Home
Analysis and Actions for Robust Electronics Production
Contents
1. 23 Sn 23 2 4 1 Economie Order Quantity sisi 23 2A Se PO LAE E M CIE IM 24 2 9 Man factra Dy tt 26 A A A 26 AO Paste zes nen 26 FASS WG 27 2 934 DESIGN naeh 27 2 5 92 00lder Mask DESIGN ana En ir id 28 2 5 6 COMPONENT OCHEMAUON 29 2 5 7 Component and Pad SpaciNQ oocccccccccccccnnccncnncnncnnnnncnnnnncnnnonnncnnnnnnnnannnss 29 259 8 18 Eel T 30 2 5 9 Fiducial Marks and Tooling 31 2 9210 WIASHAING nn 31 2 9 Varel 32 2 9 1 LESE POINTS 32 202 COMPONEN 32 20 01 UICN ee 32 2 6 4 Tall and Coloured Components 33 tt D c M DM 33 AA Marks nennen 33 al Blecltoc te DISC 8 cem nU 34 Description OT Contextos 36 3 1 Description of the Production 36 3 1 1 Labelling and Magazines A P Sand 36 32152 2000 37 PAIS Sa PPM 37 3 1 4 Philips Emerald D and ds 38 3 1 5 Matnigial Inspection and Ders 38 9 1 5 Electrovert OmnihlOw D F uretraren rae a tust ri ria 39 eise OVER e ee eine 40 3 1 8 Automated Optical Inspection G
2. 68 7 4 Quality control during production When the performance improvements suggested is implemented more time will be made available for the operators This extra time could be used for more focus on quality during production In many occasions small means are needed in order to prevent miss placed components There have been examples where a dirty nozzle or an un calibrated pick up position has caused a lot of failed products before it was discovered If these problems would be discovered and rectified in an earlier stage many failed products could be prevented This could be done through that the operator gets informed by the AOI when the same component has failed 1 e two times in a short period of time The operator could then adjust the feeder or clean the nozzle before the problem has caused numerous of failed products 7 5 Investigation of root causes of picks and place problems Many of the problems with pick and placements are not caused by the fact that the machines are old and inaccurate Bad calibration of the pick up positions unclean or broken nozzles 1s the most common reason for dropped or misplaced components in the pick and place machines To be able to reduce this problem it is needed to do investigations of what is causing the machine to not pick up a component correctly and place it in the right position This could i e involve investigations of Are the nozzles that are used suitable for the components that ar
3. The quality in the SMA lines is determined through the automatic optical inspection equipment Because of that optical inspections of this kind 1 never exact it will always detect some amount of false alarms This could i e be when a component is slightly rotated or misplaced but it 1s still acceptable from a functioning point of view The status of the false alarm rates are 16 08 in the first AOI and 11 95 in the second 45 4 4 Haldex Way Haldex group has over the last 15 years grown in both sales and profitability In order to sustain these results Haldex need to be able to adapt change and develop further In order to do this they have implemented lean manufacturing principles which they call the Haldex Way The Haldex Way is a management philosophy which focuses on customer satisfaction and at the same time achieve world class performance By implementing The Haldex Way principles in our entire group from product development and through the whole supply chain to the customer we will ensure our success 79 The Haldex way concept 1s based on three management core values Customer first Respect for the individuals Elimination of waste 4 4 1 The 10 Principles There ten principles that the Haldex Way 15 based on by following these principles the company will become a lean manufacturer 1 Standardization Standardize by defining the best method for performing an activity and to do it the same way
4. Switch off shuttle gate after MPM line 2 to make sure that sapphire is not loading board before it 1 changed over Start the printing process by switching on the and start the MPM on line 2 Sapphire Operator Line 1 Line 1 operator should start to change over Sapphire Line 2 as soon as the last board 15 out of Emerald line 2 Emerald line2 Operator Line 2 amp 3 Cut trim the feeder waste tapes Referring to MO sheet load relevant programs Referring to program feeder list check populate as necessary Check adjust PCB clamping Check adjust width on all connecting conveyors Switch to inspection mode on conveyor between Emerald and oven Start Sapphire Emerald and switch on the shuttle gate Omniflow Line 2 Operator Line 1 Referring to MO sheet load relevant program Start machine A O I Line 2 Operator Line 1 Note the time for the last board tested in the AOI Referring to MO sheet load relevant program Check realign as necessary bar code reader on input conveyor Check adjust width on all connecting conveyors Check adjust width on WES racks Switch on the inspection point to allow products through the oven Changeover finalisation Operator Line 2 amp 3 Note the time for the first product tested in the AOI The changeover time noted is now to be reported in the OEE data collection sheet Change over is now completed and the line 1 operator can now go back to line 1 81 Appendix 4 Examp
5. every time 2 Takt Time Takt time reflects the sales on the market It is defined by the available time divided by the customer demand The daily production rate shall be controlled by the takt time 3 Levelled Flow This is accomplished through evenly distribution of the products during the available time to minimize manual work and optimize the use of equipment 4 Balanced Flow This 1 done by distributing the activities evenly between the different production processes in the flow 5 Consumption Controlled Never start to produce before a customer signals a demand This is called a pull method and can be controlled by a Kanban system 6 Visualization By making production performance information visible everybody can easily follow the process The Haldex Way 2 Edition Jan Erik Dantoft 2006 46 7 Capable Process This is achieved by doing things right from the beginning by means of suitable tools good instructions and preferably a poke yoke system that makes it impossible to make an error 8 Real time Everything is supposed to be directly linked together so that there are no delays in the system In this way abnormalities can immediately be discovered This makes it easier to quickly correct the root causes so that the errors is not repeated 9 Go and See A leader should participate and support By participating in production the leader gets knowledge in order to understand the work and what problems that can ari
6. 1 a spider chart of a typical hour of an operator and the amount of travel he 1 doing The green marked track 1s the LIFO buffer O 425 Meier A f Ww MPM tr Printer Sapphire i ode d j n d 1 1 ir m E gt gt E as oul o 52 eh Seu iw 2 an ab 2 4 en Figure 35 Spider chart of an operator hour Implementation and Result The suggestion 15 to place the AOI rework station within the lines to stop the amount of time spent walking over to the station To do the move of the LIFO buffer the buffer itself needs reprogramming as well as the conveyors around it The current option is to outsource the move to the supplier A price proposal has been received from the supplier PAF Conveyor Engineers that could do this for 2000 The reprogramming needs to be done off site which means that the buffer would be unavailable for 3 days It will then take 8 hours once it is back to fit everything into place and program the conveyors to work with the buffer 55 Below are some calculated figures to display how much that is wasted because of the current position of the rework station Walking distance back and forth 29 Meters Time that is wasted walking back and forth 21 Sec Average amount of travels to AOI Rework 5 Hour Distance travelle
7. Cirrus EOLT The machine uses a learning method to decide what tolerance levels to use A correctly measured GEN2 has been used as a reference which the machine has been taught 4 1 15 Grease Y There are a couple of placed components on the PCB that are formed as cones which are filled with grease manually Connection pins to the valves are to be placed into these cones in a later stage of the production The greasing 1s done to prevent potting to get in under the pins When this has been done the cases are stored in ESD protected boxes for transport to further processing Potting 15 a process where liquid 15 poured on top of the electronics the liquid then hardens and protects the components from dirt and dampness during the use of the product 4 1 16 Rework Z The rework station is intermittently used because of the lack of operators during certain shifts When there are operators on the station they have to correct the PCBs that have failed somewhere in production When the operators are going to correct a PCB they get a slip of paper containing information about what needs correcting if it comes from the IFR The operators doing the rework have years of experience and are skilled in correcting the errors When the PCB is corrected it 1s once again tested in the IFR 43 If the PCB comes from the AOI they scan it and get a print on a computer screen which tells them what is wrong and where it is wrong They then mark this error an
8. H and 41 3 1 9 Flex Assemble Reflow Station 0 41 STALO AE E 42 3 1 11 PCB Break Out Station 42 A t cock da at La S bane ur 43 9 1 19 o0ldellthdg RODOV aaea S Nun HU NUM EID 43 SR BOIS a ee a 43 AA 43 A A 43 3 2 Capacity of the Production 44 3 3 Initial Status of the Production 45 omi Murloc Mic m RTT 46 3 4 1 Saa 46 3 4 2 Tier Model The Haldex Way and 47 4 Implementations and 48 4 1 Overall Equipment Efficiency 48 4 2 Availability 49 4 2 1 Reviewed Changeover 49 4 2 2 Reducing Stock Costs and Part Shortages 50 4 3 Performance Implementations 5 4 3 1 Component Reel Change Reduction 54 4 3 2 Relocating the LIFO Buffer essere 55 4 3 3 Test of a new Solder 57 4 4 Quality ImplementatiONS oocccccccnccncconnnncconnnnconononnonononnononennononennnnoncnnnnnnnnns 58 4 4 1 Desi
9. are difficult to estimate 5 4 1 Design Review of the GEN2 Products Background Throughout the project there has been a focus on GEN2 products and a part of the project was to do a review of the design for manufacturability and testability Through guidelines of component manufacturers and industry organisations facts about design was gathered These facts were then compared to the product in order to determine its manufacturability and testability Implementation and Result The CAD data of the GEN2 products were examined and compared to the AOI data base in order to localize where problem areas on the PCBs were These problem areas were then compared with the guidelines in order to make improvement suggestions The AOI data base showed a lot of problems with solder volume especially around the IC circuits Recommendations say that passive components should be placed at least 6 mm away from the ICs in order to minimize these problems There are currently passive components close to some IC circuits on the GEN2 that are failing A possible source to this problem can be that a step stencil is used Around the largest IC circuit on the GEN2 the stencil 15 thinner in order to get less solder on those leads to prevent shorts But because of that the distance to the adjacent components are not enough these joints might be starved or suffer from slump action 58 oe 4 f S all f Atta Sheet Figure 38 Components
10. at Haldex Brake Products in Redditch Index A 10 1915 72 amp OU mM m 12 V2r CoMT Tm 12 1 9 Ede 12 14 Product Brie a TIE 12 SAUX 1003 922 7509 nia UR 13 1 4 2 GEN2 5 Aux Accelerometer 003 9215 09 13 1 4 3 GEN2 5 Aux Accelerometer Super Aux 003 921 0 09 13 TAA GENZ SM Master ae ee 13 7 Y7 A 5 A 14 AA A 14 TE 16 1 7 RINT ATOMS ea ee ee are 16 2 Theoretical Reference aan er 18 UP 18 2 1 1 Define Value for the Customer 18 2 1 2 Identify the Value Stream 18 2 133 Balarice ING iba vd tota itu vate decoctae 18 Poa o uM QUA 18 2 1 5 CONUNUES IMPFOVEME Mi nase 18 2 2 Overall Equipment Efficiency 19 ZR E MICRO 19 22 2 19 2232 4 0 O o 22 ROC MON 22 2 3 First Time Pass Rate and First Pass
11. been introduced by other engineers at the Redditch site because of that they would like a larger coverage of ESD flooring The suggestion is ESD floor tiles that can be installed sections rather than all in one go In appendix 6 the suggested coverage of the ESD floor tiles are displayed together with the costs of the investment It was a part of this project to suggest a layout for the tiles This 15 still waiting to be signed of by management If the flooring is bought more sections will be ESD protected and fewer products will have latent ESD errors This will have an effect on returned products as well as some errors found during testing within production This will increase the quality of the products that are produced in the electronics area and it will also make the operators more flexible at their workspace 5 4 4 Solder Paste Procedure Background When looking at the prints coming out of the stencil printer it was noticed that sometimes the print on some boards were worse than others There are set practices for how to handle solder paste in order to get a good print It was observed that these practices were not always followed 63 Implementation and Result In order to address this problem a solder paste handling procedure was created there currently was none in the section The procedure tells the operator how to handle and store the solder paste See appendix 7 for the solder paste handling procedure If this procedure w
12. boards it 15 imperative to design for assembly Things to consider are trace and component spacing as well as component size orientation and position If a board 15 designed for assembly a great deal of rework can be avoided For a board to have high manufacturability it needs to have accurately placed components on the PCB with reliable solder joints These attributes of design all need to be inspected and tested before taking the product into production 3 5 1 Solder Volume The biggest source of component faults 1 excessive solder volume Excessive solder volume does nothing for strength in the solder joints Drawbridge effect and bridging are common results of excessive solder volume Inadequate solder is the source of weak or missing solder Joints for passive components and coplanarity problems with IC circuits When manufacturing a PCB it 15 important to know that non coplanar parts like IC circuits needs more solder than small passive components to get proper solder joints and less rework It is important to find a balance of solder volume to satisfy the IC circuits and not to have excess on the passive parts It 1 the height of the stencil that decides the thickness Solder Fillet Open Solder Joint D Solder Land Body a i Figure 5 Drawbridge effect 3 5 2 Solder Paste Solder paste 15 sensitive to humidity and could easily be contaminated if the paste is exposed to air it
13. each other as far from each other as possible The holes should be at a minimum of 125 43 mils 2 9375 0 0705 mm over the diagonal Referenced to the fiducial marks the maximum allowed offset 1s 2 mils 0 047 mm 3 5 10 Vias and Tracks Vias should always be covered with solder resist if they are not going to be used as a test point Vias should not be placed adjacent to solder pads They should neither be touching nor overlapping the pads If a via have to be placed near a solder pad it shall always be covered by solder resist Tracks should have the minimum distance of 0 2 mm spacing between each other They should not be less than 0 2 mm wide and the thickness should be 75u m To protect the board from ESD tracks should be placed 10 mm from the edges where conveyor tracks 1 in contact with the board Surface Mount Zero Defect Design Check List John Maxwell 3 3 6 Testability When designing a PCB for testability there are a couple of aspects to take into consideration Most of these aspects are during the design period of the product and the aspects include for example the layout of test points and test pad requirements 3 6 1 Test Points Components should never be probed directly on their solder joints or component leads This could result in latent faults which can reveal themselves during the customer s use of the product which results in returned products You should never use vias as test points because of damage
