Home
Le Maitre LSG Manual
Contents
1. 2 Do not modify the machine or use a machine which has been damaged in any way 3 Allow sufficient air circulation around the machine at all times 4 Protect the G300 from direct weather effects and wet locations 5 Only use fluids recommended by the Manufacturer 6 Do not continue to produce Fog output in an enclosed area when visibility is reduced below 50cm 7 Avoid direct Fog output continuously at persons structure or objects within close proximity of the discharge nozzle 8 Ensure sufficient air exchange vs co2 released 9 Do not place hands or exposed skin within the first 50 cm of the discharge nozzle at any time during fog production ce 21 SPECIALEFFECTSINC lemaitrefx com Nationwide Carbon Dioxide Distributors Praxair Canada 800 876 7729 USA 800 772 9247 Air Liquide Canada 514 933 0303 USA 800 820 2522 22 e ma SPECIALEFFECTSINC lemaitrefx com
2. The Floor Pocket uses very little compressed air or gas to operate a 4 diameter air supply may be attached to the Floor Pocket feed hose using the supplied Push Lock connector The Floor Pocket operates on 110 vac and opens when power is applied and closes when power is removed 10 Ga STAINLESS STEEL ae m C7 TE lemaitrefx com REPRESENTS THE FLOOR 15 e MAITTE SPECIALEFFECTSINC LSG Mark Il Ducting Suggestions Horizontal Ducting TAA No Backflow Prevention Necessary LSG Mark II with Stage FloorPocket oO L E Ill T CLF 9035 10 Tee EM CH CLF 2979 Round Floor Pocket Zum TMs vies W CLF 2979 Floo E et Backflow Preve PVC 10 Tee Side View M LOU auc HW lemaitrefx com AIDS A S W Y CLF 2979 Floor Pocke Preventer 2 CH DMX INTERFACE If you are controlling your G300 by DMX 512 then it will be necessary to control the LSG Mark II with DMX 512 This can be achieved by using the DMX LSG Interface Module Part CLF 2944 The DMX Data In and Data Out are 5 pin XLR style connectors to conform to the DMX 512 Protocol Addressing is done by
3. DIP switch using binary values LSG DMX Interface Part CLF 2944 ET Fluids BN The Molecular Fluid was originally designed for use in the LSX and LSG however many other applications were found very quickly It is a clean white thick fog practically odourless and dissi pates as it begins to warm The exterior of the LSG Mark II requires only mild soap and water to clean rc The only interior maintenance required for the LSG Mark II is that the hose end of the Liquid Carbon Dioxide supply line be kept clean and free of debris When not in use keep the supply line hose end capped or covered to prevent debris from entering and insects from nesting inside the line 17 SPECIALEFFECTSINC lemaitrefx com COO pee The following list of items may cause wet output or residue to form 1 Low CO2 Pressure less than 275 p s i g Check to ensure the Pressure Builder Valve is turned on and the pressure is over 300 p s i g before use Monitor the pressure through the cue to see if the pressure does not drop below 275p s i g If it does residue will begin to form 2 With the use of Mini Dewars this some times becomes a problem Many Gas filling Stations do not correctly fill the Mini Liquid CO2 Tank and may cause them not to perform as well as large Dewars This can be overcome by adding a High Pressure 20 pound cylinder or going to full size Dewars 3 The LSG Mark Il in not connected to the Liquid side o
4. II outlet has a diameter of 10 0 78539 x 100 78 5 square inches is the area of the LSG Mark II outlet If you require 3 locations to duct the effect to then the cross sectional area of the 3 ducts must be greater than 78 5 square inches For this example we will try a 6 diameter duct 0 78539 x 36 28 If we multiply the cross sectional area of the 6 duct by 3 duct outlets 28 x 3 84 84 is greater than 78 5 so the 6 ducting split into 3 ducts is acceptable Some form of dampering may have to be used to balance the output of different sized outputs 13 Le Maitre SPECIALEFFECTSINC lemaitrefx com 10 Automatic Round Damper The 10 Automatic Round Damper ARD is an inline damper that will open or close to allow or prevent fog from flowing down a run of 10 ducting When using with a Y connector as illustrated fog may be diverted down either or both branches of ducting The unit operated using 110 VAC and may be field set to open or close upon receiving power Two leads are provided for power connection The ARD is constructed of galvanized steel and fits inside 10 rigid pipe and held with sheet metal screws or inside a 10 flex pipe and held with a worm gear clamp DMX control can be obtained by using a DMX relay control like the CLF 2944 LSG DMX Interface 110 Volt The ARD may also be used as a cost effective back flow prevention device Ducted to location CLF 2985 10 Automatic Round D
