Home
        IDMS Analytics User Manual
         Contents
1.                                                                                                                    EIE 116    17  REFERENCES        E ds RA       REA NT    RR D o           116    IDMS ANALYTICS USER MANUAL    TABLE OF FIGURES    FIGURE 1   FIGURE 2   FIGURE 3   FIGURE 4   FIGURE 5   FIGURE 6   FIGURE 7   FIGURE 8   FIGURE 9     FIGURE 10   FIGURE 11   FIGURE 12   FIGURE 13   FIGURE 14   FIGURE 15   FIGURE 16   FIGURE 17   FIGURE 18   FIGURE 19   FIGURE 20   FIGURE 21   FIGURE 22   FIGURE 23   FIGURE 24   FIGURE 25   FIGURE 26   FIGURE 27   FIGURE 28   FIGURE 29   FIGURE 30   FIGURE 31   FIGURE 32   FIGURE 33   FIGURE 34   FIGURE 35   FIGURE 36   FIGURE 37   FIGURE 38   FIGURE 39   FIGURE 40   FIGURE 41   FIGURE 42   FIGURE 43   FIGURE 44   FIGURE 45     DMS APPLICATION LOGIN SCREEN zb ch ut et aab    aab Ned      ael babet do dar o sebo             9  USER REGISTRATION FOR Mess tech tars    p ous acti den ota fat d vea o EA ew p S Pu Cur BS Pes ee Em Ra Fest 10  MY PROFER SECTION           ta       Ga eee CDD CEP MD Acc                 a 11   DMS  ANALY ICS  STRUCTURE                       ub                                           IPM ED ER MS 12  MY WORKSPACE SECTION sex        vsu Sero           ora        To                  14  EXTERNAL ASSISTANCE PROJECTS SECTION IN MY WORKSPACE                                              15  CAPITAL INVESTMENT PROJECTS SECTION IN MY WORKSPACE                                                17  ANNOUNCEMENTS AREA IN T
2.                                                  Balance  to be Requested   3 000 610 400 100  Ministry of Foreign Affairs    0  0  Ministry of Finance  Total     0  0  Erbil    0  0  Karbala    0  0  Kirkuk    0  0                  3  2 000 100 000  Muthanna    0  0  Sulaymaniyah    0  0  Wasit    5  18 300 000 000           Necessity to address an emergency crisis      Attach Document       e g  project   Add Attachment    document  monitoring  reports  and other   User Activ rity    1      Last5    Field Original Value New Value       Figure 20  Adjust Funding Requests  Allocations Form    For each modification made to the list of funds  you should provide the comment in the  Justification for Changes in both English and Arabic languages     I DMS ANALYTICS USER MANUAL 33    You may additionally attach any related attachments to the defined funds from Attach  Document section  For details on how to attach documents or other related files  see IDMS  Capital Investments Projects Application User Manual in REFERENCES     The User Activity Log displays information about the recent changes made to the funds   Identifies the users who performed the changes and the date time when the modifications were  made     Note  In the right side you may select the number of latest updates to be displayed or you may  choose to display whole modification history on the particular record     6 2 8 Regular Funding Request Approval Procedure    The regular funding request approval diagram is pr
3.                                 57  SAMPLE GHARTAREPORT    Seer epos dtt ME SU                                    SUP IRI PRIN RUSO IL        E  59  SAMPLE C HART REPORT User de rey EUNDEM ERR QUITO UMP LIA LE i OL E AE UE 60  MAP  MODULE    Nutella                                       M LER         61  INTELLIGENT SEARCHING edet executio eiit rubea edit boa eei rox reU hime                 E dE 64  MEASURING DISTANCE ss oet  gt                            rea eats petat a      tetera darn 65    IDMS ANALYTICS USER MANUAL 5    FIGURE 46  BUFFERED ZONE QUERYING ssa da S RO x uU Fl E POR coa de Sous am ERA E MEI Susana               DD IE 66  FIGURE 4 75 SELECTING CHART TYPE      Eust etm Fita oo ovv oret redet caver epa olm ELE EO Vel xS 68  FIGURE  484 VIEWING CHART LEGEND cns ies Peas eet ciet e ex Dosen vat tio ovx Diod               ices Howe maint lees Dias           69  FIGURE A9 USING IMENT MAP e ci roa aire e ea vaa co d Pie ow Op Sh ion d t P a de Cun REED eb E pa E einn 70  FIGURE 50  VIEWING THE DATA DISPLAYED ON THE MAP        cccscccccuucesscnuccneueessaucenueenseauueueeenseuugueenns 71  FIGURE 512 SAMPEE  MAP REPORT oido                         EDU ee ee 72  FIGURE 52  SAMPLE MAP REPORT                  DTP               73  FIGURE 53  IDMS APPLICATION REPORT                                                          74  FIGURE 54  SELECTING A GROUPING FOR A                                                           76                595 COMPATIBILITY MATRIX        
4.                              leh ERE EE Ta Ee ee        tie 77  FIGURE      PREVIEWING THE  REPOR        ce De Race tta da                   dat dandis cista c tutt DE Spa DU 78  FIGURE      CREATING REPORT                                         ede  79  FIGURE 59  SAMPLE LIST REPORT                                       C EH ba er          80  FIGURE 99  CREATING  REPORT                         81  FIGURE 00  SAMPLE EIS TF REPORT  Z    eM cC ve iure                      81  FIGURE 61  REPORTS WINDOW WITH PROPERTIES FOCUS ON THE TITLE                                  nn 82  FIGURE 62 gt  FORMATTING STYBING TEXT ENTRIES                                             eaa o toS 83  FIGURE 63  REPORTS WINDOW WITH PROPERTIES FOCUS ON THE COLUMN         cecceeeeeeeeeeeeeeeueeteueteeueeeegs 84  FIGURE 64  ASSIGNING PROPERTIES TO REPORT TABLE                                                                          85  FIGURE 65  REORDERING REPORT TABLE COMPONENTS                                                     85  FIGURE 65   DEFINING THE  DATA DISPLAY EY PE puse and dpt us d edere a e d cft os be eua etus ces 86  FIGURE O7  DEFINING THE SORTING ORDER                                                                 E DAE 87  FIGURE 68  SWITCHING REPORT TABLE COMPONENTS       ccccseeeeeeeeeeeeeeeeeeueteeueeteueeteuuetteueetueeeteneteegs 87  FIGURE 69  EXPRESSIONS SECTION IN THE REPORT MODULE                                              88  FIGURE 70  ADDING  AN EXPRESSION us cuct va 
5.                          52  8 1 KEY FEATURE                                                      52  8 2 ACCESSING THE CHART  MODUL Gace         ERI EE bp               een weaned prd Me Led UNS ness 52  8 3 MAIN  SCREEN AND ITS  COMPONENTS 345259                        unte FEES Sanne bt spas Le tats 53  8 4 MLEW SCREEN AND ITS COMPONENTS              E                        cU LEVINE  57  8 5 SAMPLE CHART REPORTS      aan                         Ad up              58  8 5 1 Sample  Chart                    sae RU OE sean won                     RO aane Da eO eae 58  8 5 2 Sample Chart REDON  2        OE RR Ur xa                    Et Kb oy dei EE ERE d 59  9  MAP MODULE             a                                       E W EUR RC cis RR RU A DA RTL CER RR 61  9 1 KEY FEATURES OF THE GLS TOOL s aser oo eoa                              ON LEVE poU REND Du 61  9 2 ACCESSING THE MAP  MODULE 2  vetusta        ec os Peur ver se e p I PT EET REDDE  63  9 3 MAP MODULE SCREEN COMPONENITS                        Ebor        odes Erde nose                          63  9 4 VVORKING IN  THE MAP MODULE vavi                 enc dup QUU ur VUE M HO SUV cena TR M CD eos 64  9 4 1 ZOOMING Jn 7 ZOOMING  OUT    acabe Viso t Xo MER EDU CUR ed Pv ELA e BOE Ee b d E ROC DCN DH EUM ol RF EAD 64  9 4 2 Me  asunng JBISEal CS rue                                   65  9 4 3 Buffered Zone                                               66  9 4 4 Using                                                   
6.              66  9 4 5 MSWP OCC                                                      68  9 4 6 SG MINA                                      E da edad Cid ed 1 69  9 4 7 Viewing the Data Displayed on the                                                                   70  9 5 SAMPUE                                tens etl n eran      d c urs eh                                  71  9 5 1 Sample Map Report   5 259  quise Ie TERR CUARTA diatom VER Va e EL Ceu e rrt Dogs 71  9 5 2 Samne MaD           T T ee ean ne A 72  10  REPORT MODULE                              a a    74       1  ACCESSING THE REPORT MODULE     ad ees eae A E eae eee 74       2    CREATING A REPORT    nace er                                   eon LU PAM CEU             74  IOS    PREVIEWING A                 epu gc M cun dob      77  LOA    GENERATING A REPOR                                       EE                                             S De rovs LE ers eu          78  TOD  SAMPLE REPORT 3 vea nots      e a reais seas bot du apte E Ced          LEER T Les 79  10 5 1  Sample                uid Ra Let ev Pe y Dot os ERE his opi be oia ey eee 79  10 5 2                    REDONE 2 rrr                         I OUR VATER ETE b e da    REC    80  IOG   CBSTOMEZING REPORTS                cetus credet dM s AR ee LO AU uud  82  10 6 1  Formatting Styling Report Components                                                 82  10 6 2 Re ordering Report Table Components                                              
7.        Figure 49  Using Mini Map  9 4 7 Viewing the Data Displayed on the Map    The Advanced GIS tool is used to view the data referring to definite territorial units    governorates and or cities villages when zoomed in to this level  In order to access the data for a  specific territorial unit  point the mouse cursor on the lil button  Figure 50   The information that  is displayed in the information window includes but is not limited to   of projects implemented in  the given administrative territory    of contracts    of requests  etc  If you have plotted any  chart category on the map  the chart category details appear in the information window as well     Also  you can view information on nationwide projects and the ones implemented in outside of  Iraq  Moreover  you can also view the synopsis of the projects that do not have any territorial  reference or are of various types  To view data on these projects  point the mouse cursor on lil  button in the respective section     Note  Clicking the View Projects link at the bottom of the information window will take you to  the Details section of the application  For more information about the actions that can be taken in  this section  see DETAILS SECTION     IDMS ANALYTICS USER MANUAL    fi IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report Dashboard    Map  EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE   gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS    co Pie Chart  v
8.        My Workspace List Chart Map Report 86 Dashboard           New       Customize       Update All           Dashboard Save   Save as New   Remove   Cancel    Public Scroll Mode          Dashboard modified     Add New Item                                         ola   EXTERNAL ASSISTANCE PROJECTS   oY  Projects by Governorates   CAPITAL INVESTMENT PROJECTS      v             69  69    a N   of Projects      Expended  120   5            NI  x           50 000 000 000 000    x S           NA N N      D     N               N   gt  3 5       E 2  NE  un 3 r  HEN HERE E A uM     5               2 E 2 8 z E 9 B8 6          E   c 5    iv  lt  S E    o 2 2    a 2 z    5                        m a   a m   m       m     gt   gt  g         a          m m     uU 2     e e  Governorate   World Bank Projects   EXTERNAL ASSISTANCE PROJECTS      v  eA         i  Nation wide     E             COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 77  Customizing a Dashboard  11 4 4 Save a Dashboard    After the new dashboard has been created and items added to it  it is necessary to save it to be  able to view it later on  It should be mentioned that there are two options for saving dashboards     e Save  saves all modifications made to the dashboard   e Save as New  saves a copy of a dashboard under a new name     In order to save a dashboard   a copy of a dashboard  follow the steps below   l  Select the respective Save or Save as New option   2  Click OK in the message window indic
9.        Presidency Council    Select All   Deselect All                           ahs AS  5       01 Jan 2005 31 Dec 2016 500 000 000 000           undici                          acl      d  01 Jan 2005 31 Dec 2016 1 500 000 000 000           8 23                  01 Jan 2005 31 Dec 2016 Design 6 000 000 000 000     ee ee dada  A  a AA l 01 Jan 2005 31 Dec 2016 6 000 000 000 000    1    m                  1000  i 2 25               01 Jan 2005 31 Dec 2016 6 000 000 000 000    Cancel       Figure 15  Create Ongoing Funding Request Window    The following buttons are used for emergency funding requests and are only available during  emergency request submission period  see Financial Years Setup     e Reallocate   used to start a reallocation procedure for the selected funding requests   Reallocation is performed for requesting additional funds from other projects of the  selected ministry for the needs of the corresponding funding request    e Verify   used to verify the emergency funding request  This button 15 inactive for regular  funding requests    e Review   used to review the emergency funding request  This button is inactive for  regular funding requests     The following summary is displayed for the My Draft Funding Requests list     Note  This summary is only available when the Executing Body is specified in the Capital  Investment Project section  See Capital Investment Projects in My Workspace Module   e Requests   the number of draft requests in the list and the to
10.       2008   2009   2010   2011   2012   2013   2014   2015   2016   2017    up Create New Indicator       Responsible Organisation  All Responsible Organisations       EN                                              Governorate       Updated  All Governorates   Indicator Y Indicator Name Unit of Measure   of Locations Target Actual    Updated By  Sector IRQ 000561 1514 4al all Bta 2240     48 24  4850 4 46 kW  kilowatt  user admin    m    lt   All Sectors  gt   03 28  IRQ 000560   zzz          gs Percentage 1 33 00 66 67 Admin 25 Feb        Sub Sector Synergy 2014  All Sub Sectors       04 04  IRQ 000553   xi         ascia 414 io Number Count mayd mays   01 Feb   5   2012  Data Source 05 50  All Data Sources   IRQ 000552 44  cs paid 100     2    ace Percentage mayd mays   27 Jan   5  2012  Objectives IRQ 000550    51    d Number Count d        em Ah jp   es umber Coun mayd mays   27 Jan   All Objectives  gt    e Im  04 07  Means of Objectives IRQ 000549 2221 Number Count          mays   27 Jan        All Means of Objectives    2012  04 03  Keyword IRQ 000548 km  kilometre  mayd mays   27 Jan   8   2012  03 26  Keyword  F  Indicator IRQ 000547   km  kilometre  mayd mays   27 Jan   8     2012  Indicator Name 03 23  Description IRQ 000546 kW  kilowatt           mays   21 Jan        2012  Indicator from 5  13 28  Updated   IRQ 000545 ist   kW  kilowatt           mays   21 Jan        to 5 2012  13 18    Submit   X  Reset 123456789 10 Next gt  gt   SUMMARY 510 Indicators    10 Agr
11.       Diyala  Info Diyala _  Project Cost  U SD     Cursor position  Lat  33 93 L 4 of Projects    Advanced Search   of Contracts    of Requests    of Projects    _ Project Cost  IQD   Filter by     Project Type   Project Implementation Status  C ter   Governorate   Qadha   Year   Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity    Modified Project Cost 100   Allocation By Year  IQD    Modified Allocation By Year  IQD   Requested to Release  160   Released  IQD    Expended  IQD    Contract Cost  160     More Filters    2 Expended Credit  IQD     Y View Criteria    Remove Filters Expended Predecessor  100   Expended Total  IQD    Modified Allocated with Rollover  IQD   Rollover  IQD    Project Cost  USD    Modified Project Cost  U SD   Allocation By Year  USD    Modified Allocation By Year  U SD   Requested to Release  U SD    Released  U SD    Expended  U SD    Contract Cost  U SD    Expended Credit  U SD    Expended Total  U SD    Modified Allocated with Rollover  U SD   Expended Predecessor  U SD     View Projects    16 016 662 937  69  0  86  2 85  22 558  680 127 542  22 624 491 627 542  6 513 934 907 542  6 779 277  102 542  No data  No data  5 605 577 067 478  No data  0  0  5 605 577  067 478  6 513 934 907 542  No data  16 016 662 937  16 063 389 102  26 609 273 798  26 797 666 759 85  No data  No data  219 847 607 103  No data  0  219 847 607 103  26 609 273 798  0    Figure 50  Viewing the Data Displayed on the Map
12.      Filter by   Project Type  Project Implementation Status  Chapter  Governorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters       T View Criteria    Remove Filters       DESIGN    Map Report Dashboard    Report              5         Ya A mj g       Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report  x    i Title   Projects Yearly Allocation Charges       Show details      Compatibility Matrix    Govemorate    dd Grouping       2 Columns    Modified Allocation By Year  IQD     History  Allocated  100    Add Column  Add Sub column Add Sub column          Year      Le Reallocation Funding Type     Data Data  Le Project    L  History  Status Changed On  Add Row       Y  Reset    Submit        PREVIEW                    Projects Yearly Allocation Charges    n          Governorate  1   Year   Reallocation Funding Type   Project    History  Status Modified Allocation By Year    Cheon oa hia H  IQD  y  History  Allocated  IQD     Reallocation Funding Type  1   Project  1      History  Status Changed On  1   a0  By Year      Allocated  100     Year  1  _ a    1    History  Status Changed On  2  aD  Allocation By Year  history  Allocated  IQD           2   Prisa BURNER Se   History  Status Changed On  1   QD   1  cation By Year f  tory  Allocated  IQD  1    COPYRIGHT 2014 SYNERGY INTERNATIONAL 
13.      NDP Indicators of My Workspace                                                       41   7  CIST MODULE 2                        r CE REX UE IUE POE VOR acera s VOID VOUS RU VIDE RAE 43  7 1 ACCESSING THE LIST MODULE                       e e net ees a 43  7 2 EXPANDING THE EIST   TEM                              MER ACT d NE CHIARA EU 44  d  SORTING DEEST EM aerate dos cee aa      cou iue een LIA a iL Mua SUE  44  7 4 BROWSING AMONG BIST  TEMS            ende EXPE FUN X vant ES UA erepta VR cca        aka qn EAT 44  7 5 REFINING THE REPORT voee Eh scan ER EU REX B ER UP e pb        redu RIDE Ea UE BP      45  7 6 HIDING Z SHOWING IMAGES IN THE LIST                  etta rus vri Dos                       ea      46  7 7 MODIFYING THE CURRENT VIEW        EUER EA aC E ESCUDO SU TR RR VALE CRT RC ARA 47  7 7 1 Adding List Groups   Columns   Column Groupings                                            48  7 7 2 Re ordering Groups   Columns   Column Groupings                                           48    7 7 9 Removing Groups   Columns   Column                                                                48    IDMS ANALYTICS USER MANUAL 2    7 7 4 Seting a VIEW as                                             48  7 8 SAMPLE         tutela PPP NI      CiU ga 49  7 8 1           VIEW M NU 49  7 8 2          VICW                     OMEN SERERE cet yaa          IER E ere aa ee reac BV ene 50  8  CHART MODULE   iies xia                           OU REOR ORDRE OCC               
14.     0    85  10 6 3   Defining the  Data Display TYDE i ers veseces sano        ee 86  10 6 4 Sorting Report Table                                                                                                                                   86  10 6 5 Removing a Report Table                                                                    0  87  10 6 6 Switching Report Table Components                                                  0    87  10 6 7 Building Complex Expressions                                   Inn mns 88    LOZ   SAMPLE REPORT FORMATTING         Uo deers de ROTE deri ded cto Ee TOU e ORE Iv DA QE SOEUR  89    IDMS ANALYTICS USER MANUAL 3    11  DASHBOARD MODULE        A                                                                92  ad                                                           92  11 2 ACCESSING THE DASHBOARD  MODULE 4 rer            RI TET UE e e RIVE EI      92  11 97 MAIN SCREEN AND ITS COMPONENTS  io iuc tos ctt ic evinces A o ctt ic t ou e E E CE e wana Sh 93  114 DASHBOARD MANAGEMENT                     atentatit ad uet ete pe ita ra wate C MES t e erae 94   11 4 1 Create    New Dashboard      Exe E Ee ER Can es Ea c bec eL EE b anten 94  11 4 2 Add an Item to a Dashboard 2  o xe                                  ste der ac ae et dua i 95  lIT1 4 3  xustomize d DaslbOdEPtv iter ree ese ETRURIAE Mi 96  IAA    Save a bBashbOSQ       abe o E DAE LBS                                      97  11 45    Delete    DasnDOGSEG          eU 
15.     9 5 Sample Map Reports  In the following chapters  you can see several samples on maps     9 5 1 Sample Map Report 1    71      Categories      Scaling     Chart      Administrative  C Auto       Governorate  C Qadha    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC       You will get the following map report if you have selected Project Implementation Status as a    map category and opened the Legend panel  Figure 51      IDMS ANALYTICS USER MANUAL 72    My Profile About         fe  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       My Workspace List Chart Map Report Dashboard    f   Save    Save as            EXTERNAL ASSISTANCE PROJECTS                                                                  DONOR PROFILE   gt  CAPITAL INVESTMENT PROJECTS    GO Pie Chart v  IRAQ DEVELOPMENT PROJECTS    Cursor position   Uats s29 21 Long  45 06  wow ww           C None  Advanced Search i  Nation wide    Chapter     Project Implementation Status     Scaling       Categories    i  Outsite of Iraq No Scale      of Projects    of Contracts       Filter by   Project Type       Project Implementation Status i  Unspecified    Chapter  Governorate    Qadha  Year    i Various      of Requests     of Projects   Project Cost  100    Modified Project Cost  100     Modified Allocation By Year  IQD   Modified Allocation By Expense Type  Modified Allocation By Location  IQD            Beneficiary Gol Agency   Beneficiary Gol Entity     Executing Body Gol Agency i  Diwaniyah  Executing Body Gol En
16.    Chapter   Govemorate   Qadha   Year   Beneficiary Gol Agency   Beneficiary Gol Entity   Executing Body Gol Agency   Executing Body Gol Entity    More Filters       T View Criteria    Remove Filters    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC       Figure 44  Intelligent Searching    Scaled zoom        zoom out    This option allows zooming in   zooming out using the scale tool available in the  Advanced GIS                This means that when changing the zoom scales by clicking either on or   you  can magnify or reduce the viewport according to the scale value     IDMS ANALYTICS USER MANUAL 65    Mouse wheel based zoom in  zoom out    This option supports mouse wheel based zooming in   zooming out  In order to enlarge or reduce  the viewport using the scroll wheel button of the mouse  you should click anywhere on the map  and use the wheel button in the backward motion to zoom in and in the forward motion to zoom  out     Zoom by Selection    This option allows magnifying the original viewport or a portion of it using the mouse  To be able  to enlarge an area on the map  you should activate the Zoom by Selection option by clicking the    7   button then select a region on the map to magnify   9 4 2 Measuring Distance    In the Map module  you can measure the distance between two points on the map     To do this  click r4 button  select the point on the map and drag the mouse to the second point  to trace a path to measure  Figure 45   The measured distance will b
17.    IRAQ DEVELOPMENT  MANAGEMENT  SYSTEM  IDMS                       5  USER MANUAL    Version 3 1       IDMS ANALYTICS USER MANUAL 1    TABLE OF CONTENTS    ty  ENTRODUCTUON                                                                                                                   6  2 5 OVERVIEW                               E UUNMULERNRR VUE E MUR EK                                    AE NT 6  Jji  WHO USES                    ri ba RR DOLUS CN CRM RE bene RR a 8  4  LOGGING INTO THE I DMS APPLI CATI ON                                                                                                                       9  4 1 REGISTERING FOR A USERNAME AND PASSWORD                                nnns 10  4 2 ACCESSING I DMS WITHOUT REGISTRATION ss        E eux deed wees batte Sup Rv            11  5     DMS ANALYTICS STRUCTURE        RE EXT RR ENXEXERRRERRIMO FRE                                   12  6    MY WORKSPACE MODULE 555i wa c OE RR OU RR c cu a CDD aaa 14  6 1 EXTERNAL ASSISTANCE PROJECTS IN MY WORKSPACE MODULE                                         15  6 1 1 Adding an External Assistance Project                                            eene nnns 16  6 1 2 Viewing External Assistance Project Details                                                       16   6 2 CAPITAL INVESTMENT PROJECTS IN MY WORKSPACE MODULE                               ems 16  6 2 1 Managing ANNOUNCEMENTS            Ced dee            EO E VA Ld EVE DOERV ERE EMEN        18  6 2 2 Fina
18.    e Qadha  displays the border information for all qadhas     9 4 5 Viewing Legend    To explain the data series or categories on the map  the legend is used to identify the patterns or  colors that are assigned to the selected categories  Figure 48   It is worth mentioning that each  data series or category is represented by a unique pattern or color in the map legend  which is  displayed in the following ways    e Inthe Legend section if you have chosen to apply any category to the map    e        bottom left side of the map if you have selected to view data on the scaling map     IDMS ANALYTICS USER MANUAL 69    fc IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Map Report Dashboard    Map  EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE     gt  CAPITAL INVESTMENT PROJECTS      Pie Chart      IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS   LEE 1       D   Info nts    Cursor position  Lat  32 91 Long  47 15    Categories       C None  i  Nation wide    Chapter     Project Implementation Status     Scaling    Advanced Search    Filter by  N  4 i  Outsite of Iraq  Project Type      Project Implementation Status M       Administrative       Chart    i  Unspecified    Auto     Go      Governorate  Year p    i  Various H C Oadha  Beneficiary Gol Agency              Beneficiary Gol Enti     p d  pue  Executing Body Gol Agency  Executing Body Gol Entity  More Filters       T View Criteria    Remove Filters      Agriculture      Industrial     Communications and Transportat
19.   Project Implementation Status  ig    Unallocated 190 14 248 540 988 4 032 639 595 369    EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE    gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS    Anbar 133          Er  Advanced Search   Babil 84  ae  ux    Filter by      Dahuk 3 706 503 748 726 597  Project Type    Project Implementation Status  Chapter  Governorate                             1 099 080 748 127 600  ear   Beneficiary Gol Agency CIP 172015 1 099 080 748 127 600 Implementing  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity      Refine Report    Nationwide 4 19 456 273 7 404 774 680  20 068 490 736 1 439 834 492 786  16 597 983 321 174 441 693 445    Baghdad 711 36 763 417 012 1 766 819 425 051    Basrah 22 511 037  722 1 437  065 659 896    Unspecified 2 607 387 598 997      AL  Amadia Qadha 1 099 080 748 127 600           Duhok Qadhas 36    Smeel Qadha 0    More Filters       Y View Criteria    Remove Filters                                     Dhi Qar  Diwaniyah  Diyala   Erbil   Karbala  Kirkuk  Maysan  Muthanna  Najaf   Ninawa  Outside of Iraq  Salah ad Din  Sulaymaniyah  Various    Wasit    17 729 852 833  16 932 340 473  16 016 662 937  5 265 141 182  17 046 455 171  16 043 661 696  20 237 132 057  17 805 631 438  18 396 212 276  22 612 222 731  408 555 799  19 111 318 549  32 021 385  67 907  383 381  3 307 653 233    Figure 38  Sample View 2    202 213 769 210  211 395 557 360  219 847 607 103  791 647 05
20.   for or the whole list of entities for the administrator  Here you may adjust the yearly  allocations for the requests  local and foreign amounts  For details  see Adjust Project  Funding Requests Allocations    Note  This button is not available during emergency submission period when the regular  project submission period is expired  see Financial Years Setup     Submit  submits all selected draft requests    Note  This button is only active when Balance  to be Requested  summary field has a  positive value  for details on balance requirements  see below  and all selected drafts are    I DMS ANALYTICS USER MANUAL 23    grey  all mandatory information is provided for them   This button goes inactive if at least  one red draft is selected  For details on drafts coloring  see above    e Move Back   Move Next   used to move the selected drafts to the previous  next year   The moved funding requests will appear in the My Draft Funding Requests list for the  previous next year and will disappear from the same list for the current year     Create Ongoing Funding Request for 2014  All amounts are displayed in  IQD  Iraqi Dinars     1 Note  Ongoing Projects that are either marked as Completed or have their Start End Dates not spanning year 2014 are not shown below   Projects that already have an ongoing request submitted for this year cannot be selected  2014 are not shown below     Implementation    Gol Entity   Project Title Start Date End Date Status    Total Project Cost  2013 
