Home
CEE Spin Coater/Hotplate Operation
Contents
1. to request dispense from the syringe Figure 18 Enter 1 for dispense 9 Enter the dispense time This depends on the resist viscosity and the N2 pressure on the syringe If you have a high viscosity you may need longer to dispense or for a low viscosity fluid you will need less time The N2 pressure on the syringe may need to be increased for a high viscosity fluid Note that the dispense time the viscosity of the fluid and the pressure on the syringe all play together to produce a puddle of the right volume to coat the wafer properly Figure 19 Enter dispense time Two seconds in the case of low viscosity watery PMMA 495 MW C4 E Beam Resist The N2 pressure on the syringe is about 9 psi 10 Enter the spin speed to spread the resist over the wafer In this case the spin speed is 3500 rpm Figure 20 This display indicates that for spin program one the first velocity 1s 3500 rpm A 0 will appear in the underline position when you hit 0 again 11 Enter the acceleration ramp rate This is given in units of rpm per second I think Figure 21 Enter the ramp rate in RPM per second DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 10 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas 12 Enter 0 for no dispense in the NOZZEL request line sa EE CEI Figure 22 Entering 0 prevents resist dispense for this step 13 Enter the sp
2. warm the wafer to avoid more sudden temperature changes 2 The Contact mode simply allows the wafer to sit un aided on the surface of the hotplate and bake like an ordinary simple hotplate 3 The Vacuum mode actually applies vacuum to the hotplate holes and sucks the wafer down onto the surface for better heat conduction and a closer wafer temperature to the actual hotplate temperature Figure 5 Proximity selection 5 Input the time you want the wafer to sit suspended on the gas cushion In this case I use this wafer suspension method to allow me to place the wafer on the hotplate and the wafer to scoot under gas power to the centering posts and settle down Figure 6 Enter the time in minutes and seconds for the wafer to sit on the gas cushion Remember to hit enter each time you input a number for the program to go on 6 Enter another optional bake Method Figure 7 We have selected CONT for wafer hotplate contact 7 For method 2 enter the bake time for this condition We consider the first two steps as transitory to nestle the wafer into its home position and quickly but gently warm the wafer for the true bake under vacuum suck down conditions lt see Figure 8 Enter the bake time for the CONT method 8 Enter another optional bake Method Figure 9 We have chosen the third method of hard contact between the wafer and the hotplate for the true bake 9 Ent
3. descriptive and will be explained as they are encountered in this paper SPINNER PROGRAMMING In this section we will explain spinner programming by using an example program and explaining the steps as they appear 1 Hit the RESET key to bring the controller to its home point readout Hit the OPT button once or twice to access the spinner function Figure 13 Home display for the spinner 3 Hit the PROG button to start the programming mode Figure 14 Program display with program number inserted 4 Enter the program number This means in this case hit the number 1 button and then hit ENTER for the program to accept the entry After the ENTER key is hit the programming display moves to the next entry step 5 Enter 0 for dispense This causes the syringe to refrain from dispensing fluid at this step Figure 15 Enter 0 to not dispense fluid at this step 6 Enter the spin velocity in RPM For this program we will dispense resist onto a stationary wafer so enter 0 for the spin speed Figure 16 Enter 0 for no rotation during the dispense step DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 9 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas 7 Enter the ramp acceleration For this case we are not spinning so enter 0 Figure 17 Enter 0 for no acceleration because we are not rotating 8 Enter 1
4. posts don t move 4 When the wafer is centered tilt the alignment posts away from the wafer and lift the alignment arm up until it is in its stable retracted position The alignment posts that dangle under the arm can be tilted away from the wafer with a little thumb tab on the top of the arm Make sure that the arm is lifted to a stable position before closing the spinner lid Jf it falls back down it will break your wafer and fling wafer fragments into your face Figure 43 Using the tab on the centering arm move the alignment posts away from the wafer and then lift the arm up and into its retracted position 5 Close the spinner lid Make sure that the syringe tip is vertical and not smashed up against the lid and pointing off center DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 21 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 44 Wafer centering arm retracted and lid closed 6 Check or set N2 pressure for the syringe to the proper predetermined pressure for dispensing your type of resist This pressure is set with the knob on the little box sitting on top of the keypad section of the system Figure 45 Syringe pressure control For low viscosity material use low pressure for thick viscous fluids raise the pressure This constant pressure provides the push to dispense the fluid DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 22 of 25 DOCUMENT NUM
