Home
Installation and operation manual
Contents
1. Installation and operation manual Drying cabinet TS 93 E v PODAB Thank you for choosing the drying cabinet TS 93 E from PODAB We hope that it will be of great use for you and ask you kindly to read the instructions carefully FOR YOUR SAFETY the information in this manual must be followed to prevent property damage and personal injury NOTE The paragraphs marked WARNING and CAUTION appearing in this manual are not meant to cover all possible conditions and situations that may occur It is very important that water and electricity are handled with great care and respect by both installation technicians and end users PODAB 2013 2 Contents Safety regulations Important safety instructions Specification Dimensions Technical information Assembly instructions Installation of the cabinet Step 1 Put the cabinet in place Step 2 Fasten the cabinet to the wall Step 3 Connect the cabinet to the ventilation channel Step 4 Connect the drying cabinet to the main switch Step 5 Control that the heating relay is working Requirements for ventilation Ventilation channel choice of material Requirements for incoming air Ventilation channel design Evacuated amount of air and pressure fall User manual Automatic programs Select drying time manually Gentle drying Maintenance Take good care of the cabinet Ventilation system Keep your cabinet efficient and economical 000 A 22
2. 22 22 22 22 22 23 23 23 23 24 25 25 25 25 26 26 26 26 OPODAB 2013 Safety regulations Throughout this manual you will find text warnings in text box es WARNING and CAUTION In these boxes you ll find the safety measurements you ll have to take end user service staff or installation staff CAUTION Indicates hazardous situation that if not avoided could cause minor personal injury or property damage Indicates hazardous situation that if not avoided could cause severe personal injury You will also find precautions marked IMPORTANT and NOTE These are followed by information of what should be consid ered IMPORTANT to inform the reader of special steps that must be taken in order to prevent injuries on the cabinet NOTE to inform what is important to know but it cannot cause personal injuries or injury on the cabinet OPODAB 2013 Important safety instructions To minimize the risk of fire electrical shock personal injuries or death when the cabinet is in use the following precautions must be followed 10 TT T2 13 14 19 16 17 19 Read the instruction before using the drying cabinet Follow the installation instructions for proper electrical connection Never dry textiles that have been washed dipped or ex posed to fire dangerous substances or fluids Never add fire dangerous or explosives substances to the cabinet The cab
3. produces inflammable dust To minimize the risk for fire the evacuation of the cabinet must be connected to a ventilation channel that evacuates the air Never let the evacuated air into a room or a Surrounding where there is a risk for ignition Do not use ventilation channels in plastic or fire dangerous material Ventilation channel choice of material Ventilation channel ducts connections etc are not included The ventilation channels shall be at least 160 mm in diameter and should not have channels or similar on the inside We recommend that the ventilation system is built with rigid metal ducts for best result Flexible evacuating ducts for drying cabinets can also be used NOTE Never use flexible ducts through walls or other cov ered areas NOTE Do not screw or nit the ventilation channel so that the screws will come through the inside of the pipe This construction will gather dust and impaire the cabinet s per formance The channel shall always be separated from the other ventiltion in the house Requirements for incoming air In order to make the cabinet work properly it is very important that there is enough incoming air in the room The incoming air must be at least 400 m hour If the cabinet is placed in a room where the incoming air is not enough we recommend that you install an air exchanger Con tact PODAB for more information Ventilation channel design IMPORTANT Always make the chann
4. IRON DRY For laundry to be ironed SLIGHTLY DRY For laundry that will not be ironed or only lightly ironed A NA ep vl CABINET DRY For laundry that will not be ironed 42 EXTRA DRY AN For particularly thick fabrics Select drying time manually TIMED DRYING The cabinet has a timed drying program for the user who prefers to set the time manually Set the time The default drying time when entering Timed drying program is 0 15h Increase the drying time with the plus button The drying time can be increased to a maximum of 5 00h Gentle drying For delicate fabrics and synthetics gentle drying should be used The temperature is reduced Activate gentle drying mode by pushing button 3 during program select PODAB 2013 Maintenance Take good care of the cabinet Only use a damp cloth with a mild detergent when cleaning the cabinet Never use solvent to clean the display Ventilation system Loosen the ventilation pipe on the cabinet every year and clean if necessary around the evacuating channel IMPORTANT Always switch off the electricity before start ing to work with the cabinet Inspect with set intervals the complete ventilation channel don t forget the outer wall There can easily be leafs and other rubbish that chokes We recommend that you once a year take down the service doors and vacuum clean around the fans and elements Keep your cabinet efficient and econom i