14. noisy but is the most flexible technique These techniques work without to many negative effects on component yields They are somewhat more restricted than the bad examples but the advantages in the long run result in higher component yields There should be PCB bridges between the individual boards to support them through the production process These should be placed 25 mm from each other to give proper support 3 5 9 Fiducial Marks and Tooling Holes Fiducial marks are used as reference points by optical systems to locate the position of a board within production equipment The camera locates the fiducial and determines whether it correctly positioned or within tolerances There should be at least two fiducial marks on every individual board one at each side They should be placed diagonally or if more than two marks have been placed they should be symmetrically placed The marks should be round and copper plated with at least 1 mm across the diagonal They should then have a copper free area which is also clear of solder resist around the plated centre This should then be surrounded by a robber bar which is a small copper lining An image of a fiducial mark is presented below No test points are to be placed 5 mm from the centre of the fiducial because of possible confusion in the machines Tooling holes should be used as fixtures to the board there should be at least two on each individual board They should be placed diagonally from
15. of products that goes through all linked processes without the need for rework Overall FTPR 1s also commonly called First Pass Yield 3 4 Order point System The most common way to determine when to order is to use an order point system This system uses a specified stock level called the order point to determine when to order When the stock level goes below the order point a new order is to be raised The order point is based on the demand during the lead time and the safety stock that is needed This means that the order will arrive when the stock level is equal to the safety stock if the demand 15 like predicted The safety stock will cover for variations in demand during the lead time Below 15 an example of how the stock level could look like when using an order point system with fixed order quantity and a safety stock Pieces Time Lead time Q Predetermined Order Quantity R Order Point SS Safety Stock Figure 4 Order point system 3 4 1 Economic Order Quantity EOQ is a method of comparing the elements of the cost to supply an item By using this method the economic order quantity is determined in order to minimize total costs of stock EOQ is calculated by using the following formula and the following inputs 2 x Annual usage in units x Order Processing Cost EOQ Annual carrying cost per unit 7 The Haldex Way 27 Edition Jan Erik Dantoft 2006 8 http www ies luth se log courses iet064 L
16. production efficiency 3 2 4 Quality This category tells the quality of the products that are processed Every error causing products to be reworked or scrapped should be recorded and accounted into this calculation The first thing to calculate 15 the number of approved products Number of Approved Products Number of Products Processed Number of Rework and Scrap By dividing this number with the number of products processed the quality 15 calculated Quality Number of Approved Products Number of Products Processed One can never have an OEE of 100 because there will always be breakdowns change over performance losses and quality failures OEE 15 a very useful tool and 15 part of many lean manufacturers methods to get leaner and more efficient E 2 http www oee com oee_factors html 2008 07 06 http www oee com calculating_oee html 2008 07 06 22 3 3 First Time Pass Hate and First Pass Yield First time pass rate is a measurement used to determine the quality of the output of a process FTPR is the rate of products that are right first time RFT through a process First time pass rate indicates how many of the processed product that went through without the need for rework Rework processes is non value added activities therefore it 15 important to strive for 100 FTPR When calculating overall FTPR it 15 important to consider all the process steps within the cell or work area This 15 calculated by the rate
17. the turning point on SMA Lines Move sensor on end conveyor to trigger when a board passes the LIFO buffer Program modifications on existing control units Trigger the conveyor in the rack tower to move in forward direction This could be done by using the sensor in the turning point as an input trigger Remove trigger input from the AOI to the turning point so that it always turns it in the same direction Add one parameter to decide if the board should be lifted or not Set memory if board fails in AOI Use the same output that is used for determining the direction of the turning point Add memory as an argument for lifting the board When a board is lifted then reset memory again to prepare for the next board X ADI Failed Board SET Go OF FLAT UF PLAGE BOTH SIDES 450 011 A515 4910 ri m SET xz 1 PICK UP LIADIKG Tut BIDE 1 PCSITIH FLAG SLOT PLAG ur COUPIED FACH HHI bl Sn SET N521 i m SIDE 1 op HERTA East ERT 4533 1 SIDE 3 ue M t Ft 43523 SIDE 2 Figure 46 Example of PLC program modification red lines marks the change 7 8 Using OEE for Continuous Improvement A part of the Haldex Way is to work with continuous improvement An excellent tool to use in order to continuously improve would be OEE By implementing OEE into shop floor meetings they will be alerted of the top reasons of downtime in the production sy
18. they have to disconnect themselves and connect themselves to a new grounding point There are two sections of flooring in the electronics that are grounded This is the most effective way to remove ESD and still allow the operators to be flexible The downside is that you need grounded shoes in order for this to work At the moment these shoes are not used and therefore making this investment a waste To make the investment work for its cost the operators need the ESD protected footwear provided to them There are more sections in the electronics that would benefit from the ESD protected flooring i e by the IFRs in order to make the operators more flexible A cost efficient proposal 1s to purchase ESD floor mats or to use the left over ESD flooring which can be cut out and fitted to the areas that need the protection The areas proposed to cover are by the AOI rework stations between the IFRs and by the hot bar In order to make these floor mats to work as intended they as well need the grounded footwear The proposal 15 that permanent personnel will be supplied with the footwear and foot straps will be provided to the temps This 1s because it 1s an investment in the personnel as well as in the production Implementation and Result Quite early after that the ESD proposal was presented to management the ESD shoes was purchased All personnel working within the electronics now have a pair of ESD shoes A larger investment than ESD floor mats have
19. to lower the amount of post handling rework There are areas on the board that always experience too much deflection to achieve high yields and reliability Such areas are corners and edges If components are kept away from them by more than 200 mils 4 7 mm these problems would be minimized Deflection causes stress to the board which can result in cracked solder joints STRESS BOARD BOARD CORNER Figure 13 PCB corner stress The GEN2 motherboards contain three smaller boards and there are several techniques available to separate these boards from the motherboard There are a few existing bad techniques for example Prescored boards with manual breakout Perforated boards with manual breakout Shearing including blanking shears Routing Breakout tabs prerouted boards Prepunched boards a ea HC BOARD DEPANELIZATICN AND MOU edie Se deal VT RES y TFI mm ch 4 NTING HIGH STRESS AREAS Figure 14 High stress areas and break out stress 30 The reason why these techniques are bad is that they might expose the PCB and its components to too much deflection and stress so that solder joints might crack But there are also some techniques that work 1 High speed fine tooth saws can only do linear cuts and need a rigid fixture 2 Laser cutting can only cut through 47 mils 1 1045 mm thick PCB because of excessive charring of board edges 3 Water jet 15 slow and
20. will oxidize this will make the paste degenerate causing bad printability Therefore there are specifications about the handling of solder paste during storage and usage The specifications are from KOKI the supplier of the solder paste used at Haldex KOKI specify that the paste should be stored in a fridge with a temperature of 5 10 it should never be frozen It is recommended to store the solder paste containers on its side and rotate them regularly This will help to prevent layering in the paste since the solder and flux have different densities When a container is removed from the fridge it must be allowed to reach room temperature without any heating method It can be removed from the fridge the previous day to ensure that it has reached room temperature the lid should never be removed during this time When the solder paste have reach room temperature and is going to be used it should be stirred by using a stainless steel or chemically resistive plastic spatula It is recommended to stir at least 1 2 minutes to get the correct viscosity When the paste 1s to be added to the stencil it is recommended to use plastic tools to ensure that the stencil do not get damaged To much solder paste added to the stencil results 1n lesser printability so there should never be more solder paste than to the height of the squeegee blade 26 Already used solder paste should never be mixed with fresh solder paste It is allowed to reuse solder pa
21. 2 4 Select install required stencil for next product 2 9 Check adjust width on all connecting conveyors 2 6 Start screen printing process 2 8 Switch off shuttle gate to make sure that sapphire is not loading board before it is changed over 3 Sapphire amp Emerald line3 Operator Line 2 amp 3 3 1 Cut trim the feeder waste tapes 32 Referring to MO sheet load relevant programs 319 Referring to program feeder list check populate as necessary 3 4 Check adjust PCB clamping 3 5 Check adjust width on all connecting conveyors 3 6 Switch to inspection mode on the conveyer between Emerald and Omniflow line 3 3 7 Start production by turning on Sapphire Emerald and the shuttle gate on line 3 4 Omniflow Line 3 Operator Line 2 amp 3 4 1 Referring to MO sheet load relevant program 4 2 Start machine 5 A O I Line 3 Operator Line 2 amp 3 2x Referring to MO sheet load relevant program 22 Check realign as necessary bar code reader on input conveyor 5 4 Check adjust width on all connecting conveyors all the way to MPM Line 2 5 4 Switch to inspection mode on conveyor before MPM Line 2 2 9 Switch on inspection point on line 3 to allow products through the oven 90 MPM line2 Operator Line 2 amp 3 If required remove clean current stencil Load program for next product Install set up tooling for next product Select install required stencil for next product Check adjust width on all connecting conveyors
22. 440 00 5 249 60 530 37 B nonum 5 839 80 240 510 1418 04 Extremities E Usage DICKE EDEN EE Stock Value New ry ir Ro Number of Orders New ee 22 40 88 40 z 998 20 z 5957 211 ENEE EE ERO Totals of All Calculations Humber of Orders Todz 83 Appendix 5 Design Suggestions for GEN2 3M Top Side Suggestions 04 1 n E Na Old DI Jt 84 Bottom Side Suggestions 86 ADA 13187 ese n gt yi 4 Vea M Seems CLE sad n y N y d a t A B 4 1 e gt X ih Jf de P P 7 jj 4 1 7 FF 4 T 7 a st WEE Ne PME d 5 90 D Ln e ul E 1 NO T T Dp C 84 len c Q d Q N O E gt V 00 5 lt S 9 Jr N S cd M Tw El Meal eo C EHEN Hr 9 O 2 n A n Ege EE p E oF g 3 19 91 Already existing ESD flooring Appendix 7 Solder Paste Procedure Storage e The solder paste should be stored in a refrigerator with the temperature 5 10 C e The paste shoul
23. 5 an automated optical inspection AOI is performed The machine inspects if the components have been correctly placed and if they have been correctly soldered It combines PCB Computer Aided Design CAD data with an online component library to create an inspection program The machine is equipped with several standard resolution and high resolution cameras with different angles several flashes to take a multitude of photographs of the PCB These photos are then analysed through comparison with reference photos and set tolerance levels to determine if soldered joints have enough paste and that they have been soldered correctly It also determines the right components are at the right place and have the correct orientation Figure 26 Photo of AOI 4 1 9 Flex Assemble Reflow Station Q When the PCB has passed though the AOI four flex cables need to be mounted in order to connect the three separate boards This is carried out in a part automatic and part manual station An operator load and unload the machine with PCBs and the machine solders the flex cables onto the PCB using a heated element 4 Figure 27 Photo of flex station 4 1 10 IFR R A component and function test is carried out in a rig called the IFR It tests circuits and components through test points placed on the If an error is found the PCB 1 sent to the rework station The IFR test covers 92 2 9o of the components on a GEN2 There are nearly 800 com
24. Design Check List John Maxwell Mechanical Equipment Interface Standard SMEMA 74 10 Appendixes Appendix 1 Haldex Way Tier Model 5 PLATINUM The Haldex Wa Balanced Flow 1 Real Time Takt Time Continuous Improvement 2 55 9 Site KPI s 16 Standardization 3 Set Up and Change Over 10 Process KPI s 17 Product Development 4 Error Proofing Poka Yoke 11 Haldex Way Principles and Values 18 Six Sigma 5 Consumption Controlled Process Pull 12 Mapping 19 Environmental Management 6 Total Productive Maintenance TPM 13 Inter Company Value Stream 7 Overall Equipment Effectiveness OEE 14 Visualization 2 TPM OEE 13 Mapping amp VSM 35 Go and See 14 Visualization 3 Set up times 9 Cross Functional Teams Continuous Imp 15 Standardization 4 Mistake Proofing Poka Yoke Site Key Performance Indicators KPI s Environmental Management Consumption Controlled Pull 1 Process Key Performance Indicators KPI s Overall Equipment Effectiveness Principles amp Values of Haldex Way 1 are calculated and reported with trends identified 5 Communication Boards amp Visualization 9 Principles of Haldex Way Displayed Gap Analysis Administration and Operations 6 Standardization 10 Value Stream Mapping 3 100 Employee educated in The Haldex Way T Cell Teams Continuous Improvement 11 Preventative Maintenance 4 55 training and e
25. EOLT Grease Magazine Figure 17 Process chart of production lines at Haldex Redditch There are two connected automatic production lines where the first line prints assemble and reflow the bottom side of the PCB and the second line does the top side After the automatic lines there is a manual line which tests and finalises the product The PCBs that are fed into the production system contain three smaller boards which are held together by a frame this 1s called a motherboard 4 1 1 Labelling and Magazines A P S and Y When batch of GEN 15 initiated the PCBs are first labelled with an individual barcode and then stacked in magazines of 20 PCBs The barcode is used to identify the PCB throughout the production system The magazines are manually fed into an auto magazine handler The magazine handler then automatically loads a new PCB into the system when needed There is a second auto magazine handler placed at the end of the production system which loads the populated PCBs into new magazines when they have gone through the automatic production lines 36 4 1 2 Ultraprint 2000 B and 1 The Ultraprint 2000 is a fully automated stencil printer that deposits solder paste on printed circuit boards prior to population of surface mounted components The supplier of the machine is the company MPM and this is the first process in the production system Figure 18 Photos of Ultraprint 2000 The following figure explains t
26. GS UN 4 gt T 18 9 gt F on N Gs unN Link pings universitet TEKNISKA H GSKOLAN Analysis and Actions for Robust Electronics Production at Haldex Brake Products Ltd Philip Andersson Tommy Eklund Monteringsteknik Examensarbete Institutionen f r ekonomisk och industriell utveckling LIU IEI TEK A 08 00456 SE Abstract This master thesis report contains information about a project carried out at Haldex Brake Products that is situated in Redditch England The Redditch site is part of the Commercial Vehicle Systems division within the Haldex group Haldex Brake Products is designing and producing electronic anti lock brake systems The latest product 15 called GEN2 and the project goal was to increase productivity and achieve more stability within the production processes of this product The goal was achieved trough implementation suggestions affecting the three categories in overall equipment efficiency OEE Nine of the biggest implementations are presented in this report Some of the suggestions are already implemented and some are under progress to be implemented These implementations will result in an increase in productivity with additionally 953 products per week The expected results are based on calculations on an average product The report also contains suggestions for future actions to even more increase the efficiency of the production processes
