IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware

image

Contents

1. ss00e 224 7 0 Planning and Installation Worksheets cccsscsscsssssees 22D 8 0 Appendix Notices i cccscissisccstssccccssvssessesccseeseccssssssesvsccsersnacececsiesses 290 5 1 TAO AR CS osc sos osc c5s esoeaciccenes das cececessaeascchuausnaetessacadeceecodesdusatacduscascosece 237 Copyright IBM Corp 2008 7 22 08 9 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Figures Figure 1 An InfiniBand network with four switches and four servers connected seeeeseeeceteeeeseeseeeeeeeeseeeeeneesees 14 Figure 2 Cluster components involved in data flOW eececeecesecceseeeeesecseesecnevecsaeeeceaecaeesecaeseeeneeeeeeaeseeeaecaeeeeenesered 19 Figure 3 High Level Software Architecture 00 cceceeescsseeeceseseeesecseesecneeseesecseeecsaeeecsaecaessecaeseecneeaeeaeenaeeeeeaeeneeneeaee 20 Figure 4 Simple configuration with InfiniBand ee ecceseseeseceseseeesecseesecnevsecsaeeecsaeceeesecaeveecnaeeeseecnaeeceaeeeeeneeated 20 Figure 5 Management Subsystem Functional Diagram cececeeccesessessecseeeeceeesecsseeecesecaeesecaessecnaeeeceeenaesaecaeeeeeneeered 27 Figure 6 Vendor Log Flow to CSM Event Management cccccessccssecsseeecseeeeceseeeceseceessecaeseecnaseeeeaeseeeaceaeeeeeaesaeed 35 Figure 7 Typical Fabric Manager Configuration on a single Fabric Management Server 49 Figure 8 Typical Fabric Management Server configuration with 8 subnets
2. Verify the discovery of the cluster servers by the management consoles Update the system firmware Verify the system operation Use the server installation manual to verify that the system is operational Customize LPAR and HCA configurations Load and update the operating system Power on and configure IP address of the switch Ethernet connections This must be done before attaching it to the service VLAN Connect switches to the cluster VLAN If there is more than one VLAN all switches must be attached to a single cluster VLAN and all redundant switch Ethernet connections must be attached to the same network Prerequisites for W3 M3jand W2 Verify discovery of the switches Update the switch software Customize InfiniBand network configuration C1 through C4 for cabling the InfiniBand network Note 1 It is possible to cable and start networks other than the InfiniBand networks before cabling and starting the InfiniBand network 2 When plugging InfiniBand cables between switches and HCAs connect the cable to the switch end first This is particularly important in this phase of the installation Copyright IBM Corp 2008 7 22 08 64 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware C1 Route cables and attach cables ends to the switch ports Apply labels at this time C2 If 12x HCAs are connecting
3. chassis errors Record the location of the problem and see Table of symptoms on page 169 diff indicates that there is a difference from the baseline to the latest health check run See Interpreting diff files on page 157 While the following is intended to be comprehensive in describing how to interpret the health check results for the latest information on health check see the Fast Fabric Users Guide When any of the health check tools are run the overall success or failure will be indicated in the output of the tool and its exit status The tool will also indicate which areas had problems and which files should be reviewed The Copyright IBM Corp 2008 7 22 08 154 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware results from the latest run can be found in FF_ANALYSIS_DIR latest Many files can be found in this directory which indicate both the latest configuration of the fabric and errors differences found during the health check Should the health check fail the following paragraphs will discuss a recommended order for reviewing these files If the s option save history was used when running the health check a directory whose name is the date and time of the failing run will be created under FF_ANALYSIS_DIR in which case that directory can be consulted instead of the latest directory shown in the examples below It is recommended to first review the results for any esm if usin
4. destination fabnotices fifo pipe var log csm syslog fabric notices group root perm 0644 log source src filter f fabnotices destination fabnotices fifo h Setup the condition for the above sensor and link a response to it The method depends on whether or not the CSM MS is defined as a managed node Note The method documented here is for a CSM MS that has NOT been defined as a managed node If the CSM MS is defined as a managed node you will not set the condition s scope to be local 1 Make a copy of the pre packaged condition AnyNodeAnyLoggedError and set the ManagementScope to local 1 for local mkcondition c AnyNodeAnyLoggedError m 1 LocalNodeAnyLoggedError ii To the condition link a response which will log entries startcondresp LocalNodeAnyLoggedError LogNodeErrorLogEntry The above condition response link will log node error log entries to var log csm errorlog CSM MS hostname on the CSM management server Copyright IBM Corp 2008 7 22 08 112 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware iii If you want to broadcast wall the events to the system console enter startcondresp LocalNodeAnyLoggedError BroadcastEventsAnyTime Note Using BroadcastEventsAnyTime will result in many events being broadcast to the console when servers are rebooted iv If you want to create any other response scripts you will use a similar format for the startcondresp command af
5. Clustering systems using InfiniBand hardware on page 14 Under this chapter there are references to information resources provided an overview of the cluster components and a section on supported component levels Information resources on page 14 This details the various information resources for key components to the Cluster fabric and how to get them These resources are referenced throughout the document Therefore it is very important to read this and gather up required documents as soon as possible Fabric communications function overview on page 18 Discussion of fabric data flow Management subsystem function overview on page 25 Discussion of management subsystem Supported components in an HPC cluster on page 36 Component supported and pertinent feature software and firmware minimum shipment levels Cluster Planning on page 37 This chapter provides information for planning the cluster and its fabric Planning Overview on page 37 This is a navigation guide for going about the planning process Required Level of support firmware and devices on page 39 This is minimum ship level information It references a web site to get the latest information Server Planning on page 40 Planning InfiniBand network cabling and configuration on page 40 and Management Subsystem Planning on page 45 These are the main subsystems that need to be planned Pl
6. If you are installing a cluster with a single HMC and you are not cluster ready hardware server go to step 6 5 H4 M2 To perform installation of the HMCs in the management subsystem with CSM and Cluster Ready Hardware Server or a DHCP server that is not an HMC use the following procedure Note Perform this procedure if you are Installing a new cluster with CSM and a cluster ready hardware server Adding an HMC to a cluster that already has CSM and a cluster ready hardware server Adding an HMC to a cluster with only a single HMC Adding an InfiniBand network to an existing cluster with multiple HMCs that is not currently using CSM and cluster ready hardware server Copyright IBM Corp 2008 7 22 08 100 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware a To enable the cluster ready hardware server with CSM to connect correctly to the service processors and BPCs be sure to use the systemid command on the CSM MS This manages passwords Without it CSM and CRHS cannot communicate properly with the BPAs and service processors b Disable the DHCP server on the HMC and assign the HMC a static IP address so that there is only one DHCP server on the Ethernet service VLAN and so that device discovery will occur from the cluster ready hardware server in CSM Note If the HMC is currently managing devices disabling DHCP on the HMC will temporarily disconnect the HMC from its managed devi
7. Fabric Management Server Telnet or ssh to the Fabric Management Server Ifyou set up the server that is running the Fast Fabric Tools as a managed device you can dsh commands to it from CSM 2 3 3 5 CSM Overview Description Documentation When to Use Host How to access Cluster Systems Management CSM is used by the system admin to monitor and manage the cluster CSM Planning and Install Guide CSM Administration Guide Use this to monitor remote logs from the switches and Fabric Management Servers and to remotely execute commands on the switches and Fabric Management Servers After configuring the switches and Fabric Management Servers IP addresses remote syslogging and creating them as devices CSM can be used to monitor for switch events and dsh to their CLI CSM Management Server Use CLI or GUI on the CSM Management Server Copyright IBM Corp 2008 7 22 08 31 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 3 6 HMC Overview Description Hardware Management Console Each HMC is assigned management of a group of servers If there is more than one HMC in a cluster this is accomplished by using the Cluster Ready Hardware Server on the CSM MS This is not intended to be a complete description of the HMC Documentation HMC Users Guide When to Use To set up and manage LPARs including HCA virtualization To access Service Focal Point for HCA and server
8. ccccesessseseceeeeeceeeeeceseeeeesecaeeseeereres 50 Figure 9 High level cluster installation floW ccessssssecseeseceeeeeceseceeesecseesecsevseceaeeeceaecaeeeecaeeatesecaeeeecnaseeeeaeeeeeaeeated 62 Figure 10 Management Subsystem Installation Tasks eeececcesescessecseeeeceeeeceseeeeaecseesecneseecnaeeeesaeceseeeeaeeeeeneeaees 97 Figure ll Setup remote logging 8 sc ccs ank Ae oh inant nk A nee 108 Figure 12 Remote Command Execution Setup cccceccccccesssssscessceeeceseceaecseeaeceaeceeecaeecaeeeseseaesseeseneseeseenseeneenaeenaes 117 Figure 13 Cluster Fabric Management FloW ceescsssssecseeseceseeeceseceeesecseescesecaeesecneeseceaeecesaecaeesecaeeseenaeeeeeaecateaeeas 146 Copyright IBM Corp 2008 7 22 08 10 of 238 Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 Table 8 Table 9 Table 10 Table 11 Table 12 Table 13 Table 14 Table 15 Table 16 Table 17 Table 18 Table 19 Table 20 Table 21 Table 22 Table 23 Table 24 Table 25 Table 26 Table 27 Table 28 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Tables Content Highlights 225 55 sescesect AE nace se chat bp tee bbees loved sdtote suena saddecbpece local sd beta E AAE General Cluster Information Re sources s c spanned a an e a k a ie n IBM Cluster Hardware Information ReSOurces ccscseccsssscceseseeeeceeseeneeeeceaeceeesecaeceeesecaeesecneeeeeeaeeeeeaeeaees Clust
9. sbin all_ analysis c etc syconfig iba_mon conf 8 11 018 sbin all_analysis c etc syconfig iba_mon conf 8 11 0 19 20 sbin all_ analysis c etc syconfig iba_mon conf 13 14 0 21 22 sbin all_ analysis c etc syconfig iba_mon conf 15 16 0 23 sbin all_analysis o etc syconfig iba_mon conf 17 19 0 0 1 sbin all_analysis c etc syconfig iba_mon conf 20 21 0 2 3 sbin all_analysis c etc syconfig iba_mon conf 20 21 0 4 5 sbin all_analysis c etc syconfig iba_mon conf 22 23 Table 14 Symbol error thresholds 24 hour cycle 1 hour intervals 0 1 4 8 11 12 13 14 15 16 17 19 20 21 22 23 Count 10 3 4 5 6 7 8 9 10 Clear yes no no no no no no no no If you wish to use different intervals bear in mind that the above error thresholds were calculated using the formula Copyright IBM Corp 2008 7 22 08 153 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Roundup 10 errs 24 hours number of hours from 0 Example for the 12 hour in a day Roundup 10 errs 24 hours 12 4 The minimum error threshold recommended is 3 because it is possible to get a burst of two errors within a short time and still have a healthy link 5 5 2 Output files for Health Check The Fast Fabric Health Check output file use is documented in the Fast Fabric Toolset Users Guide This section will introduce the highlights Location of the output fi
10. Cluster summary worksheet Cluster name Application HPC or not Number and types of servers Number of servers and HCAs per server Note If there are servers with various numbers of HCAs list the number of servers with each configuration for example 12 servers with one 2 port HCA 4 servers with two 2 port HCAs Number and types of switches include model numbers Number of subnets List of GID prefixes and subnet masters assign a number to a subnet for easy reference Switch partitions Number and types of frames include systems switches management servers AIX NIM Linux Distribution Number of HMCs CSM and Cluster Ready Hardware Server to be used If yes gt server model Number of and models for Fabric Management Servers Number of Service VLANs Service VLAN domains Service VLAN DHCP server locations Service VLAN InfiniBand switches static IP addresses not typical Service VLAN HMCs with static IP Service VLAN DHCP range s Number of cluster VLANs Cluster VLAN domains Cluster VLAN DHCP server locations Cluster VLAN InfiniBand switches static IP addresses Cluster VLAN HMCs with static IP Cluster VLAN DHCP range s AIX NIM server info Copyright IBM Corp 2008 7 22 08 225 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardwa
11. b For switches log onto the switch and look at the log If necessary use the switch command line help or the switch Users Guide for how to do this Verify that you can ping the source which should be either the Fabric Management Server s or the switch s service VLAN IP address a If you cannot ping the source device then you should use standard network debug techniques to isolate the problem on the service VLAN Take into consideration the CSM MS connection the Fabric Management Server connection the switch connection and any Ethernet devices on the network Also assure that the addressing has been setup properly If this is CSM on AIX open the file that Event Management is monitoring on the CSM MS and look for the log entry This is var log csm syslog fabric notices If it is not in there go to Event not in CSM MS var log csm syslog fabric notices on page 204 If this is CSM on Linux go to the next step If this is CSM on Linux tail the file that Event Management is monitoring on the CSM MS and look for the log entry This is var log csm syslog fabric notices If it is not in there go to Event not in CSM MS var log csm syslog fabric notices on page 204 If this is CSM on Linux go to the next step Note The tail will only yield results if there was nothing in the var log csm errorlog CSM MS hostname file and the syslog daemon had tried to write to var log csm syslog fabric notices Check the event management s
12. c924flecl10 ppd pok ibm com IB PORT 1 INFORMATION iba0 c924flec10 ppd pok ibm com IB PORT 2 INFORMATION iba0 For Linux use the following dsh v N LinuxNodes ibv_ devinfo grep B1 lst seven bytes of GUID grep ehca Example results gt dsh v N AIXNodes ibv_devinfo grep B1 0002 5500 103a 72 grep ehca hca_id ehcao d The server is in the first field and the adapter number is in the last field c924f1ec10 ppd pok ibm com and ibao in AIX or ehca0 in Linux e To find the physical location of the logical switch port use the logical switch number and iba device found above with the Table 25 IBM GX HCA physical port mapping from iba device and logical switch on page 187 Example Results iba0 ehca0 and logical switch 1 map to C65 T1 Therefore c924flec10 C65 T1 is attached to port 3 of SilverStorm 9024 DDR GUID 0x00066a00d90003d3 8 This procedure ends here 6 9 4 Finding devices based on a known physical switch port Use this procedure if the physical switch port is known and the attached physical HCA port must be determined This applies to IBM GX HCAs For more information on the architecture of IBM GX HCAs and logical switches within them see IBM GX GX HCA on page 21 Note This procedure has some steps that are specific to operating system type AIX or Linux This has to do with querying the HCA device from the operating system For AIX the adapter is called ibaX where X is a number 0
13. important for a successful install Improper ordering can result in very long recovery procedures Copyright IBM Corp 2008 7 22 08 99 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 4 3 HMC Installation This installation procedure is for an IBM Service representative Before starting this installation procedure obtain HMC Installation instructions Do not use these instructions until you are directed to do so within this procedure During the HMC Installation for HMC information reference the Cluster summary worksheet on page 71 which should have been filled out during the planning phase for the cluster NOTE If there are multiple HMCs on the service VLAN DO NOT setup the HMC as a DHCP server as instructed Otherwise this would result in multiple DHCP servers on the service VLAN service VLAN Note CSM is the recommended systems management application It is required to be installed with Cluster Ready Hardware Server under the following conditions 1 You have more than one HMC 2 The customer has opted to install CSM and Cluster Ready Hardware server in anticipation of future expansion The detailed procedure follows 1 H1 M1 Paying attention to the note below perform the physical installation of the Hardware Management Console HMC hardware on the floor Note HMCs might have a maximum distance restriction from the devices that they manage Generally you want to minimiz
14. 2 2 8 Non IBM device drivers Non IBM device drivers for Linux are available from the distributions Non IBM device drivers are not supported on IBM System p HPC Clusters using AIX The vendor provides the device driver used on Fabric Management Servers See Management subsystem on page 25 2 2 9 IBM host stack The HPC software stack is supported for IBM System p HPC Clusters The vendor host stack is used on Fabric Management Servers See Management subsystem on page 25 Copyright IBM Corp 2008 7 22 08 24 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 Management subsystem function overview The management subsystem is a collection of servers consoles applications firmware and networks which work together to provide the ability to Install and manage firmware on hardware devices Configure devices and the fabric Monitor for events in the cluster Monitor status of devices in the cluster Recover and route around failure scenarios in the fabric Diagnose problems in the cluster IBM and vendor system and fabric management products and utilities can be configured to work together to manage the fabric It is highly recommended that you also review the following types of material to better understand InfiniBand fabrics More specific documentation references can be found in Information resources on page 14 1 The InfiniBand standard specification from the InfiniBand Trade Associatio
15. 5 4096 5 4096 put rate in parantheses node_appearance_msg thresh 10 10 10 10 10 10 10 10 Primary Switch Priority 1 2 1 2 Backup Switch Priority Backup Switch Priority Backup Switch Priority Fast Fabric Toolset Planning Host based or embedded SM __ Host based for FF ALL_ ANALYSIS List of switch chassis 10 1 1 16 10 1 1 17 10 1 1 18 10 1 1 19 List of switches running embedded SM if applicable N A Subnet connectivity planning is in Subnet Management Planning above Chassis list files _AllSwitches list all switches Host list files AIIFM list all Fabric MS Notes Copyright IBM Corp 2008 7 22 08 91 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 0 Installing an HPC Cluster that has an InfiniBand network Use this chapter to physically install your Management Subsytems and IB hardware and software This section documents the necessary steps for the hardware and software installation Do not proceed unless you have read and understand the chapter on Cluster Planning on 37 or your role has been planned by someone who has read that chapter Before beginning any installation procedure for the most current release information see the IBM Clusters with the InfiniBand Switch web site link at http www14 software ibm com webapp set2 sas f networkmanager home html This documentati
16. 7 22 08 7 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 6 11 3 Subnet Manager log format iS ad Ge aie i Roca wesernl 189 6 12 Diagnosing link errorS esssccecesssececssooccesesooccessscocessoocceessooecesssoseeee 191 6 13 Diagnosing and repairing switch component problema 194 6 14 Diagnosing and repairing IBM system problems sse0ee 194 6 15 Diagnosing configuration Changes ssccccsssssscccssssssssccsssssssceees 194 6 16 Checking for hardware problems affecting the fabric 194 6 17 Checking for fabric configuration and functional problems 195 6 18 Checking InfiniBand configuration in AIX cccscccsssseeeeeee 195 6 19 Checking System Configuration in ATX cssccccssssssccsssssssceees 197 6 20 Checking multicast groups ccccsssscscssssssccssssssssccsssssscsssssssceeees 198 6 21 Diagnosing swapped HCA ports ccsssssccsssssssccccsssssscccsssssecoeees 199 6 22 Diagnosing swapped switch ports ccccssccccssssssccsssssssssccsssssssceees 199 6 23 Diagnosing performance Problem ccsscssccccsssssssccsssssssscees 200 6 24 Diagnosing and recovering ping ProblemMs cccccccccsssssssccees 201 6 25 Diagnosing application Crashes ccscccsccccssssssccssssssssccsssssssesees 201 6 26 Diagnosing management subsystem problems sccssssssoeees 202 6 26
17. Embedded Subnet Manager worksheet ESM or HSM to be used License obtained from vendor CSM Server Address es for remote logging Subnet Subnet Subnet Subnet Subnet Subnet Subnet Subnet 1 2 3 4 5 6 7 8 Primary Switch Priority Backup Switch Priority Backup Switch Priority Backup Switch Priority Broadcast MTU put rate in parantheses LMC GID prefix smAppearanceMsgThresh 10 10 10 10 10 10 10 10 Notes Copyright IBM Corp 2008 7 22 08 80 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following worksheet is used to plan Fabric Management Servers A separate worksheet should be filled out for each server It is intended to highlight information that is especially important for management subsystem integration in HPC Clusters with an InfiniBand network It is not intended to replace planning instruction in the QLogic installation and planning guides Note On any given subnet or group of subnets the backup Fabric Management server should have a symmetrical configuration to that of the primary Fabric Management Server This means that an HCA device number and port on the backup should be attached to the same subnet as it is to the corresponding HCA device number and port on the primary Fabric Management Server worksheet one per server Server Name Server IP address on cluster VLAN Server Mo
18. IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 Get the adapter device For AIX use the following ibstat p grep p 1lst seven bytes of GUID grep iba Example results gt ibstat p grep p 00 02 55 00 10 24 da9 grep iba IB PORT 1 INFORMATION iba0 IB PORT 2 INFORMATION iba0 Device iba0 For Linux use the following ibv_devinfo grep B1 lst seven bytes of GUID grep ehca Example results ibv_devinfo grep B1 02 5500 1024 d9 grep ehca hca_id ehcao Device ehca0 5 Find the logical switch associated with logical HCA for the interface 6 Logon to the Fabric Management Server 7 Translate the operating system representation of the logical HCA GUID to the subnet manager representation of the GUID a For AIX reported GUIDs delete the dots 00 02 55 00 10 24 d9 00 becomes 000255001024d900 b For Linux reported GUIDs delete the colons 0002 5500 1024 d900 becomes 000255001024da900 8 Find the logical HCA GUID connection to the logical switch a Ifthe baseline health check has been run use the following command If it has not been run use step b grep A 1 Og GUID port var opt iba analysis baseline fabric links b Ifthe baseline health check has not been run you must query the live fabric using the following command iba_report o links grep A 1 Og GUID port Example results gt grep A 1 0g 0x00025500103a7200 1 var opt iba analysis
19. If you do not know which partitions use the HCA you must expand the following for each partition profile and record which partitions use the HCA a Select each partition profile that uses the HCA b From the menu click Selected Properties c Inthe Properties dialog click the HCA tab d Using its physical location locate the HCA of interest e Verify that the HCA is managed by the HMC 6 To determine whether to defer maintenance there are two possibilities e Ifyou find that the HCA is not managed by the HMC it has failed in such a way that it will be GARDed off during the next IPL Therefore consider that until maintenance is performed any of the partitions using the failed HCA might not properly activate until the HCA is unassigned This affects future IPLs that the customer wishes to perform during the deferred maintenance period Also any other failure that requires a reboot also results in the partition not activating properly To unassign an HCA please see Recovering from an HCA preventing a logical partition from activating on page 211 If you unassign the adapter while the partition is active the HCA is actually unassigned at the next reboot e Ifyou find that the HCA is managed by the HMC the HCA failure will not result in the GARDing of the HCA and deferred maintenance will not risk the prevention of partition activation because of a GARDed HCA Installing or replacing an InfiniBand GX host channel adapter ends
20. Switch Model Switch name set using setIBNodeDesc CSM Device name Frame and slot cluster VLAN IP address Default gateway GID prefix LMC O default 2 if used in HPC cluster NTP Server Switch MTMS Fill out during install New admin password Fill out during install Remote logging host CSM MS is recommended Ports Connection 1 16 Oo jo IN ITD v A O JIN Copyright IBM Corp 2008 7 22 08 229 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Use the following worksheets for planning switches with more than 24 ports ones with leafs and spines The first worksheet is for the overall switch chassis planning The second worksheet is planning for each leaf Director Core Switch gt 24 ports Switch Model Switch name set using setIBNodeDesc Frame and slot Chassis IP addresses 9240 has two hemispheres Spine IP addresses indicate spine slot Default gateway GID prefix LMC O default 2 if used in HPC cluster NTP Server Switch MTMS Fill out during install New admin password Fill out during install Remote logging host CSM MS is recommended Leaf ___ Leaf ___ a ee ee e ee ee Ls ee ee f pao o a l Ls o E es f m e Copyright IBM Corp 2008 7 22 08 230 of 238 IBM System
21. firmware and devices that are needed to support HPC cluster with an InfiniBand network ends here 3 3 Server Planning Server planning relative to the fabric will involve deciding The number of each type of server you require The type of operating system s running on each server The number and type of HCAs that are required in each server Which types of HCAs are required in each server Addressing for the InfiniBand network consider IP subnet addressing restriction on page 44 Addressing for the service VLAN for FSP access from CSM and HMCs Addressing for the cluster VLAN for operating system access from CSM Note Logical Partitioning is generally not done in HPC Clusters Along with server planning documentation you should use Server planning worksheet on page 73 as a planning aid Finally it is a good idea to review server installation documentation to help plan for the installation When you know the frames in which you wish to place your servers record the information in the Frame and rack planning worksheet on page 72 3 4 Planning InfiniBand network cabling and configuration Before you plan your InfiniBand network cabling review the hardware installation and cabling information for your vendor switch Contact QLogic support for details and documentatio006E Search for the documentation regarding the 9000 Series InfiniBand switches While planning your cabling keep in mind the IBM server and frame physical chara
22. on page 176 Call your next level of support for QLogic software problems 6 6 Service procedures The following table lists the common service procedures found in this document Use this table if you have a particular type of service task in mind Keep in mind that many of these service procedures reference service procedures and information in other documents However they will be highlighted in these procedures if there are any considerations that are special to clusters If you are trying to diagnose a symptom you should begin with Table of symptoms on page 169 before proceeding with this table Table 22 Service Procedures Task Rebooting the cluster Special procedures Procedure Rebooting the cluster on page 219 Rebooting or re powering an IBM system Rebooting Powering off an IBM System on page 219 Get debug data from switches and Subnet Managers Capturing data for fabric diagnosis on page 174 Using script while collecting switch information Using script command to capture switch CLI output on page 176 Mapping fabric devices to physical locations Mapping fabric devices on page 177 Setting an already installed cluster to run at 4K MTU Counting the number of fabric devices Counting Devices on page 220 Preparing for smoother handling of EPO situations Handling EPO situations on page 223 To setup CSM Event Management for the fabric again
23. s Ethernet ports must connect to the same cluster VLAN Update the switch firmware code as required See the IBM Clusters with the InfiniBand Switch web site at http www 14 software ibm com webapp set2 sas f networkmanager home html for information regarding switch code levels Set the switch name Temporarily stop the embedded Subnet Manager and performance manager from running depending on configuration this may be a permanent state Setup logging o Enable full logging o Enable full logging format o Point switch logs to the CSM Management Server Set the chassis MTU value according to the installation plan See the switch planning worksheet or Planning MTU on page 42 If the switch is not planned to be running an embedded Subnet Manager o Make sure the embedded Subnet Manager is disabled o Disable the performance manager o Disable the default broadcast group If this switch will be running an embedded Subnet Manager o Use the license key to enable embedded Subnet Manager to be run on the switch o Setup the priority based on the fabric management worksheet o Set the GID prefix value according to the installation plan See the switch planning worksheet or Planning GID Prefixes on page 49 o If this is an HPC environment set the LMC value to 2 o Set the broadcast MTU value according to the installation plan See the switch planning worksheet or Planning MTU on page 42 Point to NTP server Instruct the customer to v
24. you will see errors reported against the links on which you are operating 4 After making repairs you should perform the procedure in Verifying link FRU replacements on page 217 6 4 3 Reboot repower scenarios Reboot repower scenarios pose a potential problem in masking a real failure If someone is rebooting many servers they will most likely ignore all link errors around the time of the reboot Any un associated link failures must occur again before the problem is recognized To avoid this problem use the procedure in Rebooting the cluster on page 219 or in Rebooting Powering off an IBM System on page 219 6 4 4 The importance of NTP Fabric diagnosis is dependent on NTP service for all devices in the cluster This will allow proper correlation of events based on time Without NTP timestamps may vary significantly and cause difficulty in associated events Copyright IBM Corp 2008 7 22 08 168 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 5 Table of symptoms The following tables of symptoms are to be used to diagnose problems reported against the fabric There is a separate table for each reporting mechanism in which the symptom is cross referenced to an isolation procedure The following table is used for events reported in the CSM MS Fabric Event Management Log varNog csm errorlog CMS MS hostname on the CSM MS The CSM auditlog may point to that file Furthermore it is a reflection of s
25. 1 Problem with event management or remote syslogging 0 0 0 ceceeeeeereeees 202 6 26 1 1 Event not in CSM MS var log csm errorlog cccesccesccesecesecrseeneeeneeseeeeseescesseeseeeseseeenaes 203 6 26 1 2 Event not in CSM MS varNlog csm syslog fabric notices n os 204 6 26 1 3 Event not in CSM MS varNlog csm syslog fabric infO cccsceeeecteeceeeceeecesecnseeseeeaes 206 6 26 1 4 Event not in log on fabric management SCLVET ccsceeeeestente ence eeeeeeeeeeeeecesecusecaeente 208 6 20 15 Event NOt in SwWitCh LOS ec icssceaccecscesteosasnasesedeesavosssdeciecsaeciascascpsdedhdssdsesseendenstesdaseasenod ests 209 6 26 2 Re configuring CSM event management ccceceeseesceceteceeeeeeeeeeeeeeeaees 209 6 27 Recovering from an HCA preventing a logical partition from CUNY E LHD 1 T TAAR EE E SEE A E E 211 6 28 Recovering ibX interfaces ssssccccssosecesssocecessssoceesssoececssooecsssssseeee 212 Copyright IBM Corp 2008 7 22 08 8 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 6 28 1 Recovering a single ibX interface in ATX cee ceccceecseeseceneeceeceteeseeeensees 212 6 28 2 Recovering all of the ibX interfaces in an LPAR in AIX ssseseseseseeseseee 213 6 28 3 Recovering an ibX interface tcp_sendspace and tecp_recvspace s s s 214 O284 Recovering mil0 Mi AVX fstschescasacedeasienvsds inno aa rE REAR deena AE A aa iR 214 6 28 5 Recovering icm in AIX ssessssssesse
26. 2 General Cluster Information Resources on page 15 2 Check IBM Clusters with the InfiniBand Switch web site see Table 2 General Cluster Information Resources on page 15 for any known issues or problems that would affect the IP Network Interfaces Make any changes required 3 Look for hardware problems using the procedure in Checking for hardware problems affecting the fabric on page 194 4 Check the HCA configuration for the interfaces that cannot ping For AIX use Checking InfiniBand configuration in AIX on page 195 For Linux use Error Reference source not found on page Error Bookmark not defined 5 Check for fabric configuration and functional problems using the procedure in Checking for fabric configuration and functional problems on page 195 6 Check multicast group membership at the subnet managers using the procedure in Checking multicast groups on page 198 If there is a problem recreate the problem interface s as described in one of the following procedures For AIX and ibX interfaces Recovering ibX interfaces on page 212 For Linx and ehcaX interfaces Error Reference source not found on page Error Bookmark not defined 7 Reboot LPARs If this resolves the problem call your next level of support 8 Recycle the subnet managers If this resolves the problem call your next level of support a Bring down the fabric managers on all Fabric Management Servers etc init d iview_fm stop Verif
27. 255 255 0 a state up 6 28 5 Recovering icm in AIX Recovering the icm in AIX involves removing all InfiniBand interfaces and then rebuilding them along with the icm This is detailed in Recovering all of the ibX interfaces in an LPAR in AIX on page 213 6 29 Recovering to 4K MTU Use this procedure if your cluster should be running with 4K MTU but it has already been installed and not running at 4K MTU This is only valid for clusters using AIX You will do the following tasks 1 Set the Subnet Manager to 4K MTU 2 Set the HCAs to 4K MTU 3 Verify that the subnet is setup properly The detailed procedure follows 1 Configure the Subnet Manager for 4k MTU If you are running a host based Subnet Manager do the following Note Instructions are written for recovering a single Fabric Management Server s subnets at a time a Log on to the Fabric Management Server b Stop the Subnet Manager etc init d iview_fm stop Copyright IBM Corp 2008 7 22 08 214 of 238 e IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Verify that the Subnet Manager is stopped by running ps f grep iview Edit the fabric manager configuration file etc sysconfig iview_fm config and as needed update the lines defining SM_X_def_mc_mtu to 0x5 where SM_X is the Subnet Manager number on this Fabric Management Server Update all Subnet Manager instances that should be configured for 4K MTU The following example has 4 Subnet Manager
28. All the worksheets and checklists are available to be copied in Planning and Installation Worksheets on page 225 3 12 1 Using planning worksheets The worksheets do not always cover all situations especially with regard to the number of instances of slots in a frame servers in a frame or I O slots in a server However they should provide enough of a base concept upon which you can build a custom worksheet for your application In some cases you might find it useful to bring the worksheets into a spreadsheet so that you may fill out repetitive information Otherwise you can devise a method to indicate repetitive information in a formula on printed worksheets so that you do not have to complete large numbers of worksheets for a large cluster that is likely to have a definite pattern in frame server and switch configuration Complete worksheets in the following order You will have to go back through some of the worksheets to fill out information from the others as you generate it Cluster summary worksheet on page 71 Frame and rack planning worksheet on page 72 Server planning worksheet on page 73 Applicable vendor software firmware planning worksheets a QLogic Switch planning worksheets on page 74 b QLogic Fabric Management worksheets on page 79 5 CSM Planning Worksheet on page 76 AwYNo For examples of how to fill out the worksheets see Worksheet examples on page 82 Planning worksheets ends here Copyright
29. C65 T4 f02n11 C65 T4 f01n12 C65 T4 f02n12 C65 T4 Leaf _ Leaf _ Ports Connection Ports Connection f07n01 C65 T4 f08n01 C65 T4 f07n02 C65 T4 f08n02 C65 T4 f07n03 C65 T4 f08n03 C65 T4 f07n04 C65 T4 f08n04 C65 T4 f07n05 C65 T4 f08n05 C65 T4 f07n06 C65 T4 f08n06 C65 T4 f07n07 C65 T4 f08n07 C65 T4 f07n08 C65 T4 f08n08 C65 T4 f07n09 C65 T4 f08n09 C65 T4 f07n10 C65 T4 f08n10 C65 T4 f07n11 C65 T4 f08n11 C65 T4 f07n12 C65 T4 f08n12 C65 T4 Copyright IBM Corp 2008 7 22 08 87 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 8 4 CSM Planning worksheet example CSM Planning Worksheet CSM MS Name _ egesm01 CSM MS IP addresses service VLAN _10 0 1 1 10 0 2 1 cluster VLAN _10 1 1 1 CSM MS Operating System _ ATX 5 3 NTP Server CSM MS Server Model _ System p 520 Frame 11 syslog or syslog ng or other syslogd _syslog Switch Remote Command Setup DeviceType IBSwitch QLogic for QLogic Switches ___ IBSwitch QLogic RemoteShellUser admin note if should be different from admin RemoteShell ssh RemoteCopyCmd usr bin scp Device names addresses of switches egfl1sw01 egf11sw02 egf11sw03 egf11sw04 Device groups for switches AllIBSwitches Fabric Management Server Remote Command Setup DeviceType FabricMS RemoteShellUserID __ root root default RemoteShell ssh RemoteCopyCmd usr bin scp Device names o
30. D E E A E T 159 5 6 1 Remotely accessing QLogic switches from the CSM MS sssssssssssssssesseseessee 159 Sal Updating Code si sscaccscsisassaveassiosesaonsshacesedsessenccsedeassoansssnns sengeseenwssoaosseans 161 5 7 1 Updating Fabric Manager Come i cccpticn sais ccesad ncteuas myoaldaoRtada ecdaenhaers 161 5 7 2 Updating Switch Chassis O06 xareccee iad ee cecce eos teins ne ee es 162 Copyright IBM Corp 2008 7 22 08 6 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 5 8 Finding and Interpreting Configuration Changes sssssee 162 5 9 Hints on USING iba_report cccsssssscccccssssssscssssssssscssssssscsssssseeees 163 6 0 Cluster SErviCe ccccccccccccccccccccccccccccccccccscccccccccsccccsscccssccsssees LOD 6 1 Cluster service overview cicssssecsscont seszessosesccnsisadennsdacssooessoocasscsesoebensnies 165 6 2 Service responsibilities sesisecccccece sesencssceed ecsevescodccseeveccecesencscecesdsuvsncucees 165 6 3 Fault reporting mechanisms ccsccccssssssscccsssssssccssssssssscsssssssssees 165 6 4 Fault diagnosis aPproach cccccsssccccsssssscccsssssssccsssssssseccssssssscsees 166 cat UC BES WOE CV CTICS soit oles cheat thea a dd ea ni eee tl a aa 166 6 4 2 Approach to link problem isolation c ce eccececeseceeeeeeeceececeaecessecneeeeeeeenaees 167 6 4 3 Reboot repower scenarios cits iaiias sway Sey Nag Rosier Ua etal 168 6
31. For example you may set up the Fabric Management Server as a node By setting it up as a device rather than a node you may find it easier to group it differently from the IBM servers a If you are only defining a single Fabric Management Server as a device for CSM use the following command Otherwise go to step b definehwdev d Fabric MS DeviceType FabricMS RemoteShellUser USERID RemoteShell usr bin ssh RemoteCopyCmd usr bin scp b To define multiple Fabric Management Servers use the f flag to identify a device definition file as in the CSM Command Reference Guide Key attributes are e Name gt the hostname of the network adapter for the Linux host e DeviceType gt a unique name for the type of device Eg QLogicMS for QLogic Management Server e The following attributes are for SSH and dsh e RemoteShellUser USERID gt USERID has permissions to Fast Fabric or the Fabric Manager e RemoteShell usr bin ssh e RemoteCopyCmd usr bin scp Note Refer to the CSM manpages on deviceattributes for a list of available attributes for defining a device c Define at least one hardware group to address all Fabric Management Servers at once hwdevgrp w DeviceType FabricMS AllFabricMs d Exchange ssh keys using updatehwdev k D AllFabricMS Note Because there is a mixture of devices being defined the a option cannot be used e You may now use dsh dordsh D to remotely access the Fabri
32. Guide using InfiniBand Hardware Reporting Mechanism Description The following logs usually do not have to be accessed when remote logging and CSM Event Management are enabled However sometimes they may be required to be captured for debug purposes Fabric Notices log on This is an intermediate log where NOTICE or higher severity log CSM MS entries from switches and Subnet Managers are received via syslogd on the CSM MS This is located on the CSM MS in varllog csm errorlog syslogd fabric notices This is a pipe on a Linux CSM MS and thus cannot be viewed normally Reading from the pipe will cause event management to lose events Info log on CSM MS This is an optional intermediate log where INFO or higher severity log entries from switches and Subnet Managers are received via syslogd on the CSM MS This is located on the CSM MS in varNog csm errorlog syslogd fabric info Switch log This includes any errors reported by the chassis manager internal switch chassis issues like for power and cooling or logic errors etc This is accessed via the switch CLI or Fast Fabric tools var log messages on Fabric This is the syslog on the Fabric Management Server where Host based Management Server Subnet Manager logs reside Keep in mind that this is the log for the entire Fabric Management Server Therefore there may be entries in there from components other than Subnet Manager 6 4 Fault diagnosis appr
33. HCA on page 21 6 35 3 Counting HCAs The number of HCAs depends on the type of HCAs used Copyright IBM Corp 2008 7 22 08 221 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware There is one HCA per physical PCI HCA card Do not forget the HCAs used in theInfiniBandManagement nodes The number of HCAs per IBM GX GX HCA depends on the number of LPARs defined There is a logical HCA per LPAR defined to use the HCA See IBM GX GX HCA on page 21 6 35 4 Counting End ports The end ports depends on the type of HCAs used and the number of cables actually connected The number end ports for PCI HCAs is equal to the number of connected cable connectors on the PCI HCAs The IBM GX GX HCA has two ports connected to logical HCAs 6 35 5 Counting Ports The total number of ports is takes into account ports from all of the devices in the fabric In addition there is the concept of a port used for management of the device This is not to be confused with a switches management port that connects to a cluster VLAN Instead each switch chip and HCA device has a management port associated with it too Table 28 Counting Fabric Ports Device Number of ports Spine switch chip 25 24 for fabric 1 for management 13 num connected cables 12 connected to spines 1 for management num Peat sven chip connected cables 24 port switch chip 1 num connected cables 1 for management num c
34. HCAs do not connect or apply power to the servers at this time Note Do not proceed in the server install instructions WCII or Information Center past the point where you physically install the hardware Follow the installation procedures for servers found in Worldwide Customized Installation Instructions WCIIs for each server model that is installed by IBM service representatives For all other server models customer procedures for initial server setup are available in Copyright IBM Corp 2008 7 22 08 122 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware For POWER6 IBM Resource Link for the IBM system being installed see http www ibm com servers resourcelink where you should start with the Library Resource Link access requires an IBM Registration ID IBM ID For POWERS IBM systems Hardware Information Center http publib boulder ibm com infocenter eserver v 1r3s index jsp Click IBM systems Hardware Information Center Initial server setup Procedures for installing the GX InfiniBand host channel adapters are also available in the IBM systems Hardware Information Center click IBM systems Hardware Information Center Installing hardware b S2 Verify that the DHCP server is running on the CSM management server c After the Ethernet service VLAN and management consoles have completed the initial installation and configuration they are ready to discover and
35. IBM Corp 2008 7 22 08 70 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 2 Cluster summary worksheet Cluster summary worksheet Cluster name Application HPC or not Number and types of servers Number of servers and HCAs per server Note If there are servers with various numbers of HCAs list the number of servers with each configuration for example 12 servers with one 2 port HCA 4 servers with two 2 port HCAs Number and types of switches include model numbers Number of subnets List of GID prefixes and subnet masters assign a number to a subnet for easy reference Switch partitions Number and types of frames include systems switches management servers AIX NIM Linux Distribution Number of HMCs CSM and Cluster Ready Hardware Server to be used If yes gt server model Number of and models for Fabric Management Servers Number of Service VLANs Service VLAN domains Service VLAN DHCP server locations Service VLAN InfiniBand switches static IP addresses not typical Service VLAN HMCs with static IP Service VLAN DHCP range s Number of cluster VLANs Cluster VLAN domains Cluster VLAN DHCP server locations Cluster VLAN InfiniBand switches static IP addresses Cluster VLAN HMCs with static IP Cluster VLAN DHCP range s AIX NIM
36. If you are performing data collection while logged on to the CSM MS perform the following procedure 1 You must first have passwordless ssh set up between the fabric management server and all of the other fabric management servers and also between the fabric management server and the switches Otherwise you will be prompted for passwords and dsh will not work 2 Log on to the CSM MS 3 Get data from the Fabric Management Servers using captureall f lt hosts file with Fabric Management Servers gt dsh d lt Primary Fabric Management Server gt captureall f lt hosts file with Fabric Management Servers gt e Various hosts files should have been configured which can help you target subsets of Fabric Management Servers if you don t require information from all of the Fabric Management Servers e By default the results will go into uploads directory which is below the current working directory For a remote execution this should be the root directory for the user which is most often root This could be something like uploads or home root uploads it depends on the user setup on the Fabric Management Server This directory will be references as lt captureall_dir gt 4 Get data from the switches using captureall F lt chassis file with switches listed gt dsh d lt Primary Fabric Management Server gt captureall f lt chassis file with switches gt e Various chassis files should have been configured which can help you t
37. See IBM Clusters with the InfiniBand Switch web site for latest details The following table indicates the components units that are supported in an HPC cluster Component Type Component Model Feature or minimum level 2U high end server 9125 F2A High volume server 4U high 8204 E8A Servers 8203 E4A POWER6 Blade Server 7988J22 AIX 5 3L Version 5 3 with the 5300 08 Technology Level with Service Pack 2 O S Linux SLES SLES 10 SP2 kernel Level 2 6 16 60 0 14 ppc64 with Service Pack 2 InfiniBand Device Driver Switch QLogic 9024 9040 9080 9140 9240 IBM GX HCA for 9125 F2A IBM GX HCAs IBM GX HCA for 8204 E8A and 8203 E4A JS22 HCA Mellanox 4x Connect X HCA 8258 JS22 Pass thru module Voltaire High Performance 3216 InfiniBand Pass Through Module for IBM BladeCenter CX4 to CX4 Cable QSFP to CX4 Management Node for InfiniBand IBM system x 3550 1U high T9T8AC1 fabric IBM system x 3650 2U high 7979AC1 HCA for Management Node QLogic Dual Port 4X DDR InfiniBand PCI E HCA Fabric Manager QLogic Host based Fabric Manager Embedded not 4 2 1 1 1 recommended Quicksilver InfiniServ host stack QLogic host stack and Fast 4 2 0 2 1 with Fast Fabric Fabric toolset Switch firmware QLogic firmware for the switch 4 2 1 1 1 CSM AIX 1 7 0 13 with APAR 1Z23836 Linux 1 7 0 13 with APAR IZ23836 HMC HMC V7R3 3 0 HMC Build level 20080518 1 MH0110
38. Subnet Managers and the Subnet Managers were configured to auto start all you need to do is start the Fabric Management Server after you start the other servers If the switches have embedded Subnet Managers configured for auto start then the Subnet Managers will restart when the switches come back on line 7 Run health check against the baseline to see if anything is missing or otherwise changed 8 Reset link error counters All of this EPO activity could cause link error counters to advance because the EPO is occurring at any time even during applications passing data on the fabric a On the Fabric Management Server running the Fast Fabric Toolset issue iba_report C o none If you have more subnets than can be managed from one Fabric Management Server you will need to execute this from all of the master Fabric Management Servers 9 Are there other resets that we should do for recovery 6 37 Monitoring and Checking for Fabric Problems Fabric problems can surface in several different ways While the Subnet Manager and switch logging are the main reporting mechanisms there are other methods for checking for problems too 1 Inspect the CSM MS var log csm errors CSM MS hostname log for Subnet Manager and switch log entries 2 Run the Fast Fabric Health Check tool Copyright IBM Corp 2008 7 22 08 224 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 7 0 Planning and Installation Worksheets
39. Then use Diagnosing and repairing switch component problems on page 194 Other switch LED conditions on non port LEDs See the Switch Users Guide and the QLogic Troubleshooting Guide Then use Diagnosing and repairing switch component problems on page 194 Other HCA LED conditions See the IBM systems Service Manual Then use Diagnosing and repairing IBM system problems on page 194 The following is a table of symptoms of problems reported by Fast Fabric tools Health check files are found by default on the Fabric Management Server in var opt iba analysis baseline latest lt savedate gt Refer to the Fast Fabric Toolset Users Guide for details Table 19 Fast Fabric Tools Table of symptoms Symptom Procedure Reference Health check file fabric link errors Record the location of the error s and see Diagnosing link errors on page 191 Health check file fabric comps errors 1 Record the location of the error s 2 Refer to the Fast Fabric Toolset Users Guide for details 3 Ifthis refers to a port see Diagnosing link errors on page 191 4 Otherwise see Diagnosing and repairing switch component problems on page 194 Health check file chassis errors 1 Record the location of the error s 2 Refer to the Fast Fabric Toolset Users Guide for details 3 Ifaswitch component is repaired see Diagnosing and repairing switch component problems on page 194 Health chec
40. Users Guide or found in the command line help 2 If you are expecting Subnet Manager log entries in the log and they are not there then start the Subnet Manager using the instructions found in the vendors Switch Users Guide or found in the command line help 3 If there is still a problem with logging on a switch call your next level of support 6 26 2 Re configuring CSM event management Depending on how seriously misconfigured CSM event management has become it may become necessary to deconfigure it and reconfigure it The procedure to use to do this depends on the operating system on which CSM is running AIX or Linux For CSM on AIX use the following procedure 1 Log on to the CSM M S 2 Run Iscondresp to determine which condition and responses you are using The typical condition name is either LocalAIXNodeSyslogError for CSM MS that is not a managed node or AIXNodeSyslogError for a CSM MS that is a managed node The typical response name is usually LogNodeErrorLogEntry BroadcastEventsAnyTime may also be configured Finally the system administrator may have defined another response to be used specifically at this site 3 Stop the condition response stopcondresp lt condition name gt LocalNodeAnyLoggedError lt response_name gt 4 Delete all the CSM related entries from etc syslog These are defined in Setup Remote Logging on page 108 The commented entry may not exist all local6 notice and above priorities go to the
41. advisable to issue a query to all servers to gather the HCA GUIDs ahead of time If this has been done you may then simply query a file for the desired HCA GUID A method to do this is documented in Fabric Management Server Installation on page 103 There is an HCA port for each physical port which maps to one of the logical switch ports There is also an HCA port for each logical HCA assigned to an LPAR Thus IBM HCA Port GUIDs are broken down as 7 bytes of node GUID 1 byte port id Examples of Port GUIDs are e 00 02 55 00 00 0f 13 01 e 00 02 55 00 00 0f 13 81 Because there are so many HCAs in a cluster it is best to try and get a map of the HCA GUIDs to the physical HCAs and store it in a file or print it out If you don t store it you ll have to look it up each time using the following method The best way to map the HCA GUIDs to the physical HCAs is using operating system commands to gather HCA information You can do this using dsh to all servers simultaneously The commands used depend on the operating system in the LPAR Do the following for AIX LPARs In AIX the following commands are used to query for port and node GUIDs from an AIX LPAR e ibstat n returns overall node information o ibstat n grep GUID returns the base GUID for the HCA You can use this to map the other GUID information because the last byte is the one that varies based on ports and logical HCAs The first 7 bytes are common across ports
42. also use CSM when you have only one HMC If you have a single HMC in the cluster it is normally configured to be the required DHCP server for the service VLAN and the CSM MS will be the DHCP server for the cluster VLAN If Cluster Ready Hardware Server CRHS and CSM are being used in the cluster the CSM Management Server is typically set up as the DHCP server for the service and cluster VLANs and CRHS must be configured to recognize the servers BPAs HMCs Refer to the CSM Administration Guide The servers have connections to the service and cluster VLANs Refer to CSM documentation for more information on the cluster VLAN Refer to the server documentation for more information on connecting to the service VLAN In particular pay attention to e The number of service processor connections from the server to the service VLAN e If there is a BPC for the power distribution as in a 24 inch frame it may provide a hub for the processors in the frame allowing for a single connection per frame to the service VLAN After you understand the number of devices and cabling of your service and cluster VLANs you will need to consider the device IP addressing Here are the key considerations 1 Determine the domain addressing and netmasks for the Ethernet networks that you will implement Assign static IP addresses a Assign a static IP address for HMCs when you are using CSM and Cluster Ready Hardware Server This is mandatory when you have multipl
43. and logical HCAs e ibstat p returns port information o ibstat p egrep GUIDIPORT returns just the port number and the GUIDs associated with that port Note It can take up to a minute for the above commands to return In order to use CSM to get all HCA GUIDs in AIX LPARs use the following command string which assumes that all of your servers are running AIX Instead of a use N AIXNodes to access just AIX LPARs in a mixed environment gt dsh av ibstat n grep GUID nodel Globally Unique ID GUID 00 02 55 00 00 0 13 00 node2 Globally Unique ID GUID 00 02 55 00 00 0b 8 00 The above information should be good enough to map any HCA GUID to a node system For example the logical switch port 1 of an HCA might have a final byte of 01 So the node port 1 GUID would be 00 02 55 00 00 0f 13 01 If you don t have a stored map of the HCA GUIDs but you have a GUID for which you wish to search use the following command for AIX LPARs Using the first seven bytes of the GUID will allow for a match to be made when you do not have the port GUID information available from the ibstat n command dsh av ibstat n grep GUID grep 1lst seven bytes of GUID You should have enough information at this point to identify the physical HCA and port with which you are working Copyright IBM Corp 2008 7 22 08 178 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Once you
44. appropriate number of devices that you have in the IBM systems s that has been rebooted see Counting Devices on page 220 Keep in mind that the devices may come up over several scans of the fabric by the Subnet Manager s so you may have to add up the appearance counts over several log entries However the health check below will take care of checking for any missing devices Run sbin iba_report C o none to clear error counters on the fabric ports before doing a health check on the current state Otherwise you will pick up errors caused by the reboot Continue to boot the IBM systems through the operating system load If you can wait about ten minutes before you a run health check to look for errors and compare against the baseline configuration The wait period is to allow for error accumulation Otherwise run it now to check for configuration changes which will include any nodes that have fallen off of the switch a Run all_analysis see Health Checks on page 151 and the Fast Fabric Toolset Users Guide b Look for configuration changes and fix any that you find see Finding and Interpreting Configuration Changes on page 162 c Look for errors and fix any that you find see Table of symptoms on page 169 If you did not wait 10 minutes before running the health check you should re run it after about 10 minutes to check for errors a Run all_analysis or all_analysis e see Health Checks on page 151 and the Fast Fabric
45. are not connected to the IBM system s see Table of symptoms on page 169 2 Wait for the IBM system to come up through the operating system load a As devices come back online there will be appearance NOTICEs from the Subnet Manager s You can count the number of devices and make sure the count corresponds to the appropriate number of devices that you have in the IBM systems s that has been rebooted see Counting Devices on page 220 Keep in mind that the devices may come up over several scans of the fabric by the Subnet Manager s so you may have to add up the appearance counts over several log entries However the health check below will take care of checking for any missing devices 3 Run sbin iba_report C o none to clear error counters on the fabric ports before doing a health check on the current state Otherwise you will pick up errors caused by the reboot 4 Ifyou can wait about ten minutes before you a run health check to look for errors and compare against the baseline configuration The wait period is to allow for error accumulation Otherwise run it now to check for configuration changes which will include any nodes that have fallen off of the switch a Run all_analysis see Health Checks on page 151 and the Fast Fabric Toolset Users Guide b Look for configuration changes and fix any that you find see Finding and Interpreting Configuration Changes on page 162 c Look for errors and fix any that you find se
46. baseline fabric link 60g 0x000255001024d900 1 CA IBM G2 Logical HCA lt gt 0x000255001024d902 2 SW IBM G2 Logical Switch 1 9 The logical switch port is in the last line of the results of the query Get the name for the logical switch This tells you which logical switch attaches to the physical switch port Also record the logical switch GUID lt gt logical switch GUID port SW logical switch name IBnodeDescription Example results Logical Switch 1 Logical Switch GUID 0x0025501024d902 9 To find the physical location of the logical switch port use the logical switch number and iba device found above with the Table 25 IBM GX HCA physical port mapping from iba device and logical switch on page 187 Example Results iba0 ehca0 and logical switch 1 map to C65 T1 Copyright IBM Corp 2008 7 22 08 186 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 10 Find the physical switch connection to the logical switch a Ifthe baseline health check has been run use the following command If it has not been run use step b grep A 1 0g GUID var opt iba analysis baseline fabric links b Ifthe baseline health check has not been run you must query the live fabric using the following command iba report o links grep A 1 0g GUID Example results gt grep A 1 0g 0x00025500103a7202 var opt iba analysis baseline fabric links 20g 0x000255001024d902 1 SW IBM G2 Logical Sw
47. basis for the IBM GX HCAs This will match any generation of IBM GX HCA that happens to be in the cluster Note While the HCA keeps track of most of the prescribed counters it does not have counters for Transmit Packets or Receive Packets iba_report C o none The above query will return nothing but it will clear all of the port statistics on all switch chassis Copyright IBM Corp 2008 7 22 08 164 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 0 Cluster service Documents referenced in this section can be found in Information resources on page 14 6 1 Cluster service overview The Cluster service chapter covers e Service responsibilities on page 165 e Fault reporting mechanisms on page 165 e Table of symptoms on page 169 has several tables of symptom organized by fault reporting mechanism e Service procedures on page 172 has a lookup table of service procedures 6 2 Service responsibilities IBM Service Representatives are responsible for IBM parts that are not Customer Serviceable Units The customer is responsible for IBM Customer Serviceable Units CSU Either the customer or the vendor is responsible for vendor switches and cables unless otherwise contracted 6 3 Fault reporting mechanisms Faults may be surfaced through various fault reporting mechanisms found in the following table For more details on the management subsystem that supports these reporting mechanisms see Manag
