Home
Vertex Spa Heating Manual
Contents
1. 21 3 Wind Region Definitions Smoothed Op Ba coastline gt Latitude 20 25 27 30 Latitude Wind Region A Wind Region B E Wind Region C B GE Wind Region D Coastal region boundaries are smooth lines set in from a smoothed coastline by 50km 100km or 150km lines Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 25 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 21 4 Terrain Category Definitions e Terrain Category 1 Open terrain few obstructions Example flat treeless poorly grassed plains e Terrain Category 2 Open terrain with scattered obstructions having heights from 1 5m to 5m with at least two building type obstructions per hectare Example farmland and cleared subdivisions with isolated trees e Terrain Category 2 5 Averaged intermediate between Terrain Category 2 and Terrain Category 3 e Terrain Category 3 Numerous closely spaced building obstructions having heights from 3m to 10m with at least 10 house size obstructions per hectare Example fully developed suburb or light industrial estates 21 5 Roof Edge Exclusions Zones Higher wind loading zone Observe edge exclusion Installation zone Note Collector installations within a roof edge exclusion zone require 2 X the fixing strength in that local area Collector installations within a roof corner exclusion zone require 3 X the fixing stren
2. Adjusting the Set Under temperature Thermostat Time of day biasing the thermostat should be mounted so that its flat face is rotated by about 20 toward East from the arrays mounting orientation to help lower the activation criteria during mid mornings after the spa pool temperatures have cooled overnight This rotation also helps to bias the system toward higher temperature in the evenings when the spa pools temperatures are higher Insulation biasing If the thermostat switches on too readily on cool days and or you run your spa at a high preferred temperature then the thermostat should be installed without the silicon insulation Insulation biasing If the thermostat does not switch on readily enough and or you run your spa at a lower temperature then the thermostat should be installed with the silicon insulation Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 35 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 28 Installing the Over Temperature Thermostat 40 C Important If the area of your collector array is oversized for your pool spa and or you have a highly insulated pool spa pool you will require a safety thermostat to prevent the potential overheating of your pool spa The thermostat assembly should always be installed on the DANGER higher temperature OUTLET RETURN SIDE of the collector array General Spa Pool Safety Notice Prolonged bathing in hot wat
3. C lt 10 Roof Pitch 12 5 Roof Pitch 15 Roof Pitch 17 5 Roof Pitch gt 20 Roof Pitch aiaa 1 290 Kg 255 Kg 225 Kg 210 Kg 190 Kg Tais 2 aiis 215 Kg 185 kg 170 Kg 160 Kg ae 220 Kg 195 Kg 170 Kg 155 Kg 145 Kg Pinin 3 Se 175 Ke 155 Kg 145 Kg 130 Kg As an example if you are in Wind Region B and Terrain Category 3 and have a roof pitch 12 5 then any single panel in your collector system could experience momentary peak uplifts of 120Kg per panel You should make sure your Vertex Solar Pool amp Spa Heating System Installation amp User Manual Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved Page 24 panels and fixing components can withstand your relevant loadings See below for Terrain Category and Wind Region definitions Note Installations involving a second story roof or higher or houses on hills or panels mounted 50mm or greater above the roof structure have higher potential wind loadings Please contact info EcoOnline com au for ultimate wind loadings based on your details WARNING 21 2 Frequency of Extra Fixings for Different Regions For ultimate wind loadings Extra Fixings Required see Tables above Less than 70Kg per panel Stainless guide line is not required but still recommended Greater than 70Kg per panel Stainless guide line is required across each row Greater than 120kg per panel Stainless guide line is required with in between anchor points
4. and or suction line during drain down Check for air leaks or air traps see above section on allowed suction line angles 31 2 Check for Balanced Water Flow through All Collectors 1 With the sun shining on the collectors and the pump operational run your hand over every part of each collector Collectors should be cool to the touch while the top of each collector could be slightly warmer Hot spots indicate that there is no water flow through this part of the collector 2 Toeliminate hot spots make sure the top header pipe of the entire collector array runs straight and that it has a slight slope minimum 2 with the outlet having the highest point The inclination of the array may need to be increased If there is no sun available to perform this test do not leave the pump connected Do not let the system run for the first time unattended CAUTION During full sun operation the outlet water flow should be strong with a temperature no Tip greater than about 5 7 C that of the inlet 31 3 Legionaries Risk The Vertex system must be switched off 1 hour before spa use Disinfectant should be introduced and the filter pump run for at least 1 hour before spa pool use Always follow WARNING disinfection advice supplied by your spa pool manufacture Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 40 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 32 Service and Ma
5. available insert an old SOW halogen globe into the panels electrical connect do not do this is full sun angle panel to sun to reduce power 3 Check that the wires in the connector aren t twisted internally and the positive and negative connections line up 4 Check the polarity in the solar panel junction box see section 26 5 If it still won t start please contact us at info EcoOnline com au for a replacement pump Sometimes an air locked mode can arise in the pump when a sufficiently large air bubble makes its way into the inlet of a working pump In this state water cannot be pushed higher nor can the column of water above the pump make its way back through the spinning rotor In this mode the pump can overheat and burn out within 15mins Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 14 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 16 Collector Array Configurations Important Vacuum breaker valve assembly Mount on vertical inlet just off the roof Point valve vertically upwards slope up top header pipe toward the outlet Unscrew black air intake nozzle from eg ep spa LI To make sure all air bubbles are evacuated upon filling collectors MUST be installed d full with a minimum recommended pitch of 5 Also ideally the top header pipe should Read Carefully have a 1 or 2 upward slope toward the top outlet return such that the
6. each row WARNING Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 22 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 20 3 Single Row Tile Roof Fixings Stainless steel straps Double MUST allow for collector contraction strap Ki all WE EE ee BR WE AS II unn Semer Aluminium C A II let OCH al LECH Stainless steel 4mm End cable In between cable cable anchor point anchor point line Z Use iwo cable ties Use perforated band under tile anchor point For single or multi row arrays in wind regions B aluminium L angle MUST be run for the top and bottom of each row WARNING 20 4 Perforated Band Under Tile Anchor Point For Region B or Two row arrays Attachment point should be over bottom batten here Use perforated stainless Ki supplied or hoop iron Band should be reasonably taut Screw band to batten here Screw band to batten Bolt band together here Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 23 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 21 Wind Proofing Note roof installation of these panels in Wind Region D is not recommended This section provides general advice on wind loadings If you have any doubt about your wind loadings please contact info EcoOnline com au 21 1 Ultimate Peak Wind Loadings
