Home

BJ194Z-9S4 Network Multi-meter User Manual Version

image

Contents

1. 33 11 TECHNICAL SERVICE 34 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 2 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 1 SUMMARIZE BJ194Z 9S4 series Network Multi meter is a high end multifunction power meter It is the ideal choice for monitoring and measuring of power systems It can measure all of the power parameters in power grid Current Reactive power Voltage Apparent power Frequency Energy Active power Power factor Have variety of input and output port for option through the analog port digital I O port and pulse output port to transmit the electric parameter For transformers generators capacitor banks and motors of the distributed detection automatic control system on line monitoring display It can replace the traditional analog or many digital measurement instruments such as ammeter voltmeter power meter power factor meter frequency meter etc with the advantages of improving system reliability making the on site wiring convenient and reduce system cost With serial port BJ194Z 9S4 Network multi meter can connect with PC and use Modbus to set programming and read the data Based on
2. In level 1 menu of bus Choose item data and the meter shows like this bUS dREA Then press CD enter the level 3 menu allowing us to set the communication data format Factory setting n 8 1 bUS bUS bUS GALA JALEA dGAEA of Pai n8 i Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 20 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 4 Digital Output Setting Press CA return to level 1 menu In this section user will set 1 Digital output type 2 Output delay 3 Choose the electrical parameter 4 Set the alarm value 5 Set the hysteresis value Note If the meter have more than one channel digital output you can set the DO 2 DO 3 as the following step please select the appropriate output settings in the level 1 menu 7 4 1 Output type In level 1 menu use CKD and C gt gt to choose item DO 1 and the meter shows like this dos then press CH enter the level 2 menu choose TYPE The meter shows 2 1l do i then press CY again enter the level 3 menu Use KKD and gt gt to select the output type meter shows like this do
3. 11 6 OPERATION MODE 12 7 SETUP PROCEDURE 15 7 1 Input Password 15 7 2 Input Signal Selection 15 7 3 Communication Preferences 19 7 4 Digital Output Setting 21 7 5 Analog Output Setting 25 7 6 System SettiNg 28 7 7 Menu Structure 30 7 8 Display Character instructions 31 8 PULSE OUTPUT 32 9 SAFETY CONSIDERAT IONS 33 10 MAINTENANCE
4. 7 5 3 Set the low value for transmission output In level 1 menu of AO 1 Choose item LDIS meter shows like this Ho I Ld 5 then press G enter the level 3 menu user can set the low value Ho i man l IUL i Press gt to input the number from O 9 Press XK to move the cursor After password switch press CD to confirm the input value is 1 9999 Default 0000 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 26 lt Chongqing Blue Jay Electronic Co Ltd Product Manual Note Alarm value is about the secondary side value such as AC100V ACSA Voltage unit is 0 1V Current unit is 0 001A Active power unit is 0 1W Reactive power unit is 0 1VAR Power factor Is 0 001 Frequency 0 01HZ 7 5 4 Set the full scale value for transmission output In level 1 menu of AO 1 Choose item HDIS meter shows like this Ho Hdi 5 then press CDH enter the level 3 menu user can set the full scale value Ho man l IULI ft Press gt gt gt to input the number from 0 9 Press CZD to move the cursor After password switch press CD to confirm the input value is 1 9999 Default 5000 Note Alarm value is about the secondary side value such as AC100V
5. J60 Product Manual Note A different range will affect the accuracy of measurements If the accuracy is 0 5 Select 100V range means the minimum scale value is 0 5V 100 x 0 5 Select 380V range means the minimum scale value is 1 9V 380 x 0 5 7 2 3 Current measure range In level 1 menu of IN Choose I SCL meter shows like this Sth i SLL then press CY _ enter the level 3 menu user can see the current range n LOLL 5 5A Maximum measured value is 5A 1A Maximum measured value is 1A D S a 1 SEL Note Select a different range will affect the accuracy of measurements if the accuracy is 0 5 Select 1A range means the minimum scale value is 0 005A 1 x 0 5 Select 5A range means the minimum scale value is 0 025A 5 x 0 5 7 2 4 Voltage transformation ratio In level 1 menu of IN Choose item r PT meter shows like this Tel 0086 023 86850812 Fax 0086 023 67636974 Email tech cqbluejay com Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 17 lt Chongqing Blue Jay Electronic Co Ltd Product Manual i AT r PE then press CH enter the level 3 menu allowing us to set the current transformer Ha r PE NAN t UUU t Press gt gt gt to input the number from 0 9 Press CZD to move the