21.   link in the right  upper corner of the page     I DMS ANALYTICS USER MANUAL 10    Note  If you have forgotten your password  you can retrieve it by clicking the Forgot Your  Password  link in the Login Screen and confirming your identity  After submitting your identity  information  you will receive the password into the e mail account indicated     4 1 Registering for a Username and Password  New users can sign up for a username and password to start using the system     In order to register in the system  follow the steps described below   l  Click the Request a New Account link at the bottom of the Login Screen  A User  Registration Form  Figure 2  will appear   2  Fill in the information requested   3  Click the Submit button to submit the information provided     fe  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       User Registration Form       Head of Office of Refugee  amp  IDP Affairs  Al Kindi St  International Zone  Baghdad   Iraq        Required Field    baghdadirc state gov    Comment      Please type the content of the security image in the  textbox below      You may click on the security image to have it re   SAUL EM generated  in case the characters are not clear         NZGX2           Note  You should provide a valid E mail address  It will be used for future correspondence        Figure 2  User Registration Form    Once you submit the registration form  the IDMS administrator receives a notification  The  administrator will review the information submitted and 
22.  0 0 0       j      1 1      LI       IL DL Ll                  ee              4 7 cl 4                 Figure 55  Compatibility Matrix  10 3 Previewing a Report    At any time during the process of creating a report  look in the Preview section at the bottom of  the page  in order to view the final structure of the report  Figure 56   The Preview will not be  ready for viewing unless there is at least one table row defined     IDMS ANALYTICS USER MANUAL 78    A Contact us  idmshelpdesk  2mop gov iq My Profile About Log Out      At  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    R My Workspace List Chart        Report Dashboard Help                    Report                         8 3      A    amp    EXTERNAL ASSISTANCE PROJECTS OOOO  DONOR PROFILE Z DESIGN   gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report x  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS _  i Title      Show details EA Compatibility Matrix        Add Grouping  Advanced Search i Columns  i Rows   of Projects   Title   Project Cost  USD    Modified Allocation By Year  IQD    Expended  IQD    Add Column  Add Sub column Add Sub column Add Sub column Add Sub column Add Sub column  Filter by    Chapter    Project Type L project   Data Data Data Data Data  Project Implementation Status    Add Row  Chapter  Govemorate  Qadha  Year A One or more rows columns  in red  you selected may no
23.  014150  3               5  jy ias           04000054174 100 000 000 ahmed jumaa di        gt   PROCESSED Process  ID            vj RQSO 014197 522 3 yl 5 ili        LD Cue I 01800004006000124 250 000 Synergy Admin 06 May 2014 UNDER Process        itle   11 50 S PRIMARY  Description REVIEW                     Objectives  Request from rj          Submitted       Request        4                      Summary   Approved      to w    Project Request from 5          Bii  to       gt   Submit     Reset       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 16  Functions and Summary in Submitted List of Capital Investment Projects Section  6 2 5 Approved Projects    The Approved Projects list displays projects approved by the MoP Investment Unit group users   Figure 17   The following information is displayed in the list   e ID   the code of the request  You will see the request code here if the request is copied  from an approved project  and New for the new request for the selected year   Title   the title of the project   Project Code   the project code   Expended in Current Year   the funds expended for the project in the selected year   Expended          the expended funds from the originally approved amount allocated for  the selected year   Updated By   last update author   e Updated On   last update date   e Status   the status of the submitted project describes its revision stage  The following  Statuses are available   o STOPPED   appears when the project is sto
24.  2013  one 01 01 2014   01 02 2014      31 12 2014 E        01 02 2014  5  31 12 2014        1 12 2015     2016 E  el  rs        2017 5 5    mn    Figure 12  Financial Years Setup Window in My Workspace    Note  The Regular Request Submission Start Date should be before Regular Request Submission  End Date  and Emergency Request Submission End Date should be after Regular Request  Submission End Date        Mon Tue Wed Thu Fri Sat Sun    1 2 d 4           8 8 10 11  12 13  14  15 16 17 18  19 20 21 22 24 24 25  26 27 28 29 30 31    Today 15 Tue  6 May 2014 Reset    Figure 13  Calendar    6 2 3 My Draft Funding Requests    The My Draft Funding Requests list displays the draft requests created by the Executing Body  group users  The following information is displayed tn the list       ID  the system generated unique request code    e Title   the title of the request    e Project Code   the request related project code  If the request has been copied from   some other project  you will see the code of the original project here   e Required Funding   the funds requested in the request   e Updated By   last update author     I DMS ANALYTICS USER MANUAL 21    e Updated On   last update date   e Status   the status of the draft  Following values may be seen in this column     O    CREATED   for initially created draft requests  both regular and emergency requests   Note  For definition of regular and emergency requests  see Capital Investment  Projects in My Workspace Module    REQU
25.  7 g      N     rad ie 45            all         jai     N 50 000 000 000 000                  E N 2011   14            ao                           E N aa2011   CAPITAL INVESTME      5 N N SN NW  i     N E  Set Sector   CAPITAL INVEST     S   z 2    5 5 E     2    9 g  Sector wise Distribution of                           3 z   6    8  i      2   5 a     5 S 5 5    L  Location wise distribution of Ex           gt     a E    Disbursement by Governorate        Governorate           Donor Commitments by Gover           Ongoing Projects by Ministries      World Bank Projects   EXTERNAL ASSISTANCE PROJECTS      Drag and drop the desired component onto  the dashboard screen    i  Nation wide E         Projects by Ministries            11 4 3 Customize    Dashboard             COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 76  Adding a New Report    In the Dashboard module  you can customize any dashboard created  i e  rename the dashboard   save the changes made to it  save a copy of the dashboard  delete a dashboard  and or discard  the changes made  For details  see below     In order to customize a dashboard  follow the steps below   1  Click the Customize button  A new section will appear displaying all customizable options  in the Dashboard module  Figure 77    2  Take the necessary action   3  Save the changes     IDMS ANALYTICS USER MANUAL 97    a Contact us  idmshelpdesk mop gov iq My Profile About Log Out        4  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       
26.  Additionally  the following summary information is displayed for each Gol   e Ceiling Assigned  Allocated   the total ceilings for all listed drafts of the selected  executing body  defined in the Final Allocation field of the Adjust Budget Ceilings form   e Balance  Submitted Requests    the remainder calculated based on the Assigned  Ceiling and the total of all submitted and approved requested funds   e Balance  to be Requested    the remainder calculated based on the Assigned Ceiling   the total of all draft  submitted and approved requested funds     IDMS ANALYTICS USER MANUAL    Adjust Project Funding Requests for Year 2013    Gol Entity   Project Foreign Currency  E  Amanat Baghdad    0   E  Presidency Council    0   E  Council of Ministers    4          gal je TE Rosa           Ian   Hass    BLD pial              y                                                                                                gol      Blah cb    acad a        00    Project Cost Local   Foreign                         3 000 000 000 4 000 000 000                                            14 000 000 000 2 000 000 000                                                       200 000 500 000                                                                                     400 400                                        Ceiling Assigned Allocated  Balance  Submitted Requests       Required Field    Total    3 000 610 400    1 000 110 000    2 000 000 000    500 000    400              gian   
27.  CIP 172082  CIP 172182  CIP 172365  CIP 172744  CIP 172761  CIP 172762  CIP 172867    Babil 34  Baghdad 711  Basrah 146  Dahuk                            Qar             View Criteria    Remove Filters    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC       Figure 85  Initial View       Filter by  Governorate       Governorate   Diyala   Erbil   Kirkuk   Muthanna   Najaf   Hinawa   Outside of          Salah ad Din m                                                   Exclude          Diwaniyah  Karbala  Maysan    Current Criteria     Governorate       kabla                jM                                  Figure 86  Sample Filtering Criteria    The following view will appear  Figure 87      IDMS ANALYTICS USER MANUAL 112    4 fc  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart                   Dashboard Help    List felsave    8         4  3     EXTERNAL ASSISTANCE PROJECTS                DONOR PROFILE Please note  a filter is applied   you are currently reviewing a selection sub set of all projects     gt  CAPITAL INVESTMENT PROJECTS   Refine Report Modify Current View    IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS Govemorate   Qadha              Project   of Projects Project Implementation Status        Diwaniyah 99     Unspecified 89   Advanced Search     AL Diwaniya Qadha 11    AL Daghara Nahia 1      AL Diwaniya Qadha center 10    Project Type CIP 172054  Project Implementation Status  Chapter CIP 172082    xwGovernorate CIP 172182    Qadha    ou
28.  CIP 172959   Project Implementation Status     RQSN 013706   Chapter   Governorate 2013   Qadha    2014   Year   Beneficiary Gol Agency   CIP 172960   Beneficiary Gol Entity   CIP 172971   Executing Body Gol Agency   Executing Body Gol Entity   CIP 172973    More Filters      CIPA72974  T View Criteria    Remove Filters   CIP 172975    CIP 172976          CIP 172978  MY VIEWS           172979    2014 29    2015 3  Results 1   29 of 29    Total Zoe e             COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 28  Expanding the List Item Level  7 3 Sorting List Items    You can sort the list view by column by clicking on the name of the column  This will sort the list  alphabetically or numerically depending on the type of data entered into that column  Clicking  the upward  or downward pointing arrow that appears on the column can reverse the order of  the list     7 4 Browsing among List Items    You can browse among the list items by clicking on the number link of the page to navigate to   The Previous and Next buttons can be used to move to the required page     IDMS ANALYTICS USER MANUAL 45  7 5 Refining the Report    In the List module  you can refine the list view displayed on the screen to focus on specific data   Options for refining a report are listed in the Refine Report area  Figure 29   The criteria in the  Refine Report section are dependent on the groups in the user defined current view  See    Modifying the Current View     For example  if you have
29.  Category section and selecting the category ies  listed     Note  When pointing the mouse cursor on a respective icon image on the map  you can view the  details for the selected category     Scaling    This option is used to view the data on a scaling map  This means that the selected data series  will not be displayed in form of graphs  but the administrative territories will be colored according  to the selected scaling category instead  The scaling legend at the bottom left side of the map  prompts on the coloring pattern used     To enable this option  expand the Scaling section in the Layers panel and select one of the  possible alternatives listed     Chart    You can plot different data series on a map and view them in the form of different graphs  such  as pie charts or bar charts  You can turn on this option by expanding the Chart section in the  Layers panel and selecting the chart category  ies  to be displayed on the map  By default  the  selected category  ies  will appear in the form of a pie chart  However  you can choose the view  the data in the form of a bar chart by selecting the appropriate option from the Chart Type drop   down  Figure 47      Note  When pointing the mouse cursor on any of the chart constituents  you can view the data  that stands behind it  The details on plotted chart categories are displayed when clicking the li  button     IDMS ANALYTICS USER MANUAL 68    fe IRAQ DEVELOPMENT MANAGEMENT SYSTEM    E My Workspace List Chart Map Report 
30.  Entity    Executing Body Gol Agency      Executing Body Gol Entity  More Filters    i  Reset     Submit    i Columns    Project Cost  USD    Add Column  Add Sub column Add Sub column       T View Criteria    Remove Filters             PREVIEW                     Peeacomus     Governorate  2   Project Cost  USD        Project  1  Title  1  Project Cost  USD   1   Project  2  Title  2  Project Cost  USD   2        COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 59  Creating Report 2    You will have the following result  Figure 60           Refine Report BA          Governorate Please Select            Submit    Reset    Unallocated             Cos  USD    geri Sard  Cual   Ca       idah 45      Lac          42123 sud                            gine je cl    CIP 170924  CIP 170926 30 263 750    CIP 170927 6 061 200    CIP 170928    CIP 170930    CIP 170932  CIP 170933       pal idal  45 2       Bic    seal Aa xal                            iiy      istal                      iota  idal   6 2         Je   CIP 170936    CIP 170990 NLIS TA  m    CIP 170996       CIP 170997 qi fud cR aas y az    lul 5 45 5    CIP 170998               ikae  Lac                             ERR  i         Figure 60  Sample List Report 2      N wn  N                      e  5    Co         29 452 500    13 206 000    14 200 000    6 898 360    13 972 800  2 875 500    8 920 172    3 372 500    1 675 600    IDMS ANALYTICS USER MANUAL 82  10 6 Customizing Reports    You can customize the rep
31.  INDICATORS SECTION IN MY WORKSPACE  crac an E e cc RC I Re Y i c ga vil pr e ecl e n 40  CREATE NEW INDICATOR BUTTON IN NDP INDICATORS SECTION                                nnns 41  ADVANCED SEARCH IN NDP INDICATORS                                                                 42  IDMS APPEH CATION LIST MODULE veces Cete dues ora qos ui US s    pus prada Rui UM UE 43  EXPANDING  THE LIST  TEM LEVEL deis eost Robe OR c e RR LIS ERR NUR         ETE                 De Pasa Fett ios 44  REFINE REPORT AREA                    ene oes                                       45  REFEINING A                   46  SHOWING IMAGES IN THE  LIST          etant i o PE ERE ERE ER etat E uw UY eet Croat PE          47  MODIFYING THE CURRENT VIEW          aed ota a usa Fed s o Cota cure ce es ob E E EAS ERO CUR suspense 48  DEFINING LIST VIEW GROUPINGS FOR SAMPLE VIEW 1                                       49  DEFINING LIST VIEW COLUMNS FOR SAMPLE VIEW 1                                        49  SAMPLE VIEW                                            50  DEFINING LIST VIEW GROUPINGS FOR SAMPLE VIEW 2                                     50  DEFINING LIST VIEW COLUMNS FOR SAMPLE VIEW 2                                    51  SAMPLE                                   RID DC               51                                               MODULE             tre etta EX EERET EIA seme EH HER Pbi to Eo AEE 53  VIEW SCREEN OF THE CHART  MODULE aroetan cols cute siete ad bra ea    dta uo pate          
32.  Main Screen and Its Components    AS     4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report Dashboard          Chart                                A      B    EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE   man View   gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS Category    Governorate v   Show Top jo   Values    NDP INDICATORS    CR          Series      Show Top  10       chat oes        a 18 JB bc        s               Secondary Axis    Update   Reset default      BE       Advanced Search    Filter by   Project Type  Project Implementation Status  Chapter 640  Governorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity   480  More Filters               720    560     View Criteria    Remove Filters 400    240    0          Baghdad  Anbar  Najaf  inawa  Karbala  Dhi Qar    Various  Unallocated  Basrah   N    Diwaniyah       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 39  Main Screen of the Chart Module    1  Category   allows selecting one of the options provided in the Category drop down menu  located at the top of the Chart window  The selected category will define one of the chart  axes  Selection of a category for the chart report is required     2  Series   allows selecting one of the options provided in the Series drop down menu  located at the top of the Chart window  The selected series will define the chart legend   Selection of a series fo
33.  Mame   Expression    Expr  Member 1    pp2  Operation           Expr  Member 2       Enter Value       List Under   Primary       Publish W                 Ok   Cancel      Figure 70  Adding an Expression       Enter the expression title in the English and Arabic languages    Select the expression members and arithmetic operation from the respective drop down  lists  Figure 70     Specify where to list the expression  The following options are available    e Primary   e Secondary   Note  Secondary expressions can be used as expression members    Choose whether to publish the expression by selecting the respective checkbox    Click the Ok button to save the expression  The newly added Primary expression will  appear in the categories list  Figure 69      Sample Report Formatting    If you have indicated     Projects Yearly Allocation Changes as the report title    Year   Reallocation Funding Type   Project   History  Status Changed On as the  report rows    Modified Allocation By Year  I QD  and  History  Allocated  I QD  as columns   Applied a filter to show only 2012 year projects with REALLOCATI ON REQUESTED  request status    Assigned some value characteristics  e g  font size  background color  etc    Figure 71      IDMS ANALYTICS USER MANUAL 90    A     4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM            My Workspace List       EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE    gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS       Advanced Search    
34.  My Workspace   opens the MY WORKSPACE MODULE to  manage user specific projects   List   opens the LIST MODULE of the selected Application  see  Main Menu description below    Chart   opens the CHART MODULE   Map  opens the MAP MODULE   Report   opens the REPORT MODULE   Dashboard   opens the DASHBOARD MODULE for quick access  to the projects registered in the IDMS system   Help   opens the IDMS application help      his menu contains sections with main functions of the IDMS   application   Application   lists all applications present in IDMS   Search   contains a common and advanced search functions  among the selected application list  For details  see SEARCH       Filter     contains filtering options  For details  see FILTERING   Main Menu Bar           Public Views  Charts  Maps  Reports   memorized views    charts   maps   reports  depending on the opened module   available to all users of the application   My Views  Charts  Maps  Reports   memorized views   charts    maps   reports  depending on the opened module  created by  and available to the current user only     Left  Right arrows          used to hide open the Main Menu  bar    Up  Down arrows  H    used to collapse expand the section  in the Main Menu bar    Frame Divider   used to adjust the width of the Main Menu  bar     In this frame  all applications and modules are managed  Here are  Workspace         filtering and search results displayed     Main Toolbar       Main Menu    Manipulation  Buttons       ID
35.  Resources   Energy Resources   Material Resources   Contract Implementation Style                                                       Move Up   E Move Down    Figure 36  Defining List View Groupings for Sample View 2       IDMS ANALYTICS USER MANUAL 51       Columns          Selected Columns    of Projects    Available Columns      of Approved Projects    of Approved Regular Projects Project Cost  USD      of Cancelled Projects E Requested  USD    Title Expended  USD    Objectives Project Implementation Status  Description   Project Code   Actual Duration  Months    Actual Duration  Days    Stan Date Actual    End Date Actual   Set as default  Stop Date             Government Resolution Number      Set     Default for  Project Gost  IQD  Public Users  KPI Target                                               ff Move Up   IL Move Down    Figure 37  Defining List View Columns for Sample View 2       If you have indicated Governorate   Qadha   Nahia   Project hierarchy as a grouping  Figure  36  and   of Projects   Project Cost  USD    Requested  USD    Expended  USD     Project Implementation Status as columns  Figure 37   the following list view will appear   Figure 38      My Profile About    Ll fc  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report Dashboard    List felsave    8         4 ty          Refine Report Modify Current View    Governorate   Qadha   Nahia   Project     of Projects   Project Cost  USD    Requested  USD    Expended  USD
36.  add a project request  which  should pass an approval procedure first and then become a project  see Regular Funding Request  Approval Procedure   The approval of the project requests is handled by the MoP Investment Unit  users  Before a project request gets approved  it should be first submitted as a draft request and  then pass a revision cycle  The approved request is copied into a project entry  while request  itself remains in the system as well  Both the submitted requests and the approved projects are  visible from the LIST MODULE and are available for analytics in the CHART MODULE  MAP  MODULE and REPORT MODULE of the IDMS application     Note  To keep the project active  the responsible entity should re submit the project request  every year     IDMS ANALYTICS USER MANUAL 17    The Capital Investment Project section of the My Workspace module  Figure 7  is divided into  three groups  My Draft Funding Requests  Submitted Funding Requests and Approved  Projects  These lists display the draft and submitted project requests and the approved capital  investment projects correspondingly     Certain actions are available for each of these sections  For details see the corresponding list  description below        Contact us  idmshelpdesk 2mop gov iq My Profile About Log Out   pF   4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    E My Workspace List Chart Map Report Dashboard Help       EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS       Financial Year
37.  appear  Figure 35      My Profile About Log Out wr    L     4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart        Report Dashboard Help    List  save  RSaveas 8 ty     EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE   Refine Report Modify Current View   gt  CAPITAL INVESTMENT PROJECTS   IRAQ DEVELOPMENT PROJECTS Chapter   Project     of Projects   of Projects   by modified total cost   NDP INDICATORS   n    01   Agriculture 325 13 41 17 54      n  02   Industrial 248 10 24    Advanced Search  amp  mem           03   Communications and Transportation 264 E 7 76      I2 o4   Buildings and Services i 27 40    Frbi m      05   Education and Higher Education zs  TOJect             Project Implementation Status   EE      Chapter 07   Industrial 1 0 00  Governorate T  Qadha  Year 3 2      Y      10   Education and Higher Education 4 0 00  Beneficiary Gol Entity Results 1 8 of 8  Executing Body Gol Agency   Executing Body Gol Entity Total    100 00  More Filters       09   Buildings and Services 1 0 00    Y View Criteria    Remove Filters    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC       Figure 35  Sample View 1    7 8 2 Sample View 2                                           Groupings             Available Groups Selected Groups    Project Type Governorate  Project Nature     Qadha  Project Implementation Status Hahia  Chapter Praject  Subject Lx   Subject Type   Year   Year Month   Type of Expense   Key Performance Indicator   Funding Type   Man power
38.  approved by MoP Investment Unit  user and then project funds breakdowns should be adjusted by Executing Body  When the  reallocation is adjusted  the project enters APPROVED state again  If there are no    I DMS ANALYTICS USER MANUAL 35    enough funds for emergency project reallocation  MoP Investment Unit user rejects the  reallocation request and the projects appears back in the APPROVED state    Note  During reallocation phase  the other project which has provided funds to the project  requested reallocation will also change its state  Once reallocation was verified  the project  which provided funds should be revised independently for funds breakdown adjustment     6 2 9 Emergency Funding Request Approval Procedure   Emergency funding requests are those created after the regular requests submission deadline has  expired but before the emergency request submission end date  The emergency requests can be  submitted even with the negative Balance  to be requested  and require an emergency    processing     The emergency funding request approval diagram is presented in Figure 22     B EMERGENCY DRAFT  REQUESTS    Executing Body    MoP Investment  una    Assigned MoP Sectoral Unit       EMERGENCY SUBMITTED  REQUESTS    Sectoral Unit EMERGENCY APPROVED    PROJECTS    signed Mc wm am MoP Investment Executing Body Executing Body  oral Unit Un    txecuting Body Investment Unit    Figure 22  Emergency Funding Request Approval Procedure    1  The Executing Body group user creates 
39.  internally within the  MoP Sectoral Unit     I DMS ANALYTICS USER MANUAL 25    Submitted funding requests may be selected deselected using checkboxes allocated to each entry  in the table  The top checkbox located in the heading of the Submitted Funding Requests list is  used to select deselect all submitted projects     The following functions are available for the Submitted Funding Requests list  Figure 16      View   you may filter the submitted requests in the Submitted Funding Requests list by  the specific report status  The View drop down list contains all statuses that the request  can get in the submission cycle  By selecting the certain status from the list  only requests  with the specific status will be displayed in the Submitted Funding Requests list    Submit   sends the selected requests for an approval    Note  This button appears when the selected requests passed a revision  have the status  PROCESSED and when available funds exist in the Budget Ceilings  see Adjust Budget  Ceilings   Please note  that if a Gol entity has other projects submitted  the available  funds for the new project will be calculated depending on the ceiling allocated to the  corresponding Gol entity and the funds already used by other approved projects for the  selected year     The following summary is displayed for the Submitted Funding Requests list     Requests   the number of submitted requests in the list and the total required funds for  those requests    New   the number of ne