48. bffff0000 00000000FFFFFFFF c000 qKey 0x00000000 pKey OxFFFF mtu 5 rate 3 life 19 sl 0 0x00025500101a3300 F 0x00025500101a3100 F 0x00025500101a8300 F 0x00025500101a8100 F 0x00025500101a6300 F 0x00025500101a6100 F 0x0002550010194000 F 0x0002550010193e00 F 0x00066a00facade01 F 3 This procedure ends here Copyright IBM Corp 2008 7 22 08 198 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 21 Diagnosing swapped HCA ports Swapping of ports may be inconsequential or it may cause performance problems it all depends on which ports get swapped An in depth analysis of whether or not a swap can cause performance problems is outside of the scope of this document However a rule of thumb applied here is that swapping ports between subnets is not desirable If HCA ports have been swapped this will be uncovered by the Fast Fabric Health Check when it compares the latest configuration with the baseline configuration You will need to interpret the diff output between the latest and baseline configuration to see if a port swap has occurred In general when HCA ports are swapped they are swapped on the same HCA or perhaps on HCAs within the same IBM server Any more sophisticated swapping would likely be up for debate with respect to if it is a switch port swap or an HCA port swap or just a complete reconfiguration You may need to reference the Fast Fabric Toolset Users Guide for details on health check N
49. can leverage the RSCT event sensor and condition response infrastructure to write your own response scripts to react to fabric log entries as you desire For example you could email the log entries to an account Copyright IBM Corp 2008 7 22 08 56 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware For event monitoring to work between the QLogic switches and fabric manager and CSM event monitoring the switches CSM MS and Fabric Management Server running the host based Fabric Manager need to all be on the same VLAN Use the cluster VLAN Do the following to plan for event monitoring Review CSM administration and installation and planning guides as well as the RSCT administration guide for more information on the event monitoring infrastructure Plan the CSM MS IP address because you will point the switches and Fabric Manager to log there remotely Plan the CSM MS operating system so that you know which syslog sensor and condition to use o For CSM running on AIX the sensor is AIXSyslogSensor and the condition is LocalAIXNodeSyslog generated from AIXNodeSyslog but with local scope You can use AIXNodeSyslog for the condition if the CSM MS is configured as a managed node but you may find it easier to manage the cluster if the CSM MS is not a managed node o For CSM running on Linux the sensor is ErrorLogSensor and the condition is LocalNodeAnyLoggedError generated from AnyNodeAnyLoggedError You ca
50. captureDir_onCSM gt baseline var opt iba analysis latest lt captureDir_onCSM gt latest e Make a directory for the failed health check runs mkdir lt captureDir_onCSM gt hc_fails f To get all failed directories use the following dcp If you want to be more targeted simply copy over the directories that have the desired failure data The will pickup the directories with timestamp for names If you have a date in mind you could use something like 2008 03 19 for March 19 2008 dcp d lt captureDir_onCSM gt baseline var opt iba analysis lt captureDir_onCSM gt hc_fails 7 Get HCA information from the IBM systems a For AIX i Isdev grep ib ii Iscfg grep ib iii netstat i egrep ib ml0 iv ifconfig a v ibstat v b For Linux i lspci grep ib ii netstat i egrep ib ml0 iii ibv_devinfo v 8 tarup all of the files and directories in lt captureDir_onCSM gt 9 This procedure ends here If you wish to collect just Subnet Manager and switch chassis data and do this on the Fabric Management Server you can issue the captureall commands directly on that server 1 Log on to the Fabric Management Server 2 Get data from Fabric Management Servers captureall f lt hosts file with Fabric Management Servers gt e Various hosts files should have been configured which can help you target subsets of Fabric Management Servers 3 Get data from the switches captureall F lt chassis f
51. certain transactions therefore this statement may not apply to you This information could include technical inaccuracies or typographical errors Changes are periodically made to the information herein these changes will be incorporated in new editions of the publication IBM may make improvements and or changes in the product s and or the program s described in this publication at any time without notice Any references in this information to non IBM Web sites are provided for convenience only and do not in any manner serve as an endorsement of those Web sites The materials at those Web sites are not part of the materials for this IBM product and use of those Web sites is at your own risk IBM may use or distribute any of the information you supply in any way it believes appropriate without incurring any obligation to you Licensees of this program who wish to have information about it for the purpose of enabling i the exchange of information between independently created programs and other programs including this one and ii the mutual use of the information which has been exchanged should contact For AIX IBM Corporation Department LRAS Building 003 11400 Burnet Road Austin Texas 78758 3498 U S A Copyright IBM Corp 2008 7 22 08 236 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware For Linux IBM Corporation Department LJEB P905 2455 South Road Poughkeepsie NY 12601 5400 U S A
52. colon delimited 0002 5500 000f 3500 Linux If you need to isolate both sides of link using a known device from a log or health check result use one of the following procedures Table 24 Isolating link ports based on known information Known Information Procedure Logical Switch is known Finding devices based on a known logical switch on page 179 Logical HCA is known Finding devices based on a known logical HCA on page 181 Physical switch port is known Finding devices based on a known physical switch port on page 183 ibX interface is known Finding devices based on a known ib interface ibX ehcaX on page 185 General mapping from HCA GUIDs to physical HCAs General mapping of IBM HCA GUIDs to physical HCAs on page 178 Copyright IBM Corp 2008 7 22 08 177 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 9 1 General mapping of IBM HCA GUIDs to physical HCAs To map IBM HCA GUIDs to physical HCAs you must first understand the GUID assignments based on the design of the IBM GX GX HCA See IBM GX GX HCA on page 21 for information on the structure of an IBM HCA With the HCA structure in mind you should note that IBM HCA Node GUIDs are relative to the entire HCA These Node GUIDs always end in 00 For example 00 02 55 00 00 0f 13 00 The final 00 will change for each port on the HCA Note If at all possible during installation it is
53. correct missing nodes and links Once corrected the health checks should be rerun to look for further errors If the change was expected and is permanent a baseline should be rerun once all other health check errors have been corrected latest fabric 0 0 comps stderr if this file is not empty it can indicate problems with iba_report which can result in unexpected problems or inaccuracies in the related comps file If possible problems reported in this file should be corrected first Once corrected the health checks should be rerun to look for further errors latest fabric 0 0 comps diff this indicates that the components in the fabric or their SMA configuration has changed This file should be reviewed and as necessary the latest fabric 0 0 comps file should be compared to baseline fabric 0 0 comps As necessary correct missing nodes ports which are down and port misconfigurations Once corrected the health checks should be rerun to look for further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been corrected Finally it is recommended to review the results of the chassis_analysis If chassis configuration has changed the chassis_analysis chassis_analysis the FF_CHASSIS_CMDS and FF_CHASSIS_HEALTH configuration settings will select which chassis commands are used for the analysis When using the default setting for this parameter the files should be reviewed in the follow
54. counter statistics You might use this to watch the traffic out of a particular HCA In this case the portguid is an IBM GX HCA See General mapping of IBM HCA GUIDs to physical HCAs on page 178 for commands that can help you determine HCA guids In this case the GUID of concern is associated with a specific port of the HCA While the HCA keeps track of most of the prescribed counters it does not have counters for Transmit Packets or Receive Packets iba_report o route D nodeguid lt destination NodeGUID gt S nodeguid lt source NodeGUID gt The above command queries the state of the routes from node on the fabric to another node is used in the sense of a node on the fabrc not in the sense of an LPAR or a server You can find the node GUIDs using the procedure in General mapping of IBM HCA GUIDs to physical HCAs on page 178 Instead of doing as instructed and grepping for only the first 7 bytes of a node GUID you should consider recording all 8 bytes You can use iba_stat n for HCAs in AIX LPARs and ibv_devinfo v for HCAs in Linux LPARs If you have a particular LPAR for which you wish to determine routes you could use a portGUID instead iba_report o route D portguid lt destination portGUID gt S nodeguid lt port NodeGUID gt iba_report d 5 s o nodes F nodepat IBM Switch The above query gets node information with enough details to also get the port counters The focus is on any IBM logical Switch which is the
55. day clocks in sync It is extremely important to do this for the sake of being able to correlate events in time NTP Users Guide Set this up during installation NTP Server The admin would access this by logging onto the box on which the NTP server is running This is done for configuration and maintenance Normally this is just a background application 32 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 3 9 Fabric Viewer Overview Description The Fabric Viewer is a user interface to access the Fabric Management tools on the various subnets It is a Linux or Windows application The Fabric Viewer must be able to connect to the cluster VLAN to connect to the switches It must also connect to the Subnet Manager hosts via the same cluster VLAN Documentation QLogic Fabric Viewer Users Guide When to Use After you have setup the switch for communication to the Fabric Viewer this can be used as the main point for queries and interaction with the switches You will also use this to update the switch code simultaneously to multiple switches in the cluster You will also use this during install time to set up Email notification for link status changes and SM and EM communication status changes Host Any Linux or Windows host Typically this would be Fabric Management Server Admin or operator workstation How to access Start the GUI on the server on which you install it or use a remote window access
56. egcsmcv01 10 1 1 1 CSM MS Cluster VLAN InfiniBand switches static IP addresses 10 1 1 10 10 1 1 13 Cluster VLAN HMCs with static IP N A Copyright IBM Corp 2008 7 22 08 82 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Cluster VLAN DHCP range s 10 1 1 32 10 1 1 128 AIX NIM server info CSM MS Linux distribution server info N A NTP server info CSM MS Power requirements See site planning Maximum cooling required See site planning Number of cooling zones See site planning Maximum weight area Minimum weight area See site planning 3 12 8 1 Frame planning worksheet example Frame planning worksheet 1 3 Frame number s 1 8_ Frame MTM or feature or type for 9125 F2A Frame size 24 19 inch or 24 inch Number of slots 12 Slots Device type server switch BPA etc Device name Indicate MTM 1 12 Server 9125 F2A egf frame n node egf01n01 egf08n12 Frame planning worksheet 2 3 Frame number s 10 Frame MTM feature _ Frame size 19 inch 19 inch or 24 inch Number of slots 4 Slots Device type server switch Device name BPA etc Indicate MTM 1 4 Switch 9140 egf10sw1 4 5 Power Unit N A Copyright IBM Corp 2008 7 22 08 83 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Frame planning worksheet 3 3 Frame
57. fabric the HCA s logical switch appears as a switch Apr 15 09 25 23 c924hsm ppd pok ibm com local notice c924hsm iview_sm 26012 c924 hsm MSG NOTICE SM c924hsm port 1 COND 4 Disappearance from fabric NODE IBM G2 Logical Switch 1 port 0 0x00025500103a7202 DETAIL Node type switch Copyright IBM Corp 2008 7 22 08 179 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following procedure will find the physical switch connection and node and HCA port and location The above log will be used as an example and example results from any queries will also be provided Get the Logical Switch GUID and note which logical switch it is in the HCA gt GUID 0x00025500103a7202 logical switch number 1 Log onto the On Fabric Management Server Find the Logical Switch GUID This query will return the logical switch side of a link as the first port of the link and the physical switch port as the second port in the link a If the baseline health check has been run use the following command If it has not been run use step b grep A 1 0g GUID var opt iba analysis baseline fabric links b If the baseline health check has not been run you must query the live fabric using the following command iba report o links grep A 1 Og GUID Example results gt grep A 1 0g 0x00025500103a7202 var opt iba analysis baseline fabric links 20g 0x00025500103a7202 1 SW IBM G2 Logical Sw
58. file for each group Some suggestions are 1 A group of all switches because they are all accessible on the service VLAN Groups that contain switches for each subnet A group that contains all switches with ESM if applicable A group that contains all switches running primary ESM if applicable Oi abe Weis Groups for each subnet which contain the switches running ESM in the subnet if applicable include primaries and backups e Create groups of Fabric Management Servers by creating a different host file for each group Some suggestions are 1 A group of all fabric management servers because they are all accessible on the service VLAN 2 A group of all primary fabric management servers 3 A group of all backup fabric management servers Plan an interval at which to run Fast Fabric Toolset health checks Because health checks use fabric resources you should not run them frequently enough to cause performance problems Use the recommendation given in the Fast Fabric Toolset Users Guide You will need to configure the Fast Fabric Toolset health checks to use either the hostsm_analysis tools for host based fabric management or esm_analysis tools for embedded fabric management Ifyou are using host based fabric management you will be required to configure Fast Fabric Toolset to access all of the Fabric Management Servers running Fast Fabric Ifyou do not choose to set up passwordless ssh between the Fabric Management S
59. firmware S5 Verify system operation Final configuration of management consoles W4 Verify switches are reachable Customize LPARs ws Update switch and HCA software Configure 12x configuration Customize groupings on itches ded W6 InfiniBand network meen one S7 Load and update operating system C4 Attach InfiniBand cables to HCAs D configuration Contact service if required 1 Verify Cluster Network Topology ae 2 Verify Cluster Network Operation All steps that input to this symbol must be completed before proceeding 7J Figure 9 High level cluster installation flow Copyright IBM Corp 2008 7 22 08 62 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Important In each task box of the preceding figure there is also an index letter and number These indexes indicate the major subsystem installation tasks and you can use them to cross reference between the following descriptions and the tasks in the figure The tasks indexes are listed before each of the following major subsystem installation items UI Site setup for power and cooling including proper floor cutouts for cable routing M1 SI W1 Place units and frames in their correct positions on the floor This includes but is not limited to HMCs CSM management servers Fabric Management Servers and cluster servers with HCAs I O devices a
60. from the frames and servers to the Ethernet service VLAN b Attach power cables to the frames and servers Use the documentation provided for the installation of these units For units that are installed by IBM Service the service representative has access to WCIIs for each server model For customer installable units setup information is available in For POWER6 IBM Resource Link for the IBM system being installed see http www ibm com servers resourcelink where you should start with the Library Resource Link access requires an IBM Registration ID IBM ID For POWERS IBM systems Hardware Information Center http publib boulder ibm com infocenter eserver v 1r3s index jsp Click IBM systems Hardware Information Center Initial server setup Procedures for installing the GX InfiniBand host channel adapters are also available in the IBM systems Hardware Information Center click IBM systems Hardware Information Center Installing hardware c 52 Apply power to the system racks or frames via the UEPO switch Allow the servers to reach the power standby state Power Off For servers in frames or racks without BPAs the server boots to the power standby state after connecting the power cable Note Do not press the power button on the control panels or apply power to the servers such that they boot to the LPAR standby state d S3 Use the following procedure to verify that the servers are now visible on the DHCP se
61. iba analysis baseline fabric links b If the baseline health check has not been run you must query the live fabric using the following command iba _ report o links grep A 1 0g GUID port Example results gt grep A 1 0g 0x00025500103a7200 1 var opt iba analysis baseline fabric link 60g 0x00025500103a7200 1 CA IBM G2 Logical HCA lt gt 0x00025500103a7202 2 SW IBM G2 Logical Switch 1 4 The logical switch port is in the last line of the results of the query Get the name for the logical switch This tells you which logical switch attaches to the physical switch port lt gt logical switch GUID port SW logical switch name IBnodeDescription Example results Logical Switch 1 8 Find the Logical Switch GUID This query will return the logical switch side of a link as the first port of the link and the physical switch port as the second port in the link a If the baseline health check has been run use the following command If it has not been run use step b grep A 1 0g GUID var opt iba analysis baseline fabric links b If the baseline health check has not been run you must query the live fabric using the following command iba report o links grep A 1 Og GUID Example results 20g 0x00025500103a7202 1 SW IBM G2 Logical Switch 1 lt gt 0x00066a00d90003d3 3 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d3 9 The physical switch port is in the last line of the results of t
62. ii To resolve any problem with a server check the diagnostic results and Service Focal Point and follow the maintenance procedures Note Typically the IBM service representative s responsibility ends here for IBM service installed frames and servers From this point forward after the IBM service representative leaves the site if any problem is found in a server or with an InfiniBand link a service call must be placed The IBM service representative should recognize that at this point the HCA link interface and InfiniBand cables have not been verified and will not be verified until the end of the procedure for InfiniBand network verification which may be performed by either the customer or a non IBM vendor When the IBM service representative leaves the site it is possible that the procedure for InfiniBand network verification may identify a faulty link in which case the IBM service representative might receive a service call to isolate and repair a faulty HCA or cable Installing and configuring the cluster server hardware ends here Copyright IBM Corp 2008 7 22 08 124 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 6 Operating System installation and configuring the cluster servers This procedure is for the customer installing the operating system and configure the cluster servers Operating System installation and configuring the cluster servers encompasses major tasks S6 and S7 and t
63. integrate the QLogic management subsystem with the IBM management subsystem It provides two major functions that can be used to manage the fabric 1 Remote logging and event management 2 Remote Command execution Remote logging and event management is leveraged to consolidate logs and serviceable events from the many components in a cluster in one location the CSM Management Server CSM MS To set this up see Setup Remote Logging on page 108 For more information on how to leverage this monitoring capability see Monitoring fabric logs from CSM MS on page 150 To understand how the logs flow from the vendor s management applications to CSM see Vendor log flow to CSM event management on page 35 Remote command execution dsh gives you the capability to issue commands to the switches and the Fabric Management Server which runs the host based subnet manages and Fast Fabric Toolset This allows you to issue commands to these entities from the CSM MS just as you can do to the nodes in the cluster You can do this interactively or you can leverage the capability by writing scripts that dsh to access the switches and Fast Fabric Toolset This can allow you to run monitoring management scripts from the central location of the CSM MS To setup this capability see Remote Command Execution setup on page 117 For more information on how to use remote command execution see Remotely accessing QLogic management tools and commands from CSM MS on page 15
64. is specified individually for each component but it should be the same for each instance For example if SM_0_priority 1 PM_0_priority 1 BM_0_priority 1 FE_0_priority 1 While it is technically possible to assign different priorities to different components within the same instance of a fabric manager it would be difficult to keep track of where the master instances were for each component on each subnet Plan for the MTU using the rules found in Planning MTU on page 42 This is for the subnet manager only There are other parameters that can be configured for the Subnet Manager However the defaults are typically chosen for those Further details can be found in the QLogic Fabric Manager Users Guide Example setup of host based fabric manager The following is a set of example entries from an iview_fm config file on a fabric management server which manages two subnets where the fabric manager is the primary one as indicated by a priority 1 These entries are found throughout the file in the startup section and each of the manager sections in each of the instance sections In this case instance 0 manages subnet and instance manages subnet 2 and instance 2 manages subnet 3 and instance 3 manages subnet 4 Copyright IBM Corp 2008 7 22 08 51 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note Comments in this example are not found in the example file They are here to help clarify where in the
65. is there a For the Fabric Management Server look at the Vvar log messages file b For switches log onto the switch and look at the log If necessary use the switch command line help or the switch Users Guide for how to do this 6 Ifthe setup on the CSM MS has proven to be good and the log entry is in the source s log check to see that the source is setup for remote logging by logging on to the source and checking on of the following a Fora Fabric Management Server running syslog not syslog ng check etc syslog syslog conf for the following line If etc syslog conf does not exist you should go to step 6 b local6 put CSM MS IPp address Note If you make a change you will have to restart the syslogd b Fora Fabric Management Server running syslog ng check etc syslog ng syslog ng conf for the following lines Assure that the destination definition uses the same protocol and port as is expected on the CSM MS the definition shown here is udp on port 514 The CSM MS information should have been noted in step 3 The standard syslogd uses udp Other syslogd s like syslog ng may use either tcp or udp filter f_fabinfo facility local6 and level info notice alert warn err crit and not filter f_iptables destination fabinfo_csm udp CSM MS IP address port 514 log source src filter f_fabinfo destination fabinfo_csm Copyright IBM Corp 2008 7 22 08 207 of 238 IBM System
66. like fifonfJGQsBw destination fabnotices fifo pipe var log csm syslog fabric notices group root perm 0644 log source src filter f fabnotices destination fabnotices fifo This procedure for CSM on Linux ends here 6 27 Recovering from an HCA preventing a logical partition from activating Use this procedure to recover a logical partition when a failed HCA is preventing the partition from activating During IPL a logical partition can be prevented from activating because an HCA has failed Do the following to unassign HCAs from partition profiles 1 Go to the Server and Partition window Click the Server Management partition Expand the server in which the HCA is installed Expand the partitions under the server ae E Do the following procedure for each partition profile that uses the HCA If you do not know which partitions use the HCA you must perform the following procedure for each partition profile a Select each partition profile that uses the HCA b From the menu click Selected Properties Copyright IBM Corp 2008 7 22 08 211 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware c Inthe Properties dialog click the HCA tab d Using its physical location find the HCA of interest e Highlight the HCA of interest and then click the Clear button The HCA s GUID Index GUID and Capability fields change to Unassigned Then click the Ok button Note A fail
67. logged in var log csm syslog fabric info on the CSM MS 6 11 2 Switch chassis management log format The switch chassis management code logs problems with the switch chassis for things like power and cooling and logic issues or other hardware failures not covered by the Subnet Manager The source for switch chassis management logs is on the switch When remote logging and CSM event management is setup as in Setup Remote Logging on page 108 these are also available on the CSM MS see Vendor log flow to CSM event management on page 35 The log format for switch chassis management logs is as follows The key to recognizing a switch chassis log is that it contains the string CHASSIS after the MSG lt msgType gt string Note This format is for entries with a severity of NOTICE or higher INFO messages are not bound by this format and are for engineering use lt prefix gt MSG lt msgType gt CHASSIS lt fru gt PN lt part number gt DETAIL lt location gt COND lt details gt lt condition gt FRU lt prefix gt timestamp and card slot number and IP address of the unit reporting the error Copyright IBM Corp 2008 7 22 08 188 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware lt msgType gt is one of the following values ERROR WARNING NOTIC INFORMATION Gl lt location gt is the value from the user settable field called InfiniBand Node Descriptio
68. modified the changes in results for those additional commands should be reviewed As necessary correct the SM Once corrected the health checks should be rerun to look for further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been corrected Next it is recommended to review the results of the fabric analysis for each configured fabric If nodes or links are missing the fabric analysis will detect them Missing links or nodes can cause other health checks to fail If such failures are expected for example a node or switch is offline further review of result files can be performed but the user must beware that the loss of the node or link can cause other analysis to also fail The discussion below presents the analysis order for fabric 0 0 if other or additional fabrics are configured for analysis Copyright IBM Corp 2008 7 22 08 155 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware it is recommended to review the files in the order shown below for each fabric There is no specific order recommended for which fabric to review first latest fabric 0 0 errors stderr if this file is not empty it can indicate problems with iba_report such as inability to access an SM which can result in unexpected problems or inaccuracies in the related errors file If possible problems reported in this file should be corrected first Once corrected the health
69. network The HPC software provided by IBM will work best with an LMC value of 2 The number of LIDs is equal to 2 where x is the LMC value Therefore the LMC value of 2 that is required for IBM HPC applications will result in four 4 LIDs per port See the section Planning MTU on page 42 for planning the Maximum Transfer Unit for various communication protocols The LMC and MTU settings planned here should be recorded in a QLogic Switch planning worksheets on page 74 which is meant to record switch and Subnet Manager configuration information Important information for planning an HPC MPI configuration ends here Copyright IBM Corp 2008 7 22 08 66 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 9 Planning 12x HCA connections HCAs with 12x capabilities have a 12x connector Supported switch models only have 4x connectors Width exchanger cables allow you to connect a 12x width HCA connector to a single 4x width switch port using a cable that has a 12x connector on one end and a 4x connector on the other end Copyright IBM Corp 2008 7 22 08 67 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 10 Planning Aids The following lists some tasks that you might do when planning your cluster hardware e Determine a convention for frame numbering and slot numbering where slots are the location of cages as you go from the bottom of the frame to the top If you have em
70. number s 11 Frame MTM feature 19 Frame size 19 inch 19 inch or 24 inch Number of slots 8 Slots Device type server switch Device name BPA etc Indicate MTM 1 2 System x 3650 egf11fm01 egf11fm02 3 5 HMCs egfllhmc01 egf11hmc03 6 CSM MS egfllcsm01 3 12 8 2 Server planning worksheet example Server planning worksheet Name s _ egf01n01 egf08n12 Type s ___ 9125 F2A_ Frame s slot s 1 8 1 12 Number and type of HCAs _ 1 IBM GX per 9125 F2A Num LPARs LHCAs 1 4 IP addressing for InfiniBand ___10 1 2 32 10 1 2 128 10 1 3 32 10 1 3 128 10 1 4 x 10 1 5 x_ IP addressing of service VLAN __10 0 1 32 10 1 1 128 10 0 2 32 10 0 2 128 IP addressing of cluster VLAN _10 1 1 32 10 1 1 128 LPAR IP addressing _10 1 5 32 10 1 5 128 MPI addressing Configuration notes HCA information HCA Capability HCA port Switch connection GID prefix Sharing C65 N A C65 T1 Switch1 Framel Leaf1 FE 80 00 00 00 00 00 00 Frame8 Leaf8 Switch2 Framel Leafl1 C65 N A C65 T2 FE 80 00 00 00 00 00 01 Frame8 Leaf8 Switch3 Framel Leafl1 C65 N A C65 T3 FE 80 00 00 00 00 00 02 Frame8 Leaf8 Switch4 Framel Leafl1 C65 N A C65 T4 Frame8 Leaf8 FE 80 00 00 00 00 00 03 LPAR information LPAR LHCA OS Type GUID Shared HCA Switch partition give name index capability egf01n01sq01 AIX 0 N A N A egf08n12sq01 Copyr
71. of 65532 The IP MTU is different from the InfiniBand fabric MTU dsh av netstat i grep ib link awk print 1 2 grep y 765532 17 Verify that the network interfaces are recognized as being up and available The following command string should return no interfaces If an interface is marked down it will return the LPAR and ibX interface dsh av usr bin lsrsrc IBM NetworkInterface Name OpState grep p resource v OpState 1 grep ib Verify HCAs ends here 6 19 Checking System Configuration in AIX To check system configuration in AIX perform the following procedures Verify CPUs To verify the availability of CPU resources a Run the command dsh av lsdev C grep proc grep AVAILABLE wc 1 b This command should return the total number of processors available in the cluster if it does not i Verify that all servers are powered on ii Fix any problems with dsh not being able to reach all LPARs iii Determine which processors are having problems by running the command dsh av lsdev C grep proc grep v AVAILABLE iv After you have identified the problem CPUs check SFP on the HMC controlling the server and complete the required service actions If no serviceable events are found try any isolation procedures for de configured CPUs that are found in the System Service Guide v When all CPUs are available continue with the procedure to verify memory c IfCPU de co
72. of the devices in the management subsystem are connected to at least two networks over which their applications must communicate Typically the site will also connect key servers to a local network to provide remote access for managing the cluster The networks are Service VLAN Cluster VLAN Public Network Internal Hardware VLAN The service VLAN is a private Ethernet network which provides connectivity between the FSPs BPAs CSM MS and the HMCs to facilitate hardware control CSM documentation refers to this as service VLAN service VLAN or management VLAN The cluster VLAN or network is an Ethernet network public or private which gives CSM access to the operating systems It is also used for access to InfiniBand switches and fabric management servers CSM documentation refers to this as the cluster VLAN Note The switch vendor documentation will refer to this as the service VLAN or possibly the management network A local site Ethernet network Typically this will be attached to the CSM MS and Fabric Management Server Some sites may choose to put the cluster VLAN on the public network Refer to CSM installation and planning documentation to consider the implications of combining these networks This is a virtual local area network VLAN within a frame of 9125 servers It concentrates all server FSP connections and the BPH connections onto an internal ethernet hub which provides a single connection to the service VLAN wh
73. on page 194 2 Look for fabric configuration problems using the procedure in Checking for fabric configuration and functional problems on page 195 3 Look for configuration problems in the IBM systems You will check for HCA availability CPU availability and memory availability a For AIX LPARs see i Checking InfiniBand configuration in AIX on page 195 ii Checking System Configuration in AIX on page 197 b For Linux LPARs see i Error Reference source not found on page Error Bookmark not defined ii Error Reference source not found on page Error Bookmark not defined 4 Ifperformance problems persist call your next level of support Copyright IBM Corp 2008 7 22 08 200 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 This procedure ends here 6 24 Diagnosing and recovering ping problems If there is a problem pinging between IP Network Interfaces ibX it is necessary to check the fabric configuration parameters and HCA configuration to assure that the problem is not caused by faulty configuration Check the JBM Clusters with the InfiniBand Switch web site for any known issues or problems that would affect the IP Network Interfaces To recover from the problem do the following 1 Assure that the device drivers for the HCAs are at the latest level This is especially important for any fixes that would affect IP Check IBM Clusters with the InfiniBand Switch web site see Table
74. p HPC Clusters Fabric Guide using InfiniBand Hardware Note If you make a change you will have to restart the syslogd c Fora switch check that it is configured to log to the CSM MS using logSyslogConfig on the switch command line Check that the following information is correct CSM MS is the host ip address The port is 514 or other than you ve chosen to use The facility is 22 The mode is 1 7 Ifthe problem persists then try restarting the syslogd on the CSM MS and also resetting the source s logging a Log onto the CSM MS b For AIX hosts run refresh s syslogd c For Linux hosts run etc init d syslog restart d Ifthe source is the Fabric Managment Server use etc init d syslog restart e Ifthe source is a switch reboot the switch using the instructions in the Switch Users Guide 8 Ifthe problem has not been fixed call your next level of support 6 26 1 4 Event not in log on fabric management server If the expected log entry is not in the Fabric Management Server s log var log messages do the following Note This assumes that you are using syslogd for syslogging If you are using another syslog application like syslog ng then you may have to alter this procedure to account for that However the underlying technique for debug should remain the same 1 Log onto the Fabric Management Server 2 Open the Wvar log messages file and look for the expected log entry 3 Ifthe log entry is in the var log messag
75. page 134 Use addKey key 2 Set the GID prefix value according to the installation plan See the switch planning worksheet or Planning GID Prefixes on page 43 3 Ifthis is an HPC environment set the LMC value to 2 b Set the broadcast MTU value according to the installation plan See the switch planning worksheet or Planning MTU on page 42 c If applicable point to the NTP server For QLogic switches this is done using the time command Details are in the Switch Users Guide Typical commands are from the Fast Fabric Management Server are as follows If remote command execution is setup on the CSM MS you can use dsh instead of cmdall Remember to use devicetype IBSwitch Qlogic to access the switches 1 Ifapplicable set time using Network Time Protocol NTP server cmdall C time S NTP server IP address 2 Ifno NTP server is present set local time using cmdall C time T hhmmss mmddyyyy 3 Set time zone where X is the offset of the timezone from GMT emdall C timeZoneConf X 1 4 Set daylight saving time where X is the offset of the timezone from GMT emdall cC timeDSTTimeout X 10 This procedure ends here If you are also responsible for cabling the InfiniBand network proceed to Attach cables to the InfiniBand network on page 134 Otherwise you may return to the overview of the installationsection to find your next set of install tasks Other install tasks involving final configuration of switche
76. page 202 Recall that you were using the logger command such that the Fabric Management Server would be the source of the log entry 6 L6 M4 Verify remote syslogging from the switches to the CSM MS a Do not proceed with this step until you have setup the CSM MS for remote logging and event management in step 1 and you have set up the switches to remotely log to the CSM MS in step 3 b Ping the switches from the CSM Management Server to assure that there is connectivity across the service VLAN If this fails use standard techniques to debug Ethernet interface problems between the CSM MS and the switches c Use the ibtest C reboot command see the Fast Fabric Toolset Users Guide to reboot all of the switches management spines because this will cause a log when they are rebooted d Log on to the CSM MS to see if the log made it through It may take a minute or two before the event management sensor senses the log entry in the CSM MS s var log csm syslog fabric notices file The switch chassis management reboot will cause a log entries from every switch with a NOTICE priority and text along the lines of Switch chassis management software rebooted e Check the varJlog csm errorlog CSM MS hostname file and verify that only the NOTICE entry was logged in it If you have waited as much as five minutes and the NOTICE entry was not logged in the var log csm errorlog CSM MS hostname file e Review the p
77. page 68 If you have completed all of the above steps you can plan in more detail using the planning worksheets provided in Planning worksheets on page 70 When you are ready to install the components with which you will build your cluster review any information in readme files and online information related to the software and firmware to ensure that you have the latest information and the latest supported levels of firmware If this is the first time you have read the Planning Overview section and you understand the overall intent of the planning tasks go back to the beginning and start traversing the links and cross references to get to the details Planning Overview ends here Copyright IBM Corp 2008 7 22 08 38 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 2 Required Level of support firmware and devices The following tables provide the minimum requirements necessary to support InfiniBand network clustering Note For the most recent updates to this information see the following Facts and Features Web site http www ibm com servers eserver clusters hardware factsfeatures html Table 2 Verified and approved hardware associated with an IBM System p POWER6 cluster with an InfiniBand network Device Model or Feature Servers POWER6 9125 F2A IBM 8204 System p 550 4U rack mount server 8204 E8A IBM 8203 System p 520 4U rack mount servers 8203 E4A Switches QLogic models 9024 90
78. product program or service is not intended to state or imply that only that IBM product program or service may be used Any functionally equivalent product program or service that does not infringe any IBM intellectual property right may be used instead However it is the user s responsibility to evaluate and verify the operation of any non IBM product program or service IBM may have patents or pending patent applications covering subject matter described in this document The furnishing of this document does not grant you any license to these patents You can send license inquiries in writing to IBM Director of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte character set DBCS information contact the IBM Intellectual Property Department in your country or send inquiries in writing to IBM World Trade Asia Corporation Licensing 2 31 Roppongi 3 chome Minato ku Tokyo 106 0032 Japan The following paragraph does not apply to the United Kingdom or any other country where such provisions are inconsistent with local law INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS PUBLICATION AS IS WITHOUT WARRANTY OF ANY KIND EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of express or implied warranties in
79. replace the adapter in the system unit For instructions on installing an InfiniBand GX HCA in your system unit see the RIO HSL or InfiniBand IB adapter topic in the IBM systems Hardware Information Center Note When a host channel adapter HCA is added to a logical partition the HCA becomes a required resource for the partition If the HCA ever fails in such a way that the system s GARD function prevents it from being used the logical partition cannot be reactivated If this occurs a pop up message displays on the controlling HMC which indicates that you need to unassign the HCA from Copyright IBM Corp 2008 7 22 08 139 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware the logical partition to continue activation The GARD function is invoked for serious adapter or bus failures that could impair system operation such as ECC errors or state machine errors InfiniBand link errors should not invoke the GARD function 4 Update the LPAR profiles for all partitions that will use the new GX HCA with the new Globally Unique ID GUID for the new InfiniBand GX HCA Each InfiniBand GX HCA has a Globally Unique ID GUID that is assigned by the manufacturer If any of these adapters are replaced or moved the LPAR profiles for all partitions that will use the new GX HCA must be updated with the new GUID The customer can do this from the HMC that is used to manage the server in which the HCA is installed Do the foll
80. replacements on page 217 If the problem is fixed go to step 16 iii Ifthe problem is still not fixed call your next level of support If any repairs are made under direction from support go to step 16 once they have been made 14 If there are open ports or known good ports on the HCA do the following Otherwise go to the next step a Move the cable connector from the failing HCA port to the open or known good HCA port b In order to see if the problem has been resolved or it has moved to the new HCA port use the procedure in Verifying link FRU replacements on page 217 If the problem is fixed go to step 16 c Ifthe problem was fixed then the failing FRU is the HCA replace the HCA using the Repair and Verify procedures for the server and HCA After the HCA has been replaced go to step 16 d Ifthe problem was not fixed then the failing FRU is the cable or the switch Engage QLogic for repair Once the problem is fixed go to step 16 15 There are no open or available ports in the fabric or the problem has not been isolated yet Do the following a Engage QLogic to replace the cable and verify the fix using the procedure in Verifying link FRU replacements on page 217 If the problem is fixed go to step 16 b Ifthe cable does not fix the problem replace the HCA and verify the fix using the procedure in Verifying link FRU replacements on page 217 If the problem is fixed go to step 16 c Ifthe HCA d
81. require a CSM Management Server you might need a server to act as an AIX Network Installation Manager NIM server for eServer diagnostics This is the case for servers that do not have removable media CD or DVD such as a 575 9118 575 Furthermore if you have servers with no removable media that are running Linux partitions you may require a server to act as a Linux distribution server If you require both an AIX NIM server and a Linux distribution server and you choose the same server for both a reboot is needed to change between the services If the AIX NIM server is used only for eServer diagnostics this may be acceptable in your environment However you should understand that this may prolong a service call if use of the AIX NIM service is required For example the server that might normally act as a Linux distribution server could have a second boot image to server as the AIX NIM server If AIX NIM services are required for System p diagnostics during a service call the Linux distribution server must be rebooted to the AIX NIM image before diagnostics can be performed The configuration settings planned here should be recorded in the CSM Planning Worksheet on page 76 Planning CSM as your Systems Management Application ends here 3 5 2 Planning for QLogic Fabric Management Applications Plan for QLogic Fabric Management Applications using the following 1 Planning Fabric Manager and Fabric Viewer on page 47 2 Planning Fast F
82. s scope to be local i Make a copy of the pre packaged condition AIXNodeSyslog and set the ManagementScope to local 1 for local mkcondition c AIXNodeSyslog m 1 LocalAIXNodeSyslog il Link aresponse startcondresp LocalAIXNodeSyslog LogNodeErrorLogEntry The above condition response link will direct log entries to var log csm errorlog CSM hostname on the management server Note var log csm errlog CSM hostname will not be created until the first event comes through iii If you want to broadcast wall the events to the system console also enter startcondresp LocalAIXNodeSyslog BroadcastEventsAnyTime Note Using BroadcastEventsAnyTime will result in many events being broadcast to the console when servers are rebooted iv If you want to create any other response scripts you will use a similar format for the startcondresp command after creating the appropriate response script Refer to the CSM Reference Guide and RSCT Reference Guide on how to do this Copyright IBM Corp 2008 7 22 08 110 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note If there are problems with the event management from this point forward and you have to remake the AIXSyslogSensor you need to follow the procedure in Re configuring CSM event management on page 209 g Proceed to step 2 on page 113 Remote Syslogging and Event Management for CSM on Linux You will be pointing the syslogd to a FIFO for servicea
83. server attached to an InfiniBand network It should be noted that both IP and InfiniBand use the term subnet These are two distinctly different entities as you will see in the following paragraphs The IP addresses for the HCA network interfaces must be set up such that no two IP addresses in a given LPAR are in the same IP subnet When planning for the IP subnets in the cluster as many separate IP subnets should be established as there are IP addresses on a given LPAR The subnets should be set up such that all IP addresses in a given IP subnet should be connected to the same InfiniBand subnet If there are N network interfaces on each LPAR connected to the same InfiniBand subnet then N separate IP subnets should be established Note This IP subnetting limitation does not prevent multiple adapters or ports from being connected to the same InfiniBand subnet It is only a statement of how the IP addresses must be configured Copyright IBM Corp 2008 7 22 08 44 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 5 Management Subsystem Planning This section is a summary of the service and cluster VLANs Hardware Management Console HMC Systems Management application and Server vendor Fabric Management applications AIX NIM server and Linux Distribution server and pointers to key references in planning the management subsystem Finally the frames that house the management consoles need to be planned Customer
84. server info Linux distribution server info NTP server info Copyright IBM Corp 2008 7 22 08 71 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Power requirements Maximum cooling required Number of cooling zones Maximum weight area Minimum weight area 3 12 3 Frame and rack planning worksheet The frame planning worksheet is used for planning how to populate frames You will likely have to understand the numbers of each device type server switch BPA For the slots you should indicate the range of slots drawers that the device will populate A standard method for naming slots can either be found in the documentation for the frames or servers or you may wish to use EIA heights 1 75 as a standard You should include frames for systems switches management servers AIX NIM and Linux Distribution Servers and I O Frame planning worksheet Frame number s Frame MTM or feature or type Frame size 19 inch or 24 inch Number of slots Slots Device type server switch BPA etc Device name Indicate MTM Copyright IBM Corp 2008 7 22 08 72 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 4 Server planning worksheet You can use this worksheet as a template for multiple servers with similar configurations For such cases you will want to give the range of names of these server
85. service subsystem Ethernet switches or routers to accommodate new servers Adding new servers to an existing InfiniBand network Adding HCAs to an existing InfiniBand This should not affect the management service subsystem network e Cable to InfiniBand switches service subsystem Ethernet ports e May require additional service subsystem Ethernet switches or routers to accommodate new InfiniBand switches e May require additional Fabric Management Servers which would affect CSM event monitoring and remote command access of the additional Fabric Management Servers e Add remote syslog capability from new Fabric Management Server and switches to CSM e Add remote execution capability from CSM to new Fabric Management Server and switches Adding a subnet to an existing InfiniBand network Copyright IBM Corp 2008 7 22 08 98 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Scenario Effects Adding servers and a subnet to an existing InfiniBand network e Cable to InfiniBand switches service subsystem Ethernet ports e Cable to servers service subsystem Ethernet ports e Build operating system update mechanisms for new servers without removable media e May require additional HMC s to accommodate the new servers If expanding beyond a single HMC or adding CSM MS and Cluster Ready Hardware server you will need to de configure the current DHCP services on the exis
86. spine or leaf board will manifest itself as either multiple link failures or loss of communication between the device and the management module Internal failures will be reported via remote logging to the CSM MS in var log errorlog CSM MS hostname Without remote logging you will have to interrogate the switch log 3 Redundant switch FRU failures are reported via the syslog and into the CSM event management subsystem The syslog should indicate the failing FRU For switches this includes power supplies fans and management modules Redundant switch FRU failures will be reported via remote logging to the CSM MS in var log errorlog CSM MS hostname Without remote logging you will have to interrogate the switch log 4 User induced link failure events are caused by things like someone pulling a cable for a repair or powering off a switch or server or rebooting a server Any link event should first be correlated to any user actions that may be the root cause The user induced event may or may not be reported anywhere If a cable is pulled it will not be reported If a server was rebooted or powered off the server logs should have recorded this The link failure caused by the user will be reported via remote logging to the CSM MS in var log errorlog CSM MS hostname Without remote logging you will have to interrogate the Subnet Manager log log 5 HCA failures will be reported to SFP on the managing HMC and forwarded to CSM SFP Monitoring
87. subnet2 amp 4 egf11fm02 Backup Subnet Manager s locations _ subnet1 amp 3 egf11fm02 subnet2 amp 4 egf11fm01 Primary Fabric MS as fabric diagnosis collector _ egf11fm01 CSM Server Address es for remote logging _10 1 1 1 NTP Server 10 1 1 1 Notes Copyright IBM Corp 2008 7 22 08 89 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 8 7 Fabric Management Server worksheet example Fabric Management Server worksheet one per server 1 of 1 Server Name _ egf11fm01 Server IP address on cluster VLAN _10 1 1 14 Server Model SystemX 3550 or 3650 3650 Frame 11 Number of PCI slots 2 Number of HCAs 2 Primary Backup NA HSM Primary subnet 1 amp 3 backup subnet 2 amp 4 Primary data collection point yes yes no Local syslogd is syslog syslog ng or other _ syslog ng CSM Server Address es for remote logging _10 1 1 1 Using tcp or udp for remote logging _ udp NTP server 10 1 1 1 Subnet Management Plannin Subnet Subnet Subnet Subnet Subnet Subnet Subnet Subnet 1 2 3 4 5 6 7 8 HCA number 1 1 2 2 HCA port 1 2 1 2 GID prefix 00 01 02 03 all start w fe 80 00 00 00 00 00 Broadcast MTU 5 4096 5 4096 5 4096 5 4096 put rate in parantheses node appearance _msg thresh 10 10 10 10 10 10 10 10 Primary Switch Priorit
88. supplied Ethernet service and cluster VLANs are required to support the InfiniBand cluster computing environment The number of Ethernet connections depends on the number of servers Bulk Power Controllers BPCs in 24 inch frames InfiniBand switches and HMCs in the cluster The Systems Management application and server which may include Cluster Ready Hardware Server CRHS software would also require a connection to the service VLAN Note While it is recommended that you have two service VLANs on different subnets to support redundancy in IBM servers BPCs and HMCs the InfiniBand switches only support a single service VLAN even though some InfiniBand switch models have multiple Ethernet connections these connect to different management processors and thus should connect to the same Ethernet network An HMC may be required to manage the LPARs and to configure the GX bus HCAs in the servers The maximum number of servers that can be managed by an HMC is 32 When you go beyond 32 servers additional HMC s are required See Solutions with the Hardware Management Console in the IBM systems Hardware Information Center It is under the Planning gt Solutions gt Planning for consoles interfaces and terminals path If you require more than one HMC to manage your cluster servers and switches you must use Cluster Ready Hardware Server in Cluster Systems Management CSM on a CSM Management Server Refer to the CSM Install and Planning Guide You can
89. that should be used for the logical HCA This information is also stored in the LPAR profile on the HMC Therefore when an HCA is replaced each partition profile needs to be manually updated with the new HCA GUID information If this step is not performed the HCA is not available to the operating system The following table describes how the HCA resources can be allocated to an LPAR This ability to allocate HCA resources allows multiple LPARs to share a single HCA The degree of sharing is driven by application requirements The Dedicated value is only used when you have a single active LPAR which needs to use all of the available HCA resources You may configure multiple LPARs to have Dedicated but only one may be active at a time When you have more than one LPAR sharing an HCA you can assign a particular allocation to it You can never allocate more than 100 of the HCA across all active LPARs For example four active LPARs could be set at Medium and two active LPARs to High 4 1 8 2 1 4 1 If the requested resource allocation for an LPAR exceeds the available resource for an HCA the LPAR will fail to activate So in the above example with 6 active LPARs if one more LPAR tried to activate on the HCA it would fail because the HCA is already 100 allocated Dedicated All of the adapter resources will be dedicated to the LPAR This is the acca default for single LPARs which is the supported HPC Cluster configur
90. that you are going to use At the least you need to understand the default syslogd that comes with the operating system on which CSM will run o Whether or not you wish to use tcp or udp as the protocol for transferring syslog entries from the Fabric Management Server to the CSM MS TCP is recommended for better reliability For remote command execution to the Fabric Management Server you will need to research how to exchange ssh keys between the Fabric Management Server and the CSM MS This is standard openSSH protocol setup as done in either AIX or Linux In addition to planning for requirements see Planning Fast Fabric Toolset on page 54 for information about creating hosts groups for Fabric Management Servers These are used to set up configuration files for hosts for Fast Fabric tools The configuration settings planned here should be recorded in QLogic Fabric Management worksheets on page 79 Planning for Fabric Management Server ends here 3 5 4 Planning Event Monitoring with QLogic and CSM Event monitoring for fabrics using QLogic switches can be done with a combination of remote syslogging and CSM event management The result is the ability to forward switch and fabric management logs in a single log file on the CSM MS in the typical event management log directory var log csm errorlog with messages in the auditlog You can also leverage the included response script to wall log entries to the CSM MS console Finally you
91. through 3 For Linux the adapter is call ehcaX where X is a number 0 through 3 For example a log entry like the following is reported with the physical being reported Here the physical information is underlined and in bold Note the Node type in italics it is a switch Apr 15 09 25 23 c924hsm ppd pok ibm com local notice c924hsm iview_sm 26012 c924 hsm MSG NOTICE SM c924hsm port 1 COND 4 Disappearance from fabric NODE SW SilverStorm 9024 DDR GUID 0x00066a00d090003d3 port 11 0x00066a00d90003d3 DETAIL Node type switch The format of the switch node is name port GUID The following procedure will find the physical switch connection and node and HCA port and location The above log will be used as an example and example results from any queries will also be provided Copyright IBM Corp 2008 7 22 08 183 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 1 Get the switch GUID and port gt GUID 0x00066a00d900034d3 port 11 2 Logon to the On Fabric Management Server 3 Find the Logical switch name This query will return the switch side of a link as the second port of the link and the logical switch port as the first port in the link a Ifthe baseline health check has been run use the following command If it has not been run use step b grep A 1 gt switch GUID switch port var opt iba analysis baseline fabric links b Ifthe baseline health check has n
92. to bring it up VNC is an example 2 3 3 10 eMail Notifications Overview Description A subset of events can be enabled to trigger an email from the Fabric Viewer These are link up and down and communication issues between the Fabric Viewer and parts of the fabric manager Typically Fabric Viewer is used interactively and shutdown after a session This would prevent the ability to effectively use eMail notification If you wish to use this function you must have a copy of Fabric Viewer running continuously for example on the Fabric Management Server Documentation Fabric Viewer Users Guide When to Use Set up during installation so that you can be notified of events as they occur Host Wherever Fabric Viewer is running How to access This setup is done on the Fabric Viewer The email is accessed from wherever you have directed the Fabric Viewer to send the email notifications 2 3 3 11 Server Operating System Overview Description The operating system is the interface for the device drivers Documentation Operating System Users Guide When to Use To query the state of the HCAs with respect to availability to applications Host IBM system How to access dsh from CSM or telnet ssh into the LPAR Copyright IBM Corp 2008 7 22 08 33 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 3 12 Management Subsystem Networks All
93. to illustrate how iba_report might be used for detailed monitoring of cluster fabric resources Much more detail is available in the QLogic s Fast Fabric Users Guide which you should read before using iba_report Parameter Description d 10 This provides quite a bit of extra detail that you would not see at the default detail level of 2 You may find it useful to experiment with the detail level when developing a query Quite often d 5 is the most detail that you can extract from a given command S This includes statistics counters in the report i seconds This will cause a query to statistics counters after waiting the number of seconds specified in the parameter Quite often this is used along with the C to clear the counters This implies the s parameter F focus info You can focus iba_report on a single resource or group of resources that match the filter described in the focus info See the Fast Fabric Users Guide for details on the many different filters that you can use like portguid nodeguid nodepat for patterns to search for h hca and p port Used in conjunction these point the tool to do the query on a specific subnet connected to the indicated hca and port on the fabric management server The default is the first port on the first HCA o slowlinks To look for links slower than expected O errors To look for links exceeding the allowed error threshold See t
94. written from the perspective of installing a single Fabric Management Server Using the instructions in the Fast Fabric Toolset Users Guide you can use the ftpall command to copy common configuration files from the first Fabric Management Server to the others You should be careful about this with the Subnet Manager configuration files because there are certain parameters like GID prefix which are not common between all Fabric Management Servers Before proceeding obtain the following documentation e IBM system x 3550 or 3650 installation guide Linux distribution documentation Fabric Manager Users Guide QLogic InfiniServ host stack documentation Fast Fabric Toolset Users Guide There is a point in this procedure which cannot be passed until the QLogic switches are installed powered on and configured and the cluster VLAN Ethernet devices are configured and powered on You will need to coordinate with the teams performing those install activities Use the following procedure for installing the Fabric Management Server It references QLogic documentation for detailed installation instructions Reference the QLogic Fabric Management worksheets on page 79 which should have been filled out during the planning phase for the cluster 1 F1 M1 Physically place the Fabric Management Server the floor 2 F2 M2 Install and configure the operating system on the Fabric Management Server 3 E3 M2 If you are going to con
