Home

Operation Manual - Bubble Tea Supply Australia

image

Contents

1. series Operation Manual Operation Manual MODEL CS SERIES VERSION 2010 00 published on January 10 2010 TABLE OF CONTENT 1 GENERAL SAFETY INSTRUCTIONS 2 MACHINE SPECIFICATIONS 2 1 Identification Label 2 2 Specification Table 3 MACHINE OVERVIEW 3 1 Espresso machine 3 2 Teapresso machine 3 3 Tea amp Espresso combo machine 3 4 Control panel description 4 INSTALLATION 4 1 Water amp Electrical Connection 4 2 Install Illustration S OPERATION PRECAUTIONS 6 STARTING UP 6 1 CE KC Korea Certificate listed machine 6 2 ETL Listed machine 7 CALIBRATION 7 1 Pump pressure adjustment 7 2 Steam boiler pressure calibration 8 PROGRAMMING 8 1 Espresso brewing unit 8 2 Teapresso amp high volume brewing unit 8 3 Temperature controller P7 PS PS P9 P10 P10 P12 P14 P17 P18 P18 P18 P19 P20 P20 P22 P23 P23 P24 P26 P26 P28 P33 TABLE OF CONTENT 9 USE 9 1 Use of control panel 9 2 Steam wand 9 3 Hot water 9 4 Filter holder 9 5 Use of High volume brewing head 10 CLEANING AND MAINTENANCE 10 1 Instant Cleaning and maintenance 10 2 Daily cleaning and maintenance 10 3 Periodically cleaning and maintenance 10 4 Filter holder diagram 10 5 Table of Cleaning and Maintenance 11 SIMPLE TROUBLE SHOOTING 12 REPLACEMENT PARTS P34 P34 P36 P36 P37 P40 P43 P43 P43 P49 P52 P54 P58 P59 1 GENERAL SAFETY INSTRUCTIONS This s an electric machin
2. A RE E Mee at SENE F tr amp se it Cr 53 A a hit a 1 a A er ts Pal BA NOTE e For espresso filter holder and tea porta filter holder the handle 1s made in plastic and should not be put into detergent otherwise the handle may be corrosive To avoid any corrosion please do not immerse handle in water Handle made in plastic DO NOT immerse it in water Water e Do not put group gasket in water see item B in fig 10 a in water or any liquid detergent e Espresso and Teapresso brewing groups have DIFFERENT copper plates Please differentiate them before you install the copper plates back to the group head otherwise it can affect the tea and espresso extraction results Copperplate for espresso Copperplate for teapresso brewing group brewing group 10 3 Periodically cleaning and maintenance 10 3 1 Boiler In case any need to put away the machine for storage and you may not use machine for long in order to prolong the boiler s lifetime please turn off the machine and release all the pressure from boiler by turning on the steam knob if machine is to remain 1dle for an extended period of time After the steam 1s completely released and the pressure on steam boiler pressure gauge reads 0 please clean the drain tray and waste cup and you may put 1t away for storage NOTE Please DO NOT turn off the steam knob after the steam 1s released for storage Keep the steam knob on When
3. Please ensure the machine to be drained completely before it is removed and put away for storage If water gets frozen inside the pipes and boiler of the machine 1t can damage machine For install and removal of the machine please contact qualified service person 2 MACHINE SPECIFICATIONS 2 1 Identification Label Every machine has an identification label placed on the front of the machine as illustrated below The label includes information of model number voltage serial number wattage and its certificate Please do not remove this label in order for technician to check electrical information in the future T 1 ay E PET AL mA A A ey tee eS Se m 2 2 Specification Table ESPRESSO se Bm L Model CS1 CS2 gt CS3 Boiler Capacity Voltage Weight Group 220 240 2500 50 60 220 240 4700 50 60 220 240 6500 50 60 Color E ya TR Preheat Built in Steam pes an Ali poter Boiler Outpour in Tea Voltage Weight Unit Brewing Unit Capacity Capacity Brewing Unit Model CS2T 50 60 68kg CS2TS C53T 3 2l 6 220 240 6900 50 60 90kg 220 240 6500 50 60 68kg CS3TS CSB2T 220 240 6900 90 60 90kg 220 240 6900 50 60 113kg Color E 75 CS3T CS3TS CSTSC3 i CST3 CST2C CSTS2C ie High Volume Boiler Capacity Built in Steam Brewing 7 Outpour in Tea Voltage Model Teapresso Espresso Unit Teapresso Espresso Brewing
4. 9 5 8 Safety Locking Lid NOTE Machine will NOT deliver any water or operate 1f the lid 1s not correctly shut in order to protect operators Please make sure the lid is accurately shut before you operate the push buttons 10 CLEANING AND MAINTENANCE 10 1 Instant Cleaning and maintenance 10 1 1 Brewing system After each brewing remove filter holder and press the fifth button to remove all residual tea and ground coffee from the shower screen which 1s screwed onto the group head Then fit filter holder to the brewing group again important don t fix it too tightly Press the fifth button shake filter holder to clean group gasket and remove Le PS residual ground coffee along side PEN ar Pe En ae Er ha E Es A qd ROS Ar Sa gt A A a a m ia HE Y Fa Ben 10 1 2 Filter cup Rinse filter holder with hot water after each brewing to dissolve residual oils in the filter cup and prevent coffee oils from affecting coffee quality 10 1 3 Steam Wand After making steamed milk use a slightly moistened soft cloth to wipe steam wand and steam nipple After wiping pull the steam knob to release a steam burst through the tube to remove any residual milk remaining in the nozzle a ae PEF CORRE LL Fe p pe ah Y oom a A RE E Mee at SENE 10 2 Daily Cleaning and Maintenance F tr amp se it 10 2 1 Cleaning the Machine Body Lai Aa rt ee ee y A FR Wipe the machi
