Home

User manual - CGF Products

image

Contents

1. steam manifold Interference in blower motor Loose hose connection RMB not level RMB recessed behind drywall Grill modified Damaged steam manifold 6 Fresh Indoor Air Quality CORRECTION Connect power supply to F and INT terminals on back of control module Check continuity through field wiring See that fan symbol shows on LCD Display See that jumper installed in AB AB terminals See that humidistat is demanding humidity Check for correct voltage at blower motor Test Blower motor Replace if necessary Correct kink 580 or dip in steam hose where condensate has pooled Correct kink in condensate hose Correct elevated part of condensate hose water only flows downhill See that RMB is level left right front back Remove debris wires etc from blower Check steam hose condensate hose and Stainless fitting connections See that RMB is level left right front back See that mounting flanges are on front face of drywall not behind drywall See that original grill is in use unchanged Inspect manifold for crack or broken weld replace if necessary Inspect o ring joint between stainless fitting and manifold for damage or missing parts Agency Elite Steam 03U400150 Rev 3 0 10 Form 35 27 Rev 30
2. Elite Steam Remote Wall Blower Fresh Indoor Air Quality User manual gt READ AND SAVE lt Revision 3 0 THESE INSTRUCTIONS READ AND SAVE gt THESE INSTRUCTIONS We wish to save you time and money Read this manual to insure correct installation and safe use of this product WARNINGS BEFORE INSTALLING OR HANDLING THE REMOTE BLOWER PLEASE CAREFULLY READ AND FOLLOW THE INSTRUCTIONS AND SAFETY STANDARDS DESCRIBED IN THIS MANUAL AND ON THE LABELS ATTACHED TO THE REMOTE BLOWER CAUTION ALWAYS DISCONNECT THE MAIN POWER TO THE HUMIDIFIER BEFORE OPENING OR SERVICING THE HUMIDI FIER OR REMOTE BLOWER IMPORTANT BEFORE beginning installation Check for shipping damage to cartons Mark the shipping waybill accordingly Open cartons and check for any hidden damage Mark the shipping waybill accordingly Check packing slip to ensure all items have been received Notify General Filters of any shortages or damaged parts You must notify General Filters within 5 working days of any shortages This product is to be installed only in a residential setting The conditions of the environment and the power supply voltage must comply with the specif ed values listed on the data label in the humidif er All other uses and modif cations made to the humidif er that are not authorized by the manufacturer are considered incor rect and the manufacturer assumes no liability for the consequences of any such unauthorized use and will void the war
3. ck or bottom Remove the knockouts for the steam hose condensate hose and electrical connections 12 1 8 WIDE Insert the RMB housing into the wall and bend the four securing tabs around the back of the drywall Secure the RMB housing to the wall using predrilled holes located on the four one inch flanges of the RMB unit Use 8 drywall screws four required to penetrate the wall and pass through the slot in the securing tab behind the drywall Note 1 The four one inch flanges on the face of the RMB unit must be on the outside of the drywall Failure to locate the flanges on the outside face of the drywall may result in water leakage and household damage SECURING TABS WITH SCREW SLOT 4 PLACES PRE DRILLED SCREW HOLES FOR WALL Fig 6 1 The RMB is fitted with a power supply terminal block with two terminals and a screw terminal located on the RMB housing for connecting the ground wire The power wires should be 16 gauge or larger shielded cable with ground Power wiring should be run through the electrical knockout in the RMB and be supported by the screw type strain relief Supplied to prevent damage to the terminal block The power will be supplied from the terminals F and INT FAN located on the back side of the humidifier control module The power supply wire must enter the humidifier on the bottom or back then be secured in the humidifier to prevent tension on the wire or connections To access