95. you are going to use At the least you need to understand the default syslogd that comes with the operating system on which CSM will run Whether or not you wish to use tcp or udp as the protocol for transferring syslog entries from the Fabric Management Server to the CSM MS You must use udp if the CSM MS is using syslog If the CSM MS has syslog ng installed you may use tep for better reliability The switches only use udp Ifsyslog ng is used on the CSM MS there will be a sre line that controls the ip addresses and ports over which syslog ng will accept logs The default setup is address 0 0 0 0 which means all addresses For added security you may wish to plan to have a sre definition for each switch s and Fabric Management Server s ip address rather than opening it up to all ip addresses on the service VLAN For information on the format of the sre line see Setup Remote Logging on page 108 Remote command execution from the CSM MS to the Fabric Management Servers is especially advantageous when you have more than one Fabric Management Server in a cluster For remote command execution to the Fabric Management Servers you will need to research how to exchange ssh keys between the Fabric Management Server and the CSM MS This is standard openSSH protocol setup as done in either AIX or Linux Copyright IBM Corp 2008 7 22 08 46 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware If you do not
96. you are installing f Physically install InfiniBand switches into 19 inch frames or racks and attach power cables to the switches according to the instructions for the InfiniBand switch model This will automatically power on the switches There is no power switch for the switches Note Do not connect the Ethernet connections for the cluster VLAN at this time W2 Set up the Ethernet interface for the cluster VLAN by setting the switch to a fixed IP address provided by the customer See the switch planning worksheet Use the procedure in vendor documentation for setting switch addresses Note You will either be attaching a laptop to the serial port of the switch or you will be attaching each switch individually to the cluster VLAN and addressing it with the default address to get into the CLI and customize its static IP address As indicated in Planning QLogic InfiniBand switch configuration on page 41 QLogic switches with managed spine modules will have multiple addresses There is an address for each managed spine as well as an overall chassis address used by whichever spine is master at any given time If you are customizing the IP address of the switch by accessing the CLI via the serial port on the switch you may wish to leave the CLI open to perform the rest of the customization This won t be necessary if the Fast Fabric Toolset has been installed and can access the switches because Fast Fabric tools allow
97. you are using syslogd on the CSM MS If you are using another syslog application like syslog ng you may have to set things up slightly differently but these instructions should prove useful in understanding how to set up the syslog configuration a Log on to the CSM MS running AIX as root b Edit the etc syslog conf to direct the syslogs to a file to be monitored by CSM event management The basic format of the line is facility min priority destination Ifyou are using syslog ng you will need to adjust the format to accomplish the same type of function Add the following lines so that local6 facilities used by Subnet Manager and the switch with log entry priorities severities of INFO or higher NOTICE WARNING ERROR etc are directed to a file for debug purposes The disadvantage of this is that var will have to be monitored more closely so that it does not fill up If you cannot maintain this you can leave out this line optional local6 info and above priorities in another file local6 info var log csm syslog fabric info Note You can use different file names but you have to record them and update the rest of the procedure steps with the new names c touch the output files because syslog won t create them on its own i touch var log csm syslog fabric notices il touch var log csm syslog fabric info d Refresh the syslog daemon refresh s syslogd Copyright IBM Corp 2008 7 22 08 109 of 238
98. you to update multiple switches simultaneously For QLogic switches key commands are setChassisIpAddr setDefaultRoute Don t forget to use an appropriate subnet mask when setting up the IP addresses Set the switch name For QLogic switches use setIBNodeDesc Disable subnet manager and performance manager functions If embedded subnet management will be used this will be reversed after the network cabling is done Make sure that the embedded Subnet Manager is not running by using smControl stop Make sure that the embedded Subnet Manager does not start at boot using smConfig startAtBoot no Make sure that the performance manager is not running by using smPmBm3Start disable W3 Attach the switch to the cluster VLAN Note If the switch has multiple Ethernet connections they must all attach to the same Ethernet subnet W4 For QLogic switches if the Fast Fabric Toolset is installed on the Fabric Management Server verify that the Fast Fabric Tools can access the switch Referring to the Fast Fabric Toolset Users Guide use a simple Copyright IBM Corp 2008 7 22 08 131 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware query command or ping test to the switch For example the pingall command could be used as long as you point to the switch chassis and not the servers nodes 8 W5 Verify that the switch code matches the latest supported level indicated in IBM Clu
99. 0 etc sysconfig fastfabric conf This will assure that only root can use the Fast Fabric tools and also only root can see the updated password 16 It is a good practice to enter the configuration information for the server in its etc motd Use the information from the QLogic Fabric Management worksheets on page 79 17 If you wish to monitor the fabric by running the health check on a regular basis review Setting up periodic fabric health checks on page 151 Do not set this up until the fabric has been completely installed and verified 18 This procedure ends here Further procedures that involve the Fabric Management Server are e Setup Remote Logging on page 108 e Remote Command Execution setup on page 117 Copyright IBM Corp 2008 7 22 08 107 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 4 7 Setup Remote Logging Remote logging to the CSM Management Server will help cluster monitoring by consolidating logs to a central location This will involve setting up remote logging from the following locations to the CSM MS e Fabric Management Server see step 2 e InfiniBand switches see step 3 e Service Focal Point on the HMCs see step 4 Note Steps 5 and 6 involve verifying the remote logging setup The following figure Figure 11 Setup remote logging illustrates tasks L1j through L6 for setting up remote logging It also illustrates how the remote logging setup t
100. 008 7 22 08 232 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware General QLogic Fabric Management worksheet Host based or embedded SM LMC 4 is default MTU Chassis Broadcast mtu rate for broadcast Fabric Management Server Names Addresses on cluster VLAN Embedded Subnet Manager Switches Primary Subnet Manager s location Backup Subnet Manager s locations Primary Fabric MS as fabric diagnosis collector CSM Server Address es for remote logging NTP Server Notes Copyright IBM Corp 2008 7 22 08 233 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Embedded Subnet Manager worksheet ESM or HSM to be used License obtained from vendor CSM Server Address es for remote logging Subnet Subnet Subnet Subnet Subnet Subnet Subnet Subnet 1 2 3 4 5 6 7 8 Primary Switch Priority Backup Switch Priority Backup Switch Priority Backup Switch Priority Broadcast MTU put rate in parantheses LMC GID prefix smAppearanceMsgThresh 10 10 10 10 10 10 10 10 Notes Copyright IBM Corp 2008 7 22 08 234 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Fabric Management Server worksheet one per server Server Name Server IP address on cluster VLAN Server Model
101. 1 IBM logical switch 1 0x00066a00d90003d6 14 SW 0x00025500000d8b80 1 SW IBM 0x00025500000da080 1 SW SilverStorm 9024 DDR logical switch 1 IBM logical switch 1 5 5 4 Querying Status Querying fabric status is done in several typical ways Check logs on the CSM MS as in Monitoring fabric logs from CSM MS on page 150 Fast Fabric Toolset Health Check as in Health Checks on page 151 Check Service Focal Point instances for HCAs in FRU lists You can also use SFP monitoring as described in the CSM Administration Guide Fast Fabric Toolset s iba_report is very powerful See the Fast Fabric Toolset Users Guide for details on iba_report Many of the typical checks that you would do with iba_report are done in the Health Check However you can do many more targeted queries using iba_report Also see Hints on using iba_report on page 163 Fast Fabric Toolset s saquery fills in some gaps left by iba_report See the Fast Fabric Toolset Users Guide for details on saquery Chassis Viewer can be used to query one switch at a time See the Switch Users Guide Fabric Viewer can be used to get a GUI look at the fabric See the Fabric Viewer Users Guide These do not exhaust the possible methods for querying status Further information is available in the Switch Users Guide the Fabric Manager and Fabric Viewer Users Guide and the Fast Fabric Toolset Users Guide Copyright IBM Corp 2008 7 22 08 158 of 238 IBM System p HPC Cluster
102. 2 Expected configuration changes are those that relate to repaired devices or intended configuration changes 5 Ifany problems were found fix them and restart this procedure Continue to do this until you are satisfied that a repair is successful or that a configuration change has been successful and that neither has resulted in unexpected configuration changes 6 If there were expected configuration changes perform the procedure in Re establishing Health Check baseline on page 217 7 This procedure ends here Copyright IBM Corp 2008 7 22 08 218 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 33 Rebooting the cluster If you are performing maintenance which requires you to reboot an entire cluster the following should be considered l 2 Assure that you have a baseline health check that can be used to check against when the cluster is back up Consider disabling the Subnet Managers before proceeding with the reboots This will prevent new log entries caused by the reboot process While it will also suppress real problems those will be uncovered in the subsequent health check in step 7 Reboot the cluster but make sure the LPARs stop at LPAR standby When the IBM systems are at LPAR standby restart the Subnet Managers a As devices come back online there will be appearance NOTICEs from the Subnet Manager s You can count the number of devices and make sure the count corresponds to the
103. 2 Planning an IBM GX HCA configuration ssssesseeseesseeseeseessesseseessressessresseese 43 3 4 2 1 IP subnet addressing restriction seeeseseseesrseeeeseeeresrrrreresrresesresrssrerresesrresesresrereses 44 3 5 Management Subsystem Planning ssesessssseceessosoccesesoocessssoceessssesee Fo 3 5 1 Planning CSM as your Systems Management Application ceeceeseeeteee 46 3 5 2 Planning for QLogic Fabric Management Applications ccccescceeseeeteee 47 3 5 2 1 Planning Fabric Manager and Fabric Viewer 47 3 5 2 2 Planning Fast Fabric Too lset cccccssccsssceessecesneeenseceencecseceeccecsseceeaeecsaecseaeeceaeeeeaeecsaeeesaes 54 3 5 3 Planning for Fabric Management Server ccceecceeseeesceeseeceeeceeeeeeeeeeseeesseenes 55 3 5 4 Planning Event Monitoring with QLogic and CSM s sssssssssessesessssessessrssresseese 56 3 5 5 Planning Remote Command Execution with QLogic from the CSM MB 57 3 6 Frame Planning ssececssosececssocecesssoocecessscoccesoocceessooecessscoeesssseceessssssees JO 3 7 Planning Installation FloW eessoseoecssooccssssocecssssocecessoocessssooeessssoseese DI J Ll HOS installation Ponts n scrontann nnen e RE A R eds 59 3 7 2 Installation Responsibilities By Organization ss seseseeseseseessesesssessessessressesse 59 Copyright IBM Corp 2008 7 22 08 3 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents
104. 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware b Use the switch documentation for pointing the switch to a remote syslog server If you wish to use the command line method use sub step i If you wish to use the Chassis Viewer use sub step ii In either case you must also execute sub step iii 1 From the switch Command Line or Fast Fabric Toolset s cmdall issue logSyslogConfig h csm_ip_address f 22 p 514 m 1 ii From Chassis Viewer in the Syslog Host tab using the IP address of the CSM MS and pointing to Port 514 You must do this for each switch individually iii In either case assure that all Priority logging levels with a severity above INFO are set to log using logShowConfig on the switch command line or using the Chassis Viewer to look at the log configuration If you need to turn on INFO entries use the following On the switch command line use LogConfigure and follow the instructions on screen In Chassis Viewer this is done in the log configuration window Note The switch command line and Chassis Viewer do not necessarily list the log priorities with respect to severity Assure that a LogShowConfig will result in something like the following where Dump Fatal Error Alarm Warning Partial Config Periodic and Notice are enabled The following example has Info enabled as well but that is optionsl Configurable presets index name state 1 Dump Enabled 2 Fatal Enabled 3 E
105. 3 7 3 Install responsibilities by units and deViCeS cecceeceeeseeesseceeceeeeeeeeeeseeesseenes 60 3 7 4 Order of installation escuen ansias ni siana 61 3 7 5 Installation Coordination Worksheet cc cece cece eecccecccccecccccccccececececececececeeevees 65 3 9 Planning 12x HCA COnnections cccccssssssccsssssscccccssssssscccssssssscees 67 3 10 PU crim ANS ecole csc idesens cecteddsasccescsSscwedensesdadwedeesediveendbevedesdecccsntuenccads 68 3 11 Planning checklist ssooeoesssooecesosoecesssooccesssooeesssocccessooecessscosessssoseesso 69 3 12 Planning worksheets esesssocecsssssccccssooccessscoeessssoceessooccesssooseesssosseese 70 3 12 1 Using planning worksheets i si 4 35s3 lt cisasaetoascariecerteaveeard sate eany aetna ates 70 3 12 2 Cluster summary worksneeticsasut asdaciuacsiemoscalinxsarieaieasiv aemeeousteses 71 3 12 3 Frame and rack planning worksheet cccccceceseceseceeeeeeseeceeeceeeeeeeenseeesaeens 72 3 12 4 Server planning worksheet ss sessseesseseesseessessessresseestesresseeseeseesseesseseesseesse 73 3 12 5 QLogic Switch planning worksheets 5 5 esiehcineaiss eaten letdvadusaien acta egees 74 3 12 6 CSM Planning Worksheets cccssssscssescesecsssscssscssscessceseecssanssscessasesnasens 76 3 12 7 QLogic Fabric Management worksheet sys s00 sss dscessnciscesassasta ss seeisatea doves cessde 79 2 8 Worksheet examples 520 pavacanciousaccateieraeeonsrunsevasvaeseaba
106. 4 4 The importance of NERS ica ast cen ces eavareueetylivecanetonsdonaganseunta te styles anes eeenans 168 6 5 Table OF symptomS ces ceseseceissvacescoasseczess sonsnactuceceasseetusetacssnccazauavseeatesszed 169 6 6 SEF VICE PIOCEGULES se cc2ccsissseccsad acscedesdvsceeed sbdicseneccsizasecessdu steeceasscacsucatt 172 6 7 Capturing data for fabric CiaQnoOsis ccssssscccccsssssssecsssssssseees 174 6 7 1 Using script command to capture switch CLI output cece eeeceeereeeees 176 6 8 Capture data for Fabric Manager and Fast Fabric problemas 176 6 9 Map ping Fabric devices ssiscccscccseseicccecdecccssesescedectesdesceestentecSeccsssnctoccdses 177 6 9 1 General mapping of IBM HCA GUIDs to physical HCAS eee eens 178 6 9 2 Finding devices based on a known logical switch ccceeceeseeseeeteeeteeeeees 179 6 9 3 Finding devices based on a known logical HCA eecceeceeceeteeeteeeteeeees 181 6 9 4 Finding devices based on a known physical switch port ccesceeseeeeeeees 183 6 9 5 Finding devices based on a known ib interface ibX ehcaX eects 185 6 10 IBM GX HCA Physical port mapping based on device number 187 6 11 Interpreting switch vendor log formats sscccsssssssccsssssssceees 188 GAN Log SEVER NIGS iisu anais aR tuataabas taser shuatbannetasthenicaataaausturaeed 188 6 11 2 Switch chassis management log format cece ceesceeseceeeeeteeceteceteeeeeeeeaees 188 Copyright IBM Corp 2008
107. 40 9080 9120 9240 Host Channel Adapters HCAs The feature code is dependent on server Order one or more InfiniBand GX Dual port HCA per server that requires connectivity to InfiniBand networks The maximum number of HCAs allowed depends on the server model Fabric Management Server IBM system x 3550 or 3650 SLES 10 Linux QLogic HCAs Note HPC proven and validated to work in an IBM HPC cluster For approved IBM System p POWER6 and eServer p5 InfiniBand configurations see the Facts and Features Web site http www ibm com servers eserver clusters hardware factsfeatures html Table 3 Minimum levels of software and firmware associated with an InfiniBand cluster Software Minimum Level AIX AIX 5L Version 5 3 with the 5300 08 Technology Level with Service Pack 2 SUSE Linux Enterprise Server 10 SUSE Linux Enterprise Server 10 SP2 with Copyright IBM Corp 2008 7 22 08 39 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware IBMInfiniBand GX HCA driver and OpenIB Gen2 Stack available in SLES10SP2 AS Hardware Management Console V7R3 3 System firmware level for System pOWER 6 InfiniBand switch firmware QLogic 4 2 1 1 1 Fabric Manager QLogic 4 2 1 1 1 Fast Fabric Toolset QLogic Host stack for Fabric Management Server QLogic s InfiniServ 4 2 0 0 39 For the most recent support information refer to the IBM clusters with the InfiniBand Switch web site Required Level of support
108. 5_0519 Copyright IBM Corp 2008 7 22 08 36 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 0 Cluster Planning Plan a cluster that leverages InfiniBand technologies for the communications fabric This section covers the key elements of the planning process and helps you organize existing detailed planning information When planning a cluster with an InfiniBand network you bring together many different devices and management tools to form a cluster Major components to consider are Servers T O devices InfiniBand network devices Frames racks Service VLAN including o HMCs o Ethernet devices o Cluster Systems Management CSM Server for multiple HMC environments e Management Network including Cluster Systems Management CSM Server Servers to provide operating system access from CSM InfiniBand switches Fabric Managemetn Server AIX Network Installation Management NIM server for servers with no removable media Linux distribution server for servers with no removable media e System management applications including o HMC o CSM o Fabric Manager o Other QLogic management tools Fast Fabric Toolset Fabric Viewer and Chassis Viewer e Physical characteristics such as weight and dimensions e Electrical characteristics e Cooling characteristics 01070 Q0 O Information resources on page 14 is intended to help you find references for many required documents and other Intern
109. 9 and Remotely accessing QLogic switches from the CSM MS on page 159 5 2 2 QLogic Subnet Manager The QLogic Subnet Manager configures and maintains the fabric 5 2 3 QLogic Fast Fabric Toolset The Fast Fabric Toolset is a powerful suite of management tools from QLogic They are highly recommended for managing and monitoring a cluster fabric Reference the Fast Fabric Toolset Users Guide for details on any recommended commands For more suggestions on using Fast Fabric tools see the QLogic Best Practices for Clusters Guide Fast Fabric commands and tools that are suggested are found in the following table Table 11 Recommended Fast Fabric tools and commands Tool Command Comments cmdall To issue Command Line Interface commands to all switches simultaneously Health check tools all_ analysis Use health check tools to check for problems during install problem fabric_analysis and so on determination and repair You can also run them periodically to proactively check for problems or unexpected changes to the network by comparing current state and configuration with a baseline captureall Use this to capture data for problem determination Copyright IBM Corp 2008 7 22 08 147 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Tool Command Comments pingall Use this to ping all the switch chassis on the network to determine if they are accessible from the Fabric Manageme
110. A and the switch port If it appears unseated reseat the cable and do the following Otherwise go to the next step a Check the LEDs b Ifthe LEDs light the problem is resolved Go to step 16 c Ifthe LEDs do not light go to the next step Check the cable for damage If the cable is damaged perform the following procedure Otherwise proceed to the next step a Replace the cable Before replacing the cable check the manufacturer and part number to assure that it is an approved cable Approved cables are available in the BM Clusters with the InfiniBand Switch web site its URL is found in Table 2 General Cluster Information Resources on page 15 b Perform the procedure in Verifying link FRU replacements on page 217 c Ifthe problem is fixed go to step 16 If not go to the next step If there are open ports on the switch do the following Otherwise go to step 14 a Move the cable connector from the failing switch port to the open switch port b In order to see if the problem has been resolved or it has moved to the new switch port use the procedure in Verifying link FRU replacements on page 217 c Ifthe problem was fixed then the failing FRU is on the switch Engage QLogic for repair Once the repair has been made go to step 16 If the problem was not fixed by swapping ports proceed to the next step d Ifthe problem was not fixed by swapping ports then the failing FRU is either the cable or the HCA Ret
111. ALYSIS that includes all possible analysis tools You will only need a hostsm or esm embedded SM entry e If you have a host based SM edit the entry to look like export FF_ALL_ANALYSIS FF_ALL_ANALYSIS fabric chassis hostsm e If you have an embedded SM edit the entry to look like export FF_ALL_ANALYSIS FF_ALL_ANALYSIS fabric chassis esm e Using a pattern that matches the names of your switches setup the FF FABRIC HEALTH variable The following is an example which assumes that the default names were left in place The default names begin with SilverStorm It also removes the clear of errors that exceed threshold export FF_FABRIC_HEALTH FF_FABRIC_HEALTH s o errors o slowlinks F nodepat SilverStorm e Also if applicable make sure that the etc sysconfig iba esm_chassis has the list of switch IP addresses for switches that are running the Embedded SM The etc sysconfig iba ports file must have a list of ports on the Fabric MS The format is a single line listing the HCA ports on the Fabric Management Server which are attached to the subnets There should be one port per subnet The format for identifying a port is hca port If4 ports are connected the ports file should have a single line like 1 1 1 2 2 1 2 2 Assure that tcl and Expect are installed on the Fabric Management Server They should be at least at the following levels You can check using rpm qa grep expect and rpm qa grep tcl Copyri
112. Any link event should first be correlated to any existing HCA failures that may be the root cause The link event caused by the user will be reported via remote logging to the CSM MS in var log errorlog CSM MS hostname Without remote logging you will have to interrogate the Subnet Manager log log 6 Server failures will be reported to SFP on the managing HMC and forwarded to CSM SFP Monitoring Any link event should first be correlated to any existing server failures that may be the root cause 7 Performance issues are most likely going to be reported by users Unless one of the above failure scenarios is identified as the root cause a method for checking the health of the fabric will be required to either identify an unreported problem or to positively verify that the fabric is in good health Although performance problems can be very complex and require remote support some initial diagnosis can be performed using the procedure in Diagnosing performance problems on page 200 8 Application crashes are typically reported by users There are many causes for application crashes which are outside the scope of this document However some initial diagnosis can be performed using the procedure in Diagnosing application crashes on page 201 9 Configuration changes are typically reported by Fast Fabric Health Check Configuration changes can be caused by many things some are benign and some indicate a real problem Examples of configuration chan
113. C Clusters Fabric Guide using InfiniBand Hardware Linux SLES 10 operating system One QLogic HCA for every 2 subnets to be managed by the server to a maximum of 4 subnets QLogic Fast Fabric Toolset bundle which includes the QLogic host stack see Planning Fast Fabric Toolset on page 54 The QLogic host based Fabric Manager see Planning Fabric Manager and Fabric Viewer on page 47 The number of Fabric Management Servers is determined by the following parameters o Up to 4 subnets can be managed from each Fabric Management Server o One backup Fabric Management Server for each primary Fabric Management Server is recommended o For up to 4 subnets a total of 2 Fabric Management Servers is recommended one primary and one backup o For up to 8 subnets a total of 4 Fabric Management Servers is recommended two primaries and two backups A backup fabric management server that has a symmetrical configuration to that of the primary fabric management server for any given group of subnets This means that an HCA device number and port on the backup should be attached to the same subnet as it is to the corresponding HCA device number and port on the primary Designate a single Fabric Management Server to be the primary data collection point for fabric diagnosis data Itis highly recommended that CSM event management be leveraged in a cluster In order to do this you need to plan for the following o The type of syslogd
114. COPE 0 mkrsrc f tmp ErrorLogSensorDef IBM Sensor v Run opt csm csmbin monerrorlog f var log csm syslog fabric notices p f fabnotices Note Notice that the p parameter points to the f_fabnotices entry that was defined in etc syslog ng syslog ng conf f If you get an error back from monerrorlog indicating a problem with syslog there is probably a typo in the etc syslog ng syslog ng conf file The message will have a form like the following The key is that syslog is in the error message screen The is a wildcard monerrorlog syslog i Look for the typo in the etc syslog ng syslog ng conf file by reviewing the previous steps that you have taken to edit syslog ng conf ii Remove the destination and log lines from the end of syslog ng conf iii Re run opt csm csmbin monerrorlog f var log csm syslog fabric notices p f_fabnotices iv If you get another error examine the file again and repeat the recovery procedures g Check the etc syslog ng syslog ng conf file to assure that the sensor set it up correctly The following lines should be at the end of the file Note Because it is a generic CSM command being leveraged for InfiniBand monerrorlog will use a different name from fabnotices_fifo in the destination and log entries It is a pseudo random name that will look something like fifonfJGQsBw filter f fabnotices facility local6 and level notice alert warn err Crit and not filter f iptables
115. Condition Response File Named Pipe File Named Pipe Notes Copyright IBM Corp 2008 7 22 08 78 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 7 QLogic Fabric Management worksheets This worksheet is intended for planning QLogic Fabric Management It is intended to highlight information that is especially important for management subsystem integration in HPC Clusters with an InfiniBand network It is not intended to replace planning instruction in the QLogic installation and planning guides Complete the following worksheets General QLogic Fabric Management worksheet Embedded Subnet Manager worksheet if applicable Fabric Management Server worksheet General QLogic Fabric Management worksheet Host based or embedded SM LMC 4 is default MTU Chassis Broadcast mtu rate for broadcast Fabric Management Server Names Addresses on cluster VLAN Embedded Subnet Manager Switches Primary Subnet Manager s location Backup Subnet Manager s locations Primary Fabric MS as fabric diagnosis collector CSM Server Address es for remote logging NTP Server Notes Copyright IBM Corp 2008 7 22 08 79 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following g worksheet is for planning an embedded Subnet Manager Most HPC Cluster installations should use host based Subnet Managers
116. Copyright IBM Corp 2008 7 22 08 17 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Most of the links are listed along with the documents The IBM HPC Clusters Software Information can be found in two places e For the document library go to http publib boulder ibm com infocenter clresctr vxrx topic com ibm cluster csm doc clusterbooks html aix_lin ux17 e For online documentation go to http publib boulder ibm com infocenter clresctr vxrx index jsp 2 2 Fabric communications function overview The Fabric communications section describes the main components involved in application data flow There are several figures illustrating overall data flow and software layers in an IBM System p High Performance Computing HPC cluster with an InfiniBand fabric It is highly recommended that you also review the following types of material to better understand InfiniBand fabrics More specific documentation references can be found in Information resources on page 14 l The InfiniBand standard specification from the InfiniBand Trade Association 2 Documentation from the switch vendor The following table lists the main components in fabric data flow and where to find an overview of them in this document Table 6 Main components in fabric data flow Component Reference IBM Host Channel Adapters HCAs IBM GX GX HCA on page 21 Vendor Switches Vendor switch on page 23 Cables Cabl
117. DHCP on the CSM MS a Install the CSM management server system hardware b Update the operating system on the CSM management server Copyright IBM Corp 2008 7 22 08 101 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware c Install the CSM code on the CSM management server d As appropriate enable the CSM management server as the DHCP server for the service VLAN and the cluster VLAN If you are using a separate DHCP server perform this step on that server instead of the CSM management server Define the subnet ranges for the service and cluster VLANs If you are using a separate DHCP server perform this step on that server instead of the CSM management server Ph Configure the DHCP ranges for the servers and BPCs If you are using a separate DHCP server perform this step on that server instead of the CSM management server g Add the planned static IP addresses for the HMCs to the Cluster Ready Hardware Server peer domain 3 Do not proceed until the service and cluster VLANS Ethernet devices have been installed and configured as in Install and configure Service VLAN devices on page 99 4 CM3 M3 Cable the CSM Management Server to the service and cluster VLANs If you are using a separate DHCP server cable it to the appropriate VLANs too 5 CM4 M4 Start the DHCP server on the CSM Management Server or if applicable on aseparate DHCP server This step blo
118. Fabric Guide using InfiniBand Hardware ii Now you may check the interfaces for the HCA devices ibx and ml0 using netstat in grep v link awk print 1 2 The results should look like the following where the MTU value is in the second column Name Mtu en2 1500 ib0 65532 ibl 65532 ib2 65532 ib3 65532 ib4 65532 ib5 65532 ib6 65532 ib7 65532 ml0 65532 100 16896 100 16896 Note If you have a problem where the MTU value is not 65532 you must follow the recover procedure in Recovering ibX interfaces on page 212 f If you are running a host based Subnet Manager to check multicast group creation on the Fabric Management Server run saquery for the specific subnet Remember that you must provide the HCA and port through which the Subnet Manager connects to the subnet sbin saquery o mcmember h HCA p HCA port Each interface will produce an entry like the following Note the 4K MTU and 20g rate GID Oxff12601bffff0000 0x0000000000000016 PortGid O0xfe80000000000000 0002550070010 00 MLID 0xc004 PKey Oxffff Mtu 4096 Rate 20g PktLifeTime 2147 ms QKey 0x00000000 SL 0 FlowLabel 0x00000 Hophimit Oxff TClass 0x00 Note You can check for misconfigured interfaces using something like the following which looks for any Mtu that is not 4096 or rate is 10g sbin saquery o mcmember h HCA p port egrep B 3 A 1 Mtu 0 3 Rate 10g 4 If you are running an embedded Subnet Manager to che
119. Guide x x x JS22 IBM GX HCA Custom Install Instructions one for each HCA feature x x x Custom Install http w3 rchland ibm com projects W CID BladeCenter Users Guide x x x JS22 HCA Dale Weiler 1350 documentation Mellanox pass thru 1350 docs BOM amp Mark Smolen x x x module Fabric IBM System x 3550 amp 3650 documentation Management Server Management HCA vendor documentation x x x Node HCA QLogic Switch Model Users Guide x X x switches Switch Model Quick Setup Guide xX x QLogic InfiniBand Cluster Planning Guide xX X QLogic InfiniBand Cluster Troubleshooting Guide xX QLogic 9000 CLI Reference Guide xX X The base IBM system p POWER6 documentation will be available in the IBM systems Resource Link found in http www ibm com servers resourcelink where you should start with the Library Resource Link access requires an IBM Registration ID IBM ID The QLogic documentation is initially available from QLogic support Check the JBM Clusters with the InfiniBand Switch web site for any updates to availability on a QLogic web site Any exceptions to the location of information resources for cluster hardware as stated above have been noted in the table Note QLogic uses Silverstorm in their product documentation 2 1 3 Cluster management software information resources Cluster Management Software Information Resources are found in the following Table 4 Cluster Management Software I
120. HCAs 8204 E8A or 8203 E4A Broadcast MTU 2K 4 BC Rate 10GB 3 for SDR switches or 20GB 6 for DDR switches Homogeneous ConnectX HCA only Chassis MTU 2K 4 HCAs Broadcast MTU 2K 4 BC Rate 10GB 3 for SDR switches or 20GB 6 for DDR switches Heterogeneous GX HCA in 9125 F2A Chassis MTU 4K 5 Between HCAs compute servers and GX Broadcast MTU 2K 4 compute HCA in 8204 E8A or BC Rate 10GB 3 8203 E4A GPFS servers POWER6 GX HCA Chassis MTU 4K 5 Between HCAs compute amp P5 HCA Broadcast MTU 2K 4 POWER6 GPFS servers BC Rate 10GB 3 Heterogeneous ConnectX HCA compute Chassis MTU 2K 4 HCAs amp P5 HCA GPFS servers Broadcast MTU 2K 4 BC Rate 10GB 3 The configuration settings for fabric managers planned here should be recorded in the QLogic Fabric Management worksheets on page 79 The configuration settings for switches planned here should be recorded in the QLogic Switch planning worksheets on page 74 Planning MTU ends here 3 4 1 2 Planning GID Prefixes This section briefly describes why and how to plan for fabric GID prefixes in an IBM System p HPC Cluster Each subnet in the InfiniBand network must be assigned a GID prefix which will be used to identify the subnet for addressing purposes The GID prefix is an arbitrary assignment with a format of XX XX XX XX XX XX XX XX For example FE 80 00 00 00 00 00 01 The default is FE 80 00 00 00 00 00 00 T
121. IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware LY 1 of 238 Copyright IBM Corp 2008 7 22 08 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 1 0 Document overview ccccccccccccccccccccccccccccccccccccccccccccccccccccccces LD 2 0 Clustering systems using InfiniBand hardware 0 14 2 1 Information resources cccccccssccccccscscccccccccccccccceccccccccecccccccccccccocceee LF 2 1 1 General cluster information resources ao csesdeecssecacesdWeccgesceccsractsedddbwonceerseeale 15 2 1 2 Cluster hardware information resources c ccccceeeseceseceeeeeesceceseeesseceteeeeaeeesees 15 2 1 3 Cluster management software information reSOUFCES eceseeeteeneeeeeeeeeteeeaes 16 2 1 4 Cluster software and firmware information reSOULCeS cccesseeeteceeeeeeeeeeeees 17 2 2 Fabric communications FUNCTION overview ccccccccccccccccccccscccccseee LS Did IBM GX GX ACA visa cae ieee A Adi pasar ease Atanas E es atesens Mase OA 21 2 2 1 1 Logical Switch naming convention sc cscsssssssssssssssssssssssesssssssssesssssssssssssssssiesssssssuneesssen 22 2 2 1 2 ICA StatisticS COUN EA E a a aa EE a aE E EO EE TAE E aaae 23 222 Nendor SWINE Sa teera e e e e a a agen AE ETa a TEE E EER 23 2 2 3 QLogic switches supported by IBM ya ieic tasels eae scsessoaavs Necsutleseelivdeatergass 23 22 A C blE Sirnarasa enea aaa alan a Ea aa
122. IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e Setup a sensor for syslog fabric notices file by copying the default and changing the default priority filter and monitored file as lsrsrc i s Name AIXSyslogSensor IBM Sensor gt tmp AIXSyslogSensorDef ii modify the tmp AIXSyslogSensorDef file by updating the Command attribute to opt csm csmbin monaixsyslog p local6 notice f var log csm syslog fabric notices ili Remove the old sensor rmsensor AIXSyslogSensor iv Make the new sensor and keep its scope local CT_MANAGEMENT_SCOPE 0 mkrsrc f tmp AIXSyslogSensorDef IBM Sensor Note Local management scope is required or you will get an error indicating that the node CSM MS is not in the NodeNameList V Run opt csm csmbin monaixsyslog f var log csm syslog fabric notices p local6 notice vi Wait about two minutes and check the etc syslog conf file The sensor should have placed the following line in the file The sensor s default cycle is to check the files every 60 seconds The first time it runs it recognizes that it needs to setup the syslog conf file with the following entry local6 notice var log csm syslog fabric notices rotate size 4m files 1 f Setup the condition for the above sensor and link a response to it Note The method documented here is for a CSM MS that has NOT been defined as a managed node If the CSM MS is defined as a managed node you will not set the condition
123. InfiniBand switch installation and configuration for vendor switches EE A S E E EE EEE E ES 129 4 7 1 InfiniBand switch installation and configuration information for expansion 129 4 7 2 InfiniBand Switch installation and configuration procedure cceeeeee 129 4 8 Attach cables to the InfiniBand network cscscscssscessseesees 134 4 8 1 Cabling the InfiniBand network information for expansion cesses 134 4 8 2 InfiniBand network cabling procedure 0 cccecceesceeseeeteceseeeeeeeeseecsaeenteeeees 134 4 9 Verify the InfiniBand network topology and operation 136 4 10 Installing or replacing an InfiniBand GX host channel adapter 139 4 10 1 Deferring replacement of a failing host channel adapter eee 140 4 11 Verifying the installed InfiniBand network fabric in AIX or Copyright IBM Corp 2008 7 22 08 5 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 4 11 2 Verifying the GX HCA to InfiniBand fabric connectivity in Linux 142 4 12 Fabric verification oicitsscsccsscccanccacssavessuassacanssseuasssdonnssceeacssseusasvounnseees 142 4 12 1 Fabric verification responsibilities ccs 2sssacssccssancessasexceassazssdastavsecerbanonsdanseed 142 4 12 2 Reference documentation for Fabric verification procedures cee 142 4 12 3 Fabric v rific tion TASKS csyiisorcauncs ener deeauessreatancd cass niseenSnuatdesemndanc t
124. Monitoring Best practice for monitoring the fabric Re configuring CSM event management on page 209 procedures Monitoring fabric logs from CSM MS on page 150 General monitoring for problems How faults are reported Diagnosis procedures Monitoring Fabric for Problems on page 149 Fault reporting mechanisms on page 165 Diagnosing symptoms Table of symptoms on page 169 Capturing data for fabric diagnosis Capturing data for fabric diagnosis on page 174 Capturing data for Fabric Manager or Fast Fabric software problem Capture data for Fabric Manager and Fast Fabric problems on page 176 How to map devices from reports to physical devices Mapping fabric devices on page 177 How to interpret the switch vendor log formats Interpreting switch vendor log formats on page 188 Copyright IBM Corp 2008 7 22 08 172 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Task Diagnosing link errors Procedure Diagnosing link errors on page 191 Diagnosing switch internal problems Diagnosing and repairing switch component problems on page 194 Diagnosing IBM system problems Diagnosing and repairing IBM system problems on page 194 Diagnosing configuration changes from health check Diagnosing configuration changes on page 194 Diagnosing performance problems Diagnosing performance problems on page 200 Diagnosi
125. Rs Using the first seven bytes of the GUID will allow for a match to be made when you do not have the port GUID information available from the ibv_devinfo v command gt dsh av usr bin ibv_devinfo n grep node_guid grep 1st seven bytes of GUID You should have enough information at this point to identify the physical HCA and port with which you are working Once you know the server in which the HCA is populated you can issue an ibv_devinfo i port number to the server and get the information on exactly which HCA matches exactly the GUID that you have in hand End of Linux LPAR section 6 9 2 Finding devices based on a known logical switch Use this procedure if the logical switch in an HCA is known and the attached switch and physical HCA port must be determined This applies to IBM GX HCAs For more information on the architecture of IBM GX HCAs and logical switches within them see IBM GX GX HCA on page 21 Note This procedure has some steps that are specific to operating system type AIX or Linux This has to do with querying the HCA device from the operating system For AIX the adapter is called ibaX where X is a number 0 through 3 For Linux the adapter is call ehcaX where X is a number 0 through 3 For example a log entry like the following is reported with the Logical switch port being reported Here the Logical switch information is underlined and in bold Note the Node type in italics to the InfiniBand
126. S and the source Note If you are using CSM on SLES10 SP1 or higher you must assure that syslog ng is given read write permission through AppArmor to the named pipe var log csm syslog fabric notices If you have a problem with event management or remote syslogging picking up Subnet Manager or switch events use this procedure Start with the table of symptoms below Symptom Procedure Event is not in the var log csm errorlog CSM MS i hostname on the CSM MS Event not in CSM MS var log csm errorlog on page 203 Event is not in Var log csm syslog fabric notices on the Event not in CSM MS CSM MS var log csm syslog fabric notices on page 204 Event is not in War log csm syslog fabric info on the CSM MS Event not in CSM MS var log csm syslog fabric info on page 206 Event is not in the log on the Fabric Management Server Event not in log on fabric management server on page 208 Event is not in the log on the switch Event not in switch on page 209 Copyright IBM Corp 2008 7 22 08 202 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 26 1 1 Event not in CSM MS var log csm errorlog If the event is not in the var log csm errorlog CSM MS hostname file do the following l 2 Log on to the CSM MS Start by looking at the log on the device that is logging the problem and make sure that it is there a For the Fabric Management Server look at the war log messages file
127. Server e System management applications HMC and CSM Where Fabric Manager will run host based HSM or embedded ESM Fabric Management Server for HSM and Fast Fabric Toolset Physical dimension and weight characteristics Electrical characteristics Cooling characteristics Ensure that you have required levels of supported firmware software and hardware for your cluster See Required Level of support firmware and devices on page 39 Review cabling and topology documentation for InfiniBand networks provided by the switch vendor Review Planning Installation Flow on page 59 Review Important information for planning an HPC MPI configuration on page 66 If using 12x HCAs review Planning 12x HCA connections on page 67 Review Planning Aids on page 68 Complete planning worksheets Copyright IBM Corp 2008 7 22 08 69 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Complete planning process Review readme files and online information related to the software and firmware to assure that you have up to date information and the latest support levels Planning checklist ends here 3 12 Planning worksheets The planning worksheets should be used for planning your cluster Tip It is best to keep the sheets somewhere that is accessible to the system administrators and service representatives for not only the install but also for future reference during maintenance upgrade or repair actions
128. Such information may be available subject to appropriate terms and conditions including in some cases payment of a fee The licensed programs described in this document and all licensed material available for it are provided by IBM under terms of the IBM Customer Agreement IBM International Program License Agreement or any equivalent agreement between us Any performance data contained herein was determined in a controlled environment Therefore the results obtained in other operating environments may vary significantly Some measurements may have been made on development level systems and there is no guarantee that these measurements will be the same on generally available systems Furthermore some measurement may have been estimated through extrapolation Actual results may vary Users of this document should verify the applicable data for their specific environment Information concerning non IBM products was obtained from the suppliers of those products their published announcements or other publicly available sources IBM has not tested those products and cannot confirm the accuracy of performance compatibility or any other claims related to non IBM products Questions on the capabilities of non IBM products should be addressed to the suppliers of those products All statements regarding IBM s future direction or intent are subject to change or withdrawal without notice and represent goals and objectives only This information contai
129. SystemX 3550 or 3650 Frame Number of PCI slots Number of HCAs Primary Backup NA HSM Primary data collection point yes no Local syslogd is syslog syslog ng or other CSM Server Address es for remote logging Using tcp or udp for remote logging NTP server Subnet Management Plannin Subnet Subnet Subnet Subnet Subnet Subnet Subnet Subnet HCA number HCA port GID prefix Broadcast MTU put rate in parantheses node_appearance_msg thresh 10 10 10 10 10 10 10 10 Primary Switch Priority Backup Switch Priority Backup Switch Priority Backup Switch Priority Fast Fabric Toolset Planning Host based or embedded SM for FF ALL ANALYSIS List of switch chassis List of switches running embedded SM if applicable Subnet connectivity planning is in Subnet Management Planning above Chassis list files Host list files Notes Copyright IBM Corp 2008 7 22 08 235 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 8 0 Appendix Notices This information was developed for products and services offered in the U S A IBM may not offer the products services or features discussed in this document in other countries Consult your local IBM representative for information on the products and services currently available in your area Any reference to an IBM
130. The Subnet Manager log format 6 11 1 Log severities IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following table illustrates the log severity levels used by QLogic switches and Subnet Managers These severities are standard syslog priority levels Priority is the term that is used to refer to severity in a syslog entry Table 26 QLogic Log Severities Severity Significance Example Error Acaorable events Voltage level is outside acceptable Need immediate action 4 Have severity level above Information Notice and operating rango Warning Temperature went above critical Logged to CSM event management threshold Warning ears sates FRU state changed from online to a ction can be deferred ffi Have severity level above Information Notice and anne below Error Power Supply N 1 redundancy not Logged to CSM event management available Notice E e eveuls Switch chassis management Could be a result of user action or actual failure 5 7 software rebooted Have severity level above Information and below Warning and Error FRU state changed from not present Logged to CSM event management to present Events which do not require any action Information Have severity level below Notice Warning and ECS passes HOST Error telnetd connection requested by Provide advanced level of engineering debug lt ip_address gt information useful for postmortem analysis Optionally
131. The old baseline is a group of files in var opt iba analysis baseline Run all_analysis b Check the new output files in var opt iba analysis baseline to verify that the configuration is as you expect it Refer to the Fast Fabric Toolset Users Guide for details 6 31 Verifying link FRU replacements This procedure is used to verify Link FRU replacements This procedure relies on you having recorded the LED states before the fix I 2 3 E s oS OY N Proceed only if you have replaced a Link FRU Check the LEDs on either side of the cable If the LEDs are not lit the problem is not fixed Return to the fault isolation procedure that sent you here Otherwise proceed to the next step If the LEDs were not lit before replacing the cable and they are now lit the problem is fixed Return to the fault isolation procedure that sent you here Otherwise proceed to the next step Log on to the Fabric Management Server or have the customer log on and perform the remaining steps Run sbin iba_report o errors C to check and clear the error counters Wait several minutes to allow new errors to accumulate Run sbin iba_report o errors again If the link reports errors the problem is not fixed Otherwise the problem is fixed Copyright IBM Corp 2008 7 22 08 217 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 10 This procedure ends here Return to the fault isolation procedure that sent you her
132. This will be a total of four managed spines o Each managed spine gets its own management Ethernet address o The chassis will have two management Ethernet addresses One for each hemisphere o Review the 9240 Users Guide to assure that you understand which spine slots are used for managed spines The total number of management Ethernet addresses is driven by the switch model o 9024 has one address o 9240 has from 4 no redundancy to 6 full redundancy addresses Copyright IBM Corp 2008 7 22 08 41 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware o All other models have from 2 no redundancy to 3 addresses For topology and cabling see Planning InfiniBand network cabling and configuration on page 40 Chassis Maximum Transfer Unit MTU must be set to an appropriate value for each switch in a cluster For more information on this see Planning MTU on page 42 For each subnet you will need to plan a different GID prefix see Planning GID Prefixes on page 43 You should assign a name to each switch It should be something that indicates its physical location on a machine floor You may wish to include the frame and slot in which it resides The key is a consistent naming convention that is meaningful to you and your service provider If you have a 4x switch connecting to 12x HCA you will require al2x to 4x width exchanger cables For more details see Planning 12x HCA connections on page 67 Whil
133. Toolset Users Guide b Look for errors and fix any that you find see Table of symptoms on page 169 c Ifyou did not use the e parameter look for configuration changes and fix any that you find see Finding and Interpreting Configuration Changes on page 162 This procedure ends here 6 34 Rebooting Powering off an IBM System If you are rebooting or powering off an IBM system for maintenance or repair use the following procedure to minimize impacts on the fabric and to verify that the system s HCAs have rejoined the fabric 1 Reboot the IBM system a Errors will be logged for the HCA links going down and for the logical switches and logical HCAs disappearing b If you wish you can assure that the number of devices disappearing corresponds to the appropriate number relative to the number of HCAs that you have in your IBM system s that has been Copyright IBM Corp 2008 7 22 08 219 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware rebooted see Counting Devices on page 220 In this way you will assure that nothing disappeared from the fabric that was not in the rebooted IBM system s or connected to the IBM system s If you do not check this at this time the health check done further down in this procedure will check for any missing devices but detection of the problem will be delayed until after the IBM system s has rebooted c If devices disappear that are not in the IBM system s or
134. Verify that all servers are powered on Run the command dsh av lsdev Cc adapter grep sn grep v Available This command returns a list of HCAs that are visible to the system but not available Reboot any LPAR linked to an HCA that is listed as not available Check SFP and HPSNM for errors related to the links associated with any HCA listed as not available When all HCAs are listed as available to the operating system continue with the procedure to verify HCA numbering and the netid for LPAR Check HCA allocation across LPARs For HPC Cluster there should only be one active LPAR and the HCA should be Dedicated to it Assure that the fabric is balanced across the subnets The following command string gathers the GID prefixes for the ib interfaces These should be consistent across all LPARs Copyright IBM Corp 2008 7 22 08 196 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware dsh av netstat i grep ib link awk split 4 a for i 5 i lt 12 i printf a i printf n 15 Verify that the tcp_sendspace and tcp_recvspace attributes are set properly rn dsh av ibstat v grep tcp _send tcp_recv Because superpackets should be on the expected attribute value results are tep_sendspace 524288 and tep_recvspace 524288 16 Verify that the IP MTU is configured properly All ibX interfaces should be defined with superpacket on which will result in an IP MTU
135. X HCA can also be configured to support up to 16 LHCAs In this case the HCA presents each physical port to the Subnet Manager as a 17 port logical switch with up to 16 LHCAs Ultimately the number of ports for logical switch is dependent on the number of LPARs concurrently using the GX HCA The Power 5 GX HCA supports up to 64 LHCAs In this case it presents each physical port to the Subnet Manager as a 65 port logical switch where port connects to the physical port and 64 ports connect to LHCAs As opposed to how it works on POWER6 systems for Power 5 systems it does not matter how many logical HCAs are actually defined and used by Logical Partitions The number of nodes presented includes all potential logical HCAs for the Copyright IBM Corp 2008 7 22 08 21 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware configuration therefore each physical port on a GX HCA in a Power 5 system presents itself as a 65 port logical switch The Hardware Management Console HMC that manages the server in which the HCA is populated is used to configure the virtualization capabilities of the HCA Each logical partition is only aware of its assigned logical HCA For each partition profile a GUID is selected with a logical HCA The GUID is programmed in the adapter itself and cannot be changed Since each GUID must be different in a network the IBM HCA gets a subsequent GUID assigned by the Firmware You can choose the offset
136. a eni 23 2 2 5 Subnet Maaget scann nnosioni idna i n a a a a 24 2 DOP O Wer Hypervisot z resi hig ees a Silas a a ole as cei R Sa Gans 24 22 rIBM deyice CIUIVETS sce coat tate Gs eat ioe AN tat Ai Ae Ga tase bY Madea SE fas 24 2 2 8 Non IBM device drivers 5 cciysssesctedscheciaasdsceeiiaideceasusesstedoeseiGiusdectientereedeatectanssees 24 2 29 IBM host stack idoira natera i a e a a aa aaia 24 2 3 Management subsystem function overview sssssesesssooecssssocceessssesees 2D 2 3 1 Management subsystem integration recommendations ceecceseeeteeneeeeeeeee 25 2 3 2 Management subsystem high level functions seseseseeeeeseeesessreresrsreseserreresrses 25 2 3 3 Management subsystem Overview ssessssssesseserssresseserssressessrssressessresresseesees 26 2 3 3 1 Switch Chassis Viewer Overvie W orriren n a 29 233 2 SWIUCH CL Oyervie Wisemen e th wie ev ewer ein ce a a a E RED e e a 29 2 3 33 Fabric Manag r Overview sasiore sianakt Ens ai i EEES E EEE erite 30 2 3 3 4 Fast Fabric Toolset OvervieW scccssccessceessecesnceenseceencecsseceencecsaecseneecsaecseaeeseeeeeaeeceeeeeaaes 31 233 3 CSM OVvervl Wescvans te lt eccek sa casts tu she aes te eat e aa eae 31 2B DsO gt HMG OVOP inoseni aeina ies Lee E EES See a asa ca So ceca a Stings Sac ag seg a ov uc EAE 32 DB 3 7 FSP OVO View assavsvccccciectiascenstconcpeectenstcceagestsanadents vad cabeecuvndbeooiseatdaeuersuscadedadcscadeotaevasecpescss 32 C
137. a little differently than with a new cluster flow The flow for Server installation and configuration is based on a new cluster installation but it will indicate where there are variances for expansion scenarios The following table outlines how the new cluster installation is affected altered by expansion scenarios Scenario Effects e Configure the LPARs to use the HCAs Adding InfiniBand hard t aie Phair PRs ua earn e Configure HCAs for switch partitioning existing cluster switches and HCAs e Perform this procedureas if it were a new cluster Adding new servers to an existing installation InfiniBand network e Perform this procedure as if it were a new cluster Adding HCAs to an existing InfiniBand installati n network e Configure the LPARs to use the new HCA ports e Configure the newly cabled HCA ports for switch partitioning Adding a subnet to an existing InfiniBand network e Perform this procedure as if it were a new cluster Adding servers and a subnet to an installation existing InfiniBand network Copyright IBM Corp 2008 7 22 08 125 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 6 2 Operating System installation and configuring the cluster servers procedure 1 S6 Customize LPARs and HCA configuration Note When setting up the LPAR profiles you must configure the HCAs using the procedure found in Installing or replacing a
138. abric Management Server may be leveraged from the CSM MS However the system administrator may also choose to do such things by directly logging on to switches or Fabric Management Servers Hosts More details about the components illustrated in Figure 5 Management Subsystem Functional Diagram on page 27 are available in the following table and sub sections Copyright IBM Corp 2008 7 22 08 27 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The Table 7 Management subsystem server consoles and workstations on page 28 is a quick reference for the various management hosts or consoles in the cluster including who is intended to use them as well as the networks to which they are connected The subsequent sub sections describe the applications that run on the servers and consoles described in Table 7 Management subsystem server consoles and workstations Table 7 Management subsystem server consoles and workstations Hosts Software Hosted Server Type Operating User s Connectivity System CSM MS Cluster System IBM Systemp AIX or 1 Admin 1 Cluster VLAN Manse MEN eM IBM System x ma 2 Service VLAN Fabric 1 Fast Fabric Tools IBM System x Linux 1 Admin 1 InfiniBand Managemen 2 Host Based Fabric 2 Switch 2 Cluster VLAN Server Manager service same as Recommended provider switches 3 Fabric Viewer optional HMC Hardware Management IBM system x prop
139. abric Toolset on page 54 3 Planning for Fabric Management Server on page 55 3 5 2 1 Planning Fabric Manager and Fabric Viewer Most details are available in the Fabric Manager and Fabric Viewer Users Guide from QLogic This section will highlight important information from a cluster perspective The Fabric Viewer may be used as documented by QLogic The Fabric Manager has a few key parameters that should be setup in a specific manner for IBM System p HPC Clusters Here are key points to planning your fabric manager in an IBM System p HPC Cluster Note Refer to Figure 7 Typical Fabric Manager Configuration on a single Fabric Management Server on page 49 and Figure 8 Typical Fabric Management Server configuration with 8 subnets on page 50 for illustrations of typical fabric management configurations IBM has only qualified use of a host based fabric manager HFM The HFM is more typically referred to as host based Subnet Manager HSM because the Subnet Manager is generally considered the most important component of the fabric manager The host for HSM is the Fabric Management Server see Planning for Fabric Management Server on page 55 o The host requires one HCA port per subnet to be managed by the Subnet Manager o Ifyou have more than 4 subnets in your cluster you should have 2 hosts actively servicing your fabrics To allow for backups you would require up to 4 hosts to be Fabric Management Servers That would
140. age 194 Security Errors on switch or HCA Call your next level of support t ee Bare If anything is done to change the hardware or software configuration for the fabric use Re establishing Health Check baseline on page 217 Other Exceptions on switch or HCA Call your next level of support ports If anything is done to change the hardware or software configuration for the fabric use Re establishing Health Check baseline on page 217 Events where the Subnet Manager First check for problems on the switch or the server on which the Subnet SM is the node responsible for the Manager is running If there are no problems there contact QLogic problem If anything is done to change the hardware or software configuration for the fabric use Re establishing Health Check baseline on page 217 Copyright IBM Corp 2008 7 22 08 169 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following table is used for any symptoms observed using hardware LEDs on HCAs and switches These include switch LEDs that are virtualized in the Chassis Viewer Table 18 Hardware or Chassis Viewer LEDs Table of symptoms Symptom Procedure Reference LED not lit on switch port See Diagnosing link errors on page 191 LED not lit on HCA port See Diagnosing link errors on page 191 Red LED that is not on a switch port or HCA See the Switch Users Guide and the QLogic Troubleshooting Guide
141. agers see Fabric Management Server Installation on page 103 For embedded Subnet Managers see InfiniBand switch installation and configuration for vendor switches on page 129 If you had previously defined the HCA devices remove them using the following for i in lsdev grep Infiniband awk print 1 do rmdev 1 i d done Note The above for loop will remove all of the HCA devices To remove a specific device like ib0 simply use the rmdev 1 ibo d where x the HCA device number Run cfgmgr Run mkdev for the icm Run mkiba for the devices After the HCA device driver is installed and mkiba is done run the following to set the device MTU to 4K and turn enable super packets for iin lsdev grep Infiniband awk print 1 egrep v iba icm do Copyright IBM Corp 2008 7 22 08 215 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware chdev l i a superpacket on a tcp _recvspace 524288 a tcp _sendspace 524288 a srq size 16000 a state up done Note The above for loop works will modify all of the HCA devices To modify a specific device like ib0 use chdev l ibO a p_key 0xffff a q key 0 a superpacket on a state up 3 Verify the configuration a Verify that the device is set to superpackets on for iin lsdev grep Infiniband awk print 1 egrep v iba icm do echo i lsattr El i egrep super done Note To verify a single device like ib0 use lsa
