Home

Installation and Operation Manual Version: TS-M Version: TS-RM

image

Contents

1. Most of the information is self explanatory Some comments follow Battery temperature is displayed only if a Remote Temperature Sensor is connected If the RTS was connected and then failed the display will indicate C or F Battery voltage is measured at the controller terminals The Battery sense display is the actual battery voltage measured with the sense wires to avoid the voltage drop to the battery terminals valid means the sense wires are connected and working correctly The Solar voltage is measured at the solar input terminals If in a PWM state the voltage will be the average of solar Voc and battery voltages with the FET switches opening and closing Last Eq displays the number of days since the last equalization cycle TriStar temperature displays the heat sink temperature For the Load mode some of the above display screens are not shown The load voltage and current consumption are displayed 16 TRISTAR SYSTEM DIAGNOSTICS 5 0 System Settings This set of display screens provides the following functions confirm that the setup and DIP switches are correct provide version numbers and other information for tech support select a language or change the temperature display to F 5 1 Locate System Settings Scroll down to the display screen TriStar Settings Press the gt pushbutton to reach the subset of displays with information about the TriStar settings and sys
2. Battery current 3 Battery temperature only if the remote temperature sensor RTS is installed 4 Amp hours generated since the last reset 5 Present operating state NightCHECK DISConnect NIGHT FAULT BULK PWM00 FLOAT EQULIZ A Fault indication will blink on and off An Alarm indication will alternate with the present state Operating status conditions for Load mode are NORMAL LVDWARNing LVD FAULT DISConnect The second display below provides bar graphs for battery voltage and charging current V 281 A m Fault Alarm and Battery Service will blink in the lower right corner if one of these conditions is present 11 MORNINGSTAR CORPORATION 3 5 1 The third display below provides cumulative information collected over time For battery charging this includes 3 14 4V 11357Ah 12 3V 11 3kWh 1 Highest battery voltage resets with Ah reset 2 Lowest battery voltage resets with Ah reset 3 Total amp hours generated by the system 4 Total kWh s generated by the system Fault Alarm and Battery Service will blink in the lower right corner if one of these conditions is present NOTE The cumulative meter information will be retained if the controller power is disconnected Also note that the amount of CO saved by the solar energy can be calculated from the total kWh generated 1 kWh 1 kg 2 2 pounds of CO saved These figures are for
3. This final installation step can be used to select another language or to change the temperature displays from C to F See Section 5 3 for more information gt NOTE The first press of a meter pushbutton will only turn on the backlight The meter display will not change 1 Press the pushbutton to scroll down to TriStar Settings continued 5 MORNINGSTAR CORPORATION 2 4 Meter Selections and Confirmations continued 2 Press the gt pushbutton and then scroll down to the display for changing the language Select one of the four languages if other than English is desired 3 Move down to the next display for changing temperature units from C to F If a change to F is desired follow the directions in the display 4 The other Settings displays can be used to confirm that the TriStar DIP switch settings are correct 5 Return to one of the top three operating displays 4 57 9 18 8 89 0 35 m E f 33 02 1 30 33 02 1 30 o i 8 89 i i i 0 35 27 94__ 2286 2286 2794 mm 1 10 0 90 0 90 1 10 inches Ya aa Remote Meter Mounting Figure 2 2 6 TRISTAR INSTALLATION 3 0 Operation The four pushbuttons are in the shape of directional arrows Changing a display screen will be in the direction of the arrow up or down left or right The meter can be left in any display screen but it is