27. O sheet load relevant program 5 2 Check realign as necessary bar code reader on input conveyor 5 4 Check adjust width on all connecting conveyors all the way to MPM Line 2 5 4 Switch to inspection mode on conveyor before MPM Line 2 Switch on inspection point on line 3 to allow products through the oven 78 MPM line 2 Operator Line 2 amp 3 If required remove clean current stencil Load program for next product Install set up tooling for next product Select install required stencil for next product Check adjust width on all connecting conveyors Switch off shuttle gate after MPM line 2 to make sure that sapphire is not loading board before it 1 changed over Start the printing process by switching on the conveyor and start the MPM on line 2 Sapphire line 2 Operator Line 1 Line 1 operator should start to change over Sapphire Line 2 as soon as the last board 15 out of Emerald line 2 Emerald line 2 Operator Line 2 amp 3 Cut trim the feeder waste tapes Referring to MO sheet load relevant programs Referring to program feeder list check populate as necessary Check adjust PCB clamping Check adjust width on all connecting conveyors Switch to inspection mode on conveyor between Emerald and oven Start Sapphire Emerald and switch on the shuttle gate Omniflow Line 2 Operator Line 1 Referring to MO sheet load relevant program Start machine A O I Line 2 Operator Line 1 Note the time for th
28. Safety stock To make sure that the stock does not run out a safety stock 15 often needed Reasons to stock shortages could be uncertainties in demand during the lead time or length of the lead time It could also be caused by human mistakes or system malfunctions To determine a suitable safety stock two different aspects need to be taken into consideration The first 1 the service factor This 15 based on how certain the business wants to be that production 1s supplied at all time When the service level 15 decided the normal distribution 15 used to calculate the service factor The second aspect is the standard deviation during the lead time This 1s the deviation during the time between when the order is raised and when it is available for production The deviation should be determined based on recent history of demand The standard deviation during the lead time is then multiplied by the safety factor to determine the safety stock with the decided service level http www inventoryops com economic order quantity htm 2008 07 03 I http www inventoryops com safety_stock htm 2008 07 03 24 Avg Demand during lead time N Service Level Probability of shortage d L S Z from normal distribution table Ex Service Level 5096 75 90 98 Safety Factor 0 0 0 67 1 28 2 05 25 3 5 Manufacturability When designing electronics for assembly there are numerous aspects to consider Due to circuit density on surface mounted
29. Symmetry 1s important because of the thermal mass induced on the pads during the reflow If asymmetry in the pads solder migration can result 1n drawbridges missing solder joints or shorts COMPONENT ROTATION t L MIGRATION SOLDER SOLDER REFLOW E MIGRATION Nr SOLDER LANDS and TRACES Figure 6 Solder migration Vias and plated thru holes that are present can result in starved or missing solder joints caused by capillary action of the solder Guide lines for trace designs are 1 Limit the number of traces entering a pad to a single trace if possible to reduce solder migration 2 Symmetry 15 important Balance the trace entry to a pad to minimize any induced component rotation 3 No vias or plated thru holes in a pad it steals solder from the joint A test to see if the trace and pad design is working correctly is to screen print a PCB and then reflowing it without any components Signs of migration or missing solder can then easily be detected and evaluated In the following figure recommended trace designs can be found 24 0 010 Min A 25bmm Figure 7 Recommended trace designs 3 5 5 Solder Mask Design Solder mask materials vary from dry film laminate to screen wet film or photoimageable liquid solder mask Solder mask thickness range from 0 6 mils 15 2 um to 9 mils 22 8 mm across the different mask types Improper solder mask design can cause two dif
30. achieved by the ability to slow down tires without locking the brakes The system also has the ability to slow down separate wheels axles or sides if it is needed to keep the trailer on the road EB GEN2 contains two modules that are put together in order to assemble a finalised product the valve module and the electronic control unit ECU module The valve module distributes air pressure between the different outputs in order to apply force to the pneumatic brakes and thereby slow down a specific wheel axel or side The ECU is the brain of the system It determines which valve output is to be used and how much air pressure is needed in www haldex com 10 03 08 12 order to brake the specific tire as efficiently and controlled as possible In order for the ECU to know which commands to send it relies on sensor inputs These inputs could 1 be tire speed or tilting angle The cables that are connected to the brakes are also manufactured at Haldex Brake Products and they can therefore deliver complete EBS systems There are three versions of the GEN2 that currently are being produced and there 15 also another version being developed The new version is supposed to enter production in September 2008 2 4 1 GEN2 5 Aux 003 9227 09 This is the simplest of the versions of GEN2 it contains the basic functions of an EBS It can stop or slow down the tires without locking the brakes 1t also contains 3 auxiliaries which mean that ad
31. al Inspection Test equipment that through the use of cameras and flashes compare the photos taken with CAD data and tolerance levels CAD Computer Aided Design Drawings made with computer software IFR International Flight Recorders The old supplier name of the test equipment used to test components and function The supplier name is still used as the equipment name EOLT End of Line Test An abbreviation for any test equipment that is at the end of the production line LIFO Last In First Out The abbreviation for the function of equipment that sends the last entered product out first SMED Single Minute Exchange of Die A tool used to minimize change over time by converting internal change over to external MO Manufacturing Order An order of X amount of product Y 1 Disposition The second chapter of the report contains background information about the project The company and the product that the project focused on 15 described as well as the methodology used during the project The third chapter is the theoretical reference frame and contains information about the different tools and methods used during the project The chapter also describes best practise when designing electronics which has been used during the implementation phase of the project The forth chapter 15 a description of context containing more in dept background information to the project Description of the production system at Hal
32. art shortage has the last couple of months stopped the line for about 68 hours month and on top of that it has caused several unnecessary changeovers One of the biggest problems is that the amount of components that actually is held on site is different from the stock levels in the computer system 50 At the moment the same component is delivered several times a week in different batch quantities 042 6439 09 was delivered 9 times between the 29 May and the 1 July The quantities varied between 8000 and 44000 on 4000 component reels At the same time many other types of components was delivered This large variation of components delivered at the same time is obviously taking a lot of time to sort book label and place at the correct position The complexity of receiving several deliveries may be one of the reasons why stock levels differ from the computer system because of misplaced or wrongly labelled reels It is important to take all aspects into account when deciding what when and how much to order of every single component that is used simple and good way to do this is to use the Economical Order Quantity Implementation and Result The suggestion is to use an order point system that uses a safety stock based on the amount of feeder positions for each component The order quantity 1s calculated using EOQ In the cases where EOQ suggest higher order quantities than the storage capacity it is recommended to go as close as possible
33. as to be followed the quality of the print would increase and this will result in a higher quality in the joints This causing less rework and errors in the test equipment 5 4 5 Validating Repeatability in Test Equipment Background At the early stages of the project it was decided that a test batch of 50 pieces of GEN2 were to be assigned to the project The GEN2 version that was given was the most sophisticated one the one containing super aux and the accelerometer One of the key parts of the test batch was to test the boards in several test fixtures of IFRs This was to determine if there are differences in the test equipment Implementation and Result The boards were followed through production and observations of possible errors in the equipment as well as quality errors were found The boards were produced during four hours and the results were recorded within the different databases of the test equipment The boards were processed and then tested The boards that failed were then reworked and tested again as they normally would have The only difference was that the boards were tested in both of the test fixtures available One major observation was made The fixtures were showing different test results One board could pass in the first fixture but fail in the next one This 15 a major concern because it 15 safety equipment that is being manufactured at Haldex This 1s one of the things that will be added to the future action
34. asurement becomes more accurate Some deviations in the process might not be found in one time period but will reveal themselves as problems over time Your Attack Plan Set up plans in order to attack the deviations found in the previous steps Find solutions to the problems and set up deadlines for when the solutions should have been implemented Set up improvement teams that should work with implementing solutions of problems Assign tasks and ownership of these tasks Le make attack plans for the top three problem causes every time period exchange a problem cause with a new one when it has been solved Implement Your Plan When the attack plans have been completed implement all the solutions suggested If the problem hasn t been solved by the time of the next step stone this problem should be pursued the upcoming time period Observe and Learn When the solutions have been implemented the results should be measured in order to see the effects If the implementation has had a positive effect this should be transferred over to other processes as well in order to learn from the problems It is important to follow up on the implementations several time periods after implementation in order to see improvements over time 15 2 6 Resources Name Title Phone Number E mail Jerry Ralph Production Engineering Manager 44 1527 499625 jerry ralph haldex com Project Manager Electronics Production Engineer 44 1527 499658 ann crompton O halde
35. ate static electricity from personnel and equipment By using these materials the right way ESD hazardous effects can be reduced Le to protect the products from the static that 1s generated in the operator s clothes a cotton coat could be used Grounded equipment and flooring in combination with conductive shoes can be used to dissipate static electricity from personnel and machines P http www esda org basics partl cfm 2008 07 03 Electronics manufacturing processes Prentice Hall Inc p 449 Landers T L 1994 17 Microelectronics System Packaging Technologies C 17 8 Tummala R R T 2003 18 Electrostatic Discharge Control Vermason Ltd P http www allaboutcircuits com vol_3 chpt_9 1 html 2008 07 03 34 35 4 Description of Context 4 1 Description of the Production System Through this chapter the production system of the electronics at Haldex Brake Products 1s explained The processes are described in order as if a PCB would have been assembled in the system The following process chart describes the flow Errors H Magazine UP 2K Sapphire Emerald Inspection Omniflow 5 4 i i i i i i i i i i Rework G i 4 i AO i Errors i Automatic Production Lines i i i i 1 1 i IFR Manual Production Line N Magazine PCB Break Casing Solder Robot Cirrus
36. ciency of the equipment After the first couple of weeks it was noticed that the information needed of the OEE data collection sheets was not collected as it was supposed to be It was therefore decided that an introduction booklet was to be written This was called Introduction to Overall Equipment Efficiency and together with education sessions this booklet was used to make the operators more aware of OEE The production engineering department have also been educated in the use and calculation of OEE in order for them to proceed with the OEE measurement after the project has ended Currently there are five processes with complete OEE results every week In order to reach bronze tier in the Haldex Way this needs to be expanded to all the key processes within the whole factory 48 5 2 Availability Implementations The implementations in this section are the ones that affect the availability category of OEE 5 2 1 Reviewed Changeover Procedure Background Analysis of OEE showed that the changeover time especially from or to any GEN2 product was very high According to production engineering department the average changeover to GEN2 was 140 min After investigations of the changeover procedure some big improvement possibilities were found The old changeover was according to the following procedure When the current product was finished on line 3 the changeover was commencing in the MPM printer on Line 3 The operator was then changin
37. ction We have found that OEE gives a good overview of how well different processes are performing and how one process can be affecting another OEE also shows us what is causing production not to run or run slower than ideal The result from OEE calculations has throughout the project been the base for what to focus on By knowing what has caused the line to stop and for how long we can use that data to show decision makers that the investment for implementing our suggestion to solve the problem 1s worth doing We have found that the cooperation between departments it not always easy and efficient Therefore we have decided to have a number of improvement projects undergoing at all time throughout the project This 1 in order to not get a stand still because of that we are waiting for another department to act Stock Level The Haldex way says that stock levels should be as low as possible This is not working at Haldex Redditch Low stock levels have in this case caused numerous part shortages and high order processing costs This has caused purchasing and good inwards to work more with order processing than necessary Low stock levels in general are good but in this case we are talking of very low cost components with high usage We have found that the order processing cost per year on most of the components are many times higher than the carrying cost Therefore we suggested implementing EOQ and safety stock to reduce both problems caused inef
38. d during one hour 145 Meters Total time wasted during one hour 1 Min 45 Sec Total time wasted during 4 weeks 14 Hours 1 75 Minutes x 8 Hours x 3 shifts x 5 days x 4 weeks Cost of the wasted time per week 291 2 14 Hours x 20 8 Distance per Shift 1160 Meters Distance per 4 weeks 69 6 Kilometres 1160 Meters x 3 Shifts x 5 Days x 4 Weeks This means that Haldex are currently paying the operators 291 2 every 4 weeks just to walk On the following page pups layout is presented as a spider chart as well C10 a unt I f 4 Figure 36 Spider chart of an operator hour after move of LIFO buffer Another matter to take into account is that some of the times when the operators is by the AOI rework station an alarm goes off in one of the machines Le the sapphire on line 2 stops because of a feeder jam In average this happens 2 times out of the 5 times when they are over there This means that the travel distance is prolonging the stop in the machinery In this example we use the entire travel time in order to compensate for that operator finishes what he she was doing by the station before going and fixing the feeder jam Amount of wasted production time each week 84 Min 21 seconds x 16 times during a shift x 3 shifts x 5 days If this investment was to be made it would earn itself back in 27 5 weeks based on standard labour cost alone Then Haldex would actually be paying the ope