5. CST3 CSTSC3 CSBTC CST2C CSTS2C CSB2C Steam boiler pressure is controlled by pressure switch The pressure inside the boiler continues to rise as the water s heated by the heating elements Reducing pressure 1s reducing temperature while increasing pressure 1s increasing temperature The manufacture has already adjusted the pressure to be 1 2bar which 1s the best recommended pressure Please check if your pressure on the pressure switch is 1 2bar or on the green zone 1 1 4bar see fig 7 e 7 e if so you don t need to adjust the pressure In case there is a need to calibrate the pressure please follow below procedure for calibration NOTE Please turn off the machine before undertaking this operation NOTE please contact your service representative to conduct this Take apart of the top plate on the machine and locate the pressure switch on the up right size Remove the yellow case from the pressure switch Use screw to adjust the pressure as shown in below fig 7 f Turn it clockwise to decrease pressure while counterclockwise to increase pressure A complete screw turn results in 0 1 bar variation p i pa fig 7 f 8 PROGRAMMING NOTE there is not presetting in the factory Please contact your service representative to consult tea amp espresso programming detail If you have had programming detail in hand you may follow the steps below to set up the machine with stop watch and measuring cup 8 1
6. fig 6 e 6 2 ETL Listed machine CS1 CS2 CS3 Please turn the main switch to position 1 directly and the machine will refill and heat up automatically rn Te E ta Fre Machine off E E Lo SS A EP alt e a dy ji ha al a y pe E nt Machine on fig 6 7 CALIBRATION 7 1 Pump pressure adjustmen The manufacturer has already adjusted the pump pressure to be 9 bar the best recommended pressure when machine is tested in the factory After machine starts up and water refills please press continuously flow button and read pressure on your pressure gauge to see 1f the pressure s 9bar or 1f the indicator 1s on green zone 8 10bar as shown in the below If yes the pressure is correct If not you may need to adjust pressure as shown below NOTE Please contact your service representative to undertake this operation Please attach portafilter into the brewing group with filled ground coffee Press continuously flow and stop button Use the screw to turn the pump clockwise as shown in below picture to increase pressure while turn counterclockwise to reduce pressure e a E te gt e E a Y oom a P Mm gt a E a Fa E A AED pri hs A ds i E a P it e Ca A fig 7 c 7 2 Steam boiler pressure calibration Boiler pressure adjustment is only applied on below models espresso machine CS1 CS2 CS3 tea amp espresso machine espresso side s boiler CST2 CSTSC2
7. first button will go off and the rest buttons will be flickering as fig 8 1 and fig 8 1 This means the first button is successfully programmed and 2 4 buttons haven t yet being programmed Control panel Ea e 5 Ecs foe ag ta faia er E al nae a aaa E On E 4 a tea a a a a a High volume brewing unit s control panel fig 83 8 2 2 5 Repeat step from 8 2 2 1 to 8 2 2 4 to finish the multi se ctional programming for 2 3 4 buttons 8 2 2 6 After you finish the programming for all the buttons plea se turn the programming switch back to OFF position 8 3 Temperature controller For teapresso brewing unit it s possible to adjust the boiler temperature by electrical temperature controller Please see fig 8 k to see the temperature controller and its function description 1 The Yellow digits in the screen are the boiler temperature display 2 red digits shows temperature that you set up 3 buttons in the right side corner is temperature adjusting buttons 4 buttons in the left side corner are function buttons Press temperature adjusting buttons up to increase temperature while down to decrease temperature Please noted the adjustable temperature range is from 0 C 105 C Setting is not possible 1f temperature exceeds this range It is possible if there is temperature variation about 2 C between the display temperature and the setting temperature because
