Home
Manuale 122 (GB)
Contents
1. EC GPs Once the plugs D have been A6 Connection for hose 3 drainage removed they should not be used N B Hoses 1 and 2 for the again decalcification system must always be C Hot water connection filled with water Therefore this Use a 90 cm flexible stainless System must not be emptied during steel hose installation Cold water connection CA Electrical connection for the Use a 90 cm flexible stainless IPX4 sauna box with PG13 5 steel hose cable clamp Connection for hoses 1 and 2 for the sauna unit and for hose 5 for the shower head with nebulizer Connection for hose 8 for the vertical massage and for hose 10 for the back massage Cleaning of the taps with filter Connection between the electrical cable coming from the dome and cable coming from the power unit Connection for hose 4 boiler lt 7 teuco ENEON SERVAR OUS MODELSITT I ONLY FOR ARTICLES 122 STEAM 122 EASY EQUIPOTENTIAL EARTHING CONNECTION Connect the metal parts of the ca bin with the yellow wire as indica ted in the diagram There is a terminal at point 7 for the equipotential connection of the other grounds present in the room N B If one of the components indi cated in the diagram is not present on the model purchased insulate the corresponding fast on FAST ON INSULATED EMERGENCY TAP ART 122 EASY SHOWER
2. are aligned N B After adjusting the slide assembly lock the nuts D in place inserting the covers K with the inner wings facing outwards 17 tEUCO Bag B screws for step 13 FIXING THE SHOWER TO THE WALL Position the shower cabin against the wall To fasten the unit lift the sauna dome and place a spacer between the track and the dome itself Insert the bracket T into the plate P which has already fastened to the wall and onto the screw C on the shower cabin Tighten the bracket T with the nut and washer C2 Move the shower cabin next to the wall position the bracket T1 on the frame drill a hole in the wall insert the screw with the fischer and fasten the bracket T1 to the frame tightening the screw with the washer C1 Remove the spacer and center the dome on the shower cabin see fig 8 Open the top of the dome by removing the screws C3 fasten the bottom of the dome with the nut and washer C2 onto the screw C located on the shower cabin Repeat this last procedure on the other side with the other nut and washer C4 Close the top of the dome and fasten in place with the screws which were removed earlier Fit the side panel by sliding it down from the top so as to hook it onto the support brackets on the frame Fix the side panels by tightening the towel knob with the screws and washers C3 insert the trim
3. 17 tEUCO Right side Model Left side Model Measurements in mm C Hot water connection for 42 tap fittings N B Installation must take place once floors and F Cold water connection for tap fittings 12 walls are completed O Connection for drainage pipe recessed in floor 142 The room in which the sauna is to be installed CA Electrical connection for sauna IPX4 should be at least 230 cm for the model that can be box with cable press PG 13 5 inspected at this height Siphon The electrical installation must comply with the safety regulations for bathroom installation as described in the enclosed user s manual ELECTRICAL ART 122W 122R HYDRAULIC CHARACTERISTICS CHARACTERISTICS Delivery Delivery Multifunctions Sauna Sauna and Multifunctions aE ue Capacity Pressure Pressure Kw I min Min Max Min Max Min Max 2MEX18 1 2 112 2NEX18 Before connecting the appliance make sure that the voltage indicated on the rating plate is the same as that of the electric mains i information and characteristics shown do not bind Teuco Guzzini Spa who reserves the right to make any modifications it retains necessary without any prior waming or notice of replacement 18 lt 7 teuco ASSEMBLING THENCABINGT TIN All screws and accessories which are necessary for installation are in the appropriate box Bag A with s
4. C3 Remove the screw from the end piece on the bottom track Apply silicone to the end of the track at the point indicated Position the panel B on the shower base and fasten it to the track with the screw and washer re moved earlier C Insert the screws and washers C1 into the frame of the back shower panel and into the shower base without tightening them 17 tEUCO Fasten the panels A and B to gether with the screws nuts and washers C3 Tighten the screws C1 which have already been inserted into the shower base Consult the attached manual for in structions on how to install the taps Bag A screws for phases 4 5 INSTALLING THE SIDE PANEL Apply silicone to the groove in the track in the area corresponding to the position of the side panel and end cap Slide the side panel B1 into the bottom track Position the threaded pins on the support for the side panel B1 so that they match up with the holes on the back panel B if necessary use a 2 5 Allen wrench Check that the seal fits properly along the entire length of the side panel B1 support Fasten the side panel B1 to the back panel B by tightening the nuts with washers C 42x60 SNS o 5 17 tEUCO INSTALLING THE TOP TRACK Remove the screws from the ends of the top track Insert the track onto the ends of th
