Home

Installation of chain and chain brackets

image

Contents

1. Tissing S p r ag AL f N 1 zL a ee ee f k aam IZ Si oF he Positive Stop in fully closed position A Keep the 3 distance at least between operator and chain lt A B gt 3 ra a E bracket if the roller hit Positive stop in an accident P aL i 3 It is suggestion that there is a 4 10cm distance at least between lt 4 minimum the gate edge and the gate wall when the gate is fully open Positive Stop in fully opening position D Keep the 3 distance at least between operator and chain C p gt 3 pening bracket if the roller hit Positive stop in an accident Stevie ug A Parts List t lt Release Key 2 pcs Cc O Remote Control 2 pes Magnet bracket 2 pcs Square U Bolt 4 pcs Round U Bolt 4 pcs Chain 20ft eA Ss Magnet Assembly 2 pcs Chain Box 1 pc L Bracket 2 pcs Master Link 3 pcs 10 Washer 12 pcs 8 Washer 20 pcs 6 Washer 4 pcs M8x70 Bolt C C C 4 pes 10 Lock Washer 8 Lock Washer 6 Lock Washer 12 pes 20 pcs 4 pcs M10x30 Bolt a v Socket Head Screw 4 pes M10 Nut 8 pcs M8 Nut 20 pcs M640 4 pcs Optional Accessories Parts List Optional Alarm Lamp 1 pc Photocell Beam System 2 5 Video Intercom LM140A 1 set LM102 1 set LM162 Mounting post for keypad 1 pc LM107 Keypad wi
2. so that the opener will stop at the in N desired open position when the Open spring Wancor ca limit switch approaches it Oem The higher magnet component ore must be installed at left side and Chain Box Gate Opener lower magnet component must be installed at right side from the view inside of property Finally adjust the magnet to the proper position by moving the gate with the motor The magnet should be 39 59 away from the magnetic limit switch If it is too far away the switch will fail to work The distance between the magnet and the opener should be 1 2 12mm with the opener cover on Adjust the position of the magnet until the positions of the opening and closing meet the requirement Connecting of the Control Board Control Board ED fa Ea SAOIDIPOADINIG binini wa a lt i CLLO PHOTO OSC Oooog Pw seaga a E ON S ES ES miw P aaa OTOUOEETETOE m a oe a UP COM DN 12 GND PHO COMO SIC XB2 XB1 jad i Start Capacitor 0 a an a e Loop Detector LM154 aaa Photocell LM102 Limit Switches Emitter Receiver 4 Alarm Lamp LM140A Wired Keypad LM106 12 1 Motor The BLACK wire of the motor should be connected into the 6 terminal The RED wire of the motor should be connected into the 7 terminal The YELLOW wire of the motor should be connected into the 8 terminal 2 Start Capacitor One pin of the start capacitor sh
3. 13 terminal The RED wire of the external receiver should be connected into the 12 terminal 9 Wired Keypad 12VDC The RED wire of the wired keypad should be connected into the 12 terminal The BLACK wire of the wired keypad should be connected into the 13 terminal The WHITE wire of the wired keypad should be connected into the 16 terminal The BLUE wire of the wired keypad should be connected into the 15 terminal Setting of the Control Board 1 DIP Switches The DIP switches are used to set the running time Control Board of the motor in midway mode auto close time of the gate opener and fast change the open close direction which is determined by the position of dl the gate opener installed DIP Switch 1 2 Running time of the motor la in Midway Mode 11 This mode enables user to drive the vehicle through the gate quickly when the gate opens to certain width DIP Switch 1 ON 2 Seconds OFF 0 DIP Switch 2 ON 4 Seconds OFF 0 NOTE The midway function would be disabled if both DIP switches are turned off Factory default setting is disabled ON E g D i a E Running time of the opener in midway mode is 2 4 6 seconds 12345 DIP Switch 3 4 Auto close time of the gate opener DIP Switch 3 ON 30 Seconds OFF 0 DIP Switch 4 ON 60 Seconds OFF 0 NOTE The auto close function would be disabled if both dip switches are turned to off factory
4. 10 4 pes Socket Head Screw M640 4 pcs Spring Washer 6 4 pcs Plain Washer 6 4 pcs Gate Operator g the position of anchor bolts was placed scot a Chain Box according to the position of mounting o Base Plate holes on the base plate bef te etnio saa oles on the base plate before concrete Spring Washer 10 4 pes become harden Big Pioin Naair 5 Mount the base plate to the concrete 10 4 pes Pad It s only temporary installation Anchor Bolt g i 4 pcs Further adjustment will be required when install the chain 6 Mount the chain box to the base plate by using screws and washers don t make the four screws too tight Manual Operation The opener should be put in the manual emergency release position before fitting the chain installing the opener and limit switch The process is as follows Cable Concrete Pad 1 Push the cover in arrow direction now the key slot appears 2 Insert release Key into the key slot and turn it in counter clockwise 90 to disengage the clutch between the gear shaft and power output Now the opener is in the manual operation 600 mm Installation of chain and chain brackets y Gate Frame 1 Chain Brackets TES gt 114 2 1 Please refer to below chain brackets figure which shows U bolt L bracket and chain bolt een Use the U bolts square or round to attach th