5. art until the door is completely closed Keypad Display Program select Gentle drying ON OFF Increase time Start stop Ae M E Program fast forward during drying Select program Change program by pushing program select button 2 The symbol of the chosen program gets highlighted and the pro gram name is showed on the screen Read more about the dif ferent programs below Start program Push start stop button button 5 in order to start the drying cabinet Pause program To pause a working programme open the doors Close the doors and push the start button to continue drying Cancel program To cancel a working program push the start stop button CAUTION If a program is interrupted before the cool down has finished the inside of the drum could be very hot 25 Cool down All programs have a cool down phase of 10 minutes This cool down time is included in the chosen time for the timed drying program During cool down the clothes are reconditioned and the drying cabinet is cooled down A running program can be fast forward to cool down using the P button Automatic programs The drying cabinet is equipped with the function HTS Humidity Tracking System This function is activated in the au tomatic program mode The drying time adjusts to the laundry in the cabinet To choose automatic program mode Choose automatic program by pushing button 2 The cabinet has four different programs
6. cabinet is not assembled after the manufacturer s instructions there is a risk that the cabinet can cause per sonal injuries or injuries on property OPODAB 2013 Specifications Dimensions Loading capacity kg Ibs Drying capacity g min Hanging length m Drying time min Evacuated air max m3 h Heating effect KW Total effect kW Fuse A Energy consumption kg kWh Part No Drying of 12 kg cotton dry weight washed and high spinned to 43 residual moisture 15 minutes cool down excluded Dried to 0 residual moisture OPODAB 2013 6 Assembly instructions Tools You need the following tools to easily install the drying cabinet TS 93 E e Cordless screwdriver e Wrench e Hex key 3 and 5 mm e Level e Torx screwdriver bit no 25 7 PODAB 2013 PODAB 2013 8 9 PODAB 2013 10 PODAB 2013 11 PODAB 2013 PODAB 2013 12 PODAB 2013 13 14 PODAB 2013 15 PODAB 2013 PODAB 2013 16 47 OPODAB 2013 31 Connect the cables Light LIGHT Relay boat Humidity sensor HUMIDITY Temp sensor NTC1 Relay board X11 Door switc DOOR PODAB 2013 18 19 PODAB 2013 20 PODAB 2013 54 OPODAB 2013 Installation of the cabinet Step 1 Put the cabinet in place Place the cabinet with enough space in front of the cabinet and on the sides to be able t
7. cal e The ventilation channels shall be as short as possible e f possible dry the same type of textiles at the same time PODAB 2013 26 27 OPODAB 2013 SERVICE SUPPORT Telefon 031 752 01 00 Fax 031 752 01 50 E mail info podab se www podab se Ww PODAB AB PODAB Ekonomivagen 9 436 33 Askim SWEDEN Tel 46 0 31 752 01 00 Fax 46 0 31 752 01 50 E post sales podab se www podab se PODAB 2013 06 27
8. els as short as pos sible NOTE If a drying cabinet is installed in an old ventilation channel please clean the channel properly In order to make the cabinet work properly the incoming air flow must be enough The amount of evacuated air per hour is depending on how high the pressure fall in the ventilation channel is 23 Material the design and the length of the channel have a large impact on the air flow In order to get the best possible perfor mance the pressure fall shall be as low as possible When the air is transported through the channel it is exposed to different kind of resistance Factors that give a low pressure fall e Smooth inner walls on the pipe e Large diameter on the pipe e Short length on the pipe e Few curves e Few angels 90 degrees PODAB 2013 Evacuated amount of air and pressure fall In order to get TS 92 to work properly the ventilation channel shall be designed to get an out coming air flow from the cabinet of about 300 m h When the cabinet is installed to an existing channel system the cabinet can be calibrated to optimize the air flow In order to gain this air flow the pressure fall must not exceed 260 Pa By an airflow of 300 m h and a diameter of the pipe of 160 mm this corresponds to a straight smooth ventilation channel of 170 m Pressure fall estimation The counter pressure in the ventilation channel can be mea sured with a pressure meter The measuring po
