Home

Installation Instructions

image

Contents

1. 10 Gauge up 40 ampa 5 Gauge up to 4 anes OGaupe up to To ares 4 Gays w to ares Gerne Remote Console HHO Instalation Electrical Wiring Diagram Operation When the remote console is NOT being used the small on off switch inside the PWM box must be switched on for the PWM to function Turning the knob clockwise will increase the current output to the HydroTube Turning it counterclockwise will reduce the current going to the HydroTube Remote console has a on off override switch that will turn the PWM on or off Precautions Do not connect directly to a battery charger Doing so can damage the PWM Always use a relay Always use a fuse or circuit breaker If your wires are getting hot use a larger gauge wire akk k k k k k k k fe fe ak 288 K k 3k 2k k 2K K fe is 288 2K K 2K 2K 2K ok Step 2 Filling the electrolyte tanks and bubblers 1 Once you have double checked to insure that the physical and electrical installation has been done correctly and power is available when turned on mix up enough electrolyte distilled water and KOH to fill each electrolyte tank 2 3 full The amount of electrolyte will depend on the size of the electrolyte tanks and the model of your HydroTube We recommend that you initially mix 1 liter of electrolyte at a time Use a mix of 1 liter of distilled water and 150 grams of KOH flakes This will yield Hybrid Hydrotech s recommended KOH concentration of 15 NOTE KOH based electro
2. open your HydroTube This will cause leaks If a problem should arise call your Hybrid Hydrotech Authorized Dealer immediately Never operate your HydroTube above the operating wattage calculated for the HydroTube model you have purchased See Step 3 Setting the correct amperage later in this manual Never use a higher concentration of electrolyte than called for in the Installation manual and only use Potassium Hydroxide KOH flakes or powder as the electrolyte Never make your electrolyte solution in the electrolyte tanks Solutions of water and KOH can cause severe burns Mixing KOH with water creates a heat producing reaction that can raise the solution temperature approaching 200 F 93 C and can melt containers not designed to withstand these temperatures Always premix the electrolyte solution in an open thick plastic container and let it cool down to room temperature before pouring it carefully into the electrolyte tanks 3K kK K K K 3K K 3K 3K 3K 3K K 3K K 3K K 3K 3K K 3K K 3K Step la Physically Install and configure the system The HydroTube must be installed horizontally and has been designed to support mounting clamps located within 3 4 of each end of the Tube DO NOT place mounting clamps more than 3 4 inside the ends of the tube as this may cause leaking The HydroTube may be installed by supporting it from the top bottom or side DO NOT use the bolts at the ends of the HydroTube as mounting attachmen
3. HydroTube Installation Instructions Hybrid Hydrotech LLC is proud to offer the HydroTube the most efficient and reliable Hydrogen gas generator available in its price range The HydroTube comes with a 90 day warranty against issues due to workmanship and material defects As with any device proper setup adjustment and maintenance of the HydroTube is critical to achieve the best possible gas separation Hydrogen from Oxygen and the highest purity Hydrogen gas possible Please read the following instructions before installation of the HydroTube Improper setup adjustment and maintenance of the HydroTube per Hybrid Hydrotech LLC s requirements will void the warranty WARNING The following actions will void the HydroTube warranty l Never operate your HydroTube at electrolyte temperatures above 130 F 54 5 C Electrolyte temperatures above 130 F 54 5 C will damage the internal gas separation membranes To manage the HydroTube s electrolyte operating temperature always use a good quality constant current Pulse Width Modulator PWM Never operate your HydroTube at a voltage that it is not rated for HydroTube model s beginning with HT5 xxx require a DC voltage between 12v 14v HydroTube model s beginning with HT10 xxx require a DC voltage between 24v 28v HydroTube model s beginning with HT50 xxx require a DC voltage of 120v 122v Never tamper with loosen any nuts or try to remove the outer tube to
4. ce either of these two leveling methods has been completed you will produce the maximum H and O available from the water in your tanks before needing to refill with water 0S Make sure the electrolyte tank caps are tightly closed Turn the HydroTube on and let the electrolyte reach an operating temperature of 100 F 110 F 37 8 C 43 3 C Look to see which electrolyte tank H or O has a higher electrolyte level If the H tank has a higher electrolyte level then add a small amount of water 1 4 to the H bubbler The level of the H tank should begin to lower Wait 15 seconds to see if the water in the H tank is slightly lower no more than 1 8 than the O tank level If it is then the tanks are leveled If the H tank level is still higher add another 1 4 of water to the H bubbler and wait 15 seconds Repeat this process until the H tank level is slightly lower but not more than 1 8 lower than the O tank level If the O electrolyte tank has a higher electrolyte level than the H tank level then add a small amount of water 1 4 to the O bubbler The level of the O tank should begin to lower Wait 15 seconds to see if the water in the H tank is slightly lower no more than 1 8 than the O tank level If it is then the tanks are leveled If the O tank level is still higher than 1 8 add another 1 4 of water to the O bubbler and wait 15 seconds Repeat this process until the H tank level is s
