Home
Manual SMART-HEATER V2.0
Contents
1. 0 ee m T e O mulu e 1 Universal Power 500 Watt normal power for Uni etc ieee 181 EMEN oes e 00 5 Pumpen Kick Periode X Std all 48 hours Pumpen Kick during time 5 X 10 msec 5 Sec Control Passat Werk ratal ung Logout Adjustments must be performed once during the commissioning in the control menu entries changes are made the menu can be exited about this feature The control menu after inactivity changes automatically after 5 minutes in normal mode to the start screen Control Logout aus Conbd wenu Logout 54 J Operation Smart Meter In the SMART HEATER 3 PCs smart meters are integrated in the upper part This high precision instruments are used to logging and require no separate parameter assignment through the installer or operator Various readings can be selected and read using the touch buttons The operation s associated what measuring point for the 3 SDM that it is identically regardless In the SMART HEATER 3 PCs smart meters are integrated in the upper part This high precision instruments are used to logging and require no separate parameter assignment through the installer or operator Various readings can be selected and read using the touch buttons The operation s associated what measuring point for the 3 SDM that it is identi
2. 22 G9 Cartridge heater For the operation to heating instead of a DH you must take 3 heating rods of the cartridge to the n connector 07 08 09 10 11 12 to connect Pay attention to the maximum power of 5 kW per heating element 3x5kW total Should you want to connect more than 1 heating element the connection of n cartridges in an external junction box is making Caution The amount of the individual values of the heating elements H1 H2 H3 the cartridges must meet the following conditions All heating elements must have the same power 3 x 3kW example 3x1kW 3x5kW etc No Star Connection is not allowed for the heating elements of the heating cartridge or have the triangle connection Should the case be to change internal wiring of the cartridges on single wiring so that each element is individually accessible phase N Assignment is done from left to right L2 oben 93 4 2 Sicherung SDM 11 Einspeisung L3 Sicherung DC Sicherung SDM cinspeisung _ DRUM HEATER 01 bel Data 5 Data 3 COM Data3 030 RSE Data 4 COM Data4 000 RSE p x 5 D 3 8 MW Erzeugung L1 52 unten S1 oben 51 MW Verbrauch L1 52 unten S1 oben MW Verbrauch L2 52 unten S1 MW Verbrauch L3 S2 unten S1 oben DRUM HEATER Sensor Letung 1 DRUM HEATER Sensor Lekun ul
3. Frequenz Strom CosPhi Leistun q Umleitung Spannung amp stm o0 Eoo 5 Leistung akt Leistung ges Messung Erzeugung misituni ze 3 Webserver errors Keine Daten von SMD1 DH Puffefbetneb Ohne Sensor Keine Daten von SMD2 AA Baugruppe defekt Keine Daten won DH Alarm Ubertemperatur Leistung Phase 1 berlast SH Geh use Iso Fehler Leistung Phase 2 berlast Schwerer Systemfehler Leistung Phase 3 berlast Universalleistung gt als angegeben Phase L1 fehlt Unterspannung Snenleisiung gt als angegeben Phase L2 fehlt Unterspannung Temperatur Sollwert gt Grenzwert Phase L3 fehlt Unterspannunqg Farametrierung Patrone falsch bertemperatur Drumheater P atrone bertemperatur System Drahtbruch Sensor Temp Drahtbruch Sensor Temp 2 Drahtbruch 5 Drahtbruch Sensor Temp Ke Drahtbruch 5 Drahtbruch Sensor Temp Syste Sensor Temp 3 Sensor Temp Online 4 Webserver Control Pumpen Kick Periode x Std 2 5500 6500 6500 Pumpen Kiok Dauer x10ms Patronen in Pumpen Machlauf x10ms Firmware Code 26011961 Delta Temperatur DH Puffer Hysterese W rmeregelung Tyas SMD _ 10 Grenzwert Ubertem be Tverz 0 x 100ms em Grenzwert Temp System Tverz Endstufen x 10ms Temperatur System 20 x St
4. Gigaset DX600 192 168 0133 wv a lt Start Teamviewer FRITZ Box Mozilla Fi QS 02 RP 17 44 FRITZ Box Mozilla Firefox File Edit view History Bookmarks Tools Help FRITZ Box 192 166 0 1 e B Most Visited E Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows PC 192 168 0 25 192 168 0 25 PC 192 168 0 26 192 168 0 26 PC 192 168 0 27 192 168 0 27 192 168 0 32 192 168 0 32 PC 192 168 0 33 192 168 0 33 192 168 0 34 192 168 0 34 PC 192 168 0 35 192 168 0 35 192 168 0 36 192 168 0 36 PC 192 168 0 47 192 168 0 47 192 168 0 51 192 168 0 51 Raphaels iPhone 192 168 0 30 Smartheater 192 168 0 130 Portfreiqabe Q vaio 192 168 0 137 Bi LAN Waermepumpe 192 168 0 111 BS LAN Hier k nnen Sie Netzwerkgerate hinzuf gen denen eine feste IP Adresse zugewiesen werden soll und die bisher noch keinen Kontakt zur FRITZIBox hatten hinzuf gen Aktualisieren Hilfe Start Teamviewer FRITZ Box Mozilla Fi 17 45 70 7 Selection Assign the SH always the same IP 192 168 0 130 2 FRITZ Box Mozilla Firefox File Edit History Bookmarks Tools Help S FRITZ Box gt 192 168 0 1 c 7 2 Most Visited gt Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen 1 Windows Media Windows b
5. Wl Manual SMART HEATER V2 0 Helease 04 10 2015 Table of contents A ED 2 Imre RR 4 C EEN mm 5 s 6 E SDEGUNCAH ON 7 Mechanical e tA toit SU oe NER eee 9 G Electrical InstallaBon noo neu 9 GI Mam ConBnIectOH uo oot EE NUES MEL 13 eege 14 G3 Transducer 15 G4 Transducers position in the 16 G5 Transducers position consumption A 17 Transducers position generation 18 G7 Transducer connection EE 19 GS DRUM HEA TER 21 9 Cratridbe Deafer ss a 22 Temperature SelisOE eu 23 EMS 24 G12 Modus with 2 DRUM HEATER Winter Summer een 25 G13 Ripple control receiver 27 H SLOELUD a coast ee IE LM HIR MID ELEME 20 I SERVICE DISDIaV ei 31 RE eerie Is 32 L RT ud 32 urnigbriud 22 2 22 EE 33 IE munia 35 ers dert lil o O 39 Ka od adn ee 40 in 43 J Operation Smart Meter sas a aar rea 55 MatrIx Calculdtioli
6. en MW Erzeugung L3 S2 unten S1 oben DRUM HEATER 02 DRUM HEATER 03 DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 DRUM HEATER 16 DRUM HEATER 04 DRUM HEATER 05 4 Einspeisung N lt 2 5 mm Universalausgang L1 min 2 5 mm Universalausgang N 4mm min 4mm 4 min 4mm 222 10 Temperature Sensor Only the core temperature sensor will be connected via the sensor pairs 4 wires from the DH to the SH is necessary for the operation of the SH Make sure that even when the cartridge Heater operation of the SH core sensor clearly can detect the temperature of the water reservoir To connect 1 2 the temperature sensor as accessory available to the connector The remaining sensors for T1 2 and if any buffers are generally optional Because it is pure resistance measurement by means of PT1000 sensors a reverse polarity of the connecting wires is not relevant Make sure that the sensor wires separately and not be laid in a harness or a cable channel with electrified wires A measured value of distortion due to the induction of the electrified wires otherwise or the display of measured values shuttling remarkably strong Assignment is done from left to right Data 3 COM Data3 030 RSE oben DOM e L2 unten S1 ol HPI Sicherung SDM L1 Sicherung 13 iversalausgang L1 DRUM HEATER 12 Pat St
7. Betriebs art 51 Overrun time in sec input of the after run time of the circulation pump to switch off command Input in x 10msec Preset at the factory or by reset 500 5 seconds Pump kick period input when the next pump kick should turn on the circulation pump for the duration of a pump kick to avoid a blocking of the pump after a period of inactivity Entered in STD Preset at the factory or by reset 48 48 hours Pump kick duration input how long should the last time the duration of pump kick Input in x 10msec Preset at the factory or by reset 500 5 seconds If no pump kick is required change the parameters for the pump kick period to 00 and a permanent operating on 99 Control U rrweslzpurnpanbetieb S Purnper Kick Dauer Sok EEE Heset RSE The power decrease cycle power each requested by the utility company is totaled after each request cycle and stored in the SH By activating the factory reset this count value is set to zero Control Rezet RSE Listung MEE x es la JS H MLF 50 Heset factory setting factory all relevant parameters of the SH are preset to default values for quick setup These values can be reset at any time if necessary using the reset factory setting on the initial state Preset at the factory or by activating the factory settings
8. Grencwert Leistung ls Manual For troubleshooting or start up of the SH in conjunction with special Consumption as the heat generator or universal Consumption the installer can control the individual amplifiers manual Caution In manual mode the outputs without considering errors or temperature set values limits are used The system can be driven in this mode limitless even up to the point of self destruction Time delayed display of the States by a off to 3 seconds Preset at the factory or by reset from Control Handbetrieb vorher Manuell aktwierer C Fa CH FD CH FAS ur MM Stufe Stufe Stufe Stufe lt E Eras Unwas Stufsb Hu Hu 50 DH Betrieb an Buffer If you want to operate the DH to a buffer tank water tank you enable this mode 1 In the port you must also connect the temperature sensor Buffer and enable The circulation pump starts if the core temperature of the DH Delta gt buffer temperature is and switches off after the set delay time The DH as return rise without heat on a buffer should be provided then the mode 2 is to choose The temperature sensor Buffer can be eliminated then The circulation pump starts at the same time with a heat level and switches off after the set delay time Preset at the factory or by reset 1 Control 1 DH BEatiab an Fufferspeicher lt gt DH BEetiab as R cklaufanheburng