5. for proper operation of the unit Lubricate shafts and sprockets Keep opener clean at all times Check and tighten anchors bolts Check for loose or corroded wire Ensure the opener is well earthed and correctly terminated Always check the Stop Reverse in case of obstruction function when performing any maintenance If this function can t be made operable remove this opener from service until the cause of the malfunction is identified and corrected According to Waste of Electrical and Electronic Equipment WEEE directive WEEE should be separately collected and treated If at any time in future you need to dispose of this product please do NOT dispose of this product with household waste Please send this product to WEEE collecting points Ls where available www WholesaleGateOpener com 7106 S 220th St Kent WA 98032 USA sales WholesaleGateOpener com 2010 2012 LockMaster All Rights Reserved
6. is not on Check the battery in your remote control Replace the battery if necessary 4 When you open or close the gate by pressing key 1 and key 2 which have been programmed gate will stop in mid travel or reverse before reaching the fully limit position a The opening force or closing force is adjusted too small Turn the Potentiometer 1 and 2 to increase the force b Gate is obstructed Remove the obstruction 5 The gate opens but stops and will not return a Please note the two magnet brackets fixed plate are different one is higher and another is lower Please try to exchange the two brackets position b Please try to exchange the limit switch wires CL close and OP open There are two reed switches inside the magnetic limit switch one is upper and another is lower Maybe the magnet position was installed in the middle so it inducts both switches Adjust the magnet upper or lower 6 The gate can open but fails to close a Photocell is obstructed Remove obstruction b The limit switch is failed Disconnect the limit switches and try it again c The start capacitor of the motor is failed Replace the capacitor d The electric component on the control board has been damaged Replace the electric component or replace the control board 7 The motor is run but the gate doesn t move The clutch for emergency release is adjusted properly and is not slipping Maintenance Every six months check the following items
7. LockMaster Sliding Gate Opener User s Manual Please read and follow all warnings precautions and instructions before installation and use Periodic checks of the opener are required to ensure safe operation For residential use only Save this manual www WholesaleGateOpener com Table of Contents General Safety esac vind deodoves sienna pave ea dada eed e AE die ited dca e ara s TREE wing dea vated sae Dade 2 Preparation Tor Installations sseivia ce ceases ne date dea eee cgeg se vars aa a pind nye vhe etal A Lee aga SAh 3 Pants List sosteisne sch chorale vag wiesa a a e Md bad etabsesn gud dash aa aaa aa aag Ana Taai EE 4 Optional Accessories Part List c ccccec ec ec eee cece eee eee eee ene e eects ee ea ease ee ea ease eaeseeeaeaeaeaeeeeeneees 5 Technical Specifications amp Feature cccccccceee eee e nent eee eee eee eeeeee eect ee nets ee eeeeneeeeeeeeeeeeeeeeeeeeeasas 5 Installation Overview maiseanna ede eaves ces ea a od ahead eh dedi eeu teenie eee 6 Installation of the Opener s22seas sce toes cer cape cee rinie eased ga gees aa otal eee tai vadheaeebeneadcneegitvens 6 Manual Operations ce sccc ascsbeasianceeser checesedednnudndesdededendedocadersa e eeg pter a aeeai ae seeds 7 Installation of chain and chain brackets cccecececeeee eee neces eee eeeaeeee ease ee ee ease ee eeeeeeeeeeeeeeeeees 8 Installation of the Limit Switch 2 2 0 0 0 cccccc cece cece cece ee
8. default setting ON E g E a i l Auto close time of the gate opener is 30 60 90 seconds 234353 DIP Switch 5 Left Right open ON Right open factory default setting OFF Left open Turn switch OFF to change the opening direction easy if necessary r ON Right open factory default setting For gate to open toward right and close toward left OFF Left open For gate to open toward left and close toward right meee ia ei le Cl 2 Potentiometers The potentiometer A is to adjust the OPEN stall force of the gate opener The Potentiometer B is used to adjust the CLOSE stall force of the gate opener Turn the potentiometer clockwise to increase the stall force Turn the potentiometer counter clockwise to decrease the stall force Control Board e e e e J je e J e e o Nv AA e e Ea pa FD cafi ga e se dhe aii q mm a ea on im naeg Ea oe Booris HEP 000000900 COOCGOGOGD eee pene L N LALBU WV XB2 X81 UP COM DN 12 GND PHO COMOISI Test the reversing sensitivity For the sake of safety it is very important to test the reversing sensitivity as soon as the control board set is finished The reversing sensitivity adjustment is inverse correlation with stall force adjustment in potentiometer A and potentiometer B In other word the stall force level is higher the reversing sensitivity level is lower Put an imm
