1.                                    1    OCC workstation 14 units  2    21  Monitor 14 units  3    Switch 1 unit  4    46  LCD 4 units  5    A3 network laser printer 1 unit  6    A4 laser printer 2 units  7    Laptop 2 units  8    Communication equipment  9    UPS 1 unit  10    Power Generator 1 unit          Traffic Department of the City of Skopje          1           Computer analogous to the OCC workstation 2 units       79                                                       2    21  Monitor 2 units  3    A4 laser printer 1 unit  4    46  LCD 4 units  5    Equipment for communication with the Data Centre   Garage   1    Computer 4 units  2    19  Monitor 4 units  3    A4 laser printer 4 units  5    Equipment for communication with the Data Centre  4 units  6    Smart ticket reader 4 units                   Issuance of personalised tickets                                                    1    Computer for issuing personalised smart tickets 8 units  2    19  Monitor 8 units  3    Digital camera 8 units  4    A4 laser printer 8 units  5    Smart card printer 8 units  6    A4 scanner 8 units  7    Card recharging device 8 units  8    Equipment for communication with the Data Centre  8 units  Vehicles  1    Vehicle computer unit with GPS GPRS unit and attached POS printer 500 units  2    Vehicle installation and cabling 500 sets  3    Validator 500 units                   Ticket control                   1    Smart ticket controlling device 50 units       Additional equipme
2.     Form 3A     Reference list     contract s  of implemented projects with the offered  Solution with at least 250 buses operating on city lines in an EU Member State   with average min  120 000  hundred and twenty thousand  transactions   validations  per day  operational in the past 3 years  stating amounts  dates and  minimum 1  one  reference of satisfactory performance     To the Form 3A  please enclose      Confirmations issued and stamped by the Contractor confirming that works  related to the subject of this Public Call satisfy the project performances in  accordance with the Contract  that is  its operability    In cases of submission of joint offer  the required condition shall be met by all the  Consortium members jointly     yes    yes    no    no       Form 4A     Statement by sufficient personnel of the bidder    yes    no       Form 5A     Statement for sufficient technical personnel of the bidder    yes    no       Form 6A     Statement of the bidder that the Design Project meets the technical  specification from the Tender documentation and the Charts in the Form 6A    yes    no       Form 7A     Statement of the bidder for appointment of working team    yes    no       Document for registered activity   DRD Form issued by the Central Registry of the  Republic of Macedonia as a proof that the legal entity is registered    In case when the bidder is foreign legal entity  proof that the entity is a member of  proper professional association in accordance with 
3.     The whole building should be monitored with adequate video surveillance solution  The  surveillance should be 24x7 carried out by the surveillance service department  that is  the  physical security personnel       Stable redundant power supply    In order to have uninterrupted operation of the systems in the Data Centre it needs to be  equipped with a stable redundant power supply  All systems in the Data Centre will be  connected to the redundant power supply  This means that in case of failure of the main grid   the UPS systems  i e  the system for uninterrupted power supply  will automatically come  online  These systems should be a combination of batteries and diesel generators  All of the  components of the power supply system should also be redundant  i e  doubled  This means  that in case of failure of the main grid  the Data Centre power supply and operation will not  experience any interruption       Professional Fire Protection    All facilities within the Data Centre will be adequately protected against fire  This system should  be automatically activated in case of fire  Fire alarms should be an addressable system  Also   the Data Centre should be equipped with a modern fire suppression system       Professional Air Conditioning    All facilities within the Data Centre will be equipped with redundant air conditioning units  connected to the redundant power supply  This means that in case of failure of the main grid   the air conditioning units in the Data Cen
4.    In other cases envisaged in the Law     Contracts with third parties  Article 45    The provisions of this Contract signed by the Carrier of the Procurement and third parties for the  purpose of fulfilling the obligations of this Contract  shall be subject to the provisions in this  Contract and must be in compliance thereof     Article 46    The Carrier of the Procurement shall be liable for the damanges that have occurred due to its  own fault  in case of complete or partial realisation of the contractual obligations  the damages  that have occurred due to System shortcomings  as well as damages due to omission by the  Carrier of the Procurement or by third parties contracted by the Carrier of the Procurement  for  the amount of the actual damages and incurred losses  provided the damages suffered by the  Contracting Authority is higher than the amounts of the guarantees referred to in Article 31 and  33 of this Contract     38    Incurred losses shall be the revenues of the Contracting Authority generated in a period during  which the failure was rectified commensurate to the average daily revenues in the last 3 months  prior to the occurrence of the failure     Article 47    The Carrier of the Procurement shall not be responsible for any data loss as a result of  additional actions  software and hardware modification caused by unauthorised use by the  employees of the Contracting Authority    In case the employees of the Contracting Authority followed the enclosed inst
5.    REPUBLIC OF MACEDONIA  CITY OF SKOPJE  PUBLIC TRANSPORT COMPANY SKOPJE  bul  Aleksandar Makedonski  Number 10    TENDER DOCUMENTATION    FOR AWARDING PUBLIC PROCUREMENT CONTRACT AND IMPLEMENTING A  PROCUREMENT OF AUTOMATIC VEHICLE LOCATION SYSTEM AND SMART TICKETING  SYSTEM IN THE JSP SKOPJE VEHICLES    No  70 2012    Skopje  December 2012    Content  ANNOUNCEMENT FOR SUBMITTING A PUBLIC PROCUREMENT CONTRACT  No 70 2012      INVITATION TO SUBMIT A BID    ll INSTRUCTION TO BIDDERS    GENERAL INFORMATION    DEO ee    CONTRACTING AUTHORITY   RIGHT TO PARTICIPATE   SUBJECT OF THE PUBLIC PROCUREMENT CONTRACT   TYPE OF PROCEDURE FOR AWARDING A PUBLIC PROCUREMENT CONTRACT  MANNER OF REALISATION OF THE PUBLIC PROCUREMENT CONTRACT  AMENDMENTS AND EXCEPTIONS FROM THE MANNER FOR REALISATION OF THE  PUBLIC PROCUREMENT CONTRACT   DURATION OF PUBLIC PROCUREMENT CONTRACT   CRITERIA FOR ESTABLISHING BIDDER    CAPABILITIES   MANNER FOR PROVING THE CAPABILITY      CLARIFICATION AND INTERPRETATIONS OF THE TENDER DOCUMENTATION    AMENDMENT AND SUPPLEMENTS TO THE TENDER DOCUMENTATION     BID PREPARATION     BID SUBMISSION     BID SUBMISSION EXPENSES     FINANCIAL SECURITY MEANS     CRITERIA FOR AWARDING A PUBLIC PROCUREMENT CONTRACT     PUBLIC BID OPENING     CONFIDENTIAL INFORMATION     NOTIFICATION OF BIDDERS     LEGAL REMEDY     RIGHTS AND OBLIGATIONS OF THE CONTRACTING AUTHORITY AND THE BIDDER    SIGNING THE PUBLIC PROCUREMENT CONTRACT     APPLICATION OF LEGISLATIONS    lil  CONTRACT TEMPL
6.    The Carrier of the Procurement undertakes  in the course of the duration of this contract  to  maintain the fully installed equipment and software as part of its regular and emergency  maintenance and in accordance with the plans and procedures of annexes 3 and 4  of Article 4  of this contract  following the requirements of the tender documentation     Article 28    The Carrier of the Procurement undertakes  on the territory of the city  for the purpose of sale of  the tickets  and following the list provided by the Contracting Authority  to equip 8  eight  points  of sale for the issuance of personalised tickets and the sale of recharging of tickets  and 50  points of sale that shall sell and recharge the non personalised tickets  to install 3 automatic  vendor machines for the sale and recharging of the non personalised tickets  to provide and  install 500 fiscal printers in the buses of the Contracting Authority     33    The Carrier of the Procurement undertakes to fulfil the obligation of Paragraph 1 of this Article  before the temporary commitment of the System     Value of the Contract  Article 29    The total value of the Contract for the Procurement  Installation and Commissioning of the  System  in all aspects compliant with the subject of the contract of Article 1 of this contract  shall    amount to  in writing    euros denars  to which the VAT is calculated in the  amount of  in writing    euros denars  or a grand total of  in writing     euros denars     Pay
7.    The reporting of an assault theft will activate a clear audio and video signal in the Controlling  Centre which will maintain the alarm until the dispatcher confirms the message receipt  The  vehicle that has sent the message for reporting an assault theft should clearly indicated in the  call list  When such message is sent by the vehicle  the vehicle s current position will also be  sent  The reply from the OCC  that is  the confirmation that the alarm was noticed  is sent back  as an encoded message on the driver s display in the moment when the dispatcher will confirm  the message receipt     Message for reporting an accident extra ordinary situation    This function will be assigned to a button in VCU and should be easily selectable at any  moment  The selection of this function will send a message to the Control Centre  At the same  time the vehicle s current position on the route will also be sent  The message will initiate a  specific audio and video signal to the Dispatcher of the Control Centre     Communication between the Control Centre and the Vehicle    The communication between the OCC and the vehicle will be in most case automatic  The  standard communication will entail sending data to all vehicles via the so called GPRS  communication system at specific time intervals which may be altered but initially fixed at 10  seconds as default setting  The time interval may have different values for so called  regular  operation  and  backup operation   The time in
8.   Procurement of the Public Procurement Bureau and the Official public medium of the EU or in  the appropriate business publication or technical and professional newsletter available to the  wider international professional and other public     4 1 3 This procedure shall not be realised through electronic means via Electronic system for  Public Procurement  ESPP   except in the part of electronic auction which shall be  implemented via ESPP  https   www e nabavki gov mk      4 1 4 More details about the use of the electronic means for domestic and foreign economic  operator  In order to participate in the electronic auction please register yourself on ESPP  The  economic operator can register on the ESPP by filling in a registration form   comprising part of  ESPP   and ESPP shall automatically process the data from the registration form  generate  code and submit it on the registered e mail of the economic operator  More details on the  registration and use of the system can be found on the web page  https   www e   nabavki gov mk  and in the ESPP Manual dedicated for the economic operators which can be  downloaded from the ESPP main page in the part    Economic operators        4 1 5 More details about the electronic auction  Contracting authority shall use electronic  auction as a final phase of the open procedure  The initial price on the electronic auction shall  be the lowest price of the accepted offers in the first phase of the procedure  The subject if the  electroni
9.   The Training Plan should contain the detailed content of the training   prerequisite knowledge of the trainees  number of trainees per training  training duration   schedules per days and groups and similar     The Training Plan should envisage     Training for bus drivers    The Bidder should provide training for the drivers on how to use the devices which are part of  this System and are installed in the vehicles  The training should include       System sign in      Bus line  direction  shift selection      GPS system control operations      Sales of POS  penalty fee  tickets      Communication with the Control Centre     Driver sign out       Report on the daily turnover     Training for dispatchers    The training of the dispatchers will be carried out by using the application for dispatchers and  should include       Vehicle monitoring     Vehicle management     Communication with vehicles   e  Training for the tariff management personnel    The training for the tariff management personnel should cover the operation of the smart  ticketing application     Training for the controllers    The training for the controllers will be carried out by using the passenger controlling devices and  should include       Controller sign in     Ticket control     Issuing penalty fee tickets to passengers without tickets     Data transfer to the OCC     Controller sign out       Training for the system administrator  The training of the system administrator should include     Familiar
10.   Therefore  subject to  the evaluation shall be the total offered price including import customs fees and excluded VAT     4 2 2 Bid price shall be written with numbers and letters     4 2 3 Providing certain offer contains unusually low price   significantly lower than real market  price rising suspicion regarding realisation of the Contract  the Contracting Authority shall  require written explanation on details of the offer regarded as relevant to justify the price of the  offer  prior to the rejection of the offer  Providing the economic operator can not explain in  writing the reasons for such offer within 2 days of the date of submitting the request  or the  Committee decides not to accept the explanation  the offer shall be rejected     4 3 Bid currency    4 3 1 The bid price shall be expressed in denars or in Euros  The Macedonian denar shall be  used as a currency for bid evaluation purposes  The exchange rates used shall be the  exchange rates of the National Bank of the Republic of Macedonia  and the rates of exchange  shall be those applicable 14 days before the final deadline for bid submission     4 4 Deadline  manner and conditions of payment  4 4 1 The bidder shall accept the following deadline and manner of payment     The bidder shall agree for the Contracting authority to pay the Total amount for purchasing of  the System to be paid on 3  three  equal instalments     The manner and deadline of the payment shall be defined in the Contract for the procuremen
11.   requirements defined by the Contracting authority in the Tender documentation     TECHNICAL SPECIFICATION       Part Comment    1  Automatic vehicle location  subsystem    1 2 Functions       1 2 1 Timetables       1 2 2 Monitoring       1 2 3 Information on the operation  status       1 2 4 Statistics       1 2 5 Management       1 2 6 Passenger information       1 3 Data base       1 4 Interfaces to other systems       2  Smart ticketing subsystem       2 2 Functional blocks       2 2 1 Ticketing system       2 2 2 Functions and description of  the devices          104       2 2 3 Management tools and  statistics       2 3 Data base       2 4 Interfaces to other systems       3  Joint functions and structure       3 1 Operational control centre       3 2 Communication interface       3 2 1 Organisation of wireless data  communication       3 2 2 Ways of communication       3 3 System administration       4  Equipment  software and tickets       4 1 Equipment       4 1 1 Operational OCC       4 1 2 Vehicle equipment       4 1 3 Equipment in the Traffic  Centre for the City of Skopje       4 1 4 Autobase garage equipment       4 1 5 Interconnection with existing  equipment for informing  passengers at 10 bus stops       4 1 6 Portable ticket validation units       105          4 1 7 Equipment for issuing  personalised tickets       4 1 8 Equipment of recharging  tickets       4 1 9 Stand alone ticke vending  machines       4 2 Software       4 3 Tickets       5  System impl
12.   shall be     Documents for determination of the personal circumstance  given in point 9 of the   tender documentation     Contract Model  given in the Annex 1 of this tender documentation     Bid form 1A  given in the Annex 2 of this tender documentation     Bidder   s reference list  given in the Annex 3A in the Annex 2 of this tender   documentation     Statement Form 4A for bidder s sufficient personnel  given in the Annex 2 of this   tender documentation     Statement Form 5A for bidder   s sufficient technical personnel  given in the Annex 2   of this tender documentation     Statement Form that bidder   s Design project meets the technical specification with   Table 6A  given in the Annex 2 of this tender documentation     Statement Form 7A that bidder   s designated a work team  given in the Annex 2 of   this tender documentation     Statement Form 8A that the bidder is not subjected to   o legally effective judgment pronounced against him her for participation in a  criminal organization  corruption  fraud or money laundering  given in the Annex  2 of this tender documentation     Form 9A for the List of confidential information  given in the Annex 2 of this tender   documentation     Statement form 10A proving that the bidder accepts the conditions of the Public call    given in the Annex of this tender documentation  signed and stamped by the   bidder   s responsible person    Form 11A     Specification of additional equipment with guaranteed prices in Euros    Bi
13.   various types of mobile  tickets in the tariff systems      e The mobile phone payment method should be elaborated in details in the Preliminary  Design and the Technical Documentation of the Bidder that will be a comprising part of the Bid     In order to make the System compatible with the new generation of NFC mobile devices  the  validators must support this technology  For the purpose of increasing the security and control  when using NFC mobile devices  it is necessary to store all security information related to this  technology in the internal memory of the certified device or in the SIM card of the mobile  provider     Mobile phone payment  the Bidder should enable this feature within one year from the trial run  of the System  The Solution must be compliant with the requirements in the Tender  Documentation and readily usable for most of the population  irrespective of the type of the  mobile telephone and without any additional expenses and technical requirements     Functional Level 1  Functions and Device Description  This level covers all functions of the passenger identification devices which may be       Mobile  VCU  ticket validation devices  POS ticket sales devices  POS receipt  for drivers   as well as passenger controlling devices        Fixed  equipment for issuing personalised tickets  ticket recharging devices  independent  devices for issuing and recharging tickets  so called ticket vending machines and similar      The Contracting Authority require
14.  Authority  Several basic elements of the tables which should be created  are presented below     Network of Bus lines and Bus stops     Table of bus lines      Table of bus stops      Table of starting and ending stations  terminals      Table of garages     55    Timetables    Types of timetables  winter  summer  holiday season  by section  reduced and similar      Timetable for each bus line     Vehicle Data     Vehicle identification  garage number  registration number and similar      Technical characteristics of the vehicle  type  model  capacity  etc        Vehicle age      Vehicle status     Driver Data     Basic data  HR number  name and surname  driving shift  garage     Backup drivers per garage and driving shifts      Driver history     Communication Plans    Plans for Extra ordinary Situations     Internal Flow of Information    Interfaces to Other Sub systems    There is a need for a large number of interfaces for interconnection with other systems  apart  from the smart ticketing system  the following may be included  video information system and  video surveillance in the vehicle  system for giving way at crossroads and similar   Therefore   the Bidder should enable an open data format in the AVL Sub system and allow the Public  Partner to adapt them to interfaces of other systems     The System must be based on an open platform  i e  use the SIRI  Service Interface Realtime  Information  standard  thus enabling easy development of independent web services as 
15.  CODE  MK 07280102000288568  SWIFT  KRSKMK2X to the JSP SKOPJE   designating the following     Tender documentation fee for Public Procurement No 70 2012    The bidders who have collected the tender documentation can also collect the forms  enclosed to the tender documentation upon request sent to olgica jsp com mk     The bidders can sent their offer via regular mail or submit them in the Archives of the  Contracting Authority by 13 00 local time on 07 03 2013  the latest     Thank you in advance for your cooperation     Skopje Authorised person  31 12 2012    ll  INSTRUCTION FOR THE BIDDERS    1  Contracting Authority    The Contracting Authority is Pubic Transport Company JSP Skopje  registered in Skopje  on blvd  Aleksandar Makedonski No 10  Republic of Macedonia     2  Right to participate in the Public Call    2 1  Domestic and foreign legal entities are entitled to participate in the public call  under the  terms and conditions set out in the Law on Public Procurement  the Public Call and this Tender  Documentation    The participation in the Public Call  the domestic and foreign entities may be      individual  individual application and realisation of the Contract       individual with engaged sub contractor  s  individual application with certain parts of the  Contract realisation given to subcontractor  s       group of bidders  Consortium  submitting joint offer     Individual participation    2 2  Individual participation on the Public Call shall be in cases when
16.  STS System   The computer will enable storing and sending data to the OCC via GPRS  wireless communication  VCU will allow audio and SMS communication with the Centre       There should be one ticket validation devices  so called validator  at the front door nearby  the driver  The validator shall be comprised of reader of contactless smart tickets  display   loudspeaker  memory module  VCU communication module  as well as buttons or touch  screens allowing the selection of trip zone prior to ticket validation on bus line with  functioning zone tariff system       One POS device for selling tickets with POS receipts directly connected to the VCU  which  will register the sales in the same way as validating a ticket       GPS device for determining coordinates  and the vehicle position accordingly   75      Device for wireless communication  GSM GPRS  with the Data Centre     Audio and video display device for notifying the passengers in the vehicle  and    Digital input output interface for additional interconnection to other systems     Vehicle Computer Unit  VCU   The VCU should be compliant with the following technical and operational properties     Sufficient internal memory for storing data on   o Corridors  bus lines  bus stop locations   o Timetables   o Pricelists  tariffs   o Ticket whitelists blacklists     o Atleast 100 000 datasets on the vehicle location and at least 20 000 datasets on  ticket validations       Protection from data losses during communication in
17.  analysis of the  Enterprise     The following data  specific to the STS sub system  should be contained in the database   e Number of passengers  total number  per bus line  per corridor    e Passenger categories  number of pupils  students  senior citizens and similar    e Large clients  companies that buy collective employee tickets    e Points of sale for personalised tickets   e Points of sale for ticket recharging   e Blacklists of invalid  stolen  damaged tickets and similar   e Data on sales recharging of ticket per point of sale and ticket category   e Data on ticket validation per vehicle  bus stop  bus line  time of day and similar     e Data on distributed smart tickets per points of sale  as well as minimum required stock of  smart tickets per point of sale     67    Interfaces to other systems    A large number of interfaces  which will be elaborated below  are needed for interconnection  with other systems     Vehicle Management Sub system    The interface with the AVL Sub system is one of the basic functions of the overall system  If  needed  the STS may use information from the AVL on bus stop locations when calculating the  amount in case of tariff system with specific borders or zones or in case of a check in check out  system     Planning Systems    As already mentioned  the planning systems will be used to provide basic data such as bus line  networks  timetables  etc  The planning system will include the following       Systems for statistical data proce
18.  counting from the day of its entry into force     24    Manner of Realisation of the PPC    Article 3    The Contracting Parties agree that the Carrier of the Procurement realises the PPC in the  following manner     To elaborate the Main Project  and in case of deviation of the completion status from  the Main Project to also elaborate the Completion Status Project    To procure and deliver the equipment and the materials necessary for the installation  of the System    To deliver and install equipment of 8  eight  points of sale for the production of  personalised tickets and the sale and recharging of all types of tickets  and to deliver  and install equipment in 50 points of sale which can sell and recharge all types of  tickets    To implement training as stipulated in the tender documentation to some of the staff  with the Contracting Authority    To carry out the installation  functioning and maintenance of the equipment for ticket  personalisation and recharging    To enable the communication of all parts of the System with the Operational Control  Centre    To install 500 fiscal printers in the buses of the Contracting Authority    To install and bring into function 3  three  autonomous ticketing printers   To install 40 information displays and to bring into function 50 information displays   To provide the so called eCloud support i e  the overall server infrastructure  the  hardware and the systemic software  necessary for the unobstructed and high  performance f
19.  days from the  Contract signing     The Bidder shall be obliged to include in the Main Project a detailed technical and technological  elaborate of both sub systems within this System  the AVL Sub system and the STS Sub   system  and in accordance with the specified equipment elaborate the methods and stages for  installing the equipment     The Main Project must be compliant with the technical descriptions in the tender  documentation  and the basis for its creation is the Preliminary Design that the Bidder will  enclose to the documentation for participation in the public procurement  The Main Project  should take into consideration the requirements concerning the required System capacities  as  well as the conditions and deadlines for its implementation     Within the Main Project  the Bidder shall be obliged to submit also     A Detailed Training Plan for the System users      System Inspection and Testing Plan      Plan and procedures for regular system maintenance      Plan and procedures for corrective system maintenance     These appendices must be in compliance with the request of the Contracting Authority and the  technical description in the tender documentation     The approval of the Main Project will be given by a Commission established by the Contracting  Authority     System implementation in stages and System acceptance    The implementation will be carried out in predefined stages with deadlines and schedule  envisaged in the System Implementation Plan     
20.  domestic or foreign legal  entity submits offer and implements the Contract for automatic vehicle location system and  smart ticketing system in JSP Skopje vehicles  hereinafter  Contract      2 3  In case when the selected most favourable bidder is foreign legal entity  it shall be bound to  provide Service Centre in Skopje  Republic Macedonia not later than 7 days prior to signing the  Contract  and it shall be responsible for equipment servicing and functioning of the System  subject to this Contract     2 4 Providing the bidder     foreign legal entity does not provide Service Centre referred to in the  sub point 2 3  the Contracting Authority shall sign the Contract with the second best bidder and  activate the Bid Guarantee from the most favourable  first ranged  bidder     Individual participation with engaged sub contractor  s    2 5  Individual participation with subcontractor  s in the Public call shall have domestic or foreign  entity providing it submits offer but engages other domestic or foreign entity as subcontractor for  the realisation of the Contract as sub contractor for certain parts of the Contract and regulate  the relationship for such engagement with separate Contract     2 6  In cases referred to in the sub point 2 5  of this Tender documentation  the offer must list  each sub contractor  s  and the Bidder shall submit the documentation referred to in the point 9  of this tender documentation  proving that the sub contractor  s fill in the condition
21.  in the  vehicles    To submit a detailed description of all the installed software components    To submit the flow charts of all the functional interdependencies and interrelations of the  installed hardware and software components    To submit all the relevant technical descriptions  sketches and flow charts    Before commission of the System to enter the data on the coordinates of the bus stops   lines and bus stop distances    In the shortest possible period and without obstructing the operation of the System to  replace the appropriate parts of the equipment or the integral equipment that shall  manifest an error originating from the same reason twice within a period of one year  from the temporary commitment    Before commencing the installation of the equipment  to submit a certificate of  electromagnetic compatibility     Article 24    In order to realise the PPC  the Carrier of the Procurement undertakes      To elaborate the Main Project  and in case of deviations from the completion status of  the Main Project  to elaborate a Completion Status Project      To procure the equipment and the materials      To implement the equipment and the software      Toimplement the training according to the Training Plan      To inform the passengers about the usage methods of the System      To procure all the types of tickets      To carry out the installation and functioning of the equipment for ticket personalisation  and ticket recharging      To organise the passenger comp