9. The sensor cables temperature shall not be installed in combination with high current cables to avoid any inductive influence on the measured values The cables of the SMART HEATER must be on a multiple device installation of several SMART HEATER separately and not in series On the heating or universal output of SMART HEATER no EMC filters are necessary Beware of lines for the transmitter if necessary shielded and sufficiently low impedance high diameter if the length gt 10 m is for the connection of 1 n is heating cartridges a suitable gt Caution A short circuit to the terminal of the DRUM HEATER the heating element or the Universal output leads to the immediate damage of the semiconductor power amplifiers in the device This warranty and the warranty claims shall expire Caution The SH V requires a 3 phase power with a phase shift of 120 degrees and a right spin Caution If you should provide heaters instead of a DH you must notify your utility may also if the power per phase is greater 4 6 kW The utility checks and granted the approval or release for the connection if necessary Should your EVU refuse this release do not operate the cartridge Caution Please pay attention when choosing the MW lines that that length gt 10m a larger cross section 1mm and if necessary to provide a shield for these leads Unilaterally set up The wiring for 51 52 must be when reading influences separately and not i
10. meter cupboard distribution of the heater wire at DRUM HEATER 16 x 2 5 mm 5 PE for Cartridge heater n the sensor wire of the DH 4 x 0 75 mm if necessary the circulation pump on the DH if the temperature sensors PT1000 2 wire in buffer mode also the buffer sensor of the transducer for the Self Consumption 6 x 0 8 mm of the transducer for the self produced energy 6 x 0 8 mm the SMART HEATER by means of the integrated main switch can be switched on As a startup screen appears the firmware ID and changes automatically after about 5 seconds to Home image which can be changed in all other menus Again the image can be called any time from the home menu info SMART HEATER If an error is made the display color from white changes gt red and all functions and power amplifiers outputs are disabled the display is blocked for 5 seconds Only the display color changes according to the fault again on white and the proper function of the SMART HEATER is guaranteed Achtung Bitte bahaber Sia Feher St rungen Arschis erd mit utt best tigen 29 First the installer must check all parameters settings in the control menu correct and if necessary Proper function is necessarily dependent on the correct entries in the menu Control Access to the control menu is protected by password See control Under normal circumstances are
11. ota tei 50 KI Matrix Algorithmus reote REESE tro n 50 K2 DRUM HEATER Modus Matrix Value of Steps 0 to 13500 60 Cartridge Heater Modus Matrix Value 0 to 3 61 L LED DISDIA 62 L1 Blink frequency Modus with DRUM HEATER mme 63 L2 Blink frequency Modus with 64 L3 Blink Frequency Modus Universal Output 64 14 Blink Frequency Collective 64 EE 65 N DynDNS for Webserver Option 66 Webserver Option ar eee tones 68 Internet 77 E E ee 80 Smart Phone Access to SET ame 81 5 Safety Informations eo tis a ca en 82 STEET RENE d E ME 84 VA Ve ee E MEE 85 Parameter lot 86 Besen 67 Manufacturer Copyright E 88 Declaration or Conformity ante en ee 89 Functions The SMART HEATER consists of an intelligent control system which could allow an unprecedented increase in the equity share in itself generated energy in photovoltaic wind or water power in connection with a 15kW heating power unit A small revolution for the energy conscious and aspiring to the self sufficiency op
12. configure your router sample AVM Fritz box Note The Web server has the default IP address 192 168 0 130 and can not be changed Make sure that this does not create IP conflicts on your IT network and can change the address of another network station with this IP If necessary you must change the IP number range of the router so that the IP 192 168 0 130 is reached instructions 1 Establish connection of SH to the Internet via the router using the LAN cable 2 Ensure that an Internet connection is available 3 In the browser address bar enter http fritz box 4 Enter the password for the Fritz Box 5 Enable the expert opinion under System View FRITZ Box Mozilla Firefox File Edit History Bookmarks Tools Help FRITZ Box 192 168 0 1 7 Most Visited R Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows cf Abmelden 3 Ansicht Experte Inhalt 9 Hil bersicht Ansicht Internet Telefonie Heimnetz Expertenansicht aktivieren Die Expertenansicht erm glicht den Zugang zu Detail Einstellungen die f r den normalen Betrieb nicht erforderlich sind Dii Einstellungen werden jeweils am passenden Men punkt zus tzlich angezeigt Die Einstellungen setzen weitergehende WLAN Netzwerk Kenntnisse voraus DECT system Ereignisse Energiemonitor Push Service Info Anzeige Nachtschaltung FRITZIBox Kennwo
13. in operating mode 1 2 or 4 the power measured by the SH exceeds this value this will be shown as a disorder Troubleshooting possible Installer correct the input Power cartridge Heater greater than specified In the menu Control the services of 3 heating elements of the Cartridge Heater are to enter If the heating mode with cartridge Heater is selected and the power measured by the SH exceeds this value this will be shown as a disorder Troubleshooting possible Installer correct the input Temp set value limit the maximum temperature set point is defined in the menu Control When the operator exceeds this value at the input menu setpoint this is displayed as error Troubleshooting possible Installer correct the input Fatal system error the parameter sets stored in the SH and algorithms for matrix control are continuously monitored by the built in firmware of the PLC Should be detected when the parity check or data block an error this will be shown as a disorder SH ISO error Detected fault of the housing insulation of the SH Distributor contact no fault remedy possible Device replacement necessary Starunigen Faze Eingabs Fsatronrenlastunger Parameter zu klein Fat oren gisas ds angegeben Tamp Solwet Grenze schwerer Syetemteher 2 0 Fehler 4 Bus error SMD x The smart meter is placed at the front of the SH and communicate with the control system
14. of the SH via a bus system which is constantly monitored Should the corresponding smart meters send any feedback this will be shown as a disorder Distributor contact fault remedy possible Device replacement necessary Power phase x too big the maximum load of the phase of L1 L2 and L3 is defined in the menu Control In case of an overload this is indicated as a disorder Troubleshooting possible Installer correct the entry and check the power of the Consumption Universal St rungen Bustehier S matmata S 1 Eusfsher B usteher S matmata 5 Lastung Fhsss 1 gok Press 2 zu gof lasturg Fressszugo DRUM HEATER Overtemperature Thermo Switch in the DH has raised N Distributor contact no fault remedy possible Device replacement necessary AA Defective Assembly SH defective control Assembly N Distributor contact no fault remedy possible Device replacement necessary DH buffer operation without buffer sensor buffer temperature sensor is missing defective or its wire breakage monitoring is not enabled Troubleshooting possible Installer fix the sensor line the input for the open circuit Monitoring St rungen Drurn Heater berternperstur 44 Baugrupoes defekt Putfer Betnet ohne Fuffer F uber _42 I8 Access for Installer Access to the control menu is password protected because these settings may be changed
15. only by trained specialist personnel Code only for the installer qualified personnel By entering incorrect parameter the system can not be destroyed but produce least his position precarious statuses Any warranty claims against the manufacturer do not have a subsequent alteration of these parameters if they have caused the damage and are not a normal operation The sharing in the control menu turns off automatically after approx 5 minutes after inactivity Perform code and enter again control select and confirm The submenus are released with real input Eingabe Fasst El 43 I9 Control Controll X all wires of temperatures sensors monitors for a breakage or a short circuit The sensors T1 T2 and T3 are for the operation of the SH not imperative exception sensor for buffer and connect it only when needed The monitoring of these sensors can here according to or be voted out The sensors monitors for core and system are always active and can not deactivated Preset at the factory or by reset on Control bees hung T 1 bernschung Sensor TZ Oberwachung Sensor Control Kerr Sensor Puffer O bersahur Sensor System 44 Max TEMP system limit for system temperature of power electronics Preset at the factory or by reset 55 C Hysteresis control the setpoint of temperature
16. output yes adjustable Display Touch Display in Monochrom Optionen Web server additional transducers additional temperature sensors 2 transducer 1 User Manual English German Mechanical Installation The SMART HEATER is to mount the enclosed fastening material on wall carrier The appliance is designed exclusively for the fixed installation and not for mobile use and designed Watch out for a dry and solid mounting place that has cooled see specification Weight ambient temperature etc 2 piece fastenings for wall mounting are located on the upper edge of the housing An additional fastening hole for dowels etc is located in the bottom behind the cover of the cable connection compartment Center 600 54 Lr i D I DE e SS SSS EE IS SS 1 A FL N lut gg ul G il 1 Pr dI pm Sr g n 625 Electrical Installation Electrical Connection The main supply of SMART HEATER is for 3Ph PE designed depending on the external and internal wiring voltage at different terminals into the cable connection compartment of the SH can be connected The SMART HEATER and the adjacent units must be earthed anyway for reasons of personal safety as well as to the reduction of electromagnetic interference and radiation PE