9. e chain brackets to gate frame Spring Washer 6 4 pes Gate f Plain Washer 6 4 pcs Hex Nut MS 4 pes JZ 4 Plain Washer 2 If Both the square bolts and round bolts are not i paa E Lf fit for the gate frame use the appropriate bolts to Eo SA spmg vere l 10 2 pes n_i Eo aing Hex Nut M10 2 pes attach the chain brackets to gate frame cg 2 How to install the chain ai 1 Place the chain around the top of the idler m r n f Hi Ii wheels and under the drive sprocket in chain box 2 Connect a chain bolt to one end of chain from chain box by using master link Then insert the chain bolt to the L bracket and fix them each other by washers and nuts temporarily Nuts will be further Master Link Chain Bolt L Bracket adjusted for a proper chain tension later 3 Connect second chain bolt with another end of chain from chain box then attach bolt to the L bracket on opposite end of gate using the washers and nuts 4 Make sure that the chain is line up exactly with the position where the chain on the chain idler wheel 5 Get the desired chain tension by adjusting two chain bolts of the both end Cut the unwanted length of chain if necessary T EEEE 6 Fix the base plate by tightening the washers and nuts 7 Insert the opener shaft into the drive sprocket of chain box Mount the opener by tightening the bolts and washers 8 Fix the chai
10. e eee eee een e ee eee e eee eee ee eee Erren 9 Connecting of the Control Board cccccc eee eee e eee eee eee eee eee eee eee eee ease eee see ea ee eeneaeaeaeaes 10 Setting of the Control Board cc ccececec cence eee e cee eee eee nee eee eee e eee nsec eens eens ee ee eens eeneetieeeeees 11 Test the reversing sensitivity 0 cece ene eee e eee ene eee ee nee nana eae aasaaaeaaaeeeneees 13 How to learn or erase the remote cccceccee cece eee eee eee ener e een cee eae e nese nese seen ee enna 13 How to use the remote to control the Opener ccceceee cece eee eee eee eee ee ceee eee seats tees ea eeeeaeaes 13 Trouble Shooting grein e a a a ewan a E bua Gia sanyo EAE ia ans WE ba ats 13 Maintenance eieae oaks Oa das Rada ad Hee a le odie ode edie Sh eee ee esa de 14 Thank you for purchasing SCG 50H sliding gate opener We are sure that the products will be greatly satisfying as soon as you start to use it The product is supplied with a user s manual which encloses installation and safety precautions These should be read carefully before installation and operation as they provide important information about safety installation operation and maintenance This product complies with the recognized technical standards and safety regulations General Safety A WARNING An incorrect installation or improper use of the product can cause damage to persons animals or properties e Scrap packi
11. ion Before proceeding to your opener installation check if your gate structure is in accordance with the current standards especially as follows The gate sliding track is linear and horizontal and the wheels are suitable the gate should be mounted and moving freely Check that the structure is sufficiently strong and rigid and that its dimensions and weights conform to those listed in the specifications table of this document Make sure that the gate is plumb and level The fence posts must be mounted in concrete The gate does not bind or drag on the ground e The gate manual operation can be carried out smoothly along its entire run and there is no excessive side slipping The opening and closing gate stops are positioned A WARNING Remember that control devices are intended to facilitate gate operation but can not solve problems due to any defects or deficiency resulting from failure to carry out correct installation or maintenance Take the product out of its packing and inspect it for damage Should it be damaged contact your dealer Remember to dispose of its components cardboard polystyrene nylon etc according to the current prescriptions Refer to the following Figures for gate installation Using the post or wall as a stop either directly or indirectly is not recommended SO as to protect the post or wall against damaging shock from the sliding gate Closing Dy er ON Ii imi E i ne T
12. n Be sure that the opener is installed in a level and paralleled position and is properly secured Improper installation could result in property damage severe injury and or death Before starting installation ensure that there is no point of friction during the entire movement of the gate and there is no danger of derailment Ensure that the Warning Signs are present Necessary Tools The following tools may be necessary to install the Gate opener You will need screwdrivers an electric drill wire cutters and a wire stripper a socket set and possibly access to a welder When install the opener you should build a concrete pad to support the base plate of opener in order to maintain proper stability The installation proceeds are as follows 1 Dig a hole for a concrete pad which should be approximately 60 x 36 x 35cm 24 x 14 x 14 It may protrude 10 cm 4 above ground and 25 cm 10 in depth underground Increase the pad height if necessary to protect the system from flooding heavy snow etc 2 Prepare one or more conduits for the electrical cables before pour concrete Remember that cable conduits have to pass through the hole in the base plate 3 Pour concrete and before it starts to harden check that it is parallel to the gate leaf and perfectly level 4 The four anchor bolts must be set into the concrete when it is poured make sure Hex Bolt M1030 4 pes Spring Washer 10 4 pes Plain Washer