22.  information  signed and stamped in accordance with the  Instructions     the Form shall be filled in  stamped and signed by all Group members    The Form shall be copied in case of bigger number of group members who submit joint bid  that is  larger  number of information    The Form shall be filled in  stamped and signed only by the bidders submitting the Joint bid     99    Form 3A           Automatic vehicle location system and smart ticketing system       BIDDERS    REFERENCE LIST       Form 3A    Reference list     contract s  of implemented projects with the offered Solution with at  least 250 buses operating on city lines in an EU Member State  with average min  120 000   hundred and twenty thousand  transactions  validations  per day  operational in the past 3  years  with amounts  dates long wit minimum 1  one  confirmation of satisfactory  implementation    ANNEX  The certificates issued and stamped by the Contractor verifying that the delivered works  subject to this Public Call have been implemented by the bidder and that they are operational  with high   quality  the installed inner equipment is manufactured by the bidder    The certificates must be contain Contractor s memorandum with accurate name and address of the  Contractor  Contractor s certificates must be stamped and signed by the Contractor   s responsible  person  Providing the certificate is issued in foreign language  the bidder shall submit translation of the  certificate into Macedonian language p
23.  is not manufactured  anymore  and the procurement of spare parts and maintenance is also difficult     Hence  there is a need to realise a project for contemporary  efficient and well maintained  vehicle location system  regulation and control of the transport service  as well as introduction of  a contemporary system for ticketing  monitoring and controlling the transport of passengers   thus providing a contemporary system thereof     The introduction of an automatic vehicle location system and a smart ticketing system is  expected to achieve many economic and social benefits  Such benefits will arise from  increasing the quality of transport services  strictly following the prescribed timetables  as well  as allowing timely corrections and reducing the waiting time in accordance with the existent  traffic situation in the City  Concerning the ticketing  this project will enable easy and swift  ticketing by reducing the delay time at the bus stops  Also  there is a possibility to establish  various payment methods  possibility to introduce various tariff systems   Concerning the  notification of passengers  the benefits are expected in the timely provision of audio and video  information on bus arrivals at the bus stops via the information displays at such bus stops  as  well as via SMS messages and the Internet  One should not neglect the fuel savings due to the  transport rationalisation and the reduced stopping time of the vehicles at the bus stops  thus  reducing air p
24.  more trusting in the System and use it more actively     Notifications during Trips    Notification of passengers during the trips includes providing information in vehicles and at bus  stops     Notification in Vehicles  The following information should be provided to the passengers     Next bus stop  on the display inside the vehicle        Next bus stop  automatic audio message over the vehicle P A   public announcement   system        The notifications shall be on the internal displays  if any are available in the buses  as well  as via an audio public announcement system     e The System should enable interconnection to other electronic devices for notification of  passengers in the vehicle  such as TFT monitors on which the trip route and other trip related  parameters may be monitored     Notification at Bus stops    Currently  there are 10 three line one sided information displays at 10 bus stops in Skopje with  higher volume of passengers  which are part of a separate system  The AVL System should  allow interconnection and integration of these information displays with the 40 information  displays which are subject of this procurement  The current operator of the existing information  displays will provide all required data to the Bidder who will be awarded this public procurement   such as hardware information  used protocols and similar  The displays should show the arrival  time for a specific vehicle at the bus stop  bus line number  direction of the vehicle  e
25.  obligations     2 13  Within the procedure for awarding Contract for public procurement  each bidder can  participate with a single offer  All offers shall be dismissed providing the bidder       participate in more than one offer either individually and or as a Consortium member       participate as sub contractor in other individual offer and or offer submitted by a  Consortium     3  Subject of the Public Procurement Contract    3 1  Subject of the Public Procurement Contract  hereinafter  PPC  shall be purchase   installation  servicing of the automatic vehicle location system and smart ticketing system in 500  JSP SKOPJE vehicles  including installation of 3  three  smart ticketing machines on locations  in the City area  hereinafter  System   in accordance with the conditions defined in the Tender  Documentation     The System comprises of two systems  sub systems    e automatic vehicle location system  regulation and control over the transport service  and  e electronic  intelligent  ticketing system so called smart tickets     4 1 Type of procedure for awarding Public Procurement Contract    4 1 1 Public Procurement Contract shall be awarded by applying international public call upon  an open procedure  which shall be finalised by electronic auction as a final phase of the  procedure     4 1 2 Call for awarding the Public Procurement Contract No  70 2012 in question shall be  published in the Official Gazette of the Republic of Macedonia  Electronic System for Public
26.  post may also be used as a standard work position without the  need of additional adaptations and without any limitations     1 head dispatcher who will coordinate the work of the dispatchers and will manage the  passenger notification sub system     1 administrator  computer network administration  adding new users  assigning user  privileges  monitoring the system for communication and data exchange among the OCC   vehicles  garages  points of sale and similar   The administrator will detect and attempt to  rectify small faults in the System     1 position for data updates  entry of new and update of existing data  storing and retrieval of  stored data      3 traffic engineer positions  performing expert tasks related to drafting and correcting  timetable  traffic flow analysis  traffic modes in case of extra ordinary situations  traffic  related control and analysis      1 tariff management position  performing tasks related to the tariff systems  draft pricelists of  services  ticket types  passenger categories  passenger control methods  etc       1 position for preparing the calculations  preparing and controlling the data required for  conducting and drafting the calculations      1 head of the AVL Sub system   1 head of the STS Sub system   1 head of the Operational Control Centre     OCC     All posts require equipment with same quality and performances that may be used  irrespectively of the post  it should not be dependent on the hardware  but rather on the  appli
27.  procurement  carrier  Provided Performance guarantee for timely and high quality implementation of the  Contract is invoked  the Contracting authority shall publish negative reference on the ESPP     15 3  Performance guarantee for high quality System functioning in the warranty period    15 3 1  The most favourable bidder bounds to submit Performance guarantee for high quality  System functioning in the warranty period     15 3 2  The guarantee should contain a clause that it is non puttable  unconditional  payable on  first call and without objection right with a possibility for partial realisation and renewable to a  amount of 15  of the offered price in the final Bid     15 3 2  Guarantee referred to in the sub point 15 3 1  shall be submitted within 7 days from the  date of final acceptance of the System and it shall be valid for 30 days after the Contract validity  date     15 3 4  The Guarantee referred to in the sub point 15 3 1  shall be renewable each 12 months     15 3 5 The Performance guarantee for high quality System functioning shall be invoked in  cases and in a manner set out in the Contract     16  Criterion for awarding a public procurement contract  Economically most favourable   bid     16 1 The acceptable bid shell be the one fully satisfying all conditions and mandatory minimum  requirement s for proving bidder   s capability defined in the tender documentation    16 2 The most favourable bidder shall be the one offering economically most favourable of
28.  should be enabled  e g  if the user clicks on a vehicle  in the GIS overview  new window  giving more vehicle details  should appear     All functions and operational dialogues  displays and reports should be in Macedonia     Overview of system users    The data link connecting the OCC with the Bidder s Data Centre must provide real time data  download for at least 500 vehicles  The hardware infrastructure of the Data Centre should be  scaled in such a way that 30  increase of envisaged vehicles will not deteriorate the  application performance  In other words  the hardware infrastructure should be scalable     Apart from the OCC users who will have access to the System via an independent network that  will be realised within this Project  access should be provided to other users as well       To the users of the existing computer network of JSP Skopje  at least 30 concurrent  users        To the users of the existing computer network of the City of Skopje  Traffic Department   10 concurrent users        To the users of the existing computer network of Sloboda Prevoz  10 concurrent users      To the users of the existing computer network of Mak Express  10 concurrent users        External users  citizens  will have access via Internet and via the SMS Server  at least  200 concurrent users      The system users will be divided into groups and access rights will be assigned at group level   Users will have assigned access for specific tasks  for instance  entry and modificatio
29.  subject within 30 days from the date of receipt of the detailed explanation on the dispute  each  of the contracting parties shall retain the right to initiate proceedings before the competent court  in the Republic of Macedonia to resolve the dispute     Confidentiality  Article 52    The contracting parties  their employees and consultants hereby agree that they will treat as  confidential all documents related to this Contract  including the Contract itself  information of    39    technical and commercial nature  as well as the documents related to the financial and other  indicators related to the PPC  and shall prevent access to third parties thereof  except in cases  where it is required by the valid regulations in the Republic of Macedonia or when they need to  be presented before competent authorities in order to obtain the resepctive approvals and  permits related to the PPC    The obligations of the contracting parties stipulated in this Article shall remain in force after the  Contract termination     Notifications    Article 53    All notifications between the contracting parties will be in writing and will be delivered by courier  or via registered mail     Amendments and supplements    Article 54    The amendments and supplements to this Contract will be made in writing in a form of an  Annex to this Contract  in accordance with the Public Procurement Law and the Contractual  Law     Separability    Article 55    If any of the provisions in the Contract  is fu
30.  the transporter s central system  OCC  is to manage the processes at this level  and communicate with Level 3  Both levels  2 and 3  represent a so called back office that  entails management and administrative functions     The charging system functions at this level are comprised of       Collection and control of acquired funds in cash including a complete security system and  exact determination of revenues       Management of charging media     Collection of damaged smart tickets     Complaint handling service     Functional Level 3    The charging system centre is located on this level  In the beginning  after the implementation  of the AVL and STS System  levels 2 and 3 will represent one logic unit until there is only  transporter in the System  JSP Skopje  When other transporters join the System  the levels will  be separated and the overall level 3 access control will be transferred to the City of Skopje  The  following functions will be executed at this level       Central settlement point  calculation for revenue distribution      Central coordination of transporters     Central management of data  control and maintenance thereof       Collection of traffic and revenue data on each bus line  preparation and calculation of  revenues       Marketing and passenger information     Analysis  planning and development     Apart from these functions  functional level 3 should provide     Calendar with details on the automatic tariff system change     Collection of statis
31. 0  two hundred thousand   EUR    In case the Carrier of the Procurement fails to ensure functioning of the complete System in the  period between the final acceptance and the expiration date of the Contract  or fails to rectify  the shortcomings that have occurred within the deadlines set in accordance with the Plan and  Appendices 3 and 4 and Article 4 of this Contract  due to reasons that may not be attributed to  the Contracting Authority  the Carrier of the Procurement shall be obliged to pay to the  Contracting Authority a fine of 4 000 EUR expressed in equivalent denar value according to the  middle exchange rate of NBRM at the day of payment for each day after the deadline  and not  more than 400 000  four hundred thousand  EUR    The Carrier of the Procurement shall not be obliged to pay a contractual penalty in case the  non fulfilment of the contractual obligations or the violation of the deadlines were not due to its  fault        Mutual Contract termination  Article 37    The contracting parties may decide to terminate the PPC with mutually agreement by both  contracting parties  irrespective of the realisation status  at any moment  and in such case they  shall determine the conditions and consequences of the termination  as well as resolve their  mutual rights and obligations arising from this Contract    Only a written agreement on the termination between the contracting parties will have a legal  effect     36    Unilateral Contract termination  Article 38    
32. 13 6  The bidders may not modify  replace or withdraw their bids after the final deadline for bid  submission     14  Bid expenses    The bidder shall take all the expenses related to preparation and submission of the bid  and the  Contracting authority shall not be held responsible for those expenses  regardless of the Bid  procedure and results from the Public procurement     The expenses rising from the bid preparation and submission shall be borne by the bidder and  they shall not be recognised     The bidder shall borne the risks related to bid submission  including force majeure     15    15  Bid financial guarantees    Bid financial guarantee shall be   e Bid guarantee   e Performance guarantee for timely and high quality implementation of the System  and  e Performance guarantee for high quality System functioning in the warranty period     The guarantees shall be issued in Euros or in denar counter value as per the average  exchange rate of the NBRM on the day of its issuance     Providing the bidder submits guarantee from foreign bank  it should be acceptable for the  Contracting authority     The financial guarantee shall be entitled to the Contracting authority     Basic information about the Contracting authority      PUBLIC TRANSPORT COMPANY SKOPJE     Skopje  Republic of Macedonia      bul     Aleksandar Makeodnski    No 10      Unique registration number 4057040     Unique tax number 4030955261 454     Denar bank account  280 105 100 714 312  Foreign currency 
33. ATE    IV  TECHNICAL SPECIFICATION    V  FORMS       INVITATION TO SUBMIT A BID  PUBLIC TRANSPORT COMPANY      JSP SKOPJE  number and date    JSP SKOPJE  NQP SHKUP       INVITATION TO SUBMIT A BID    Dear Sir Madam     PUBLIC TRANSPORT COMPANY     JSP SKOPJE with an address at bul  Aleksandar  Makedonski No  10  Skopje  hereinafter  Contracting Authority   contact telephone number   389 2 3174 979  working hours 7 to 15 00   fax 389 2 3174 260 e mail  nenad jsp com mk   contact person Nenad Kuzmanovski  needs to procure automatic vehicle location system and  smart ticketing system in JSP Skopje vehicles     For that purpose  the contracting authority  hereby  implements procedure to reward a  Public procurement contract for works using an open procedure  in accordance with article 64 of  the Law on Public Procurement     Official Gazette of the Republic of Macedonia    no  136 07   130 08  97 2010  53 2011 and 185 2011   and therefore it published the advertisement number  70 2012     We kindly ask you to submit to us your bid for the above subject of the public  procurement contract  Enclosed to this invitation please find attached the tender documentation  which contains and information which will help you to prepare the bid  The tender  documentation costs 3 090 00MKD 50 00 Euros     The aforementioned fee shall be paid to the following bank account of the Contracting  Authority  Denar account 280 105 100 714 312 Alpha Bank AD Skopje  that is foreign currency  account IBAN
34. After the completion of each stage  the Acceptance Commission will perform acceptance of said  system implementation stage  The acceptance will include quantitative equipment acceptance  and qualitative acceptance by verifying the functionality  The acceptance will always be  conducted in the presence of Bidder s representatives  After the acceptance has been  completed  the Commission will draft a Report on its activities in a form of Minutes  and after all  members of the Commission and the Bidder s representative sign it  one copy will be sent to the  Bidder     During the quantitative acceptance the Commission will check the delivered and installed  equipment and will review the enclosed certificates of the manufacturer  If it is established that  the equipment is damaged  not new or if part of the equipment is missing  the Contracting    83    Authority and the Bidder will draft Minutes stating the facts discerned during the on site  verification  Any shortcomings or damages on the equipment and its parts that have occurred  during the delivery due to fault of the Bidder will be rectified by the Bidder in the shortest time  possible at his expense  The equipment and parts thereof which have not been delivered nor  installed due to mistake will be delivered and installed in the shortest time possible in  accordance with the Main Project and at the Bidder s expense     During the qualitative acceptance the Commission will check the functionality of the System   The check w
35. At those points of sale  the passengers will also be able to submit  complaints concerning their smart tickets     Equipment for recharging smart tickets    The equipment for recharging smart tickets is a device that is comprised of components for  reading and writing on smart cards  Also  this device should contain a part for communicating  with the Data Centre     e The Contracting Authority has envisaged procuring 58 such devices     Standalone devices for issuing and recharging tickets without an operator  so called  ticket vending machines    These devices are completely stand alone and will help the passengers procure a ticket at any  time of the day by self service  Three  3  such devices will be distributed in accordance with the  requirements of the Contracting Authority at locations of interest where passengers should have  the opportunity to recharge their smart tickets without the presence of an operator  24 hours a  day  These devices should issue empty smart tickets and recharge existing smart tickets  and  the payment may be completed by using coins  banknotes and credit debit cards  Therefore   each of these devices should be able to perform the following functions       LCD screen and possibility for user interaction      Provide audio support      Contactless smart card reader and writer      Printer of smart cards     Reader of bank cards with magnetic strips or chips     Built in thermal printer      Accept coins and banknotes      Return coins      Multi 
36. ER DOCUMENTATION FOR PROCUREMENT   INSTALLATION AND MAINTENANCE OF AN AUTOMATIC VEHICLE  LOCATION SYSTEM AND SMART TICKETING SYSTEM OF JSP  SKOPJE    Introduction    The Vision and Mission of JSP SKOPJE  hereinafter  JSP  is to become an efficient   contemporary organised and rational enterprise that will meet all needs of the citizens for a fast  and efficient public inner and outer city transport  JGPPP   thus providing normal functioning and  performance of everyday duties of the citizens  legal persons and state bodies existing in the  City of Skopje     The inner and outer city system for mass transportation of passengers is a very complex  system and its survival requires long term  optimal  permanent and high quality solutions for  improving the system  the service quality  the efficiency and the management  It is necessary  to increase the attractiveness of the public transport for the citizens and the visitors of the  capital city    At the moment  there is no single communication system for traffic control and management   but JSP vehicles are partially equipped with a radio telecommunication system and are  connected to a Dispatching Centre which controls and regulates the traffic only on the lines  maintained by JSP  whereas the private transport vehicles are not part of such management  system  Additionally  the ticketing system is obsolete and is performed by validating paper tickets in  the vehicles  The validation devices are over 20 year old technology  which
37. OR BIDDER   S SUFFICIENT TECHNICAL CAPACITY         hereby declare to have sufficient technical capacity to perform the contracting    requirements in the Public Call  Automatic vehicle location system and smart ticketing  system           Signature of the    Date  responsible person       stamp       The Form shall be filled in  signed and stamped in accordance with the Instructions  along with the requested evidences enclosed     In case of joint bid  the filled in Form shall be signed and stamped by all Group  members     102          Form 6A          Automatic vehicle location system and smart ticketing system       STATEMENT FORM THAT BIDDER   S DESIGN PROJECT MEETS THE  TECHNICAL SPECIFICATION IN THE TENDER DOCUMENTATION         hereby declare that the submitted Design project    Automatic vehicle location system  and smart ticketing system    meets the whole minimum technical requirements defined  by the Contracting authority in the Technical specification of the Tender    documentation        Signature of the  Date  responsible person    stamp       The Form shall be filled in  signed and stamped in accordance with the Instructions    along with the requested evidences enclosed   In case of joint bid  the filled in Form shall be signed and stamped by all Group    members     103       Table of Form 6A    NOTE FOR BIDDERS     In the column    Comment     the bidder shall write the number of the  Annex page paragraph of his her Design project meets the minimum technical
38. Personal circumstances      Capability to perform a professional activity      Economic and financial circumstances      Technical or professional capability     The requested documentation shall be submitted in original or as a copy verified by the bidder   stamped and signed by the authorised person  with a notification    Authentic to the original        When examining the completeness and validity of the documents for verifying the bidders     capability and during the bids    evaluation  Public Procurement Committee may request  clarifications of submitted and additional documents from the bidder  providing there is no  significant deviations from the requested documents     No changes to the bid  except correction of arithmetic errors may be requested or allowed by  the commission or by the economic operator     9  Proving the capability  9 1  Personal circumstances    9 1 1 The contracting authority shall exclude from the procedure for awarding a public  procurement contract  any economic operator that       Within the last five years has had a legally effective judgment pronounced against  him her for participation in a criminal organization  corruption  fraud or money  laundering       Is subject to a bankruptcy procedure or a liquidation procedure     Has unpaid taxes  contributions or other public dues       That has a criminal sanction for performed criminal acts for legal entities or side  sanction involving prohibition to participate in public call proceedings  
39. Transmission Equipment    The Bidder should envisage and list in the Preliminary Design all necessary equipment for any  kind of communication between the Data Centre and the other components of the System     Vehicle Equipment    The equipment should be able to operate in harsh conditions characteristic for the public  transport vehicles  vibrations  low and high temperatures  humidity  dust particles  mechanical  shocks  electromagnetic fields  vandalism           Electromagnetic compatibility means that the equipment in the vehicle does not interfere in the  operations of other electronic devices and systems  mobile telephones  radio and TV signals   traffic light management system  in vehicle internet hotspot devices and similar  and vice versa     The Bidder will provide adequate certificate confirming that the equipment satisfies the  conditions in the buses and is electromagnetically compatible     The equipment installed in buses should be firmly fixed in place  but should be easily  assembled and disassembled by experts in case of parts failure  Also  the equipment should  have round edges for the purpose of avoiding passenger injuries     Basic components of the vehicle equipment are as follows       Vehicle driver computer unit with sufficient memory which may store all data necessary to  the functioning of the System  pricing tables with various tariffs  corridors  bus lines   timetables and other operational parameters required for the functioning of the AVL and 
40. When this Contract expressely states that the Contract will be deemed as terminated  or there  is a possibility to unilaterally terminate the Contract  as well as in other cases when one of the  contracting parties fails to meet its responsibilities undertaken with this Contract  in a manner  and under conditions and deadlines envisaged thereof  the Contract will be deemed as  terminated  when one of the contracting parties will immediately inform the other contracting  party  in writing  the it deems the Contract as terminated    By exception from paragraph 1 of this Article  in case when the Contract does not envisage  additional deadline for meeting the obligation  one contracting party may maintain the Contract  in force  if it immediately informs the other contracting party that it provides an extended  deadline for meeting the undertaken responsibilities    If one contracting party allows the other contracting party an extended deadline in order to meet  the undertaken responsibilities  and the other contracting party fails to meet the obligations  within said deadline  the Contract will be deemed as terminated after the expiry of the extended  deadline    The extended deadline referred to in paragraph 2 of this Article shall not prevent the  Contracting Authority to collect the contractual penalty referred to in Article 36 of this Contract     Unilateral Contract termination by the Carrier of the Procurement  Article 39    The Carrier of the Procurement may terminate t
41. according to line  bus type   garage  transport  and similar      The application must allow updates to the database concerning fuelled up buses  Also  the  application will allow free generation of reports by using any of the data fields available in the  database  for instance  the report should include fields for covered distance  tanked fuel  quantity  lost one way trips and transported passengers     number of validations for specific  period per bus or for a defined group of buses      It should be possible to define data  object  for  on time  vehicle arrival  e g      1 min  of the  envisaged timetable      All reports should be easily exported into various formats  Excel  PDF  XML and similar      Log Files    All events are kept in the so called log file  The log files should be easily exported into various  formats  Excel  PDF  XML and similar      Operational Log    All operational and technical data  including irregularities such as accidents  sub system parts  failures and similar  registered by the AVL System  must be chronologically recorded in the  operational log  indicating the date  time  workstation  and responsible dispatcher in the Control  Centre  Maximum deviations  including event time and location  must also be recorded  The  operational log must be stored in real time and be included in the regular data backups     The application should enable log overview by certain criteria  e g  vehicle code  bus stop code  and similar   as well as by time para
42. account  IBAN CODE    MK07280102000288568  SWIFT  KRSKMK2xX   Alpha Bank AD   The Contraciting authority may not return back the financial guarantee prior to the validity  deadline     Providing there is an extension of the deadlines of the contracting obligations during the  Contract implementation  the validity of the Guarantee for timely and high quality System  implementation and Performance guarantee for the high quality System functioning     15 1  Bid guarantee    15 1 1  As part of the bid  the bidder shall provide a bid guarantee in the amount of at least 2   of the total bid value     15 1 2  The bid guarantee shall be in the form of deposited funds or in a form of bank  guarantee  issued by a banking institution selected by the bidder and acceptable by the  contracting authority    15 1 3  The bid guarantee shall be in the form of deposited funds by the bidder  the funds shall  be transferred to the following gyro account 280 105 100 714 312 in Alpha Bank     15 1 4  In case of bank guarantee  it should   a  contain non puttable  unconditional  payable on first call and without objection right   6  be submitted in original  copies shall not be acceptable      B  be valid upon the end of 14 days for the first ranked bidder  including the date of  Contract signing     r  for all other bidders who participated in the procedure for rewarding PPC  it should be  valid until the 7 day from the date of adoption of decision for the most favourable bid     15 1 5  Each bid t