4. and Spanish After changing the language all the displays will be in the selected language 2 Change Temperature The temperatures are displayed in C but can be changed to F Refer to the installation Section 2 4 for more information Both of these selections can be changed at any time and without limit 18 TRISTAR SYSTEM SETTINGS 6 0 Troubleshooting the Meter The TriStar meters take all the displayed information directly from the TriStar controller There should not be any conflicts between the meter and the controller regarding data values So the meter trouble shooting will focus on problems and faults with the meter itself 6 1 Troubleshooting Steps There is no display e the RJ 11 cable may be plugged into the wrong connector socket move to the other socket on the meter refer to Figure 2 2 the connector may be loose in the socket remove and reconnect press firmly until there is a click there may be a break in the cable wire see Section 6 2 below note that the TS M controller mounted version must be working correctly for the remote meter to work troubleshoot the TS M version first if both are installed battery voltage is below 9 0 volts meter turns off LCD meter backlighting is dim or does not light e if there is enough ambient lighting in the room the backlighting may not be noticeable below 12 7V the backlighting starts to dim in proportion to the battery voltage belo
5. coal and petroleum generated electricity delivered to the home Manual Operations Display screens located below the operating displays and also in the Diagnostic group provide for various resets and manual functions These are shaded in the Meter Charts Manual Resets A frequently used manual reset is located below the operating displays Reset Ah This display screen can be used to reset the Ah value indicated on the first operating display the resetable Ah This will also reset the High amp Low battery voltages in the third operating display at the same time Hold the gt pushbutton for 2 seconds and all three values will be reset to zero 12 TRISTAR OPERATION 3 5 2 Two other manual resets can be found at the bottom of the Diagnostics screens Reset Ah Total This will reset the total Ah and total kWh values to zero These values are normally not reset However if a new battery is installed for example the owner may wish to reset these figures Note that once these are reset the previous total Ah and total kWh values are lost Battery Service If battery service was done early this screen can be used to reset the service interval back to zero Manual Equalization or Load Control The display screen below Reset Ah will start an equalization cycle While in equalization holding the gt pushbutton again for 2 seconds will stop the equalization cycle This can be repeated without limit Battery eq
6. defects in material and workmanship for a period of FIVE 5 years from the date of shipment to the original end user Morningstar will at its option repair or replace any such defective products CLAIM PROCEDURE Before requesting warranty service check the Operator s Manual to be certain that there is a fault with the meter Return the defective product to your authorized Morningstar distributor with shipping charges prepaid Provide proof of date and place of purchase To obtain service under this warranty the returned products must include the model serial number and detailed reason for the failure the panel type array size type of batteries and system loads This information is critical to a rapid disposition of your warranty claim Morningstar will pay the return shipping charges if the repairs are covered by the warranty WARRANTY EXCLUSIONS AND LIMITATIONS This warranty does not apply under the following conditions Damage by accident negligence abuse or improper use Unauthorized product modification or attempted repair Damage occurring during shipment THE WARRANTY AND REMEDIES SET FORTH ABOVE ARE EXCLUSIVE AND IN LIEU OF ALL OTHERS EXPRESS OR IMPLIED MORNINGSTAR SPECIFICALLY DISCLAIMS ANY AND ALL IMPLIED WARRANTIES INCLUDING WITHOUT LIMITATION WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE No Morningstar distributor agent or employee is authorized to make any modification or extension
7. operations continued 7 MORNINGSTAR CORPORATION Display Structure continued Fourth Group TriStar Settings The final group of displays describe the TriStar settings This includes reference information to verify the settings selected for the controller the software and hardware versions and the TriStar serial number At the bottom of this group are user selections for temperature display and language Meter Display Charts The next two pages exhibit the Solar Charging and Load Control display charts Diversion is similiar to Solar Charging These charts can be useful for locating specific display screens The four groups of displays discussed above are identified in the display charts Backlighting The first push of any of the four meter pushbuttons will turn on the backlight The backlight will remain on for 5 minutes from the last button press NOTE When turning on the backlight there is no change in the display The second press of any pushbutton will then change the display screen This applies to both TS M and TS RM meter versions NOTE Only one meter will be backlit at a time Pushing a button on a second meter will automatically turn off the backlight on the first meter If the battery voltage falls below 12 7V the backlighting will begin to dim Backlighting will continue to dim proportionally to the battery voltage down to 10 0V Below 10 volts the backlighting will begin to cycle which could caus