142. al6 and level notice alert warn err crit and not filter f iptables 6 restart syslogd using etc init d syslog restart 7 Setup the ErrorLogSensor again a Copy old sensor into a new definition file using lsrsre i s Name ErrorLogSensor IBM Sensor gt tmp ErrorLogSensorDef b Edit tmp ErrorLogSensorDef c Change Command to opt csm csmbin monerrorlog p f_fabnotices f var log csm syslog fabric notices d Only after creating and editing tmp ErrorLogSensorDef may you remove the sensor by using rmsensor ErrorLogSensor Note If the sensor did not exist you may still continue to the next step e Make the ErrorLogSensor and keep the management scope local CT MANAGEMENT SCOPE 0 mkrsrc f tmp ErrorLogSensorDef IBM Sensor f Note Local management scope is required or you will get an error indicating that the node CSM MS is not in the NodeNameList Run opt csm csmbin monerrorlog f var log csm syslog fabric notices p f fabnotices Copyright IBM Corp 2008 7 22 08 210 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note Notice that the p parameter points to the f_fabnotices entry that was defined in etc syslog ng syslog ng conf g Ifyou get an error back from monerrorlog indicating a problem with syslog there is probably a typo in the etc syslog ng syslog ng conf file The message will have a form like the following The key is that syslog is in the erro
143. alth check should have been taken to allow a comparison of the current configuration with a known good configuration see Re establishing Health Check baseline on page 217 Comparison results will reveal configuration changes After performing a current health check all_analysis you will go to the analysis directory Wvar opt iba analysisNatest and look for files ending in diff Using the Fast Fabric Toolset Users Guide you can determine what information is contained within each file This will allow you to determine what has changed If nothing should have changed then you will need to change back to the original configuration If the configuration changes that were found are legitimate then a new baseline should be taken using the procedure in Re establishing Health Check baseline on page 217 Copyright IBM Corp 2008 7 22 08 162 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 9 Hints on using iba_report While under most monitoring circumstances you can rely on health checks as in Health Checks on page 151 you may have occasion to do some more advanced monitoring using iba_report on the fabric management server Some suggested parameters are in the following table You can use these parameters of iba_report to get detailed information Some examples of a few uses of iba_report follow the table This is not meant to provide exhaustive coverage of iba_report Instead it provides a few examples intended
144. and FE 0 For each Fabric Management Server plan which HCA and HCA port on each will connect which subnet You will need this to point each fabric management instance to the correct HCA and HCA port so that it will manage the correct subnet This is specified individually for each component However it should be the same for each component in each instance of fabric manager Otherwise you could have the SM component of the fabric manager 0 manage one subnet and the PM component of the fabric manager 0 managing another subnet This would make it very confusing to try to understand how things are setup Typically instance 0 will manage the first subnet which will typically be on the first port of the first HCA and instance will manage the second subnet which will typically be on the second port of the first HCA and instance 2 will manage the third subnet which will typically be on the first port of the second HCA and instance 3 will manage the fourth subnet which will typically be on the second port of the second HCA Plan for a backup Fabric Manager for each subnet o Assign priorities for each Subnet Manager instance so that you have a master and backup takeover scheme The master has the highest priority number The lowest priority is 0 and the highest priority is 15 Typically you will only have a single backup for each subnet so you will typically use priority number for the master and priority number 0 for the backup o This
145. and logical switches within them see IBM GX GX HCA on page 21 Note This procedure has some steps that are specific to operating system type AIX or Linux This has to do with querying the HCA device from the operating system For AIX the adapter is called ibaX where X is a number 0 through 3 For Linux the adapter is call ehcaX where X is a number 0 through 3 For example if there is a problem with ib0 use the following procedure to determine the physical HCA port and physical switch port associated with the problem 1 Record the ib interface number and server For example ibl on c924flec09 2 Logon to the server with the ib interface of interest 3 From netstat get the Logical HCA GUID associated with the ib interface For AIX use netstat I ib interface you will need to add leading zeroes to bytes that are returned with single digits You need the last 8 bytes of the Address Example results gt netstat I ibl Name Mtu Network Address Ipkts Ierrs Opkts Oerrs Coll ibl 65532 link 3 0 0 0 b fe 80 0 0 0 0 0 1 0 2 55 0 10 24 d9 1 65 0 7 0 0 ibl 65532 192 168 9 192 168 9 65 65 0 7 0 0 GUID 0 2 55 0 10 24 d9 1 00 02 55 00 10 24 d9 01 For Linux use ifconfig ib interface Example results gt ifconfig ib0 grep inet inet6 addr fe80 202 5500 1024 d900 64 Scope Link GUID 02 5500 1024 d900 gt add the leading zeroes to get 0002 5500 1024 d900 Copyright IBM Corp 2008 7 22 08 185 of 238
146. anning Installation Flow on page 59 This helps you understand how various tasks relate to each other as well as who needs to do what Finally it illustrates how certain tasks are prerequisites to others With that information you can coordinate the installation team in a more efficient manner Copyright IBM Corp 2008 7 22 08 12 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Content Description Planning worksheets on page 70 Planning worksheets are intended to cover the important cluster aspects that affect the cluster fabric You may have other worksheets you wish to use but they should cover the information in the provided worksheets These are duplicated at the end of the document to make it easier to copy them Other planning There are other planning sections that are referenced by the previous sections Installing an HPC Cluster that has an InfiniBand network on page 92 Procedures for installing the cluster Cluster Fabric Management on page 145 Contains best practices and tasks for managing the fabric Cluster service on page 165 Contains high level service tasks This is intended to be the launch point for servicing the cluster fabric components Planning and Installation Worksheets on page 225 Another place for the planning worksheets The intention is to make these easier to copy than the versions in the planning overvie
147. arget subsets of switches if you don t require information from all of the switches e By default the results will go into uploads directory which is below the current working directory For a remote execution this should be the root directory for the user which is most often root This could be something like uploads or home root uploads it depends on the user setup on the Fabric Management Server This directory will be references as lt captureall_dir gt 5 Copy data from the primary data collection Fabric Management Server to the CSM MS Copyright IBM Corp 2008 7 22 08 174 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware a Make a directory on the CSM MS to store the data This will also be used for IBM systems data For the remainder of this procedure the directory will be referred to as lt captureDir_onCSM gt b Run dcp d c lt captureall_dir gt lt captureDir_onCSM gt 6 Copy health check results from the Primary Fabric Management Server to the CSM MS You will copy over the baseline health check and the latest It is also advisable to copy over any recent health check results that contain failures a Make a baseline directory on the CSM MS mkdir lt captureDir_onCSM gt baseline b dcp d lt captureDir_onCSM gt baseline var opt iba analysis baseline lt captureDir_onCSM gt baseline c Make a latest directory on the CSM MS mkdir lt captureDir_onCSM gt latest d dcp d lt
148. as prescribed in InfiniBand switch installation and configuration for vendor switches on page 129 1 If this is a switch to switch link use the troubleshooting guide from QLogic Engage QLogic service and exit this procedure 2 If this is an IBM HCA to switch link continue to the next step 3 Map the IBM HCA GUID and port information to a physical location and determine the switch physical location using the procedure in Mapping fabric devices on page 177 4 Before proceeding check for other link problems in the CSM Event Management Log 5 If there is an appearance notification after a disappearance notification for the link it is quite possible that the HCA link bounced or the node has rebooted 6 If every link attached to a server is reported as down or all of them have been reported disappearing and then appearing do the following Copyright IBM Corp 2008 7 22 08 191 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware a Check to see if the server is powered off or had been rebooted If this is true the link error is not a serviceable event therefore you should end this procedure b The server is not powered off nor had it been rebooted The problem is with the HCA Replace the HCA using the Repair and Verify procedures on the HMC which manages the server in which the HCA is populated and exit this procedure 7 Ifevery link attached to the switch chassis has gone down or all
149. as the data IBM recommends using a host based Subnet Manager HSM which will run a Fabric Management Server The host based Subnet Manager scales better than the embedded Subnet Manager and IBM has verified and approved the HSM See also Management subsystem on page 25 For more information on Subnet Managers see the InfiniBand standard specification or vendor documentation 2 2 6 Power Hypervisor The Power Hypervisor PHyp provides an abstraction layer between the hardware firmware and the operating system instances It provides functions to exploit Power 6 GX HCA implementations e UD Low Latency Receive Queues e Large page memory sizes e Shared Receive Queues SRQ e Support for more than 16K Queue Pairs QP The exact number of QPs will be driven by cluster size and available system memory PHyp also contains the Subnet Management Agent SMA to communicate with the Subnet Manager and present the HCA as logical switches with a given number of ports attached to the physical ports and to logical HCAs For more information see IBM GX GX HCA on page 21 Furthermore PHyp contains the Performance Management Agent PMA used to communicate with the Performance Manager which collects fabric statistics such as link statistics including errors and link usage statistics For more information on SMA and PMA function see the InfiniBand architecture document available 2 2 7 IBM device drivers IBM provides device drivers used in AIX
150. asks relate to key tasks illustrated in Figure 10 Management Subsystem Installation Tasks on page 97 Ethernet Devices Perform Tasks Perform Tasks Perform Tasks Perform Tasks H1 through H7 El and E2 CM through CM3 F1 through F7 Cable HMCs to the service Ethernet Cable CSM MS to Cable Fabric MS to network the service VLAN the service VLAN Cable switches to Fabric MS service ethernet config amp verification L4 Setup SFP monitoring on CSM Setup Remote Logging on CSM Setup Remote Setup Remote Logging from Logging from Fabric switches to CSM M S to CSM Verify Remote Logging from Fabric M S to CSM Remote Loggi All steps that input to this symbol must be completed before proceeding YV Figure 11 Setup remote logging Copyright IBM Corp 2008 7 22 08 108 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Do not start this procedure until all of the following tasks have been completed The HMCs have beeen installed and cable to the service VLAN H6 The CSM MS has been installed and cabled to the service and cluster VLANs CM4 The Fabric Management Server has been installed and cabled to the cluster VLAN F8 The switches have been installed and cabled to the cluster VLAN W3 The service and cluster VLANS Ethernet devices have been installed and cabled E2 Sr un 1 IL1 M4 Setup remote lo
151. at the source of the log has an entry with its address Switches use udp Fabric Management Servers are configurable for tcp or udp In any case assure that the udp line is always used 5 If the entries are not there perform the procedure in Re configuring CSM event management on page 209 If this fixes the problem end this procedure If the entries are there go to the next step 6 Look at the log on the device that is logging the problem and make sure that it is there a For the Fabric Management Server look at the Wrar log messages file b For switches log onto the switch and look at the log If necessary use the switch command line help or the switch Users Guide for how to do this 7 Ifthe setup on the CSM MS has proven to be good and the log entry is in the source s log check to see that the source is setup for remote logging Copyright IBM Corp 2008 7 22 08 205 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware a Fora Fabric Management Server running syslog not syslog ng check etc syslog syslog conf for the following line If etc syslog conf does not exist you should go to step 7 b Otherwise after you finish this step go to step 8 local put CSM MS IPp address Note If you make a change you will have to restart the syslogd using etc init d syslog restart b Fora Fabric Management Server running syslog ng check etc syslog ng syslog ng conf for the following lines Assure t
152. ation If you have multiple active LPARs you cannot simultaneously dedicate the HCA to more than one active LPAR High 4 of the maximum adapter resources Medium 1 8 of the maximum adapter resources Low 1 16 of maximum adapter resources 2 2 1 1 Logical Switch naming convention The IBM GX HCAs have a logical switch naming convention based on the server type and the HCA type Server HCA chip base Logical Switch Name 5 X IBM Logical Switch 1 or P ny IBM Logical Switch 2 IBM G2 Logical Switch 1 or System p POWER6 Second Generation IBM G2 Logical Switch 2 Sysetem p POWER6 First Generation Ee ne IBM G1 Logical Switch 2 Copyright IBM Corp 2008 7 22 08 22 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 2 1 2 HCA Statistics counters The statistics counters in the IBM GX HCAs are only available from HCAs in System p POWER6 servers You can query the counters using Performance Manager functions with the Fabric Viewer and Fast Fabric s iba_report see Hints on using iba_report on page 163 While the HCA keeps track of most of the prescribed counters it does not have counters for Transmit Packets or Receive Packets 2 2 2 Vendor switches Vendor switches are used as the backbone of the communications fabric in an IBM HPC Cluster using InfiniBand technology These are all based on the 24 port Mellanox chip 2 2 3 QLogic switches supported by IBM IBM supports QL
153. ay need to approach the Management subsystem installation and configuration differently than with a new cluster installation The flow for the Management subsystem installation and configuration task is based on a new cluster installation but it will indicate where there are variances for expansion scenarios The following table outlines how the new cluster installation is affected altered by expansion scenarios Scenario Effects e Cable to InfiniBand switches service subsystem Ethernet ports e May require additional service subsystem Ethernet switches or routers to accommodate new InfiniBand switches e Install a Fabric Management Server e If there are multiple HMCs in the existing cluster you must use CSM and Cluster Ready Hardware Server e Add remote syslog capability from Fabric Management Server and switches to CSM e Add remote execution capability from CSM to Fabric Management Server and switches Adding InfiniBand hardware to an existing cluster switches and HCAs e Cable to servers service subsystem Ethernet ports e Build operating system update mechanisms for new servers without removable media e May require additional HMC s to accommodate the new servers If expanding beyond a single HMC or adding CSM MS and Cluster Ready Hardware server you will need to de configure the current DHCP services on the existing HMC and reconfigure using DHCP on the CSM MS or other DHCP server e May require additional
154. ba_report C o none to clear error counters on the fabric ports before doing a health check on the current state Otherwise you will pick up errors caused by the reboot 3 Ifyou can wait about ten minutes before you a run health check to look for errors and compare against the baseline configuration The wait period is to allow for error accumulation Otherwise run it now to check for configuration changes which will include any nodes that have fallen off of the switch a Run all_analysis see Health Checks on page 151 and the Fast Fabric Toolset Users Guide b Look for configuration changes and fix any that you find see Finding and Interpreting Configuration Changes on page 162 You may see new part numbers serial numbers and GUIDs for repaired devices Fan trays do not have electronic VPD and thus will not indicate these types of changes in configuration c Look for errors and fix any that you find see Table of symptoms on page 169 4 Ifyou did not wait 10 minutes before running the health check you should re run it after about 10 minutes to check for errors a Run all_analysis or all_analysis e see Health Checks on page 151 and the Fast Fabric Toolset Users Guide b Look for errors and fix any that you find see Table of symptoms on page 169 c Ifyou did not use the e parameter look for configuration changes and fix any unexpected ones that you find see Finding and Interpreting Configuration Changes on page 16
155. be two hosts as primaries and two hosts as backups o Consolidating switch chassis and Subnet Manager logs into a central location is highly recommended Because CSM is also recommended as the Systems Management application the CSM MS is recommended to be the recipient of the remote logs from the switch You can direct logs from a Fabric Management Server to multiple remote hosts CSM MS s Setup Remote Logging on page 108 is the procedure used for setting up remote logging in the cluster Backup Fabric Management Servers are highly recommended for HSM Copyright IBM Corp 2008 7 22 08 47 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware At least one unique instance of Fabric Manager to manage each subnet is required o A host based Fabric Manager instance is associated with a specific HCA and port over which it will communicate with the subnet which it manages o For example if you have 4 subnets and one Fabric Management Server it will have 4 instances of Subnet Manager running on it one for each subnet Also the server must be attached to all 4 subnets o The Fabric Manager consists of four processes the subnet manager SM the performance manager PM baseboard manager BM and fabric executive FE For more details see Fabric Manager Overview on page 30 and the QLogic Fabric Manager Users Guide o It is common in the industy for the terms Subnet Manager and Fabric Manager to be used inte
156. ble events and a file for informational events a Log onto the CSM MS running Linux as root b Edit the configuration file for the syslogd so that it will direct entries coming from the Fabric Management Server and the switches to an appropriate file Note This procedure documents the use of syslog ng which is the default syslogd for SLES 10 SP1 and higher If the level of Linux on the CSM MS is using syslog instead of syslog ng use Using syslog on RedHat Linux based CSM MS on page 116 When you return from that procedure you will want to return to step g on page 112 Note Log entries with a priority severity of INFO or lower will be logged to the default location of var log messages i Edit the etc syslog ng syslog ng conf file ii Add the following lines to the end of the file Fabric Notices from local6 into a FIFO named pipe filter f fabnotices facility local6 and level notice alert warn err crit and not filter f_iptables Note The sensor that will be created later will add the lines to etc syslog ng syslog ng conf that are required to direct the entries to a particular log file Also make sure that the following is in the src stanza and uncommented You must use udp to receive logs from switches and the Fabric Mangement Server udp ip 0 0 0 0 port 514 Note The ip 0 0 0 0 entry indicates that the server will allow entries from any ip address For added security you may wish to speci
157. ble events should be addressed If a vendor has discovered and resolved a serviceable event then the serviceable event should be closed out of Service Focal Point Prerequisite for V2 is V1 V3 You might have to contact service numbers to resolve problems after service representatives leave the site In Installation Coordination Worksheet on page 65 you will find a suggestion for a worksheet to help coordinate tasks among install team members and teams 3 7 5 Installation Coordination Worksheet Use the following worksheet to help coordinate installation tasks Each organization should use a separate installation sheet and it should be completed using the flow illustrated in Figure 4 on page 20 It is good practice to let each individual and team participating in the installation review the coordination worksheet ahead of time and identify their dependencies on other installers Management console installation steps M2 M4 actually have multiple tasks associated with each of them You should also review the details for them Figure 10 Management Subsystem Installation Tasks on page 97 and see where you can assign to different people those tasks that can be performed simultaneously Table 9 Sample Installation coordination worksheet Organization Task Task description Prerequisite Scheduled Completed tasks date date Copyright IBM C
158. c Management Server from the CSM MS 2 R2 M4 Setup remote command execution with the switches Note The following is just one of several methods by which you can setup remote command execution to a QLogic switch You may use any method that best fits your use The QLogic switch does not use a standard shell for its Command Line Interface Thus it should be setup as a device and not a node For dsh and updatehwdev to work you definitely need the command definition file a Create a device type command definition file for the switch device This is very important for dsh and updatehwdev to work with the switch s propriertary command line i If var opt csm IBSwitch Qlogic config exists you can skip the creation of this file and go to step b ii Create the path var opt csm IBSwitch Qlogic iii Edit the file var opt csm IBSwitch Qlogic config Copyright IBM Corp 2008 7 22 08 118 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware iv Add the following lines to the file QLogic switch device configuration Please follow the section format to add entry value pair like below main EntryName Value main SSH key add command on device must be upper case K ssh setup command sshkey add dsh Special command before remote command e g export environment variable pre command NULL Command used to show the return code of last command executed Note the command output must be a nu
159. c Toolset using QLogic docs M M2 Install and Configure Host based Fabric addresses to them Ethernet Devices Manager per QLogic i 7 Physically locate documentation Continue HMC install El Ethernet network per HMC Jevice Assign static IP i address for service SOn Install and configure Both Ethernet network Update HMC Ethernet network VLANs Cimware devices for service and cluster VLANs cluster VLAN service VLAN Cable HMCs to the service Ethernet network Performec elsewhere Server Install and Configuration with Management Consoles From switches to CSM From SFP to CSM Setup Remote Logging From Fabric M S to CSM v Cable Fabric MS to the cluster VLAN Cable CSM MS to the service and cluster VLANs Fabric MS CM4 Start DHCP on config amp CSM MS verification From CSM to Fabric M S From CSM to switches Setup device groups Setup Remote Command Execution All steps that input to this symbol must be completed before proceeding YV Figure 10 Management Subsystem Installation Tasks Copyright IBM Corp 2008 7 22 08 97 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 4 1 Management subsystem installation and configuration information for expansion If this is a new installation skip this section If adding or expanding InfiniBand network capabilities to an existing cluster then you m
160. ce command profiles that allow dsh to work with the proprietary switch CLI See Remote Command Execution setup on page 117 and Remotely accessing QLogic switches from the CSM MS on page 159 Subnet Manager running in a switch chassis or on a host Fast Fabric tools running on a fabric management server host This host will be an IBM System x server running Linux and the vendor s host stack In order to diagnose the fabric and check the health of the fabric we rely heavily on existing vendor tools 1 2 3 The QLogic Fast Fabric Toolset running on the Fabric Management Server Host is recommended to provide the main diagnostic capability The QLogic Fast Fabric Toolset s health check facility is especially important when there are no clear events indicating a specific problem but there is an observed degradation in performance The indicators of a problem in the fabric will be a Any errors that have gone previously undetected b Any configuration changes including missing resource You can access vendor diagnostic tools using the CSM dsh command For connectivity the CSM MS must be on the same cluster VLAN as the switches and the management servers running the Subnet Managers and Fast Fabric Tools 2 3 3 Management subsystem overview The management subsystem in the System p HPC Cluster solution using an InfiniBand fabric loosely integrates the typical IBM System p HPC cluster components with the QLogic components This
161. ces If the current cluster already has CSM MS and a cluster ready hardware server or does not require an additional HMC go to step 6 c Change existing HMCs from DHCP server to static ip address such that the address is within the cluster s Ethernet service VLAN subnet provided by the customer but outside of the DHCP address range d Reboot the HMC 6 H5 M2 Return to the HMC install documentation finish the installation and configuration procedures However DO NOT attach the HMC cables to the service VLAN until instructed to do so in step 9 of this procedure After finishing those procedures continue with step 7 7 H6 M2 Ensure that your HMCs are at the correct software and firmware levels See the IBM Clusters with the InfiniBand Switch web site at http www 14 software ibm com webapp set2 sas f networkmanager home html for information regarding the most current released level of the HMC Follow the links in the readme file to the appropriate download sites and instructions Further information about HMC service level is available at http www 14 software ibm com webapp set2 sas f hmc home html Follow the links for the appropriate level of HMC code 8 Do not proceed until the following requirements have been met a The CSM Management Server has been setup as a DHCP server as in CSM Management Server Installation on page 101 or you have only a single HMC which will remain as a DHCP server b The Etherne
162. ch the health check manually or script its launch via a service like cron Copyright IBM Corp 2008 7 22 08 144 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 0 Cluster Fabric Management This will be a lot more along the lines of theory and best practice than detailed procedures Documents referenced in this section can be found in Information resources on page 14 This chapter is broken into the following sections A brief description of how to use each section is included e Cluster Fabric Management Flow on page 146 illustrates an approximate flow for typical management activities in a cluster e Cluster Fabric Management Components and their Use on page 147 describes the various applications used for cluster fabric management and how they will be typically used e Cluster Fabric Management Tasks on page 149 describes how to perform various management tasks or where to find out how to perform those tasks It will be referenced by the other Cluster Fabric Management sections Copyright IBM Corp 2008 7 22 08 145 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 1 Cluster Fabric Management Flow The following will illustrate a typical flow of cluster fabric management activities from the point of a successful install onward It can be referenced while reading the Cluster Fabric Management Tasks section on page 149 Installation complete Map IBM HCA device location
163. checks should be rerun to look for further errors latest fabric 0 0 errors if any links with excessive error rates or incorrect link speeds are reported they should be corrected If there are links with errors beware the same links may also be detected in other reports such as the Links and comps files discussed below latest fabric 0 0 snapshot stderr if this file is not empty it can indicate problems with iba_report such as inability to access an SM which can result in unexpected problems or inaccuracies in the related Links and comps files If possible problems reported in this file should be corrected first Once corrected the health checks should be rerun to look for further errors latest fabric 0 0 links stderr if this file is not empty it can indicate problems with iba_report which can result in unexpected problems or inaccuracies in the related Links file If possible problems reported in this file should be corrected first Once corrected the health checks should be rerun to look for further errors latest fabric 0 0 links diff this indicates that the links between components in the fabric have changed been removed added or that components in the fabric have disappeared This file should be reviewed and as necessary the latest fabric 0 0 links file should be compared to baseline fabric 0 0 1links If components have disappeared review of the latest fabric 0 0 comps diff file may be easier for such components As necessary
164. ck multicast group creation run the following on each switch with a master Subnet Manager If you have set it up you may use dsh from the CSM MS to the switches see Remote Command Execution setup on page 117 remember to use devicetype IBSwitch Qlogic when pointing to the switches smShowGroups There should be just one group with all the HCA devices on the subnet being part of the group Note that mtu 5 indicates 4K mtu 4 indicates 2K The following example shows 4K MTU Oxff1240 1 bffff0000 00000000FFFFFFFF c000 qKey 0x00000000 pKey OxFFFF mtu 5 rate 3 life 19 sl 0 0x00025500101a3300 F 0x00025500101a3100 F 0x00025500101a8300 F 0x00025500101a8100 F 0x00025500101a6300 F 0x00025500101a6100 F 0x0002550010194000 F 0x0002550010193e00 F 0x00066a00facade01 F 5 Once the servers are up and running and CSM is installed and can dsh to the servers map the HCAs This will help with future fault isolation For more details see Use the procedure found in General mapping of IBM HCA GUIDs to physical HCAs on page 178 a Log on to the CSM M S Copyright IBM Corp 2008 7 22 08 127 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware b Create a location for storing the HCA maps such as home root HCAmaps Note If you do not have mixed AIX and Linux nodes instead of using the N parameter in the following commands you may use a and store all nodes in one file eg NodeHCAmap c For AIX nod
165. cks other installation tasks for servers and management consoles that require DHCP service from Cluster Read Hardware Server 6 Itis a good practice to enter the configuration information for the server in its etc motd Use the information from the CSM Planning Worksheet on page 76 7 This procedure ends here Other procedures involving the CSM Management Server are these are part of ILI L3 and IR1 R2 which are all part of major task M4 e Setup Remote Logging on page 108 e Remote Command Execution setup on page 117 4 4 5 Operating System Install Servers Installation This procedure is performed by the customer While there is reference to installing Operating System Install Servers this procedure really concentrates on the need for diagnostics service using an Operating System Install Server In particular eServer diagnostics for System p servers are available only in AIX you will need an AIX SPoT even if you are running another operating system in your partitions on servers no removable media CD or DVD Before proceeding obtain documentation on the following Server AIX NIM server and Linux distribution server e Server installation guide for the Operating System Install Server AIX NIM or Linux distribution server e For NIM obtain installation information from AIX documentation e For Linux obtain Linux distribution documentation Depending on where you install the Operating Sys
166. configuration information for EXPANSION iuri a vans sdactuskseanig ua tbacteaad ag to adecdasehusees ints aa ean canta cana a aaa 98 4 4 2 Install and configure Service VLAN devices cccccescceseceeeeeesceesseceseeeeeeeeaees 99 443 HMC instalation se acetates yeas aecoes igs r a ae sem oe eos 100 4 4 4 CSM Management Server Installation ccc eeceesceesseceeeceeeceeeeeeeeceaeeneeeesees 101 4 4 5 Operating System Install Servers Installation ee cesceeceeeteeeseeeeteeeteeeees 102 4 4 6 Fabric Management Server Installation cc cc ccccccceseceeeeeeeeeeeeceeeeteeeeeeeeaees 103 4A Setup Remote Logging os yous voici saes eae eee wa a 108 4 4 7 1 Using syslog on RedHat Linux based CSM MS viscsssssssscsssssssssssssssssssssssssssssssssssssssssssvees 116 4 4 8 Remote Command Execution sSetip cass icesiviceas idee teates eemuaaae wens 117 4 4 9 Server Install and Configuration with Management Consoles 0 008 120 4 5 Installing and configuring the cluster server hardware 121 4 5 1 Server installation and configuration information for expansion 121 4 5 2 Server hardware installation and configuration Procedure cceseeeeeees 122 4 6 Operating System installation and configuring the cluster servers125 4 6 1 Server installation and configuration information for expansion 0 125 4 6 2 Operating System installation and configuring the cluster servers procedure 126 4 7
167. connect to frames and servers on the Ethernet service VLAN Proceed to step 6 6 To connect the resources in each rack of servers to the Ethernet service VLAN and verify that addresses have been correctly served for each frame or rack of servers perform the following procedure By doing this one frame or rack at a time you can verify that addresses have been served correctly which is critical for cluster operation a M3 Connect the frame or server to the Ethernet service VLAN Use the documentation provided for the installation of these units IBM Service personnel can access the WCIIs for each server model that is not a customer setup model Customer server setup information is available For POWER6 IBM Resource Link for the IBM system being installed see http www ibm com servers resourcelink where you should start with the Library Resource Link access requires an IBM Registration ID IBM ID For POWERS IBM systems Hardware Information Center http publib boulder ibm com infocenter eserver v 1r3s index jsp Click IBM systems Hardware Information Center Initial server setup Procedures for installing the GX InfiniBand host channel adapters are also available in the IBM systems Hardware Information Center click IBM systems Hardware Information Center Installing hardware Note Do not proceed in the server install instructions WCII or Information Center past the point where you attach the Ethernet cables
168. cteristics that affect cable planning In particular e Consider the server height and placement in the frame to plan for cable routing within the frame This affects the distance of the HCA connectors from the top of the raised floor e Consider routing to the cable entrance of a frame e Consider cable routing within a frame especially with respect to bend radius and cable management e Consider floor depth Copyright IBM Corp 2008 7 22 08 40 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e Remember to plan for connections from the Fabric Management Servers see Planning for Fabric Management Server on page 55 If you are using 12x HCAs for example in a 9119 590 server you should review Planning 12x HCA connections on page 67 to understand the unique cabling and configuration requirements when using these adapters with the available 4x switches Record the cable connection information planned here in the QLogic Switch planning worksheet on page_74 for switch port connections and in a Server planning worksheet on page 73 for HCA port connections Planning InfiniBand network cabling and configuration ends here 3 4 1 Planning QLogic InfiniBand switch configuration Most QLogic switch planning should be done using QLogic planning resources including general planning guides and planning guides specific to the model being installed QLogic switches require some custom configuration to work well in a
169. d but simple count based thresholds The recommended time period between error counter clears is every 24 hours The following will address how to setup a 24 hour monitoring cycle at 4 hour intervals The link error counter thresholds are defined in the etc sysconfig iba iba_mon conf file which needs to be set up for each interval s threshold Then cronjob s must be set up that reference these configuration files 1 Save the original file cp p etc sysconfig iba iba_mon conf etc sysconfig iba iba_mon conf original 2 Create a new file for each time period throughout a 24 hour cycle This will allow you to point to a specific threshold for that time period This will help reduce false callouts of suspected faulty links Because you will need to reference these files with the all_analysis script name them based on the time period in which they will be used iba_mon conf time period 3 Edit to update the symbol errors threshold to the value in Table 13 Symbol error thresholds 24 hour cycle 4 hour intervals on page 153 The default is shipped at 100 Leave all other thresholds at their default value Error Counters SymbolErrorCounter 100 For example using Table 13 Symbol error thresholds 24 hour cycle 4 hour intervals below for hour 12 you would have a file named iba_mon conf 12 with the following symbol error threshold setting Error Counters SymbolErrorCounter 5 4 Setup cron jobs to run all analy
170. d installation roles it is possible that someone else may need to perform these actions Coordinate this with the appropriate people e For QLogic embedded Subnet Managers use smControl start and smPmBmStart enable and smConfig startAtBoot yes This may be issued at the switch command line or using Fast Fabric s cmdall For QLogic host based FabricManagers use iview_fm start as directed in Fabric Management Server Installation on page 103 Contact the person installing the Fabric Management Server and indicate that the Fabric Manager may not be started on the Fabric Management Server 7 This procedure ends here If you are responsible for verifying the InfiniBand network topology and operation you may proceed to that procedure Attach cables to the InfiniBand network ends here Copyright IBM Corp 2008 7 22 08 135 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 9 Verify the InfiniBand network topology and operation This procedure is performed by the customer Verifying the InfiniBand network topology and operation encompasses major tasks v3 which are illustrated in the Figure 9 on page 62 Note This procedure cannot be performed until all other procedures in cluster installation have been completed These include the management subsystem installation and configuration server installation and configuration InfiniBand switch installation and configuration and attaching cables to the InfiniBand n
171. dees ceenasaceccagn yess emeaeeraplaes eee 82 3 12 8 1 Frame planning worksheet example ccccscccsscecesecesnceensecescceesseceeacecaeceeneecsaeeeeaeecneeesaes 83 3 12 8 2 Server planning worksheet example si sccccscsssssssssvssssssssvsssvsssssssssssssssvsssseessssssssesssessssseees 84 3 12 8 3 Switch Planning Worksheet example cccsccsccccssecesnceesseceeccecnseceeaeecsseeseaeecsseeeeaeeenseeeaees 85 3 12 8 4 CSM Planning worksheet example cccccccesecesssesenceesseceecceeseceeaeeceaeceeaeecseeseaeeenaeeesnes 868 3 12 8 5 CSM Event Monitoring worksheet example cccccccssecesnceesseceencecnsecesncecsseceeneecsseeeaees 89 3 12 8 6 General QLogic Fabric Management worksheet example ccss ssssvsssssssssssssssssssvsssseeee 89 3 12 8 7 Fabric Management Server worksheet example c scssssssssvsssssssssvssssssssssssssssssssssssvees 90 4 0 Installing an HPC Cluster that has an InfiniBand network 92 4 1 IBM Service representative installation responsibilities 92 4 2 Cluster Expansion or partial installation ccssscccsssssssccssssssssseees 93 4 3 Site setup for power cooling and floor cccsssrsccssssssssccssssssssceees 93 4 4 Management subsystem installation and configuration 006 95 Copyright IBM Corp 2008 7 22 08 4 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 4 4 1 Management subsystem installation and
172. del SystemX 3550 or 3650 Frame Number of PCI slots Number of HCAs Primary Backup NA HSM Primary data collection point yes no Local syslogd is syslog syslog ng or other CSM Server Address es for remote logging Using tcp or udp for remote logging NTP server Subnet Management Plannin Subnet Subnet Subnet Subnet Subnet Subnet Subnet Subnet HCA number HCA port GID prefix Broadcast MTU put rate in parantheses node_appearance msg thresh 10 10 10 10 10 10 10 10 Primary Switch Priority Backup Switch Priority Backup Switch Priority Backup Switch Priority Fast Fabric Toolset Planning Host based or embedded SM for FF ALL ANALYSIS List of switch chassis List of switches running embedded SM if applicable Subnet connectivity planning is in Subnet Management Planning above Chassis list files Host list files Notes Copyright IBM Corp 2008 7 22 08 81 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 8 Worksheet examples This example is for a 96 way cluster with four subnets Cluster summary worksheet Cluster name Example eg Application HPC or not HPC Number and types of servers 96 9125 F2A Number of servers and HCAs per server Each 9125 F2A has one HCA Note If there are servers w
173. double quotes around the key and single quotes around the entire sshKey add command ii Assure that the following is in etc fastfabric conf export FF_LOGIN METHOD FF_LOGIN_METHOD ssh c Setup secure communication between Fabric Management Servers using one of the following methods Use the setup_ssh command in the Fast Fabric Toolset Use the Fast Fabric Toolset iba_config menu Choose the options Fast Fabric Host setup Setup Password less ssh scp Use typical key exchange methods between Linux servers 15 If you chose not to set up passwordless ssh from the Fabric Management Server to switches and to other Fabric Management Servers you must update the etc sysconfig fastfabric conf with the proper password for admin The following procedure assumes the password is xyz Detailed instructions are in the Fast Fabric Users Guide a Edit etc sysconfig fastfabric conf and assure that the following lines are in the file and are not commented out FF LOGIN METHOD and FF PASSWORD are used for Fabric Management Server access FF CHASSIS LOGIN METHOD and FF_CHASSIS ADMIN PASSWORD are used for switch chassis access export export export export FF_LOGIN METHOD FF_LOGIN METHOD telnet FF _PASSWORD FF_PASSWORD FF CHASSIS LOGIN METHOD FF_CHASSIS_ LOGIN METHOD telnet FF_CHASSIS ADMIN PASSWORD FF_CHASSIS ADMIN PASSWORD xyz b chmod 60
174. e 6 32 Verifying repairs and configuration changes Once a repair or configuration change has been made it is good practice to verify that 1 A repair has fixed the problem and that no other faults have been introduced as a result of the repair 2 A configuration change has not resulted in any faults or inadvertent configuration changes It is important to understand that configuration changes include any change that results in different connectivity fabric management code levels part numbers serial numbers etc See the Fast Fabric Toolset Users Guide for the types of configuration information that is checked during a health check Perform the following procedure Note As devices come online there will be appearance NOTICEs from the Subnet Manager s You can count the number of devices and make sure the count corresponds to the appropriate number of devices that you have in the IBM systems s that has been rebooted see Counting Devices on page 220 Keep in mind that the devices may come up over several scans of the fabric by the Subnet Manager s so you may have to add up the appearance counts over several log entries However the health check below will take care of checking for any missing devices 1 Check LEDs on the device ports and any port connected to the device See the System Users Guide and the Switch Users Guide for information on LED states If there is a problem found see Table of symptoms on page 169 2 Run sbin i
175. e HMCs in the cluster b Assign a static IP address for switches when you are using CSM and Cluster Ready Hardware Server This is mandatory when you have multiple HMCs in the cluster Determine the DHCP range for each Ethernet subnet 4 Ifyou must use CSM and Cluster Ready Hardware Server the DHCP server is recommended to be on the CSM Management Server and all HMCs must have their DHCP server capability disabled Otherwise you are in a single HMC environment where the HMC is the DHCP server for the service VLAN LoS If there are servers in the cluster without removable media CD or DVD you will require an AIX NIM server for System p server diagnostics If you are using AIX in your partitions this will also provide NIM service for the partition The NIM server will be on the cluster VLAN Copyright IBM Corp 2008 7 22 08 45 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware If there are servers running Linux in your partitions that do not have removable media CD or DVD a Linux Distribution server is required The Cluster summary worksheet on page 71 should be used to record the information in this section Frames racks need to be planned for the management servers Consolidate the management servers into the same rack whenever possible The following management servers should be considered e HMC e CSM management server e Fabric management server e AIX NIM and Linux distribution servers e NTP ser
176. e InfiniBand switch installation and configuration for vendor switches on page 129 The subnet managers MUST be running before you start to configure the interfaces in the partitions If the commands start failing and an Isdev grep ib reveals that devices are Stopped it is likely that the subnet managers are not running b Run mkdev for the icm For example mkdev c management s infiniband t icm c Run mkiba for the devices For example mkiba a ip address i ib0 A iba0 p 1 P 1 S up m 255 255 255 0 d After the HCA device driver is installed and mkiba is done run the following to set the device MTU to 4K and turn on enable super packets for iin lsdev grep Infiniband awk print 1 egrep v iba icm do chdev 1l i a superpacket on a tcp_recvspace 524288 a tcp _sendspace 524288 a srq size 16000 a state up done Note The above for loop will modify all of the HCA devices in the partition To modify a specific device like ib0 use chdev 1 ibO0 a superpacket on a tcp_recvspace 524288 a tcp_sendspace 524288 a srq_size 16000 a state up e Verify the configuration i Verify that the device is set to superpackets on for iin lsdev grep Infiniband awk print 1 egrep v iba icm do echo i lsattr El i egrep super done Note To verify a single device like ib0 use lsattr El ibO egrep mtu super Copyright IBM Corp 2008 7 22 08 126 of 238 IBM System p HPC Clusters
177. e Table of symptoms on page 169 5 Ifyou did not wait 10 minutes before running the health check you should re run it after about 10 minutes to check for errors a Run all_analysis or all_analysis e see Health Checks on page 151 and the Fast Fabric Toolset Users Guide b Look for errors and fix any that you find see Table of symptoms on page 169 c Ifyou did not use the e parameter look for configuration changes and fix any that you find see Finding and Interpreting Configuration Changes on page 162 6 Ifyou repaired an HCA the latest health check will identify that you have a new GUID in the fabric You will need to perform the procedure in Re establishing Health Check baseline on page 217 however only do that after you have run a health check against the old baseline to assure that the repair action resulted in no inadvertent configuration changes such as a swapping of cables 7 This procedure ends here 6 35 Counting Devices When faults or user actions cause devices to appear and disappear from the fabric it is important to know how to count them relative to your expectations However counting fabric resources is not as intuitive as the casual user may desire Subnet Managers in the industry tend to report resources at a very low level Thus without a guide such as this one would need to understand the InfiniBand standard specification fairly well The virtualization capabilities of the IBM GX HCAs further compl
178. e distributed the HCA Topology ports from the servers in a consistent manner across subnets For example all corresponding ports on HCAs within servers should connect to the same subnet like all HCA 1 port 1 s should connect to subnet 1 and all HCA 1 port 2 s should connect to port 2 Full bandwidth Did you choose to implement a Full bandwidth topology using topology the vendor recommendations found in the vendor s Switch Users Guide and Planning and Installation Guide This procedure ends here 6 18 Checking InfiniBand configuration in AIX This procedure will check for HCA availability and configuration in AIX Perform the following operations from the CSM MS Verify HCAs are visible to LPARs dsh av lsdev Cc adapter grep iba we 1 i Copyright IBM Corp 2008 7 22 08 195 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware If the number returned by the system Matches the number of ibas in the cluster continue with the procedure to verify that all HCAs are available to the LPARs Does not match the number of HCAs continue with this procedure Run the command dsh av lsdev Cc adapter grep iba gt iba_list Open the generated file iba list and look at the number of HCAs that are visible to the system HCAs that are visible to the system are listed as Defined or Availablee For each LPAR having HCAs that are not visible check to see if the HCA was assigned
179. e groups should be considered for o All the fabric management servers o All primary fabric management servers o All of the switches o A separate subnet group for all of the switches on a subnet e You will be exchanging ssh keys between the CSM MS and the switches and Fabric Management Server e For more secure installations plan to disable telnet on the switches and the Fabric Management Server The configuration settings planned here should be recorded in the CSM Planning Worksheet on page 76 Planning Remote Command Execution with QLogic from the CSM MS ends here 3 6 Frame Planning After reviewing all the sections on servers fabric devices and the management subsystem you should review the frames in which to place all of the devices Fill out the worksheet in Frame and rack planning worksheet on page 72 Copyright IBM Corp 2008 7 22 08 58 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 7 Planning Installation Flow The following sub sections are included Key Install Points Installation Responsibilities By Organization Install responsibilities by units and devices Order of Install Install Coordination Worksheets Cie eh 3 7 1 Key installation points When you are coordinating the installation of the many systems networks and devices in a cluster there are several factors that drive asuccessful a installation jk The installation order of physical units is important While u
180. e passwordless ssh is recommended from CSM MS and the Fabric Mangement Server to the switch chassis it is also recommended that you change the switch chassis default password early in the installation process For Fast Fabric Toolset functionality all of the switch chassis passwords should be the same Consolidating switch chassis logs and embedded Subnet Manager logs into a central location is highly recommended Because CSM is also recommended as the Systems Management application the CSM MS is recommended to be the recipient of the remote logs from the switch You can only direct logs from a switch to a single remote host CSM MS Setup Remote Logging on page 108 is the procedure used for setting up remote logging in the cluster The information planned here should be recorded in a QLogic Switch planning worksheets on page 74 Planning QLogic InfiniBand switch configuration ends here 3 4 1 1 Planning MTU Depending on your configuration there are different recommended Maximum Transfer Units MTUs The following Table 8 MTU Settings on page 42 indicates the MTU values that MPI and IP require for maximum performance Cluster Type indicates the type of cluster with respect the generation and type of HCAs used You either have a Homogeneous cluster based on all HCAs being the same generation and type or a Heterogeneous cluster based on the HCAs being a mix of generations and types Cluster Composition by HCA indicates the actual generat
181. e support teams would normally require to diagnose fabric problems This can result in a large amount of data If you wish to collect a more targeted set of data please refer to the various unit and application users guides and service guides for information on how to do that This procedure will capture data from 1 Vendor fabric management applications and vendor switches 2 IBM systems information to reflect the state of the HCAs A key application for capturing data for most fabric diagnosis activities is the Fast Fabric Toolset see the Fast Fabric Toolset Users Guide The Fast Fabric captureall will be used to gather 1 Subnet Manager data 2 Switch chassis data Pay close attention to how the command line parameters change from which devices data is collected Because all of the Fabric Management Servers and switches are connected to the same service VLAN it is possible to collect all the pertinent data from a single Fabric Management Server which should have been designated while planning the Fabric Management Servers see Planning for Fabric Management Server on page 55 and QLogic Fabric Management worksheets on page 79 The references above will also explain and record the configuration files required to access the Fabric Management Servers and switches that have the desired data In particular you will need to understand the role of hosts and chassis files that list various groupings of Fabric Management Servers and switches
182. e syslog ng on the CSM MS to accept one or the other or both Fabric Info from local6 to CSM MS CSM IP address filter f_fabinfo facility local6 and level info notice alert warn err crit and not filter f_iptables destination fabinfo_csm udp CSM MS IP address port 514 log source src filter f_fabinfo destination fabinfo_csm Note If you wish to log to more than one CSM MS or to another server make sure to change the destination statement s handle for each instance and then refer to a different one for each log statement For example fabinfo_csm1 and fabinfo_csm2 would be good handles for logging to different CSM MS s Another alternative handle Restart the syslog daeemon etc init d syslog restart if the syslog daemon is not already running use etc init d syslog start You have now setup the Fabric Management Server to remotely log to the CSM MS You will be able toverify Fabric Management Server remote logging operation when you get to step 4 3 L3 M4 Point the switch logs to the CSM Management Server a Do not proceed until you have installed configured and cabled the Fabric Management Server to the service VLAN as in InfiniBand switch installation and configuration for vendor switches on page 129 You must also have installed configured and cabled the CSM MS as in CSM Management Server Installation on page 101 Copyright IBM Corp 2008 7 22 08 113 of
183. e the distance from the HMCs to their managed servers so that IBM Service Representatives can perform their tasks in an efficient manner Also if you are adding new servers into an existing cluster you may need to install one or more new HMCs to manage the new servers Otherwise if this is not a new cluster installation you should not have to add more HMCs to the cluster 2 H2 M2 Before proceeding assure that the server frames systems are not powered on and are not attached to the service VLAN 3 H2 M2 Perform the initial installation and configuration of the HMCs using the HMC documentation further details are available in the IBM systems Hardware Information Center http publib boulder ibm com infocenter eserver v 1r13s index jsp See the Managing hardware platform consoles and interfaces topic collection NOTE HMC and IBM managed server installation documentation directs the installer to enable DHCP on the HMC At that point in the HMC and managed server installation documentation STOP the HMC installation procedure and go to step 4 You will be instructed to return to the HMC documentation after the appropriate steps have been taken in this procedure 4 H3 M2 Choose from the following items then go to the appropriate step for your cluster Ifyou are installing CSM and enabling Cluster Ready Hardware Server or you are using a DHCP server for the service VLAN that is not an HMC go to step 5
184. e the repair and troubleshooting procedures in the Switch Users Guide or the QLogic Troubleshooting Guide 2 If any repair is made or if anything is done to change the hardware or software configuration for the fabric use Re establishing Health Check baseline on page 217 3 This procedure ends here 6 14 Diagnosing and repairing IBM system problems IBM system problems are most often reported in Service Focal Point through serviceable events If an IBM system problem is reported the repair action may affect the fabric Use the procedure found in Rebooting Powering off an IBM System on page 219 6 15 Diagnosing configuration changes Configuration changes in the fabric are best determined by using Fast Fabric Health Check see Health Checks on page 151 1 Ifyou have been led here because you noted that HCA ports may have been swapped see Diagnosing swapped HCA ports on page 199 2 Ifyou have been led here because you noted that switch ports may have been swapped see Diagnosing swapped switch ports on page 199 3 This procedure ends here 6 16 Checking for hardware problems affecting the fabric To check for hardware problem that might affect the fabric perform the following 1 Open Service Focal point on all HMCs and perform prescribed service any open serviceable events If you have redundant HMCs configured you need only open Service Focal Point on one HMC in each set of redundant HMCs 2 Check for switch or Subne
185. een when swapping two ports on the same HCA KKKKKKKKKKKKKKK KKK 25 29 KKK 10g 0x00025500000da080 1 SW IBM logical switch 1 lt gt 0x00066a0007000ced 8 SW SilverStorm 9120 GUID 0x00066a00020001d9 Leaf 1 Chip A 10g 0x00025500000da081 1 SW IBM logical switch 2 lt gt 0x00066a00d90003d6 14 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 30g 0x00025500000da100 1 CA IBM logical HCA 0 So o 2 0 10g 0x00025500000da080 1 SW IBM logical switch 1 lt gt 0x00066a00d90003d6 14 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 10g 0x00025500000da081 1 SW IBM logical switch 2 lt gt 0x00066a0007000ced 8 SW SilverStorm 9120 GUID 0x00066a00020001d9 Leaf 1 Chip A 30g 0x00025500000da100 1 CA IBM logical HCA 0 You can see in the swap in the above example by charting out the differences using the following table HCA Port Connected to switch port in baseline Connected to switch port in latest 0x00025500000da080 1 SW IBM logical switch 1 0x00066a0007000ced 8 SW SilverStorm 9120 GUID 0x00066a00020001d9 Leaf 1 0x00066a00d90003d6 14 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 10g 0x00025500000da081 1 SW IBM logical switch 2 0x00066a00d90003d6 SilverStorm 9024 DDR GUID 0x00066a00d90003d6 14 SW 0x00066a0007000ced 8 SW SilverStorm 9120 GUID 0x00066a00020001d9 Leaf 1 The following is an example of what might be seen when swapping two ports on the same switc
186. eferred to in the Fast Fabric Toolset Users Guide is considered to be Fast Fabric Toolset host in IBM HPC Clusters e You do not have to set up rsh and ssh access to the servers from the Fast Fabric Toolset host e You will not use the MPI performance tests because they are not compiled for the IBM host stack e HPL is not applicable e You will generally use only parameters that list switch chassis and never issue commands to hosts b Update the following Fast Fabric configuration files These files list the switch and Fabric Manager servers that make up the fabric This provides the ability to report and execute commands across the fabric concurrently e The etc sysconfig iba chassis file must have the list of all the switch chassis in the fabric Each chassis is listed on a separate line of the file You may use either the IP address or the resolvable hostname for the chassis address e If you have planned for groups of switches create a file for each group e The etc sysconfig iba hosts file should have a list of all of the Fabric Management Servers e If you have planned for groups of Fabric Management Servers create a file for each group e Setup the etc sysconfig fastfabric conf file with the appropriate FF_ALL_ANALYSIS and FF FABRIC HEALTH environmental variable values This should include the fabric chassis and SM analysis The SM analysis depends on the type of SM you are using Note that there is a commented entry for FF ALL AN
187. emarked terms are marked on their first occurrence in this information with a trademark symbol or these symbols indicate U S registered or common law trademarks owned by IBM at the time this information was published Such trademarks may also be registered or common law trademarks in other countries A current list of IBM trademarks is available on the Web at Copyright and trademark information at www ibm com legal copytrade shtml InfiniBand is a trademark and or service mark of the InfiniBand Trade Association Intel is a trademark or registered trademark of Intel Corporation or its subsidiaries in the United States and other countries Copyright IBM Corp 2008 7 22 08 237 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Java and all Java based trademarks are trademarks of Sun Microsystems Inc in the United States other countries or both Linux is a trademark of Linus Torvalds in the United States other countries or both UNIX is a registered trademark of The Open Group in the United States and other countries Other company product and service names may be trademarks or service marks of others Copyright IBM Corp 2008 7 22 08 238 of 238