5. the set point was at 100 C the hotplate would not indicate ready until the temperature came to within the range 97 to 103 C Se Option 9 This option toggles the communications link between the system controller and the hotplate temperature controller Normally this is left in the active state so that the computer can remotely set the temperature of the hotplate Hotplate Programming The programming mode is accessed by hitting the Opt button on the keypad to switch to the appropriate function program then hitting the Prog button and observing the instructions in the display The display lists several things on the same line which you will need to interpret to effectively instruct the tool There are three sections to the display line Program number instruction for step number and data entry The format is described by the following sample instruction line E cm p S fs 2 2 Figure 1 Example of hotplate readout format Program 1 PGM 1 Operation time for step 2 TIME2 Number of minutes 0M and Number of seconds 5S Other formats are more self explanatory DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 4 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas In order to explain how to program the hotplate we will run through an example that has a number of frills included just to show more of the capabilities of this system The program
6. the syringe housing by unscrewing the knurled knob at the front This allows the front door of the housing to open giving you freedom to remove or insert a syringe barrel There is a fail safe vent that releases pressure on the syringe barrel as the door opens You will hear a fizz of N2 leaking out while the door is open This is normal Figure 32 Note the slotted knurled knob at the lower left of the black syringe housing This releases the syringe for servicing Also note the knurled knob on the back side of the Al base This knob releases the black syringe housing for removal and syringe replacement DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 15 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 33 Open syringe housing showing suck back bearing up left and pushed down right This rolling action squeezing the flexible needle tube acts as a valve and suck back system to prevent liquid dripping back onto the wafer The hole in the upper left face of the housing 1s the pressure safety release to help prevent spewing resist all over everything 8 Place the next syringe barrel into the housing Insure that it is seated firmly and as far down towards the tip as possible and that the flexible needle is seated in the V groove guide properly Also if this is a used needle rotate the barrel such that the previously squeezed flat needle is oriented so that the roller bearin
7. 1 is a single step function that enables the operator to bake wafers without prior system programming This is outlined in a subsequent subsection entitled Running the Un Programmed hotplate Option 5 This option allows the user to change substrate size on the hotplate DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 3 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Option 6 This option loads default data into the general operation of the hotplate and applies to every program After the CEE system is turned on at the red On OFF rocker switch just to the left of the keypad data is entered into the keypad to program or configure the system Press Opt to toggle into the hotplate control mode Press Config to enter the configuration menu Press 6 to enter the actual configuration loop Enter a number for the number of seconds to float the wafer on a N3 gas pillow as it is being loaded Remember to press ENTER after every entry for the controller to accept the entry Floating the wafer just above the hotplate surface makes for an easier tweezers loading and unloading operation 5 Enter a number for the number of seconds to float the wafer on the N gas pillow as it is being unloaded 6 At this point the display will ask for a percent error in the temperature Three percent for example would be the maximum error tolerated before actually baking wafers If