39. d never be frozen Preparation e Solder paste is to be taken out of the refrigerator 24 HOURS BEFORE USE in order to allow it to reach room temperature It must reach room temperature before use e Make sure that the paste isn t out of date e When container is removed from the refrigerator the time and date is to be written on the container e No heating method to speed up the process is allowed e The lid of the container should never be removed during the 24 hours otherwise the paste will oxidize and dry out making it a bad quality paste Usage e Use solder paste with the earliest stated time and date that has been removed from the refrigerator e The solder paste should be thoroughly STIRRED with a chemically resistive plastic spatula for 2 3 MINUTES e Before adding solder paste to the stencil make sure it is clean clean it at every change over clean it using the automated wash system chemically resistive plastic spatula should be used when applying solder paste to the stencil to ensure no damage to the stencil 1 made e not add to much solder paste to the stencil the amount should not exceed the height of the squeegee blade e Always KEEP THE LID ON the container tightly closed when not in use e When performing a change over put the remaining old solder paste into a separate cleaned container do not add to an unused paste container DO NOT MIX USED SOLDER PASTE WITH FRESH ONE e Before
40. d send it back onto the production line it is not tested in the AOI again The operator doing the rework coming of the IFR then rework the marked ones before they are tested in the IFR A PCB is allowed to be reworked three times if the errors haven t been corrected at this point it 1s scrapped Figure 31 Photos of rework stations 4 2 Capacity of the Production System These are the cycle times and capacities of the processes in the production system The numbers are subjected to transport times between processes and errors in the equipment making production come to a halt It is also subjected to that the PCBs are RFT These are the cycle times of GEN2 products Name of Process Capacity PCBs Hour Cycle Time PCB Production Line MPMUPOK 190 0 B ElectrovertOmniflowS 590 ee 7 3 MPMUPOK 0 0 po Vitroincs Soltec My Reflow Oven 940 0 PP 3 min 30sec 60 5 min All Bottleneck Capacity Bottleneck Capacity of all Processes Table 3 Capacity Figures of the Production System These numbers are not reflecting the real capacity of the production system because they are subjected to failures If you account the fact that there is rework and retesting of PCBs after the IFR it will show that this test 15 the bottleneck of the system Today they got a FTPR with variations between 75 5 By assuming that all PCBs that fail the first time have had 44 rework and then passes the secon
41. d test It would give that 25 5 of the PCBs need to be retested and therefore lowers the IFR capacity In this case the real capacity would be approximately 13 1 PCBs hour This is not the case because often the PCBs need a second and third rework before passing or even being scrapped If you account this the capacity will be even lower and the test becomes a bottleneck to the system 4 3 Initial Status of the Production System The initial status was determined in order to discover deviations from perfect production Initial status 15 also to be used to evaluate improvements made to the system The status of the system was determined by analysing the FTPR and OEE for the different processes within the production system The status was only determined in the equipment that are affecting the manufacturing of GEN2 Overall Equipment Efficiency SMA Lines Hot Bar IFR 1 IFR 2 Casing Line Availability 67 4 65 4 46 7 55 6 61 8 66 4 71 5 52 7 58 4 77 4 96 Quality FTPR 81 0 96 94 4 85 3 77 1 96 94 0 96 36 2 96 51 1 96 21 0 96 25 0 96 44 9 Table 4 Average OEE and Products Produced in Key Processes Downtime Reasons Hours per Week Change a 9 9 9 Nowork _ 5 a Waiting For Operator gt fs 6 m Table 5 Downtime in the Key Processes Due to the downtime reasons and inefficient production Haldex have had an average of late deliveries to a value of 82 500 per month
42. d with the schematics of the product that is about to be manufactured 38 4 1 6 Electrovert Omniflow 5 F The Omniflow 5 1 the first of the two reflow soldering ovens in the production system Both ovens are convection reflow ovens which mean that air 15 directed through a heating element and then directed onto the material that 15 to be heated this 1s shown in the following figure The heated air 15 evenly distributed through symmetrical holes in the oven Figure 22 Convection reflow process The conveyor track transports the PCB into the oven with a speed that will determine the time that the PCB will pass through every zone of the oven The oven has five different heating zones that all can be set to different temperatures ES During a reflow process with solder containing lead the characteristic of a reflow process should look like the one in the following figure The initial stage of the reflow process 15 to preheat the solder therefore named preheat zone The temperature should rise slowly up to the temperature of the soak zone this will minimize the possibility of solder paste spatter caused by out gassing The soak zone 1 used to slowly get the solder pastes temperature up to the of the peak zone and to active the flux in the paste The flux 1s used to remove residues and oxygen in the paste in order to increase the solder ability 22 Omniflow 5 Instruction Manual 39 Tp Temperature Tr alpha F
43. dex and its initial status as well as a description of the lean principles used at Haldex The fifth chapter describes problems found and implementations made to solve these problems The chapter also describes the results of each implementation and their effects on Chapter six is a summarization of all the results in the previous chapter Chapter seven contains information about suggestions made for future projects at Haldex suggestions made are observations made during the project that because of time shortage could not be addressed The eight chapter contains conclusions made at the end of the project Containing both of the authors insights to the project Chapter nine contains the references used in the project report and chapter ten contains the appendixes to the report 10 11 2 Introduction 2 1 Background Haldex Brake Products 1s having problems with sustaining stability within their electronics production In order to raise their throughput and RFT they need to find the reasons of the instability and implement changes to solve the problems By solving these problems Haldex will also reach a higher level of the Haldex Way Lean Manufacturing Principles and will be able to market themselves as a company with successful lean production 2 2 Goal The goal is to improve the GEN2 assembly process in order to increase productivity and achieve more stability within the production process The goal is also to im
44. ditional sensors or equipment can be connected to the EBS Example of equipment that can be connected 1 an info centre these are also produced at the Redditch site The info centre gives diagnostic information that identifies problems quickly to minimise downtime 2 4 2 GEN2 5 Aux Accelerometer 003 9215 09 A more advanced version containing the same abilities as 003 9227 09 additionally it contains an accelerometer that can identify if the trailer 1s tiling The EBS will then brake the tires needed to reverse the tilting and get the trailer back into a normal state 2 4 3 GEN2 5 Aux Accelerometer Super Aux 003 9210 09 This 1 the most advanced version it contains the same abilities as 003 9215 09 but also contain a super auxiliary This adds an additional 3 inputs outputs to the EBS adding the ability to connect even more advanced diagnostic equipment like the DIAG This is a computer software which gives information about speeds distances brake demand and trailer load giving complete information about the trailer 2 4 4 GEN2 3M Master The newest version is called GEN2 3M Master The old versions are called 2M which stands for 2 modulators Each modulator allows another axle to be controlled by the EBS So the new version therefore allows three axles to be monitored and controlled The reason why the development of the product was initiated was because of a customers demand for this specification One of the most impor
45. e future 12 73 9 References Online references http www haldex com 10 03 08 http www lean org WhatsLean Principles cfm 2008 07 04 http www hci com au hcisite2 toolkit pdcacycl htm 2008 07 04 http www oee com world class oee html 2008 07 06 http www oee com oee factors html 2008 07 06 http www oee com calculating oee html 2008 07 06 http www 1ies luth se log courses 1iet064 Lektioner 8 Lagerstyrning pdf 2008 07 04 http www inventoryops com economic_order_quantity htm 2008 07 03 http www inventoryops com safety_stock htm 2008 07 03 http www ipc org 2008 06 14 http www esda org basics partl cfm 2008 07 03 http www allaboutcircuits com vol_3 chpt_9 1 html 2008 07 03 Printed References The Haldex Way 2 Edition Jan Erik Dantoft 2006 SMD Technology Reflow Soldering Philips Electronic Manufacturing Technology 1995 SMD Technology Solder Paste and Solder Paste Application Philips Electronic Manufacturing Technology 1995 Technical Information KOKI Super Low Void Solder Paste Ultraprint 2000 Hi Series System Support Guide Omniflow 5 Instruction Manual User manual myReflow com Electrostatic Discharge Control Vermason Ltd Electronics manufacturing processes Prentice Hall Inc p 449 Landers T L 1994 Microelectronics System Packaging Technologies C 17 8 Tummala R R T 2003 Automated optical inspection guidelines for PCB assembly design Orbotech 2008 Surface Mount Zero Defect
46. e holding up the product flow These processes are important to focus on in order to get as low changeover time as possible It was discovered that the changeover has to be carried out differently depending if the system is changed over to a faster or slower processed product To get an overview of the changeover and the tasks needed a block diagram was compiled This show how much time it takes to change over different processes and how long it takes for the previous product to get processed Based on these results two new changeover procedures were compiled These can be found in appendix 3 In theory it should take 35min to do a changeover according to both procedures This changeover time has also been confirmed by trials By changing the way the changeover is measured and by reorganising the way the changeover is carried out the time has been reduced from 140 min to 35 min This reduction in changeover time will allow approximately 153 extra products to be produced each week based on an average product This will affect OEE in the SMA lines as following OEE of SM Line 2 amp 3 Current Increase Expected Availability 67 4 71 5 96 64 664 Quality FTPR 81 0 810 562 847 Average Products per Week 2501 2654 Table 6 Implementation Effects on OEE and Products 5 2 2 Reducing Stock Costs and Part Shortages Background The main goal for purchasing and stores is to supply the SM lines with components at all times P
47. e last board tested in the AOI Referring to MO sheet load relevant program Check realign as necessary bar code reader on input conveyor Check adjust width on all connecting conveyors Check adjust width on WES racks Switch on the inspection point to allow products through the oven Changeover finalisation Operator Line 2 amp 3 Note the time for the first product tested in the AOI The changeover time noted is now to be reported in the OEE data collection sheet Change over is now completed and the line 1 operator can now go back to line 1 79 2 to Prepare for changeover before production has finished in the MPM on line 3 Line 2 amp 3 operator makes sure that boards are labelled and loaded before changeover Request help from Line 1 operator Line 1 operator is running Line 2 amp 3 during changeover Line 1 operator should at the first part of the changeover focus on getting the old product out of the lines and getting the new product to queue up behind the machine that 15 currently being changed over When the old product is out of Emerald Line 2 the Line operator helps to change over Sapphire Omniflow and AOI on line 2 Start change over procedure on line 3 1 Commence with changeover in Line 3 when the last board has been printed 2 MPM line3 Operator Line 2 amp 3 2 If required remove clean current stencil 2 2 Load program for next product 2 9 Install set up tooling for next product
48. e placed Is the right routines for exchanges and cleaning of nozzles used What 15 causing the pick up position to move When the causes are known there 1 time to come up with routines for how to prevent these problems 7 6 Investigate variations in the screen print quality By observations it has been discovered that there 15 variations in printing quality One board could have a good print and the next board in the production flow could have a bad print To make sure that the screen printing quality 15 high these variations need to be reduced Investigations of what 15 causing these variations need to be carried out When the cause 15 discovered routines needs to be put in place to ensure high print quality These causes could i e be inefficient cleaning variations in squeegee pressure etc 7 7 PLC and Robot programming skills on site At the moment Haldex needs to outsource PLC and robot program modifications Recommendations for the future are to invest in training for the maintenance personnel so that these modifications could be done on site by Haldex staff This will in the long run reduce outsourcing costs and simplify rearrangements of the production equipment to move the LIFO buffer and do the program modifications is a relatively simple fix that easily could have been done on site by Haldex personnel 69 Actions needed Move the end conveyor to the other side of the LIFO buffer Get the whole unit in position after
49. eed of rework First Time Pass Rate This 1s the rate of products that is RFT through a process or production cell FPY First Pass Yield This 1s the rate of products that is RFT through multiple processes GEN Generation 2 This 15 Haldex Brake Product s most recent product OEE Overall Equipment Efficiency OEE is a measurement of how efficient a process or production system is PCB Printed Circuit Board A PCB is a circuit board populated with electronical components SMA Lines Surface Mount Assembly Lines This is a production line that assemble PCB s In this report SMA Lines refers to the SMA Line 2 and 3 at Haldex Brake Products in Redditch PDCA Cycle Plan Do Check Act Cycle A working procedure for continuous improvement EBS Electronic Brake System A sophisticated brake system that through sensor inputs can determine which wheel or axel needs to be slowed down ECU Electronic Control Unit The electronic part of the EBS EOQ Economic Order Quantity A formula used to calculate the most economic order quantity PLC Programmable Logical Controller A system used to control manufacturing processes IC Integrated Circuit A chip component that contains several smaller components inside ESD Electrostatic Discharge A phenomenon occurring when negatively and positively charged materials come in contact with each other causing a discharge AOI Automated Optic
50. ektioner 8_Lagerstyrning pdf 2008 07 04 23 Annual Usage This 1s the annual usage of an item based on forecasts If forecasts are not available the annual usage can be based on historical data Order Processing Costs This 1 the sum of all the fixed costs that occur each time an item 15 ordered This includes the cost of all steps from raising the order to handle the goods when it arrives The order cost 1s primarily the cost of labour associated with processing the order Costs of phone calls faxes postage envelopes transaction etc associated with the order can also be included to get a more accurate costing Carrying cost Carrying cost is the cost associated with having inventory on site Carrying cost is represented as the annual cost per unit of the average stock that is kept on site The cost 1s calculated as a percentage of the average stock value for an item Parameters that are included in the carrying cost 15 as following Capital binding cost 15 the cost of binding capital in raw material This is determined by the interest that is paid for the capital that 15 invested in material or the loss of interest that could have been earned 1f the capital was invested instead of being tied up Insurance costs and taxes that are related to the total value of the inventory should also be included in the carrying cost The cost of the physical storage area should only be included if it is variable based on the inventory level 3 4 2
