Home
Christie Duo Stacking Frame
Contents
1. 17 Specifications Torque Requirements CHAISTIE Bolt Type Value M8 x 20 mm 30 in Ib M8 x 60 mm 30 in Ib M12 x 100 mm 50 in Ib 18 Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 Corporate offices USA Cypress ph 714 236 8610 Canada Kitchener ph 519 744 8005 Worldwide offices United Kingdom ph 44 118 977 8000 France ph 433 0 1 41 21 00 36 Germany ph 49 2161 664540 Eastern Europe ph 36 0 1 47 48 100 Middle East ph 4971 0 4 299 7575 Spain ph 34 91 633 9990 Singapore ph 65 6877 8737 Beijing ph 86 106561 0240 Shanghai ph 86 21 6278 7708 For the most current technical documentation please visit www christiedigital com Japan ph 81 3 3599 7481 South Korea ph 82 2 702 1601 CHRISTIE
2. Repeat steps 1 to 7 to install the second hard drive tray on the top projector shelf If you need to tilt the hard drive tray up or down loosen the M8 bolt in the enlarged slot and slide the hard drive tray up or down When your adjustment is complete tighten the M8 bolt Secure the Duo Stacking Frame to the Floor Secure the feet to the floor with the appropriate hardware not provided Christie Duo Stacking Frame Installation Manual 15 020 101055 01 Rev 1 03 2013 Installation and Setup Attach the RealD XL Shelves A WARNING Two people are required to complete this procedure If required attach the RealD XL shelves 1 Install 2 RealD XL plates on each RealD XL shelf a Align the top 2 mounting holes of 1 RealD XL plate with the 2 locking t nuts on the inside edge of the shelf bracket If necessary slide the locking t nuts until they align correctly Loosely secure the RealD XL plate in position with 1 M8 bolt 1 lock washer and 1 flat washer in each of the 2 mounting holes Thread the M8 bolt into the locking t nut from step a Repeat steps a and b to install the second RealD XL plate on the opposite side of the RealD XL shelf Tighten the 2 M8 bolts from step b Repeat steps a to d to install 2 RealD XL plates on the second RealD XL shelf 2 Install the bottom RealD XL shelf a e Place the RealD XL shelf on top of the front of the bottom projector shelf Align the bottom 2
3. lll nns 15 Secure the Duo Stacking Frame to the Floor 0 0 o oo 15 Attach the RealD XL Shelves elles 16 pam AA 17 Physical scm isa Hagens P SOR dus dr dL x teehee ds od dudo e Web Lee yaa dug nest 17 Torque Requirements llle rns 18 Christie Duo Stacking Frame Installation Manual i 020 101055 01 Rev 1 03 2013 CHRISTIE Introduction Use the Christie Duo Stacking Frame to vertically stack two projectors so both projector lenses point directly at the screen The Christie Duo Stacking Frame includes an off set duct to assist with heat extraction from the lower projector two adjustable external hard drive trays two adjustable touch panel controller TPC mounts and two shelves for mounting RealD XL boxes This document provides information and procedures for installing the Christie Duo Stacking Frame For information about setting up your projectors and aligning images see the Christie Duo User Manual P N 020 100978 xx The Christie Duo User Manual can be downloaded from the Christie web site www christiedigital com Requirements 2 port windows or 1 shared extra tall port window 2 identical Christie projectors CP2220 CP2230 CP4220 or CP4230 key delivery message KDM for each projector e 1 Christie integrated media block I MB for each projector Solaria software release version 3 1 0 3 or later Technical Support North and South America
4. 1 800 221 8025 or tech support christiedigital com Europe Middle East and Africa 44 0 1189 778111 or techsupport emea christiedigital com Asia Pacific tech asia christiedigital com Christie Duo Stacking Frame Installation Manual 1 020 101055 01 Rev 1 03 2013 CHAISTIE What s In The Box Make sure you have all of the items listed below before installing the Christie Duo Stacking Frame 1 Right Front Post 1 Left Front Post 2 Hard Drive Trays 1 Hardware Bag 42 M8 x 20 mm bolts 2 spare 42 flat washers 2 spare 42 lock washers 2 spare 14 M8 x 60 mm bolts 2 spare 14 M12 x 100 mm bolts 2 spare 1 Bottom Projector Shelf I 10 t nuts 2 spare 4 M6 x 35 mm bolts 1 Roll of Red PVC Tape y l not required for the 2 Foot Adjustment Tools ej installation not required for the i l installation 2 TPC Supports SS 1 Right Rear Post I les 3 1 Left Rear Post 4 RealD XL Plates 1 Pair of Binoculars not required for the installation 2 RealD XL Shelves 1 Christie Duo User Manual not required for the installation 1 Front Brace 2 Side Braces Christie Duo Stacking Frame Installation Manual 3 020 101055 01 Rev 1 03 2013 CHRISTIE Installation and Setup This section provides information and procedures for installing and positioning the Christie Duo Stacking Frame Follow the procedures in the order that they are