17. to 99 Preset at the factory or by a reset 0 addition Control Temp System H stsress Fega ung Ausschatesit Endstufen Leietungekormektur Mut a Leistungekonrekctur Add 1 29 45 Limit core temperature As additional safety routine the SH has limit value monitoring for the core temperature of the DH or the Cartridge Heater which generates an error when reached Preset at the factory or by reset 95 C Control Grerzwert Ke nternperat 46 oervice interval timer intrinsic counter for service intervals If the value is gt 100 please inform customer service Preset at the factory or by reset O display only Modbus delay delay value for error evaluation of bus components input in x 10msec Preset at the factory or by reset 500 5 seconds Control Sence nterna aher V erzogerung us Heating type select of the operating mode with DRUM HEATER or cartridge heater The selection is carried out by entering the appropriate code in the input field Preset at the factory or by reset 1 Control 1 gt Heizert mit mit Parore Heizart CZ 47 Cartridge heater power 1 2 3 input of 3 heating element benefits in cartridge Heater operation Enter at n cartridge Heater the power according to the examples as sum power The individual values of the heating elements H1 H2 H3 the cartridge Heater must be identi
18. x 5 kWh maximum power when the cartridge heater operation arise The sum power of the individual heating elements must be the same for all 3 heating elements 61 L LED Display To the Visual display of the diverted amount of energy a white high power LED is installed in the cable area is illuminated by the transparent logo in the cable compartment cover The LED flashes at the pace of the diverted amount of power of the DRUM HEATER cartridge Heater or universal device and will also serve as an optical fault indicator N Caution The LED can be switched off by tilting the upper part of the LED bracket The possibility to switch off the LED is necessary because with an open cable area and active operation of the SH the very bright LED 30 000 mcd eyesight can hurt LED 62 L1 Blink frequency Modus with DRUM HEATER 5x Blink Blink 7x Blink 8x Blink 9x Blink 10 Blink Blink 12x Blink 13x Blink 14x Blink 15 Blink 16x Blink 17x Blink 18x Blink 19x Blink 20x Blink 21x Blink 22x Blink 23x Blink 24x Blink 25x Blink 26x Blink 63 L2 Blink Frequency Modus with Cartridge Heater Ix Blink Redirected power corresponding to the heater power H1 2x Blink Redirected power corresponding to the heater power Hl H2 3x Blink Redirected power corresponding to the heater power Hl H2 H3 L3 Blink Frequency Modus Universal Output Ix Blink Universal Output aktiv L4 Blink Frequen
19. 11 Pat Stab 3 L DRUM HEATER 10 Pat Stab 2 N DRUM HEATER 09 Pat Stab 2 L DRUM HEATER 08 Stab 1 N DRUM HEATER 07 Pat Stab 1 L DRUM HEATER 02 DRUM HEATER 03 DRUM HEATER 04 DRUM HEATER 16 DRUM HEATER 05 DRUM HEATER 06 DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 ohrung and min 2 5 mm Universalausgang L1 mn 2 5 Universalausgang N min 4mm gt min 4mm E lt Receiver Signal100 Potential Free Contact K4 from RSE and COM Receiver Signal060 Potential Free Contact K3 from RSE and COM Receiver Signal000 Potential Free Contact K1 from RSE and COM Receiver Signal030 Potential Free Contact K2 from RSE and COM Residence Residence Residence 1 Buffer 1 Buffer 1 Buffer storage storage storage Water Water Water 2 DRUM 2 DRUM 2 DRUM HEATER HEATER HEATER 4 RSE 3 SMART 4 RSE 3 SMART 4 RSE 3 SMART Receiver HEATER Receiver HEATER Receiver HEATER CELL LLL CLL CLL LLL 7 RSE Signal 5 Grid 6 EVU Power Plant _ 28 Startup After the proper installation amp connection The main line 5 x 4 0 mm and 3x25A hedging in the
20. 2 Connector top gt S1 SDM Consumption Phase L2 Connector down gt S2 Connector top gt S1 SDM Consumption Phase L3 Connector down gt S2 Connector top gt S1 20 G8 DRUM HEATER A DRUM HEATERs must be connected with a 16 x 2 5mm PE Wire This is only on the numbered order of assignment The internal ceramic elements of the DH and Thermo monitoring are integrated in the DH and require no further connection The operating parameters of the DH are stored as a set of parameters in the SH V by default If you want to use a third party product check the specification and operating parameters of the manufacturer and apply the change in the control menu of the No function guarantees or warranty claims can be applied incorrectly entered operating parameters of the DH Assignment is done from left to right etung 3 4 14 Einspeisung L2 Sicherung SDM 11 Sicherung SDM Einspeisung L3 Sicherung DC Einspeisung N MW Erzeugung L1 52 unten S1 oben MW Erzeugung L2 S2 unten S1 oben E x a e m 8 BE 9 5 Si MW Verbrauch L1 S2 unten S1 oben MW Verbrauch L2 S2 unten S1 oben MW Verbrauch L3 S2 unten S1 oben Data 3 COM Data3 030 RSE Data 4 COM Data4 000 RSE Data 5 MW Erzeugung L3 S2 unten S1 oben min 2 5 mm Universalausgang L1 25 mm Universalausgang 4 min 4mm 1 4mm
21. 4115 DL 34115 GL 34115 FL 34115 EL cL SNS LL 8145 UL BO 34115 BO 0 DU al GO ejns 8145 8145 20 8145 LO 00 9145 60 Cartridge Heater Modus Matrix Value 0 to 3 Alternatively you can run the SMART HEATER with 1 or more different cartridge heater All cartridge heater must have 3 heaters If you use one or more standard cartridge heater n as the heating system pay attention to the correct internal wiring of the cartridge heater 3 cartridge heater are necessary which are individually connected to the SMART HEATER The operating voltage of the heating elements is prescribed with 240V AC Operation with 400V in the star Delta starting is not possible Pay attention to the potential equalization PE You should be more than 1 connect PCs cartridge heater must be no greater 3x5kW the total connected load of the heating elements Multiple cartridge Heater are parallel to connect and to connect the SMART HEATER as one cartridge heater Pay attention to the potential equalization PE The power parameters of the corresponding cartridge Heater power shall be deposited in the SMART HEATER manually Menu control To take a standard cartridge heater and note the 3 individual services to enter them as total power in the commissioning phase under control Do you want to connect multiple cartridge Heater the connection 1 2 or 3 must each do not exceed DKW Thus 3
22. 68 0 111 aa LAN LL Hier k nnen Sie Netzwerkger te hinzuf gen denen eine feste IP Adresse zugewiesen werden soll und die bisher noch keinen Kontakt zur FRITZIBox hatten Gerat hinzuf gen Aktualisieren J Start TeamViewer FRITZ Box Mozilla Fi E om New port shares set as follows http FRITZ Box Mozilla Firefox File Edit History Bookmarks Tools Help FRITZ Box E 192 168 0 1 ir 8 2 Most Visited Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows cf Abmelden CA Ansicht Experte 8 Inhalt 7 Hilfe _ bersicht Portfreigabe Internet Portfreigabe aktiv f r Andere Anwendungen Online Monitor Bezeichnung HTTP Server Zugangsdaten Protokoll Kindersicherun EA BEE von bis Port Freigaben an Computer Smartheater v DSL Informationen an IP Adresse 132 158 0 130 Priorisierung an Port D Telefonie Heimnetz Abbrechen WLAN 10 FTP Setting FTP FritZ Box cf Abmelden Ansicht Experte 8 Inhalt 7 Hilfe Ubersicht Internet Portfreigabe aktiv f r Andere Anwendungen Bezeichnung FT Protokoll Online Monitor Kindersicherung an Computer Smartheater DSL Informationen an IP Adresse 192 168 0 130 an Port Priorisierung Telefonie Heimnetz Abbrechen W
23. LAN DECT System 11 telnet Setting telnet cf Abmelden 3 Ansicht Experte Inhalt Hilfe Ubersicht Internet Portfreigabe aktiv f r Andere Anwendungen Bezeichnung Protokoll Online Monitor Zugangsdaten Kindersicherung an Computer Smartheater DSL Informationen A an IP Adresse 192 168 0 130 Priorisierung bis Port 23 Telefonie bait Abbrechen WLAN DECT 7A 12 SMART HEATER settings plc cf Abmelden FT Ansicht Experte BE Inhalt 7 Hilfe bersicht Internet Portfreigabe aktiv f r Andere Anwendungen EEN Bezeichnung Smartheater ce Protokoll v an Computer Smarheater DSL Informationen d an IP Adresse 132 158 0 130 Priorisierung 5 094 Telefonie Heimnetz Abbrechen WLAN _75 13 DynDNS adjust if necessary FRITZ Box Mozilla Firefox File Edit View History Bookmarks Tools Help FRITZ Box 192 168 0 1 Most Visited E Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows Abmelden Ansicht Experte 8 Inhalt Hilfe bersicht Freigaben Internet Portfreigaben Fernwartung Dynamic DNS VPN IPv6 Online Monitor ber Dynamic DNS k nnen Anwendungen und Dienste f r die in der FRITZIBox Firewall Portfreigaben eingerichtet wurden unter einem festen Domainnamen aus dem Internet erreicht werden obwohl
24. M HEATER 04 DRUM HEATER 05 DRUM HEATER 06 DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 DRUM HEATER 16 Tempe DRUM HEATER Sensor Letung 1 DRUM HEATER Sensor Lekung 3 4 fa LED Anzahl Stufe rzsch 2 Ge t D 2 5 mm Universalausgang L1 IDN Wire black Wire green yellow 13 G2 Universal Output No thermal energy in the available excess capacity should be required and the corresponding operating mode uni a is activated so the excess energy will be automatically directed to the universal output This output can be for single phase consumers such as power storage refrigeration units etc to be used for a maximum power of 5 kW EVU inform and request performance gt 4 6kW Assignment is done from left to right L2 DC Sicherung SDM 11 Sicherung DC DRUM HEATER 122 2 Stab 3 N DRUM HEATER Sensor Letung 1 f DRUM HEATER Sensor Lekung 3 4 DRUM HEATER 07 Pat Stab 1 L DRUM HEATER 06 Pat Stab 1 N DRUM HEATER 09 Pat Stab 2 L DRUM HEATER 10 Pat Stab 2 N DRUM HEATER 11 P Stab 3 L Einspeisung Einspeisung L3 DRUM HEATER 01 DRUM HEATER 02 DRUM HEATER 03 DRUM HEATER 04 DRUM HEATER 05 DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 DRUM HEATER 16 DRUM HEATER 06 Temperatur Sensor T2 Leitung 1 2 Temperatur Sensor Puffer Letung 1 2 Temperatur Sensor T1 Leitung 1 2 T