7. it is functioning correctly and that collectors are draining properly The collector s facets around weld points should never appear collapsed concave by negative pressure Collector Plastic Contraction Collectors can relax and contract by X 10mm in length over the initial first few years It should be checked that the stainless steel straps or fixings have not become too tight as a result If required straps will need to be loosened slightly This check should be carried out when the collectors are cool water flowing Debris Accumulation Inspect the inner of the collectors Depending on X conditions collectors may need to be flushed with a suitable cleaning agent for debris accumulation after many years of use Fatigued weathered loose and or corroded wiring or electrical connections poses a fire risk even at low voltage WARNING 32 1 Collector Puncture Repair Procedure Drill out the puncture using a sharp drill bit being careful not to drill into the opposite wall Inject chlorine resistant pool silicon into the collector inner to create a 10cm inner silicon disk plug Wait one day before re pressurizing Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 41 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 33 Trouble Shooting Problem Cause Solution Pump is running smoothly but no water is coming out of t
8. not over tighten hose clamp at this stage HDPE has a high thermal expansion You ll S LE Tip need to re tighten these with cool water running through the collectors at a later stage Make sure all nuts are accessible for future tightening The inlet outlet adapter PVC barbs should be glued into the silicon joiner with any neutral cure silicon A flat spatula type surface should be used to push silicon into the barbs indentations as shown Why PVC barbs can soften at extreme roof stagnation temperatures and contract sightly with clamps pressure HDPE will not contract significantly at maximum roof stagnation temperatures Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 20 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 20 Roof Fixings When working with power or hand tools always follow the safety instructions e Wear the recommended personal protective equipment such as gloves safety WARNING glasses respiratory and hearing projection Make sure electrical cables are kept away from any water and from foreign objects which pose a potential cable severing or crushing hazard When using glues solvents or sealing agents make sure you know and seek the proper first aid in case of an accident 20 1 Application of the PVC Coated Stainless Steel Straps Thread Thread rea strap through Fold wings Threaded length must be ouR buckle around threaded Min
9. EcoOnline Vertex 3 0 Solar Spa Heating System Installation amp User Manual Revised 18 09 2015 Optex Solar Pty Ltd P AAN Y e www EcoOnline com au wt Eco Online com au email info EcoOnline com au energy smart solutions Copyright 2012 Optex Solar Pty Ltd All rights strictly reserved This publication is protected by copyright law and unless otherwise specified is for your personal and non commercial use only No part of this publication may be reproduced or distributed by any process electronic or otherwise without the specific written permission of Optex Solar Pty Ltd Trademarks appearing in this manual are the sole property of Optex Solar Pty Ltd or their respective owners Nothing in this publication shall be construed as granting any express or implied license to use any intellectual property of Optex Solar Pty Ltd otherwise than for personal and non commercial use only Optex Solar Pty Ltd must not to the full extent permitted by law be held liable for any claim cost including legal costs damage expense loss including fines penalties set offs and consequential loss or liability arising from the use or misuse of any product described in this publication unless expressly provided otherwise in this publication Information as well as any products described in this publication are subject to change without notice Vertex Solar Pool amp Spa Heating System Installation amp User Manual Pa
10. Pty Ltd All rights strictly reserved L The Vertex System is not self priming and requires the installation of the pump outside of but below the waterline of your pool spa Read Carefully 3 Warranties EcoOnline offers the following Warranties e 20 year return to base Warranty on all MOTECH cell solar PV panels e 5 year return to base limited Warranty on all Vertex system HDPE collectors e 1year return to base limited Warranty on all Vertex system pumps See EcoOnline com au Terms and Conditions page for further details Customer please note Collector warranty is VOID if collectors are installed Read Carefully e without a vacuum release valve on the inlet line e or ina manner that prevents collector from fully draining when the pump stops Such installations will expose the collectors to strong fatiguing positive negative pressures and or stagnant hot chlorinated water on hot days These situations will have detrimental effects on the collectors which will limit lifetimes and can also result in significant shrinkage of the collectors which would put strain on roof attachments means Pump warranty is VOID if pumps are installed Read Carefully e without a protective bypass line e or with inappropriately sloped or non air tight suction line e or without the Vertex strainer 4 System Sizing Guarantee Sizing systems is difficult involving a lot of factors which we could get wrong Hence in addition to the abov
11. as considered A protective bypass line was installed no more than 1 2 meters pump height with a minimum 3mm bypass passage 31 Operating Instructions The system strainer should be cleaned regularly depending on spa use L For pools larger than 15m we recommend that the filter pump run at least a short Read Carefully period in the evening so as to help mix the warm water deeper into the pool otherwise the top layer of warm water will cool excessively at night We strongly recommend the system be switched off during pool spa use or when you go on holidays The system can be switched on after use making sure people are away from the CAUTION outlet and that the pump is still primed 31 1 Switching the System ON for the First Time W e recommend you wait till a sunny day and follow this procedure 1 After the under temperature thermostat has turned ON connect the pump which will start in 3secs Listen to the pump start after an initial purge of air the pump should run smooth 2 After 5 mins running disconnect the pump and let the system drain down Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 39 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 3 After 30 mins worth of draining reconnect the system and check that the pump starts smoothly If the pump does not start perfectly smoothly during this second start up then air is getting into the pump