5. ccw off to cw full speed DMX Control Channel x controls Fan Speed lt 25 off Channel x 1 controls 50 Flow or relay 1 Channel x 2 controls 100 Flow or relay 2 The LSG MKII High Power Combo has the same features as the High Power but also provides for the use of high pressure Liquid CO2 at standard output non High Power Remote 50 button 100 button Not used with High Pressure Liquid CO2 Fan Speed dial controls fan Off CCW amp On CW Note When used in a High Pressure Liquid CO2 in Standard Mode only use the 50 button The High Pressure Liquid CO2 will cause the 100 valve to freeze DMX Control Control x controls Fans Speed lt 25 Off Channel x 1 controls 50 Flow used with High Pressure Liquid CO2 Channel x 2 100 Flow NOT used with High Pressure Liquid CO2 Note When using the LSG High Power the fog machine delay as discussed on page is controlled either manually via remotes or via DMX When fog and or CO2 are activated the LSG fan speed should be at least 25 to prevent backflow 11 Le Maitre SPECIALEFFECTSINC lemaitrefx com Low Pressure 350 Lb Liquid CO2 Tank The LSG Mark II Low Pressure uses CO2 Cylinders similar to the one pictured to the right These are available from the local welding supply centre or look in the Yellow Pages under Carbonics and are some times referred to as Dewars Typically there are three valve handles a pressure gauge and a
6. the LSG Mark Il this is achieved by opening the pressure builder valve at least one to three hours in advance of use by turning counter clockwise 11 Open Liquid valve s fully by turning counter clockwise 12 When the G300 Fog machine is up to operating temperature activate the Smoke button on the remote control The CO2 will be activated first After the appropriate delay time passes smoke issue will start You will know when the gas has been purged from the supply hose by the difference in noise that the LSG Mark II makes 13 Verify cool temperature output using your hand by passing it through the fog output noting the temperature u Liquid Carbon Dioxide L S G Control Signal wmm Fog Fluid 350 Lb Liquid Carbon Dioxode LSG Dewar EH 8 NH NH NH 8 NH NH 8 8 BH BM BH m HM BM NW Low Smoke Generator a G300 a E Lo WY Instalation Model Shown Above SY Touring Model Available E 10 Le Maitre SPECIALEFFECTSINC lemaitrefx com The LSG High Power features dual low pressure valve operation as well as variable fan speed The valves can be operated independently for 50 flow 100 flow or combined 50 boost 150 Both fan speed and valve activation are controlled by either the handheld remote or the DMX Interface both included Remote 50 button controls relay 1 100 button controls relay 2 Fan Speed dial controls fan from
7. 6 EN 26 3 4 CO 28 1 2 28 1 2 17 7 16 Q lemaitrefx com zd 7 SPECIALEFFECTSINC Stand Alone 25 3 16 21 I 19 25 3 16 al P 19 Le 21 mi 19 i i i o 23 23 23 Y Y 1 With Road Case 60 I 24 i 35 T LL SPECIALEFFECTSINC lemaitrefx com EM TU ne gt ves io These instructions are given for systems using a G300 with LSG Control Option Part CLF 2777 Alternate control options are given further in this manual 1 Place the G300 output directly against the foam ring input of the LSG Mark II Tech Tip Proper alignment can be observed by shining a flashlight into the C 10 exit of the LSG Mark Il and noting the G300 output nozzle is centred in the LSG Mark Il input Keyswitch in G Fog 2 Connect the blue Twist lock connector from the LSG Mark II into Custom port on Mode the rear panel of the G300 3 Power up the G300 by turning on the Mains switch NOTE Ensure that the G300 is in G or Fog mode which is indicated by a flashing G in the Ready Flash window of the remote display T