5. mounting holes of the RealD XL plate with the locking t nuts on the inside of the bottom projector shelf If necessary slide the locking t nuts until they align correctly Loosely secure the RealD XL plate in position with 1 M8 bolt 1 lock washer and 1 flat washer in each of the 2 mounting holes Thread the M8 bolt into the locking t nut from step a Repeat steps b and c to install the second RealD XL plate on the opposite side of the RealD XL shelf Tighten the 2 M8 bolts from step c 3 Repeat step 2 to install the upper RealD XL shelf 16 CHRISTIE Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 CHAISTIE Specifications This section provides the specifications for the Christie Duo Stacking Frame Physical Frame Height 172 cm 67 7 in Frame Height with Projector Frame Depth 232 cm 91 3 in 140 cm 55 1 in Frame Depth with RealD Boxes and Extractor 226 cm 88 9 in Frame Width 104 cm 40 9 in Frame Width with External Hard Drive Tray 112 cm 44 1 in Mass 125 Kg 175 6 Ib 79 88 9 in 12 25 cm 4 7 9 8 in 48 61 cm 18 9 24 in 8 cm 3 1 in gt 183 13 cm 72 1 iN maximum 78cm 30 7 in minimum Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 104 112 cm 40 9 44 1 in 60 cm 23 6 in
6. provided Do not complete the procedures out of order Install all bolts to the torque specifications listed in Torque Requirements on page 18 Assemble the Frame During assembly align the posts so that the support brackets point toward the inside of the frame 1 Attach the bottom of 1 side brace to the back of the left front post with 2 M12 x 100 mm bolts Insert each bolt through a hole on the opposite side of the post and thread the bolt into the brace until it is flush with the post surface This method is also used for steps 2 6 2 Attach 1 front brace to the side of the left front post with 2 M12 x 100 mm bolts 3 Attach the right front post to the other side of the front brace from step 2 with 2 M12 x 100 mm bolts Christie Duo Stacking Frame Installation Manual 5 020 101055 01 Rev 1 03 2013 Installation and Setup CHAISTIE 4 Attach the left rear post to the other side of the side brace from step 1 with 2 M12 x 100 mm bolts 5 Repeat step 1 for the right front post 6 Repeat step 4 for the right rear post 7 Secure each of the 6 diagonal brace supports to their respective posts with 2 M8 x 60 mm bolts 8 Verify that all support brackets point toward the inside of the frame and verify that all 4 posts are perpendicular to the ground 9 Tighten all bolts to prevent the frame from shifting 10 Position the frame as close to the port window wall as possible Leave s
7. the projected image is adjusted by raising or lowering the brackets at each corner of the projector shelves To prevent twisting of the stacking frame raise or lower the front or rear shelf support brackets in pairs 1 Loosen do not remove the 2 M8 bolts in each of the 2 front or rear shelf support blocks 2 Move the shelf support blocks down an equal distance 3 Tighten the M8 bolts in the support blocks you loosened in step 1 4 Loosen the M8 bolts in the enlarged holes on each of the shelf support brackets ofa oy gt a gt e 5 While someone supports the projector shelf slowly loosen the lower M8 bolt on the shelf support brackets Slowly lower the shelf support bracket onto the shelf support block 6 Tighten the 2 M8 bolts in the support brackets you loosened in step 4 10 Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 CHAISTIE Installation and Setup Raise the Projector Shelf The position of the projected image is adjusted by raising or lowering the brackets at each corner of the projector shelves To prevent twisting of the stacking frame raise or lower the front or rear shelf support brackets in pairs 1 Loosen the M8 bolt in the enlarged hole on each of the 4 shelf support brackets O J 0 2 Loosen do not remove the 2 lower M8 bolts in each of the 2 front or rear shelf support brackets gt 3 Raise the projector shelf and sh