6. lt Chongqing Blue Jay Electronic Co Ltd Product Manual Show the active energy value Viz K M Ca EP one The second line LED display for the high 4 bit ta V A W Wh digital The third line LED display for the lower 4 bits 0000 5 1 V A Var Varh rH O Combined to 8 digit for energy value EEF g 7 J B l V A Cos Hz Screenshots show EP 73 8Wh ES se a T r SE i Press can switch show the negative active i es eS a ka energy data lt j D gt SET lt gt Viz O EP OKOM te ck aia Show the negative active energy value 5 2 Coco PA Vie Vai Screenshots show EP 867 6Wh PQH F O gt B 5 16 Press wD can switch show the positive active V A Cos Hz energy data T T i r ak i ree a ae Cee ee Te lt q D gt SET lt gt Show the positive reactive energy value Oo FY DEOM The second line LED display for the high 4 bit m O TARM digital The third line LED display for the lower 4 bits 6 1 0000 PH OQO Combined to 8 digit for energy value EEF a BY 10 T Ace ig Screenshots show Eq 647 0varh Se oe a Press CY can switch show the negative reactive Eao oaa i energy data lt q O gt SET lt amp 123 K M OB EW OO Show the negative reactive energy value m O V A W Wh gogo S
7. do Jldo CIPE EIRE tyPE Cn Rir GFF Tel 0086 023 86850812 Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing Email tech cqbluejay com 21 lt Chongqing Blue Jay Electronic Co Ltd Product Manual r n Mean remote control mode there have pulse and level output mode more detail refer chapter_7 4 2 Host inquiry 01 05 00 01 FF 00 DD FA Relay value Address Code Relay address FFO0 close 0000 open CRC Slave answer 01 05 00 01 FF 00 DD FA Relay value Address Code Relay address FFO0 close 0000 open CRC RS485 communication please refer to chapter 8 1 ALr Mean directly alarm mode OFF Mean the relay will not work 7 4 2 Set output delay In level 1 menu of DO 1 Choose item DELY and the meter shows like this do dELY Then pressC Y gt enter the level 3 menu user can set the delay value doz i dELY UgU Press gt gt gt to input the number from O 9 Press CZD to move the cursor After password switch press G to confirm the input value is 1 9999 Default 0010 Note The setting of relay value is indicating the width pulse output value 0000 is for level output The setting value resolution is 10ms which means 0
8. Chongqing 10 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 5 SCREEN DISPLAY 5 1 Panel Diagram D_ EC ebp gB vn BEBEN aa eto gt HAAB aa 5 2 Display Summary Explanation Indicator of the current display 4 LED show the display module reading data Show the direction of the current Negative symbol measure data red LED on mean otherwise means a Three lines 4 digital LED show power 3 data include voltage current power power factor frequency etc And the contents of the programming menu 4 Indicator of the data Unit K means thousand M means million 5 Enter key For menu selection and confirmation Used to open the menu and return to previous menu 7 Left and Right key Set the programming value Note Please see detail instructions of items at OPERATION MODE Digital display module Menu key Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 11 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 6 OPERATION MODE When the 194Z 9S4 is powered up the entire symbol will be on and the meter starts to self test After some seconds the meter is ready for operation and shows one of the available screens QD
9. Parameters on display can be switched by pressing key CKD or Cc LCD shown on screen at any moment When the key lt lt is pressed the screen CURRENT values of each phase are now showing Pressing again the key XK the screen will show the following parameters successively In setting menu pressing XK can move the setting cursor to left Pressing gt gt gt can enter the number 0 9 Fa gt gt T DF This key named SET key pressing it can open the programming menu and return to previous menu g N This key named Enter key pressing this key you can exit it with saving any modification that you might have done in menu operation press Enter key and user can go to the next menu Note Press key CKO or in normal standby status and the meter will show different data in main screen In the menu set mode when changes the parameter and exit setting the meter will ask to SAVE press CAD exit without saving press C save and exit Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 12 lt Chongqing Blue Jay Electronic Co Ltd Product Manual Screen Shown Explain Show the phase voltage Ua Ub
10. Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 15 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 2 1 Choice the input net mode In level 1 menu use CKD and gt gt to choose item IN and the meter shows like this n then press CH enter the level 2 menu choose LINE meter shows n Li nE a Then press YD again enter the level 3 menu Use KD and gt to select the right wiring mode meter shows like this in fC Oo Lia Ag nd Note Selecting the wiring mode must match with actual wiring or the reading data will go Terp Soon n n A wrong 7 2 2 Voltage measure range In level 1 menu of IN Choose item U SCL and the meter shows like this aaia pn r c un then press amp enter the level 3 menu user can see the voltage range Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 16 lt Chongqing Blue Jay Electronic Co Ltd at I i IC rt OF LAI 100V Maximum measured value is 100V 380V Maximum measured value is 380V n mer UOLL
11. Uc three phase four wire Vi K M z g JE 7 5 i or line voltage Uab Ubc Uca nn A three phase three wire 1 a d E8 V A Var Vai In the three phase4 wire connection press S amp A PQH O Sru pi EE can switch show the phase voltage and line mer O Sy C466 voltage v A Cost Hz Screenshots show Ua 236 7V KS Ss Ub 236 8V l po A l Uc 236 6V iL SE Sr Shows three phase current la Ib Ic units amp va O OKOM Screenshots show la 5 001A mm p m s00 l V AWW Ib 5 000A Ic 5 000A 2 S000 w O n ee In High Voltage Measurement EPEQE O i 500g J a Gia O K means in thousands O M means in million j a aiis me pm n C i E a ae When the indicatior on please do the above lt E SET a treatment vw O g JJ0g OKOM Shows the total active power P m O U A Ww ow total reactive power Q g g g g total power factor PF C 3 ror A ee Screenshots show P 3302kW EPEQF O Q Okvar 400 V A Cos6 Hz PF 1 000 l aks ia igs an E i Eo ae eT oe ca C SET lt 4 Vi23 O He OKOM m O V A W Wh Show grid frequency 4 E s5000 V A Var Varh i j ra QO Screenshots show F 50 00Hz EFF V A Cos Hz a oie l aay ae LAG ac gt SET ced Tel 0086 023 86850812 Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing Email tech cqbluejay com 13
12. conditions The instrument must not be powered on and used until its definitive assembly is on the cabinet s door If the instrument is not used as manufacturer s specifications the protection of the instrument will be damaged When any protection failure is suspected to exist for example it presents external visible damages the instrument must be immediately powered off In this case contact a qualified service representative 4 1 Installation Mounting Instrument is to be mounted on panel cut out 91 0 8 x 91 0 8 mm Keep all connections into the cabinet Note that with the instrument powered on the terminals could be dangerous to touch and cover opening actions or elements removal may allow accessing dangerous parts Therefore the instrument must not be used until this is completely installed 1 96 p 62 j Front view Side view Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 7 lt Chongqing Blue Jay Electronic Co Ltd Product Manual Notes Input signal BJ194Z using a separate acquisition calculate for each measurement channel to ensure consistent in use for different load forms its a variety of connection mode Access wire shall be met the current 2 5 square mm voltage of 1 5 square millimeters A Voltag
13. for transmission output HdlS Output type Analog Output Setting AO 1 Product Manual 12 20 4 20 0 20 Default is 12 20 UA UB UC FR Default is UA 0000 9999 Default is 0000 0000 9999 Default is 5000 Note Not all 194Z series network multi meter have the complete menu settings Please confirm your purchased network multi meter ha s the corresponding extension module Without the module the corresponding part of the menu is not valid 7 9 Display Character instructions User passwords PASS Input error Us er settings menu Communication settings menu orl itn ezza unl m 1 O LI a m 0 m Shows scal input value oO Tr Set the decimal point Communication parameter setting D FBR D Metter address setting CO gt Baud rate 8 data bits 1 stop bit even parity 8 data bits 1 stop bit odd parity 8 data bits 1 stop bit no parity Confirm the change o l Co te rO co Ln CZ m SEL Input voltage range selection f SEL Input current range selection Set PT ratio as J La O Select phase Route 1 switch output settings Route 2 switch output settings O OL a A E ag j ma WC System parameter settings Choose Setted parameter The corresponding parameters oln an ma o aim 0 Na Set the alarm value C Show Low alarm se
