Home

Construction and Mining Machines Specifications

image

Contents

1. etc should be specified in the user manual 7 2 The descriptions of all components used by the manufacturer their dimensions etc and technical drawings or spare parts lists where additional description is required should be given in the user manual and parts codes should have been defined p REPUBLIC OF TURKEV PRIVE MNISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION 7 3 On the work machine the name address of the manufacturer the machine model model year motor power and serial no information should be specified on a plate in an easily visible manner 7 4 Noise value level if with a cabin the noise level inside the cabin should be specified on the machine 7 5 The warning signs and lights as specified in TS EN 474 1 2007should be affixed on the machine and the user manual in a visible manner 7 6 The manufacturer should not be using used or discharged parts in the valve production This does not mean not using materials obtained by re cycling 7 7 The vehicle check list for each product group should be defined and this list should be controlled after the installation final control before shipment 7 8 The general checks of the connection elements hose bolts etc are required to be repeated after the vehicle production is completed 7 9 Controlling of the oil and water levels of work machines radiator water ant freeze engine water gearbox oil and hydraulic and the att
2. provide required information and document for the audit team The QT should be directly reporting to top management The QT performs its duties in harmony with the existing QT of the company The QT may also have other duties within the manufacturer s organization 6 QUALITY CONTROL ACTIVITIES 6 1 Methods of data analysis failure prevention and determining eliminating failure causes are one of the major elements of the Product Conformity Assessment Mark Therefore the EW REPUBLIC OF TURKEV PRIME MINISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION manufacturer should be using and making use of effective and valid quality control monitoring evaluation and improvement techniques in the construction machine manufacturing line 6 2 In the light of the techniques mentioned in article 6 1 the approach of the manufacturer for improving its processes should be gt To determine the expectations from the process for each process product specifications period fault rate etc gt Determination of fault causes in the light of the data obtained by evaluation of the machinery materials method measurements people environmental factors gt Conducting systematic work related to elimination of causes for failure by suitable methods gt Evaluation of work conducted 6 3 The manufacturer in addition to the control test activities in the interm processes on the construction machine production line and on
3. qualification required of their fields with sufficient level of training experience knowledge and accumulation 5 2 2 The technical personnel of the companies shall be of sufficient number and sufficient level in terms of production engineering workshop project construction and R amp D 5 2 3 The personnel working at special processes welding non destructive testing X ray etc should be certified in their fields 5 2 4 The manufacturer should be using modern engineering methods and requirements Finite Element Analysis CFD or computer calculated programs etc in the construction machine design and R amp D 5 3 Quality Control Related Personnel 5 3 1 The construction machine manufacturer should have formed a Quality Team QT having sufficient experience and training in order to continuously control the product quality and raise the quality The Quality Team QT should be independent of the production and should operate directly attached to the top management 5 3 2 The manufacturer should form a Quality Team QT consisting of 2 people a production authority and a quality authority within the organization before applying for the TURQUM Mark The QT is responsible for coordinating the work to be done within the company regarding the TURQUM Quality Mark preparing the documents and related papers conducting activities related to increasing the effectiveness of the Mark to contact with the OAIB to accompany the audits to
4. remedied gt Up to date information regarding how the product and spare parts shall be ordered product spare part codes explanation of the coding system etc gt Communication information regarding after sales services of the manufacturer related to the construction machine service spare parts request advice etc 9 2 Spare Parts 9 2 1 The manufacturer should be able to provide all spare parts for the construction machine it sells for_a period of 10 years following the sales date and should include the clause that they shall be provided in the sales agreement it makes with the customer 9 2 2 The manufacturer should have the inventory systems and structure to provide the spare parts requested by the customer in the shortest possible time and if an agreement has been made with the customer regarding the time to provide spare parts it should be able to provide spare parts in the timeframe mentioned in such agreement 9 2 3 The manufacturer should deliver the spare parts it provides to its customer together with documents with instructions and or drawings showing how they should be installed 9 3 Service 9 3 1 The manufacturer should be able to provide a high quality and reliability after sales service related to the construction machine it sells Related required information shall be shared with the auditor regarding the service organization and its capabilities 9 3 2 The manufacturer should have formed the service organi