8. A2004 LI 001 Copyright The University of Texas at Dallas Figure 41 Note the slot in the silver liner in the black chuck and the post on the side of the motor shaft They must match and seat when attached 3 Replace the chuck with the chosen size Note the notch in the chuck receiver cylinder that fits over the motor shaft It fits over the pin in the shaft to prevent twisting on the shaft This must fit correctly to prevent damage when the attachment screw is tightened Figure n 4 Lightly tighten the chuck screw Make sure before tightening the screw that the chuck fits properly and does not wobble on the shaft 5 Return the removed chuck to its proper place RESIST DISPENSING 1 Did you remember to start the hotplate operation before spending all this time fixing the syringe If not then do it now and wait until it warms up to the set point temperature The instructions are way up above here It will take about 15 minutes or so 2 Lift the spinner lid and lower the wafer centering arm Make sure that the alignment posts are vertical Make sure that you don t accidentally damage the syringe 3 Place a wafer onto the chuck and scoot it up against the alignment posts DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 20 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 42 Centering the wafer Gently slide the wafer against the alignment posts making sure that the
9. BER FA2004 LI 001 Copyright The University of Texas at Dallas 7 Make sure that the in line N valve is open Figure 46 Open the N valve before starting the dispense process This is easy to forget but remember I told you so right here 8 Push the Opt key to select the spinner operation 9 Push the Run key and enter your dispense program number Press enter after the program number for the system to accept your selection Figure 47 Enter the program number for the spin operation 10 Press Start The system will rotate the wafer slowly for you to verify that the wafer is centered If it wobbles more than about 1 16 of an inch total recenter the wafer If you need to recenter it just lift the lid lower the alignment arm and push the wafer against the alignment posts Then check it again by pushing the 0 key as instructed on the readout Figure 48 Press START to begin the dispense program The first action will be for the spinner to rotate the wafer slowly so the operator can see if the wafer is DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 23 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas truly centered on the chuck If the total wobble is more than about 1 8 of an inch recenter the wafer before continuing Retest centering by hitting 0 11 When the wafer is centered press Start again This will start the resist dispense an
10. CEE Spin Coater Hotplate Operation Roger Robbins October 7 2004 The University of Texas at Dallas Erik Jonsson School of Engineering DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas CEE Spin Coater Hotplate Operation Roger Robbins 10 07 2004 C MyDocuments Teaching RogerPapers CEEcoater doc CEE Spim Coater Hotplate OP6i a WO Misicecciscoauiccrossnedvsccectenesveenauasiussousenesdaemaoeatonsnece l CEE Spin Coaten Hotplate Opera On sensisse en nnn E E 3 PO a E A E E T 3 Prode O e A T E E E T ETE 3 Homie EOT AAI A E E A E E E E 3 FORD PAGS C Onn SEO e en E E E E E 3 HoD RO rA eR E E E E A 4 Running the Programmed Hotplate cccccsessssssseeessessesssssesessssssssseseeseeeeseeeeegs 7 Running the Un Programmed Hotplate iscsssssscacivaisccnsesiscessdeaetavsdersaneivesenensestecanndeaeeers 8 SDT PEO E a a ne ene eee ore ee eee ee eee eee 8 RoE oane POC S Oe oie eee er mene Renee err e ee oie teeter een Sener reer enn tere in ere 11 Be NG i PIN een wate sins agence aren eee waar sine sa gpenareeeemeaeemaneon ots 11 WATERTON TIN e A E O E E E E 19 CHUCK REPLACEMEN D secrecion Ee 19 RESDT BIDEEN IN e Stennett etre eter rete eer eer rt 20 DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 2 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas CEE Spin Coater Hotplate Operation Roger Ro
11. bbins 10 07 2004 C MyDocuments Teaching RogerPapers CEEcoater doc Purpose The UTD Clean Room has obtained a new spin coater the CEE system from Brewer Scientific that contains a simple syringe operated spin coater and a clever vented hotplate for soft bake operation to remove the resist solvent This document describes the operation procedures for resist coating of wafers and subsequent soft bake The original instruction manual is insufficient to instruct an inexperienced operator Introduction The CEE spin coater system is a combined hotplate and spinner controlled by a single microprocessor There are two levels of operation required to utilize the full potential and flexibility of this system programming and operation There are allocations for ten programs with battery backed memory The microprocessor is switched between hotplate control and spinner control by pressing the Opt button on the microprocessor front panel This is a toggle switch so that pressing it multiple times will switch back and forth between each operation Hotplate Programming Hotplate Configuration Configuring the hotplate involves setting the default operating parameters that affect all hotplate programs There are just a few options in this procedure However there is generally no need to change these after they have been initially set This documentation records the procedure in case there is a need to revise the configuration Option 1 Option
12. comes right off Clean it up in the solvent hood with proper solvent for the resist and reinstall it back onto the CEE spinner Generally Acetone will work for most resists DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 25 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas
13. d the wafer will rotate at the selected speed or sit stationary according to your program selection When the dispensing is complete the wafer will ramp up to the selected spin speed for the selected time When the wafer comes to a stop the system will beep loudly and ask for the wafer to be removed kan apts Figure 49 As the wafer is spinning the display shows the real time spin speed and the time remaining for the spin cycle At completion the controller beeps and displays the instructions to remove the wafer To stop the beeping hit STOP 12 Carefully lift the lid and remove the wafer It will not be held down by vacuum at this point Be careful not to inadvertently push it off the chuck while trying to pick it up The system will now be ready to coat another wafer Figure 50 At completion remove the wafer and close the lid 13 When you are finished close the in line N3 valve This will help prevent slow drips or accidental discharge of resist by future operators DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 24 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 51 Remember to close the in line Nz valve to prevent accidents NOTE After you finish your coating operation clean up all the resist in the spin bowl Please do this in the solvent hood Also clean up the hood Figure 52 Remove the resist catch bowl It just lifts up and the Stainless ring
14. er the bake time for the vacuum period After hitting the ENTER key the program returns to the home display and is ready to run DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 6 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 10 Enter the bake time for the vacuum method Running the Programmed Hotplate After the hotplate is programmed baking a wafer is as simple as selecting a bake program attaining the set point temperature and then placing the wafer on the hotplate The system will beep when the bake time is up The clever thing about this hotplate is that it is exhausted and the vile vapors out gassing from the wafer will be captured and sent away without having to first breathe them in to the detriment of our bodies Therefore keep the lid on the hotplate down all the time You can lift it up for cleaning 1 Turn on the CEE system at the red rocker switch by the keypad 2 Turn on the vacuum pump under the front right edge of the table The off on labels are located on the table top at the right front corner Figure 11 Vacuum pump switch under the right front corner of the table 3 On the key pad select the hotplate function by pressing the Opt key until the hotplate title arrives on the readout Press Run Press the program number for your program Press Enter Press Start If the vacuum pump is not turned on at this point the system w
15. g will press it flat against the opposing wall of the front door Most importantly make sure that the Teflon needle is seated in the V groove as it exits the black syringe housing Otherwise it can be pinched closed and become nonfunctional vr mr m Figure 34 Syringe placement in the housing Note the flat part of the needle parallel to the roller This roller should be in the down and locked position DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 16 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas 11 12 13 for installing the syringe The photo shows it in the up position Most importantly make sure that the Teflon needle is seated in the V groove as it exits the black syringe housing Close the syringe housing front door and screw in the locking thumbscrew Release the suck back piston by pressing down on the piston shaft slightly and releasing it This will press the roller against the needle closing the path of fluid flow This is a key step to prevent drips when you fill the syringe with resist If the syringe needle is new press the piston shaft down and release it about 30 times to form the needle shape This flattens the Teflon tube of the needle so that the resist flow valve action is secure and the suck back operation is consistent Suck back prevents drips Replace the syringe body into the lid assembly Pay attention to making sure that the flex
16. ible needle shaft make it through the hole in the bottom of the receiver and does not become folded up inside the housing Figure 35 Placing the syringe body in the receiver Make sure that the flexible needle makes it through the small hole in the bottom of the aluminum base Pour an appropriate amount of resist into the syringe barrel Estimate how much resist you will need for the number of wafers you will coat and use only the minimal amount of resist Any extra may become waste Figure 36 Pouring resist into the syringe Note the rag to catch spills DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 17 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas 14 Insert the syringe plug and push it down to the top of the liquid level removing as much trapped air as possible This prevents resist from getting in to the N2 pressure line and clogging up the works when the lid 1d opened for wafer transfer Figure 37 Insert the white plug and push it all the way to the liquid surface pushing out all the air 15 Affix the syringe pressure cap onto the syringe Place it crossways over the top of the syringe barrel push it in and then rotate it until it locks against the barrel wings Hold the barrel of the syringe so it does not twist in the housing and damage the needle Figure 38 Installing the syringe cap Fit it crosswise and then twist it until it latches under the wings Be s
