Home
        MicroWin - ELCONTROL ENERGY NET Srl
         Contents
1.                                                                         35   Rel  MW 1 1 Subject to modifications without prior notice     Page 2 of 35       Via Vizzano  44   40044 Pontecchio Marconi            Italy  am                39 051 6782006            39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it  MicroWin    Windows 9x and Windows NT 4 0 Data Management Software  for the MICROVIP 3 Plus Handheld Analyser    1 General Description    MicroWin is a software package running in Windows 9x and NT 4 0 environments designed to manage the  MICROVIP 3 Plus Handheld Analyser  MicroWin allows you to read all the measures stored in the instrument  and perform both manual or automatic measuring surveys  When used together with a MICROVIP 3 Plus  analyser  the program allows you to download  catalogue and file the measuring surveys contained in the  internal memory of the analyser  as well as manage them just like the rms surveys executed on the PC  directly by MicroWin  A single configuration setup window allows you to display  modify and update all Setup  parameters of the instrument  including PT and CT ratio  type of insertion  integration time  power meters  type standard1  STD1   standard2  STD2  or co generation  COG   automatic print type  LOG type  STD or  SAMPLE   enable disable harmonic analysis and thd referred to the fundamental or to the rms value  etc   The program can operate in two modes  ON Line and OFF Line    While
2.                                                2                                  uv         TI     fame                                                                                                                                       ram              cum                                    1       wl      ue      m  m      m             ue                ell          LE               arr  arm  LEF  LFI  LF                                        Rel  MW 1 1 Subject to modifications without prior notice     Page 31 of 35    m Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy         Tel   39 051 6782006            39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it       7 3 The Harmonic Spectrum       Elcantral Energy Net SpA  Automatic Surve hicrovvin  Record    10001 1st 24th Harmonic bar graph L1 Record date        113533  100   75   50   25   D  1 2 3 4 5 B T F    wd 11 dz 13 14 15 18 dr d8 18 2D 21 22 23 24  100   X of fnd  75        24  Ln  ov of                                                       Printed an  12 20 2001 12 14 12 Page 1         sa onte aq        oro          T                   orci          vae TEL 00    reed            vay rh  Rel  MW 1 1 Subject to modifications without prior notice     Page 32 of 35         Via Vizzano  44   40044 Pontecchio Marconi            Italy                   39 051 6782006    i             39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it 
3.                       5  2 1 CONFIGURING THE      SERIAL                           5  2 2 CONFIGURING THE INSTRUMENT                                        5   3 ONLINE MODE         7  3 1 DOWNLOADING THE INTERNAL MEMORY OF THE    5                                  7  3 2 DISPLAYING THE                                                                                            essa                 7   3 2 1                              ces                 a                  8  3 3 CARRYING OUT MEASURING SURVEYS                                                                  9  3 3 1 Measuring Survey Menu    2                                    9  SP                                           M                   9  SOC MEME uoce mp                                     n 11     EEG LISSE MODE                                   15  41 ORGANISATION OF MEASURING SURVEYS                                        15  4 2 DISPLAYING AND PROCESSING    MEASURING SURVEY         cccsceccececcececcececcececaccucccaccucuccecuececsuaececaeeeuaeeas 16  4 3 EXPORTING MEASURES      A TEXT           17   5 MEASURES AND GRAPHS DISPLAY WINDOW SS                                                                    19  5 1 iR   NRI EI 19  c AME  BO                  20  5 3 HARMONIC SPECTRUM         20  5 4 VOLTAGE AND CURRENT                  5                                                     sese              20                                                      21   5 5 1 Recorder                   
4.                  22  5 5 2   Setting the Number of Channels and Associating a Parameter                                                  22  5 5 3 Indicators of Current Record and Random Record Search                   essen nenas 24  5 6   RMS MEASURES IN SPREADSHEET FORMAT         sccscsccececcececcececcececcceccacceccececuececueuuceeaececuesecsuaessuaeeeeaeeas 25  5 6 1 Showing    Set of Measures AS                                               25  5 6 2 Exporting    Set of Measures to a                                        26   6 CUSTOMISING THE COLOUR SCHEME OF                                                      unen nnn unen nun unen nura 27   7 PRINTING MEASURES AND GRAPHS                    e eren nnne nnne a hh RR IR                                       RR RO RR RR                   29  7 1 MEASURING SURVEY INFORMATION                                                                                        30  7 2 RMS MEASURES IN SPREADSHEET FORMAT                    essa assise esses sage                                      31  7 3   THE HARMONIC                                                           pese sese sere esee                                  32  7 4   VOLTAGE AND CURRENT                   5                                            33  7 5   RMS TRENDS                                                                                                    34   8 SYSTEM REQUIREMENTS                       eren nennen                                        
5.       7 4 Voltage and Current Waveforms    Elcontral Energy Met SpA Automatic Surve Microvwin       Record           Waveform diagram L1 Record dere TETTE 11 25 33           lal                                           tal                     20 0       Printed an  02 20 2001 12 15 34 Page 1  o     MJFE HFF  lippi                           cies ini Ecc rae TET Od                                                         ic          ch    Rel  MW 1 1 Subject to modifications without prior notice     Page 33 of 35        Ph Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy  E              39 051 6782006                 39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it       75 Rms trends    Elcontral Energy Met SpA Automatic Surve Microvwin               Trend diagram       Pf LL Lo ft       02 20 2001    11 35 33 11 37 03 11 38 33          1                ll lolo     id 0220 2001    11 35 33 11 37 03 11 38 33          11 35 33  37 0 11 38 33                                                        07 20 2001       11 25 33 11 37 03 11 22 33  Printed an  02 20 2001 12 15 12 iP 1                                rekrea             Pe rae TET                                                                                      ch    Rel  MW 1 1 Subject to modifications without prior notice     Page 34 of 35    Via Vizzano  44   40044 Pontecchio Marconi          Italy  Tel   39 051 6782006  Fax  39 051 845544    http   www elcontrol energy n
