Home
Installation Guide - Am
Contents
1. Cedar wall ___ iC gt Heater SSS Es Rails are e SS amid _ E SIDEVIEW SE M B Ss J i FRONT VIEW I Components for 3 sided heater guard Heater guard rail installation e 2x 2x2 corner posts legs e All components come ready to be as e 3x 1x4 rails long piece rails for front sembled e 6x 1x4 short piece rails for each e Observe distances around heater for side guard rail walls benches and other e 2x Wall brackets obstructions e Misc screws e Follow the heater manufacturer s 2 sided heater guard will have 1 post and clearances recommendations 9 one side only Do not cut down heater guard to fit SURANA MAA N OPAC I ORI mM i Gas Burner Overview Standino Pilot Generator Assembly Includes Thermopile and pilot light Gas Burner Thermopile wires to gas valve at base of burner assembly Pilot Light pre plumbed to gas valve A _ gt Gas Orifice Must be factory prepared according to gas type and altitude of location Burner Lip Step 1 Gas Air Adjuster Slides under the burner bracket on the for Propane Only floor of the heater chamber Burner Bolt Step 2 Locks burner in place Burner Installation 1 Burner lip must be inserted into the burner bracket on the inside base of the heater chambe
2. sauna room Finish Insulate the space between the backpanel and the exterior wall per local codes Ensure wall material rests behind the lip on the back panel Place 1 fiberglass insulation against the interior side of the back panel Remove paper from stainless flashing and start screws to galvanized do not tighten Remove butterfly nut from bottom of intake box and slide burner assembly out of the unit Slide heater into place guide insulated high limit wires through the hole on the in take bracket Secure heater to stainless steel flashing with two screws Tighten screws on the corners of the flashing Slip burner inside heater through the intake box allowing the burner lip to fit under the burner bracket Replace the butterfly nut and screw to secure the burner Place caution sign on flashing above heater Carefully uncoil the thermostat probe and using the pull wire previously placed gen tly pull the probe into the sauna room attach the thermostat probe ten inches below ceiling as far away from heater as possible The probe must be placed horizontally in the provided thermostat probe cover Install heater guard rail Chassis 240 245 280 285 Wall to Face of Heater 33 Side of Heater to Wall Min Co 12 Height of Heater Shell 40 Wall to Inside of Guard 99 41 Min Floor to Bottom of shell SCANIA BA A M O RT R M Scandia Ultra Sauna Heater Guard Rail TOP VIEW Back Wall
3. studs Insulate area between back panel and exterior wall in accordance with local code Centerline of the flue opening must be a minimum of 26 1 2 from the side wall Metal tabs at the bottom of the back panel must rest on the finished floor If the interior wall material is more than 3 4 thick spacers should be placed between the stud and the back panel Adjust intake box and flue collar to wall thickness Walls thicker than 5 1 2 will require extensions Installing the control box Control box should be installed when sauna room is framed in prior to the finishing steps of the sauna room Control box is mounted to the studs facing outside the room at the farthest point away from the heater Control box should be 48 from the floor on center Place a nail 10 below the interior ceiling on the stud facing the sauna room String a pull wire from the nail to the control box 25 ft of low voltage two lead wire is supplied in the control box Run this wire from the control box to the heater intake box and through the opening in the side of the box SCANIA MAA N OPAC I ORI mM i Exterior Back Panel Rough in 40 000 BTU Heater 240 245 e 20 1 4 ____ Back Panel Through wall rough in A Exhaust vent W 9 1 2 in x H 9 1 2 in B Intake vent W 13 3 4 in x H 6 in After intake and exhaust Openings are roughed in and interior back panel is installed place flue collar in the exhaust vent opening adjusting to