8. recommended to use one of the top three operating displays for useful system information There are two initial screens TriStar version and serial number that are only displayed at start up This information can also be found under TriStar Settings during normal operation Solar Charging mode will be used in this manual to illustrate general meter displays The displays for Load and Diversion are similar to Solar Charging 3 1 Display Structure There are over 30 display screens that can selected with the four pushbuttons These displays are organized into four functional groups to make it easy to access the display you need Refer to the charts in Section 3 2 that show the complete set of meter displays First Group Operating Displays Three displays provide real time operating figures volt amp bar charts and cumulative operating figures Using the I pushbut tons each of these three display screens can be quickly accessed Second Group Manual Operations The next two display screens provide for frequently needed manual operations These include resetting amp hours and high low battery voltage starting and stopping battery equalization and LVD low voltage load disconnect override in load mode Third Group Diagnostics The next screen enters a section of diagnostic displays This area indicates faults or alarms and real time operating data for the controller At the bottom of this group are less frequently used manual
9. TRISTAR Digital Meters Installation and Operation Manual Version TS M Version TS RM MORNINGSTAR 1098 Washington Crossing Road Washington Crossing PA 18977 USA phone 215 321 4457 fax 215 321 4458 email info morningstarcorp com www morningstarcorp com MF 0 Woy ECT C300 3 Important Safety Instructions s sss ii 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 Meter Description 1 1 Meter Versions 2s 12 General s unsere SO STER Deeds 2 Installation o eoe e NO ORE ASUAEE 3 2 1 General Information 3 22 TS M Installatioti rec etr Rr e 3 2 3 TS RM Installation cre neret ert tet eere 4 2 4 Meter Selections and Confirmations ssssssss 5 Operation oos vee mee ee eer p HERI Tete RUE 3 1 Display Str ct te o eorr cents 3 2 Meter Display Charts 33 Baecklightinga sue ee rre e 3 4 Operating Displays sss 3 5 Manual Operatiofis etmtire ect integer eas Diagnostics ise eh I bench M qae eae 4 1 Locate Diagnostics en cte 4 2 Faults amp Alarms Displayed 4 3 Using the Diagnostic Data AriStar Setlings eter acta teretes detecta 5 1 Locate System Settings 5 2 Information Displayed sss 5 3 Language and Temperature Selections 17 Troubleshooting the Meter 6 1 Troubleshooting Steps sss 6 2 Repair RJ 11 Connection W artanty ea een tite ne p UR ER e er dee pner tide 22 Speci
10. a full range of operating and diagnostic information for the TriStar s battery charging load and diversion operating modes This manual will generally describe the solar battery charging mode with notes where the load or diversion mode displays are different General Use The meter will display a great deal of information about the TriStar controller and the operation of your system In addition the meter enables manual functions and controller diagnostics These capa bilities will increase your confidence that the system is working properly and will help you to improve system reliability battery life and system performance It is worth the time getting to know your meter The organization of the display screens is described in Section 3 1 It is easy to move around the various display areas and to scroll up or down and left or right using the four pushbuttons as indicated below JD AW LEFT RIGHT UP DOWN There is a limit of two meters that can be used with a single TriStar controller Both can be remote or one local and one remote Only one meter is able to have backlighting at any given time 2 TRISTAR DESCRIPTION 2 0 Installation The TriStar meters can be added to the controller when it is first installed or at anytime after the controller has been in service 2 1 General Information The meter installation involves two or three steps Mount the meter to the TriStar TS M or at a remote location TS RM C