51. er to get accurate figures It is the times of when the equipment 1s not running because of unplanned reasons I e the equipment breaks down causing halt to production or that there 1 a part shortage making it impossible for the operator to proceed with the work An unplanned downtime needs to be at least 10 minutes in order to be classified as a downtime if it takes less it should not be recorded Different reason codes are used to classify the unplanned downtime in order to group problems together and by that making them easier to target as a problem area The reason codes are explained below M Unplanned Maintenance When unplanned maintenance is performed this reason code should be used This is when the operator chooses to stop the equipment to prevent future breakdowns from happening I e the operator stops the equipment in order to make an adjustment B Breakdown This reason code should be used when there 15 a breakdown causing a stop in the equipment The operator could not prevent the stop and is therefore a breakdown I e the equipment stopped because of malfunction O Waiting for Operator If there 1s an operator stationed at the equipment but he she 1 not available to the equipment this reason code should be used I e the operator 1s working elsewhere because of personnel shortage 20 E Waiting for Engineer This reason code should be used when production has stopped and it needs the attention of an eng
52. esses This way the longest cycle time will be reduced and the bottleneck removed The GEN2 3M Master 1s being tested and will likely be initiated into production as planned The effects on quality of the implemented changes will first be displayed during production because of that there currently is no AOI program for the product or IFR test fixture yet Anticipations of the quality results are that they will contain fewer false alarms in the AOIs and result in less rework and by that raising the FTPR 5 4 3 Electro Static Discharge Proposal Background When manufacturing electronics it 1s important to protect the products from electrostatic discharge ESD can harm products making them malfunction in the early stages of its lifecycle Nine out of ten products that have been damaged by ESD are unnoticeable to the eye but reveal themselves as zero kilometres errors or in the later stages of usage 62 At the moment the operators in the electronics production at Haldex Redditch use wrist strap that dissipate ESD and they also use shielding coats The coats do not dissipate ESD they only lower the risk of generating more ESD The wrist straps grounds the operators and therefore removes ESD generated The wrist straps do not allow the operators to be very flexible because of that they need to connect their strap to a grounding point with a cable This allows them to move in a 2 meters radius from the grounding point If they need to move further away
53. eter 042 6981 09 the carrying cost will be reduced by 1316 a year and the order processing cost increased by 127 Detailed cost information of the mentioned components above and some other example components are to be found in appendix 4 By having bigger order quantities on high usage low value components the amount of deliveries will be reduced significantly This will make it easier and more efficient to handle the goods This will also make it harder to make mistakes like labelling the reels incorrectly or putting them in the wrong storage position The safety stock will even more reduce the risk that part shortage or part losses cause the lines to stop The safety stock will cover for variations in demand during the lead time and also some stock losses Even with a big safety stock 1t is important to have the correct stock levels on the computer system The new system 15 not as sensitive to small stock losses as the old system but reoccurring stock losses without adjustments will in the long run cause the safety stock to run out and the line to stop By ordering less often there will be a significant reduction in the amount of work needed for processing orders and handling goods This time could instead be used for regular stock takes to make sure that the real stock level is the same as in the computer system This could in example be done prior to a component refill Low stock levels also have a negative effect on the quality in the outpu
54. ferent types of faults The first fault is misregistration of solder mask layout or obscuring of a pad surface causing faulty solder joints 2 pur EE SOLDER MASK THICKNESS OVER THICKNESS SOLDER MASK SOLDER LAND GT Figure 8 Ideal solder mask P SOLDER MASK CAPACITOR Ac SOLDER FILLET SOLDER 24 H 5 Y L2 P do ENS marit i SUBSTA ATE 7239 i x Figure 9 Bad solder mask print The second fault is solder mask thickness If the solder mask 15 too thick it can result in drawbridge effects this could be eliminated by having solder mask windows under components It also makes cleaning of flux residues trapped beneath components easier You should place solder mask between IC circuits pads if there are traces running between those pads High density boards should use photoimageable solder masks to minimize registration problems 28 2 j SOLDER SOLDER MASK p 222222 Figure 10 Solder mask windows 3 5 6 Component Orientation Passive components that are of low mass can suffer from disorientation due to differential heating in the reflow process To prevent this the orientation of the passive components should be so that the solder joints enter the solder zone simultaneously and low mass IC circuits should enter along their long axis The orientation should be along a para
55. ficient component ordering Wrong Focus We have throughout the project found that there has been a great focus on getting new SMA equipment What we have seen 15 that the current equipment is well capable of meeting the demand It has not taken much investigation to see that the biggest problem to production has been inefficient stock handling This would not have been solved by new equipment By picking the low hanging fruits suggested during the project we expect an increase in productivity with approximately 38 that is equal to an extra 953 products a week and there is still a lot of room for improvements By improving the current system as much as possible we expect that Haldex will be able to meet the demand for some more time When Haldex Brake Products has showed that the current system 1s producing as efficiently as possible and the system 15 still not capable of meeting the demand Then we think that Haldex brake products have showed that they are worth the investment of new equipment Future With the competition from low cost countries Haldex needs to be a lean and efficient producer in order to be the most profitable alternative We think that Haldex in Redditch has a skilled staff and there 1 lot of potential for improvements With better communication and cooperation between the departments and more focus on stable and efficient processes we are positive that Haldex will stand the competition and be worth the investments needed for th
56. flow it will show which activities that adds value and which does not This way a manufacturer knows where to focus to reduce waste 3 1 3 Balance the Flow By balancing the flow from raw material to finished products all the wasted resources like waiting time between processes will be reduced Optimally would be to have a single piece flow through the processes To have a perfect balanced flow means that all processes runs at the same speed and the product moves from process to process without delay 3 1 4 Pulling Flow This means that the customer demand is controlling the production This eliminates over production and makes production more flexible to changes in customer demand 3 1 5 Continues improvement The last step is to continuously improve all processes This could be done by standardization to make sure that known problems never reoccur A good method is to work according to the PDCA cycle PDCA stands for Plan Do Check and Act This means that you first should plan how to improve the process When it is decided how when and who should solve the problem it 1s time to do what has been planned This is often a test or an experiment When the Do phase is carried out it is time to check the result of the activity If conclusions can be made the next step 15 to act This could also be described as standardization 1 e decide how work process should be carried out and make sure it 1s carried out the same way every time to elim
57. future products have a higher manufacturability 5 4 2 Design Review of GEN2 3M Background During the project it was introduced that a new product was being developed and was to be taken into production in early September the GEN2 3M Master Because of that a review of the GEN2 s design was performed in the early stages of the project it was decided that a review of the new product was also to be done in order to make design suggestions which would improve the finalised product Implementation and Result The design review of the GEN2 was compared with the new products CAD data and several design suggestions was made concerning trace design component spacing orientation size and position of test pads In total there were 28 areas on the new product where changes were suggested All the areas suggested are based on the data gathered from the AOI quality reports areas where there are several errors weekly By attacking these areas the errors will not be transferred to the new product and thereby increase the quality results Below 15 an example of a suggested change that was implemented Figure 43 The photo to the left is of the old GEN2 design The photo to the right is the implemented change onto the Figure 44 The photo to the left is of the old GEN2 design The photo to the right is the implemented change onto the 61 In appendix 5 most of the suggested changes can be found In total of 25 out
58. g over all the machines on line 3 This was done all the way to MPM on Line 2 When Line 3 was changed over the production was started During the Line 3 changeover the production was still going on Line 2 to finish off the last products of the batch When Line 3 was up and running again the operator started to changeover Line 2 When all the machines and conveyors was changed over and the loader at the end of the line was adjusted the machines was started and Line 2 started to produce the new product The duration of the changeover was measured as the time it took to physically changeover Line 3 and Line 2 Unfortunately this changeover was not always followed The biggest reason 15 that the line stops allot because of pick errors and reel changes When the operator changes over Line 3 and Line 2 stops the operator needs stop changing over and get Line 2 running again The constant running back and forth has made the operators to change over both Line 3 and 2 before starting production Philips Lines 2 amp 3 Changeovers MPM Printer Figure 32 SMA Lines Implementation and Result To get a better understanding of what need to be done in order to reduce the changeover time it is Important to measure the changeover time correctly to see how much time 15 lost because of the changeover A correct way of measuring changeover would be to measure the time it takes from the last board of the current p
59. gn Review of the nenn 58 4 4 2 Design Review of GEN2 61 4 4 3 Electro Static Discharge 62 4 44 Solder Paste Procede 63 4 4 5 Validating Repeatability in Test Equipment 64 5 SUM Mali ZallOn or Resultado 66 O ie I UL IL Um 68 6 1 Investigation of Solder Ball 68 6 2 Official design rules document is ae te ac cepa eus 68 So Ne nD 68 6 4 Quality control during 69 6 5 Investigation of root causes of picks and place problems 69 6 6 Investigate variations the screen print 69 6 7 PLC and Robot programming skills on 1 69 6 8 Using OEE for Continuous Improvement 70 6 9 Repeatability in Test 71 6 10 Flux Residues on Connection Pins 1 1 01 4 4 71 TP GOWNS ISO IVS A 72 PONS SS aha ee em 74 JADDSHOIXOS siii 75 Declaration of Abbreviations Right First Time A product that 1 right first time 1s produced without the n
60. he different steps of the stencil printing process The machine uses a Squeegee to press solder paste into the apertures of a laser etched stencil that is positioned on top of the PCB Though the height of the stencil the correct amount of solder paste is applied to the PCB and through the positions of the apertures the solder paste is placed on top of the component pads Y Ww rM M Figure 19 The different steps in a screen printing process 4 1 3 Philips Sapphire C and J The second process in the production system 1 the Philips Sapphire pick and place unit Its purpose 15 to place small components like resistors and capacitors onto the PCB An optical inspection of the 16 performed prior to placement of components The machine uses twelve heads with nozzles to place the components The system uses vacuum to pick up the components and by having twelve heads it can pick up and place twelve components at a time Each individual component is inspected by a laser before placement in order to determine if it 1s the correct component and that it has the correct orientation 2 Ultraprint 2000 Hi Series System Support Guide 2 SMD Technology Solder Paste and Solder Paste Application Philips Electronic Manufacturing Technology 1995 37 Figure 20 Photos of Philips Sapphire The Philips Sapphire 15 equipped with two sets of heads this allows it to process two PCBs at the same time Half of the compo
61. igure 23 Heat profile of convection reflow process The peak zone is where the solder goes above its melting point and where the joint 15 soldered Too much time spent in this zone can cause possible decreasing joint strength in inter metallic layers The last zone is a cooling zone where the temperature should decrease slowly in order to get the joints to a solid state Several heating zones can be used as either preheat soak peak and cooling zones The times and temperatures depend on the solder paste used in the process i Figure 24 Photo of Omniflow 5 4 1 7 My Reflow Oven M This 1s the second reflow oven used in the production system This oven has 6 heating zones and 2 cooling zones Because it has more heating and cooling zones the temperatures of the and solder 15 easier to define This oven solders the components on the top side of the The components on the bottom side is smaller and 15 therefore mounted first on the PCB if the bigger components on the top side would have been mounted first their mass could make them fall of the PCB during the second reflow in the My Reflow Oven m 2 SMD Technology Reflow Soldering Philips Electronic Manufacturing Technology 1995 Technical Information KOKI Super Low Void Solder Paste 2 User manual myReflow com 40 Figure 25 Photo of My Reflow Oven 4 1 8 Automated Optical Inspection G H N and O After that the components have been soldered in the Omniflow
62. inate the initial problem To complete the cycle it now time to start all over again http www lean org WhatsLean Principles cfm 2008 07 04 gt http www hci com au hcisite2 toolkit pdcacycl htm 2008 07 04 18 Figure 3 The PDCA cycle 3 2 Overall Equipment Efficiency Overall equipment efficiency 15 a simple and practical monitoring tool Through three categories it will help to define problem areas within manufacturing processes The three categories are availability performance and quality and they are used to improve the efficiency of machines and assembly lines 3 2 1 How is it calculated The results of an OEE calculation are presented through percentages An example of world class OEE is shown below Availability 90 0 Performance 95 0 96 Quality 99 9 95 OEE 85 0 The industry average is about 60 and there are not a lot of companies in the world that have world class OEE OEE 15 calculated though multiplying the three categories together Availability x Performance x Quality The first time a company measures OEE they usually find themselves way below the industry average This is not uncommon but by identifying shortcomings within production through the use of OEE this measurement usually is raised to the industry average in short period of time 3 2 2 Availability This category measure the time when the equipment actually was up and running compared to the time that was available to