17. ill announce it with an error message 8 The readout will announce when the hotplate has arrived at the programmed set point temperature 9 Place the wafer against the two posts on the hotplate Keep the lid of the hotplate always down to capture the evolving vapors a ee ea DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 7 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas 10 When the programmed bake time is up the CEE system will beep loudly You can then remove your wafer with a tweezers and kill the beeping by hitting STOP Running the Un Programmed Hotplate For a special one time bake operation you do not have to go to the trouble to program the hotplate It can be done with a few simple instructions 1 Press the Opt key to get into the hotplate program This is a toggle switch between the hotplate and the spinner 2 Press the Config key to open the configuration menu 3 Respond to the Config menu with the number remember to hit Enter after the number for the program to accept your response of the hotplate program having the temperature you want to bake with This completes the set up and the hotplate is now ready to run This is silly How do I set an arbitrary temperature I want just for the moment 4 Hit the Run key and the number of the program with the temperature you want and then hit Enter 5 Wait for the temperature to stabil
18. in time There is no dispense during this stage Figure 23 Spin time entry 14 End program Enter nothing just by hitting ENTER again and the program will insert END to stop the programming mode 15 The program will now return to the spinner home position This screen looks like that depicted in step 1 of this flow Resist Coating Process SYRINGE LOADING This sequence is immensely important If it is not followed exactly then there exists the highly probable scene of spewing resist over the CEE table floor you and having everyone else laughing at you while you spend an hour wiping up resist Therefore pay particular attention to the sequence in the following list of steps Note particularly the arrangement of N gt lines attached to the syringe dispense body There are two lines One 1s a valve actuated 70 psi line that drives the dispense and suck back valve roller during dispense The other is a constant pressure line that delivers a set reduced pressure to the syringe for the purpose of pushing out the resist during dispense DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 11 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 25 Note the routing of the N2 pressure lines to the syringe dispense head The line system that attaches to the TEE connector at the top right of the black syringe housing and then trails over to the top of the syringe is
19. ize This could take up to 15 minutes depending on how far the temperature has to change 6 Hit Start to run the bake 7 The Hotplate timer will then start counting up time 8 When the time reaches your target hit Stop and the hotplate will end the run You can repeat this operation as many times as you need When a programmed bake is required just hit RESET and RUN and the program number then ENTER and the hotplate program will begin when you hit START Spinner Programming Spinner programming gives you full control of how you want to dispense and spin your wafers The control parameters are 1 Puddle dispense with no wafer rotation 2 Dynamic dispense with the wafer rotating at a selectable speed 3 Dispense time 4 Rotational acceleration 5 Rotational spin speed 6 Spin time 7 Dispense rate These parameters are programmed in as many steps per program as you need to accomplish the desired dispense profile Spinner programming has display formatting that can be a bit more involved than the simple hotplate instructions Figure n shows an example DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 8 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 12 Example readout format Program 1 PG 1 input description Velocity VEL Step 0 0 and value 0 with units RPM There are other formats that are more self
