Home
        User`s Manual
         Contents
1.              0 0   eee 3  1 3 Major Features of the Equipment                   eeceeeeeeeeeeeeeeees 3  1 4 Basic PRINCI UE 4    2  WORKING PRINCIPLE  amp  TECHNICAL  INDICES  eree N 6    2 1 Working Principle        sssasasensnnneneuenennnnennennnnrnnnnnnnnrunnnnennnnnnnnennnn nnne 6  2 2 Product Features            ccccccsssssssssesssesssesssesssesssessseesseesseesseesseesseeess 7  kd Ile IT 10  2 3 1 Major Technical e E 10  2 3 2 Ambient Environment Condtion  10  2 3 3 Power Supply Requirements           c  ccc cceeeeceecccdeeecceeendacdecnedacdadeeceedeesedeecedeadeedassedasveseoeeedsenedes 10  2 3 4 Mechanical Characteristics                cccccccccccececsessececeeecesuessececeeeseaaeeeeeeeseeaeaeeeeeeeeeeaueeseeeseeaeaas 11  PRERANE ETE E E aca ncecsias saahnane tobias A A Saas tuadaeeeaspessaaensneoaneesinrh ngactaaseaupiaas ETE 11  3  SYSTEM COMPOSITION    ww  12  3 1 EE ege EEEEEEEEEE 12  3 1 1 DUPIOK GR eenegen gi ceed eles cs beaten fanunteds pial geben REESEN bob eege dee gegen 12   3 D EE 13  3 13 RFF1 2  50 Cable ee 14  SPPA    E 15  3 3 Power Supply Ont    eee eeeeeeeeeeeeeeeeeeeeeeeeeeaeeeeeeeeeetaeeeeeees 16    GZF9003 V Wireless Repeater  User   s Manual    SEENEN 17  3 4 1 Outdoor Omni Directional Antenna  ee eee ee ecee ee eeeeeeeeeaeeeeeeeeeeetneeeeeeaeeeeeeaeeeenneeeene 17  3 4 2 Directional  PanelAntennay  c  isteiieh eee cei hich etal el ale E A ERA EA EREE 18  S453 VAG AMtenna NEE 19  34 4 Short Backtire  AMENA  sirro a eege EES 20  SET 21  3 4 6 1 2
2.   TY    WRI    GZF9003 V Wireless Repeater  User   s Manual    requirements when they are laid along the steel towers      When cables are buried for laying  feed line must be buried at  depth of 0 8m and must be protected with zinc plated steel tube or  PVC tube  A warning sign must be set up in every 5     10m along  the route of the feed lines       See figures for illustration of cable installation    5 6 2 Installation of the Service Antenna  amp  Feeder    The installation of the service antenna and the connected feeder is shown in figure 5 6 2              A1  Donor antenna Link antenna A2  Link antenna Service antenna B  Antenna connector C  Antenna feeder    D  amp  E   RF  lightning arrestor connectors    figure 5 6 2 Connection of the service antenna and feeder    The service antenna of the GZF9183 V Repeater is usually plate antenna  45    60    90    and 120        5 6 3 Making Joint      Making of RF co axial cable joint should be in accordance with the  53    GZF9003 V Wireless Repeater    User   s Manual    requirements in the drawing of the making of cable joint    The redundant length of cable should be unified  The size of  peeling of each layer should be suitable with the corresponding  part of cable plug    When cutting and peeling with knife the cable jacket and  insulation  force shall be properly used not to damage woven  screen and cable core    Cable core should be soldered correctly and firmly with proper  quantity of soldering tin  Soldered dot sho
3.   User   s Manual    d  Diagram of output power test of remote equipment downlink     Link Antenna      3  H           Spectrum Analyzer       rop my   gt  oer       s  daaa    yo d  We  L   au wes    Attenuator       Spectrum Analyzer    ya as  A  KS K        994    PE  4    Link Antenna    6 2 3 Implementation of System Test    GZF9183 V debugging  GSM       Signals received within outdoor coverage system by donor    antenna shall be tested with spectrometer to ensure quality of    signals received and that strength of signals meets requirements    of index  reaching  85  55dBm       Downlink Signal which is amplified in the repeater should be    measured at the antenna port which is connected with service    antenna  the signal power shall be 33 45dBm based on the type    of downlink PA     GZF9003 V Wireless Repeater    User   s Manual    Uplink signal received by service antenna shall be measured by  spectrometer after it pass the service antenna to ensure whether  it is good enough to be amplified  the power value shall between   85  55dBm    Uplink signal which is amplified in the repeater shall be measured  by spectrometer in the antenna port which is connected with  donor antenna  The value shall be 27 33dBm based on the type  of uplink PA    Downlink output shall be measured by spectrometer and downlink  gain shall be adjusted to ensure strength of output signals  reaches 43dBm   the nominal value of the equipment    The isolation between uplink and downlink shall b
4.   User   s Manual    plan    Check the power supply to see if they meet the requirements for   equipment    Opening and self examination of the construction  test and  analyze by testing tools  testing mobile phone  panorama  software  to see if the index for coverage meet the  requirements     The checking and analyzing include  coverage  switch  signal quality  re choice in  local area and other relevant standards for inspection and acceptance     5 1 5 Organization for Construction  Inspection  amp  Acceptance    Purpose  formulate rational process for construction inspection and  acceptance  re arrange report of inspection and acceptance  coordinate  with construction unit for inspection and acceptance so the construction  can be smoothly inspected and accepted    Process for Completion Inspection and Acceptance    After the opening of the construction  when the construction is found  to have met the requirements after self examination with the  presentation of report of completion  drawings of completion  final  account of completion  construction summary and other necessary  documents  it will be proper to submit application for inspection and  acceptance to the construction unit to perform inspection and  acceptance according to process  The process is     Re arrange various reports and files    Organize inspection and acceptance authorities  organize  inspection and acceptance committee or team in accordance with  the construction scale and relation    Re arrange all 
5.   VSWR  1 5  Input Impedance 500  Gain 17dBi  Front to Back Ratio 14 5dB  Polarization Type Vertical or Horizontal  Beam width 49    Max Power 150W  Lightning Protection DC Ground  Connector Type N Female  Mechanical Specifications  Number of Element 9 Element  Length 908mm  Weight 647g  Rated Wind Velocity 210km h  Diameter of Installation Pole  45 950 mm  19    GZF9003 V Wireless Repeater  User   s Manual    3 4 4 Short Backfire Antenna               aI   A     HX Prac    K Rat  D  Amr 7  2410 E    300  2M    For its high gain  short backfire antenna is usually used as the donor antenna    of Frequency Shifting Repeater     Electrical Specifications       Frequency Range MHz     824 896 870 960                               VSWR  lt 1 35   Input Impedance Q  50  Gain dBi  17  Polarization Vertical or Horizontal  Half Power Horizontal Beamwidth 25     Vertical Horizontal Beamwidth 3dB  17     First Upper Side Lobe Suppression dB   17   Front to Back Ratio dB  30  Max power W  200  Lightning Protection DC Earthing       Connector    N type  Female        Mechanical Specifications             Diameter m  0 9  Weight kg  10  Rated Wind Velocity km h  126       Reflector Material    Aluminum Alloy Pipe                Radiator Material Copper  Diameter of installation pole mm 48 90  20 Ai R    GZF9003 V Wireless Repeater  User   s Manual    3 4 5 Arrestor       Arrestors are usually equipped between the cables joining the equipment and antenna  to protect the equipment against li
6.   s Manual    design      Pilot assembly must be made before the installation of tower  combined in separate parts  The deviation of screw aperture  position must be less than 2mm       Effective lightning conductor must be installed in iron tower     GZF9003 V Wireless Repeater  User   s Manual       6  Site Opening  amp  Debugging    Site opening work flow chart                              1 Follow up record list    Installation Completion 2 Proposal design        Quality check for installation  process    VSWR test  2  Waterproof check       Quality check of antenna feede       arrest check    1  Form of quality check and acceptance  2  Form of process check and acceptance    3  Grounding and lightening                   Equipment test        1 Project of system test       System test 2 Report of system test    3 Report of equipment test    1 Job guidance for equipment test    2 Project of equipment test                   2 Route test    Network optimization             1 Control of antenna power    3  Data statistics of machine room  of base station                  1 Sorting of test data  2 Opening report       Sorting of opening data             6 1 Tools for Opening      One spectrum analyzer or spectrometer     One signal source      One set of special tool      One VSWR tester        Alcohol and absorbent cotton     62    3 Sorting of follow  up self check          Submit to the Owner for confirmation       GZF9003 V Wireless Repeater    User   s Manual      Several
7.   shall be fastened with clips or bandage    Grounding  Sound grounding of antenna  feeder and mainframe   which complies with three points grounding    It OMC mentioned above shall conform to construction process  hereto  Rectification and improvement shall be made if  requirements above are not satisfied till improvements conform to  construction specifications and requirements presented by the    owner     6 2 2 Implementation of Equipment Test    Efforts shall be made to ensure whether performance index of  equipment is affected or not in process of transportation and installation  and signal source is checked  Check shall be conducted on signal  source  donor antenna or wired coupling  to see whether it works  normally or the transmission hits targets    Equipment test  main equipment shall be powered on for line up   through which  Owner   s requirements on various index shall be satisfied  to ensure minimum interference to the system from the main equipment     meanwhile  records shall be done     GZF9003 V Wireless Repeater  User   s Manual    a  Input power of local equipment     Receiving power from BTS               BTS Service    Antenna Donor Antenna     Sz Spectrum Analyzer    BTS    Index  receiving power of donor antenna shall be higher than    75dBm     b  Diagram of output power test of local equipment downlink        BTS Service  Antenna    Attenuator    BTS    c  Input power of remote equipment     Be SS Link Antenna       65    GZF9003 V Wireless Repeater
8.   the integrated GZF9183 V  repeater is tightly sealed so that its anti rainfall strength is up to 3mm min   GB4785 84  and its anti splash strength is up to 3m s  water speed    water tight rubber spacers  service life  10 years  are used between the  bottom housing and the top cover  the leakage rate is 1 0Pa cm  s   GB2423 23 submersion method   the dust preventing capability is up to  10mg m  particles  floating  and 3 0mg m  particles  falling    GB4795 84   To prevent local temperature rise of the housing resulting  from direct sunshine in summer  the repeater is designed with an    integrated sun shield and with the latest patent coating technique     5  Reliability  Industrial level components are used  which can  sustain a temperature range of  40  C    85  C so that the product  can work reliably in a wide range of environments  the power  supply of the integrated system is designed with high redundancy  to make sure that the power module can work under normal load in  75  C and start normally in  35  C  the repeater is provided with  multi level lightning protection devices to ensure reliable lightning   8    GZF9003 V Wireless Repeater    User   s Manual    protection for the power supply  antenna and feeder  The lightning  protection device of the power supply is a combination of a gas  discharge tube and a piezo resistor and is designed with 2 level  protection  so that it can absorb very high lightning strike energy as  well as remove residual voltage satisfact