5. 9 1 User Manual 9 1 1 The manufacturer should prepare a user manual for every construction machine bearing the TURQUM Quality Mark and deliver this manual to the customer for every construction machine it sells 9 1 2 In addition to the user manual prepared in Turkish if it exports it should prepare a copy of the manual in the language of that country or the language deemed to be suitable by the country 9 1 3 The user manual prepared for the construction machine should include gt All technical specifications related to the construction machine gt Full safety instructions related to the transportation installation functioning and maintenance of the construction machine and detail information and drawings describing its operation transportation installation electrical connection diagrams etc gt A maintenance and lubrication instruction describing all maintenance and lubrication procedures for the construction machine with drawings and tables where required and including the maintenance lubrication period the equipment required to be used and the lubricant types p REPUBLIC OF TURKEV PRIVE MNISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION gt An exploded drawing lists and main consumables replacement instructions showing all parts of the construction machine gt Possible failures which may arise related with the construction machine their causes and information on how they can be
6. OAIB conducts in order to examine and evaluate the production facilities and the products of the manufacturer in relation to the product conformity assessment certification activities according to the related product conformance specifications The audits consists of certification follow up control scope and address change controls Audit Team AT Is the team consisting of 1 chief auditor and at least 1 auditor assigned to examine and evaluate the products of the manufacturers according to the related product conformance specifications and responsible for conducting the audit on the site and on document reporting the results and submitting to the Certification Committee p REPUBLIC OF TURKEV PRIVE MNISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION Warranty Is the certificate given by the manufacturer to the customer regarding the construction machine does not have any materials workmanship and production faults and which brings certain obligations to the manufacturer to be valid for a certain period Service Is the after sales repair maintenance and service given for the construction machine in case requested by the customer 4 PREREQUISITE 4 1 The manufacturer who applies to OAIB in order to obtain the Quality Mark TURQUM should be a construction machine manufacturer and should be operating in the said production area for at least 3 years 4 2 In the event of any standard being in force r
7. achments that require lubrication should be checked for lubrication 7 10 In paint areas deficient painting bubbling crater lifting cracking and leaking controls should be performed 7 11 If the machine has a cabin water insulation tests of the cabins should be performed 7 12 All hydraulic and mechanical systems should be operated for 15 minutes and their functions should be tested 7 13 General cleanliness and visual checks of the machines should be performed 7 14 For machines having a cabin and weighting more that 1500 kg their cabins should have been tested against rolling and falling objects TS EN 13510 ROPS TS EN ISO 3449 2006 FOPS The manufacturer may perform these tests itself however if it cannot perform the tests in its own organization these tests are required to be performed by an accredited organization 7 15 The performance and safety tests specified in the machinery directive and reliability standards TS EN 474 TS EN ISO 12000 2 etc are required to be performed and reported and should be submitted upon request 7 16 The functions of the equipment inside the cabin air condition buttons etc are required to be checked after the production of the machine 8 WARRANTY p REPUBLIC OF TURKEV PRIVE MNISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION 8 1 The manufacturer should observe The Consumer Protection Law numbered 4077 in effect of the Turkish R
8. amination of the conformance of the manufacturer to the conditions specified in the Product Conformity Assessment Specifications by the audit team at the manufacturer facilities This audit includes stages such as the document E REPUBLIC OF TURKEY PRIME MNSTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION production and quality processes equipment personnel test activities final product examination Certification Product Conformity Assessment Agreement is signed with those manufacturers whose conformance to Product Conformity Assessment Specifications have been determined in previous stages and they are given the right to use the Product Conformity Assessment Certificate and TURQUM Quality Mark Monitoring is the monitoring of the continuous conformance of the products of the manufacturer who has obtained the right to use the TURQUM Quality Mark to the Product Conformity Assessment Specifications by methods such as controls and customer complaints 2 PURPOSE and SCOPE 2 1 Purpose The purpose of this Product Conformity Assessment Specifications is to clarify the conditions that construction machine manufacturers who wish to obtain Quality Mark TURQUM are required to meet in terms of production quality test service spare parts etc activities and the technical specifications of the product 2 2 Scope These product conditions cover gt Prerequisites gt Machinery Equip
9. elated to the construction machines the manufacturer produces and exports the construction machine is required to meet said Turkish Standard and meet the conditions of the product standard In the event there is no Turkish Standard in effect related to the construction machine the construction machine of the manufacturer should be manufactured according to the TSEK mark EN Standard and or international standards ISO DIN BS ANSI etc or a standard mandated in the country where the construction machine is being exported to and said product should meet the conditions of the standard 4 3 The manufacturer should have the ISO 9001 2000 Quality Manufacturer System certificate or should meet the quality management system conditions The ISO 9001 2000 certificate or the quality management system of the manufacturer should cover all the facilities where the construction machines he applies to obtain the TURQUM Mark are produced 4 4 The manufacturer should hold the CE mark or meet the related CE Mark regulations related to the construction machine he applies to obtain a Product Conformance Mark for 4 5 The manufacturer should be producing according to the related legal environmental work health and safety legislation 5 MACHINERY EQUIPMENT AND PERSONNEL CONDITIONS 5 1 Machinery Equipment and Test Stand 5 1 1 The manufacturer should have the machinery and tool park of sufficient qualification to be able to produce to the accuracy it specif