43. ays the latest prior the final deadline for bid submission     10 2  Interested bidder may require clarifications of the tender documentation  tortuousness or  omissions  thereof in writing addressed to  bul  Aleksandar Makedonski No 10  fax  389 2 3174  260  or on e mail address nenad jsp com mk designated     Questions to the Public  Procurement Committee       10 3  Additional clarification via telephone or verbally is not be allowed     10 4  Clarifications shall be submitted to all interested bidders within 3 days who collected the  tender documentation  without disclosing the identity of the interested bidder requesting the  clarification     10 5  All additional information and clarifications related to the bid shall in writing present  comprising part of the tender documentation     11  CHANGES AND ADDITIONS TO THE TENDER DOCUMENTATION    11 1  The Contracting authority shall retain the right to  no later than 6 days before the  expiration of the final deadline for submission of the bids  to make changes or additions to the  tender documentation  about which it shall inform all economic operators that have acquired the  tender documentation    11 2  In case of modifying the tender documentation  the Contracting authority can extend the  final deadline for bid submission on request by the economic operator and it shall allow at least  6 working days for submission of bids after having disclosed the clarifications additions to the  economic operators     11 3  In case o
44. be given way at crossroads  For that purpose  each  vehicle should be equipped with a device that will communicate directly with the signalling  system at the crossroads  using the vehicle GPS data  The AVL System should be upgradeable  and able to connect to this System  The Bidder should make available the GPS positioning of  the buses to the TMS System  as well as put at disposal all necessary protocols and other  technical documentation  and the interface between these two systems will be provided by the  supplier of the TMS System     57    Smart Ticketing Sub system with Contactless Cards  STS     Introduction    The Public Transport Smart Ticketing Sub system should enable unique way of monitoring   managing  controlling and clearing of collected assets     This Sub system should enable use of the existing  but also of various tariff systems  The use of  this System will tend to increase cashless charging  as well as introduce a unique payment  system for the overall public transport in the City of Skopje     Functional Blocks   The STS Sub system will be comprised of two main functional blocks      Ticketing system  and     Administrative system    The following points describe all main functions of this Sub system   Level 3     Centre for Monitoring and Management of the Charging    System  e centralized calculation    e centralized coordination of transporters    e central data management and maintenance  e user and ticket data protection   e marketing and user noti
45. c auction shall be the total price including the costs and discounts  import customs fees  excluded of VAT  that is  initially submitted prices of all qualified bidders  Prior to the electronic  auction realised in a procedure where the most favourable bid was selected  the Committee  shall perform full evaluation of the initially submitted bids  awarding points for each criteria  element of the economically most favourable bid  Based upon the conducted evaluation and  awarded points  initial ranking list is established of all qualified bidders  The bidders can  decrease their initially submitted prices on the electronic auction and increase the awarded  points of the element price whilst the other elements remain unchanged during the e auction  and after it  Invitations for e auction shall be sent in an electronic form via ESPP after the  complete evaluation of the initial bids  to all economic operators who had submitted acceptable  bids in the first phase of the procedure and who are registered in the ESPP     Invitation for participation in the auction shall be sent electronically on the e mail addresses of  the contact person given in the Offer Form and who shall be pre registered in the ESPP     4 2 Bid price    4 2 1 The offered price shall contain all expenditures and discounts of the economic operator  and it shall be given without VAT  which shall be given separately  The offered price shall  include all import fees  if applicable  and they shall be given separately
46. cation used      This is the minimum level of operational posts in the OCC and adequate expansion thereof  should be possible     Basic requirements related to the user interface    The user interface should be compliant with the Windows standards  i e  functions and objects  should be selected using a mouse and a keyboard  For each entry  the System will provide  adequate response  In most of the cases  the result of any action should be shown immediately   and in case of delays due to processing  an indicator should be shown suggesting that the  System is processing the request  In any case  the longest delay of the System response  should not exceed 10 seconds     The basic version of the application should contain all necessary tools depending on the user  privileges  Each function should be linked to an additional help function which describes it  accordingly     Each user should be able to make individual adjustments related to the user profile which will  be visible every time said user signs in the System  e g  font used and similar   The colours and  symbols should be the same for all posts and must not be individually altered  Reset function  should exist  i e  returning to default settings should be available     All modifications of the input parameters  bus lines  bus stops  timetable and similar  should be  entered only once  and the application should automatically use such data in all required  overviews and reports     Fast transfer from one screen to another
47. cting Authority to  the Supplier  shall cover  aside from renting the hardware  system software and database     13    maintenance  after sales support  of the application software  applications for Automatic  Vehicle Location and Smart Ticketing   as well as the overall costs for the generated GPRS  traffic     Accordingly  the following issues should be carefully reviewed     Responsibility for the data      Responsibility for functioning of the system      Allocation of user rights      Data protection      Data archiving      Time synchronisation  etc     The System must be designed in such a way as to be adaptable to the eventual modification  required by the Contracting Authority     Archiving    Current data in the System should be archived at regular time intervals  This way  the System  may be restored to a previous state in case of failure  The interval and method for data backup  should be configurable     The data should be archived automatically on a daily basis  and a software tool for easy  restoration of the archived data should also be provided     Time Synchronisation    The Bidder should envisage time synchronisation between the OCC and all vehicles and other  active objects in the System  points of sale  controlling devices  information displays and  similar      Equipment    Presented below is the framework description of the equipment that should be owned by the  Contracting Authority  and which will enable achieving the minimum requirements for the  ope
48. d guarantee  in original      Providing the bidder applies as Consortium submitting joint offer  Statement Form 2A  from all Consortium members submitting joint bid  given in the Annex 2 of this tender  documentation      12 2 1  Type and number of forms depends on the bidder   s application  individual  individual  with sub contractor or as a Group of bidders   Consortium      12 2 2  Comprising part of the Technical documentation shall be     e Design solution as a basis for the implementation of the PPC  prepared based upon  the technical specification given in the tender documentation listing the minimum  requirements     The bidder selected as the most favourable one and who will be rewarded a Contract  shall be bound to develop a Main project based upon the Design solution  The Main  project shall be a basis for purchasing equipment  mount the equipment and software  along with the complete implementation of the System in accordance with the conditions  and requirements given in the Tender documentation     13    e Detailed equipment specification  hardware and software  shall contain     name of the equipment with basic features and minimum standards     equipment manufacturer and quantity  and    software specification     e System and Software installation dynamics divided by phases  development of Main  project  probation of the System and final acceptance of the System  which must be in  accordance with the requirements by the Contracting authority given in the tec
49. d offer does not contain confidential  information     18 3  The bid price shall under no circumstance be regarded as confidential information     19  Notifying the bidders    All bidders participating in the Public Procurement procedure shall be notified in writing about  the selection of the most favourable bid  within a period of 3 days after the decision about  awarding the Contract  Enclosed to the notification  the Contracting authority shall submit a  copy of the decision and justification  thereof     20  Legal protection    Each bidder  along with any economic operator who collected tender documentation  can at any  time during the procedure submit claim to the Public Procurement Committee and  simultaneously to the State Committee acting upon complaints from public procurements     Unsatisfied bidders along with the entities who have collected the Tender documentation are  entitled to submit a complaint against the Decision for selection     21  Rights and obligation of the Contracting authority and the bidders    Mutual rights and obligations of the Contracting authority and the bidder related to the  realisation of the PPC shall be defined in the PP Model Contract  enclosed to this Tender  documentation     22  Signing the PP Contract    PP Contract shall be signed with the most favourable bidder  after the finalisation of the  Decision for selection of the most favourable bidder  in deadline not longer than 180 days from  the day of opening the bids     Contracti
50. date  time  vehicle    71    garage number  message text and similar      For each message type  there should be a possibility to have an accompanying sound in the  driver computer unit     Sending encoded instructions to the driver should also be envisaged     Apart from the text messages from the Centre to the driver  the System should provide direct  audio communication between the dispatcher and the driver  This communication may be  initiated only by the dispatcher  and it may be requested by the driver by pushing a button on  the VCU     From Driver to the OCC  Dispatching Centre     The driver should have the possibility to select a predefined message to be sent to the  Dispatching Centre  Three types of messages should be defined  reporting an assault theft   reporting an accident extra ordinary situation and other messages including a request for audio  contact with the dispatcher     The messages are displayed in the Control Centre and depending on their type may be  accompanied with visual and audio signal  The messages are shown according to priority and in  chronological order  All messages and their corresponding replies are recorded in the  operational log in chronological order     Message for reporting an assault theft    The message reporting an assault theft in the bus will be done in an inconspicuous way  e g   double short push on a button activated by the foot     When such message is sent by a vehicle  it should receive the highest priority in the OCC  
51. der  computer and laser printer      Equipment for communication with the Data Centre     Drivers  smart card readers  if collected cash is handed over there    e  Equipment for passenger notification at bus stops  Information displays will be installed at 40 10 bus stops     This system will provide the following     Data transfer management between the Data Centre and the Information Displays     Updating the displayed data       Monitoring the display status and its software and hardware functioning  whether the display  is free of faults and whether there are faulty LEDs        Transmit status information from the display to the Data Centre   e  Portable ticket controlling device    The ticket controlling device will be used by controllers when conducting passenger controls in  the vehicle  It should be lightweight  powered by high capacity battery  incorporating a smart  ticket reader and writer  Also  it should have an integrated thermal printer resistant to shocks     11    Equipment for issuing personalised tickets  The equipment for issuing personalised tickets shall be comprised of     Computer     Scanner     Digital camera connected to the computer     Smart card printer     Communication device  read write data  with smart card     Laser printer for other purposes     Smart ticket recharging device     Device for communication with the Data Centre     e 8 such points of sale should be equipped in City of Skopje at locations defined by the  Contracting Authority  
52. e  Hence  the  dispatcher   duty officer will be able to monitor how many drivers are following the planned  roster  and marked in different colour see the drivers operating outside the planned rosters     Statistics   General functions   In essence  the AVL monitors the vehicles on their designated routes    Within the software tools  the application should enable overview of the following     Sign in sign out registration  movement of vehicle or group of vehicles     o Graphic display of vehicle s movement  on a line diagram and on an  electronic map      o Passed distance in kilometres  effective  null and similar    o Movement velocity and speeding     o Completed and uncompleted one way trips  distance between the beginning  and the end of each bus line      o Number of entries in and exits from the garage     Overviews of data related to the bus line    o Deviation from the envisaged route    o Average velocity     o Elapsed time on the bus line  at the bus stop  at the terminals  and outside  the bus line       Management overview      Event overview      Overview of unprocessed requests by the OCC     Overview of information sent to passengers       Reports on equipment errors   51      Overview of SMS messages according to message type   Filtering and displaying of processed results according to various criteria must be enabled   Drafting of selected monthly or periodical reports must be enabled     All overviews must be available for a predefined group of vehicles  
53. e communication with the Control Centre  will be in both directions  The vehicle will send data to the Control Centre on its current position  in regular time intervals  the time intervals may be altered  but the default configuration will be  set to 10 second intervals   and the Control Centre will receive all necessary information  The  System should enable remote configuration of the application parameters in the vehicle by the  Control Centre     Public transport vehicles will be monitored 24 hours a day  The specific location of the vehicle  must be determined with a margin of error smaller than 20 metres in the area  In case the  communication between the vehicle and the Centre is interrupted  all data related to the vehicle  position in a certain moment should be stored in the internal memory of the vehicle computer  unit  VCU   As soon as the link with the Centre is re established  all stored and unsent data will  be sent respectively     In case a vehicle may not be located on a specific bus line  and is located on another location in  the operational area  the Control Centre should automatically receive the information on that  vehicle  and said vehicle should be indicated differently from the other vehicles     Vehicles with interrupted communication should also be indicated differently than the other  vehicles  e g  in different colour      Trip Monitoring    The AVL System should indicate a warning to the dispatcher in case a vehicle may not register  for the tri
54. e functional at a distance of several centimetres away from the validator   i e  the controlling and recharging devices     At application level  the tickets should at least store in their memory the following data     Security code and algorithm     Serial number     Ticket system number     Card user type and applicable tariff     Current money balance  ticket credit balance     Expiration date time of the ticket     Data on the last three trips  validator number  amount  date and time        Data on the last three recharging actions  added amount  transaction number  point of  sale code  date and time of transaction      Smart ticket standards  The contactless smart tickets must support the following standards   ISO IEC 14 443 Contactless Integrated Circuit Card  that is    ISO IEC 14 443     1   ISO IEC 14 443  2   ISO IEC 14 443  3   ISO IEC 14 443     4  Type A or Type B   The plastic tickets must support the AES or triple DES security standard   The cards should include a 4K read write memory     Aside from the Mifare type cards  it is desirable for the Smart Ticketing System to also use the  Calypso type cards     82    System Implementation and Maintenance  System Implementation   The System implementation will include      Main System Project      System implementation and acceptance in stages      Trial period  and     Final acceptance after completion of the trial period     Main Project    The Bidder should draft a Main Project for System implementation within 30
55. e senior  citizens tickets should not be valid when employees go to work and students go to school      These tickets  even when free of charge  must be validated while entering the vehicle     When validating the ticket  the same data should be recorded as in the case of payment with  non personalised smart tickets     Paying for a Ticket     POS receipt from the vehicle driver    Passengers who are rarely using the public transport in Skopje may pay directly in the vehicle   By paying in cash  the passenger will receive a POS receipt containing the registration and  garage number of the vehicle  as well as date and time of issuance  Such tickets will be time   limited  90 minutes from the time of issuance  and will be valid only in the vehicle where they  have been issued  These tickets will be considered as penalty charge tickets and will be approx   50  more expensive than the amount debited from the smart cards  The POS device should be  either incorporated in the driver control unit or an external device connected to the VCU in such  a way that all sales transactions are recorded in the same manner as the payments via the  validator  Also  the GPRS System will be used to transfer data from the POS reports of all  drivers  and the Centre will be able to generate adequate reports  e g  fiscal receipts of sold  tickets per driver  per bus line  per time period      Due to the long procedure for certification of a new POS  connecting some of the already  certified POS devic
56. e tariff policies and the tariff system     Possibility to integrate the tariff system for all participants of the public transport of  passengers and revenues settlement between the various entities participating in the  transport     Reducing misuse of forged tickets and monthly passes which are currently being used   and use of smart cards with better security     Collection of data on transported passengers by categories  bus lines and corridors   System simplicity and accessibility to passengers     Enabling more types of payments  discounts and benefits depending on passenger  category  number of realised trips  time of day when trips take place  and similar       Collection of various statistical data that will enable calculating the profitability of each  line and corridor with great accuracy     The sub systems will be comprised of several functional assemblies  These assemblies will be  described in more details below  The Bidder is not obliged to follow the criteria given in the  description of the individual assemblies to the letter  since only one of the possible solutions will  be presented  The Bidder is obliged to meet all required system functionalities in its solution   For the purpose  the Bidder should draft a preliminary design     Preliminary Design    The Bidder should draft a Preliminary Design which should be in accordance with all  requirements of the Contracting Authority and the technical documentation     The Preliminary Design should contain a Lo
57. egally effective judgment for participation in a criminal  organization  corruption  fraud or money laundering  pronounced against  him her    e Confirmation that he she is not subject to a bankruptcy procedure opened  by a competent authority    e Confirmation that he she is not subject to a liquidation procedure opened  by a competent authority    e Confirmation of paid taxes  contributions and other public dues issued by  a competent authority in the country where the economic operator is  registered    e Confirmation from the Registry of criminal sanction for not performed  criminal acts for legal entities or side sanction involving prohibition to  participate in public call proceedings  public procurement contracts and  contracts for public private partnership imposed against him her   e Confirmation from the Registry of criminal sanction for not performed  criminal acts for legal entities or side sanction involving temporary or  permanent ban for performing specific activity imposed against him her   and   e Confirmation that there is no legally effective judgment imposing a  misdemeanour sanction involving prohibition to perform a profession   activity or duty  or prohibition to perform a specific activity  imposed  against him her   e Balance Sheet and Income Sheet for the previous 3  three  years  2009   2010 and 2011  with positive financial results issued by the competent    authority in the bidder s country of registration  In the R M  the competent  body for issu
58. ehicle number   bus line number and name  velocity  previous and next bus stop  driver information  vehicle  capacity and similar    Printing and snapshot of the zoom window in adequate text or graphic format should be  enabled     Event Table    Events relevant to a specific drive should be available to the dispatcher and upon his her  request should be presented in an adequate table  The following data is usually entered in the  event table  driver reports on assaults  robbery  vehicle malfunction  accident and other extra   ordinary situation  automatic coded message from the vehicle or a system message     When needed  the System should enable defining other events that will be monitored by the  dispatcher     When reviewing the event table  the dispatcher should be able to define priorities  showing  events by priority in descending order  After an appropriate response to a specific event  the  event is automatically deleted from the dispatcher s table  but is automatically stored in the  System memory     Table of initiated actions    The AVL System should enable the dispatcher to keep an operational log  i e   table of initiated  actions  The status of each action should be shown  active inactive  and sorting actions by  various criteria should also be possible  It should be possible to select one or several actions   display detailed information on the actions  modify and delete the actions     Monitoring of deviations during Timetable execution    The dispatcher in t
59. ementation and  management       5 1 System implementation       5 1 4 Training       5 2 System maintenance       5 2 1 Regular maintenance       5 2 2 Urgent maintenance          Signature of responsible  person    Date  stamp       Each page of the Form should be filled in  initialled  stamped  and signed by the  responsible persons of the Bidder     In case of joint bid submission  all members of the group should fill in the Form and sign  by the responsible persons of each group member     106    Form 7A          Automatic Vehicle Location System and Smart Ticketing System     STATEMENT OF THE BIDDER FOR ASSIGNING THE WORK TEAM       We hereby declare that in case of signing the Contract with the Contracting Authority  of the public call   Automatic Vehicle Locations System and Smart Ticketing System   we will assign a work team with a team leader        Signature of responsible    person  Date  stamp             The Form should filled in  signed and stamped and submitted with the required proof in  accordance with the Contract     In case of joint bid submission  all members of the consortium  shall sign and stamp  their own copies of the Form enclosed to the joint bid     107    Form 8A             Automatic Vehicle Location System and Smart Ticketing System       STATEMENT THAT EFFECTIVE DECISION FOR PARTICIPATION IN CRIMINAL  ORGANISATION  CORRUPTION  FRAUD OR MONEY LAUNDERING HAS NOT  BEEN ISSUED AGAINST THE BIDDER       Pursuant to Article 146 of the Public Procure
60. ent  trip velocity       Current distances between vehicles on a bus line       Representation of the vehicle in various colours depending on their status in relation to  the timetable  e g  deviation from the planned interval  elapsed time passed from  departure return and similar        Special markers on the display for indicating vehicles which are not signed in or are  having problems communicating with the Control Centre       Objects that should be always available for display to the dispatcher  bus lines  bus  stops on a specific bus line  vehicles  planned vehicles on a specific bus line  content of  bus stop information displays  if any   as well as other predefined objects of interest to  the dispatcher       The vehicles may be arranged into groups  according to the line  vehicle type  garage   transporter or any combination thereof  for instance  show all vehicle type LAZ on line    49    no  2 from the garage Gjor  e Petrov  transporter JSP Skopje        Vehicle location on the maps should be presented with an arrow     direction of  movement       The System should support raster and vector maps  as well as allow changes of the  coordinate system and vehicle colours     e Object Zoom Function    Detailed information on each object  driver  vehicle  bus line  bus stop and similar  should be  displayed with the help of the so called zoom function  There should be an option to define the  content of the zoom window  whereas the minimal dataset should contain the v
61. ents    Place and date Bidder    Responsible person    Signature and stamp    98    Form 2A          Automatic vehicle location system and smart ticketing system       STATEMENT FROM THE GROUP MEMBERS SUBMITTING JOINT BID       We  hereby act as Consortium submitting joint bid No  dated   upon a  Public Call    Automatic vehicle location system and smart ticketing system       We hereby authorise the Group member  from   to act on the behalf of other Group members in front of  the Contracting Authority  receive written correspondence upon the said Call and submit the  requested financial deposits which the Group members are charged for    Providing the joint bid is evaluated as the most favourable  we are aware of the obligation to  submit an original legal act for joint actions  are in accordance with the requirements of the  Contracting authority  prescribed in the Instructions for developing the bid              Name and registered Signature of the responsible  No  head office  address of person and stamp by the    the Group members group member    Type of work performed  by the Group member       Authorised group Signature of the authorised    member  person       stamp       Signature of the authorised    person       stamp       Signature of the authorised    person       stamp       Signature of the authorised    person       stamp       Signature of the authorised    person                stamp        Date                 The Form shall be filled in with the requested
62. er has a registered head office in the territory of  Republic of Macedonia  it shall submit     b  Certificate that he she is not a subject to misdemeanour sanction involving yes no  prohibition to perform a profession  activity or duty  or prohibition to perform a  specific activity  imposed against him her    C  Certificate that he she is not a subject to criminal sanction for performed  criminal acts for legal entities or side sanction involving prohibition to participate in  3 public call proceedings  public procurement contracts and contracts for public  yes no  i private partnership imposed against him her   d  Confirmation that he she is not subject to a bankruptcy liquidation procedure  opened by a competent authority     Providing the subcontractor has a registered head office in the territory of Republic  of Macedonia  the competent authority to issue such certificates shall be the  competent court or the Central registry in the R M    sh i E i yes no  Providing the subcontractor does not have a registered head office in the territory of  Republic of Macedonia  he she shall submit a Certificate from the competent  authority in the country of registration  accompanied by a compulsory translation  into Macedonian language  stamped by the authorized translator     The given evidences shall not be older than 6  six  months calculated  backwards as of the deadline for submission of offers        Confirmation from the competent authority of paid taxes  contributions and y
63. erformed by authorised translator                                         Name  contact  Name and Nameconihe Date of Value of the person and  No    address of the cit implementation   performed telephone  Contractor y of the works works number of the  Contractor  Signature of the responsible  erson  Date  P          stamp          The Form shall be filled in  signed and stamped in accordance with the Instructions  along with the requested evidences enclosed    In case of joint bid  the filled in Form shall be signed by all Group members and they  shall submit the requested evidence  the requested condition shall be met by the Group  members jointly      The Form may be copied in case of larger number of information     100    Form 4A          Automatic vehicle location system and smart ticketing system       STATEMENT OF AVAILABLE TECHNICAL CAPACITY         hereby declare to have sufficient number of engaged workforce with appropriate  professional training to perform the contracting requirements in the Public Call     Automatic vehicle location system and smart ticketing system           Signature of the    Date  responsible person       stamp       The Form shall be filled in  signed and stamped in accordance with the Instructions  along with the requested evidences enclosed     In case of joint bid  the filled in Form shall be signed and stamped by all Group  members     101       Form 5A          Automatic vehicle location system and smart ticketing system     STATEMENT F
