrared lamp to heat up When reach the peak temperature or the chip pad melts put away the chip by the tweezer or vacuum nozzle After carry out the infrared lamp temperature wave it comes back automatically When the main body cools down well you should turn off the power supply The general reflow process operation the operation is about the same to the sealing off The differences are as the follow first clean the pad and plant the solder ball preheat up the PCB board place the chip dir
11. tp www tech168 cn 10 IRDA WELDER T 890 USER MANUAL causing the solder paste does not melt If the peak temperature is high or the reflow time is long the metal power will be oxidized and affect the welding quality and serious is causing the component and PCB board damaged 2 The set of temperature wave Set the wave according to the solder paste and the above foundation Different solder paste choose and set different waves In addition the temperature wave has related to the PCB the density and size of components Generally lead free welding temperature should be higher 40 than melting point Instructions 1 Examination and starting Inspect the infrared lamp body temperature sensor and power line to check if they are in good connection 2 Adjustment and preparatory work before sealing off repair 1 Put and adjust the PCB board Pull out the slid support unscrew the closing handle on the bracket adjust the PCB board bracket and put the PCB board aim at the bracket rabbet Put the PCB board on the socket screw the closing handle on the PCB board bracket fix well the PCB board move the slid support to choose the suitable operating position 2 Adjust the infrared lamp holder Unscrew the lamp body closing handle move the lamp handle and make the infrared lamp laser aims at the middle of the sealing off repairing chip screw the lamp body closing handle Adjust the lamp body height by adjust whirl the focusing knob And keep

Download Pdf Manuals

image

Related Search

Related Contents

HSM BS10Cs  JORNAL DO LLOYD JULHO 2013 PB.pmd  Air Handling Unit Systemair VR User manual  AN2 ZestETM1 User Interface Examples  TRAITEMENT DES SUPPORTS ET PRIMAIRES  FREE DYMO label printer when you buy 15 LW  Smeg PV640N hob    Samsung SGH-C170 Vartotojo vadovas  

Copyright © All rights reserved.
Failed to retrieve file