9.  Inch Super Suppleness Cable cece eeeeeeeceeeeeeeeeneeeeeeneeeeeeaeeeeeeeeeseaeeeseeeeeeenneeeened 22    4  EQUIPMENT TEST  amp  DEBUGGING    23    4 1  Test Condition  Instruments  Meters  amp  Relevant    PCCOSSONGS niricivirinviiriaviariricvivia iiaeiai iaeiaiai avaritia vivan 23  4 1 1 Ke elle EE 23  4 1 2 Instruments  Meters  amp  Relevant ACcessories  23   4 2  Testing Frequency Band To be customized                         23   4 3  Testing Method  amp  Procedure                eceeseeceeeeseeeeeeeeteeeeeeeeeees 23  4 3 1 Maximum Output Power  23  4 3 2 MAXUM UT Gal E 24  4 3 3 Auto  Level Control  ALC  cise eriari nicae irina arikiia 24  4 34  Gain Adjustment Range  sirsiran adea aai aeaa adaa a e ai eaaa tiatia 25  4 3 5 Gain Adjustment Step Length  amp  Error 0     eeeceeeceeeesneeeeeeneeeeeeeeeeesnaeeeeeeaeeesneeeeeenaeeeenenaees 25  4 Eeler EE Re NEE 26  4 3 7 Voltage Standing Wave HRato  eccceceeeneeeeeeeeeeenneeeeeenaeeeseneeeeeenaeeeseeaaeeesneeeesenaeeeenenaees 26  4 3 8SPUNOUS  EMISSION DEE 27  GERT lat TN 27  43 10  Group Time DC EE 28  4 3 11 Noise ole UE 29    5    CONSTRUCTION PROCESG                     30    5 1 Construction EE 30  5 1  Reconnaissance Of WOrKS  oeri ieiceieaden erana aaa EAEE RAE AE EERE NERE 31  9 1 2 Engineenng DESION EE 32  5 1 3 Organization Of CONStUCUON oerinoar ea a aar or E 33  5 1 4 Opening  amp  Self Examination of the Construction    36  5 1 5 Organization for Construction  Inspection  amp  Acceptance     sseeeeierrriiesrriie
10.  and security inspector find any potential danger after their  examination of the total construction according to the relevant  security regulations and quality standard  they must inform  engineering supervisor and order them to re manage  Meanwhile   ask the party to fill in     Report on Construction Quality Accident     and Table of Construction security Accident according to the real  situation and hand them in to chief engineer and construction unit  for examination and file   Chief engineer must formulate plan for construction  plan for  progress of construction according to the actual situation at site  and submit them to the owner for approval  To assure smooth  construction  a chief engineer must consult the owners  35    GZF9003 V Wireless Repeater    User   s Manual    concerning all the issues and verify them before the start of  construction  then formulate scientific  reasonable  standard   secure  economical and operative construction organization plan   Chief engineer must explain some issues in the construction plan  that may bring some impact on owner and will not start  construction until he gets the consent of the owner  Civilized and  secure construction must be conducted    ProblOMC for balance  interference and indoor outdoor switch  may appear due to the unpredictable factors in the optimization  even though the feasibility of the plan has been studied in the plan  in the optimization of the system  The above problOMC must be  removed in time and pers
11.  jumpers and adapters       Several attenuators       One set of route tester    6 2 Details for Opening    6 2 1 Check on Process    Quality check shall be carried out based on quality standards of    Hongxin while completing check on technical index of the project     VSWR test  VSWR test shall be implemented by means of trouble  positioning and test results shall be recorded in details   Requirements  VSWR of antenna feeder system tested by  equipment portss1 4    Process of antenna installation  installation shall be implemented  correctly and securely and ensure the position and direction for  installation are correct and azimuth angle of antenna shall be  recorded  azimuth with true north as 0      Process of equipment installation  ensure the equipment is  installed securely  height and location of installation are exact  without causing damage to cabinet appearance  equipment be  installed within cabinet with power clamper fastened within  equipment  connected with feeder line and marks be correct   correct connection with power supply to provide safety and  reliability    Cable laying  ensure cables are laid smartly  waterproof treatment  of connecter is sound and lightening arresting measures are  adopted     Marks  Correct and easy for examining   63    GZF9003 V Wireless Repeater    User   s Manual    Connection  Correct and secure    Wiring  Secure connection  sound fastening  straight  smart and  reasonable wiring to which big elbows shall not be allowed  wiring
12.  signal will be sent into filter to clear out the useless signal   Then the signal will be shifted to the other frequency and amplified to the    signal with the same frequency and high power  the power range is from    4    Be    WRI    GZF9003 V Wireless Repeater  User   s Manual    1W to 30W based on the type of High Power Amplifier  HPA   Then the  link antenna will send the signal to the remote unit  The remote unit will  shift the signal back to the original frequency and amplify it  By the  service antenna of remote repeater  the amplified RF signal will be used    to covering the dead zones  Just as the figure 1 1 shown            ge EH e Ech        lb 7       u    Coupler    Coverage area    BS Local unit    Remote unit    figure 1 1  The basic principle of Frequency Shifting Repeater    GZF9003 V Wireless Repeater  User   s Manual    2  Working Principle  amp  Technical  Indices    2 1 Working Principle    The radio signal is introduced to repeater by its donor antenna from the  BTS  In the downlink  the TX signal from BTS is isolated from uplink in the  duplexer  and sent to DET  In the duplexer connected with donor antenna   part of signal coupled in 50dB will be used by wireless modem  Then the  downlink signal will be sent to the LNA to be amplified  with which the  noise figure is still low  After that  the signal will be filtrated by IF filter which  has very high Q value  At last  it will be amplified again by the high power  amplifier HPA   After such a prog
13.  signals may  be influenced by shadow or semi shadow in some areas  generally  referred to as dead zone or semi dead zone  bringing serious impact on  voice quality or even causing failure to normal communication  To solve  this problem  apart from adding more base stations  the deployment of  mobile communication repeater  characterized by quick expansion of  coverage and reduction of cost  shall be an ideal cost effective choice of  high efficiency    Frequency Shifting Repeater of mobile communications is an  important tool to expand network coverage  reduce network cost and  realize network optimization  Frequency Shifting Repeater of GSM  mobile communications is meant to amplify communication signal   extend network coverage  to improve communication quality by  amplifying some weak received signals and expanding the signal  coverage and to distribute traffic load in various base stations with  efficiency  In the course of network optimization  Frequency Shifting  Repeater of GSM mobile communications offers a wide variety of  application  In some areas  such as satellite cities of some large cities   remote residential areas  countries and towns or other dead zones or  shadow areas formed due to the natural or human obstacles  such as  high mountains  large buildings  tunnels or underground stores    Frequency Shifting Repeater of GSM mobile communications shall be    the most economical and reasonable solution to the effective coverage    GZF9003 V Wireless Repeater  
14.  the lightning net nearest to the antenna  bracket  They should not be connected into houses    Indoor ground wires should not be connected with the lightning  net on high positions such as the outdoor roof    Ground wires put in PVC pipe should be fixed in the same  principle with that of radio frequency cable laying  When they are  placed in wire casing  the fastening interval for wire casing is    0 3M     5 7 1 2 Connection of Ground Wires    Ground wires between equipment and users feeder lines  user  antenna brackets and grounding row are sub ground wire   connected with 16mm2 copper cored rubber cable    Ground wires between grounding row and ground net or outdoor  antenna bracket and ground net are bus ground wires  connected  with 35mm2 guide lines    Sub ground wires should be connected with grounding pole of the  equipment case using 60Alug    Sub ground wires should be connected with supplier user  antenna bracket and grounding row using 200Alug    Bus ground wires should be connected with grounding row and  ground net using 300A lug    Grounding point on feeder lines should be directly sealed with  waterproof clay and then packed in electric adhesive plaster     56    He    WRI    GZF9003 V Wireless Repeater    User   s Manual    Grounding points on grounding row or ground net must be sealed    with lubricant to avoid water and rust     5 7 1 3 Handling of Lightning System    All the input and output terminals of outdoor equipment must be  connected with lightnin
15. 0W  Connector Type N Female  IMP3  107dBm  Lightning Protection DC ground  Mechanical Specifications  Height 3m  Weight 10kg  Rated Wind Velocity 60m s  Maximum Diameter 52mm  Diameter of installation pole P60 mm   17    GZF9003 V Wireless Repeater    User   s Manual    3 4 2 Directional Panel Antenna          Directional panel antenna usually works as service antenna to offer directional coverage    to appointed area        Electrical Specifications                                              Frequency Range 790 960MHz  VSWR  1 5  Input Impedance 500  Gain 18dBi  Polarization Type Vertical   3dB  Horizontal Beam width 65     3dB  Vertical Beam width 30    First Upper Side Lobe Suppression  16dB  First Down Null Fill  20dB  Front to Back Ratio 225dB  Max Power 500W  Connector Type N Female  IMD3  107dBm  Lightning DC Ground       Mechanical Specifications       Dimension  LXWH     260x250x40 mm             Weight 0 5kg  Wind Loading Area 0 09 m    Rated Wind Velocity 210km h       Radiating Element Material    Aluminum Alloy       Radome Material    UV Protected ABS       Diameter of Installation Pole           50 9114 mm    GZF9003 V Wireless Repeater  User   s Manual    3 4 3 Yagi Antenna    e       i       1 At  l    Ka K4       Directional Yagi antenna usually works as service antenna to offer directional coverage to    appointed area        Electrical Specifications                                                             Frequency Range 890 960MHz  Band width 70 MHz
16. Q standard load  both of 50W   one set  respectively    6  Some coaxial cables  4 2  Testing Frequency Band To be customized   Downlink  935 960MHz    Uplink  890 915MHz    4 3  Testing Method  amp  Procedure    4 3 1 Maximum Output Power    1  Connect testing system according to figure 4 3 1 make the    calibration according to the dotted line before test      GZF9003 V Wireless Repeater  User   s Manual            Repeater Attenuator    el Spectrum analyzer    Signal Generator       figure 4 3 1  2  Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link   3  Set the output frequency of signal generator as the central  working frequency of repeater   4  Set repeater gain to its maximum   5  Adjust the output level of signal generator until the output of    repeater reaches the required index value     4 3 2 Maximum Gain   1  Connect testing system according to the real line in figure 4 3 1    2  Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link    3  Set the output frequency of signal generator as the central  working frequency of repeater    4  Set repeater gain to its maximum    5  Adjust the output level of signal generator until the output of  repeater reaches its maximum  The maximum gain of repeater is  the difference between the output power of repeater and the    output power of signal generator     4 3 3 Auto Level Control  ALC   1  Connect testing syst
17. The RF unit  the main functional module of the GZF9183 V Repeater  serves to  bi directionally receive and transfer the radio signals transmitted by the BTS and the  mobile phone  It consists of LNA and HPA in the uplink  so It does in the downlink     3 1 1 Duplexer       Coupling    coupler       Duplexer connected with donor antenna    Duplexer connected with service antenna    Configuration   Link Duplexer in the GZF9183 V plays several roles in the repeater system  First   duplexers connected with donor antenna and service antenna contain filters in the  downlink and uplink  The filters in uplink reject the downlink band just as the downlink  ones reject the uplink band  So the uplink and downlink are isolated into independent  channels  There are two duplexers for one GZF9183 V repeater  one is connected with  donor antenna  the other is connected with service antenna  For the duplexer connected  with donor antenna  two coupler ports will be provided  but the two ports have different  coupled values  are 50dB  the port for uplink power detection has a coupled value of 50dB   the other port for wireless modem has a coupled value of 20dB  For the duplexer near the  service antenna  only one 50dB coupler port will be provided for downlink signal power  detection    Donor Duplexer   ANT  Donor Antenna   RX  Uplink PA RF OUT   TX  Downlink LNA RF IN    GZF9003 V Wireless Repeater   User   s Manual   Wireless Modem Coupling  Wireless Modem  Coupling  RX 50dB   DET RF2   Servi