13. n box by tightening the four lax screws Chain Bolt s Sy 3S Se XP lG idler Wheel 7 i Master Link Chain i r i Thoroughly fasten the four nuts as well as spring washers onto anchor bolts tightly enabling the opener is firmly secured on the concrete pad during the whole gate travel 3 Check position of opener and chain brackets 1 The chain brackets must be mounted to the same height as the chain on the idler wheels Incorrect 2 The opener must be parallel to the gate 3 Make sure there is 1 distance at least between the chain box and the gate after you position the base plate Installation of Magnets for Limit Switches Before install limit switch make sure the gate opener is put in manual operation the clutch connected with gear shaft is disengaged and the mains power supply is disconnected Position the two Magnet Components approximately on the gate and move the gate by hand to fix them in place Fit magnets bracket Push the gate fully closed by hand es A Magnet Bracket a N Locate and install the magnet bracket oye O 15mm_ x Higher Magnet so that the opener will stop at the i Component gS desired close position when the close AH limit switch approaches it 4 viet ena Push the gate fully open by hand a i Component Locate and install the magnet bracket Hex Bot MB 70
14. ng materials plastic cardboard polystyrene etc according to the provisions set out by current standards Keep nylon or polystyrene bags out of children s reach e This product was exclusively designed and manufactured for the use specified in the present documentation Any other use not specified in this documentation could damage the product and be dangerous e The factory declines all responsibility for any consequences resulting from improper use of the product or use which is different from that expected and specified in the present documentation e Do not install the product in explosive atmosphere e The factory declines all responsibility for any consequences resulting from failure to observe Good Technical Practice when constructing closing structures door gates etc as well as from any deformation which might occur during use e Disconnect the electrical power supply before carrying out any work on the installation Also disconnect any buffer batteries if fitted e Fit an omnipolar or magnetothermal switch on the mains power supply having a contact opening distance equal to or greater than 3 5 mm e Make sure a residual current circuit breaker with a 30mA threshold is fitted before the power supply mains e Check that earthing is carried out correctly connect all metal parts for closure doors gates etc and all system components provided with an earth terminal e Fit all the safety devices photocells electric edges etc
15. obile object along the gate path and then operate the gate to strike it during the open and close cycles The gate must reverse as soon as object is struck with it If the gate doesn t reverse please increase the reversing sensitivity by turning the potentiometer in counter clockwise direction Turning the stall force potentiometer toward to MIN position to increase the reversing sensitivity Note 1 If the sensitivity setting is too higher the gate will stop or reverses very easy by itself while there is little obstruction or resistance such as strong wind or heavy snow sometimes Note 2 Always check the gate reversing function every each time of control board set or restart after power off How to learn or erase the remote Learn the remote Press and release the learn button the REM LED light will be on then press the key in the remote twice in 2 seconds the REM LED light will flash for 4 seconds Now the PWR LED id remote has been learnt successfully Erase all the remote codes Press and hold the learn button until the REM LED light is off Now all remote codes have been erased How to use the remote to control the opener R Key A is used to operate the opener to work alternately open stop close stop open When the Midway Mode function is enabled Key B is used to achieve the Midway Mode function open the gate for the pre setting time When the Midway Mode function is disabled the opener works alternately open stop clo
16. ould be wired to the 7 terminal another to 8 terminal 3 Limit Switches The RED wire of the limit switches should be connected into the 11 terminal The BLACK wire of the limit switches should be connected into the 10 terminal The YELLOW wire of the limit switches should be connected into the 9 terminal 4 Alarm Lamp One wire of the alarm lamp should be connected into the 4 terminal another should be connected into the 5 terminal 5 Photocell Normal Open Use a 2 core cable to connect the terminal of the photocell s emitter to the 12 terminal the terminal to the 13 terminal Also the and terminals of the photocell s receiver should be connected to the 12 and 13 terminals in parallel Use another 2 core cable to connect the NO terminal of the receiver to the 14 terminal the COM terminal to the 15 terminal 6 Push Button The push button should be wired to the 15 and 16 terminals The gate opener works alternately by pushing the button open stop close stop open 7 Loop Detector First insert the LOOP DETECTOR BOARD into the CONTROL BOARD and then connect the twisted pair to the 17 and 18 terminals 8 External Receiver The BROWN wire of the external receiver should be connected into the 16 terminal The BLACK wire of the external receiver should be connected into the