63. ineer in order to solve the problem I e test equipment has stopped working and needs an engineer in order to begin production again The problem can not be solved by the operator Q Quality Stopped Process The operator notices a quality problem within the output of the equipment and therefore stops the production in order to adjust the problem I e the products coming out of the equipment has defects and the operator knows how to solve the problem P Part Shortage When there 1 a part shortage and the operator needs to stop the process in order to fill up the shortage this reason code should be used This reason code should also be used 1f the operator has to stop the production in order to look for a part Le the equipment needs labelled boards but there are none he she therefore needs to stop production in order to label them N No Work This reason code should be used when there is an operator stationed at the equipment but he she does not have any products to work on in the equipment I e the operator needs to wait by the equipment for products that are on their way o Reoccurring Setup This reason code should be used when there is a reoccurring setup in the equipment The setup needs to have the same duration every time so that one can measure the frequency instead I e the operator does a test which always takes a fixed number of minutes and this is done several times each shift the operator then puts down the freque
64. it It is calculated through six gathered information sources available time planned downtime planned operative time unplanned downtime change over time and available operative time These six different information sources are explained below i http www oee com world_class_oee html 2008 07 06 19 Available Time This is the time when the equipment is available for production Le the equipment 15 available for production 24 hours each day then the available time 1s 24 hours The only exception for this is when the equipment purposely have not been running for reasons like bank holidays Planned Downtime This 15 the time when it 15 planned that the equipment is not supposed to run The planned downtime is breaks lunched planned maintenance and planned meetings It 15 only these categories that are planned downtime things that are planned for and happen on a daily or weekly basis The times for these are also to be constant in order for them to be planned If a meeting always varies in time you actually can not say that it was planned Planned Operative Time This 1s the time that is made available to production It 1s a simple calculation of subtracting the planned downtime from the available time Planned Operative Time Available Time Planned Downtime The time that is left 1s the time that you have planned to be producing parts in your equipment Unplanned Downtime These times needs to be collected as they happen in ord
65. k that the supplier holds for them This could be up to 16 week worth of stock Investments needed for this implementation 15 the purchasing of 40 back plates to a total amount of 1160 In order for production to run smoothly it 15 still needed the same amount of reels in minimum stock as before Because that the new reels contains more components the minimum stock level will increase The increase in stock cost based 9 carrying cost 15 approximately 1188 a year The result of this implementation should according to calculations reduce the wasted production time with approximately 7 hours per week This also means that 7 hours of the operator s time will be made available for other tasks The time could i e be used for continuous quality control or preparations for future reel changes This will allow for approximately 330 more products to be produced each week and will result in an increase in OEE as following 54 OEE of SM Line 2 amp 3 Current Increase Expected Availability 82 4 A 82 4 624 72 365 Quality FTPR 81 0 810 443 91 Average Products per Week 3058 3388 Table 8 Implementation Effects on OEE and Products 5 3 2 Relocating the LIFO Buffer Background Currently one of the AOI Rework stations is placed on the outside of the SMA Lines This forces the line operator to waste time by walking over there several times each hour in order to check boards that have failed in the AOI Below
66. le of Stock Cost Reduction 43 Bigger Reel Components LL ELTE BEBE Long 2 Teras mee 1 o 42 34 seme 2 a ee 042553300 E sp E o7 20 0425969809 4 BO e mae 09545 g 218 9 92 enee E Male ee esse ere BANI rel 3 eree le eoe 71 1 E 000 raaj esse 80 no a 5 goo em me JE ee 2 2 esna E ap eale zee ossa e AE TE o o A eo me Ee Ee 2 e awe oe a 15 enze e eel sele 8 asu E 328240 24973 male EE Ese 82 10 Rand om Components Average Stock Value Today Average Stock Value New Number of Orders Today Number of Orders New EEE 22 548 e e ma s we a 77 e so mofe 14 40 Je iel 2a 11250 50 84 eres 1 aa eses le roj soje sse tele 05 ae Em 5 Extremities de del Cost 800 288 0 310505 D42 981 05 5316 00 zm 042630009 89 600 00 10
67. llel axel to the direction of the conveyor track movement Small components should have perpendicular long axis orientation to the conveyor track movement COMPONENT ORIENTATION AND DEFECTS MINIMUM DEFECTS MAXIMUM DEFECTS Figure 11 Component orientation 3 5 7 Component and Pad Spacing Component separation 15 an important factor to consider when designing for manufacturability It becomes difficult to inspect solder joints or remove defective components when pad to pad or component body to pad spacing drop below 50 mils 1 175 mm The spacing can be reduced when using reflow soldering to a minimum of 25 mils 0 635 mm if needed but this can reduce the yield of the process Components shouldn t be placed 137 mils 3 21 mm from the edge of the board because of the conveyor tracks IC circuits should have at least 6 mm of clearance around them to minimize solder volume problems soc Adjacent IRR m Component Components Musso hn mm 1 25rnrm Solder Adjacent Component oos dao Wit Figure 12 Component spacing 29 3 5 8 Handling Stress Post handling stress is another factor to take into consideration this could happen during testing depanelizing of the mother board installation of connectors or mounting of the PCB into a case There are not a vast amount of research within the area of bending and handling of boards But there are some guidelines which have proven
68. ncy of the setup Change Over Time This 15 the time when the equipment 1 not running because of an undergoing change over The times that are to be recorded are from when the equipment stopped producing products to when it begins producing once again All change over times are to be recorded the 10 minute rule do not apply here Available Operative Time When all the information about unplanned downtime and change over time has been gathered one can calculate the available operative time This 1 the time when production was actually up and running It is calculated through subtracting the unplanned downtime and the change over time from the planned operative time Available Operative Time Planned Operative Time Unplanned Downtime Change Over Time Calculating Availability When all the numbers have been gathered one can calculate the availability this through dividing the available operative time with the planned operative time Availability 2 Available Operative Time Planned Operative Time This will give a percentage and basically tells how much of the available production time was used for production 21 3 2 3 Performance This category tells how well the equipment performed during the production time calculated in the availability If it were a perfect world this figure would be 100 even though there are breakdowns and other unplanned downtime reasons But in reality that this 15 not possible reasons why the perf
69. nents are placed by the first set of heads and 15 then moved to the next set for placement of the remaining components The components are fed to the pick and place unit by feeders The feeders are loaded with reels of single packaged components When a component is picked up from the pick up location the machine triggers the feeder to feed the next component into position This allows the pick and place unit to pick up a certain component at the same position every time Every component has an own feeder This gives the pick and place unit access at all times to all the components needed to assemble a PCB this allows high speed placement of components of Various sizes 4 1 4 Philips Emerald D and K The third process 1 a pick and place unit called the Philips Emerald This machine places the larger components onto the PCB The Emerald is equipped with two heads allowing it to place two components at a time This machine operates in the same way as the Sapphire apart from that it only has one set of heads that are placing all the components and can therefore only process one PCB at a time Ud E s E Figure 21 Photos of Philips Emerald 4 1 5 Manual Inspection E and L After the pick and place units have placed the components a manual inspection is performed on the first assembled This is only done at the beginning of a new batch to see if the change over have been correctly configured The PCB is compare
70. nt T 2 80000 40000 20000 Figure 34 Stock levels of suggested system The annual costs of this system would be Order Processing Costs 159 88 Carrying Costs 8 10 Total Costs 167 98 The difference between today and the suggested system for this component would be an increase in carrying cost of 5 4 a year and a reduction of order processing cost of 963 32 per year The reduction of the total annual cost would be 957 92 Calculations of 43 of the high usage components have been carried out to show the potential of the new ordering system Today s System ouggested System Order Processing Costs 32 947 20 2 481 62 Carrying Costs 355 19 1 350 05 Total Costs 33 302 39 3 831 66 The difference in total costs would be 29 470 73 The cost reduction 1s because of the reduction in the amount of times the components are ordered Today these 43 components are ordered and delivered 3156 times a year With the suggested system this number will be reduced to 240 times per year for these components With two deliveries a week it will be delivered 2 3 different components each time instead of 31 32 52 will in some cases suggest lower stock levels and order quantities than what 1 currently held This 1s because of that these components have a high price which means that they have a high carrying cost Le by reducing the stock level and order quantity on the accelerom
71. nt components so this has a major impact on production performance Based on the current production quantities there 15 an average reel change loss of 16 hours per week This loss will be reduced to 14 hours in the near future when PLC which is one of the most produced products is no longer going to be manufactured in Redditch Implementation and Result The action that was taken to reduce the component change time was to increase the size of the component reels This will make more hours available to production Calculations were made to determine which component has the highest usage on the three most produced products I e Component 042 5393 09 is placed 13 times on one product which has a weekly quantity of 450 products per week The same component on the same feeder 15 also used to populate 450 products of 8 components per product This adds up to 9450 components per week By increasing the reel size from 5000 per reel to 20000 per reel the changes is reduced from 2 in a week to 0 5 in a week This results in 4 25 minutes more production time each week To be able to increase all the reels that affect production significantly some investments has to be made Some of the feeders used are not adaptable for big reels By fitting a back plate on the existing feeder it will be possible to increase the reel size After some investigation it was decided to buy in 40 new back plates In order to increase the reel sizes Haldex first need to use up the stoc
72. o be used as information to the suppliers of what 1s expected out of their work products 7 3 SMED Currently there are some SMED activities being investigated within electronics but in order to get an impact effect on the change over times a complete SMED exercise needs to be done SMED single minute exchange of die 15 about converting internal change over to external An internal change over is performed when the equipment is stopped change over that can not be performed when the machine 1 up and running External 15 all change over that can be done during production A simple question to ask the operators to ask themselves when they do a change over is do I need to do this now while the machine 15 stopped or could it be done while it 1s running The procedure of SMED is to identify all key activities a changeover and classify them as internal or external every step should be accounted Next step 1s to evaluate if any internal could be changed to an external Change the procedure do trial runs and re evaluate This should work accordingly to the PDCA cycle The SMED exercise should involve all areas of expertise both operators and engineers It is important to focus all changes on production time lost instead of actual equipment setup time As mentioned in the change over procedure review it is lost production time that 1s to be measured when performing a change over By using SMED the changeover time can be reduced significantly
73. of the 28 design suggestions were well received and implemented onto the new product When a test batch was manufactured a number of boards were examined in order to find more design suggestions It was found that polarity markings were badly placed The marking was placed underneath the components instead of adjacent to the components This makes it difficult for the operators to do a manual inspection of the polarity If the markings would be placed on the outline of the component they could easily check this manually On the bottom side of the PCB there are no polarity markings Figure 45 Left photo is of top side which contains polarity markings The right photo is of the bottom side and is without polarity markings One problem with the old GEN2 2M was that the board was flexing and bending This means that the placement height in the pick and place units are inconsistent and that the component are placed on an unstable surface This may result in badly placed components and damaged or dirty nozzles The laminate material used in the test batch of the new GEN2 3M makes the board more stable It is important to keep a good material when this product goes into production The new product has a more balanced population of components on top and bottom This allows for a more balanced flow in the production lines To optimize the efficiency of the production system it is important to strive towards the same cycle time in all the different proc
74. of the pin to the end of the connection pad is equal or greater than 0 5 mm gt Figure 15 Distance to end of pads 3 6 6 Polarity Marks In order to maximize the AOI s ability to discover components that is placed with the wrong polarity it is important to use components with distinctive polarity marks It is recommended to follow these guidelines when choosing a component pi There should be a good contrast between the polarity mark and the component body The polarity mark must be solid 1 e a continual line Text or other types of broken marks make it difficult to differentiate between the polarity mark and the component body There should be a gap between the polarity mark and the component edge It is recommended having a gap of at least 1 8 of the component length The polarity mark should be at least 1 8 of the total component length in width Automated optical inspection guidelines for PCB assembly design Orbotech 2008 33 Good contrast between polarity mark Distance from edge should be and component body Minimum 1 8 of total component length Polarity mark width should be minimum 1 8 of total component length Figure 16 Polarity markings 3 7 Electro Static Discharge This phenomenon occurs naturally and can not be eliminated Everything around us is loaded with negative and positive 1 Humans generate lot of electrostatic energy just by moving around 1 e by rubbing syn