14. lt Chongqing Blue Jay Electronic Co Ltd Product Manual BJ194Z 9S4 Network Multi meter User Manual Version 1 2 BBB OKO A W Wh A Var Varh A Cost Hz Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing lt Chongqing Blue Jay Electronic Co Ltd Product Manual Read me When you use BJ194Z 9S4 series Network Multi meter be sure to read this user manual carefully and be able to fully understand the implications the correct guidance of operations in accordance with user manual which will help you make better use of BJ194Z 9S4 series Network Multi meter and help to solve the various problems at the scene 1 Before the meter turning on the power supply be sure that the power supply within the provisions of the instrument 2 When installation the current input terminal must non open voltage input terminals must Non short circuit 3 Communication terminal RS232 RS485 or Ethernet is strictly prohibited to impose on high pressure 4 Be sure the instrument wiring consistent with the internal system settings 5 When communicating with the PC instrument communication parameters must be consistent with the PC Please read this user manual carefully Please save this document Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village P
15. this section 7 3 1 Meter communication address setting One or some BJ194 meter can be connected to a P C With this system we can get all the parameters in one central point of reading The BJ194 has a serial RS 485 or RS 232 type output according to the model If we connect more than one device to the same communication line RS 485 we have to assign to each of them a different code or direction from 1 to 247 since the P C needs the identification of every measuring point In level 1 menu choose the item bus the meter shows like this bUS Then press CY gt enter the level 2 menu choose the item Addr the meter shows like this bUS Addr Pres gt gt to input GA the number from 0 9 Press CLD to move the cursor After password press CY to confirm the input value is 1 9999 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 19 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 3 2 Communication Baud rate setting In level 1 menu of bus Choose item BAUD and the meter shows like this bUS bAUd Then press CY enter the level 3 menu allowing us to set the Baud rate 2400 4800 or pus EUS BUS baud bAUG o bAUd 2400 4800 9600 7 3 3 Choose communication format
16. universal AC DC power input if not for a special statement we provide the 220VAC DC or 110VAC DC power interface for standard products Instruments limit work power supply AC DC 80 270V please ensure that the auxiliary power can match with BJ194Z series meter to prevent damage to the product A Suggest install 1A fuse in the fire line side B For the areas with poor power quality suggest install lightning surge suppressor and rapid burst suppressor to prevent lightning strikes Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 8 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 4 2 Connection Terminal Upper connection terminal 1 2 5 5 60 47 48 49 50 16 15 Power supply RS485A RS485B GUD APs aP RP Re AO AO 1 Supply voltage input 0 V 48 Active energy pulse output 2 Supply voltage input 220 Va c 49 Reactive energy pulse output 58 RS 485 50 Reactive energy pulse output 59 RS 485 16 Analog output 60 RS 485 GND 15 Analog output 47 Active energy pulse output Middle connection terminal 20 19 22 21 70 71 72 73 74 DO1 DO2 COM DI1 DI2 DI3 DI4 20 Route 1 digital output 71 Route 1 digital input 19 Route 1 digital output 72 Route 2 digital inpu
17. 001 is 10ms 9999 means 99 99s Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 22 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 4 3 Choose the electrical parameter In level 1 menu of DO 1 Choose item PArA meter shows like this do PArA then press amp enter the level 3 menu user can choose the output parameter Note There are two alarm mode indicate with XX H and XX L XX H mean the rising edge alarm XX L mean the falling edge alarm IA H mean when the A phase current is rising to a certain value then output alarm Example 13 H mean when one phase of A B C phase current is rising to a certain value then output alarm PS L mean when Three phase total power is falling to a certain value then output alarm 7 4 4 Set the alarm value In level 1 menu of DO 1 Choose item VALU meter shows like this do vALU then press G enter the level 3 menu user can set the alarm value do wALU ggg a oom Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 23 lt Chongqing Blue Jay Electronic Co Ltd Product M
18. AC5A Voltage unit is 0 1V Current unit is 0 001A Active power unit is 0 1W Reactive power unit is 0 1VAR Power factor Is 0 001 Frequency 0 01HZ 7 5 5 Example of analog output Set analog output TYPE 4 20mA LdlS 0000 PARA select la HdlS 5000 This mean when A phase current is 0 000A output 4mA current is 5 000A output 20mA Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 27 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 6 System Setting Press CA return to level 1 menu In this section user will set 1 Backlight time of the LCD 2 Clear energy counters 3 Set display mode 4 Change the password 7 6 1 Set the LCD backlight time In level 1 menu use CKD and C gt gt to choose item SYS meter shows like this 595 then press lt gt enter the level 2 menu choose LCd t meter show 595 LLdt then press GA again enter the level 3 menu Use CD and to select the value Note Minimum step is 1 minute 0005 for 5 minutes which means if not any operation in 5 minutes the backlight will turn off Set value gt 1000 the backlight always on Set value 0000 the backlight always off 7 6 2 Clear energy counters In level 1 menu of SYS Choose item CLr E meter shows like this Te