25. NN Winter Summer operat n F pm BEE um MK o 2 2221 EI ZI I EI I DRUM HEATER example mt 2 305 Drumkiester lece ion with 2 p LL vi oqey uod System configurat 26 G13 Ripple control receiver RSE The concept of network stabilization through controlled decentralized power take off 15 based on the intelligent control of SMART HEATER 3 and the high performance heating element 13 5kW DRUM HEATER 2 which can be remotely controlled through a ripple control receiver RSE 4 of the electricity supply company 6 About this RSE interface integrated in the SMART HEATER 3 EVU 6 from a distance all Germany via RSE signal 7 can enable the SMART HEATER 3 electrical heating by means of DRUM HEATER 2 The energy required 15 obtained directly from the SMART HEATER 3 from the net 5 and leads directly to the network relief at There are 3 different power levels which can be activated via the circular control signal 7 of the electricity supply company 6 from a distance and if necessary channel level 100 13 50kW round 13 50kW channel level 060 8 10kW rounded 08 00kW channel level 030 4 OSkW rounded 04 00kW Assignment is done from left to right ale v 09 Einspeisung L3 Einspeisung N DRUM HEATER 12 Pat Stab 3 N DRUM HEATER
26. Please read carefully all safety instructions in this manual before installing this SH N Explanation of warning signs Caution This symbol indicates a potentially dangerous situation and that death or severe personal injury and or property damage may result or has a potentially dangerous situation that can lead to low or moderate injury and or property damage To reduce the risk associated with hazardous voltage The product must not be modified in any way Which are approved only by the Krentzel GmbH spare parts are used Do not use the wall mounted system in moist environments A damaged SH for wall mounting may not be used To reduce the fire and explosion risk The SH do not immerse in liquids or allow to get wet Connect the SH only at a network with the permitted voltage current and frequency To reduce the risk associated with environmental contamination Dispose of all system components in accordance with applicable regulations If desired the free disposal of SH s or DH by Krentzel GmbH can be initiated N KEEP THIS ANWIRE CAREFULLY 82 T CE Marking The SMART HEATER has the CE mark and is externally visible attached to the housing Note for electromagnetic compatibility and low voltage directive see certificate of conformity and rating plate on the device _ 3 U WEEE RoHS WEEE notice the following information is only valid in EU States the signs right corresponds to the guidelines of the
27. ab 3 N DRUN HEATER 11 9 Stab 3 L MW Erzeugung L1 S2 unten S1 oben L u DRUM HEATER 10 Pat Stab 2 N DRUM HEATER 06 Pat Stab 1 N DRUM HEATER 09 Pat Stab 2 L cinspeisung Data 4 COM Data4 000 RSE DRUM HEATER 07 Pat Stab 1 L Sicherung DC Einspeisung N MW Erzeugung L3 S2 u DRUM HEATER 01 DRUM HEATER 02 DRUM HEATER 03 DRUM HEATER 05 DRUM HEATER 06 DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 DRUM HEATER 16 MW Verbrauch L1 S Einspeisung L3 min 4mm 4 gt Anzanl Stufe Data 1 COM Data1 100 RSE DRUM HEATER 04 een A SensorWaterButerisorage ei NX mers O Sensor Wire vom DH Wire 1 2 Sensor Wire vom DH Wire 3 4 08 G11 Webserver For the visualization of the SH in the Internet a Web server can be installed optionally SH is already preset for the operation of a Web server and requires only the connections to the SH to your router switch Pay attention to the configuration of your router see Wire in chapter N connector front on the Web server knows connector plug fit LAN cable rs45 up to the Web server green top of the Web server plug Connector green Connector white DRUM HEATER 11 Pat Stab 3 L DRUM HEATER 12 Pal Stab 3 N DRUM HEATER 10 Pat Stab 2 N DRUM HEATER 08 Pat Stab 1 N DRUM HEATER 09 Pat S
28. aot Eirepeisung aus Netz 299 5 mode Active when selected RSE signal 100 Active if by the utility company of the RSE 100 switching signal is RSE signal 060 Active if by the utility company of the RSE 060 switching signal is RSE signal 030 Active if by the utility company of the RSE 030 switching signal is RSE signal 000 Active if by the utility company of the RSE the switching signal for 000 off is Meldungen Fragaba E S RSE Signa 100 R SE Sigra RSE Signa Lar RSE Signal 000 Active stage displays the respective active power amplifier of the performance part Meldungen S tute Stufaz tubes LED Stufe Stufen M 36 Temperature displays the respective temperatures in Celsius 1 ISIE LAS emperatur Kern emperatur Putter Dy emperatur Systeam sensors not connected or defective sensor cables lead that shows the value of 819 Generation Display the generated renewable power limited to 32 000W Consumption Indicator of the consumption power limited to 32 000W Grid income Display of differential performance of generation and consumption limited to 32 000W Current heat output display of the measured current performance to generate heat Associated heat output display the provided heat output Current universal service di
29. cal Is done by entering the corresponding power in W in the input field Preset at the factory or by reset 0 Control Patrone Leistung 1 Patrona Leistung 2 Fabore Leistung BE Ear 48 Display configuration Changes the contrast or the brightness of the display can be carried out here In addition also a display test as well as specific changes of the touch function and other functions is integrated in the sub menu Setup Settings changes in the setup of the displays can lead to malfunction of the SH Control ciel Menu 49 Uni output power Input of the nominal power of the universal Consumption Preset at the factory or by reset 500 watt Delay uni monitoring The power consumption of the universal Consumption is monitored by the SH Because some devices have a high starting current by switch on the monitoring may be delayed to get no interference Input in x 100msec Preset at the factory or by reset 333 33 seconds Limit power L1 L2 L3 the power consumption of all 3 phases are monitored by SH The design of power amplifiers size is set kW per phase in continuous operation and protected by this limit overheating for max 5 Preset at the factory or by reset 5500 watt Control lenrieisturg Verz gerung Uri berug WE Seay Grerewert Leistung LI WERE Leisturg 2
30. cally regardless Measured values of Generation Measured values of Consumptions Measured values of Surplus IMPORT EXPORT vi 5 4 gt vy nm mn om 9 Measured values of the Generation display the voltages currents and services individually or summed for the total energy produced by wind water or photovoltaic Measured values of Consumption Display the voltages currents and services individually or summed for the total consumption energy in your home or business Measured values of Surplus Display the voltages currents and power individually or summed for the entire in the DRUM HEATER Cartridge Heater or universal output diverted energy 55 Phase to neutral voltages Current on each phase Phase to neutral voltage THD m ma m adi uw m E rar u CoA Pm av 2 lus ems lt gt Mad a m oo j zu E Lo MEN c ow TUS tum E p D H jux e u a B ege Key for voltage and current display the voltages and currents of the measuring point can by touching this button Note Prior to delivery of a SH is this over several hours on maximum power in our test bench of Krentzel GmbH tested SH are due to the display of the SDM and
31. ck Uni Leistung Soll Uni Leistung Ist in WW 2138440 ei W rmeleistung Soll in W FREbestung 1118918 Warmeleistung lst FRE Leistung Zyklus 5916 gt A Sensor T 1 DH f r Putter a a Drum Heater Betrieb m 9 Fatronen Betrieb RSE aktiv IBSE UD esensn Rseoo Q JAVA The Web server requires a Java Runtime Environment Runtime for display in a Web browser If these messages appear when you launch your SMART Heaters confirm the site of SH as a trustworthy site Replace if necessary your browser to Google Chrome Firefox Safari Opera etc Java hat Anwendungskomponenten entdeckt die eine Sicherheitsbedrohung darstellen k nnten Name IMasterP6 10 00 Ausf hrung der potenziell unsicheren Komponenten blockieren empfohlen Mehr Informationen Die Anwendung enth lt sowohl signierten als auch nicht signierten Code Wenden Sie sich an den Hersteller der Anwendung um sicherzustellen dass der Code nicht unbefugt ge ndert wurde Disable unsigned code verification F Nie automatisch herunterladen pes P e de gt Sandbox Warnbanner anzeigen V Annahme von JNLP Sicherheitsanforderungen durch Benutzer zulassen V Kein Prompt f r Clientzertifikatauswahl wenn keine Zertifikate oder nur eir be vy Warnung wenn Sitezertifikat nicht mit Hostnamen bereinst
32. cy Collective fault continuous Blink collective fault 64 Fuses protective The SH V has 7 fine fuses plus an automatic overload detection of the individual phases in order to protect people and the system against damage The backups have an automatic fuse failure detection which is indicated by LED on the top locking head after triggering LED red has fuse tripped N Distributor contact no fault remedy possible Device replacement necessary Assignment is done from left to right 7 Sicherung Einspeisung L3 Sicherung SDM L 1 Sicherung SDM L Sicherung SDM 3 M HEATER 03 M HEATER 04 M HEATER 05 M HEATER 06 M HEATER 07 P at Stab 1 L M HEATER 08 Pat Stab 1 N M HEATER 09 Pat Stab 2 L DRUM HEATER 10Pat Stab 2 N DRUM HEATER 11 Pat Stab 3 L DRUM HEATER 12Pat Stab 3 N DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 DRUM HEATER 16 H D Es 2 DRI DR DR DR d LED Anzahl Stufe fiin 25 mn Universalausgang L1 1 Fuse 1 240V Power Supply DC 2 Fuse 1A 240V SDM s L1 3 Fuse 1A 240V SDM s L2 4 Fuse 1A 240V SDM s L3 65 DynDNS for Webserver Option If you have opted for the option of the Web server you must enter a unique address for access over the Internet browser Internet Explorer Firefox etc for your SH To enable this you need a so called DynDns ad