188. ement subsystem on page 25 Further information is also available in Vendor log flow to CSM event management on page 35 and Monitoring fabric logs from CSM MS on page 150 Table 16 Fault Reporting Mechanisms Reporting Mechanism Description CSM Event Management Used to monitor and consolidate Fabric Manager and switch error logs Fabric Log This is located on the CSM MS in varllog csm errorlog CSM MS hostname CSM auditlog This is part of the standard event management function It is accessed using the Isevent command It is a summary point for RSCT and CSM event management It can help point to activity in varllog csm errorlog and HMCs SFP Hardware LEDs The switches and HCAs have LEDs Service Focal Point This is the standard reporting mechanism for IBM systems managed by HMCs Chassis Viewer LED This is a GUI that runs on the switch and is accessible from a web browser It provides virtual LEDs that represent the switch hardware LEDs Fast Fabric Toolset There are two ways the Fast Fabric Toolset will report fabric problems The first is from a report output The other is in a health check output Customer reported problem This is any problem that the customer reports without indicating any of the reporting mechanisms Fabric Viewer This is a GUI that provides a view into current fabric status Copyright IBM Corp 2008 7 22 08 165 of 238 IBM System p HPC Clusters Fabric
189. enn 143 4 12 4 Fabric Verification Procedure 4 023 23 caspiasasheces bstcachsaaiese a aadseencepbseaneaees 143 4 13 RUIME GrrOVs iscsi ceaisssscacsscdesdsccsasssisecadssscasssecenisdedanscsoncosesseacesecenncsaus 144 5 1 Cluster Fabric Management FIOW cccsssssccssssssscscsssssscccsssseeees 146 5 2 Cluster Fabric Management Components and their Use 147 DU GS es ree EEEE cadets Stig cheat Olea E ela Ss cee adds 147 5 2 2 QLogic Subnet Mang eer ossessioni a a ei acide E anes 147 5 2 3 O bocie Fast Fabric Toolset c s0srs cist tde caaieetedin tak aio mast a aa n a a ai 147 5 2 4 QLogic Performance Manager incense ds ecient seed aster eR Aeneas 148 5 3 Cluster Fabric Management Task6 cccscsssccsssssssscccssssssececssessees 149 5 4 Monitoring Fabric for Problems cccccssccccssssssscscsssssscssssessees 149 5 4 1 Monitoring fabric logs from CSM MS eceecceccceseceseeceeeeeeeeeeseeceaeenteeeeeeensees 150 5 5 Health CHECKS 55 scsssasuscssedensved scsbsassgessacbisssnssandsvcensssabsoonedstonncscansgoaedexene 151 5 5 1 Setting up periodic fabric health checks 0 0 0 ceceeseeesceeseeeseeeeteeeeeeeeeeenaees 151 5 5 2 Output files for Health Check cosh tenet acceso aistul sth um Guu ntshid wasthcn aut tas 154 5 3 3 l terpreting diff MeS etaren ne a ues cy e ys E E n 157 5 39 4 Q erying Statuses ia nai a a aa a a aa aa a p aa 158 5 6 Remotely accessing QLogic management tools and commands from ORAA TA
190. ensor condition response setup Refer to the CSM Commands Reference Guide and the man pages for details You may also need to refer to the CSM Administration Guide for general information on Event Management The following table will remind you which sensors conditions and responses apply to various CSM configurations CSM Config Sensor Condition Response CSM on AIX and AIXSyslogSensor LocalAIXNodeSyslog LogNodeErrorLogEntry CSM MS is not a BroadcastEventsAnyTime managed node optional CSM on AIX and AIXSyslogSensor AIXNodeSyslog LogNodeErrorLogEntry CSM MS is a BroadcastEventsAnyTime managed node optional CSM on Linux and ErrorLogSensor LocalNodeAnyLoggedError LogNodeErrorLogEntry CSM MS is not a BroadcastEventsAnyTime managed node optional CSM on Linux and ErrorLogSensor AnyNodeAnyLoggedError LogNodeErrorLogEntry CSM MS is a managed node BroadcastEventsAnyTime optional a Make sure that the sensor is setup with usr bin Issensor e use it without a parameter to see which sensors are setup e use it with the desired sensor name to see details on where that sensor is being run Copyright IBM Corp 2008 7 22 08 203 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e Unless you have chosen to set it up otherwise it should be sensing var log csm syslog fabric notices e If there is a problem with the setup of the sensor recover using t
191. ep 5 all local6 notice and above priorities go to the following file local6 notice var log csm syslog fabric notices b If the CSM MS is running SLES 10 SP1 or higher it is using syslog ng and the following lines should be in etc syslog ng syslog ng conf Note The actual destination and log entries may vary slightly if they were setup using monerrorlog Because it is a generic CSM command being leveraged for InfiniBand monerrorlog will use a different name fromfabnotices_fifo in the destination and log entries It is a pseudo random name that will look something like fifonfJGQsBw filter f fabnotices facility local6 and level notice alert warn err crit and not filter f_ iptables destination fabnotices fifo pipe var log csm syslog fabric notices group root perm 0644 log source src filter f fabnotices destination fabnotices fifo The following udp and tcp definitions are in the sre stanza udp ip 0 0 0 tcp ip 0 0 0 Note If the Fabric Management Server is only using udp as the transfer protocol for log entries then the tcp line is not needed Step 6 indicates how to check this In either case make note of the protocols and ports and ip addresses in these lines Using 0 0 0 0 will accept logs from any address If you wanted more security you may have had a line for each switch and Fabric Management Server from which you wish to receive logs If you have a specific address named assure th
192. er Management Software Information Resources cccceesceeseessceeeeesecseesecesecsecseecseecaeeeseeeeeeneeentenes Cluster Software and Firmware Information ReSOUrCES ccsesecsceeecsseeeceseeeeesecseesecneeseeeaeeeeeaesaeeeeeaeeates Main components in fabric data flow ceccesccessceseceseceseeseecseeeseeseecseessecesecseceaeceaeceaecaaecaeesaeceaeeeeeeeeneeass Management subsystem server consoles and Workstations c c cesceesseeseeesceseeeseeeseceaecaeecaeeeaeeeeceeenreees MTU Settings sen sees pan n EE ceeds anc hcg dee eda E ee ied ae asta A Ree ae eee dines Sample Installation coordination Workshect ccccccsseesseeseeeseeeeeeeeeeseceseeecesecesecaecaecseecseeseeeeeseeeneenaees Example Installation coordination Worksheet c cccccesscesscesecesecesecseecseeeseeeeeeseeeeenseenseseeeeeneeeeenseenaes Recommended Fast Fabric tools and commands eccesesccssesseeeecseverceeeeeceaecaeesecaeeseenaeeeceaeceeeaecaeeeeeneees Cluster Fabric Management Tasks 4022 niena e E RAR ie RAT Sie eee eee eh Symbol error thresholds 24 hour cycle 4 hour intervals c ceccesseesesesceeeceseceseceseceecseecaeeeseeseeeeeeneeees Symbol error thresholds 24 hour cycle 1 hour intervals c ceccesseesseesceeeceeeceeeeseceecaeeeseeeseenseeeeeneeees Updating Code References and Tmpacts cecccescceseesseesseeeeeseeeseeeseeseceseeeseceseceaecaecsaecaeecaeeeaeenseseeeeereees Fault Reporting Mechanism
193. erify that the switch is detected by the CSM Management Server using the verify detection step in the following procedure Copyright IBM Corp 2008 7 22 08 130 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware If you are expanding an existing cluster also consider the following items e For QLogic switch command help on the CLI use help lt command name gt Otherwise the Users Guides should help with both a section on the commands as well as identifying the appropriate command in its procedural documentation e For new InfiniBand switches perform all the steps in the following procedure on the new InfiniBand switches Do the following procedure to install and configure your InfiniBand switches 1 Review this procedure and determine if the Fabric Management Server will have the Fast Fabric Toolset installed and be on the cluster VLAN before you finish this procedure If Fast Fabric tools are available you can customize the multiple switches simultaneously once you have them configured with unique IP addresses and they are attached to the cluster VLAN If you don t have Fast Fabric tools ready you will need to customize each switch individually In that case you may wish to do the customization step right after you setup the switch management IP address and give it a name W1 Physically place frames and switches on the floor e Review the vendor documentation for each switch model that
194. erver and the switches you will need to set up the fastfabric conf file with the switch chassis passwords The configuration setting planned here should be recorded in QLogic Fabric Management worksheets on page 79 Planning for Fast Fabric Toolset ends here 3 5 3 Planning for Fabric Management Server With QLogic switches the Fabric Management Server is required to run the Fast Fabric Toolset which is highly recommended for managing and monitoring the InfiniBand network Furthermore with QLogic switches unless you have a very small cluster it is recommended that you use the host based Fabric Manager which would run on the Fabric Management Server too The Fabric Management Server has the following requirements IBM system x 3550 or 3650 o The 3550 is 1U high and supports 2 PCI e slots Therefore it can support a total of 4 subnets o The 3650 is 2U high and supports 4 PCI e slots However at this time QLogic subnet management only supports 4 subnets on a server Therefore the advantage of the 3650 over the 3550 lies with processing power for scaling to very large clusters or for sharing the Fabric Management Server with other functions Remember to plan rack space for the fabric management server If space is available it is recommended that the Fabric Management Server be put in the same rack with other management consoles like HMCs CSM MS and so on Copyright IBM Corp 2008 7 22 08 55 of 238 IBM System p HP
195. es on page 23 Subnet Manager within the Fabric Manager Subnet Manager on page 24 Phyp Power Hypervisor on page 24 Device Drivers HCADs IBM device drivers on page 24 Non IBM device drivers on page 24 Host Stack IBM host stack on page 24 Copyright IBM Corp 2008 7 22 08 18 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following figure illustrates the main components involved in fabric data flow POWER6 Non BladeCenter AIX HCAD Linux HCAD Partition FW support POWER6 PHyp BladeCenter JS22 AIX HCAD Linux HCAD Partition FW support Firmware Fabric Management Fabric Management Subnet Manager Subnet Manager InfiniBand Cables InfiniBand switch InfiniBand Cables InfiniBand switch Hardware GX HCAs 4x DDR PCI e HCA POWER6 System Figure 2 Cluster components involved in data flow POWER6 Blade Copyright IBM Corp 2008 7 22 08 19 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The following figure illustrates the high level software architecture User Space e Application 5 fe n sigila Parallel ESSL Z ia ew z x a 5 l Q LAPI HAL User Space Verbs I HYP IF_LS 5 m Linux Open IB or AIX InfiniBand Support gt os HMC InfiniBand HCA IBM or Vendor k InfiniBand Network Vendo
196. es file the problem is not with the Fabric Management Server s log 4 Ifthe log entry is not in the source s syslog then the problem is with the logging subsystem a If this was a test log entry using the logger command or some similar command check your syntax and try the command again if it was incorrect b Ifthe source is the Fabric Management Server check to make sure that the syslogd is running by using ps i If syslogd is not running start it using etc init d syslog start b Ifyou are missing Subnet Manager logs then verify that the fabric manager is running and start it if it is not Use the vendor s Fabric Manager Users Guide to do this c If syslogd is running and the Subnet Manager is running and you did not have a problem with syntax for the logger command then try restarting syslogd using etc init d syslog restart d Verify that there is an entry in syslog conf or syslog ng conf that directs logs to var log messages e Ifthe Fabric Management Server is still not logging properly call your next level of support or try troubleshooting techniques documented for syslogd in the operating system documentation Copyright IBM Corp 2008 7 22 08 208 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 26 1 5 Event not in switch log If the expected log entry is not in the switch log do the following 1 Log onto the switch and look at the log using the command in the vendors Switch
197. es run dsh v N AIXNodes ibstat n grep GUID gt home root HCAmaps AIXNodeHCAmap d For Linux nodes run dsh v N LinuxNodes ibv_devinfo v grep node_guid gt home root HCAmaps LinuxNodeHCAmap 6 This procedure ends here Operating System installation and configuring the cluster servers ends here Copyright IBM Corp 2008 7 22 08 128 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 7 InfiniBand switch installation and configuration for vendor switches Use this procedure if you are responsible for installing the vendor switches The InfiniBand switch installation and configuration encompasses major tasks W1 through W6 which are illustrated in Figure 9 on page 62 Note If possible this procedure should not begin before the management subsystem installation and configuration procedure is completed This will alleviate the situation where various installation personnel may be waiting on site for key parts of this procedure to be completed Depending on the arrival of units on site this is not always practical Therefore it is important to review the Order of install on page 61 and Figure 9 on page 62 to identify the merge points where a step in a major task or procedure being performed by one person is dependent on the completion of steps in another major task or procedure being performed by another person Obtain the following documentation QLo
198. et resources that will help you plan your cluster It is not an exhaustive list of the documents that you will need but it should provide a good launch point for gathering required information Use Planning Overview on page 37 as a roadmap through the planning procedures Read through the Planning Overview once without traversing any of the links to other sections so that you can understand the overall planning strategy Then go back and follow the links that direct you through the different procedures The Planning Overview the planning procedures and the sub procedures are arranged under headings in a sequential order for a new cluster installation If you are performing an installation other than that for a new cluster you may need to pick and choose which procedures to use but you should do so in the order in which they appear in the Planning Overview For a new cluster install you can read through to the end of the Cluster Planning chapter If you are using the links in Planning Overview on page 37 note when a planning procedure ends so that you know when to return to the Planning Overview on page 37 The end of each major planning procedure will be indicated by planning procedure name ends here 3 1 Planning Overview Read through this Planning Overview section once before traversing any links so that you can understand the overall planning strategy Then go back and follow the links that direct you rhrough the different procedure
199. et to an installation existing InfiniBand network 4 7 2 InfiniBand Switch installation and configuration procedure It is possible to perform some of the tasks in this procedure in a method other than that which is described If you have other methods for configuring switches you also must review a few key points in the installation process with Copyright IBM Corp 2008 7 22 08 129 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware regard to order and coordination of tasks and configuration settings that are required in a cluster environment Review the following list of key points before beginning the switch installation process Power on the InfiniBand switches and configure their P addresses before attaching them to the cluster VLAN Alternatively you must add each switch to the cluster VLAN individually and change the default IP address before adding another switch Note The switch vendor documentation referes to the Ethernet connection for switch management as the service VLAN Switches will be set with static P addresses on the cluster VLAN o Ifa switch has multiple managed spines or management modules each one will require its own address in addition to an overall chassis IP address o You will also need to set up the default gateway If an InfiniBand switch has multiple Ethernet connections for the cluster VLAN and the cluster has multiple cluster VLANs for redundncy the switch
200. etween wiki and HPC customers and IBM teams The HCP Central wiki also Central forum links to HPC Central forum where customers can post questions and comments http www 941 ibm com collaboration wiki display hpccentral HPC C entral Note QLogic uses Silverstorm in their product documentation 2 1 2 Cluster hardware information resources Cluster Hardware Information Resources are found in the following Table 3 IBM Cluster Hardware Information Resources Table 3 IBM Cluster Hardware Information Resources Site Planning System i and System p Site Preparation and Physical for all IBM Planning Guide systems POWER6 Site and Hardware Planning Guide systems Installation Guide for MachineType and Model Copyright IBM Corp 2008 7 22 08 15 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Mgmt Component Document Plan Install amp Sve Servicing the IBM system p MachineType and Model X 9125 F2A PCI Adapter Placement xX X Worldwide Customized Installation Instructions WCIT x 8204 E8A IBM service representative install instructions for IBM 8203 E4A machines and features http w3 rchland ibm com projects WCIL Logical Logical Partitioning Guide X partitioning for Install Instructions for IBM LPAR on System i and System x all systems p BladeCenter Planning Install amp Service
201. etween the customer and the supporting hardware teams Note Given the complexity of typical cluster installations the manufacturer strongly recommends the use of a trained authorized installer Customer installation responsibilities e Set up of management consoles HMCs and CSM management servers e Install customer setup units according to server model e Update system firmware e Update InfiniBand switch software including Fabric Management software e If applicable install and customize the Fabric Management Server o including connection to the service VLAN o including any required vendor host stack o if applicable the QLogic Fast Fabric Toolset e Customize InfiniBand network configuration e Customize HCA partitioning and configuration e Verify the InfiniBand network topology and operation Copyright IBM Corp 2008 7 22 08 59 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware IBM Installation Responsibilities e Install and service IBM installable units servers and adapters and HCAs This includes the model F2A systems e Verify server operation for IBM installable units Third Party Vendor Installation Responsibilities Note This document cannot detail the contractual possibilities for third party responsibilities By contract the customer may be responsible for some of these activities It is suggested that you note the customer name or contracted vendor when planning these activities so that yo
202. etwork The following documents are referenced by this procedure e For IBM units o IBM HCA WCH o Server service guide e For QLogic units o Fast Fabric Toolset Users Guide o Switch Users Guide o Fabric Manager and Fabric Viewer Users Guide Note It is possible to perform some of the tasks in this procedure in a method other than that which is described If you have other methods for verifying the operation of the InfiniBand network you still must review a few key points in this installation process with regard to order and coordination of tasks and configuration settings that are required in a cluster environment e This procedure cannot be performed until all other procedures in the cluster installation have been completed These include o Management subsystem installation and configuration including Fabric Manager Fast Fabric Toolset o Server installation and configuration o InfiniBand switch installation and configuration o Cabling the InfiniBand network e The exceptions to what must be completely installed before performing this verification procedure include installation of the IBM HPC software stack and other customer specific software above the driver level e IBM service is responsible for replacing faulty or damaged IBM cable part numbers e Vendor service or the customer is responsible for replacing faulty or damaged non IBM cable part numbers e The customer should check the availability of HCAs to the operating sys
203. f original Create a new file for each time period throughout a 24 hour cycle This will allow you to point to a specific threshold for that time period This will help reduce false callouts of suspected faulty links Because you will need to reference these files with the all_analysis script name them based on the time period in which they will be used iba_mon conf time period Edit to update the symbol errors threshold to the value in Table 14 Symbol error thresholds 24 hour cycle 1 hour intervals below The default is shipped at 100 Leave all other thresholds at their default value Error Counters SymbolErrorCounter 100 For example using Table 14 Symbol error thresholds 24 hour cycle 1 hour intervals below for hour 12 you would have a file named iba_mon conf 12 with the following symbol error threshold setting Error Counters SymbolErrorCounter 5 Set up cron jobs to run all analysis with different threshold files For example if you start the 24 hour interval at 6AM the crontab could look like the following which assumes that the switch names begin with SilverStorm and that at 6AM the C is used to reset the counters 0 6 FF FABRIC HEALTH s C o errors o slowlinks F nodepat SilverStorm sbin all_ analysis etc syconfig iba_mon conf 0 0 7 11 sbin all_analysis c etc syconfig iba_mon conf 1 4 0 12 15
204. f07n04 C65 T1 4 f08n04 C65 T1 5 f07n05 C65 T1 5 f08n05 C65 T1 6 f07n06 C65 T1 6 f08n06 C65 T1 7 f07n07 C65 T1 T f08n07 C65 T1 8 f07n08 C65 T1 8 f08n08 C65 T1 9 f07n09 C65 T1 9 f08n09 C65 T1 10 f07n10 C65 T1 10 f08n10 C65 T1 11 f07n11 C65 T1 11 f08n11 C65 T1 12 f07n12 C65 T1 12 f08n12 C65 T1 A similar pattern as above is used for the next 3 switches Only the 4 switch s worksheets will be shown here Director Core Switch gt 24 ports 4 of 4 Switch Model _ 9140 Switch name _egsw04 Frame and slot f10s04 Chassis P addresses __ 10 1 1 13 9240 has two hemispheres Spine IP addresses slot1 10 1 1 19 slot2 10 1 1 23 set using setIBNodeDesc indicate spine slot Default gateway GID prefix _ fe 80 00 00 00 00 00 03 LMC 2 O default 2 if used in HPC cluster NTP Server _ CSM MS Switch MTMS Fill out during install New admin password Remote logging host _ CSM MS Fill out during install CSM MS is recommended Copyright IBM Corp 2008 7 22 08 86 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Leaf __ Leaf __ Ports Connection Ports Connection f01n01 C65 T4 f02n01 C65 T4 f01n02 C65 T4 f02n02 C65 T4 f01n03 C65 T4 f02n03 C65 T4 f01n04 C65 T4 f02n04 C65 T4 f01n05 C65 T4 f02n05 C65 T4 f01n06 C65 T4 f02n06 C65 T4 f01n07 C65 T4 f02n07 C65 T4 f01n08 C65 T4 f02n08 C65 T4 f01n09 C65 T4 f02n09 C65 T4 f01n10 C65 T4 f02n10 C65 T4 f01n11
205. file you would find these entries Start up configuration BM_0 start yes FE _0_start yes PM_0 start yes SM_0_start yes M_1_start yes _ Start yes 1_start yes _1_start yes _ Start yes 2_start yes _2_start yes _2_start yes _start yes 3_start yes _3_start yes _3_start yes we l nv T lt v w i w ae ee gE N W w nun Ze tb Instance 0 SM_0_device 0 SM_0_port 1 SM_0 _priority 1 SM_X Imc 2 MTU 4K SM_X def mc_mtu 0x5 rate is DDR SM_0_def mc _rate 0x6 SM_0_gidprefix 0xfe80000000000001 SM_0_node_appearance_ msg_thresh 10 PM 0 device 0 PM_0 port 1 PM_0 priority 1 BM_0_device 0 BM_0 port 1 BM_0 _priority 1 FE_0_device 0 FE _0 port 1 FE_0_priority 1 Instance 1 SM_1_device 0 SM_1 _port 2 SM_1_priority 1 SM_1 Imc 2 MTU 4K SM_1_ def_mc_mtu 0x5 rate is DDR SM_1 def _mc_rate 0x6 SM_1_gidprefix 0xfe80000000000002 SM_1_ node appearance msg_thresh 10 PM_1 device 0 PM_1 port 2 PM_1 _priority 1 BM_1_device 0 BM_1 port 2 Copyright IBM Corp 2008 7 22 08 52 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware BM_1_priority 1 FE_1_device 0 FE_1_port 2 FE_1_priority 1 Instance 2 SM_2_ device 1 SM_2 port 1 SM_2 priority 1 SM X Imc 2 MTU 4K SM_X_ def _mc_mtu 0x5 rate is DDR SM_ 2 def _mc_rate 0x6 SM_2_gidprefix 0xfe80000000000003 SM_2 node appearance msg_thresh 10 PM _ 2 device 1 PM 2 port 1 PM_2 priorit
206. following file local6 notice var log csm syslog fabric notices 5 restart syslogd using etc init d syslog restart 6 Setup the AIXSyslogSensor again a Copy old sensor into a new definition file using lsrsre i s Name AIXSyslogSensor IBM Sensor gt tmp AIXSyslogSensorDef b Edit tmp AIXSyslogSensorDef c Change Command to opt esm csmbin monaixsyslog p local6 notice f var log csm syslog fabric notices d Only after creating and editing tmp AIXSyslogSensorDef may you remove the sensor by using rmsensor AIXSyslogSensor Note If the sensor did not exist you may still continue to the next step e Make the new sensor and keep the management scope local CT MANAGEMENT SCOPE 0 mkrsrc f tmp AIXSyslogSensorDef IBM Sensor Note Local management scope is required or you will get an error indicating that the node CSM MS is not in the NodeNameList 7 Delete everything in the error monitoring directory var opt csm__aix syslog 8 Restart condition response association using startcondresp lt condition name gt lt response name gt 9 A short time later the following file appears in var opt csm_err_mon Copyright IBM Corp 2008 7 22 08 209 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware monaixsyslog_run local6 notice var log csm syslog fabric notices 10 Check the etc syslog conf configuration file to assure that the appropriate entries were added by monaixsyslog As
207. fy each switch s and Fabric Management Server s ip address in a separate line You must use the appropriate protocol as defined above udp ip 192 9 3 42 port 514 udp ip 192 9 3 50 port 514 c With syslog ng you must configure AppArmor to allow syslog ng to access the named pipe var log csm syslog fabric notices to which the remote syslog entries will be directed Syslog ng requires read write permission to named pipes i Edit the syslog ng file for AppArmor etc apparmor d sbin syslog ng ii Add var log csm syslog fabric notices wr just before the closing brace y in the sbin syslog ng stanza For example sbin syslog ng include lt abstractions base gt var run syslog ng pid w var log csm syslog fabric notices wr Copyright IBM Corp 2008 7 22 08 111 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware d Restart AppArmor etc init d boot apparmor restart e Setup a sensor for syslog fabric notices by copying the default and changing the default priority filter and monitored file i lsrsrc i s Name ErrorLogSensor IBM Sensor gt tmp ErrorLogSensorDef ii Modify the tmp ErrorLogSensorDef file by updating the Command attribute to Command opt csm csmbin monerrorlog f var log csm syslog fabric notices p f_fabnotices iii Remove the old sensor rmsensor ErrorLogSensor iv Make the new sensor and keep its scope local CT_MANAGEMENT_S
208. g embedded subnet managers or hostsm if using host based subnet managers health check failures If the SM is misconfigured or not running it can cause other health checks to fail in which case the SM problems should be corrected first then the helath check should be rerun and other problems should then be reviewed and corrected as needed Fora hostsm analysis the files should be reviewed in the following order latest hostsm smstatus make sure this indicates the SM is running If no SMs are running on the fabric that problem should be corrected before proceeding further Once corrected the health checks should be rerun to look for further errors latest hostsm smver diff this indicates the SM version has changed If this was not an expected change the SM should be corrected before proceeding further Once corrected the health checks should be rerun to look for further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been corrected latest hostsm smconfig diff this indicates that the SM configuration has changed This file should be reviewed and as necessary the latest hostsm smconfig file should be compared to baseline hostsm smconfig As necessary correct the SM configuration Once corrected the health checks should be rerun to look for further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been cor
209. g the instructions found in the Fast Fabric Toolset Users Guide Assuming you have set up the default chassis file to include all switches this should be pingall C ii On the CSM MS ping the switches or issue an fwVersion command to all of the switches using dsh This is made easier by using the IBSwitch Qlogic device type or setting up device groups in Remote Command Execution setup on page 117 The following is an example using the IBSwitch Qlogic device type and the fwVersion command dsh D IBSwitches devicetype IBSwitch Qlogic fwVersion iii If available from a console connected to the cluster VLAN open a browser and use each switch s IP address as a URL to verify that the Chassis Viewer comes up on each switch The QLogic switch Users Guide contains information about the Chassis Viewer iv If you have the QLogic Fabric Viewer installed bring it up and verify that all the switches are visible on all of the subnets The QLogic Fabric Manager and Fabric Viewer Users Guide contains information about the Fabric Viewer e Verify the switches are correctly cabled by running the baseline health check as documented in the Fast Fabric Toolset Users Guide These tools are run on the Fabric Management Server i Clear all the error counters cmdall C ismPortStats clear noprompt ii Run all_analysis b iii Go to the baseline directory as documented in the Fast Fabric Toolset Users Guide iv Check the fabric links files to ass
210. ge 191 The following table is used for symptoms found in Service Focal Point or by CSM Service Focal Point Monitoring Table 20 SFP Table of symptoms Symptom Procedure Reference Any code Use the IBM system Service Manual Then use Diagnosing and repairing IBM system problems on page 194 The following table is used for any symptoms reported outside of the above reporting mechanisms Table 21 Other Table of symptoms Symptom Procedure Reference Performance problem reported Diagnosing performance problems on page 200 Application crashes relative to the fabric Diagnosing application crashes on page 201 Management Subsystem Problems including unreported errors Diagnosing management subsystem problems on page 202 HCA preventing a logical partition LPAR from activating Recovering from an HCA preventing a logical partition from activating on page 211 Ping problems Diagnosing and recovering ping problems on page 201 Copyright IBM Corp 2008 7 22 08 171 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Symptom Procedure Reference Not running at desired 4K MTU Recovering to 4K MTU on page 214 Bad return codes or software failure indicators for Fabric Manager or Fast Fabric Software Check link to switch Use Capture data for Fabric Manager and Fast Fabric problems
211. ges follow For more details see Diagnosing configuration changes on page 194 Inadvertently moving a cable or swapping components around Replacing a part with one that has a different serial number Leaving a device powered off Link failure causing a device to be unreachable Firmware level change 6 4 2 Approach to link problem isolation In general for InfiniBand fabric problems you want to look at log entries which are a few minutes before and after a particular entry which you are diagnosing to see if these events are associated and which of these entries may indicate root cause Therefore the general InfiniBand isolation flow follows For a detailed procedure see Diagnosing link errors on page 191 1 Within a few minutes on either side of any event see how many other events are reported Copyright IBM Corp 2008 7 22 08 167 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 If there are multiple link errors first check for a common source This can be complex if non associated errors are reported around the same time For example if an HCA fails and a switch link fails which is not connected to the HCA you must be careful to not associate the two events a Map all link errors so that you understand which switch devices and which HCAs are involved You may have to map HCA GUIDs to physical HCAs and the servers in which they are populated so that you can check Service Focal Poi
212. gging and event management for the fabric on the CSM MS There are two sets of instructions One is for CSM running on AIX and the other is for CSM running on Linux Even if you don t plan on using CSM the remote syslog setup instructions would still be useful to consolidate Subnet Manager and switch logs into one place Note It is assumed that the Fabric Management Server setup for remote syslogging has already been done Note This procedure assumes that the CSM MS is NOT defined as a managed node It is assumed that administrators who have set up the CSM MS as a managed node are experienced and can modify this procedure to accommodate their configuration The key is to monitor the var log csm syslog fabric notices using a sensor and setting up a condition to monitor that sensor and direct the log entries to var log csm errorlog CSM MS hostname If the CSM MS is running AIX go to Remote Syslogging and Event Management for CSM on AIX below After finishing the event management set up proceed to step 2 on page 113 If the CSM MS is running Linux go to Remote Syslogging and Event Management for CSM on Linux on Remote Syslogging and Event Management for CSM on Linux on page 111 After finishing the event management set up proceed to step 2 on page 113 Remote Syslogging and Event Management for CSM on AIX You will be pointing the syslogd to one or two files into which to place the remote syslogs Note It is assumed that
213. ght IBM Corp 2008 7 22 08 104 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware expect 5 43 0 16 2 tel 8 4 12 16 2 e If this is going to be the primary data collection point for fabric diagnosis make sure this is noted One method would be to add this to the etc motd 7 F6 M2 If you are using a host based Fabric Manager install it using the Fabric Manager Users Guide The following are key rpms to install a iview_agent 4 2 0_0_xx rpm 4 2 0 0 xx refers to the level of the agent code b iview_fm 4_2_0_0_xx rpm 4 2 0 0 xx refers to the level of the fabric manager code c sm_query sm_query is a utility to get information from the Subnet Manager Note Do not start the Fabric Managers until the switch fabric has been installed and cabled completely Otherwise you will cause unnecessary log activity from the Fabric Manager which could cause confusion when trying to verify fabric operation d Run iview_fm stop This will assure that the Subnet Manager is stopped until it is required Verify that the Subnet Manager is stopped by running ps eflgrep iview 8 E6 M2 Configure the host based Fabric Manager by updating the iview_fm config file using the Fabric Manager Users Guide Note For more information about Fabric Management configuration see Fabric Manager Overview on page 30 and Planning Fabric Manager and Fabric Viewer on page 47 There is a separate instance
214. gic Switch Users Guide and Quick Setup Guide QLogic Best Practices Guide for a Cluster From your installation planner obtain QLogic Switch planning worksheets on page 74 4 7 1 InfiniBand switch installation and configuration information for expansion If this is a new installation skip this section If you are adding or expanding InfiniBand network capabilities to an existing cluster then you may need to approach the InfiniBand switch installation and configuration a little differently than with a new cluster flow The flow for InfiniBand switch installation and configuration is based on a new cluster installation but it will indicate where there are variances for expansion scenarios The following table outlines how the new cluster installation is affected by expansion scenarios Scenario Effects A Perf this task as if it were a new cluster installation Adding InfiniBand hardware to an epee easter pe existing cluster switches and HCAs You should not have to perform anything outlined in this Adding new servers to an existing majortask InfiniBand network You should not have to perform anything outlined in this Adding HCAs to an existing InfiniBand major task network Perform this task on new switches as if it were a new cluster Adding a subnet to an existing InfiniBand installation network Perform this task on new switches as if it were a new cluster Adding servers and a subn
215. gs for the resulting link downs shutdown the Subnet Managers e Why Excessive log entries can mask real problems later and also cause problems with extensive debug by upper levels of support Copyright IBM Corp 2008 7 22 08 223 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 EPO the IBM systems running on external 480V AC power Depending on the nature of the EPO you may leave the switches up provided that adequate cooling and power can be supplied to them a Ifyou can t leave the switches up then if you have stopped the embedded Subnet Managers you can shutdown the switches at any time Recall that you will either have to power off at a circuit breaker or pull all of the switch power cables because they have no physical or virtual power switches b Ifyou have to power off the Fabric Management Servers and you can do it before the IBM systems and the vendor switches that would eliminate the need to shutdown Subnet Managers e Why Consider the implications of excessive logging if you leave Subnet Managers running while shutting down devices on the fabric 3 Hit the 480V external AC power wall EPO 4 Once the situation is resolved restore wall power and re power the servers 5 After the servers are up walk the floor and look for LED indications of problems on the servers and switches and switch ports 6 Start the Subnet Managers If you had powered off the Fabric Management Server running
216. h Copyright IBM Corp 2008 7 22 08 157 of 238 KKK KKK KKK KKK IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware KKKKKKKKKKKK 17 19 KKKK 10g 0x00025500000d8b80 1 SW IBM logical switch 1 lt gt 0x00066a00d90003d6 15 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 10g 0x00025500000d8b81 1 SW IBM logical switch 2 LA L9 S 10g 0x00025500000d8b80 1 SW IBM logical switch 1 lt gt 0x00066a00d90003d6 14 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 10g 0x00025500000d8b81 1 SW IBM logical switch 2 kkkxkxkxkxkxkxkkkxxk 25 27 10g 0x00025500000da080 1 SW IBM logical switch 1 lt gt 0x00066a00d90003d6 14 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 10g 0x00025500000da081 1 SW IBM logical switch 2 2D 2 eE 10g 0x00025500000da080 1 SW IBM logical switch 1 lt gt 0x00066a00d90003d6 15 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d6 10g 0x00025500000da081 1 SW IBM logical switch 2 You can see in the swap in the above example by charting out the differences using the following table Note that the logical switch 2 lines happen to be extraneous information for this example because their connections are not shown by diff this is a result of using C 1 Switch Port Connected to HCA port in baseline Connected to HCA port in latest 0x00066a00d90003d6 15 SW 0x00025500000d8b80 1 SW IBM 0x00025500000da080 1 SW SilverStorm 9024 DDR logical switch
217. hat the destination definition uses the same protocol and port as is expected on the CSM MS the definition shown here is udp on port 514 The CSM MS information should have been noted in step 3 The standard syslogd uses udp filter f_fabinfo facility local6 and level info notice alert warn err crit and not filter f_iptables destination fabinfo_csm udp CSM MS IP address port 514 log source src filter f_fabinfo destination fabinfo_csm Note If you make a change you will have to restart the syslogd using etc init d syslog restart c For a switch check that it is configured to log to the CSM MS using logSyslogConfig on the switch command line Check that the following information is correct If it is not update it using logSyslogConfig h host p 514 f 22 m 1 The CSM MS is the host ip address The port is 514 or other than you ve chosen to use The facility is local 8 Ifthe problem persists then try restarting the syslogd on the CSM MS and also resetting the source s logging a Log onto the CSM MS b For AIX CSM run refresh s syslogd c For Linux CSM run etc init d syslog restart d Ifthe source is Subnet Manger running on a Fabric Management Server log on to the Fabric Management Server and run etc init d syslog restart e Ifthe source is a switch reboot the switch using the instructions in the Switch Users Guide using reboot on the switch CLI or Fast Fabric U
218. have to remove the interfaces and rebuild them You can also try simply bringing each one up as in Recovering a single ibX interface in AIX on page 212 The following commands can be run individually but the example uses loops on the command line The procedure must be modified based on the number of ibX interfaces in the server The following procedure is an example for a server with 8 ib interfaces get original set of ibX interfaces a lsdev grep InfiniBand awk print 1 egrep v iba icm remove the ibX interfaces for i in lsdev grep Infiniband awk print 1 egrep v iba icm do rmdev is only used for recovery purposes and not during installation rmdev 1 i d done remove the iba s for I in lsdev egrep iba 0 9 awk print 1 do rmdev 1 i d done remove the icm rmdev l1 icm d map the ib interfaces to iba s and addresses ib0 iba0 ibl iba0 ib2 ibal ib3 ibal ib4 iba2 ib5 iba2 ib6 iba3 ib7 iba4 addresses are just examples ib0addr 192 168 1 1 ibladdr 192 168 ib2addr 192 168 3 1 ib3addr 192 168 ib4addr 192 168 5 1 ib5addr 192 168 ib6addr 192 168 7 1 ib7addr 192 168 ooN errr cfgmgr re create the icm mkdev c management s infiniband t icm re make the iba s this loop really just indicates to step through all of the iba s and indicate the appropriate ibXs for each There should be two ibX interfaces f
219. he server part of M4 which are illustrated in Figure 9 on page 62 You will be installing operating systems and configuring the cluster s servers Note If possible do not begin this procedure until Management subsystem installation and configuration on page 95 is completed This helps alleviate the situation where various install personnel may be waiting on site for key parts of this procedure to be completed Depending on the arrival of units on site this is not always practical Review Order of install on page 61 and Figure 9 on page 62 to identify the merge points where a step in a major task or procedure that is being performed by one person is dependent of the completion of steps in another major task or procedure that is being performed by another person Before proceeding obtain the following documentation e Operating System installation guides e HCA install articles from the IBM systems Hardware Resource and Information Centers If this installation is for a cluster expansion or addition of hardware to a cluster before proceeding review Server installation and configuration information for expansion below 4 6 1 Server installation and configuration information for expansion If this is a new installation skip this section If you are adding or expanding InfiniBand network capabilities to an existing cluster by adding servers to the cluster then you may need to approach the Server installation and configuration
220. he Fast Fabric Users Guide for details on error thresholds Note The LinkDown counter in the IBM GX GX HCAs will be reset as soon as the link goes down This is part of the recovery procedure While this is not optimal the connected switch port s LinkDown counter will provide an accurate count of the number of LinkDowns for the link o misconnlinks Summary of links connected with mismatched speed o links Summary of links including to what they are connected Note iba_report is run on a subnet basis If you wish to gather data from all subnets attached to a fabric management server a typical technique is to use nested for loops to address the subnets via the appropriate HCAs and ports to reach all subnets For example for h in 1 2 do for p in 1 2 do iba_report o errors F nodepat SilverStorm done done Copyright IBM Corp 2008 7 22 08 163 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Examples All of the following examples simply query over the first port of the first HCA in the fabric management server You need to use p and h to direct the commands over a particular HCA port to reach the proper subnet iba_report o comps d 10 i 10 F portguid 0x0002550070011a00 The above command will get the comps report 10 seconds after clearing the counters for the portguid 0x002550070011a00 The d parameter set to 10 gives enough detail to include the port traffic
221. he GID prefix is set by the Subnet Manager Therefore each instance of the Subnet Manager must be configured with the appropriate GID prefix On any given subnet all instances of the Subnet Manager master and backups must be configured with the same GID prefix Planning GID Prefixes ends here 3 4 2 Planning an IBM GX HCA configuration An IBM GX host channel adapter HCA needs to have certain configuration settings to work in an IBM POWER InfiniBand cluster These are IPoIB performance between compute nodes may be degraded because they are bound by the 2K MTU Copyright IBM Corp 2008 7 22 08 43 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e GUID index e Capability e GID prefix for each port of an HCA InfiniBand subnet IP addressing based on subnet restrictions see IP subnet addressing restriction on page 44 Each physical InfiniBand HCA contains a set of 16 globally unique IDs GUIDs than can be assigned to partition profiles These are used to address logical HCA LHCA resources on an HCA You can assign multiple GUIDs to each profile but you can assign only one GUID from each HCA to each partition profile Each GUID can be used by only one logical partition at a time You can create multiple partition profiles with the same GUID but only one of those partition profiles can be activated at a time The GUID index is used to choose one of the 16 GUIDs available for an HCA It can be any numbe
222. he existing cluster 4 8 2 InfiniBand network cabling procedure It is possible to perform some of the tasks in this procedure in a method other than that which is described If you have other methods for cabling the InfiniBand network you still must review a few key points in the installation process with regard to order and coordination of tasks and configuration settings that are required in a cluster environment Copyright IBM Corp 2008 7 22 08 134 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware IBM is responsible for faulty or damaged IBM part number cable replacement Do the following to complete your switch network cabling 1 Obtain and review a copy of the cable plan for the InfiniBand network Label the cable ends before routing the cable 2 3 Power on the switches before attaching cables to them 4 C1 Route the InfiniBand cables according to the cable plan and attach them to only the switch ports Refer to the switch vendor documentation for more information on how to plug cables m C4 Connect the InfiniBand cables to the HCA ports according to the planning documentation 6 If both servers and switches have power applied as you complete cable connections you should check the port LEDs as you plug the cables Refer to the switch vendor s switch Users Guide to understand the proper LED states Fabric Management may now be started Note Depending on assigne
223. he procedure in Re configuring CSM event management on page 209 b Make sure that the condition is setup with usr bin Iscondition e use it without a parameter to check the state of the various conditions gt Monitored or Not Monitored e use it with the specific condition as a parameter The SelectionString will tell you which sensor it is monitoring e The condition should be associated with the sensor c Make sure the response is linked to the condition with usr bin Iscondresp e use it without a parameter to see the complete list of condition response combinations e use it with a specific condition as a parameter and you ll get a list of responses associated with that condition e The response and condition should be linked 7 You may have to restart the RSCT subsystem according to the RSCT Users Guide 8 Ifthe problem has not been fixed call your next level of support 6 26 1 2 Event not in CSM MS var log csm syslog fabric notices If the event is not in the remote syslog file for notices on the CSM MS War log csm syslog fabric notices do the following Note This assumes that you are using syslogd for syslogging If you are using another syslog application like syslog ng then you may have to alter this procedure to account for that However the underlying technique for debug should remain the same 1 Log onto the CSM MS 2 Verify that you can ping the source which should be either the Fabric Management Serve
224. he query Get the name and port for the switch The name should have been given such that it indicates where the switch is physically lt gt switch GUID port SW switch name IBnodeDescription Example results 5 Port 3 on switch SilverStorm 9024 DDR GUID 0x00066a00d90003d3 This switch has not been renamed and is using the default naming convention which includes the switch model and GUID Find the physical switch connection 6 Logon to the CSM Management Server 7 Find the server and HCA port location Note If you have a map of HCA GUIDs to server locations use that to find in which server the HCA is located and skip step a a Convert the logical switch GUID to Operating system format which drops the Ox and uses a dot or colon to delimit bytes For AIX a dot delimits each byte 0x00025500103a7202 becomes 00 02 55 00 10 3a 72 02 For Linux a colon delimits two bytes 0x00025500103a7202 becomes 0002 5500 103a 7202 b Drop the last two byte from the GUID 00 02 55 00 10 3a for AIX 0002 5500 103a 72 for Linux c Run the following command to find the server and adapter number for the HCA Copyright IBM Corp 2008 7 22 08 182 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware For AIX use the following dsh v N AIXNodes ibstat p grep p 1lst seven bytes of GUID grep iba Example results gt dsh v N AIXNodes ibstat p grep p 00 02 55 00 10 3a 72 grep iba
225. here Copyright IBM Corp 2008 7 22 08 141 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 11 Verifying the installed InfiniBand network fabric in AIX or Linux Verifying the installed InfiniBand network fabric in AIX or Linux After the InfiniBand network is installed the GX adapters and the network fabric must be verified through the operating system To verify the installed InfiniBand network fabric in AIX or Linux refer to the following topics e ATX see Verifying the GX HCA connectivity in AIX e Linux see Verifying the GX HCA to InfiniBand fabric connectivity in Linux 4 11 1 Verifying the GX HCA connectivity in AIX To verify the GX HCA connectivity in AIX check the HCA status by running the lsdev C grep ib script An example of good results for verifying a GX HCA is ibaO Available Infiniband host channel adapter 4 11 2 Verifying the GX HCA to InfiniBand fabric connectivity in Linux Refer to the documentation provided with SUSE Linux Enterprise Server 10 SP2 with IBMInfiniBand GX HCA driver and OpenIB Gen2 Stack Refer to the instructions in the eHCAD install file contained within the download from SourceForge web site http sourceforge net projects ibmehcad Verifying the installed InfiniBand network fabric in AIX or Linux ends here 4 12 Fabric verification This section describes how to run afabric verification application and check for faults to verify fabric opera
226. hooting Guide QLogic Switch Users Guide Ye Copyright IBM Corp 2008 7 22 08 142 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 12 3 Fabric verification tasks To verify fabric operation you will 1 Install the Fabric verification application Setup the Fabaric verification application Clear error counters in the fabric to have a clean reference point for subsequent health checks ge Se Perform verification by doing the following a Run the Fabric Verification application b Look for events revealing fabric problems c Runa Health check 5 Repeat steps 3 and 4 until no problems are found in the fabric 4 12 4 Fabric Verification Procedure 1 Install the Fabric verification application using any instructions that come with it 2 Clear the error counters in the fabric using sbin iba_report C o none 3 Run the Fabric Verification application using any instruction that come with it If there are multiple passes then you should return to step 2 for each pass 4 Check for problems a Check Service Focal Point on all HMCs If there is a serviceable event reported contact IBM Service If you setup Service Focal Point monitoring as in Setup Remote Logging on page 108 you can check for events on the CSM MS first by using the procedures for SFP monitoring in the CSM Administration Guide b Check the switch and Subnet Manager logs i Onthe CSM MS check var log csm errorlog CSM MS hos
227. ibm com webapp set2 sas f networkmanager home html for information regarding the most current release levels of system firmware power subsystem firmware applies to IBM systems with 24 inch racks Follow the links in the IBM Clusters with the InfiniBand Switch web site to the appropriate download sites and instructions S5 Verify system operation from the HMCs by performing the following procedure at each HMC for the cluster a Bring the servers to LPAR standby and verify the system s viability by waiting several minutes and checking Service Focal Point If you cannot bring a server to LPAR Standby or there is a serviceable event reported in Service Focal Point perform the prescribed service procedure as found in i For POWER6 IBM Resource Link for the IBM system on which the LPAR is running see http www ibm com servers resourcelink where you should start with the Library Resource Link access requires an IBM Registration ID IBM ID ii For POWERS IBM systems Hardware Information Center http publib boulder ibm com infocenter eserver v 1r3s index jsp b To verify each server use the following procedure to run the eServer diagnostics i Depending on the server and who is doing the installation you may want to run these diagnostics from the CD ROM AIX NIM SPoT or concurrently from an installed AIX operating system The LPAR must be configured and activated before you may run eServer diagnostics
228. icate the matter with how logical devices are interpreted by the Subnet Manager The following resources are generally reported by the Subnet Manager when they appear or disappear Even if the exact resource is not always given there is a count given 1 Switches Copyright IBM Corp 2008 7 22 08 220 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 HCAs or channel adapters CAs 3 End ports 4 Ports 5 Subnet Managers Note The count of the number of resources is given by an individual Subnet Manager If there are multiple subnets you must add up the results from the each master Subnet Manager on each subnet 6 35 1 Counting Switches Physical switches generally come in two varieties 1 24 port base switch 2 Director level with spines and leafs These are the big ones with 48 ports or more With the IBM GX HCA you also get a logical switch per physical port This is what connects the logical HCAs to the physical ports which yields the capability to virtualize the HCA A physical switch is constructed using one or more switch chips A switch chip has 24 ports used to construct the fabric A base 24 port switch needs only one switch chip to yield 24 ports The director level switches like the 9120 use cascading switch chips interconnected to yield a larger number of ports supported by a given chassis This gets you to the concept of leaf boards that have the cables and then spines that in
229. ich is external to the frame Copyright IBM Corp 2008 7 22 08 34 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 4 Vendor log flow to CSM event management One of the important points of integration for vendor and IBM management subsystems is log flow from the vendor s management applications to CSM event management This provides a consolidated logging point in the cluster The flow of log information is illustrated in Figure 6 Vendor Log Flow to CSM Event Management on page 35 For it to work you have to set up remote logging and CSM Event Management with the Fabric Management Server and the switches as in Setup Remote Logging on page 108 Remote Logging Enabled and CSM Event Management Enabled are indicated in the figure where these functions must be enabled for the flow to work CSM Management Server Subnet Manager ms var log csm syslog fabric info Switch Remote Logging Enabled Log Ch assis Remote Manager Logging Enabled Remote Logging Enabled a CE er var log csm syslog fabric notices Fabric Management Server SM Event Management Enabled pitta CSM Event anaga Management Syslog var log messages a var log csm errorlog CSM MS hostname Auditlog Figure 6 Vendor Log Flow to CSM Event Management Copyright IBM Corp 2008 7 22 08 35 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 4 Supported components in an HPC cluster
230. ide using InfiniBand Hardware gt dsh v N AIXNodes ibstat p grep p 00 02 55 00 10 3a 72 grep iba c924flecl0 ppd pok ibm com IB PORT 1 INFORMATION iba0 c924flecl10 ppd pok ibm com IB PORT 2 INFORMATION iba0 d For Linux use the following dsh v N LinuxNodes ibv_devinfo grep B1 1lst seven bytes of GUID grep ehca Example results gt dsh v N AIXNodes ibv_devinfo grep B1 0002 5500 103a 72 grep ehca hca_id ehcao0 e The server is in the first field and the adapter number is in the last field c924f1ec10 ppd pok ibm com and ibao in AIX or ehca0 in Linux f To find the physical location of the logical switch port use the logical switch number and iba device found above with the Table 25 IBM GX HCA physical port mapping from iba device and logical switch on page 187 Example Results iba0 ehca0 and logical switch 1 map to C65 T1 Therefore c924flec10 C65 T1 is attached to port 3 of SilverStorm 9024 DDR GUID 0x00066a00d90003d3 7 This procedure ends here 6 9 3 Finding devices based on a known logical HCA Use this procedure if the logical HCA in an HCA is known and the attached switch and physical HCA port must be determined This applies to IBM GX HCAs For more information on the architecture of IBM GX HCAs and logical switches within them see IBM GX GX HCA on page 21 Note This procedure has some steps that are specific to operating system type AIX or Linux This has to do
231. ific to each server in the server s documentation and do this at the time of planning or you can work with the IBM Service Representative at the time of the installation to make the proper notation with regard to IBM location code Generally the only piece of information not available during the planning phase is the server s serial number which is used as part of the location code HCAs generally have the location code U server feature code 001 server serial number Px Cy Tz where Px represents the planar into which the HCA plugs Cy represents the planar connector into which the HCA plugs Tz represents the HCA s port into which the cable plugs Copyright IBM Corp 2008 7 22 08 74 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Use the following worksheet for planning 24 port switches 24 port switch worksheet Switch Model Switch name set using setIBNodeDesc CSM Device name Frame and slot cluster VLAN IP address Default gateway GID prefix LMC O default 2 if used in HPC cluster NTP Server Switch MTMS Fill out during install New admin password Fill out during install Remote logging host CSM MS is recommended Ports Connection 1 16 Oo jo IN ITD v A O JIN Copyright IBM Corp 2008 7 22 08 75 of 238 IBM System p HPC Clusters Fab
232. ight IBM Corp 2008 7 22 08 48 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Fabric Management Server Fabric Manager 0 SM_0 PM_0 BM_0 FE 0 Fabric Manager 1 SM_1 PM 1 BM _1 FE 1 Fabric Manager 2 SM _ 2 PM 2 BM 2 FE 2 Fabric Manager 3 SM 3 PM 3 BM 3 FE 3 Note In the etc sysconfig iview_fm config file HCA1 would correspond to SM_X_device 0 and HCA2 would correspond to SM_X_device 1 Figure 7 Typical Fabric Manager Configuration on a single Fabric Management Server Copyright IBM Corp 2008 7 22 08 49 of 238 Primary FMs for subnets to 4 priority 1 Backup FMs for subnets 1 to 4 priority 0 Primary FMs for subnets 5 to 8 priority 1 Backup FMs for subnets 5 to 8 priority 0 Figure 8 Typical Fabric Management Server configuration with 8 subnets Fabric Management Server 1 Fabric Manager 0 Priority 1 Fabric Manager 1 Priority 1 Fabric Manager 2 Priority 1 Fabric Manager 3 Priority 1 Fabric Manager 0 Priority 0 Fabric Manager 1 Priority 0 Fabric Manager 2 Priority 0 Fabric Manager 3 Priority 0 Fabric Manager 0 Priority 1 Fabric Manager 1 Priority 1 Fabric Manager 2 Priority 1 Fabric Manager 3 Priority 1 Fabric Manager 0 Priority 0 Fabric Manager 1 Priority 0 Fabric Manager 2 Priority 0 Fabric Manager 3 Priority 0 Copyright IBM Corp 2008 7 22 08 IBM System p HPC Clu
233. ight IBM Corp 2008 7 22 08 84 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 8 3 Switch Planning Worksheet example Director Core Switch gt 24 ports 1 of 4 Switch Model 9140 Switch name _egsw01 Frame and slot f10s01 Chassis IP addresses 10 1 1 10 set using setIBNodeDesc 9240 has two hemispheres Spine IP addresses slot1 10 1 1 16 slot2 10 1 1 20 indicate spine slot Default gateway GID prefix _ fe 80 00 00 00 00 00 00 LMC 2 O default 2 if used in HPC cluster NTP Server CSM MS Switch MTMS Fill out during install New admin password Fill out during install Remote logging host _ CSM MS CSM MS is recommended Leaf _1_ Leaf _2_ Ports Connection Ports Connection 1 f01n01 C65 T1 1 f02n01 C65 T1 2 f01n02 C65 T1 2 f02n02 C65 T1 3 f01n03 C65 T1 3 f02n03 C65 T1 4 f01n04 C65 T1 4 f02n04 C65 T1 5 f01n05 C65 T1 5 f02n05 C65 T1 6 f01n06 C65 T1 6 f02n06 C65 T1 7 f01n07 C65 T1 7 f02n07 C65 T1 8 f01n08 C65 T1 8 f02n08 C65 T1 9 f01n09 C65 T1 9 f02n09 C65 T1 10 f01n10 C65 T1 10 f02n10 C65 T1 11 f01n11 C65 T1 11 f02n11 C65 T1 12 f01n12 C65 T1 12 f02n12 C65 T1 Copyright IBM Corp 2008 7 22 08 85 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Leaf _7_ Leaf _ 8_ Ports Connection Ports Connection 1 f07n01 C65 T1 1 f08n01 C65 T1 2 f07n02 C65 T1 2 f08n02 C65 T1 3 f07n03 C65 T1 3 f08n03 C65 T1 4
234. ile with switches listed gt Copyright IBM Corp 2008 7 22 08 175 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e Various hosts files should have been configured which can help you target subsets of Fabric Management Servers 4 By default data will be captured to files in the uploads directory below the current directory when you run the command 5 Get Health check data from a Baseline health check var opt iba analysis baseline b Latest health check var opt iba analysis latest c From failed health check runs var opt iba analysis lt timestamp gt 6 7 1 Using script command to capture switch CLI output If you are directed collect data directly from a switch CLI it is typical to capture the output using the script command which is available on both Linux and AIX The script command captures the standard output stdout from the telnet or ssh session with the switch and places it into a file Note Some terminal emulation utilities will allow you to capture the terminal session into a log file This may be an acceptable alternative to using the script command To do this perform the following 1 On the host from which you will log into the switch run script lt dir gt lt switchname gt capture lt timestamp gt e Choose a directory into which to store the data e Itis good practice to have the switch s name in the output filename e Itis good practice to put a timestamp into the ou