6.       wf Automatic Sure     1 25 2000 17 55 00     01 25 2000 17 58 00 48                 z  Automatic Sure    01 26 2000 18 01 00 01 26 2000 18 03 00 48 ExXECUT    Eemove       Automatic Surv    01 26 2000 18 04 00 01 26 2000 18 07 00 11 STOPPED   X Automatic sure     1 26 2000 18 06 00 01 26 2000 18 08 00 0              SEW       Automatic Surv    01 26 2000 18 08 00 01 26 2000 18 09 00    READ    D Automatic Surv    01 26 2000 18 10 00 01 26 2000 18 12 00 0 READY Get setup      sort by   Begin time              Time    18 07 11       If you want to delete        or more survey from the scheduler list  select them and press Remove  This  applies also to surveys already executed  Note  however  that if you delete an executed survey from the list   the entire measuring survey will be deleted from the disk also  and all the data it contains will be lost  The  program asks for confirmation before proceeding with the deletion     Automatic surveys can have the following status     e  9 READY      E    RUNNING   e    EXECUTED   e    SKIPPED   e    STOPPED     Survey ready to be executed    Survey being executed    Survey already executed    Survey skipped    Survey aborted before its scheduled end     Tip  Always download the instrument setup manually when configuring a new automatic survey by pressing  the Get Setup button     Rel  MW 1 1 Subject to modifications without prior notice     Page 14 of 35    m Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy         Tel   39 
7.   MW 1 1 Subject to modifications without prior notice     Page 6 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy  Tel   39 051 6782006  Fax  39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it       3 ON Line Mode  3 1 Downloading the Internal Memory of the Instrument    Select File Download  The following window is displayed     Memory Download x     Download Statistics         Records found                          ble  Records done                   surveys found      BEBEHEEE    Expectedtime  00 02 00  Elapsed time  00 00 47       If the memory of the instrument contains valid data  the window will show the number of records found and  other memory usage statistics  To start download  press the Start button  The application will now begin  downloading the configuration of the instrument to be used for the creation of surveys     Downloading configuration    E Please wait            This operation requires a few seconds  When the configuration has been successfully downloaded  the  application starts the download of the actual data  This phase may require up to several minutes  depending  on communication speed and amount of data in memory  The program display a current updated estimate of  the remaining download time  After successful download of the raw data  the program checks for the  presence of different surveys by analysing the time difference between successive records  For instance  if  the interval betwee
8.  40044 Pontecchio Marconi  BO    Italy  am          Tel   39 051 6782006  riconiro Eis                http   www elcontrol energy net    ener g y net sales elcontrol energy it    5 2 THD Measures    This window contains three panes  one for each phase  showing the Total Harmonic Distortion Factor  THD   of V and   with respect to the fundamental and the total rms value     For more details  please refer to the relevant User Manual of the instrument        indcMeasures                        5 3 Harmonic Spectrum    These windows  one for each phase  contain two panes tiled horizontally     e A section shows the numerical values of the measures of V and   and CosPhi from the 1     to the 24   harmonic  plus their DC component  i e  harmonic 0   in both their absolute values and as a percentage  of the fundamental    e The other section shows a graphic representation of the harmonic spectrum of V and   as a percentage  of the fundamental     The size of the two panes can be adjusted by dragging the separation bar between the two sections with the  mouse    To sort the measurements in numerical order  either ascending or descending  click with the mouse on the  title buttons of the relevant column  By default  the values are sorted by harmonic  leftmost column      Moving the cursor to the graphs enables the Point and Measure function  When this function is active  if the  cursor is left for more than two seconds on a given point on a graph  a small box is displayed showing the 
9.  C B bit C 2 stop       Even       Ensure that the serial communication parameters of the instrument match the configuration set on the PC   For more details  please refer to the relevant User Manual of the instrument  Note  An incorrect configuration  of these parameters may cause communication problems between PC and instrument    Tip  It is advisable to always select a high transmission speed in order to minimise communication times  e g   19200 or 38400 baud    The following communication speeds are available  1200  2400  4800  9600  19200 and 38400     2 2 Configuring the Instrument    Select Setup   Instrument to display the Instrument Configuration window     Downloading configuration      Please wait            All the Setup parameters of the MICROVIP 3 Plus can be accessed and set from a single Instrument Setup  window  Select the desired values and press OK to update the configuration on the instrument   For more details  please refer to the relevant User Manual of the instrument     Rel  MW 1 1 Subject to modifications without prior notice     Page 5 of 35    http   www elcontrol energy net  sales elcontrol energy it    Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy    Tel   39 051 6782006            39 051 845544       Instrument setup    2                                  Note  Updating and verifying the configuration may require a few seconds  During this time  the screen  shows the Updating and Verification windows     Uploading configuration       Rel
10.  Help topics     Immediately under the Main Menu 1  a group of icons  which collectively are referred to as the Tool Bars  The  icons are grouped in five sets  Main  Survey Control  Views Control  Measures Trend Control  Recorder  function  and Record Position  You can toggle the display of the icons ON and OFF using the View  command in the Main Menu  The position on the screen of each Tool Bar can be changed as desired  To  move a Tool Bar  place the mouse pointer in the area next to the buttons of the bar you want to move  Now  drag it while keeping the left button of the mouse pressed  The selected bar disengages from its original  position and moves with the mouse pointer  Release the left button of the mouse when the bar is in the  desired position  The bar may be left floating anywhere on the screen or it can be docked to any of the four  edges of the main window     Rel  MW 1 1 Subject to modifications without prior notice     Page 4 of 35    Via Vizzano  44   40044 Pontecchio Marconi          Italy        4            Tel   39 051 6782006          39 051 845544    http   www elcontrol energy net    energy net sales elcontrol energy it    2 Initial Configuration  2 1 Configuring the PC Serial Port    To display the Serial Port Settings Window  select the menu item Setup     Communication  Select the  desired communication parameters and press the OK button to confirm the changes     Communication settings                 38400          Mone    7 bit    1 stop     Oded
11.  in ON Line mode  an instrument must be connected to the RS232 serial port of the PC using the  appropriate cable to display measures  launch surveys  and download the internal memory of the instrument   OFF Line mode is used to analyse previously saved measuring surveys and an instrument does not  necessarily have to be connected to the PC  Only one measuring session can be active at any given time        you cannot execute more than one measuring survey at the same time  It is however possible to analyse  two or more previously saved surveys  even while a survey is being carried out or  executed   The only  limitations are the computing power of the PC and its available memory and disk space    An automatic Scheduler allows you to schedule measuring surveys so that they can be launched and  stopped without the intervention of the operator  You only need to configure begin and end dates and times  of the survey  sampling frequency  setup parameters of the instrument  and a description label  The survey  ocheduler can be accessed at any time to add  amend or cancel measuring surveys    Both the default language and the international conventions for numbers  currency  date and time  etc  can  be changed in real time  When first started  the program self configures itself to use the current international  preferences     1 1 The Main Window    When first started  the program displays the following window        MicroWin       x                   252601          Survey Measures 