64. es is hereby recommended     When issuing a POS receipt  the same data should be recorded as in the case of payment with  non personalised smart tickets     Mobile Phone Payment    Taking into account that on one side mobile payment reduces production and distribution  expenses when compared to other payment methods  an on the other hand increases  passenger comfort by providing new and simple bus ticket payment methods  the delivered  system must enable mobile payment function through which the users may pay for the transport  service by using their mobile phones     60    This payment method should enable controllers much easier control by access to passenger  mobile phones and comparing the data with that in the System     The mobile payment should be realised in the following way       Validation of mobile tickets will be performed by establishing direct communication between  the user s mobile phone and the validator installed in the bus  In order to achieve increased  security and control  the reading zone of the validator s immediate surrounding should be  limited     e When paying with a mobile phone  the same data should be recorded as in the case of  payment with non personalised smart tickets     e The duration of the mobile phone payment operation  i e  payment validation  should be  less than 5 seconds     e The System should be flexible concerning the mobile phone payment  and it should be easy  to add new functionalities  such as passenger transfers and similar
65. es no  other public duties    a  Provided the subcontractor has a registered head office in the territory of  Republic of Macedonia  the competent authority to issue such certificates shall be  the Public Revenue Office     yes no    yes no  4  b  provided the bidder does not have a registered seat in the territory of Republic of  Macedonia  he she shall submit a Certificate from the competent authority in the yes no  country of registration  accompanied by a compulsory translation into Macedonian  language  stamped by the authorized translator     The given evidences shall not be older than 6  six  months calculated yes no  backwards as of the deadline for submission of offers                    5  Balance Sheet and Income Sheet for the previous 3  three  years  2009  yes no       92                   2010 and 2011        Documentation written in English language must be accompanied by a stamped translation from  authorized Court translator    We are aware and accept the fact that in case of failure to submit all evidences for fulfilment of the  tender documentation requirements for engagement of sub contractor  the Contracting Authority shall  dismiss our offer as incomplete           Signature of the authorised person  Date              stamp       This Form shall be filled in by circling the answers  yes    or  no     meaning that the  required documentation is submitted to the bid  proving fulfilment of the requirement   stipulating the date  signing and stamping it as i
66. f Paragraph 1 of this Article shall be  more closely defined in the Commission Establishment Decision which shall have to comply in  all aspects with this contract     Training of Some of the Staff with the Contracting Authority  Article 18    In compliance with the Training Plan  Annex 1 of Article 4 of this contract  in the course of the  implementation of the System  and not later than the final commitment of the System  the  Carrier of the Procurement shall implement training of persons appointed by the Contracting  Authority    The Contracting Authority shall provide the training premises  at his own expense    The Carrier of the Procurement undertakes to provide for the Contracting Authority in the  meaning of Paragraph 1 of this Article  the training equipment and materials in Macedonian  language     30    Data  amp  Information Confidentiality  Article 19    The Contracting Authority shall be authorised to enter and update the data  on timetable   vehicles  drivers  tariffs  etc   in the System database    The Contracting Authority shall have the right to ownership of all the data in the System  database  and these shall be considered a business secret     Article 20    The Carrier of the Procurement undertakes to keep all the data and information that he may  learn in the course of the realisation of this contract as a business secret    The Carrier of the Procurement shall not have the right to use data from the database outside  the System  nor to report them or t
67. f extending the final deadline  the Contracting authority shall be obligated to  inform in writing all economic operators that have acquired the tender documentation     12  Preparation and submission of bids    12 1  Preparation of the bid   The bid shall be prepared in accordance with the conditions set out in the Public Call and the  Tender Documentation and it is submitted on the original bid form  enclosed to the tender  documentation    12 1 1  Preparation and filling in the bid   Interested bidder prepares one original of the Bid form    The Bid form must contain filled   in all requested positions and all required data    Bid form is filled in  written  in one original  written with indelible ink and signed by the  responsible person of the economic operator  In cases of Consortium the bid shall be signed by  all members of the Consortium  All pages of the bid  except the unaltered print literature shall be    initialled by the person that signs the bid  Any writing between lines  erasure or writing over  previous texts shall be valid only if signed or initialled by the individual that signs the bid     12    Providing the bid is not filled in as requested in the tender documentation  the bid shall be  rejected as unacceptable     12 1 2  The provisions in the sub point 12 1 1  shall be applicable for the filling in of the other  forms   comprising part of the Tender documentation     12 2  Content of the bid    Comprising part of the bid  apart from the Bid form  1A 
68. f possible   in case of distributed tariff zones  each zone should be surrounded by maximum 4 different  tariff zones     68    Operational Control Centre    The Operational Control Centre should provide secure access to the Data Centre where all  applications will be hosted  enabling the functions for receiving  sending  processing and storing  of data     The OCC should enable and facilitate the work of dispatchers  tariff management  system  administration and simultaneous use of the System by all users     The Contracting Authority will provide the necessary area for the OCC operations  including  electricity and office furniture  as follows       1 room will house the head dispatcher and other dispatchers  including one unoccupied  post for training and testing       1 room for traffic engineers      1 room for tariff calculation and management      1 room for the system administrator and data management      1 room for the head of the Operational Control Centre  OCC      e The Bidder selected as most favourable for this procurement shall be obliged to provide  its own insight and comment whether the offered premises are satisfactory to the required  conditions and what should be eventually corrected  rectified  repaired  remodelled   added  or expanded     Work position    14 work positions will be needed in the OCC     69    2 dispatcher positions     1 testing   training position that should allow on the job training without any impact on the  regular operations  This
69. f several statistical overviews     Drafting reports related to the charging system     Management using the charging data     Insight in passenger flows and transport requests    The reports should include the following       Data on procured  assigned and sold tickets in a certain time period according to ticket  type  point of sale and similar       Data on the revenue generated from tickets sold in a certain time period according to  ticket type  point of sale and similar       Data on public transport utilisation for a certain time period  according to ticket type  i e   to passenger category  bus line  corridor and similar       Overview of all remaining relevant financial  traffic  organisational and usage data of  interest to public transport management       Dynamic graphic overview  dynamic graphic data monitoring  of the number of  passengers  the load of each station individually  as well as the vehicle load individually  and the totals for a defined time period     e All overviews and reports will be defined in the Contract between the Contracting Authority  and the Bidder  including an option to expand and upgrade them     Database    Well organised database is essential for the efficient operation of the Smart Ticketing System   The Bidder should be responsible for collecting and maintaining the data     The both sub systems  AVL and STS  should use the same database which will easily and  simply generate various report types that are necessary for the business
70. f the Procurement undertakes  upon completion of the trial period  to eliminate al  the identified shortcomings in the functioning of the System        Article 13    The Carrier of the Procurement undertakes  not later than 10 days before the completion of the  trial period  to submit an application to the Contracting Authority for a the final commitment of  the System    The final commitment of the System means the commitment of the full System that had been  brought into the condition of a full functioning    During the final commitment of the System  the Commitment Commission shall verify whether  the installation of the System is compliant with the technical specification stipulated in the  tender documentation  the Main Project or the Completion Status Project  and also whether the  obligations had been met that were undertaken by the Carrier of the Procurement under the  provisions of this PPC     28    The final commitment of the System shall be confirmed by way of signing the commitment  protocol  which shall be signed by the Commitment Commission and the Carrier of the  Procurement     29    Functioning of the System    Article 14    The Carrier of the Procurement undertakes to secure the continuous functioning of the System   starting from its final commitment until the expiration of the validity period of this contract   In case the System fails to function for 24 hours  the penal provisions of this contract shall    apply     Article 15  The Carrier of the Procure
71. fer    16 3 Criterion for evaluation of the economically most favourable bid     Note  When evaluating the below listed criteria  the Contracting authority shall include external  professional persons     17    Criteria Points    16 3 1 Total price of the procurement   50  points    after the e auction   16 3 2 Reference list     contract s  of implemented projects with   10  points    the offered Solution with at least 250 buses operating  on city lines in an EU Member State  with average  min  120 000  hundred and twenty thousand  transactions   validations  per day  operational in the past 3 years    16 3 3 Reference list of implemented projects with offered   5  points   solution from an EU city with a participation of several legal   entities in the city line transport and income share  clearing    between them  operational for minimum of 3 years     16 3 4 Quality of offered solution   35 points   as follows   16 3 4 1  Module for development of timetables and drivers rosters    6 points  16 3 4 2  Module for real time monitoring of vehicles    6 points  16 3 4 3  Technical solution    5 points  16 3 4 4  Module for dynamic graphic layout of numbers of passengers  per vehicles   line and workload of the bus stands    5 points  16 3 4 5  System possibility for parallel use of Mifare and Calypso cards    5 points  proof     reference list of implemented projects with  Calypso and Mifare cards  16  3 4 6  Mobile Payment where the mobile device communicates with the validat
72. fications   e planning and development    Wired communication Wireless communication             Transporters    Level 2     Operation control and surveillance  central operational computer of the transporter   Level 1     Primary devices  validators  smart card recharging  wireless payment   Level 0     Smart ticket or POS ticket as proof of payment  mobile phone     Figure 1  Structure of the Ticketing System          Ticketing System    The Ticketing System is covering the functional levels 0 and 1     Functional Level 0    This level represents the in vehicle payment methods that should be provided by the STS  System       Contactless plastic smart cards tickets  mostly used payment method      POS device receipts connected to the driver control unit  penalty charge ticket issued in the  vehicle      58      Mobile phone payment   The following chapters will give detailed description of various in vehicle payment methods     Contactless Plastic Smart Tickets    These tickets will be made of hard plastic with built in chip and high level protection  They will  be in compliance with the following standards     ISO IEC 14 443 Contactless Integrated Circuit Card  that is   ISO IEC 14 443   1  ISO IEC 14 443  2  ISO IEC 14 443  3  ISO IEC 14 443     4  Type A or Type B   Regarding their security  they will support the AES or triple DES security standard   The cards should have 4K read write memory     Aside from the Mifare type cards  it is desirable for the Smart Ticketing Sy
73. followed by the vehicle negotiating the city streets with a  defined starting and ending terminal     Garage  Autobase      Location for maintaining and parking the vehicles   Timetable     Plan for performing the transport tasks for each bus line     Public Transport Network     Established network of lines with adequate accompanying  infrastructure  bus stops  terminals and garages      Abbreviations     46    System   Automatic Vehicle Location and Smart Ticketing System with contactless  cards     OCC   Operational Control Centre  Dispatching Centre  AVL     Automatic Vehicle Location Sub system   STS     Smart Ticketing Sub system    GPS   Global Positioning System  based on determining locations by using Geo   stationary Satellites     GSM      Global System for Mobile Communications  most popular and mostly used  standard in the world of mobile telephony     GPRS     General Packet Radio System for GSM     GIS     Geographic Information System  system containing all relevant data related to a  specific geo location     Automatic Vehicle Location Sub system  AVL     Introduction    The Public Transport Automatic Vehicle Location  AVL  Sub system will represent the basic tool  for dispatchers and traffic engineers to manage and plan the transport of passengers     Functions    The functionality and main requirements that should be met by the AVL Sub system will be  described in more details in the following points     Timetables    The AVL Sub system should enable drafti
74. for regular data backups     In order to achieve better system availability  the solution should envisage a secondary Data  Centre in a different location  at least 50 km away from the primary location  where full data  replication may be carried out within 24 hours  that is  a Disaster Recovery solutions     The overall server infrastructure should be connected to the following local area networks   1  OCC  Dispatching Centre    2  City of Skopje     Traffic Department   3  Transporter JSP Skopje   4  Transporter Sloboda Prevoz  Freedom Transport     5  Transporter Mak Express    For the purpose of achieving increased security  the Bidder should ensure interconnection    with dedicated fibre optic links with high reliability  The Bidder should provide the required  terminal equipment for establishing the data link at the side of the Contracting Authority     The Smart Ticketing System will have fulfilled its task if it minimises and easily records all    misuse attempts by passengers  At the same time  the System should ensure the safety and  trust among transporters  if several transporters join the public transport  concerning data  accuracy related to charging and generated revenues  Therefore  all commercial transactions  should be specially protected from misuse by any party  The solution should ensure high  availability and reliability of at least 99 97  data integrity     66    Management Tools and Statistics   Statistics   The STS application should enable drafting o
75. g Authority shall collect the remaining part of the Guarantee    If  within the defined deadline of Paragraph 1 of this Article  the Carrier of the Procurement fails  to renew the Guarantee  this contract shall not instigate legal action  and the Contracting  Authority shall have the right to collect the Guarantee for the participation in the procedure        Invocation of the Guarantee for a Timely and Quality Implementation of the System  Article 32    The Contracting Authority shall partially invoke the Guarantee to collect the Contractual Penalty  of Article 40 of this contract in the amount of the Contractual Penalty that needs to be collected   in case the Carrier of the Procurement  by fault of his own  delays    e The elaboration of the Main Project  Article 4 of this contract      e The temporary commitment of the System  Article 12 of this contract      34    e The training of some of the staff with the Contracting Authority  Article 18 of this  contract     e The equipment of 8  eight  points of sale for the issuance of personalised tickets  and  also for the sale and recharging of all types of tickets  and of 50 points of sale that shall  sell and recharge all types of tickets  Article 28 of this contract     e The installation of 3 automatic vendor machines for the issuance and recharging of the  non personalised tickets  Article 28 of this contract     e The provision and installation of 500 fiscal printers in the buses of the Contracting  Authority  Article 28 
76. gical Architecture System Model describing in  details all functionalities of both sub systems  the Sub system for vehicle management and the  Sub system for smart ticketing  The Preliminary Design should define and present a model of  the technological processes and procedures  the implementation method  the functioning and  control of both sub systems within the System     It should also contain a hardware and network solution for the Operational Control Centre  as  well as the main requirements concerning the necessary network infrastructure which should be  provided in order to realise the Project  fibre optics and copper cables  Internet connection  and  similar      The Preliminary Design should particularly focus on the data protection system  as well as on  the interfaces for exchanging data with other systems  The Preliminary Design should give  directions concerning the System development  user training  and performance maintenance of  the overall System     The realisation should be envisaged into stages  whereas the Preliminary Design should define  the implementation scope and duration of each stage  as well as envisage the occurrence of  undesired distortions which may impede realisation     The design of the two sub systems AVL and STS should be an integrated one and should have  a single access point between the two sub systems  as well as a single database     Used Terms and Abbreviations    The terms used in the technical specification are not general defini
77. h a predefined audio and light signal     The Preliminary Design should separately elaborate the validation method in various tariff  zones in a proposal  allowing the passenger to select the travelling zone using a touch screen  or specific buttons     Passenger Control    Passenger control will be conducted by controllers who should be equipped with a device for  controlling smart tickets and a special ID card     The controller will use his her ID card when entering the vehicle  subject of the control  During  the identification  the computer will automatically block the validator  and the validator data will  be simultaneously transferred to the controlling device     The controlling device should be lightweight  resistant to mechanical shocks and easy to use  It  should be battery charged allowing at least 4 hour autonomous operation  with an integrated  printer and a smart card read write capability  e g  block irregular smart tickets      62    While executing the control function  this device should show ticket data and produce an audio  signal when the ticket is validated     In case of invalidated tickets  the controller will hear a different sound notifying the irregularity  and may block the ticket  The controlling device may print a penalty fee receipt for passengers  without validated tickets     The controlling device should enable verification of completed smart card and mobile phone  validations     At the end of the controlling process  the controller signs 
78. hat does not contain a bid guarantee shall be rejected by the Contracting  authority as incomplete and unacceptable     15 1 6  The guarantee shall be invoked if     e withdraws its bid after the deadline for submission of bids   e the most favourable bidder refuse to sign the Procurement Contract    16    e the most favourable bidder signing the Contract fails to provide a performance  guarantee for timely and high quality execution of the Contract within 7 days from the  date of signing the Procurement Contract     15 2  Performance guarantee for timely and high quality implementation of the System    15 2 1  The most favourable bidder bounds to submit original Performance guarantee for timely  and high quality implementation of the System     The Guarantee should contain a clause that it is non puttable  unconditional  payable on first  call and without objection right with a possibility for partial realisation and renewable to an  amount of 5   five percents  of the offered price in the final Bid     15 2 2  Guarantee referred to in the sub point 15 2 1  shall be submitted within 7 days from the  date of Contract signing and it shall be valid for 30 days after the final acceptance of the  System     15 2 3 Performance guarantee for timely and high quality implementation of the Contract shall  be invoked providing the procurement carrier does not fulfil some of the PPC obligations within  the prescribed period  which shall be the subject of written notification sent to the
79. he Commission identifies shortcomings during the commitment of Paragraph 1 of this  Article  it shall order the Carrier of the Procurement to eliminate those shortcomings within a  deadline stipulated in the minutes    In case when the Carrier of the Procurement fails to eliminate the shortcomings within the  deadline of Paragraph 2 of this Article  the Contracting Authority shall have the right to invoke  the Guarantee for the Timely and Quality Installation of the System in the amount necessary to  eliminate the shortcomings     Article 12    The temporary commitment of the System is the commitment that takes place upon the  completion of the implementation of the full System prepared for a trial work    The Carrier of the Procurement undertakes to prepare the System for a trial work  temporary  commitment of the System  within a deadline of     days from the day of elaboration  of the Main Project  but not later than 300  three hundred  days from the day of entry into force  of the PPC    In case the Carrier of the Procurement delays the preparation of the System for a trial work by  fault of his own  the Contracting Authority shall charge him the Contractual Penalty for each day  of the delay    From the day when the temporary commitment was made shall start the trial work period of the  System that shall last no longer than 30  thirty  days    The trial work means the testing of the full System  whereby the System is commissioned to a  full functionality    The Carrier o
80. he Controlling Centre should be automatically notified on the deviations that  have occurred  It should be possible to additionally define the types of deviations and include at  least the following       Accidents and other extra ordinary situations     Deviations from previously defined values      Vehicles with technical defects      Cancelled trips     e The occurrence of each deviation should be accompanied by a sound     Driver information  50    The vehicle computer unit  VCU  represents the main interface for communication with the  Operational Control Centre  OCC   This computer is equipped with a touchscreen  monitor  which should display the following data in a normal state       Date  time      Vehicle and driver number      Bus line number      Status of the communication link with the OCC     GSM network status      Name of next bus stop      Tariff data     All functions should be available via the menu and said functions should be ease to use   One  touch  operations should be envisaged for routine procedures     When entering the vehicle  the driver signs in in the System by using his her ID card  The VCU  device shall store all authentication attempts  Each unauthorised attempt to access the vehicle  should also be registered  The System should be able to identify the driver and read out the bus  schedule even in case of no GPRS connection to the Data Centre  As soon as the GPRS  connection is re established the driver sign in should be reported to the Centr
81. his Contract before the expiry date thereof with  unilaterally expressed willingness to do so in writing   The termination deadline referred to in paragraph 1 of this Article shall be 120 days     Unilateral Contract termination by the Contracting Authority  Article 40    The Contracting Authority may terminate the Contract in the following cases     If the Carrier of the Procurement fails to install or make operational the System even  with the extended deadline  Article 7  paragraph 4 of this Contract      If the System is not functioning in accordance with the manner  terms and deadlines  envisaged in the Contract     In other cases defined in the Contract   The Contracting Authority may terminate this Contract with unilateral expression of willingness  to do so in writing   The termination deadline referred to in paragraph 1 of this Article shall be 30 days     Bankrupcy or Liquidation of the Carrier of the Procurement    Article 41    The Contract will be deemed terminated due to fault of the Carrier of the Procurement in case a  bankrupcy or liquidation procedure is initiated thereof     Force Majeure  Article 42    The contracting parties agree that none of the contracting shall be liable to the other contracting  party due to violation or non performance of this Contract in case of Force Majeure     37    In the cases referred to in paragraph 1 of this Article  the contracting parties shall agree to new  terms and deadlines for fulfilment of this Contract or shall mut
82. hnical  specification in the Tender documentation     Providing the bidder   s technical documentation does not satisfy the minimum requirement  contained in the Technical specification in the Tender documentation  it shall be considered  unacceptable     12 2 3  A bid submitted on a form that does not contain all the elements in accordance with the  tender documentation shall be considered unacceptable     12 3  Bid language    The bid  as well as the complete correspondence and documents exchanged between the  Contracting authority and the bidder shall be submitted in the Macedonian language and its  Cyrillic letter  The printed literature comprising part of the bid may be in another language   providing they are accompanied by a correct translation in Macedonian language  In case of  translation  each page needs to be signed and stamped by an authorized person of the bidder  verifying the correctness of the translation     12 4  Period of bid validity    Bids shall be valid at least 180 days from the opening day of the bid  Bids that are valid for a  period shorter than the period prescribed in this point of the Tender documentation shall be  rejected by the contracting authority as unacceptable     12 5  Alternative bids    Alternative bids are not allowed     12 6  Sealing the bids    The economic operator shall enclose the original copy of the bid  forms referred to in the sub   point 12 2 of the Tender documentation  type and number depend on the bidder   s form of  ap
83. idators with a specific  date of validity  so that the validator may contain two pricelists at the same time  the current one  which is being used and the new one which will be used tomorrow for instance     VCU should detect if the validator becomes non operational and immediately send an alarm to  the Control Centre stating the reasons for the failure     Driver ticket sales    The driver should focus on the driving  and on controlling the smart ticket validation  however   the post should not become a sales point  Therefore  the driver will sell only penalty fee tickets  using a POS device equipped with predefined buttons for easier issuance of tickets     Ticket validation device   validator    The smart tickets will be read  encoded and verified by the validation device  The validator will  check whether the smart ticket is authentic  blacklisted or damaged  it will read the ticket  verify  its privileged tariff and credit balance  The validator will use different audio signals and a light  signal to indicate each validation depending on the tariff  The validator will sound special signals  for invalid tickets or blacklisted tickets  Notification thereof will also be displayed in front of the  driver     The validator will enable communication with the mobile phone during the validation of the  payment for the transport service using a mobile phone     During the validation  the validator display should show the charge for the trip and the new  balance on the tickets wit
84. idder was registered   12  i f       yes no  In the territory of Republic of Macedonia  the competent authority to issue such  certificates shall be the Central Registry of the Republic of Macedonia   In case of submitting a jont bid  the required evidence shall be submitted to each  Consortium member  and the reuired condition for the financial capacity shall be  met by the Consortium members jointly   Original bid guarantee or deposited funds in the amount of at least 2  of the total  13 bid value which shall be non puttable  unconditional  payable on first call and a aa    without objection right with a validity date of minimum 194 days as of the date of y  bid opening   14  Form 9A     List of confidential information yes no  15  Form 10A     Statement proving acceptance of conditions yes no    Design solution of the Automatic vehicle location system and smart ticketing  6    yes no  system for the public transport of the passengers  17  Detailed specification of the equipment yes no  18 Dynamics Plan for the implementation of the equipment  hardware  and yes no       software per phases             90          19  Model Contract yes no       20 Form 11A Specification for additional equipment with guaranteed prices  expressed in Euros             yes no       Documentation written in English language must be accompanied by a stamped translation from authorized  Court translator     We are aware and accept the fact that in case of failure to submit all evidences for fulfil