18. User   s Manual                      S N Coding Name Quantity   Remark  1 Canopy  including accessories  1  2 GB817 85 Panhead bolt M5 X 10 2  3 Steel expansion bolt M5 X 60 2  4 Steel expansion bolt M12 X 110 2                      table 5 5 4 Details for installation scheme  Installation Instruction     Step 1   As shown in figure 5 5 4 firstly bore four holes on wall for installation with Churn Drill   hammer   size of which is the same as that of installation hole for canopy     Step 2   Remove staple bolt and Pedestal  1  from the canopy     Step 3   As shown in figure 5 5 4 put four steel expansion bolts and expanding pipes into bored  holes  then put nuts onto steel expansion bolts and screw them down tightly     5 6 Antenna Feeder Installation    The GZF9183 V Repeater should be connected to the set of antenna  feeder system  it is the service antenna connected to the service interface   The requirements for the installation of the antenna feeder system of the  GZF9183 V Repeater are the similar to those for the BTS  with the  differences described below  For more information  please read the  requirements for the installation of the BTS antenna feeder system  refer  to Installation Manual for GZF9183 V GSM Frequency Shifting Repeater     5 6 1 Laying Cables    The models  specifications  direction and positions of the laying of  the cables of the equipment must comply with the requirements  It  is prohibited to unroll the cable at random from the center  No twist   k
19. User   s Manual    of these networks since these areas are demanding a greater coverage  rather than capacity  Frequency Shifting Repeater of GSM mobile  communications is cheap with easy installation  It will greatly reduce the  investment in equipments and running cost to expand the network by  Frequency Shifting Repeater    GZF9183 V Frequency Shifting Repeater provides operators with  multiple solutions that can save the investment in equipments and  running maintenance cost without lowering the network quality  As a  supplement to GSM base stations  in the areas with some dead zones   the coverage of GSM network can be easily expanded to the dead  zones that need covering to solve the problem of coverage    By using GZF9183 V Frequency Shifting Repeater of mobile  communications of excellent performances manufactured by Wuhan  Hongxin Telecommunication Technologies Co   Ltd  the  surplus capacity of networks can be re planned or re arranged so that  the resources of networks will be used to their maximum  The  application of GZF9183 V repeater shall attract more traffic load with its  short cycles  immediate returned profits  easy installation and savings of  network resources and expand the network coverage with low cost to  make up for the insufficient coverage of system base station  It is a good  solution to optimize network with Frequency Shifting Repeater in  networks    In some areas with tough conditions  Frequency Shifting Repeater  of mobile communications is c
20. WRI HX SM GZF9183 V RB 0    GZF9183 V  GSM Frequency Shifting Repeater    User   s Manual    September 2004    Version 00 00 01    Wuhan Research Institute of Posts and Telecommunications  Wuhan Hongxin Telecommunication Technologies Co   Ltd     September 2004    Copyright    2004 Hongxin Telecommunication Technologies Co   Ltd  Wuhan P  R  China   All rights reserved    No part of this documentation may be excerpted  reproduced  translated   annotated or duplicated  in any form or by any means without the prior written  permission of WRI Hongxin Telecommunication Technologies Co   Ltd    Fiberhome Group Hongxin Co    88 Youkeyuan Rd HongshanDist Wuhan P R China  Website  http   www wri com cn     http   www hxct com  Post Code  430074   Customer Support Center    85 27 8769 4409    Fax    85 27 8769 2579   E mail internationalmarket wri com cn      i    Preface    GZF9183 V Frequency Shifting Repeater of GSM Mobile Communication is an important  part for constructing a hybrid GSM mobile communication network  It mainly serves to  receive and amplify uplink and downlink radio frequency  RF  signals so as to extend the    coverage of BTS     This Technical Manual deals with the principles  functions  structure  installation   debugging  operation  maintenance  and transport etc of the GZF9183 V Frequency  Shifting Repeater and is intended to guide users to properly install  operate and maintain  the GZF9183 V Frequency Shifting Repeater    Statement  The actual product may di
21. all over the  country while all the standards set by the operators are under  simultaneous execution    The following organization flow must be observed for the execution  of a single respective construction works  The general working flow of  the GZF9183 V Repeater is shown in figure  5 1     Accepting Task for Site Reconnaissance    Form of Report of Project  ema       Reconnaissance Status Site Reconnaissance Reconnaissance         Design of the P lan of  Proposal Design  the Works  Design  confirmation Weg  Construction of works             Report of Project       Execution       Report on    Completion    Completion of Works       Start in Steady Operation    UE E E E EE    Application for Inspection Report of Inspection    Completion data    and Acceptance       30       FiverMome    GZF9003 V Wireless Repeater  User   s Manual    figure 5 1 The general working flow of the GZF9183 V Repeater    Based on the above figure  the organization flow of respective works  can be generally classified into  reconnaissance  design  construction   self inspection  start  inspection and acceptance as well file  re arrangement     5 1 1 Reconnaissance of Works    Purpose  detailed reconnaissance of works can bring the design plan  closer to real works and can endow the design with more rationality and  technical feasibility to generate convenience for the construction at middle  phase and the start and inspection and acceptance in the later phase   Organization flow   1 Collection of 
22. and requirements from the  construction unit  It is requested that all the construction processes must  be thoroughly checked one by one according to the processes and  drawings  Once any omissions are found and need making up  operation  plan must be made right on spot to arrange rational construction for  modification  The system shall be opened once it is confirmed to be  qualified and shall start pilot operation for a period of time  depending on  actual situation in various places    Preparations for data of construction completion   The data and documents for construction completion are the major   files that display the overall information on the construction and will   be helpful for the future maintenance and repair    The data and documents for construction completion include the   following    Reconnaissance report  design plan  plan design evaluation sheet    bill of materials  record of equipment installation and debugging    record of inspection and acceptance of dead zone construction    See relevant report specimen for various specimen    Inspection and acceptance  Inspection and acceptance is the evaluation of the construction quality   The persons in charge of the construction  chief engineer  must submit  inspection and acceptance report to construction unit to assure the  smooth inspection and hand over to avoid any delay during the  inspection and acceptance of the construction  It must be emphasized  here that the application for inspection and acceptanc
23. ations and wear safety hats for on the ground    operations  and take care never working in rainstorms     5 2 2 User   s Cooperation    WRI Hongxin   s technicians will take charge of the equipment installation  and the user   s technicians should provide help if necessary  To ensure  the normal running and maintenance of the equipment  the user   s  technicians should proactively work together with WRI Hongxin   s  engineers and technicians and get familiar with the installation  structure     40    GZF9003 V Wireless Repeater  User   s Manual    cabling  debugging procedure  etc     5 2 3 On site Survey    Before installation  the installation technicians should consult with the  project manager of the user and learn whether the installation site is  ready for equipment installation  Specifically  they should survey such it  OMC as the installation site  iron tower or high pole  surrounding  environment  temperature and humidity  and power supply  Where  conditions permit  they should make an on site survey together with the  relevant persons of the user     5 2 4 Installation Tools    Installation tools include  electric percussion drill  iron hammer  pulley   rope  safety belt  safety hat  ladder  screwdriver  hacksaw  knife  pliers   spanner  compass  tape  tweezers  electric iron  etc     5 2 5 Technical Documentation    The installation technicians should keep on hand  and read in advance   such documents as Project Design Document  Equipment Installation  Specificati
24. be led in directly from the power  outlet  The power inlead should be 2mm  conductor shorter than 30 m     Note  To ensure personal safety  make sure to disconnect the  external contactor before connecting 220VAC power supply to the  equipment and take care never to work in rainstorms     5 7 2 1 Power Cable Laying and Installation of Power Supply    Power supply without stable voltage of its transmission line  system is required to have a mainstay    For input power supply of equipment  live wire  zero line and  ground wire must be correspondingly connected  Dielectric  resistance between cable cores and between cable cores and  ground should not be less than 1M Ohm    Alternating current 220V power supply wires adopt 2 5mm2x3  rubber kicking    Power supply wire should not be tied together with other cables   Cable laying of Power supply should be put in PVC pipe  straight  and vertical    If power supply wire needs to go through wall  the parts in the wall  must be added with PVC pipe or corrugated pipe for protection   and the hole on the wall must be sealed with fireproofing clay   The fixed interval of horizontal   vertical wiring of power supply  wire in PVC pipe is 1 meter  and the interval of wiring in 100x40  wire casing is 0 3 meter    Power supply wire between equipment and distribution case can    be cut off  No plug needs to be used  The terminal can be directly    58    He    WRI    GZF9003 V Wireless Repeater    User   s Manual    connected to creepage prevent
25. ce Duplexer   ANT  Antenna   RX  Uplink LNA RF IN   TX  PARF OUT   Coupling  TX    50dB   DET RF1   1  Frequency Range Downlink 890MHz 915MHz Uplink 935MHz 960MHz  2  Power Capacity 2100W    3  Out band suppression  935MHz gt 70 dB  915MHz gt 70 dB   925MHz gt 30 dB  980MHz gt 30 dB   880MHz gt 30 dB   4  Group Time Delay 150ns Max in band   5  Ambient Temperature  40 70   6  Connector Type SMAFemale   7  Ambient Humidity  lt 95 Non condensing   3 1 2 PA   Downlink PA       930MHz 960MHz ALC Auto Level Control 40W Output Power Amplifier   Label    HXPA945 30 40m01a        945    means downlink module    40    means max output  power is 40 watt    PA module in GZF9183 V is equipped in the downlink     27V DC power connects to the relevant outlet of power supply module     FiberMome Technologies    GZF9003 V Wireless Repeater  User   s Manual    3 1 3 RFF1 2     50 Cable    2       Electrical Specifications                                              Impedance Q   50 1  Max Work Frequency MHz 3000  RF Peak Voltage kV 1 39  Peak Rating Power kW 19  800 1000MHz 160dBc  IMD3  1600 2000MHz 160dBc    B JBW  0 1000MHz    28 26  Echo Ullage dB    B JBW  1000 2000MHz  26 24  1000MHz 11 100  Attenuation dB m  000MHZz 17 100  1000Hz 0 71  Average Rating Power kW  000Hz 0 48  Mechanical Specifications  Max Pull N  500  Single Flection 15  Min  Incurvated Semidiameter  mm   Many Flection 30  Working Temperature Range      40  70  Watertightness Rate IP 68             GZF9003 V Wireless Re