40.  last update author    Updated On   last update date    Ready for Submission    indicates whether all mandatory fields are provided in the  project draft and it is ready to be submitted or not  If the project draft is ready to be  submitted  a corresponding Submit button      appears next to this column     6 1 1 Adding an External Assistance Project    To add a new external assistance project from the My Workspace module  follow the instructions  below   1  Goto the External Assistance Projects tab of the My Workspace module   2  Click the Create New Project button  Figure 6   This will open an Add External  Assistance Project form which is described in the External Assistance Projects Application  User Manual  see REFERENCES     6 1 2 Viewing External Assistance Project Details    Depending on your permissions you may also see or edit external assistance projects added by  other users     To view details of drafts and submitted projects in the My Workspace module  follow the steps  below    Go to the My Workspace module    Click the External Assistance Project tab    Expand the corresponding My Drafts Projects or My Submitted Projects list  Figure 6    Click the project you wish to see the details for  You will be directed to the Details section  of the External Assistance Projects application  For more information  see DETAILS  SECTION      gt  ope    6 2 Capital I nvestment Projects in My Workspace Module    To create a capital investment project in IDMS  you should first
41.  of the  project    e Update Physical Progress by indicating the most recent physical data of the project    e Stop due to being temporarily non actual  Stopped projects may be continued again   copied to the draft for the current year or for the next year    e Cancel due to being non actual  Cancelled projects may be continued again  copied to  the draft for the current year or for the next year    e Create Draft for the Current  Next Year for copying the project to the current next  year  The copied project will appear in the My Drafts Funding Requests list of the  current next year and will have the same project code as the original project   However  all other details of the copied project will be individual    e Reallocate if additional funding is required for the project  With this action  the  project will enter into reallocation request revision phase  Reallocation is performed to  request additional funds from other projects of the selected ministry for the needs of  the corresponding funding request     For details on each of these actions  and what data is required while taking the action  see  Capital Investment Projects User Manual in REFERENCES     5  For projects that have requested reallocation  the Assigned MoP Sectoral Unit user may  either verify the reallocation request or send it to the revision  Verified reallocation  requests are processed to the next stage where funding for reallocation should be  confirmed  If the funding is available  reallocation is
42.  selected Approve Year  gt  Project hierarchy as the groupings for the  view  you will be able to filter the data by Approve Year  In the same way  if you have indicated  Approve Year  gt  Project  gt  Year hierarchy as the groupings for the view  you will be able to filter  the data by an Approve Year and Year     A Contact us  idmshelpdesk mop gov iq My Profile About Log Out   4  Af  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM                        My Workspace List Chart Map Report Dashboard Help  List                       9 9     EXTERNAL ASSISTANCE PROJECTS    5              DONOR PROFILE     Refine Report Modify Current View   gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS Approve Year Please Select  gt   NDP INDICATORS Year Please Select v  B            0 Reset  Advanced Search Approve Year   Project   Request   Year   of Approved Projects  amp     1987 1       5        Filter by    1989 1  Project Type    Project Implementation Status   1990 1  Chapter   1991 1  Governorate  Qadha   1992 1  Year  Lt t  Beneficiary Gol Agency        Beneficiary Gol Entity   1994 1  Executing Body Gol Agency  Executing Body Gol Entity   1995 1  More Filters      1996 1   T View Criteria    Remove Filters   1997 1    1998 1  nie          2000 3   VE     a  3    2002 5    2003 5    2004 8    2005 5    2006 58    2007 5    2008 6    2009 6    2010      2011 2 370         COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 29  Refine Report Area    Once you select the approp
43.  socio economic  development  as well as to support the Government in effectively managing development  assistance and promoting the accountable and transparent use of resources     IDMS is a powerful tool to view project data organised into lists  reports  charts  and maps   present the project data in the form of different analytical reports in the List  Chart  Map and  Report modules  memorize save the reports  print them  and export them into PDF  MS Word and  MS Excel format files     IDMS is designed to provide quick access to the project and aid data remotely via Internet  Once  you have accessed the application  you can view the project data stored in the database  add  new projects  edit existing ones  etc     In the current design  I DMS consists of the following applications     e External Assistance Projects   this application is designed to track the ongoing projects  that are financed from external sources  e g  donor community  International NGOs  etc   Once you have accessed this application  you are able to view project details  track aid  flows to the country  and create analytical reports in the List  Chart  Map and Report  modules  Moreover  in this application you can add new projects or modify the information  of existing projects through the built in on line Data Entry module     e Donor Profile   this application is designed to track the donor profile information   Moreover  it gives the donor organisations   entities the possibility to provide informa
44.  you can create dashboards   include reports under them  etc     IDMS ANALYTICS USER MANUAL 93    11 3 Main Screen and Its Components    A ic  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM Contact us  idmshelndesk mon govia   MyProfile   About   Log Out          My Workspace List Chart Map Report 85 Dashboard      of Projects  Expended  IQ           Projects by Governorates   CAPITAL INVESTMENT PROJECTS   4      50 000 000 000 000       Customize   Update All    New                 Save   Save as New   Remove   Cancel      hd Hass           Dashboard modified  Public     Scroll Mode  F      gt               EXTERNAL ASSISTANCE PROJECTS      gt   it of Projects by Province   CAPITAL INVESTMENT PROJECTS   ey     amp  A w  a     Awa     Y          of Projects 22 Expended  IQD              i  Nation wide      i  Outsite of Iraq      i  Unspecified                                    i Various    Nationwide  Basrah 4  inawa           iia   Salah ad Di ni  Dhi       m    Governorate    95 600 000 min       1 1 47 800 000         9              Basran         Maysan        Various  Baghdad  Muthanna  Dhi Qar  Other    Salah ad Din       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 73  Dashboard Module    e Dashboard Selector   contains a list of pre defined dashboards  By choosing a definite  dashboard from this list  you can view the reports stored in the selected dashboard     e Customize   allows performing the following operations     Name   displays the dashboard name    
45. 0  620 055  135 216  156 656 817 427  1 570 478 238 768  1 327 939 152 929  1 372 996 984 896  141 306 719 062  186 806 675  1 341 836 578 408  1 108  139 240  1 813 846  712 568  729 437 525 400          Results 1  22 of 22         COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    IDMS ANALYTICS USER MANUAL 52  8  CHART MODULE    The IDMS application is equipped with a powerful chart designer that empowers you with all  necessary tools to create charts for professionally looking presentations and reports  A user   friendly interface  great number of visual effects and pre defined chart types  flexible chart  components selection  and on screen real time chart visualization make using the chart designer  an easy and delightful experience     8 1 Key Features    You can make use of the following key features of the Chart tool in IDMS   Y Rich user interface that supports movable windows for arranging the screen as desired   Y The ability to resize the charts directly in the workspace   Y The ability to show or hide the data labels and legends   Y The ability to customize the coloring  or choose pattern filled charts for black and white  printing     8 2 Accessing the Chart Module  As it has been stated above  the system provides for the opportunity to present data in the form    of different charts  In order to access the Chart module of the system  click the Chart tab  The  Chart module appears where a pre defined chart is displayed     IDMS ANALYTICS USER MANUAL 53    8 3
46. 014  which envisages approximately 3000 projects with a total  value of US 186 billion to be implemented over the coming five years  This system was designed in collaboration by teams of  experts from the Ministry of Planning  USAID Tatweer  the UNDP  and Synergy International Systems  The IDMS will foster  accountability and transparency in managing development resources in Iraq     The IDMS is hosted on a secure server within the Ministry of Planning in Baghdad  However  users are able to access the system  online  An offline version is also available for users with slower internet connectivity  Due to the cutting edge processes and  technology used to integrate JavaScript with Oracle 11g  this system is wholly capable of managing the complex portfolio of  development projects across all of the 18 provinces of Iraq  Users of the system will include MoP staff  line ministries  governors   offices  executive offices of the GOI  and donor organizations     ANALYTICS  amp  REPORTING GUIDES DATA ENTRY GUIDES LOGIN AS A GUEST       IDMS Analytics     Extemal Assistance Projects      IDMS Handbook    Capital Investment Projects User Name     Donor Profile      NDP Indicators Password       Standard Operating Procedures  Request a new account    Forgot your password                 Figure 1  IDMS Application Login Screen    A successful login directs you to the My Workspace module of the IDMS application     You may switch the login screen language of IDMS into Arabic by pressing  
47. 014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 23  Advanced and Quick Search Options in Capital Investment Projects Section    6 2 12 1 Quick Search    The quick search options are displayed in the My Workspace module right above the list of capital  investment projects and requests  You may want to filter the list of projects and requests for the  certain Year  Executing Body  or Agency     Selecting either of the criteria in the quick search toolbar will displayed a filtered list of  projects requests     Note  You may join both the Quick Search and the Advanced Search criteria together to get the  needed filtering     To reset the yearly filtration and display the list of projects requests of all years  press the All  link in the right side of the quick search toolbar     6 2 12 2 Advanced Search    The advanced search mechanism is used to filter the list of indicators depending on the given one       more advanced search criteria  Figure 23      The following advanced search criteria are available   e Governorate   filters by the governorate the project is dedicated to   e Funding Type   filters by the funding type assigned to the project   e Project Type   filters by the new or ongoing projects     I DMS ANALYTICS USER MANUAL 39    e Sector   filters by the economy sector the project is dedicated to    e Implementation Status   filters by the status of the project request    e Keyword  filters the indicators by the keywords  You may want to search the indicated  keywor
48. 11 4 2 Add an      to a Dashboard    In order to add a report to a dashboard  follow the steps described below    1  Click the Add New Item link  The list of all reports previously saved reports will appear   Figure 75     2  Select a report to add to a dashboard and drag and drop it onto the main screen    3  If you want to add another report to the dashboard  select it in the list  drag it onto the  main screen and hold the left mouse button until a green rectangle appears on the screen  indicating an area where the new report can be placed  Keep the mouse button pressed  until the green rectangle turns blue and release the mouse button  Figure 76     4  You may add multiple reports to the dashboard     Note  The reports can be arranged either in vertical or in horizontal order  Once the place for the  report is selected  it cannot be changed     IDMS ANALYTICS USER MANUAL 96         Contact us  idmshelpdesk mop gov iq My Profile About Log Out E  4  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM      My Workspace List Chart                        Dashboard       Customize   Update All    New    Save   Save as New   Remove   Cancel      Dashboard modified    0 Add New         Public Scroll Mode     Olu   EXTERNAL ASSISTANCE PROJECTS   e v  Projects by Governorates   CAPITAL INVESTMEN          s          i                                    N   of Projects  gt  Expended  120     of Projects by Province   CAP                                     CAP                  e             5 NJ  
49. 13   2014   2015   2016   2017  Governorate  All Governorates Y   amp l    Add Announcement  Funding Type    Figure 10  Add Announcements Button in Capital Investment Projects Section    This will activate the Announcements field  Figure 11      g q My Profile About Log Out   22         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM             LJ My Workspace Dashboard  EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup  ESEARCH CRITERIA      Executing Body Amanat Baghdad   All Agencies      Add Edit Ceilings   ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  Governorate  All Governorates      Please note that the deadline for emergency projects has been extented to October 2014     Funding Type E   All Funding Types  gt     Project Type   AI Projet Types    Emy Draft Funding Reawests  4          Figure 11  Editing Announcements Area in Capital I nvestment Projects Section    Enter the announcement text in the English and Arabic languages and press the Submit    Announcement button  2  to post the announcement  The date of the last update will be  displayed in the Announcement area  To remove the posted announcement  activate the  Announcements field by clicking it and remove the text of the announcement  If no  announcement was made  regular users will not see the announcements area in the Capital  Investment Projects section of the My Workspace module     6 2 2 Financial Years Setup    In the Financial Years S
50. 171147    Sil  3 aaa      1  Y More Filters    T d Aen carm PE Re mplementing    T View Criteria    Remove Filters CIP 171148                    cies Implementing    CIP 171151 Seyi al         idad 45 p      Implementing  CIP 171155 ED s Stall        Implementing  CIP 171158    pal pl            Posting Advertisement  CIP 171225 LEL gi il        Jane has Implementing     Sub Sector of Health Sector         Sub Sector of Environment and Sustainable Development       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 90  Search Results    IDMS ANALYTICS USER MANUAL 116  16  LOGGI NG OUT    Once you have finished using IDMS  it is necessary to terminate the session and log off  In order  to log off from the system  press the Log Out button in the upper right corner of the system  window     17  REFERENCES  Please refer to the following IDMS related documents     IDMS External Assistance Projects Application User Manual  IDMS Capital Investments Projects Application User Manual  IDMS Donor Profile Application User Manual   IDMS NDP Indicators Application User Manual   IDMS Administration Center User Manual    
51. 21 Jan   Gi  2012  Indicator from rj 13 28  Updated     IRQ 000545   iz    bol gts   ASQ 42      lt  132 1 kW  kilowatt           mays   21 Jan      to  5  2012  13 18   gt   Submit     Reset 123456789 10 Next gt  gt   SUMMARY 510 Indicators  10 Agriculture  59 Education    25 Environment and Sustainable Development  57 Fiscal Management   35 Health Sector   22 Housing sector   85 Industrial   19 Population and Unemployment  23 Private Sector   47 Spatial Dev   26 Tourism   74 Transport and Communication  8 Wastewater   12 Water   8 Youth Sector       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 25  Create New Indicator button in NDP Indicators Section    This will open      Add Indicator form which is described in IDMS NDP Indicators User Manual  see  REFERENCES     6 3 2 Viewing Indicator Details  Depending on your permissions you may also see or edit NDP indicators added by other users     To view details of drafts and submitted projects in the My Workspace module  follow the steps  below   l  Go to the My Workspace module   2  Click the NDP Indicator tab   3  Click the indicator you wish to see the details for  This will open indicator details  For  details  see REFERENCES     6 3 3 Search in NDP Indicators of My Workspace    The advanced search mechanism is used to filter the list of indicators depending on the given one  or more search criteria  Figure 26      IDMS ANALYTICS USER MANUAL 42         My Profile About Log Out   x         4  IRAQ DEVELOPMENT M
52. 47    My Profile About Log Out                4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report Dashboard Help    List felSave  RSaveas 0 9  EXTERNAL ASSISTANCE PROJECTS    gt   DONOR PROFILE   Refine Report Modify Current View     gt  CAPITAL INVESTMENT PROJECTS    IRAQ DEVELOPMENT PROJECTS Project Implementation Status   Project   of Approved Projects    NDP INDICATORS      Unspecified 422       Feasibility Study 56        Design 70  Advanced Search      Posting Advertisement 112        Implementing    Filter by       Cancelled    Project Type   Project Implementation Status     Chapter      Se   Governorate   ERN     Qadha     Stopped   Year   Beneficiary Gol Agency      Settlement accounts   Beneficiary Gol Entity   Executing Body Gol Agency    94 Ay ply cine   Executing Body Gol Entity Results 1   11 of 11  More Filters            Accomplished    Total 2 423  T View Criteria    Remove Filters       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 31  Showing I mages in the List    Note  Clicking the     button will hide the images   7 7 Modifying the Current View    It is possible to modify the list that is currently displayed in the List module  You can add new  groupings to it or remove the selected ones   un   select columns  re order them  etc  The steps  described below provide for the necessary instructions for modifying the current view    1  Click the Modify Current View link at the top right corner of the List screen  A 
53. ANAGEMENT SYSTEM    ED My Workspace List Chart        Report Dashboard       EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS       ISEARCH CRITERIA   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  Responsible Organisation    All Re sible Organisati up Create New Indicator                                           Governorate Updated  All Governorates Indicator Y Indicator Name Unit of Measure   of Locations Target Actual    Updated By      IRQ 000561 1514 23221  1 82 333              49 24  491 4 46 kW  kilowatt  user admin pg  m    lt   lt   All Sectors 03 28  IRQ 000560   iaza 1  1 em          Percentage 1 33 00 66 67 Admin 25 Feb        Sub Sector Synergy 2014       Sub Sectors _ _ 04 04  IRQ 000553 22               4           Number Count mayd mays   01 Feb        2012  Data Source 05 50  All Data Sources IRQ 000552   2544  cos    100 USE 2   285 Percentage mayd mays   27 Jan   8  2012     Objectives IRQ 000550   3   Number Count d     12                 N              Objectives z    umber Coun mayd mays     m   04 07  Means of Objectives IRQ 000549      5 3   1 Number Count mayd mays   27 Jan        All Means of Objectives 2012  04 03  Keyword IRQ 000548 2   adl          km  kilometre           mays   27 Jan   8  2012  03 26  Keyword  F  Indicator IRQ 000547     km  kilometre  mayd mays   27 Jan         F  Indicator N       al ndicator Name 03 23  Description IRQ 000546 2 kW  kilowatt  mayd mays   21 Jan       2012  Ind
54. Although  public users have access to the project data  they are  not able to create new projects or modify   delete the existing ones     Public users wishing to view project data should click the LOGIN AS A GUEST button  Figure 1    They will be directed to the List module of the IDMS application     IDMS ANALYTICS USER MANUAL 12  5  IDMS ANALYTICS STRUCTURE  I DMS consists of the following main sections     e MY WORKSPACE MODULE   used for quick access to the projects registered in the IDMS  system by the user s group    e LIST MODULE   used to create and execute ad hoc queries on the data and acquire  results in the form of a list    e CHART MODULE   used to filter and display the data in a chart form    e MAP MODULE   used to filter and display the data in    map form    e REPORT MODULE   generates complex reports over one or more criteria and presents the  output in the printable and user friendly format    e DASHBOARD MODULE   used for quick access to the projects registered in the IDMS  system     The IDMS main window has a complex preview as it is shown in Figure 4              al Contact us  idmshelpdesk 2mop gov iq My Profile About Log Out   p    Haad a  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM  Main Toolbar                  My Workspace Chart Map Report Dashboard    felsave PRSaeas 4          EXTERNAL ASSISTANCE PROJECTS M  DONOR PROFILE   Refine Report Modify Current View   gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS Project Type   Project Implementat
55. D    Modified Allocation By Year  IQD   Modified Allocation By Expense Type  Modified Allocation By Location  IQD   Allocation By Year  IQD    Requested to Release  100   Released  100    Expended  IOD    Contract Cost  100    Expended Credit  100    Expended Predecessor  100   Expended Total  100    Modified Allocated with Rollover  IQD  Rollover  100    Project Cost  USD    Modified Project Cost  USD   Modified Allocation By Year  USD   Modified Allocation By Expense Type  Modified Allocation By Location  USD   Allocation By Year  USD    Requested to Release  USD   Released  USD    Expended  USD    Contract Cost  USD                                                                                                                                                                    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    IDMS ANALYTICS USER MANUAL 74  10  REPORT MODULE    In the Report module of the IDMS application  you can create and execute ad hoc queries on the  data  and acquire results in the form of different reports     10 1 Accessing the Report Module    As it has been stated above  the system provides for the opportunity to create different sorts of  list reports  In order to access the Report module of the system  click the Report tab  You will be  navigated to the Report module of the application where the Report Designer  Figure 53  will  open     In this module  you can create list reports  save them as pre defined reports  arrange them       the desir
56. D Iraq   OP 10337    Involving the        journalists and media in organising Public Debates for the Constitutional process  admin user 04 Apr 2013 07 15 04 Apr 2013  and Support a New Democracies TV film Festival    DAD Iraq   OP 39537   PARSON STUDY  TAL AFAR HQ Ninawa  Govn   Tal Afar  Dist  01 Apr 2008  0  OP 35549  1B  NATIONAL PLC NETWORK REHABILITATION  GRC  01 Apr 2008  0  OP 35550  1    REGIONAL WIRELESS COMMUNICATIONS NETWORK 01 Apr 2008  0  OP 35551  10  SOUTHEAST REGION CONTROL CENTER  GRS  01 Apr 2008  0       35552  1    NORTHWEST REGION CONTROL CENTER  GRN  01 Apr 2008  0       35564  CONTRACT TERMINATED   PARSONS  BORDER POST   AS SUL  08   DARALWA 01 Apr 2008  0  OP 35566  CONTRACT TERMINATED   PARSONS  BORDER POST   AS SUL  15   JUTON 01 Apr 2008       123456789 10 Next  gt  gt        COPYRIGHT 2012 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 6  External Assistance Projects Section in My Workspace    Note  Only submitted drafts are displayed in the List table of the External Assistance Projects  application  see LIST MODULE  and accessible to other users of the IDMS application     In this section  an external assistance project may be created  details of existing projects can be  viewed and edited     I DMS ANALYTICS USER MANUAL 16  The information displayed in the My Workspace for each project includes the following     Project I D   the code of the External Assistance Project    Project Title   the title of the External Assistance Project    Updated By  
57. Dashboard    Map  EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE     gt  CAPITAL INVESTMENT PROJECTS      Pie Chart      IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS 4 B                  Info      Scaling    Advanced Search      i  Nation wide       i  Ert          i  Outsite of Iraq    i  Unspecified       Chart      of Projects     of Contracts     of Requests     of Projects   Project Cost  100    Modified Project Cost  100    Modified Allocation By Year  100   Modified Allocation By Expense Type  1  Modified Allocation By Location  IQD   Allocation By Year  IQD    Requested to Release  100   Released  100    Fnandad  Tn    Filter by   Project T     Project Implementation Status  Chapter   Governorate   Qadha   Year   Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters          i Various          1 EJ EJ EJ EJ EJ DJ EJ Ed ISI E KI          T View Criteria    Remove Filters    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC       Figure 47  Selecting Chart Type  Administrative    You can turn on border information by expanding the Administrative section in the Layers panel  and selecting one of the following options    e Auto   displays border information for all territorial units when the zoom in is selected   For example  if you zoom in to the qadha level  the border information for both  governorates and qadhas will be displayed on the map    e Governorate   displays the border information for all governorates 
58. ERGY INTERNATIONAL SYSTEMS  INC    Figure 74  Adding a New Dashboard    1  Click the New button at the upper right corner of the screen  New field appears in the left  part of the screen to give a name other than the default one to the dashboard and to save  it  Also  the list of all existing pre defined reports is used to add new items to the  dashboard  Figure 74     2  Give the desired name to the dashboard in the English and Arabic languages    Add reports to the dashboard  see Add an Item to a Dashboard    4  Save it     E    IDMS ANALYTICS USER MANUAL 95    My Profile About Log Out   pe         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM      My Workspace List Chart Map Report 85 Dashboard       Customize v   Update All    New    Save   Save as New   Remove   Cancel  Public      Scroll Mode            Il cj Add New Item       of Projects by Province   CAP       t                                  CAP        gt                  2                        3151 pahe      2011   14            us all                  2011   CAPITAL INVESTME      Set Sector   CAPITAL INVEST       Sector wise Distribution of Exte      Location wise distribution of Ex        Disbursement by Governorate          World Bank Projects   EXTERN                   Cammitments hv Gover    Drag items here                                            7    Drag and drop the desired component onto  the dashboard screen       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 75  List of Pre defined Reports  
59. Eee a Ie Een adde etae tne RN 97       Discard the Changes                         98  Ll4 7              tesa        s Saw teense ae                                   98   12  DETALLS SECTION                                          ober a sativus heared                                                 99  Wo ACCESSING THE DETAILS  SECTION eco                 laces              bub ee             bad een      99  12 2  BROWSING AMONG PROJECTS  ox    Eve                           vede A AE        101  12 3 PRINTING THE PROJECT DETAILS                                          ERR EHE RA 101  12 4  EDITING AN EXISTING PROJECT        ed               cct        Pt DER Pr Re her ber e fo ERE EHE 101   13  CUSTOMIZED                                lt                                                                                             102  L3 L  SETTIHING REPORT  OPTIONS sida des secu dui souder v            suu Ed eso uv veles otc ead Vetus ciu voa        dE 102  L3 2  ONINO IREPORT S                            Soa edocet emn Acasa Rus Ue E Scania a ae DIA        102   13 2 1     How to Save New Reports  rro e IRI tei ERtRETPR Sex        Nae UERITAS 103  13 2 2        to Save a Copy of the Report                                                          103  13 3  RE ORGANISING REPORTS                                                                              104  13 3 1 Renaming Reports and Report                                                          emnes 104  13 3 2 D
