Home
PDF_manual
Contents
1. User Manual for Separera 30 Engelska Congratulations on your purchase of a Separera 30 Before installing your new Separera 30 we recommend that you read through this instruction in its entirety We know from experience that the faults which may occur almost always has to do with installation and maintenance In order to get a hassle free use take a moment and go through the instruction It is absolutely worth it A Separera which has been properly installed is completely odour free If odour should appear you have most likely missed or misunderstood something in the use and care manual Ve mention this now to remind you how important it is to get the toilet correctly installed from the start reading this manual is the best guarantee to reaching full product satisfaction Important things to always remember The moisture content is an important component of the biological process so it is important to retain the moisture as long as possible even when the toilet is switched off Apart from the natural needs being taken care of during a visit to the toilet the only thing that should go into the toilet is toilet paper How the Separera 30 works This urine separating toilet is constructed from eco friendly material and is designed to cope with high demand over many years What does separating waste mean Well the toilet is designed so that on any toilet visit solid waste is separated from the liquid urine This means that
2. Separera has two chambers one for urine and another for solid waste Both must be dealt with in accordance with local regulations Contacting Environmental Health Contact Environmental Health office regarding local health regulations This always applies when installing any type of toilet The Separera box contains Toilet with fan Lide Urine hose 1 5 m Screw with washer for wall bracket according to option A Special Humus Ventilation Pipe 50 cm for wall e Mesh Cover 2 Composting Chambers 40 litres Latrine Bags 10 The installation kit accessories The installation kit contains ventilation pipes 4xI m ventilation pipe with 55 mm outer diameter exterior pipe I x I lm with I 10 mm outer diameter insulation 2 x m reducing coupling roof flashing and insect netting The connection kit used in installation option B can be ordered by your retailer Further accessories Pipe Bends 30 and 45 Insulation Ventilation Pipe Special Humus Ejector Tank Latrine Bags Separera In cross section Upper section 2 Toilet seat 3 Air intake 4 Screen 5 Urine bowl 6 Urine hose 7 Optional ways to lead out the urine 8 Plug Cord 9 Inside container with a plastic bag 10 Lower section I I Fan motor 12 Handle 13 Wall bracket 14 Cover MAIN TENANCE Urine drainage Urine can be drained away in a number of different ways Check what is required by your local author
3. ing to chosen option 7A or 7B e Position the lower section 10 against the external FAN fix the cover using screws and nuts Np Z wall of the room pre mounted e Mark for wall brackets screws ventilation pipe and hose e Measure and drill a hole in ee ae w the roof for the ventilation A es pipe 55 mm Saw a hole for the urine hose 25 mm e Pass the urine hose ed ption B through the floor wall from above and seal with silicone e Set the lower section in position and seal between the floor and the toilet Connect the urine hose to the urine bowl Fix the hose using hose clamps being careful not to damage the nipple e Mount the ventilation pipes unsleeved end into the rubber coupling Screw the toilet securely to the wall using screws and washers a sealing using asphalt sealant roof covering tile felting or tin plastic e Install the ventilation pipe and seal the passage through the exterior roof using asphalt sealant to prevent leaks non sleeved sleeved pipe B1 B2 Use no more than 2 pipe bends and none over 45 angle to ensure a natural draught Insulate all piping that passes through cold spaces e g in the loft and on the outside of the building this is to prevent condensation e Cut the exterior pipe to fit the angle of the roof e Position the roof flashing use soapy water to make this ea
4. ity there are variations depending on ground conditions and the water table You should never just deal with it as you see fit as this could have a harmful effect A house hold of 4 people will produce around 35 litres of urine per week this is equivalent to about 3 kg of artificial fer tiliser which is a considerable amount There must be a drop in the hose coming out and away from the toilet to avoid salt deposits for longer hoses it may be helpful to connect it to a 32 mm PVC pipe GREY WATER Connect the hose to an existing drainage system such as a percolation basin or similar It is important that pipes have enough of a drop for urine not to remain standing in the hose If neces sary the hose may be angled to create a water trap In this case it is important to pour through a litre of hot water now and again to prevent the build up of salt deposits in the hose Grey water drainage INFILTRATION May consist of a pit or a ditch outside the house Put large stones macadam around the hose mouth and then fill with sand EJEKTORTANK If you want to use the urine as liquid fertiliser there is a special tank available as an accessory it can be ordered from your dealer or from us Urine contains large quantities of nutrient salts making it a useful fertiliser for lawns With the ejector tank you get the correct dilution for watering Ejector tank connection to 1 2 garden hose Eng Electrical co