5. cules that get attached to the Hydrogen gas The less water there is in the bubbler the less effective that cleaning action is Now that the electrolyte tanks are level you should let the HydroTube run for 10 15 minutes and watch the electrolyte levels in the tanks They will lower as water is used but the electrolyte should remain level during operation DO NOT FORGET TO DO THIS STEP a Turn the HydroTube off b When the water in both bubblers are clear of any bubbles use a black permanent ink felt tip marker to draw a line on the outside of each tank and bubbler at the water line This will be the level that you will fill each tank and bubbler to each time you add water or when you totally replace the water in your tanks and bubblers Refilling to these lines ensures that you will get the most gas out of your electrolyte your gas will be as clean as possible and you will not have to level your tanks and bubblers again Step 4 b Electrolyte tank leveling using the visual method A YouTube video is available at http youtu be TMOEx0Vp088 This method requires a little more time is less accurate than using a manometer NOTE Whether you use a manometer to level the electrolyte in the tanks or you do a visual leveling the objective is the same While the HydroTube is operating you want the level of electrolyte in the H electrolyte tank to remain equal to or very slightly below the level of the electrolyte in the O tank On
6. current Using the wrong Gauge wire can over heat and melt the wire s protective insulation burn out the PWM and possibly catch fire 8 Gauge up to 55 amps 6 Gauge up to 75 amps 4 Gauge up to 95 amps Wire connections are very important Crimped ring wire connection should be secure The best connection is a soldered connection Consider soldering the ring ends to your wires A bad connection will build heat and can burn out the PWM Instructional video http youtu be ZcmSeLIwetU link is case sensitive Internal Connections 12 24 volt power is connected to the 3 pin external terminal marked P A 16 to 20 Gauge wire should be used This wire must be connect to a switch or a relay for emergency shutoff See diagram Ground bolt Connects directly to the battery negative Do not ground to the frame if you will be pulling more than 25 amps Load Bolt Connects directly to the HydroTube s Negative connection Remote Console Connect a RJ 45 CAT 5 data cable between the console and the PWM It will snap into the data ports A cable up to 8 foot may be used Over 8 feet and the consoles LED meter will not read properly This unit is designed for HIGH power applications over 20 amps The unit will work under 15 amps but won t regulate as well gt Circuit Breaker Vehicle Battery 685 Ground to Frame oa Sending cents Unit 1 oe Safety Switch Pump Relay Heavy Guage Wire 28 te 24 gauge mire
7. er open the bubbler drain to allow only 1 or 2 drips of water per second Look at the manometer screen If the number on the screen starts to approach zero 0 000 then let the bubbler drip until the number fluctuates equally above and 10 11 12 13 below zero for example 0 050 to 0 050 At this point the electrolyte tanks will be level If the number on the screen moves or 100 psi higher or lower away from zero turn off the Hydrogen bubbler drain and open the Oxygen bubbler drain to allow only 1 or 2 drips of water per second 1 drip per second takes longer to balance but gives you more time to react and is more forgiving especially your first time through this process Look again at the manometer screen and you should see the number on the screen start to approach zero 0 000 Let the bubbler drip until the number fluctuates equally above and below zero for example 0 050 to 0 050 and then close the bubbler drain At this point the electrolyte tanks will be level Turn off the power to the HydroTube disconnect and turn off the manometer and replace the manometer fittings with a plug or a one way check valve that only lets air in to the tank Note If during your first time leveling you drain the Hydrogen bubbler to less than 1 2 way full it s best to refill both bubblers to 3 4 full and start again from step 1 This is because the water in the Hydrogen bubbler acts as a cleanser to strip off any KOH mole