12.  measure in that specific point  expressed in the units of measurement selected on the vertical and horizontal  axes of the reference system  In our case  it will be percentage and the harmonic number        MS Spectrum L1 lt Measures gt      fol x     n       Spectrum L2  Measures   5   0  1 n      Spectrum L3 lt Measures gt  iof         1      9 of fnd  2 1  4    g  1  7 5  8     9    8  10  9  11    10    12 al                           A a       13     ae boy a e aa 1415 15 125 18 18  205210220230 24  14 1  of fnd  i 13          14    16  18  1   19  21113  4  20                    1 2    4 8 b    H 9S 1 1112 13 14 15 JB 17               21 22  23 24       5 4 Voltage and Current Waveforms    If the survey and or measure is a waveform  the program lets you display oscillograms of voltage and current  for each phase  The scale factors are automatic for Y axis and fixed for the X axis  corresponding to 80  milliseconds  4 cycles at 50 Hz and 4 8 cycles at 60 Hz   The automatic scale factor keeps the signal at the  maximum resolution  approximately 80  of the full range   by adjusting the range of the display as    Rel  MW 1 1 Subject to modifications without prior notice     Page 20 of 35       Via Vizzano  44   40044 Pontecchio Marconi            Italy  ES  TF   Tel   39 051 6782006                          39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it       necessary  The channel ID label is displayed at the top right  The first 
13.  the memory of the instrument  Together  with the main window  the screen may contain also other secondary windows showing numeric measures  and graphs  These secondary windows are enabled from the View menu or with the Tool bar  According to  the type of measure  numeric or waveform   only the appropriate menu items will be available  For instance   in a numeric type measuring session  the menu item that enables waveform views will not be available  By  default  the program will prepare for a waveform measure session  and will open the following secondary  views automatically  Waveform  Spectrum  Trend and rms  All changes made in the Instrument Setup  window will be applied immediately before the beginning of the measuring  The instrument is interrogated at  fixed intervals  equal to the maximum sampling frequency of 3 seconds  The program saves the records with  the measures on disk so that they can be available later  The memory is cyclic  when a maximum limit is  reached  the older records are overwritten with new data  The total recording capacity is 44640 records   corresponding to about one and half day day with a sampling rate of 3 seconds     Rel  MW 1 1 Subject to modifications without prior notice     Page 8 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy  Tel   39 051 6782006  Fax  39 051 845544    http   www elcontrol energy net    ener y       sales elcontrol energy it          To start the measuring session  press the    button      the co
14.  the survey is momentarily put in pause mode  the window keeps the last displayed values   As only measures are displayed  the indicators are empty  unless you enter the pause mode and use the  recording function     With function Find Record  you can position in whatever point of the measuring survey  By pressing the  button located on the left of the indicators  the following window is displayed     Rel  MW 1 1 Subject to modifications without prior notice     Page 24 of 35    Via Vizzano  44   40044 Pontecchio Marconi          Italy  Tel   39 051 6782006  Fax  39 051 845544  http   www elcontrol energy net  sales elcontrol energy it    Elcontrol    energy          Find Record         Date and Time           Dum        262000       Cancel    2  E  17 29 20      kp    Humber             Find record number       Set date and time of the required record  then press OK  You can also choose a position by record number   To do 50  select the case Find record number  enter the record number and press OK  Then  all windows  with measures and graphs displayed will be updated with the set record     5 6 rms Measures in Spreadsheet format    After selecting View Survey  the screen displays a window of data arranged in spreadsheet format  in which  the rows represent the records of the survey and the columns contain the rms value of the parameter  indicated in the first row          Survey lt 20010215 001 Automatic Survey      kvarh       02 15 2001 111226      0 00 22980 0 00 0 00 0 0
15. 0  02 15 2001 11 12  TE 233 28 EN 000 229 80 11032 80   1480300000 00 16943 50  02 15 2001 DES 21122    214 98 11032 80   1480300000 00 16943 50  02 15 2001      23152 EN 228 17 11032 80   1480300000 00 16943 50  02 15 2001      23214      0 00 22852 11032 80 1480300000 00 16943 50  02 15 2001  ES 23153             229 33 11032 80   1480300000 00 16943 50  02 15 2001      232 34        229 80 11032 80 1480300000 00 16943 50  220 00 BI 000 21777 11032 80   1480300000 00 16943 50    02 15 2001    02 15 2001  02 15 2001    02 15 2001  02 15 2001    Selection            nnn 99447                   CET    1480300000 00  1480300000 00  1480300000 00  1480300000 00    16943 50  16943 50  16943 50  16943 50    11032 80 1480300000 00  11032 80 148030000000  11032 80 1480300000 00  11032 80 148030000000    16943 50  16943 50  16943 50  16943 50  amp     02 15 2001 11 12       227 66        0 00  02 15 2001      223 19          0 00  02 15 2001   11 12  58 026 0 00  02 15 2001              22958 BRUER 0 00       This window displays the same rms measures contained in the modbus ASCII string of all the measurements  for MANUAL and AUTOMATIC surveys  or with the same rms measurements contained in the instrument  memorisation record for REMOTE surveys  please refer to the user manual of the instrument      Red characters are used to signal a communication error with the instrument  In this case  the last values  before the interruption are repeated     5 6 1 Showing a Set of Measures as Gr
16. 051 6782006            39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it       4 OFF Line Mode  4 1 Organisation of Measuring Surveys    Regardless of their           Manual  Automatic or Remote   measuring surveys are organised as follows  A new  directory  called Survey  is created in the installation directory of the program  This directory contains all the  survey files  At this level  a directory is created for each new measuring survey  with a name assigned  according to the following pattern     YYYYMMDD NNN AAAA   A  where     YYYY   year   MM   month   DD   day   NNN   progressive number from 000 to 999  used to identify surveys of the same type carried out in the  same day    e AAAA   A   descriptive label defined by the user     A survey includes     A survey file  with the extension  chr  containing the parameters that define the survey  The program  considers this the document file  This file is very small and it has the same name of the directory in which it  resides     One or more  XXX file  where XXX is a number from 000 to 999  containing the records with the measures or  the waveform samplings  These files  based on the set sampling rate  may reach sizes in the order of the  megabyte    For example  let us assume that the program has been installed in the directory C  ElcoEner MicroWin     Cs           ElcoEner           MicroWin           Survey    t  19990406    000 Manual Survey          19990406 000 Manual survey c