26. construction   communication with Party A concerning the arrangement for  construction  also responsible for logistics  He is responsible for  chief engineer   Material Manager  keep and control the material during the  construction  Coordinate  control and distribute all materials for  construction  Buy the material and solve the problem of urgent  needs of the materials  He must manage the material in good  order   Progress of Construction  To assure the progress of construction  a reasonable  arrangement for progress of construction must be made to ensure  an orderly construction  In the course of construction  it is required  that progress of construction must be controlled with good  follow up in addition to strict and reasonable arrangement of the  progress of construction   Predict  analysis and solutions on key and difficult issues in  various phases of construction  Predict and analyze possible key and difficult issues in various  phases of construction before start of construction and provide  solutions   In case of any alterations in the construction  they must be  analyzed for feasibility under the supervision of engineering  supervisor based on the     Sheet for Alteration of Engineering  Design    formulated by the company  Then fill in    Sheet for  Alteration of Engineering Design    after confirmation that the  alteration shall not affect the system in technique and report to  chief engineer   QC and security inspector shall strictly control quality  when QC 
27. curs     6 2 5 Collection of Opening Data    a  Sorting of test data    Data to be cleared up include at least the following      gt      gt    gt    gt     Data for equipment test  Data for system test  Data for route test    Statistics data for equipment room    Data above shall be submitted to the Owner as evaluation basis     b  Opening report    All documentation shall be cleared up and summarized as opening report for the project    when each index is confirmed to meet requirements presented by the Owner or included    in Construction Specifications of Outdoor Repeater and Opening Specifications of    Outdoor Repeater prepared by WRI Hongxin     Opening reports include      gt      gt     Implementation scheme of the Project     List of equipment  main materials and assisting materials     69    GZF9003 V Wireless Repeater  User   s Manual     gt  Amendments and causes of plan  describe it OMC to be changed and causes  for such changes in construction in detail     gt  Working index of main equipment  including all index of main equipment to be  tested as required by opening specifications     gt  Test data includes VSWR test data  output power of equipment  input power of  donor antenna and test data for uplink noise floor of equipment  Premier test  software is recommended for DT dialling test  which includes RxLevsub of  coverage area and route map and statistic report list of such data as RxQualSub   Handover and Cell Reselect data     gt  Issues in suspension in pr
28. data  The data collected during reconnaissance are classified into natural  environment data and mobile signal data based on the characteristics of  the coverage of mobile communication   1 1 Natural environment data   General environment  including the general environment in the coverage  area such as height of buildings  geographic location  flow of people   good for analyzing call numbers inside the buildings   structure of the  buildings and other information   Local environment  service area of each building  length and width    layout of each floor  local characteristics  positions of passages and so  on   1 2 Environment for wireless signal   The detailed data collection on the wireless environment in the coverage  area shall bring convenience for design plan making to rationally control  the position of antenna and output power of the antenna and also control  switching during design to avoid any modification after the start of the  construction due to the defective coverage   During reconnaissance  each works must contain the following wireless  information  information on the nearby base station  position  frequency   sub area code   signal coverage of each floor   1 3 Testing methods  Digital camera  can take the pictures of the panorama and local view of  the typical position in coverage area   GPS locator  collect the longitude and latitude of the coverage area and  station   Ruler  measure the acreage  length  distances between the emitting    31    GZF9003 V Wi
29. e measured  the  value shall be at lest 120dB    VSWR of antenna feeder system within working frequency shall  be measured by means of length measuring methods with VSWR  tester  typically  lt 1 4  to ensure the antenna feeder system works  normally    Input power of antenna shall be measured with spectrometer to    ensure it meets design requirements     Test of monitoring system    Mainly perform tests on reliability and accuracy of monitoring system as well as    integrity of function  meantime  make detailed record about them     6 2 4 Implementation of Network optimization    3       GZF9003 V Wireless Repeater  User   s Manual    a  Test of antenna power    Input power of each antenna port shall be tested prior to formal opening and test results    recoded in detail shall be taken along with design plan as basis for evaluation on check    and acceptance of construction quality and the owner     b  Route test    c  Content for test    Coverage situation after completion of the project shall be tested  and analysed through testing software  Effects upon completion  shall be described in terms of coverage and quality and at the  same time switching between area covered and those uncovered  shall be tested to ensure the system exerts no effects on targets to  be covered  Test data cleared up shall be compared with those  prior to coverage  results of which shall be adopted as evaluation  basis for check and acceptance to be conducted by the owner    Test instrument  spectro
30. e of construction  can not be made to the construction unit until it is confirmed that the  construction is found reliable in compliance with the acceptance standard  after rational way of testing so as to ensure the rate of passing in  inspection and acceptance to improve the reputation of the company     GZF9003 V Wireless Repeater  User   s Manual       5 2 System Installation    Work flow of outdoor construction shown as the figure 5 2     Work flow of Outdoor Construction    Assignment of  Construction          Understand the  requirements of  the construction  party and owner                Plan for  construction    Material arrangement  for construction        bill of materials for  engineering installation  Installation of list of equipment  host machine for installation      bill of material for  Inst allation of c installation of  feed line of antenna feed line of antenna                   bill of materials of    Installation of c installation of                      accessories accessories    Yy  Accomplishment of re management of  construction mooo i i  installation constructin materials  figure 5 2  39    GZF9003 V Wireless Repeater  User   s Manual    5 2 1 Installation Flow    The general working flow of the GZF9183 V Repeater is shown in figure 5 2 1          Grounding    AC DC Power Connection          figure 5 2 1 The general working flow of the GZF9183 V Repeater    To ensure safety during the installation  make sure to wear safety    belt for overhead oper
31. eater    User   s Manual    design requirements    Grounding of antenna bracket  for tower  should be in accordance  with the design requirements    For installation of antenna bracket  for tower  on roof  full  consideration should be given to the carrying capacity of the roof  structure    Antenna bracket  tower  installed on roof should not damage the  original waterproof layer of the building  If damaged  waterproof  handling should be made    Stay wire rope used for fastening of antenna bracket  for tower   should satisfy requirement of pulling force and be adjusted with  the degree of its tightness    The depth of stay wire should accord with requirement  and the  deviation should not exceed 5cm  The deviation of pull distance  should not exceed 10cm    Antenna bracket  for tower  must be of certain strength and  stableness  and satisfy the wind resistance requirement after  installation of equipment and safety requirement of operation on  the tower    Basic abutment plate should be installed according to designed  elevation and be adjusted well with its level  Fill the cement under  the plate    There should be no oil paint on the flange plate to maintain good  electric contact    The connection bolts should be all fastened  Sufficient measures  should be taken to avoid looseness  Stay wire should be adjusted  to reach the vertical degree specified in the design     Tower shoe should be installed at the position required in the  60    GZF9003 V Wireless Repeater  User 
32. ed in light specific construction to  strictly provide all flows  reinforce the management of site construction and  practice liability system of each work for each individual    Organization structure    1 The following structure can be adopted for organization to assure the       GZF9003 V Wireless Repeater    User   s Manual    orderly operation and to eliminate troubles     Chief Engineer  formulate and arrange the feasibility plan  according to the Rules of Management for Engineering Start   Specifications for Construction and Service Specifications for the  Construction of the company  regularly or irregularly check the  construction and is responsible for the quality of the engineering   progress  cost control  security and all affairs of the construction  and shall order the construction team to re manage when he finds  disqualification during the construction of the works   Engineering Supervisor  responsible for the progress and  technique of the construction  Organize and arrange the  construction by all units according to the Engineering Design   Specifications for Construction and Service Specifications for  Construction  Formulate the schedules for construction  guide  and standardize the execution of the engineering by the  construction units  solve problOMC at the site  ask construction  units to assist quality control engineers and debugging engineers  to conduct quality control and debugging  control and check daily  progress  Engineering supervisor is respo
33. eeeseaueeeeceeseeseaaeeeeeess 54  5 7 Grounding  amp  Power Supply Connection see 55  37 1 Equipment  Grounding E 55  5 7 2 Power Supply Connechon    nr rerteetn tnne teettttnntrettttntnnsteertn ennn testten nn nen ennnen 58    5 8 Installation of Embracing Pole  amp  Antenna Bracket  for    TOWE    Ree se re ee re se are ee araa a ee ea eee ere 59  6  SITE OPENING  amp  DEBUGGING                62  6 1 Tools for Opening E 62  6 2 Details for Opening                eeecececeeeeceeeseeeeeeeeeeeeeeeeeeeeeeeeetaeeeeeees 63  6 2  Renee Ree 63  6 2 2 Implementation of Equipment Test    64  6 2 3 Implementation of System Test      2   c cccceccesceceedecceeeesecdeeeedendaseeceedecsedeesuaeedeedescedaedeseeeeedeeneees 66  6 2 4 Implementation of Network optimization                cccccseseeeseeeesceeeeeeeeeeeeeeeeseasseaeseeeaeaeaeaeeeaaaaaes 67  6 2 5 Collection of Opening Data     2      ccececcsccceessseceesseseeenecteceenacasecnescccesndsnetnceartesseccensesenorenesst seis 69  iti    GZF9003 V Wireless Repeater  User   s Manual    7  SYSTEM MAINTENANCE    71  8  PRECAU  IONS EE 72  9  TRANSPORTATION  amp  STORAGE          73  9 1 Transportation een Pee oer one pe enn onEE ern Sree pert oe per re arp nore 73  Ee LE 73  10  APPENDIX TERMS  amp   ABBREVIATIONS    EE 74    GZF9003 V Wireless Repeater  User   s Manual    1  System Overview    1 1 Overview    In GSM mobile communication system  limited by the coverage of base  station or by geographic environment  the transmission of