8. Christie Duo Stacking Frame Installation Manual 020 101055 01 CHAISTIE Christie Duo Stacking Frame Installation Manual 020 101055 01 NOTICES COPYRIGHT AND TRADEMARKS 2013 Christie Digital Systems USA Inc All rights reserved All brand names and product names are trademarks registered trademarks or trade names of their respective holders REGULATORY The product has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the product is operated in a commercial environment The product generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of the product in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at the user s own expense CAN ICES 3 A NMB 3 A 9 AE AES AF CE dps HER 9 7 7 o LY RAA EE 484 JAL RAA 48 7 AA 2994 ABE AS ESezUu GENERAL Every effort has been made to ensure accuracy however in some cases changes in the products or availability could occur which may not be reflected in this document Christie reserves the right to make changes to specifications at any time without notice Performance specifications are typical but may vary de
9. Christie Duo User Manual P N 020 100978 xx Attach the TPC Supports 14 Slide 1 lock washer and 1 flat washer over 1 M8 x 20 mm Thread a t nut three full turns onto the end of the M8 bolt Repeat steps 1 to 3 for the second M8 x 20 mm bolt While holding the TPC support align and then insert the t Hold the TPC support in position and tighten a M8 bolt This Tighten the second M8 bolt Repeat steps 1 to 7 to install the second TPC support on the bolt Insert the threaded end of the M8 bolt through a TPC support mounting hole nuts on the end of the M8 bolts into the slot in the side rail of the bottom projector shelf turns the t nut 90 degrees and locks it into position top projector shelf Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 CHAISTIE Installation and Setup Attach the Hard Drive Trays Slide 1 lock washer and 1 flat washer over 1 M8 x 20 mm bolt Insert the threaded end of the M8 bolt through a hard drive tray mounting hole Thread a t nut three full turns onto the end of the M8 bolt Repeat steps 1 to 3 for the second M8 x 20 mm bolt While holding the TPC support align and then insert the t nuts on the end of the M8 bolts into the slot in the side rail of the bottom projector shelf Hold the hard drive tray in position and tighten the M8 bolt This turns the t nut 90 degrees and locks it into position Tighten the second M8 bolt
10. age caused by use of a projector lamp beyond the recommended lamp life or use of a lamp supplied by a supplier other than Christie d Problems or damage caused by combination of a Product with non Christie equipment such as distribution systems cameras video tape recorders etc or use of a Product with any non Christie interface device e Problems or damage caused by the use of any lamp replacement part or component purchased or obtained from an unauthorized distributor of Christie lamps replacement parts or components including without limitation any distributor offering Christie lamps replacement parts or components through the internet confirmation of authorized distributors may be obtained from Christie f Problems or damage caused by misuse improper power source accident fire flood lightening earthquake or other natural disaster g Problems or damage caused by improper installation alignment or by equipment modification if by other than Christie service personnel or a Christie authorized repair service provider h Problems or damage caused by use of a Product on a motion platform or other movable device where such Product has not been designed modified or approved by Christie for such use i Problems or damage caused by use of a projector in the presence of an oil based fog machine j For LCD projectors the warranty period specified applies only where the LCD projector is in normal use Normal use means the LCD pro