17. 17 55 24 Close         Rel  MW 1 1 Subject to modifications without prior notice     Page 12 of 35    r Via Vizzano  44   40044 Pontecchio Marconi          Italy  FM Fa     Tel   39 051 6782006                 39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    Note that the status bar changes  The status bar shows now the next survey ready to be executed     READY  Automatic Sur ey  001 26 2000 17 59 46             e Repeat the steps above to add other surveys to the list     You can display scheduled surveys at any time  Select the survey that you wish to display and press the  View button  If the survey has not been executed yet  it will be displayed in the Setup window  from where it  can be modified if desired  Otherwise  it will be displayed as if you had selected the File   Open command   described later in this manual  During the execution of a survey  you can enable the secondary views  showing measures and graphs     Scheduled surveys can be sorted according to various criteria  By name  by begin time  by end time  by  number of records or by status  The default sorting order is by begin time  To change sorting order  click on  the corresponding title bar or select the required sorting order in the Sort by combo box     At the set time  the configuration of the instrument is updated with the set values  and the survey starts  automatically  The program window looks like this     s MicroWin    e  x     File Survey Setup Optio
18. 99 minutes and 59 seconds   chosen by the user as sampling rate in the Timing tab  The measures and graphs windows are instead  updated at fixed intervals of 3 seconds  In a Manual survey  the beginning and end time input boxes are  disabled  They will be updated with the beginning and the end of the survey     Surveys can have a virtually unlimited duration  limited only by the space available on the hard disk  Real  time trend measures recording is instead limited  The memory is cyclic  when a maximum limit is reached   the older records are overwritten with new data  The total recording capacity is 44640 records   corresponding to about one and a half day with a sampling rate of 3 seconds     Before launching a Manual survey  proceed as follows     e Set the sampling rate in the Timing tab    e Configure the instrument in the Instrument Setup tab    e Set name and type  numeric or waveform  of the survey in the General configuration tab  By default  the  program assigns the name Manual Survey           To start the measurement survey  press the button in the control window  If changes have been made  in the configuration of the instrument  the new configuration is uploaded immediately before the beginning of  the measures  The Communication indicator      starts flashing  and the secondary windows are updated  with the new measures  The titles of all the windows are also updated with the name of the survey  Please  note that while the communication with the instrument is a
19. Setup Options View Help             Ready En  Re  e       Rel  MW 1 1 Subject to modifications without prior notice     Page 3 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy                  5 Tel   39 051 6782006  F Fax  39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    The window contains a Title  a Main Menu  Tool Bars for fast access to the main function of the application   a Work Area in which are displayed the various Measure Windows of the instrument  Graphs  etc   and a  Status Bar which shows  The status of the Automatic Scheduler  the System Clock and the status of the  serial communication with the instrument     1 2 The Main Menu    e File  Open  print and print preview of a measuring survey file  From this menu you can also download  the internal memory of MICROVIP 3 Plus    e Survey  This command allows you to launch Manual Surveys  configure the Survey Scheduler  and  terminate both Manual and Automatic surveys at any time    e Measures  With this command you can display measures and graphs without saving the data on file  i e   without executing a measuring survey     e Setup  With this command you can configure the serial port of the PC  as well as display  edit and  update the setup parameters of the instrument    e Options  Default language setup    e View  Allows you to toggle on and off the display of Tool Bars and Status Bar    e Help  Displays a window with information on the program and
20. V       Avrg        Rel  MW 1 1    Page 23 of 35    Subject to modifications without prior notice     Via Vizzano  44   40044 Pontecchio Marconi            Italy  Tel   39 051 6782006  Fax  39 051 845544    http   www elcontrol energy net    ener y       sales elcontrol energy it       Avrg  S   Avrg  P   Thd ref  V fnd  L1   Thd ref  V rms  L1   Thd ref    fnd  L1   Thd ref    rms  L1   Thd ref  V fnd  L2   Thd ref  V rms  L2   Thd ref    fnd  L2   Thd ref    rms  L2   Thd ref  V fnd  L3   Thd ref  V rms  13   Thd ref    fnd  L3   Thd ref    rms  L3   Harm V  L1    Harm     of fnd  L1   Harm    L1    Harm 1  of fnd  L1   Harm Cosphi  L1   Harm V  L2    Harm V  of fnd  L2   Harm    L2    Harm 1  of fnd  L2   Harm Cosphi  L2   Harm V  L3    Harm V  of fnd  L3   Harm    L3    Harm 1  of fnd  L3   Harm Cosphi  L3     Note  When you select a harmonic measure of V    or the CosPhi value  you also need to specify the  harmonics order in the corresponding input box     All changes are permanent  i e   the program saves them in the configuration registry so that they can be  replicated in the next work session     5 5 3 Indicators of Current Record and Random Record Search    Just below the main menu a small window displays number  date and time of the record currently displayed  in measures and graphs display windows           00067  01 26 2000 17 29 28    With a survey in progress  indicators are continuously updated with information concerning the record of the  last measuring  If
21. Via Vizzano  44   40044 Pontecchio Marconi          Italy    a pt   2 Tel   39 051 6782006              39 051 845544    3   2        http   www elcontrol energy net    net sales elcontrol energy it       MicroWin    User s Manual   Rel  MW 1 1    Windows 9x and Windows NT 4 0 Data Management Software  for the MICROVIP 3 Plus Handheld Analyser    i   EMEN             ti           hi         eae  T      ns           AN              M             A  d   wv un E   ie ue               5  DS  0    sent   0   9 5                     Een mtem noms     MOM 6e    cad               MO         T            S 1  omy           a              ML     EN   cs ha  omy       ilt   1 ewe A     I             al      n  i       Rel  MW 1 1 Subject to modifications without prior notice     Page 1 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy                  5 Tel   39 051 6782006  F Fax  39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    MicroWin    Windows 9x and Windows NT 4 0 Data Management Software  for the MICROVIP 3 Plus Handheld Analyser    Table of Contents    1 GENERAL DESCRIPTION                     eere                                                                                                                           Re sura 3  1 1 THE MAIN Wy IN                        3  12 THE ic artes                                           4   2 INITIAL CONFIGUBATION                                                           