34. em according to the real line in figure 4 3 1   2  Shut down reverse link while measuring forward link  and shut down    forward link while measuring reverse link   24    GZF9003 V Wireless Repeater  User   s Manual    3  Set the output frequency of signal generator as the central working  frequency of repeater   4  Set repeater gain to its maximum   5  Adjust the output level of signal generator until the output of repeater  reaches its maximum   6  Increase the output level of signal generator by 10dB  measure  the output power of repeater with spectrum analyzer  ALC value is    the difference between this value and maximum output power     4 3 4 Gain Adjustment Range  1  Connect testing system according to the real line in fig4 3 1    2  Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link    3  Set repeater gain to its minimum    4  Adjust the output of signal generator until the output of repeater  reaches its maximum    5  Measure the output level of repeater with spectrum analyzer   Minimum gain is the difference between this value and the output  of signal generator  The difference between maximum gain and    minimum gain is Gain adjustment range     4 3 5 Gain Adjustment Step Length  amp  Error  1  Connect testing system according to the real line in figure 4 3 1   2  Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link   3  Set the output frequency of si
35. ened bolt  flat washer 8  GB97 1 85  and spring washer 8  GB93 87      Step 2     As shown in figure 5 5 1  remove down panel of main casing for Repeater  fit four M8X25  bolts  GB5870 86  over the installation hole of equipment  the installation hole of frame   flat washer 8  GB97 1 85  and spring washer 8  GB93 87  in turn  and fasten them with  Nut M8  GB6170 86  for connection     Step 3     As shown in figure 5 5 1  install the down panel  and connect earth wire for equipment    with ground reliably        GZF9003 V Wireless Repeater  User   s Manual    ll Repeater Installation Mode of Bracket on Wall             figure 5 5 2 Scheme of installation        E    3    GZF9003 V Wireless Repeater  User   s Manual                                        S N Coding Name Quantity   Remark  1 Protective casing 1  2 8 038 009R1A Bracket  1  1  3 8 038 010R1A Bracket  2  1  4 GB5870 86 Screw bolt M8 X 25 4  5 GB6170 86 Nut M8 4  6 GB97 1 85 Flat washer 8 4  7 GB97 1 85 Flat washer 12 6  8 GB93 87 Spring washer 8 4  9 GB93 87 Spring washer 12 6  10 Steel expansion bolt M12X110 6                      table 5 5 2 Details for installation scheme    Installation Instruction     Step 1   As shown in figure 5 5 2 firstly bore six holes on wall for installation with Churn Drill   hammer   the size of which is the same as that of installation hole for bracket     Step 2    As shown in figure 5 5 2 put six steel expansion bolts and expanding pipes into bored  holes  then fit bolts over the i
36. eriirerrnsrrins 37   5 2 System USCA ALON reais case scensieaseenenenoscesscanaasnansnintneousnannntneuse 39   ii    GZF9003 V Wireless Repeater  User   s Manual    5 2 1 Installation FIOW  0          cccccccccecssseseeecceceaeeuseceeeceeeaeeseeeeeeeseaueaseceseeeseaueaseceseeeseauesseceeseeaeaaaeeeess 40  D 2 2 Users  COOP SLALOM E 40  6 223    ON SITE  SUEY gege ENEE EE EE A NENEA AAE E EERE 41  5 2 4 Installation Le EE 41  5 2 5 Technical Documentation    41  5 3 Installation CONnditiONS                ces escessessceeseesessesseeseesaeenaes 41  5 3 1 Basic Installation Conditions               ccccccscccecccececeeseecececececeeaeeeceeeseaueaseceseeeseaueaeseeeseeaeansseeess 41  5 3 2 Recommended Environment Requirements                   ccccccceeeeeeceeceeeeeeeeeeeeeeeeeeseseenaeaeeeeeeeeee 42  5 4 Equipment Check tiniciicimmnscurnncimenamaoueamemeaeeles 42  5 4 1 Counting the Goods  rrna eles mere veneer eee cio aie 42  5 4 2 Unpacking Inspechon   ccccece cece cece ee eeeeee eect eect ee ceaeaeceeeeeseeeaaaeeeeeeesesceaeeeeeeesesencaeaeeeeeeeeees 43    5 5 Installation of the Main Chassis of the GZF9183 V    SE E 43  5 6 Antenna Feeder Installation               ccccsscsssessesssesssessseesseeeaes 50     6 1 Laying Cables EE 50  5 6 2 Installation of the Service Antenna  amp  Feeder              cccccccsseseecccececeaseseececeeeseauesseeeeseeseaaeneeeess 53  5 6 3 Ee CO GE 53  5 6 4 Precautions for Antenna Feeder Installation                 ccccccssseececececeaueesecec
37. ffer from what is described in this manual  due to frequent update of WRI Hongxin products and fast development of  technologies in the future  Please contact the local WRI Hongxin office for the  latest updating information of the product     Notice    1 Based on users    need  the actual working frequency of WRI repeater is  to be customized  In this manual  we provide the repeater with  frequency 935 960MHz for downlink and 890 915MHz for uplink    2 Based on users    need  the power supply AC input voltage value  provided by WRI is to be customized  either  In this manual  we provide  repeater with 220V 50Hz AC or 48V DC power supply  in fact   110V 60Hz AC power supply is also optional    3 Based on the users    need  the output power of both downlink and  uplink is to be customized  and the output power range is from 0 5W to  10W for uplink and from 2W to 40W for downlink    4 Based on user   s need  the way for band selecting is to be customized   broadband  band selecting or channel selecting is optional  In this  manual  we provide repeater with channel selecting    5 About GZF9183 V  here    900    stands for working frequency     3    stands  for country code named by Hongxin  and    V    stands for repeater type     GZF9003 V Wireless Repeater  User   s Manual    CONTENT    1  SYSTEM OVERVIEW         sas101211901012110010211122   1    1 1 OvervieW asic scsssintsseiesersntnariesnssnces an ons sional eens banter dnnissnd 1  1 2 Scope of Application of the Equipment 
38. g Inspection Report   Both parties shall sign the Report  and then the goods shall be handed  over to the user  Each party shall hold one copy of the Unpacking  Inspection Report  and the project supervisor should feed back the     Inspection Conclusion    within seven days to the vendor for  documentation     5 5 Installation of the Main Chassis of the GZF9183 V  Repeater    Mounting on an embracing pole or wall    The GZF9183 V Repeater is attached with such installation fittings as  installation board and fixing pieces  The chassis of the GZF9183 V    Repeater can be mounted either on the wall or on a high pole     The bottom of the equipment is usually about 1 2 m above the ground     I  Repeater Installation Mode of Bracket on Embracing Pole    WRI    GZF9003 V Wireless Repeater  User   s Manual          figure 5 5 1 Scheme of installation    44  s  gt   I HH  WRI eee ere re ees    GZF9003 V Wireless Repeater    User   s Manual                                        S N Coding Name Quantity Remark  1 Protective casing 1  3 8 038 023R1A Staple bolt 2  4 8 038  ZJ Bracket 1  5 8 309 044R1A M12 lengthened bolt 4  6 GB5870 86 Screw bolt M8X25 4  7 GB6170 86 Nut M8 4  8 GB97 1 85 Flat washer 8 4  9 GB93 87 Spring washer 8 4  10 GB6170 86 Nut M12 4  11 GB847 85 Flat washer 12 4                   Installation Instruction     Step 1     table 5 5 1 Details for installation scheme    As shown in figure 5 5 1  fasten the bracket and staple bolt on embracing pole with M12    length
39. g conductor    For all the outdoor repeaters  it must be ensured that three points  be connected with ground    When connecting the lightning conductor with ground wires  the  direction of the wires should be downward  but not upward  which  helps instantaneous current to be rapidly guided into the ground   In order to decrease inductance when the lightning conductor is  connected with ground wires  the curving angle of ground wires  should be above 90    and the curvature radius above 130mm   The grounding points of equipment protection zone  feeder lines   outdoor antenna backstop should be apart from each other  Every  grounding points require to have a fine connection without any  loose and be made anti oxidation handling  to be covered with  rust resisting lacquer or silver powder  and waterproof and  antisepsis handling    Lightning rod  hold pole lightning should have a diameter of  12 15mm and a length of 1500mm  Outdoor antenna should be  within the 450 protection angle of the lightning rod    The grounding earth resistance of all the grounding nets should  be less than 5Q  For places where the thunderstorm days per  year is less than 20 days  their grounding earth resistance may be  less than 10Q    For details  refer to the grounding criteria of repeater system     57    Be    WRI    GZF9003 V Wireless Repeater    User   s Manual    5 7 2 Power Supply Connection    For the GZF9183 V Repeater not requiring standby power supply  the  48V DC or 220V 50Hz AC power can 
40. g power  coverage  range  uplink and downlink balance  out of band suppression  and group  time delay  Wha  s more  a number of technologies have obtained    patents in China     2  Module design  Module design is the development trend of system    7    GZF9003 V Wireless Repeater    User   s Manual    design and makes it easier for upgrading and maintenance  To meet  market demands  WRI Hongxin has developed a flexible and effective  series repeater module system through meticulous system certification   unit analysis  rational division of modules and proper index analysis  thus  paving the way for the flexible arrangement of multiple types of    machines     Interior monitor and control  M amp C   The interior M amp C module of the  GZF9183 V Repeater is the control core of the whole repeater and  implements four functions  detection  control  communication  and  alarming  The standby battery on the M amp C board maintains the normal  running of the system in case of power off and sends a power off alarm  to the OMC center  and supports  monitors or resets wireless Modem   the LED  indicator and MIC switch interface provide onsite maintenance  without tools  and the serial interface of the portable computer is  connected directly to the system to provide a more convenient local M amp C    means     Structure  The integrated system is made of aluminum alloy and its  surface is treated with advanced technique to ensure excellent EMC  performance and anti corrosion performance
41. ghtening surge electricity                                                                 Parameters   SL 35R SL 35P SL 23R SL 23P  Frequency Range DC 2500MHz DC 1500MHz  Impedance 500  Insertion Loss 0 2dB  VSWR  1 2  Power Capacity 200W  Discharge Voltage DC230V 15  Insulated Resistance 210000MQ DC100V   Connector Type N J N K N K N K N J N K N K N K  Dimension 58 25 35mm 75 20 45mm  Weight 140g 110g   21  Je Ai F    GZF9003 V Wireless Repeater  User   s Manual    3 4 6 1 2 Inch Super Suppleness Cable       The cable often works as a part of antenna feeder for joining master and BTS  slave unit  and antenna        Mechanical Specifications                               Run Temperature Range 40  70  Min Setting Temperature 20  Max Pull N 500  Weight kg km 190  Min  Incurvated Semidiameter Single Flection 15  Many Flection 30  Electrical Specifications  Impedance Q 50 1  Attenuation dB m 10 9 100  950M   Transmit Speed Coefficient 0 82  Max Rating Power kW 0 34  950MHz   Echo Ullage customized  Capacitance pF m 82  22    GZF9003 V Wireless Repeater  User   s Manual    4  Equipment Test  amp  Debugging    4 1  Test Condition  Instruments  Meters  amp  Relevant    Accessories    4 1 1 Test Condition  1  Temperature   25   55    2  Relative humidity  35 95     4 1 2 Instruments  Meters  amp  Relevant Accessories  1  Signal generator  one set  2  Spectrum analyzer  one set  3  Vector network analyzer  one set  4  Noise Figure analyzer  one set  5  30dB electric attenuator and 50
42. gn  plan and determine the design direction based on the design plan and  requirements for current works    3 Perfect designing contents  complete all the contents of the plan  such as  design basis  panorama data analysis based on reconnaissance  report    4 Analysis on feasibility and rationality of the plan  all plans must be  analyzed in terms of technical feasibility and rationality such as  prediction on the border magnetic field  switch analysis  interference  analysis  balance analysis and so on    5 Quotation  rationally quote on the plan according to the market  requirements after repeated examination of the feasibility of technical  plan and verify the pricing of the plan after comparison    Key requirements for design    1 Reinforce the analysis on the rationality of the plan   2 Decide reasonable editing format and corresponding fonts according to  the template of the design    3 Reinforce the analysis on pilot panorama testing    4 Use special drawing tools  Microsoft Visio  to draw the point location  drawings and system frame    5 Hand signature shall be requested for places of signature     5 1 3 Organization of Construction    Purpose  according to statistics  the start or poor effect at the start of  system after the completion of construction is usually caused by disorder in  construction and management  Therefore  apart from strict execution  according to the process provided in relevant documents  specific plan for  construction of works must be formulat