235. ing HCA can be unassigned from the logical partition profile while the logical partition is active hung or inactive If the logical partition is currently active the logical partition needs to be shutdown and then activated for this update to take effect You do not have to do reactivate the logical partition if you are deferring maintenance on an HCA By changing the defective HCA to Unassigned in the partition profile you are ensuring that the next activation is not prevented by a failing HCA 6 This procedure ends here 6 28 Recovering ibX interfaces There are several levels at which you may recover ibX interfaces which are the interfaces to the HCA in AIX 1 Recovering a single ibX interface in AIX on page 212 2 Recovering all of the ibX interfaces in an LPAR in AIX on page 213 Before performing any of the above procedures if you have GPFS 6 28 1 Recovering a single ibX interface in AIX First try and bring the interface up ifconfig ib interface up You may have to completely remove and rebuild the interface rmdev 1 ibX chdev 1 ibX a superpacket on a state up a tcp _sendspace 524288 a tcp_recvspace 524288 a srq_size 16000 mkdev 1 ibX Copyright IBM Corp 2008 7 22 08 212 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 28 2 Recovering all of the ibX interfaces in an LPAR in AIX If you are recovering all of the ibX interfaces in a server it is probable that you will
236. ing InfiniBand Hardware The Event Monitoring worksheet follows this worksheetn allows for multiple Sensor Response mechanisms to be documented CSM Planning Worksheet CSM MS Name CSM MS IP addresses service VLAN cluster VLAN CSM MS Operating System NTP Server Server Model Frame syslog or syslog ng or other syslogd Switch Remote Command Setup DeviceType IBSwitch QLogic for QLogic Switches RemoteShellUser admin note if should be different from admin RemoteShell ssh RemoteCopyCmd usr bin scp Device names addresses of switches Device groups for switches Fabric Management Server Remote Command Setup DeviceType FabricMS RemoteShellUserID root default RemoteShell ssh RemoteCopyCmd usr bin scp Device names or addresses of Fabric MS Device groups for Fabric MS Primary Fabric MS for data collection Copyright IBM Corp 2008 7 22 08 77 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware CSM Event Monitoring Worksheet syslog or syslog ng or other Accept logs from any ip address 0 0 0 0 yes default Fabric Management Server Logging tcp or udp port 514 default Fabric Management Server ip addresses Switch Logging is udp protocol port 514 default Switch chassis ip addresses NOTICE INFO Sensor
237. ing order latest chassis hwCheck make sure this indicates all chassis are operating properly with the desired power and cooling redundancy If there are problems they should be corrected but other analysis files can be analyzed first Once any problems are corrected the health checks should be rerun to verify the correction latest chassis fwVersion diff this indicates the chassis firmware version has changed If this was not an expected change the chassis firmware should be corrected before proceeding further Once corrected the health checks should be rerun to look for further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been corrected latest chassis diff These files reflect other changes to chassis configuration based on checks selected via FF_CHASSIS_CMDS The changes in results for these remaining commands should be reviewed As necessary correct the chassis Once corrected the health checks should be rerun to look for Copyright IBM Corp 2008 7 22 08 156 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been corrected If any health checks failed after correcting the related issues another health check should be run to verify the issues were all corrected If the failures are due to expected and permana
238. ing servers hardware to an servers to an Adding HCAs subnet to and a subnet to an existing cluster existing to an existing an existing existing switches and InfiniBand InfiniBand InfiniBand InfiniBand HCAs network network network network F3 Site serp tor floor tile cut power cooling and Yes Yes Yes Yes outs for cables floor on page 93 4 4 Management subsystem installation Yes Yes for install No Yes Yes and configuration on images page 95 4 5 Installing and configuring the cluster Yes Yes Yes No Yes server hardware on page 121 4 7 InfiniBand switch installation and If CSM and configuration for Yes CRHS will be No Yes Yes vendor switches on used page 129 4 8 Attach cables to the InfiniBand Yes Yes Yes Yes Yes network on page 134 4 9 Verify the Diin Band netwouls Yes Yes Yes Yes Yes topology and operation on page 136 CRHS Cluster Ready Hardware Server This occurs when 1 A single HMC is in an existing cluster and at least one more HMC is to be added to the cluster 2 Servers are being added to an existing cluster 3 Added servers require you to add one or more new HMCs 4 You must use CSM and CRHS and configure the switches with static IP addressing on the cluster network 4 3 Site setup for power cooling and floor The Site setup for power cooling and the floor encompasses major task U illustrated in Figure 9 on page 62 Copyright IBM Cor
239. ins is critical to achieving correct cluster device discovery It is also important to have a central DHCP server which is recommended to be on the same server as CSM M3 Connect servers hardware control points to the service VLAN as instructed by server installation documentation The location of the connection is dependent on server model and may involve connected to BPCs or directly to a server s FSP connection Do not attach switches to the cluster VLAN at this time Also attach the management consoles to the service and cluster VLANs Note Switch IP addressing is going to be static Each switch comes up with the same default address Therefore you must set the switch address before it comes onto the service VLAN or bring the switches one at a time onto the service VLAN and assign a new IP address before bringing the next switch onto the service VLAN M4 Do the portion of final Management console installation and configuration which involves assigning or acquiring servers to their managing HMC s and authenticating frames and servers through Cluster Ready Hardware Server This is only required when you are using CSM and Cluster Ready Hardware Server Copyright IBM Corp 2008 7 22 08 63 of 238 Do the following Switch installation and configuration tasks W2 through W6 Do IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note The double arrow between M4 and S3
240. install a new cluster If you understand the full installation flow of a new cluster installation you can more easily identify the tasks that you will perform when you expand your InfiniBand cluster network Tasks such as adding InfiniBand hardware to an existing cluster adding host channel adapters HCAs to an existing InfiniBand network and adding a subnet to an existing network are discussed later in this section To complete a cluster installation all devices and units must be available before you begin installing the cluster Fundamental tasks for installing a cluster include Site is set up with power cooling and floor requirements Install and configure switches and processing units Install and configure the management subsystem Connect cabling of units to the service VLAN Verify that the units can be discovered on the service VLAN Verify basic unit operation Connect cabling for the InfiniBand network Verify the InfiniBand network topology and operation POS rh eta The Figure 9 High level cluster installation flow on page 62 breaks down the tasks by major subsystem The following list illustrates the preferred order of installation by major subsystem The order minimizes potential problems with having to perform recovery operations as you install and also minimizes the number of reboots of devices during the install 1 Management consoles and the service VLAN Management consoles include the HMC and any server running CSM as
241. ion The following figure illustrates a single physical 2 port HCA This is realized with a single chip which can support two ports A 4 port HCA card has two chips with a total of 4 logical switches realized by having 2 logical switches in each of the 2 chips 2 Port IBM GX GX HCA logical logical Port 1 switch logical Port 2 switch logical HCA logical HCA The logical structure affects how the HCA presents itself to the Subnet Manager Each logical switch and logical HCA presents itself as a separate InfiniBand node to the Subnet Manager on each port Each logical HCA will present itself to all logical switches in the HCA Each logical switch has a port Globally Unique Identifier GUID for the physical port and a port GUID for each logical HCA Each logical HCA has two port GUIDs one for each logical switch The number of nodes that can be presented to the Subnet Manager is also a function of the maximum number of LHCAs that can be assigned This is a configurable number for POWER6 GX HCAs and it is a fixed number for pSeries Power 5 GX HCAs The Power Hypervisor PHyp communicates with the Subnet Manager using the Subnet Management Agent SMA function in Phyp The Power 6 GX HCA defaults to support a single LHCA In this case it presents each physical port to the Subnet Manager as a 2 port logical switch where 1 port connects to the logical HCA LHCA and the second port connects to the physical port The Power 6 G
242. ion Responsibilities for Switch Network Cabling The customer must work with the switch manufacturer or its designee or another contracted organization to determine who is responsible for installing the switch network cabling However if a cable with an IBM part number fails IBM service is responsible for servicing the cable Installation Responsibilities for Service VLAN Ethernet Devices Any Ethernet switches or routers required for the service VLAN are the responsibility of the customer Installation Responsibilities for Service VLAN Cabling Whichever organization is responsibility for the installation of a device is responsible for connecting it to the service VLAN Installation Responsibilities for Fabric Manager Software The Customer is responsible for updating the Fabric Manager software on the switch or the Fabric Management Server Copyright IBM Corp 2008 7 22 08 60 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Installation Responsibilities for Fabric Management Server The Customer is responsible for installing customizing and updating the Fabric Management Server Installation Responsibilities for QLogic Fast Fabric Toolset and host stack The Customer is responsible for installing customizing and updating the QLogic Fast Fabric Toolset and host stack on the Fabric Management Server 3 7 4 Order of installation This section provides a high level outline of the general tasks required to
243. ion and type of HCAs being used in the cluster Switch and Subnet Manager SM Settings indicates the settings for the switch chassis and Subnet Manager that are recommended The Chassis MTU is used by the switch chassis and applies to the entire chassis and should be set the same for all chassis in the cluster Furthermore Chassis MTU affects MPI The Broadcast MTU is set by the Subnet Manager and affects IP It is part of the broadcast group settings It should be the same for all broadcast groups MPI MTU indicates the setting that MPI requires for the configuration IP MTU indicates the setting that IP requires MPI MTU and IP MTU are included to help understand the settings indicated in the Switch and SM Settings column The BC rate is the broadcast MTU rate setting which will either be 10GB 3 or 20GB 6 SDR switches run at 10GB and DDR switches run at 20GB The number in parentheses indicates the parameter setting in the firmware and SM which represents that setting Table 8 MTU Settings Homogeneous System p5 GX HCA only Chassis MTU 2K 4 2K 2K HCAs Broadcast MTU 2K 5 BC Rate 10GB 3 Copyright IBM Corp 2008 7 22 08 42 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Homogeneous System p POWER6 GX Chassis MTU 4K 5 HCAs HCA only in 9125 F2A Broadcast MTU 4K 5 BC Rate 10GB 3 for SDR switches or 20GB 6 for DDR switches Homogeneous POWER6 GX HCA in Chassis MTU 2K 4
244. ion in Management Subsystem Planning on page 45 The planning information will address When you need Cluster Systems Management CSM HMCs in a cluster AIX NIM and Linux distribution servers Planning CSM as your Systems Management Application on page 46 Planning for QLogic Fabric Management Applications on page 47 Planning for Fabric Management Server on page 55 Planning Event Monitoring with QLogic and CSM on page 56 Planning Remote Command Execution with QLogic from the CSM MS on page 57 7 After you understand the various devices in your cluster review Frame Planning on page 58 as a final step to assure that you have properly planned where to put devices in your cluster 8 After you understand the basic concepts for planning the cluster review the high level installation flow information in Planning Installation Flow on page 59 There are hints about planning your installation and also guidelines to help you to coordinate between you customer and IBM Service Representative Responsibilities and vendor responsibilities during the installation process 9 Consider special circumstances such as whether you are configuring a cluster for High Performance Computing HPC Message Passing Interface MPI applications in which case you should refer Important information for planning an HPC MPI configuration on page 66 10 For some more hints and tips on installation planning refer to Planning Aids on
245. itch 1 lt gt 0x00066a00d90003d3 3 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d3 The physical switch port is in the last line of the results of the query Get the name and port for the switch The name should have been given such that it indicates where the switch is physically lt gt switch GUID port SW switch name IBnodeDescription Example results Port 3 on switch SilverStorm 9024 DDR GUID 0x00066a00d90003d3 This switch has not been renamed and is using the default naming convention which includes the switch model and GUID Logon to the CSM Management Server Find the server and HCA port location Note If you have a map of HCA GUIDs to server locations use that to find in which server the HCA is located and skip step a a Convert the logical switch GUID to Operating system format which drops the Ox and uses a dot or colon to delimit bytes For AIX a dot delimits each byte 0x00025500103a7202 becomes 00 02 55 00 10 3a 72 02 For Linux a colon delimits two bytes 0x00025500103a7202 becomes 0002 5500 103a 7202 b Drop the last two bytes from the GUID 00 02 55 00 10 3a for AIX 0002 5500 103a 72 for Linux c Run the following command to find the server and adapter number for the HCA For AIX use the following dsh v N AIXNodes ibstat p grep p l1lst seven bytes of GUID grep iba Example results Copyright IBM Corp 2008 7 22 08 180 of 238 IBM System p HPC Clusters Fabric Gu
246. itch 1 lt gt 0x00066a00d90003d3 3 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d3 The physical switch port is in the last line of the results of the query Get the name and port for the switch The name should have been given such that it indicates where the switch is physically lt gt switch GUID port SW switch name IBnodeDescription Example results Port 3 on switch SilverStorm 9024 DDR GUID 0x00066a00d90003d3 This switch has not been renamed and is using the default naming convention which includes the switch model and GUID 11 Therefore for ibO in the server the C65 T1 HCA port is attached to port 3 of SilverStorm 9024 DDR GUID 0x00066a00d90003d3 12 This procedure ends here 6 10 IBM GX HCA Physical port mapping based on device number Use the following table to find IBM GX HCA physical port based on iba device and logical switch number For more information on the structure of the IBM GX HCA see IBM GX GX HCA on page 21 Table 25 IBM GX HCA physical port mapping from iba device and logical switch iba Switch EA4 EA8 warner fa foss ibatieneat_ 2 C65 T4 C66 T1 i 1 i 2 a re noma inaaiehea2 2 costa i peee 2 a ibadieheas Ji ibasieheas 2 C66 T3 C66 T4 Copyright IBM Corp 2008 7 22 08 187 of 238 6 11 Interpreting switch vendor log formats This section is broken down into sub sections to cover e Log Severities e The switch chassis management log format e
247. itch chassis management code is embedded firmware that runs in the switch chassis While the fabric manager code updates are documented in the Fabric Manager Users Guide please consider the following e For the switch chassis management code the Fast Fabric Toolset has the capability to update the code across all switches simultaneously using the ibtest command see the Fast Fabric Toolset Users Guide e If you only need to update code on one switch you can do this using the Chassis Viewer see the Switch Users Manual e You need to place the switch chassis managment code on the Fabric Management Server e Ifyou have multiple primary Fabric Management Servers you can issue the ibtest command from CSM MS using dsh to all of the primary Fabric Management Servers simultaneously This capability must be setup using Remote Command Execution setup on page 117 5 8 Finding and Interpreting Configuration Changes Configuration changes are best found using the Fast Fabric Health Check tool see Health Checks on page 151 Note If you have multiple primary Fabric Management Servers you must run the health check on each primary server because Fast Fabric can only access subnets to which its server is attached You may consider using CSM MS to remotely execute this function to all primary Fabric Management Servers see Remotely accessing QLogic management tools and commands from CSM MS on page 159 At the end of the installation process a baseline he
248. ith multiple switches or multiple fabric managers simultaneously Switch Users Guide After the configuration setup has been performed the user will probably only use the chassis viewer as part of diagnostics after the Fabric Viewer or Fast Fabric tools have been employed and isolated a problem to a chassis Switch Chassis The Chassis Viewer is accessible via any browser on a server connected to the Ethernet network to which the switch is attached The switch s IP address is the URL that will bring up the chassis viewer 2 3 3 2 Switch CLI Overview Description Documentation When to Use Host How to access The Switch Command Line Interface is a non GUI method for configuring switches and querying state It is also used to access the embedded Subnet Manager Switch Users Guide After the configuration setup has been performed the user will probably only use the CLI chassis viewer as part of diagnostics after the Fabric Viewer or Fast Fabric tools have been employed However using CSM MS dsh or Expect remote scripts can access the CLI for creating customized monitoring and management scripts Switch chassis Telnet or ssh to the switch using its IP address on the cluster VLAN Fast Fabric Toolset dsh from the CSM MS Laptop connected to the RS 232 port Copyright IBM Corp 2008 7 22 08 29 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 3 3 Fabric Manager Overview Desc
249. ith its firmware level opt csm bin dsh D AllIBSwitches devicetype IBSwitch Qlogic fwVersion more g You may now use dsh dor dsh D to remotely access the switches from the CSM MS Do not forget to use the devicetype option so that dsh uses the appropriate command sequence to the switches 3 R3 M4 It is good practice to create device groups to allow you to direct commands to groups of switches and Fabric Management Servers The above steps had you set up a group for all Fabric Management Servers and a group for all switches See the CSM Administration Guide for more details on setting up device groups Some possible groupings are Copyright IBM Corp 2008 7 22 08 119 of 238 b c d IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware All the fabric management servers AllFabricMS All primary fabric management servers All of the switches AllIBSwitches A separate subnet group for all of the switches on a subnet 4 This procedure ends here 4 4 9 Server Install and Configuration with Management Consoles This procedure simply outlines the considerations for final configuration of management consoles HMC CSM OS install servers to work with servers It is included to help understand final configuration of the Management Subsystem The task references in this procedure are all from Figure 9 High level cluster installation flow on page 62 Do not start this procedure until all
250. ith various numbers of HCAs list the number of servers with each configuration for example 12 servers with one 2 port HCA 4 servers with two 2 port HCAs Number and types of switches include model numbers 4 9140 require connections for Fabric Management Servers and for 9124 F2As Number of subnets 4 List of GID prefixes and subnet masters assign a number to a subnet for easy reference subnet 1 FE 80 00 00 00 00 00 00 egf11fm01 subnet 2 FE 80 00 00 00 00 00 01 egf11fm02 subnet 3 FE 80 00 00 00 00 00 00 egf11fm01 subnet 4 FE 80 00 00 00 00 00 01 egf11fm02 Number and types of frames include systems switches management servers AIX NIM Linux Distribution 8 for 9125 F2A 1 for switches CSM MS and Fabric Management Servers AIX NIM server on CSM MS Number of HMCs 3 CSM and Cluster Ready Hardware Server to be used If yes gt server model Yes Number of and models for Fabric Management Servers 1 System x 3650 Number of Service VLANs 2 Service VLAN domains 10 0 1 x 10 0 2 x Service VLAN DHCP server locations egesmsv01 10 0 1 1 CSM MS Service VLAN InfiniBand switches static IP addresses N A see Cluster VLAN Service VLAN HMCs with static IP 10 0 1 2 10 0 1 4 Service VLAN DHCP range s 10 0 1 32 10 0 1 128 Number of cluster VLANs 1 Cluster VLAN domains 10 1 1 x Cluster VLAN DHCP server locations
251. ities go to the following file local6 info var log csm syslog fabric info b Ifthe CSM MS is using syslog ng the following lines should be in etc syslog ng syslog ng conf filter f fabinfo facility local6 and level notice alert warn err crit and not filter f iptables destination fabnotices fifo pipe var log csm syslog fabric notices group root perm 0644 log source src filter f fabnotices destination fabnotices fifo port 514 port 514 udp ip tcp ip Note If the Fabric Management Server is only using udp as the transfer protocol for log entries then the tep line is not needed Step 6 indicates how to check this In either case make note of the protocols and ports and ip addresses in these lines Using 0 0 0 0 will accept logs from any address If you wanted more security you may have had a line for each switch and Fabric Management Server from which you wish to receive logs If you have a specific address named assure that the source of the log has an entry with its address Switches use udp Fabric Management Servers are configurable for tcp or udp 4 Ifthe entries are not there do the following a Edit the etc syslog conf or syslog ng conf file and add it to end of the file b Restart the syslogd For AIX hosts run refresh s syslogd For Linux hosts run etc init d syslog restart 5 Look at the log on the device that is logging the problem and make sure that it
252. jindicates that these two tasks cannot be completed independently As the server installation portion of the flow is completed then the management console configuration can be completed Setup remote logging and remote command execution and verify these operations When M4is complete the BPAs and cluster servers service processors must be at power standby state To be at the power standby state the power cables for each server must be connected to the appropriate power source Prerequisites for M4 are M3 52 and W3 co requisite for M4 is S3 The following server installation and configuration operations S2 through S7 can be performed sequentially once step M3 has been performed IM3 53 S4 S5 S6 S7 W2 W3 W4 W5 W6 This is in the Management Subsystem Installation flow but the tasks are associated with the serves Attach the cluster server s service processors and BPAs to the service VLAN This must be done before connecting power to the servers and after the management consoles are configured so that the cluster servers can be discovered correctly To bring the cluster servers to the power standby state connect the cluster s servers to their appropriate power sources Prerequisites for S2 are M3 and S11
253. k file fabric links diff Speed or width change indicated Record the location of the change and see Diagnosing link errors on page 191 Copyright IBM Corp 2008 7 22 08 170 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Symptom Procedure Reference Health check file e fabric diff e chassis diff e esm diff e hostsm diff file and indicates configuration change 1 Record the location of the change s 2 Refer to the Fast Fabric Toolset Users Guide for details 3 Ifthe change is expected perform Re establishing Health Check baseline on page 217 4 Ifthe change is not expected perform Diagnosing configuration changes on page 194 Health check e chassis diff e esm diff e hostsm diff file and indicates firmware change 1 Record the location of the change s 2 Refer to the Fast Fabric Toolset Users Guide for details 3 Ifthe change is expected perform Re establishing Health Check baseline on page 217 4 Ifthe change is not expected perform Updating Code on page 161 Health check stderr file This is a problem with health check Check link to subnet Check the cluster VLAN for problems Use Capture data for Fabric Manager and Fast Fabric problems on page 176 Call your next level of support for QLogic software problems Error reported on a link from health check or iba_report See Diagnosing link errors on pa
254. know the server in which the HCA is populated you can issue an ibstat p to the server and get the information on exactly which HCA matches exactly the GUID that you have in hand End of AIX LPAR section Do the following for Linux LPARS In Linux the following commands are used to query port and node GUIDs from a Linux LPAR e ibv_devinfo v returns attributes of the HCAs and their ports o ibv_devinfo v grep node_guid will return the node GUID o ibv_devinfo v egrep GIDIport will return GIDs for ports The first 8 bytes are a GID mask and the second are the port GUID e ibv_devinfo l returns the list of HCA resources for the LPAR e ibv_devinfo d HCA resource returns the attributes of the HCA given in HCA resource The HCA resource names are returned in ibv_devinfo l e ibv_devinfo i port number returns attributes for a specific port e man ibv_devinfo to get more details on ibv_devinfo In order to use CSM to get all HCA GUIDs in Linux LPARs use the following command string which assumes that all of your servers are running Linux Instead of a use N LinuxNodes to access just Linux LPARs in a mixed environment gt dsh av usr bin ibv_devinfo n grep node_guid nodel node_guid 0002 5500 1002 5800 node2 node_guid 0002 5500 100b 800 If you don t have a stored map of the HCA GUIDs but you have a GUID for which you wish to search use the following command for Linux LPA
255. les is configurable in etc sysconfig fastfabric conf The default location of output files is var opt iba analysis baseline latest lt timestamp gt The FF_ ANALYSIS _ DIR variable defines the output directory with the default of var opt iba analysis Filename type of health check fast fabric command suffix fabric basically Subnet Manager queries about fabric status chassis switch chassis firmware queries hostsm queries about Subnet Manager configuration esm queries about embedded Subnet Manager configuration fast fabric commands used by health check are detailed in the Fast Fabric Toolset Users Guide Suffixes errors errors exist in fabric Note Link down errors will only be reported by the switch side of an IBM GX HCA to switch link diff change from baseline see Interpreting diff files on page 157 stderr error in operation of health check call your next level of support All output files should be queried before taking a new baseline to assure that the saved configuration information is correct The all_analysis utility isa wrapper for fabric analysis chassis analysis hostsm analysis and esm analysis The analysis routines use iba_report to gather information Key output files to check for problems fabric links fabric errors Record the location of the problem and see Diagnosing link errors on page 191
256. ll also be required to run two different instances of the Fast Fabric Toolset running on two different servers to query the state of all subnets Fast Fabric Toolset will be used to interface with e Switches e Fabric Management Server hosts e Not IBM systems To use CSM for remote command access to the Fast Fabric Toolset you will need to set up the host running Fast Fabric as an device You should exchange ssh keys with it for passwordless access The master node referred to in the Fast Fabric Toolset Users Guide is considered to be the host running the Fast Fabric Toolset In IBM System p HPC Clusters this is not a compute or I O node but is generally the Fabric Management Server You will not use the MPI performance tests because they are not compiled for the IBM System p HPC Clusters host stack High Performance Linpack HPL is not applicable The Fast Fabric Toolset configuration must be set up in its configuration files The default configuration files are documented in the Fast Fabric Toolset The following list indicates key parameters to be configured in Fast Fabric Toolset configuration files e Switch addresses go into chassis files e Fabric Management Server addresses go into host files Copyright IBM Corp 2008 7 22 08 54 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e The IBM system addresses do not go into host files e Create groups of switches by creating a different chassis
257. lso target specific devices and ports with these commands this is also documented in the Fast Fabric Toolset Users Guide Note These commands must be executed on each Fabric Management Server that has a master subnet manager running on it e During installation or reconfiguration to verify that there are no errors in the fabric and that the configuration is as expected o Raun repeatedly until configuration looks good sbin all_analysis b e Once everything is verified after an installation or repair a baseline health check is saved for future comparisons Repairs that lead to serial number changes on FRUs or movement of cables or switch firmware and software updates constitute configuration changes o sbin all_analysis b e Periodically to monitor the fabric see also Setting up periodic fabric health checks on page 151 o sbin all_analysis Note The LinkDown counter in the IBM GX GX HCAs will be reset as soon as the link goes down This is part of the recovery procedure While this is not optimal the connected switch port s LinkDown counter will provide an accurate count of the number of LinkDowns for the link e To just check link error counters without comparing against baseline for configuration changes O sbin all_analysis e e During debug to query the fabric This can be helpful for performance problem debug o To save history during debug sbin all_analysis s e During repair verification to identify errors or inad
258. m com infocenter clresctr vxrx index jsp The QLogic documentation is initially available from QLogic support Check the JBM Clusters with the InfiniBand Switch web site for any updates to availability on a QLogic web site 2 1 4 Cluster software and firmware information resources Cluster Software and Firmware Information Resources are found in the following Table 5 Cluster Software and Firmware Information Resources Table 5 Cluster Software and Firmware Information Resources Mgmt Component Document Plan Install amp Sve AIX ATX Information Center x x x http publib boulder ibm com infocenter pseries v5r3 index jsp topic com ibm aix doc doc base aixinformation htm Linux Obtain from your Linux distribution source x x x GPFS Concepts Planning and Installation Guide x x GPFS Administration and Programming Reference xX X GPFS Problem Determination Guide X GPFS Data Management API Guide X Tivoli Workload Scheduler LoadLeveler Installation Guide E Tivoli Workload Scheduler LoadLeveler Using and 3 Administering IBM HPC x x Clusters Tivoli Workload Scheduler LoadLeveler Diagnosis and Software Messages Guide Parallel Environment Installation 3 Parallel Environment Messages i Parallel Environment Operation and Use Vol 1 amp 2 x Parallel Environment MPI Programming Guide x Parallel Environment MPI Subroutine Reference ii
259. management sensor senses the log entry in the CSM MS s var log csm syslog fabric notices file Copyright IBM Corp 2008 7 22 08 114 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e Check the war log csm errorlog CSM MS hostname file and verify that only the NOTICE entry was logged in it The INFO entry should not have made it into the syslog fabric notices file and thus should not have been picked up by the sensor If you have waited as much as five minutes and the NOTICE entry was not logged in the varllog csm errorlog CSM MS hostname file e Review the previous setup instructions to assure that they were performed correctly paying close attention to the setup of the etc syslog conf file or syslog ng conf file e Use the procedure in Problem with event management or remote syslogging on page 202 Recall that you were using the logger command such that the Fabric Management Server would be the source of the log entry f Check the varJlog csm syslog fabric info file and verify that both the NOTICE entry and the INFO entry are in the file This only applies if you have chosen to set up the syslog fabric info file If one or both entries are missing e Review the previous setup instructions to assure that they were performed correctly paying close attention to the setup of the etc syslog conf or syslog ng conf file e Use the procedure in Problem with event management or remote syslogging on
260. mbership perform the following procedure 1 Ifyou are running a host based Subnet Manager to check multicast group creation on the Fabric Management Server run saquery for the specific subnet Remember that you must provide the HCA and port through which the Subnet Manager connects to the subnet sbin saquery o mcmember h HCA p HCA port Each interface will produce an entry like the following Note the 4K MTU and 20g rate GID Oxff12601bffFf 0000 0x0000000000000016 PortGid O0xfe80000000000000 0002550070010 00 MLID Oxc004 PKey Oxffff Mtu 4096 Rate 20g PktLifeTime 2147 ms QKey 0x00000000 SL 0 FlowLabel 0x00000 HophLimit Oxff TClass 0x00 Note You can check for misconfigured interfaces using something like the following which looks for any Mtu that is not 4096 or rate is 10g sbin saquery o mcmember h HCA p port egrep B 3 A 1 Mtu 0 3 Rate 10g 2 Ifyou are running an embedded Subnet Manager to check multicast group creation run the following on each switch with a master Subnet Manager If you have set it up you may use dsh from the CSM MS to the switches see Remote Command Execution setup on page 117 remember to use devicetype IBSwitch Qlogic when pointing to the switches smShowGroups There should be just one group with all the HCA devices on the subnet being part of the group Note that mtu 5 indicates 4K mtu 4 indicates 2K The following example shows 4K MTU Oxff1240 1
261. meric value in the last line e g hello world 0 post command showLastRetcode brief b For each switch define the switch as a device for CSM using the following command definehwdev d switch address DeviceType IBSwitch Qlogic RemoteShellUser admin RemoteShell usr bin ssh RemoteCopyCmd usr bin scp c To define multiple switches use the f flag to identify a device definition file as in the CSM Command Reference Guide Key attributes are e Name gt the hostname of the switch e DeviceType gt a unique name for the type of device e The following attributes are for SSH and dsh e RemoteShellUser admin e RemoteShell usr bin ssh e RemoteCopyCmd usr bin scp Note Refer to the CSM manpages on deviceattributes for a list of available attributes for defining a device d Define a device group for the switches hwdevgrp w DeviceType like IBSwitchsQlogic AllIBSwitches 66 99 Note Because the DeviceType is IBSwitch Qlogic it conflicts with mkrsrc s use of the as a delimiter Therefore the is used as a wildcard to avoid this issue e Exchange ssh keys with IBSwitches group using updatehwdev k D AllIBSwitches devicetype IBSwitch Qlogic Note Because there is a mixture of devices being defined the a option cannot be used f Verify remote access to the swiches using the following command You should not have to enter a password and each switch should reply w
262. mind that you cannot work with interactive commands via remote command execution You may choose to leverage some of the Fast Fabric Toolset command scripts that perform operations that otherwise require user interaction on the switch CLI In that case you can still do remote command execution from CSM however you have to issue the command to the Fast Fabric Toolset on the Fabric Management Server see Remotely accessing QLogic management tools and commands from CSM MS on page 159 The following are not supported in CSM with QLogic switches dsh execution in interactive mode is not supported for QLogic switch dsh execution in DSH context is not supported for non node devices Note this restriction is not introduced by this enhancement rsh shell is not supported only ssh remote shell is supported Only one kind of device type is supported in one dsh updatehwdev invocation updatehwdev a dsh A is not supported when there are mixture of user defined device QLogic and common devices defined dcp is not supported with the QLogic switches Copyright IBM Corp 2008 7 22 08 160 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 7 Updating Code Updating Code mainly references component documentation describing code updates for key code that affects the fabric The following table gives references and enumerates impacts for key code updates In some cases errors may be logged because links c
263. mmand execution setup tasks relate to key tasks illustrated in Figure 10 Management Subsystem Installation Tasks on page 97 Ethernet Devices Perform Tasks El and E2 8 erformed Cable CSM MS to Cable Fabric MS to elsewhere the service Ethernet F the service Ethernet Cable switches to Fabric MS service ethernet config amp verification Setup Remote Setup Remote Execution from CSM Execution from CSM to switches to Fabric M S Setup device groups Setup Remote Command Execution All steps that input to this symbol must be completed before proceeding YV Figure 12 Remote Command Execution Setup Do not proceed with this procedure until all of the following tasks have been completed The CSM MS has been installed and cabled to the service and cluster VLANs CM4 The Fabric Management Server has been installed and cabled to the cluster VLAN F8 The switches have been installed and cabled to the cluster VLAN W3 The service and cluster VLANS Ethernet devices have been installed and cabled E2 Gut Copyright IBM Corp 2008 7 22 08 117 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware R1 M4 Setup remote command execution with the Fabric Management Server Note The following is just one of several methods by which you can setup remote command execution to a Fabric Management Server You may use any method that best fits your use
264. mmand for CLI ssh setup command sshKey add o So dsh does not try to set environment pre command NULL o Last command for the return code post command showLastRetcode brief Setup switches as devices with o DeviceType IBSwitch Qlogic o RemoteShellUser admin o RemoteShell usr bin ssh Define at least one device group for all switches using hwdefgrp with the following attributes Copyright IBM Corp 2008 7 22 08 159 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Oo DeviceType IBSwitch Qlogic o Suggested Group name IBSwitches Make sure keys are exchanged using updatehwdev Once you have setup remote command execution from the CSM MS to switches as in Remote Command Execution setup on page 117 you can access any command to the switch that does not require user interaction by issuing the following dsh from the CSM MS dsh d switch device list devicetype IBSwitch Qlogic switch command You could also use a device grouping as well which is a standard CSM technique One possible group setup was suggested in in Remote Command Execution setup on page 117 dsh D IBSwitches devicetype IBSwitch Qlogic switch command If you wish to access switch commands that require user responses the standard technique is to write an Expect script to interface with the switch Command Line Interface You may wish to remotely access switches to gather data or issue commands remotely Keep in
265. n Pay particular attention to information on managers 2 Documentation from the switch vendor Pay particular attention to Fabric Manager and Fast Fabric Toolset documentation 2 3 1 Management subsystem integration recommendations Cluster Systems Management CSM will be the IBM systems management tool that provides the integration function for InfiniBand fabric management The integration leverages existing function within CSM Major advantages of CSM in a cluster are The ability to issue remote commands to many nodes and devices simultaneously The ability to consolidate logs and events from many sources in a cluster using event management For more information on the functions and advantages of CSM see CSM documentation The recommended switch and fabric management tools from QLogic are Fabric Manager Fast Fabric Toolset Chassis Viewer Switch Command Line Interface Fabric Viewer Managed switch models will be used in System p HPC Clusters 2 3 2 Management subsystem high level functions In order to address management subsystem integration functions for management will be divided into the following categories 1 Monitor the state and health of the fabric 2 Maintain 3 Diagnose 4 Connectivity In order to monitor the fabric 1 We provide a method to get asynchronous events that indicate status and configuration changes into the CSM event management subsystem This is achieved by forwarding syslog entrie
266. n on page 103 e It uses the Performance Manager and other performance manager agents to collect link statistics for health checks and iba report results for fabric error checking Therefore performance manager must be enabled for such checks to be successful 5 2 4 QLogic Performance Manager The performance manager is generally something that you only access indirectly Fabric viewer is one tool to access the performance manager Fast Fabric s iba_report does not access the performance manager to get link statistics Copyright IBM Corp 2008 7 22 08 148 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 3 Cluster Fabric Management Tasks Cluster Fabric Management Tasks includes how to monitor critical cluster fabric components and how to maintain them as well These tasks do not cover how to service or repair faults or errors but they will reference appropriate procedures in either another document or in Cluster service on page 165 Table 12 Cluster Fabric Management Tasks Task Reboot the entire cluster Minimize IBM systems Management effect on fabric Reference Rebooting the cluster on page 219 Reboot one or a few servers Monitor for general problems Rebooting Powering off an IBM System on page 219 Monitoring Monitoring Fabric for Problems on page 149 Monitor for fabric specific problems Monitoring fabric logs from CSM MS on page 150 Manually querying s
267. n IBM System p HPC cluster The configuration settings that need to be planned are e P addressing on the cluster VLAN should be configured static The address should be planned and recorded Chassis MTU value Switch name 12x cabling considerations Disable telnet in favor of ssh access to the switches Remote logging destination CSM MS is recommended New chassis passwords The IP addressing a QLogic switch will have on the management Ethernet network is configured for static addressing These addresses are associated with the switch management function Important QLogic management function concepts are The 9024 switches have a single address associated with its management Ethernet connection All other QLogic switches have one or more managed spine cards per chassis If you want backup capability for the management subsystem you must have more than one managed spine in a chassis Each managed spine gets its own address so that it can be addressed directly Each switch chassis also gets a management Ethernet address that is assumed by the master management spine This allows you to use a single address to query the chassis regardless of which spine is master To setup management parameters like which spine is master each managed spine must be addressed separately H The QLogic 9240 switch chassis is broken into two managed hemispheres Therefore you will require a master and backup managed spine within each hemisphere
268. n InfiniBand GX on page 139 Ensure that you do the step that configures the GUID index and capability for the HCA in the LPAR a Define LPARs using using the following procedures During this procedures you must Configure the HCAs using the procedure found in Installing or replacing an InfiniBand GX on page 139 Ensure that you do the steps that configure the GUID index and capability for the HCA in the LPAR i For POWER6 IBM Resource Link for the IBM system on which the LPAR is running Note 9125 F2A servers with heavy I O planars will have an extra InfiniBand device defined This is always iba3 Delete this from the configuration ii For POWERS IBM systems Hardware Information Center 2 S87 After the servers are connected to the cluster VLAN install and update the operating systems If servers do not have removable media you must use an AIX NIM server or Linux distribution server to load and update the operating systems 3 If your server is running AIX you must do the following to properly setup for 4K MTU To determine if you should be using 4K MTU see Planning MTU on page 42 and the QLogic Switch planning worksheets on page 74 If you do not require 4K MTU the default is 2K and you should proceed to step 4 a Do not perform amkiba until you have properly setup your Subnet Managers for 4K MTU For host based Subnet Managers see Fabric Management Server Installation on page 103 For embedded Subnet Managers se
269. n and configuration ends here Copyright IBM Corp 2008 7 22 08 120 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 5 Installing and configuring the cluster server hardware This procedure is intended to be executed by IBM System Service Representative or the customer responsible for installing cluster server hardware Installing and configuring the cluster server hardware encompasses major tasks S3 through S5 and the server part of M3 and M4 which are illustrated in Figure 9 on page 62 You will be installing and configuring the cluster s servers Note If possible do not begin this procedure until the Operating System Install Servers Installation on page 102 is completed This helps alleviate the situation where various install personnel may be waiting on site for key parts of this procedure to be completed Depending on the arrival of units on site this is not always practical Review Order of install on page 61 and Figure 9 on page 62 to identify the merge points where a step in a major task or procedure that is being performed by one person is dependent of the completion of steps in another major task or procedure that is being performed by another person Before proceeding obtain the following documentation e Server Install documentation including applicable Worldwide Custom Install Instructions WCID e HCA install articles from the IBM systems Hardware Reso
270. n on the System tab of the GUI or via the CLI command setIBNodeDesc Up to 64 characters Defaults to GUID lt condition gt is one of the conditions from the CHASSIS Reporting Table Text includes a unique ID number lt fru gt associated with the condition lt part number gt is an ASCII text field which identifies the QLogic part number for the associated FRU lt details gt is optional information that is relevant to the particular event Example switch chassis management log entry Oct 9 18 54 37 sl0t101 172 21 1 29 MSG NOTICE CHASSIS SilverStorm 9024 GUID 0x00066a00d8000161 COND 9999 This is a notice event test FRU Power Supply 1 PN 200667 000 DETAIL This is an additional information about the event 6 11 3 Subnet Manager log format The Subnet Manager logs information about the fabric This includes events like link problems devices appearing and disappearing from the fabric as well as information regarding when it is sweeping the network The Subnet Manager log can be either on a switch in the same log as the Switch Chassis Management Log for embedded Subnet Managers or in the syslog var log messages of the Fabric Management Server for Host based Subnet Managers When remote logging and CSM event management is setup as in Setup Remote Logging on page 108 the Subnet Manager logs are also available on the CSM MS see Vendor log flow to CSM event management on page 35 The format
271. n use LocalNodeAnyLoggedError for the condition if the CSM MS is configured as a managed node but you may find it easier to manage the cluster if the CSM MS is not a managed node Determine the response scripts to use o Use of LogNodeErrorLogEntry is the minimum requirement to combine log entries to a varllog csnverrorlog file o Use BroadcastEventsAnyTime to broadcast events to the CSM MS console This will result in many broadcast during reboot scenarios so if you use this you will want to establish a procedure to disable it when you know that you are doing operations like shutting down all the servers in a cluster o Consider creating response scripts that are specialized to your environment For example you may wish to email an account with log entries Refer to RSCT and CSM documentation for how to create such scripts and where to find the response scripts associated with LogNodeErrorLogEntry and BroadcastEventsAnyTime which can be used as examples Plan regular monitoring of the filesystem containing var on the CSM MS to assure that it does not get overrun The configuration settings planned here should be recorded in the CSM Planning Worksheet on page 76 Planning Event Monitoring with QLogic and CSM ends here 3 5 5 Planning Remote Command Execution with QLogic from the CSM MS Remote commands can be executed from the CSM MS using dsh to the Fabric Management Server and the switches It can be an important addition
272. nd storage devices and InfiniBand switches You can physically place units on the floor as they arrive however do not apply power nor cable any units to the service VLAN or to the InfiniBand network until instructed to do so Management console installation steps M2 M4 actually have multiple tasks associated with each of them You should also review the details for them in the beginning of Management subsystem installation and configuration on page 95 through Figure 10 Management Subsystem Installation Tasks on page 97 and see where you can assign to different people those tasks that can be performed simultaneously M2 Perform the initial management console installation and configuration This includes HMCs CSM Fabric Management Server and DHOP service for the service VLAN Plan and setup static addresses for HMCs and switches Plan and setup DHCP ranges for each service VLAN Note 1 Ifthese devices and associated services are not set up correctly before applying power to the base servers and devices you will not be able to correctly configure and control cluster devices Furthermore if this is done out of sequence the recovery procedures for doing this part of the cluster installation can be quite lengthy 2 When acluster requires multiple HMCs CSM is required to help manage device discovery In this case the setup of CSM and the cluster ready hardware server peer doma
273. nect the Fabric Management Server s to a public Ethernet network not the service nor the cluster VLAN do so at this time 4 F4 M2 Install and cable the HCA s in the Fabric Management Server s The HCAs must be installed before proceeding to the next step Cabling of the HCAs to the fabric can wait but do not start the fabric manager software until the fabric management server s HCAs have been cabled to the fabric 5 E5 M2 To install the QLogic InfiniServ host stack and Fast Fabric toolset use the InfiniServ Fabric Access Software Users Guide Key steps are a Untar the InfiniServ tarball b Execute the INSTALL script using the appropriate flags as described in the QLogic documentation Copyright IBM Corp 2008 7 22 08 103 of 238 a IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note DO NOT enable IPoIB on the Fabric Management Server or do not install the IPoIB capability Otherwise the multicast groups may be negatively impacted by IPoIB on the Fabric Management Server setting up groups that are not valid for the compute and I O servers on the fabric c Reboot to start the InfiniServ Stack M2 Setup the Fast Fabric Toolset Configure the Fast Fabric Toolset according to the instructions in the Fast Fabric Toolset Users Guide When configuring the Fast Fabric Toolset consider the following application of Fast Fabric within HPC Clusters e The master node r
274. nfiguration persists call your next level of hardware support d Verify CPUs are running at expected frequencies dsh av usr pmapi tools pmcycles M Verify CPUs ends here Verify memory To verify the availability of memory resources a Run the command dsh av lsattr E l1 memO awk if 1 goodsize g 2 else p 2 END d p g print d grep v 0 Copyright IBM Corp 2008 7 22 08 197 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note The result of the awk is the difference between physical memory and available memory Unless there is de configured memory if you drop the grep v 0 every LPAR should return 0 zero The operating system has access to all memory resources the system will return you to a command prompt without returning data You may now exit Memory requires configuration check SFP on the HMC controlling the server LPAR and service as instructed Note Before you perform a memory service action make certain that the memory was not de configured for a specific reason 5 If the network still has performance problems call the next level of support c Ifno problems are found in SFP perform any System Service Guide instructions for diagnosing de configured memory d Ifthe memory de configuration persists call your next level of support Verify Memory ends here 6 20 Checking multicast groups To check multicast groups for proper me
275. nformation Resources Table 4 Cluster Management Software Information Resources Mgmt Component Document Plan Install amp Svc QLogic Subnet Fabric Manager and Fabric Viewer Users Guide x x x Manager QLogic Fast Fast Fabric Toolset Users Guide X X X Fabric Toolset Copyright IBM Corp 2008 7 22 08 16 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Memt Component Document Plan Install amp Sve QLogic InfiniServ Fabric Access Software Users Guide x x x InfiniServ Stack HMC Installation and Operations Guide for the HMC X xX Operations Guide for the HMC and Managed Systems X Cluster Systems Management Planning and Installation xX x Guide CSM Cluster Systems Management Administration Guide x Cluster Systems Management Command and Technical X Reference The HMC documentation is available along with the base System p POWER6 documentation in the IBM systems Resource link found in http www ibm com servers resourcelink where you should start with the Library You can access the HMC documentation via the Resource Link requires an IBM Registration ID IBM ID The IBM CSM documentation is available in two places e For the product library go to http publib boulder ibm com infocenter clresctr vxrx topic com ibm cluster csm doc clusterbooks html aix_lin ux17 e For online documentation go to http publib boulder ib
276. nits may be placed physically on the floor in any 2 order after the site is ready for them there is a specific order in how they are cabled powered up and recognized on the service subsystem 3 The types of units and contractual agreements affects the composition of the installation team The team may consist in varying numbers of customer IBM or third party vendor personnel For more guidance on installation responsibilities see Install responsibilities by units and devices on page 60 4 Ifyou have 12x HCAs and 4x switches switches must be powered on and configured with proper 12x groupings before servers are powered on The order of port configuration on 4x switches that are configured with groups of 3 port acting as a 12x link is very important Therefore specific steps must be followed to ensure that the 12x HCA is connected as a 12x link and not a 4x link 5 All switches must be connected to the same service VLAN If there are redundant connections available on a switch they must also be connected to the same service VLAN This has to do with the P addressing methods used in the switches 3 7 2 Installation Responsibilities By Organization Within a cluster that has an InfiniBand network different organizations are responsible for various installation activities The following provides guidance about responsibilities for a typical installation However it is possible for the specific responsibilities to change because of agreements b
277. ns examples of data and reports used in daily business operations To illustrate them as completely as possible the examples include the names of individuals companies brands and products All of these names are fictitious and any similarity to the names and addresses used by an actual business enterprise is entirely coincidental COPYRIGHT LICENSE This information contains sample application programs in source language which illustrates programming techniques on various operating platforms You may copy modify and distribute these sample programs in any form without payment to IBM for the purposes of developing using marketing or distributing application programs conforming to the application programming interface for the operating platform for which the sample programs are written These examples have not been thoroughly tested under all conditions IBM therefore cannot guarantee or imply reliability serviceability or function of these programs Each copy or any portion of these sample programs or any derivative work must include a copyright notice as follows your company name year Portions of this code are derived from IBM Corp Sample Programs Copyright IBM Corp _enter the year or years_ All rights reserved 8 1 Trademarks IBM the IBM logo and ibm com are trademarks or registered trademarks of International Business Machines Corporation in the United States other countries or both If these and other IBM trad
278. nsider the following e For the host based fabric manager use the instructions for updating the code found in the Fabric Manager Users Guide O You should also save the iview_fm config file to a safe location so that if something goes awry during the installation process you can recover this key file You could use remote command execution from CSM MS as in the following example where cl17lopsm3 is the Fabric M S address The cd which precedes the installation command is required so that the command is run from its path dsh c d cl7lopsm3 cd root infiniserv_software InfiniServMgmt 4 1 1 0 15 INSTALL i mpi e For embedded Subnet Managers the Fast Fabric Toolset has the capability to update the code across all switches simultaneously using the ibtest command see the Fast Fabric Toolset Users Guide If you only need to update code on one switch you can do this using the Chassis Viewer see the Switch Users Manual O You need to place the new embedded Subnet Manager code on the Fabric Management Server Copyright IBM Corp 2008 7 22 08 161 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware o Ifyou have multiple primary Fabric Management Servers you can issue the ibtest command from CSM MS using dsh to all of the primary Fabric Management Servers simultaneously This capability must be setup using Remote Command Execution setup on page 117 5 7 2 Updating Switch Chassis Code The sw
279. nt Server ibtest Use this primarily to update firmware and reboot switches management firmware switch chassis management and embedded Subnet Manager iba_report Use this to generate many different reports on all facets of fabric configuration and operation Fast Fabric Toolset Menu Fast Fabric functions can be accessed using the Fast Fabric Toolset menu which is a TTY menu This can be especially helpful in learning the power of Fast Fabric Important information to remember about Fast Fabric Toolset follows e Do not use Fast Fabric tools to manage the IBM servers and IBM HCAs CSM is the proper tool for systems management in an IBM system p HPC Cluster In fact many of the Fast Fabric tools for node management will not be useful in an IBM HPC Cluster e It runs on the Fabric Management Server e It can only query host based Subnet Managers that are on the same Fabric Management Server e It can only query subnets to which the Fabric Management Server on which it is running is connected If you have more than 4 subnets you will need to work with at least two different Fabric Management Servers to get to all subnets e You must update the chassis configuration file with the list of switch chassis in the cluster See Fabric Management Server Installation on page 103 e You must update the ports configuration file with the list of HCA ports on the Fabric Management Server See Fabric Management Server Installatio
280. nt addition to the management infrastructure It effectively integrates the QLogic management environment with the IBM management environment Remote command execution allows the user to do manual queries from the CSM MS console without having to log in to the switch It also allows for writing management and monitoring scripts that run from the CSM MS which can improve productivity for administration of the cluster fabric One could write scripts to act on nodes based on switch activity or act on switches based on node activity The following is a list of CSM remote command capabilities that support QLogic switches dsh execution is supported for QLogic switch updatehwdev is supported for QLogic switch to transfer ssh keys from MS to QLogic switch dshbak command is supported for QLogic switch dsh z flag is supported for QLogic switch Display the exit status of the last remotely executed device group is supported for QLogic switch The switches use proprietrary Command Line Interface In order for CSM to work with the switch CLI there are certain profiles that need to be setup and there is also a new dsh command parameter that must be used to reference the switch command profile Details are in Remote Command Execution setup on page 117 The following highlight the important aspects in this setup Command definition file var opt csm IBSwitch QLogic config must be created with the following attributes o ssh key exchange co
281. nt changes once all other errors have been corrected a baseline should be rerun 5 5 3 Interpreting diff files If the results files of a Fast Fabric Health Check include any file named diff there is a difference between the baseline and the current health check This file is generated by the health check comparison algorithm using the diff command with the first file file1 being the baseline file and the second file file2 being the latest file The default diff format that is used is with context of one line before and after the altered data This is the same as a diff C 1 This can be changed by entering your preferred diff command and options using the variable FF DIFF _CMD inthe fastfabric conf file details can be found in the Fast Fabric Toolset Users Guide The information that follows is assuming the default context You ll see something like the following repeated throughout the diff file These lines indicate how the baseline file1 differs from the latest file2 health check xxx line 1 line 2 lines from the baseline fil line 1 line 2 lines from the latest file KKKK The first set of lines encased in asterisks indicates which line numbers contain the lines from the baseline file that have been altered The associated line numbers and data from the latest file follow Please use man diff to get more details on diff Several example scenarios follow The following is an example of what might be s