33. d Consumption is limited in the control display on the maximum value of 9 999 999 Watts 9 999kW Caution The measurement is carried out by transducer with max 100A per phase Higher currents services should be recorded an appropriate transducer must be inserted Separate request of KRENTZEL GmbH 11 A A Caution It should be connected only a DRUM HEATER or a heating cartridges at the same time A parallel operation of these two different heating systems is not allowed Caution In the operating mode Heating cartridge a separate temperature sensor must be connected to Terminal 1 2 of the DRUM HEATER sensor terminals to the internal temp regulator of the SH the actual value of the heating water to be communicated Caution The update time of the SDM can amount to up to 10 seconds Therefore the displayed measured values and the resulting surplus values is never up to date and can thus guarantee no 10096 excess utilization by the SH Caution The ads in the touch screen and the Webserver are provided by the SDM Because these values are sent with up to 10 seconds of delay in the display units the data may significantly differ from the real values Caution There shall be no further active heating system in the hydraulic line of DRUM HEATER raise the temperature of water in addition because the thermal protection switch is internally installed in the DH can trigger 95C ER Cable line conn
34. dress This address can apply for free E g at the company SELFHOST WWW SELFHOST DE and choose there own a catchy name for example www Smartheater Mustermann selfhost bz the following guide has been created as an example with the provider SELFHOST and the router manufacturer AVM FritzBox Anleitung 1 Registrieren und einen Account f r eine kostenlose DynDns erstellen DYN DNS Accounts Aliasname ID Aktuelle IP Letztes Update Updates LOGIN L schen standard 150178 17 02 2013 15 03 47 1 Details x Neuen DYN DNS Account anlegen DYN Account standard ID 150178 Aktion modifi Zugangsdaten Updateclient Benutzername Passwort Hostname entzersenmmost 02 manuelle Update URL erstellen Authentifizierung per GET Parameter Hilfe Authentifizierung per HTTP Basic Authentication Hilfe gew nschte Update 55 15 274 107 Vorgabe IP vom Browser Textausgabe Ausgabe mit OK Error Text Hostliste Ausgabe der Hostliste Aufruf zur Ausgabe von dyndns org Return Codes Hilfe Optionen Remoteliste Ausgabe der aktiven IP Checker HTTP Status des Apache verwenden Informationen zur Schnittstelle Passwort andern offen lassen f r keine Anderung neues Passwort neues Passwort Wiederholung 66 2 Select the router configuration the DynDNS provider Selfhost 3 Enter your allotted by Selfhost username 4 Enter your shared by Selfhost domain name hos
35. ection All electrical connections are made without tools the State of the art push in technology at the terminals in the cable compartment As a result you can use solid wires also stranded with and without wire end ferrules You need no special tools using the integrated operation handle loosen wires easily and quickly Simply press the Orange control button and the contact is opened G1 Main Connection Install from the main distribution counter Cabinet for the SMART HEATER at least a 5x4mm cable with a maximum length of 10 m For longer lengths of cable you increase the cross section according to the VDE guideline Make sure that the connection point via a residual current circuit breaker and circuit breaker 3x 25A in the meter cupboard is secured In the SH is connected directly to the terminals L1 L2 and L3 and N blue Terminal and Terminal PE green Assignment is done from left to right ng 1 2 lur Sensor T2 atur Sensor Puffer Letung 1 2 oben Sicherung 12 DRUM HEATER 09 Pat Stab 2 L Einspeisung L2 Einspeisung L3 Einspeisung N MW Erzeugung L3 S2 unten S1 oben DRUM HEATER 07 Pat Stab 1 L DRUM HEATER 08 Pat Stab 1 N DRUM HEATER 10 Pat Stab 2 N DRUM HEATER 11 Pat Stab 3 L DRUM HEATER 12 Pat Stab 3 N Temperatur Sensor 1 Leitung 1 2 Temperatur Sensor T3 Leitung 1 2 lt DC MW Verbrauch L1 52 unten S DRUM HEATER 01 DRUM HEATER 02 DRUM HEATER 03 DRU
36. eigt die Datenmengen die aus dem Internet auf Ihren PC geladen werden Upstream zeigt den Datenfluss von Ihrem PC zum Internet Geschwindigkeit kBit s 33 420 Internet 34 400 EB Assistenten Einrichten Update Telefone 25 800 17 200 8 600 0 Downstream ts Start Teamviewer 2 FRITZ Box Mozilla Fi Or search under home network gt network the SMART HEATER SH and the device Edit 69 FRITZ Box Mozilla Firefox File Edit view History Bookmarks Tools Help FRITZ Box 192 168 0 1 SI Most Visited E Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows A FritZ Box cf Abmelden CA Ansicht Experte Inhalt 7 Hilfe bersicht Netzwerk M Internet Ger te und Benutzer Programme Netzwerkeinstellungen Telefonie Heimnetz Name IP Adresse Verbindung Eigenschaften NETTEN android 30ec9228ef7 5428 192 168 0 31 E k USB Ger te android 99b3e4aba4700cef 192 168 0 147 android caBe2ee7fd65575c 192 168 0 21 Tat WLAN android dace7f508785e4d3 192 168 0 129 baut System android e081021622619716 192 168 0 131 aa LAN we android fl772771b885b4ef 192 168 0 139 En WLAN Assistenten BLACKBERRY CCOE 192 168 0 20 5 ER UEM BRNO01BA92004A0 192 168 0 126 dau Carstenkrentzel 192 168 0 2 Chiaras iPhone 192 168 0 28 xp i DREAMBOX8000 192 168 0 132 Drucker Brother 192 168 0 128
37. emperatur Sensor T3 Leitung 1 2 2 Data 3 COM Dats3 030 RSE 4 4 gt Output Universal 240 5kW Wire brown L1 Output Universal 240V max 5kW Wire blue N Output Universal 240 max 5kW Wire gr ge PE Caution IN The universal output is intended for cartridge heaters or similar heating elements since no temperature control to prevent overheating by regulators 14 G3 Transducer functions For proper operation install transducer 2 PCs To run only the 3 phases of the respective connection point through the rectangular openings of the transducer Caution No direct connection to the public mains network is necessary only the transducer contacts behind the cover are to prove The contacts behind the cover are an if necessary shielded Control Wire or with an increase of Wire diameter to lead the SMART HEATER if Wireslenghts 10m The transducer trio of the 3 in 1 series with 100A 5A can be mounted directly before or after a circuit breaker Mounted only on the top hat rail with DIN carrier rail holder 1 Transducer for consumption Put the transducer in the meter cupboard to free place on a top hat rail This must be the current consumption of the House without compromising the performance of the SMART HEATER and measure without the power generated 2 transducers for generating Set the transducer after the inverter in your production system the AC output or also in the mete
38. erators of a photovoltaic system or other renewable generation systems The SH can massively support your heating system and might even replace as well as the universal output a power storage control units air conditioning units chargers or infrared heaters etc specially designed for homes businesses and agriculture The system is built exclusively with wear free and absolutely maintenance free high performance components in the manufacturing industry and designed for a long service life Through the sophisticated control concept and the integration of various interfaces for non proprietary consumer also retrofit a SH is at any time possible and installed in a short time The mounting of the SH is easily performed by any qualified electrician The entire system by means of optional Webserver can be monitored via the Internet and on request in addition to the use of remote maintenance and service support by Krentzel GmbH The handmade system is built in Germany tested and distributed only through select distributors KRENTZEL GmbH Safety WARNING These warnings apply to all persons who work on the SMART HEATER The non observance of the following instructions may cause severe injury or installation and maintenance of SMART HEATER result in fatal accidents may be carried out only by qualified personnel Working on the SMART HEATER or its input and output cables never if the SMART HEATER to the mains is connected Befo
39. ersicht _ Details f r Smartheater Internet Telefonie Sie k nnen den Namen beibehalten oder einen eigenen Namen vergeben z B PC Arbeitszimmer Netzwerk IP Adresse 192 168 0 130 USB Ger te Speicher NAS MAC Adresse 00 30 56 5 1 29 WLAN Diesem Netzwerkger t immer die gleiche IP Adresse zuweisen DECT System Klicken Sie hier um diesen Computer aus dem Standby Modus zu starten Wake On LAN Computer starten Assistenten Einrichten Update Telefone Kindersicherung Deaktiviert Portfreigaben Die folgenden Freigaben sind aktiv Bezeichnung Protokoll Port an Port Smartheater 9094 9094 HTTP Server TCP 81 80 Abbrechen Start Teamviewer 2 FRITZ Box Mozilla Fi Uu 8 Alternatively click directly on Port sharing the description of the device 2 FRITZ Box Mozilla Firefox File Edit View History Bookmarks Tools FRITZ Box 192 168 0 1 2 Most Visited Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows 192 168 0 25 192 168 0 25 PC 192 168 0 26 192 168 0 26 PC 192 168 0 27 192 168 0 27 PC 192 168 0 32 192 168 0 32 PC 192 168 0 33 192 168 0 33 PC 192 168 0 34 192 168 0 34 PC 192 168 0 35 192 168 0 35 PC 192 168 0 36 192 168 0 36 PC 192 168 0 47 192 168 0 47 PC 192 168 0 51 192 168 0 51 Raphaels iPhone 192 168 0 30 Smartheater 192 168 0 130 Portfreiqabe Q vaio 192 168 0 137 aa LAN Waermepumpe 192 1