22. always corresponds to the last 60 x sampling time  seconds     Moving the cursor to the graphs enables the Point and Measure function  When this function is active  if the  cursor is left for more than two seconds on a given point on a graph  a small box is displayed showing the  measure in that specific point  expressed in the units of measurement selected on the vertical and horizontal  axes of the reference system     A dotted line is used to signal a communication error with the instrument  In this case  the last value before  the interruption is repeated  When the communication is resumed  the plotting of the trend will also resume  normally     Rel  MW 1 1 Subject to modifications without prior notice     Page 21 of 35    r Via Vizzano  44   40044 Pontecchio Marconi          Italy        Tel   39 051 6782006      Fax  39 051 845544    http   www elcontrol energy net    ener g y       sales elcontrol energy it         Trend lt Measures gt                  18 52                    mE                          pen            01 726 2000   7 14 06                    17 12 52                     17 14 52    5 5 1 Recorder Function    With the Measures trend window displayed  the Recorder function is also active  The Recorder function  allows you to pause momentarily the real time trend plotting to move to other positions in the recording   Note  however  that the only thing that stops is the automatic scrolling of the graph  Even while in pause  he  program continues to recor
23. aphs    Using the mouse  select one to four parameters  columns  for as many lines as desired  Click the right hand  mouse button and select the Plot rms option from the Selection context menu  The selected measurements  will be displayed as oscilloscope type graphs in a new window that appears  In this context  you can toggle  the plotting mode of the parameters between histogram and trend  If the number of selected records is more  than can be contained on the relevant pane  two buttons at the lower left corner   lt  and  gt   will let you scroll  the display towards the right or towards the left as necessary     Rel  MW 1 1 Subject to modifications without prior notice     Page 25 of 35            Via Vizzano  44   40044 Pontecchio Marconi            Italy           Tel   39 051 6782006         n            39 051 845544    _ http   www elcontrol energy net  ener g y       sales elcontrol energy it    Drawing select data       x     1 00           0  17 27 10 17 28 48  96 0       17 27 10 17 28 48              01 26 2000 C Trend        lt       gt    Drawing      Histogram      of Records    121          This window will display also     e The date of the records displayed in the oscillogram   e The total number of the selected records   e The record sample rate     The recording times of the first and last records shown in the graph are displayed at the extremities of the X   axis of the quadrant  Moving the cursor to the graphs enables the Point and Measure function  Whe
24. cord for REMOTE surveys  please refer to the user manual of the  instrument   XXX is a progressive number from 000 to 999  used to split a very long survey         AXXX  File with the measurements of V and   and CosPhi from the 1    to the 24  harmonic for each  phase  plus the absolute value of their DC components  XXX is a progressive number from 000 to 999   used to split a very long survey    e  PXXX File with the measurements of V and   and CosPhi from the 1   to the 24  harmonic for each  phase  plus the value of their DC components as                          XXX is a progressive number from 000  to 999  used to split a very long survey    e  WXXX File with the waveform samplings of V and   for each phase  XXX is a progressive number from  000 to 999  used to split a very long survey  This file is generated only if the measuring survey is  waveform     A Tab  ASCII 09  is used as a field separator character     In the first three files  each row corresponds to a record in the measuring survey  while each column contains  the value of the parameter indicated in the first row  In the sampling export file  each record of each phase is  saved on two lines  The first line corresponds to the voltage  and the second line corresponds to the current     WARNING  For each campaing  the export files are always created in the same directory and with the same  name  So  when an export is split into more files  the last export overwrites the previous one  If necessary   move the pre
25. ctive  all data entry boxes in the Control window  are disabled     E  To stop the measuring survey  press the    button in the control window  The control buttons disappear to  indicate that the survey has been completed  A new view is enabled  Records  in which you can display the  measures in spreadsheet format     Rel  MW 1 1 Subject to modifications without prior notice     Page 10 of 35         Via Vizzano  44   40044 Pontecchio Marconi            Italy           Tel   39 051 6782006    i f Fax  39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    When you close the Control window  all secondary views are also closed with it     3 3 3 Automatic Survey    Automatic survey must first be set up  This operation is carried out with the Automatic Survey Scheduler  To  display the Scheduler  select Survey Scheduler from the menu   Note  The Scheduler remains always active  even when it is not displayed on screen     survey scheduler                                Get setup    Sort by   Begin time     Date    01 26 2000 Time    17 51 15 Close         Automatic surveys are managed and scheduled from this window  The window shows a sorted list in which  each line represents a different survey  For each survey  the following information is displayed  Name  begin  date and time  end date and time  the number of records in the survey  and the current status  1     READY   EXECUTED  etc  This information is updated in real time     To add a ne
26. d the measured values until the measure or the measuring survey 15 stopped  explicitly     To interrupt the plotting of the measure trend  press the pause button in the Tool bar                           The Tool bar changes and the following functions are enabled  Fast Rewind  Normal Rewind  Playback   Play  Normal Forward and Fast Forward     I4   4  4 T HH      gt  gt    gt t    To restart the plotting of the measure trend  press pause again   If other secondary views are displayed together with the trend window  these will be linked to the Recorder    function  i e  if the trend window is paused  the other windows will also be paused  When Pause is on  the  secondary views display the first record in the display range of the measures trend window     5 5 2 Setting the Number of Channels and Associating a Parameter to a Channel    The number of channels or tracks and the parameter associated to each channel can be configured as  desired using the Setup Trend menu item     Rel  MW 1 1 Subject to modifications without prior notice     Page 22 of 35         Via Vizzano  44   40044 Pontecchio Marconi          Italy  Tel   39 051 6782006  Fax  39 051 845544  http   www elcontrol energy net  sales elcontrol energy it    The program can plot a minimum of one and a maximum of four channels  To enable a channel  tick the  Enable selection box  To change the parameter associated to each channel  select it from the combo box of  the relevant channel  The parameters available are     
27. ed in Measures Menu    3 3 2 Manual Survey    To display a Manual survey  select Survey Manual from the menu  After downloading the configuration of  the instrument  the program will show the following windows     Rel  MW 1 1 Subject to modifications without prior notice     Page 9 of 35    r Via Vizzano  44   40044 Pontecchio Marconi          Italy    ii Tel   39 051 6782006      Fax  39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    SA MicroWin    e  x     File Survey Setup Options View Window Help    seale  Melly maje           p n    pr                   Spectrum Li   Manual              jys _    tart  Sto          Spectrum L2 lt Man al                      As you can see  the display for surveys is virtually identical to the display for measures  described in a  previous paragraph  The Control window  however  now contains a third tab  Timings in addition to  Instrument Setup and General  Timings allows you to configure both the length of the survey and the timing   or sampling  of data acquisition  By default  the program will prepare for a waveform measure session  and  will open the following secondary views automatically  Waveform  Spectrum  Trend and rms  These  secondary windows are enabled from the View menu or with the Toolbar  According to the type of measure   numeric or waveform   the appropriate menu items will be enabled or disabled     The data is saved on file at regular intervals  in the range from 3 seconds to 