282. nt for any adapter errors that may have induced link errors For mapping of HCAs see General mapping of IBM HCA GUIDs to physical HCAs on page 178 Look for a switch internal error in var log csm errorlog CSM MS hostname this contains possibly serviceable events from all of the Fabric Manager and switch logs in the cluster Look for an internal error on an HCA in SFP This may bring a link down Look for a server checkstop in SFP This may bring a link down Map all internal errors to associated links i If there is a switch internal error you ll likely have to determine association based on whether the error is isolated to a particular port leaf board or the spine ii If there is an adapter error or server checkstop you ll have to see with which switch links they are associated If there are no HCA or server events reported in SFP and you know there was nothing rebooted that could have caused the event and the link errors span more than one HCA then the problem is very likely to be in the switch If neighboring links on the same HCA are failing it could very well be the HCA which is faulty Links on IBM HCAs are in pairs If the HCA card has four links then T1 and T2 are a pair and T3 and T4 are a pair 3 Ifthere are link problems isolation may have to be done using cable swapping techniques to see how errors follow cables This might impact another link which is perfectly good If you are swapping cables
283. oach This section discusses general approaches to fault diagnosis used in this document This is intended to supplement the information in Table of symptoms on page 169 The sub sections that follow should be read in order Each one may reference another more detailed section 1 Types of events on page 166 illustrates the more common events that affect the fabric and how they might be reported and interpreted 2 Approach to link problem isolation on page 167 discusses how to approach a link problem 3 Reboot repower scenarios on page 168 discusses the impact of reboots and repowers on the fabric 4 The importance of NTP on page 168 discusses why it is important to configure NTP on the service and cluster VLANs 6 4 1 Types of events Fabric problems can be categorized as follows 1 Link problems which are reported via remote logging to the CSM MS in var log errorlog CSM MS hostname by the Subnet Manager Without remote logging you will have to interrogate the Subnet Manager log directly a Ifa single link is failing this will isolate you to a switch port the other side HCA or another switch port and a cable Copyright IBM Corp 2008 7 22 08 166 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware b If multiple links are failing a pattern may be discernible which will point you to a common FRU such as an HCA a switch leaf board or a switch spine 2 An internal failure of a switch
284. oes not fix the problem engage QLogic to work on the switch Once the problem is fixed go to step 16 16 If the problem has been fixed run Fast Fabric Health check and check for diff files Be especially aware of any inadvertent swapping of cables For instructions on interpreting health check results see Health Checks on page 151 a If the only difference between the latest cluster configuration and the baseline configuration is new part numbers or serial numbers related to the repair action run a new Health Check baseline to account for the changes b If there are other differences between the latest cluster configuration and baseline configuration perform the procedure in Re establishing Health Check baseline on page 217 This will pick up the new baseline so that future health checks will not show configuration changes c If there were link errors reported in the health check you will have to go back to step 1 of this procedure and isolate the problem 17 This procedure ends here Copyright IBM Corp 2008 7 22 08 193 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 13 Diagnosing and repairing switch component problems Switch internal problems can surface in the CSM MS var log csm errorlog CSM MS hostname file or in Fast Fabric tools reports or health checks If a switch component problem is being reported do the following 1 Contact QLogic with the log or report information Or us
285. of the Subnet Manager log is as follows The key to recognizing a Subnet Manager log entry is the string ISM following the string MSG lt msgType gt Note This format is for entries with a severity of NOTICE or higher INFO messages are not bound by this format and are for engineering use lt prefix gt MSG lt msgType gt SM lt sm_node_desc gt port lt sm_port_number gt COND lt condition gt NODE lt node_desc gt port lt port_number gt lt node_guid gt LINKEDTO lt linked desc gt port lt linked_port gt lt linked_guid gt DETAIL lt details gt lt prefix gt timestamp and card slot number OR hostname and IP address of the unit reporting the msg lt msgType gt is one of the following values ERROR WARNING NOTIC INFORMATION Gl lt sm_node_desc gt and lt sm_port_ number gt indicate the node name and port number of the SM that is reporting the message For ESM port number 0 lt condition gt is one of the conditions from the event SM Reporting Table text includes a unique ID lt node_desc gt lt port_number gt and lt node _guid gt are the InfiniBand Node Description Port Number and Node GUID of the port and node that are primarily responsible for the event Copyright IBM Corp 2008 7 22 08 189 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware lt linked_desc gt lt linked_port gt lt linked_guid gt are optional fields describing the
286. of the following tasks have been completed The HMCs have beeen installed and cable to the service VLAN H6 1 2 3 1 M4 The CSM MS has been installed and cabled to the service and cluster VLANs CM4 The service and cluster VLANs Ethernet devices have been installed and cabled E2 Final configuration of management consoles This is actually performed in Installing and configuring the cluster server hardware on page 121 during the steps associated with S3 and intended to give you an idea of what will be done in that procedure M4 If you add servers and HCAs you will need to perform these tasks Note a The BPCs and servers must be at power Standby before proceeding See Server Install and Configuration b procedure up to and including major task 52 DHCP on the service VLAN must be up and running at this point The procedure below is The following tasks are performed when you do the Server Installation and Configuration procedure a Verify that the BPCs and FSPs are acquired by the DHOP server on the service VLAN b If using Cluster Ready Hardware Server CRHS setup the peer domains and HMC links in CRHSon the CSM MS as instructed in the CSM Administration Guide c If using CRHS perform server and frame authentication with CRHS on the CSM MS as instructed in the CSM Administration Guide 2 This procedure ends here Management subsystem installatio
287. of the various fabric management components running to manage each subnet In the iview_fm config file you must configure each instance of each component a At the beginning of the parameter settings in the iview_fm config file you must configure each component of each instance of the fabric manager to start when you start the fabric manager Below each attribute begins with SM_X_ lt attribute gt where X the Subnet Manager instance on the Fabric Management Server For an example of how these parameters would look in an iview_fm config file used for managing 4 subnets see Example setup of host based fabric manager on page 51 BM _ X start yes FE X_start yes PM X start yes SM_X start yes Note Any instances that are not in use should be set to start no Like SM_2_ start no b Point to the proper HCA for each Fabric Manager instance SM_X_device lt hca gt PM_X_device lt hca gt BM_X_device lt hca gt FE_X_device lt hca gt c Point to the proper port on the HCA for each Fabric Manager instance SM_X_port lt hca port gt PM_X_port lt hca port gt BM_X_port lt hca port gt FE_X_port lt hca port gt d Set the priority for each Fabric Manager instance SM_X_priority lt priority gt SM_X_priority lt priority gt PM_X_priority lt priority gt BM_X_priority lt priority gt FE_X_priority lt priority gt Copyright IBM Corp 2008 7 22 08 105 of 238 10 11 12 14 IBM System p HPC Clusters Fabric Guide
288. of them have been reported disappearing and 10 11 12 13 then appearing do the following a Check to see if the switch chassis is powered off or was powered off at the time of the error If this is true the link error is not a serviceable event therefore you should end this procedure b Ifthe switch chassis is not powered off nor was it powered off at the time of the error the problem is in the switch chassis Engage QLogic service and exit this procedure If more than 2 links attached to a switch chassis have gone down but not all of the links with cables have done down or been reported disappearing and then appearing the problem is in the switch chassis Engage QLogic service and exit this procedure Check Service Focal Point for serviceable events against the HCA If the HCA was reported as part of a FRU list in a serviceable event This link error is not a serviceable event therefore no repair is required in this procedure If you replace the HCA or a switch component based on the serviceable event go to step 16 in this procedure Otherwise you may exit this procedure Check the LEDs of the HCA and switch port comprising the link Use the IBM system Manual to determine if the HCA LED is in a valid state and use the QLogic switch Users Guide to determine if the switch port is in a valid state In each case the LED should be lit if the link is up and unlit if the link is down Check the seating of the cable on the HC
289. ogic switches in HPC Clusters The following models are supported For more details on the models see QLogic literature and the Users Guide for the switch model available at http www qlogic com or contact QLogic support Note QLogic uses SilverStorm in their product names e 9024 24 port e 9040 48 port e 9080 96 port e 9120 144 port e 9240 288 port 2 2 4 Cables IBM recommends the following cables for supported HPC configurations POWER6 4x DDR copper QSFP CX4 6m passive Vendor 9125 F2A 26awg 10m active 26awg 14m active 30awg POWER6 12x 4x DDR CX4 CX4 3 10 IBM Link operates at 4x speeds 8204 E8A amp width exchanger 8203 E4A copper JS22 4x DDR copper CX4 CX4 Multiple lengths Vendor Used to connect between PTM amp switch Intra rack 4x DDR copper CX4 CX4 Multiple lengths Vendor For use between switches Fabric 4x DDR copper CX4 CX4 Multiple lengths Vendor For connecting the Fabric Management Management Server to Server subnets to support host based Subnet Manager and Fast Fabric Toolset Copyright IBM Corp 2008 7 22 08 23 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 2 5 Subnet Manager The Subnet Manager is defined by the InfiniBand standard specification It is used to configure and manage the communication fabric so that it can pass data It does its management in band over the same links
290. olate a link error to a FRU Be sure to record which steps you have taken in case you have to contact your next level of support or in case QLogic must be contacted The basic flow of the procedure is 1 Determine if the link errors may merely be symptoms caused by a user action like a reboot or another component failing like a switch or a server Isolate to the FRU Repair the FRU Verify that the link is fixed OSs Sale GON Naty A Exit the procedure Determine the physical location of both ends of the cable Verify that the configuration wasn t inadvertently changed If a switch component or HCA was replaced take a new health check baseline Note This procedure may have you swap ports to which a cable end is connected Be sure that you do not swap ports with a link connected to a Fabric Management Server This will jeopardize fabric performance and also capability to do some verification procedures Note Once you have fixed the problem or cannot find a problem after doing anything to disturb the cable HCA or switch components associated with the link it is very important to perform the Fast Fabric Health Check prescribed in step 16 to assure that you have returned the cluster fabric to the intended configuration The only changes in configuration should be VPD information from replaced parts Note If you replace the managed spine for the switch chassis you will have to redo the switch chassis setup for the switch
291. ollowing procedure 1 On the Fabric Management Server run Fast Fabric Health Check all_analysis see Health Checks on page 151 To diagnose symptoms reported by health check see Table 19 Fast Fabric Tools Table of symptoms on page 170 Note The health check will be most effective for checking for configuration problems if a baseline health check has been taken and is stored in the var opt iba analysis baseline directory on the Fabric Management Server Otherwise changes in configuration cannot be sensed If there is no baseline health check for comparison you need to perform the same type of configuration checks that were done during installation see InfiniBand Switch installation and configuration procedure on page 129 For the host based Subnet Managers also use Fabric Management Server Installation on page 103 You need to check that the following configuration parameters match the installation plan A reference or setting for IBM system p HPC Clusters is provided for each parameter that you will check Parameter Reference GID prefix Must be different for each subnet see Planning GID Prefixes on page 43 LMC Must be 2 for IBM system p HPC Clusters MTU Planning MTU on page 42 Note that this is the fabric MTU and not the MTU in the stack which can be a much greater number Cabling plan Vendor s Switch Users Guide and Planning and Installation Guide Balanced It is usually best to assure that you hav
292. ome down when as a result of a unit being rebooted or repowered Table 15 Updating Code References and Impacts Code Reference Impact CSM CSM Administration Guide e CSM event management will be interrupted eA reboot will interrupt remote logging IBM GX GX Code Release notes and operating e Fabric will be impacted HCA device driver system manuals Reboot will cause links to go down and errors to be logged IBM system System Service Manual e Concurrent updates have no impact firmware e Non concurrent updates will cause links to go down and errors to be logged IBM power System Service Manual e Concurrent updates have no impact firmware e Non concurrent updates may cause links to go down and errors to be logged Fabric Manager Fabric Manager Users Guide e Subnet recovery capabilities will be lost during including SM Fast Fabric Toolset Users Guide the update If a hardware error occurs at this time application performance may suffer See Updating Fabric Manager Code on page 161 Switch Chassis Switch Users Guide e No impact to the fabric Management Fast Fabric Toolset Users Guide See Updating Switch Chassis Code on page 162 If a hardware error occurs during this time it will not be reported unless the error still exists when the new code comes up 5 7 1 Updating Fabric Manager Code While the fabric manager code updates are documented in the Fabric Manager Users Guide please co
293. ommands and User Manuals and methods to be used by this procedure follow You can work with each switch individually using a command on its Command Line Interface CLI If the Fast Fabric Toolset is installed on the Fabric Management Server at this point you can check the code levels of multiple switch simultaneously using techniques found in the Fast Fabric Toolset Users Guide Set the chassis MTU value according to the installation plan See the switch planning worksheet or Planning MTU on page 42 For setting chassis MTU use ismChassisSetMtu lt value gt on each switch 4 2K 5 4K For each embedded Subnet Manager use the following commands for final configuration e Set the priority smPriority lt priority gt e For LMC 2 smMasterLMC 2 e For 4K broadcast MTU with default pkey smDefBcGroup OxFFFF 5 lt rate gt rate 3 SDR 6 DDR rate e For 2K broadcast MTU with default pkey smDefBcGroup OxFFFF 4 lt rate gt rate 3 SDR 6 DDR rate e For GID prefix smGidPrefix lt GID prefix value gt e For node appearance disappearance threshold 10 smAppearanceMsgThresh 10 If this switch has an embedded Subnet Manager Copyright IBM Corp 2008 7 22 08 132 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 1 Enable the Subnet Manager for operation using the license key Do not start the embedded Subnet Manager yet That will be done during another procedure Attach cables to the InfiniBand network on
294. on does not cover installation of I O devices other than those in the InfiniBand network All I O devices that are not InfiniBand devices are considered part of the server install procedure 1 Separate the installation tasks based on the generalized tasks and the people responsible for them as outlined in Installation Responsibilities By Organization on page 59 and Install responsibilities by units and devices on page 60 2 Make sure that you understand Planning Installation Flow on page 59 Pay close attention to the merge points that are crucial to the coordination of a successful install 3 The detailed installation instructions which are documented within this chapter follow the Order of install on page 61 in Cluster Planning The major task numbers found in Order of Install will be referenced in the detailed instructions The detailed instructions may contain several steps to execute a major task a 4 3 Site setup for power cooling and floor on page 93 4 4 Management subsystem installation and configuration on page 95 4 5 Installing and configuring the cluster server hardware on page 121 4 6 Operating System installation and configuring the cluster servers on page 125 4 7 InfiniBand switch installation and configuration for vendor switches on page 129 4 8 Attach cables to the InfiniBand network on page 134 4 9 Verify the InfiniBand network topology and operation on page 136 4 10 Installing or replacing an InfiniBand GX ho
295. onnected cables PCI HCAs number of connected cables 1 1 num LPARs 1 physical port 1 for management 1 for each LPAR that logical switch uses this HCA 6 35 6 Counting Subnet Managers The number of Subnet Managers is equal to one master plus the number of standbys on the subnet 6 35 7 Counting Devices Example For the example the configuration for the subnet is Devices Connectivity 1 9024 switch 5 HCA connections 4 connections to the 9120 1 9120 switch 5 HCA connections 4 connections to the 9024 3 F2A 1 IBM GX HCAs per node 3 IBM GX HCAs 1 connection to 9024 1 connection to 9120 iia ia a 1 2 port PCI HCA per host 2 PCI HCAs 1 connection to 9024 1 connection to 9120 The resulting report from the master Subnet Manager is DETAIL 25 SWs 5 HCAs 10 end ports 353 total ports 4 SM s Copyright IBM Corp 2008 7 22 08 222 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Resource Count Calculation 1 per 9024 12 leaf chips per 9120 SWs 25 2 chips 3 spines per 9120 2 LSW per HCAs 3 GX HCAs 1 12 6 6 25 HCAs 5 2 PCI HCAs 3 IBM GX HCAs Endports 10 5 HCAs 2 Ports 353 See the example ports calculation below SM s 4 1 Master 3 Standbys The following illustrates how the number of ports were calculated Device Ports Calculation 3 connnecti
296. ons to GX HCAs 2 connections to PCI HCAs NA w 4 switch to switch connections 1 management port 9120 150 25 ports 3 spines 2 switch chips per spines spine 13 ports 12 leaf chips 3 connections to GX HCAs 2 connections to PCI HCAs 4 switch to switch connections 9120 leafs 165 LSWs 18 3 ports 6 LSWs LHCAs 6 2 ports 3 logical HCAs PCI HCAs 4 2 ports 2 HCAs Total Port Count 10 150 165 18 6 4 353 6 36 Handling EPO situations Emergency Power off EPO situations are considered to be rare events However it is understood that certain sites may have more power issues than others for various reasons including power grid considerations In any case it is recommended that the site develops an EPO procedure This is a sample procedure to be used with QLogic switches assuming that you have an issue with just the external 480V AC power to the servers Details on how to do each step have been omitted To finalize the procedure you will require the vendor switch User Manual Fabric Management Users Guide and the server service guide Example commands are documented here but they should be verified with the latest User Manuals and service guides If there is a particularly compelling reason for doing a certain step or for doing a step at a certain time in the procedure a bullet will follow it with the reason why 1 To reduce the number of events in the lo
297. opyright IBM Corp 2008 7 22 08 2 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table of Contents 2 3 3 8 NEP OVCPVICW noniine E ada casvaaa ON TERE sats Qansetevs deeats tat aE E Ea AE aE EN Aeae 32 2 33 90 Fabri Vewer OVE a a n a A a E aaaea a Ri 33 2 3 3 10 eMail Notifications OV rvieW iseer aeiiiie i 33 2 3 3 11 Server Operating System OVerview scccssccessceessecsenceessecsencecseceeacecsaeeseaeecsseceeaeecsseeenees 33 2 3 3 12 Management Subsystem Networks 1ccsccesssecessceenseceseceesceceseeeeacecsseeeaceceeeeeeaaecseneeenaes 34 2 3 4 Vendor log flow to CSM event management sssssnssessesseessesresseesreserssressesese 35 2 4 Supported components in an HPC Cluster ccssssccssssssscccsssssseeees IO 3 0 Cluster Planning 2 sisees cesses scctesusassawscnceestauvesadvsesnsuceceasstanesacctesasseostec 7 3 1 Planning Overview iccesiscctecectesesiccsceds ocvecacvetcssstecectesscicencsis sdecdectesssueewese 7 3 2 Required Level of support firmware and devices sscccsssseeseees 3D 3 3 S rver Planning sso cecsssccscde cece eaedecctencSuckesetedeceleccdesetoneeteds deeapectetteees 0 3 4 Planning InfiniBand network cabling and configuration 40 3 4 1 Planning QLogic InfiniBand switch configuration cccceesceeeeeeeeteeeteeees 41 IALL Planine MTU ntt e hak ees E OE dak ee abe a 42 341 2 Planning GID Prefixes issiria aiea iaar eiaa REE taadaa 43 3 4
298. or each iba for i in a do eval iba i eval ib addr i addr you must provide the ibX interface number ib0 7 and address for each ibX interface separately mkiba A S iba i i a Sib addr p 1 P 1 S up m 255 255 255 0 done Copyright IBM Corp 2008 7 22 08 213 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Re create the ibX interfaces properly This assumes that the default p_key Oxffff is being used for the subnet for iin lsdev grep Infiniband awk print 1 egrep v iba icm do chdev 1 i a superpacket on a tcp _recvspace 524288 a tcp sendspace 524288 a srq size 16000 a state up done 6 28 3 Recovering an ibX interface tcp_sendspace and tcp_recvspace Perform the following to recover the tcp_sendspace and tcp_recvspace attributes for an ibX interface Setting the ibX interface to superpacket on should accomplish this too Setting the interface to superpacket on will not work if the interface had previously been set to superpacket on and the tcp_sendpace or tep_recvspace attribute values have been changed ibX ib0 ibl ib2 ib3 ib4 ib5 ib6 or ib7 chdev 1 ibX a tcp_sendspace 524288 a tcp _recvspace 524288 6 28 4 Recovering ml0 in AIX To recover the ml0 interface in AIX you should remove it and rebuild it rmdev l1 ml0 d cfgmgr Sml0ip the ip address of ml0 in this LPAR chdev 1 ml0 a netaddr Sml0ip a netmask 255
299. orp 2008 7 22 08 65 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table 10 Example Installation coordination worksheet Organization IBM Service Task Task description Prerequisite Scheduled Completed tasks date date S1 Place the model servers on floor 8 18 2008 M3 Cable the model servers and BPAs to service VLAN 8 18 2008 S2 Bring up the model servers 8 18 2008 S3 Verify discovery of the system 8 19 2008 S5 Verify System operation 8 19 2008 Planning Installation Flow ends here 3 8 Important information for planning an HPC MPI configuration The following section documents information that you need to plan an IBM HPC MPI configuration Assumptions e Proven configurations for HPC MPI are limited to o 8 subnets per cluster o Upto 8 links out of a server e Servers are shipped pre installed in frames e Servers are shipped with minimum level of Firmware to enable system to IPL to Hypervisor Standby Other considerations Because HPC applications are designed particularly with performance in mind it is important to configure the InfiniBand network components with this in mind The main consideration is that the LID Mask Control LMC field in the switches needs to be set to provide more LIDs per port than the default of one This provides more addressability and better opportunity for using available bandwidth in the
300. ot been run you must query the live fabric using the following command iba report o links grep A 1 Og switch GUID switch port Example results gt grep A 1 gt 0x00066a00d90003d3 11 var opt iba analysis baseline fabric links 20g 0x00025500103a6602 1 SW IBM G2 Logical Switch 1 lt gt 0x00066a00d90003d3 11 SW SilverStorm 9024 DDR GUID 0x00066a00d90003d3 4 The logical switch is in the second to last line of the results of the query Get the name for the logical switch This tells you which logical switch attaches to the physical switch port lt gt logical switch GUID port SW logical switch name IBnodeDescription Example results Logical Switch 1 5 Logon to the CSM Management Server 6 Find the server and HCA port location Note If you have a map of HCA GUIDs to server locations use that to find in which server the HCA is located and skip step a a Convert the logical switch GUID to Operating system format which drops the Ox and uses a dot or colon to delimit bytes For AIX a dot delimits each byte 0x00025500103a7202 becomes 00 02 55 00 10 3a 72 02 For Linux a colon delimits two bytes 0x00025500103a7202 becomes 0002 5500 103a 7202 b Drop the last two byte from the GUID 00 02 55 00 10 3a for AIX 0002 5500 103a 72 for Linux c Run the following command to find the server and adapter number for the HCA For AIX use the following dsh v N AIXNodes ibstat p gre
301. ote This assumes that a baseline health check has been taken previously see Health Checks on page 151 1 Run all_analysis 2 Goto var opt iba analysis latest default output directory structure 3 Look for fabric X Y links diff where X is the HCA and Y is the HCA port on the Fabric Management Server that is attached to the subnet This helps you map directly to the subnet with the potential issue Presumably this is not the same HCA which you are trying to diagnose 4 If there is no fabric X Y links diff file there is no port swap Exit this procedure 5 If there is a fabric X Y links diff there may be a port swap Continue to the next step 6 Use the procedure in Interpreting diff files on page 157 and the procedures in the Fast Fabric Toolset Users Guide to interpret the diff file 7 Ifyou intended to swap ports do the following Otherwise go to the next step a You will need to take another baseline so that future health checks will not fail Use the procedure in Re establishing Health Check baseline on page 217 b Inspect the cable labels If necessary change them to reflect the latest configuration c Then exit this procedure 8 If you did not intend to swap ports swap them back and go back to the beginning of this procedure to verify that you have been successful in swapping the ports back to their original configuration 9 This procedure ends here 6 22 Diagnosing swapped switch ports Swapping of po
302. other end of the link described by the lt node_desc gt lt port_number gt and lt node _guid gt fields These fields and the LINKEDTO keyword will only appear in applicable messages lt details gt is an optional free form field with additional information for diagnosing the cause Example Subnet Manager log entry Oct 10 13 14 37 slot 101 172 21 1 9 MSG ERROR SM SilverStorm 9040 GUID 0x00066a00db000007 Spine 101 Chip A port 0 COND 99999 Link Integrity Error NODE SilverStorm 9040 GUID 0x00066a00db000007 Spine 101 Chip A port 10 0x00066a00db000007 LINKEDTO 9024 DDR GUID 0x00066a00d90001db port 15 0x00066a00d90001db DETAIL Excessive Buffer Overrun threshold trap received Copyright IBM Corp 2008 7 22 08 190 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 12 Diagnosing link errors This procedure is used to isolate link errors to a FRU Symptoms that lead to this procedure include Symptom Reporting mechanism Link down message HCA resource logical switch logical HCA end node disappearance reported QLogic log or CSM MS log containing QLogic logs var log csm errorlog CSM MS hostname HCA resource logical switch logical HCA node disappearance reported FastFabric health check with diff file LED on switch or HCA showing link down LEDs Chassis Viewer Fabric Viewer Use the following procedure to is
303. owing a b c Go to the Server and Partition window Select the Server Management partition Expand the server in which the HCA is populated Expand the Partitions under the server Expand each partition that uses the HCA and perform the following for each partition profile that uses the HCA i ii iii iv v vi vii Select each partition profile that uses the HCA From the menu click Selected Properties In the Properties dialog click the HCA tab Using its physical location find and select the HCA of interest Click Configure Enter the GUID index and Capability settings If this is a new installation obtain these settings from the installation plan information If this is a repair refer to the setting that you previously recorded in step 2 If the replacement HCA is in a different location than the original HCA you should now clear the original HCA information from the partition profile by choosing the original HCA by its physical location and clicking Clear Note If the following message occurs when you attempt to assign a new unique GUID you might be able to recover from this error without the help of a service representative A hardware error has been detected for the adapter U787B 001 DNW45FD P1 Cx You cannot configure the device at this time Contact your service provider The Service Focal Point can be accessed on your HMC see the Start of call procedure in Service Guide fo
304. p 2008 7 22 08 93 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The setup for the power cooling and floor construction must be complete before proceeding to install the cluster This should meet all documented requirements for the individual units frames systems and adapters in the cluster Generally this is performed by the customer or possibly an IBM Installation planning representative or a third party contractor All applicable IBM and vendor documentation should be consulted Note If installing HCAs into existing servers you should only have to perform operations involving cable routing and floor tile cut outs Copyright IBM Corp 2008 7 22 08 94 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 4 Management subsystem installation and configuration The Management subsystem installation and configuration encompasses major tasks M1 through M4 which are illustrated in Figure 9 on page 62 This is the most complex area of an HPC cluster installation It is affected by and affects the other areas such as server installation and switch installation etc very much Many tasks can be performed simultaneously while others are critical to be done in a particular order You will be installing and configuring HMCs a service VLAN a cluster VLAN a Fabric Management Server and a CSM Management Server as well as building an AIX NIM SPoT to run eServe
305. p p 1lst seven bytes of GUID grep iba Example results gt dsh v N AIXNodes ibstat p grep p 00 02 55 00 10 3a 72 grep iba c924flecl0 ppd pok ibm com IB PORT 1 INFORMATION iba0 c924flecl0 ppd pok ibm com IB PORT 2 INFORMATION iba0 d For Linux use the following dsh v N LinuxNodes ibv_devinfo grep B1 1lst seven bytes of GUID grep ehca Example results Copyright IBM Corp 2008 7 22 08 184 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware gt dsh v N AIXNodes ibv_devinfo grep B1 0002 5500 103a 72 grep ehca hca_id ehcao0 The server is in the first field and the adapter number is in the last field c924f1ec10 ppd pok ibm com and ibao0 in AIX or ehcao in Linux To find the physical location of the logical switch port use the logical switch number and iba device found above with the Table 25 IBM GX HCA physical port mapping from iba device and logical switch on page 187 Example Results iba0 ehca0 and logical switch 1 map to C65 T1 Therefore c924flec10 C65 T1 is attached to port 3 of SilverStorm 9024 DDR GUID 0x00066a00d90003d3 7 This procedure ends here 6 9 5 Finding devices based on a known ib interface ibX ehcaX Use this procedure if the ib interface number is known and the physical HCA port and attached physical switch port must be determined This applies to IBM GX HCAs For more information on the architecture of IBM GX HCAs
306. p HPC Clusters Fabric Guide using InfiniBand Hardware CSM Planning Worksheet CSM MS Name CSM MS IP addresses service VLAN cluster VLAN CSM MS Operating System NTP Server Server Model Frame syslog or syslog ng or other syslogd Switch Remote Command Setup DeviceType IBSwitch QLogic for QLogic Switches RemoteShellUser admin note if should be different from admin RemoteShell ssh RemoteCopyCmd usr bin scp Device names addresses of switches Device groups for switches Fabric Management Server Remote Command Setup DeviceType FabricMS RemoteShellUserID root default RemoteShell ssh RemoteCopyCmd usr bin scp Device names or addresses of Fabric MS Device groups for Fabric MS Primary Fabric MS for data collection Copyright IBM Corp 2008 7 22 08 231 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware CSM Event Monitoring Worksheet syslog or syslog ng or other Accept logs from any ip address 0 0 0 0 yes default Fabric Management Server Logging tcp or udp port 514 default Fabric Management Server ip addresses Switch Logging is udp protocol port 514 default Switch chassis ip addresses NOTICE INFO Sensor Condition Response File Named Pipe File Named Pipe Notes Copyright IBM Corp 2
307. particular LPAR for which you wish to determine routes you could use a portGUID instead iba_report o route D portguid lt destination portGUID gt S nodeguid lt port NodeGUID gt You can find the portGUIDs using the procedure in General mapping of IBM HCA GUIDs to physical HCAs on page 178 You will want to use ibstat p for HCAs in AIX LPARs and ibv_devinfo v for HCAs in Linux LPARs If the above procedure for checking routes does not yield a solution go to Diagnosing performance problems on page 200 6 26 Diagnosing management subsystem problems These are procedures to debug management subsystem problems These concentrate on IBM vendor management subsystem integration issues Individual units and applications have their own troubleshooting guides 6 26 1 Problem with event management or remote syslogging Before reading these procedures it is suggested that you review Vendor log flow to CSM event management on page 35 to understand the flow of logs Note The term source is used in this section to generically refer to where the log entry should have been originally logged This will typically either be a Fabric Management Server for host based Subnet Manager logs or a switch for switch chassis logs or embedded Subnet Manager logs Note Before proceeding first verify that you can ping between the CSM MS and the source of the log entry If you cannot then there is probably an Ethernet network problem between the CSM M
308. ps you map directly to the subnet with the potential issue 4 If there is no fabric X Y links diff file there is no port swap Exit this procedure 5 If there is a fabric X Y links diff there may be a port swap Continue to the next step 6 Use the procedure in Health Checks on page 151 and the procedures in the Fast Fabric Toolset Users Guide to interpret the diff file 7 Ifyou intended to swap ports do the following Otherwise go to the next step a You will need to take another baseline so that future health checks will not fail Use the procedure in Re establishing Health Check baseline on page 217 b Inspect the cable labels If necessary change them to reflect the latest configuration c Then exit this procedure 8 If you did not intend to swap ports swap them back and go back to the beginning of this procedure to verify that you have been successful in swapping the ports back to their original configuration This procedure ends here 6 23 Diagnosing performance problems This is a generic procedure for isolating performance problems Performance degradation can result from several different problems including a hardware failure Installation problems Configuration issues Before calling your next level of service do the following to isolate a performance problem The detailed procedure follows 1 Look for hardware problems using the procedure in Checking for hardware problems affecting the fabric
309. pty space in a frame reserve a number for that space e Determine a convention for switch and system unit naming that includes physical location including their frame numbers and slot numbers e Prepare labels for frames to indicate frame numbers e Prepare cable labels for each end of the cables Indicate the ports to which each end of the cable is to connect e Document where switches and servers are located and which HMCs manage them e Printout a floor plan and keep it with the HMCs Planning Aids ends here Copyright IBM Corp 2008 7 22 08 68 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 11 Planning checklist The planning checklist helps you track your progress through the planning process All the worksheets and checklists are available to be copied in Planning and Installation Worksheets on page 225 Table 10 Planning checklist Step Target Complete Start planning checklist Gather documentation and review planning information for individual units and applications Assure that you have planned for e Servers e I O devices e InfiniBand network devices e Frames racks for servers I O devices and switches management servers e Service VLAN including o HMCs o Ethernet devices o CSM Management Server for multiple HMC environments o AIX NIM server for servers with no removable media o Linux distribution server for servers with no removable media o Fabric Management
310. r s or the switch s cluster VLAN IP address a If you cannot ping the source device then you should use standard network debug techniques to isolate the problem on the cluster VLAN Take into consideration the CSM MS connection the Fabric Management Server connection the switch connection and any Ethernet devices on the network Also assure that the addressing has been setup properly Copyright IBM Corp 2008 7 22 08 204 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 Ifyou are using CSM on Linux check the Apparmor configuration with syslog ng to assure that var log csm syslog fabric notices wr is in the etc apparmor d sbin syslog ng file If it is continue to the next step If it is not perform the following procedure a Add the line var log csm syslog fabric notices wr to the etc apparmor d sbin syslog ng file before the You must remember the comma at the end of the line b Restart AppArmor using etc init d boot apparmor restart c Restart syslog ng using etc init d syslog restart d If this fixes the problem end this procedure Otherwise go to the next step 4 Check the syslog configuration file and verify that the following entry is in there a If the CSM MS is running AIX it is using syslog not syslog ng and the following line should be in etc syslog conf If etc syslog conf does not exist you should go to step 4 b Otherwise after finishing this step go to st
311. r addresses of Fabric MS __ egf11fm01 egf11fm02 Device groups for Fabric MS __ AIIFMS MasterFMS BackupFMS Primary Fabric MS for data collection egf11fm01 Copyright IBM Corp 2008 7 22 08 88 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 8 5 CSM Event Monitoring worksheet example CSM Event Monitoring Worksheet syslog or syslog ng or other syslog Accept logs from any ip address 0 0 0 0 yes yes default Fabric Management Server Logging tcp or udp __udp port 514 514 default Fabric Management Server ip addresses _10 1 1 14 10 1 1 15 Switch Logging is udp protocol port _514 514 default Switch chassis ip addresses __10 1 1 16 10 1 1 17 10 1 1 18 10 1 1 19 NOTICE File Named INFO Sensor Condition Response Pipe File Named Pipe var log csm var og csm fabric syslog notices fabric syslog info AIXSyslogSensor LocalAIXNodeSyslog LogNodeErrorLogEntry Notes 3 12 8 6 General QLogic Fabric Management worksheet example General QLogic Fabric Management worksheet Host based or embedded SM _ Hoost based LMC 2 2 is default MTU Chassis 4096 Broadcast _ 4096 ___ mtu rate for broadcast 4096 Fabric Management Server Names Addresses on cluster VLAN _egf11fm01 egf11fm02 Embedded Subnet Manager Switches N A Primary Subnet Manager s location _ subnet1 amp 3 egf11fm01
312. r diagnostics for servers without removable media CD and DVD drives The eServer diagnostics are only available in AIX and will require an AIX NIM SPoT even if partitions are running Linux If your partitions are running Linux you will also need a Linux distribution server for updating the operating system to be used on the partitions in servers without removable media While it is typical to use the CSM MS as the DHCP server for the service VLAN if a separate DHCP server is to be installed you will follow the DHCP installation tasks as described in the installation procedure for CSM This is not a detailed description of how to install the management subsystem components because such procedures are described in detail in documentation for the individual devices and applications This procedure documents the order of installation and key points that you need to consider in installing and configuring the management consoles The management consoles that are to be installed in this section are the HMC the CSM Management Server and the Fabric Management Server The management consoles are key to successfully installing and configuring the cluster because they are the heart of the management subsystem Before you do any significant bring up and configuration these devices must be installed and configured so that they are ready to discover and manage the rest of the devices in the cluster During management subsystem install and configuration you
313. r from 1 through 16 Quite often you will assign a GUID index based on which LPAR and profile you are configuring For example on each server you may have 4 partitions The first paritition on each server might use a GUID index of 1 and the second would use a GUID index of 2 to the third would use a GUID index of 3 and the fourth using a GUID index of 4 The Capability setting is used to indicate the level of sharing to be done This can be one of the following 1 Low 2 Medium 3 High 4 Dedicated While the GID prefix for a port is not something that you explicitly set it is important to understand the subnet to which a port attaches This is determined by the switch to which the HCA port is connected The GID prefix is actually configured for the switch See Planning GID Prefixes on page 43 Additional information on partition profiles is available in the Information Center http publib boulder ibm com infocenter eserver v 113s topic iphat iphatparprofile htm The configuration settings planned here should be recorded in a Server planning worksheet on page 73 which is used to record HCA configuration information Note 9125 F2A servers with heavy I O planars will have an extra InfiniBand device defined This is always iba3 Delete this from the configuration Planning an IBM GX HCA configuration ends here 3 4 2 1 IP subnet addressing restriction There are restrictions to how you may configure IP subnet addressing in a
314. r message screen The is a wildcard monerrorlog syslog i Look for the typo in the etc syslog ng syslog ng conf file by reviewing the previous steps that you have taken to edit syslog ng conf ii Remove the destination and log lines from the end of syslog ng conf iii Re run opt csm csmbin monerrorlog f var log csm syslog fabric notices p f fabnotices iv If you get another error examine the file again and repeat the recovery procedures 8 Delete everything in the error monitoring directory var opt csm_err_ mon 9 Edit AppArmor setup file for syslog ng etc apparmor d sbin syslog ng 10 11 12 13 15 Assure that var log csm syslog fabric notices wr is in the file before the You must remember the comma at the end of the line If changed sbin syslog ng restart apparmor using etc init d boot apparmor restart Restart condition response association using startcondresp lt condition name gt lt response name gt A short time later the following file appears in var opt csm err mon monerrorlog run f fabnotices var log csm syslog fabric notices Check the etc syslog ng syslog ng conf configuration file to assure that the appropriate entries were added by monerrorlog Typically the entries will look like the following However monerrorlog will used a different name from fabnotices_fifo in the destination and log entries It will use a pseudo random name that will look something
315. r replace an InfiniBand GX HCA do the following 1 Obtain the WCII from http w3 rchland ibm com projects WCIL and use that in conjunction with these instructions 2 Ifyou are performing an adapter replacement first record information about the adapter being replaced Important information includes the logical partitions in which it is used the GUID index used in each logical partition and the capacity used in each logical partition Do the following from the Hardware Management Console that manages the server in which the HCA is installed a Obtain the list of partition profiles that use the HCA If there is no list proceed to the next step b Obtain or record the GUID index and capability settings in the partition profiles that use the HCA i Go to the Systems Management window ii Select the Servers partition iii Select the server in which the HCA is installed iv Select the partition to be configured v Expand each partition that uses the HCA If you do not know which partition uses the HCA you must expand the following for each partition profile and record which ones use the HCA as well as the GUID index and capability settings 1 2 3 4 5 Select each partition profile that uses the HCA From the menu click Selected Properties In the Properties dialog click the HCA tab Using its physical location find the HCA of interest Record the GUID index and capability settings 3 Install or
316. r the server and perform the indicated procedures Check the Service Focal Point and look for reports that are related to this error Perform any recovery actions that are indicated If you cannot recover from this error contact your service representative 5 After the server is booted verify that the HCA is recognized by the operating system See Verifying the installed InfiniBand network fabric in AIX or Linux on page 67 6 You have finished installing and configuring the adapter If you were directed here from another procedure return to that procedure 7 This procedure ends here 4 10 1 Deferring replacement of a failing host channel adapter If you plan to defer maintenance of a failing host channel adapter HCA there is a risk of the HCA failing in such a way that it could prevent future logical partition reactivation To assess the risk determine if there is a possibility of the HCA preventing the reactivation of the logical partition If this is possible you must consider the probability of a reboot during the time that maintenance is deferred To determine the risk do the following Copyright IBM Corp 2008 7 22 08 140 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 1 Go to the Server and Partition window Click the Server Management partition Expand the server in which the HCA is installed Expand the partitions under the server A E a Expand each partition that uses the HCA
317. r z Figure 3 High Level Software Architecture The following figure shows a simple InfiniBand configuration illustrating tasks software layers windows and hardware The illustrated HCA is intended to be an single HCA card with 4 physical ports However one could interpret it also as a collection of physical HCAs and port for example two cards each with two ports Application Task MD MPI LAPI z Application Task InfiniBand HAL MPI LAPI InfiniBand HAL ee InfiniBand VIRTUAL Window InfiniBand VIRTUAL Window InfiniBand Switch Figure 4 Simple configuration with InfiniBand Copyright IBM Corp 2008 7 22 08 20 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 2 1 IBM GX GX HCA The IBM GX GX host channel adapter HCA provides server connectivity to InfiniBand fabrics Attaching to the GX GX bus provides much higher bandwidth to from the adapter and therefore better network performance than using an adapter on a PCI bus Because of server form factors including GX GX bus design each server that support an IBM GX GX HCA has its own HCA feature The GX GX HCA has the ability to be shared between logical partitions LPARs Each physical port can be used by each LPAR The adapter itself is logically structured as one logical switch connected to each physical port with a Logical Host Channel Adapter LHCA for each logical partit
318. rchangeably because the Subnet Manager performs the most vital role in managing the fabric The HSM license fee is based on the size of the cluster that it will cover See vendor documentation and web site Embedded Subnet Manager ESM considerations O O IBM is not qualifying the embedded Subnet Manager If you use an embedded Subnet Manager you may experience performance problems and outages if the subnet has more than 64 IBM GX GX HCA ports attached to it This is because of the limited compute power and memory available to run the embedded Subnet Manager in the switch and because the IBM GX GX HCAs also present themselves as multiple logical devices because they can be virtualized see IBM GX GX HCA on page 21 Considering these restrictions IBM recommends that you restrict embedded Subnet Manager use to subnets with only one model 9024 switch in them If you plan to use the embedded Subnet Manager you will still require the Fabric Management Server for the Fast Fabric Toolset see Planning Fast Fabric Toolset on page 54 Therefore using ESM will not eliminate the need for a Fabric Management Server The need for a backup Fabric Management Server will not be as great but it is still recommended You may find it simpler to maintain host based Subnet Manager code than embedded Subnet Manager code You must obtain a license for the embedded Subnet Manager It is keyed to the switch chassis serial number Copyr
319. re Linux distribution server info NTP server info Power requirements Maximum cooling required Number of cooling zones Maximum weight area Minimum weight area Copyright IBM Corp 2008 7 22 08 226 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Frame planning worksheet Frame number s Frame MTM or feature or type Frame size 19 inch or 24 inch Number of slots Slots Device type server switch BPA etc Device name Indicate MTM Copyright IBM Corp 2008 7 22 08 227 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Server planning worksheet Name s Type s Frame s slot s Number and type of HCAs Num LPARs LHCAs IP addressing for InfiniBand IP addressing of service VLAN IP addressing of cluster VLAN LPAR IP addressing MPI addressing Configuration notes HCA information HCA Capability HCA port Switch GID prefix Sharing connection LPAR information LPAR LHCA OS Type GUID index Shared HCA Switch partition give name capability Copyright IBM Corp 2008 7 22 08 228 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Use the following worksheet for planning 24 port switches 24 port switch worksheet
320. rected Foranesm analysis the FF_ESM_CMDS configuration setting will select which ESM commands are used for the analysis When using the default setting for this parameter the files should be reviewed in the following order latest esm smstatus make sure this indicates the SM is running If no SMs are running on the fabric that problem should be corrected before proceeding further Once corrected the health checks should be rerun to look for further errors latest esm smShowSMParms diff this indicates that the SM configuration has changed This file should be reviewed and as necessary the latest esm smShowSMParnms file should be compared to baseline esm smShowSMParms As necessary correct the SM configuration Once corrected the health checks should be rerun to look for further errors If the change was expected and permanent a baseline should be rerun once all other health check errors have been corrected latest esm smShowDefBcGroup diff this indicates that the SM broadcast group for IPoIB configuration has changed This file should be reviewed and as necessary the latest esm smShowDefBcGroup file should be compared to baseline esm smShowDefBcGroup As necessary correct the SM configuration Once corrected the health checks should be rerun to look for further errors If the change was expected and permament a baseline should be rerun once all other health check errors have been corrected latest esm diff if FF_ESM CMDS has been
321. reference labels to help cross reference them between figures and procedures The first is from Figure 10 Management Subsystem Installation Tasks on page 97 and the second is from Figure 9 High level cluster installation flow on page 62 For example E1 M1 indicates task label E1 in Figure 10 Management Subsystem Installation Tasks on page 97 and task label M1 in on page 62 Copyright IBM Corp 2008 7 22 08 95 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Please note any steps that are in a gray background Those steps are performed under InfiniBand switch installation and configuration for vendor switches on page 129 Copyright IBM Corp 2008 7 22 08 96 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware HMCs H1 Physically locate _ HMCs Start HMC install per HMC documentation Physically Locate AIX NIM and Linux Distribution Servers H2 Using CSM or H3 DHCP Server Yes Install and configure 12 Install Servers Cable Install Servers to 13 cluster VLAN Disable DHCP service on the HMCs and assign static IP C Fabric MS f Physically locate CMi Physically locate Fl Fabric MS CSM MS Perform base CSM installation per CSM documentation F2 Install Linux Attach to local F3 network if desired Install amp configure F4 HCAs Install and Configure InfiniServ and Fast Fabri
322. remote commands via dsh to the Fabric Management Server or switch on which the embedded fabric manager is running You can access many instances at once using dsh For host based fabric managers log on to the Fabric Management Server For embedded fabric managers use the Chassis Viewer switch CLI Fast Fabric Toolset or Fabric Viewer to interact with the fabric manager Copyright IBM Corp 2008 7 22 08 30 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 3 3 4 Fast Fabric Toolset Overview Description Documentation When to Use Host How to access Fast Fabric tools are a set of scripts that interface with switches and the various managers to help quickly interface with many switches and managers at once and distill out useful pieces of status information Additionally Health check tools have been developed to help the user identify fabric error states and also unforeseen changes from baseline configuration They are run from a central server called the Fabric Management Server Note that these tools were developed to also help manage nodes running the QLogic host stack The set of functions that do this are not to be used with an IBM system p HPC Cluster because CSM is used for systems that are managed in these clusters Fast Fabric Toolset Users Guide These should be used during install to look for problems These can also be used for health checks when performance degradation is observed
323. rep string Search for a specific string or set of strings lsevent n list of nodes Search for records from a specific node lsevent B MMddhhmmyyyy Search based on a begin date lsevent E MMddhhmmyyyy Search based on an end date lsevent O x Get last x entires Service Focal Point is another important log that you can check on the CSM MS if you setup SFP monitoring as described in the CSM Administration Guide which also describes how to interpret the log information on the CSM MS This will tell you the basic information about the hardware event including which HMC to query for more details Other fabric logs for engineering use may be stored in var log messages This is done if you set up the switches and Fabric Management Servers to send INFO and above messages to the CSM MS while performing the procedure in Setup Remote Logging on page 108 Copyright IBM Corp 2008 7 22 08 150 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 5 Health Checks Obtain the Fast Fabric Toolset Users Guide for reference throughout this section There are several times that health checks are done The method for interpreting results varies depending on what you are trying to accomplish The most generic health check available is all_analysis which will be referenced in this section There are some underlying health check tools beneath all_analysis which may be researched in the Fast Fabric Toolset Users Guide You can a
324. reported hardware events To control the server hardware Host HMC How to access Go to the HMC console near the machines there s generally a single keyboard and monitor with a console switch to access multiple HMCs in a rack should there need to be multiple HMCs Or you canaccess the HMC via a supported web browser on a remote server that can reach the HMC 2 3 3 7 FSP Overview Description Flexible Service Processor for the server When to Use How to Access Required Connectivity CSM and the managing HMC must be able to communicate with the FSP over the service VLAN For machine type 9125 servers this connectivity is facilitated via an internal hardware virtual local area network VLAN within the frame which connects to the service VLAN Documentation IBM system Users Guide When to Use The FSP is in the background most of the time and the HMC and CSM provide the information It is sometimes accessed under direction from engineering Host IBM system How to access This is primarily used by service personnel Direct access is rarely required and is done under direction from engineering using the ASMI screens Otherwise CSM and the HMC are used to communicate with the FSP 2 3 3 8 Description Documentation When to Use Host How to access Copyright IBM Corp 2008 7 22 08 NTP Overview This is used to keep the switches and management servers time of
325. revious setup instructions to assure that they were performed correctly paying close attention to the setup of the etc syslog conf file e Use the procedure in Problem with event management or remote syslogging on page 202 Recall that you were using the logger command such that the Fabric Management Server would be the source of the log entry f Check the WvarJlog csm syslog fabric info file and verify that the NOTICE entry is in the file This only applies if you have chosen to set up the syslog fabric info file If one or both entries are missing e Review the previous setup instructions for switches remote syslog setup to assure that they were performed correctly g Use the procedure in Problem with event management or remote syslogging on page 202 Recall that you were using the ibtest command such that the switches were the source of the log entry Copyright IBM Corp 2008 7 22 08 115 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware h Verifying switch remote logging ends here Proceed to step 7 7 This procedure ends here 4 4 7 1 Using syslog on RedHat Linux based CSM MS Note Do not use this procedure unless you were directed here from within another procedure If the level of Linux on the CSM MS uses syslog instead of syslog ng use the following procedure to set up syslog to direct log entries from the Fabric Management Server and switches instead of the one documented under Remote Sy
326. ric Guide using InfiniBand Hardware Use the following worksheets for planning switches with more than 24 ports ones with leafs and spines The first worksheet is for the overall switch chassis planning The second worksheet is planning for each leaf Director Core Switch gt 24 ports Switch Model Switch name set using setIBNodeDesc Frame and slot Chassis IP addresses 9240 has two hemispheres Spine IP addresses indicate spine slot Default gateway GID prefix LMC O default 2 if used in HPC cluster NTP Server Switch MTMS Fill out during install New admin password Fill out during install Remote logging host CSM MS is recommended Leaf ___ Leaf __ Ports Connection Ports Connection 1 1 2 2 3 3 4 4 5 5 6 6 f 7 8 8 9 9 10 10 11 11 12 12 3 12 6 CSM Planning Worksheets This worksheet is for planning CSM It is intended to highlight information especially important for management subsystem integration in HPC Clusters with an InfiniBand network It is not intended to replace planning instruction in the CSM Installation and Planning Guide If you have multiple CSM Management Servers CSM MS you should complete a worksheet for each one The Switch Remote Command Setup and Fabric Management Server Remote Command Setup allow for multiple devices to be defined Copyright IBM Corp 2008 7 22 08 76 of 238 IBM System p HPC Clusters Fabric Guide us
327. rietary 1 IBM CE 1 Service VLAN a ole i ee 2 Admin 2 optionally a a Cluster VLAN or public VLAN Switch 1 Chassis firmware Switch chassis proprietary 1 Admin Cluster VLAN 2 Chassis viewer 2 Switch Cas hess ivi requires public 3 Embedded Fabric oe network access A provider Manager optional Admin 1 Admin workstation User User 1 Admin Network access to Workstation 2 oplioially Fabre preference preference management servers Viewer 3 Launch point into management servers optional requires network access to other servers Service 1 Serial interface to Laptop User 1 Switch RS 232 to switch laptop switch preference service This is not provided by providet IBM as part of the 2 Admin cluster It is provided by the user or the site 1 Cluster VLAN NTP Server NTP Site preference Site N A gt Service VLAN preference Copyright IBM Corp 2008 7 22 08 28 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note The following sub sections are broken down by application in the management subsystem 2 3 3 1 Switch Chassis Viewer Overview Description Documentation When to Use Host How to access The switch chassis viewer is a tool for configuring a switch as well as a tool for querying its state It is also used to access the embedded fabric manager Since it can only work with one switch at a time it does not scale well Use the Fast Fabric Toolset and CSM to work w
328. right IBM Corp 2008 7 22 08 216 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware parameter devicetype IBSwitch Qlogic as outlined in Remotely accessing QLogic switches from the CSM MS on page 159 smShowGroups There should be just one group with all the HCA devices on the subnet being part of the group Note that mtu 5 indicates 4K mtu 4 indicates 2K Oxff1240 1 bffff0000 00000000FFFFFFFF c000 qKey 0x00000000 pKey OxFFFF mtu 5 rate 3 life 19 sl 0 0x00025500101a3300 F 0x00025500101a3100 F 0x00025500101a8300 F 0x00025500101a8100 F 0x00025500101a6300 F 0x00025500101a6100 F 0x0002550010194000 F 0x0002550010193e00 F 0x00066a00facade01 F 6 30 Re establishing Health Check baseline This is needed after changing the fabric configuration in any way The following activities are examples of ways in which the fabric configuration may be changed Repair a faulty leaf board which leads to a new serial number for that component Update switch firmware or Subnet Manager Change time zones in a switch Add or delete a new device or link to a fabric A link fails and its devices are removed from the Subnet Manager database Perform the following procedure to re establish the health check baseline 1 2 3 4 Make sure that you have fixed all problems with the fabric including inadvertent configuration changes before proceeding Save the old baseline This may be required for future debug