17. reless Wired 1 pc LM106 12 1 pc LM105 card LM170 External Receiver Loop Detector 1 pc LM138 1 pc LM155 Technical Specifications amp Features Specifications Power supply 120V 60HZ or 230V 50HZ Motor 120VAC or 230VAC Absorbed power 750W Gate moving speed 7 9 second 20 cm second Max gate weight 2 600KGS Max torque 75Nm Environmental conditions From 15 C to 40 C Protection class IP44 Dimensions 40x23x55 CM Features Easy to install and low maintain Midway mode Quick selection for gate open close direction 5 7 Video Intercom 1 set LM165 Wall push button 1 pc LM147 Get the desired chain tension by adjusting the chain bolts Reliable rolling code technology Emergency release key in case of power failure Stop Reverse in case of obstruction during gate opening closing Built in adjustable auto close 0 30 60 90 seconds Built in max 90 seconds Motor running time MRT for multiple safety protection Reliable electromagnetism limit for easy adjustment Can be equipped with wide range accessories Installation Overview Alarm Lamp _ __ Sliding Gate p X N N Pd f ri Higher Magnet amp Concrete Pad Gate Operator Chain Lower Magnet amp U Bolt amp Photocell Magnet Bracket N Magnet Bracket L Bracket amp Base Plate i Chain Bolt Installation of the Opener Cautio
18. se stop open by pressing Key B Troubleshooting Have a multimeter to check voltage and continuity Use caution when checking high voltage terminals 1 Motor only runs toward one direction a The limit switch is failed Disconnect the limit switches and try it again b The start capacitor of the motor is failed Replace the capacitor c The electric component on the control board may be damaged Replace the electric component or replace the control board 2 The gate will not open or close a The power switch is OFF Make sure the power switch is ON 13 b The limit switches are failed Disconnect the limit switches and try it again c Connecting wires or terminal blocks are too loose Check the connecting wires and terminal blocks d The motor has been damaged Replace the motor if necessary e The thermal protector is working because the high temperature after long working time Please wait for 20 minutes to let the motor become cold f The electric component on the control board has been damaged Replace the electric component or replace the control board 3 Remote control does not work a The distance you use the remote is too far away from the opener Try it again closer b Remote control is not suitable for receiver After making sure the codes are correct erase remote controls and then re program the codes in the device c Broken receive board Replace receive board d The indicator light of remote control
19. which are needed to protect the area from any danger caused by squashing conveying and shearing e Position at least one visible indication device Alarm lamp and fix a Warning sign to the structure Install Warning Sign On Both Sides Of The Gate Moving Gate Can Cause Or Death f Keep Clear Gate may move at any time e The factory declines all responsibility with respect to the automation safety and correct operation when other supplier s components are used e Only use original parts for any maintenance or repair operation e Do not modify the automation components unless explicitly authorized by the factory e Instruct the product user about the control systems provided and the manual opening operation in case of emergency e Do not allow persons or children to remain in the automation operation area e Keep radio control or other control devices out of children s reach in order to avoid unintentional automation activation The user must avoid any attempt to carry out work or repair on the automation system and always request the assistance of qualified personnel e Anything which is not expressly provided for in the present instructions is not allowed e Before installing the gate opener check that all moving part as well as the sliding gate is in good mechanical condition correctly balanced and opens and closes properly e Save these instructions for future use Preparation for Installat

Download Pdf Manuals

image

Related Search

Related Contents

INSTALLATION MANUAL CONVENI-PACK  UIC - University of New Hampshire  MovinCool Office Pro 12 Service manual    DESIGNING AND MAINTAINING WEB PAGES: A GUIDE FOR  ダウンロード  DESCRIPTION : Prêt à l`emploi, PROTECT`ALU protège les  Getting Started Guide  JVC GD-V501PCE User's Manual  Manual de usuario  

Copyright © All rights reserved.
Failed to retrieve file