43. gnal generator as the central  working frequency of repeater     4  Set repeater gain to its maximum     25    GZF9003 V Wireless Repeater  User   s Manual    5  Adjust the output of signal generator until the output of repeater  reaches its maximum    6  Measure the output power of repeater with spectrum analyzer    7  Decrease repeater gain by step  Use spectrum analyzer to  measure the output power for every step length decrease of    repeater and record it  until repeater gain reaches the minimum     4 3 6 Ripple In Band  1  Connect testing system according to the real line in figure 4 3 1    2  Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link    3  Set the output frequency of signal generator as the central  working frequency of repeater    4  Set repeater gain to its maximum    5  Adjust the output level of signal generator until the output of  repeater reaches its maximum  i e  the output of signal generator  iS Lin max    6  Connect testing system according to the real line in figure 4 3 1   the dotted line is a figure showing the connection in calibrated  testing system     7  Set the output level of vector network analyzer as Lin max     8  Use vector network analyzer to measure in band ripple     4 3 7 Voltage Standing Wave Ratio    1  Connect testing system according to the real line in figure 4 3 2   2  Shut down reverse link while measuring forward link  and shut    down forward link while measuring re
44. haracterized by its strong adaptability   quick construction and high sound quality  It can cover the entire  coverage area  GZF9183 V Frequency Shifting Repeater of mobile  communications can solve the problem remote areas  highways     railways and airport  In the areas where the frequency of the base  2    GZF9003 V Wireless Repeater  User   s Manual    station is not used  the extra communication capacity can be transmitted    to other areas so that equipment shall be fully used     1 2 Scope of Application of the Equipment    Applicable to airport  stations  mountain area  railway lines  holiday  village  tourist areas  large scale industry and mining enterprises   remote residential areas  countryside and dead zones and shadow  areas of mobile communication  Especially it is important for the area  where the wireless signal environment is very complex and putting the    optical fiber is very difficult     1 3 Major Features of the Equipment    1  Use filter with high selectivity and low insertion loss and  multi grade filter technology to enhance the isolation between  uplink and downlink    2  No interference to the base station and other radio equipments  with low noise for the system  proper linearity and high power    3  Ensure normal working of the repeater under tough environment  with automatic level control  ALC  function    4  Unique wireless digital transmission and remote monitoring  system with various ways of monitoring and convenience for  network maintena
45. hibited to pull the cable by force      When cables vertically pass through machine rooms  the holes  must be reinforced according to design with measures against  rain  When cables horizontally pass the rooms  the holes must be  reinforced with protective frames and sealed after the cables are  fixed  Cables must not be hurt when they are being sealed  The  protective frames should have colors harmonious with the color of  the wall      RF cables and AC cables must be laid separately  Proper  measures must be taken to separate them when they have to be  placed together      Itis prohibited to enlace the cables along with the lightning cables      When the cable is laid in frames or casing  the laying must be flat  and even  Feed line must be enlaced evenly along the frame  See  2 3 1 4 for fixed distances for feed lines  Cables must be lined  closely in order after being enlaced  Extra part of laces must be  cut off      When cables are laid in suspense  they must be fixed with cable  hooks along the suspended cables  The size of the hooks   250mm for 1 2    cable radius and 350mm for 7 8    cable radius   See 2 3 1 4 for requirement for fixed distances      When the cables are laid along walls  laying must be flat and even   Feed lines must be fixed with cable clamps  Cables must be  protected in sleeves  PVC tube or zinc plated sleeves   The  bending part of the feed line must be enlaced with soft tube        Cables must be fixed with special cable fixer according to the  
46. ion switch  For example  if power  supply wire is not long enough  more wires can be connected with  it  but live wire zero line and ground wire must be connected in  separate points  and soldered with soldering tin  The section to be  soldered should first be packed with electric adhesive plaster  and  be closed in pyrocondensation pipe    When connecting power supply  full preparation for safety should    be made to ensure absolute body safety     5 7 2 2 Installation of Power Supply    5 8 Installation    tower     Requirements for power supply connection of solar repeater  First  connect the charging controller with circuit of accumulator  then  connect solar plate with the circuit of the charging controller   Power supply in solar repeater requires to be installed in places  with long time and sufficient sunlight    Whether power supply in solar repeater should be installed in the  south facing the north or in the north facing the south depends on    local conditions     of Embracing Pole  amp  Antenna Bracket  for    When embracing pole is buried in the earth  the depth of its  burying can be determined according to soil texture and the  height of the hold pole  A depth of 0 8 1 2m shall apply for a  6mhold pole  1 2 1 6m for a 8m hold pole  1 6 1 8m for a 10m  hold pole and 2 0 2 2m for a 12m hold pole    The lightning mark  paint mark and the installation of lantern  if  required  of antenna tower should be in accordance with the    TY    WRI    GZF9003 V Wireless Rep
47. kinds of technical documents    Perform self evaluation of the construction quality    Submit completion report to construction unit for inspection and  acceptance    Preparations for completion inspection and acceptance  Completion and acceptance process is a key to on time completion   qualification and acceptance by the construction unit  To assure the  smooth inspection and acceptance of the construction  it is required  that construction must be performed step by step according to the  general requirements of the plan  The following preparations are  included before inspection and acceptance     Continue to perfect self examination and properly handle the ending    work  Ending work shall appear at the period close to completion of    37    GZF9003 V Wireless Repeater  User   s Manual    construction while some sporadic unfinished work will come out  Ending  work is sporadic  spattered  small in scale and widely spread  If they are  not finished in time  they can influence the completion inspection and  acceptance of the construction  According to our experience for  completion of construction  we must properly handle the ending work in  view of the new projects and sort out the ending work to eliminate them   Operation of self examination of construction  at opening of the   construction  all that are related to the coverage of the construction must  be checked  Usually the following index and data must be understood   coverage rate  call quality  drop off rate  switch 
48. le     1  For installation on an iron pole  the grounding cable of the  equipment is usually connected to the iron pole  iron tower   The  grounding resistance  R  of the iron pole should be less than 10 Q  and the grounding junction pieces should be protected from    corrosion     2  For installation on the wall  the grounding cable of the equipment is  connected to the integrated grounding bar  The grounding resistance  R   of the grounding bar should be less than 5 Q and the grounding junction    pieces should be protected from corrosion     5 7 1 1 Cable Laying of Ground Wires     Bus ground wires should be of 35mm    guide line  and sub ground  wire of 16mm  guide line      Ground wires must be protected in PVC pipe or placed in wire  casing  straight   vertical with decoration concerned       f ground wires go through the wall  the part in the wall must be put  into PVC pipe or corrugated pipe for protection  and the hole on  the wall must be sealed with fireproofing clay      Ground wires should not go in a 90   right angle  The curvature  radius should be more than 130mm       f ground wires of antenna bracket and ground wires of feeder line    55    TY    WRI    GZF9003 V Wireless Repeater    User   s Manual    are connected with the lightning conductor on the roof  inversed  funnel  that is  distiller  should not be shaped  and the direction of  the funnel must be downward    The terminal grounding points of ground wires of antenna bracket  fall in the ground net or
49. lue chosen      Delay   Connect the testing system according to the real line in figure  4 3 2    Set the central frequency of network analyzer as the central  frequency of repeater  frequency span as the operating band  width of repeater  and the output level as the maximum input level  of repeater  Calibrate delay in transmission measurement method  according to the dotted line in the figure 4 3 2    Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link    Set repeat gain to its maximum     Measure group delay with network analyzer     WRI    GZF9003 V Wireless Repeater  User   s Manual    4 3 11 Noise Figure            Noise Figure  E Analyzer    figure 4 3 3       1  Connect testing system according to figure 4 3 3  make the  calibration according to the dotted line before test    2  Shut down reverse link while measuring forward link  and shut  down forward link while measuring reverse link    3  Set repeater gain to its maximum  Measure NF with noise figure    analyzer     WRI    GZF9003 V Wireless Repeater  User   s Manual       5  Construction Process    5 1 Construction Flow    In light of the status of the construction at the early stage and current  new requirements on the construction from the operators  the following  specifications for the organization and execution of the project  construction are formulated to ensure the quality of the construction and  to establish a reputable image of WRI Hongxin Corp  
50. meter  Pilot premier test software     Notepad  Mobile phone to be tested  GPS and digital camera     Location and panorama of project  Data shall be collected by means of GPS and    digital camera     Test of coverage quality within coverage area    Premier software for dialling test shall be used to test route coverage and coverage    peripheries shall be tested     Field strength of coverage  Premier for data test shall be adopted  to test field strength within area tested  basis of which shall be  plan design standard or standards set by the owner  As for  outdoor coverage design  signal strength received by mobile  phone tested is normally no less than    70dBm within 85  of area    coverage and no less than    80dBm within 90  of area coverage  68    GZF9003 V Wireless Repeater  User   s Manual    any spots in coverage in principle and field strength of coverage  shall meet standards specified in design plan and set by the  owner      Speech quality   lt 4 grade within 95  of the total      Access success ratio within wireless coverage  it is required that  mobile station may be switched to network in 95  of the positions    of cover area and 99  of time limit     Data collection of equipment room of base station    It is necessary to understand and make statistics on data of signal source base station    of equipment upon opening of the system and effects on base station from data shall be    observed  Parameters shall be readjusted timely when abnormal circumstance oc
