Home

INSTALLATION MANUAL OF STEAM ROOM

image

Contents

1. Install the top lamp and handle Use the sealing glue to seal the connecting alu gaps at the inner side of the steam room and do not use the steam room till 24hours later 27 Connect the power and use this steam room as to the manual User Manual of Steam Room Multicolor and dynamic fluorescent screen System turn on auto infall System turn off auto drain With Steam Spray Light Fan MP3 and other control functions Range of steam time 10 60minutes Range of steam temperature 0 90 C With automatic temperature control and multi protective function from over temperature dry heating over voltage leakage and so on Side spray function top spray bottom spray Built in stereo FM Radio module with automatic search station function m INSTALLATION INSTRUCTION 28 NOTICE Only after strictly checking water intake pipes steam pipes and connecting lines of the power control cabinet and confirming pipeline unblocked and wires in order can the product be switched on and work Note Never open the steamer in shortage of water The main engine of the steamer and power control cabinet should NOT be installed in the show
2. 09 4307 Power M 8281 M 8282 M 8283 Diagram for water and electricity M 8284 Diagram for water and electricity M 8285 n Diagram for water and electricity Lay the aluminums as the below diagrams for each model M 8281 8282 11 Sy TENE i A M 8285 Installation Steps Take M 8281 as an example for other models Insert the two pieces front and back screws of downside frame alu into the groove of backboard alu 13 Insert two glasses into the groove of backboard alu and bottom frame Insert the alu into the backboard alu as to the below diagram 236x2044 Insert the I aluminum into the groove of the two vertical frame aluminums Oo o e o 8 DI o 09568 Insert the alumin into outside part of the two downside frame screws as ko the diagram Insert the aluminum into outside part of
3. the top spray will work and the LCD shows Top Spray signal Press the spray key for the second time the bottom spray will work and the LCD shows Bottom Spray signal Press the spray key for the third time the cycle spray function will be activated and change the direction from top to bottom every five seconds Press the spray key for the fourth time all the spray function and the LCD stops Lighting Press the Light button to turn on off the light and LCD shows ON OFF of light and its working status 30 Fan Press the Fan button to turn on off the light and LCD shows ON OFF of Fan and its working status Radio MP3 switch Press the Radio MP3 switch key for the first time to turn on the Radio function and the LCD will show the Radio working signal Press the Radio MP3 switch key for the second time to turn off the Radio function and to turn on the MP3 function and the LCD will show the MP3 working signal Press the Radio MP3 switch key for the third time the system will turn off the Radio MP3 function and the LCD will lose all the signals B The system is embedded with stereo FM radio with frequency display digital tuning and automatic searching and stored function Under the working status of Radio function press the MEM for two seconds the system will search the channels between 88 0MHz 108 0MHz and store up the well received channels at one time under better signal If the stored channels are not well received press MEM k
4. Packing List 1 LED top light Iset 18 Jet 10set 2 Lampshade 1set 19 Shelf aluminum 2set 3 Glass coping Iset 20 Water tap 1set 4 Back topside frame 1pc 21 Hand holdshower 1set 5 Backside glass 1pc 22 Control panel 2pc 6 Left front vertical fram 1pc 23 Right side top rm 1pc 7 Left topside frame 1pc 24 Right side front frame 1pc 8 rob back vertical 1pc 25 Sealingjointstrip 1pc 9 Marble slab 2pc 26 Fronttopside frame 2PC 10 Left side glass 1pc 27 side water holding strip 16pc 11 Leftside bottom frame 1pc 28 Handle 1pc 12 Bottom tray 1pc 29 Glue magnetic strip 2pc 13 Backside downside frame 1 pc 30 Movable glass 1pc 14 Small cover for bottom tray 1pc 31 Gemel 1set 15 Right side bottom frame 1pc 32 16 Right side glass 2pc 33 17 Steam outlet 8pc 34 Requisite Tools Percussion drill Wood block Drill bit 23 2 96 Cross screwdriver EY ANNALS d Level feet Plastic hammer Pencil Straight screwdriver e Adjustable wrench Pliers Silicon sealant gun Measuring tape e V A o lt y Cold and hot water pipe is connected into this hole through the bottom tray Cold and hot water pipe is pre buried in this position Regulate the adjustable foot holder 7 m of bottom tray to low a little bit the f I position of water outlet and lay all TE the holders on ground Sy lt
5. frame screws as to the diagram 21 Insert the screws of aluminum into the groove of the two vertical frame aluminums Insert the 465 2044mm glass L into the groove of the vertical side frame aluminum 22 Insert the screws of aluminum into the groove of the two vertical frame aluminum s 23 e 2 G NC a 4 AT rCTv lt cvy _ ENT m S Lm 7 N S __ S e Insert the sealing joint strip into the gap between glass and aluminum j _ pr z Install the gemel and the fixed glass and install the parts as to the diagram ujta Door bottom water holding aluminum M Ma A Aluminum end cap Water holding adhesive tape CD sellos 24 Use the 4 20 self tapping screws to fix the top cover onto the topside frame 25
6. in parameters and specifications and output wirings should not be mutually short circuit The machine should be installed in strict accordance with the installation regulations by qualified personnel E vo Note The Company shall claim no responsibility when users violate the provisions of the instruction and result in adverse consequences Operation Instructions controlle keyboard function as follows Fan Lighting Power switch TU H P E rin Time setting Steam Radio MP3 switch LS Sd m uuu setting Volume FM switch Key parameter MEM m E E key parameter 29 Diagram One controlle keyboard function as follows System turn on Press random button can start the machine when electricity is on The LCD indicates current screen room temperature lights are on and the system is in stand by status Steam Press the Steam button can turn on off the light and LCD shows ON OFF of Steam and its working status Temperature setting Press Temperature button to set steam temperature each press on Temperature button once can Increase or reduce 1 pre set default value is 40 C When environmental temperature is higher than the pre set temperature steam can not be turn on Time setting Press Time button to set the steam time each press timet button once can increase or reduce I min pre set default value is 20min Spray Press the spray key for the first time