11. e backlighting conflicts with two meters installed The lower voltage limit for the meter is 9 3V If the voltage falls below 9V the meter display will turn off The backlight draws very little current The backlighting would have to be turned on more than 28 hours to consume 1 Ah of energy 8 TRISTAR OPERATION SOLAR CHARGING Operating Displays Section 3 4 Manual Operations Section 3 5 Diagnostics Section 4 0 TriStar Settings Section 5 0 a 13 5v 25c 12 3A 1234 5Ah FLOAT V Bn A 14 4V 12 3V 11357Ah 11 3kWh LO Reset Ah Hold 2 sec Equalize START Hold 2 sec Diagnostics Press gt e to Return Diagnostics Faults 1 of 3 HVD TriStar Settings Press gt e to Return TriStar Settings Alarms NONE TS 60 v01 01 01 Serial 03010001 oc 10 30A Battery 14 35V Meter v01 01 01 Battery Sense 14 40V valid Mode Charge 12v Auto Battery Type 5 Float 13 40v Regulation 14 40V PWM Equalize 15 15V Automatic 28d Language English gt Units C gt State PWM10 Solar 17 70V Last Eq 13d total 11357Ah reset 1234 5Ah TriStar 35 C 123456 hours Battery Service 13d 2s reset Reset Ah total Hold 2sec MORNINGSTAR CORPORATION LOAD Operating Displays Section 3 4 Manual Operat
12. e other pushbuttons to confirm one or more are working if the others work this pushbutton may have dirt on the contact to clean disconnect the power remove the 2 phillips screws that fasten the meter to the cover plate and remove the meter assembly from the yellow pad clean the pushbutton contact and the circuit board contact area with alcohol and a cotton swab Dirt is trapped between the display and the label window disconnect power and remove the 2 phillips screws that fasten the meter to the cover plate remove the meter assembly from the cover plate clean the label window and replace the meter assembly Cable or connector has been damaged if Morningstar Corp remains in the first display screen there is a cable wiring fault if Communications Error is displayed there is a broken cable wire see the notes below for repair Repair RJ 11 connection The meter connecting cable is a standard 6 conductor telephone cable with RJ 11 modular connectors If the cable or connectors are damaged the cable can either be repaired or replaced 20 TROUBLESHOOTING THE METER A standard flat 6 wire phone cable should be used With the RJ 11 connectors the cable assembly appears as shown in the diagram below SE A 4 wire cable can also be used for shorter distances 21 MORNINGSTAR CORPORATION 7 0 Warranty LIMITED WARRANTY The TriStar meters versions TS M and TS RM are warranted to be free from
13. fications ancien den dei und 23 i TRISTAR DESCRIPTION IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important safety installation and operating instructions for the TriStar meters The following symbols are used throughout this manual to indicate potentially dangerous conditions or important safety instructions WARNING Indicates a potentially dangerous condition Use extreme caution when performing this task CAUTION Indicates a critical procedure for safe and proper operation of the controller CP NOTE Indicates a procedure or function that is important to the safe and proper operation of the controller General Safety Information e Read all the instructions and cautions in the manual before starting the installation There are no user serviceable parts in the meters Do not disassemble or attempt to repair the meter Ensure that both the battery and the solar power have been disconnected before installing or disconnecting the meter There are no fuses or user replaceable parts in the meters Do not allow water to enter the meter ii SAVE THESE INSTRUCTIONS 1 0 Meter Description The TriStar is a technically advanced and professional solar system controller Two digital LCD meter versions are available for the TriStar controller and their displays are identical One version is mounted on the controller the other is for remote locations This manua