8. CO2 level indicator located on the top of the Liquid CO2 Tank These valves handles should be labelled as Gas Vent Liquid and Pressure Builder We will cover each of these below CE CIA S10 8 This is used if a CO2 gas supply is utilized As we only use the liquid supply to operate the LSG Mark Il this valve is not opened This is the source of our liquid supply of Liquid Valve CO2 The LSG Mark Il CO2 supply hose is threaded onto the valve outlet being sure to use the appropriate sealing washer and tighten to eliminate any leaks When ready to operate the LSG Mark II open the Liquid n valve fully by turning counter clockwise Pressure Builder The pressure builder is a very important Pressure Builder Valve component in achieving the proper LSG Mark Il operating pressure We can monitor this operating pressure by observing the pressure gauge located on the top of the Liquid CO2 Tank Ideally the operating pressure of the Liquid CO2 Tank is 310 330 p s i g This is achieved by opening the pressure builder valve prior to operating the LSG Mark II 12 LeMa SPECIALEFFECTSINC lemaitrefx com TECH TIP Building the pressure to the proper level may take up to an hour so it is suggested that the Pressure Builder valve be fully opened one to three hours before use Pressure Gauge NOTE The Liquid CO2 Tank is equipped with a May not be exactly as shown pressure relief valve that is fixed to ope
9. LSG Mark II Operations Manual 06 20 05 lemaitrefx com Please Read Carefully Before Operating a Table of Contents Page 1 Introduction Page 2 Warning Page 3 Technical Specifications Page 5 LSGMK II High Pressure using 20lb Inverted Cylinders Page 7 LSG MK II High Pressure using 50lb Cylinders Page 9 LSG MK II Low Pressure using 350lb Liquid CO2 Tank Page 11 LSG MK II High Power Page 11 LSG MK II High Power Combo Page 12 Low Pressure 350lb Liquid CO2 Tank Page 13 Ducting Page 14 10 Automatic Round Damper Page 14 Flex to Rigid Adaptor Page 14 Rigid Pipe Hose Adaptor Page 15 Round Floor Pocket Page16 LSG MK II Ducting Suggestions Page17 Alternative Control Methods Page 17 Recommended Fluids Page 17 Maintenance Page 18 Troubleshooting Residual Buildip amp Wet Output Page 20 Warranty Page 21 Safety Precautions Page 22 Nationwide Carbon Dioxide Distributors SPECIALEFFECTSINC lemaitrefx com a Introduction EA Water Based Fog Technology is achieved by pumping a Glycol Processed Water mixture through a heat exchanger The heat exchanger has been heated to the point where at the fog fluid mixture will vaporize The fluid s own vaporization forces the hot mixture through the output nozzle where when mixed with ambient air it forms an opaque aerosol fog The fog is made up of tiny droplets of glycol that form around the small particles in the air The suspended droplets reflect the light which is
10. aitre fluids must always be used Any trace of other fluids will automati cally void ALL warranties Accept no substitutions as there are no exceptions to this rule Proof of purchase or proof of sale must always accompany any warranty returns An RA return authorization number must be noted on the outside of any box returned to our facilities Any packages without a clearly marked RA number will not be accepted by our receiving depart ment Freight on warranty items are freight prepaid to our facility and we will prepay freight back to your facility after repair by the most economical means available Should you require the item express returned then you are responsible for any difference in freight cost Return of any product must be done within 30 days of purchase The pack age must be returned freight prepaid and the RA number clearly marked on the outside of the box A restocking charge of up to 25 may be levied Only credits are issued to the dealers account Any product not returned within 30 days is considered purchased Le Maitre Special Effects Inc considers all it s product to be safe for use in the application it was intended Le Maitre Special Effects takes no responsi bility for misuse or incorrect use Always refer to equipment owners manual for proper use 20 Le Maitre SPECIALEFFECTSINC lemaitrefx com EE MMWES 1 Ensure that operation of the machine is supervised by suitably trained and authorised person nel
