Home
- H2 Solar Shop
Contents
1. General Information Installing the temperature sensor The solar collector temperature sensor should be installed in the sensor sleeve nearest to the collector array flow To ensure optimal contact between the temperature sensor and the surrounding environment the gap between the sensor sleeve and the sensor element should be filled with a suitable conducting compound All materials used for installing temperature sensors sensor element conducting compound cables sealing and insulating materials must be suitably temperature resistant up to 250 c Operating pressure The maximum operating pressure is 10 bar Removal of air from the system bleeding The system should be properly bled at commissioning to remove as much air as possible from the system We would recom mend that after 2 to 4 weeks of operation the system is bled again Warning When bleeding the system there is a risk of scalding due to steam and hot transfer fluid and appropriate care must be taken Only operate the bleeding valve if the temperature of the heat transfer fluid is below 60 c When bleeding the system the collectors must not be hot Cover the collectors and if possible bleed the system in the morning Checking heat transfer fluid The heat transfer fluid must be checked at least every four years with regard to its antifreeze content and pH value e Check the antifreeze with an antifreeze tester and replace or refill if necessary We would recommend
2. Works are in place See also Builders Protection Ordinance If non personal fall protection or fall arrest systems cannot be installed for technical reasons all personnel must be secured by means of suitable safety harnesses Only use safety harnesses safety belts lanyards and straps shock absorbers fall arresters that were tested and certified by authorized testing bodies If non personal fall protection or fall arrest systems are not provided working without the use of suitable safety harnesses may lead to falls from heights and therefore cause serious or lethal injuries Ladders not properly secured against sinking in sliding or falling over may lead to danger ous falls Whenever you are near live overhead electric cables where contact is possible only work if itis ensured that they are voltage free and this is secured for the duration of work The live parts are secured by the ESB by covering them or cordoning them off And are deemed safe by ESB transmission supervisor Or advised safety distances are maintained Voltage radius 1m with voltages up to 1000V 3m with voltages from 1000V to 11000V 4m with voltages from 11000V to 22000V 5m with voltages from 22000V to 38000V gt 5m in case of unknown voltages The manufacturer hereby guarantees to take back products identified with an eco label and to recycle the materials used Only the heat transfer mediu
3. a target protection of 25 c e Check the pH value with a pH indicator rod If the limit pH value is less than 7 0 then replace the heat transfer fluid Collector maintenance The solar collectors should be inspected visually once a year for any signs of damage leaks or contamination System commissioning checklist Customer details Name Address Telephone number Mobile number E mail address Installer details Company name Address Telephone number Mobile number E mail address Web site MCS number System summary Number of Asis One 1A collectors Type and volume of cylinder Type of pump station and controller Type of solar circuit fitted Commissioning date Solar collector serial numbers Solar collector mounting brackets and clips inspected and secure Solar collector connections inspected and properly fitted and tightened Type of weatherproofing of roof penetrations for in let and outlet pipe work and sensor cable Penetration weatherproofing inspected and properly fitted Collector sensor probe securely fitted into collector sensor pocket Primary pressure limit of weakest component System pressure when cold Fuse rating for fused spur supply to controller and pump Controls and sensors checked and operating correctly At setting for controller for switching system on At setting for controller for switching system off Maximum cylinder temperature setting in control
4. Operation Manual MCS Asis One Collector This is an important document keep it in a safe place m nt re n ewa b e S Mint Renewables Limited Fockbury House Fockbury Road Dodford Bromsgrove Worcestershire B61 9AP Phone 01527 711591 Email enquiries mintrenewables co uk 6 mint renevvables O Table of contents D sign and SUVE sonnes 2050000060643520 F90M05 E E See N ern 3 General Terms and ConditionNS iccccciccccciiiciccciiccecceraa 6 Safety POCA OIG serpan T sacs A annua tk 7 System PHAM acanscanestesnesarsaeaatsaediessecseendtenneatsatacexcueudonnotenenetasneacene 9 SV SECM Netal UON a A 04G 0400440040 MERS sma tees Les netes 10 Installation SCICMIAUIC ssnctsccnszsaanctevevesadecetasneesctosecarsnadesdsaseancseacentteetes 13 Hydraulic Configurations sosise aaa 14 General Intormati on ceemmsmtesasomismtenmxmmiesmsemsmedm msae ei 16 TEC Ca DO iein S 17 System CommissioNnINE scs mseicosicscisiasinernic siian 18 Design and survey report Date Reference Completed by Surveyor contact no Client details Name Address Tel Mobile E mail oO uj BB w System type Building type if house record whether detached semi detached or terraced Number of storeys Domestic hot water DHW DHW plus space heating Swimming pool heating House Block of flats Sheltered housing Commercial describe Approximate age of building Is build