8. of different operating environment For function button it 1s optimized and locked prior to leaving the factory so please do not operate function button NOTE for espresso brewing unit please see 7 2 for temperature adjustment _ a ee renan S D I GD 5 x E NS F r De e f a Boiler temperature display yellow digits Temperature setting display red digits Em fie Bo E Temperature adjusting buttons A po LYF i Y es Li ON eh PRES E de Figh ig a mA 4 de u AA A E E T hr dl j i m e he a y A AA 4 ar ur 9 USE 9 1 Use of Control Panel 9 1 1 Espresso brewing unit 9 1 1 1 brewing fixed amount of espresso Suppose you have programmed espresso output previously please put ground coffee into a filter cup use tamper to tamp the coffee firmly and then fit it into the brewing group Please press one of the four buttons the coffee will be brewed accordingly to your previously set up After reaching the required amount of espresso the machine will stop automatically If you want to discontinue the brewing just touch the fifth button the coffee flow will stop 9 1 1 2 Continuous output Don t need any previous setup just put coffee into a filter cup and fit 1t into brewing group Press the fifth button and the coffee will be brewed Touch the fifth button again
9. CSTSC2 VOODOO OQ CST3 CSTC3 200960 CST2C CSTS2C Teapresso brewing unit control panel Sight Glass Boiler level check window High volume brewing unit control panel 2 in steam boiler amp pump pressure gauge O Hot water wand Steam boiler pressure gauge O Semb Pumpprsureguge OD Minh O O O Brevinggrup E Espresso filter holder D High volume brewing head nn OD Homero 06008 O OCCOS 1 Espresso brewing unit control panel 1 Cuprack 2 Sight Glass Boiler level check window 2 Teapresso brewing unit control panel 3 2in 1 steam boiler de pump pressure gauge 3 High volume brewing unit control panel 4 Steam boiler pressure gauge 4 Hotwater wand Steam knob Pump pressure gauge 6 Steam wand 6 Temperature controller T Mainswitch D Drain Tray Brewing group Foot 9 Espresso filter holder 9 High volume brewing head 0 Teapresso filter holder Q Hot water knob 3 4 Control panel description 3 4 1 Teapresso brewing unit control panel Fifth button Continuously flow button 3 4 2 Espresso brewing unit control panel A OL Continuously flow button 3 4 3 High volume brewing unit control panel Fifth button Continuously flow button oe a p leere de a de ip ba 7 a te ee dl tl ai 5 krat Pi
10. Espresso brewing unit only for CS1 CS2 and CS3 NOTE For model CS1 CS2 and CS3 machine the control panel of two or three brewing groups will copy the right ones setting spontaneously If you want to set up differently for each panel please first program the right group and then the left 8 1 1 Turn on the programming switch see fig 8 a then start to program 8 1 2 The LED of U buttons on control panel will be lit the fifth LED will flicker see fig 8 b It means we are n the process of setting up the amount of continuous output Control panel a s A i ne Y Ta E e En e 3 nae i Sa aa i E E a 4 a ao al 8 1 3 Before setting up the first button please put measuring cup under the brewing group And then continue to touch the first button and holding on the button until reaching the required amount of water Keep you hand off the panel Meanwhile the first button s light will be off the other three buttons still lit and the fifth button flickers see fig 8 c It means the first button is programmed Control panel fig 8 c 8 1 4 Repeat steps from 8 1 1 3 and finish the setup of 2 4 buttons with required amount of water 8 1 5 When you finish the programming of these four buttons turn the programming switch to OFF see fig 8 a and finish the setting up the amount of continuous putout 8 2 Programming for Teapresso and Tea amp e
11. Ls i cm qu a A a a e Bushing tea filter hold neck to see if it is stained er only 1 For the inner hole of the base check to see ifany tea leaves Shaft grind wheel get clogged inside Filter base tea filter holder only Use dampened cloth to 2 For the surface of the filter base clean it check to see it is stained NOTE DO NOT use scrub sponge or wire bru shes high volume brewing unit filter see 9 5 fig 9 h Copper plate see 10 2 2 fig 10 a Shower screen see 10 2 2 fig 10 a ERASE AA E poa pa as a gt O Hot water sprayer 3 a ot Doll re Sy a si la el a a Z Steam nipple Cleaning Operations Please place 3g detergent powder in the filter holder and initiate auto backflushing systemto clean the group head See 10 2 2 for detail operation a Put 12g detergent powder into 2L hot water in a stainless steel container b Immerse these items in prepared hot water and leave it for one night c Please rinse and assemble all these items before you start to work next day NOTE Please do not immerse the filter holder s handle which is made in plastic into water to avoid damage of handle a For hot water wand there is a sprayer in the end ofthe wand Please remove itfrom hot water wand b For steam wand there is a nipple in the end ofthe wand Please remove it fromsteam wand c Put 6g detergent powder into 500c c about 170z boil