40. ext SMART HEATER I3 Menu Dialog Selection to the home screen or more submenus Betriebsart St runsen Morrow MIN Istwerte dol lwerte pone eee 14 Modus oelection of operating modes Mode 0 System is standby no surplus power for Generation or universal output is possible Mode 1 Only surplus power to the universal output No Power for Generation is possible Mode 2 Surplus power for Generation is possible The remaining surplus power to the universal output is redirected automatically after reaching the temperature set point Mode 3 Only surplus power for Generation possible There is no power to the universal output Mode 4 Full supply the power allocation for Generation is made and the universal output regardless of the amount of the surplus power It derives the maximum performance to reach the Temp set value on the outputs The universal output is activated after switching off the heat Mode 5 in manual mode N Caution Basically the energy allocation for heat generation has always precedence over the universal output if the appropriate operating mode is selected D System Anlage 1 gt Un W re is gt Waruell RSE mode when this mode is enabled the EVU on the RSE interface can specify up to 4 different surplus services from a distance the SMART HEATER This 1s independent of the current heig
41. ht of the generation and the consumptions So that the utility can the customer including at requires heat energy free of charge at the disposal Caution For this operating mode must the DRUM HEATER to a buffer tank can be connected and the corresponding operating mode to buffer to be activated otherwise an error 15 displayed Non RSE no action at a distance about the EVU possible There are 3 4 different RSE channels channel level 100 13 5OkW channel level 060 8 IOKW channel level 030 4 05 reali _ 34 I5 Monitoring Request heat Active when the core temperature below the entered value Full message heat active when the core temperature is below the setpoint value minus the hysteresis decrease DRUM HEATER operation Active when DH mode is selected Cartridge Heater mode active when the operating mode for cartridge Heater is selected Mode DH to buffer active in conjunction with cache mode DH for return rise active for return rise Meldungen gt Anforderung Var re Vall residung Var re Lrurm Heater Eetneb Fatr ner Beinsb Beinsbsst DH an Putter un f r F cklaufanhbg ourplus available active if more power generated as consumption is emergency main line Power from grid active when in operating mode full care performance must be obtained from the EVU because there is not enough surplus power berschuss vorhanden M
42. immt be Lm Sitezertifikat von Server anzeigen auch wenn es g ltig ist Sicherheits berpr fung von gemischtem Code Sandbox vs vertrauensw rdig eM 7 Aktivieren Warnung anzeigen falls erforderlich M 7 Aktivieren Warnung ausblenden und mit Schutz ausf hren 7 Aktivieren Warnung ausblenden und nicht vertrauensw rdigen Code nich i Verifizierung deaktivieren nicht empfohlen Haee Sicherheitseinstellungen V Zertifikate und e m f r cn aktivieren eA EI Onlinezertifikatsvalidierung aktivieren bee EI 551 2 0 kompatibles ClientHello Format verwenden ff SSL 3 0 verwenden 4 n Anwenden Smart Phone Access to SH If you want to access with your smart phone Apple or Android operating system on the SH this is the browser from Spidercontrol possible On normal PC have the browser via Java runtime environment with whose help the MMI run as Java applets in your browser The operation of Java applets is not possible on the popular smartphones under iOS or Android To enable the visualization on these devices the SpiderControl developed MicroBrowser app With this app you can all Web HMI with SpiderControl or SpiderControl OEM or CoDeSys Webvisu implements were direct viewing Please the app for Android or Apple download and install on your smart phone Download http www spidercontrol net de ubapps php 81 5 Safety information s
43. minus the hysteresis makes the switch on point for the requested heating power of the SH Preset at the factory or by reset 3 C owitch off time power amplifiers the response times for the shut down of the power electronics can be extended manually The switch point in the zero passage of the sine wave AC voltage will not affect Input in x 10 MS Preset at the factory or by reset 0 0 0 seconds Power factor correction multi The production related fluctuation in the power of DH s can 1 be up to 10 of the nominal power of DH s The input power of the DH does not follow a linear function but an exponential function at the bottom of 2nd degree 0 1kW In order to adjust the desired power of the DH s actually needed surplus power so that as close to the redirection performance is the exponential function by means of a multiplier to be adjusted Entered in 1 to 99 Preset at the factory or by the reset code 50 multiplier Power factor correction Addi The production related fluctuation in the power of DH s can be up to 10 of the nominal power of DH s The input power of the DH does not follow linear function but an exponential function at the bottom of 2nd degree 0 1kW In order to adjust the desired power of the DH s actually needed surplus power so that as close to the redirection performance is the calculated surplus power to be adjusted by means of an additionally added performance value Entered in O
44. n combination with other power cables Caution Please make sure that on the lines of the SH no overvoltage occur through direct or indirect by lightning Caution If DRUM HEATER operation no series connection is not allowed with multiple DH s in the Hydraulic flow to prevent overheating of the DH 10 Caution The SH V required a 3 phase grid with a phase shift of 120 degrees This right spin must prevail absolutely at the measuring points of instrument transformers Consumption and Production Also the phase order shall not deviate from L1 L2 L3 Caution To reduce errors as well as inductive or capacitive influences of the cables for the transducer use shielded cables The shield is then generally only one side to connect an equipotential bonding The electrician must ensure that the hedging in the meter cupboard on the correct selectivity of LS SLS F switch Caution oystems for the generation of heat based resistive consumers can slightly increase the leakage current N or PE Should this be the case so the power supply of the SH connected with a secure separate RCD with corresponding leakage current in the main distribution Caution Some utility of the SH limit the allowed power of heat generation systems per phase or for all phases in the TAB Please seek approval by your utility company before connecting the SH Caution The calculation of power income from the difference between Production an
45. oor environment The warranty does not cover devices that are used outside of the following conditions 100V 240V AC 50 60 Hz e 10 1050 10 8096 humidity non condensing 0 1828m 0 6000 feet above zero a The air inlet outlet and the heat sink must not be clogged Inadequate ventilation can lead to malfunction of the product and cause damage that is not covered by the warranty b This warranty does not cover additional costs including but not limited to the Dismantling cleaning or installation of the Krentzel GmbH Product adjustments mechanical or electronic on Krentzel GmbH product c This warranty does not Consumptions Items sampl Fuses d This warranty is not transferable e The Krentzel GmbH does not guarantee orders if the Krentzel GmbH Logo or the display have been removed with the operating data or serial number except in the cases where writing on the reasons for the modified labeling for partnership requirements f This warranty does not cover transport costs or the costs of transport insurance the incurred when the product is Krentzel GmbH sent to the Krentzel GmbH for warranty service These costs are borne by the customer If the damage can not be identified or reproduced the customer the costs incurred can be calculated If your warranty includes a change out service and the damage caused by the technician can not be identified or reproduced the customer the costs incurred can be calcula
46. ough the left L2 through the middle and L3 through the left The flow of the power is always from 1 gt P2 Should negative performances in the display are shown in the smart meters the flow direction was confused you must change it 19 The reading wire according to the wiring diagram to connect is on the 6 measurement terminals behind the cover The designation of 51 or S2 refers to the Terminal designation on the transducer Assignment is done from left to right DRUM HEATER 08 Stab 1 N 1 DRUM HEATER 12 Pal Stab 3 N Sicherung 12 Sicherung SDM Einspeisung L3 DRUM HEATER 11 Pat 5146 34 Temperatur Sensor T3 Leitung 1 2 DRUM HEATER 10 Pat Stab 2 N DRUM HEATER 09 Pat Stab 2 L DRUM HEATER Sensor Lekung 3 4 DRUM HEATER 01 DRUM HEATER 02 DRUM HEATER 03 DRUM HEATER 04 DRUM HEATER 07 Pat Stab 1 L DRUM HEATER 13 DRUM HEATER 14 DRUM HEATER 15 DRUM HEATER 16 DRUM HEATER 05 DRUM HEATER 06 LED Anzahl Stufe isl EHE 6 lt uu lt qi lt 25 Universalausgang L1 SDM Generation Phase L1 Connector down gt S2 Connector top gt S1 SDM Generation Phase L2 Connector down gt S2 Connector top gt S1 SDM Generation Phase L3 Connector down gt S2 Connector top gt S1 SDM Consumption Phase L1 Connector down gt S
47. r 1 Cartridge Heater consists of 3 _ 87 Y Manufacturer Copyright Krentzel GmbH D 28865 Lilienthal Germany Fax 0049 4298 939229 Mail ENERGIE KRENTZEL NET Web ENERGIE KRENTZEL NET c 2013 Krentzel GmbH All rights reserved 88 Z Declaration of Conformity KRENTZEL ENERGIE GmbH requirernents of DIN EN standards feted below are from the product SMART HEATER the Krentzel GmbH fully met The SMART HEATER wes developed designed and manufactured in accordance wih the EC directives The applied harmonized standards are shown in the followmg table ine 22 6 2013 B DIN EN 61010 1 VDE 0411 1 OIN EN C This deciaraton of conformity loses ts validity 4 the product without the express consent of the Krentzel 5 modified supplemented or changed any other way components that do not belong to the accessories bult into the product as well as in case of incorrect connection or incorrect use Krentzel GmbH Seeberger Landstrasse 103 D 28865 Lfenthai Germany ENERGIEQDKRENTZEL Web ENERGIE KRENTZEL NET 89