5. ant Width room Depth Height Design and survey report continued Additional information for swimming pools Length OA RE DC Volume e E E litres 31 Pool dimensions Width Number of coils OO anmmm mmsimm smss Proposed solar Average depth gt 0 uenc een 25 j Vented cylinder type P u Unvented L Outdoors mM l l 32 Poollocation Please note and special cylinder fittings In ground C 26 required e g shower fitting pumped secondary fittings Above ground mM eran 33 isa pool cover used when pool is not in use Yes No Proposed Portrait vertical T eee r 27 mounting cceur ation Landscape horizontal u Oil C 28 Proposed solar Fully filled pressurised L 34 Type of fuel used shu LI circuit type Drainbaek u to heat the pool Electricity LI 29 Approximate distance between proposed Solid fuel LI solar collector location and solar cylinder S m None a Please note recommendations for solar 30 circuit pipe route and note any If pool room where appropriate roof has complications or special features 35 not been described in 14 to 20 please pro vide dimensions and notes on structure General Terms and Conditions Installation and commissioning should be undertaken by an MCS Certified Solar Installer Company General terms and conditions of warranty state that all installations must completed by a MCS certified and qualified solar installer company who is currently on the live MCS re
6. bearing roof surfaces and substructures The structural load bearing capacity of the roof and the substructure must be assessed on site by a suitably experienced professional before mounting the collectors Particular attention should be paid to the quality of the timber substructure in terms of the stability of the screw joints necessary for installing the collectors In particular it is essential to have the entire collector structure verified at the installation site by a qualified engineer in regions with high wind speeds The assessment should also take into account any special features of the particular site that could lead to increased loads high wind speeds snow loads etc 6 mint renevvables O Lightning protection Potential bonding of the building It is not necessary to connect collector arrays to the lightning protection of the building please observe the specific electrical regulations For installations on metal substructures at the installation site authorised lightning protection specialists must be consulted The metal tubes of the solar circuit must be connected to the main potential equalization bus by means of a conductor green yellow with a cross section of at least 16mm CU HO7V U or R It is possible to ground the collectors to a ground rod The grounding line must be laid outside the house The ground rod must also be connected to the main potential equalization bus by a line with the same cross
7. gister of installers All installer companies should work to the Building Regulations in force at the time of installation The manufacturer s warranty will only apply if these installation instructions are followed The warranty does not cover any damage caused by non observance of this manual The correct functionality of the system is only guaranteed if the installation instructions are followed The end client should be informed at system handover that system should be checked visually once pre year and the heat exchange fluid changed once every four years This document is part of the warranty and should be kept in a safe place and handed over to the end user client on completion of works Instructions for installation and transport Mint Solar Collectors kits are delivered on pallets Never store outside in water logged conditions Always store on a flat surface with glass facing upwards maximum 8 collectors per stack or vertical with glass facing outwards The use of a carrying strap is recommended for transporting the collector The collector must not be lifted at the connections Avoid impacts and mechanical actions on the solar collector Mint Solar Collectors should only be used in professionally designed systems with all system components and materials being appropriately rated for use in solar water heating systems and properly installed Structure The collectors may only be mounted on sufficiently load
8. imited Fockbury House Fockbury Road Dodford Bromsgrove Worcestershire B61 9AP Phone 01527 711591 Technical support 01302 364416 Email enquiries mintrenewables co uk