11. amper CLF 2949 LSG Y Splitter 10 x 2 10 CLF 2985 10 Automatic Round Damper Ducted to location Flex to Rigid Adaptor The CLF 9033 10 Adaptor Flex Hose to Rigid is used when a connection between flex hose and rigid pipe is needed Rigid Pipe Hose Adaptor CLF 2957 LSG MKII Rigid Pipe Hose Adaptor is used with the LSG Touring Raod Case model and extends the LSG fog output to outside the road case where pipe connections can be made easier 14 7 SPECIALEFFECTSINC lemaitrefx com Round Floor Pocket The Round Floor Pocket is designed to be flush mounted into the stage floor and is pneumatically operated and gt gt electrically controlled The Floor Pocket connects to either our 10 Rigid or 10 Flex Hose DMX control can be obtained by using a DMX relay control like the CLF 2944 LSG DMX Interface 110 Volt The Floor Pocket may be mounted as shown in the illustration 1 Layout a 10 34 diameter and a 12 34 diameter hole on the same centers onto the stage floor 2 Cut a through hole into the stage on the 10 34 diameter markings 3 Route away approximately a 5 16 recess in the remaining 12 34 diameter layout for the recess 4 Insert the floor pocket into the hole cut into stage noting the orientation of the fog deflector if being used 5 Mount the Flush Mount Ring over the Floor Pocket while aligning screw holes and fasten using screws provided
12. ate to desired fog output level It is recommended to start at 16 and adjust accordingly The maximum recommended flow for the LSG Mark II High is 20 7 An LSG Mark II High requires high pressure CO2 bottles These are normally available in 20 or 50 lb sizes For ease of use it is recommended that bottles with liquid siphon tubes be used 7 e mal SPECIALEFFECTSINC lemaitrefx com Ready SMOKE OFF Flash FlowRate Flash M X Minutes Seconds INTERVAL DURATION FLOW RATE SMOKE ON G300 Remote Interface Ema We do NOT recommend inverting the 50 Ib cylinders as they may pose a tipping hazard Use 50lb cylinders equipped liquid siphon tubes 8 The second connection to be made is the CO2 supply hose This is connected to the liquid port of the CO2 supply Connect two or more cylinders in a series fashion as illustrated below A fibre washer is necessary to prevent leaks and are available from your gas supplier 9 Tighten the CO2 supply fitting snug with appropriate wrench 10 Open the Liquid valve s fully by turning counter clockwise 11 When the G300 Fog machine is up to operating temperature activate the Smoke button on the remote control The CO2 will be activated first After the appropriate delay time passes smoke issue will start You will know when the gas has been purged from the supply hose by the difference in noise that the LSG Mark Il makes 12 Verify cool temperature outp
13. f the Liquid CO2 Tank You must always use the Liquid CO2 from the Liquid CO2 Tank NOT the Vapour 4 If using ducting the duct may have a kink or some kind of obstruction in it 5 Fog machines nozzles are not straight out of the machine These must be straight to ensure the fog can fully expand Visually check the copper tubes at the G300 output to ensure the fog is exiting the output If they are not use a pair of pliers and adjust Be careful as they may be extremely HOT 6 Fog Machine is not lined up with the entry hole This is where the G300 meets the LSG Mark II If this does not meet direct and straight the fog can not expand fully Take a flashlight and shine it through the 10 opening of the LSG Mark II and look through to the input to see if it is lined up properly 7 The G300 is not processing the fog properly Remove the machine from the LSG Mark II turn on the G300 and plave your hand in the fog stream 24 away from the front of the machine Your hand should be dry You will feel a slight warming but do not confuse this for moisture If the machine is not performing properly your hand will be very wet The G300 should be serviced to rectify the problem 8 Too much fog is being pushed through the LSG Mark Il On the High Pressure LSG Mark Il we would recommend less then a 20 Flow Rate setting on the G300 remote on the Low Pressure LSG Mark Il we would recommend Less then a 25 Flow Rate setting on the G300 remote 9 Wro