51. nce    5  Modularized design facilitates assembly and maintenance    6  Equipped with perfect network management system and friendly  operation interface as well highly reliable operation and failure  treatment capability     7  When monitoring center has not been established  technicians can  3    GZF9003 V Wireless Repeater    User   s Manual    monitor  set  modify the parameters of all the modules of GSM  repeaters and easily collect equipment warning information via  local PC  Once the repeater fails  OMC can immediately send  warning information to designated mobile stations or phones at  will    When monitoring center has been established  technicians can  monitor and control repeaters by OMC software in monitoring  center for optimize parameters and upgrade software according to  the actual situation of network  It will facilitate the monitoring of the  working of Frequency Shifting Repeater of GSM mobile  communication  See Repeater OMC Operation Instructions of  WRI Hongxin Co   Ltd  attached separately  for detailed operation    information     1 4 Basic Principle    GZF9183 V Frequency Shifting Repeater is one of WRI Hongxin series    repeaters     The style of network grouping of GSM Frequency Shifting Repeater is    flexible and in variety according to the real situation  The basic ways are    as follows     Using such a repeater  the local repeater will receive the coupled signal  by cable or RF signal by air from Base Station service antenna  and the  received
52. notting or winding are allowed     50    GZF9003 V Wireless Repeater  User   s Manual      When laying the cable  the cable must be unrolled from the cable  reel radially step by step in relaxed way  It is prohibited to unroll  the cable at random from the center  It is prohibited to unroll the  cable at random from the center  No twist  knotting or winding are  allowed  No surge or dog leg are accepted     Cables must be lined in good order to reduce curves  If they must  be bent  the bending radius must meet the following    requirements     Linear diameter Second time bending First time bending    radius radius      Feed line must fix with laces  L type base of feed line  and       wave guide card with single double hole  partition code and PVC    tube  The table for the fixed distance is as follows     Eed  lt 1 2    feed line  gt 1 2    feed line       When placed 1 0m 1 5m  horizontally      In the areas like a machine room and passages where cables are    exposed  cables must be protected with sleeves  PVC or silver  plated tube   Cables must be cased in soft sleeves at bending  points and fixed with pipe clamps  Check 2 3 1 4 for the distances   The following is the table for the diameter of PVC tube     a  lt 1 2    feed line  gt 1 2    feed line    51    WRI PRE LETE    Technatagios    GZF9003 V Wireless Repeater  User   s Manual    Diameter of the PVC tube 25mm or 32mm      Cables have to be recalled and re installed when trouble appears  in construction  It is pro
53. nsible for chief engineer   He must report construction schedule to chief engineer and is not  allowed to execute the schedule until it is approved  Engineering  supervisor must report progress of the construction to chief  engineer every day    Security Inspector  responsible for the security of the  constructions  including checking of the certificate for operation at  high places and electrician   s certificate  all problOMC in operation  at high places  construction of the works with potential danger and  safe lighting    QC  responsible for quality control of the construction  Inform  Party A and the owners of the requirements for system inspection  and acceptance  control the process for the whole construction   strictly check the operation and construction of the works  according to the cable laying standard and construction  specifications of Party A or Supervisor  Inform Engineering  Supervisor in written forms of the disqualification in the  engineering or potential trouble and ask him to revise  All the  written notice for modification must be handed in to chief engineer  after the construction is finished as a basis for evaluation of the  construction units    Project Coordinator  responsible for the coordination of  everything at the construction site  such as taking the equipment    34    GZF9003 V Wireless Repeater    User   s Manual    2     3     and arranging the entrance of the transportation equipment   entrance permits of all persons  water and power for 
54. nstallation hole on bracket as well as flat washer and spring  washer  at last put nuts onto bolts and screw them down tightly     Step 3    As shown in figure 5 5 2 remove down panel of equipment  fit four M8X25 bolts   GB5780 86  over the installation hole of equipment  the installation hole of bracket  flat  washer and spring washer in turn  and fasten them with nuts for connection     Step 4   As shown in figure 5 5 2 install up and down panels and connect earth wire for equipment  with ground reliably     GZF9003 V Wireless Repeater  User   s Manual    lll Installation Mode for Repeater Canopy on Embracing Pole       figure 5 5 3 Scheme of installation                         S N Coding Name Quantity   Remark  1 Canopy  including accessories  1  2 GB817 85 Panhead bolt M5 X 10 2  3 GB5870 86 Screw bolt M12 X 60 2  4 GB97 1 85 Flat washer 12 2  5 GB93 87 Spring washer 12 2                      table 5 5 3 Details for installation scheme    Installation Instruction     Step 1   As shown in figure 5 5 3 fasten canopy and attached staple bolt on embracing pole with  bolt M12X60  GB5870 86   flat washer 12  GB97 1 85  and spring washer12  GB93 87      Step 2   As shown in figure 5 5 3 fasten bracket A and B of canopy on installation platform based  on actual conditions of project     GZF9003 V Wireless Repeater  User   s Manual    IV  Installation Mode for Canopy on Wall             figure 5 5 4 Scheme of installation    49  Se   gt         le    GZF9003 V Wireless Repeater  
55. oject  it is required to clarify in detail issues    unspecified in the project     GZF9003 V Wireless Repeater    User   s Manual    7  System Maintenance    It is unnecessary to shut down the equipment without special need once  the equipment is put to use  Therefore  equipment must be used in  ventilated and clean environment  avoiding dust from entering the  equipment  consequently causing damage    The equipment must be shut down immediately for maintenance once  abnormities incur  such as noise from module increases or odor  appears   Check if the antenna fails to receive signal due to the change  of angle when the signals can no be received or received poorly while  the equipment is found to work with normality  Adjust antenna and re fix  it when it is found with changed angle    When the equipment is working normally  do not touch the joints  between equipment if not necessary so as to prevent joints from getting  loosened and improperly contacted  When equipment fails  user must  turn it off and notify our company  It is not allowed to take apart the joints    between the equipment or to turn on the equipment  to avoid accident     Please contact WRI Hongxin Co  if you have any questions     GZF9003 V Wireless Repeater    User   s Manual    8  Precautions     gt  The products of our company have been tested and aged before    delivery so as to ensure quality    The products are sealed upon delivery and no units or individuals  are allowed to unseal them without the a
56. ons  and User   s Manual for the GZF9183 V Frequency Shifting  Repeater     5 3 Installation Conditions    5 3 1 Basic Installation Conditions    The GZF9183 V Repeater is designed to work outdoors under the  temperature  25  C    55  C and relative humidity  lt 95   so it can  work in the outdoor natural environments at most areas  The    following basic conditions should be ready before installation     1  220V AC or 48V DC power is available   According to user   s    requirement     He    WRI    GZF9003 V Wireless Repeater  User   s Manual    2  Agrounding bar is available nearby     3  There are appropriate buildings  iron towers or high poles to    service antenna     5 3 2 Recommended Environment Requirements    1  The first choice is wall mounting in a room that is cool  dry  well ventilated   provided with fire control facilities  free from corrosive gases or smoke   and water tight on the roof  with the electromagnetic interference field  intensity less than 140dB uv m  0 01 MHz   110000 MHz      2  The second choice is a shady and well ventilated outdoor wall without    direct sunshine or rain drenching   3  The third choice is a common wall  iron tower or high pole     4  The installation height should be such as to facilitate RF cabling  heat    radiation  safety protection and maintenance     5  Independent and stable 150VAC 260V AC nominal 220V 50Hz or  44VDC 54VDC power should be provided  based on different need   the value of AC power is to be customized  fo
57. ons in charge in relevant departments  should exchange and consult with each other at proper time to  perfect the optimization of the whole system    Key Requirements   Quality must be strictly controlled in the construction in various  places of the country based on the construction at the early phase  so as to eliminate the following    Construct without familiarization of the drawings or the construct  while drawings have not been check jointly  alter design without  the approval of the design department    Fail to construct according to drawings    Fail to construct according to the standard for inspection and  acceptance of the construction    Fail to construct according to relevant operation process   Construct blindly without basic knowledge of structure   Management for construct is in disorder  Construction plan is  improper  Construction order is wrong  Technical organization is  poor  Technical explanation is not enough  Construct against  regulations  Neglect quality control and inspection and  acceptance  All these will lead to quality problOMC     5 1 4 Opening  amp  Self Examination of the Construction    Purpose  formulate flow for opening and improve on the quality of the  construction   Preparation before opening    Check the route of feed lines of antenna to determine if the  facilities are constructed according to drawings or if they are  fastened    Check the output power of signal source to see if it agrees with the    36    GZF9003 V Wireless Repeater  
58. orily  The MTBF of the  integrated system is not shorter than 60000 hours  the MTTR of the  integrated system is shorter than 30 minutes  and the maintenance  guarantee time is shorter than 24 hours  The service life of the    product is at least 10 years     WRI    GZF9003 V Wireless Repeater  User   s Manual    2 3 Technical Indices    2 3 1 Major Technical Indexes  E E    Noise Figure       VSWR       Gain adjustment range 45 dB   105 dB 45 dB   105 dB          Gain adjustment step 1dB 1dB    Table 2 3 1 Major technical indices of the GZF9183 V Repeater    2 3 2 Ambient Environment Condition  Ambient temperature   25  C    55  C  Storage temperature   40  C    85  C  Relative humidity   lt  95   Air Pressure  70 106kPa    2 3 3 Power Supply Requirements    Power Supply  220V AC 50Hz or 48V DC  Allowed fluctuation range of voltage  180 260VAC  44 54VDC    Allowed variation range of frequency  45Hz   65Hz  Power Consumption   lt 300Watt    10    GZF9003 V Wireless Repeater  User   s Manual    2 3 4 Mechanical Characteristics    The GZF9183 V meets IP65 standard and can be fixed to the wall  or the installation pole with installation accessories    The physical appearance of GZF9183 V Repeater is shown in Fig   2 3 4        GZF9183 V  Fig 2 3 4    2 3 5 Interfaces    Antenna interface  N type connector  Portable computer and wireless modem interface  RS232    11    FiberMome Technologies    GZF9003 V Wireless Repeater  User   s Manual    3  System Composition  3 1 RF Unit    