75. ontained less flux and therefore made it more testable The down side is that lower amount of flux means that the paste has lesser solder ability A test batch of 10 PCBs was produced with the more testable solder paste the product was GEN2 003 9210 09 The initial results were good and there were no problems testing the boards in the IFRs A couple of the boards were tested in a test rig that tests 1f the flex cables have been soldered correctly The test rig pulls the flex cables of the board and if they are pulled off before predetermined force they do not pass the test all tested boards passed the boards were then taken to a test facility where they were x rayed in order to investigate voiding inside the joints The results were dire and most joints contained a huge amount of voiding The following photographs are of the x rays taken 57 Figure 37 X ray photos of voiding It was obvious that the change of paste was not the best way to tackle the connection problem Another possible solution is to change the stencil apertures to make the screen printer apply less solder on the connection pins This exercise is currently carried out by one of the production engineers at Haldex 5 4 Quality Implementations The implementations in this section are the ones that affect the quality category of OEE No results on the quality in OEE have been estimated in this section This is because of that the effects of these implementations
76. ormance 15 lower than perfect can for example be that the equipment is not running as fast as it should or that all the downtime in the availability calculation has not been filled in An unrecorded breakdown tell that the equipment was up and running when it actually was not this making one to believe that the equipment was not running as fast as it should and therefore lowers the performance It is very important that everything is filled in as 1t happens There will always be some performance losses because of unplanned downtime This 15 because of the downtime that 1 not recorded so if there are a lot of these this will show in the performance The performance 15 calculated through the number of products processed and the ideal time it takes to process one product The reason why the average time it takes to produce one product is not used is that one are not aiming for the average but for the perfect world This is not possible but it 15 the only way to know if the equipment is doing the very best that it can Products processes and the ideal cycle time are multiplied together and this will give the time it actually should have taken to produce those products in a perfect world The results of this are then divided with the available operative time used in availability Performance Number of Products Processed x Ideal Time per Product Available Operative Time The percentages that this gives tell how far away the equipment is from perfect
77. placed close to an IC circuit with solder volume problems According to guidelines the amount of traces from a solder pad should be minimized to one the corresponding pad should then have symmetrical trace pattern to minimize solder migration and rotation of the component There is currently more than one trace on most of the solder pads on the GEN2 and the trace patterns are not symmetrical As shown in the picture below there are non symmetrical trace patterns which can result in rotated components Figure 39 Components with bad trace design There are some specifications about recommended spacing between components There should be at least 50 mils 0 635 mm of spacing between components to make automated optical inspection easier Some components are below this recommendation 25 mils are allowed in a reflow process which GEN2 is processed through but some components go below this recommendation as well 59 Figure 40 Component spacing In order to get enough support when populating the board tooling holes should be used Because of that the mother board contains three smaller boards all individual boards might need tooling holes in order to get the correct support for the process Currently the board 15 flexing when being populated by the pick and place machines A different sort of support 1s needed and the material of the PCBs needs revision in order to reduce this problem There are supports bridges between the individual boa
78. plan and needs to be addressed after the project has ended 64 65 6 Summarization of Results The following numbers describe the increase in products produced Because of that the hot bar and the casing line do not process any other product than GEN2 the increase in products is also displayed as if we only had produced GEN2 Average Products Produced Week SM Line 2 amp 3 Hot Bar IFR 1 IFR 2 Casing Line 368 Increase Increase as GENI 3537516 23 1352 Table 10 Estimated Effects on Products Produced Overall Equipment Efficiency Availability 82 4 90 8 79 4 83 5 93 8 75 0 89 0 52 7 58 4 82 5 Quality FTPR 81 0 94 4 85 3 77 1 94 0 50 0 76 2 35 7 37 6 72 6 Increase of OEE 13 8 432 1 14 7 12 5 96 27 7 Table 11 Estimated Effects on OEE Downtime Reasons Hours per Week Change Over 9 9 9 NWek 9 po 9 Waiting for Operator o 9 B 9 gt Table 12 Estimated Downtime after Implementations The quality effects of the implementations are difficult to estimate and are therefore not accounted for in the results The increase in produced products per week with additionally 953 average products or 516 GEN2 will significantly reduce the amount of late deliveries that Haldex currently have The new more efficient ordering system will reduce the order processing cost and allow personnel to work wi
79. ponents on a GEN2 but 232 components aren t tested individually but through circuit tests the percentage 1s as high as mentioned NL AAA E Figure 28 Photos of IFR The function test uses simulations in order to test the functionality and if an error occurs it 1s sent to the rework station The IFR can give information about RFT failures and the rework done to fix the failures 4 1 11 PCB Break Out Station T The motherboard contains three smaller boards that are held together by bridges The machine cuts these bridges by pressing two sharp tools against each other The scrap is separated from the boards by being held by vacuum nozzles The boards are unloaded and at the same time the scrap is thrown away After this process the boards are connected only by flex cables Figure 29 Photo of break out machine 42 4 1 12 Casing U The separated boards are then placed in a casing in order to protect it when it eventually 1s mounted onto a trailer This 1 simple manual process done by an operator 4 1 13 Soldering Robot V To connect the inputs and outputs of the board to the connector pins in the casing a soldering robot 15 used The robot solders each pin one by one which is a totally automated process The operator loads and unloads the PCBs Figure 30 Photo of soldering robot 4 1 14 Cirrus ELOT X When all the pins are properly soldered the inputs and outputs are tested in a test machine called the
80. port brackets that reflect Do not mark components such as tantalum capacitors with a marker pen before inspection this causes confusion when checking component polarity 3 6 3 Edge Clearance The distance from a component to the edge of a PCB should not be less than 4 75 mm on both sides of the boar This 1s to make clearance for the conveyor track 12 http www ipc org 2008 06 14 SMEMA 1 2 Mechanical Equipment Interface Standard 32 3 6 4 Tall and Coloured Components A tall component is the ones that are more than 350 mils 8 225 mm high Components of these heights should be placed together preferably in rows to minimize mixture with low components This 15 because of that the optical inspection systems get shadows from the tall components onto the low components which results in errors Low components should be placed at least the distance of the height of the tall component from the tall component Other colours than black should be avoided because of reflections of flashes in the optical inspection systems 3 6 5 IC Pins To minimize reflections it 1 important to avoid the use of white or yellow service print under the IC pins It is also important to not place high reflective test pads or holes under the IC pins These types of high reflective surfaces can be misinterpreted by the AOI as short circuits and cause false alarms To improve inspection of solder joints it 15 preferable that the distance from the end
81. prove the FTPR and OEE of the production system 2 3 Company Presentation The project initiator 15 Haldex Brake Products which is situated Redditch England and 15 a part of the Commercial Vehicle Systems division within Haldex group It is a manufacturing company that have development and production of brake systems that are sold to manufacturing companies of heavy trucks trailers and buses Two of their Swedish customers are Scania and Volvo The Haldex Redditch site 15 the only production unit within the group that produce electronics The Haldex group contains four different divisions which are the Commercial Vehicle Systems Garphyttan Wire Hydraulics Systems and Traction Systems The group currently has 23 production plants in the countries Sweden Germany England Hungary USA Mexico Brazil India and China Employees Net Sales M SEK Haldex Group 4683 7890 Commercial Vehicle Systems Division 3064 4765 Haldex Brake Products 26 1 7 Table 1 Employees and Net Sales of Haldex 2 4 Product Descriptions Haldex Brake Products manufacture approximately 25 different products The project focuses on the latest product that Haldex released onto the market the EB GEN2 This product is an electronic anti lock brake system EBS that is mainly used on trailers This system allows the truck and trailer to stop or slow down in all road conditions without risking that the driver loses control This 15
82. rators for value adding activities instead of walking If it is taken into account that this will result in more production hours as well then the payback period will be even shorter This investment is all about removing non value adding activities from production removing muda waste which is a part of being a lean manufacturer 56 This implementation will result in approximately 66 more products per week and an increase in SMA line as following OEE of SM Line 2 amp 3 Current Increase Expected Availability 82 4 MEN 82 4 73 69 75 0 Quality FTPR 81 0 810 91 500 Average Products per Week 3388 66 3454 Table 9 Implementation Effects on OEE and Products 5 3 3 Test of a new Solder Paste Background When boards are produced there 1 excessive flux collecting itself on top of 10 connector pins on the boards The reason why this is a problem is when they are tested in the IFRs Because of the excessive flux on the connector pins the test pins can not penetrate the none conductive flux and by this making the test abort itself causing retesting Currently the operators are using sandpaper to scrape off the excess on the pins This adds flux residue onto the board making it a none clean board It is also time consuming making the operators waste production time Implementation and Result To remove the connection problem in the IFR machines a new solder paste was tested This new solder paste c
83. rds and the motherboard according to Haldex own guidelines these should be as close as 25 mm from each other which they are not The breakout method used at Haldex is not a recommended one fine tooth sawing could be used instead Figure 41 Distance between break out bridges There is a white coloured component on the top side of the board which results in reflections and shadowing of other components in the AOI To switch to a black component would be an improvement This component is also a tall component the AOI supplier themselves recommend that components are placed with at least the components height as a distance to the next component Figure 42 A tall and white coloured component Vias should be covered by solder resist in order to decrease the amount of air that can pass through the holes when being vacuum held If this would be changed the PCBs would be easier to fixate in all equipments using vacuum fixtures of these aspects were presented to the design engineers at the Redditch site They were presented as design guidelines in order to address problem areas that exist within production 60 The guidelines were not well received by the design engineers There currently is no official design documentation containing manufacturability aspects for the design engineers to take into consideration when designing new products This sort of documentation has been suggested in the action plan of this report in order to make
84. re that boards are labelled and loaded before changeover Request help from Line 1 operator Line 1 operator is running Line 2 amp 3 during changeover Start change over procedure on line 3 1 Commence with changeover in Line 3 when the last board has been printed 2 line 3 Operator Line 2 amp 3 ZA If required remove clean current stencil 2 2 Load program for next product 2 3 Install set up tooling for next product 2 4 Select install required stencil for next product 25 Check adjust width on all connecting conveyors 2 6 Start screen printing process 2 8 Switch off shuttle gate to make sure that sapphire is not loading board before it is changed over 3 Sapphire line 3 Operator Line 1 D Line 1 operator should start to change over Sapphire Line 3 as soon as the last board 15 out of Emerald line 3 Emerald line 3 Operator Line 2 amp 3 3 2 Cut trim the feeder waste tapes 3 9 Referring to MO sheet load relevant programs 3 4 Referring to program feeder list check populate as necessary 39 Check adjust PCB clamping 3 6 Check adjust width on all connecting conveyors 3 7 Switch to inspection mode on the conveyer between Emerald and Omniflow line 3 3 8 Start production by turning on Sapphire Emerald and the shuttle gate on line 3 4 Omniflow Line 3 Operator Line 1 4 1 Referring to MO sheet load relevant program 4 2 Start machine 5 A O I Line 3 Operator Line 1 5 1 Referring to M
85. reusing old paste repeat the usage procedure once again
86. roduct through the AOI on Line 2 to the first board of the next product through the same machine By measuring the changeover this way it 1s easy to see that the changeover time can be reduced significantly by starting to change over as early as possible By starting to change over to the new product as soon as the last board of 49 the current product has entered the sapphire on Line 3 a lot of time can be saved By the time the last board 1s finished in emerald Line 3 the MPM is changed over and the operator could start to change over the pick and place units By chasing the last board through the lines a great deal of time could be saved For this to work smoothly it has to be two operators on the lines during the changeover One operator is primarily running the lines and one is changing it over This is made possible by changing the shifts so that there will always be two operators trained on the lines between to 10pm By planning so that all changeovers are carried out during these hours the new changeover procedure will work This will significantly lower the changeover time which will result in lower labour cost or more products produced To be able to compile a new changeover procedure some timings were made on how much time it takes to change over all the different machines and conveyors It was also investigated how much time it takes to process different products in all the processes This was done in order to see which processes ar
87. se 10 Continuous Improvement By using the PDCA cycle Haldex constantly challenge their results In this way they always strive for improvements within their production 4 4 2 Tier Model The Haldex Way and Targets The work of implementing the Haldex Way 15 continually carried out at the Haldex Redditch site In order to proceed to the next step many different goals have to be reached Haldex Redditch site 1s at this time at the copper tier In order to reach the bronze tier a number of activities have to be implemented One of the biggest problems is to sort out the FTPR it has to be increased to a stable 94 The Haldex Way tier model can be found in appendix 1 5 Implementations and Results In this chapter the implementations proposed during the project will be explained Overall equipment efficiency has been used as a measurement through out the project AII implementations have therefore been categorised according to how they affect the three categories of OEE The first implementation that 1s described 1s the actual implementation of a correct OEE measurement 5 1 Overall Equipment Efficiency Background In the beginning of this project it was discovered that OEE was not calculated and measured correctly according to common practice and the Haldex Way It was just the performance section that was calculated in the electronics department as well as the other departments It 15 important to calculate OEE correctly and