14. ge to read G300 and the machine continues in its start up procedure 4 Adjust remote Interval control dial fully clockwise until DEL appears on the display 5 Adjust remote Duration control dial until desired delay is displayed up to 30 seconds NOTE This delay allows the liquid CO2 to purge the supply hose of CO2 gases ensuring only liquid is available for optimum cooling The recommended formula for calculating delay time is 1 sec for every three feet of supply hose 6 Adjust the remote flow rate to desired fog output level It is recommended to start at 16 and adjust accordingly The maximum recommended flow for the LSG Mark Il Low is 25 7 An LSG Mark II Low requires a 350 Ib Low Pressure Liquid CO2 Tank You must connect the supply hose to the Liquid output of the Liquid CO2 Tank This is usually clearly indicated on the Liquid CO2 Tank outputs 9 e mal SPECIALEFFECTSINC lemaitrefx com TReady SMOKE OFF Flash eoo o m Minutes Seconds ee ee Sa eee Ta INTERVAL DURATION FLOW RATE SMOKE ON G300 Remote Interface 8 The second connection to be made is the CO2 supply hose This is connected to the liquid port of the CO2 supply A fibre washer is necessary to prevent leaks and are available from your gas supplier 9 Tighten the CO2 supply fitting snug with appropriate wrench 10 The Liquid CO2 Tank pressure as indicated on the pressure gauge must read between 300 340 psi to operate
15. n at 350 Pressure Relief Valve p s i g The pressure relief valve is in place to ensure the internal Liquid CO2 Tank pressure does not exceed 350 p s i g AS you approach the ideal operating pressure the relief valve may open slightly and release CO2 gas Although this is sometimes noisy this is no cause for alarm simply close the pressure builder valve by turning clockwise EE eee If ducting is required the LSG Mark II output requires a 10 flexible duct and can be ducted up to 50 feet horizontally The ducting is available insulated or non insulated and can be purchased though an industrial supply company or from Le Maitre Part CLF The LSG Mark II may also be ducted vertically up to 20 feet to produce a waterfall or cascade effect When ducting fog vertically the remaining fog in the duct must not be allowed to backflow into the LSG Mark II When this happens repeatedly the glycol in the fog may condensate on the inside of the G300 damaging the electronic components See further in this manual for suggested solutions and ducting examples TECH TIP f dividing the output to more than one location while ducting make sure the sum of all cross sectional areas of the final duct sizes is equivalent or greater than the cross sectional area of the LSG Mark Il 10 outlet Doing this will prevent any backpressure being created by the LSG Mark II The formula for cross sectional area 0 78539 x diameter squared Example The LSG Mark
16. ng Fluid is being used Le Maitre Special Effects Molecular should be the only fluid used Longer lasting fogs can cause this but again it is not observed often If another manufacturers fluid is used this will definitely cause this type of problem 18 Le Maifre SPECIALEFFECTSINC lemaitrefx com 10 The fresh air or the air inlets on the LSG Mark II are obstructed This happens some time when things get moved around or items are placed on top of the LSG Mark II and drape over the inlet holes Or the unit is placed too close to a wall or another piece of equipment It can also happen if the LSG Mark II is installed in a very small room and no make up air is allowed to enter causing a vacuum within the room This is also very rare but possible 11 The LSG Mark Il Valve is defective or damaged and is not allowing enough Liquid CO2 into the LSG Mark Il 12 The LSG Mark Il is damaged and is not getting good air flow 13 The internal air expanding unit is damaged or has come dislodged from it s mounting device If you are experiencing a residue problem and the above checklist has failed to solve the problem please call Le Maitre Special Effects for assistance in rectifying the problem 19 Le Maitre SPECIALEFFECTSINC lemaitrefx com Warranty Warranty Return Policy Warning All warranty is one year parts and labour unless specified and is on manu facturer defect only Overuse or poor maintenance is not accepted Le M
