Home

UNIVERSAL NODE UN2011

image

Contents

1. 13 14 Y une s gt D 15 16 Figure 3 Universal Node UN2011 UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Cade MAN N79 AA Document No 20 490 000 280A APRITECDB 4 2 2 Power Supply The Universal Node UN2011 is powered from mains Provision is made for charging an internal battery to serve as a standby power supply if mains power fails The battery is to be ordered separately and is to be installed by the User Space is provided to mount the battery inside the unit The power supply is fitted with a connection to supply power to a modem MOD2000 A fault relay is supplied on the power supply board This relay can be used to remotely indicate a faulty power supply mains failure battery not connected under voltage etc 4 2 3 Arcnet interface A NC2011 Network Card is fitted as standard to provide for interfacing to a two wire RS485 FP2000 Arcnet Network Using Network Extension modules NE2011 NE2051 the unit can be configured to provide for conversion between optical and RS485 mediums as well as implementation of a wide range of topologies For detail regarding Arcnet Network Topologies refer to the FP2000 Network Configuration Guide 4 2 4 Interface to External RS232 Systems Connections to external systems are made by means
2. 11 Configure the serial port SER2 for modem configuration refer to section 6 2 UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pane 11 Pana 12 APRITECDB 5 3 6 TO TELEPHONE LINE TELEPHONE LINE ADAPTER IF REQUIRED posue TO SER2 TO 5V ON POWER SUPPLY NOT USED 5V TO PRINTER NOT USED FIX IN POSITION TO PREVENT CONTACT PHONE LINE POWER HARNESS TO EARTH GREEN ep CE FP 350 LINE MODEM MODEM Figure 6 Modem MOD2000 Interconnection Diagram MAINS POWER CONNECTION When connecting the mains plug to a suitable power cord ensure that Mains Live is connected to the terminal marked L Mains Neutral is connected to the terminal marked N and that Mains Earth is connected to the terminal marked GND or by UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Cade MAN N79 AA Document No 20 400 000 806 APRITECDB 6 SOFTWARE CONFIGURABLE SETTINGS 6 1 DEFAULT SETTINGS The UN2011 is supplied with a specific default configuration For changing the default configuration refer to Section 6 2 The following default configuration settings apply to the UN2011 Network Node address 0 5 Note Network Operational mode Serial Ports SERI SER2 Ar
3. Ensure that the battery selected complies with specification refer to Appendix A 3 Remove the protective cover from the double sided self adhesive tape and position the battery as shown in Figure 3 Fix it in position with the strap provided Ensure that the strap is sufficiently tightened to prevent it from coming lose 4 Connect the battery as shown Observe correct polarity Incorrect polarity can seriously damage the unit 5 3 3 Connecting the Power supply and Fault Relay refer to Figure 5 1 Ensure that the mains power is disconnected before opening the unit 2 Connect the fault relay as shown in Figure 5 3 Route the wires away from sharp edges and corners and fix in position Note The relay is shown in the fault condition FAULT RELAY CONTACTS SHOWN e IN FAULT CONDITION Figure 5 Fault relay Connections UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code 070 AA Document No IN AAN NNN ANK APRITECDB 5 3 4 Connecting the RS232 External System refer to Figure 3 1 Ensure that the Universal Node is disconnected from mains power before opening it 2 Ensure that the default configuration of the Serial Port SER2 as detailed in section 6 1 meets that of the External RS232 System If not refer to section 6 2 3 Check the RS232 cable 4 Connect the RS232 cable to the serial port SER2 on the CPU card as well as to the RS232 port of the External Syst
4. of a RS232 cable supplied with the Universal Node Two RS232 ports are provided These are referred to as SER1 and SER2 A modem is required if the UN2011 is to be interfaced to a telephone line The UN2011 is supplied without a modem The modem MOD2000 is to be ordered separately and is to be installed by the User Space is provided inside the Universal Node to fit the Modem 4 2 5 Configuring the Universal Node The Universal Node is provided with default configuration settings for both serial ports SER1 and SER2 Only SER2 settings can be changed if required UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pana A 5 Pana fi 4ARITECH INSTALLATION 5 1 5 2 UNPACKING Open the container and carefully remove the contents Keep all packing material until correct operation of the equipment has been verified IF ANY EQUIPMENT IS DAMAGED e Immediately notify the freight carrier e Notify the Supplier who will arrange for the repair or replacement as appropriate CHECK THE CONTENTS AGAINST THE LIST BELOW e Universal Node UN2011 e Mains Power Cable Plug e RS232 Data Cable REPORT ANY MISSING ITEMS TO THE SUPPLIER PRECAUTIONS To ensure safe operation and to keep the product safe pay heed to the information cautions and warnings in this manual Failure to do so will violate the safety standards of design manufacture and int
