Home
        Installation Guide - Am
         Contents
1.          Cedar wall       ___                           iC   gt   Heater    SSS Es                                                                      Rails are  e         SS amid      _ E SIDEVIEW SE M           B     Ss    J i FRONT VIEW I  Components for 3 sided heater guard  Heater guard rail installation   e 2x 2x2 corner posts   legs e All components come ready to be as   e 3x 1x4 rails long piece rails for front sembled  e 6x 1x4 short piece rails for each e Observe distances around heater for  side guard rail  walls  benches and other  e 2x Wall brackets obstructions  e Misc  screws e Follow the heater manufacturer s     2 sided heater guard will have 1 post and clearances recommendations  9  one side only     Do not cut down heater guard to fit     SURANA    MAA N OPAC I ORI mM i    Gas Burner Overview   Standino    Pilot Generator Assembly  Includes  Thermopile and    pilot light       Gas Burner          Thermopile  wires to gas valve at  base of burner  assembly                                                                         Pilot Light  pre plumbed to gas valve A    _     gt        Gas Orifice  Must be factory prepared  according to gas type and  altitude of location    Burner Lip Step   1  Gas Air Adjuster Slides under the burner bracket on the   for Propane Only  floor of the heater chamber    Burner Bolt Step  2  Locks burner in place    Burner Installation  1  Burner lip must be inserted into the burner bracket on the inside base of the heater chambe
2.  sauna room    Finish    Insulate the space between the backpanel and the exterior wall per local codes  Ensure wall material rests behind the lip on the back panel   Place 1    fiberglass insulation against the interior side of the back panel   Remove paper from stainless flashing and start screws to galvanized  do not  tighten    Remove butterfly nut from bottom of intake box and slide burner assembly out of  the unit    Slide heater into place  guide insulated high limit wires through the hole on the in   take bracket  Secure heater to stainless steel flashing with two screws    Tighten screws on the corners of the flashing    Slip burner inside heater through the intake box allowing the burner lip to fit under  the burner bracket  Replace the butterfly nut and screw to secure the burner   Place caution sign on flashing above heater    Carefully uncoil the thermostat probe and using the pull wire previously placed gen   tly pull the probe into the sauna room    attach the thermostat probe ten inches below ceiling as far away from heater as  possible  The probe must be placed horizontally in the provided thermostat probe  cover    Install heater guard rail     Chassis 240 245 280 285    Wall to Face of Heater 33    Side of Heater to Wall  Min   Co 12     Height of Heater Shell 40       Wall to Inside of Guard 99    41      Min      Floor to Bottom of shell       SCANIA    BA A M O RT R M    Scandia Ultra Sauna Heater Guard Rail                TOP VIEW Back Wall             
3.  studs   Insulate area between back panel and exterior wall in accordance with local code   Centerline of the flue opening must be a minimum of 26 1 2    from the side wall    Metal tabs at the bottom of the back panel must rest on the finished floor    If the interior wall material is more than 3 4    thick spacers should be placed between the stud and the back  panel   Adjust intake box and flue collar to wall thickness  Walls thicker than 5 1 2    will require extensions    Installing the control box    Control box should be installed when sauna room is framed in prior to the finishing steps of the sauna room  Control box is mounted to the studs facing outside the room at the farthest point away from the heater  Control box should be 48    from the floor on center   Place a nail 10    below the interior ceiling on the stud facing the sauna room  String a pull wire from the nail  to the control box    25 ft of low voltage two lead wire is supplied in the control box  Run this wire from the control box to the  heater intake box and through the opening in the side of the box       SCANIA    MAA N OPAC I ORI mM i    Exterior Back Panel Rough in    40 000 BTU Heater  240 245  e 20 1 4    ____      Back Panel                Through wall rough in     A  Exhaust vent  W 9 1 2 in x H 9 1 2 in   B  Intake vent  W 13 3 4 in x H 6 in     After intake and exhaust  Openings are roughed in and  interior back panel is installed  place flue collar in the exhaust  vent opening adjusting to 