48. r cupboard Caution The SH V 3 required phase grid with a phase shift of 120 degrees This right spin must prevail absolutely at the measuring points of instrument transformers Consumption and Production Also the phase order shall not deviate from L1 L2 L3 Caution IN Each performance at the measuring points is calculated by the SH totaly all 3 phases If you have only a phase at the measuring points Generation or Consumption available the openings for L2 and L3 on the MW will remain free Caution The performance calculation in the measurement locations of the SH is carried out by the formula P U Cosphi Power calculation Test your production system such as Inverter that of the CosPhi prescribed by the VDE and EVU as the value CosPhi 1 reached 0 9 15 G4 Transducers position the grid P g nach Zeite OQO residual Circuit breakers FI transducers Generation transducers Consumption 16 G5 Transducers position Consumption Integration des Messwandlers Verbrauch in die bestehende Haus Installation 7 G6 Transducers position Generation Integration des Messwandlers Erzeugung in die bestehende Haus Installation chig G7 Transducer connection The 3 phases of the electrical wire through the openings and in any case comply with the order Through the right opening of the transducer L1 thr
49. re carrying out any work inside the SMART HEATER housing make sure that no dangerous voltages Main switch etc Unlock unintentionally secure voltage determine if voltage is present at the SMART HEATER or external control circuits perform any work on the control cables Externally powered control circuits can lead to dangerous voltages even in the SMART HEATER if the voltage supply of the SMART heater is switched off Live parts inside the housing are protected against direct contact if all protective covers from art Case Front System Area B Display Generator Smartmeter m Display Service Display Consumption il Display Surplus Smartmeter Bottom Main Switch Power inline Temperature Local Area on off Universal Generator Drum Heater Sensors Network Consumption Webserver Note The screw connection of the system part is protected by special lacquer The guarantee and warranty will be void if damage Specification Weigts 40 kg Fuses from cabinet grid 3x25A 3 240 AC 50Hz Power Connection 3Ph N PE with n pcs Cartridge Heater total 3x5 0kW 15kW a infinitely variable DRUM HEATER DH27 b up to max 3 step with cartridge Power consumption increase Wire break detection yes adjustable Full supply possible heating substitutes yes Universal Output yes up to 5kW circulation pump
50. rt Einstellungen sichern Firmware Update Zur cksetzen Ansicht Zeitzone Sprache Start Teamviewer 2 FRITZ Box Mozilla Fi 6 6 In Internet Online Monitor on port forwarding click FRITZ Box Mozilla Firefox File Edit View History Bookmarks Tools Help FRITZ Box Google Most Visited gt Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media Windows E FRITZ Box cf Abmelden FT Ansicht Experte inhalt Hilfe bersicht E Online Monitor Internet Online Monitor Online Zahler Tarif bersicht Online Monitor 7 Der Online Monitor stellt Informationen zu Ihrer Internetverbindung und zu aktivierten Zusatzfunktionen zur Verf gung ugangsdaten DSL bereit Internet verbunden seit 24 05 2013 um 15 01 Uhr IP Adresse 85 16 225 78 Dynamic DNS aktiviert smartheater selfhost bz Status Fehler Portfreigabe aktiviert 5 Portfreigaben eingerichtet Kindersicherung Freigaben DSL Informationen Priorisierung Durch einen Klick auf die Schaltfl che Neu verbinden wird die Internetverbindung kurzzeitig getrennt und anschlie end automatisch wiederhergestellt Die FRITZIBox erh lt dabei von Ihrem Internetanbieter in der Regel eine neue IP Adresse Heimnetz WLAN DECT System Die folgenden Darstellungen zeigen die aktuelle Auslastung Ihrer Internetverbindung Downstream z
51. sich die ffentliche IP Adresse der FRITZIBox mit jeder Kindersicherung Interneteinwahl ndert Freigaben Zugangsdaten Dynamic DNS benutzen DSL Informationen RR Geben Sie die Anmeldedaten f r Ihren Dynamic DNS Anbieter an Priorisierung Telefonie Dynamic DNS Anbieter selfhost de Neuen Domainnamen anmelden Heimnetz Domainname smarheater selfhost bz WLAN Benutzername 123456 DECT Kennwort System Kennwortbest tigung jeeee aan Abbrechen Einrichten Update Telefone ts Start Teamviewer 2 FRITZ Box Mozilla Fi 76 Internet If you have applied for your web address at a DynDNS provider and the router configuration is complete restart your web browser Internet Explorer or Firefox And enter your address as follows into the browser most distant www mustermann selfhost bz smartheater html Caution As additional address of your address must always smartheater html follow Change your PC should show safety messages as and or install the missing JAVA applications see Java and change the security settings for this site of the PC to the property trustworthy p 1 Webserver Home SMARI HEATER V2 1 UnksusfW rme ein Vollversomunna ein Hand Manuell ein Erzeugung L1 Frequenz Strom CosPhi boo 0 98 Leistung akt 0 99 Leistung ges Ku Verbrauch L1 Spann ng E
52. splay of the measured current power of the universal output Universal service assigned to display the provided power for the universal output The display value of the current thermal power can be significantly lower than was allocated by the SH assigned heat output This is line loss and the manufacturing tolerances of the respective heating system caused by When the DRUM HEATER operation the power difference may be higher due to tolerances in the ceramic components and be called normal lstwerte Erzeugung Werbrauch Aktuale Wer ree Alctuella Unwersallastung Unwversalastung 247 RSE power date display the power decrease by a ripple control receiver command requested by the utility company 100 or 6096 or 30 RSE power cycle display the power required by your electricity company within a measuring cycle between the switch and switch off command of the RSE RSE total power display of power requested so far by the utility company netted added Service interval timer If gt 100 service inform via factory reset 0 RSE Lastung Aktuell RSE Leistung Zyklus in RSE Lastung Gesamt in Serce Intarvall Zsner 385 16 Setpoint Temperature setpoint input of the set point temperature which should reach the DH or the heating cartridge in the heating system The maximum input value is limited by the limi
53. stem the system area of the SH regulates and controls the surplus power to 15kW via high power electronics The semiconductor is monitored for temperature and report this at the maximum permitted value is reached under control Distributor contact no fault remedy possible Device replacement necessary Missing phase L1 L2 L3 all 3 phases are necessary for the proper operation of the SH If one of the phases is missing in the local area network or network congestion reduces one of the voltages below 200V AC this is detected and displayed as a disorder normal 230 240V AC Troubleshooting possible Installer power discharge by switching off by strong consumer in the House and checking the mains voltage of the EVU on the smart meter of the SH and their backups in the connection compartment ot rungern berternperatur Ken Heizelerrernt Ternperstur Systeam Phase Ld fehlt Unterspannung Phase 12 fehlt Unterspannung Phase L3 fehlt Unterspannung 40 Incorrect input cartridge Heating Power menu Control to enter the 3 heat outputs are for cartridge Heater operation All 3 of the Cartridge heater heating elements must have the same power sample 3x3kW etc Troubleshooting possible Installer correct the input Parameter universal power too small In the menu Control the required power consumption of the device battery charger for power storage refrigeration etc is for the Universal Output to enter When
54. t in the control menu to the top Delta temperature DH buffer input of the set point temperature from which temperature difference from the DH to the buffer tank the circulation pump is switched on This value is required only for the DH mode with a buffer tank GG allwverte Temperatur Sollwert Delta Temperatur DH Puffer _ 39 I7 Errors Wire break the cable of the temperature sensors are monitored for wire breakage or short circuit the sensor values are then displayed 819 The sensors for T1 T2 and T3 are connected for the operation of the SH not necessarily necessary and only when necessary The monitoring of these sensors is accordingly in the menu Control The sensor Buffer is necessarily required for DH buffer mode and must be connected and its monitoring in the menu Control to be activated 1 Troubleshooting possible Installer check of the sensor cables and connection in the wiring area of the SH If necessary replacement of the sensor or lines St rungen Lrahtbruch Terpersturseneor 1 Lrahtbruzh T ermperaturesrieor 2 Lrahtbruzh T ermperatiresrieor 3 Lrahtbruch T erperatiresrieoe Kerr Lrahtbruch T erperaturesreoe Puffer Lrahtbruch Terperstursereor Syetam Core heater temperature If the maximum temperature of the heating system entered under Control is achieved the SH recognizes this as a fault Troubleshooting possible Installer control of the core sensor Limit temperature sy
55. t name 5 Enter your nominated by Selfhost password 6 Save the router configuration FRITZ Box Mozilla Firefox File Edit View History Bookmarks Tools Help FRITZ Box 9 192 166 0 1 Most Visited ZS Erste Schritte Aktuelle Nachrichten Kostenlose Hotmail Links anpassen Windows Media B Windows cf Abmelden T Ansicht Experte Inhalt Hilfe bersicht Freigaben Internet Portfreigaben Fernwartung Dynamic DNS VPN IPv6 Online Monitor e Uber Dynamic DNS konnen Anwendungen und Dienste f r die in der FRITZIBox Firewall Portfreigaben eingerichtet wurden unter einem festen Domainnamen aus dem Internet erreicht werden obwohl sich die ffentliche IP Adresse der FRITZIBox mit jeder Kindersicherung Interneteinwahl ndert Freigaben DSL Informationen Zugangsdaten Dynamic DNS benutzen SIM Geben Sie die Anmeldedaten f r Ihren Dynamic DNS Anbieter an Priorisierung Telefonie Dynamic DNS Anbieter selfhost de v Neuen Domainnamen anmelden Heimnetz Domainname smarheater selfhost bz WLAN Benutzername 123456 Kennwort System Kennwortbest tigung Assistenten Abbrechen Einrichten Update Telefone Start Teamviewer FRITZ Box Mozilla Fi 67 Webserver Option After the Web server is properly installed and connected in the cable compartment of SH s follow the instructions to