85. ifts  and the time interval between 2 vehicles for a specific time of the  day  and the application will create the graphic timetable that will enable the traffic engineers to  spot the critical points and by changing the input parameters tune up the timetable     As soon as the traffic engineers set the optimal timetable  the application should generate all  required reports such as  line timetable  bus stop timetable  passenger timetable  driver  timetable  number of vehicles in use by type and garages  number of operating drivers  planned  hours of effective work and waiting times  planned kilometres per line  null mileage and similar     The application should enable fast and easy testing of the alternative timetables and saving of  each tested option     Bus Driver rosters    The AVL Sub system should enable drafting of bus driver rosters by the Traffic Department of  JSP Skopje  The bus driver roster will be compared to currently registered drivers of certain  services and if there are any differences to the planner roster  the changes will be indicated on  a separate display monitored by the dispatcher duty officer  By using this System  misuse of  and changing bus drivers by certain service departments without the knowledge of the superiors  would be avoided in the future     47    Monitoring  Automatic Vehicle Location    All vehicles should be equipped with GPS devices for automatic vehicle location and devices for  wireless communication with the Control Centre  Th
86. ill be conducted in accordance with the System Inspection and Testing Plan  The  Commission may request checks which are outside the scope of the System Inspection and  Testing Plan  All noticed deficiencies concerning the functioning of the System will be stated in  the Minutes and a deadline for their rectification will be set  The Bidder shall be obliged to  remedy any eventual remarks stated in the Minutes within the set deadline  In case of  unsuccessful quality control  the procedure will be repeated within the deadline in the Minutes  set for rectifying the deficiencies  The deadline shall commence at the moment the Minutes are  signed by the Bidder     After completing the overall system implementation  the Provisional Acceptance Commission  will carry out the acceptance of the System     The Bidder shall be obliged to conduct the system testing and commissioning in accordance  with the System Inspection and Testing Plan     The provisional acceptance will mark the beginning of the trial period which will last for 1 3  months  During this period the overall System will be tested  The Bidder shall be obliged to  rectify all noticed deficiencies in the system operation during the trial period     After completing the trial period  the Final Acceptance Commission will carry out the final  acceptance of the System     In case there are any differences between the actual situation and the Main Project  within one  month of the final acceptance of the System  the Bidder sha
87. ing this certificate is the Central registry of R M     2  Comprising part of the technical documentation shall be     97    Design solution as a basis for the implementation of the PPC  prepared based  upon the technical specification given in the tender documentation listing the  minimum requirements     The bidder selected as the most favourable one and who will be rewarded a  Contract shall be bound to develop a Main project based upon the Design  solution  The Main project shall be a basis for purchasing equipment  mount the  equipment and software along with the complete implementation of the System  in accordance with the conditions and requirements given in the Tender  documentation     Detailed equipment specification  hardware and software  shall contain     name of the equipment with basic features and minimum standards      equipment manufacturer and quantity  and     software specification     System and Software installation dynamics divided by phases  development  of Main project  probation of the System and final acceptance of the System   which must be in accordance with the requirements by the Contracting authority  given in the technical specification in the Tender documentation     Part Ill     Financial part       1  Validity period of the offer    minimum 180 calendar days as of the date of bid calendar days  opening                          2  Total price  Euros denars without VAT  In letters  Euros denars  3  VAT Euros denars          The value of the 
88. ion from the Registry of criminal sanction for not performed criminal acts  for legal entities or side sanction involving temporary or permanent ban for  performing specific activity imposed against him her  and      Confirmation that there is no legally effective judgment imposing a misdemeanour  sanction involving prohibition to perform a profession  activity or duty  or prohibition  to perform a specific activity  imposed against him her     9 1 3 The statement from indent 1  sub item 9 1 2 shall be prepared and signed by the  economic operator himself herself and it need not be notarized by a competent authority     9 1 4 The confirmation that no bankruptcy procedure or liquidation procedure has been opened  against the economic operator  along with the confirmations from the Registry on performed  criminal sanctions referred to in the indents 2 and 3  sub point 9 1 2 shall be issued by  competent authorities in the country where the economic operator is registered  In the Republic  of Macedonia  a competent authority to issue such confirmation is the Central Registry of the  Republic of Macedonia or the competent court     9 1 5 The confirmation of paid taxes  contributions and other public dues shall be issued by a  competent authority in the country where the economic operator is registered  In the Republic  of Macedonia  the competent authority to issue such certificates shall be the Public Revenue  Office     9 1 6 The confirmation stipulated in indents 5  6 and 7  s
89. ioning of the full System   The tasks and the subject of activities of the Commitment Commission shall be more closely  defined in the Commission Establishment Decision which shall have to comply in all aspects  with this contract     Article 10    The Commitment Commission shall undertake the commitment of each stage of the System  within the deadline of 3  three  days from the day of completion of each stage of implementation  of a part of the System  with a mandatory presence of a representative from the Carrier of the  Procurement     27    After each inspection carried out on a part of the System of Paragraph 1 of this Article the  Commission shall draw up minutes for the inspection made  that shall be submitted to the  Contracting Authority not later than 3 days from the day of commitment    In case the Commission identifies shortcomings  it shall order the Carrier of the Procurement to  eliminate those shortcomings within a deadline stipulated in the minutes    The commitment procedure shall be repeated until the successful commitment of each stage in  the implementation of the System within the deadline of Article 9 of this contract     Temporary and Final Commitment of the System  Article 11    During the temporary and the final commitment of the implemented System  the Commission  shall  upon the inspection  draw up minutes for the inspection made  that shall be submitted to  the Contracting Authority not later than three days from the day of commitment    In case t
90. isation with the hardware components of the System       Organisation and familiarisation with all application within the System   85    Tra    Setting the parameters of the System     ining for traffic expert associates    The training for the expert associates should include     Familiarisation with the system structure    Familiarisation with the application    How to use the vehicle monitoring and management data    How to generate new reports in accordance with the requirements     How to use the data for planning and developing the public transport     Estimated number of training participants is presented in the table below                                   Ser  Description Number of participants  1 Driver 80  2 Dispatcher 20  3 Tariff management 2  4  Controller 50  5 System administrator 3  6 Traffic expert associate 20       Apart from this  the Bidder will envisage and provide training for the personnel that will work on  issuing personalised smart tickets  as well as for the sellers who will recharge the tickets     System Maintenance during the Warranty Period    The system maintenance will be comprised of regular and corrective maintenance     Regular Maintenance    The Bidder should follow the plan and procedures for regular system maintenance     Regular maintenance will entail the following activities concerning the system equipment and    soft    86    ware     Performing monitoring and preventive maintenance activities and undertaking actions for  preventio
91. isplaying all necessary information and  allowing user interaction  e g  zone selection and similar        While validating the validator must store in its internal memory and then forward it to the  VCU the following data     o Ticket serial number   o Transaction type   o Previous balance on the ticket and the amount deducted from the balance     76    o Date and time of the transaction   o Transaction number   o Validator number   During each transaction the validator must write on the ticket the following data   o Validator number   o Transaction type   o Amount deducted and the new balance   o Date and time of the transaction     Equipment in the Traffic Department of the City of Skopje    Equipment for monitoring the vehicle on their respective bus lines  in similar way it is done by  the dispatchers in the Control Centre  should be installed at the premises of the Traffic  Department of the City of Skopje  the only difference being the lack of vehicle management  capability  For that purpose the following equipment is envisaged       2 workstations  same as in the OCC  with a 21  monitor for each       4 46  LCD displays forming one large wall screen that may display images from any of this 2  workstations either on one or on all 4 LCDs of the wall screen as a single image       A4 laser printer     Equipment for communication with the Data Centre     Equipment in the garages  The garage equipment will be comprised of     Administrative work position     vehicle forwar
92. laint service      To enable the communication of all parts of the System with the Operational Control  Centre      To keep the full System in a state of quality functioning throughout the guarantee period     Article 25    The Contracting Authority shall inform the Carrier of the Procurement about each relocation of  the equipment in the vehicles  the car base or the Control Centre    In case of need to relocate the equipment of Paragraph 1 of this Article  the Carrier of the  Procurement shall carry out disassembly and reassembly of the equipment within an agreed  deadline    The relocation of the equipment shall be regulated by way of an annex to this contract     Article 26    The Carrier of the Procurement undertakes  in the course of the duration of this contract  to  incorporate technical alterations and innovation in the equipment and software  following the  manufacturer   s instructions and in accordance with the work safety regulations and the  regulations enhancing the safety of the equipment or the software  without additional costs    The Carrier of the Procurement may  in the course of duration of this contract  and by a written  consent by the Contracting Authority  incorporate technical alterations and innovations that  enhance the functionality and the capacities of the equipment and the software    The incorporation of the technical alterations and innovations of Paragraph 2of this Article shall  be regulated by way of annex to this contract     Article 27 
93. lingual support  Macedonian  Albanian  English      Wireless communication with the Control Centre      Water resistant  vandal proof enclosure     78      Power supply from the main grid  but also its own      Battery which will enable at least 30 minutes independent functionality after the  power supply failure     Minimum System Requirements     The proposed system should meet or exceed the following performance criteria     Processing of at least 200 000 ticket transactions per day    Processing of at least 50 000 ticket transactions per hour  during peak hours    Supported terminals  gt  5000 terminals    Average duration plastic card transaction   lt 0 4s   Average duration of mobile device transaction   lt 5s    Minimum requirements for the equipment to be installed at the premises of the  Contracting Authority                    OCC workstation Intel   Xeon  Quad Core 2 5GHz 8MB  RAM 4GB  Hard disk drive  250GB  Graphics card 512MB  DVD RW  Network Controller 1Gb s   Garage computer Intel   Core  2 Duo 2 GXz  RAM 2 GB  Hard disk drive 250GB   Graphics card 512MB  DVD RW   Computer for issuing Intel   Core   2 Duo 2 GHz  RAM 2GB  Hard disk drive 250GB    personalised tickets Graphics card 512MB   DVD RW   Laptop Intel   Xeon  Quad Core 2 Duo T6500 series processors   RAM    4GB  Hard disk drive 250GB  Graphics card 512MB  DVD RW   Network Controller 1Gb s          System Equipment Specification with minimum planned quantities     Operational Control Centre     OCC     
94. lish  communications at specific time intervals  and when the communication is re established  all  accumulated  non transferred data will be transferred from the VCU to the Control Centre     Communication System    The Communication System should provide all required functionalities for data transfer between  the Bidder s Data Centre on one side and the vehicles  OCC  garages  bus stops and  transporters  if several transporters are included in the transport  on the other side     The communication between the Data Centre and the OCC  garages  and the City of Skopje  should be conducted via copper fibre optic cable  Wireless communication will be used between  the vehicles  points of sale and bus stops equipped with information displays and the Data  Centre  and said communication it will be realised in a secure way by establishing a private  APN     System Administration    System administration shall be a service provided by the Bidder for which it shall receive from  the Contracting Authority a so called eCloud maintenance monthly fee  This monthly fee shall  include the costs for the overall GPRS traffic     eCloud    The eCloud term in this Technical documentation shall mean provision of hardware  servers    system software and a database by the Bidder that will be installed in its Data Centre and run  the applications for Automatic Vehicle Location and Smart Ticketing which are subject of the  procurement  The monthly fee for the eCloud that will be paid by the Contra
95. ll be obliged to submit in written and  electronic form a Project for the Actual Situation of the System     Documentation    The accompanying documentation should contain  technical description and technical  characteristics of the System  operation manual for each device  hardware maintenance  manual  hardware and software installation and configuration manual     Also  it should contain detailed functional description of the implemented hardware and software   functional description of the System and its elements      Detailed description of all configurable system parameters and how they may be configured   Detailed description how to use each System application   Detailed description how the overviews and reports are configured     The overall accompanying documentation should be in Macedonian  excluding the technical  description of the hardware which may be in English     Training   The Bidder shall be obliged to organise and conduct the training for the system users  drivers   dispatchers  forwarders  administrators  etc   until the completion of the system implementation   that is  before the trial period  The Contracting Authority will provide the premises for conducting  the training  At his own expense the Bidder will provide the trainers  equipment and  documentation required for carrying out the training  The training will be in Macedonian     The Main Project of the Bidder should include a Training Plan according to which the system  84    users will be trained
96. lly or partially void or unenforceable   e The remaining provisions will remain in effect without any changes  and  e The contracting parties will convene as soon as possible in order to conduct good will  negotiations to replace the void or unenforceable provisions with new ones that will  become legally valid and will be as relevant as possible to the realisation of the goals of  this Contract     Contract language  Article 56    This Contract is drafted in Macedonian   All amendments  additions and appendices to the Contract will also be drafted in Macedonian   The language of written communication between the contracting parties shall be Macedonian     Appendices  Article 57  The following appendices are comprising part of this Contract   e Appendix 1     Tender Documentation with technical specifications  and  e Appendix 2     Bid of the selected Bidder   The Contract and all of its appendices shall represent a whole unit     In case of differences between the Contract and the appendices  the Contract provisions shall  prevail     40    Entry into force  Article 58  This Contract shall enter into force on the day the performance guarantee is delivered   Number of Contract copies  Article 59    This Contract is drafted in 6  six  equal copies  of which 3  three  copies for each contracting  party     FOR THE CONTRACTING AUTHORITY FOR THE CARRIER OF THE  PROCUREMENT  Director Responsible person    M Sc  Miso Nikolov    41    42    IV  TECHNICAL SPECIFICATION    OF THE TEND
97. ment Law  Official Gazette of RM no   136 07  130 08  97 10  53 11  185 11 and 24 12     consolidated text    hereby give the  following     STATEMENT      director   executive director   responsible person  of the Bidder  hereby declare that myself and the legal person     has not been issued an  effective court decisions for participation in criminal organisation  corruption  fraud or  money laundering in the past five years     Bidder   STAMP   name    responsible persons   In 2013    In case of joint bid submission  all members of the consortium  shall sign and stamp  their own copies of the Form enclosed to the joint bid     108       Form 9A             Automatic Vehicle Location System and Smart Ticketing System       LIST OF CONFIDENTIAL INFORMATION          The Bidder shall write the information  number of appendix page paragraph in the Bid  that is considered confidential                                   Time period during  Number of pages Reasons why such  Confidential which the  containing said information is deemed  Ser    Information information will be  information confidential  confidential  Signature of responsible  person  Date  stamp          In case of joint bid submission  all members of the consortium  shall sign and stamp  their own copies of the Form enclosed to the joint bid     109       Form 10A             Automatic Vehicle Location System and Smart Ticketing System       STATEMENT FOR ACCEPTING THE CONDITIONS       We hereby declare that by submi
98. ment Terms  Article 30    The Contracting Authority undertakes to pay the price of the completed procurement   installation and commissioning of the System  subject to this contract  in 3  three  equal annual  instalment  upon submission of an invoice    The subject to this contract shall be considered fully realised when the System Commitment  Protocol is signed     Guarantee for a Timely and Quality Implementation of the System  Article 31    The Carrier of the Procurement undertakes within a deadline of 7 days from the signing of the  PPC to submit to the Contracting Authority an original Bank Guarantee for a timely and quality  implementation of the System  whose period of validity shall be 30 days longer than the  expiration of the deadline for the final commitment of the System    The Guarantee shall include a clause that it is    irrevocable  unconditional and payable upon first  invocation and without the right to objection  partially payable and renewable    in the amount of  5  of the value of the PPC or     euros denars    In case of partial payment of the Guarantee before the final commitment of the System  the  Carrier of the Procurement undertakes to renew it within a deadline of 15 days from the day  when the Guarantee was partially paid    If  within the defined deadline of Paragraph 3 of this Article  the Carrier of the Procurement fails  to renew the Guarantee  the PPC shall be deemed terminated by fault of the Carrier of the  Procurement  and the Contractin
99. ment of the tender  documentation requirements  the Contracting Authority shall dismiss our offer as incomplete           Signature from the authorised person  date              stamp       This Form shall be filled in by circling the answers  yes    or  no     meaning that the  required documentation is submitted to the bid  proving fulfilment of the requirement   stipulating the date  signing and stamping it as instructed in the Instructions    In case of joint bid  the Form shall be copied in needed number of copies  depending on  the Consortium members    Each Consortium member is bound to sign and stamp the copy of the Form A in the  instructed manner     91       Form B           Automatic vehicle location system and smart ticketing system           LIST OF COMPULSORY DOCUMENTATION RELATED TO THE MANIFACTURER SUBMITTED  BY THE BIDDER       No  Enclosed to the bid  apart from the Form B  please find        In order to prove the capability for execution of professional activity  the  bidder shall submit document for registered activity for the manufacturer   issued from the Trading Registries kept in accordance with the national  regulations within the country of registration     yes no       Statement from the responsible person of the manufacturer that in the last  five years had not been subject to a legally effective judgment pronounced  against him her for participation in a criminal organization  corruption  yes no  fraud or money laundering    a  providing the bidd
100. ment shall have to provide the so called eCloud support for  the System  This includes the provision of the hardware  servers   system software   database  communication devices  etc  that shall be installed in their Data Centre  The  Carrier of the Procurement undertakes to provide high performances of the applications  for the automatic vehicle location and the smart ticketing subject to this procurement   He shall also enable its connection to other parts of the System     For the services of Paragraph 1 of this Article  the Contracting Authority shall pay to the Carrier  of the Procurement a monthly fee for the eCloud service in the amount of 0 6  of the value of  the procurement of this contract  This monthly fee shall also include the maintenance of the  applicative software for the AVL and STS as well as the costs for the full generated GPRS traffi     Article 16    The Data Centre shall have to meet the highest standards for the provision of a permanent and  continuous functioning of the System  data safety  protection against unauthorised access  fire  protection  and other safety standards  in all aspects compliant with the requirements of the  tender documentation and the technical documentation     System Functioning Monitoring Commission  Article 17    For the purposes of monitoring the functioning of the System  the Contracting Authority shall  establish a the System Functioning Monitoring Commission    The tasks and the subject of activities of the Commission o
101. mented     16 3 3 Proof for the criterion No  3 3 shall be Notification from the bidder stating that among  implemented solutions there are several transport entities and that there is income sharing   clearing  existing among them  The bidder shall submit contact data of all participants in the  implemented transport solution   During the evaluation  upon a request from the Contracting  authority  the bidder shall organise onsite visit of one of the pointed locations where system has  been implemented     For the criteria No  3 4 1  3 4 2  3 4 3  3 4 4 and 3 4 6  the bidder must mandatory prepare and  organise presentation of the offered solution  The date and time of the presentation shall be  agreed with each bidder individually on the day of opening the bids     The bidder must provide all necessary technical pre requisites for the presentation of the  offered application  proper software and hardware  at the location of the Contracting authority   For the purposes of detailed evaluation  the whole equipment should be left available to the  Committee up to the finalisation of the procedure     When presenting the bidders    solutions  the Contracting authority shall compare the functional  and analytical features and advantages of the offered solutions and in accordance with the  presentations and independent evaluation by the Committee  shall perform proper evaluation     For the criteria 3 4 1  the possibility for creating timetables and drivers schedules shall be  eval
102. meters  time  hour  day  from to date and similar      The log must be available for manual input of data in addition to the existing records  subject to  prior approval and special indication thereof  whereas deletion and modification of log data is  not permitted     It should be possible to use the data in the operational for a specific time period  hour  day   week  month  etc  depending on the needs of the dispatcher     Vehicle Statistics    All relevant data related to the vehicles will be recorded and stored for further analysis  It should  be possible to draft various reports on individual vehicles or groups of vehicles that will include  the following       Time period of use of vehicles on and outside the bus line     Time period of use of backup vehicles     Effective  null and total distance passed in kilometres       Performed transport activity  location km  driving hours  passenger km   passenger place km        Completed   uncompleted departures  one way trips      Deviations from the planned timetable       speeding  exceeding movement velocity    52    Driver Statistics    Similar to vehicle statistics  it should be possible to generate statistical reports related to the  drivers  They should include the following       Sign in   sign out  working hours       Monitoring of all additional entries in the work process  night shifts  standby shifts and  similar  as well as calculation of night work  work on holidays  over time       Monitoring of all interrupti
103. n of data   various set of overviews  administration and similar   Each user will be registered in the System  with username and password     70    The system administrator may add new users  as well as delete existing users and change user  rights     Communication Interface  Organisation of wireless communication data transfer    The System should be designed in such a way as to enable efficient and secure data transfer  by using technology that provides maximum integrity and data protection during the transfer   Existent GSM GPRS technology is envisaged for wireless communications  in order to  guarantee better security  traffic will be routed via private APN      Communication management means concurrent operation of 1000 vehicles in accordance with  the required standards  Also  the System should enable operation without reducing the  performance even if the number of vehicles increases by 30      The communication with automatic transfer of standard data will be scheduled in cycles of  minimum 10 second time intervals  as described in this Chapter  Accordingly  the required  communication capacity will be 3000 datagrams per minute for all vehicles     The overall GPRS communication and data transfer among the System components will be  ensured by the Bidder  and it will be incorporated as a cost in the monthly fee for the eCloud  hardware and software service  The monthly fee shall also include the maintenance of the AVL  and STS application software     Communication r
104. n of unplanned equipment failures     Setting the System for achieving maximum performance improvements   Updating the installed software with patches and new releases     Identification and assistance during troubleshooting related to the installed software      patches and releases     Troubleshooting issues related to interconnections with various software products and other  devices     Software migration to new active platform     Updating the documentation while and or after completing the modifications        The response time for regular maintenance must not exceed 8 hours from the receipt of the  request sent by the Contracting Authority  Within that timeframe  the Bidder shall inform in  writing the Contracting Authority concerning the activities that will be undertaken and the  timeframe for complying with the request     The part of the regular maintenance related to preventive maintenance will be carried out in  accordance with a previously defined plan and programme proposed by the Bidder and adopted  by the Contracting Authority  In case the Bidder plans to derogate from the plan  the Contracting  Authority must be informed in writing thereof at least 24 hours before the planned activity is  undertaken     The Bidder shall be obliged to cover all expenses for the software upgrades during the Contract  validity period     Detailed procedures for the regular maintenance will be also enclosed     Corrective Maintenance    Corrective maintenance will entail remedia
105. n the future other transporters under  the same criteria concerning the quality service and the same calculation principles     Service Calculations    The calculations concerning the service will be conducted for a specific time period  usually at  the end of the month  and the calculation algorithm will be defined by the City of Skopje in  cooperation with JSP SKOPJE and other transporters     53    Management    The Vehicle Pool Management System must provide tools and functions which will assist the  dispatchers in managing the regular traffic  and in case of traffic disturbances  accidents  extra   ordinary situations  special events and similar      Procedures for Extra ordinary Situations    The driver should be able to communicate with the Dispatching Centre with predefined  messages  The Dispatching Centre  OCC  should be able to establish voice communication  with the driver and depending on the circumstances inform and alert the Police  Paramedic  Services  Fire Services  the teams of internal and bus line control and similar for the purpose of  addressing any undesirable extra ordinary situation  The System should provide internal  procedures for operator that should be observed in case of extra ordinary situations     Notification of Passengers    Notification of passengers is an important function of the AVL  The notification of passengers  will take place before and during the trips  The passenger notifications should be precise so that  the patients may become