8. l to or very slightly below the level of the electrolyte in the O tank Once either of these two leveling methods has been completed you will produce the maximum H and O available from the water in your tanks before needing to refill with water Once this pressure balancing process is complete and you ve marked the water level lines on the bubblers and tanks you ll never have to repeat this process again as long as you refill the bubblers and tanks to these water line marks During operation water in the electrolyte tanks is depleted and water in the bubblers becomes contaminated as it cleans KOH from the gases Make sure that you periodically check the level of water in the tanks and bubblers and refill both to the water level lines established during the initial tank leveling operation Equalizing the Electrolyte tank levels is very easy to do when looking at the screen on a differential manometer however it is more difficult when visually balancing the HydroTube One additional point if you intend to use the HydroTube to generate Hydrogen gas for storage and compression you must purchase a Hydrogen purifier and gas dryer to ensure that stray Oxygen atoms and moister are removed before the Hydrogen gas is compressed Users of the HydroTube for Hydrogen storage and compression do so at their own risk Hybrid Hydrotech LLC does not recommend the use of the HydroTube for storage and compression of Hydrogen gas Hybrid Hydrotech LLC will
9. lightly lower but not more than 1 8 lower than the O tank level Let the HydroTube run for 10 to15 minutes to insure that the electrolyte levels have stabilized and that the H tank electrolyte level stays no more than 1 8 inch below the electrolyte level in the O tank Turn off the HydroTube Note Please insure that your bubblers are at least 1 2 way filled The water in the Hydrogen bubbler acts as a cleanser to strip off any KOH molecules that get attached to the Hydrogen gas The less water there is in the bubbler the less effective that cleaning action is DO NOT FORGET TO DO THIS STEP a Turn the HydroTube off b When the water in both bubblers are clear of any bubbles use a black permanent ink felt tip marker to draw a line on the outside of each tank and bubbler at the water line This will be the level that you will fill each tank and bubbler to each time you add water or when you totally replace the water in your tanks and bubblers Refilling to these lines ensures that you will get the most gas out of your electrolyte your gas will be as clean as possible and you will not have to level your tanks and bubblers again Enjoy Your HydroTube
10. lyte is highly alkaline and can cause sever burns The mixing of distilled water and KOH flakes causes an endothermic heat producing reaction Always wear plastic gloves and protective eye wear while working with KOH electrolyte 2 Make sure that the power to the HydroTube is turned off and all drain plugs are closed to insure that the electrolyte doesn t pour out 3 Pour the electrolyte into each electrolyte tank equally and wait 10 to 15 seconds while it fills the HydroTube Once you can no longer see any bubbles rising in the tanks mix and pour in additional electrolyte until the electrolyte tanks are 2 3 full Once the tank electrolyte levels have equalized use a black permanent ink felt tip marker to draw a line on the outside of each tank at the water line This will be the level that you will fill to each time you add water or when you totally replace the electrolyte Be sure to wait until the amounts of electrolyte in each tank have leveled 4 Fill each bubbler full with water In extremely cold environments use a 50 50 or less mix of water with an environmentally safe non polluting non foaming anti freeze FKK K K K 3K 2K K 3K 2K 2k K K K 2K FK K K ok 2k Step 3 Setting the correct amperage Hybrid Hydrotech recommends that the HydroTube be operated at 294 watts liter minute of H gas The HydroTube s recommended wattage can be achieved in any combination of voltage within the voltage range of model
11. n the Electrolyte Tanks The HydroTube has been designed with inlet and outlet ports at each end of the tube to maximize electrolyte and gas flow Although the HydroTube will operate using the inlets and outlets on just one side Hybrid Hydrotech recommends that the ports on both ends of the HydroTube be used Using all the inlet and outlet ports will smooth out fluctuations in the gas flow and gas pressure variations Note The HydroTube s internal pressures are designed to self balance and will automatically produce 99 pure Hydrogen However to ensure that an even amount of electrolyte remains in each tank during operation make sure that an equal amount of resistance is applied to the gas flow from both the H and O tanks The following leveling methods have been designed to level the amount of electrolyte in each tank Hybrid Hydrotech recommends that Step 4 a of the tank leveling process be accomplished using a 10 psi differential manometer Use of a manometer for the initial tank leveling reduces this step to a matter of minutes and will insure maximum usable electrolyte in each tank This type of manometer is inexpensive and available on the web Our Authorized Dealers can also sell you this item Whether you use a manometer to level the electrolyte in the tanks or you do a visual leveling the objective is the same While the HydroTube is operating you want the level of electrolyte in the H electrolyte tank to remain equa