14. ions Section 3 5 Diagnostics Section 4 0 TriStar Settings Section 5 0 10 a 13 5v 25c 12 3A 1234 5Ah NORMAL V B A 14 4V 12 3V 11357Ah 11 3kWh Reset Ah Hold gt 2 sec Turn Load OFF Hold gt 2 sec Diagnostics Press TriStar Settings Press gt e to Return TriStar Settings TS 60 v01 01 01 Serial 03010001 Meter v01 01 01 Mode Load 12v Auto Battery Type 5 LVD LVR 11 9V 13 4V Language English Units e C gt to Return Diagnostics Faults 1 of 3 Overcurrent Alarms NONE Battery 13 23V 12 34A Battery Sense 13 51V valid State NORMAL Load 14 35V total 11357Ah reset 1234 5Ah TriStar 35 C 123456 hours Reset Ah total Hold 2sec TRISTAR OPERATION Operating Displays A few seconds after the TriStar is powered up one of the following screens will be displayed 13 5v 25c 12 3A V d m 14 4V 11357Ah l 1234 5Ah FLOAT A sm m 12 3V 11 3kWh These display screens are configured in a continuous circular loop and can be quickly accessed by scrolling either left or right The first display below provides general operating information For battery charging this information includes 13 5v 25c 12 3A 1234 5Ah FLOAT Battery voltage N
15. l will help you to become familiar with the TriStar meters features and capabilities Some of these follow UL Recognized for use with TriStar controllers Complies with CE and LVD standards Suitable for 12 24 48 Vdc systems Fully protected from wiring faults Can be added to a TriStar at any time Controller mounted and remote meter versions can be used together Nonvolatile memory will retain settings with no power Extended LCD temperature rating 20 C to 70 C Multilingual display English French German Portuguese Spanish Provides for manual resets Diagnostic capabilities with informative displays Confirmation of the TriStar controller settings Remote version supplied with 30m 98 4 ft connecting cable Connections are by standard RJ 11 6 position modular plugs 5 year standard warranty 1 1 Meter Versions This manual describes two standard versions of a 2x16 digital LCD meter that can be used with the TriStar solar controller Version TS M This local meter is provided as an assembly that replaces the TriStar front access cover The TS M meter mounts to the TriStar controller Version TS RM This remote meter is provided with a mounting plate and 30m 98 4 ft of cable It is identical to the TS M version except that the TS RM version can be mounted at some distance from the controller continued 1 MORNINGSTAR CORPORATION Meter Versions continued Both meters display
16. onnect the meter cable to the RJ 11 connectors Select a different language or temperature display optional All information displayed by the meter is provided by the TriStar controller No adjustments to the meter are required Everything is automatic Both meters are rated for indoor use only There is a limit of two meters per TriStar A single TriStar controller cannot power three meters Two TriStar controllers cannot be connected to a single meter To replace or extend the remote meter cable see Section 6 0 2 2 TS M Installation To install the controller mounted meter follow these steps in order C NOTE Disconnect all power to the TriStar The meter will not be damaged if connected with power but power should be disconnected whenever the access cover is removed for safety 1 Use a phillips screwdriver to remove the TriStar s four access cover screws CAUTION Be careful that the access cover does not hang or dangle from the RJ 11 cable The resulting stress on the cable could damage the meter or the connectors The cable is short to help prevent such stress continued 3 MORNINGSTAR CORPORATION 2 2 TS M Installation continued 2 Connect the cable to the RJ 11 socket on the TriStar and then to the meter Looking at the back of the meter connect to the left RJ 11 socket Note that if the cable is connected to the wrong RJ 11 meter socket there will not be any damage and the LCD displa
17. r short circuit e TriStar hot limiting output due to high heat sink temperature Current limit limiting an overcurrent condition Current offset current reading an offset greater than 1 amp Battery sense battery voltage sense error Batt Sense disc battery sense was working but is now disconnected Uncalibrated calibration out of range return to factory for calibration RTS miswire sense wires are connected to the RTS terminal HVD high voltage alarm in diversion mode high d high duty cycle in diversion mode miswire system wiring problem detected outside the TriStar FET open FET should be closed but are open P12 check the TriStar power supply C NOTE If the RTS or battery sense wire is disconnected or the wire is broken or loose while working properly a fault is indicated However if power is removed and the TriStar is restarted the controller cannot detect the RTS or battery sense and there will no longer be an alarm or indication of a problem If there is any question about the status of these attachments use the Diagnostic displays to confirm that the battery sense or RTS is working correctly 4 3 Using the Diagnostic Data A full set of operating information is displayed below the Fault and Alarm display screens These values are real time and can change while the screen is being displayed continued 15 MORNINGSTAR CORPORATION