5. APRITECDB UNIVERSAL NODE UN2011 OPERATING AND INSTALLATION MANUAL Revision 4 3 April 2000 4ARITECH ZIPITECIH CONTENTS 1 PURPOSE 1 2 SCOPE 1 3 APPLICABLE DOCUMENTATION 1 4 INTRODUCTION 2 4 1 GENERAL 2 4 2 DESCRIPTION 4 5 INSTALLATION 6 5 1 UNPACKING 6 5 2 PRECAUTIONS 6 5 8 INSTALLATION 7 6 SOFTWARE CONFIGURABLE SETTINGS 13 6 1 DEFAULT SETTINGS 13 6 2 CHANGING DEFAULT SETTINGS 14 6 3 MODEM SETTINGS 14 APPENDIX A UNIVERSAL NODE SPECIFICATION A 1 APPENDIX B EMULATION CONTROL KEYS B 1 UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Cade MAN 079 AA Naciiment No 20 A490 000 806 Pana i APRITECDB This manual serves as a guide to the user when installing and using the Universal Node 1 PURPOSE UN2011 2 SCOPE This manual is subdivided into different subsections and provides detailed information regarding the following Section 3 Section 4 Section 5 Section 6 Appendix A Appendix B provides a list of documentation that can be referred to if additional information regarding networking is required gives a description of what the Universal Node does and how it works describes the installation and commissioning of the Universal Node including the precautions that must be adhered to gives an overview of the hardware and settings provides a detail specification of the Universal Node provides a list of Emulation Keys to be used when changing default set
6. E UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Cade MAN 079 AA Document No 20 400 000 a06 Pana 2 4ARITECH TELEPHONE TELEPHONE LINE LINE FP2000 SERIES FP2000 SERIES UNIVERSAL NODE OF PANELS OF PANELS UN2011 REPEATERS REPEATERS WITH INTERNAL MODEM MOD2000 FITTED a MAINS ARCNET NETWORK RS485 OPTICAL FIBRE Figure 2 Universal Node Modem Application UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Cade MAN 079 AA Naciiment No 20 490 000 806 RS232 Pana 2 Pana 4 4ARITECH 4 2 4 2 1 DESCRIPTION General The Universal Node UN2011 consists of the following refer to Figure 3 Strap to hold battery in place Battery to be ordered separately 12V 1 2Ah Central Processor Card NC2011 NC2051 Arcnet Card Power Supply Mainsplug with fuse Transformer 60 SL OE iss 9s ao Battery terminals Note When connecting battery observe correct polarity 9 Mounting Holes 4 5mm Diameter 10 Modem MOD2000 Optional 11 Serial Port SER1 12 Serial Port SER2 13 Modem Power connection 14 Fault Relay 15 Memory Lock and Service Switches 16 Start up Switch
7. Product Code MAN N79 4 Document Na 20 400 000 06 APRITECDB APPENDIX B EMULATION CONTROL KEYS No Description Keyboard key 0 Reserved ctrl 1 Scroll ctrl A 2 Display Alarm ctrl B 3 Reserved ctrl C 4 Print Screen ctrl D 5 Alpha Numeric ctrl E 6 Right Arrow ctrl F 7 Reserved ctrl G 8 Left Arrow ctrl H 9 Silence Buzzer ctrl 10 Down Arrow ctrl J 11 Reset ctrl K 12 Disable ctrl L 13 Enter ctrl M 14 Test ctrl N 15 Sound Sounder ctrl O 16 Sounder Delay ctrl P 17 Sounder Disable ctrl Q 18 Silence Sounder ctrl R 19 Fire Brigade Disable ctrl 5 20 Fire Brigade Delay ctrl T 21 Reserved ctrl U 22 Fire Brigade Stop ctrl V 23 Reserved ctrl W 24 Reserved ctrl X 25 Reserved ctrl Y 26 Up Arrow ctrl Z 27 Exit ctrl 28 Reserved ctrl 29 Panel ctrl 30 All ctrl 31 Fire Brigade signal ctrl _ UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 August 1998 Product Cade MAN N79 AA Daciment No 20 400 000 806 Pana R 1
8. cnet Port Every node on the network must have a unique address 15 15 Note The operational mode must be the same for all items connected to the network Emulation Mode this allows for connecting to the serial port of a computer to change default settings Set up Mode this allows for direct connection to a computer to enable up down load of site data FPConfig application software as well as emulation Maintenance Manager Application software SER1 and SER2 protocol Baud rate 9600 8 Data bits 1 Stop Bit No Parity DTE Equipment Data Rate 156Kbps Bus UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pana 13 Pana 14 4ARITECH 6 2 6 3 CHANGING DEFAULT SETTINGS Please Note Changing the Default setting of Serial Port SER1 on the Universal Node is not possible The following procedure is recommended to change the Default Configuration Settings of the Universal Node Before you attempt to change the Software Default settings ensure that you have Windows 95 loaded on your system and that you have access to Hyper Terminal Copyright 1995 Hilgraeve Inc or similar application software Connect SERI of the Universal node to the COM1 COM2 or COM3 of your system Configure COM1 COM2 or COM3 of your system using Hyper Terminal to the following e Baudrate 9600 e 8 Data bits e 1StopBit e No Par