12. as installed with a 1 to 2 slope toward the outlet Aluminium channel was laid top and bottom of the collector array as shown in the manual Ultimate uplift wind loadings were considered and panels secured appropriately The stainless steel strapping was installed with sufficient play to allow for collector contraction The roof edge exclusion zone was observed A hot spot check was performed All collectors are cool during full sun exposure top of panels may be warmer The PV panel is mounted with at least 2cm clearance from its mounting surface for underside ventilation The collector array faces anywhere from West to North East A vacuum release valve was installed on the roof near the collector inlet line The outlet is submersed in the pool spa A minimum of stress is placed on the pumps inlet outlet pipe connections The pump and enclosure is well supported pump does not hang by the inlet outlet connections The pump and filter were installed with allowed orientations only so as not to create air traps All suction line prior to the pump is air tight and slopes up toward to the pump with no air traps The over temperature thermostat was installed and tested The thermostat U channel and thermostat itself is well insulated from the surroundings PVC plumbing lines were laid at such an angle so that all water drains from them for frost proofing The possibility of a drain down event caused by a failure in the Vertex plumbing lines w
13. as to provide foot or handholds from the outside of the barrier e For spa pools and above ground pools do not lean the collector array against the side of the spa or pool so as to create a ramp or climbable object Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 13 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 15 Pump and Solar PV Panel Test LI During the following test DO NOT allow the pump to run completely dry as this may damage the pump Read Carefully 1 On a sunny day pour water into the pumps inlet and block the pumps outlet 2 If you have a panel with an under temperature thermostat you will need to bring it up to temperature with a hair dryer 3 Situate the solar PV panel away from sunlight Connect the panel to the pump using the electrical connector Pick up the solar panel and angle toward the sun the pump should start in 3 4 secs 4 Check to see that the pump is working for a few seconds 5 Familiarize yourself with the noise characteristics of a fully primed and partly primed pump You will need to diagnose potential air locks in your pump Note pump can run partly primed for a few seconds without damage 15 1 What if the Pump Won t Start 1 Check that there is sufficient sun and that no cell of the panel is shaded 2 Check that the under temperature thermostat is ON and that the panel is producing power if a multimeter is not
14. ass amp Drain Down Line A protective bypass line 15 with 3mm constriction must be installed for the system The bypass line should be placed at not more than 1 to 2m pump height CAUTION Why Solar power is an intermittent power supply In part sun the pump may not be supplied with sufficient power to reach the pump height Without a bypass line this will result in a running pump with no cooling water flow which can overheat a pump Secondly with a non return valve in place the by pass allows the system to drain down Protective bypass line must be installed Non return valve j non spring loaded 3 3mm constriction Bypass line should be no more than 1 2m from water level Strainer 24 1 Installation The drain tube should be installed on the supply and return solar lines leading up to the roof approximately 1 2 metres from water level To install drill into the PVC pipe using an 8 5mm drill Note PVC plastic should be preheated to 40 C using a heat gun or it may split when drilling Insert the rubber grommet into the hole tapered end first Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 29 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 25 Suction Line and Pump Mounting Configuration The pump should be supported such that there is a minimum amount of stress on the pump s inlet and outlet piping The pump should not be susp
15. ation amp User Manual Page 37 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 29 Connecting the Inline Over Temperature Thermostat and Extension Wire The 5m extension cord can be used to extend the lenght of any connection Over temperature thermostat 20mm PVC We return line The connectors should not be in a position such that they are continuously exposed to splashing spa water or rain ingress which can run down the cord and make its way inside the connector WARNING The electrical system of the Vertex system cannot be modified in any way such as for example the introduction of any alternate power supply other than the solar panel supplied Vertex system electrical components cannot be used as part of any other modified system WARNING Never run a 12 24V cable near or in the same compartment or conduit as other 240V cables due to the chance of mistaking the two cables at some later point in time during installation or servicing WARNING LI Before turning ON the pump for the first time please refer to section 31 1 Switching Read Ca refully the System ON for the First Time Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 38 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 30 Important Installation Check List Your installation must have the following elements OOOOOROOODOOOOOOOOOOO The top header pipe w
16. ck for blockages or water restrictions and the ability of the chosen pump configuration to pump strongly up to the required height A larger pump configuration may be required The solar panel is in full sun and is connected to the pump however the pump is not working The under temperature thermostat may have not come to temperature yet Potentially faulty pump solar panel or thermostat switch or rotor blockage in the pump Check the power of PV panel first by inserting a standard GX5 3 base 12V Halogen globe into the connector pins Check the pump by connecting to a 18VDC battery If the pump has been exposed to potential particles in the water the rotor could be blocked dissemble the pump slowly on a clean table take note of the assembly clean any blockages When priming the system air bubbles do not stop appearing at the suction inlet Air leak in the suction and or array inlet lines Negative pressure at vacuum breaker valve Check all connections on the suction pump and array inlet line and make sure they are air tight Install a small constriction in the return line to increase back pressure The system overheated my spa pool past 40 C Faulty or inadequately insulated thermostat assembly Check that the thermostat is working by immersing the aluminium U channel in 45 50 C water keeping the thermostat switch dry Insulate the thermostat switch assembly properly The syst
17. d drill with 8mm Hex socket Screwdriver with 8mm socket fitting Clear silicon Hack saw metal blade to reduce PVC filing size PVC glue Green pressure Level Soldering iron 3mm drill bit Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 11 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 13 Safety When Working at Heights WHEN WORKING AT HEIGHTS SAFETY COMES FIRST A person can easily fall off a ladder or roof and be seriously injured For installations on a roof pitch greater than 22 and or a double story house we strongly recommend a highly competent professional installer install DANGER your solar collector array The installer MUST use an appropriate safety harness The installer should always take the necessary safety precautions e Choose an appropriate day cool dry calm and partly cloudy e Plan out your install make sure you have all required components tools and have plenty of allocated time e Only work at heights when you are well rested and alert e Never work alone always work with at least one other person e Always use a Safety harness or fall arrest system attached to appropriate roof anchor points e Wear clothes that fit well but that do not restrict movement e Use proper non slip shoes e Use sunscreen 13 1 Ladder Safety Tie ladder here The chance of a falling from a ladder should never be 900mm underes