56. t sold as part of SH s subject to individual warranties EXCEPT FOR THE WARRANTIES STATED ABOVE INCLUDES ALL OTHER WARRANTIES Krentzel GMBH THIS CONCERNS EXPRESS AND IMPLIED WARRANTIES INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE AND NON INFRINGEMENT If this equipment does have within the above stated warranty period defects this is only right to ask for a replacement unit The exchanged unit will then become the property of Krentzel GmbH If approved warranty claim subject to the warranty period for the replacement device only the remaining warranty period of the original device In case of warranty you must present proof of purchase with date of purchase otherwise the encoded in the serial number manufacturing date is taken as the start of the warranty period The following are exceptions to the warranty conditions stated above a This warranty does not Krentzel GmbH products modified or damaged or by misuse improper storage accidents vandalism false Installation negligence improper transport damage or acts of war Natural disasters sample fire flood lightning unsuitable electric Supply voltages software problems and interactions with non damaged Krentzel GmbH products or installation work by unauthorized electrical specialist personnel Normal wear and tear is not covered under the warranty The Krentzel GmbH product was developed for use in the typical ind
57. tab 2 L DRUM HEATER 02 DRUM HEATER 07 P at Stab 1 L DRUM HEATER 16 DRUM HEATER 03 DRUM HEATER 04 DRUM HEATER 05 DRUM HEATER 01 DRUM HEATER 06 in 2 5 mm Universalausgang L1 AM p m 24 G12 Modus with 2 DRUM HEATER Winter Summer The SMART HEATER can be used also for the operation of 2 DRUM HEATER cartridge Heater You can use a DRUM HEATER cartridge heater pool heating and in the winter as an example in the summer a DRUM HEATER cartridge heater for heating The switching is done manually on the shift box Supplied by your electrician Caution For the operation of the SH to a switch box the red link 17 head and the Green sensor wire 2 wire are necessary to connect the green dotted lines are optional temperature sensors which are not necessary for the operation They are not needed just uncheck the open circuit monitoring of these sensors control menu For the operation of on a swimming pool you must integrate a heat exchanger if the pool water is chlorinated SMART H EATER der KRENTZEL GmbH Warmetau scher von Ihrem Klempner DRU M H EATER der KRENTZEL GmbH Umwalzpumpe von Ihrem Klempner 25 LL ALL SEET SEET RT m s mese m ION EI IE SI SEI ZEIT ZEI ZZ II I ZZ MW GE NS
58. ted ALL WARRANTIES AND LIMITED WARRANTIES ARE VOID IF THE Krentzel GMBH PRODUCT DOES NOT OPERATE AS DEFINED Krentzel GMBH BETRIEBSANWIRE DESCRIBED IN USE E W Parameter log Logging the changed parameters in the Control Menu Description Parameters from delivery Modus Temperature setpoint Delta Temperatur DH buffer RSE Modus Power Cartridge Heater L1 2 und 3 Wire brocken monitoring Heating Modus DH Modus Universal Power Universal Output delay control Limit Temp system Hysterese Temperatur control Delay time outpt signal Power factor correction multi Power factor correction Addi Limit for Temperatur Core Cartridge Delay time Modus Follow up time circulation pump Pump Kick Periode Pump Kick during time Limit Power per Phase LI L2 L3 Parameters Changing Signatur Installer 86 SH DH RU EVU LED SDM MW PLC AC DC Hz W WR FI TAB 5 RCD H1 H2 H3 heating elements Legend SMART HEATER DRUM HEATER 27 energy utilities Power Plant Power Supplier Potential equalization ground light emitting diode smart meter Internet protocol Transducers Programmable Logic Controller AC DC Hertz Frequency Wattage Inverter Residual current circuit breaker Technical connection conditions v RUs ripple control receiver Residual Current Circuit Breakers English One element of a heater cartridge heate
59. the display of the Web server already some kW added in the fields of the display This is not an error but a quality indicator and a ready and tested system thus signaled the customers The bar indicator shows current measured power of SDM from the SH is in operation 56 Services button by pressing this key you can display the power of the measuring point _ Following values are available active power P cos phi reactive power U I sin phi apparent power S kW 1 real power P will be in Watt active power P U cos phi W 1000 W 1kW kVar reactive power Q is in var Volt Amperes Reactive specify reactive power I sin phi var 1000 var 1kvar kVA apparent power S VA specified in apparent power 5 voltage U 1 VA current 1kVA 1000VA Instantaneous active power kW ep Tom Instantaneous reactive power Kar E 3 En s Netted values peak power factor frequency etc button by pressing this button you can display the special values of the measuring point n ai Power factor total Power factor of each phase 58 Matrix Calculation K1 Matrix Algorithmus The matrix of the SH produces the disposition of surplus power in smallest possible deliverables in pending status for the connected heating system according to an effective algorithm to maximize the efficienc
60. there to make any changes and already set for DH operation Should the SH be used with cartridge Heater is to enter just the cartridge Heater performance and change the type of heating on Cartridge Heater 30 Service Display The SH is operated exclusively via the touchscreen Operation Inactivity the illumination of the display goes out after 10 minutes and is switched on by pressing button again A recognized disorder toggles the display color to red and changes only after resolved error automatically on white gt menu forward Foe menu backwards ior Quit error Menu home El Entry field for data input After confirming with Enter UEL Press ESC to cancel the command Caution The control panel stores all parameters in a built in RAM memory During a power outage the buffering is done by a button cell in the system control panels part of the SH A replacement of battery can perform by qualified personnel only The shelf life is about 5 years 31 11 Info Dialog Display the firmware version and serial number appears automatically after switching on the power supply The image changes automatically after approx 5 seconds to the home screen The desired language can be selected in this dialog SMART Firmware vO Senen Hummer Krentzel Gmb phe sche Deutsch 12 Home Dialog Selection to the Info screen or n
61. waste electrical and electronic equipment directive 2002 96 EC WEEE The symbol means that the device with unsorted household waste must be disposed of but must be fed the required decommissioning recycling system or pass the Krentzel GmbH to the free disposal u WELLE X RoHS information The Krentzel GmbH can SH system that directive comply with the RoHS regulations issuing a RoHS certificates European EU restriction of hazardous substances RoHS directive 2002 95 EC RoHS directive compliance means that any of the following substances in higher concentrations than the following maximum concentrations in homogenous materials contain the product or component unless the substance is part of an application that is excluded from the RoHS directive a 0 196 lead by weight mercury hexavalent chromium polybrominated biphenyl PBB and polybrominated diphenyl ethers or b 0 0196 cadmium by weight This information correspond to the current knowledge of the Krentzel GmbH and may be based on knowledge that the Krentzel GmbH has been provided by third parties 84 V Warranty It is guaranteed that the SMART HEATER S for a period of 730 days 24 months from date of purchase is free from defects in material and workmanship It is guaranteed that all supplied with the SH accessories for a period of 730 days 24 months from date of purchase are free from material and production defects Optional accessories that are no
62. y of the heater When using a DH is the maximum value of the matrix quasi almost continuously with a cartridge heater can reach only the value of 3 As a general rule the bigger the matrix value content is greater the efficiency of the system Note At cartridge Heater with relatively high rates of SMART HEATER can control only the cartridge heater if the power of the difference is greater than 1 power specification Thus decreases the efficiency of the system in a cartridge Heater high power The use of a DRUM HEATER is to provide for the achievement of the highest efficiency and the finest gradation highest value of matrix DH N Caution The cartridge heater you will be used must have 3 heaters H1 H2 H3 The individual heating capacities of 3 heating elements must be all the same The heating elements does not have a Star Delta connection 59 A V4 rmnart H eater A4 mart H eater 5 it Patrone Beispiel 3 1 Pr Wi Betrieb mit S Betrieb mit S Betrieb mit Betrieb mit TID K2 DRUM HEATER Modus Matrix Value of Steps 0 to 13500 M DOSEL M nnnL M nngzL M OOO b MOGEL M non L M OOSOL M 0000 M 0056 0006 0058 0008 0004 0099 0009 0099 0005 Doct ooo DOSE DODE 0092 0002 0091 0001 005 0 t SS gg SS SS 8145 DC ole 8148 EZ 8145 9145 LC 94135 24115 BL 34115 ZL 3
Download Pdf Manuals
Related Search
Related Contents
Hampton Bay HDP11959 Installation Guide 取扱説明書 インテリジェントバルブポジショナ EA10S 形 耐圧防爆構造 Quantum FastStor 2 User's Manual MANUEL D`UTILISATION - Distributions Avantgarde Manual de instalação e configuração 9,67$ - Brasil Security Shop Copyright © All rights reserved.
Failed to retrieve file