20. t any resist that may still be in the syringe and spraying it over everything while you stand there with wide eyes trying to stop it Figure 28 In Line N2 cutoff valve for preventing unexpected and inadvertent expectoration of resist all over unintended surfaces 4 Obtain a syringe barrel and label it according to what resist you are going to use These syringe and needle systems are disposable but expensive If you can use them for extended times then we can keep the expense low In order to do this you can store them with the needle folded up to seal the resist inside To use the syringe again just replace the needle DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 13 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 29 Labeled syringe 5 Screw the dispensing tip to the end of the Luer syringe barrel Figure 30 Syringe and needle system Tip attachment and white plug cap 6 Push down on the suck back piston and lock it in the ON position with the small lock pin on the outside of the housing This forces the roller bearing away from squeezing the needle and allows you to freely insert a new needle into the dispense assembly DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 14 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 31 Fingers are pointing to the suck back piston top and locking pin bottom 7 Open
21. the low pressure dispense line The other line that ends at the top left of the black syringe housing 1s a valve actuated 70 psi line for the purpose of driving the dispense and suck back valve roller during dispense 1 Turn on the vacuum pump before starting It looks like a standard light switch under the front right edge of the table Figure 26 Vacuum Switch on right front edge of table 2 Turn on the CEE power and establish which hotplate program to run This starts the hotplate warming while you are loading the resist into the syringe The on button is the little red rocker switch just to the left of the keypad Press the Opt button to select the hotplate Then press Run and the program number and Enter The hotplate will take about 15 minutes to stabilize at the set point DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 12 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 27 Computer keyboard and readout Red On switch on left of keyboard Opt button at left end of lower key row 3 Slide the Syringe N line valve to OFF This is the little in line cylindrical valve in the small clear Tygon line running to the syringe cap It has OFF and ON markings on it But to be complete here you turn off the valve by sliding the moveable valve sleeve away from the syringe cap This prevents a continuing supply of N2 pressure from pushing ou
22. ure to hold the barrel of the syringe to prevent it from twisting and damaging the needle 16 Slide the in line N valve to OPEN This allows the N gt to pressurize the syringe barrel The pressure remains constant during operation The syringe is now ready for operation DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 18 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas Figure 39 Open the N2 valve by sliding the sleeve towards the syringe WAFER COATING Coating a wafer requires placing a wafer on the spinner chuck centering it and then calling up and running the proper coating program The wafer alignment is a bit tricky and will be described first There are several wafer chucks available Currently we have a 2 inch diameter chuck and a 4 inch diameter chuck The 2 inch chuck must be used for 3 inch and 4 inch diameter wafers The 4 inch chuck can handle 5 and 6 inch wafers Do not use either of these chucks for any material smaller than the diameter of the chuck This will cause the resist to be sucked into the vacuum port on the spindle and cause the spinner to degrade and finally fail CHUCK REPLACEMENT 1 Remove the chuck by unscrewing the vented cap head screw in its center Figure 40 Removing the vented screw to replace the spinner chuck 2 Carefully lift the chuck off the spindle DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 19 of 25 DOCUMENT NUMBER F
23. will be 1 for a 4 inch wafer 1 To begin programming first hit the RESET key to clear the system and then hit PROG Figure 2 View of the keypad showing the RESET and the PROG keys The OPT key toggles between the spinner and the hotplate function This figure shows the Home position for the hotplate This is reached by hitting the RESET key and toggling the OPT key until this screen appears Figure 3 After hitting the PROG key the screen looks like this It is asking for you to hit a number key to label a new program or call up a previous program 2 Enter the program number to start your programming Remember to hit ENTER for the program to accept your entry 3 Enter the temperature for program 1 Figure 4 Enter the temperature in C for program 1 4 Hit one of the Method buttons on the far right side of the keypad This tells the hotplate program how to handle the wafer contact with the hotplate There are three modes 1 Proximity Contact and Vacuum For the Proximity operation the system has the ability to float the wafer like an air hockey puck in close proximity to the hotplate by spewing N gt gas out of the holes DOCUMENT TITLE CEE Spin Coater Hotplate Operation Page 5 of 25 DOCUMENT NUMBER FA2004 LI 001 Copyright The University of Texas at Dallas in the hotplate surface The purpose of this method is to gently
Download Pdf Manuals
Related Search
Related Contents
GDR operating the ministand Powersine 200-800 manual rev4endf M2087 OPERATING INSTRUCTIONS ENGLISH Abrir / Descargar Manual Inclusion 2011 - Delaware Department of Education User Manual Brodit 511377 holder HDR 1000 QA Tool Copyright © All rights reserved.
Failed to retrieve file