7. INSTALLATION MANUAL OF STEAM ROOM 311 M 8282 i M 82 M Aal General Installation Diagram 8283 M 8283 TZ General Installation Diagram 34 33 32 M 8284 General Installation Diagram r 51 MENS TS 54 32 General Installation Diagram M 8285 M 8281 8283 M 8285 M 8282 Packing List 1 LED top light 1set 18 Jet 10set 2 Lampshade 1set 19 Shelf aluminum 2set 3 Glass coping 1set 20 Hand hold shower 1set 4 Back topside frame 1pc 21 Control panel 1set 5 Backside glass 1pc 22 Up connecting frame 2PC 6 Left front vertical frame 1pc 23 switch valves for functions 1pC 7 Left topside frame 1pc 24 Cold and hot water 1pc 8 Left side back vertical ipc 25 Backboard glass 1pc
8. er room The main engine must be installed in the vertical direction showed by the arrow on the machine body Inner hole of steam pipeline should be over 15mm Installation of valves on the exhausting steam pipes is strictly forbidden Electrical equipment not recommended by the manufacturers should NOT be connected to the machine Unauthorized disassembling and repacking the already fixed wirings in the machine or pulling up and insert the wirings and plug ins in the power control cabinet is strictly prohibited Pipelines should be connected to the water outlet of the main steam engine in during installation in order to leading water to the drainage location of the room body It is suggested that water purifier be connected to the inlet of the product so as to prolong the usage life of the machine In hard water area the main steam engine should be cleaned and water scale eliminated regularly It is suggested that the main steam engine be checked every three months and cleaned according to the scaling situation The procedures are as follows dilute 5 10 grams of citric acid with 1 4 liter warm water dismantle the pipe connecting to the outlet of the main engine inject the citric acid solution from the outlet connect the steam pipe leave it aside for 60 minutes switch on the machines and heat 30 minutes switch off the machine and empty it Connecting wirings of the power control cabinet should be connected according to the plug
9. ey to delete the channels If need searching by manual press the VOLUME FM switch key to enter the searching status and press the or key to adjust the channel between 88 0MHz 108 0MHz If pressing the or key without stop the system could search the channels automatically between 88 0MHz 108 0MHz when the channel is found the system will stop searching and start to play this channel then press MEM key to store this channel Under the working status of MP3 function press the Volume FM switch key and press the or key to choose the list on the MP3 E Volume setting Press the Volume FM switch key to enter the Volume adjusting status and press the or key to adjust the volume add Aroma liquid medicine drop the aroma liquid medicine into the screw hole at the top of the steam output on the steam machine and start to use it System switch off Press the power on off key to shut down all the function and screen content
10. frame 9 Marble slab 2pc 26 Frontvertical frame 2pc 10 Left side glass 1pc 27 Sealing joint strip 16pc 11 Leftside bottom frame 1pc 28 Front topside frame 1pc 12 Bottom tray 1pc 29 Side water holding strip 2pc 13 Backside downside frame 1pc 30 Handle 1pc 14 Small cover for bottom tray 1pc 31 Glue magnetic strip 1PC 15 Backside board glass 1pc 32 Movable glass 1pc 16 Down connecting frame 2pc 33 Gamal 2pc 17 Steam outlet 8pc 34 Front downside frame 1pc Packing List LED top light 1set 18 Jet 10set 2 Lampshade 1set 19 Shelf aluminum 2set 3 Glass coping 1set 20 Hand holdshower Iset 4 Back topside frame 1pc 21 Control panel 1set 5 Backside glass 1pc 22 Up connecting frame 2pc 6 Left front vertical frame 1PC 23 switch valves for functions 1pc 7 Left topside frame 1pc 24 Coldandhot water pc 8 Left side back vertical 1pc 25 Backboard glass 1pc frame 9 Marble slab 2pc 26 Front vertical frame 1pc 10 Left side glass 1pc 27 Sealing joint strip 16pc 11 Left side bottom frame 1PC 28 Front topside frame 1pc 12 Bottom tray 1pc 29 Side water holding strip 2pc 13 Backside downside frame 1pc 30 Handle 1pc 14 Small cover for bottom tray 1PC 31 Glue magnetic strip 1pc 15 Backside board glass 1PC 32 Movable glass 1pc 16 Down connecting frame 2pc 33 Pulley 4pc 17 Steam outlet 8pc 34 Front downside frame 1pc 06 M 8284
11. the two downside frame screws as to the diagram 15 16 Insert the I aluminum into the groove of the two vertical frame aluminums i O O Put aluminum into the op groove of the two vertical E n frame aluminum s O O lo O 0000000 Put aluminum into the groove of the two vertical frame aluminums 18 3 Insert the screws of aluminum into the groove of gt the two vertical frame aluminums Insert the glass into the groove of backboard aluminum KA Insert the x Haluminum into outside part of the two downside frame screws as to the diagram Insert the 664 2044mm glass into the groove of the vertical side frame aluminum 19 20 Insert the aluminum into outside part of the two downside

Download Pdf Manuals

image

Related Search

Related Contents

MHz  EWRC550LX    USO E MANUTENZIONE  PCL601MOD - Anaheim Automation    Gainward PowerPack! Pro/685 TV-DVI AGP GeForce FX 5500  StarTech.com 10 ft 24V to 2x4 Powered USB Cable  Phillips Manufacturing Company LT6VYL 8 Instructions / Assembly  pc deep tine-0  

Copyright © All rights reserved.
Failed to retrieve file