5. lid down If there is a good natural INSTALLATION The toilet room itself The toilet can be placed anywhere you like it does not need to have a particular room temperature However the composting process will be more rapid in a warmer room as the microorganisms thrive ina warm environment It must be possible to conduct urine away from the toilet Separera is therefore most suitable as a summer toilet as there may be problems with managing the urine in wintertime Air supply Make sure there is a good air supply for example through a 10 mm gap under the door or via a vent Air will be evacuated via the toilet so cross draughts must be avoided Ventilation Ventilation can be either via an external wall or up through the roof Option A ventilation through external wall The toilet is accompanied by an installation kit according to OptionA e Lift off the upper section 1 of the toilet remove the inner container 9 e Drill or cut a hole in the lower section for the urine hose according to chosen option 7A or 7B e Position the lower section 10 against the external wall of the room e Mark for wall brackets FAN ventilation pipe and hose e Drill a hole in the external eee screws with nuts wall for the ventilation pipe 55 mm hole centre 300 mm Option A from the floor Saw a hole for the urine hose 25 mm A L e Fit the ventilation pipe and seal inside and out using washers silicone Fit the i
6. nnection Separera is approved for installation in wet rooms For permanent installation a qualified electrician must install a multi pole switch If the mains supply cable is damaged it must be replaced by the manufacturer or another qualified person Solid waste With normal use a family of four produces around 7 litres of solid waste per week To create compost that is nice and loose add a few litres of Special Humus once a week You need to base the emptying frequency on how often the toilet is used and by how many people For example after 4 6 weeks use by 4 people it will be time to switch composting chambers Lift out the inner container and carry it out add a little ordinary topsoil and put the lid on Place the container in a shady place in the garden for post composting It takes 6 to 9 months of post composting as a rule before the contents can be used as a fertiliser Put a latrine bag in the other inner container and fit this in place beneath the toilet General advice Wash the urine bowl with water now and again to prevent salt deposits If insects get into the toilet you can sprinkle BioLet Insektsstopp on the compost If you do experience a bad smell in the room check the pipe connections are properly sealed and that there is an adequate air supply To clean the toilet use only mild detergent Never use abrasive cleaning agents If you leave the house for more than 2 days switch off the fan and put the
7. nsect netting Option A 370 mm Option B 415 mm ejectortank Alternative ejectortank position e Pass the urine hose through the floor wall and seal with silicone Set the lower section in position and seal between the floor and the toilet Connect the urine hose to the urine bowl Fix the hose using hose clamps being careful not to damage the nipple e Fit the ventilation pipe to the fan kit 11 Screw the toilet securely to the wall using screws and washers Place a bag in the composting chamber and fold it over the edge Place the container inside the lower section and check that the metal railing covers the edge of the urine bowl and that the bag does not cover the fan The bag is tightened in the front by the metal railing and in the back by the handle e Pour approximately 5 litres of Special humus into the toilet e Plug into an earthed socket Option B ventilation through the roof Priot to mounting the Installation Kit and Connection Kit are needed these can be purchased from the place where the toilet was purchased To install the ventilation pipe loosen the two through screws holding the fan motor in place Then install it using the two extra screws that are in the lower section under the fan motor Place the connecting piece on the fan cover e Lift off the upper section 1 of the toilet remove the inner container 9 e Drill or cut a hole in the lower section for the urine hose accord
8. sier For those with a tin roof it may be best to get a metal worked to make some metal flashing e Place the outer pipe with the roof flashing over the insulated ventilation pipe e Adjust the roof flashing to the external roof and seal firmly with asphalt sealant between the flashing and the roof e Once all the piping is insulated and covered fit the reducing coupling on the top and then fit the insect netting e Place a bag in the composting chamber and fold it over the edge Place the container inside the lower section and check that the metal railing covers the edge of the urine bowl and that the bag does not cover the fan The bag is tightened in the front by the metal railing and in the back by the handle e Pour approximately 5 litres of Special humus into the toilet e Plug into an earthed socket IMPORTANT Insulate the pipe according to the instructions Do not use pipe bends over 45 degrees and avoid having more that two this is to ensure a natural draught when the toilet is not in use Eng Anteckningar Notes
Download Pdf Manuals
Related Search
PDF_manual pdf manual pdf manual directory pdf manual download pdf manual search pdf manuals online pdf manual directory virus pdf manual compressor
Related Contents
取扱説明書 télécharger le fichier PDF ici - MRC manual de usuario tasa fija anual interbanking Notice d`entretien FR libretto prodotto dal Prof. Giacometti Dell 720 Personal Computer User Manual VÁLVULA DE DILÚVIO FIRELOCK NXT™, SÉRIE 769 Elektro-Geh-Gabelhochhubwagen Electric pedestrian stacker Copyright © All rights reserved.
Failed to retrieve file