17. o switch into G Mode Keyswitch A Ensure the power to the G300 is off in H Haze Mode B Set the keyswitch to the G mode position C Turn on Main power switch D The display will change to read G300 and the machine continues in its start up procedure 4 Adjust remote Interval control dial fully closkwise until DEL appears on the display 5 Ajust remote Duration control dial until desired delay is displayed up to 30 seconds NOTE This delay allows the Liquid CO2 to purge the supply hose of CO2 gases ensuring only Liquid is available for optimum cooling The recommended formula for calculating delay time is 1 sec for every three feet of supply hose 6 Adjust the remote flow rate to desired fog output level It is recommended to start at 16 and adjust accordingly The maximum recommended flow for the LSG Mark II High is 20 7 An LSG Mark II High requires high pressure CO2 bottles These are normally available in 20 or 50 Ib sizes For ease of use it is recommended that bottles with liquid siphon tubes be used If using 20 Ib bottles without the siphon tube simply invert the bottles and place them in the bottle rack on those high pressure models so equipped If mobile bottle racks are necessary they may be ordered using Part CLF 2951 x 5 e mal SPECIALEFFECTSINC lemaitrefx com SMOKE OFF l INTERVAL DURATION FLOW RATE SMOKE ON G300 Remote Interface We do NOT recommend inve
18. rting the 50 Ib cylinders as they may pose a tipping hazard Use 50 Ib cylinders equipped liquid siphon tubes 8 The second connection to be made is the CO2 supply hose This is connected to the liquid port of the CO2 supply Connect two or more cylinders in a series fashion as illustrated below A fibre washer is necessary to prevent leaks and are available from your gas supplier 9 Tighten the CO2 supply fitting snug with appropriate wrench 10 Open valve s fully by turning counter clockwise 11 When the G300 Fog machine is up to operating temperature activate the Smoke button on the remote control The CO2 will be activated first After the appropriate delay time passes smoke issue will start You will know when the gas has been purged from the supply hose by the difference in noise that the LSG Mark Il makes 12 Verify cool temperature output using your hand by passing it through the fog output noting the temperature High Pressure Bottles Liquid Carbon Dioxide Without Siphon Tube S G Control Signal Inverted to Obtain Liquid Supply Rack to invert Small Bottle included with High Pressure wmm Fog Fluid LSG L L L n a a a L L LSG Low Smoke Generator Liquid Carbon Dioxide E gem G300 20 LITER 6 ye PAIL WwW Installation Model Shown Above T Touring Model Available SPECIALEFFECTSINC lemaitrefx com Em These ins
19. tructions are given for systems using a G300 with LSG Control Option Part CLF 2777 Alternate control options are given further in this manual 1 Place the G300 output directly against the foam ring input of the LSG Mark II TECH TIP Proper alignment can be observed by shining a flashlight into the C 10 exit of the LSG Mark Il and noting the G300 output nozzle is centered in the LSG Mark II input Keyswitch in G Fog 2 Connect the blue Twist lock connector from the LSG Mark II into Custom port on Mode the rear panel of the G300 3 Power up the G300 by turning on the Mains switch NOTE Ensure that the G300 is in G or Fog mode which is indicated by a flashing G in the Ready Flash window of the remote display To switch into G Mode Keyswitch in H Haze A Ensure the power to the G300 is off Mode B Set the keyswitch to the G mode position C Turn on Main power switch D The display will change to read G300 and the machine continues in its start up procedure 4 Adjust remote Interval control dial fully clockwise until DEL appears on the display 5 Adjust remote Duration control dial until desired delay is displayed up to 30 seconds NOTE This delay allows the liquid CO2 to purge the supply hose of CO2 gases ensuring only Liquid is available for optimum cooling The recommended formula for calculating delay time is 1 sec for every three feet of supply hose 6 Adjust the remote flow r