18. e Warranties EcoOnline offers a System Sizing Guarantee as follows If we sized your system or you use our online calculator and you took our advice and you aren t happy with the systems performance heat output then you can purchase up to 25 more panels originally supplied by EcoOnline up to two years after your original purchase and we will ship the items free of shipping charges 5 Collector Sizing Guide An interactive collector sizing calculator can be found on our website at http www EcoOnline com au product information solar pool heating sizing guide Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 5 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 6 Pump Sizing Guide An interactive pump sizing calculator can be found on our website at http www EcoOnline com au product information solar pool heating sizing guide When installing this system it is imperative to check whether the pump will provide a sufficient water flow rate at the pump height of the installation CAUTION 7 Spa Chemistry Compatibility Guide This system is not compatible with bromide chlorination hydrochloric acid use and or acidic pool spa water pH less than 7 2 Sodium Carbonate must be added to protect the system from acidic pH lt 7 pH should be maintained between 7 2 7 8 for maximum system longevity If absolutely required Sodium Bisulphate acid can be used to k
19. eep the pH down CAUTION Incompatible Chemistries Alternatives Chemistry X Bromide Based Chlorination V Any other Chlorination or Sanitation X Hydrochloric Acid V Sodium Bisulphate Acid X Acidic Water pH less than 7 2 VY Water pH greater than 7 6 Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 6 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 8 Roof Type Compatibility Guide The average air gap distance between the mounted collector and roof structure has a strong influence on wind loadings If panels are to be installed on a roof then the following should be observed to limit wind uplift potential WARNING 1 Installed panels should lay flat touching the roof structure It is recommend the air gap distance between the bottom of the installed collector and the valley points of the roof corrugations should be no greater than approximately 25mm Panels should have adequate clearance from roof edges Panels on roofs should not be mounted on tilt frames Corregated metal roof or tile roof Collector Collector bottom to roof valley air gap Le should be less than approx 25mm Roof Type Air Gap Distance Recommendation Standard Corrugated Iron roof Custom Orb 17mm Okay Relatively Flat Tile roof Less than 25mm Okay Spandek Iron roof 24mm Okay Modulated Tile roof Greater than 25mm Region A Only Trimdek Iro
20. em turns off midday below my preferred temperature Reduced flow rate in the system is creating a large temperature differential triggering the over temperature thermostat Check plumbing for blockages and or air locks You may need a stronger pump Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 42 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved
21. enclosure Pump GE bb outlet Ta onto rubber Ti 5 full turns damper e i y __ Center pumps fittings Never carry the pump by the electric supply cable as this may damage the pump and make it unsafe CAUTION The pump can be fixed in place by running a perforated metal band around the plastic base and screwing to a wooden frame CAUTION The stainless steel hose clamps on the enclosure should be tightened AFTER the enclosure and piping is fixed in place This is to release any stress on the pumps inlet outlets connections CAUTION Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 33 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 26 Solar PV Panel Mounting Caidanhiiawiretetettenn nal Before mounting the panel you will need to thread gt r the PVC wire into the junction box and solder the A AT brown or red wire to the right hand side or positive terminal and the blue or black wire to the w CH D gt KA e fe left hand side or negative terminal Check for the Solder browned Ge and markers in the junction box We highly wire to right terminal recommend a plug made from cut wire be used to weatherproof seal the other wire hole Replace junction box cover Wires must be soldered to the terminal if a loose or corroded connection develops over time it can create a resistive load which could melt or bur
22. ended in the air by its inlets and outlets without support CAUTION Use only the supplied non spring non return valve or flap valve Why A small pump will have trouble pushing against a spring loaded valve adding to the CAUTION pump height This will reduce flow and can overheat and damage the pump The pump should be installed in a way which allows easy access dismantling for maintenance Connection of the pipe work to the pump should permit the removal of the pump without the need to cut the pipe work Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 30 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 25 1 Allowed Suction Pipe Configurations All piping from the suction points to the collector array MUST be sloped upwards There can be no air trap sites in the suction line CAUTION Why Small air bubbles can accumulate in the suction line when the system drains down through the suction line Air pockets in the suction line can release large air bubbles which can air lock a pump no matter how far the pump is below the water line This leads to zero flow overheating and pump failure All piping from the suction points to the collector array MUST be sloped upwards Re Air trap Downward slopes Pump outlet are not allowed downward slopes KH J are not allowed xX Air trap Horizontal runs are not allowed mW potential air a f _ Suction
23. er may increase a person s normal core body temperature of 37 C which could result in hyperthermia Persons affected by DANGER hyperthermia may experience weakness fainting nausea drowsiness and muscle cramps as a result they may experience a failure to perceive the impending danger of prolonged immersion and the need to exit the spa pool and or they may be physically unable to exit the spa pool Using an accurate thermometer the spa pool owner should always check water temperatures do not exceed 40 C before allowing people to enter the spa pool A water temperature of 38 C or lower is recommended for young children or pregnant women Never use alcohol drugs or medication before entering a spa pool AS a precautious when working around a spa bath we recommend all mains power be switched off The Vertex system is extra low voltage safe however if you have any doubts about your ability to carry out electrical work on the Vertex system we recommend your DANGER wiring is installed and serviced by a qualified electrician Apply silicon to adhere thermostats 1 Place Aluminiu around the 20mm PVC return line Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 36 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved Press down Use electrical tape to secure hard to thermostats while silicon sets thin silicon at 2 Armaflex Cable tie w
24. eturn line or suction line in other words water in the return line should never be forced to travel uphill while conversely when the pump Read Carefully is running water in the suction line should never travel downhill Return line from roof No U bends Unscrew air intake fully in the return KR line Mount vacuum release valve on vertical inlet gt line just OFF the roof Water line EN Outlet near Outlet port Pump water line Suction ports Strainer Return from roof U bends form Return from Add extra Vertex vacuum G air locks which roof S breaker valve to remove add to the air lock pump height Unscrew air intake fully Return line runs L below water level Install open on adds to positive air pressure pump vacuum breaker valve at water level height LEN If any part of the return line plumbing or return outlet port is installed far below the d full water line greater than 0 5meters then an extra Vertex vacuum beaker valve should Read Carefully be installed at the water level to minimize the extra pump height created LI The Vacuum Breaker valve should face vertically upward Unscrew black air intake nozzle Read Carefully Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 28 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 24 Protective Byp
