Home
micro-adjustable pull-out flat panel mounts
Contents
1. Figure 1 Mounting WBLS to Wall The WBLS has been designed to be mounted directly onto either a wood stud or concrete wall Installing WBLS to a Wood Stud Wall 1 Determine the center of the TV screen and where it should be located on the wall 2 Locate the closest stud to the left and right of the selected location NOTE Ifthe screen area lies over a stud use that stud and the stud to either the left or right of it 3 Line up the notches on mount R with center of screen marking to determine vertical center See Figure 2 4 Measure up 7 1 2 190 5mm from the center point to mark location of the upper mounting slots See Figure 2 ORION OC sxx Installation and User s Guide 7 1 2 190 5mm Vertical center of mount 5 Figure 2 Using a level mark the wall on each stud to attach the mount through the upper mounting slots See Figure 3 WARNING ELECTRICAL SHOCK HAZARD CUTTING OR DRILLING INTO ELECTRICAL CORDS OR CABLES CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of electrical wires and cables before drilling or installing fasteners WARNING EXPLOSION AND FIRE HAZARD CUTTING OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain
2. http www orionimages com Attaching Interface Brackets to TV 1 Align the center of the pull out uprights U and V with center of screen See Figure 9 NOTE The diamond shape hole in the bracket corresponds to the center of the mount Center of bracket Figure 9 WARNING IMPROPER INSTALLATION CAN LEAD TO DISPLAY FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT Using screws of improper size may damage your display Properly sized screws will easily and completely thread into display mounting holes If spacers are required be sure to use longer screws of the same diameter 2 Select correct screws spacers if necessary and universal washers from the hardware bag A N and attach brackets U and V to back of screen See Figure 9 NOTE Uprights may need to be pulled out to the extended position in order to install screws through proper holes Attaching Screen to Wall Mount 1 Attach wall bracket caps Y to top and bottom of both wall brackets See Figure 10 Figure 10 ORION Of 28 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 Installation and User s Guide 2 Adjust Velcro pull strap if necessary so it does not extend beyond bottom of screen See Figure 11 NOTE Do NOT allow both interface brackets
3. 304 8mm WARNING ELECTRICAL SHOCK HAZARD CUTTING OR DRILLING INTO ELECTRICAL CORDS OR CABLES CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of electrical wires and cables before drilling or installing fasteners WARNING EXPLOSION AND FIRE HAZARD CUTTING OR DRILLING INTO GAS PLUMBING CAN CAUSE DEATH OR SERIOUS PERSONAL INJURY ALWAYS make certain area behind mounting surface is free of gas water waste or any other plumbing before cutting drilling or installing fasteners Installation and User s Guide ORION Of z2 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 Figure 4 5 Drill one 5 16 pilot hole at each marking 6 Install an anchor QA into each upper pilot hole using a hammer making sure that the anchor is flush with the wall 7 Use two 5 16 x 2 1 2 lag bolts QC and two 5 16 flat washers QB to attach top of mount R to anchors in wall 8 Mark the attachment points for the lower mounting slots See Figure 4 9 Drill one pilot hole at each marking for lower mounting holes See Figure 4 10 Install an anchor QA into each lower pilot hole using a hammer See Figure 4 11 Use two 5 16 x 2 1 2 lag bolts QC and two 5 16 flat washers QB to attach the mount to the wall through the lower mounting holes See Figure 4 12 Slide rails to approximate center of screen location
4. 3 for the other upright for additional security Figure 15 http www orionimages com USA Headquarter A OR ON ee orion IMAGES CORPORATION Europe UK ORION Images Corporation Design Develop Manufacture LCD LED Security Monitors 2011 ORION Images Corp All rights reserved www orionimages com Asia Korea gt n U Installation and User s Guide 7300 Bolsa Avenue Westminster CA 92683 714 766 6300 714 766 6310 102 Knightwood Crescent New Malden Surrey KT3 5JW U K 44 0 7979 152 943 403 403 Bucheon Technopark 4 Danji Apt 193 Yakdae dong Wonmi gu Bucheon si Gyeonggi do 420 734 Korea 82 70 8240 4400 82 70 8240 4403 Ka
5. 1 6cm WARNING Exceeding the weight capacity can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the combined weight of all components located on the WBLS does not exceed 150 Ibs 68 kg ORION Of zz 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 http www orionimages com Installation and User s Guide DIMENSIONS WBLS NOTES MAXIMUM MOUNTING PATTERN WIDTH IS 30 0 762mm MINIMUM MOUNTING PATTERN WIDTH IS 3 94 100mm MOUNTIS 3 72 94 4mm DEEP WHEN FLATTO WALL EXTENSION DISTANCE IS 7 0 177 8mm WITH A MAXIMUM EXTENSION FROM WALL OF 10 7 272mm FOR REC ESSED APPLICATIONS MINIMUM VERTICAL LIFT FOR HOOK ENGAGEMENT IS 56 14 2mm Q Q Q Q O Q Q Q Q Q Q DIAMOND amp NOTCH AUGN WITH VERTICAL G OF MOUNT 15 10 383 4 TD CT 2 000000000080000000000 12 00 MINIMUM SPACING WALL PLATES SLIDE FREELY ON RAILS 30 00 762mm MAX 3 94 100mm MIN MEASUREMENTS MILLIMETERS INCHES ORION Of zz 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 http www orionimages com Installation and User s Guide LEGEND CO 4 Z Tighten Fastener Loosen Fastener Phillips Screwdriver Open Ended Wrench 3 Hex Head Wrench Pencil Mark Drill Hole 2 Optional Security Wre