20. ut using your hand by passing it through the fog output noting the temperature u a a Liquid Carbon Dioxide L S G Control Signal wmm Fog Fluid Liquid Siphon T a LI a a LI a a LI LI a L a a LI m LSG Liquid Carbon Dioxide Low Smoke Generator High Pressure Ier G300 BottleWith L3 ers Liquid Siphon Mem LJ Tube PAIL J Q Installation Model Shown Above N Touring Model Available ANNES 8 SPECIALEFFECTSINC lemaitrefx com These instructions are given for systems using a G300 with LSG Control Option Part CLF 2777 Alternate control options are given further in this manual 1 Place the G300 output directly against the foam ring input of the LSG Mark Il TECH TIP Proper alignment can be observed by shining a flashlight into the C 10 exit of the LSG Mark Il and noting the G300 output nozzle is centered in the LSG Mark II input Keyswitch in G Fog Mode 2 Connect the blue Twist lock connector from the LSG Mark II into Custom port on the rear panel of the G300 3 Power up the G300 by turning on the Mains switch NOTE Ensure that the G300 is in G or Fog mode which is indicated by a flashing G in the Ready Flash window of the remote display To switch into G Mode Keyswitch in H Haze A Ensure the power to the G300 is off Mode B Set the keyswitch to the G mode position C Turn on Main power switch D The display will chan
21. why fog will take on the colour of the light illuminating it Eee eee The patented LSG Mark Il technology uses liquid C02 to the cool the fog generating a consistent effect at sub zero temperatures This process enables you to produce large quantities of low lying fog on a continuous basis without cue time limitations or the messy water residue associated with other technologies The LSG Mark II is compact and mobile facilitating most applications The unique partnering of a fog effect with liquid C02 is cost effective while providing a longer lasting effect Designed to be utilized with the LSG Mark Il the Le Maitre Genuine Molecular Fog Fluid provides a dry thick white effect with a consistent dissipation that eliminates any ambient hazing The LSG Mark II couples with the Le Maitre G300 offering the most advanced controls and fog output available The LSG Mark II consumes approximately 8 lbs of Liquid Carbon Dioxide per minute of operation at 350 PSI At the typical variflow setting of 20 the G300 will consume approximately 34 of a gallon of fluid per hour constant The system can be controlled via the standard digital remote control DMX or show control The DMX LSG Mark II Interface allows the LSG Mark II amp G300 to be controlled on separate DMX channels Standard equipment includes 10 ducting sleeve to facilitate standard ducting in many configurations based on fog distribution requirements 1 SPECIALEFFECTSINC lemaitref
22. x com ring x gt 4 n gt 4 gt 4 gt 4 gt 4 gt 4 Important Safety Instructions Do not touch or place hands expose skins within 50 cm of discharge nozzle Important Safety Instructions Ensure sufficient air exchange vs CO2 released Important Safety Instructions Do not remove the outer case until power has been disconnected from the machine Important Safety Instructions Persons suffering from asthma or allergenic sensitivity may experience irritation discomfort or allergic symptoms when exposed to fog effects Important Safety Instructions Ensure that this unit is grounded at all times Failure to do so may result in serious injury Important Safety Instructions Never use alternative fluids Toxicity free output is your responsibility M S D S Available at lemaitrefx com 2 SPECIALEFFECTSINC lemaitrefx com Technical Specifications Model LSG Low Smoke Generator Low Pressure LSG Low Smoke Generator High Pressure LSG Low Smoke Generator High Power Combo Type CO2 Operated Fog chilling unit couples with Le Maitre G300 Water Base Fog Generator Size See Illustations that follow Weight Installation version w Cart 100 Ibs less G300 Roadcase version 150 Ibs less G300 Power Rating 110 Volt A C 50 60 Htz 20 Amps With G300 Fog Generator 220 Volt A C 50 60 Htz 10 Amps With G300 Fog Generator LSG Mark Il Illustration With Cart Le 51 15 1
Download Pdf Manuals
Related Search
Related Contents
Toshiba x200 ツーハンドルシャワーバス水栓 (一時止水付) RI78V4 Real-Time Operating System User`s Manual: Coding Teac CD-Rewritable W524E CD Ken-A-Vision INS-SC15 User's Manual スティックキャリア Altronix Vertiline166D Copyright © All rights reserved.
Failed to retrieve file