25. from bottom spa xX sump outlet are not allowed K dirt particles may jam impeller a S All suction line connections must be made with air tight PVC glue sockets Pink Teflon tape with silicon grease should be applied to any threaded connections on the suction line and pump connections CAUTION Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 31 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 25 2 Allowed Mounted Pump Orientations Water line 3 1 l 1 1 1 1 1 upside down vertically up The pump must be mounted as shown above so that it automatically flood primes without needing to force water through See Pump Enclosure Assembly section to understand the internal orientation of the pump within the enclosure CAUTION 25 3 Allowed Mounted Strainer Orientations Water line Air bubble traps _ Water Flow L Te S Water Flow Contains air traps okay Contains air traps Contains air traps The strainer must be mounted so that it automatically flood primes without needing to force water through CAUTION Page 32 Vertex Solar Pool amp Spa Heating System Installation amp User Manual Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 25 4 Pump Enclosure Assembly Teflon and silicon grease Insert this end first screw on Insert bottom
26. ge 1 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved Contents L Key Trim seier E E E sibatecissacdensbaeceds REN E E E T EE sa lecaddeadeddevebbee dds E T A 3 2 Pre Installation Suitability amp Safety Checker 4 S SNE 5 d System Sizing Guarantee wc ig eege ed age sx cece Eege gege eege dead a Seen ce eu E E EEKEREN EENI EER 5 5 Collector SIZING GUI EE 5 CEET KEREN 6 7 Spa Chemistry Compatibility Guide ccccccccssccccecessessaeeeceeecessesaaaeeececssesseeaeaeeeeecuscesauaeaeeeeecessesauaeeeesessessnsanaeeesess 6 8 Root Type Compatibility EI 7 9 Wind and Climate Considerattons ceecceeeccecsseceeneeeeeceeceeeeesaeceeaaeceeeecsaeeeeaaecseaeeceaeeeesaeeeeaaeseeaeeseaeeeeaaeeseaeeeeeeeees 7 10 Included System COMPONENTS EE 8 11 Additional Required Components Not Supplied ccccscccesssececsessececsesseeeceesaeeecsesseeeceesaececsesaeeecsesaeeeceeaaeeeenaas 10 12 REQUIRED TOOIS 2 lt 5i 4 cescescee cesastaenas ceessdibdaiee a a a a E E E EE EE RaR 11 13 Safety When Working at Heights ccccccccccccsssessnsscecececseseseeaesesececesseseeaeseeecssesesaeaeeeeeceseeseaaeaeeeeeeeseesenaeaeesesensees 12 14 Choosing A Place to Install the Collector Array 13 15 Pump and Solar PV Panel TeSt Seege ege e Eege Eer 14 16 Collector Array Configurations fo scacee c 8ssseen seed ccecses see Rue EENS ENEE SES REENEN ee 15 17 Roof Attachment Options c cccccccessssssssceeeeeces
27. gth in that local area WARNING Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 26 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 22 Plumbing Diagram 1 Ball valve 3mm drill hole 7 Vacuum release valve 13 Electrical connector 2 In line strainer 8 40C Safety thermostat cutout 14 Grated suction inlets 3 Union barrel socket joint 9 Return line inlet adapter 15 Protective bypass line 4 Solar Pump 10 Plumbing water line soild 16 3mm Constriction 5 Solar electric PV panel 11 Electrical wire dashed 17 Non return valve non spring loaded 6 Solar thermal collector array 12 Undertemperature thermostat The installation of at least two Australian Standard approved suction outlet adapters 600mm apart connected by a T piece PVC plumbing is mandated for pools and spas WARNING Make sure all PVC saw shavings are cleared prior to gluing and that lines are flushed clean before connecting pumps PVC shavings can block the impeller of the pump resulting in burnout We recommend a metal hack saw when cutting PVC pipe to reduce shaving size CAUTION Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 27 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 23 Installing the Vacuum Beaker Valve amp Avoiding Potential U bend Air Locks L There should be no U bends in the r
28. he spa outlet The pump configuration may be undersized Morning light is not strong enough to reach the pump height There is a blockage or the PVC ball valve is closed Check for blockages or open PVC ball valve Wait for 11am 3am sun for a North install There maybe U bend air traps in the plumbing lines which are adding to the pump height these should be removed Failing these points a stronger pump may be required Pump is running loudly Air bubbles making their way through the pump Wait a few seconds for the pump to clear any air bubbles If it continues disconnect check for air leaks in the suction line and then reprime the system Some of the collectors are hot when the sun is shining and the pump is running fully Water is not flowing evenly through all collectors Make sure the header pipe is straight and sloped toward the outlet Panels should be mounted with a minimum 5 10 degree pitch to remove surface air bubbles The outlet flow is strong and the system is working but the pool is not warm enough Potentially undersized system Check for balanced water flow through all collectors If flow is balanced and the system is working then the system is undersized Consider using a solar blanket or add more collectors The outlet water flow is low and the outlet water is very warm to hot during operation Potentially undersized pump configuration or water restrictions Che
29. hts strictly reserved DO NOT use self Screw through taping screws into rafter or battens Use blocking if required Use 1 2mm rubber isolation pad Batten Rafter Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 18 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 18 Collector Mounting Procedure anchour points if required Install windproofing 4 Lay and strap second 2 Lay and bottom E strap collectors 3 Measure and mount top rail 1 Mount bottom rail tighten hose clamps 5 Lay plumbing and turn on water flow to collectors 6 With water flowing cool and contract 7 With water flowing install top 8 Install any extra windproofing if required CAUTION CAUTION WARNING Collectors will contact in length by up to 10mm over time and 12mm thermally for an ultimate contraction of 22mm in length per panel For a two row array strapped between a top and bottom aluminium rail the total ultimate contraction is then 44mm The top and bottom strap must have sufficient play to account for this ultimate contraction It is strongly recommended that the top straps be applied while cool pool spa water is flowing through the panels The collectors can be walked on without damage For tile roofs with solar roof hook care should be taken not t
30. imum Cnn Use underside section strap f EH as far as it will go to protect against Curl underside end Strap must allow for collector contraction IMPORTANT DO NOT over tighten stainless steel strapping Strapping must WARNING have sufficient play to allow for collector contraction For the installation of two rows between two aluminium channels top and bottom strapping should be loose enough to insert your little finger between the strapping and the header pipe Why Over tightened straps can experience tension and continual flexing of the metal due to the thermal contraction of the collectors This can result in metal fatigue of roof fixings over time Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 21 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 20 2 Single Row Metal Roof Fixings Stainless steel straps Double MUST allow for collector ge strap N Aluminium angle all EL EE SW m KE EH corners so O T Stainless steel 4mm FAJE cable D Res n Wei line End cable anchor point In between cable anchor point Bridge peaks if gap falls on valley odi Use folded double bands All screws must be sunk into batten rafter or wooden back blocking self tapping screws not allowed For single or multi row arrays in wind regions B amp C aluminium L angle MUST be run for the top and bottom of