6. OR AN Na ORION IMAGES H 3 H fi CORPORATION Installation amp User s Guide Individual Video Wall Mount MICRO ADJUSTABLE PULL OUT FLAT PANEL MOUNTS http www orionimages com All contents of this document may change without prior notice and actual product appearance may differ from that depicted herein http www orionimages com Installation and User s Guide A IMPORTANT WARNINGS AND CAUTION A CAUTION alerts you to the possibility of CAUTIONS damage or destruction of equipment if you do not follow the corresponding instructions A WARNING A WARNING alerts you to the possibility of WARNING Failure to read thoroughly understand and serious injury or death if you do not follow the instructions follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty Itis the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided WARNING Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment Reinforce the structure as required before installing the component The wall to which the mount is being attached may have a maximum drywall thickness of 5 8
7. U and V to be located on same side of wall bracket See Figure 11 NOTE NEVER place both interface brackets U and V to one side of the wall mount center line See Figure 11 Center Line CL e fe Pullstrap Do TEED 90000000000000000000 3 MoD Ht 00000000000000000000 NEVER place both interface brackets to one side of the wall mount center line CL 00 000000000000000 0000000000000000 aa DOT 000 ja A Both interface brackets must NEVER be located to one side of the wall brackets Figure 11 3 Hang top hook of interface brackets U and V onto the top bar of the mount R See Figure 12 4 Slide screen and bars to desired viewing position 5 Route cables between wall and bars NOTE The pull out feature allows the screen to be pulled away from the wall for easy cable access following installation CAUTION PINCH POINTS Keep fingers hands and cables out of pinch p
8. area behind mounting surface is free of gas water waste or any other plumbing before cutting drilling or installing fasteners 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 http www orionimages com 6 Drill one 7 32 pilot hole in each stud 7 Use two 5 16 x 2 1 2 lag bolts QC and two 5 16 flat washers QB to attach top of mount R to wall See Figure 3 8 Mark the attachment points for the lower mounting slots making sure the attachment points are located on the studs See Figure 3 9 Drill 7 32 pilot holes at markings for lower mounting holes See Figure 3 10 Use two 5 16 x 2 1 2 lag bolts QC and two 5 16 flat washers QB to attach the mount to the wall through the lower mounting holes See Figure 3 11 Slide rails to approximate center of screen location Installing WBLS to Wall Concrete Concrete Block 1 Determine the center of the TV screen and where it should be located on the wall 2 Line up the notches on mount R with center of screen marking to determine vertical center See Figure 4 3 Measure up 7 1 2 190 5mm from the center point to mark location of the upper mounting slots See Figure 4 4 Using a level mark the wall through both upper mounting slots See Figure 4 CAUTION MINIMUM HORIZONTAL DISTANCE BETWEEN WALL BRACKETS IS 12 304 8mm Do not place mounting brackets closer together than 12
9. nch TOOLS REQUIRED FOR INSTALLATION 7 32 5 5mm Wood Stud 5 16 7 9mm Concrete M5 included 1 2 3 16 6 included included ORION Of zz 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 http www orionimages com Installation and User s Guide R 1 wall mount LSMVU shown asher P 1 M5 packed with N QA 4 5 16 e 5 16 x 2 1 2 U 1 left pull out upright 4 right pull out upright Y 4 LSMVU uprights shown wall bracket cap LSMVU only ORION Of zz 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 http www orionimages com INSTALLATION WARNING IMPROPER INSTALLATION CAN LEAD TO MOUNT FALLING CAUSING SEVERE PERSONAL INJURY OR DAMAGE TO EQUIPMENT It is the installers responsibility to make certain the structure to which the mount is being attached is capable of supporting five times the weight of the WBLS and all attached equipment not to exceed 150 Ibs 68 kg NOTE Proceed to either the Installing WBLS to a Wood Stud Wall Installing WBLS to Wall Concrete Concrete Block IMPORTANT For video wall mounting mounts should be installed one screen height apart vertically and approximately one screen width apart horizontally See Figure 1 one screen width
10. oint areas 6 Pull downward on the pullstraps and swing inward toward wall latching interface brackets to lower bar and locking bottom of screen to the mount See Figure 12 http www orionimages com Pullstraps Screen not shown for clarity O Figure 12 Plumb Adjustment 1 Using the provided 1 2 wrench X turn plumb adjustment bolt to the left to adjust screen away from the wall See Figure 13 2 Using the provided 1 2 wrench X turn plumb adjustment bolt to the right to adjust screen toward the wall See Figure 13 O O W oO 2 plumb adjustment on S Figure 13 ORION Of zz 7300 Bolsa Avenue Westminster CA 92683 Tel 714 766 6300 Fax 714 766 6310 Installation and User s Guide Adjusting Roll Height of Wall Brackets NOTE The height adjust wall brackets allow adjustment of 1 2 1 Turn to right tighten to raise side of screen See Figure 14 2 Turn to left loosen to lower side of the screen Raises screen Q 2 Lowers screen Screen not shown for clarity Figure 14 Locking Mount Optional 1 Add security bracket S to the mount See Figure 15 2 Add padlock not included through holes on small security bracket S and mount 3 Add hold back bracket T to the mount to secure mount in recessed position See Figure 15 4 Repeat Steps 1
Download Pdf Manuals
Related Search
Related Contents
TSSTTV0000-033 TDSHーBA 保管用 ETAT DE VAUD italian-chap 1 newEncore R お客さま価値の創造 caution Universal Radio Control OWNERS MANUAL Model 535 Side-by-Side Refrigerator Use & Care Guide for Dispensing and Copyright © All rights reserved.
Failed to retrieve file