28. et    ener y net sales elcontrol energy it       8 System Requirements       100  IBM compatible PC with Pentium processor or equivalent running at 133MHz or above    e Microsoft Windows 95 OSR2 or above  Windows 98 or Windows      4 0 with Service Pack    or above       16 MB of        memory for Windows 95 98  32 MB recommended       24 MB for Windows NT  32 MB  recommended     e SVGA at a resolution of 800x600 and 256 colours    e 160 MB of available space on the hard disk  for the installation of the program and the execution of a  minimum number of measuring surveys    e CD ROM drive    e Pointing device or mouse     Note  All names are registered trademarks of their legitimate owners     Rel  MW 1 1 Subject to modifications without prior notice     Page 35 of 35    
29. existing surveys  checks that the survey end time has not occurred yet   etc  If you enter a survey begin time later than the survey end time  the program corrects the survey end  time and makes it equal to the survey begin time  The same happens if you enter a survey end time  which 15 earlier than the survey begin time     Instrument setup   Automatic Survey x     Timings   Instrument setup   General                             Thu  Jan 27 2000            January 2000                  ved Thu  te       c        B 4 5 b T 0 9   oo      11 12 13 14 15 16  Ve Ste              ef 25 CH 25 29 30  a fel B 3 4 5 b         Today  26 01 00    wen               e Set the sampling rate in the Timings tab  The data is saved on file at regular intervals in the range from     seconds to 99 minutes and 59 seconds  chosen by the user as sampling rate in the Timings tab    e Configure the instrument in the Instrument Setup tab    e Set name and type  numeric or waveform  of the survey in the General configuration tab  By default  the  program assigns the name Automatic Survey     e Press OK to confirm and commit the survey to the schedule list  At this point the survey is ready to be  executed     Begin     wed Jan 26 2000 x    51                               sample rate          5            survey scheduler    Begin time      Automatic Surv    01 26 2000 17 56 00 01 26 2000 17 58 00        0 READY                           Get setup    Sort by   Begin time     Date    01 26 2000 Time    
30. he corresponding button CH1  CH2  CH3               e Select the area for which you want to change the colour by pressing one of the buttons in the Color  Selection group  A window similar to this will appear     Color    E oe         E   S  Bee  EI 1       E NEN NL NI                                                                                               e Select the desired colour and press        e Repeat the procedure for all areas for which you want to change the colour        Rel  MW 1 1 Subject to modifications without prior notice     Page 27 of 35      m Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy      Tel   39 051 6782006  Fax  39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    e When you have completed the procedure  press OK in the Colour Setup window  All changes will be  applied to the original graph     Rel  MW 1 1 Subject to modifications without prior notice     Page 28 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy  Tel   39 051 6782006  Fax  39 051 845544    http   www elcontrol energy net    ener y       sales elcontrol energy it       7 Printing Measures and Graphs    The program allows you to print  on monochromatic and colour printers  several pages with the rms  measures and graphs  for hard copy filing  These pages can be printed in landscape or portrait orientation   as desired  A print preview function lets you inspect the page on screen before actual printing  The pr
31. hr     19990406 000 Manual Survey 000     19990407 000 Manual Survey 001      19990408 000 Manual Survey 002    t  19990409 000 Manual Survey           19990409 000 Manual Survey chr     19990409 000 Manual Survey 000        19990410 000 Manusal Survey O001         19990110 000 Automatic Survey      19990110 000 Automatic Survey chr    19990110 000 Automatic Survey 000    19990111 000 Automatic Survey 001    19990112 000 Automatic Survey 002    19990113 000 Automatic Survey 003             Rel  MW 1 1 Subject to modifications without prior notice     Page 15 of 35    http   www elcontrol energy net  sales elcontrol energy it    Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy              39 051 6782006    l Fax  39 051 845544    4 2 Displaying and Processing a Measuring Survey    To open and display a measuring survey file  select the menu item File Open  In the first window  you select  the directory that contains the required measuring survey     J 20010220 000 Automatic Survey  20010220 000                  Survey  _  20010220 001 Manual Survey       Double click the directory of the desired survey  A second window opens  Select the desired file and click on  Open          20010220 000 Manual Survey a    20010220 000            Survey chr         The      with the measuring survey is now loaded in memory and the following windows open      screen     Rel  MW 1 1 Subject to modifications without prior notice     Page 16 of 35    Via Vizzano  44   40044 Pontecchio Ma
32. inters  are managed following the standard Windows criteria     The Print Preview and Print function refer to the currently selected window  i e  the window on top  that has  the active Title Bar  To print a window  first select it  either by clicking on it  or with the Windows command  from the Main menu     Note  When there is a measuring survey in execution  you can display a Print preview or print an rms Trend  only if the Recorder is on pause     The following pages show a few examples of hard copy printouts     Rel  MW 1 1 Subject to modifications without prior notice     Page 29 of 35    Ficontrol    energy          Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy  Tel   39 051 6782006  Fax  39 051 845544  http   www elcontrol energy net  sales elcontrol energy it       7 1 Measuring Survey Information       Rel  MW 1 1                    doe cries ini Ecc rame TET Od ed   Od ed ey ch    Subject to modifications without prior notice     Page 30 of 35    Elcontrol Energy Met SpA Automatic Surve Micrevin  Survey report  wow             Instrument setup   Version   CT Ratio   Harmonic Analysis      50Hz   Print         Via Vizzano  44   40044 Pontecchio Marconi            Italy    i m  am   Tel   39 051 6782006  2             39 051 845544    http   www elcontrol energy net    ener y net sales elcontrol energy it       7 2 rms Measures in Spreadsheet format    T      ow wu roni ros rt     NM      NH H h h                    uja oo ofa 32 afa           aja a apa    
33. n this  function is active  if the cursor is left for more than two seconds on a given point on a graph  a small box is  displayed showing the measure in that specific point  expressed in the units of measurement selected on the  vertical and horizontal axes of the reference system     5 6 2 Exporting a Set of Measures to a Text File    To export data  select by means of the mouse the desired records  Click the right hand mouse button and  select the Export    option from the Selection context menu  The selected measurements will be exported  automatically     Measures export x            Expor setup         All    Range    See paragraph 4 3 for further details     Rel  MW 1 1 Subject to modifications without prior notice     Page 26 of 35    http   www elcontrol energy net  sales elcontrol energy it    Via Vizzano  44   40044 Pontecchio Marconi  BO    Italy              39 051 6782006    l Fax  39 051 845544    6 Customising the Colour Scheme of Graphs    To change the default colours used in a graph  right click anywhere on the graph and select the Options   Colors menu item  The window that appears allows you to select the colours of all the different areas of the  oscillogram  such as  Panel colour  Plot colour  Pen colour  etc  Note  The colour setup window shows the  same number of channels or tracks  1 to 4  displayed in the graph being configured     Colors settings     100 0       100 0    CH2     100 0      100 0       e Select the channel to configure by pressing t