31. in the summer while installations closer to vertical gt 45 produce more heat during spring autumn For ground mounted arrays under no circumstances should a collector array be mounted in anyway so as to compromise the effectiveness of a pool or spa Child Safety Barrier DANGER Allotment Boundary The figure to the left shows an example of a Child Safety EE Barrier marked with a dashed line A collector array should not be mounted near the Child Safety Barrier both on the inside and outside of the Pool Area unless Government The Building Commission or SPASA for details regarding pool safety barriers in your state AN Child Safety Barrier DO NOT Compromise proper clearances are observed Consult your Local Please keep up to date with regulations as they change over time For more information see AUSTRALIAN 3 4 STANDARDS 1926 1 2007 AND 1926 2 2007 FOR POOL EE SAFETY BARRIERS Dwelling Allotment Boundary e Do not install the collectors leaning against the outside of a Child Safety Barrier so as to create a climbable object for children to access the pool or spa e Collectors installed inside the pool area in front of a boundary fence must be offset away from the Street boundary fence with the proper clearance from the top of the fence so as not to provide a foothold for a child climbing into the pool area e Do not install the collectors too close to the inside of a Child Safety Barrier so
32. intenance Schedule Important before carrying out any system maintenance you MUST check for any manual and or technical service bulletin updates and download the latest installation manual from www EcoOnline com au downloads CAUTION 1 e Annual After Maintenance Issue Service Procedure Month Quarter Checks 5 Years Barb Plastic Relaxing All the stainless steel hose clamps may need X X retightening as plastic relaxes overtime Corroded or Fatigued Wiring Wiring solder connections and wire X X fixings should be checked for damage and or corrosion signs Silicon Joiner Chemical Attack Disconnect a single silicon joiner dry and check that the water exposed inside section has not turned grey or X X become unfirm to the touch This would indicate chemical attack from a pH lower than 7 Replace as needed Stainless Strap Fatigue Inspect all stainless steel fixing straps for wear of PVC coating around the sharp Aluminium L angle edge which would X indicate fatigue working of straps Replace as needed Mounting Frame The integrity of the collector mounting frame and wind proofing components should be checked for any degradation X Replace as needed Plumbing Degradation Plumbing lines and fittings should be checked X for signs of UV and or chemical damage Replace as needed Vacuum Release Valve The vacuum release valve is a critical system X component It should be checked that
33. ires together using supplied stainless tie away from foam Cable tie around foam insulation 3 wm 60mm Armaflex Wire orientation should not allow water droplet ingress Over temperature thermostat assembly MUST be installed in a sheltered location away from rain and sun expose and in such a way that any water droplet condensation on pipes or wires cannot run inside the assembly WARNING Adequate insulation of the Aluminium U channel is required otherwise the exposure of the U channel to cooler external air may prevent the U channel and hence the face of the thermostat from reaching the cut off temperature WARNING The supplied 40 C thermostat with secondary failsafe will disconnect the pump s positive wire if the temperature of the water in the return line is about 40 to 42 C The temperature differential across the solar collector array will mean that your spa temperature should be at or below 40 C during trigger 28 1 Adjusting the Spa Temperature If you require a lower spa temperature we recommend you use ball valve 1 to constrict flow slightly This will increase the temperature differential across the collector array and turn the system OFF faster Note if you are going to be using this method we recommend you drill a 3mm hole in ball valve 1 in case you accidently close this valve fully as this could block all flow and burn out your pump Vertex Solar Pool amp Spa Heating System Install
34. lable these horizontal lengths should span the collector array or be as long as possible see section 6 1 below e 60mm galvanized timber screws e Black outdoor paint optional Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 10 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 11 2 Roof Mounting If installing the panels on a roof you will also require the following extra items 32mm x 32mm x 3mm Aluminium angle 4mm stainless steel cable amp four cable ties per row These are available in any plumbing store The aluminium angle is available from Capral Ltd or Ullrich Aluminium Pty Ltd 11 3 Additional Plumbing Components You also require some of the following extra items depending on your system These should be available in any spa swimming pool supplier i a vm PVC 25mm piping PVC 20mm piping PVC 20mm barrel union join 20mm Spa flex flexible PVC hose recommend for frost prone areas Other 20mm or 25mm PVC plumbing bits CAUTION We recommend AS 1477 compliant PVC 20mm piping with PN9 pressure rating or greater and matching PVC fittings be used for all plumbing We also recommend 20mm spa flex flexible PVC hose for suction line pump plumbing Do not use any irrigation fittings as they are not compatible with chlorinated water 12 Required Tools Battery powered han
35. mming pools e AS 1170 2 2011 Amend 2 Dec 2012 Structural design actions Wind actions e HAZPAK produced by the work cover authority e AS 3000 2007 Sections 6 3 6 4 amp 6 5 e AS 1926 1 amp 1926 2 2007 swimming pool safety location of safety barrier Please print this manual out and keep it for your reference Please take the time to read the entire manual before starting any work Particular attention should be given to text contained in the following key terms Please note EcoOnline has a strong product safety policy do not install products without reading safety guidelines in the manual Please report any product safety issues or near misses to info EcoOnline com au no matter how trivial Indicates a SAFETY issue that is likely to cause injury or death if the user does not follow the instructions DANGER Indicates a SAFETY issue that may cause injury or death if the user does not follow the instructions WARNING Indicates a SAFETY issue that may cause injury or property damage if the user does not follow the instructions CAUTION LEN Refers to critically important information related to the correct functioning of the system Read Carefully a Tip Refers to useful information for the optimal operation of the system Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 3 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 2 Pre Installation Sui
36. n roof 29mm Region A Only Klip lok lron roof 43mm Not Recommended Flatdek Iron roof 45mm Not Recommended Panels installed above the roof structure with 50mm or greater underneath air gaps experience much higher wind loadings and are now subject to the Australian wind loading WARNING S2ndare AS NZD 1170 2 9 Wind and Climate Considerations It is the responsibility of the installer to consider wind loading factors see wind proofing section below If the installation site is within strong wind speed areas then the extra stainless steel guide line must be installed across each row with the in between panel CAUTION anchor points Do not assume supplied components are sufficient Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 7 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 10 Included System Components Panel Kit ry 835mm 1 x HDPE collector panel 2 x 40mm reinforced silicon joiners 4 x Stainless steel hose clamps ni 6 x 316 stainless straps black 1 x 25cm length perforated 316 stainless band Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 8 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 12V Solar Pump Kit gt i 1 x 40W or 60W 12V Solar pump with 1 x 40W or 60W Solar panel with 1 x PVC 316SS mesh Strainer p