18. rms Displayed In the event a Fault or Alarm condition has been detected by the TriStar FAULT or ALARM will be indicated in the top three operating displays Moving the meter display down to the Diagnostic displays the specific fault or alarm condition will be identified Use the gt pushbutton to display each specific problem A Fault causes automatic protection and the current switches FET s will open The Faults that can be displayed include the following External Short external short circuit Overcurrent current exceeds rating RTS shorted remote temperature probe short circuit RTS disconnected RTS was working but is now disconnected FET Short FET switches are shorted closed Software a software problem HVD a high voltage disconnect e TriStar hot heat sink temperature exceeded limits DIP sw changed a DIP switch changed while running or a setting error Setting edit an EEPROM setting was edited while running 14 TRISTAR SYSTEM DIAGNOSTICS Reset a reset due to an interrupted fault typically power cycle Miswire a system wiring fault An Alarm indicates a problem but the TriStar continues to operate The problem must be recognized and repaired as soon as possible The Alarms that can be displayed include the following e Ths disconnected heat sink temperature sensor is open Ths shorted heat sink temperature senso
19. tem setup In addition to the controller configuration hardware and software versions are identified to support troubleshooting Use the up and down pushbuttons to scroll through the screens To return to the primary meter displays press the up pushbutton until to Return is displayed Press the lt J pushbutton as indicated to return to the main TriStar Settings display screen Then scroll up to the top three operating displays 5 2 Information Displayed The first displays indicate the TriStar and meter software versions and the TriStar serial numbers This identification will be important if technical support is required The remaining displays provide specific information that describes the operating mode charging algorithm and specific functions If in a charging mode the PWM or On Off method of charging is identified This information can be used to confirm that the controller has been adjusted and setup as desired If any of these values do not seem correct review the TriStar controller manual and confirm the DIP switch positions 5 3 Language and Temperature Selections The bottom two display screens provide for selecting a language or different temperature units continued 17 MORNINGSTAR CORPORATION 5 3 Language and Temperature Selections continued 1 Change Language One of four languages other than English can be selected for the meter displays The available languages are French German Portuguese
20. to this warranty MORNINGSTAR IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY KIND INCLUDING BUT NOT LIMITED TO LOST PROFITS DOWNTIME GOODWILL OR DAMAGE TO EQUIPMENT OR PROPERTY 1098 Washington Crossing Road Washington Crossing PA 19877 USA Tel 215 321 4457 Fax 215 321 4458 Email info morningstarcorp com www morningstarcorp com 22 MORNINGSTAR WARRANTY Technical Specifications These specifications are for the TriStar LCD meters only METER Voltage accuracy Self consumption Limit of meter Display limit CD temp rating BACKLIGHTING Time backlit Backlighting current e Start to dim backlight Start to cycle backlight MECHANICAL Mounting plate dimensions Plate material Meter weight Connector type TS M cable TS RM cable Cable temperature ENVIRONMENTAL Ambient temperature Storage temperature Humidity Specifications subject to change without notice Designed in the U S A Assembled in Taiwan MS ZMAN TSMO1 A MAY 03 23 12 24V 0 196 50 mV 48V 0 1 100 mV 7 5 mA not backlit 42 5 mA with backlighting 9 3V 90V 20 C to 70 C extended temperature rated 5 minutes 35 mA 28 hours backlighting 1 Ah lt 12 7 V lt 10 0 V 116 x 116 mm 4 56 x 4 56 inch powder coated steel 0 23 kg 0 5 Ib TS M 0 18 kg 0 4 Ib TS RM RJ 11 6 pin 0 13m 5 inch 6 conductor 30m 98 4 ft 6 cond