12. Unit Brewing Unit Brewing Unit 220 240 5500 50 60 220 240 9500 50 60 220 240 7000 50 60 220 240 7000 50 60 220 240 7000 50 60 90kg 220 240 000 50 60 S0Kq 220 240 7000 50 60 113kg 3 MACHINE OVERVIEW 3 1 Espresso machine 7 je peu SAS ver E a CET oe a Pe nf re q AE E di lt j i il da Ter Ee ES ES o A A O 60 000 Cs 2900 o 8000 0 CS2 200000 CS3 Espre sso brewing unit control panel qd Teapresso brewing unit control panel 2 Sight Glass Boiler level check window High volume brewing unit control panel OD 2 in steam boiler amp pump pressure gauge O 8 Espresso filter holder High volume brewing head 3 2 Teapresso machine 9 o gt 0 j o D CS2T CS2TS O CS3T CS3TS Espresso brewing unit control panel Teapresso brewing unit control panel High volume brewing unit control panel Hot water wand Steam knob Steam wand Main switch Brewing group Espresso filter holder a 1 Cuprack 2 Sight Glass Boiler level check window 2 in steam boiler amp pump pressure gauge Steam boiler pressure gauge Pump pressure gauge Temperature controller D Drain Tray Foot High volume brewing head 0 Hot water knob 3 3 Tea amp Espresso combo machine OU CST2
13. and the machine will stop brewing Control panel Fifth button Continuously flow button O 0 4 DO O OO Programmable buttons fig 9 a 9 1 1 Teapresso brewing unit 9 1 2 1 brewing fixed amount of teaspresso Suppose you have programmed teaspresso output previously please put cut tea or tea bag into tea porta filter and then attach it into the tea brewing group Please press one TT of the four buttons the tea will be brewed accordingly to your previously set up After Eee Sa reaching the required amount of tea the machine will stop brewing automatically If LE A 7 te wy e you want to discontinue the brewing just touch the fifth button the tea flow will stop i i mi aY Tia me ir e _ Ea ie a te 9 1 2 2 Continuous output Don t need any previous setup just put tea into a filter cup and attach it into brewing group Press the fifth button and the tea will be brewed Touch the fifth button again and the machine will stop brewing Control panel Fifth button Continuously flow button po e T lt i y E A En Ze La F 4 1g a i q i amp dl a Y 1 E e VAS NA i p Programmable buttons fig 9 b High volume brewing unit s control panel Programmable buttons 9 2 Steam Knob Turn steam knob counterclockwise to draw steam through the steam wand Steam output will increase the further the steam knob is
14. e Fr U Simas ur Er a E do a Es Ne dd n To E a a In at a 4 T o ha a ra pr ent pee 4 INSTALLATION 4 1 Water amp Electrical Connection 4 1 1 Machine is equipped with a stainless steel pipe with female PF 1 2 ID In case any need to connect additional pipe please use pipe with PF 1 2 OD 4 1 2 Machine is equipped with a drain pipe with 18mm size Outer diameter 4 1 3 Machine must apply 220V 240V single phase electrical system 4 1 4 Please use an independent No Fuse Breaker NFB that conform to the safety regulation separately do not use a socket The NFB should have a minimum contact space of 3 mm and provide electrical spike and drain protection 4 2 Install Illustration S OPERATION PRECAUTIONS Read this manual carefully before using your machine Do not use the machine and turn off the power when water outage When operating the machine for the first time or replacing water softener and filtration system remove the water inlet tube and allow it to dram for about one minute in order to get rid of impurities from the water Please check and confirm normal water supply before turning on power Please check and make sure brewing group with water delivery when press continuously flow buttons Operating the machine when brewing group has no water delivery may cause the electric heating element to overheat and burn out After installing the machine please check to mak
15. e sure that during water intake steam boiler pressure gauge indicator s within the green zone 1 1 4bar and the pump pressure gauge indicator is also within the green zone 8 10bar In case any need to adjust the pressure please refer to calibration section The temperature of the steam wand hot water wand and brewing unit is very high Don t expose your hands to them never touch or your get injured by high temperature To avoid overheating electric wires should be kept untangled and free of obstructions Don t block air intake or outlet vents on the machine Never cover or otherwise prevent the free a ra O ee RE flow of air across the cup warmer SE e Please wipe the accessories with a soft cloth or specific detergent powder Don t use scrub Cas OA sponge or wire brushes era E er gt F y 4 After machine power has been switched off always let the machine set for at least 3 seconds before restarting Place an appropriate quantity of ground coffee n the filter cup and tamps the ground coffee firmly Clean all residual coffee from the rim and sides of the filter This 1s to ensure a good seal and full pressure when brewing coffee and prolong the lifetime of group gasket 6 STARTING UP After water supply and electrical connections have been made please proceed to initiate the machine 6 1 CE KC Korea Certificate listed machine start up the machine as below a Please turn the main