4. g a 6 loop in the condensate hose Note 1 Do not force the steam hose onto the stainless fitting this will cause the manifold to break Apply some water to the inside of the hose and ease the hose onto the fitting 2 For information on hose connections in the Elite Steam Humidifier please see the humidifier manual STEAM INLET CONNECTION CONDENSATE HOSE CONNECTION Fig 7 1 1 9 RMB GRILL INSTALLATION Attach the air filter to the grill install the grill over the housing face and use the provided screws and pre drilled holes to secure the grill to the RMB housing The steam manifold will extend out past the face of the grill The grill may be painted to match decorations in the home NOTE 1 Use only the grill that was provided with the RMB kit Any alterations or changes to the grill may result in water leakage and damage to the home 10 MAINTENANCE Air filter maintenance is essential for maintaining a constant flow of air to the distributor Neglect ing the air filter cleaning and or replacement will seriously effect the operation of the RMB unit Maintenance is the responsibility of the user The air filter should be vacuumed or rinsed with water at least once per year More frequent cleaning may be necessary Note For new construction the air filter must be cleaned as needed during construction and again when construction is compete 11 STARTUP The RMB blower will operate when the humidifie
5. r has a demand for humidity Operation will con tinue for 30 seconds after the demand is complete 12 TECHNICAL SPECIFICATIONS steam output lb hr T storage temperature rated power W rated air f ow rate cfm noise level open field at maximum speed one metre from the front panel dB 13 TABLE OF SPARE PARTS Order Number 1545 1540 1534 1535 1913 1912 7559 7536 7528 7647 7648 Part Number RMB15 RMB35 15 02 35 02 20 2 20 3 35 10 35 20 35 26 35 27 P 241 P 242 PartName Remote Mount Blower Kit Remote Mount Blower Kit Room Blower Assembly 110v forRMB15 Room Blower Assembly 240v for RMB35 Steam Hose 7 8 ID Condensate Hose 3 8 ID Hardware kit RMB15 RMB35 Internal steam distributor manifold Front Grillfor RMB includes filter labels RMB Installation Instructions Steam Hose Clamp 16 Condensate Hose Clamp 6 value or range 0 12 10 to 70 3 2 7 A 0 RMB will not operate Noises from RMB Water dripping from RMB GENERAL FILTERS INC 43800 GRAND RIVER AVE NOVI MICHIGAN 43875 1115 WWW GENERALAIRE COM CANADIAN GENERAL FILTERS LTD 400 MIDWEST ROAD SCARBOROUGH ONTARIO M1P3A9 WWW CGFPRODUCTS COM CAUSE Wrong connection at humidifier Faulty power supply wiring Humidifier not calling for operation Faulty RMB Wiring or wrong RMB Faulty RMB Blower Steam gurgling in steam hose Steam gurgling in
6. ranty Please note that the humidif er contains powered electrical devices and hot surfaces All service and or maintenance operations must be performed by qualif ed personnel who are aware of the necessary precau tions and are capable of performing the operations correctly Disconnect the humidif er from the main power supply before accessing any internal parts The humidif er must be installed in accordance with all local and national standards WARNING Your humidif er requires water to operate Do NOT mount it above materials or machinery that could be damaged if a leak occurs General Filters assumes no responsibility for consequential or inconse quential damage as a result of any leaks Disposal of the parts of the humidif er the humidif er is made up of metallic and plastic parts All parts must be disposed of according to the local standards on waste disposal Warranty on materials 2 years from the date of production excluding the consumable parts ON DU PF Pe a N Pe O H A W CONTENTS 4 OPER 4 CHOOSING LOCATION 4 OOP EINIIN Grease 5 HOUSING KNOCKOUT Svatuchissnuinieh iceman 5 INSTALLATION 6 ELECTRICAL 5 7 FOS CONNEC TIONS aa 8 RMB GRILL INSTALLATION ceseessssste