11. elf support brackets and then tighten the M8 bolts you loosened in steps 1 and 2 4 Loosen do not remove the M8 bolts in each of the shelf support blocks that are below the shelf support brackets you raised in step 3 5 Move the shelf support blocks up until they are in contact with the shelf support brackets and then tighten the M8 bolts in the support blocks Christie Duo Stacking Frame Installation Manual 11 020 101055 01 Rev 1 03 2013 Installation and Setup CHAISTIE Install a Projector on the Top Projector Shelf A WARNING Four people are required to safely lift and install a projector 1 Place the top projector shelf on the floor with the foot brackets facing up 2 Loosen do not remove the 2 screws on each of the 4 foot brackets 3 Position the off set duct on the top projector shelf so that it rests between the two aluminum supports Make sure the CONNECT TO EXTRACTOR label on the off set duct faces up and to the rear of the projector shelf 4 Load a projector on the top projector shelf Place the rear of the projector over the slotted center brace and off set duct and the front of the projector over the solid center brace To prevent keystone of the projected image make sure the projector is square with the shelf The projector s lens axis should be parallel with the shelf length 5 Slide a foot bracket over each of the 4 projector feet The notch in the foot bracket should fit around the p
12. jector is not used more than 8 hours a day 5 days a week For any LCD projector where normal use is exceeded warranty coverage under this warranty terminates after 6000 hours of operation k Image retention on LCD flat panels Failure due to normal wear and tear PREVENTATIVE MAINTENANCE Preventative maintenance is an important part of the continued and proper operation of your product Please see the Maintenance section for specific maintenance items as they relate to your product Failure to perform maintenance as required and in accordance with the maintenance schedule specified by Christie will void the warranty CHRISTIE Table of Contents liroduclibllecequew qve 2 REPERI TP PIDE EE ebmbme ev e ne Kenn dub 1 Requirements uude xoc d ee RUE UR RU RR RUE Roa e P Ro Rd CR aoe Rod Dod 1 Technical Support x usd 534 2244422 pri RE a a a i a a E ya 1 Whats ln The BO ra 3 Installation and Setup oio ur RARA REA RARA 5 Assemble the Frame sag wba meee Pee Red DED EER ERE Leimen 5 Install a Projector on the Bottom Projector Shelf llle 7 Attach the Bottom Projector Shelf to the Frame eren 8 Adjust the Projector Aim 9 Install a Projector on the Top Projector Shelf ellen 12 Attach the Top Projector Shelf to the Frame llle ee 13 Adjust the Projectors sux RE ORG EES ET Ee ELE AAA R OR URGR OS Re RUE d 14 Attach the TPC Supports i 14 Attach the Hard Drive Trays
13. ottom of the shelf 2 Align the M8 inserts located on the bottom of the shelf with the bracket holes 3 Secure the bottom projector shelf in position with 2 M8 x 20 mm bolts 2 lock washers and 2 flat washers in each of the 4 bottom shelf support brackets 8 Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 CHAISTIE Installation and Setup Adjust the Projector Aim The front to back and side to side tilt of the projector must not exceed 10 This limit ensures safe lamp operation and proper positioning of the liquid cooling reservoir NOTICE A WARNING Three people are required to safely lift the projector shelf and adjust the projector aim When adjusting shelves keep your hands and other body parts away from pinch points The difference between the front shelf support brackets and the rear shelf support brackets determines the projector aim angle 1 Temporarily connect the offset duct to the projector 2 Turn the projector power on 3 Aim the projector image onto the screen 4 Raise or lower the front or rear shelf brackets until the image is centered on the screen See Lower the Projector Shelf on page 10 or Raise the Projector Shelf on page 11 u Turn the projector power off 6 Remove the offset duct Christie Duo Stacking Frame Installation Manual 9 020 101055 01 Rev 1 03 2013 Installation and Setup CHAISTIE Lower the Projector Shelf The position of
