Home
        Construction checklist - Backyard Metal Casting
         Contents
1. Construction checklist    Preparation       Read through the entire assembly instruction manual        Remove the lid from the cart assembly and tightened the bracket bolts  if needed            Center the internal support ring in the lid                    Remove the wheels in preparation to paint the cart     Painting       Paint the entire cart              Re install the wheels after the cart   s paint is dry        Paint the furnace lid and body shell with heat resistant paint                 Install the lid raising lever on the hinge   s stub mount        Preparation for installing refractory          Fabricate the lid vent form  A 3  diameter 2 1 2  tall cylinder        Fabricate the drain form  A 2  diameter 2 5 8  tall cylinder           Fabricate the chamber form  Cut top and bottom disks and secure them in the form tube              Fabricate the tamping tool and centering guides from plywood        Obtain a suitable mold  3 1 2 to 4  diameter and 1 1 2  tall  to form plinth blocks           Securely cover the tuyere hole with tape from outside the furnace shell                    Obtain refractory  Buy or mix your own from scratch     Construction checklist is continued on the next page     Construction checklist page 2    Installing the refractory       Gather all forms  tools  tamping stick  centering guides  hand shovel  and organize them  neatly        Mix the refractory according to the instructions           Place drain form in furnace baseplate and tamp in 
2. talcasting     www BackyardMetalcasting com    
3. the base              Center the chamber form and ram refractory half way up the furnace body        Insert the half full furnace body into the cart so it won   t have to be installed when full and  heavy              Ensure that the chamber form does not    float    and rise upward in the refractory         _  Complete furnace body and    strike off    the top of the furnace refractory flat and level        Take note of when the body was finished  Return every 30 minutes to check the refractory   s       firmness  to carve the burner passage        Set the vent form in the lid                    Center the lid   s internal support ring  Using strong tape on the outside of the lid brackets  where the ring   s arms protrude will help keep the ring centered        Fill lid with refractory  Avoid leaving air pockets or other such flaws           Strike of the surface of the filled lid flat           Make plinth blocks with the remaining refractory           Check the body refractory for firmness  Carve burner passage if firm enough to support itself                 Allow at least three days to pass for the refractory to harden  Starting date             _  Fire the lining slowly as instructed in the manual        Check for damage to lining  Repair as needed  Hairline cracks are normal with all refractory                    Congratulate yourself on completing the build  Follow the instructions in the user   s manual  to install the propane components and use the furnace  Happy Me
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
取扱説明書 - 三洋電機  máquinas importantes na construção máquinas    Weider WEEVSY30810 User's Manual  TV-Spielkonsole / TV-konzolo TV konzol / TV Games Console    仕様(PDFファイル)  ガーデンフェンス 取扱説明書  KS AuthentiCare®  化学物質安全性データシート(MSDS)    Copyright © All rights reserved. 
   Failed to retrieve file