60. Governorate    All Governorates       Please note that the deadline for emergenct projects has been extended to October 2014  Funding Type    All Funding Types      Project Type  All Rroiert Types    Figure 8  Announcements Area in the Capital Investment Projects Section    The Financial Years Setup link in the right upper side of the Capital Investment Projects section   Figure 9  leads to the Financial Years Setup form to select active years and define regular and  emergency request submission dates     gov iq   My Profile   About Log Out   pe         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM                E My Workspace Dashboard  EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup  ESEARCH CRITERIA      Executing Body Amanat Baghdad   All Agencies        Add Edit Ceilings  ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  Governorate  All Governorates      Please note that the deadline for emergenct projects has been extended to October 2014  Funding Type  All Funding Types  gt    Project Type    Figure 9  Financial Years Setup Link in the Capital Investment Projects Section    Requests are considered as regular if they are created within the regular request submission  period  For regular requests  the workflow is described in Regular Funding Request Approval  Procedure     Requests created after the regular requests submission deadline has expired are considered as  emergency  They can still be submitte
61. HE CAPITAL INVESTMENT PROJECTS SECTION                                  18  FINANCIAL YEARS SETUP LINK IN THE CAPITAL INVESTMENT PROJECTS                                         18  ADD ANNOUNCEMENTS BUTTON IN CAPITAL INVESTMENT PROJECTS                                           19  EDITING ANNOUNCEMENTS AREA IN CAPITAL INVESTMENT PROJECTS SECTION                           19  FINANCIAL YEARS SETUP WINDOW IN MY                                                         20  CALENDAR  21326082 Unit 1213 HOS Rb Eo                            uo aae T           TE DIRE  20  FUNCTIONS AND SUMMARY IN DRAFT LIST OF CAPITAL INVESTMENT PROJECTS SECTION               22  CREATE ONGOING FUNDING REQUEST                                                              23  FUNCTIONS AND SUMMARY IN SUBMITTED LIST OF CAPITAL INVESTMENT PROJECTS SECTION         26  SUMMARY IN APPROVED LIST OF CAPITAL INVESTMENT PROJECTS SECTION                               27  ADJUST BUDGET CEILINGS FORM   PART 1         ccccecsceccucsecctecceuceutteceeetteceeuttseeeurteettsenas 29  ADJUST BUDGET CEILINGS FORM PART 2  1  cce xcu x m ERO EET CE EE EXCURRIT DECR 30  ADJUST FUNDING REQUESTS  ALLOCATIONS FORM                              nemen haha 32  REGULAR FUNDING REQUEST APPROVAL PROCEDURE                                       33  EMERGENCY FUNDING REQUEST APPROVAL PROCEDURE                                  enhn nn 35  ADVANCED AND QUI CK SEARCH OPTIONS IN CAPITAL INVESTMENT PROJECTS SECTION                 38  NDP
62. I RI NG EMERGENCY FUNDI NG   shows up for emergency requests only when  no enough funding is available to process the request    EMERGENCY FUNDI NG REQUESTED   shows up for emergency requests only when  funding is requested for the request    EMERGENCY FUNDING VERIFIED   shows up for emergency requests only when  funding for the request has been verified    EMERGENCY FUNDI NG REVI SI ON REQUESTED   shows up for emergency requests  only in the stage of funding revision    EMERGENCY FUNDING REJECTED   shows up for emergency requests only when  funding for the request has been rejected    EMERGENCY FUNDI NG APPROVED   shows up for emergency requests only when  funding for the request has been approved     e Actions   you may view       edit   2   and delete   X  the draft request   Note  The delete action is available to administrator or Executing Body users and serves  as a permanent delete for the funding request  the record will be fully deleted from  IDMS      In the My Draft Funding Requests list  drafts are marked in red and grey colors  Red drafts are  those that are still pending mandatory information to be provided and cannot be submitted at  this stage  Grey drafts are ready for the submission     Draft projects may be selected deselected using checkboxes allocated to each entry in the table   The top checkbox located in the heading of the My Draft Funding Requests list is used to  select deselect all draft projects  Figure 14   Below are listed functions to perform ov
63. MS ANALYTICS USER MANUAL 14  6  MY WORKSPACE MODULE    The My Workspace section  Figure 5  of the IDMS application provides quick access to the  projects and indicators created by the corresponding user     In order to access the My Workspace module  click the My Workspace tab in the Main Menu of  the IDMS application  Editing permissions for records in the My Workspace can be based on the  user  whether the user has created the record  or user s group  whether someone from the group  user belongs to has created the record   All these permissions are granted and managed from  IDMS Administration Center  see IDMS Administration Center User Manual in REFERENCES      The My Workspace contains the following sections     e External Assistance Projects   the draft and submitted external assistance projects are    displayed here  See External Assistance Projects in My Workspace Module   e Capital Investment Projects   the draft requests and approved capital investment    projects are displayed here  See Capital Investment Projects in My Workspace Module   e NDP Indicators   the National Development Plan Indicators are displayed here  See NDP    Indicators in My Workspace Module             My Profile   About   Log Out               4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       ED My Workspace List Chart Map Report Dashboard    EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS       Create New Project    i Project records will be available for submission only 
64. Modify  Current View window  Figure 32  will appear presenting the administrator with the  groupings columns selected and available for the list view    2  In the Groupings section  add   re order   remove groups    In the Columns section  add   re order   remove columns    4   n the Cross Tab Groupings section  define add   re order   remove column groupings for  the view    5  Set the view as default  if necessary  Please  note that the view can appear as default for   a current user or for unregistered public users    6  After finishing making changes in the view  click the OK button for the changes to take  effect  Or  click the Cancel button to discard the changes made     aa    I DMS ANALYTICS USER MANUAL 48          Groupings         Available Groups Selected Groups    Project Implementation Status  Project            x Cancel      Set     default  Key Performance Indicator  Funding Type Set as Default for  Man power Resources Public Users  Energy Resources    4  Mowe          Move Down       Figure 32  Modifying the Current View  7 7 1 Adding List Groups   Columns   Column Groupings    In order to add a group   column   column grouping to the list  follow the steps below   1  In the Available Groups   Columns panel  select the group   column   column grouping to  be added to the list   Note  It is possible to select several groups   columns by means of the Shift or Ctrl  keyboard buttons     2  Click the  gt   Select  button  The selected group s    column s  will app
65. ONAL WIRELESS COMMUNICATIONS NETWORK 01 Apr 2008  0  OP 35551  10  SOUTHEAST REGION CONTROL CENTER  GRS  01 Apr 2008  0  OP 35552  1E  NORTHWEST REGION CONTROL CENTER          01 Apr 2008  0  OP 35564  CONTRACT TERMINATED   PARSONS  BORDER POST   AS SUL  08   DARALWA 01 Apr 2008  0  OP 35566  CONTRACT TERMINATED   PARSONS  BORDER POST   AS SUL  15   JUTON 01 Apr 2008       123456789 10 Next  gt  gt        COPYRIGHT 2012 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 5  My Workspace Section    IDMS ANALYTICS USER MANUAL 15  6 1 External Assistance Projects in My Workspace Module    In this page you may see a list of draft and submitted external assistance projects  Each project  created in IDMS either from the My Workspace module or from the corresponding application  Should get submitted first in order to become public and official  Below is the procedure of project  Submission     e        user adds an external assistance project  It is saved as a draft in the user s  workspace  in the My Draft Projects list  Figure 6   Drafts may also be viewed and edited  by other users that have the corresponding permissions  Further  drafts should be revised  by the user or by the corresponding project manager    e If all mandatory fields are filled in the project form  then draft gets a    Ready    state in the  Ready for Submission  column of the drafts table  If at least one mandatory field is not  yet filled  the draft has  Not Ready  state    e Only drafts with the  Ready  state can b
66. P 170586  CIP 170587    7 100 000  1 567 183            1   170588 dsl py pal                       os    40 xa    4 260 000       11 040 500      1   170590           alf sk iiia jani 53 995 500                CIP 170592       o o o  Ei 5 z          2g                        FIM          t   E Ey bab o      mE        E  b  LI        e   8 2  3  s   2 x  e 8        o  o              o                  wo 4 e             e e     9    5 S      2 2 9     s       8          als       Figure 58  Sample List Report 1  10 5 2 Sample Report 2    If you have indicated   e Governorate as the report table grouping   e Project as the report row   e Title and Project Cost  USD  as columns  Figure 59    e Applied a filter for the governorate field to show only Babil projects     IDMS ANALYTICS USER MANUAL 81           4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    R My Workspace List Chart                                      Help          Report Esae  savas   S a A wj g     EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE DESIGN      CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS       Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report  x    i Title      Show details    Compatibility Matrix       Governorate    Advanced Search Add Grouping    Filter by   Project Type  Project Implementation Status  Chapter  Governorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol
67. P Allocation  Planned Allocation  Allocation Approved by Mop   CoM  Allocation Approved by Parliament  Rollover Amount  Final Allocation   this field expresses the summary of the Rollover Amount and  Allocation Approved by Parliament  if available  otherwise Allocation Approved by Mop    CoM  if available  If  it is not available  then the Planned Allocation will be displayed   2  Make the appropriate changes      the input fields and save them by clicking the   OK  button     For each of the above data  the Total is calculated for all agencies in the Gol entity and for all  Gol entities in the fund and is displayed in red color next to the corresponding fund and Gol  entity name     Note  All values in the Adjust Budget Ceilings form are displayed and inserted in the local  currency IQD  Iraqi Dinar     For each modification made to the ceilings  you should provide a comment in the Justification  for Changes in both English and Arabic languages     You may additionally attach any ceilings related attachments from Attach Document section   For details on how to attach documents or other related files  see IDMS Capital Investments  Projects Application User Manual in REFERENCES     I DMS ANALYTICS USER MANUAL 31    The User Activity Log displays information about the recent changes made to the funds   Identifies the users who performed the changes and the date time when the modifications were  made     Note  In the right side you may select the number of latest updates to be d
68. R EUR DEVE IR DPI MEN ER            UR be Ve FUE BET Nds 110  FIGURE      INI NAL VIEW See avs iet                                       ERU ELI                  C ME 111  FIGURE G6  SAMPLE FIETERING CRITERIA                        Y Ra e b ERO FR E yb Ya Ed 111  FEGURE O A FIETERED  LIST      C rM 112  FIGURE      CREATING A SEARCH CRITERIA      E E ET ANEA 113  FIGURE      DEFINING SEARCH CRITERIA                  pe UE AAT ETE ID    eae es 114    FIGURE 90S SEARCH RESULTS eite etti eE a vi      ve e E T        bI DE Et and pu o 115    IDMS ANALYTICS USER MANUAL 6  1  INTRODUCTION    The purpose of this document is to describe how the Iraq Development Management System   IDMS  application functions and to provide the necessary instructions to ensure successful work  with the application  Use of this document and compliance with the standards specified herein is  mandatory for anyone working with the mentioned application     2  OVERVIEW    The Iraq Development Management System  IDMS  is an automated information management  system which is designed to improve efficiency and coordination of donor activities in Iraq  It is  also a powerful tool for tracking and analyzing aid flows  The system serves as the main database  and data collection and reporting system as it ensures effective access to the aid data     The main objective of IDMS is to serve as a reliable and credible source of information on overall  donor contributions to Iraq s reconstruction  economic recovery and
69. Row link and selecting the appropriate item from  the menu that appears  Please note that it is possible to select one row at a time from the  list of available rows    5  Select table columns by clicking on the Add Column link and selecting the appropriate  item from the menu that appears  Please note that it is possible to select one column at a  time from the list of available columns    Note  Once the report column is selected  an Add Sub column link becomes available  under the selected column  It allows indicating how the row details displayed under each  column will be divided     I DMS ANALYTICS USER MANUAL 76                                                    fe  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM            My Workspace Dashboard    Report  ejsave  8             8 Fa          amp         EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE Z DESIGN   gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report x  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS  i Title      Show details        Compatibility Matrix     Add Grouping  Advanced Search i Columns  2 Rows                   Add           o    Expression  Add Row Project General Information      Request General Information  gt           Filter by  Request Financial Information      Project Type Organisations    Executing Body Gol Entity  Project Implementation Status Important Dates    Execut
70. SYSTEMS  INC       Figure 71  Creating and Formatting a Report    You will have the following result  Figure 72      IDMS ANALYTICS USER MANUAL        Refine Report       Reallocation Funding Type Please Select     gt   Submit    Reset    Year   Reallocation Funding Type   Project    History  Status Changed On Modified Allocation By Year  100   History  Allocated  IQD   Edit Breakdown by Type of Expense                           Transfer  CIP 171437  22 Oct 2013 04 55 29 AM  CIP 171445  22 Oct 2013 04 55 30 AM  CIP 172961  06 Jun 2013 04 23 29 AM  06 Jun 2013 04 25 23 AM  CIP 172962  06 Jun 2013 04 40 09 AM  28 Feb 2013 01 30 21 AM  28 Feb 2013 01 48 19 AM  28 Feb 2013 02 05 10 AM  28 Feb 2013 02 13 08 AM  CIP 172963 340 000 000  06 Jun 2013 04 23 30 AM 340 000 000                      T T 1   mammae         SSCS    Report generated      15 Apr 2014 15 18 by Synergy Admin             History  Request Status       REALLOCATION REQUESTED    2 000 000  2 000 000  2 000 000  210 000 000  210 000 000  210 000 000  210 000 000  210 000 000  210 000 000             80500036       moam  wsmm      600 000 an  C  waemGWama                     210000000          77 20200000                                 77             Figure 72  Sample Formatted Report       91    IDMS ANALYTICS USER MANUAL 92  11  DASHBOARD MODULE    Reporting requirements have changed dramatically over the past few years  Nowadays  it is not  enough to be able to produce a report to analyze data  but it is more esse
71. Save   saves a dashboard so that it can be shared with other users    Save as New   saves a dashboard as a new one  This option is especially useful if you  need to make modifications in a definite dashboard while keeping the source  information intact  This way overwriting of the original dashboard is prevented    Public   makes the dashboard available to other users as well if selected    Scroll Mode   toggles the scrollbar thus allowing additional space for adding reports  to the dashboard    Remove   deletes a dashboard together with its contents    Cancel   discards the modifications made to the dashboard currently displayed on the  screen     e Update all   loads the latest data from the database     e New   creates a new dashboard     IDMS ANALYTICS USER MANUAL 94    e Add New Item   adds a new report under the definite dashboard from the list of all pre   defined reports previously created     e Dashboard Workspace   the main screen of the Dashboard module where the content of  a definite dashboard is viewed     11 4 Dashboard Management    11 4 1 Create a New Dashboard    In order to create a new dashboard  follow the steps below     Al Contact us  idmshelpdesk mop gov ig My Profile About Log Out   pe  A  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report   Dashboard       Customize v Update All o New    Save   Save as New   Remove   Cancel    Public F  Scroll Mode  E         Eg Add New Item       Drag items here       COPYRIGHT 2014 SYN
72. Show       Data Table     Data Label      Legend    Pattern Show in      In percent    v   Font               Size       Advanced Search           rt igiene  E Unspecified Implementing  jog i m Accomplished Unspecified  Project Implementation Status      Posting Advertisement missi lii  Chapter m Design Posting Advertisemi  a     Not Implemented yet   Design    Year   Feasibility Study Not Implemented y   Beneficiary Gol Agency     Stopped Feasibility Study              Gol En     Settlement accounts Stopped  xecuting Body Gol Agency    RUN NO E  Executing Body Gol Entity       Cancelled  More Filters    Bore Cancelled  Other    T View Criteria    Remove Filters      of Projects      of Projects  1 376  422  247  112  70        56  35  26  11  1    60    Project Cost  USD  98 977 024 578  2 566 458 973  2 333 533 380  10 258 171 984  2 546 740 419  1 643 040 195  7 304 789 226  1 148 421 368  60 377 405  16 401 782  133 718 661    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 42  Sample Chart Report 2       IDMS ANALYTICS USER MANUAL 61  9  MAP MODULE    In the Map module of IDMS  you can make use of an advanced GIS tool for data visualization   mapping and analysis     In this module  you can plot data directly on a map and then access that data through the map   You can also query  aggregate  disaggregate  filter  and edit data on a map  visually capture data  at any desired level  from the most general to the most detailed  down to the district level     More
73. Sub Sector       Figure 89  Defining Search Criteria                         114    If you have selected to look for Industrial among project chapters  titles  descriptions and NDP  sub sectors  Figure 89   the following search result  Figure 90  will appear     IDMS ANALYTICS USER MANUAL 115    fe  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       My Workspace List Chart Map Report Dashboard Help    List  save RSaveas 4 ty     EXTERNAL ASSISTANCE PROJECTS     A             DONOR PROFILE Please note  a filter is applied   you are currently reviewing a selection sub set of all projects       gt  CAPITAL INVESTMENT PROJECTS   Refine Report Modify Current View    IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS Chapter   NDP Sub Sector   Project   of Projects Project implementation Status          a 02   Industrial 248       Industrial   Unspecified    Advanced Search          Increase Electricity Production                        CIP 170924      Soe sae 3 Implementing    Filter by  CIP 170925 Cub      2             Implementin  Project Type B  Project Implementation Status CIP 170930 paf                      implementing  Chapter P  38   Coa fe nal  Governorate            Qadha   CIP 170932      iall   5 20          Implementing  Year     CIP 171080 4453 punta 26 y        Implementing  Beneficiary Gol Agency   Beneficiary Gol Entity CIP 171143 CPAP y jars       Implementing  Executing Body Gol Agency CIP 171144 Sab ady gia      2           Implementing  Executing Body Gol Entity      CIP 
74. Unit group users  During multilevel  revision  including revisions by one or more Sectoral Units and negotiations with the Line  Ministry   the following actions may be taken over the submitted project requests    e Reject due to negotiation results  For rejected projects  draft projects with all the data  of the corresponding project may be created for the current or the next year    e Abandon due to insufficient funding available or other reasons that may come out  during the official revision  For abandoned projects  draft projects with all the data of  the corresponding project may be created for the current or the next year  or project  may be copied to the next year  Copied project will have the same project code as the  original project  However  all other details of the copied project will be individual   Abandoned projects may be processed again  if needed    e Approve for an implementation  The approved requests are copied into a project and  are displayed in the Approved Projects list  Figure 17     Note  To approve the project  there should be enough Allocation Approved by  Parliament for the selected Executing Body  as defined in the Adjust Budget Ceilings    form  For details  see Adjust Budget Ceilings     4  For approved projects  the following actions are available    e Update Attachments by providing additional notes comments about the project and  uploading project related documents    e Update Financial Progress by indicating the most recent financial data
75. Year   Beneficiary Gol Agency   Beneficiary Gol Entity   Executing Body Gol Agency   Executing Body Gol Entity     Reset    Submit            T View Criteria    Remove Filters     PREVIEW                                                 Governorate  2     Project Cost  USD   Project  1  Title  1  Project Cost  USD   1   Project  2  Title  2  Project Cost  USD   2              COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 61  Reports Window with Properties Focus on the Title Field    The Properties window will appear  Please note that for text entries the Properties window  includes text formatting buttons and a text area  Figure 62   For other report components  like  rows  columns  etc   the Properties window also allows assigning additional characteristics  e g   sorting order  reference text  etc   Figure 64      IDMS ANALYTICS USER MANUAL 83          Verdana    10    H    Preview Text    Cancel       Figure 62  Formatting  Styling Text Entries    3  Change the properties as needed   Note  To prevent you navigating away from the section every time when modifying the  properties of a different report table component  the Properties window allows selecting  the next item to be modified  To do that  you need to select the appropriate instance from  the Items drop down list in the Properties window  The list contains the previously  selected report table components    4  Click the Apply button for the changes to take effect  Clicking the OK button will close the  
76. agement and oversight of specific programs funded under this title  and other types of program support such as quality assurance  qualtiy          Attach Document          rk X Se Added by admin user      06 06 2013  e g  proj  document  monitoring X 2x Added by admin user on 06 06 2013  reports  and other    X    Added by samah samah on 13 02 2014    Added by samah samah on 17 02 2014  Added by samah samah on 18 02 2014    Added by alaae zeki on 20 02 2014       Added by alaae zeki on 20 02 2014    Figure 18  Adjust Budget Ceilings Form   Part 1    I DMS ANALYTICS USER MANUAL 30    X reat               Samah investmerir u                      Added by samah investment on 02 03 2014       a Added by ahmed jumaa on 04 03 2014    Add Attachment    User Activity Log  Show   Last 5       Field Original Value New Value  ahmed jumaa  2    06        2014 04 26     Synergy Admin  3    06 MAR 2014 01 46  Synergy Admin  2    06 MAR 2014 01 46  admin user  2    04        2014 04 10    admin user  1    04 MAR 2014 04 10       Figure 19  Adjust Budget Ceilings Form   Part 2    To insert budget ceiling data for the agency  you should expand the corresponding Fund   Gol  entity   Agency by clicking the plus sign next to them     In order to insert budget ceiling amounts for the selected Gol Entity   Agency  follow the steps  below   l  Click the    Edit  button to the left of the Government entity information on which you  would like to edit  The following data input fields will appear   ND
77. an emergency funding request  It is saved as a  draft in the My Draft Funding Requests list of the My Workspace module  Figure 14   At  this stage  the draft can be moved to the next year  The emergency funding request will  appear in the My Draft Funding Requests list for the next year and will disappear from the  same list for the current year     I DMS ANALYTICS USER MANUAL 36    Note  Only Executing Body group users and administrators are able to edit the emergency  request drafts at this stage    2  Even with the negative Balance  to be Requested   Executing Body can submit the  emergency funding request  However  before entering the SUBMITTED state  emergency  request is passing through a funding approval procedure  If there is enough funding  available for the emergency request  the request will be submitted  otherwise  if no  enough funds are available  the emergency request will remain in the EMERGENCY  FUNDING REJECTED state  From this state  the emergency request        be moved to the  next year  When moved  the emergency funding request will appear in the My Draft  Funding Requests list for the next year and will disappear from the same list for the  current year    3  On the next stage  the submitted emergency funding requests are passing through the  complicated revision cycle managed by the Assigned Mop Sectoral Unit group users   During multilevel revision  including revisions by one or more Sectoral Units and  negotiations with the Line Ministry   the follow
78. ata to be presented in the system in two  languages  English and Arabic     IDMS ANALYTICS USER MANUAL 8  3  WHO USES IDMS     The table below lists the groups of users that might be accessing and managing the IDMS  application       Users Group Who are they  Why they need I DMS access   IDMS system  Administrators   d Access to the entire data stored in IDMS   administrator  Executing Body Ministry or Responsible for creating a new project request   ExB  Governorate users with all the required data and saving it as a draft     Responsible for revising the draft project requests     Assigned MoP making necessary changes and applying the draft    Ministry of Planning s uM         Sectoral Unit y   9 for a submission  This user also negotiates with  Sectoral Unit users     MSU  the Line Ministry before sending the draft forward  to the MIU    Ministry of Planning s   Responsible for sending the revised draft project   Investment Unit request for an approval first to the Council of   users Ministers and then to the country Parliament     MoP Investment  Unit  MI U        For each user group  a specific role is assigned by the IDMS system administrator  in accordance  to the requirements  Depending on the role  users get certain permissions to add  edit or modify  and view entries in the IDMS application     Note  If you do not have enough permission to perform certain actions  please refer to your  project coordinator or system administrator     Besides the group listed above  c
79. ate changes and save  them  If you wish to keep the modifications  do not forget to save the modified report  see Saving  Reports     13 6 Exporting Reports    From the Chart  Map  and Report modules  you can design appropriate reports and export them  in the PDF  MS Word and MS Excel formats     In order to export the reports in the PDF  MS Word and MS Excel formats  follow the steps below     l  Click the respective    Export in PDF format          Export in MS Word format       m   Export in MS Excel format  button  A separate window will open   2  Make changes  if necessary     IDMS ANALYTICS USER MANUAL 107    13 7 Printing Reports    From the Chart  Map  and Report modules  you can design appropriate reports and print them  out  In order to print out the selected report  follow the steps below   1  Click the    Print  button on the top toolbar in the right side of the screen  A separate    window will open   2  Select the Print option     IDMS ANALYTICS USER MANUAL 108  14  FILTERING    The system allows for data filtration  Filtering is used to narrow down the information displayed in  the reports  The filtration works in the Step by Step technology  which enables to implement new  filtering over the results of the previous one  This option reduces the size of reports and makes  them easier to read  Filters can be added to new or existing reports  Defined filtering is applicable  for list  reports  charts  and maps     The list of the most frequently used filter catego