16. e user manual in which operation maintenance and safety information are specified Please read and file it carefully After unpacking please check to ensure your machine has not been damaged during the shipping Please notify your service representative or qualified technician regarding all questions or concerns before installing Please note that the machine package material including plastic bag and Styrofoam can be dangerous and should be kept out of reach of children There s an identification label stuck in the front of unit Before operating please check to ensure the power source corresponds to the rating shown on the identification lable The manufacturer doesn t take responsibility due to improper install and usage Please use separate power source which corresponds to the unit s power rating Please use No Fuse Breaker NFB that conforms to the safety regulation separately Do NOT use a socket The NFB should have a minimum contact space of 3 mm and provide electrical spike and drain protection The ampere must be sufficient for providing the required electric current to this machine Be sure to use a grounded power source to prevent electric shock and ensure the safety of this machine and relative personnel ET E en AE E see hp The machine must be used in accordance with its original design Additional use is ii pales a inappropriate and dangerous Injury or loss caused by wrong use or operation mistake
17. en the top lid f g 9 g 9 5 2 Stainless steel basket After the lid is open a stainless steel filter see fig 9 h will be found inside the high volume brewing head Please take the filter from brewing head and put required quantity of tea or tea bag inside the filter 9 5 5 9 5 7 After required tea amount 1s put inside the basket please put it inside the high volume brewing head and shut the lid Supposed you have already programmed the buttons as S PROGRAMMIN Please press any programmed button and the machine will brew tea automatically After the machine finished brewing tea please turn on the water tap knob see fig9 g counter clockwise to obtain brewed tea from the brewing head After the brewed tea 1s flowing out of brewing head please open the lid and get the basket from the brewing head and shut the lid The use of water switch There 1s a water switch on the top of lid see fig 9 1 turn the switch left as position the machine will be delivering radiating hot water and whirling steam for the best extraction result Tig 1 Tig 9 Turn the switch to the back as position AY see fig 9 i water will be flowing along the inner wall of the brewing head This s designed for the use to clean the inner side of the brewing head to avoid mixed taste before you proceed to prepare another kind of tea brewing Please perform this operation after you finish 9 5 6
18. et up the machine with stop watch and measuring cup 8 2 2 1 Turn on the programming switch see fig 8 d and then start to program 8 2 2 2 The LED of buttons w ll be shown as fig 8 g and fig 8 h It means we are n the process of setting up the amount of continuons putout Control panel Flicker 8 2 2 3 Press fifth button entering the process of multi section pre infusion system with all buttons flickering 8 2 2 4 After you press the fifth button then you are entering the process of multi section pre infusion system The principle for programming multi section pre infusion is to 1 hold the same button for water delivery and the machine will record the water amount 2 leave the button until reaching required time for soaking the material and 3 touching the fifth button means finish the programming of this button Starting the setting of multi section pre infusion for the first button please touch first button until required amount water 1s delivered Leave the button until the desired pre infusion time is reached This is the first stage of pre infusion setting If you don t want to extend another phase of pre infusion setting press fifth button to confirm If you want to set more phases of pre infusion repeat step 8 2 2 4 1 2 Make sure to press fifth button to confirm you finish the button programming After finishing the programming for the first button the lights of