9. ed in 6 1 meets the requirement node ID Operational Mode Data Rate Topology 3 Configure and connect the Arcnet Card NC2011 as follows Bus Topology Only e Remove the Jumper J1 on the Arcnet card select Bus Topology mode Determine if the Universal Node is positioned at a an End of line position If it is then the RS485 Line must be terminated with an End of line resistor equal to the characteristic impedance of the cable Insert jumper J1 next to the RS485 connections on the Network Extension Card This terminates into a resistance of 120 O Resistance can be added if the cable characteristic impedance is not 120 Q e Ensure that the screen of the RS485 cable is continued between nodes and that it is grounded at one point only This can be done through inserting a jumper J2 on the network card e Connect the RS485 wires For more detail on Topologies Network Cards Network Extension Cards as well as wiring refer to the Network configuration Guide UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pane 7 Pana 2 N 4ARITECH Jumper Termination End Of Line e Channel A e Repeater mode MEA SSSR Jumper Earth selection Connection J11 O DE O e Figure 4 Network Card Connections 5 3 2 Installation of a battery 1 Ensure that mains power is disconnected before opening the unit
10. em 5 Configure the RS232 system e Unique Node Identification e Configure RS232 protocol parameters 6 Connect mains to the Universal Node and start the external RS232 system The RS232 serial connection is via a 9 Pin D type male connector The table below describes the pin outs of the connector as well as the requirements for the cable UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pana 9 APRITECDB Pana 10 The required connections for the Universal Node are described in the following table Direction RS232 System Pin name Pin number Universal Node Pin number Pin name 25pf 9pf 1 DCD 6 DSR lt DTR 20 4 2 RX i TX 2 3 3 IS gt RX 3 2 gt DCD 8 1 4 DTR gt DSR 6 6 5 CHEN GND 7 5 7 HEN 1 gt CTS 5 8 8 CTS RTS 4 7 9pf 9 pin female D type connector 25pf 25 pin female D type connector UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Cade MAN 079 AA Document No 20 400 000 a06 APRITECDB 5 3 5 Connecting the Modem to the Universal Node and a Telephone Line refer to Figure 3 and Figure 6 The following procedure describes the installation of the MOD2000 modem The MOD2000 modem is provided with a bracket for wall mounting For installing this bracket into the Universal Node refer to Figure 3 1 Remove the protective cover from
11. ended use of the equipment N LESER The above symbol on equipment supplied accompanies caution and warning messages summarised below e The Universal Node is intended for installation by qualified and trained personnel e Ensure that the correct procedures are followed when installing the equipment e Ensure that the input voltage of the equipment corresponds with that of the power outlet before connecting it to mains power UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code 070 AA Document No IN AAN NNN ANK APRITECDB e Always disconnect unit from Mains power before opening it Close the unit before connecting power e Shock hazards may exist ifthe Universal Node is not properly grounded e Ensure that the lid of the Universal Node is in the closed position and that the two screws provided for fixing the lid in position are properly tightened e Any modification maintenance or repair are permitted only by authorised personnel 5 3 INSTALLATION The following procedure is to be followed for installing a Universal Node assuming that the ARCNET network design is completed 5 3 1 Configuring and connecting the Arcnet Card to the FP2000 Network refer to Figure 3 and Figure 4 1 Ensure that mains power is disconnected from the Universal node before opening it disconnect the battery 2 Ensure that the default configuration of the Arcnet Network as detail
12. ication string of the Site This string is being used to locate the events Note that these settings can be configured depending on modem type using the Modem function in the SYSTEM SET DEFAULT menu UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pane 15 4ARITECH APPENDIX A UNIVERSAL NODE SPECIFICATION A1 PERFORMANCE A 1 1 DATA COMMUNICATION Serial ports RS232 Protocol Default Arcnet Port RS485 Protocol Default A 1 2 POWER SUPPLY Input Power Fuse Type Battery Type Fault Relay A 2 PHYSICAL CHARACTERISTICS Mass 5 kg Two 2 8 Data Bits 1 Stop Bit No Parity 9600 Bits per second DTE equipment On options refer to FP2000 Reference Guide One 1 156 Kbps Bus Topology On options refer to FP2000 Reference Guide 230 V AC 50Hz 10VA 160mA 250V T 1 2 12V Maximum switching current 2A 24VDC refer to section 5 3 3 Maximum power rating 50WDC Dimensions 65 x 400 x 300 mm UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 August 1998 Product Cade MAN N79 AA Document No 20 400 000 806 Pane A 1 ARITECH ENVIRONMENTAL Temperature Operational 0 C to 40 C Storage 30 C to 65 C Relative Humidity 20 80 non condensing UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 August 1998 Pana A 2