34. n two records is two seconds  all the subsequent records with the same time interval will  be saved in the same survey  If and when this interval changes  the current survey is closed and another         is opened automatically  This approach allows the program to identify the various different survey queued in  the memory of the instrument  At the end of the procedure  the screen shows the number of surveys found  If  desired  the MicroWin allows you to clear the internal memory of the instrument  To do so  press the Clear  button    Note  After clearing the memory  all surveys contained in the instrument will be lost and can no longer be  recovered    Downloading can be stopped at any time by pressing the Abort button  To leave the Download window   press Close     3 2 Displaying the Measures    To display the measures of the instrument  select the Measures menu item  After downloading the  configuration of the instrument  the program will show the following windows     Rel  MW 1 1 Subject to modifications without prior notice     Page 7 of 35    r Via Vizzano  44   40044 Pontecchio Marconi          Italy    ii Tel   39 051 6782006      Fax  39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it             SA MicroWin    e  x   File Survey Setup Options View Window Help  saelas  melo            wf  n    gt        Measures       Instrument setup   General      PT Ratio CT Ratio                      i                      The Main Menu cha
35. nges to the structure described below  and the relevant Tool Bar icons are enabled      3 2 1 Measures Menu    e File  Open  close  print and print preview of a measuring survey file  This menu allows you also to  download the internal memory of the MICROVIP 3 Plus    e Survey  This command allows you to launch Manual Surveys  configure the Survey Scheduler  and end  at any time both Manual and Automatic surveys    e Setup  This command allows to configure the serial port of the PC  display  edit and update the Setup   parameters of the instrument  as well as configure the rms measures trend in real time    Options  Set colours for the different graphs  waveform  harmonic spectrum  trend  etc      View  Allows you to toggle on and off the display of Tool Bars and Status Bar    Window  Arranges the windows on screen or brings a specific window on top    Help  Displays a window with information on the program and Help topics     These items will be explained in detail in the following paragraphs     Measures display can be configured as follows  A main Control window contains two configuration tabs   Instrument Setup and General  Instrument Setup is identical to the one described in Configuring the  Instrument  General is used to set both a descriptive label  or title  for the current measuring session  and  the type of measure     numeric  rms  or waveform  This window contains also a third read only option  which  is selected if the numerical survey opened was downloaded from
36. ns View Window Help  8     8                        1                    E                0272072001  11 35 33       20010220 000 Automatic Survey lof x                      3      stan  Stop    Timings   Instrument setup   General                    Begin    Tue  Feb 202001   Tue  Feb 202001  v                              Sample rate       55    05 EN           Survey scheduler       Measuring          Begin time  E  Automatic Surv    02 20 2001 11 35 00 02 20 2001 11 38 00 1 RUNNING    Wily   Get setup      Sort by   Begin time    Date    02 20 2001 Time    11 35 36 Close    Ready RINSE De e e        The survey scheduler status is updated  status RUNNING  and the survey being executed is indicated by the  icons    and   flashing      sequence     The status bar shows now the name of the survey being executed     PTE ee           E  To stop the measuring survey before its scheduled end  press the button in the control window  The  control buttons disappear to indicate that the survey has been completed  A new view is enabled  Records   in which you can display the measures in spreadsheet format  The scheduler tags STOPPED surveys with    the  amp  icon  In this case  the Control window remains open in the client area of the main window   Upon reaching the scheduled survey end time  the survey is ended automatically  and the control window is    closed  The survey scheduler indicates the status of the survey as    EXECUTED        Rel  MW 1 1 Subject to modifications without 
37. ntrol window      changes have been made     the configuration of the instrument  the new configuration is uploaded immediately before the beginning of  the measures  The Control window changes  The Communication indicator      starts flashing  and the  secondary windows are updated with the new measures        Measures   jo x     ew  Starti stop    Measuring    Z         Please note that while the communication with the instrument is active  all data entry boxes in the Control  window are disabled     E  To stop the measurement session  press the E button in the control window  In the control window  the          star key and the data entry boxes are re enabled  It will remain small  You must change its size manually to  access the setup tabs     When you close the Control window  all secondary views are also closed with it     3 3 Carrying Out Measuring Surveys    A measuring survey is a binary file containing  sequentially  all the measures requested to the instrument   Measuring surveys can be performed in three different modes     e Manual  The user starts and stops data acquisition manually   e Automatic  The user configures one or more surveys in a survey list  A component of the program   called Automatic Survey Scheduler monitors the status of this list  to start and stop automatically the    surveys listed as required   e Remote  Measuring surveys carried out directly by the MICROVIP 3 Plus     3 3 1 Measuring Survey Menu    This menu is identical to the one describ
38. prior notice     Page 13 of 35    Via Vizzano  44   40044 Pontecchio Marconi          Italy  Tel   39 051 6782006  Fax  39 051 845544    Elcon        http    Icontrol  t  energy nef       survey scheduler       44 ExECuUT       End time  0122622000 77 56 00 01 26 2000 17 58 00       w Automatic Surv                   Set    Get setup                  sw  eee       e      Close    Date    01 26 2000 Time    18 11 48    sort by   Begin time           When the survey scheduler is programmed and ready to execute an Automatic survey  there could arise  problems if you decide to launch a Manual survey or download the internal memory of a MICROVIP 3 Plus   The criteria adopted to solve this type of conflict is the following  Priority is always given to the Manual  measuring survey or to the memory download operation  and it is the responsibility of the operator to stop  the survey or abort the download  Only in the event of a measuring session  that has a lower priority  can the  program stop it before launching an automatic measuring survey     In case of overlap conflicts  five minutes before the scheduled beginning of an automatic survey  the Survey  scheduler title bar will start flashing  indicating the cause of the conflict and the time remaining to solve it  If  the problem is not solved in the time available  the Survey scheduler will tag the survey that could not be    executed with a SKIPPED icon X        survey scheduler       Date     01 26 2000    Close    Begin time   