19. EC 688 IEC 255 3 1989 2kV AC RMS 1 minute between input output case power supply Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 5 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 EMC Test standard Test voltage Electrostatic discharge immunity IEC 61000 4 2 8Kv test level 4 Electrical fast transient burst a input IR Powersunii aki immunity test p PPly Surge Shock immunity test Pe aaa a mode test voltage 8 Work environment Temperature 20 C 60 C Humidity RH 20 95 No condensation 9 Protection Panel IP54 Case IP20 10 Storage Conditions Temperature 25 C 70 C Humidity RH 20 95 11 Working Power AC 80 265V 45 65Hz DC 80 380V DC 20 60V Optional Maximum power consumption 6W 12 Dimensions L x W x H 96mmx96mmx71mm 13 Installation hole size L x W 91 0 8mm x 91 0 8mm Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 6 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 4 INSTALLATION AND START UP The manual you hold in your hand contains information and warnings that the user should respect in order to guarantee a proper operation of all the instrument functions and keep it in safety
20. RATIONS All installation specification described at the previous chapters named INSTALLATION AND STARTUP INSTALLATION MODES and SPECIFICATIONS Note that with the instrument powered on the terminals could be dangerous to touching and cover opening actions or elements removal may allow accessing dangerous parts This instrument is factory shipped at proper operation condition 10 MAINTENANCE The 194Z does not require any special maintenance No adjustment maintenance or repairing action should be done when the instrument is open and powered on should those actions are essential high qualified operators must perform them Before any adjustment replacement maintenance or repairing operation is carried out the instrument must be disconnected from any power supply source When any protection failure is suspected to exist the instrument must be immediately put out of service The instrument s design allows a quick replacement in case of any failure Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 33 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 11 TECHNICAL SERVICE FAQ s 1 The BJ 194Z Network multi meter once cabled and connected is seen to give a correct voltage and current reading but shows negative values for active power generation This is an error with the cabling for the current
21. an be simultaneously read in the screen Indicator LED on the left shows currently displayed the parameters o K means in thousands o M means in million OTHER FEATURES Low size 96 x 96 mm panel mounting meter True R M S measuring system Instantaneous maximum and minimum values of each measured parameter Energy measurement indication through a lighting led RS 485 or Ethernet optional type communication to a PC Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 4 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 3 2 Specifications 1 Reference standard Basic electricity GB T 13850 1998 IEC688 1992 Active power GB T17215 2002 IEC61036 2000 Reactive power GB T17882 1999 IEC61268 1995 2 Accuracy standards a Voltage 0 5 fs Current 0 5 fs Active Power 0 5 fs Reactive Power 0 5 fs Apparent power 0 5 fs Power Factor 0 5 fs Active Energy 1 rd Reactive Energy 2 rd Frequency 0 05 rd 3 Input Voltage Rated 400V optional 100V Current Rated 5A optional 1A Frequency 45 65Hz 4 Load Voltage lt 0 5VA phase rated 220V Current lt 0 5VA phase rated 5A 5 Overload Current 1 2 times rated continuous 10 seconds for 10 times the rated Voltage 1 2 times the rated continuous 10 seconds for 800V 6 Dielectric strength I
22. anual Press gt gt gt to input the number from 0 9 Press CZD to move the cursor After password switch press GA to confirm the input value is 1 9999 Default 5500 Note Alarm value is about the secondary side value such as AC100V ACSA Voltage unit is 0 1V Reactive power unit is 0 1VAR Current unit is 0 001A Power factor Is 0 001 Active power unit is 0 1W Frequency 0 01HZ 7 4 5 Set the hysteresis value In level 1 menu of DO 1 Choose item HYS meter shows like this do i HYS then press CH enter the level 3 menu and user can set the alarm value doci NAN I GUL 3 Press to input the number from 0 9 Press CZD to move the cursor After password switch press CY to confirm the input value is 1 9999 Default 5500 Note hysteresis value is for preventing the relay repeated action Example Alarm value 3 700A hysteresis value 0 030A Rising edge alarm Measured value is 3 700A then relay action output alarm When measured value is bellow 3 670A the relay will be closed Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 24 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 5 Analog Output Setting Press CA return to level 1 menu In this section user will set 1 Analog output type 2 Choose th