4. unattended e Sauna bathing is not suitable for those with health problems e Sauna room must be vented according to manufacturers specifications or Scandia installation instructions e Heater guard must be installed SCANIA MAA N OPAC I ORI mM i Heater Component List Heater Body Unit Back panel w external through wall covers Stainless steel flashing internal back panel cover Venting component option flue cap or draft hood 5 Complete burner assembly natural gas or propane O Control box with cover wires knobs Imported high density sauna rocks i Gas Burner a Pilot Light pre plumbed to gas valve 4 SCA N DIA Model F SCANIA BAA M O PAC TRI M YOUR HEATER SHOULD INCLUDE Control Panel Main Heater Unit Sauna Rocks Thermostat sensor wall cover and rock tray insert Installation Instructions Warning Signs Back panel assembly Back panel flashing Flue cap or elbow and draft hood set HEATER SIZING Ultra Sauna Gas Fired Heaters 80 000 BTU 80 sq ft 7 43 sq m 240 sq ft 22 30 sq m 80 000 BTU 80 sq ft 7 43 sq m 240 sq ft 22 30 sq m 85
5. Heater Model Serial SCANAHIF MANUFACTURING ULTRA SAUNA HEATER Proudly made in USA since 1964 Gas Heaters 40 000 80 000 BTU Installation Instructions amp User Manual d lt s ddd NN PO Box 636 Eagle Idaho USA 83616 l T 877 467 2862 F 208 286 0290 info scandiamfg com www scandiamfg com SCANIA BA A M O PAC T RI M BEFORE YOU START PLEASE READ CAREFULLY e Heater and controls must be installed by a licensed professional e Heater controls must never be installed inside the sauna room e Heater controls should never be placed near water e Heater must be installed according to local codes e Ensure all factory connections are tight Wires may have come loose in shipping e Heater should not be operated without recommended amount of rocks e Sauna door must always open outward e Sauna door can never include a lock e Sauna should be constructed of soft wood i e clear western red cedar e Sauna room should never have tile walls or benches e Do not treat or varnish sauna wood e Use only Scandia high density sauna rocks e Check and clean rocks and rock tray twice a year or as needed e he warning signs and sauna usage plaque must be displayed e Sauna room sizing is based on standard 7 foot ceiling e Only use aroma stone when using fragrances to protect heater e Do not touch the heater while in operation e Do not cover the heater e Never hose down the sauna e Never leave children
6. Sauna Heater Sizing e Minimum and maximum room sizes are based on a 7 foot ceiling height e Properly sized heater will bring room temperature to desired level in approximately 30 to 60 minutes e An undersized heater may experience instances of the heater unit overheating and a longer time to bring the room up to temperature e The maximum room sized is based on the heater bringing the room temperature from 60 to 180 in 60 minutes e Sauna room must be properly vented for heater to work effectively SCANDIA BA A M O PAC T OR M Rough in Sizing guidelines Note Your Scandia Ultra gas sauna heater should be installed only by a licensed electrician and HVAC professional Improper or unofficial installation will void warranty Gas Line 40 000 BTU 80 000 BTU BJ e 1 D 21 2 Cedar wall lining 240 amp 245 40 000 Feleo 18 1 2 21 2 20x32 o 3 1 2 24 1 2 elle 10 1 4 efe u u u Ww u 8 1 4 X u Ww u u W u 280 amp 285 80 000 40 29 ar aar xas S a512 32 20 12 12 1 4 14 Wall to Wall to outside Cedar wall inside lining Cedar wall lining D back panel D back panel assembly N L assembly N S q S eS SCANIA BA A M O PAC T RI M Rough in control box and interior back panel 40 000 BTU Heater 240 245 In
7. l lead assembly one red one white pilot light assembly wire d White wire N D gt lf gen y POL x 7 S Red wire to pilot gen Pilot Control Knob Di Turns pilot on off Used to light Gas Valve at Base of Heater Use the supplied 25ft control lead wiring to Gas Sauna Heater High limit to Thermostat connect controls to pilot Rear view of sauna heater connection Connect and high limit Po Ne we roaches Timer to Gas Valve Use millivolt wiring red wire green wires from gas valve to terminal 2 on 24 hour control High Limit Wire Metal cased wire line from heater wT Thermostat to High Limit Use white wire from control lead wire millivolt wire Ground Wire To ground terminal Neutral Wire To terminal 6 Hot Wire Controls 24 Hour timer version To terminal 5