59. peater  User   s Manual    3 2 M amp C       OMC    Port232       M amp C Board          In the repeater  the working flow procedure is shown above  All the active modules are connected    in serial line to M amp C board     GZF9003 V Wireless Repeater  User   s Manual    3 3 Power Supply Unit    300W 48V DC   220 AC Power Supply       Rating Output Power  300W   Input Voltage Range  48V DC   220V AC input  Output Voltage Type   27V 10A   9V 3A   Features  1 Modularized and small sized design     2 High power consistency    3 DC DC converting technology    4 Own interface to backup battery  can control charge and  discharge of backup battery    5 Over Voltage Protection  Over Current Protection  Over  Temperature Protection  Backup Battery Low Voltage  Protection    Structural Figure   the input DC voltage is to be customized     Battery Low Volt Batte   gt  Protection Circuit y     27V  Output  i DC DC DC DC  220V AC  rent ircui Module Converting       Circuit    DC DC  5V Output  Module       GZF9003 V Wireless Repeater    User   s Manual    3 4 Accessories    3 4 1 Outdoor Omni Directional Antenna    Outdoor omni directional       antenna usually works as service antenna to offer    omni directional coverage to appointed area        Electrical Specifications                                                          Frequency Range 870 960MHz  VSWR  1 5  Input Impedance 500  Gain 11 5dBi  Polarization Type Horizontal or Vertical  Beam width 1 2 Power Points 8    Max Power 50
60. r example  110V 60Hz AC  power will be provided in some country   which mustn   t be shared with    other large power communication equipment and electric appliances   6  The installation building  iron tower or high pole should be provided with  lightning protection facilities and should be strong and stable enough     7  The antenna backstay or roof should be provided with a pole to help  mount the antenna  The diameter of the pole may be 50mm   80mm   depending on the antenna to be mounted  A ladder should also be  available to help mount the antenna  All metal parts should be properly  grounded and provided with lightning protection facilities     5 4 Equipment Check    5 4 1 Counting the Goods    Check whether the packing box is intact in appearance  If any goods are    wrong or missing or if the outer package is damaged seriously  stop  42    He    WRI    GZF9003 V Wireless Repeater   User   s Manual  unpacking immediately and find out the cause  and report to the relevant  department     5 4 2 Unpacking Inspection    Open the packing box if it is intact  Handle with care to avoid damaging  anything    After the packing box is opened  check whether the goods inside match  the packing list and whether the packing list matches the inspection list  in the Unpacking Inspection Report  If any goods are wrong or missing  or if the outer package is damaged seriously  find out the cause  and  report to the relevant department    After unpacking inspection  fill out the Unpackin
61. r shock  and no strong magnetic field  exists  The storehouse should be kept in good ventilation     WRI    GZF9003 V Wireless Repeater  User   s Manual    10  Appendix Terms  amp  Abbreviations    Automatic Level Control       74    
62. reless Repeater  User   s Manual    suppliers    Panorama Testing  by panorama testing and scientific method  collect  the accurate wireless signal in the coverage area to provide detailed  and authentic data for design of the works    2 Location of stations  determine the location of the equipment station after  the coordination with construction units or realty owners according to  the types of repeaters  The location of the stations must be fixed in view  of convenience for construction and meeting the conditions of the  works    3 Introduction of power  sites with proper AC power supply shall be chosen  with priority according to the site environment  the length of power  introduction cable should not exceed 1000m considering the  attenuation   and solar power shall be chosen if there is no AC power  available near the coverage station    4 Choice of fundamental construction  mainly for outdoor works    determine the model and length for the type of the holding pole for the  donor and service antennae  determine the types  metal sheet room  and house of bricks  of the equipment  solar  protection as well as the  sizes  Determine if there are any special requirements for the main  equipment or feed line of antenna  such as the area with frequent  lightening  based on the local climate    5 Re arrangement of data  Standardized reconnaissance data shall be good for formulating design  plan and good for filing and checking of the files of works  Therefore  all  the testing da
63. ress  the power of the signal will reach  1W to 30W depending on the type of HPA  In the uplink  the progress of  amplifying signal is very similar to the downlink  just in different frequency   From the input of donor antenna to the output of service antenna  the gain  of repeater system will usually be 90dB  The gain of LNA is about 55 60dB   and the gain of HPA is about 50 55 dB  Total gain of repeater system can  be modified by setting the value of the digital attenuators ATT  located in    the LNA and HPA  The dynamic range of ATT is more than 60dB     GZF9003 V Wireless Repeater  User   s Manual    Link Antenna       Transducer         Donor Antenna        Service Antenna  Link Antenna Local unit       Transducer                Transducer                Remote unit    2 2 Product Features    1  Excellent RF indices  Based on her insight into GSM system  WRI  Hongxin has incorporated the GZF9183 V Repeater as a part of the  GSM mobile communications system in designing the system indices of  the product to make sure that the RF links are transparent and unblocked  for adequate absorption of traffic  And ensure the excellent performance  of the RF links though proper allocation of the indices of the RF parts and  the powerful optimization capability of the RF system  And also make the  integrated system have excellent GSM parameter features through  analysis  careful designing and strict control of such key parameters as  noise characteristics  uplink downlink transmittin
64. ta must be filed after the collection and testing  As for the  panorama testing data  it must be analyzed and corresponding  reconnaissance report shall be filled in after their re management     5 1 2 Engineering Design    Purpose  to provide detailed  reasonable and feasible solutions for   the works so that a complete plan shall be readily available for   construction   The reasonableness of the design plan shall decide the control on  progress of the works and quality control of the works  The defective  design plan shall delay the progress of works  harm the quality  lead to the  increase in cost and potential danger for construction  Therefore   considering the actual situation of construction in various places  we  require that when formulating and verifying a design plan of works  we  must make full analysis in the aspects of technique  organization   management and economy comprehensively to assure the technical    32    GZF9003 V Wireless Repeater  User   s Manual    feasibility and economic rationality for better quality construction   Design flow    1 Determine design purpose and design plan  determine the requirements  and coverage target of a respective works based on the technical  bidding documents of construction unit  Plan the scale of current works  and design  determine the design contents and estimation plan after  careful study of the reconnaissance and technical bidding documents    2 Formulate general frame of the plan  formulate general frame for desi
65. uld be smooth without  spines and not be in a shape of knurl  Co axial cable plug must be  firmly assembled strictly according to its installation instruction by  use of complete fittings  and assembly position must be correct   If at the cutting point a pyrocondensation sleeve is required  the  pyrocondensation sleeve shall have identical and proper length   providing even pyrocondensation    For construction of cable  protect terminals from water and  humidity  A terminal exposed outdoors must be made waterproof  handling with waterproof adhesive tape  Terminals must be sawn    off if they are affected with damp or if water enters into them     5 6 4 Precautions for Antenna Feeder Installation    The donor  link and service antenna shouldn t be too near vertically     otherwise self excited reception and transmission may result     The antenna feeder system must be installed by experienced    professionals     Do not install the antenna near any power line so as to ensure personal    safety     All exposed connectors must be sealed with self adhesive waterproof    54    GZF9003 V Wireless Repeater  User   s Manual    tape and electric isolating tape     5 7 Grounding  amp  Power Supply Connection    5 7 1 Equipment Grounding    The GZF9183 V Repeater must be grounded properly  On the sides of  the main chassis of the GZF9183 V Repeater are grounding bolts   which  are connected to the ground with 2mm  or thicker copper wire  The  grounding cable should be as short as possib
66. uthorization of our  company  Our company shall not be liable for any consequences  caused due to the unauthorized start of the product    Check all the attached accessories by packing list upon reception  of the equipment of our company  Contact the supplier in time for  any shortage    Our company owns the property right of our products which is  protected by State law  No units or individuals are allowed to copy  them  Our company shall investigate any of these actions for their  legal responsibilities and reserves the right to claim for economic    losses duly suffered     GZF9003 V Wireless Repeater    User   s Manual    9  Transportation  amp  Storage    9 1 Transportation    9 2 Storage    The GZF9183 V Repeater is encased in three layers in delivery   The inlayer is a moisture proof water proof plastic bag  the middle  layer is a shockproof plastic foam card  and the outer layer is an  aluminium mould box  The GZF9183 V Repeater can be  transported via the truck or train  avoiding rough  loading unloading  case upside down  severe squeezing  direct  exposure to the rain or snow  and mechanical damage     The GZF9183 V Repeater should be placed in the original packing box  before it is used  The storage environment requires that the  temperature should be 25  C   65  C and the relative humidity should  not be greater than 95   There should be free of harmful gas or  combustible  explosive and corrosive chemical materials  and there is  no violent mechanical vibration o
67. verse link   26    GZF9003 V Wireless Repeater  User   s Manual    3  Set the output level of vector network analyzer as the maximum  input level of repeater    4  Set repeater gain to its maximum    5  Use network analyzer to measure VSWR of the operating band at  the connected port     6  Other ports shall be tested in the same method        Ka  D  N  Es  Les    E  S  a  SS  le   3  2  D  q  E   ie   g  o  o   gt     figure 4 3 2    4 3 8 Spurious Emission   1  Connect the testing system according to the figure 4 3 1    2  Shut down reverse link while measuring forward link  and shut down  forward link while measuring reverse link   3  Set repeater gain to its maximum   4  Set the start frequency  stop frequency and corresponding RBW   value as required in the test    5  Measure the spurious emission of this frequency band with spectrum    analyzer     4 3 9 Uplink SNR    GZF9003 V Wireless Repeater    User   s Manual    1     4 3 10 Group Time    1     Connect the testing system according to the real line 1n figure  4 3 1    Shut down the forward link    Set repeater gain to its maximum    Set the frequency of the two signal generators as that of f1 and  f2 in the reverse operating band  Output power f1   85dBm  f2    45dBm  The difference between the peak power amplified at f1  and bottom peak noise power is uplink SNR the following is the  setting of spectrum analyzer   the central frequency is f1  band  width 200kHz  RBW automatic  Referenced level proper     average va
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
2014 Jeep Compass User`s Guide  9 - Bosch Security Systems  Sony VGN-CR125E Marketing Specifications  Troubleshooting tips Appendix 9:  NEOFORM CUSHION USER MANUAL  Bedienungsanleitung  Philips NT3160  ICC ICFOJ1M301 fiber optic cable  SIstema de Control y Registro de Casos Interestatales del Estado de  取扱説明書    Copyright © All rights reserved. 
   Failed to retrieve file