23. creenshots show Eq 828 0Wh 6 2 V A Var Varh Oo P su A ron O Press can switch show the positive reactive energy data ea 7 8280 V A Cos Hz ae T Tj i m a a a i Proa tam Ya i lt j D gt SET lt Tel 0086 023 86850812 Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing Email tech cqbluejay com 14 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 SETUP PROCEDURE The SETUP procedure of the BJ194Z 9S4 is performed by means of several SETUP options Once into the SETUP use the keyboard to select different options and enter required variables 7 1 Input Password A 4 figure password is required to be entered in case that in case that the meter will work without permission At normal display mode press CAD to enter the programming mode meter display PASS Meter display Ask for the password Press gt gt gt to input the password number from O 9 Press CKD i N to move the cursor After password switch press CDH to confirm the input If password is correct meter can enter next setting Notes the default password is 0001 7 2 Input Signal Selection Press CA return to level 1 menu In this section user will set 1 Input net mode 2 Voltage measure range 3 Current measure range 4 Voltage transformation ratio 5 Current transformation ratio
24. cursor After password switch press CD to confirm the input value is 1 9999 Note The input values represent the voltage transformer primary side voltage secondary side voltage Secondary side voltage is 100V or 380V user set it at section 7 2 2 7 2 5 Current transformation ratio In level 1 menu of IN Choose the item r CT meter shows like this n r CE then press CY enter the level 3 menu allowing us to set the current transformer n r CE NAN UUU t Press gt gt gt to input the number from 0 9 Press CZD to move the cursor After password switch press G to confirm the input value is 1 9999 Note The input values represent the current transformer primary side voltage secondary side current Secondary side current is 1A or 5A user set it at section 7 2 3 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 18 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 3 Communication Preferences 7 Press CA return to level 1 menu In this section user will set 1 Meter communication address 2 Baud rate 3 Communication format Note Not all the meter have communication function please make sure your purchase meter first if no communication mode you can skip
25. e electrical parameter 3 Set the zero value for transmission output 4 Set the full scale value for transmission output Note If the meter have more than one channel analog output you can set the AO 2 AO 3 as the following steps please select the appropriate output settings in the level 1 menu 7 5 1 Output type In level 1 menu use CKD and C gt gt to choose item DO 1 meter shows like this Ho then press CH enter the level 2 menu choose LINE meter shows Ho 1 LYPE then press CY again enter the level 3 menu Use KD and C to select the output type meter shows like this Ho 1 lHe Ao EYPEJ EYPE EYPE eo G20 0 20 Note output type can choose 12 20mA 4 20mA 0 20mA default is 12 20mA Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 25 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 7 5 2 Choose the electrical parameter In level 1 menu of AO 1 Choose item PArA meter shows like this Ho 3 PH H N then press amp enter the level 3 menu user can choose the output parameter ae Ho i PACH ft 9 E Note The analog parameter can set la Ib Ic Ua Ub Uc P Q H F default is UA