12. not accept liability for damages injuries or death caused from accidents due to the compressing and storage of Hydrogen gas Note If you are using a differential manometer to level the electrolyte tanks do the following before you begin l 2 3 Drill and thread a hole in the top portion of each electrolyte tank The hole will need to be large enough to screw in a 1 8 O D barbed threaded fitting Connect the manometer pressure tubes to each barbed end Once the system is balanced you will remove the barbed fittings and manometer tubes and either screw a nylon plug in to the holes or screw in nylon 5 or less PSI cracking pressure one way air check valves We recommend that the check valves be installed to prevent water being sucked into the tanks from the bubblers when the HydroTube is not in operation and a vacuum in the tanks is created due to electrolyte cooling If water is sucked up from the bubblers into one of the tanks it can unlevel the tanks which we just leveled Make sure that the H and O lines from the bubblers are vented to the open air turn the HydroTube on and allow the HydroTube to run until the electrolyte is at least 100 F 37 8 C Turn the HydroTube off at least 30 minutes to let the electrolyte cool Turn the HydroTube back on until the electrolyte has once again reached at least 100 F 37 8 C Note You may see some foaming in the tanks Do not be concerned This occurs during the break in of
13. series being operated 12 14 volts 24 28 volts or 120 volts and an Amperage that equals 294 watts liter minute of H gas or 325 S Series watts liter minute of H gas For Example Model HT5 804 is designed to operate between 12v 14v DC It is designed to generate 1 7 Ipm of H gas at Hybrid Hydrotech s recommended power consumption of 294 watts liter minute of H The general formula to determine the recommended operating amperage at any voltage within 12v 14v is Model lpm of H 294 voltage Operating Amps At 12 volts the Amperage would be 1 7 Ipm 294 watts 12 volts 43 65 amps At 14 volts the Amperage would be 1 7 lpm 294 watts 14 volts 35 7 amps At 13 5 volts the Amperage would be 1 7 Ipm 294 watts 13 5 volts 37 02 amps To determine the kWh that a specific Model HydroTube will consume over an hour multiply the Model H Ipm as listed in the Price and Performance section of our web 0 294 kWh The general formula is Model Ipm of H 0 294 Energy consumption per hour in kWh For Example The HT5 804 produces 1 7 lpm of H gas when operated at Hybrid Hydrotech s recommended wattage of 294 watts liter minute Therefore the total kWh consumed over 60 minutes will be 1 7 0 294 0 5 kWh of electricity A kWh calculator is available at http www rapidtables com calc electric watt to kwh calculator htm OK OK OK OK K 2K K OK OK OK K K K OK K K K K OK OK K K Step 4 Leveling the Electrolyte i
14. t points Insure that your HydroTube s physical installation is done per the diagram on the next page These instructions assume that the HydroTube has already been electrically connected properly The following color conventions are followed Red Positive power connection Black Negative power connection Green Hydrogen Blue Oxygen Be sure to label the Hydrogen tank and bubbler with an H or Hydrogen and the Oxygen tank and bubbler with an O or Oxygen ooo 78 Hydrogen out HO HydroTube ydrogen oxygen cell HydroTube Plumbing Diagram 388 K 3K 8 K K K K K 2 3K 3K fs 3K K K 2K 2k 2 2 2 os ok K Step 1b Electrically Install the system EXTEMELY MPORTANT Make sure that you HydroTube is electrically connected based on the labeling on the HydroTube and the legend above Red Positive and Black Negative and that the DC power source voltage is appropriate for the HydroTube you have purchased Installation Instructions for the GreenFuelH2O 50 90 AMP Constant Current PWM Hydrogen Power Controller The GreenFuelH2O0 PWM FEATURES Works with 12 or 24 volt charging systems Handles High loads up to 90 amps continuous model dependent Efficient design needs no cooling fan Constant current function keeps current steady Wire gauge size and length of wire are VERY important The longer distance the electricity has to travel the lower the wire Gauge should be for the same amount of
15. the HydroTube as the plates and gaskets initially release surface oils and other impurities into the electrolyte It will not affect the quality of the gas This foaming will go away after the first mixture of electrolyte has been replaced Step 4 a Pressure balancing using a manometer This process normally take less than 5 minutes It doesn t matter what measurement scale your manometer measures in psi Mbar kPa inHg mmHg etc For these instructions we will use psi Read your manometer user manual to learn how to use your manometer It s actually a very easy device to use 2 Unscrew the electrolyte tank caps 1 2 way to avoid any pressure buildup in the tanks Connect the manometer and manometer tubes to the 1 8 barbed fittings on the tanks As a habit I prefer connecting the left manometer tube to the Hydrogen tank but it doesn t matter Turn the HydroTube on and let the electrolyte reach an operating temperature of 100 F 110 F 37 8 C 43 3 C Turn on the manometer and zero out the pressure differential by resetting it Please read your manometers user manual to learn how to do this Close the electrolyte tank caps Your manometer will now show a number higher or lower than 0 000 This pressure on the screen will fluctuate slightly The fluctuation is usually a few 10 of a PSI If you decide stop and restart the balancing process before its complete repeat steps 1 4 amp 5 Starting with the Hydrogen bubbl

Download Pdf Manuals

image

Related Search

Related Contents

Kaiser Fototechnik 4000 projector accessory  1.ご売却頂く端末の初期化 2.端末暗証番号の初期化 3.FeliCaアプリ(IC  CORDLESS TELEPHONE  

Copyright © All rights reserved.
Failed to retrieve file