13. ity e DTE Equipment Using Hyper Terminal connect the relevant COM1 2 or COM3 port of the System to the Universal Node Configure the Universal Node as required using the Emulation control keys as detailed in Appendix B For detail on menus and how to navigate through them refer to the FP2000 reference Guide An example on how to configure the serial port SER2 for a modem is given in section 6 3 MODEM SETTINGS 6 3 1 Modem Settings at the Universal Node The following procedure is to be followed to configure serial port SER2 for a modem application e Give the Universal Node a Node ID SYSTEM CONFIGURATION ID Format 0 R or P O R Repeater Panel For the Universal Node the following option is available un m 0 0 Change this into the Node ID of the PC acting as a global repeater Example PC Own Node ID 2 gt un m 0 2 UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code 070 AA Document No 20 400 000 806 APRITECDB e Assign the serial port SER2 to be a modem port SYSTEM CONFIGURATION COMMUNICATION PORT SETUP SER 2 MODEM e Complete your modem set up SYSTEM CONFIGURATION COMMUNICATION MODEM The following parameters must be configured Wait for connection Pause between dials Max dialling attempts Init string for example ATL1E1 amp FOM1 NO W0 Q3 amp Q0 amp WO0S0 2 Dial command Escape Hang up Test ID This is the identif
14. the double sided self adhesive tape on the rear mounting surface of the bracket supplied with the modem 2 Position the mounting bracket inside the Universal Node as shown in Figure 3 and fix in position using the double sided self adhesive tape 3 Before connecting the Modem to the Universal Node ensure that the battery and the mains power is isolated 4 Carefully study the Modem User s Manual For connecting the Modem to the Universal Node and Telephone Line refer to Figure 2 Figure 3 and Figure 6 5 Connect the Green Earth wire leading from the Modem to the Earth Stud inside the Universal Node Please note that the modem and associated circuitry is only protected if this connection is made 6 Connect the Power Harness leading from the modem to the Power supply Observe correct polarity Please note that the connector leading to the printer is not used lt is to be tied down using mounting studs provided inside the Universal node 7 Connect the RS232 input on the modem to serial port SER2 8 Connect the Telephone line to the Modem Protection Board use the Telephone cable adapter supplied if required 9 Slide the Modem into the bracket inside the panel and fix all cables in position using the hardware supplied P Clips and nuts Ensure that the modem cannot slide out of the bracket if the universal node is turned upside down 10 Restore Battery and Mains power to the Universal node and turn the Power Switch on the Modem ON
15. tings 3 APPLICABLE DOCUMENTATION Product Code 1 Network Amplifier Operating and Installation Manual MAN 043 2 FP2000 Series Analogue Addressable Fire Panel Reference Guide LKFP2503 3 FP2000 Serial Communication Format MAN 039 4 FP2000 Installation and Commissioning Manual LKFP2003 5 FP2000 Network Configuration Guide MAN 042 UNIVERSAL NODE UN2011 Operating amp Installation Manual Revision 4 3 April 2000 Product Code MAN N79 AA Document No 20 400 000 806 Pana 1 4ARITECH 4 INTRODUCTION 4 1 GENERAL The Universal Node provides an access point for external systems to the FP2000 ARCNET network It links the FP2000 serial communication format implemented via RS232 and the FP2000 ARCNET protocol implemented via RS485 Optical fibre Note ARCNET is a registered trademark of Datapoint Corporation The basic function of the Universal Node may best be described by referring to Figure 1 and Figure 2 which depict the unit in typical applications PC FP2000 SERIES FP2000 SERIES OF PANELS OF PANELS DID REPEATERS REPEATERS SS Es UNIVERSAL Em LI NODE UN2011 Rosse MAINS ARCNET NETWORK RS485 OPTICAL FIBRE Figure 1 Universal Node No Modem Application UNIVERSAL NOD

Download Pdf Manuals

image

Related Search

Related Contents

Tostador traducido  PDF de la disposición  JT0ー350 ク ランクプーリープーラー取扱説明書  Massive Table lamp 36584/17/10  AR-N5205A System Guide  Belkin AC Charger, UK Plug  Fujitsu LIFEBOOK T5010  Trust Laser Mouse MI-6950R  AquaLabCX-2v3 AquaLab CX  

Copyright © All rights reserved.
Failed to retrieve file