39. rconi            Italy  Tel   39 051 6782006  Fax  39 051 845544             http   www elcontrol energy net  ener g y net sales elcontrol energy it     MicroWin    e  x   File Survey Setup Options View Window Help  saose  e c e                  B  00001 02 20 2001  11 31 57         20010220 001 Manual Survey    Timings   Instrument setup                         Begin     Tue  Feb 20 2001       EXECUTED                   The rules already described apply to the display of a measuring survey also when in OFF Line mode  The  control window is created with all fields disabled and set read only  No control buttons are available  Based  on the type of survey selected  numeric or waveform   the program opens the appropriate windows showing  measures or graphs  A new view is available  with the absolute measurements shown in spreadsheet format   where the rows represent the records of the survey and the columns contain the rms value of the parameter  indicated in the first row     When in OFF Line mode  it is not necessary for an instrument to be connected to the serial port of the PC     Special attention must however be paid to any scheduled automatic surveys as they will be executed  automatically at the set time     4 3 Exporting Measures to a Text File    All data recorded in a measuring survey can be exported to a text file that can later be imported by other  data processing applications  such as Excel or similar     To export a file  select File Export from the menu  A windo
40. track corresponds to the voltage  and  the second track corresponds to the current     Moving the cursor to the graphs enables the Point and Measure function  When this function is active  if the  cursor is left for more than two seconds on a given point on a graph  a small box is displayed showing the  measure in that specific point  expressed in the units of measurement selected on the vertical and horizontal  axes of the reference system  In this case  it will be Volts or Amps and the number of milliseconds     WA Waveform L1 lt Measures gt  Bl ey ae    Z       Waveform L2 lt Measures gt   loj x             Waveform L3 lt Measures gt                          Iv       5 5 rms Trends    The trend function lets you track the changes in time of rms values  The figure below show the default  window showing four channels  voltage  V   current  1   active power  P  and power factor  PF  for the three  phases    In this case also  the scaling for the Y axis is set automatically to keep the signal at the maximum resolution   80  of the full range   The scale of the X axis  instead is fixed  and corresponds to 60 samplings   expressed either as the sampling interval or the instrument query interval  In this case  the instrument is  queried every 3 seconds  so the display window will be 60 x 3 2 180 seconds  3 minutes      When the last value plotted goes past 95  of the time window displayed  the tracks scroll to the left  erasing  the older data  This means that the data displayed 
41. vious files to another directory before exporting the survey     Rel  MW 1 1 Subject to modifications without prior notice     Page 18 of 35    Via Vizzano  44   40044 Pontecchio Marconi          Italy  Tel   39 051 6782006  Fax  39 051 845544  http   www elcontrol energy net  sales elcontrol energy it    Ficontrol    energy             5 Measures and Graphs Display Windows  5 1 rms Measures    This window shows the main rms measures  both three phase and for each individual phase  such as   Voltage  V   Current  1   Active power  P   Power factor  PF   Reactive power       Apparent power  S    Frequency  f   the four positive and negative active and reactive power meters  Wh   Wh   varh  and varh     the averages and the peaks of the three phase or single phase active  reactive and apparent power   Depending on the current survey type  will be displayed one of the following views     rms lt Measures gt                 Three phase    V          o E              zb               5          Waveform Survey    rms lt Measures gt         Three                                  lt                                                                r  Average                   1      e       rms MANUAL or AUTOMATIC Survey         rms  20000703 000 MICROVIP3 Plus 3Phase rms             Three phase    1      m      lt         1                                              rms REMOTE Survey    Rel  MW 1 1 Subject to modifications without prior notice     Page 19 of 35    m Via Vizzano  44  
42. w Survey press Add   Note  The first time that a survey is added  the configuration of the instrument is downloaded automatically     No error signal is displayed  however  if the instrument is not connected or does not respond  The program  sets up a default configuration and continues  Immediately after  the Survey Setup window is displayed     Instrument setup   Automatic Survey         Timings   Instrument setup   General                 weal Jan 26 2000      Begin       DI Jan 262000      17 51 52     17 51 52      Sample rate       55    00 02                       As you        see  this window is similar to the Manual survey Control window  This has been designed       purpose to reduce learning times  The only difference is that the input boxes for the survey begin and end  times are now enabled     To schedule an automatic survey  proceed as follows     Rel  MW 1 1 Subject to modifications without prior notice     Page 11 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy    m  am   Tel   39 051 6782006  2             39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it    e Set the times that you want the survey to begin and end in the timings tab  The minimum duration of a  measuring survey must be at least equal to the set sampling time  There is no maximum  The program  checks the settings for errors or timing conflicts  and issues a warning if necessary  For instance  the  program checks for overlaps with 
43. w is displayed in which you can select whether to  export the entire file  All  or a specific Range     Measures export         Export setup       To export the entire survey  select All and press Export  To export a section of the survey only  select  Range  enter the first record of the range to export in the From box  and the last record of the range to  export in the To box  and press Export    Tip  Use the spreadsheet view  View Records  to see the number of records of the desired export range     Rel  MW 1 1 Subject to modifications without prior notice     Page 17 of 35    Via Vizzano  44   40044 Pontecchio Marconi            Italy     n    f   i Tel   39 051 6782006             39 051 845544    http   www elcontrol energy net    ener g y net sales elcontrol energy it            Export setup            All    Range    During export  the screen shows the progress of the operation  The Export button is replaced by an Abort  button  This operation may require up to several minutes  based on the type of survey and its length  The  procedure can be stopped at any time by pressing the Abort button     The export files are created in the same directory containing the measuring survey  and consist of four  different file types  identified by their extension                  File with the same rms measures contained in the modbus ASCII string of all the measurements  for MANUAL and AUTOMATIC surveys  or with the same rms measurements contained in the  instrument memorisation re
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
X350 Sync 3.5 User Manual  Samsung Galaxy Tab 3 Lite (7.0) Керівництво користувача  バスブロックバー取扱説明書    Sony SAL1650 camera lense  OSCILLOSCOPE PROBE LF-20A / LF-60A / LF-100A  PERFORMER PLUS USER'S MANUAL    Copyright © All rights reserved. 
   Failed to retrieve file