37. n surrounding material or cause WARNING SES Bolt under temperature thermostat mount to mid mounting hole Bolt L angles to panels bottom mounting holes pE Note shading on even a single cell will cut the output of the entire panel An aluminium angle should be attached to the back of the solar panel for mounting purposes using the back mounting holes If your system came with an under temperature thermostat you will need to drill a hole in the thermostat mount and bolt to the solar panel frame such that the under temperature thermostat with insulation fits into the channel Important Wind loading should be considered 26 1 Solar PV Panel Location For ease of maintenance short wire issues and a reduced chance of lighting strike we highly recommend that the solar panel is mounted as close to the ground as possible without running into shading issues Generally speaking the PV panel should be mounted at near the same pitch and azimuth compass direction as the collector array However for west facing collector installations it is preferable that the PV panel face NW Your solar panel and under temperature thermostat form the pumps control system they should be oriented with Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 34 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved respect to the main collector array such that the system comes on at the right time and s
38. o step on or near a roof hook as you may crack a tile Take extreme care to use non slip shoes and never walk on wet collectors HDPE material is slippery and waxy If the collectors need to be walked on for mounting purposes ALWAYS use a safety harness and fall arrest system Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 19 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 19 Collector Array Plumbing Connections Laceration hazard Always cut away from your body and ensure no parts of the body are in front of the cutting blade DO NOT perform this task when you are tired or in a rush WARNING BEFORE CUTTING put aside two collectors per row with undamaged end caps For all remaining collectors cut the single end cap off using a sharp blade Plastic should be softened with a hair dryer to make cutting much easier Check all collector pipe connections for raised edges or grooves on the weld lines which could channel water and cause leaks Shave any edges or grooves flat with a blade being careful not to cut into the pipe After inserting silicon joiners and hose clamps moderately tighten the clamps using a hand screwdriver with an 8mm hex socket Do not glue in silicon joiners as this allows for some collector contraction movement over time If there is a pin hole leak a small amount of silicon can be used to seal Vly z Do
39. or instruction concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure that they do not play with the appliance The safety over thermostat MUST be installed for systems involving an oversized collector array greater than 100 pool coverage area or for highly insulated spa pools due to the potential for overheating in summer At present this collector array system is not recommended for installations in cyclonic regions C or D or on houses situated on top of hills exposed to strong winds or on second story or higher roofs The Vertex system is for heating outdoor chlorinated or otherwise treated spas ONLY This system is not to be used to heat indoor spas chlorinated or otherwise OR fresh bodies of water due to the potential for Legionaries bacteria build up Potential flooding resulting from the failure of the Vertex system s plumbing connections or extreme weather events must be considered by the purchaser installer such that flood water from such a failure at any point of a Vertex system will drain safely Building regulations vary from state to state and MUST override any instructions supplied in the Vertex system manual It is the responsibility of the purchaser installer to check that installations comply with any relevant state laws and regulations Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 4 Copyright 2015 Optex Solar
40. per Panel The following Tables specify the ultimate peak uplift any single panel can experience in a 1 in 500 year extreme storm or cyclone event according to Australian Standard 1170 2 2011 Amend 2 Dec 2012 These tables assume 1 Panels are mounted on touching the roof structure or no more that 20mm off the roof surface 2 Panels are situated away from a roof edge or corner 3 Installation is on a first story roof 4 Shortest side length of the building is more than twice the average building height i e flat building If your installation falls outside of these assumptions please contact info EcoOnline com au for alternative loadings Ultimate Peak Uplift Loadings Per Panel in Wind Region A Kg Region A lt 10 Roof Pitch 12 5 Roof Pitch 15 Roof Pitch 17 5 Roof Pitch gt 20 Roof Pitch SE 1 ZER 110 Kg 95 Kg 90 Kg 80 Kg SS 2 100 Kg 90 Kg 80 Kg 70Kg 65 Kg dach 30 Ke 80 Kg 70 Kg 65 Kg 60 Kg Riests 3 poe 75 Kg 65 Kg 60 Kg 55 Kg Ultimate Peak Uplift Loadings Per Panel in Wind Region B Kg Region B_ lt 10 Roof Pitch 12 5 Roof Pitch 15 Roof Pitch 17 5 Roof Pitch gt 20 Roof Pitch SE 1 nee Ne 175 Kg 150 Kg 140 Kg 130 Kg Ben 2 SE Ek 125 kg 115 Kg 105 Kg ees SES RS 115 Kg 105 Kg 100 kg Dreier 3 135 Kg 120 Kg 105 Kg 95 Kg 90 Kg Ultimate Peak Uplift Loadings Per Panel in Wind Region C Kg Region
41. seseaeeeceeecssseeaeseceescesseeaaeseeeeeseeseaeaeeeeesesseseuaeaeeeeecesseseaeaeeeeseeses 16 18 Collector Mounting Procedure ccccsessssccececesseseaececeeecsesusaeaeseceescesscsaeaeseeecesessesaaaeseeeeeseuuaeaeeeeesesseseaeaeeeeseeeees 19 19 Collector Array Plumbing Connection 20 20 ROOM E EE 21 21 Wind BEI e Le TEE 24 22 Plumbing Dipta cc seszasecetdecses assvsateedecsesoegsasacendedees sng seateniegscsdsgsanateigegs E aa Eo s0sedacadeaned sudenauasteniesssebestaccteies 27 23 Installing the Vacuum Beaker Valve amp Avoiding Potential U bend Air LOCKS cscsssccceeecessessnaeeeeeeseesssnseaeeeeess 28 24 Protective Bypass amp Drain DOWN Une 29 25 Suction Line and Pump Mounting Configuration 30 26 Solar PV Panel Moptlng g Zeen Eege Eege ees Ehe Eens eech 34 27 Installing the Under Temperature Thermostat A0 35 28 Installing the Over Temperature Thermostat 407 36 29 Connecting the Inline Over Temperature Thermostat and Extension Wire 38 30 gt Important Installation CHECK List sssini eaen nna e aar a EEEa EEE aaaea a a a s 39 31 ele ll D ee de 39 32 Service and Maintenance Schedule AAA 41 ES an Nee le Lee TEE 42 Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 2 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 1 Key Terms This manual was written to follow guidelines and recommendations given in e AS 3634 1989 Solar heating systems for swi