106. ng authority may sign the PP Contract with the second ranked bidder under the same  conditions and in the same deadline applicable for the first ranked bidder  provided the first   ranked bidder failed to comply the conditions and did not sign the PP Contract within the  deadline referred to in the paragraph 1 of this point  and the deadline for signing the Contract  commences at the moment of submission of the written invitation to the second ranked bidder     Duration of the Contract shall be 3  three  years and 10  ten  months  as of the date of its entry  into force     21    23  Application of the legislation    Any issue not regulated in the tender documentation shall be subject to the Law on Public  Procurements and the Law on Obligations     22    Ill  Contract Model     CONTRACT  FOR THE PROCUREMENT AND IMPLEMENTATION OF THE  AUTOMATIC VEHICLE LOCATION SYSTEM AND THE SMART  TICKETING SYSTEM IN THE VEHICLES OF JSP SKOPJE    Pursuant to Article      of the Public Procurement Law  The Official Gazette of the Republic of  Macedonia No  136 2007  130 2008  97 2010  53 2011 and 185 201 1        The text of the Contract is not final and shall be finalized depending on the Economic Operator   s Bid   under the condition the so defined text is not deviating from the basic elements contained in the TenderD     23    Contracting parties     1  Public Transport Enterprise SKOPJE  headquartered at Bul  Aleksandar Makedonski br   10  Skopje  represented by its Director Mi  o Nikol
107. ng bus driver rosters      Optimisation of vehicle utilisation      Vehicle monitoring and management application for dispatchers       Passenger notification in the vehicle  at the bus stops  via web application and via SMS  service       Database management  entry  updating  archiving       Smart Ticketing Sub system  data collection and drafting reports      Calculation of work performance per transporter      Revenue settlement      Administration of the overall system and data protection      Application for remote setting of vehicle parameters and devices     Web application  various statistical overviews and reports      81         Application for the transporters     The Bidder should provide the required licences for the operation of the listed application  software     The Bidder should provide software licences for the operating system  Windows 7  and other  packages  Windows Office 2007  for all computers that will be installed at the premises of JSP  and the City of Skopje for this Project     In case of several transporters  the Bidder should provide data separation  as well as  transporter level access and application level access     Tickets    The System will use contactless plastic smart tickets  incl  processor  memory and antenna for  communication with the reader   POS tickets issued by the driver and a possibility to pay with a  mobile phone by registering the payments in the vehicle validator     Contactless Plastic Smart Tickets    The tickets should b
108. ng timetables by the Traffic Department of JSP  Skopje in cooperation of the Traffic Department of the City of Skopje  The selected timetable  should be transmitted wirelessly to all vehicles  Such data transfer will occur when the  timetables change  If any of the vehicles have not updated their last timetable  due to any  reason  such vehicles should be marked differently on the dispatcher s display  By using this  System  large volume of input data would be received in the future  thus facilitating the creation  of timetables  as well as optimising the number and operation of vehicles     When modelling designing the timetables it is necessary to minimize the number of required  vehicles and drivers in order to perform the transport service  The application must enable  creation of a graphic and numeric timetable taking into account previously acquired data on the  busyness of the lines calculated using the completed validations on a specific line during a  specific time of the day  When the timetables are created  corridors with several passing lines  should be taken into consideration in order to avoid overlapping and simultaneous arrivals of  several buses at the same bus stop     Also  the application should take into consideration the points where the lines cross each other  in order to enable transfers of passengers from one to another line     The traffic engineers will enter data on the number of vehicles  vehicle operation mode  three  shifts  two shifts  split sh
109. nsortium   the economic  and financial capability shall be proven by taking into account all the resources of the  Consortium members  and the carrier need to fulfil minimum 50  of the required criteria     9 4  Technical or professional capability    9 4 1  In order to get qualified as capable for execution of the PPC from the point of view of  technical and professional capability  the bidder needs to submit     e Reference list of contract  s for implemented project with offered solution for minimum of  250 city line buses  with an average minimum of 120 000  hundred and twenty   transactions  validation  per day  operational in the previous 3 years  listing the  amounts  dates  along with minimum of 1  one  recommendation for successful  implementation     As a proof of aforementioned the bidder fills in the Form 3A enclosed to this Tender  documentation  signed and stamped by the bidders responsible person and submits  certificate s issued by the Contracting authority where the system was implemented     e Proof  Statement  of availability of properly qualified technical personnel required for  mounting of the whole equipment and quality control  that the bidder can use     As a proof of available properly qualified technical personnel the bidder fills in the Form 4A  enclosed to this Tender documentation  signed and stamped by the bidder   s responsible  person     e Report  Statement  on devices and technical equipment available to the bidder  intended for the implemen
110. nstructed in the Instructions    The Form for the Sub contractor shall be copied  signed and stamped by the sub   contractor  The Form shall be copied in needed number of copies  depending on the  number of engaged sub contractors and shall be submitted for each one of them for  signing and stamping by the bidder in the instructed manner    The filled in  signed and stamped Form shall be submitted by the bidder acting with  sub contractor  s     93       Form 1A   Automatic vehicle location system and smart ticketing system       BID FORM    Bidder   s memorandum    Based upon Public Call for awarding the PPC for Automatic vehicle location system and  smart ticketing system     No  70 2012 from 09 01 2013  published by the Public  Transport Company     JSP Skopje  with a registered head office on bul  Aleksandar  Makedonski No  10  Skopje and the tender documentation we collected  we submit the  following        OFFER  Part       General information  i 1  individual application  WEEP OEA ERE HING MEGI 2  application with sub contractor s  NUMBER OF OFFER 3  Group of bidders  Consortium              GENERAL INFORMATION ABOUT THE BIDDER             NAME OF THE BIDDER authorized Consortium       TAX NUMBER  II  NAME of the Consortium   subcontractor                            il  NAME of the Consortium   subcontractor  HEAD OFFICE             UNIQUE REGISTRATION NUMBER OF THE  CITIZEN    TAX NUMBER             In case of joint bid  that is  in case bidder engages sub contractor 
111. nt       1    Smart ticket recharging device 50 units       2    Device for standalone issuing and recharging of smart tickets  so called   3 units  ticket vending machine                   3    Three line information display 40 units  Plastic card with 4 kB chip 200 000 units       80    Additional equipment provision in the guarantee period    The bidder  according to the specified Specification for devices and segments of the  System  is obliged to give guaranteed prices in Eur which will be valid for the entire  duration of the guarantee period     Additional equipment specification with guaranteed prices expressed in Euros                       DESCRIPTION OF THE EQUIPMENT Price in  EUR   Computer unit in the vehicle   GPS device   Fiscal printer   Validator       Device for smart tickets control       Device for smart tickets recharging       Digital camera       Printer for smart tickets printing       OPO   ON LI      Device for autonomous smart tickets issuing and recharging so called  ticket vending machine with connection       10    Three rows informative display with connection       11    Plastic card with chip 4kb  according to the technical documentation                 12    Cabling of one bus       Software    The Bidder should provide the software necessary for functioning of the System  The software  should be capable of complying with the following requirements  i e  should include at least the  following applications       Drafting timetables      Drafti
112. o be valid  and  the guarantee is valid for another 30 days after the Contract expires   The guarantee should include a clause  non revocable  non conditional  payable upon first call  without a right to object  with an option for partial realisation and renewable   in the amount of  15  of the PPC value or EUR denars     EUR denars   If the Carrier of the Procurement fails to furnish the Guarantee within the deadline stipulated in  paragraph 1 of this Article  the PP Contract will be deemed as terminated due to non   compliance by the Carrier of the Procurement  and the Contracting Authority will invoke the  Guarantee referred to in Article 31 of this Contract   If the Carrier of the Procurement fails to furnish the Guarantee within the deadline stipulated in  paragraph 1 of this Article  the PP Contract will be deemed as terminated due to non   compliance by the Carrier of the Procurement  and the Contracting Authority will invoke the  Guarantee referred to in Article 31 of this Contract        Activation of the Guarantee for quality functioning of the System  Article 34    In case the System is not functional between the final acceptance and the expiration date of the  PP Contract  or the shortcomings are not rectified within the deadlines set in Appendices 3 and  4 and Article 4 of this Contract  or the obligations which are subject of this Contract and the Bid  are not fulfilled  the Contracting Authority will activate and collect in full the Guarantee     35    The Cont
113. of the Procurement the use of data necessary for the  elaboration of the Main Project and the System software      To appoint person s  responsible for the hardware and software operation      In an interval of every two months to consider the requests by the Carrier of the  Procurement relating to the improvement of the System     Article 23  In order to realise the PPC  the Carrier of the Procurement undertakes       To deliver the equipment in its original packaging  suitable for transport of that type of  equipment to the place of delivery and installation     31    32    The delivered equipment and containers shall have to include a certificate of origin and  a producer s certificate vouching for the genuine product  and timely and in writing to  inform the Contracting Authority about the time of each delivery of the elements of the  System    To submit to the Contracting Authority the full technical documentation for the entire  equipment delivered  hardware and software  with notarised product warranties and  description of the entire system  with a detailed description of each function and each  sub system  user manual and technical maintenance manual  technical description and  technical characteristics  hardware handling  measuring and maintenance methods   hardware and software installation and configuration  sketches and graphs  etc    To submit a detailed functional description of the hardware and software that shall be  installed  functional description of the S
114. of this contract   and   e The installation and commissioning of the System  Article 7 of this contract   or its final  commitment  Article 13 of this contract      The Contracting Authority shall invoke and collect the Guarantee in full if the Carrier of the  Procurement  within the additionally allowed deadline  and by fault of his own  fails to install and  commission the System  that is  its final commitment is not made  Article 13 of this contract      The Contracting Authority shall invoke and collect the Guarantee in full if the Carrier of the  Procurement fails to provide the Guarantee for the quality functioning of the System within the  deadline of Article 33 of this contract     The Contracting Authority shall invoke and collect the Guarantee in full in all cases when this  contract is deemed terminated by fault of the Carrier of the Procurement  or when it becomes  unilaterally terminated by the Carrier of the Procurement during the validity period of the  Guarantee  due to reasons that cannot be ascribed to the Contracting Authority     Guarantee for quality functioning of the System    Article 33  Within 7 days from the expiry of the performance guarantee for the System  the Carrier of the  Procurement shall be obliged to submit to the Contracting Authority an original bank guarantee  for quality functioning of the System for a duration of 3 years and 10 months  with an obligation  to successively renew it within 15 days from the date the last guarantee ceased t
115. ollution  as well as protecting the environment by replacing the paper tickets   which usually end up on the streets or the city greenery  with smart chip card tickets that will  last for at least 10 years     General Requirements    In order to avoid additional investments  the Bidder should offer an integrated solution for an  automatic vehicle location system and a smart ticketing system with contactless cards  Apart  from the common hardware components which will be installed in the vehicles  GPS device   driver control unit and similar   and the single two way data transfer system  a common control  centre is also required  including hardware and software for storage and processing of the  needed data  Therefore  we will consider it as a single System with two Sub systems  The data  generated by the System will be sensitive and must be protected from misuse  The access to  the data must be clearly delimited  i e   various user profiles should be defined  Also  the data  should be stored on servers in secure premises with controlled access and clearly defined  security protocols     The System should use standardised components  if possible  hardware and software   All  communication interfaces to external systems should be standardised or open     43    All utilised components should be in compliance with the following conditions     Electromagnetic Interference  EMI  and emissions should be in compliance with  internationally recognised standards     Electromagnetic Com
116. om the day of adoption of the Main Project together with  its annexes by the Contracting Authority    The installation shall be carried out through defined stages and dynamics as foreseen in the  Dynamics Plan for the Equipment and Software Installation  henceforward  Dynamics Plan   which represents an integral part of the Carrier of the Procurement   s bid    The Contracting Authority shall preserve the right to make amendments in the Dynamics Plan in  agreement with the Carrier of the Procurement     Article 6    The installation of the System shall have to be carried out in accordance with the Main Project  and   in accordance with the existing regulations  standards and norms on quality stipulated in the  technical specification and tender documentation    The Carrier of the Procurement undertakes to apply the state of the art technology and  technical  amp  technological solutions when incorporating the equipment in the System that shall  improve its functionality  by way of employing patented i e  branded technology that the Carrier  of the Procurement has available    The Carrier of the Procurement undertakes to implement the full software that shall provide for  the functioning of the System    The Carrier of the Procurement undertakes  in case minor amendments arise in the regulations  throughout the duration of the PPC  to make the necessary alterations in the software  The  Carrier of the Procurement shall make these alterations at his own expense    In case the C
117. on  10    Three line information display and interconnection  11    Plastic chip card 4kB  as per the Tender Documentation   12    Single bus cabling                111       
118. ons of the work process       Driver replacements     Service Scope    The AVL should enable monitoring of the scope and performance of performed services for all  vehicles and bus lines individually  as well as for the transporter as a whole  For that purpose  the following data should be monitored       Performance of planned trips      Registered departures  at terminal  and at certain main bus stops along the route      Uncompleted planned trips      Additional trips      Reallocation of vehicles per bus line      Distance passed  null  effective and total      Time period of vehicle use and number of shifts per vehicle      Number of vehicles active in traffic       Number of transported passengers  this data will be collected when the passengers use  the ticket validating device        Average delays at bus stops per vehicle or a group of vehicles in a specific period     Other data requested by the Contracting Authority     Service Quality    The AVL System should enable service quality control  that is  a possibility for the Traffic  Department of the City of Skopje to monitor the realisation of the planned timetables expressed  in percentages  The City of Skopje will establish certain criteria concerning the service quality to  be provided by JSP SKOPJE  Depending on the performance related to the set criteria  the  calculations concerning the performed services and the settlements between the City and JSP  Skopje will be realised  The System will enable to include i
119. ontracting Authority asks for significant alterations in the software  such an  alteration shall be regulated by way of an annex to this contract     Article 7  The Carrier of the Procurement undertakes to install and commission the System  the final  commitment of the System  within the deadline of days from the day of entry into force  of this PPC     26    In case the Carrier of the Procurement fails to implement the System by fault of his own  within  the deadline of Paragraph 1 of this Article  the Contracting Authority may allow for an additional  deadline for the installation and commissioning of the System  but not longer than 15 days    In case the Carrier of the Procurement delays the installation and commissioning of the System   the final commitment of the System  by fault of his own  the Contracting Authority shall charge  a Contractual Penalty for each day of the delay    In case the Carrier of the Procurement fails to install and commission the System within the  additionally allowed deadline and or the final commitment is not carried out  this contract shall  be deemed terminated by fault of the Carrier of the Procurement  and the Contracting Authority  shall fully invoke the Guarantee of Article 31 of this contract     System Installation Monitoring Commission  Article 8    The Contracting Authority  for the purpose of adoption of the Main Project and monitoring of the  installation of the System  shall establish a special System Installation Monitoring Commi
120. or      8 points  as follows    16 3 4 6 1  number   types of mobile telephones supporting mobile payment     4 point   16 3 4 6 2  duration of payment operations  2  points   16 3 4 6 3 transaction safety     1 point   16 3 4 6 4  simplicity of control procedure  1  point  Total  100 points    16 2 The interpretation of criteria into points when selecting economically the most favourable offer   the Contracting authority evaluates in accordance with the following methodology     16 3 1  Price  50 points      the bid shall be evaluated in percents compared to the lowest offer bid  and such bid shall be multiplied with the maximum number of points and the sum shall be divided  with the subject bid price using the following formulae     18    lowest offered price x maximum number of points    N  mber Of POINS Sian senate cesarean eae ene oe ner  bid price  Cmin  X  S aaa 5  Cc    interpretation of the symbols   S   awarded points   C  bid price   Cmin   lowest offered price   X   maximum number of points    16 3 2  Proof for the criterion No 3 2 shall be stamped copy of the Contact for each  implemented solution  respectively  reference from the Contractor for successfully implemented  contract  Statement from the Contractor for the total number of system validation in 2011 and  contact data of the Contractor  During the evaluation  upon a request from the Contracting  authority  the bidder shall organise onsite visit of one of the pointed locations where system has  been imple
121. ordance with the Decision from the City of Skopje Council  the funds have been  transferred on special  earmarked  account of the Contracting Authority intended for  procurement of the System referred to in the point 3 1 The special account  No  within Bank AD Skopje           5 3 3 The funds of the Contracting body shall not be used for payment of person and entities   import of goods in cases when such payment or import is banned by a Decision from the UN  Security Council in accordance with the Chapter 7 from the UN Charter     6  Amendments and derogations in the realisation of PPC    Amendments and derogations in the terms  conditions and realisation of PPC shall be permitted  solely upon written consent from the Contracting authority and it will be subject to Contract  Annex signed by the Contracting parties     7  Duration of the PPC    Duration of the Contract shall be 3 years and 10 months  three years and ten months   commencing at the date of entry into force of this Contract     Duration of the Contract may be prolonged upon manner  terms and conditions set out in the  Contract  and in accordance with the Law on Public Procurement and Law on Obligations     8  Criteria on verifying the bidders    capability    In order to participate in the Contract awarding procedure  that is  in order for the offers to be  evaluated  the bidders need to be selected as qualified  For the purpose of qualification  the  bidders will have to submit documentation to prove their      
122. out with his her identification card thus  putting the validator in regular operational mode     It should be possible to transfer the data from the controlling device of the controller to the  Control Centre and to draft daily and periodical reports     Issuance of personalised tickets    Personalised ticket will be issued at eight  8  specific points of sale  These points of sale will be  equipped with passenger photographing devices and smart ticket printers which will print the  photograph on the smart card itself  The personalised ticket will also store the personal data of  the user  name  surname  address   privileges  travelling zones and other benefits  if any  The  process of issuing a personalised ticket must not last more than 5 minutes     The point of sale and the Control Centre should have a permanent communication link     Ticket recharging  Tickets may be recharged in the following ways     1  At any of the fifty  50  points of sale with a recharging device  as well as at the eight  8   personalisation points     2  Via so called ticket vending machines  standalone assemblies installed at bus stops  which autonomously issue blank smart tickets that may be recharged afterwards     3  By paying an invoice issued to enterprises for collective employee tickets   4  Recharging with a mobile phone     1  Ticket recharging devices should be located at the points of sale provided by JSP Skopje   The recharging device may recharge non personalised smart tickets and ex
123. outes    This part describes in details all communication routes and all functions that must be provided     Communication between the Control Centre and the Driver    The communication between the dispatcher in the Control Centre and the vehicle driver is  hereby described     From the Centre to the Driver    Any exchange of messages between the dispatcher and the driver via wireless communication   as well as all information intended for the driver and the passengers send by the dispatcher   should be shown in the OCC  stored and recorded in the operational log     The dispatcher in the Control Centre may select the vehicles he she communicates with in  several ways       Sending a message to one vehicle  selected from the route or by the vehicle code        Sending a message to several unrelated vehicles  selected from the route or by the vehicle  codes        Sending a message to all vehicles from one operational group  and    Sending a message to all vehicles  all vehicles from all operational groups      There must be a possibility to move vehicles from one group into another  as well as create  various vehicle groups     Vehicle selection to which the dispatcher sends messages must be simple  The dispatcher  should be able to select some of the predefined messages or type the text he she wants to  send to the driver  At the same time  as soon as the message is sent to the OCC  the following  data related to said message should be recorded in the operational log  e g   
124. ov  henceforward  Contracting Authroity   on  the one hand     and  2    represented by  henceforward  Carrier of  the Procurement   on the other          On 2013 concluded the following       CONTRACT  FOR THE PROCUREMENT AND IMPLEMENTATION OF THE AUTOMATIC  VEHICLE LOCATION SYSTEM AND THE SMART TICKETING SYSTEM IN THE  VEHICLES OF JSP SKOPJE    Subject of the Contract  Article 1    The Carrier of the Procurement for the procurement  installation  commissioning  and  maintenance of the automatic vehicle location system and the electronic  intelligent  smart  ticketing system in 500 buses of the Contracting Authority  henceforward  the System   and the  provision of the functioning of the System until the end of this contract  regulates the mutual  rights and obligations of the Contracting Authority and the duration of this contract  in  accordance with the Public Advertisement No  70 2012 published on ESPP  the Official Gazette  of the Rep ublic of Macedonia No  05 of 9 January 2013  and with the Tender Documentation  No   2013 and the accepted Bid No    which are an integral part of this  contract   The System consists of two systems  sub systems    e system for automatic vehicle location  regulation and control of the transport service   and  e the electronic  intelligent  ticketing system with the so called smart  henceforward   smart  tickets     Contract Duration  Article 2    The duration of the public procurement contract  henceforward  PPC  is 3 years and 10 months  
125. ovisions in this  Contract  The penalty provisions may be applied only for the number of hours for which the limit  was exceeded     The Bidder shall be obliged to provide all necessary spare parts required for the maintenance of  the user equipment  subject of this procurement     The Bidder must submit a detailed procedure for corrective maintenance  as well as the  organogram of his 24 7 support service department in charge of receiving notifications and  rectifying faults     For each established failure or defect of the System  as defined in paragraphs 2 and 3 of this  Article  the Contracting Authority and the Bidder shall be obliged to draft and sign a Report  which will clearly state the type of failure and the time needed to remedy the situation     87    88    V  FORMS    Form A          Automatic vehicle location system and smart ticketing system          FORM     INSTRUCTION FOR PROVING CONDITIONS FULFILMENT       No     In the offer  with the Form A we hereby enclose the following        Form 1A     Offer Form    yes    no       Form B     List of mandatory documentation the bidder submits for the sub   contractor s  filled in  signed and stamped Form is submitted only by a bidder who  applies with the sub contractor  s for each sub contractor  respectively     yes    no       Form 2A     All Consortium members submitting joint bid  Form filled in with  required data  signed and stamped by all Consortium members is submitted in  case of joint bid     yes    no   
126. p or have registered too late  It should be possible to monitor the following points  related to the vehicle trip       Vehicle sign in      Departure from the garage      Start from the terminal      Sign in replace driver      Register replace bus line      All departures and arrivals at the terminals      End ofthe trip including the last stop over at a terminal     Leaving the garage      Vehicle sign out     Monitoring while replacing driver    The AVL System should control all planned changes of the driver  Sign ins and sign outs of the  drivers are forwarded to the database in the Control Centre     Timetable Monitoring    The AVL System should follow all deviations from the planned timetables of all vehicles  The  time tolerance may be defined as a configurable parameter  If the vehicle is moving at a velocity  that will lead to deviate more that the time tolerance  the application should inform the    48    dispatcher who should then undertake actions  e g  mark the vehicle in a different colour if it is  late  that is  if it arrives earlier than envisaged      Information related to the operational status    The AVL System should enable displaying all relevant information to the dispatchers  drivers  and other competent personnel in an adequate manner     Such information is     Basic information related to the vehicle  whether it is in use  outside or in the garage      Vehicle location  at which bus line  route location  location outside the route      Deviation f
