Home

ONLITE – Central CPS Quick commissioning QUICK

image

Contents

1. for circuit monitored sub distributions see also commissioning notes chapter 4 8 a Selecta circuit created before b Create all lamps which are installed in this circuit function new lamp c Set lamp parameters description etc d Repeat steps a and b for further circuits e Calibrate circuit For this purpose select the action Lamp calibration in menu Test see also user manual chapter 6 6 Issue date 11 07 Page 1 of 2 ONLITE Central CPS Quick commissioning E ZUMTOBEL 6 2 Configuring and addressing lamps for DALI single monitored sub distributions see also commissioning notes chapter 4 8 7 a b c d Assign lamp addresses circuit 1 to n Set lamp parameters description etc If on the part of the customer the lamps should be grouped the assignment is done during the addressing procedure Only required if groups have been created The group switch functions are assigned in the selection Group configuration Configuring lamps and assigning lamps to groups if required Y Done O Check system see also commissioning notes chapter 5 a Check switching to DC emergency mode release the mains to battery switching in menu Test b Perform a manual function test Check the result of the function test in the test book c Check the status of each emergency luminary according to the desired switch mode d Check switching to emergency mode check phase monitor loop accordin
2. ONLITE Central CPS Quick commissioning E ZUMTOBEL QUICK COMMISSIONING 1 2 3 4 5 Insert fuses battery and mains see also commissioning notes chapter 4 1 4 2 and 4 3 a Mains fuses first b Battery fuses afterwards Fuses inserted battery and mains Y Done O Enable outgoing circuits see also commissioning notes chapter 4 4 Close outgoing fuses F1 F20 for L red and N blue each Outgoing circuits enabled Y Done O Login in see also commissioning notes chapter 4 5 Login to the CPS system Login performed Y Done O Create sub distributions see also commissioning notes chapter 4 6 a Enter number of sub distributions b Insert identification type of SD DALI or current circuit monitored c If on the part of the customer particular switch inputs are required which should be valid throughout the SD these must be entered in the section special switches see also user manual chapter 8 6 Sub distribution s created Y Done O Set up circuits see also commissioning notes chapter 4 7 a The available circuits must be created for each sub distribution b If on the part of the customer particular switch inputs are required which should be valid throughout the circuit these must be entered in the section Properties under switching logic 1 to switching logic 3 see also user manual chapter 8 3 Circuits set up Done O Configure and address lamps Configuring lamps
3. g to planning requirement Trigger test directly at the phase monitor e Perform a duration test after the batteries have been charged completely CPS must be connected to mains supply at least 10 hours Observe the operating times of the building Perhaps prior consultation is necessary Check the result of the duration test in the test book f Write down the software version the software version can be found on page System configuration under update System check Y Done O Issue date 11 07 Page 2 of 2

Download Pdf Manuals

image

Related Search

Related Contents

Users Guide / Manual  janvier 2012 (pdf - 14,13 Mo) - Ville de Bourg-La  Oster 155876 Blender User Manual  Samsung GW76N-BP Наръчник за потребителя  Zanussi ZWF 385 User's Manual  Manual de utilização de 4GL Interactive Debugger  Gebruikers- en Installatiehandleiding Aqua Plus  TD1262L/C 数字化扫频仪  Techne Tecal 425H Dri-Block Calibrator Manual PDF  1 USER MANUAL S11 Zen  

Copyright © All rights reserved.
Failed to retrieve file