9. ing listed Is building in conservation area Solar fraction No of occupants Approximate daily hot water usage at 50 c per occupant Low circa 50 Medium circa 60 High circa 70 Low 30 litres Medium 50 litres High 70 litres loo oo O O El El Design and survey report continued 10 11 12 13 14 15 16 17 18 Type of fuel Gas used for water heating and approximate LPG Oil annual consumption in Electricty kWh Solid fuel Hot water Vented storage type Unvented D oes property Yes No have combi boiler If yes type Pitched roof Proposed Flat roof location for solar Ground mounted collectors Frame mounted on wall Roof orientation Roof pitch Type of roof covering eg Slate flat tile pan tile etc Roof condition Any shading eg none from a tree from a structure part of the day a lot of the day O OIO O CI O O 19 20 21 22 23 24 Available roof Width pare Height up roof Any roof obstructions e g Dormer sky light chimney stack Please sketch the proposed location of the solar collec tors relative to the roof plan of the building Are there any access restrictions for erecting scaffold if so draw on sketch in i eetettncrteeiess For pitched roof collectors are to Mounted on roof LI LI be Roof integrated Space for solar cylinder s in airing _ cupboard pl
10. ler Cylinder temperature sensors secured and sensor cable tied neatly Expansion vessel capacity Expansion vessel pre charge pressure System commissioning checklist continued Volume of drain back vessel if drainback circuit used System flow rate Primary circuit volume Type of heat transfer fluid used Earth bonding present Direction of non return valve checked Position and type of air vents used Air vent s isolated after commissioning Type and thickness of insulation used Pipe work all insulated apart from tee off to expansion vessel and air vent Pump operation and checked and pump running quietly Pump speed setting Method of anti scalding in DHW circulation Location of fused isolation switch Location of pressure gauge System explained to customer System documentation provided to customer MCS Declaration to be completed by the commissioning engineer confirm that the system described in this commissioning checklist has been installed at the address stated The system design is in line with best practice and the system has been installed to comply with the Microgeneration Certification Scheme Standard MIS3001 and with all legal requirements All notifiable works have been carried out by suitably qualified personnel and have been notified to the relevant authorities Signed Print name Date of commissioning BBAV mint renewables CERTIFICATE BBA 0133 2012 Mint Renewables L
11. m specified may be used 00 OPP gt P P Safety harnesses should be fixed above the users whenever possible Safety harnesses should only be fastened to sufficiently load bearing structures or fixing points Never use damaged ladders e g wooden ladders with split runners or rungs or bent or buckled metal ladders Never try to repair broken runners rungs or steps on wooden Ladders Ensure that ladders are put up safely Ob serve the correct leaning angle 68 75 Prevent ladders from sliding falling over or sinking into the ground e g using wider feet feet suited to the ground or hooking devices Only lean ladders against secure points Secure ladders in traffic areas by suitable Cordoning Contact with live electric overhead cables can be lethal Wear protective goggles when drilling and handling solar collectors evacuated tube collectors have a danger if damaged of implosion Wear safety shoes when carrying out installa tion Work Wear cut proof safety gloves when mounting collectors and handling evacuated tube collectors danger of implosion Wear a helmet g mint renewables O EIE Z e NM XL System Installation Schematic Steca Wiring connections Pump connections Live Neutral Earth T1 T2 Power connections Live Neutral Earth E E 1 Ee ae oy mo le di 2 it Tha Pe P P PEA L I a_i e as Na
12. section as above Connections compression connection fittings Connect the collectors using the certified solar compression connections supplied with your kit Precautions must be taken to protect the connection pipes against temperature fluctuations caused by heat expansion expansion bends flexible piping In this case no more than 6 collectors may be connected in series Larger collector arrays must be assembled with expansion bends or flexible members inserted in the links IMPORTANT check the pump design When tightening the connections always apply counter pressure with a wrench or another spanner to prevent damage to the manifold connections Collector inclination General notes The collector is suitable for installation at an angle of between 15 75 Steps must be taken to ensure that water and other contaminants such as dust etc are prevented from getting into the collector connections and ventilation holes Warranty Warranty claims can only be made if an appropriate specification of antifreeze is used and maintenance is carried out correctly Ladder and scaffolding assembly 5 Meter Arbeitsplatz L TG sechirkanto lt BO Safety Precautions A gt Pb bb PRS Before commencing mounting work on roofs it must be ensured in all cases that the non personal fall protection and fall arrest systems required by DIN 18338 Roof Covering and Roof Sealing Works and DIN 18451 Scaffolding
Download Pdf Manuals
Related Search
Related Contents
Sikadur Arena uTV 2 user guide,ERC リストホルダー 525N 取扱説明書 Wizard of Oz User`s Manual Version 4.0 - Deep Blue 取 扱 説 明 書 - フジクリーン工業株式会社 U3700 Series User's Guide Samsung 460DRN-A User Manual Sous-couche antirouille gris Copyright © All rights reserved.
Failed to retrieve file