19. ing water in a stainless steel container d Immerse the sprayer and steam nipple in water and leave it for one night e Place themback in next working day before you start to work jojojo o ojojojo joi S DE DE 111 ER Tool for cleaning Filter pad see 10 3 5 Check to see if element gets staine Soft water filter element Active carbon filter element Drain Tray Check to if any residualtea amp coffee left on the tray Drain pipe Cleaning Operations Replace new element Apply some agent on a brush and clean the drain tray with hot water Replace a new one All lights on control panel turn on aj ip ba 7 a te ee ee ai 5 q Pt a Ai AT Aa dd La A qua Le gt u Alllights on ONE control panel flash NOTE After two minutes of water input no water comes out from brewing group when you press continously flow button NOTE It will take more than two minutes to replenish water when the machine is used for the first time No water comes out from brewing group O Brewing for a long time without reaching setup valuve 1 Water level probe does not function properly 2 Water intake solenoid is out of order 3 No water 1 Coffee powder or tea is too fine grinded and clogged filter cup 2 Water intake solenoid valve is out of order 3 Flow meter is out of order 11 SIMPLE TROUBLE SHOOTING 1 Make sure that the water switch is ON and there
20. is water flowing 2 Turn off the machine Restart after 3 seconds 3 Notify local dealer 1 Adjust coffee grounds and tea fineness 2 Ensure water input is normal 3 Press any key to eliminate the breakdown signal and notify local dealer Wait at least 3 seconds to restart the machine after turning it offto ensure previous data stored in memory is erased Turning the machine on too quickly may cause the mach ine to function improperly 12 REPLACEMENT PARTS For reference ECO Eressure relief valve ere ATT Filter pad 1 3 months depends on water quality 5 yy Filter element active carbon 1 3 months depends on water quality Filter element soft water resin 1 3 months depends on water quality E Pis F a er o a go nd m Me a ta er pe Fee LES re D A A q YD Y A g AR yA ody i Wi a Er
21. ne exterior with soft slight dampened cloth daily before starting re operations If necessary a mild non corrosive cleaning agent may be applied to the cloth NOTE Do not spray cleaning agent directly on the espresso machine body to avoid ts Pal Da corrosion and possible damage to circuits 10 2 2 Espresso and Teapresso Brewing Units Cleaning Automatically back flushing feature Brewing system needs to be cleaned every day by back flushing function Please follow procedures as below refers to fig 10 a 10 b a Remove screw 9 shower screen B and copper copper plate from the group head be careful metal components may be hot b Place the rubber disc in filter cup see fig 10 b and apply about 2 3 grams of espresso machine detergent Attach the filter holder to the group head and check for tightness OT copperpinte CI fig 10 a A Rubber disc fig 10 b c Press first and fifth buttons simultaneously to start automatic back flushing function The first and fifth button will be off and middle three buttons will be lit This auto back flushing system will do 10 cleaning cycles see fig 10 c NOTE If you want to discontinue the cleaning press 3rd button to stop Control panel De Qol O um Qe fig 10 c d After the auto flushing cycle is done release the filter holder press fifth button and shake the holder to wash the gasket inside the g
22. r automatically The light on touch panel will flash as self detection 1f water flow info machine exceeds two minutes see Trouble Shooting Section and power will be cut off automatically to protect the system To resume normal functions turn off the machine for 2 3 seconds and turn on the machine again For ETL listed machine The heating element will not operate when water in the machine 1s less than the minimum required level When starting the machine without any water in the tank heating will be delayed for about 60 seconds For CE and KC Korea Certificate listed machine when you initiate the machine or any F w a _ Mas E a ir du need to turn on the machine after machine 1s not used for a long time please firstly make sure RER the water supply is normal and press every continuously flow button until the water flows for SRP more than 5 seconds After you confirm the water flows for more than 5 seconds you can turn A the main switch to position 2 to heat up the machine This is to protect heating element from en damage Before the use of machine you must confirm there isn t any frozen water inside the boiler Even though the machine hasn t been installed the temperature for water must be kept over the freezing point The damage caused by frozen water inside the tube or boiler won t be covered by the manufacturer Machine 1s shipped from factory with water drained from boiler and exchanger