10. epublic Ministry of Industry and Trade and related legislation of the countries it exports to 8 2 The manufacturer if it exports in addition to the warranty certificate prepared in Turkish for every construction machine it sells should also prepare a copy of the certificate in the language of the country it exports to or in another language deems suitable by that country The Warranty certificate should include gt The name full address and communication information of the manufacturer gt Signature of the manufacturer s authorized person and the country stamp gt The model type and serial number of the construction machine under the warranty coverage gt The warranty period and the date it takes effect gt Matters included and excluded with the warranty gt The obligations of the manufacturer and the consumer during the warranty period 8 3 The manufacturer should provide a minimum of 2 year warranty following the sales date that the construction machine it has sold is free of any material workmanship and production faults and shall perform correctly when the conditions of use given in the user manual are taken into consideration 8 4 Unless there is a specific liquid the chemical and physical properties of which have been previously agreed upon with the customer the warranty provided by the manufacturer for the construction machine performance shall be valid for cold water 9 USER MANUAL SPARE PARTS AND SERVICE
11. eriod of 10 years following the sales date and should include the clause in the sales agreement it makes with the customer that it is capable of providing the same gt The manufacturer should be able to provide for a fee planned maintenance services related to the construction machine it sells gt The manufacturer should have a system to track all kinds of the service requests by its customers and the records of the services provided for a period of 10 years in the past gt The data of the manufacturer obtained from the service organization systems its own product quality services and customer satisfaction shall be analyzed and evaluated to improve the service The manufacturer may provide these services through an organization within its own country or via a distributor authorized organization etc In case a distributor an authorized organization etc is used it should prove that it is capable of meeting the conditions of Article 11
12. ies in the manufacturer instructions throughout the process stages of the product from the raw material to the formation of the final product together with the required measurement control and test equipment 5 1 2 The manufacturer should have evaluated all factors for all the machinery equipment used in the production which may impact the production quality adversely temperature dust moisture vibration interaction of the machinery access of unauthorized personnel etc and taken all required measures EW REPUBLIC OF TURKEV PRIME MINISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION 5 1 3 The manufacturer should continuously review all his equipment infrastructure auxiliarv facilities during the production period and keep at the sufficient qualification capable of producing the product at the foreseen qualifications 5 1 4 The manufacturer is required to have a test stand to be able to conduct the performance tests of the construction machines he manufactures at required sensitivity It is mandatory that the sensitivities and accuracies of the measurement devices here are calibrated to cover the periods in which the test is conducted It is required that the tests of the construction machines are performed at the test stand according to the ISO 9906 hydraulic performance acceptance tests 5 2 Personnel Assigned for Production and Design 5 2 1 All personnel working at the production should have the
13. long term guarantee service capability to the customers worldwide they will also assist the manufacturer to achieve the level of quality to enable them to compete with their competitors in developed countries increase their customer potential and market share and aid the company to maintain and quality production system with a global level of quality The TURQUM Quality Mark is not only a system for testing and control of the final product but is at the same time a systematic approach foreseeing that the total production system of the producer is of a certain level of adequacy and quality Based on this approach If a production facility is of the required qualification in terms of quality required for a construction machine group the construction machines of the manufacturer produced at that facility in a similar manner and which are in the production program of the manufacturer shall also be considered to be adequate in terms of quality If due to technical limitations at the facility any size limitation is required on the product this shall be additionally specified in the certificate 1 1 1 Certification Process TURQUM Quality Mark certification process consists of 5 phases Application Application by the manufacturer by filling out the application form and submitting mandatory documents in its attachment to OAIB in order to obtain the right to use the TURQUM Quality Mark Document Examination Audit at the Facility is the ex
14. ment and Test Stands gt Conditions Related to the Personnel working on the Production and Design gt Personnel related to Quality Control gt Safety and Technical Conditions Related to the Product gt Warranty Conditions gt User Manual Spare Parts and Service Conditions that the manufacturer is required to meet in order to supply a better quality to its customers 3 DEFINITIONS and ABBREVIATIONS General Secretariat of Central Anatolian Exporters Union OAIB Is the party which evaluates and certifies the product quality of the manufacturers according to the Product Conformity Assessment Specifications and any other document required for the evaluation of the product Product Conformity Assessment Procedure Is the process of evaluation and certification of the product quality according to the product conformance specification and any other document required for the evaluation of the product performed by OAIB p REPUBLIC OF TURKEV PRIVE MNISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION Product Conformity Assessment Agreement Is the document signed between the Manufacturer and OAIB describing the rights and obligations of the parties arising out of certification activities Product Conformity Assesment Certificate Is the document prepared by OAIB in the name of the manufacturer within the scope of the agreement made between the manufacturer and the OAIB showing that the produc