80. ategories are presented  This view is also available from the  main screen under the View Criteria hyperlink     IDMS ANALYTICS USER MANUAL 109    2  Select a Category item from the list in the first text area    Note  In case the category items list is long and hard to browse in  you can search for a  specific item s  by providing search criteria in the respective field  The search result will  return all possible matches  Figure 83     3  Click the downward pointing arrow button to add the item selected to the list in the  second text area  Figure 84     4  Repeat steps 2 and 3 to add more than one category item    Note  If a Category item needs to be removed from the second text area  select it from  the list in the second text area and click the upward pointing arrow button    5  Click the OK button to apply the filtering to the ad hoc query and to the screen that was  active prior to the filtering alterations  i e  List  Chart  or Map   The system will regenerate  and download  to the client s side  an updated report that applies the updated filtering  criteria     Filter by  Executing Body Gol Agency    institu               Executing Body Gol Agency  Martyrs Institute    Prisoners Institute  x Cancel    E Reset         Exclude          Current Criteria        Figure 83  Searching for a Category Item    Note  It is possible to exclude a Category item s  from being included into the filtering criteria to  be created  Select the Exclude checkbox in this case  All the Cate
81. ating the dashboard   the changes to it have been  saved successfully     11 4 5 Delete a Dashboard    In order to delete a dashboard  follow the steps below   l  Select the dashboard that you want to delete  Its contents will be displayed on the main  screen   2  Click the Remove link  The selected dashboard will be deleted     IDMS ANALYTICS USER MANUAL 98  11 4 6 Discard the Changes    In order to discard the changes made to the dashboard currently displayed on the screen  follow  the steps below   1  Click the Cancel link   2  Confirm that you want to discard all changes made to the dashboard by clicking OK in the  warning message window that appears     11 4 7 Update Data  For decision makers  it 15 very important to have access to the latest data available  This is why    the Dashboard module allows you to update all reports included in various dashboards  In order  to load the latest data from the database  select the Update      option     If you want to update the data in an individual report  click   Refresh button in the top toolbar  of the report screen  The latest data for the selected report will be loaded from the database     IDMS ANALYTICS USER MANUAL 99  12  DETAILS SECTI ON    IDMS has a built in Details section  where detailed project information can be viewed  e g   project financial information  the sector s  of economy it supports  the project location  etc     The Details section can be accessed from the List  Chart  Map  Report and My Workspace  modul
82. blic Views  Charts  Maps  Reports or My Views  Charts  Maps  Reports section  see Main  Menu Bar description in IDMS ANALYTICS STRUCTURE  for data analysis and comparison  For this  purpose  select the report to display and click one of the following Generate Report buttons to  the left of the report name     e    in the List module   e dll  in the Chart module   e P  inthe Map module   e    in the Report module     The selected report will open in the application window  List  Chart  and Map modules  or a new  window  Report module   The same results can be achieved if you click the report name     13 5 Editing Pre defined Reports    To save you the time and the effort of structuring a report from the scratch when it is necessary  to introduce some modifications in any of the pre defined reports stored under Public Reports or  My Reports  the Edit option has been designed in the Report module     In order to edit reports  click the    Edit  button to the left of the report to edit  The selected  report structure will be loaded in the application window giving you the possibility of formatting  and styling it in the desired way  For more details on how to apply formatting to the reports  see    Customizing Reports     The pre defined List and Chart reports stored in Public Views  Charts or My Views  Charts can  also be edited after you have selected to view them  see Viewing Pre defined Reports   Once the  selected report is loaded in the application window  make the appropri
83. bmitted    Request  Approved    Project Request from 5   Update             to     gt   Submit     Reset    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 14  Functions and Summary in Draft List of Capital Investment Projects Section    New Project   opens a form where a new project request may be created  For details on  the New Project form  see IDMS Capital Investments Projects Application User Manual in  REFERENCES    Ongoing Project   opens a list of approved projects for the selected Executing Body  and or Agency for the selected year  Figure 15   This list displays only projects marked  other than Accomplished  set from the Implementation Status field described in IDMS  Capital Investments Projects Application User Manual  see REFERENCES  and with the  Start End Dates spanning the selected year  Projects that already have an ongoing  request created for the selected year are not listed here    By selecting the ongoing project  you may create a new request for the current year for  that project  To do that  expand the Gol list  choose one or more ongoing projects and  press Create Draft button  The new funding request will be generated with the unique  Request Code and will appear in the My Draft Funding Requests list  The project Type for  the new funding requests will be  Ongoing     Adjust Funding Requests   available for administrator and Executing Body group users  and displays a list of Gol  Government of Iraq  entity the Executing Body is responsible
84. ce module  you are offered to use    an advanced search and a quick search features to filter the list of projects requests with some  criteria  Figure 23      IDMS ANALYTICS USER MANUAL 38    9 My Profile About Log Out   pF    a   4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    ED My Workspace List Chart Map Report Dashboard Help       EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup            Add Edit Ceilings       Governorate  All Governorates    Fal Please note that the deadline for emergency projects has been extented to October 2014    Funding Type  All Funding Types                                                    All Project Types  Sector Create Request for       New Project   C  Ongoing Project  All Sectors  v ID Title 7 Project Code Required Funding Updated By Updated On Status  Implementation Status RQSN 014289        il be cL     2            30      04009 50 000 000 000 test4 test4 20 Mar 2014        All Statuses x         cREATED   BJ    Keyword    Submit      Move            Move Next    Reallocate      Verif  Search In   F  Project Code SUMMARY 1 Requests 50 000 000 000 IQD  1 New 50 000 000 000 100  ID 0 Ongoing           Title CEILING ASSIGNED 10 000 000 000 IQD       Balance  Submitted Requests  10 000 000 000 IQD  Description Balance  to be Requested   40 000 000 000 IQD  Objectives             Request  Submitted    Request  Approved    Project Request from  Update    to        Submit Reset          COPYRIGHT 2
85. ct Ref       Cols3  Title    Figure 68  Switching Report Table Components    IDMS ANALYTICS USER MANUAL 88    3  Define what component item the selected instance needs to switch place with  The  selected component item will be removed from its current position and added as an item  to the specified component  For instance  switching is selected between table grouping  and row  the table grouping item will be removed from table grouping and added as the  row item  while the row item will    trade    places with the table grouping item     10 6 7 Building Complex Expressions    I DMS is incorporated with a tool that allows building complex expressions based on mathematical  equations  These expressions can then be used as column and sub column items when drawing  up a report     In order to add an expression  follow the steps below   1  Go to the Report module   2  Click the Add button at the bottom of the Expressions section  Figure 69   The  Expressions window will appear  Figure 70      AS fe 4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM ee                           My Workspace List Chart        Report Dashboard Help  Report               5                     A       g   EXTERNAL ASSISTANCE PROJECTS       DONOR PROFILE Z DESIGN   gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report x  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS _  i Title   t2 Show 
86. d if        will consider them important and if enough funding  will be available  Emergency requests can be submitted with negative Balance  to be requested   and unless the Emergency submission date is not expired  For emergency requests  the workflow    is described in Emergency Funding Request Approval Procedure     The Capital Investment Indicators section in the My Workspace module is enriched with an  advanced search mechanism  For details  see chapter Search in Capital Investment Projects     The Add  Edit Ceilings button is used to adjust Budget Ceilings of Gol  Government of Iraq   entities for the corresponding year  This option is only available to the IDMS administrators and  MoP Investment Unit group users  For details  see Adjust Budget Ceilings     6 2 1 Managing Announcements    Note  Only the MoP Investment Unit members and administrators are allowed to manage the  announcements in the Capital Investment Projects section     IDMS ANALYTICS USER MANUAL 19    If you have enough permission to edit announcements  click the Add Announcement link at the  top of Capital Investment Projects section  Figure 10      ov iq My Profile About Log Out   pe         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM             E My Workspace Dashboard  EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup  EISEARCHCRITERIA   Executing Body Amanat Baghdad  gt   All Agencies x       Add Edit Ceilings   ALL   2008   2009   2010   2011   2012   20
87. details      Compatibility Matrix      Govemorate    Advanced Search Add Grouping  2 Columns   2  i Rows x           mw  Lu      Title Project Cost  USD      Add                            Add Sub column Add Sub column Project General Information     Filter by     Request General Information  gt   Project Type   jec Data Data Request Financial Information  gt   Project Implementation Status Add Row Organisations     Chapter Important Dates    Governorate Sector and Location    Qadha Financial              Procurement     Beneficiary Gol Agency Required Resources     Beneficiary Gol Entity Monitoring and Evaluation     Executing Body Gol Agency Change History    Executing Body Gol Entity Financial Ceiling    More Filters      Financial Transfer    Y View Criteria    Remove Filters Project Implementation Status      Reset    Submit                                   20                        Primary       Expressions    100  sad 42             fr 100  st 4 3         Governorate  1    gt  z                  o Tte                   USD                  Tite  1  Project Cost  USD   1   Project  2  Title  2  Project Cost  USD   2     Governorate  2            Cost  USD              E    Secondary     approvalmunascancell            DD    Project  1  Title  1  Project Cost  USD   1   Project  2  Title  2  Project Cost  USD   2           COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 69  Expressions Section in the Report Module    I DMS ANALYTICS USER MANUAL 89    10 7   
88. diti x Sa rec dem a e caine de II Eo re I Ace EET       89  FIGURE 71  CREATING AND FORMATTING A REPORT      cccceeceeeeeeeeeueeeeeeteteueeeeuteteueeteeuetteueeteegneteutenens 90  FIGURE 72  SAMPLE FORMATTED REPORT         due uou        M EUN Poe urn idR 91  EIGURE 73  DASHBOARD MODULE                  EP ONERE Fer bnt Rex                    93  FIGURE 74  ADDING A NEW                                                                                                                                     94  FIGURE 75  LIST OF PRE DEFINED  REPORTS              a pea Rd                           dE 95  FIGURE 7 6  ADDING    NEW REPORT      eil cu uico We ede deba ma Sra est c bc c de remi v Ea p    96  FIGURE 77  CUSTOMIZINGADASHBOAR Beis eettusts                           teo demo rp    spa 97  FIGURE 73  DETAILS SECTION    ci datu Spem dra tutu bebe oc acum cons date S             100  FIGURE 79  SEMMING THE REPORT OPTIONS ius rosa e                                                          IR TUDIN E EUR INR 102  FIGURE 50   MEMORIZING AUREPORT wcosunes roin                                                      103  FIGURE GL  ORGANISING THE REPORTS   254545805342 erHA RO CERE                                                        ek ER ees 104  FEGURE O2  FILTERS c ar         Ne                  108                832  SEARCHING FOR A CATEGORY LTEM s2ssaccicacicniintasancics                     QNS CR            109  FIGURE  64 gt  CREATING FILTERING CRITERIA prr EP Ga VE ARR BEE
89. ds in the Project Code  ID  Title  Description and or Objectives fields    e Request Submitted   filters by the date or a range of dates when the request was  submitted  Calendar popup is available for these fields  see Figure 13  Calendar    e Request Approved   filters by the date or a range of dates when the request was  approved  Calendar popup is available for these fields  see Figure 13  Calendar    e Project  Request Updated   filters by the date      a range of dates when the project or  request was updated the last time  Calendar popup is available for these fields  see Figure  13  Calendar     Once one or more criteria are selected  press the Submit button to get the filtered list of  projects requests  If you want to clean the filtering  press the Reset button in the searching  section of the screen to clear the defined criteria and then press Submit to get the whole list of  projects requests     6 3 NDP Indicators in My Workspace Module  In this page you may see a list of all indicators created from the My Workspace module or from    the corresponding application by the corresponding user or other users from the same user  group  The indicator related information and progress is also outlined in the NDP Indicators table     IDMS ANALYTICS USER MANUAL 40       My Profile About Log Out   x         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    E My Workspace List Chart Map Report Dashboard       EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS 
90. e Create New Indicator button  Figure 25           4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    ED My Workspace List Chart Map Report Dashboard       EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS       genre ne nen  Responsible Organisation Create New Indicat  All Responsible Organisations       Le                                              Governorate Updated  All Governorates   Indicator 7 Indicator Name Unit of Measure   of Locations Target Actual    Updated By              180 000561 22240 ilal i Etat                      49 24  4850 4 46 kW  kilowatt  user admin      a   lt   All Sectors   03 28  IRQ 000560 22240  jini p      Percentage 1 33 00 66 67 Admin 25 Feb        Sub Sector Synergy 2014  All Sub Sectors  gt   _ _ 04 04  180 000553   2222                  403      Number Count mayd mays   01 Feb        2012  Data Source 05 50  All Data Sources   IRQ 000552        aj      100        180  Percentage mayd mays   27 Jan     2012  Z5  Dbiectives IRQ 000550           Number Count d            Ble tpl      umber Coun mayd mays   27 Jan   8  All Objectives         04 07  Means of Objectives IRQ 000549           Number Count mayd mays   27 Jan     All Means of Objectives   2012  04 03  Keyword IRQ 000548 km  kilometre           mays   27 Jan        2012  03 26  Keyword Indicator IRQ 000547 2 4 km  kilometre           mays   27 Jan           Indicator          ndicator Name 03 23  Description IRQ 000546 isl           kW  kilowatt           mays   
91. e expressed both in metric  and English units of measure     Note  Measuring is calculated using the latitude and longitude coordinates from point to point  and does not consider elevation     fe  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    E My Workspace List Chart Map Report    EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE    gt  CAPITAL INVESTMENT PROJECTS Zoom to  ala   GO     Pie Chart v    IRAQ DEVELOPMENT PROJECTS ele ee  NDP INDICATORS       Info    Cursor position  Lat  31 48 Long  40 52 7  Categories    Scaling   i  Nation wide 3 Chart   i  Outsite of Iraq    Administrative        C Aut        i Unspecified c x        i ype   overnorate  1 1    Proiect Implementation Status J various    Qadha  Governorate              is i Ninsws  Year  Beneficiary Gol Agenc  Beneficiary Gol Entity  Executin Gol Agen  Executing Body Gol Entity    More Filters       T View Criteria    Remove Filters    i Diwaniyah       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 45  Measuring Distance    IDMS ANALYTICS USER MANUAL 66  9 4 3 Buffered Zone Querying    This feature in the Advanced GIS tool is used to select a point on a map and display any type of  data within a given radius  In addition  the tool is easily navigable through a Mini Map  Navigation  Bar and Intelligent Search Tools     Lm     To be able to create a buffered zone to view data for  select the Y  button  and then select the    region on the map to highlight  The selected area will be activated while the rest of 
92. e numeric values will appear in the report  follow the steps  below   1  Click the report component for which you want to define the display type of the numeric  values   2  Select the Show As option from the actions menu  Figure 66    3  Define whether the values of the selected component should be displayed as a Numeric  Value or Percentage   4   f the Percentage data display type is selected  specify the category against which the  percentage will be calculated     Note  The data display type for the report components can also be defined from within the  Properties window     Expression  Show As F   Numeric Value   2L Sorting Order     6 Percentage   Project  Move Left    Remove      Replace     57 Switch Place With      Properties    Figure 66  Defining the Data Display Type  10 6 4 Sorting Report Table Components    You may change the order in which the table components will appear in the final report  The  report table components can be sorted either in an Ascending  A Z  or a Descending  Z A  order   In order to alphabetically sort the report table components  follow the steps below     1  Click the component item for which the sorting order needs to be changed    Select the Sorting Order option from the actions list  Figure 67     3  Define whether the report item values should be sorted in the ascending or descending  order  Please note that selecting the None option from the list removes the sorting  criteria             Note  The sorting order for the report compon
93. e submitted  To submit a draft  press the Submit  button       in the My Draft Projects table             My Profile   About   Log Out                4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM            My Workspace List Chart Map Report Dashboard    EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS       Create New Project    i Project records will be available for submission only when all required fields are filled in        Project ID Project Title 7 Updated By Updated On Ready for Submission                          DRAFT water supply Ready  0  DRAFT build sustainable capasity in iraq Not Ready      DRAFT The Project for Improvment of transit Switches admin user 16 Dec 2012 02 17 Ready B   DAD Iraq   DRAFT Rehabilitation and medium term Interventions in Water  amp  Sanitation in the Southern Governorates of admin user 01 Feb 2012 04 17 Not Ready  Iraq   DAD Iraq   DRAFT ICT in education for iraq project Ready bl  0  DRAFT ICT in education for iraq project Ready B       DRAFT Human Rights Project for        2006   2007 Phase   8 Phase 11 hala kamel 06 Sep 2012 05 55 Ready Bl   icd                             Project ID Project Title   Updated By Updated On Submitted On  OP 2670  Public Affairs Reporting Workshops and News Exchange           Elections 2004 2005  admin user 23 Sep 2008 11 36 23 Sep 2008   DAD Iraq   OP 10336    Involving the Iraqi journalists and media in covering the Constitutional process  admin user 04 Apr 2013 07 08 04 Apr 2013   DA
94. ear in the  Selected Groups   Columns panel     7 7 2 Re ordering Groups   Columns   Column Groupings    In order to re order the selected groups   columns   column groupings  follow the steps below   1  Select the group   column   column grouping that needs to be re ordered in the Selected  Groups   Columns panel   2  Click the Move Up   Move Down button     7 7 3 Removing Groups   Columns   Column Groupings    In order to remove the selected groups   columns   column groupings from the list  follow the  steps below   1  In the Selected Groups   Columns panel  select the group   column   column grouping that  needs to be removed from the list              2  Click the  lt    Unselect  button  The selected group s    column s    column grouping s   will be removed from the Selected Groups   Columns panel     7 7 4 Setting a View as Default  After making changes in the view currently displayed in the List module  you can set the newly    created view as default  This means that the new view will be displayed when the user accesses  the List module     IDMS ANALYTICS USER MANUAL    49    In order to set a view as default  follow the steps below   1  Make the necessary changes in the current view as described in the sections above   2  After finishing  click the Set as Default button in the Modify Current View window  Please  note that the view will be set as default only for the current user     Note  Clicking the Set as Default for Public Users button will display the view to 
95. ed way  print them  etc     4 Contact us  idmsheipdesk mop gov ig My Profile About Log Out      4  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    LB My Workspace List Chart        Report Dashboard Help       Report  ejsave  8               8     th A      amp         EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE Z DESIGN        gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report x  IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS  i Title        Compatibility Matrix    Add Grouping       Advanced Search 2 Columns  2 Rows  Add Column    Add Row               Filter by   Project Type  Project Implementation Status  Chapter  Governorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters        Reset    Submit    Y View Criteria    Remove Filters        PREVIEW       Report Preview       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 53  IDMS Application Report Module  10 2 Creating a Report    In order to create a report  i e  to structure the report table and choose what information should  appear in the rows and columns of the table  add report components  which are     I DMS ANALYTICS USER MANUAL 75    e Text entries   title  subtitle  header  and footer  For these fields  the expected input is a   free text   Note  By default  the Report Designer gives you the p
96. egend   explains the categories and data series displayed on the chart    e Pattern   allows choosing a pattern filled chart for black and white printing    e Coloring Option   allows defining whether the chart should be displayed in multiple  colors or in one of the colors available    e Show In   allows defining how the numeric values will be displayed on the chart  To  avoid large number occupying too much space  you can choose to view the numbers in  thousands   millions   billions     2  Title   a text box to enter the chart report title     3  Note   a text box to enter additional information about the chart report     IDMS ANALYTICS USER MANUAL 58    4  Footer   a text box to Insert a portion of text that will appear in the bottom area of the  chart report     5  Subtitle   a text box to enter a subtitle for the chart report     6  Font   allows selecting the font the chart report title subtitle footer note will appear in     7  Size   allows selecting the font size the chart report title subtitle footer note will appear  in     8  Workspace   the main working area in the Chart module where the chart designed is  displayed     8 5 Sample Chart Reports   In the following chapters  you can see several samples on charts    8 5 1 Sample Chart Report 1   If you have selected Governorate as a chart category    of Projects     of Requests as  values to be shown on the chart  clicked the 3D Column chart button to specify the chart type     and activated the Data Table option i
97. either approve the application or reject  it  In case the application is approved  you will receive an e mail message to the provided e mail  address  The e mail will contain your login information details  username and automatically  generated password  and the link to the IDMS login page     IDMS ANALYTICS USER MANUAL 11    Once logged in with the received username password  you can manage your details  i e  change  personal data and the password  To edit personal details  log into the application  go to the My  Profile section  Figure 3  and make the appropriate changes           IRAQ DEVELOPMENT MANAGEMENT SYSTEM    My Profile        Required Field     a  Note  You should provide a valid E mail address  It will be used for future correspondence     First Name   Paul  Last Name   Kirshaw    E mail   baghdadinc state gov    Organisation   US Embassy to           Tithe           Position   Head of Refugee  amp  IDP Department    Postal Address   Al Kindi St   International Zone  Baghdad  Iraq    Phone      If you would like to change your password  please type the current and the new passwords in the fields  below     Old Password    New Password     Confirm Password         Figure 3  My Profile Section  4 2 Accessing I DMS without Registration    To ensure more flexibility and to provide access to the project data to a wider range of users  the  system is designed in such a way that it allows public users to enter it without having to register  for a username and password  
98. eleting Reports or Report Groups             ccc cece cece cece Is esa 105  Ba JAddIDng                        vn epi e hec atte vac e    dub poe    105  13 3 4  Re ordering Reports ANd Groups              c cece cece cece cece Ime 105  13 35  Setting a Report as Default          VATER EN PUE EE RA UAR eet eee 105  13 3 6 Setting a Report as Default for Public Users                                                    105  134 VIEWING PRE DEFINED  REPORTS                                                   EFE UE                 106  13 5  EDITING PREDEFINED REPORTS                             d ere erp atrae 106  13 6     EXPORTING REPORTS                       E EVE E PE E ERE ERE ra XR             E EE ca ER SS 106            3PRINTINGAAEPORTSus xut            eoa        IA EIUS Duca          If pM DEAE       Aer RE bands 107   14                       TT             a          RR 108             CREATING FILTERING CRITERIA                   a DR ac e                      eo f re EE ce ied 108  142    SAMPLE FIETERING CRITERIA                                     110   15  SEAR      e cS 113  ESL d ir zeigt SEE                                    OT                        ee Mae eee 113  L522    ADVANCED                              Fat vit divisi RUNI                 DU            113  15 53     SAMPLE SEARCH CRITERI A 9222022252529    de oe YU                                 PD Eon 114   16  LOGGING OUT                                                                           
99. ents can also be defined from within the Properties  window     I DMS ANALYTICS USER MANUAL 87    t     Expression     Show As d   2  Sorting Order t None     Move Up Sort Ascending     Move Down Sort Descending     Mowe Left     Move Right      Remove   45 Replace d   45 Switch Place With        Properties                Figure 67  Defining the Sorting Order  10 6 5 Removing a Report Table Component    It is possible to remove a report table component from being included in the report  if this 15  necessary  In order to remove a report table component  follow the steps below   1  Click the component item that needs to be removed   2  Select the Remove option from the menu that appears  The selected grouping value will  be removed     10 6 6 Switching Report Table Components    The report table components may be switched between report grouping  rows and columns  If  there are sub columns selected  switching between table groupings   rows and columns is  disabled  It is possible to switch between table groupings   rows and sub columns     In order to switch report table components  follow the steps below   1  Click the component item that needs to be switched   2  Select the Switch Place with option from the menu that appears  Figure 68        Sorting Order      Total      Move Up    Move Left    Move Right     Remove     Move To j  41  Replace d  hd Switch Place With   Rows   gt   Properties Project  Tables  Governorate  C ols1  Title  Cols   Donor  Project Cost  USD   Proje