4.  unattended   e Sauna bathing is not suitable for those with health problems   e Sauna room must be vented according to manufacturers specifications  or Scandia installation instructions    e Heater guard must be installed    SCANIA    MAA N OPAC I ORI mM i    Heater Component List          Heater Body Unit      Back panel w external through wall covers      Stainless steel flashing  internal back panel cover      Venting component option  flue cap or draft hood   5  Complete burner assembly  natural gas or propane     O Control box with cover  wires  knobs          Imported high density sauna rocks                                                                                                                                                                                                 i Gas Burner                                           a                                                                                          Pilot Light    pre plumbed to gas valve 4   SCA N DIA             Model F       SCANIA    BAA M O PAC TRI M    YOUR HEATER SHOULD INCLUDE    Control Panel   Main Heater Unit   Sauna Rocks   Thermostat sensor wall cover and rock tray insert    Installation Instructions   Warning Signs   Back panel assembly   Back panel flashing   Flue cap or elbow and draft hood set       HEATER SIZING    Ultra Sauna Gas Fired Heaters    80 000 BTU 80 sq ft  7 43 sq m  240 sq ft  22 30 sq m   80 000 BTU 80 sq ft  7 43 sq m  240 sq ft  22 30 sq m                85    
5. Heater Model    Serial      SCANAHIF    MANUFACTURING       ULTRA SAUNA HEATER    Proudly made in USA since 1964    Gas Heaters   40 000 80 000 BTU    Installation Instructions     amp  User Manual    d        lt   s    ddd     NN       PO Box 636 Eagle Idaho USA  83616 l  T  877 467 2862 F  208 286 0290 info scandiamfg com www scandiamfg com    SCANIA    BA A M O PAC T RI M    BEFORE YOU START PLEASE READ CAREFULLY    e Heater and controls must be installed by a licensed professional   e Heater controls must never be installed inside the sauna room   e Heater controls should never be placed near water   e Heater must be installed according to local codes    e Ensure all factory connections are tight  Wires may have come loose in  shipping    e Heater should not be operated without recommended amount of rocks   e Sauna door must always open outward    e Sauna door can never include a lock    e Sauna should be constructed of soft wood  i e  clear western red cedar    e Sauna room should never have tile walls or benches   e Do not treat or varnish sauna wood   e Use only Scandia high density sauna rocks   e Check and clean rocks and rock tray twice a year or as needed   e  he warning signs and sauna usage plaque must be displayed   e Sauna room sizing is based on standard 7 foot ceiling   e Only use aroma stone when using fragrances to protect heater   e Do not touch the heater while in operation   e Do not cover the heater   e Never hose down the sauna   e Never leave children
6. Sauna Heater Sizing    e Minimum and maximum room sizes are based on a 7 foot ceiling height   e Properly sized heater will bring room temperature to desired level in  approximately 30 to 60 minutes   e An undersized heater may experience instances of the heater unit  overheating and a longer time to bring the room up to temperature   e The maximum room sized is based on the heater bringing the room  temperature from 60 to 180 in 60 minutes   e Sauna room must be properly vented for heater to work effectively          SCANDIA    BA A M O PAC T OR M    Rough in Sizing guidelines    Note  Your Scandia Ultra gas sauna heater  should be installed only by a licensed  electrician and HVAC professional  Improper  or unofficial installation will void warranty                 Gas Line           40 000 BTU  80 000 BTU  BJ e   1   D  21 2                                                          Cedar wall                  lining    240  amp  245   40 000 Feleo 18 1 2    21 2    20x32 o 3 1 2   24 1 2  elle 10 1 4  efe  u  u u Ww u 8 1 4  X u Ww u u W u  280  amp  285   80 000     40 29 ar  aar xas  S a512  32    20   12 12 1 4   14    Wall to Wall to  outside Cedar wall inside  lining          Cedar wall  lining             D  back panel D  back panel  assembly  N L assembly  N                                                                                    S  q  S  eS    SCANIA    BA A M O PAC T RI M    Rough in control box and interior back panel    40 000 BTU Heater  240 245     In
7. l lead     assembly  one red  one white     pilot light assembly wire d      White wire N      D  gt  lf gen y  POL       x  7        S     Red wire      to pilot gen  Pilot Control Knob  Di  Turns pilot on off  Used to light        Gas Valve at Base of Heater     Use the supplied 25ft     control lead    wiring to  Gas Sauna Heater High limit to Thermostat   connect controls to pilot  Rear view of sauna heater connection  Connect and high limit    Po Ne we roaches  Timer to Gas Valve Use  millivolt wiring   red wire    green wires from gas valve to terminal    2 on 24 hour control  High Limit Wire   Metal cased wire  line from heater        wT    Thermostat to High Limit  Use white wire from control    lead wire   millivolt wire        Ground Wire  To ground terminal  Neutral Wire  To terminal  6  Hot Wire    Controls  24 Hour timer version  To terminal  5       