23. r element Turn the ore Ar er lower shell to secure it to the upper shell and tighten by hand gt a ai i 3 de Le AL h rite o do 2 eS u E j ija a nn E ee nn t a RET a q AT s A i we e Open the water inlet and allow water to flow out from the filter gradually for about Tes one minute in order to clean impurities from the filter Close the water inlet and AK connect the high pressure water inlet hose to the machine Open the water inlet again Start the machine machine following normal procedures gt Inlet port e u u a I a I A E a e E 3 ce y e a T nd a a ag A or a of dame fs Le si ee a p Filter pad En Active carbon filter element Soft water resin filter element 10 4 Filter holder diagram 10 4 1 espresso filter holder 10 4 2 Tea filter holder O som Turning around the shaft grinding wheel inside Please follow below precedure to clean tea filter holder s Remove number D Insert into 5 Clean the inner side hole ofthe filter base by turning around the shaft grinding wheel 10 5 Table of cleaning and maintenance Check Tool for cleaning 1 Group head Espreso filter holder amp Teaspreso filter holder see 10 4 Espresso filter amp tea filter u AAS er CRE Spring tea filter holder Check to see if any tea leaves get only clogged Pe Er u e ga e pal ae ae ab ol Si m am se Tr Te ur Ex P
24. roup head Continue process until water in the filter cup appears clear and clean e After flushing remove the holder and press the fifth button to flush residual cleaning solution from brewing system Turn off the fifth button after about one minute f During the flushing process please rinse the copper plate and shower screen and use dampened cloth to clean them Don t use scrub sponge or wire brushes 10 2 3 High Volume Brewing System cleaning Automatically back flushing feature a Please apply 20 grams detergent NSF approved into the high volume brewing head b Press first and fifth buttons simultaneously to start automatic back flushing function This auto back flushing system will do 10 cleaning cycles If you want to discontinue the cleaning press 3rd button to stop see fig 10 c c After auto flushing cycle 1s done press fifth button to flush until the water appears clear and clean 10 2 4 Cleaning of filter holder and filter It is important to clean filter holders after your use the machine to ensure the best machine maintenance Please disassemble filter holders see 10 4 and clean them by proper tool Please refer to 10 5 for detail operation Please use NSF approved detergent powder to ensure safety LE eee A ey d FS a CP se os Sr a ha A Bir q e Pe En ae Er ka E fa Tr 4 are pi Fe nt E ia a Y Fa Ben u LE ae FLE er rere p pe ah Y oom Li
25. spresso combo machines MODEL CS2T CS2TS CS3T CS3TS CSB2T CST2 CSTSC2 CSTS2C CST3 CSTSC3 CSBTC CST2C CSB2C 8 2 1 Espresso brewing unit 8 2 1 1 Turn on the programming switch see fig 8d then start to program 8 2 1 2 The LED of 1 4 buttons on control panel will be lit see fig 8 e and the fifth button flickers It means we are in the process of setting up the amount of continuos output Control panel fig 8 e 8 2 1 3 Before setting up the first button please put measuring cup under the brewing group And then continue to touch the first button and holding on the button until reaching the requird amount of water keep you hand off the panel Meanwhile the first button s light will be off the other three buttons still lit see fig 8 f and the fifth button flickers It means the first button s programmrd Control panel fig 8 1 8 2 1 4 Repeat steps from 8 2 1 1 to 8 2 1 3 and finish the setup of 2 3 4 buttons with required amount of water 8 2 1 5 When you finish programming of these four buttons turn the programming switch to OFF and funish the setting up the amount of continuous putput 8 2 2 Teapresso brewing unit amp high volume brewing unit NOTE there is not presetting in the factory Please contact your service representative to consult tea amp espresso programming detail If you have had programming detail in hand you may follow the steps below to s
26. switch to position 1 to refill water into exchange boiler Self detection program will be initiated and lights will flash from left buttons to right see fig 6 a b Please wait for 2 3 minutes for water refill into exchanger system c After 2 3 minutes please press continuously flow button the fifth button on each control panel See fig 6 b c d to check 1f any water delivery from brewing group If so please proceed to next step If not please check 1f water supply 1s normal Water fill Machine off fie 6 4 E bid Note For all teapresso machine and tea amp espresso combo machine motor is initiated by A pressing fifth button So please press fifth button to ensure automatic water filling gt Ad e gt a k next step to avoid to damage of heating element Note Please make sure there is water delivery from brewing group before you proceed to Check to see if any water delivery from brewing ne Fifth button Continuously flow button Fifth button Continuously flow button High volume brewing head Fifth button Continuously flow button d Turn the main switch to position 2 to heat up the machine After about 20 minutes the heating sounds stop the machine is heated Water fill A ASE Es Machine off Machine on heating up gt Wa u ar A q pa Ad ZN ir en Fe ae Ora NE TSE