100. er the  selected drafts in the My Draft Funding Requests list     Note  The functions described below are not available after the emergency request submission  end date  see Financial Years Setup         IDMS ANALYTICS USER MANUAL 22         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    g q My Profile About   Log Out     2    LJ My Workspace List Chart Map Report 58 Dashboard Help    EXTERNAL ASSISTANCE P       ROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS       Financial Years Setup             EISEARCHCRITERIA     Executing Body Amanat Baghdad   All Agencies        Add Edit Ceilings  ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  Governorate  All Governorates     Gal Please note that the deadline for emergency projects has been extented to October 2014  Funding Type  All Funding Types x   Project Type  All Project Types    Sector Create Request for       New Project        Ongoing Project    Functions  All Sectors          ID Title Y Project Code Required Funding Updated By Updated On Status   Implementation Status    RQSN 013937 testsaif2014 01001 5 000 000 admin user 06 Jun 2013 REQUIRING GI 2 Xx  All Statuses x  05 57     EMERGENCY 7  Keyword FUNDING  Search In   F  Project Code        000 000 IQD     5 000 000 IQD   E  Title 0 Ongoing 0100   e    F  Description CEILING ASSIGNED 70 000 000 000 IQD Summary     Balance  Submitted Requests  70 000 000 000 IQD       Objectives Balance  to be Requested  69 995 000 000 IQD  Request from rj    Su
101. es  In the Details section  the user can view detailed project information  browse among  other projects listed under the same parent item  print project details  etc  Moreover  the user is  able to modify an existing one  Please note that for modifying an existing project  special user  permissions are required     12 1 Accessing the Details Section    In order to access the Details section  follow the steps below   l  Access the Details section by clicking on the one of the following    e  n the My Workspace module  Click the respective project  You will be directed to the  Details section  Figure 78     e  n the List module  Click the project for the details to be displayed  This will open the  Details section of the application where more detailed information about the project  will be displayed    Note  Depending on the list representation settings  additional expanding the list  items may be required to reach the project    e  n the Chart module  Click the chart for the details to be displayed  e g   click a  relevant bar to see what it consists of   This will open the Details section of the  application where all items matching the selection will be listed  The first item in the  list will be displayed in an expanded mode    e  n the Map module  Point the mouse cursor on the object on the map  The project  information window will appear  In order to access the project details section select the  View Projects link  This will open the Details section  The first item in 
102. esented in Figure 21     i 1 R EQUES TS    Executing Body    SUBMITTED  REQUESTS    Assigned MoP APPROVED  Executing Body PROJECTS       Executing Body    Assigned MoP      Assigned        Sectoral Unit  Sectoral Unit       Assigned M tme  ih  Sectoral Unit Mo  4 nt Assigned MoP  Un             Investment Unit    Figure 21  Regular Funding Request Approval Procedure    1  The Executing Body group user creates a funding request  It is saved as a draft in the My  Draft Funding Requests list of My Workspace module  Figure 14   At this stage  the draft  can be moved to the next year  The funding request will appear in the My Draft Funding  Requests list for the next year and will disappear from the same list for the current year   Note  Only Executing Body group users and administrators are able to edit the request  drafts at this stage    2   f Balance  to be Requested  for the current year is a positive value  Planned Allocation    Rollover Amount is greater than 0  and the draft is ready for the submission  i e  all  mandatory information is provided   the Submit button located under My Draft Funding  Requests list becomes active  Executing Body group user submits all selected drafts for  further revision  The submitted funding requests will appear in the Submitted Funding  Requests list  Figure 16      I DMS ANALYTICS USER MANUAL 34    3  On the next stage  the submitted funding requests are passing through the complicated  revision cycle managed by the Assigned Mop Sectoral 
103. etup window  Figure 12   active financial years should be selected for  Capital Investment Projects     Note  New projects can be created and ongoing projects may be accessed only for active years   No changes  i e  editing or moving  could be made to the funding requests projects associated  with inactive years     To set the year active  select the Is Active checkbox for the certain year   To define the regular request submission period  select the Regular Request Submission Start    Date and Regular Request Submission End Date from the corresponding fields  To define the  emergency request submission end date  choose a date from Emergency Request Submission    IDMS ANALYTICS USER MANUAL 20    End Date field  For all date fields in this window  a calendar popup 15 available  see Figure 13   Calendar     Financial Years Setup  1 Please indicate which Financial Years should be Active for Capital Investment Projects     Note The system will provide access to Create New and Ongoing Funding Requests and pass the Funding Requests through the CIP Workflow only for Active years  For Funding  Requests Projects associated with years that are not marked as Active  the system will not allow any changes  i e  editing or moving the Funding Request through the workflow      Regular Request Regular Requ est            Years Submission Start Submission End Submission End Is Active  Date Date ce   2006  2009  2010  2011  2012 01 07 2012 31 12 2012 31 12 2013  2013 01 01 2013 30 06 2013 31 12
104. gencies for the corresponding year  The Gol entities are  grouped in funds  Every Gol entity shows a list of underlying agencies for which the budget  ceilings should be defined     Note  The users can only be associated to Government Investment Fund and Regional  Development Fund  Other funds in the list do not have any user associations     IDMS ANALYTICS USER MANUAL 29    Adjust Budget Ceilings of Gol Entities for Year 2014     Required Field    All amounts are displayed in        Iraqi Dinars     7 e   7 Allocation Approved   Allocation Approved    Fund   Gol Entity   Agency HDP Allocation Planned Allocation by MoP   CoM by Parliament Rollover Amount Final Allocation  Government Investment Fund 2 000 000 2 480 002 000 000 2 480 002 000 000 20 471 004 000 000 1 000 000 20 471 005 000 000  Regional Development Fund 200 000 000 000 110 000 000 000 110 001 000 000 10 110 000 000 10 110 000 000    Petro Dollar Fund       Kurdistan Regional Government    E  Other  x Anbar  x Baghdad  A Basrah    Dhi Qar  A Kirkuk    Najaf   j Ninawa    Salah ad Din       Agricultural Initiative Fund    Cj Marshes Development Fund    TOTAL 200 002 000 000 2 590 002 000 000 2 590 003 000 000        20 481 114 000 000 1 000 000 20 481 115 000 000    ae ill     ee  Justification for ENG    ARE                     changes The funds being provided under the budget modification are administrative costs  defend as usual and recognised overhead  including established indirect rules 2   for agencies  man
105. gory items that appear in the  second text area will be excluded from the filtering criteria to be created     IDMS ANALYTICS USER MANUAL 110             Filter by  Governorate          Governorate     Unallocated         Cancel    zs Reset              1 Exclude       Current Criteria     Governorate       Figure 84  Creating Filtering Criteria    14 2 Sample Filtering Criteria    If the following was selected for the initial view  Figure 85   and you have indicated     e Governorate as a filtering category  and   e Diwantyah  Karbala  and Maysan as category items  Figure 86      IDMS ANALYTICS USER MANUAL 111    My Profile About Log Out               4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart        Report Dashboard Help    List  save  8                          EXTERNAL ASSISTANCE PROJECTS MM                             _          lt       _                DONOR PROFILE   Refine Report Modify Current View     gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS Govemorate   Qadha              Project   of Projects Project Implementation Status Ee    NDP INDICATORS         Nationwide 4  Anbar 133    Advanced Search    Filter by   Project Type  Project Implementation Status    Chapter n  Governorate Diwaniyah    Qadha     Unspecified   Year z   Beneficiary Gol Agency     AL Diwaniya Qadha  Beneficiary Gol Entity T A   Executing Body Gol Agency A  Executing Body Gol Entity     AL Diwaniya Qadha center    More Filters    CIP 170926  CIP 172054 
106. gt  5 2     p      5 Q      5 5    8 8 8    lt     Tm  gt                 c B  gt     S E      9   zz  lt            2      2 2 9                    8  82 8  la     33938    58  5                   18 31 13 99  1     315 2                  4 8                 F     8 8 5 5  22  2 2  2 2  2 219  91                   zz 2                       2                       8 2592 39       3                                                                2                             Oooo             Bsy chagedOn              1                  j          I    L  J  E  EL  LL bL  Ld  I     History  Field Changed YearMonth       pe         Es      da        pe                        24333333   HistoryyFund                                                   1  1      1                    History  Project Implementation Status           p gt  fe pe te Jeje Jefe J J  ee E                           _                            History StatusChangedOn                                           1  L                  O ERREA a   Beneficiary GolAgency f       CT                     1 1   l  L  J  Ld                    Q    ERR  CHE  91 1131311 E E E E A E E D E    Contract implementation Style   J   J                 I                           1  1  DL E  eee LL eee LL       X O O E  EMEND     ee ee ee e             D l     ES pa fa Ja  Jele       Jek d  eee ee  a oo  pe eS    80 ee ee Eee  pewesewedEy                 ee             ee ee eee    E     1 1 11 11 1 1 111 LT T T T 1                
107. icator from 13 28  Updated    IRQ 000545     o    3 5 sS       42 4312  kW  kilowatt           mays   21 Jan      to  gt      2012  13 18     gt   Submit K  Reset 123456789 10 Next gt  gt     SUMMARY 510 Indicators  10 Agriculture  59 Education  25 Environment and Sustainable Development  57 Fiscal Management  35 Health Sector  22 Housing sector  85 Industrial  19 Population and Unemployment       23 Private Sector   47 Spatial Dev   26 Tourism   74 Transport and Communication  8 Wastewater   12 Water   6 Youth Sector       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 26  Advanced Search in NDP I ndicators Section    The following search criteria are available    Responsible Organisation   filters by the organisation responsible for the indicator    Governorate   filters by the governorate the indicator is dedicated to    Sector   filters by the economy sector the indicator is dedicated to    Sub Sector   filters by the sub sector the indicator is dedicated to    Data Source  filters by the data source information for the indicator    Objectives   filters by the objective set for the indicator    Means of Objectives   filters by the means of objectives for the indicator    Keyword   filters the indicators by the keywords  You may want to search the indicated   keywords in the ID  Title  and or Description fields    e Indicator Updated   filters by the date or a range of dates when indicators were  updated the last time  A calendar popup is available for these f
108. iculture   59 Education   25 Environment and Sustainable Development  57 Fiscal Management   35 Health Sector   22 Housing sector   85 Industrial   19 Population and Unemployment  23 Private Sector   47 Spatial Dev   26 Tourism   74 Transport and Communication  8 Wastewater   12 Water   8 Youth Sector       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 24  NDP Indicators Section in My Workspace    In this section  the NDP indicator may be created  details of the existing indicators can be viewed  and edited     The information displayed in the My Workspace module for each indicator includes the following  information   e Indicator   the code of the indicator   Indicator Name   the title of the indicator   Unit of Measure   the unit of measure of the indicator     of Locations   the number of locations covered by the indicator   Target   the target value of the indicator   Actual        actual progress of the indicator  in percents   Updated By   last update author   Updated On   last update date   Actions   you may view       edit      and delete   X  the indicator     The NDP Indicators section in the My Workspace module is enriched with an advanced search  mechanism  For details  see chapter Search in NDP Indicators of My Workspace     6 3 1 Adding a New Indicator    To add a new NDP indicator from the My Workspace module  follow the instructions below     IDMS ANALYTICS USER MANUAL 41    1  Go to the NDP Indicators tab of the My Workspace module   2  Click th
109. ields  see Figure 13   Calendar     Once one or more criteria are selected  press the Submit button to get the filtered list of  indicators  If you want to clean the filtering  press the Reset button in the searching section of  the screen to clear the defined criteria and then press Submit to get the whole list of indicators     IDMS ANALYTICS USER MANUAL 43  7  LIST MODULE    In the List module  Figure 27  of the IDMS application  you can create and execute ad hoc  queries on projects data and acquire results in the form of a list                4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       My Workspace List Chart Map Report                    Help    List  save  Rsaveas 8 ty     EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE   Refine Report Modify Current View      CAPITAL INVESTMENT PROJECTS    IRAQ DEVELOPMENT PROJECTS Approve Year   Project   Request   Year   of Approved Projects      NDP INDICATORS 1987    Advanced Search    Filter by   Project Type  Project Implementation Status  Chapter  Govemorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters       1988                                          View Criteria    Remove Filters    1  1  1  1  1  1  1  1  1  1  1  1  1  3  3  5  5  8  5  5  5       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 27  IDMS Application List Module  7 1 Accessing the List Module    A list consists of at least one group and one column  but the actual 
110. ing Body Gol Agency  Chapter Sector and Location 4 Beneficiary Gol Entity  Govemorate Financial M Beneficiary Gol Agency  Qadha Procurement  gt            Required Resources                Beneficiary Gol Agency Monitoring and Evaluation       Beneficiary Gol Entity   Change History    m  Executing Body Gol Agency   asus vane    Executing Body Gol Entity  More Filters    Y  Reset     Project   Project Implementation Status  T View Criteria    Remove Filters   of Projects TII       Project Cost  USD     ons 8              Freview             COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC        Figure 54  Selecting a Grouping for a Report    Note  At any point it is possible to remove all components selected for the report and design a         Reset    new report from scratch by clicking the  Reset  button     Note  If you have defined a report which has incompatible columns  columns over which reports  cannot be generated   they will be marked in red and an error message will occur  To make your  reports productive  use the link  as marked in red  Figure 54  to open the Compatibility Matrix  table  Figure 55   This is a table that displays the compatibility between all categories and  measures in the database to display them in the report     I DMS ANALYTICS USER MANUAL 77          Compatibility Matrix          indicates compatibility between Category and Measure          5   8 8           3 _                  a a o or 2   a      ows Categories    Columns Measures  g g 2  
111. ing actions may be taken over the  submitted project requests    e Reject due to negotiation results  For rejected projects  draft projects with all the  data of the corresponding project may be created for the current or the next year    e Abandon due to insufficient funding available or other reasons that may come out  during the official revision  For abandoned projects  draft projects with all the data of  the corresponding project may be created for the current or the next year  or project  may be copied to the next year  Copied projects will have the same project code as  the original project  However  all other details of the copied project will be individual   Abandoned projects may be processed again  if needed    e Approve for an implementation  The approved requests are copied into a project  and are displayed in the Approved Projects list  Figure 17     4  For approved emergency projects  the following actions are available    e Update Attachments by providing additional notes comments about the project  and uploading project related documents    e Update Financial Progress by indicating the most recent financial data of the  project    e Update Physical Progress by indicating the most recent physical data of the  project    e Stop due to being temporarily non actual  Stopped projects may be continued again   copied to the draft for the current year or for the next year    e Cancel due to being temporarily non actual  Cancelled projects may be continued  again  co
112. ion    Buildings and Services     Education and Higher Education     Industrial      Education and Higher Education       Figure 48  Viewing Chart Legend  9 4 6 Using Mini Map    The Mini Map window feature displays an additional view of the country map with a position  indicator that corresponds to the current view inside the main screen  Figure 49   One of the  main features of the Mini Map is that while the Mini Map window responds to position  adjustments in the main screen  you can also interact directly with it  Double clicking any area  within the window or dragging the position cursor to the desired place will adjust position both in  the Mini Map and in the main screen to the point in the Mini Map window that the user selects     IDMS ANALYTICS USER MANUAL 70    fc IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Map Report Dashboard    Map    EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE     gt  CAPITAL INVESTMENT PROJECTS      Pie Chart      IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS            Info Wasit    Cursor position  Lat  33 00 Long  44 83         Categories    Advanced Search    Scaling  n      ii  Nation wide E Chart     1  Outsite of Iraq    Administrative    Filter by  G ifi    Auto  Pani                 Governorate  Project implementation Status   i   Various    Qadha  Governorate 4  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency   ing Body Gol Enti  More Filters       Y View Criteria    Remove Filters
113. ion Status   Project   Request   of Approved Projects    NDP INDICATORS   New  Emergency         New  Regular                   Unspecified   fanced Search     f        Feasibility Study           Menu   d  Manipulation  Buttons              CIP 172821  Filter by   Profeet Implementation Status  Chapter  Governorate   CIP 172859  Qadha  Year   CIP 172901  Beneficiary Gol Agency      Design  Beneficiary Gol Entity  Executing Body Gol Agency     Posting Advertisement  Executing Body Gol Entity  More Filters      9 Implementing    Main Menu Bar                 Cancelled    T View Criteria    Remove Filters         CIP 172848           Accomplished  ls       Stopped  Li                        Ongoing  Emergency       Ongoing  Regular  1 612  Results 1   4 of 4  Total 2 423    Workspace       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 4  IDMS Analytics Structure    It contains the following components     This is the application header that contains application name and the  Header IDMS logo  On the right side  the following functions are available   e Contact Us   e mail address of the IDMS System Administrator        I DMS ANALYTICS USER MANUAL 13    My Profile   this opens your personal settings and details  For  details  see Registering for a Username and Password    About   opens the IDMS information window    Log Off   this button is used to log off the application     This is the main toolbar of the IDMS application  The following tabs are  available here  
114. ion Status  Chapter  Govemorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency    Executing Body Gol Entity    More Filters        Reset    Submit       T View Criteria    Remove Filters            L PREVIEW          Donor  1       Project   Title   Project Cost  USD  Modified Project Cost  USD   Project  1    Title  1    Project Cost  USD   1    Modified Project Cost  USD   1        Project  2    Title  2    Project Cost  USD   2    Modified Project Cost  USD   2     Donor  2       Projet   Title   Project Cost  USD  Modified Project Cost  USD   Project  1    Title  1    Project Cost  USD   1    Modified Project Cost  USD   1   Project  2    Title  2    Project Cost  USD   2    Modified Project Cost  USD   2           COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 57  Creating Report 1    You will have the following result  Figure 58         IDMS ANALYTICS USER MANUAL 80         Refine Report Ge             Donor Please Select        Submit    Reset    Unspecified    CIP 170577  08  22             6 839 500 8 839 500          5 50 ana    CIP 170578 1 775 000 1 775 000                        53 3201 3 063 650 3 063 650  dh ie        Saal s    CIP 170580                     493 805 493 805    CIP 170581 32 660 000   CIP 170582                      463 914   Std Ca hands  oly dnd y LAG yy plat                            CIP 170583 460 435 460 435       CIP 170584 Bans i                  yg       CIP 170585 3 614 184       CI
115. ion information section   displays the name of the administrative unit when it is  pointed on the map     10 Cursor position section   displays the geographic coordinates  expressed as latitude and  longitude  for any point on the map     IDMS ANALYTICS USER MANUAL 64  9 4 Working in the Map Module  9 4 1 Zooming in   Zooming out    The GIS tool is equipped with the advanced zooming capabilities used to enlarge or reduce the  view of the map on the screen  The following zooming options are available     Free zoom in  zoom out    This option allows you to easily explore the data through Intelligent Searching  You can enter any  combination of letters in the Zoom to panel and select the administrative territory  district  to  navigate to from the list containing the search results  Figure 44   The selected item will be  magnified and displayed in the main screen     My Profile About   Log Out             4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report Dashboard Help    Map  save PRSaveas  amp  l        amp    EXTERNAL ASSISTANCE PROJECTS           gt          DONOR PROFILE LA     CAPITAL INVESTMENT PROJECTS Zoom to  al al            PieChart v  IRAQ DEVELOPMENT PROJECTS Qadha     4 AL Amara Qadha  at  39 74 Long  52 15        Categories  Shat AL Arab Qadha      Scaling  Advanced Search il Nation wide 3 Chart    i  Outsite of Iraq    Administrative    i  Unspecified   Filter by       Project            i  Various   Project Implementation Status  
116. isplayed or you may  choose to display whole modification history on the particular record     6 2 7 Adjust Project Funding Requests    In the Adjust Project Funding Requests form  Figure 20   you may see only those funds and Gol  entities which you are allowed to manage  You may expand the list of requests projects for the  corresponding Gol entity by clicking the plus sign next to it  The Foreign Currency  as well as   Project Cost and Total are not editable in this form and are defined from each project details   see IDMS Capital Investments Projects Application User Manual in REFERENCES   The Status of  the project indicates whether the project is approved or stopped     The following information may be managed here for each project   e Local   indicates the local funds requested by the project request in the local currency  IRQ  Iraqi Dinar   This value can be set to 0 from this form for the stopped projects only   e Foreign   indicates the foreign funds requested by the project request in the defined  currency  This value can be set to 0 from this form for the stopped projects only     Note  The sum of Local and Foreign funds should not exceed the Project Cost defined for the  specific project  For details on how the Project Cost is defined  see IDMS Capital Investments  Projects Application User Manual in REFERENCES     The Total of local and foreign funds provided is automatically calculated  converted into local  currency IRQ  Iraqi Dinar  and is displayed in red    
117. ity to present data on the map of the country  In order to  access the Map module of the system  click the Map tab  You will be navigated to the Map  module where the map of the country 15 displayed    In the Map module  you can choose to view different data sets displayed on the map  create and  display reports  save them as pre defined reports  arrange them in the desired way  print them   etc     9 3 Map Module Screen Components    The following figure describes some of the features available in the main screen of the Map  module  Figure 43      1  Zoom to panel   allows free zooming to the desired administrative unit  governorate or  district      2  Chart type selector   allows defining whether the data should be presented in form of a  pie chart or a bar chart when plotting graphs on the map     3  Navigation controls   a set of tools that provide common navigation functions  such as  panning and zooming     4  Map   the map of the country     5  Scale Bar   allows you to work out the distances on the map  The distances are  expressed both in the metric and English units of measure     6  Mini          an overview map of the entire country displayed in a small window allowing  quick navigation to a desired location with one click without having to zoom out  find the  new location and zoom in again    7  Layers Panel   provides a variety of data to choose to display on the map     8  Legend Panel   explains the categories and data series displayed on the map     9  Locat
118. ject  reallocation    o REALLOCATION REQUIRING FUNDING   appears when no enough funds are  available for project reallocation     g g My Profile About   Log Out     2         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM       J My Workspace List Chart Map Report 55 Dashboard Help    XTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup       EISEARCHCRITERIA Executing Body Ministry of Construction and Housing   All Agencies   Et Add Edit Ceilings  ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017    Governorate  All Governorates    EH    Please note that the deadline for emergency projects has been extented to October 2014  Funding Type  All Funding Types    Le                               All Project Types    Sector  All Sectors e  8 Submitted Funding Requests 2  Implementation Status  A Statuses 1             Keyword    m   Expended in Current   Expended  Search in  Project Code ID Title Y Project Code Updated By Updated On Status     iD Year         Title CIP 172982  5 p 34  20  05005111111 1 200 0 00 traintest26 26 Feb 2014 DM a   Process    2 traintest26 04 46 B  APPROVED      Description       Objectives reallocate  Request from 5   Submitted     to    Summary  Request from rj       Approved    Project Request from ii     Update to             Submit     Reset       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 17  Summary in Approved List of Capital Investment Projects Section    The following s
119. lic Reports and My Reports groups cannot be deleted   13 3 3 Adding a Sub group    In order to add a sub group  follow the steps below   1  Click the Add Group button   2  Fill in the desired name for the sub group   3  Click the Enter keyboard button to confirm adding     13 3 4 Re ordering Reports and Groups    In order to re order reports report groups  follow the steps below   1  Highlight the report   report group the sorting order of which needs to be changed   2  Click the Move Up   Move Down button     13 3 5 Setting a Report as Default    In order to set a report as default  follow the steps below   l  Highlight the report to be displayed in the respective module when you access it   2  Click the Set as Default button  The selected report will be marked with  default for me   option     Note  This option is available only in the Chart  Map  and Report modules   13 3 6 Setting a Report as Default for Public Users  In order to set a report as default for public users  follow the steps below   l  Highlight the report to be displayed in the respective module when a public user accesses  it   2    the Set as Default for Public Users button  Figure 80   The selected report will be    marked with  default for public users  option     Note  This option is available only in the Chart  Map  and Report modules     IDMS ANALYTICS USER MANUAL 106  13 4 Viewing Pre defined Reports    In the List  Chart  Map  and Report modules  you can view the pre defined reports stored under  Pu