21. ualizations are typically a very important element of battery service and life A manual equalization can serve many purposes continue beyond the programmed equalization cycle if the battery requires additional equalization perform an early equalization cycle before the automatic cycle begins resets the automatic cycle equalize Diversion batteries can only be done manually unless made automatic using the PC software level battery cell voltages Note that in the Load Control mode this display screen can be used to reconnect loads for 10 minutes after a low voltage load disconnect LVD There is no limit to LVD reconnects In addition pressing the right pushbutton in a normal operating mode will toggle the load on and off 13 MORNINGSTAR CORPORATION 4 0 System Diagnostics The TriStar meter can be used to troubleshoot both the controller and problems with the solar system Locate Diagnostics Scroll down to the display screen Diagnostics Press the gt pushbutton to reach the subset of displays with diagnostic information In addition to Faults and Alarms many system operating parameters are also displayed Use the up and down pushbuttons to scroll through the display screens To return to the primary meter displays scroll up to the top of the Diagnostics displays and then press the lt J pushbutton to return to the main Diagnostic screen Then scroll up to the top three operating displays Faults amp Ala
22. uctor 60 C rating 40 C to 60 C display may darken temporarily below 20 C 55 C to 85 C 5 95 NC CE MORNINGSTAR CORPORATION
23. w 10V the meter will cycle the backlighting use a flashlight if necessary to see the display for troubleshooting The chart in the manual does not match the meter display the meter being used may not exactly match the charts in this manual due to software revisions if there are substantial differences between your meter display and the charts either the wrong chart is being used or the wrong controller operating mode was selected Meter settings displayed do not match the TriStar manual there may be slight differences due to revisions if some important setpoints displayed do not match the controller settings it is likely that a DIP switch in the controller has been set in the wrong position all meter information is taken directly from the controller 19 MORNINGSTAR CORPORATION Cannot return to the top displays or exit a display e follow the meter chart in this manual and the arrows on the meter display the meter may not be able to move in the direction of the pushbutton being used try other pushbutton directions until the display screens change as the display screens change follow your progress using the meter charts at the bottom of TriStar Settings and Diagnostics it is necessary to scroll back up to the top and then return to the main path of display screens see Section 4 1 or 5 1 Does not respond to the pushbutton press the pushbutton down harder it will not break try th
24. y will remain blank Move the cable connection to the other socket 3 Carefully mount the TS M cover on the controller and fasten the 4 screws TS RM Remote Meter TriStar Meter Connections Figure 2 1 4 TRISTAR INSTALLATION CAUTION Do not force the cover into place If the large power wires are too high in the wiring compartment pushing the meter down onto the wires will damage the meter 2 3 TS RM Installation The remote meter is designed to mount into a standard duplex 2 gang electrical box or flush against a wall or cabinet with a correctly sized mounting hole 1 Connect one end of the 30 meter cable to the TriStar RJ 11 socket or to the open socket on the TS M meter if one is mounted to the TriStar See Figure 2 1 2 Connect the other end of the cable to the left socket looking at the back of the remote meter See Figure 2 1 3 Confirm the meter is working before mounting the meter TriStar power must be on If not working connect the cable to the other RJ 11 socket 4 Mount the meter to the wall or cabinet If a 2 gang box is not being used cut a hole in the wall or cabinet sized per Figure 2 2 next page Note that two remote meters can be connected to a single TriStar controller if a TS M meter is not attached to the controller Refer to Figure 2 1 The connections will be the same 2 4 Meter Selections and Confirmations

Download Pdf Manuals

image

Related Search

Related Contents

Manual del usuario SCIV2  INSTRUCTIONS - HARLEY-DAVIDSON Rostock GmbH  Desktop & Laptop Edition User Manual  ESTACIÓN DE INCLUSIÓN(2)  取扱説明書 - センチュリー  SONiM XP3400 ARMOR English  スマート 電子 消灯タイマ付EEスイッチ  Definitive Technology PROCINEMA 400 User's Manual  PCM-3718 Series User Manual    

Copyright © All rights reserved.
Failed to retrieve file