88. ste if it has been removed from a stencil and placed in a separate container with the lid on while 1 e a change over 15 performed Old solder paste that has been used should according to KOKI guidelines be exchanged at the start of every shift when producing 24 hours a day The ambience of the printing process should be 25 5 and a humidity of 40 60 RH Air conditioning is to be controlled so that it does not affect the printing process wind can cause the solder paste to dry out Squeegee speed and separation speed should be as low as possible The pressure on the stencil should also be as low as possible but still enough pressure to get a clean stencil after each print If the paste has the correct viscosity it should roll in front of the stencil any wave like or slump movement in the solder paste points to bad solder paste The stencil should be thoroughly cleaned between changeovers both top and bottom 3 5 3 Pad Design The soldered joints size and shape are affected by the design of the solder pads The components that are most prone to depend on pad design are small passive components due to their low mass Pads should be tested in the manufacturing process and the reflow process to determine if the pad designs are working as they should 3 5 4 Trace Design Traces connected to the pads are another source of faults During the reflow process heat 15 transferred from the board to the pads which then reflows the solder paste
89. stem good method to work with OEE 1 to gather all the results to calculate the greatest downtime then investigate further why that reason was the top cause of downtime Often this is the biggest problem when working with problem solving identifying the root causes of the problems OEE could therefore be a helpful tool that will make this easier 70 7 9 Repeatability in Test Equipment As mentioned in chapter 4 4 5 Validating Repeatability in Test Equipment there are different test results in different test fixtures This problem needs to be addressed in the near future The test equipment must have high repeatability and accuracy The suggestion is to perform a six sigma project in order to identify the cause and remove the problem 7 10 Flux Residues on Connection Pins In chapter 4 3 3 Test of a new Solder paste it 1s addressed that excessive flux on ten connection pins on the GEN2 PCBs create performance losses in the IFRs This problem could rather easily be fixed and would increase the performance in the IFRs By changing the apertures in the stencils this problem could be solved 71 8 Conclusions Continuous Improvement To be a lean manufacturer is all about reducing waste especially waste that has a negative effect on production Therefore it 1 important to continuously improve the production processes and surrounding systems During this project we have used OEE as a measurement to find shortcomings within produ
90. surement Observe and Learn Figure 2 Process Stability Methodology Find a Measurement The first step is to find an accurate and informative method to measure the current status of the process that needs improvement The measurement has to give information over time in order to display results of improvements Questions that should be answered with the chosen measurement are What do we want to measure How can this be measured What will this measurement tell us Is the measurement traceable over time Establish a Step Stone Next step is to determine the current status of the process with the chosen measurement Establish a step stone a reference point which improvements can be measured against in order to see the effects The measurement method needs to be consistent through out the measurement period in order to trace the effects It is therefore important that the correct measurement is chosen and that it is accurate A New Tool in Your Belt The first step stone should be used as a tool in order to find shortcomings within the process Find deviations and the causes of the deviations The more informative measurement used the more information can be retrieved in this stage about the causes of the problems A Continuous Measurement Establish deadlines for new step stones establish fixed time intervals between measurements of a new step stones Le determine a new step stone every week or month With closer time intervals the me
91. t of the SMA lines If a component runs out in a feeder and the component is out of stock the operators then often borrows of other feeders These feeders are already tweaked for a feeder setup When removing a feeder from the feeder setup it can affect the component pick up position when the feeder 1s put back onto the machine This may cause miss picks or miss placed components The same negative effect happens between exchanges of reels within the same feeder when they run out This suggestion together with reorganizing of the storage positions will eliminate downtime in the SMA lines caused by part shortage This will allow production of approximately 404 more products per week This will have the following effect to OEE in the SMA lines OEE of SM Line 2 amp 3 Current Increase Expected Availability 71 5 10 9 82 4 64 664 Quality FTPR 81 0 810 384 443 Average Products per Week 2654 3058 Table 7 Implementation Effects on OEE and Products 53 5 3 Performance Implementations The implementations in this section are the ones that affect the performance category of OEE 5 3 1 Component Reel Change Reduction Background Currently a lot of losses within production are caused by component reel changes A component change takes an average of 3 minutes Because of that the component reels are small to the size they run out often causing this 3 minute stop in production There are several hundreds of differe
92. tant aspects with the development of this product was that its manufacturability was investigated and improved 13 pp gto Figure 1 GEN2 Motherboard 2 5 Method Through personnel at Haldex a human point of view of the problems was given By reading instructions manuals as well as being educated by the personnel the production equipment has become comprehensive Through the use of product information and data sheets the products design for assembly has been interpreted Research and data collection has resulted in statistics that have been analysed and used to make conclusions and suggestions about the problems When statistics was unavailable facts has been gathered instead to strengthen suggestions These have then been discussed with the resources of the project in order to see if conclusions could be made Tests have then been made to make further conclusions and suggestions about the problems Through the previous steps mentioned the goal of the project has been reached 2 5 1 Process Stability A continuous improvement methodology was developed and used through out the project in order to improve processes The methodology is based on the PDCA cycle with a focus on obtaining process stability This methodology is based around seven action steps the following figure displays the different steps Find a Measurement Establish a Step Stone A New Tool in Your Belt Implement Your Plan Your Attack Plan A Continuous Mea
93. th value adding activities instead of processing orders It will also reduce the carrying cost for expensive components that today stand for the majority of the total carrying cost 66 67 7 Action Plan 7 1 Investigation of Solder Ball Formation Observations has shown that solder paste gets smeared out on to the PCB when components are placed in the Sapphire on Line 2 The solder paste that is not on the connection pads become small solder balls when the PCB goes through the reflow oven These could in worst case cause shorts in fine pitch components There 15 no evidence of that this 1s causing a lot of errors but it 1s still not the way it should be According to the quality department there has been one warranty return caused by solder balls but the quantity of possible defective products is immeasurable and could be considerably higher Therefore it is recommended to investigate what 15 causing these deviations in quality 7 2 Official design rules document For Haldex to be able to produce good products it 1 important that the design of the product apart from function also 1s focused on manufacturing and testing It is also important to future proof the components and other material that 1 used the design Therefore the suggestion 15 to compile a standard design rule document with inputs from design production quality and purchasing This document should be used as rules for future product development projects This should als
94. that can be done upon the vias barrel via can be used if no other alternative exist but it should then be filled with solder to make connectivity better Test pads should be placed on one side of a double sided board to minimize expensive double sided test fixtures The test pads should be circular and nominally 35 3 mils 0 8225 0 0705 mm in diameter These pads should also be located at least 125 mils 2 9375 mm from edges because of the conveyors tracks which might need the space The spacing between the pads should be 100 mils 2 35 mm if possible no less than 50 mils 1 175 mm should be used There should be at least 40 mils 1 016 mm of clearance between test pads and components to not damage the component or the probe components height as distance to a test point is a good reference Unused traces should be connected to test pads so that they can be tested to ensure that faults found are not associated with these traces To ensure better connectivity the test pads can be coated with solder or conductive non oxidant material such as gold There should be test points for every component because it results in more accurate readings cluster tests should be avoided if possible 3 6 2 Components The following general rules apply to the application and use of components Avoid the use of transparent components Try to avoid using glass bodied components that reflect If possible avoid metal plates such as screening or sup
95. thetic materials against each other When something that 1s loaded with positive ions comes in contact with another object loaded with negative ions an electrostatic discharge occurs This discharge can harm electronics in many different ways and 15 a problem when producing electronics The goal 15 to control electrostatic discharge ESD and minimize its effects on the products Control of electrostatic discharge is essential to ensure quality of electronic products The effect of ESD 1s something that 1 not easy to prove In the worst cases ESD damage will not be detected in production but it will show up much later when the costumer uses the product This is called latent damages and occurs when the components are only weakened by ESD Lan damages can be caused by even a tiny discharge that humans can not even see hear or feel To be able to prevent ESD damages it 1s important to know what causes it Materials can be broken down into three categories Generative materials are active static generators 1 plastics hair and polyester clothing These materials are important to keep away from contact with sensitive electronics products Neutral materials 1 e wood paper or cotton does not tend to generate static electricity They also work isolative which make them useful as a protection between generative materials and electronics Conductive materials like metal neutralize static electricity when bounded to ground This could be used to dissip
96. to EOQ without exceeding the storage capacity The order point is calculated by using the demand during lead time and the determined safety stock Example of Today This 1 an example of 042 6439 09 which 1 a regular capacitor The price for the component is 0 001 each During the time between the 29 May and 1 July it was ordered 9 times with a total of 41 reels The status of the stock levels is as shown below Todays Orders Stock Level Average Stock Figure 33 Stock levels of today s system If the last month is used as an average this component will be ordered 9 times each month and the average stock level is 30 000 The annual costs for this component would be as following Order Processing Costs 1 123 20 Carrying Costs 2 70 Total Costs 1 125 90 51 These costs are based on a carrying cost of 9 of the component value and an order processing cost of 10 4 per order These figures were given by the accounting department Example of Suggested System The same component would with this system have 2 orders containing 16 reels of 15000 components The new order quantity would still not take more storage space than what could be held on site and it would last into the middle of July The status of the stock levels are as shown below With 2 Reel SS 160000 4 140000 120000 100000 Stock Level Average Stock Safety Stock 60000 Order Poi
97. use it as a tool in order to discover and address the aspects with the biggest effect on production efficiency The data was gathered through an OEE data collection sheet that was filled in by the operators at the SM lines 2 amp 3 and the two IFRs The data was at this point to indistinct for a correct calculation of OEE Implementation and Result In order to get all the data needed from the electronics production a modified OEE data collection sheet was compiled The new sheet was divided into different sections for easy location of the data The data to be filled in is separated into two pages The first side is for unplanned downtime and changeover time The other side contains information about available time and planned downtime which from now on is to be filled in by the production planner at the start of each week It also contains information of what type and how many products that has been produced and how many that was sent to rework This 1 to be filled in by the operators and the quality engineer at the end of each week Based on the availability performance and quality data gathered in the collection sheets the OEE calculation 15 carried out by a production engineer The new data collection sheet could be found in appendix 2 The correct OEE 1 then to be analysed and used to discover what have had the most negative effect on production efficiency the previous week This knowledge can then be used to eliminate problems and improve the effi
98. vents and audits 8 HW Steering Committee 17 Environmental Management Achievement Values to Reach Tier Level Inventor Delivery Hegatiated Delivery Original FTPR 99 90 75 Appendix 2 OEE Data Collection Sheets Overall Equipment Efficiency Data Collection Sheet Haldex Unes JAJ ep nn Ee crones Previaus Month Equipment Hours qu B eee z pm Pnm Opealor Les O se 76 Overall Equipment Efficiency Data Collection Sheet Haldex uxwnent Hours d 10 Opecsion Les 10 Availability Total ainia of rifa Ta 5a ilad m Baiia Ihe shiti tarta Downime Total anie of plan anch shill To be Hed in pakra ma shift alarde i li Total minutes of unplanned doamime cach shill Te be Hed in when the ghh has ended Product Change Crear Time salam m Total minutes of change oer dime cach shift Tis b in ahan da Planned Mantenanos Products Produced Unplanned Downtime Reason Codes M Maintenance C Quality Stopped Process B Breakdown P Shortage O Waiting for Operator M Work E Waiting for Engineer 5 Reoccurring Setup GF369 71 Appendix 3 Change Over Procedures All to GEN2 Prepare for changeover before production has finished in the MPM on line 3 Line 2 amp 3 operator makes su
99. x com Ian Skelding Production Manager 44 1527 499616 1an skeldingOhaldex com fiona winterton Ohaldex com Monica Bellgran Director Production Technology 46 7062 56035 monica bellgran haldex com and Systems Table 2 People Resources to the Project 2 7 Limitations The project only contains information analys s and studies of the electronics production at Haldex Brake Products in Redditch The products investigated are limited to the different variations of the GEN2 product 16 17 3 Theoretical Reference Frame 3 1 Lean Manufacturing Lean manufacturing is a production philosophy which focusing on elimination of none value added activities trough the entire supply chain This means reduction of waste such as over production waiting time inventory defects transportation etc Lean production can be achieved through five action steps 3 1 1 Define Value for the Customer This means that the customer creates the demand Without demand no business Therefore it is important to define what the customer wants when it is wanted and how it is wanted Because of that the customers demands and requests continuously change it is important to re evaluate the value for the customer on a regular basis 3 1 2 Identify the Value Stream To be able to reduce as much waste as possible it is important to have a good understanding of the whole process from raw materials to finished and delivered products By identifying the value
Download Pdf Manuals
Related Search
Related Contents
Quick User Guide NEC PowerMate VL VL280 基準表(PDF形式:87KB) PLレポート 2009年度 No.5 Cooler Master Extreme 2 525 e+p F 5 TC1130 Errata Sheet Step BB Blue&Me™ Nav - Club 500 Quebec Copyright © All rights reserved.
Failed to retrieve file