7. reate condensate that must drain back to the humidifier by gravity NOTES 1 The RMB must be in the wall and connected to the humidifier by the steam hose supplied 2 The RMB must be mounted a least 12 inches above the humidifier 3 Pockets and traps in the hoses must be avoided Condensate will accumulate in low areas and prevent steam movement The steam hose must not have sharp bends or twists 4 The dimensions in Fig 3 1 and 3 2 are minimum distances to prevent the humidified air from coming in contact with people electrical equipment ceilings and cold surfaces before the steam has been completely absorbed Choose the location with care as the steam is hot and can cause burns gt 18 lt A gt 24 b v gt 72 A gt gt 72 Figure 3 1 Figure 3 2 The RMB housing will fit in a stan dard 2x6 wall with 1 2 drywall If installing in a 2x4 wall then the rear drywall must also be removed and the housing will protrude out the back of the wall Figure 4 1 below shows the wall opening dimensions for the RMB housing Notes 1 The RMB housing has flanges on the front that must be mounted on the outside face of the drywall 2 When installing in new construc tion use a piece of return air angle to mark the wall where the RMB unit will go to prevent the drywall from being installed over the location for the RMB housing Determine if the steam hose will be entering the housing from the ba
8. ssessssstesseestesneeseesteseestesseeseesteseeatenass 9 9 ARTUR 9 TEC NICAL SPECIFICA MONS prinsanna 9 TABLE OF SPARE 9 TROUBLESHOOT NO hier 10 Remote Wall Blowers are designed to distribute steam directly into the living space needing addi tional humidity They are for use only with DS35 DS25 DS15P and DS15 Elite Steam electrode humidifiers The remote wall blowers operate at different voltages RMB35 230VAC 1 for use with DS35 and DS25 RMB15 110VAC 1 for use with DS15P and DS15 Remote wall blowers may only be installed in a vertical wall distributing steam horizontally When a demand for humidity is made the Elite Steam Humidifier will start The control module will recognize the demand for steam and supply power to the RMB and the Steam Cylinder The RMB Blower will run and distribute the steam into the room The RMB grill is designed to blow steam outward and slightly down to avoid condensation on the ceiling A cleanable filter is located behind the grill to protect the RMB from large particles When the demand for humidification ends power to the steam cylinder is stopped The blower continues to run for 30 seconds to distribute any remaining steam Choose a location that will be near the Elite Steam humidifier Try to keep the length of the steam hose to a minimum The RMB must be mounted above the Elite Steam humidifier The RMB will c
9. the wire connection points on the back of the module remove the steam cylinder The connection points are covered by protec tive caps that must be removed Use two spade connectors to make the connections to the F and INT FAN terminals Note 1 The power for the RMB unit is from the terminals on the BACK of the Control Module 2 Electrical connections must be performed by qualified personnel in compliance with local codes PROGRAMMING PORT ey a 2 ic Fig 7 1 5 a ae CA a 18 REMOTE ON OFF HUMIDISTAT 2 RMB ALARM BLOWER 5 REMOTE VE 2 ly EXTERNAL DUCT FAN EXT FAH ALARM c TRR ee OOS Pie RME CONNECTIONS F AND INT FAN a F HENEN A i 24 VAC FOR A 5 1 HUMIDISTATS STEAM BOILER UNIT EXTERNAL FUSED DISCONNECT TO BE INSTALLED MOT SUPPLIED RESPECT LOCAL CODES CONNECTED TO GROUND POWER SUPPLY 110 VAC 1 PHASE 50 60 HZ 230 VAC 1PHASE 50 60 Hz Connect the steam hose to the stainless fitting located at the bottom of the manifold The stainless fitting should be inserted into the hose and secured using the hose clamp provided Connect the condensate hose to the molded hose barb fitting on the right The condensate hose needs to be trapped immediately under the blower housing or directly above the humidifier A condensate trap can be made usin

Download Pdf Manuals

image

Related Search

Related Contents

Powerlogic G3200  Halo 4 Warhead 7.1 Wireless Surround Headset / Halo 4 Trigger  ICI Troubleshooting Guide  カラードームカメラ KBI  T'nB CAJJ02  Power 180 Brushless Outrunner Motor, 195Kv - E    Transcend DDR400 1024MB  CHAPTER 11  CAPITOLATO CAPITOLATO D`ONERI  

Copyright © All rights reserved.
Failed to retrieve file