26. e input Input voltage should not exceed the rated input voltage products 100V or 400V Otherwise you should use external CT Suggest 1A fuse be installed in the voltage input side B Current Input Standard input current is 5A if greater than 5A should use external CT When the CT is connected with other instruments make sure wiring methods be used in series Before remove the current input connection must be sure to disconnect the primary circuit or shorted secondary circuit of CT In order to facilitate disassembly please do not connect to CT directly and the terminal block is suggested C Please make sure that the input voltage and current corresponding to the same phase sequence and the same direction Otherwise the Values and symbols will be wrong Power and Energy The input network configuration of instrument depends on the CT number of the system in the condition of 2 CT select the three phase three lines two components in the condition of 3 CT select the three phase four lines three component mode Instrument connection mode set of the instrument programming input network NET should be the same load wiring as measured wiring Otherwise the measurement instrument will lead to incorrect voltage or power In three phase three wire mode the measurement and shows the line voltage In three phase four wire mode the measurement and shows the phase voltage Auxiliary power BJ194Z series network multi meter with
27. ioneer Park Jiangbei District Chongqing 1 lt Chongqing Blue Jay Electronic Co Ltd Product Manual Directory CONTENTS Page 1 SUMMARIZE 3 2 APPLICATIONS 3 3 FEATURES 4 3 1 Electricity metering 4 3 2 Specifications 5 4 INSTALLATION AND START UP 7 4 1 Installation 7 4 2 Connection Terminal 9 4 3 Connection Drawing 10 5 SCREEN DISPLAY 11 5 1 Panel Diagram 11 5 2 Display Summary
28. l 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 28 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 545 LLE then press amp again to confirm clear all the energy data meter display SYS Lice SUrE And then press CA again to save the operation and exit Press CAD without save and exit 7 6 3 Set display mode In level 1 menu of SYS Choose item dISP meter shows like this 595 di 5P then press CDH enter the level 3 menu user can choose the display mode SYS 545 di SP di SP nAn HuUto Note Man means the screen display will change by press CXD and gt Auto means the screen display will change in every 10 sec 7 6 4 Change the password In level 1 menu of SYS Choose item CodE meter shows like this 595 Lod amp Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 29 lt Chongqing Blue Jay Electronic Co Ltd Product Manual then press A gt again enter the level 3 menu Use lt gt and gt gt to input the new password Note Please do not change the password If necessary please contact B
29. lue Jay technical 7 7 Menu Structure LED eerie ime 0000 1000 Factory default is 0005 Clear energy Glemesag pats CLrE po Unrecoverable for Clear data SYS Manual or Display mode dISP Automatic Factory default is manual Change the password 0000 9999 Default is 0001 Net Lin e N 3 4 N 3 3 N 1 Select the input signal network measurement Voltage Range 100V 220V Select the range of measured U SCL 380V voltage signal Select the range of measured Voltage transformation 1 9999 Setting voltage signal ratio R PT transformation ratio 1 2 scale urrent transformation etting current signa ac j 1 9999 n igral ratio R CT transformation ratio 1 2 scale Address ADDR 1 247 Instrument address range 1 247 poea BAUD 4800 9600 Default is 4800 bUS Protocol DATA 0 8 1 e 8 1 Factory default communication n 8 1 mode for the word n 8 1 Output type TYPE rn Alt OFF Default is Alr PRE 0000 9999 Default is 0010 Digital output Choose the electrical 13 H A Br Beal parameter PArA PS H U3 H Default is 3 H Set Ean vae 0000 9999 Default is 0050 hysteresis value HYS 4800 9600 Default is 4800 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 30 lt Chongqing Blue Jay Electronic Co Ltd TYPE Choose the electrical parameter PArA low value for transmission output LdlS full scale value
30. nsformer ratio has been correctly set see section on chapter7 Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 34 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 4 The BJ 194Z does not correctly display the current reading It shows values varying between 0 to 5 amps of current Ensure that the Transformer ratio has been correctly set once correctly set the current measurement shall be shown correctly see section on chapter7 For any inquiry about the instrument performance or any failure contact to Blue Jay s technical service Blue Jay After sales service Redstone Road 2 17 3 Jiangbei District 400020 Chongqing Tel 0086 023 67636974 Fax 0086 023 67636974 E mail tech cqbluejay com Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 35
31. t 22 Route 2 digital output 73 Route 3 digital input 21 Route 2 digital output 74 Route 4 digital input 70 Digital input COM pin Lower connection terminal 4 5 6 7 8 9 41 12 13 14 4 Current A phase S1 input 9 Current C phase S2 input 5 Current A phase S2 input 11 Voltage A phase input 6 Current B phase S1 input 12 Voltage B phase input 7 Current B phase S2 input 13 Voltage C phase input 8 Current C phase S1 input 14 Neutral Voltage input Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 9 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 4 3 Connection Drawing Power Supply PE TTT Tt felsojss fe Wisely fF amp amp 4 irae H ree ters P2 EE Pi z O U gt IMPORTANT REMARK If power 0 01 is shown for any of the phases and voltage and current are not zero for this phase check out following points Assure that A B and C phases coincide in voltage and current Correct polarity Reverse the current transformer placed at this phase Note This connection drawing is for reference only the actual connecting terminal please refer to the label on the rear part Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District