127. patibility  EMC  and immunity should be in compliance with  internationally recognised standards     The human health safety should be in compliance with internationally recognised  standards     Operational temperature  between  20 and 50 degrees Celsius     Resistance to drops and vibrations  applicable to the vibrating operational part of the  buses     The overall equipment should be in compliance with the standards for resistance to  humidity  dust and other environmental conditions     Basic Requirements for the Automatic Vehicle Location Sub system     Drafting timetables and bus driver rosters    Vehicle management along the bus line network    Increasing the service quality  regularity  reliability  accuracy    Increasing the efficiency of the public transport system    Optimisation and integration of the bus line network    Controlling the implementation of the planned timetable    Controlling the drivers  work  speeding  changing routes and similar      Possibility for timely and effective response by the transport organiser in case of  unforeseen traffic situations     Increasing the safety level both for drivers and passengers     Possibility for real assessment of the realisation percentage of the planned timetable by  the city authorities  in case of payment per kilometre     Improving the information provided to passengers     Basic Requirements for the Smart Ticketing Sub system with contactless cards     44    Revenue management   Improving and developing th
128. per the  requirements of the Enterprise     Additionally  the Supplier should provide support during the so called server to server  communication with the other external systems described herein     Smart Ticketing Sub system    The interface of the Smart Ticketing Sub system is one of the most important interfaces  At the  same time  the GPS data may be used for the zones in the zone tariff system     Planning Systems    Apart from the already mentioned sub systems  there are other sub systems using data from  the AVL System  as follows       Systems for statistical data processing     Planning systems  defining traffic models      56      Administrative systems     Road Traffic Management    The City of Skopje is currently conducting a procedure for implementing a Traffic Management  and Control System  TMCS   In that sense  that system should be able to interact with the AVL  System in order to send data to the Traffic Management System concerning traffic jams at  certain road sections  so that the Centre may inform other traffic participants and  if needed   change the routes according to the plans for extra ordinary situations  The Bidder of the AVL  and Smart Ticketing System should enable communication with the TMS by providing access to  all necessary protocols and other technical documentation  and the interface between these two  systems will be provided by the supplier of the TMS System     Giving Way at Crossroads    Within the TMS  public transport vehicle will 
129. percentage participation shall be fixed and unchangeable until the final implementation  of the subject to the tender documentation        3  SYSTEM IMPLEMENTATION DEADLINE       Required deadline  Offered deadline        Final deadline for the System implementation shall  be 300 days as of the entry into force of the Contract days  subject to the Public Call                4  Financial guarantee funds      Original bid guarantee  original  or deposited funds in the amount of at least 2  of the total bid  value which shall be non puttable  unconditional  payable on first call and without objection right  with a validity date of minimum 194 days as of the date of bid opening       Signed and stamped Model Contract    5  Way of payment    The bidder shall agree for the Contracting authority to pay the Total amount for purchasing of the System  to be paid on 3  three  equal instalments  The manner and deadline of the payment shall be defined in  the Contract for the procurement in question    6  e Cloud fee    The Bidder shall agree for the monthly servicing fee upon e Cloud principle  in accordance with the   requirements given in the Tender Documentation     Technical specification to be 0 6  of the offered   procurement price submitted as final offer    7  Additional equipment in the warranty period    The bidder is bound to provide guaranteed prices expressed in Euros applicable throughout the whole   warranty period  as per the given specification of devices and System segm
130. plication   signed Contract Model and Bid guarantee in sealed internal envelope which shall  have the full name and address of the economic operator with a notification    Offer    written on  the upper left angle of the envelope    The technical documentation shall be submitted in another sealed inner envelope containing the  name of the bidder with its full address and titled    Technical documentation    written in the upper  left angle of the envelope    Documents confirming bidder   s capability shall be submitted in separate sealed inner envelope  containing the name of the bidder and its full and correct address  and notification    Documents  confirming capability    in the upper left angle of the envelope     The inner envelopes are submitted in sealed external envelope   e addressed to the full and accurate address to the Contracting authority   e containing the number of the Public call  and  e    Do not open    notice shall be written in the upper left corner  preventing opening prior to  set time and date for bid opening     14    Providing all envelopes are not sealed and marked as required  the Contracting authority shall  not be held responsible for any untimely or incomplete reception of the bids or for any  premature bid opening     12 7  Single bid principle    One bidder can apply with a single bid regardless applying individually  or as a member in the  group of bidders  In contrary all bids with containing same bidder shall be rejected     12 8  Modifica
131. prove the economic and financial situation  the bidder shall submit Balance  Sheet and Income Sheet for the previous 3  three  years  2009  2010 and 2011   that is for the  period of operations provided it is shorter than three years     9 3 4  The economic and financial capability of the economic operator can be supported by  another entity  including the capability of the new group offer  Consortium of bidders   irrespective of the legal relations between the economic operator and the other entity and the  operator shall have an obligation to submit the required documentation referred to in the point 9  of this tender documentation to that the other entity fulfils the conditions regarding      Personal circumstances      Economic and financial circumstances      Technical or professional capability     If the economic operator proves its economic and financial capability by referring to the support  from another entity  the operator shall have an obligation to prove this support by providing valid    10    evidence that the other entity shall make available the appropriate financial resources to the  economic operator     9 3 5  The Balance Sheet and the Income Statement shall be issued by competent authorities in  the country where the economic operator is registered  In the Republic of Macedonia  a  competent authority to issue such confirmation is the Central Registry of the Republic of  Macedonia     9 3 6  Providing the bidders submit an offer as a group of bidders  Co
132. public  procurement contracts and contracts for public private partnership imposed against  him her      That has a criminal sanction for performed criminal acts for legal entities or side  sanction involving temporary or permanent ban for performing specific activity  imposed against him her  and      That has a misdemeanour sanction involving prohibition to perform a profession   activity or duty  or prohibition to perform a specific activity  imposed against him her     9 1 2 To prove his her personal circumstance  the economic operator shall submit the  following documents       Statement of the economic operator that  within the last five years  he she has not  had any legally effective judgment for participation in a criminal organization   corruption  fraud or money laundering  pronounced against him her       Confirmation that he she is not subject to a bankruptcy procedure opened by a  competent authority       Confirmation that he she is not subject to a liquidation procedure opened by a  competent authority       Confirmation of paid taxes  contributions and other public dues issued by a  competent authority in the country where the economic operator is registered       Confirmation from the Registry of criminal sanction for not performed criminal acts  for legal entities or side sanction involving prohibition to participate in public call  proceedings  public procurement contracts and contracts for public private  partnership imposed against him her      Confirmat
133. racting Authority will activate the Guarantee in full in all cases when this Contract is  deemed terminated due to fault of the Carrier of the Procurement  or is unilaterally terminated  by the Carrier of the Procurement for the duration of the Guarantee  due to reasons that may  not be attributed to the Contracting Authority    In case the Guarantee of Article 33 in this Contract is not activated  it will be returned to the  Carrier of the Procurement within 30 days from the expiration of the PP Contract     Collection of guarantees and compensation claims  Article 35    The Contracting Authority has the right to collect the Guarantees even when their amount  exceeds the suffered damages  as well as in cases when no damages have occurred    If the damages suffered by the Contracting Authority are exceeding the Guarantee amounts  it  shall have the right to claim the difference up to the full amount of the claim compensation     Contractual penalty  Article 36    In case the deadlines stipulated in Article 4 of this Contract have been broken  and due to  reasons that may be attributed to the Carrier of the Procurement  the Carrier of the  Procurement shall be obliged to pay a fine to the Contracting Authority in the amount of 6 000   six thousand  EUR  expressed in equivalent denar value according to the middle exchange  rate of NBRM on the day of payment for each extra day after the deadline  upon the defined  deadline schedules in the Schedule Plan  and not more than 200 00
134. ransfer them to other persons without prior authorisation  In  the contrary case  the Contracting Authority shall have the right to claim criminal liability from  the Carrier of the Procurement and to claim compensation of the incurred damage  under the  law    The obligations of Paragraph 1 of this Article shall remain valid even after the termination of the  contract     Article 21    The Carrier of the Procurement undertakes to implement all the measures necessary to prevent  the loss of data from the System in whatsoever circumstances  in case of software error   communication line problems  or electric power shortage in the data feeding  transmission or  updating processes  etc      In case of data loss that has not originated through a fault of the Contracting Authority   s staff   the responsibility for the data loss shall be borne by the Carrier of the Procurement  who shall  then have the obligation to compensate the damage and reconstruct the lost data at his own  expense     Obligations by the Contracting Authority and by the Carrier of the Procurement  Article 22    Contracting Authority undertakes      To commit the work premises and to provide the conditions for the hardware and  software installation to a functioning level 0  1 and 2 of the System      Within the internal safety regulations to enable to the Carrier of the Procurement  unlimited access to premises and vehicles where the equipment of the System shall be  installed      To provide for the Carrier 
135. ration of the AVL and STS System     Network Equipment    A gigabit network switch with at least 25  free expansion ports should be envisaged for  interconnecting of the OCC independent network     OCC Work Positions  At least 14 work positions are planned in the OCC     All work positions should be equipped with adequate computer workstation including at least a  21  monitor  3 work positions in the OCC occupied by dispatchers should be equipped with 2x  TFT monitors each  21    and capability to operate 2 monitors concurrently     Peripheral Components  74    The equipment should include all peripheral components required for the System to function   such as local and network printers  loudspeakers and similar     Installation of one central screen composed of 4x 46  LCD screens should also be envisaged   All these screens should operate independently and as one large screen  It should be possible  to transmit the image displayed at any workstation to one or to all of the 4 video screens on the  wall as a single image     Uninterrupted Power Supply   UPS    The System should have stable power supply  In case of interruptions of the regular power  supply  UPS battery that allows 30 minutes of uninterrupted operation of the overall System  should be provided  A power generator  which should be activated if the interruption to the  power supply lasts longer than 30 minutes and which will provide full uninterrupted operation of  the OCC Centre  should also be provided     Data 
136. rom the timetable  late  within the tolerance level  earlier than envisaged      Information related to the driver  basic data  working hours  sign in  sign out      Unforeseen events  technical irregularities  extra ordinary situation and similar    e   Information display methods in the Control Centre   Vehicle Display    The System enables monitoring of at least 1000 vehicles in real time within deteriorating the  System functionality     The dispatcher should have at his her disposal the following overviews       Bus stops including their codes and abbreviations  optionally represented in vertical or  horizontal orientation       Division of longer bus lines into two line diagrams       Display of vehicle groups selected by the dispatcher on an electronic map including the  vehicle icon and the garage number  line and service next to it  The mouse over action  will present the active driver data  registration number and similar  There should be a  zoom in  zoom out option  and option to drag the map over the screen  In case the  mouse is pointed over a specific bus stop  its name should be shown  and in case there  is an information display  the display information should also be shown       It should be possible to add alternative routes  Secondary routes  on the display at  proportional distances between the bus stops in case the vehicles must be re directed  due to traffic obstacles       Scale of time intervals between bus stops  depending on the distance and the curr
137. ructions furnished  by the Carrier of the Procurement  the responsibility for the data loss shall be covered by the  Carrier of the Procurement  with an obligation to compensate the damages and reconstruct the  lost data on its own expense     Article 48    None of the contracting parties shall be entitled to assign this Contract or any of its rights and  obligations to third parties without consent of the other contracting party     Valid Law  Article 49    This Contract and the relations between the Contracting Authority and the Carrier of the  Procurement shall be conducted and considered in accordance with the laws and regulations in  the Republic of Macedonia     Applicable Laws  Article 50    The provisions in the Public Procurement Law  Contractual Law and other positive legislation in  the Republic of Macedonia shall apply to all issues not regulated in this Contract     Dispute resolution  Article 51    The contracting parties are willing to negotiate in good will and resolve any disputes   misunderstandings or requests arising from and or in relation to the Contract  including  without  any limitations related to its existence  validity or termination     For the purpose of such negotiations  the contracting parties will assign their representatives  within 7 days fom the date when the other contracting party has received in writing the detailed  notification for dispute    In case both contracting parties fail to come to mutual agreement in relation to the dispute 
138. s  providing the  members of the Biddee group  that is  sub contractor is bigger than 2  the first page of  the offer shall be photocopied and enclosed to the Bid Form     95    Part Il     Technical part    1  The following forms  signed and stamped by the authorised person of the bidder   shall be enclosed to the bid     Euros     Form 2A     Statement from the Consortium members submitting joint bid    Form 3A     Reference Lists    Form 4A     Statement Form for bidder   s sufficient personnel    Form 5A     Statement Form for bidder   s sufficient technical personnel    Form 6A     Statement Form that bidder s Design project meets the technical  specification with Table 6A    Form 7A     Statement Form that bidder   s designated a work team    Form 8A     Statement Form that the bidder has not  in the last 5 years  subjected  to legally effective judgment pronounced against him her for participation in a  criminal organization  corruption  fraud or money laundering    Form 9A     List of confidential information       Form 10A  Statement form proving that the bidder accepts the conditions     Form 11A     Specification of additional equipment with guaranteed prices in      Form B      List of compulsory documentation for the sub contractor     Documents proving bidders capability set out in the point 9 of the Tender  documentation     96    e Document on registered activity   e Statement of the economic operator that  within the last five years  he she  has not had any l
139. s in the Passenger Notification System     Notification before the Trip    Notification before the trip begins when the passenger starts planning his her trip  at home  at  the office or similar  The information should be available outside the Public Transport System   One of the media that may be used for providing information to the passengers concerning the  planned trip is a web application developed by the Bidder  Apart from the planned timetable  the  web site should have a trip planner  as well as the estimated time of arrival at the requested bus  stop of the respective bus line     Also  the AVL System should include an application for passenger notification via SMS  messages  The passenger sends an SMS message containing the bus stop code and the bus  line number  and receives SMS message containing the next 3 consecutive vehicle arrivals at  the designated bus stop on the respective bus line     This application should be customized with accessibility for disabled persons  blind persons   and they should receive the message as an audio recording     Database    The database described here pertains to the basic data required for drafting the reports  Parts  of the database clarifying certain segments of data such as  bus line network  list of bus line  codes  list of driver codes  list of vehicle codes and similar  will be entered in the so called data  tables  The data tables will be defined in accordance with the requirements and in agreement  with the Contracting
140. s one validator per bus installed at the front door  It is  necessary to envisage a System upgrade in each bus with several validators  maximum  number of validator should equal to the number of bus doors      In order to improve installation security and minimise maintenance expenses  the overall  terminal equipment comprising the Smart Ticketing System  mobile  should enable       Remote software upgrades  at any time of the day with minimal disruptions to the end users       Remote diagnostics  which should enable problem reporting and  if possible  remote  troubleshooting using the Central Device Management System     Vehicle Computer Unit  VCU   The vehicle VCU should provide       Storage of all data received from the Control Centre and dispatchers  such as planned  61    timetable including all amendments and updates  bus line routes  tariffs  blacklists and  similar       Storage of data related to the ticketing system  number of validated tickets  blocked tickets   irregular tickets and similar        Utilisation of the ticketing application in the vehicle  taking into consideration all parameters  recorded in the validator and the smart ticket itself       Storage of data in case of interrupted communication with the Centre     Data transfer  from to OCC  from to autobase garage computers       Report on mobile phone payments      Printing of daily report on tickets sold via the POS device     It should be possible to transfer a new pricelist from the OCC to all val
141. s regarding       Personal circumstances    Capability to perform a professional activity     Technical or professional capability    2 7  The obligations of the sub contractor  s shall be under solidar and unlimited responsibility  of the legal entity selected as most favourable bidder     Group of sub contractors  Consortium     2 8  Group of bidders  Consortium  is also entitled to submit offer with no obligation to join in  appropriate legal form     2 9  The Consortium should have an appointed member representative for communication with  the Contracting authority and with the Consortium members and who shall have the authority to  undertake all actions on the behalf and for the account of the Consortium during the procedure  for awarding the Contract     2 10  In case of an offer submitted by a Consortium  the offer should be accompanied by a  written Letter of authorisation signed by all Consortium members authorising a  member representative to submit offer and undertake all actions referred to in the sub point 2 9   on their behalf and account  Form 2A from the Tender Documentation      2 11  In case when the Consortium is selected as the most favourable bidder  the Public Call  Contract shall be signed by all Consortium members individually  or by an authorised  Consortium member representative     2 12  All Consortium members shall be individually  solidary and responsible without limitations  in front of the Contracting party for the implementation of the Contract
142. ssibility for the misuse by the  passenger     17  Public opening of the bids    17 1  Public opening of the bids shall be held on 07 03 2013 at 13 00 hours local time at the  premises of the Contracting authority  meeting room  bul    Aleksandar Makedonski    No  10   Skopje     17 2  The bidder may have his her authorised representative at the public opening of the offers   and the authorized representatives shall bring with them to the public opening an authorization  signed by a responsible person which shall be given in writing to the Committee for Public  Procurement  hereinafter  the Committee      17 3  The authorized representatives of the bidders can participate in the procedure of the  public bid opening by providing their comments in the minutes of the bid opening     20    18  Confidential information    18 1  Contracting authority shall protect the information designated by the bidder as  confidential  especially in cases of business secrecy or royalty rights  except in cases where the  Contracting authority is duly bound to submit these information to the authorities  initiating a  complaint  administrative dispute or similar   For that purpose  the bidder should submit a List of  confidential information in the Form 9A enclosed to this tender documentation and it shall  submit it along with his her offer     18 2  Providing the bidder does not submit the List of confidential information along with the  offer  the Contracting authority shall regard the subjecte
143. ssing     Planning systems  defining traffic models and tariffs      Administrative systems     Interconnection with transporter transporters    A direct link between the transporter and its vehicles is necessary in order to provide data on  the current sales  tariff control and similar  If several transporters join  direct links for relevant  data exchange will be established between the transporters     Service interface    It is of great importance to have a so called service interface for transfer  i e  exchange of  information among the drivers  the Dispatching Centre and the employees in charge of servicing  in the shortest time possible  The Bidder should provide the data in adequate format  i e   provide the communication protocols for all parts of the AVL and STS sub systems in order to  facilitate the interconnection with other systems  as required by the Contracting Authority     New Technologies    The STS should be flexible and should enable the Contracting Authority to expand the ticket  assortment  as well as upgrade the overall system with new more advanced technologies       Possibility to use the smart tickets to pay for other services within the competencies of the  City of Skopje  parking  renting a bike  cinema  zoo  cableway  amusement park  site seeing  tours and similar        The System should support settings for various configurable tariff zones  The system should  support tariffs organised in concentric zones  as well as distributed tariff zones  i
144. ssion   henceforward  Monitoring Commission    The Contracting Authority may  instead of the Monitoring Commission  entrust the activities of  Paragraph 1 of this Article to another professional institution  at his own expense   The Commission of Paragraph 1 of this Article shall carry out the control of the compliance of     The Main Project with the requirements of the technical specification stipulated in the  tender documentation     The installed system  completion status  with the Main Project and the requirements of  the technical specification stipulated in the tender documentation   The Monitoring Commission shall carry out the control and verification of the quality of the  implementation of all types of activities and the application of regulations  standards and  technical norms during the installation of the full System and shall draw up a report on its own  work that shall be submitted to the Contracting Authority   The tasks and the subject of activities of the Monitoring Commission shall be more closely  defined in the Commission Establishment Decision which shall have to comply in all aspects  with this contract     System Commitment Commission  Article 9    The Contracting Authority  in addition to the Monitoring Commission  shall also establish the  Commitment Commission that shall undertake      the commitment of each completed stage  completion status  of the installation   of the System      provisional commissioning of the full System      final commiss
145. stem to also use the  Calypso type cards     The contactless smart tickets will be used in 2 ways  as follows     Non personalised  regular  smart tickets  and    Personalised smart tickets  personal tickets with picture and identification data      Non personalised  regular  Smart Tickets    These types of tickets are so called e wallets and their function is similar to bank debit cards  with a chip  The memory of the ticket itself records the amount  date of last recharge and date  of last validation  This ticket may be used until it has sufficient funds to pay for the trip  and may  be used not only by the person who purchased it  but also by the members of his her family and  friends     The tickets must be validated by the vehicle validator  The tickets will not be time limited and  may be recharged indefinite number of times  as per the manufacturer s recommendation   The  recharging will be organised in at least 50 points of sale in the City and the surrounding  municipalities as determined upon the request of the Contracting Authority     If the passenger requests so  the non personalised smart tickets may be registered to only one  user adding the standard identification data excluding the picture  The registration will be  performed at specific points of sale  Tickets registered in such a way will have adequate  protection in case of loss or theft  and will be rendered invalid and blacklisted upon reporting of  being lost or stolen     During the ticket validation  
146. stimated  time of arrival at the bus stop in minutes   The System should allow direct presentation of any  text message  when needed  sent by the Control Centre     Management of Displayed Information  54    The Passenger Notification System should have two levels of control     The first level is automatic control  AVL will estimate the current position of a specific vehicle  and by using an adequate algorithm enable displaying the time of arrival at the next bus stop   The algorithm should enable accuracy of the estimated time of arrival within 1 minute range  In  case of route delays due to unforeseen situations  the display should show a text message  indicating the route delay     The second level will be direct control by the Control Centre     The workstation and the operator in charge of the information display will be able to manually  type a text on each display or group of displays  in case of any deviation from the timetable for  that corridor and redirection to a different route  The messages may be predefined or free text     In case any part of this System is out of order  the displays will show no data on the vehicles in  order to avoid confusion among the passengers by showing inaccurate data  it will be possible  to display the date  time  temperature  and eventually a message that the system is temporarily  inactive   One operator in the Control Centre will be continuously responsible for monitoring the  status  responding to alarms and rectifying the fault
147. t in  question     4 4 2 Fee for e Cloud    The Bidder shall agree for the monthly servicing fee upon e Cloud principle  in accordance with  the requirements given in the Tender Documentation     Technical specification to be 0 6  of the  offered procurement price submitted as final offer     5  Manner of implementation of the Contract for Public Procurement  PPC     5 1  The bidder is bound to realize the PPC in the following manner   e develop Main project and in case of deviation from the implemented situation from the  Main project to develop the Project for the implemented situation   deliver the equipment and materials needed for mounting the System   mount the System   maintain the System in the duration of the Contract  train part of the employees of the Contracting Authority as per the tender  documentation   e perform all other obligations set out in the Tender Documentation and in the Contract     5 2  Deadline for submission and mounting of the System  training of the personnel and one  month probation of the system shall be 300  three hundred  days from the date of entry into  force of this Contract     5 3  Funding sources    5 3 1 Contracting Authority intended to finance the Contract for purchasing the equipment in  question with the funds granted by the City of Skopje Budget 2013 15     capital subsidies for  Public Enterprises as per the Decision from the Council of City of Skopje  The funds are limited  to the amount defined in the Decision     5 3 2 In acc