42. tability amp Safety Checklist The following outlines mandatory suitability and safety requirements for installing a Vertex Solar heating system Please read carefully if any of the following requirements cannot be meet a Vertex system should NOT be purchased or installed A DANGER A DANGER A WARNING A WARNING A WARNING A CAUTION A CAUTION A CAUTION A CAUTION For ground level collector installations the installer MUST check child safety fence regulations in the relevant state Under no circumstances should collectors be installed so as to compromise the effectiveness of a child pool or spa fence safety barrier by providing a climbable object Due to the potential of falling from heights mounting the solar panels on a roof or structure at heights should only be undertaken by a professional solar panel installer unless you are accustomed to and confident of performing the work safely Due to the remote possibility of a water drain down event caused by the Vertex system this system should not be installed on a pool or spa pool with a mains power electrical devise that does not have a working over temperature protection device and or will not fail safely in the event of dry running This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision
43. timated Use only solid industrial grade ladders in good repair that have been checked for faults Note even a small unexpected movement of the ladder such as a small slip can cause loss of balance and result in a fall Anchor base The ladder should be placed on solid ground and should ALWAYS be securely anchored at the base and secured at the top to prevent slipping Solar panels should not be mounted in windy or gusty conditions a panel can easily be caught in the wind and cause a loss of balance and result in a fall DANGER Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 12 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 14 Choosing A Place to Install the Collector Array When choosing a location for your collector array you should consider the following in order of importance 1 Shading the collectors should receive no shading between the hours 10am to 4pm 2 Wind the collector array should be mounted in a relatively sheltered location or with appropriate wind proofing 3 Direction collectors should face NNW for maximum heat collection however acceptable directions face between NE to W only Systems facing other directions will have significantly impaired performance Distant to pool spa collectors should be as close as possible to your spa or pool or have insulated lines 5 Mounting elevation flatter elevations lt 45 collect more heat
44. top outlet return corner of the collector array at the highest point 16 1 Array Configurations Not Recommend Water takes the shortest path with a reduced flow rate in the end panels Air lock prevents flow through first panels Air lock increases pump height and prevents draindown and prevents draindown Air lock increases pump height Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 15 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved 17 Roof Attachment Options Note the high thermal contraction and natural relaxation of HDPE Collectors will contact in length by up to 10mm over time and 12mm thermally across CAUTION temperature extremes Hence any fixing means must account for an ultimate contraction of 22mm in length per panel Key design principles when choosing a roof mounting means 1 Consider the high thermal contraction of HDPE 2 Panels should be as low down on the roof as possible to prevent the wind from CAUTION catching the underside of panels 3 The stainless steel straps should not be used to support loads only as security against excessive wind speeds 17 1 Tile Roof Mounting Frame For tile roofs we recommend using a minimum roof hook spacing of 600mm in the top and bottom row Depending on your wind loading see Wind Proofing section angle of install and the dead weight of the collectors you may require a higher densi
45. ty of roof hooks and or CAUTION a stronger Aluminium L angle if unsure please seek advice Top panel attachment Tiles Aluminium angle Strap header pipe to aluminium cross section allow for contraction A Roof rafter Screw roof hooks to roof rafter Bolt aluminium cross section to roof hooks Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 16 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved Bottom panel attachment Strap header pipe to aluminium cross section allow for contraction Use wooden plates to lift hooks if required Aluminium angle 17 2 Corrugated Metal Roof Mounting Frame For metal roofs we recommend using a minimum roof hook spacing of 600mm in the top and bottom row Depending on your wind loading see Wind Proofing section angle of install and the dead weight of the collectors you may require a higher density of roof hooks and or a stronger Aluminium L angle if unsure please seek advice CAUTION Incorrect X Strap not Straps MUST be positioned straight straight Leave 1 2mm gap between the railing and corregated roof use appropriately spaced rubber isolation pad SD Use 1 2mm rubber isolation pad Screw through into rafter Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 17 Copyright 2015 Optex Solar Pty Ltd All rig
46. ump enclosure and electrical PVC wire connector and under connector temperature thermostat if supplied Vertex Base Plumbing Kit Components 40mm metric hose barb 1 x Vacuum and 2 x 40mm hose barb to 1 x PVC clear bypass line 1 x 20mm PVC Non positive pressure air 25 32mm PVC glue kit includes 3mm return valve non spring release valve socket take off constriction loaded Vertex Solar Pool amp Spa Heating System Installation amp User Manual Page 9 Copyright 2015 Optex Solar Pty Ltd All rights strictly reserved Safety Over Temperature Thermostat Kit 2x 25mm ID Armaflex pipe insulation 1x 60mm ID Armaflex pipe insulation 1x Aluminium U channel 1 x 5m PVC Extension Wire 1 x Twin 40 C thermostats with 2m cord and positive disconnect connector 3 x PVC coated stainless cable ties Roof Mounting Solar roof hook supplied only if requested and purchased 1 x 304 Stainless solar roof hook height adjustable Dimensions A 47 5mm B 117 5mm C 60mm 11 Additional Required Components Not Supplied 11 1 Ground Mounting Support Frame You may need to build a support frame for your collector array if so you may require the following e Two 70mm x 35mm 1 3m treated pine length per collector lengths depend on mounting preferences e Two 70mm x 35mm 1 1m treated pine length per collector Preferably if transport is avai
47. witches off at the right time for maximum system efficiency 26 2 Extending the Electrical Wires The 5meter extension lead can be used to extend any of the three leads i e the 1m pump lead the 2m over temperature lead or the 5m solar lead Please note we do not recommend further extensions as this will create too high a voltage drop If a further extension is absolutely necessary we recommend you not use the 5m extension lead Instead splice in a much higher gauge wire wherever required You will need to purchase an appropriate splice kit at your local electrical supplier If unsure we strongly recommend a qualified electrician splice wires together as bad electrical connections can form a fire hazard 27 Installing the Under Temperature Thermostat 40 C a You may have been supplied with a 40 C under temperature thermostat to prevent the pump from Rotate the duri idb diti Thi d thermostat i turning on during co ut sunny conditions This under flat face 3 temperature should be attached to the side of the solar PV toward panel using the components provided The thermostat will Liam turn on when its internals which are representative of the sun internals of the polymer panel come to temperature and turn off below a certain temperature Thermostat Specifications 40 C e Normally Open disconnected e Closes at 45 C 3 C e Resets at 35 C 3 C 27 1 Cooling Issues on Spring Days
Download Pdf Manuals
Related Search
Related Contents
飲み水から 飲みたい水へ Handbuch A4 Franz-Stand 23-09-2006.FH9 - GAMMA 20-COMM-E EtherNet/IP Adapter User Manual AdeptMotion VME Developer`s Guide Ford 2007 Explorer Automobile User Manual Legacy Car Audio LDVD84 User's Manual hp scanjet 3530c escáner de superficie plana digital hp Copyright © All rights reserved.
Failed to retrieve file