8. r 2 Bolt the burner to the intake vent floor use the pre drilled hole n Ea Black l P lt Pilot LS anion i Wires COMPUTER CONTROL BOARD SWI switch connections Swi gas valve connections High limit Switct fon back wall of heater SURANA MA N OPAC I ORI mM i 60 Minute Control Wiring Overview Pilot Generator Wire Pilot Gas Line Two wires from gas valve to pilot Gas line that feeds to Thermostat to Gas Valve assembly one red one white pilot light assembly Use red wire from control lead wire N N os og White wire 5 Red wire to pilot gen Pilot Control Knob ee Ne Turns pilot on off Used to light pilot Gas Valve at Base of Heater Use the supplied 25ft PERR control lead wiring to High limit ta Timer connect controls to pilot Gas Sauna Heater connection Connect and high limit Rear view of sauna heater white wires ra brown sheathing ae Do not use A n green wires Timer to High Limit Use white wire from control lead wire High Limit Wire Metal cased wire line from heater 2 NO POWER CONNECTION REQUIRED Thermostat to Gas Valve Use red wire from control i Timer to Thermostat pre lead wire wired from factory Z Controls 60 minute timer version Pilot G Li Pilot Generator Wire ilot Gas Line z Aas line thaifeeds ie Thermostat to Gas Valve Two wires from gas valve to pilot Use red wire from contro
9. stalling the back panel Back panel should be installed when sauna room is framed in prior to the finishing steps of the sauna room Back panel is mounted directly to the face of the studs Insulate area between back panel and exterior wall in accordance with local codes Centerline of the flue opening must be a minimum of 17 1 2 from the side wall Metal tabs at the bottom of the back panel must rest on the finished floor If the interior wall material is more than 3 4 thick spacers should be placed between the stud and the back panel Adjust intake box and flue collar to wall thickness Walls thicker than 5 1 2 will require extensions Installing the control box Control box should be installed when sauna room is framed in prior to the finishing steps of the sauna room Control box is mounted to the studs facing outside the room at the farthest point away from the heater Control box should be 48 from the floor on center Place a nail 10 below the interior ceiling on the stud facing the sauna room String a pull wire from the nail to the control box 25 ft of low voltage two lead wire is supplied in the control box Run this wire from the control box to the heater intake box and through the opening in the side of the box 80 000 BTU Heater 280 285 Installing the back panel Back panel should be installed when sauna room is framed in prior to the finishing steps of the sauna room Back panel is mounted directly to the face of the
10. the wall thickness Repeat with intake box cover Walls thicker than 5 1 2 will require extensions 8 1 4 1 1 2 5 1 4 80 000 BTU Heater 280 285 Through wall rough in A Exhaust vent W 12 1 2 inx H12 1 Xijn B Intake vent W 16 1 4 inxH 8 1 4 in C Please allow 1 4 tolerance in these dimegsions After intake and exhaust Openings are roughed in and interior back panel is installed place flue collar in the exhaust vent opening adjusting to the wall thickness z Repeat with intake box cover Walls thicker than 5 1 2 will require extensions 20 3 4 ee Js TETTEI nan SAE SoD St Sat at cat Sem SoD Sam San net San tat San tam ca men ca mer ca oem oa oon oat SoD ca man em Son Se EEE San tem Sam nem cam tad can tam ca nen ca men ca nan cE Sen Se Son E xa Son ea San ar can tat oan Sem Sa nem ca men Sam tam ca oem cat oon ca mem Sas sence oon car samen can tem oan es cantar canta oe ER Rn ee Sr oer ee eS ee Sn rrr ne eer ee ner rr dao eee ce cr oer ee eer er errr ee eer eee ee errr peers ebeebededehehede eh shebedrd eh ebegeded EE E Te oa E i eggedeeegrd ed eebedrd eb eebed ees Paranna na aati agr nat agar ts ta ian taal ya oa ue Oa aah a aah ya a aan An as ag ean ag aah ay an wan aah ya og aus aah ANG yO aan OO asa aan aaah a Wan th aaah us ta a aah yaaa ys Oh aah a asa aan aah sa Wan th ae aah as aah a aa a sacs a ie 8 9 10 11 12 SCANIA BA A M O PAC UR M eo Finishing the
Download Pdf Manuals
Related Search
Related Contents
Philips Notebook USB speakers SPA6200U 2013年1月正式オープン! Gaggenau RF 471 Refrigerator User Manual User`s Manual Lenco Walky-box Operating Instructions Blu-ray Disc Player 取扱説明書等 - アイ・オー・データ機器 Purée de pommes de terre et saucisses Vitto Copyright © All rights reserved.
Failed to retrieve file