120. n the View window  the following chart report will appear   Figure 41      IDMS ANALYTICS USER MANUAL 59           4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace      Dashboard    f   Save      Save as                m   EXTERNAL ASSISTANCE PROJECTS EEE  DONOR PROFILE   gt  CAPITAL INVESTMENT PROJECTS    e  ETE Iu IR BIA   s E Cae  Coi    Advanced Search    Governorate   of Projects    Filter by  Baghdad 711  Project Type  Project Implementation Status  Chapter Unallocated  Governorate Basrah  Qadha Anbar  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters       Various    Najaf  Ninaws  Diwaniysh  Karbala  Dhi Qar  Other    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    T View Criteria    Remove Filters            Unallocated  Diwaniyah       Figure 41  Sample Chart Report 1    8 5 2 Sample Chart Report 2    If you have selected Project Implementation Status as a chart category    of Projects    Project Cost  USD  as values to be shown on the chart  clicked the 3D Pie chart button to  Specify the chart type  and activated the Data Table and Legend options in the View window   the following chart report will appear  Figure 42      IDMS ANALYTICS USER MANUAL    fc  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM     m My Workspace List Chart Map Report Dashboard    Chart               Save as    EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE    CAPITAL INVESTMENT PROJECTS    IRAQ DEVELOPMENT PROJECTS 
121. n the input window and save     IDMS ANALYTICS USER MANUAL 102  13  CUSTOMIZED REPORTING    IDMS is used to customize the already created reports in the List  Chart  Map  and Report  modules  i e  to define the way the numeric values can be displayed  their format  the number of  the items to be displayed  etc  You may re organise the reports in the desired way  include it into  a group of reports or create a new report group for it  rename the report  etc  IDMS also enables  you to export the reports to the desired format  Word  Excel  etc   or print them out     13 1 Setting Report Options    In the List and Report modules  you can set the report options  i e  define whether the numeric  values should be displayed in thousands  millions  etc     In order to set the report options  follow the steps below     1  Click the a  Set Options  button in the top toolbars  An Options window  Figure 79   will appear    2  Specify whether the row serial number should be displayed in the first column of the  generated report by selecting the appropriate value from the respective drop down list   Note  This option is available in the Report module only    3  Define the format in which the numeric values should be displayed  i e  whether the  original values should be displayed or they should be shown in thousands  millions  etc   This prevents large numeric values represented by many zeros from taking a lot of space  in the report     Show serial number in first column      Show numeric 
122. ncial Yeal SS eUD                      OE ES          ipa cH VICA 19  6 2 3 My Draft Funding REQUESTS                     RET CINA E SU            20  6 2 4 Submitted Funding Redgllests   ues reete etr y e Er In nare XT          X OE      DOC DU eR n 24  6 2 5                                 ta LR UO Er AERE                       DUAE         26  6 2 6 AGIUSt BUAGEL GCeINOS us nstetiackt bic eeo cut dpt Cales              Cun tice p REOR aa REOR 28  6 2 7 Adjust Project Funding RedilesbS                  CORR EX oda acide ue Ct dos 31  6 2 8 Regular Funding Request Approval                                                                        33  6 2 9 Emergency Funding Request Approval                                                                 35  6 2 10 Adding a Capital Investment Project Request                                                    37  6 2 11 Viewing Capital Investment Project Details                                                       37  6 2 12 Search in Capital Investment Projects of My Workspace                                     37  6 2 12 1 CCK SEI                 cb                ON cece beeen cob ene cee bie      38  6 2 12 2 Advanced SEa                          E ee ee ee ree 38   6 3 NDP INDICATORS IN MY WORKSPACE MODULE sirsiran a eee mH 39  6 3 1 Adding  a  NEW                                                     conver kee BECK dundee ae eee 40  6 3 2 Viewing Indicator                    Le TEC EU La PUE o Ev EE E E Dn 41  6 3 3 Search 
123. neficiary i Government Entity Agency  Ministry of Labor Social Affairs Directorate retirement and social security of workers  Implementation z  Status     Sector Sub Sector Objective  NDP  Objectives 1  Description 5 1  Notes 1       Figure 78  Details Section    100    IDMS ANALYTICS USER MANUAL 101  12 2 Browsing among Projects    In the Details section  you can browse among the projects  To browse projects  use  correspondingly Previous or Next buttons in the top of the Details window  Figure 78      Note       the Chart        Map modules  you can also scroll down to the bottom of the page  find  the appropriate project in the list presented and click it for the details to be displayed     12 3 Printing the Project Details    In the Details section  you can print out the details of the selected project  In order to print out  the selected project details  follow the steps below     1  Click the    Print  button in the top toolbar  A window with printer settings appears   2  Choose the printer settings as needed and press Print     12 4 Editing an Existing Project    In the Details section  you may also edit those existing projects that have been either created by  yourself or you have permissions to manage     In order to edit existing projects  follow the steps below   1  Click the Edit button at the top of the Details window  The data input window appears  which is described in the corresponding Application User Manual  see REFERENCES   2  Make the appropriate changes i
124. ntial to have a  reporting tool that will allow for a visual display of the most important information consolidated  and arranged on a single screen so that real time data can be monitored at a glance     As a comprehensive reporting tool  IDMS removes the limitations on report development giving  the possibility to view various types of reports such as lists  maps  and charts displayed in a user   friendly environment on a dashboard  Unlike  regular  reports  dashboards provide visual  at a  glance insight into the data to be analyzed  thus giving the decision makers the possibility to  leverage information assets in real time through visually rich  responsive and personalized  business intelligence dashboards  This way  they will achieve better data interpretation and  as a  result  more informed decision making     11 1 Key Features    You can make use of the following key features of the Dashboard tool in IDMS   Y An intuitive drag and drop environment that turns adding reports to a dashboard into an  easily manageable task   Fully resizable report windows   Better visualization of the information presented in graph reports   The ability to print reports for future reference   The ability to export reports on the dashboard in MS Word  MS Excel  and Adobe PDF  formats       3       11 2 Accessing the Dashboard Module    In order to access the Dashboard module of the system  you should click the Dashboard tab   This will navigate you to the Dashboard module  In this module 
125. of Communications  Diala Projects  WB h1    USA PROJECTS  Donor Commitments and Disbursements by Status  Total Donor Contributions by Governorate and Sector  Project Listed by Donor  Donor Total Commitements and Disbursements  Projects Listed by Sector  Ongoing UNDG and WE Projects According to Project Ty  Total Ongoing UNDG and WEB Projects According to Proj  Total Ongoing projects funded by WEB and UNDG   F    zista ae WB   WB ITF    4      cias  py pial Alla cras      Lial 15 WB ITE       aad gt            af gall             REPORTS  Papal          xg  WB ITF  s pens  UND itt                      Figure 81  Organising the Reports    13 3 1 Renaming Reports and Report Groups    In order to rename a report report group  follow the steps below     1  Highlight the report   report group to be renamed                    f Cancel    Set as Default for     Public Users         Set as default    E Rename        Delete           Add Group    sis Move Up        Move Down         An Organise    I DMS ANALYTICS USER MANUAL 105    2  Click the Rename button   3  Fill in the desired name for the report   report group   4  Click the Enter keyboard button to confirm renaming     Note  Public Reports and My Reports groups cannot be renamed   13 3 2 Deleting Reports or Report Groups    In order to delete a report report group  follow the steps below   l  Highlight the report   report group to be deleted   2  Click the Delete button   3  Click the OK button to confirm deletion     Note  Pub
126. orts by assigning font characteristics to report components  re ordering  rows and columns  etc  The sections below will describe the instructions to customize the reports     10 6 1 Formatting  Styling Report Components    You may format style the text entries as well as main report table captions and values by  assigning to them value characteristics such as font  font size  font color  background color   alignment  i e  left  center  or right   etc  In order to format style a report component  follow the  steps below    1  Click the report component that needs to be formatted   styled    2  Select the Properties option from the actions list that appears  Figure 61      My Profile About Log Out            9  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM      My Workspace List Chart        Report                    Help    Report  ejsave savas  8 GY      A     amp    EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE   DESIGN     gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report x  IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS  i  Title m amm   Show details      Compatibility Matrix    Governorate        Add Grouping  Advanced Search Add Groupi    2 Columns      Rows Title   Project Cost  USD    Add Column    Add Sub column Add Sub column  Filter by   Project Type Propa   Data Data  Project Implementation Status Add Row  Chapter  Governorate    Qadha   
127. ory and    chart type     Workspace   the main working area in the Chart module where the chart designed is  displayed     IDMS ANALYTICS USER MANUAL 57    8 4 View Screen and Its Components           4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM EN    LB My Workspace List Chart        Report Dashboard Help          Chart                                 A m   amp      EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE   Main    View        gt  CAPITAL INVESTMENT PROJECTS    IRAQ DEVELOPMENT PROJECTS Show      Data Table     Data Label     Legend     Pattern   Muticoor     Show in   Original      NDP INDICATORS me  ids Fete             Font                                7  Size          Advanced Search    Filter by   Project Type  Project Implementation Status  Chapter 640  Governorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity   480  More Filters               720    560     View Criteria    Remove Filters 400    240    0          Baghdad  Basrah  Anbar  Najaf  inawa  Karbala  Dhi Qar    Various  Unallocated  N    Diwaniyah       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 40  View Screen of the Chart Module    1  Show   allows selecting one or several of the following options    e Data Table   presents the information contained in the chart in a grid or matrix    e Data Label   shows the actual values of each chart cell  This option ts disabled if you  have selected the pie or line chart types    e L
128. ossibility of adding report titles   However  you can change the default view to make adjustments for other text entry  components  sub title  header and footer  as well  To be able to provide additional textual  information to the report  you will have to click the Show Details link and provide the  appropriate information in the fields that emerge  Clicking the Hide Details link will  collapse the text entry fields displaying only the Title    e Report grouping   allows grouping data according to a specific category  Grouped data  appear in different tables  Each table contains data that fall under one group of the  category specified    e Rows   group data within the report table    e Columns   show details specific to each table row    e  Sub columns   divide the row details displayed under each column     In order to add report components  follow the steps below  They provide instructions on how to  compose and submit queries     l  Type the text that should appear as the report title in the Title text box    2  Enter a Subtitle  Header  and Footer if needed    3   n the Group Report by section  specify the category  which will be used to group data into  different tables  To add a report grouping  click the Add Grouping link in the Group  Report by section and select the appropriate category from the menu that appears  Figure  54     Note  The report will be divided into as many tables as there are table groupings selected    4  Select table rows by clicking on the Add 
129. over  the GIS tool offers an impressive array of state of the art  advanced GIS features   such as the ability to zoom freely  to select a point on a map and ask the system to display any  category of data within a given radius     buffered zone querying         My Profile About Log Out               4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report Dashboard    Map  save ERSaveas      a A      amp    EXTERNAL ASSISTANCE PROJECTS SS SE a  DONOR PROFILE   gt  CAPITAL INVESTMENT PROJECTS            Pie Chart v  IRAQ DEVELOPMENT PROJECTS    Cursor position  Lat  30 58 Long  46 17         Categories      Scaling    Advanced Search i  Nation wide 3 Chart    i  Outsite of Iraq   Administrative    i  Unspecified  Filter by     Project Type 3 i  Various  Project Implementation Status    Chapter  Governorate    Qadha   Year   Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters       T View Criteria    Remove Filters            COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Select   Zoom by Selection  Distance   Buffered Zone Query    Mini Map       Figure 43  Map Module  9 1 Key Features of the GIS Tool  Below are the key features of the GIS tool in the IDMS application     e Vector based platform    IDMS ANALYTICS USER MANUAL 62    e Multi layer mapping    Dynamic number of administrative territorial units   Category or Indicator data   Static Data  Borders  Cities  Rivers  Roads  Cons
130. pied to the draft for the current year or for the next year    e Create Draft for the Current  Next Year for copying the project to the  current next year  The copied project will appear in the My Drafts Funding Requests  list of the current next year and will have the same project code as the original  project  However  all other details of the copied project will be individual    e  Reallocate if additional funding is required  With this action  the project will enter  into reallocation request revision phase  Reallocation is performed for requesting  additional funds from other projects of the selected ministry for the needs of the  corresponding funding request     I DMS ANALYTICS USER MANUAL 37    For details on each of these actions  and what data is required while taking the action  see  Capital Investment Projects User Manual in REFERENCES     For emergency projects that have requested reallocation  the Assigned MoP Sectoral Unit user  may either verify the reallocation request or send it to the revision  Verified reallocation requests  are processed to the next stage where funding for reallocation should be confirmed  If the  funding is available  reallocation is approved by MoP Investment Unit user and then project funds  breakdowns should be adjusted by Executing Body  When the reallocation is adjusted  the project  enters APPROVED state again  If there are no enough funds for emergency project reallocation   MoP Investment Unit user rejects the reallocation reques
131. pped  In this state  Yearly Allocation of the  project can be set to 0  See Adjust Project Funding Requests Allocations   Note  When the project is stopped  its implementation is suspended until it is  continued  Once the project is continued  it is checked for the availability of funding for  its implementation  If the appropriate funds are detected  the project status will be set  to APPROVED  In case there is shortage of financial means  the project will move to  the REQUIRING FUNDING stage and will remain in this state until the appropriate  funds become available   o APPROVED   appears when the project is approved   CANCELLED   appears when the project is cancelled     IDMS ANALYTICS USER MANUAL 27    Note  When the project is cancelled  it becomes available for viewing purposes only   However  it still remains available for reporting and analysis    o REALLOCATION REQUESTED   appears when the project has been requested for       additional funding    o REALLOCATION REVISION REQUESTED   appears when reallocation request was  not verified and sent back to the revision  This may happen due to lack of documents  for the reallocation request or any other related information       REALLOCATION VERIFIED   appears when the project reallocation request 15  verified  During verification  Assigned MoP Sectoral Unit user should check and confirm  reallocation documents and other request related information    o REALLOCATION APPROVED   appears when enough funds are available for pro
132. ppend After the value       24 Sort       None          Show Rows Total   ENG    Project Cost  USD     Caption  ARE    ENG    Reference  ARE    ENG  Ref  Text  ARE    E Expression  Expr  Member 1    Project Cost  USD           Operation      Select          Expr  Member 2     Select a member       Cancel       Figure 64  Assigning Properties to Report Table Components    10 6 2 Re ordering Report Table Components    This option is used to establish and modify the order of the report table components  like rows   columns  etc  In order to re order report table components  follow the steps below   1  Click the component item that needs to be reordered in the report   2  Select the respective Move Up   Move Down   Move Right   Move Left option from  the menu that appears  The report generated will maintain the order of the items that was    displayed in the Report Designer  Figure 65        Expression  Show As d     Sorting Order      Move Up    Move Down    Move Lefi                  Replace    55 Switch Place With    7 Properties  Figure 65  Reordering Report Table Components    Note  If any of these actions is not possible  the respective option will be disabled in the menu     I DMS ANALYTICS USER MANUAL 86  10 6 3 Defining the Data Display Type    You may select the way in which the numeric values to be included in the report will appear  In  the final report  the numeric values can be expressed either as a Numeric Value or Percentage     In order to set the way in which th
133. pproved       to 14 05 2014    Project Request from       Update m    to sj        Submit    Reset       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 7  Capital Investment Projects Section in My Workspace    To start managing capital investment projects  select the Executing Body first  This will filter all  projects for the selected entity  You may also select the Agency of the Executing Body to narrow  down the list of projects to the specified agency  Finally  choose a Year to display the projects  for  Once these selections are made  the filtered list of capital investment projects and the  available functions will appear in the Capital Investment Project section     On top of the Capital Investment Project section  there is an Announcements area where the  MoP Investment Unit members and administrators can post any information related to the Capital  Investment Project submission and approval procedures and any other relevant information   Figure 8   For details on how to manage announcements  see Managing Announcements     IDMS ANALYTICS USER MANUAL 18    gov ig My Profile About Log Out              4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM        J My Workspace Dashboard       EXTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup    EISEARCHCRITERIA       00    Executing Body Amanat Baghdad a All Agencies        Add Edit Ceilings    ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017          
134. quantity of groups and  columns is defined by the user   s choice of view  Please see Modifying the Current View for more  details on how to define groups   columns of a list     In order to access the List module  click the List tab  You will be navigated to the List module  In  this module  you can view data organised according to the selected groupings and columns   modify the currently used list  save it as a pre defined report  include it under a definite group   etc     IDMS ANALYTICS USER MANUAL 44  7 2 Expanding the List           It is possible to expand the list item level to view the information of the sub level s   In order to  expand the list item level  click the         sign next to the name of the list item  This will expand the  list item group level displaying the first sub level  Figure 28   This can further be expanded  unless there are no more sub levels to be displayed     Note  You can expand only one group level at a time  If you expand the group level of another  list item  the previously expanded group level will get collapsed     My Profile About Log Out   4         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart        Report Dashboard Help    List felsave RSaveas 4       EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE   Refine Report Modify Current View   gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS   2007    NDP INDICATORS T       rad    2010    Advanced Search        2011    mass cte      2013                   
135. quested in the request    Updated By   last update author    Updated On   last update date    Status   the status of the submitted project describes its revision stage  The following   Statuses are available    o ABANDONED   appears when the project is abandoned    Note  The abandoned projects remain in the Submitted Funding Requests list for the  current year and cannot be deleted    o NEGOTIATION   appears when project request is in a negotiation with the relevant  Line Ministry    o PENDING APPROVAL   appears when the MoP Sectoral Unit requires further  revisions made on the project request    o PROCESSED   appears when the project request has been accepted by the MoP  Sectoral Unit and there are enough funds available  per assigned ceilings of the  corresponding Executing Body  see Adjust Budget Ceilings                        appears when the project 15 rejected    REQUIRING FUNDING   appears when there is lack of funds requested in the  project    SUBMITTED   appears when the project is submitted to the revision    UNDER PRIMARY REVIEW   appears when the MoP Sectoral Unit is reviewing the  project    o UNDER SPECIALIZED REVIEW   appears when a specialized review is necessary  and the responsible MoP Sectoral Unit forwards the project request to another MoP  Sectoral Unit for further advice    o UNDERGOING REVISIONS   appears when the MoP Sectoral Unit requires further  revisions made on the project request    o VERIFICATION   appears when project is sent to verification
136. r   CIP 172365    Beneficiary Gol Agency CIP 172744    Beneficiary Gol Entity  Executing Body Gol Agency CIP 172761  Executing Body Gol Entity CIP 172762    More Filters          CIP 172867    T View Criteria    Remove Filters CIP 172920     AL Hamza Qadha    ALALOsdeiya achas     AL Shamiya Qadha    Karbala     Maysan  Results 1   3 of 3  Total    COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC       Figure 87  Filtered List    IDMS ANALYTICS USER MANUAL 113  15  SEARCH    IDMS is equipped with a comprehensive search mechanism  which allows searching for any  relevant information     15 1 Simple Search    The simple search interface is available to find any relevant information quickly and easily within  the integrated IDMS content  Simple search implies that you can type search operators directly  into the search box     15 2 Advanced Search    In addition to providing easy access to the content  the IDMS application has a number of specific  features that is used to find exactly what is looked for  One of these features is advanced search  that allows setting different complex conditions using the Advanced Search form  It gives several  additional fields which may be used to qualify searches by such criteria as district  sub sector   project title  etc     Follow the instructions below to create search criteria   l  Click the Advanced Search link under the Filters section  You will then be redirected to  the Filters section  Figure 88      Filter by  Advanced Search  Tex
137. r the chart report is optional           Note  Clicking the        Swap  button allows switching places of category and series  selections     3  Chart Types   allows defining the chart type  The following options are available     IDMS ANALYTICS USER MANUAL    Chart Type    2  Column im    3  3D Bar    4  3D Column Ci    5  Stacked Bar       54    IDMS ANALYTICS USER MANUAL    6  Stacked Column         7  Stacked 3D Bar       8  Stacked 3D Column         10  3D      a     11  Line k     Exgport Im  ort P     Asiar Devaopme    The vorid Bank    isianio Develop    roment ott                  LUnted Nations    States A       Lieitesct    Amant of J    Cover    Delegation or t         55    IDMS ANALYTICS USER MANUAL 56    10     Show Top  lt Number gt    indicates the maximal number of category items to be displayed  in the chart     Show Top   Number   on Secondary Axis   indicates the maximal number of series  items that should be displayed on the secondary axis in the chart  Becomes available only  if a Series is selected  This option is disabled if you have selected the pie or line chart  types     Char Count   limits the number of characters to be used to display the category item  names to the value set in this field     Values   allows selecting a value from the list that will define the main chart criteria   Update   loads the latest data from the database and displays them on the chart   Reset Default   loads the default chart built according to the default chart categ
138. required  The report containing all the real  data appears      a new window     Note  If the report to be generated is to contain a large number of data  it may take a while to  generate it  To reduce the report load time  it is highly recommended that you redesigned the  report and or applied filters so that you could focus on specific data and reduce the report size   For more details on how to set report filters  see Refining the Report     IDMS ANALYTICS USER MANUAL 79  10 5 Sample Reports  In the following chapters  you can see several samples on reports   10 5 1 Sample Report 1  If you have indicated   e Donor as the report table grouping     e Project as the row   e Title  Project Cost  USD   and Modified Project Cost  USD  as columns  Figure 57             4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM           e m         My Workspace List Chart Map Report Dashboard Help       Report                lt           8 19      A      amp         EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE  lt  DESIGN    gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report  x  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS          Show details      Compatibility Matrix       Advanced Search       2 Columns    Project Cost  USD    Modified Project Cost  USD    Add Column  Add Sub column Add Sub column Add Sub column         Filter by   Project Type  Project Implementat
139. riate category to refine the list view report by and click the Submit  button  the report will be regenerated with only the selected category data included in it  Figure  30      IDMS ANALYTICS USER MANUAL 46    AS 9  4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM      My Workspace List Chart Map Report Dashboard             List feisave PRSaveas         EXTERNAL ASSISTANCE PROJECTS rr ae SEEE E S  DONOR PROFILE   Refine Report Modify Current View   gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS Project Type Please Select m  NDP INDICATORS Approve Year 2015          gt   Submit    Reset  Advanced Search Project Type   Approve Year   Project   of Approved Projects      New  Emergency  2       pem     Filter by  CIP 173001  Project Type 1   17301  Project Implementation Status              Chapter     New  Regular  1         am Results 1   2 of 2  Year Total E    Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters       T View Criteria    Remove Filters       COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 30  Refining a Report  7 6 Hiding   Showing I mages in the List    In order to make the list load quicker  you can choose to hide the images which are displayed in  the list  These images can be donor flags  sector icons  etc     To show the images in the list  click the    button located at the top of the screen  Figure 31    All the images in the screen will display     IDMS ANALYTICS USER MANUAL 