5. SUPPORT ROD SHUT OFF VALVE FOR THERMOSTATIC MIXER MIXER OR THERMOSTATIC MIXER DIVERTER FRAME FOR BACK PANEL WITH TAPS FRAME FOR BACK PANEL WITH SEAT USING THE SHOWER FOR THE FIRST TIME Once all of the connections are made and before fastening the ca bin to the wall remove all of the adhesive tags Run the regeneration and a sauna cycle following the instructions contained in the attached user s manual Make sure that there are no water leaks in the connections made and that everything operates normally ONLY FOR ARTICLES 122 STEAM 122 EASY If there is no power to the sauna system after the electrical connec tion has been made to the mains press the red button on the power unit box If the control panel displays an er ror message all the leds will blink the first time the sauna system is turned on remove the grate and press the button for resetting the thermostat indicated with the ar row FITTING THE INSPECTION DOOR Position the shower cabin against the wall Close the door and make sure that the magnetic seals are aligned along the entire length of the door In the event that the seals do not come together as in case A or case B adjust the top slide assembly indicated by the arrow Lift the door grasping it by the supports Tighten the screw D until the magnetic seals
6. crews for steps 1 3 3a 3b FIXING THE UNIT TO THE WALL Drill the appropriate hole for fixing the unit to the wall using the measurements indicated in the diagram and then fasten the bracket P with the appropriate screw and fischer INSTALLATION INSTALLATION ON THE RIGHT ON THE LEFT POSITIONING THE SHOWER BASE Place the bathtub in the corner of the bathroom and make sure it is on a level by using the appropriate adjustable feet Prepare the drain connection using the trap supplied with the hose for the drain position it as indicated in the diagram N B The unit must be installed af ter the floor and walls have been fi nished 17 tEUCO ASSEMBLING THE BACK PANELS Place drain cover on the drain in the shower base Move the shower base away from the corner in order to proceed with the subsequent assembly steps Remove the screws C1 from the end of the bottom track Apply silicone to the end of the track as shown in the diagram Place the back panel A with the seat onto the shower base and in sert the support onto the end of the bottom track Fasten the panel A to the track with the screw and washer C1 re moved earlier Insert the screw and washer C1 into the back panel to fasten it to the shower base Bag C plastic accessories Fit the rubber doorstop M onto the panel B and fasten it with the screw and washer
7. e supports and fasten it to the back panels using the screws and washers C that were removed ear lier Tighten the screws on the ends of the side panel support B1 as in dicated in the diagram APPLYING SILICONE Apply a NEUTRAL NON ACETIC silicone so as to prevent water from leaking between the back panel and the bathtub 17 tEUCO MOUNTING THE DOOR Assemble the handles onto the door supports using the screws provided C3 Insert the track cover V and the finish end pieces Y into the top and bottom tracks Turn the nut D until it is flush with the top of the C screw Mount the door hooking the wheels P with the spring support onto the lower track Lift the door up so that the top wheels N slide into the track ONLY FOR ARTICLES 122 STEAM 122 EASY MOUNTING THE TWO CLIMATE SAUNA DOME UNTO THE SHOWER CABIN Place the adhesive steam seal onto the top edge of the back panels Insert the screw C into the appropriate hole on the back shower panel Position the sauna onto the shower cabin making sure not to damage the water and electrical hoses atta ched to it To center the sauna insert the front flap into the groove on the top track making sure that the seal G is turned toward the inside of the shower cabin n Blue 1 Yellow Green eu
Download Pdf Manuals
Related Search
Related Contents
"user manual" Developer Guide - pdf User`s Manual 取扱説明書 - M ダウンロード(PDF 0.96MB) LAVADORAS AUTOMÁTICAS EKT Hei-Con / Hei-Con G Manual de Instalação DPS Printer 2.1 CMS Software for NDR-BA2208, NDR-BA2416, NDR SAP 13 « A me suivre tu passes… Copyright © All rights reserved.
Failed to retrieve file