9. inet is not a toy Look after children who are around the cabinet Never connect the cabinet with an extension cable Only use the cabinet for what it is designed for drying clothes Always turn off the main switch before performing any ser vice on the cabinet Only authorized service technicians should perform service Always follow the installation manual The electrical con nections must be installed by authorized personnel Keep after the cabinet If it is exposed to violence there is risk that certain security functions will stop working Please contact your nearest service partner if you are unsure of the cabinet s status If the electrical cable is damaged it must immediately be changed by a person with electrical authorization The doors shall always be shut when the cabinet is in use Do not try to manipulate the lock of the doors It can lead to personal injuries If the cabinet does not stop when the doors are opened during the drying phase call for service The cabinet shall not be used if the drying programme is active when the doors are open Look after the area around the evacuating pipe so it is clean from dust and dirt To get the best drying result follow the garments washing and drying advice Never use the cabinet if any panel is broken or removed Never use the cabinet if any parts are broken or if the inside is broken Never try to manipulate or connect past any safety func tions If the
10. int shall be placed by the cabinets evacuating outlet In order to estimate the pressure fall without meter equipment we recommend the following e Identify the ventilation channel s incoming components in the air flow direction e Check the part pressure fall for each component in the table e Calculate the total amount of pressure fall by adding each parts pressure fall The table shows the most common components in a ventilation system The information shall be considered as approximate data For more information contact the manufacturer of the parts of the system Please note that the data in the table is for an air flow of 300 m h Component 125 Pipe bends 90 Reduction s Air exchanger 125 Example 10 m long 160 mm channel with 3 pipe curves which gives an estimated pressure fall of 10 x 1 5 3 x 4 27 Pa OPODAB 2013 Decrease the outgoing air flow The cabinets function and automatic programmes are optimi zed for the recommended air flow of 300 m3 h If the design of the ventilation is made so that evacuated air flow exceeds 300 m3 h the evacuation can be throttled with help of a damper Contact a ventilation expert in order to find a proper solution for your ventilation User manual Fill the cabinet To get the best drying result dry the same type of material at the same time Never fill the cabinet with more than 16 kg laundry dry weight Close the doors The cabinet will not st
11. o open the doors The feet of the cabinet can be adjusted from the inside with the help of a Hex key The feet must stand free on the floor and have an even weight distribution Use a leveler and control that the cabinet is leveled horizontally and vertically NOTE We recommend that the cabinet is installed on a firm and leveled floor Step 2 Fasten the cabinet to the wall Use the stoppers screws and washers to secure the cabinet through the back plates Fastening holes are pre drilled in the back plates NOTE Please control that the cabinet is leveled and cannot be tilted Never place the cabinet in direct contact with wooden mate rial Always use the stoppers to prevent the cabinet from direct contact to a wooden wall Leave a security distance of at least 30 mm Step 3 Connect the cabinet to the venti lation channel For further instructions se page 23 Requirements for ventila tion e Do not use ventilation channels made of plastic or foil e Place the cabinet so that the ventilation channel is as short as possible e Make sure that the ventilation channel is cleaned when a new cabinet is installed e Use a 160 mm rigid or flexible metal duct to the evacuation connection If you use rigid ducts it is important that the male connector of the ventilation tube on each section follows the air direc tion The construction shall be as straight as possible Always isolate ducts that go through non isolated a
12. reas The condensation makes dust and dirt get stuck in the channel NOTE If the cabinet is not connected according to these recommendations the warranty is no longer valid PODAB 2013 Step 4 Connect the drying cabinet to the main switch To prevent that fire and electric shock appear the cabinet MUST be connected according to the color codes on the cables Only an authorized electrician is allowed to install the electrical con nection The cabinet is prepared for one of the following electri cal connections depending on specification e 400 V 3 N 50 Hz standard e 208 240 V 3 N 60 Hz e 220 V 3 N 50 Hz It is always the buyer that has the responsibility to check that an authorized electrician makes the electrical connections of the cabinet To prevent personal injuries the cabinet shall always be con nected permanently through an all pole main switch Always ground the cabinet Also check that the connecting cable has a strain relief bush ing If not there is a risk that the cabinet will be live Step 5 Control that the heating relay is working Shut the doors and start the cabinet after about 3 seconds you can hear when the heat relays hit Wait a couple of minutes and control that the outgoing air channel becomes warm If the outgoing air channel does not get warm go back to step 4 and control that the electrical connection is installed correctly Requirements for ventilation A drying cabinet
Download Pdf Manuals
Related Search
Related Contents
Guia do usuário ALERT MULTIPLANE BALANCE™ 取扱説明書 Expresso Solubility and Expression Screening System アルペジオ 標準タイプ バトン式 取扱説明書 Rasenmäher R47VE BETRIEBSANLEITUNG Tondeuse à gazon 取扱説明書:PDF 約786KB Raypak 500 Boiler User Manual Sistemas com acionamento alternativo ao teclado e Copyright © All rights reserved.
Failed to retrieve file