148. tation of this Contract  and measures used by the  candidate to provide high quality delivery and mounting of the System     As a proof of available technical capacity and measures necessary for provide high quality  delivery and mounting of the System  the bidder fills in the Form 5A enclosed to this Tender  documentation  signed and stamped by the bidder s responsible person     9 4 2  The capability of the economic operator can be supported by another entity  including the  capability of the members of given group offer  Consortium of bidders  irrespective of the legal  relations between the economic operator and the other entity  the operator shall have an  obligation to prove this support by providing documents referred to in the point 9 of this Tender  documentation  proving that the other entity meets the conditions regarding       Personal circumstances     Capability to perform professional activity  and    Technical or professional capability    9 4 3  Providing the Contracting authority suspects the documents for determining the capability  of the bidder  it holds the right to require information directly from the competent bodies issuing  the documents to determine the bidders s capability     11    10  Clarification  interpreting  the tender documentation    10 1  The interested bidders who collected the tender documentation may require clarifications   thereof or point out to certain tortuousness or omissions in the documentation  exclusively in  writing  in 6 d
149. tend the validity of  personalised tickets  The recharging device should have a permanent communication link to the  Control Centre  and each transaction will be recorded in the Centre     2  Purchasing and recharging of smart tickets may be done via so called ticket vending  machines  standalone assemblies installed at bus stops which autonomously issue blank smart  tickets that may be recharged afterwards  These devices may use coins  banknotes  as well as  credit and debit cards  The devices will be equipped with buttons or a touch screen enabling  interactive communication for purchasing blank smart tickets that may be charged afterwards  If  one already has a smart ticket  it may be recharged  Same as the other recharging devices   these units should have a permanent link to the Control Centre and should exchange data on  the recharged smart tickets     3  All enterprises that are clients of the Contracting Authority may make payments for the tickets  of all or part of their employees  When the invoice is paid  credits will be transferred to individual  smart tickets  i e  their validity will be extended     4  The System should enable recharging of smart tickets with a mobile phone     63    Administrative System    Call Centre Tools and Support    The offered system should enable full set of functionalities and real time information so that the  system operator may establish  maintain and manage a Contact Centre for user support     Functional Level 2    The purpose of
150. terruptions with the Centre or  during power supply failures       Use the vehicle power supply with adequate protection from voltage surges and other  voltage fluctuations     Validator  The validator must be compliant with the following technical and operational properties     Ticket reading should not last more than 1 seconds       The reading area should be limited to the immediate surroundings of the validator  that is   the distance between the validator and the ticket should be less than 10 cm       If a single ticket is unwantedly brought close to the validator twice in consecutive order  it  will not be validated again  since at least 1 minute should pass before another validation is  permitted with the same ticket  unless the ticket is used to pay for several persons  and in  such case the driver should take action from his her control panel        The communication between the ticket and validator is conducted using radio frequency   RF  technology with well protected and encoded transmission       This RF technology must harmless to the human health       The Validator shall use the power supply of the vehicle  and will be protected from voltage  fluctuations by special filters       The validator must not be affected by the surrounding conditions  for instance humidity   vibrations  static electricity  heat  dust  corrosion  shocks and similar  The validator must be  operational under all of those conditions       The validator screen should be large enough for d
151. terval during regular operation must not be  longer than 30 seconds  The data which is regularly transmitted during such communication will  be as follows       Vehicle number     12      Bus line number and direction     Current vehicle position     e Apart from sending data from the vehicle to the OCC  if needed  data may be sent from the  OCC to the vehicle  in case of tariff change  upload of a new blacklist and similar      Communication Interruption    Possible causes for interrupting the communication while data is being exchanged between the  OCC and the vehicle are the following       The vehicle is in a    dead zone     in a tunnel  under an overpass  outside the line of sight of  the satellite        The vehicle computer is non operational     The data transmission equipment is non operational     Data Centre failure       Interrupted data transfer  central defect at the service provider or failure of the data  transmission channel      If the communication equipment in the vehicle is non operational  no information may be  exchanged     The vehicles which are currently unreachable  should be displayed in the Dispatching Centre at  their last Known position from where signal was received and marked in a different colour  including a note indicating interrupted communication  Also  the driver s VCU should display a  message indicating interrupted communication with the Centre     Devices in the vehicle which have lost communication with the OCC should retry to estab
152. the regulation in country where  registered  issued by the authorised body  or that it belongs to proper professional  association or organisation registered in the appropriate Registry  or any other  proof in accordance with the registration of the country where registered     yes    no          10        Form 8A   Statement that the bidder has not  in the past 5 years  been subjected  to legally effective judgment pronounced against him her for participation in a  criminal organization  corruption  fraud or money laundering     a  providing the bidder has a registered head office in the Republic of Macedonia   it shall submit    Confirmations that there is no legally effective judgment imposing a  misdemeanour criminal sanction involving prohibition to perform a profession   activity or duty  or prohibition to perform a specific activity  imposed against  him her           89    yes    yes    no    no             Confirmation from the Registry of criminal sanction for not performed criminal acts                               es no  for legal entities or side sanction involving prohibition to participate in public call i  proceedings  public procurement contracts and contracts for public private  partnership imposed against him her  Confirmations that he she is not subject to a liquidation bankruptcy procedure  opened by a competent authority   6  providing the bidder does not registered head office in the Republic of  Macedonia  it shall submit a Confirmation by the authori
153. the validator should write the data concerning the ticket serial  number  the ticket type  date and time of validation  bus garage number  the line and bus stop  where the validation occurred and the charged amount     Personalised Smart Tickets    Personalised smart tickets will be pre paid periodical tickets containing the data of the ticket  owner  type of benefits  and his her picture  This ticket will not be transferable to other users   Personalised tickets will be used by the following passenger categories     59      Elementary School students     High School students       University  Students      Unemployed or social cases     Disabled persons      Senior citizens      Collective employee tickets     Other subsidised users     The tickets may be limited to a certain validity period  annually  quarterly  monthly  semi   monthly  and may be restricted to a certain zone  These tickets will allow indefinite number of  trips in the designated zone  These tickets will be issued at special points of sale equipped with  smart card photographing and printing devices     The passengers will be able to use these tickets until they are valid  i e  until the expiration of  the period for which they were issued  Afterwards  they may be recharged and reused  It should  be possible to recharge these tickets by paying an invoice issued to an enterprise that  purchased collective tickets     It should be possible to limit the time period when these tickets are valid  for instance th
154. tical data on sold tickets per points of sale and reporting       Establishing the required databases on users  trip and transfer matrices  trip requests   white blacklists  passenger flow  average trip time  average intervals  passenger  modifications and similar       Revenue distribution procedures       Preparation of data for long term planning  tariff system and ticketing system  price  policy and policy on subsidising passengers and transporters      64    e The overall server infrastructure  hardware and system software  needed for uninterrupted  high performance operation of both functional levels 2 and 3 should be the ownership of the  Bidder  hosted in a Data Centre compliant with and incorporating the international standards on  information security observing the permitted noise levels and other emissions  located in the R   of Macedonia        Minimum requirements of the Data Centre    Data Centre Performance    The Data Centre should have raised anti static floors and should guarantee seismic stability  All  cables  power supply  networking  copper and fibre optics  should be located in separate  channel under the raised floors  i e  the principles of structured cabling should be complied with       Physical Security    The access to the data centre should be controlled via adequate access control system  The  access control system should enable access with an encoded personal card with a magnetic  strip       Video surveillance throughout the whole Data Centre 
155. ting Plan for the System that has to correspond to the  requirement by the Contracting Authority stipulated in the technical specification and the  tender documentation       ANNEX 3  Regular Maintenance Plan and Procedure for the System that has to  correspond to the requirement by the Contracting Authority stipulated in the technical  specification and the tender documentation      ANNEX 4  Emergency Maintenance Plan and Procedure for the System that has to  correspond to the requirement by the Contracting Authority stipulated in the technical  specification and the tender documentation    The Carrier of the Procurement undertakes to cover into the Main Project a detailed technical  elaboration of the two sub systems within the System  the smart ticketing sub system and the  public transport vehicle management sub system  according to the specified equipment  and  the elaboration shall also have to include the necessary elements for the incorporation of the  equipment    The Main Project must in all aspect correspond to the requirements of the technical  specification stipulated in the tender documentation  whereas the basis for its elaboration is the  preliminary design annexed to the Carrier of the Procurement   s bid    In case the Carrier of the Procurement delays the submission of the Main Project by fault of his  own  the Contracting Authority shall charge him the Contractual Penalty     Installation of the System  Article 5    The installation of the System starts fr
156. tion  replacement or withdrawal of a bid    The bidders who have collected a tender documentation may modify  replace or withdraw their  bids after bid submission before the final deadline for bid submission    The bidders may not modify  replace or withdraw their bids after the final deadline for bid  submission    The modifications  replacements and withdrawals of the bids submitted to the Contracting  Authority prior to the deadline for bid submission should be prepared  enveloped  marked and  submitted as per the instructions for bit application and the front side of the envelope containing  the modification replacement withdrawal shall be labelled with    modification        replacement    or     withdrawal    respectively     13  Bid submission    13 1  Bids may be submitted only by bidders who have collected stamped copy of the Tender  documentation from the Contracting authority     13 2  Deadline for bid submission is 07 03 2013 at 13 00 local time     13 3  The bids shall be submitted on the following address  bul Aleksandar Makedonski No  10  Skopje  R  Macedonia     13 4  The bidders can submit their bids via regular mail or personally in the Archives of the  Contracting Authority     13 5  The bidders may modify  replace or withdraw their bids in writing before the final deadline  for bid submission in an envelope containing label  designating    modification        replacement    or     withdrawal    respectively  in the Archives of the Contacting Authority     
157. tion of critical problems related to the functioning of  the System  The Bidder should be able to receive fault reports concerning the functioning of the  System by phone or via e mail  24 hours a day  7 days a week  In case of partial of full failure of  the System  the Contracting Authority will notify the Bidder via e mail of the failure within 4  hours of its occurrence  and the Bidder shall be obliged to respond within 8 hours from the  receipt of the notification  When the work order or the Minutes are signed by the authorised  person of the Contracting Authority  it will be deemed that the corrective action has been  completed     Taking into account that the system administration should be a service provided by the Bidder  for a monthly fee  eCloud fee   besides his Bid  the Bidder should submit a template service  level agreement  where the annual service availability should be at least 99 97      The Bidder shall be obliged to rectify all faults  that is  to provide functioning of the System at  functional level 0 and functional level 1 within 24 hours from the receipt of fault notification  The  Bidder may not exceed the response times for rectifying system faults at functional level 0 and  functional level 1 for more than 72 hours  calculated in aggregate throughout the calendar year     In case the number of permitted hours within the meaning of paragraphs 2 and 3 of this Article  is exceeded  the Contracting Authority shall have the right to apply the penalty pr
158. tions and are applied only  here     Subject and Responsible Persons     Contracting Authority     JSP Skopje       Bidder     Any economic operator or consortium of operators applying as partners in the  realisation of this Project       Administrator     Person administering the System       Main Dispatcher     Person that performs global traffic monitoring and supervises the  work of other dispatchers       Dispatcher     Person in charge of following certain number of vehicles lines      Operator     Person who works in the Operational Control Centre      Forwarder     Person working in the Garage on sending and receiving vehicles     Transporter     Legal or natural person in charge of the transportation       Driver     Person qualified to drive a vehicle in the inner and outer city transportation of  45    passengers   Servicer     Person who installs and maintains devices     Passenger   Any person using the public transport for passengers     Vehicles     Vehicle   Transport vehicle used in the public transport of passengers in the City of  Skopje     Group of vehicles     Part of the vehicle pool  defined by a common property  e g  all  vehicles  active vehicles  backup vehicles  vehicle used on the same bus line  service  vehicles  vehicles operating in three shifts and similar      Other Terms     Terminal     Location where the bus line begins or ends   Bus stop     Location where the vehicle stops to board and disembark passengers     Bus line     Planned route 
159. tre will not experience any interruption in their power  supply nor in their operation     e Note  The Contracting Authority retains the right to visit and conduct detailed technical  inspection of the Bidder s Data Centre during the stage of the technical bid evaluation     The solution proposed by the Bidder should be based on server based platform and enterprise  level storage connected to adequate switches  The servers should be directly connected to the  network infrastructure at adequate network speed  The architecture of the hardware and  network solution should be described in details in the Preliminary Design     The data from the smart ticketing system is very sensitive  The following should be provided in  order to protect it       Limit the access in the premises of the Bidder s Data Centre     65    Set access restrictions by establishing various access levels  i e  users with different  privileges     The solution should provide high availability of the platform  independent of hardware  failures  scalability and easy modification of server resources  disk capacity  processing  capacity  memory   in order to improve the performances in case the application need to be  expanded with new modules     Platform based on renowned brands     Possibility for monitoring and reporting in case of performance degradation or services  interruption     All security upgrades of the manufacturer implemented and independent secure service  operation     Integrated backup system 
160. try of the Republic  of Macedonia as a proof that the legal entity is registered or in case when the bidder is foreign  legal entity  proof that the entity is a member of proper professional association in accordance  with the regulation in country where registered  issued by the authorised body  or that it belongs  to proper professional association or organisation registered in the appropriate Registry  or any  other proof in accordance with the registration of the country where registered     9 3  Economic and financial circumstance    9 3 1  In order to be qualify as capable to perform the Public Procurement Contract at hand  from an economic and financial status point of view  the economic operator needs to prove  fulfilment of at least that in the past 3  three  years  2009  2010 and 2011  the entity did not  report losses in its operations and gains total income of at least 30 000 000 00  thirty million   Euros and minimum profit of 3 000 000 00  three million  Euros     The bids not complying the conditions referred to in the paragraph 1 of this sub item shall be  deemed unacceptable and shall not be evaluated     9 3 2  Providing the operator performs the activity less than 3 years  the minimum condition for  proving the economic and financial condition shall be not reported losses in its operations and a  total income of at least 10 000 000 00  ten million  Euros and minimum profit of 1 000 000 00   one million  Euros  in the operating period     9 3 3  In order to 
161. ts of the system  manner of data protection and access  limitation etc  For such purpose  the bidder should allow access to the Committee to their Data  centre to be presented with the given details of the presentation     For the criterion 3 4 4 the possibility for monitoring of average number of passengers shall be  evaluated  along with the workload of the bus stands based upon passenger validation data on  each bus stand  This application should provide real time graphical and numerical indicators     For the criterion No  3 4 5  the bidder shall submit proof in a form of signed separate copy of the  Contract for each implemented solution  statement from the Contractor then the project was  satisfactory implemented and functional with Calypso and Mifare cards along with the contact  data of the Contractor     For the criterion 3 4 6 1 types of mobile phones which can be used for payment shall be  evaluated  The bidder should submit statement about types of mobile phones which can be  used for payment and demonstrate the payment     For the criterion  4 6 2 the duration of the payment operation via mobile phones shall be  evaluated including the preparation time for the payment to the payment detection by the  validator     For the criterion 3 4 6 3 transaction safety of the mobile payment shall be evaluated     For the criterion 3 4 6 4 the simplicity of the control procedure for mobile phone payment shall  be evaluated  in terms of duration of the control and eventual po
162. tting the Bid  we fully accept the conditions of the  Public call for awarding a PP Contract no  70 2012 for installation of Automatic  Vehicle Location System and Smart Ticketing System  published on the ESPP and  in Official Gazette of the RM no ___  2013  the Invitation to Submit a Bid and all  conditions stated in the Tender Documentation  in accordance with which we submit  our Bid  We give our consent that those conditions represent an integral part of the  PP Contract     Place and Date Bidder      name     Responsible person     Signature and stamp     In case of joint bid submission  all members of the consortium  shall sign and stamp  their own copies of the Form enclosed to the joint bid     110       Form 11A             Automatic Vehicle Location System and Smart Ticketing System       SPECIFICATION FOR PROCUREMENT OF ADDITIONAL EQUIPMENT WITH THE  WARRANTY PERIOD       The Bidder is obliged to provide guaranteed prices for the below stated Specification of devices  and system segments  in EUR which will be valid during the whole warranty period     Specification of additional equipment with guaranteed prices in EUR                                                  EQUIPMENT DESCRIPTION Price in  EUR  1    Vehicle computer unit  2    GPS device  3    POS printer  4    Validator  5    Device for controlling smart tickets  6    Device for recharging smart tickets  7    Digital camera  8    Smart card printer  9    Stand alone ticket vending machine and interconnecti
163. ually terminate it    Force Majeure shall mean events outside the control of the contracting parties that may not be  opposed to or influenced in any way  thus making the implementation of this Contract  impossible     Accidental deterioration or destruction  Article 43    For the duration of the PP Contract  and until the completion of the contractual obligations  the  risk of deterioration or damages to the equipment shall be at the expense of the Carrier of the  Procurement    The Contracting Authority shall be obliged to undertake all measures in order to protect the  equipment in the operating control centre against accidental deterioration and damages    In the event mentioned in paragraph 1 of this Article  the Carrier of the Procurement shall have  no right to compensation claim for suffered damages     Extension of the PPC  Article 44    The period for which this Contract is signed may be extended with an Annex in special cases as  follows      If the System functioning has been interrupted or delayed due to objective reasons  which may not have been envisaged during the preparation of the Main Project  for  which an expert opinion is given by a Commission appointed by the Contracting  Authority      Inthe event of Force Majeure      If the functioning of the System becomes interrupted or delayed due to administrative  obstacles  administrative measures  decisions of state bodies  regulations or similar  for  which the Carrier of the Procurement is not responsible   
164. uated along with the possibility to minimise the needed vehicles and personnel to satisfy the  set out transport services  possibility to develop graphical and numerical timetable  taking into  account prevously collected data on the line workload  possibility for prompt development of  alternative timetables  form of output reports  possibility to    harmonise    the timetables and  avoiding large descrepances in the time intervals between busses and other functionalities of  the aplication     19    For the criteria 3 4 2 possibility to monitor vehicles in real time on vector and raster maps shall  be evaluated  possibility of prompt grouping and monitoring the vehicles in accordance with  different criteria  allocation to auto base  line  carrier  corridor  driver s organisational unit    visual clearance and legibility of offered maps and diagrams  possibility of alternative routes   communication between Dispatch centre and the vehicles and group of vehicles  generating  proposal for correction of current irregularities when implementing the planned timetable   possibility to generate activity report for each dispatcher  possibility to reproduce the on going of  the timetable in another prior time interval along with other application functionality     For the criteria 3 4 3 the technical solution for the Data centre shall be evaluated  along with the  server infrastructure  architecture of the network solution  devices and manner of  communication between individual par
165. ub point 9 1 2 shall be issued by the  competent authority in the country where the economic operator is registered  In the Republic  of Macedonia  the competent authority to issue such confirmation shall be the Central Registry  of the Republic of Macedonia     9 1 7 The documents stipulated in sub item 9 1 2 may not be older than 6  six months  counted  backwards from the final deadline for submission of the bids     The Committee shall accept document to prove the personal circumstance issued on the day of  public opening of the bids  but not later than the day of adopting the Decision for selection of  the most favourable bidder     9 1 8 Providing the country of registration of the economic operator does not issue the  documents referred to in the sub points 9 1 2 or in cases they do not cover the aforementioned  cases  the economic operator may submit a statement notarised with the authorised body     9 2  Capability to perform a professional activity    9 2 1  To prove the capability to perform a professional activity  the economic operator will have  to submit a document for a registered activity as a proof that the operator is registered as a  natural person or a legal entity to perform an activity related to the public procurement contract  or proof of membership in an appropriate professional association in accordance with the  regulations of the country where the operator is registered     For the domestic bidders this shall be DRD Form issued by the Central Regis
166. unctioning of the System  hosted at the Data Centre that meets and  incorporates the international standards of information technology safety  observing  thereby the rules for noise and other emission  radiation  limits  located in the Republic  of Macedonia        To provide the data transfer including GPRS communication between the parts of the    System  whereby the information from the vehicles to the Centre shall be transferred  every 10 seconds    To maintain the functioning of the System in the course of the duration of the PPC    To carry out all other obligations stipulated in the tender documentation and in this  contract     The provision of a sale point  both for personalised tickets and for the recharging of tickets  shall  mean the provision of the equipment  hardware and software  and the necessary linking  In one  word  the Carrier of the Procurement shall have to provide for a full functionality of the sale    point     Elaboration of the Main Project    Article 4    The Carrier of the Procurement undertakes  within 30 days from the day of entry into force of  this PPC  to submit to the Contracting Authority the Main Project for the System   Along with the Main Project for the System  the Carrier of the Procurement shall also submit     23    ANNEX 1  Training Plan for Users of the System that has to correspond to the  requirement by the Contracting Authority stipulated in the technical specification and the  tender documentation   ANNEX 2  Inspection and Tes
167. ystem and its elements     To submit the accompanying documentation and literature referring to the technical  characteristics  quality and the technical documentation  The documentation referred to  herein may be in the English language  in a paper or electronic form  under the condition  accurate translation into Macedonian language is provided for the adequate parts  The  Contracting Authority shall preserve the right  for a part of the documentation submitted  in English  to allow to the Carrier of the Procurement a deadline for the submission of  translation of that part of the documentation    To designate a work team headed by a manager  who shall be responsible for the  implementation  and to notify the Contracting Authority thereof in writing    To install the equipment and to integrate it in the information system of the Contracting  Authority  to test it and commission it according to the Inspection and Testing Plan   Annex 2 of Article 4 of this contract     In case there are deviations from the completion status of the Main Project  not later  than one month from the day of the final commitment of the System by the Contracting  Authority   s Commission  to submit to the Contracting Authority a Project in both paper  and electronic form that shall include the real distribution of the equipment and its  connection points and also the software configuration  The Completion Status Project  must contain a detailed specification of all the hardware elements and devices
168. zed body in the his her  country compulsory translated into Macedonian language by an authorized court  translator  yes no  The given evidences shall not be older than 6  six  months calculated backwards  as of the deadline for submission of offers   In case of submission of joint bid  the required evidences shall be submit for each  Consortium member   Confirmation of paid taxes  contributions and other public duties  yes no  a  provided the bidder has a registered headoffice in the territory of Republic of  Macedonia  the competent authority to issue such certificates shall be the Public yes no  Revenue Office   11  b  provided the bidder does not have a registered seat in the territory of Republic of  yes no  Macedonia  he she shall submit a Certificate from the competent authority in the  country of registration  accompanied by a compulsory translation into Macedonian  language  stamped by the authorized translator   The given evidences shall not be older than 6  six  months calculated backwards  as of the deadline for submission of offers  yes no  In case of submission of joint bid  the required evidences shall be submit for each  Consortium member   Balance Sheet and Income Sheet for the past 3  three  years  2009  2010 and  2011  the entity did not report losses in its operations and gains total income of at  least 30 000 000 00  thirty million  Euros and minimum profit of 3 000 000 00   three million  Euros issued by the competent authority in the country where the  b
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
RCA Lyra2 User's Manual  Philips 150S4 Computer Monitor User Manual  G 2600 FH G 2800 FH  Utica Boilers UB95M-200 Operation and Installation Manual  Manual usuario cámara de documentos Epson ELPD06    Copyright © All rights reserved. 
   Failed to retrieve file