15. t has been examined and found to be in conformance with related Product Conformity Assessment Specifications TURQUM Quality Mark Is the TURQUM logo the copyright of which is owned by OAIB and which companies certified with the Product Conformity Assessment Certificate obtain the right to use Manufacturer Is the company producing the machinery accessories and equipment requesting Product Conformity Assessment Certification services Product Is the machinery accessories and equipment produced by the manufacturer Product Conformity Assessment Specifications Is the related document prepared by the Sector Committees formed for the product by OAIB and which includes the conditions and technical regulations that the manufacturers are required to meet in order to obtain the TURQUM Quality Mark OAIB Machinery Quality Certification Department MQCD Is the office formed within OAIB in order to prepare all documents related to Product Conformity Assessment Certification activity keep records engage in promotional activities have a duty in the QT responsible for evaluating and accepting applications Quality Team QT Is the team formed by the manufacturer company within its own organization responsible for coordinating all product conformity assessment activities and consisting of at least 2 people Customer Is the real or judicial person who buys and uses the product bearing the TURQUM Quality Mark Audit Is the process that
16. the final product should be using the error prevention and improvement methods practiced in the quality control field 6 4 The calibration of measurement tools and apparatus used in the control and monitoring of the quality should be made by an accredited organization at required intervals 6 5 The manufacturer should be applying tests on the final product meeting the standard related to the product for the determination of the qualities specified in the manufacturer procedures and technical product catalogs 6 6 The manufacturer in addition to the conditions of the ISO 9001 2000 regarding Purchasing and Suppliers should be conducting work related to the improvement of the quality of the construction machine and the parts produced by its suppliers for the construction machine such as the rings casting and engine 6 7 It should be determined that the supplier holds required standards and documents A method is required to have been developed to trace the defective products and semi finished goods arriving from the supplier with regards to the lot date code and additionally the materials inspection should have been provided for 7 SAFETY AND TECHNICAL CONDITIONS These conditions do not substitute the Turkish Standards related international standard and CE regulations but cover additional safety and technical criteria related to work machines 7 1 Technical specifications of the sub groups used motor construction machine axis valve
17. vy REPUBLIC OF TURKEY i PRIME MNISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION PRODUCT CONFORMANCE SPECIFICATIONS CONSTRUCTION MACHINES Mahatma Gandhi Cad No 103 G O P 06700 ANKARA Phone 90 312 447 27 40 Fax 90 312 447 01 80 446 96 05 WEB www turqum com e mail info turqum com EW REPUBLIC OF TURKEV PRIME MINISTRY UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION 1 GENERAL INFORMATION 1 1 OAIB TURQUM Quality Mark This mark is a quality indicator granted to manufacturers whose conformances to the specifications in this document have been proven by the Central Anatolian Machinery and Accessories Exporters Union OAIB This mark to be offered for the use by the manufacturers producing machinery and accessories and exporting abroad is not mandatory and shall be offered for the use of the manufacturer after the conformance of the products within the scope of the application with the related OAIB Product Conformity Assessment Specifications are determined The products bearing the TURQUM Quality Mark shall have the qualification of a joint brand with a certain quality and address which are reliable that create a privilege with their quality and easily recognized and preferred with their logo by the customer in the markets within the country and abroad While the said Quality Mark TURQUM provides goods of a high quality and reliability and a
18. zation to provide its customer the service of required qualification and in short time In this scope gt Manufacturer s teams providing the service should be in good control of all technical practical safety information related to the construction machine and trained to be able to provide all kinds of services gt The service organization and teams of the manufacturer should have the infrastructure facilities to provide all kinds of services related to the construction machine building vehicles hand tools spare parts test and measurement devices etc gt If an agreement has been made between them regarding the manufacturer shall intervene with the construction machine within the shortest possible period following the service required is communicated it should be able to provide service within the timeframe mentioned in such agreement gt In case of an emergency service request for sudden stops in the production of the customer resulting from construction machine failure the manufacturer should have specify a time period in the sales agreement a time period that it is capable of providing service especially for such a condition There should be evidence that the manufacturer is capable of providing such service 10 vy REPUBLIC OF TURKEY l PRIME MNISTRV UNDERSECRETARIAT FOR FOREIGN TRADE OAIB CENTRAL ANATOLIAN EXPORTERS UNION gt The manufacturer should be able to provide services for the construction machine it sells for a p

Download Pdf Manuals

image

Related Search

Related Contents

Siemens WM14Y891GB washing machine  VDB-Avril-2015 - Commune de plédéliac  CableWholesale 10X6-15101 networking cable  MANUAL DO UTILIZADOR DO TECHMOUNT PARA ECRÃS  WinspectR6.User.Manual.JAN.2004  

Copyright © All rights reserved.
Failed to retrieve file