1. GENERAL INFORMATION TOOLS NEEDED TECHNICAL DATA DIMENSIONS INSTALLING VARIANTS PACKAGE MOUNTING AND INSTALLING OF OPERATOR ADJUSTMENT OF LIMITS EMERGENCY RELEASE OF MOTOR ARTIC2SP 4SP Installation and Operating Manual REV 1 00 VER 09 2011 1 GENERAL 1 1 PREPARATION INFORMATION TOOLS NEEDED TECHINACAL DATA Read carefully this manual Check the product for damage after transport Check the gate structural strength and smooth travel of gate leaves The gate leaves must move without jamming Prepare the gate before the installation of the automation The gate must meet the requirements includinginstalling of mechanical stops Check compliance of the supply mains characteristics with the requirements specied in this manual All metal parts of the operator and the gate must have reliable earth connection Check operation of the manual emergency release 1 2 BASIC SAFETY RULES Correct installation and use of the operator will ensure its safety To avoid diculty at operation follow the fundamental operating rules Do not go through the moving gate Wait until full opening of the gate and only then go through the gate Do not block up the gate aper ture Keep people and children away from the automated systems No one should cross the path of the moving gate Keep the remote controls away from children and outsiders to avoid unauthorized starting of the gate Never let children play with the automatio
2. ency release is used to release the motor in case of power cut To release the motor turn the handle by 90 degrees ATTENTION Release the motor only if the power supply is off
3. h four holes and fix using 2 supplied bolts M8x110mm To install the operator on the right leaf change the position of the oper ator and use other two pairs of holes see Picture 1 7 4 INSTALLING OF STRAIGHT AND CURVED ARMS Insert the straight arm in the driving shaft of the reducer Level the ends of the shaft and of the arm x the washer using screw M6x20 and fix the axis of the arm using 2 pairs of lock screws Connect 2 arms using screw M6x16 and washer Unblock the reducer by turning the handle clockwise and secure the curved arm to the clamp A using screw M12x50 and nut M12 When installing the operator on the right leaf follow the installation procedure showed in Picture 2 ADJUSTMENT OF LIMITS 8 ADJUTMENT OF LIMITS Upper cam Bottom cam _ Microswitches 1 Unblock the reducer and open the gate leaf until the necessary position 2 Turn the upper cam on the reducer shaft until actuation disconnection of microswitch Close the leaf and fix the cam using screw 3 Unblock the reducer and close the gate leaf leaving 100 mm before completely closed position Turn the bottom cam of reducer until actuation of closing microswitch Open the leaf and fix the cam using screw After you complete installation make all electrical connections and adjustments of the operator put on the cover fixing it with 4 bolts EMERGENCY RELEASE OF MOTOR 9 EMERGENCY RELEASE OF MOTOR Release handle Locked Emerg
4. n Do not obstruct moving of gate leaves No branches and shrubs shall be within the gate moving area are as they can impede moving of gate leaves The signal lamps must be placed where easily visible and kept clean Do not try to move the gate leaves if the operator is blocked In the event of automation failure release the operator to enable free pass and call repair specialists After change of operation mode turn o power supply of the system before manual restoration of the gate snormal position Do not make any alterations in the automated system Do not make modernization or adjustment of the automated system Call the qualied specialist to do that For effcient work of the automated system its safety devices and earth connection must be checked at least once a half year TOOLS NEEDED 5 Pliers 1 Set of spanners 2 Set of cross and straight blade screwdrivers 6 Hacksaw for metal 3 Set of drill bits for metal 4 Set of drill bits for concrete 7 Electric drill 8 Tape measure folding rule 3 TECHNICAL DATA Model Weight Supplyvoltage Rated current Power Use intensity Torque Capacitor kg V A W A Nm mF ARTIC2SP 14 220 1 3 110 50 380 10 ARTIC4SP 14 24 1 5 180 INTENSIVE USE 470 DIMENSSIONS INSTALLING VARIANTS PACKAGE 4 DIMENSIONS A 168 mm 340 mm 178 mm 5 INSTALLING VARIANTS Behind column ins
5. tallation On leaf installation 5 1 REQUIREMENTS Leaf widtm Leaf weighh 2 800 2 50 600 3 500 3 50 450 4 400 It is recommended to use an electric lock if leaf width exceeds 2 50m 6 PACKAGE When you receive your operator unpack it and check that the operator is not damaged If any damages are found contact the supplier of the operator Standard package No Name Q ty 1 Electric operator 1 2 Fastening set 1 3 User manual 1 MOUNTING AND INSTALLING OF OPERATOR 7 MOUNTING AND INSTALLING OF OPERATOR 7 1 BEFORE INSTALLING Mechanical stop If Dimension B is 0 300 mm Dimension A must not be less than 110 mm If Dimension B is 300 380 mm Dimension A must not be less than 150 mm 7 2 INSTALLING OF MOUNTING BASE AND CLAMP A Front view o 4 q 150 mm Use bolts 8 and anchors 14 mm to mount a mounting base on the pole Mounting base should be placed at a distance of not less than 150 mm from the ground Fix the clamp A on the gate leaf use bolts or welding The clamp A should be placed at a distance of 450 mm from hinge horizontally and 19 mm from mounting base installed on the pole vertically see picture MOUNTING AND INSTALLING OF OPERATOR 7 3 INSTALLING OF OPERATOR a Fj Faz Ji AA Paj Pai m Fa F P Ao ol Le tA p KZ se al Pic 1 Install the operator on the mounting base matc

Download Pdf Manuals

image

Related Search

Related Contents

工作機械取扱説明書 24 言語に対応(PDF:28 kB)  SML-40-chassis Installation Manual v1.2  Automated Commercial Environment (ACE) and International Trade  PMA Quality_Modell_PMA7501H  Atlantis Land A02-UP-W54 Computer Drive User Manual  Mode d`emploi JEOL 6510 LV  

Copyright © All rights reserved.
Failed to retrieve file