32. this power meters you can simply set up a monitoring system with the IPC and central software 2 APPLICATIONS All power parameter measurement Power factor measurement and control Energy Measurement Replacing the three phase power meter three phase electricity transmitter Transformers generators capacitors and electric motors distributed detection Medium and low pressure systems SCADA EMS DCS integrators Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 3 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 3 FEATURES 3 1 Electricity Metering By means of an internal microprocessor it simultaneously measures aan Sanaa PRAT SaIeN Single phase votes v x x x F Phase phase voltage v x x x fourent S E x xd Frequency fJ x x x x Power factor coso xx xx xx x Ratve power w xx xx xx x Reactive power va xx xx xx x Active energy wn xx xx xx x Reactive energy van xx xx xx x a quadrantelectiodata xx xx xx x Notes Phase phase voltage is Uab Ubc Uca voltage data determined by the different wiring Available x Display and communications The 194Z 9S4 delivers the visualization of above listed parameters by means of three line 4 digit led type displays Up to 3 parameters c
33. transformer secondary the direction of the transformer current has to be respected as shown in the connection diagram The current transformers have a two face primary the current must pass from P1 to P2 giving the result in secondary S1 and S2 of 5 amps The error stems from a The current transformers have been incorrectly installed As a result it gives the direction of the current as passing from P2 to P1 to resolve this problem the current transformer does not have to be dismantled and installed again but the transformer secondary S1 and S2 just has to be inverted b The connection of the current secondary in the current transformers have been incorrectly connected to resolve this problem just connect the S1 transformer secondary to the S1 on the meter and the S2 on the current transformer to the S2 on the meter 2 The BJ 194Z once cabled and connected is seen to give an incoherent Power factor and Cos reading 0 01 or similar This is again a current transformer and voltage phase connection error phase A must correspond to the current transformer installed in phase A phase B must correspond to the current transformer installed in phase B and phase C must correspond to the current transformer installed in phase C This connection is clearly shown on the back of the analyzer 3 The BJ 194Z is measuring in average voltage and is displaying the secondary voltage for example 110 volts Ensure that the voltage Tra
34. tting Show High alarm setting System password Tel 0086 023 86850812 Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing Email tech cqbluejay com 31 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 8 PULSE OUTPUT BJ 194Z network multi meter provides 2 routes pulse output for the total active energy and total reactive energy The host PLC DI module can cumulative the data of both the active and reactive power energy sent by the pulse from optocoupler relay 1 Electrical specification voltage VCC lt 48V Iz lt 50mA 2 Pulse 5000 imp kWh pulse upto 80ms This means When the meter detect 1 kWh the meter output 5000 pulse Note 1 kWh energy is for secondary side energy data if there have PT and CT accessed primary side energy data is 1 kWh xPT ratiox CT ratio For example In measure time T the received total pulse is N Primary side input of voltage is 10Kv Primary side input of current is 400A Secondary side measurement range is 100V and 5A In the time T energy accumulated is N 5000 x 100 x 80 pulse output active power reactive power Tel 0086 023 86850812 Email tech cqbluejay com Fax 0086 023 67636974 Add Building 13 2 8 Jialing third village Pioneer Park Jiangbei District Chongqing 32 lt Chongqing Blue Jay Electronic Co Ltd Product Manual 9 SAFETY CONSIDE

Download Pdf Manuals

image

Related Search

Related Contents

Tacens SAGITTA LUX  Samsung WW60J5213HSDLP Инструкция по использованию  Manual de uso  Vosstronics Primus Elegans  Samsung SGH-E800 Керівництво користувача  Construction of pathogenic, biologic and genetic bases of the  

Copyright © All rights reserved.
Failed to retrieve file