8. r   2  Bolt the burner to the intake vent floor   use the pre drilled hole     n Ea Black  l P    lt     Pilot    LS       anion    i Wires  COMPUTER  CONTROL BOARD       SWI switch connections     Swi                  gas valve  connections    High limit    Switct  fon back wall of heater        SURANA    MA N OPAC I ORI mM i    60 Minute Control Wiring Overview        Pilot Generator Wire   Pilot Gas Line  Two wires from gas valve to pilot  Gas line that feeds to Thermostat to Gas Valve assembly  one red  one white   pilot light assembly Use red wire from control lead wire  N    N  os  og    White wire 5             Red wire  to pilot gen    Pilot Control Knob  ee Ne  Turns pilot on off  Used to light pilot    Gas Valve at Base of Heater Use the supplied 25ft      PERR      control lead    wiring to  High limit ta Timer connect controls to pilot    Gas Sauna Heater connection  Connect and high limit  Rear view of sauna heater white wires  ra  brown sheathing     ae     Do not use  A n green wires    Timer to High Limit  Use white wire from  control lead wire     High Limit Wire   Metal cased wire  line from heater    2    NO POWER  CONNECTION    REQUIRED  Thermostat to Gas Valve    Use red wire from control    i Timer to Thermostat pre   lead wire     wired from factory  Z      Controls  60 minute timer version     Pilot G Li Pilot Generator Wire    ilot Gas Line  z     Aas line thaifeeds ie Thermostat to Gas Valve Two wires from gas valve to pilot  Use red wire from contro
9. stalling the back panel    Back panel should be installed when sauna room is framed in prior to the finishing steps of the sauna room  Back panel is mounted directly to the face of the studs   Insulate area between back panel and exterior wall in accordance with local codes   Centerline of the flue opening must be a minimum of 17 1 2    from the side wall    Metal tabs at the bottom of the back panel must rest on the finished floor    If the interior wall material is more than 3 4    thick spacers should be placed between the stud and the back  panel   Adjust intake box and flue collar to wall thickness  Walls thicker than 5 1 2    will require extensions    Installing the control box    Control box should be installed when sauna room is framed in prior to the finishing steps of the sauna room  Control box is mounted to the studs facing outside the room at the farthest point away from the heater  Control box should be 48    from the floor on center   Place a nail 10    below the interior ceiling on the stud facing the sauna room  String a pull wire from the nail  to the control box    25 ft of low voltage two lead wire is supplied in the control box  Run this wire from the control box to the  heater intake box and through the opening in the side of the box       80 000 BTU Heater  280 285     Installing the back panel    Back panel should be installed when sauna room is framed in prior to the finishing steps of the sauna room  Back panel is mounted directly to the face of the
10. the  wall thickness   Repeat with intake box cover  Walls thicker than 5 1 2    will  require extensions    8 1 4       1 1 2     5 1 4       80 000 BTU Heater  280 285     Through wall rough in     A  Exhaust vent  W 12 1 2 inx H12 1 Xijn   B  Intake vent  W 16 1 4 inxH 8 1 4 in     C   Please allow 1 4    tolerance in these dimegsions    After intake and exhaust   Openings are roughed in and   interior back panel is installed   place flue collar in the exhaust   vent opening adjusting to the   wall thickness z     Repeat with intake box cover   Walls thicker than 5 1 2    will   require extensions    20 3  4       ee    Js      TETTEI nan SAE SoD St Sat at cat Sem SoD Sam San net San tat San tam ca men ca mer ca oem oa oon oat SoD ca man em Son Se EEE San tem Sam nem cam tad can tam ca nen ca men ca nan cE Sen Se Son E xa Son ea San ar can tat oan Sem Sa nem ca men Sam tam ca oem cat oon ca mem Sas sence oon car samen can tem oan es cantar canta  oe ER Rn ee Sr oer ee eS ee Sn rrr ne eer ee ner rr  dao eee ce cr oer ee eer er errr ee eer eee ee errr  peers ebeebededehehede eh shebedrd eh ebegeded EE E Te oa E i eggedeeegrd ed eebedrd eb eebed ees  Paranna na aati agr nat agar ts ta ian taal ya oa ue Oa aah a aah ya a aan An as ag ean ag aah ay an wan aah ya og aus aah ANG yO aan OO asa aan aaah a Wan th aaah us ta a aah yaaa ys Oh aah a asa aan aah sa Wan th ae aah as aah a aa a    sacs    a    ie  8     9   10   11     12     SCANIA    BA A M O PAC UR M eo    Finishing the
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Philips Notebook USB speakers SPA6200U  2013年1月正式オープン!  Gaggenau RF 471 Refrigerator User Manual  User`s Manual  Lenco Walky-box  Operating Instructions Blu-ray Disc Player  取扱説明書等 - アイ・オー・データ機器  Purée de pommes de terre et saucisses Vitto    Copyright © All rights reserved. 
   Failed to retrieve file