14. pace for the 3D polarizer system 6 Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 CHAISTIE Installation and Setup Install a Projector on the Bottom Projector Shelf A WARNING Four people are required to safely lift and install a projector 1 Place the bottom projector shelf on the floor with the projector foot brackets facing up 2 Loosen but do not remove the 2 screws on each of the 4 foot brackets 3 Lift 1 projector onto the bottom projector shelf The projector lens should face the same direction as the BOTTOM FRONT label on the shelf To prevent keystone of the projected image make sure the projector is square with the shelf The projector s lens axis should be parallel with the shelf length 4 Slide a foot bracket over each of the 4 projector feet The notch in the foot bracket should fit around the projector leg and above the projector foot nut 5 Tighten the 2 screws on each of the 4 foot brackets Christie Duo Stacking Frame Installation Manual 7 020 101055 01 Rev 1 03 2013 Installation and Setup CHAISTIE Attach the Bottom Projector Shelf to the Frame A WARNING Four people are required to safely lift and install the projector shelf 1 Lift and place the bottom projector shelf and the projector on the bottom shelf support brackets Make sure that all 4 brackets are supporting the shelf and that the supporting surfaces of the brackets are flush with the b
15. pending on conditions beyond Christie s control such as maintenance of the product in proper working conditions Performance specifications are based on information available at the time of printing Christie makes no warranty of any kind with regard to this material including but not limited to implied warranties of fitness for a particular purpose Christie will not be liable for errors contained herein or for incidental or consequential damages in connection with the performance or use of this material The product is designed and manufactured with high quality materials and components that can be recycled and reused This symbol E means that electrical and electronic equipment at their end of life should be disposed of separately from regular waste Please dispose of the product appropriately and according to local regulations In the European Union there are separate collection systems for used electrical and electronic products Please help us to conserve the environment we live in Canadian manufacturing facility is ISO 9001 and 14001 certified GENERAL WARRANTY STATEMENTS For complete information about Christie s limited warranty please contact your Christie dealer In addition to the other limitations that may be specified in Christie s limited warranty the warranty does not cover a Problems or damage occurring during shipment in either direction b Projector lamps See Christie s separate lamp program policy c Problems or dam
16. rojector leg and above the projector foot nut 6 Tighten the 2 screws on each of the 4 foot brackets 12 Christie Duo Stacking Frame Installation Manual 020 101055 01 Rev 1 03 2013 CHAISTIE Installation and Setup Attach the Top Projector Shelf to the Frame A WARNING Four people are required to safely lift and install the projector shelf 1 Measure the distance between the bottom shelf and the top shelf support brackets Make sure that there is a minimum of 61 cm 24 in between them 2 Lift and place the top projector shelf on the top shelf support brackets Make sure that all 4 brackets are supporting the shelf and that the supporting surfaces of the brackets are flush with the bottom of the shelf 3 Align the M8 inserts located on the bottom of the shelf with the bracket holes 4 Secure the top projector shelf in position with 2 M8 x 20 mm bolts 2 lock washers and 2 flat washers in each of the 4 top shelf support brackets 5 Align the offset duct with the lower projector s exhaust vent 6 Lower the top projector shelf 2 5 cm 1 in to seal the offset duct and the projector exhaust duct together 7 Attach the offset duct to the lower projector with 2 M6 x 35 mm screws Christie Duo Stacking Frame Installation Manual 13 020 101055 01 Rev 1 03 2013 Installation and Setup CHAISTIE Adjust the Projectors For information about setting up your projectors and aligning images see the
Download Pdf Manuals
Related Search
Related Contents
Global Door Controls TH1100EDTBARSS48 Installation Guide User Manual - Navigation / Tracking Operator`s Guide Clique e baixe o manual em português Dossier salon de l`Auto 2012 Cleaning Instructions: USER MANUAL GE GUD24ESSJWW Use and Care Manual - Xsat Rastreadores e bloqueadores Copyright © All rights reserved.
Failed to retrieve file