140. ries is displayed under the Filter By  section  The  list of all available filter categories is displayed when the More Filters section is accessed     14 1 Creating Filtering Criteria  Follow the instructions below to create filtering criteria     Filter by  Executing Body Gol Agency    Executing Body Gol Agency    k  Kirkuk University   Library and Archives  Sf Cancel  Martyrs Institute   Medical Clinics Directorate    Ministry Center of Ministry of Communications         Reset  Ministry Center of Ministry of Construction and Housing     Ministry Center of Ministry of Construction and Housing   Ministry Center of Ministry of Culture                         LJ Exclude        Current Criteria        Figure 82  Filters    1  Click the hyperlink under the Filtering section that represents the Category according to  which the filtering will be carried out  A Filters window  Figure 82  will appear having the  Category Item pull down menu set to the selected Category  The first text area holds a list  of all the available Category items that the report could display  whereas the second text  area holds a sub set list of the first one  You can only edit the sub set list in the second  text area  At the end of the filtering  if the sub set list is empty  all the Category items will  be included in the report  If  however  the sub set is non empty  only the items in the  sub set list will be included in the report  At the bottom of the pop up window the  selection criteria from all c
141. s Setup                                                                                        ESEARCH CRITERIA    Executing Body Amanat Baghdad   All Agencies        Add Edit Ceilings  ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  Governorate  All Governorates    Fal Please note that the deadline for emergenct projects has been extended to October 2014  Funding Type  All Funding Types           LM LL LLARLL UO  All Project Types    Sector Create Request for       New Project   C  Ongoing Project  All Sectors ii        ID Title   Project Code Required Funding Updated By Updated On Status  Implementation Status RQSO 014294  iail 42 51 455                                           es 30203003 0 S i 2  RQSO 014294      5 42      es      Lg oL 2 Synergy Admin 05 May 2014    eo x  All Statuses  gt      2014 2010 m    cREATED B A  Keyword YJ  RQSO 014203     c p 5 5d 4 04000022 50 000 samah investment          CREATED  amp  2     RQSO 014202 ha   shep caa 40408023 0 admin user 02 Mar 2014 a    A x  Search In  Project Code   06 24      CREATED      ID J  RQSO 014293 xia    e p rad        40408021 0 Synergy Admin FEN    crearen 8 A X       Title    Description Submit      Move Back        Move Next    Reallocate      SUMMARY 4 Requests 50 000 IQD    0 New                  from   4 Ongoing 50 000 IQD  TA to 5  CEILING ASSIGNED 70 000 000 000 IQD  Balance  Submitted Requests  70 000 000 000 IQD  Request from   Balance  to be Requested  69 999 950 000 IQD  A
142. t and the projects appears back in the  APPROVED state     Note  During reallocation phase  the other project which has provided funds to the project  requested reallocation will also change its state  Once reallocation was verified  the project which  provided funds should be revised independently for funds breakdown adjustment     6 2 10 Adding a Capital Investment Project Request    To add a new project request  follow the instructions below   l  Goto the Capital I nvestment Projects tab of the My Workspace module   2  In the My Draft Funding Requests section  click the New Project button  Figure 14    3  This will open a form which is described in IDMS Capital Investments Projects Application  User Manual  see REFERENCES     6 2 11 Viewing Capital I nvestment Project Details  Depending on your permissions you may also see or edit project requests added by other users     To view details of draft and submitted request and the approved projects in the My Workspace  module  follow the steps below   l  Go to the My Workspace module   2  Click the Capital I nvestment Projects tab   3  Expand the My Draft Funding Requests  Submitted Funding Requests  or Approved  Projects lists  as needed  Figure 7    4  Click the request or project Title you wish to see the details for  This will open the  selected request project details  For details  see REFERENCES     6 2 12 Search in Capital I nvestment Projects of My Workspace  In the Capital Investments Projects section of the My Workspa
143. t be compatible  Click here to view the compatibility matrix    Beneficiary Gol Agency   Beneficiary Gol Entity   Executing Body Gol Agency   Executing Body Gol Entity   More Filters    Y  Reset    Submit    T View Criteria    Remove Filters TIT        PREVIEW       Chapter   Project     of Projects Project Cost  USD  Modified Allocation By Year  IQD  Expended  100                    Project  1  Title  1    Project Cost  USD   1    Modified Allocation By Year  IQD   1    Expended  IQD   1                                   Project  1  Title  1    Project Cost  USD   1    Modified Allocation By Year  100   1    Expended  100   1   Project  2  Title  2    Project Cost  USD   2    Modified Allocation By Year  IQD   2    Expended  IQD   2            Project  2  Title  2    Project Cost  USD   2    Modified Allocation By Year  IQD   2    Expended  IQD   2   j            COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 56  Previewing the Report    All your added report components and structuring results will be displayed in the Preview section  which helps you to check whether the report matches the required output or not  This section can  be expanded in order to display whole of the information     10 4 Generating a Report    The final step in the process of creating a report is report generation  By clicking the Res     Submit  button  a request to the Reporting Engine is submitted in order to access the database   gather the required data and present it in the manner 
144. t to find            earch in    Chapter x Cancel  Governorate    Gadha E Reset  Title   Description   Donor   Project Code   Objectives   Project Implementation Status  NDP Sub Sector   Contract   Contract Reference Number  Request   Request Code   Request Status  History   Transter From   Transfer To   IDMS Number    on                      Al           v        A   v        A                A           A      v                                                           Current Criteria        Figure 88  Creating a Search Criteria    IDMS ANALYTICS USER MANUAL    p    Note  The simple search  searching on all fields  is also available above the Filters section     Define the text to search for in the appropriate field    Specify the fields to look in by selecting the appropriate checkbox es    Click the OK button to apply the search criteria to the ad hoc query and to the screen that  was active prior to the filtering alterations  i e  List  Chart  or Map      15 3 Sample Search Criteria    Filter by  Advanced Search  Text to find    _  industrial           search in E  Chapter     Cancel      Governorate        Qadha      Reset  Title  Description      Donor      Project Code      Objectives  E  Project Implementation Status  NDP Sub Sector   7  Contract      Contract Reference Number  C  Request  C  Request Code      Request Status  History       Transfer From  E  Transfer           IDMS Number    Current Criteria     industria    LLL                                   NDP 
145. tal required funds for those  drafts   e New   the number of new drafts in the list and the total required funds for those drafts   e Ongoing   the number of ongoing drafts  requests created for ongoing projects  in the  list and the total required funds for those drafts   e CEILING ASSIGNED   the sum of Planned Allocation and Rollover Amount for the  selected Executing Body  as defined in the Adjust Budget Ceilings form  For details  see    Adjust Budget Ceilings     I DMS ANALYTICS USER MANUAL 24    Note  For emergency projects  see Capital Investment Projects in My Workspace Module    this is the sum of Allocation Approved by MoP   CoM and Rollover Amount for the selected    Executing Body    Balance  Submitted Requests    the remainder calculated based on the Assigned  Ceiling and the total of all submitted requested funds    Balance  to be Requested    the remainder calculated based on the Assigned Ceiling   the total of all draft and submitted requested funds     6 2 4 Submitted Funding Requests    The Submitted Funding Requests list displays the submitted requests  Figure 16  created by  the Assigned MoP Sectoral Unit group users  The following information is displayed in the list     ID   the code of the request  You will see the request code here if the request is copied   from an approved project  and New for the new request for the selected year    Title   the title of the request    Project Code   the request related project code    Required Funding   the funds re
146. the list will be  displayed in an expanded mode    Note  You can also choose to view the detailed information on all the projects that are  in progress in the given territorial unit by pointing the mouse cursor on the lil button    e Inthe Report module  Create a report indicating    Project    as a value for the report row  and click the Submit button  For more details on how to create and generate reports   please see Creating a Report  In the report generated  click the project name    2  Take the necessary actions  review the provided information  update and improve as needed   You  may also want to print the project details  see Printing the Project Details for details  The Close button    is used to return to the main screen     IDMS ANALYTICS USER MANUAL       E GENERAL INFORMATION       Project Title           yousty  Yearly Project    ts this project a Yearly Project  Yes  Funding Type i National Investment Platform  Sector 2 7  Chapter Subject Subject Type  04   Buildings and Services 003   Housing Projects  Project Type    New  Emergency   Project Code   04003333333  Project Nature   Service  Start Date     Planned Contract Actual  in 13 02 2014  when the first  contract started  End Date 2  Planned Contract Actual         14 08 2014  when the last contract  completed    Planned Contract Actual  6M 1D  Base Year i 2014  Locations     Governorate Qadha Nahia  Various Various Various  Executing Body z Government Entity Agency  Ministry of Science  amp  Technology  Be
147. the screen  will be disabled  Figure 46   This tool may be useful for presentations on screenshots to mark the  selected area on the map     fe IRAQ DEVELOPMENT MANAGEMENT SYSTEM    E My Workspace List Chart Map Report Dashboard    Map  EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE BEEN   gt  CAPITAL INVESTMENT PROJECTS Zoomto  al a GO PieChart v  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS  Info    Cursor position  Lat  33 90 Long  45 51       Advanced Search      Scaling     Nation wide E Chart    Administrative   i  Outsite of Iraq C Auto     Governorate  C Qadha  3 Unspecified    i  Various    Oats    T View Criteria    Remove Filters    Agriculture  Industrial    Communications and Transportation    Buildings and Services    Education and Higher Education    Industrial      Education and Higher Education       Figure 46  Buffered Zone Querying  9 4 4 Using Layers    The Layers feature in the Map module provides a variety of data to select to display over the  viewing area  You can use the Layers feature to display the following information    e Display categories    e Choose to view data on a scaling map    e Plot data in the form of different graphs  pie chart or bar chart        Display map features such as governorate or qadha borders     The following layers can be applied in IDMS     I DMS ANALYTICS USER MANUAL 67    Categories    This option is used to plot category data on the map and to view them in form of different icons    images  To enable this option  expand the
148. those who  access the application as unregistered public user     7 8 Sample Views    In the following chapters  you can see several samples on list reports     7 8 1 Sample View 1       T Groupings    Available Groups    Project Type   Project Nature   Project Implementation Status  Subject   Subject Type   Governorate   Gadha    Year Maonth   Type of Expense   Key Performance Indicator  Funding Type   Man power Resources  Energy Resources    Selected Groups    Chapter  Project         x Cancel    Set as default              Setas Default for    Public Users      4 Move        4 Move Down    Figure 33  Defining List View Groupings for Sample View 1         Available Columns      of Approved Projects     of Approved Regular Projects    of Cancelled Projects   Title   Objectives   Description   Project Code   Project Implementation Status  Actual Duration  Months   Actual Duration  Days    Stan Date Actual   End Date Actual   Stop Date    Government Resolution Number    Project Cost 100     Figure 34        m Columns    Selected Columns      of Projects    of Projects   e by modified total cost          p  Cancel         Set as default       Set     Default far  Public Users       d Move          Mowe Down    Defining List View Columns for Sample View 1    IDMS ANALYTICS USER MANUAL 50    If you have indicated Chapter   Project hierarchy as a grouping  Figure 33  and   of Projects      of Projects     by modified total cost as columns  Figure 34   the following list view will 
149. tion  about the amount of assistance provided to the country  etc  This is done in the built in  on line Data Entry module  Also  you can create analytical reports in the List  Chart  and  Report modules     e Capital Investment Projects   this application is designed to track the public  investment projects that have been approved for the implementation and the projects that  are currently being implemented  These projects comprise the Public Investment Portfolio    I DMS ANALYTICS USER MANUAL 7    and are financed out of the national budget  Once you have accessed this application  you  are able to view project details and create analytical reports in the List  Chart  Map and  Report modules  Moreover  in this application you can add new projects or modify the  information of existing projects  which is done in the built in on line Data Entry module     e iraq Development Projects   this application is designed to consolidate the data from  the two applications  External Assistance Projects and Capital Investment Projects     e NDP Indicators   this application is designed to track project indicators and the related  progress     The examples described in the sections below are based on the External Assistance Projects  application     IDMS provides a web based user interface and requires a web browser  Internet Explorer  pre   installed     Note  To ensure more flexibility and a more user friendly environment  IDMS has been  implemented as a bilingual system allowing the d
150. tity          More Filters        e  IC  IC          Te  ic  ac      Ee               T View Criteria    Remove Filters Unspecified  Accomplished  Cancelled   Design   Feasibility Study  Implementing   Not Implemented yet    i Muthanna                o0 00    Posting Advertisernent  Settlement accounts    Stopped                                         Qaa aly              COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 51  Sample Map Report 1    9 5 2 Sample Map Report 2    If you have selected Project Cost  USD  as a map scale  the following map report will appear   Figure 52      IDMS ANALYTICS USER MANUAL    MS 4   IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart Map Report    Map    EXTERNAL ASSISTANCE PROJECTS  DONOR PROFILE    gt  CAPITAL INVESTMENT PROJECTS  IRAQ DEVELOPMENT PROJECTS  NDP INDICATORS    Cursor position  Lat     Advanced Search    Filter by   Project Type  Project Implementation Status  Chapter  Governorate  Qadha  Year  Beneficiary Gol Agency  Beneficiary Gol Entity  Executing Body Gol Agency  Executing Body Gol Entity  More Filters          View Criteria    Remove Filters    Info Anbar    Dashboard         Pie Chart v    31 93 Long     41 09    il Nation wide  i  Outsite of Iraq  i Unspecified    i Various    Figure 52  Sample Map Report 2    73       Save      Save as         Categories     Scaling   No Scale     of Projects     of Contracts     of Requests     of Projects   Project Cost  100    Modified Project Cost  IQ
151. tly selected filters checkbox to save filtering defined along  with the report    5  Click the OK button to save the report for future reference or click Cancel to discard the  changes made     13 2 2 How to Save a Copy of the Report    In the IDMS application  you can save a copy of an existing report  The copy of the report can be  saved in a different location  with a different name or edited content     In order to save a copy of a report  follow the steps below     1  Click the                 button on the top right side of the screen  A Memorize Report window   Figure 80  will appear   2  Save the report by the steps described in the section above     IDMS ANALYTICS USER MANUAL    13 3 Re organising Reports    104    You can organise the reports in the desired way  i e  rename the reports  create groups to include    reports under  etc     From the List  Chart  Map  and Report modules  you can design appropriate reports and organise    them in the preferred way  In order to organise the reports  click the respective     Organise  Views   Charts   Maps   Reports  button at the top right side of the Screen  Reports window  Figure 81  will appear  You may perform the following actions     Deleting Reports or Report Groups   Adding a Sub group   Re ordering Reports and Groups   Setting a Report as Default   Setting a Report as Default for Public Users    PUBLIC REPORTS  Project Loan Japan  Approval by SRB  hala23 12  Golcheen 2010  Education and Higher Education  Ministry 
152. truction Sites  etc    Names and Labels   Any other type of layer    e Data visualization features    Plotting Category or Indicator Data as icons images flags   Plotting data based on GPS coordinates   Any layer which contains data associated to a precise GPS coordinate can be plotted on  the map    Coloring administrative territories based on dynamic scaling  e g  level of certain  pollution    Plotting graphs on maps   Attaching photo images to GPS locations  or conditional locations     e Reference features    Legend   Dynamic legends are displayed depending on the selection of layer s    Tooltips   Details of an administrative territories   Details on plotted categories and indicators    e Navigation features    Free zoom in zoom  out   Mouse wheel  based zoom in zoom out   Scaled zoom in zoom  out   Map Panning  mouse drag and buttons    Mini Map Preview   The preview displays a small window of the entire world or country and is used for  quick navigation to a desired location with one click without having to zoom out  find  the new location and zoom in again     e GIS specific features    Distance Measurement  Buffered Zone Querying  Geocoding    e Internationalization features    User interface multi lingual capability  Map multi lingual capability    e Export  amp  Print    Export to PDF  Word  or Excel  Print    IDMS ANALYTICS USER MANUAL 63    e Interoperability    Map retrieval via web services    9 2 Accessing the Map Module   The system provides for the opportun
153. ummary 15 displayed for the Approved Projects list    e Projects   the number of approved projects in the list and the total required funds for  those projects    e New   the number of new approved projects in the list and the total required funds for  those projects    e Ongoing   the number of ongoing approved projects  created for ongoing projects  in the  list and the total required funds for those projects       ALLOCATED   the total funds allocated for all approved projects     I DMS ANALYTICS USER MANUAL 28    e Balance  to be expended    the remainder calculated based on the Assigned Ceiling   see Adjust Budget Ceilings   the total of all draft and submitted requested funds     The following buttons are used for emergency funding requests and are only available during  emergency request submission period  see Financial Years Setup     e Reallocate   used to start a reallocation procedure for the selected projects  Reallocation  is performed to request additional funds from other projects of the selected ministry for  the needs of the corresponding funding request    e Verify   used to verify the reallocation request  This button is only active when project is  in the reallocation phase    e Review   used to review the reallocation request  This button is only active when project  is in the reallocation phase     6 2 6 Adjust Budget Ceilings    In the Adjust Budget Ceilings form  Figure 18 and Figure 19   adjust the Budget Ceilings of  Gol  Government of Iraq  entity a
154. ustomized groups may also be created on demand     IDMS ANALYTICS USER MANUAL 9  4  LOGGING INTO THE IDMS APPLICATION    The starting screen of IDMS is the Login Screen  The application requires entering a valid  username and password and then submitting them  The section below provides for the necessary  instructions on logging into the IDMS application     In order to log into the application  follow the steps described below   l  Provide the username and password in the appropriate fields in the Login Screen  Figure  1    2  Click the LOGIN button     Note  The password is case sensitive     Note  If you have failed to log in several times  the system will be blocked  Contact your system  administrator in order to unlock your user access  The number of unsuccessful login attempts is  configured from the Administration Center  see IDMS Administration Center User Manual in  REFERENCES      IRAQ DEVELOPMENT MANAGEMENT SYSTEM    The Iraq Development Management System  IDMS  is a comprehensive web based application that manages the whole cycle of  government and donor funded development projects in Iraq  inclusive of social and economic as well environmental projects  The  IDMS will also serve as a reliable  credible  and ultimately invaluable source of information on the distribution of development  projects according to sectors  provinces and implementing agencies  The IDMS was designed to support and accompany the  implementation of the National Development Plan  NDP  2010 2
155. values in  orginal              Ok     Cancel       Figure 79  Setting the Report Options    4  After finishing  click the OK button for the changes to take effect  Or  click the Cancel  button to discard the changes made     13 2 Saving Reports  After creating reports of different types  you can memorize them as pre defined reports and    include them either in the Public Reports group and make them available for all users who access  application or in the My Reports group available to you only     I DMS ANALYTICS USER MANUAL 103    There are two ways of saving a report in the IDMS application  You can save a newly created  report  or save a copy of an existing report with a different name  in a different location  or with a  different content     13 2 1 How to Save New Reports    From the List  Report  Chart  and Map modules  you can design an appropriate report and save it   In order to save the report created  follow the steps below     l  Click the  ej Save button on the top right side of the screen  A Memorize Report window   Figure 80  will appear   2  Define the report name in the Memorized Name field both in English and Arabic     Memorized Name  ENG    ARB    Include under the following Group  PUBLIC VIEWS       Include curre ntly selected filters        Ok    Figure 80  Memorizing a Report       3  Specify the group the report will be included in by selecting the appropriate value from the  I nclude under the Following Group combo box    4  Check the Include curren
156. w drafts in the list and the total required funds for those  requests    Ongoing   the number of ongoing project requests  created for ongoing projects  in the  list and the total required funds for those requests    CEILI NG ASSI GNED   the sum of Allocation Approved by MoP   CoM and Rollover  Amount for the selected Executing Body  as defined in the Adjust Budget Ceilings form   For details  see Adjust Budget Ceilings    Balance  to be allocated    the remainder calculated based on the Assigned Ceiling and  the total of all submitted requested funds     IDMS ANALYTICS USER MANUAL 26    9 My Profile About Log Out   pF         4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM    E My Workspace List Chart Map Report 58 Dashboard Help       XTERNAL ASSISTANCE PROJECTS   CAPITAL INVESTMENT PROJECTS   NDP INDICATORS Financial Years Setup                         EISEARCHCRITERIA     Executing Body Ministry of Construction and Housing   All Agencies x  E Add Edit Ceilings  ALL   2008   2009   2010   2011   2012   2013   2014   2015   2016   2017  Governorate  All Govemorates    Fal Please note that the deadline for emergency projects has been extented to October 2014  Funding Type  All Funding Types x   All Project Types    Sector  All Sectors   E Submitted Funding Requests   2  Implementation Status    ti  All Statuses   unctons       7                        view       Statuses  gt    Keyword   v  ID Title    Required Funding Updated By Updated On Status  Search In      Project Code  V  ROSO
157. when all required fields are filled in                               Project ID Project Title V Updated By Updated On Ready for Submission   DRAFT water supply Ready Bl      DRAFT build sustainable capasity in iraq Not Ready      DRAFT The Project for Improvment of transit Switches admin user 16 Dec 2012 02 17 Ready        DAD Iraq   DRAFT Rehabilitation and medium term Interventions in Water  amp  Sanitation in the Southern Governorates of admin user 01 Feb 2012 04 17 Not Ready           DAD Iraq   DRAFT ICT in education for iraq project Ready           DRAFT ICT in education for        project Ready      DRAFT Human Rights Project for        2006   2007 Phase   8 Phase 11 hala kamel 06 Sep 2012 05 55 Ready B   icd                          Project ID Project Title   Updated By Updated On Submitted On  OP 2670  Public Affairs Reporting Workshops and News Exchange   Iraqi Elections 2004 2005  admin user 23 Sep 2008 11 36 23 Sep 2008   DAD Iraq   OP 10336    Involving the Iraqi journalists and media in covering the Constitutional process  admin user 04 Apr 2013 07 08 04 Apr 2013   DAD Iraq   OP 10337    Involving the Iraqi journalists and media in organising Public Debates for the Constitutional process  admin user 04 Apr 2013 07 15 04 Apr 2013  and Support a New Democracies TV film Festival    DAD Iraq   OP 39537   PARSON STUDY  TAL AFAR HQ Ninawa  Govn   Tal Afar  Dist  01 Apr 2008  0  OP 35549  1B  NATIONAL PLC NETWORK REHABILITATION  GRC  01 Apr 2008  0  OP 35550  1    REGI
158. window and navigate you to the Report module     IDMS ANALYTICS USER MANUAL 84           4  IRAQ DEVELOPMENT MANAGEMENT SYSTEM         My Workspace List Chart        Report Dashboard Help    Report    5                   Yaw A     g  EXTERNAL ASSISTANCE PROJECTS    DONOR PROFILE DESIGN     gt  CAPITAL INVESTMENT PROJECTS Choose and structure the information you wish to report on in the table below  Expand the Preview section to view the final look and structure of the report      IRAQ DEVELOPMENT PROJECTS    NDP INDICATORS  i Title      Show details    Compatibility Matrix    Governorate     Add Grouping  Advanced Search Add Groupi       Columns           Te    Expression        400 Column    Add 5     Filter by    21  Sorting Order  gt    Project Type Project     Project Implementation Status Add Row   Chapter   Govemorate Move Right   Qadha Remove   Year  3 Replace      Beneficiary Gol Agency   57 Switch Place With      Beneficiary Gol Entity   e   Executing Body Gol Agency   Executing Body Gol Entity Y  Reset    Submit   More Filters       T View Criteria    Remove Filters     PREVIEW         Pee                                       Governorate  2   Project Cost  USD     Project  1  Title  1  Project Cost  USD   1   Project  2  Title  2  Project Cost  USD   2           COPYRIGHT 2014 SYNERGY INTERNATIONAL SYSTEMS  INC    Figure 63  Reports Window with Properties Focus on the Column    IDMS ANALYTICS USER MANUAL 85    Project Cost  USD        Show       Numeric Value     A
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
0843 FLEX Polyclonal Rabbit Anti-Human Prostate-Specific  here  Stow MS-40H User's Manual  GFI EventsManager f/Servers, Add, 1-9S, 3Y, ENG  Redi Niche RN1620S-BI Installation Guide  USER`S MANUAL  Installation Guide  交流アーク溶接機用自動電撃防止装置構造規格改正検    Copyright © All rights reserved. 
   Failed to retrieve file