27. turned Turn the knob clockwise to reduce stop steam putout You can also pull the knob n order to get steam 9 3 Hot Water Knob Turn the hot water knob counterclockwise to obtain hot water through hot water wand Hot water output will increase the further the hot water knob is turned Turn the knob clockwise to reduce stop hot water output You can also pull the knob in order to get hot water 9 4 Filter holder As tea and espresso brewing units are different you need to apply different porta filter holders for different brewing units 9 4 1 Espresso filter holder For espresso brewing unit please attach espresso filter holder to espresso group head Single portion and double outlet filter holders are available for espresso brewing system as shown in fig 9 d and 9 e brewing group Z je peu SAS ver E a CET Set ye re ea a 5 ai a os E seer A al Er q e O om a s eg A ee 2 u Ra wu dE areal e b m E da a A pa re ER he a A EA Pr mr 9 4 2 Tea filter holder For teapresso brewing system please attach tea filter holder to group head as shown in fig 9 f High volume brewing system doesn t need to use filter holder Teapresso brewing group Tea filter holder 9 5 Use of High volume brewing head 9 5 1 Open the lid of the high volume brewing head See fig 9 g Please pull the pilot p n A left and hold the handle B up to op
28. will be beyond our responsibility 1 F T Se sten u alte qe a a da L le Pr ae i f Following rules must be obeyed when using electric device Don t touch machine with wet hands or feet Don t touch machine with bare foot Don t pull the cord in order to disconnect from power source Don t expose this machine to rain or sunlight directly Don t let children and mentally challenged people use this machine The temperature of the steam wand hot water wand and brewing group is very high Don t expose your hands to them never touch or your get injured by high temperature Please follow maintenance and cleaning instructions specified in this manual to ensure the best operation efficiency of machine If the machine broke down or functioned abnormally please turn off machine and its power source and notify professional maintenance personnel to fix any damage of electronic appliance will lead to certain danger please don t fix 1t by yourself We are not responsible for the behavior conducted by not authorized service personnel take apart or fix the machine ee A ey e Please use filtered and softened water If using groundwater or tap water for brewing coffee EIA or tea please soften 1t first Unsoftened water will decompose dissolvable minerals and turn be ne to limescale after boiling The limescale will reduce the machine s thermal efficiency and machine s lifetime Machine refills wate
29. you re start the machine do not turn off the steam knob until you see water drop from the steam wand This is to balance the boiler pressure 10 3 2 Drain Tray Please turn off the machine remove the drain tray from the machine use water to rinse it and use cloth to wipe it and place it back 10 3 3 Waste Cup After removing the train tray please use dampened cloth or napkin to clean the waste cup and use hot water to rinse it This will help clean the drainpipe Ye e a So As PEDO 44 ig N ai 1 a Hos r ea Ganda Drain tray Waste cup 10 3 4 Drainpipe In case the drainpipe 1s clogged place a teaspoon of espresso machine detergent into TE the waste cup and rinse it with hot water This helps dissolve coffee in the pipe and in BATT oD clean the pipe RENT le FE ae 10 3 5 Filter PA de aen a The manufacturer recommends replacing the filter element on the resin exchange sane filter after processing 200 liters of water about 3 000 4 000 cups of coffee This schedule can be expected to vary based on the quality of water used in your machine TT IE b Replacing the Filter Elements e Close the water inlet place a water container below the filter and remove the high pressure water inlet hose from the machine Ore a e Remove the bottom cap from the filter and extract the spent filter element a ae e QA L e Wash the upper and lower caps and then mount a new filte

Download Pdf Manuals

image

Related Search

Related Contents

Bluetoothオーディオレシーバ 取扱説明書  pass pass vlille faq  

Copyright © All rights reserved.
Failed to retrieve file