329. ription The fabric manager performs these basic operations Discovers fabric devices Configures the fabric Monitors the fabric Reconfigures the fabric on failure Reports problems The fabric manager has several management interfaces that are used to manage an InfiniBand network These include the baseboard manager performance manager Subnet Manager and fabric executive All but the fabric executive are described in the InfiniBand architecture The fabric executive is there to provide an interface between the Fabric Viewer and the other managers Each of these managers is required to fully manage a single subnet If you have a host based fabric manager there will be up to 4 fabric managers on the Fabric Manager Server Configuration parameters for each of the managers for each instance of fabric manager must be considered There are many parameters but only a few will typically vary from default A more detailed description of fabric management is available in the InfiniBand standard specification and vendor documentation Documentation QLogic Fabric Manager Users Guide InfiniBand standard specification When to Use Fabric management must be enabled to manage the network and pass data You use the Chassis Viewer CLI or Fabric Viewer to interact with the fabric manager Host Host based is on the Fabric Management Server Embedded is on the Switch How to access You may access the Fabric Manager functions from CSM by issuing
330. rk topology and operation ends here Note Beyond this point are procedures that are referenced by the preceding procedures Copyright IBM Corp 2008 7 22 08 138 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 10 Installing or replacing an InfiniBand GX host channel adapter This procedure guides you through the process for installing or replacing an InfiniBand GX host channel adapter HCA The process includes e Physically installing or replacing the adapter hardware into your system unit e Configuring the LPAR profiles with a new globally unique ID for the new adapter in your switch environment e Verifying that the HCA is recognized by the operating system Notes 1 Ifyou are considering deferred maintenance of a GX HCA review Deferring replacement of a failing on page 140 2 Ifyou replace an HCA it is possible that the new HCA could be defective in a way that prevents the logical partition from activating In this case notification pops up on the controlling HMC If this occurs decide if you want to replace the new defective HCA immediately or if you want to defer maintenance and continue activating the logical partition To defer maintenance and continue activating the partition you must unassign the HCA in all the partition profiles that contain the HCA using the procedure found in Recovering from an HCA preventing a logical partition from activating on page 211 To install o
331. rm this procedure as if it were a new cluster Adding servers and a subnet to an installation existing InfiniBand network Copyright IBM Corp 2008 7 22 08 121 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 5 2 Server hardware installation and configuration Procedure 1 Select one of the following options If this is a new installation go to step 2 If you are adding servers to an existing cluster go to step 2 If you are adding cables to existing HCAs proceed to step 12 Ifyou are adding HCAs to existing servers go to Installing or replacing an InfiniBand GX on page 139 and follow the installation instructions for the HCAs WCII or Information Center instructions then proceed to step 12 2 S3 Position the frames or racks according to the floor plan 3 Choose from the following items then go to the appropriate step for your cluster Ifyou have a single HMC in the cluster and you are not using CSM and a cluster ready hardware server in your cluster go to step 4 Ifyou are using CSM and cluster ready hardware server in your cluster go to step 5 4 Ifyou have a single HMC and you are not using CSM and a cluster ready hardware server in your cluster do the following a S1 Position the servers in frames or racks and install the host channel adapters HCAs do not connect or apply power to the servers at this time Note Do not proceed in the
332. rocedure The key threshold to be changed will be the symbol errors threshold Threshold setting isdifficult at this level because the symbol error threshold being set is for every symbol error detected on the link rather than some other time based threshold in the hardware Therefore if you wish to set your own thresholds please read the rest of this section carefully so as to avoid calling out healthy links as faulty There are two rules to be used with respect to an allowable number of symbol errors on a given link and also throughout the entire fabric Because the number of allowable errors on a given link is a worst case probability it is not acceptable to allow all links in a fabric to experience the maximum allowable number of symbol errors nor is it probable that a cluster will typically experience such a condition Therefore the number of allowable symbol errors in the entire fabric is based on a combination of factors involving recovery time for errors and potential impact to variability of fabric performance 1 A link should not experience more than 10 symbol errors in a given 24 hour time period 2 For any size cluster there should be 432 or fewer symbol errors in a given 24 hour time period With the above rules in mind two different query intervals 4 and 1 hour will be addressed with guidance on how to set the thresholds At regular intervals you also need to clear the error counters because the thresholds are not time base
333. rror Enabled 4 Alarm Enabled 5 Warning Enabled 6 Partial Enabled 7 Config Enabled 8 SINTO Enabled 9 Periodic Enabled 15 Notice Enabled 10 Debugl Disabled 11 Debug2 Disabled 12 Debug3 Disabled 13 Debug4 Disabled 14 Debug5 Disabled c You have now setup the switches to remotely log to the CSM MS You may verify switch remote logging operation using step 5 4 L4 M4 Setup Service Focal Point Monitoring on the CSM Management Server and the HMCs See the CSM Installation Guide for instructions on Service Focal Point Monitoring Note This is particular useful when there is more than one HMC in a cluster 5 L5 M4 Verify the remote syslogging and event management path from the Fabric Management Server through to the CSM MS var log csm errorlog CSM MS hostname file a Do not proceed with this step until you have setup the CSM MS for remote logging and event management in step 1 and you have set up the Fabric Management Server to remotely log to the CSM MS in step 2 b Log on to the Fabric Management Server c Create a NOTICE level log and an INFO level log Replace XXX with your initials logger p local6 notice XXX This is a NOTICE test from the Fabric Management Server logger p local6 info XXX This is an INFO test from the Fabric Management Server d Log on to the CSM MS to see if the log made it through It may take a minute or two before the event
334. rts may be inconsequential or it may cause performance problems it all depends on which ports get swapped An in depth analysis of whether or not a swap can cause performance problems is outside of the scope of this document However a rule of thumb applied here is that swapping ports between subnets is not desirable If switch ports have been swapped this will be uncovered by the Fast Fabric Health Check when it compares the latest configuration with the baseline configuration You will need to interpret the diff output between the latest and baseline configuration to see if a port swap has occurred In general when switch ports are swapped they are swapped between ports on the same switch chassis Switch ports that appear swapped between switch chassis could be caused by swapping HCA ports on an HCA or between ports in the same IBM server Any more sophisticated swapping would likely be up for debate with respect to if it is a switch port swap or an HCA port swap or just a complete reconfiguration You may need to reference the Fast Fabric Toolset Users Guide for details on health check Copyright IBM Corp 2008 7 22 08 199 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 1 Run all_analysis 2 Goto var opt iba analysis latest default output directory structure 3 Look for fabric X Y links diff where X is the HCA and Y is the HCA port on the Fabric Management Server that is attached to the subnet This hel
335. rver i Check the DHCP server to verify that each server and BPC has been given an IP address For a frame with a BPC you should see an IP address assigned for each BPC and service processor connection For a frame or rack with no BPC you will see IP addresses assigned for each service processor connection Copyright IBM Corp 2008 7 22 08 123 of 238 10 11 12 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware ii Record the association between each server and its assigned IP address M4 If not using Cluster Ready Hardware Server CRHS skip to step 8 Otherwise after each server and BPC is visible on the DHCP server using instructions for CRHS in the CSM installation documentation you must connect the frames and servers by assigning them to their respective managing HMC Go to step 9 If not using Cluster Ready Hardware Server in the Server and Frame Management windows verify that each HMC has visibility to the appropriate servers and frames that it controls M4 Authenticate the frames and servers 3 In the server and frame management windows on each HMC verify that you can see all the servers and frames to be managed by the HMC S4 Ensure that the servers and power subsystems applies to IBM systems with 24 inch racks in your cluster are all at the correct firmware levels See the IBM Clusters with the InfiniBand Switch web site at http www 14 software
336. rvice on page 165 ii Run the Fast Fabric Health Check using instructions found in Health Checks on page 151 Ifa problem is encountered see Cluster service on page 165 c At this time you should run a fabric verification application to pass data on the fabric For the procedure to run a fabric verification application see Fabric verification on page 142 This includes steps for checking for faults d After running the fabric verification tool perform the checks recommended in Fabric verification on page 142 3 After fixing problems run the Fast Fabric tools baseline health check one more time This can be used to help monitor fabric health as well as diagnose problems Use sbin all_analysis b 4 Clear all the switch logs to start with a clean slate However you will want to be sure to take a snapshot of the logs before proceeding Do the following a Make a directory for storing the state at the end of installation var opt iba analysis install_ capture b Ifyou have the etc sysconfig iba chassis configured with all switch chassis listed issuecaptureall C d var opt iba analysis install capture c Ifyou have another file configured with all switch chassis listed captureall C F file with all switch chassis listed d var opt iba analysis install_ capture d cmdall C logClear 5 The InfiniBand network is now installed and available for operation 6 This procedure ends here Verify the InfiniBand netwo
337. s Do the following to plan your cluster 1 When planning your cluster you need to first gather and review the planning and installation information for the various components in the cluster Refer to Information resources on page 14 as a starting point for where to obtain such information Because this document provides supplemental information with Copyright IBM Corp 2008 7 22 08 37 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware respect to clustered computing with an InfiniBand network you must understand all of the planning information for the individual components before proceeding with this planning overview 2 Review Planning checklist on page 69 which can help you keep track of which planning steps that you have completed 3 Review Required Level of support firmware and devices on page 39 to understand the minimal level of software and firmware required to support clustering with an InfiniBand network 4 Review the planning resources for the individual servers that you wish to use in your cluster see Server Planning on page 40 5 Review Planning InfiniBand network cabling and configuration on page 40 to understand the network devices and configuration The planning information will address Planning QLogic InfiniBand switch configuration on page 41 Planning an IBM GX HCA configuration on page 43 For vendor HCA planning use the vendor documentation 6 Review the informat
338. s Run baseline health check Monitor fabric components Monitor IBM and vendor for code updates e Monitor CSM event management e Use Fast Fabric health check e Note configuration changes New level required e Performance complaints Yes Perform code maintenance e Loss of resource complaints User written monitoring scripts Configuration changed Fault or unexpected configuration change detected Verify new config Perform service action based on symptom Part replaced code required or config change required Update baseline health check Figure 13 Cluster Fabric Management Flow Copyright IBM Corp 2008 7 22 08 146 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 5 2 Cluster Fabric Management Components and their Use To understand how the the components for cluster fabric management work together see Management subsystem on page 25 The following sub sections will describe how to use the main cluster management subsystem components They will be concentrated on those tools which can help you manage the cluster in a scalable manner The Chassis Viewer and switch command line are not described below They are used mainly to manage and work with one switch at a time The QLogic documentation can help you understand their use see the switch Users Guide and the Best Practices for Clusters Guide 5 2 1 CSM Cluster Systems Management CSM is used to loosely
339. s x scccjcccscesticcnsti sa desteeds case sith E E A N teen R A E CSM MS Fabric Event Management Log Table of symptoms ssssssesssesersssseseessesressesrsresersesseseeseese Hardware or Chassis Viewer LEDs Table of symptoms cccssecsseesseeeeeesceeseeeeceseceseeeeenseeneeeseenseenaes Fast Fabric Tools Table of symptoms cccccssessceesceesceeeceseceaecesecseecaeeeneeeseeseceseeneeeeeeeeeereneeeseenseentes SEP Table of symptoms mareiro nnee a eG Ae A Be E Other Table of symptoms 02 2 3 cesses e e E eves oie a AEH ice hence sete Ae eR Service Procedures i400 ghd nni heeii ieee aie ein a ai e GOULD Forimats ise iste asec deseo d sockestens palettes Ed sect aa lets Seabee ey te kta ee E STE Isolating link ports based on known information ccccesccesecesecceeseeeseeseeeeeeeeeesecnseeneeenaeesseeeeeeenseentes IBM GX HCA physical port mapping from iba device and logical SWitCh 00 eee eeseeeseeeeeteceeeeeneeeees QLogic Log Sever itttes icc ccsseiscccag ceageles bec escetenceiee E see eete cate A AR E E Counting Switch Chips in a Fabric cccccccsseesseescessceesceeecesecesecaecsaecsaecaeeeaeeeeeseseseenseenseseeeeseneeneenseenaes Counting Fabric Ports 4 6snecad nando ead RAKES hA aaa a A WAG AN Rain RERG Aone Copyright IBM Corp 2008 7 22 08 11 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 1 0 Document overview This section is an overview of this document s struc
340. s Fabric Guide using InfiniBand Hardware 5 6 Remotely accessing QLogic management tools and commands from CSM MS Remote execution of QLogic management tools from CSM can be an important addition to the management infrastructure It effectively integrates the QLogic management environment with the IBM management environment Remote command execution allows the user to do manual queries from the CSM MS console without having to log in to the Fabric Management Server It also allows for writing management and monitoring scripts that run from the CSM MS which can improve productivity for administration of the cluster fabric One could write scripts to act on nodes based on fabric activity or act on the fabric based on node activity Once you have setup remote command execution from the CSM MS to Fabric Management Server as in Remote Command Execution setup on page 117 you can access any command that does not require user interaction by issuing the following dsh from the CSM MS dsh d fabric management server IP command list Or any other typical dsh command string may be used Keep in mind that it is recommended that the Fabric Management Server be setup as a device in CSM MS device database and not a node If you have chosen to set it up as anode then you will have to use a different parameter from d to point to it 5 6 1 Remotely accessing QLogic switches from the CSM MS Remotely accessing switch commands from the CSM can be an importa
341. s and where they are located Also you can use the configuration note to remind you of other specific characteristics of the server It is important to note the type of HCAs to be used Server planning worksheet Name s Type s Frame s slot s Number and type of HCAs Num LPARs LHCAs IP addressing for InfiniBand IP addressing of service VLAN IP addressing of cluster VLAN LPAR IP addressing MPI addressing Configuration notes HCA information HCA Capability HCA port Switch GID prefix Sharing connection LPAR information LPAR LHCA OS Type GUID index Shared HCA Switch partition give name capability Copyright IBM Corp 2008 7 22 08 73 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 12 5 QLogic Switch planning worksheets There is a worksheet in this section for each type of switch When documenting connections to switch ports it is suggested that you note both a shorthand for your own use and the IBM HCA physical locations For example if you are connecting port 1 of a 24 switch to port one of the only HCA in a model 575 server that you are going to name fln1 you may wish to use the shorthand f1nl HCA1 Port1 to indicate this connection It would be useful to also note the IBM location code for this HCA port as well You can get the location code information spec
342. s application crashes Diagnosing application crashes on page 201 Look for swapped HCA ports Diagnosing swapped HCA ports on page 199 Look for swapped ports on switches Diagnosing swapped switch ports on page 199 Diagnosing Management subsystem problems Diagnosing management subsystem problems on page 202 Ping problems Recovering from an HCA preventing a logical partition from activating Diagnosing and recovering ping problems on page 201 Repair Procedures Recovering from an HCA preventing a logical partition from activating on page 211 Repairing IBM systems Diagnosing and repairing IBM system problems on page 194 Ping problems Diagnosing and recovering ping problems on page 201 Recovering ibX interfaces Recovering ibX interfaces on page 212 Not running at desired 4K MTU Recovering to 4K MTU on page 214 Re establishing a health check baseline Verifying link FRU replacements Re establishing Health Check baseline on page 217 Verify Procedures Verifying link FRU replacements on page 217 Verifying other repairs Verifying repairs on page 218 Verifying configuration changes Verifying repairs on page 218 Copyright IBM Corp 2008 7 22 08 173 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 6 7 Capturing data for fabric diagnosis This procedure addresses collecting all of the data that th
343. s are e Setup Remote Logging on page 108 e Remote Command Execution setup on page 117 InfiniBand switch installation and configuration for vendor switches ends here Copyright IBM Corp 2008 7 22 08 133 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 8 Attach cables to the InfiniBand network Use this procedure if you are responsible for installing the cables on the InfiniBand network Cabling the InfiniBand network encompasses major tasks C1 through C4 which are illustrated in Figure 9 on page 62 Note Do not start this procedure until InfiniBand switches have been physically installed Wait until the servers have been configured This will alleviate the situation where various install personnel may be waiting on site for key parts of this procedure to be completed Depending on the arrival of units on site this is not always practical Therefore it is important to review the Order of install on page 61 and Figure 9 on page 62 to identify the merge points where a step in a major task or procedure being performed by one person is dependent on the completion of steps in another major task or procedure being performed by another person Obtain the following documentation QLogic Switch Users Guide and Quick Setup Guide QLogic Best Practices Guide for a Cluster From your installation planner obtain Cable planning information QLogic Switch planning workshee
344. s from vendor Subnet Managers and switches to the CSM Management Server CSM MS Copyright IBM Corp 2008 7 22 08 25 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The remote syslog entries arriving at the CSM MS are directed to a file or named pipe based on priority severity of the log entry a NOTICE and higher entries go to a file or named pipe that will be monitored by CSM event management b INFORMATION and higher entries go to another file for history and detailed debug purposes This is an optional approach but highly recommended Event management will leverage the A XSyslogSensor for CSM running on AIX and the ErrorLogSensor for CSM running on Linux Event management will place the NOTICE and higher log entries in the common area for error logs from operating systems The QLogic Fast Fabric Toolset s health check tools are highly recommended for regularly monitoring the fabric for errors and configuration changes that could lead to performance problems a A baseline health check is taken upon installation and configuration change b The baseline is used to compare against current state and indicate any undesired differences In order to maintain the fabric the dsh command in CSM will allow you to leverage existing vendor command line tools remotely from the CSM MS These tools are 1 Switch chassis command line interface CLI on a managed switch There are some new dsh options and hardware devi
345. s in the configuration file Also these lines would not be contiguous in an actual configuration file SM_0_def_mc_mtu 0x5 SM_1_def_mc_mtu 0x5 SM_2_ def mc_mtu 0x5 SM_3_def_mc_mtu 0x5 Also make sure the rate matches what was planned in Planning MTU on page 42 where 0x3 SDR and 0x6 DDR SM_0_def_mc_rate 0x3 or 0x6 SM_1_ def mc_rate 0x3 or 0x6 SM_2 def mc_rate 0x3 or 0x6 SM_3_def_mc_rate 0x3 or 0x6 Start the Subnet Manager etc init d iview_fm start If you are running an embedded Subnet Manager do the following Note Instructions are written for recovering a single subnet at a time Log on to the switch CLI or issue these commands from the Fabric Management Server using cmda11 or from the CSM MS using dsh If you use dsh do not forget the parameter devicetype IBSwitch Qlogic as outlined in Remotely accessing QLogic switches from the CSM MS on page 159 a b c d Stop the Subnet Manager smcontrol stop Setup the broadcast multicast group MTU smDefBcGroup Oxffff 5 Enable the broadcast multicast group smDefBcGroup enable Start the Subnet Manager smCcontrol start 2 If your server is running AIX you must do the following to properly setup for 4K MTU To determine if you should be using 4K MTU see Planning MTU on page 42 and the QLogic Switch planning worksheets on page 74 a Do not proceed to do a mkiba until you have properly setup your Subnet Managers for 4K MTU For host based Subnet Man
346. section describes the management subsystem from several perspectives 1 2 3 4 Host view Networks Functional Components Users and interfaces The Figure 5 Management Subsystem Functional Diagram on page 27 illustrates the management or service subsystem from a functional point of view Copyright IBM Corp 2008 7 22 08 26 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Service laptop a i P B Network Service RS 232 provider oeie Fabric Management Server Switch Fast Fabric Tools NTP Server Lil Admin desktop amd GUI amp RMC Es IBM Call Home Call Home is for IBM systems only and does not include switches or the Subnet Manager Figure 5 Management Subsystem Functional Diagram The above figure assumes the use of a Host based Subnet Manager HSM rather than an Embedded Subnet Manager ESM running on a switch IBM recommends the HSM instead of the ESM This is because of the limited compute resources on switches for ESM use If you are using an ESM then the Fabric Managers will be running on switches The servers are monitored and serviced in the same fashion as they are for any IBM Power Systems cluster The CSM Management Server CSM MS is the central point for management and monitoring operations for the system administrator CSM functions for event management of switch and Subnet Manager events and for remote command execution to the switches and F
347. sers Guide using ibtest on the Fabric Management Server 9 Ifthe problem has not been fixed call your next level of support 6 26 1 3 Event not in CSM MS var log csm syslog fabric info If the event is not in the remote syslog file for info var log csm syslog fabric info do the following Note This assumes that you are using syslogd for syslogging If you are using another syslog application like syslog ng then you may have to alter this procedure to account for that However the underlying technique for debug should remain the same 1 Log onto the CSM MS 2 Verify that you can ping the source which should be either the Fabric Management Server s or the switch s cluster VLAN IP address a If you cannot ping the source device then you should use standard network debug techniques to isolate the problem on the service VLAN Take into consideration the CSM MS connection the Fabric Management Server connection the switch connection and any Ethernet devices on the network Also assure that the addressing has been setup properly Copyright IBM Corp 2008 7 22 08 206 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 3 Check the syslog configuration file and verify that the following entry is in there a Ifthe CSM MS is using syslog not syslog ng the following line should be in etc syslog conf If etc syslog conf does not exist you should go to step 3 b all local6 info and above prior
348. server installation instructions WCII or Information Center past the point where you physically install the hardware Follow the installation procedures for servers found in Worldwide Customized Installation Instructions WCIIs for each server model that is installed by IBM service representatives For all other server models customer procedures for initial server setup are available in o For POWER6 IBM Resource Link for the IBM system being installed see http www ibm com servers resourcelink where you should start with the Library Resource Link access requires an IBM Registration ID IBM ID o For POWERS IBM systems Hardware Information Center http publib boulder ibm com infocenter eserver v 113s index jsp Click IBM systems Hardware Information Center Initial server setup Procedures for installing the GX InfiniBand host channel adapters are also available in the IBM systems Hardware Information Center click IBM systems Hardware Information Center Installing hardware b Verify that the HMC is configured and operational c After the Ethernet service VLAN and management consoles have completed the initial installation and configuration they are ready to discover and connect to frames and servers on the Ethernet service VLAN Proceed to step 6 5 Ifyou are using CSM and a cluster ready hardware server in your cluster do the following a S1 Position servers in frames or racks and install the
349. sis with different threshold files For example if you start the 24 hour interval at 6AM the crontab could look like the following which assumes that the switch names begin with SilverStorm and that at 6AM the C is used to reset the counters 0 6 FF FABRIC HEALTH s C o errors o slowlinks F nodepat SilverStorm sbin all_ analysis c etc syconfig iba_mon conf 0 0 10 sbin all_analysis c etc syconfig iba_mon conf 4 0 14 sbin all_analysis c etc syconfig iba_mon conf 8 018 sbin all_ analysis e etc syconfig iba_mon conf 12 0 0 22 sbin all_ analysis e etc syconfig iba_mon conf 16 2 sbin all analysis e etc syconfig iba_mon conf 20 Copyright IBM Corp 2008 7 22 08 152 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Table 13 Symbol error thresholds 24 hour cycle 4 hour intervals 0 hour 4 hours 8 hours 12 hours 16 hours 20 hours Count 10 3 4 5 7 9 Clear yes No no no no no The following will address how to setup a 24 hour monitoring cycle at 1 hour intervals The link error counter thresholds are defined in the etc sysconfig iba iba_mon conf file which needs to be set up for each interval s threshold Then cronjob s must be set up that reference these configuration files 1 Save the original file cp p etc sysconfig iba iba_mon conf etc sysconfig iba iba_mon con
350. slogging and Event Management for CSM on Linux on page 111 After finishing this procedure return to the procedure from which you were sent and continue after the steps that set up syslog ng and runs monerrorlog 1 Setup a sensor for syslog fabric notices file using monerrlog but change the default priority filter to f_fabnotices and the monitored file to syslog fabric notices opt csm csmbin monerrorlog f var log csm syslog fabric notices p local6 notice 2 Wait two minutes after running monerrorlog The following should be found in etc syslog conf local6 notice var log csm syslog fabric notices rotate 4m files 1 3 Return to the procedure that referenced this procedure and go to the step which referenced by that procedure Copyright IBM Corp 2008 7 22 08 116 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 4 8 Remote Command Execution setup This procedure is used to set up remote command execution dsh from CSM to the switches and Fabric Management Server Remote Command Execution to the Fabric Management Server setup is a standard Linux node setup except that it is recommended that the Fabric Management Server be treated as a device Remote Command Execution to the switches is standard hardware device setup The following figure Figure 12 Remote Command Execution Setup illustrate tasks R1 R2 and R3 for setting up remote command execution It also illustrates how the remote co
351. ssessresseesresresseesresrrsstessesresseessessessresseesressee 214 6 29 Recovering to 4K MTU ssesesssssccesssooccescsscoccssssoceesssocceessooesesssssesee 214 6 30 Re establishing Health Check baseline sccccsssssssccsssssssceees 217 6 31 Verifying link FRU replacements ssesesesooecesssooecssoscceessoosesssssosese 217 6 32 Verifying repairs and configuration Changes ccccsscsseees 218 6 33 Rebooting the cluster 3 sscseicss sescseisessas svcaivesssscseasecessdesesvevoas condecsassesess 219 6 34 Rebooting Powering off an IBM System ccsssssssccssssssceees 219 6 35 Counting DEVICES scssasecisscesssvavetsacdiesnsssedsetnsssdunesedasssdnacsalesseteasedncstoess 220 6 35 Counting SWIMS asia onen hace va Ustad ea aaty eae aa ha alee 221 6 35 2 Counting logical switches t52 c5c50c cons pavtassandetullnecaecboaceonscanseea nou deeutaltnes deen euecuanal 221 635 5 Counting HCAS ci teat secret n e AR stale raat eg Shoes 221 6 35 4 Counting End Ports sssesssecscastasendesszese inaro KAT daatiatvase E RES ASER e RA ESEA 222 6 33 Counting POTS narices ai anan ea wine e a a a E ae 222 6 35 6 Counting Subnet Managers esesssssessseesseseesseesresressresresersseessessessressessressre 222 6 35 7 Counting Devices Examples i scsatsees cbse iaratn aE E EER EAE 222 6 36 Handling EPO situations icsccscccciecsssssssseessesaosssocnsesonssscnscsansosonsescus 223 6 37 Monitoring and Checking for Fabric Problems
352. st channel adapter on page 139 4 11 Verifying the installed InfiniBand network fabric in AIX or Linux on page 142 4 12 Fabric verification on page 142 4 Ifyou are not performing a new install but are instead expanding an existing cluster or adding function to support an InfiniBand network see Cluster Expansion or partial installation on page 93 rpg ho ao g 4 1 IBM Service representative installation responsibilities IBM Service installation responsibilities include installing IBM Machine Types that are IBM installable versus those that are customer installable In addition to normal repair responsibilities during install it should be noted that IBM service is responsible for repairing the InfiniBand cables and HCAs IBM Service representatives are responsible for executing the following installation instructions 1 For IBM installable HMCs use HMC Installation on page 100 2 For IBM installable servers use Installing and configuring the cluster server hardware on page 121 Copyright IBM Corp 2008 7 22 08 92 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 2 Cluster Expansion or partial installation While for a new installation you would need to perform all of the major tasks listed above if an expansion or partial installation is being performed use the following table to determine which major tasks to perform Adding InfiniBand Adding new Adding a Add
353. sters Fabric Guide using InfiniBand Hardware Subnet 8 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The key parameters for which to plan for the Fabric Manager are Note If a parameter applies to only a certain component of the fabric manager that will be noted below Otherwise you must specify that parameter for each component of each instance of the fabric manager on the Fabric Management Server Components of the fabric manager are subnet manager SM performance manager PM baseboard manager BM and fabric executive FE Plana GID prefix for each subnet Each subnet requires a different GID prefix which will be set by the Subnet Manager The default is Oxfe80000000000000 This is for the subnet manager only LMC 2 to allow for 4 LIDs This is important for IBM MPI performance This is for the subnet manager only For each Fabric Management Server plan which instance of the fabric manager will be used to manage each subnet Instances are numbered from 0 to 3 on a single Fabric Management Server For example if a single Fabric Management server is managing 4 subnets you will typically have instance 0 manage the first subnet instance 1 manage the second subnet instance 2 manage the third subnet and instance 3 manage the fourth subnet All components under a particular fabric manager instance are referenced using the same instance For example fabric manager instance 0 will have SM_0 PM_0 BM_0
354. sters with the InfiniBand Switch web site at http Awww 14 software ibm com webapp set2 sas f networkmanager home html Check the switch software level using a method described in vendor s switch Users Guides These guides also describe how to update the switch s software which is available on the vendor s website For QLogic switches one of the following guides and methods are suggested You can check each switch individually using a command on its Command Line Interface CLI This command can be found in the switch model s users guide If the Fast Fabric Toolset is installed on the Fabric Management Server at this point you can check the code levels of multiple switch simultaneously using techniques found in the Fast Fabric Toolset Users Guide The fwVersion command can be used If issued using Fast Fabric tools cmdall could be used to issue this command to all switches simultaneously For updating multiple switches simultaneously the Fast Fabric Toolset is recommended 9 W6 Finalize the configuration for each InfiniBand switch You are setting up the final switch and Subnet Manager configuration These values should have been planned in the planning phase see Planning InfiniBand network cabling and configuration on page 40 and QLogic Switch planning worksheets on page 74 Subnet Manager priority MTU LMC GID prefix Node appearance disappearance log threshold For QLogic switches the pertinent c
355. suggested methods in this section These are typically described in service procedures found in Fault reporting mechanisms on page 165 Copyright IBM Corp 2008 7 22 08 149 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware This section will address where to look for problems that can affect the fabric 5 4 1 Monitoring fabric logs from CSM MS Using the CSM and RSCT infrastructure monitoring for problems can be automated However this requires user setup to customize to the user s environment This is outside the scope of this document see CSM Administration Guide and RSCT guides This assumes that you have performed the installation procedure in Setup Remote Logging on page 108 To check the fabric logs on the CSM MS go to var log csm errorlog CSM hostname This file contains log entries from switches and Subnet Managers that may point to serviceable events in the fabric If there are entries in this log see Table of symptoms on page 169 You may check the Auditlog on the CSM MS to get initial information regarding whether or not anything has been logged recently to var log csm errorlog CSM hostname The advantage of querying the Auditlog is that it can give you other information about the cluster too Use lsevent to query the Auditlog Some common usages for Isevent follow More details about the Auditlog are available in CSM and RSCT documentation Lsevent General event listing lsevent g
356. sure that there is only one such entry in the configuration file local6 notice var log csm syslog fabric notices 11 The procedure for CSM on AIX ends here For CSM on Linux use the following procedure 1 Log on to the CSM M S 2 Run Iscondresp to determine which condition and responses you are using The typical condition name is either LocalNodeAnyLoggedError for CSM MS that is not a managed node or AnyNodeAnyLoggedError for a CSM MS that is a managed node The typical response name is usually LogNodeErrorLogEntry BroadcastEventsAnyTime may also be configured Finally the system administrator may have defined another response to be used specifically at this site 3 Stop the condition response stopcondresp lt condition name gt LocalNodeAnyLoggedError lt response_name gt 4 Delete all the CSM related entries from etc syslog conf or etc syslog ng syslog ng conf These are defined in Setup Remote Logging on page 108 Typically the entries will look like the following However monerrorlog will used a different name from fabnotices_fifo in the destination and log entries It will use a pseudo random name that will look something like fifonfJGQsBw destination fabnotices fifo pipe var log csm syslog fabric notices group root perm 0644 log source src filter f fabnotices destination fabnotices fifo 5 Assure that f_fabnotices filter remains in etc syslog ng syslog ng conf filter f fabnotices facility loc
357. t Manager errors on the CSM MS in var log csm errorlog CSM MS hostname for any serviceable events that may not have been addressed yet Use the procedures in Table of symptoms on page 169 to diagnose problems reported in this log Look especially at Table 17 CSM MS Fabric Event Management Log Table of symptoms on page 169 Note If CSM Event Management is not setup you can still use the above table of symptoms However you will have to go directly to the switch and Subnet Manager logs as they are documented in the vendors Switch Users Guide and Fabric Manager Users Guide 3 Inspect the LEDs for the devices on the network and perform prescribed service procedures see Table 18 Hardware or Chassis Viewer LEDs Table of symptoms on page 170 4 Look for driver errors that do not correspond to any hardware errors reported in SFP or the switch and subnet management logs Perform appropriate service actions for the discovered error codes or call your next level of support For AIX use errpt a on the LPARs that are exhibiting a performance problem Copyright IBM Corp 2008 7 22 08 194 of 238 5 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware For Linux look at var log messages on the LPARs that are exhibiting a performance problem This procedure ends here 6 17 Checking for fabric configuration and functional problems To check for fabric configuration and functional problems perform the f
358. t devices for the service VLAN have been installed and configured as in Install and configure Service VLAN devices on page 99 c Ifthe CSM Management Server is not the DHCP server for the service VLAN then you must wait for the DHCP server to be installed and configured and cabled to the service VLAN 9 H7 M3 Cable the HMCs to the service VLAN 10 This procedure ends here 4 4 4 CSM Management Server Installation The CSM Management Server Installation is performed by the customer Before proceeding obtain the the CSM Planning and Installation Guides and the server installation guide for the CSM Management Server machine type model The following procedure is for installing the CSM Management Server in the HPC Cluster Reference the CSM Planning Worksheet on page 76 which should have been filled out during the planning phase for the cluster 1 CM1 M1 Perform the physical installation of the CSM Management Server on the floor If you are using a separate DHCP server for the service or cluster VLANs that is being installed as part of this installation activity also physically place it on the floor 2 CM2 M2 Perform the procedures in the CSM installation guide When performing those procedures you must ensure that you do the following steps If you are using a separate DHCP server for the service VLAN also perform the following steps for it and for the CSM MS do not perform the steps configuring
359. t it and when to use it relative to Planning Plan Installation Install and Management and Service Mgmt amp Svc phases of a cluster s life Copyright IBM Corp 2008 7 22 08 14 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware The tables are arranged into categories of components e General Cluster Information Resources e Cluster Hardware Information Resources e Cluster Management Software Information Resources e Cluster Software and Firmware Resources Pre GA information is in this type of box It will be withdrawn for GA 2 1 1 General cluster information resources General cluster information resources are found in the following Table 2 General Cluster Information Resources Table 2 General Cluster Information Resources TEM Cister This document j x Guide IBM Clusters readme for IBM Clusters with the InfiniBand Switch with the http www14 software ibm com webapp set2 sas f network InfiniBand manager home html Switch web site QLogic QLogic Best Practices Cluster Guide is initially available x x x from QLogic support Check the JBM Clusters with the InfiniBand Switch web site for any updates to availability on a QLogic web site InfiniBand InfiniBand Architecture documents and standard Architecture specifications are available from the InfiniBand Trade Association http www infinibandta org home HPC Central The HPC Central wiki enables collaboration b
360. t the ESM will not start on reboot by issuing cmdall C smConfig startAtBoot no b Ifyou are using a host based SM enable and start the Fabric Manager using instructions from the Fabric Manager Users Guide Key commands are i etc init d iview_fm enable ii etc init d iview_fm start c Verify proper security configuration for switches by ensuring that each switch has the required username password enabled cmdall C loginMode ii The return value should be zero If not enable it iii cmdall C loginMode 0 Set up passwordless ssh communication between the Fabric Management Server and the switches and other fabric management servers If this is not desired you will need to set up password information for the Fast Fabric Toolset in which case skip to step 15 a Generate the key on the Fabric Management Server Depending on local security requirements you will typically do this for root on the Fabric Management Server Fabric MS Typically you will use usr bin ssh keygen t rsa Copyright IBM Corp 2008 7 22 08 106 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware b Setup secure Fabric Management Server to switch communication using the following instructions i Exhange the key using where Fabric MS key is the key cmdall C sshKey add Fabric MS key Note The key isin ssh id_rsa pub Use the entire contents of the file as the Fabric MS key Remember to put
361. tandby or beyond This is so that the auto negotiation to 12x by the HMCs can occur smoothly Copyright IBM Corp 2008 7 22 08 61 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware When powering up the switches it is not guaranteed that the ports will come up in an order that will make the link appear as 12x to the HCA Therefore you must be sure that the switch is properly cabled configured and ready to negotiate to 12x before bringing up the adapters 4 To fully verify the InfiniBand network the servers must be fully installed in order to pass data and run any tools required to verify the network The servers must be powered on to Standby for topology verification a With QLogic switches you can use the Fast Fabric Toolset to verify topology Alternatively you can use the Chassis Viewer and Fabric Viewer too U1 Site Setup for power cooling and floor Management Subsystem Cable Installation Installation Route InfiniBand cables and attach to switch ports Physically locate servers S2 Bring servers up to power standby Physically locate management consoles Wi Physically locate InfniBand switches Power up switches w2 and configure IP Install and config Management consoles Cable the service and cluster VLANs No c Are there 12x HCAs Verify system S3 discovered S4 Update system
362. tatus of the fabric Querying Status on page 158 Scripting to QLogic management tools and switches Remotely accessing QLogic management tools and commands from CSM MS on page 159 Run update Baseline health check Health Checks on page 151 Diagnosing symptoms found during monitoring Table of symptoms on page 169 Map IBM HCA device locations Code maintenance Maintenance and Changes General mapping of IBM HCA GUIDs to physical HCAs on page 178 Updating Code on page 161 Finding and interpreting configuration changes Finding and Interpreting Configuration Changes on page 162 Verifying that new configuration changes were done successfully Verifying repairs and configuration changes on page 218 Run UpdateBaseline health check Health Checks on page 151 To setup CSM Event Management for the fabric again Re configuring CSM event management on page 209 5 4 Monitoring Fabric for Problems There are several ways to monitor for problems in the fabric The primary method is to query logs on the CSM MS and use health checks on the Fabric Management Server both of which may be accomplished on the CSM MS using the procedures in this section 1 Monitoring fabric logs from CSM MS on page 150 2 Health Checks on page 151 3 Querying Status on page 158 However there are also other error indicators that are typically used less frequently and as backups to the
363. tem Install services for servers this may be coupled with CSM Management Server Installation on page 101 1 A M1 Physically place the AIX NIM and Linux distribution servers the floor 2 Do not proceed until you have started the DHCP server on the CSM Management Server as prescribed in CSM Management Server Installation on page 101 3 2 M2 If you plan to have servers with no removable media CD or DVD build an AIX NIM SPoT on your chosen server to enable eServer diagnostics Refer to NIM information in the AIX documentation Copyright IBM Corp 2008 7 22 08 102 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note Because the eServer diagnostics are available only in AIX you will need an AIX SPoT even if you are running another operating system in your partitions 4 12 M2 If you have servers with no removable media CD or DVD and you are going to use Linux in your partitions install a Linux distribution server 5 B M4 Cable the Operating System Install Servers to the cluster VLAN not the service VLAN 6 This procedure ends here 4 4 6 Fabric Management Server Installation Fabric Management Installation is performed by the customer The Fabric Management Server provides two functions that will be installed and configured in this procedure 1 Host based Fabric Manager function 2 Fast Fabric Toolset Note The following procedure is
364. tem before any application is run to verify network operation e If you find a problem with a link that might be caused by a faulty host channel adapter or cable contact your service representative for repair e This is the final procedure in installing an IBM System p cluster with an InfiniBand network The following procedure provides additional details that can help you perform the verification of your network 1 Do the following to verify the network topology a Check all power LEDs on all of the switches and servers to assure that they are on See the vendor switch Users Guide and server WCIIs or IBM systems Service Manual for information on proper LED states Copyright IBM Corp 2008 7 22 08 136 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware b Check all LEDs for the switch ports to verify that they are properly lit See the vendor switch Users Guide and the IBM HCA WCII or IBM systems Service Manual for information on proper LED states c Check Service Focal Point for server and HCA problems Perform service before proceeding If necessary call IBM Service to perform service d Verify that switches have proper connectivity and setup on the management subsystem If you find any problems here you will have to check the Ethernet connectivity of the switches management servers and Ethernet devices in the cluster VLAN i On the Fabric Management Server perform a pingall to all of the switches usin
365. ter creating the appropriate response script Refer to the CSM Reference Guide and RSCT Reference Guide on how to do this i Proceed to step 2 below 2 L2 M4 Point to the CSM MS as a remote syslog server from the Fabric Management Server Note It is assumed that you are using syslogd on the CSM MS If you are using another syslog application like syslog ng you may have to set things up slightly differently but these instructions should prove useful in understanding how to set up the syslog configuration Do not proceed until you have installed configured and cabled the Fabric Management Server to the service VLAN as in Fabric Management Server Installation on page 103 You must also have installed configured and cabled the CSM MS as in CSM Management Server Installation on page 101 Log onto the Fabric Management Server Edit the etc syslog conf some Linux levels use etc syslog ng syslog ng conf 1 If the Fabric Management server is using syslog instead of syslog ng use sub step ii If the Fabric Management server is using syslog ng instead of syslog use sub step iii ii For syslog not syslog ng add the following to the bottom of the file Remove brackets when entering the CSM MS IP address send IB SM logs to CSM MS CSM IP address local6 put CSM MS IP address iii For syslog ng add the following to the bottom of the file Use udp as the transfer protocol You must d e configur
366. terconnect the various leaf boards getting you to the point where data can flow in any cable port of the switch and out any other cable port The key is to recall that there are 24 ports on a switch Each spine has 2 switch chips In order to maintain cross sectional bandwidth performance you want a spine port for each cable port So a single spine can support up to 48 ports The standard sizes are 48 96 144 and 288 port switches If you do the math you ll note that these require 1 2 3 and 6 spines respectively A leaf board has a single switch chip A standard spine has 12 4x cable connectors The number of required leafs is simple to calculate by dividing the number of cables by 12 After using 12 switch chip ports for cable connections there are 12 left over for connecting to spine chips With one spine there are 2 switch chips yielding 48 ports on the spines With 12 ports per leaf that means a spine can support 4 leafs You can quickly see that this works out to requiring 1 2 a spine switch chip per leaf Table 27 Counting Switch Chips in a Fabric Number ports Number leafs Number spines Switch chips 48 4 1 4 1 2 1 6 96 8 2 8 1 2 2 10 144 12 3 12 1 2 3 18 288 24 6 24 1 2 6 36 6 35 2 Counting logical switches The number of logical switches is equal to the number of IBM GX GX HCA ports The logical switch is the virtualization device on the GX GX HCA See IBM GX GX
367. ting HMC and reconfigure using DHCP on the CSM MS or other DHCP server e May require additional service subsystem Ethernet switches or routers to accommodate new InfiniBand switches and servers e May require additional Fabric Management Servers which would affect CSM event monitoring and remote command access of the additional Fabric Management Servers e Add remote syslog capability from new Fabric Management Server and switches to CSM e Add remote execution capability from CSM to new Fabric Management Server and switches Procedures for installing the components of the Management Subsystem follow 4 4 2 Install and configure Service VLAN devices This procedure is for the person responsible for installing and configuring the service VLAN devices This procedure will indicate the proper times to cable units to the service VLAN 1 E1 M1 Physically locate the service and cluster VLAN Ethernet devices on the floor 2 E2 M2 Install and configure the service and cluster VLAN Ethernet devices using the documentation for the Ethernet devices and any configuration details provided by the HMC install information 3 M3 Do not cable management consoles servers or switch units to the VLANs until such time as you are instructed to do so within the installation procedure for each management console Note Proper ordering of management console installation steps and cabling to the VLANs is extremely
368. tion Recommendations for fabric verification applications are found in the IBM Clusters with the InfiniBand Switch web site http www 14 software ibm com webapp set2 sas f networkmanager home html You may also choose to run your own application You may wish to consider how much of the application environment you need to bring up before running your chosen application The recommendations on the web site should require a minimal application environment and thus allow for verifying the fabric as early as possible in the installation process Even if you choose to run your own application you should still use the verification steps outlined in Fabric Verification Procedure on page 143 as part of your fabric verification procedure 4 12 1 Fabric verification responsibilities Unless otherwise agreed upon running the Fabric Verification Tool is the customer s responsibility IBM service is responsible for replacing faulty or damaged cables with IBM part numbers that are attached to IBM serviceable servers Otherwise either vendor service or the customer is responsible for replacing faulty or damaged cables which are either non IBM part numbers or are attached to customer serviceable units 4 12 2 Reference documentation for Fabric verification procedures The following documentation is important for this procedure 1 As applicable the Fabric verification application documentation and readme Fast Fabric Toolset Users Guide QLogic Troubles
369. tion to a physical location of an HCA or a switch Mapping of switch devices is largely done by how they are named at install configuration time The switch chassis parameter for this is the InfiniBand Device name A good practice is to create names that are relative to the frame and cage in which it is populated so that it is easy to cross reference Globally Unique IDs GUIDs to physical locations If this is not done correctly it can be very difficult to isolate root causes when there are associated events being reported at the same time For more information see Planning QLogic InfiniBand switch configuration on page 41 and InfiniBand switch installation and configuration for vendor switches on page 129 Note If it is possible to name a non IBM GX GX HCA using the IBNodeDescriptor it is advisable to do so ina manner that allows you to easily determine the server and slot in which the HCA is populated Naming of IBM GX GX HCA devices using the IBNodeDescriptor is not possible Therefore the user must manually map the Globally Unique ID GUID for the HCA to a physical HCA To do this you must understand the way GUIDs are formatted in the Operating System and by vendor logs While they all indicate 8 bytes of GUID they have different formats as illustrated in the following table Table 23 GUID Formats Format Example Where used dotted 00 02 55 00 00 0f 13 00 AIX hex string 0x00066A0007000BBE QLogic logs two byte
370. tname ii If any messages are found diagnose them using Table of symptoms on page 169 and the QLogic Troubleshooting Guide c Run Fast Fabric Toolset health check i On the Fabric Management Server run sbin all_ analysis ii Check results in var opt iba analysis latest To interpret results use Health Checks on page 151 and the Fast Fabric Toolset Users Guide 5 Ifa problem was found return to step 2 6 This procedure ends here Fabric verification ends here Copyright IBM Corp 2008 7 22 08 143 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 4 13 Runtime errors In an IBM system p HPC Cluster there are several methods for reporting runtime errors This section will only give a high level summary For more details see Cluster Fabric Management on page 145 and Cluster service on page 165 e IBM system runtime errors are reported to Service Focal Point with the appropriate FRU lists e Vendor switch runtime errors are first reported to the Subnet Manager and switch logs If remote logging and CSM event management are setup the errors will also be reported on the CSM MS in varllog csm errorlog CSM MS hostname If remote logging and CSM event management are not setup the user most query the Fabric Management Servers logs and the switches logs e If Fast Fabric s health check is used the output of the health check will also be used to report problems The user must either laun
371. to 4x switches and the links are being configured to run at 12x instead of 4x the switch ports must be configured in groups of three 4x ports to act as a single 12x link If you are configuring links at 12X go to C3 Otherwise go to C4 Prerequisites for C2 are W2 and C1 C3 Configure 12x groupings on switches This must be done before attaching HCA ports Assure that switches remain powered on before attaching HCA ports Prerequisite is a Yes to decision point C2 C4 Attach the InfiniBand cable ends to the HCA ports Prerequisite is either a No decision in C2 or if the decision in C2 was Yes then C3 must be done first Do V1 through V3 to verify the cluster networking topology and operation V1 This will involve checking the topology by using QLogic Fast Fabric tools There might be alternative methods for checking the topology Prerequisites for V1 are M4 S7 W6 and C4 v2 You must also check for serviceable events reported to Service Focal Point Furthermore an all to all ping is suggested to exercise the InfiniBand network before putting the cluster into operation A vendor may have an alternative method for verifying network operation However Service Focal Point should always be consulted and servicea
372. to that LPAR Using the HMC GUI on the HMC controlling each server a Verify that the HCA has been assigned to the LPAR If this is not the case see Installing or replacing an InfiniBand GX host channel adapter on page 139 b After you assign the HCA to the correct LPAR run the command dsh av lsdev Cc adapter grep sn c Ifthe HCA Is still not visible to the system continue with the sub step 5 Is visible to the system continue with the procedure to verify that all HCAs are available to the LPARs If you have an HCA that was assigned to an LPAR but the HCA is not visible to the system Go to SFP on the HMC controlling each server and review the error logs b Fix any events that are reported against each server or HCAs in that server Perform the following recovery procedure c Ifall of the interfaces in an LPAR are not configured use the procedure in Recovering all of the ibX interfaces in an LPAR in AIX on page 213 d Ifonly a single interface in an LPAR is not configured use the procedure in Error Reference source not found on page Error Bookmark not defined Verify all HCAs are available to the LPARs Run the the command dsh av lsdev Cc adapter grep ib grep Available we 1 If the number returned by the system Matches the number of HCAs in the cluster continue with the procedure to with Verify all HCAs are available to the LPARs Does not match the number of HCAs continue with this procedure
373. to the management infrastructure It effectively integrates the QLogic management environment with the IBM management environment Some good leverage points for remote command execution are e It allows the user to do manual queries from the CSM MS console without having to log in to the Fabric Management Server or switch e It allows for writing management and monitoring scripts that run from the CSM MS which can improve productivity for administration of the cluster fabric One could write scripts to act on nodes based on fabric activity or act on the fabric based on node activity e It allows for easier data capture across multiple Fabric Management Servers or switches simultaneously To plan for Remote Command Execution the following should be considered Copyright IBM Corp 2008 7 22 08 57 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware e CSM must be installed e The Fabric Management Server and switch addresses will be used e In this document Fabric Management Server and switches will be created as devices However it is possible to create the Fabric Management Server as a node e Device attributes for the Fabric Management Server will be o DeviceType FabricMS o RemoteShellUser USERID root is suggested o RemoteShell usr bin ssh o RemoteCopyCmd usr bin scp e Device attributes for the switch will be o DeviceType IBSwitch Qlogic o RemoteShellUser admin o RemoteShell usr bin ssh e Devic
374. tput filename to differentiate it from other data collected from the same switch If you use the following format you will be able to sort the files easily lt 4 digit year gt lt 2 digit month gt lt 2 digit day gt lt 2 digit hour gt lt 2 digit minute gt telnet or ssh into the switch s CLI using the methods described in the Switch Users Guide Run the command to get the data that is being requested Exit from the switch Issue CTRL D to stop the script command from collecting more data You can now forward the output file to the appropriate support team gly oN Be Ge aS This procedure ends here 6 8 Capture data for Fabric Manager and Fast Fabric problems If there is a suspected problem with the Fabric Manager or Fast Fabric software use iba_capture documented in the Fast Fabric Users Guide to capture data for debug purposes Indications of possible software problems are Bad return codes Commands that hang Other return data that does not stderr output file from health check Copyright IBM Corp 2008 7 22 08 176 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Note Always be sure to check the switch link between the Fabric Management Server and the subnet before concluding that you have a software problem Not all commands check that the interface is available 6 9 Mapping fabric devices This section describes how to map from a description or device name or other logical naming conven
375. ts on page 74 4 8 1 Cabling the InfiniBand network information for expansion If this is a new installation skip this section If you are adding or expanding InfiniBand network capabilities to an existing cluster then you may need to approach Cabling the InfiniBand a little differently than with a new cluster flow The flow for Cabling the InfiniBand network is based on a new cluster installation but it will indicate where there are variances for expansion scenarios The following table outlines how the new cluster installation is affected altered by expansion scenarios Scenario Effects Adding InfiniBand hardware to an Perform this task as if it were a new cluster installation All existing cluster switches and HCAs InfiniBand hardware is new to the cluster Adding new servers to an existing Perform this task as if it were a new cluster installation for all InfiniBand network new servers and HCAs added to the existing cluster Adding HCAs to an existing InfiniBand Perform this task as if it were a new cluster installation for all network new HCAs added to the existing cluster Adding a subnet to an existing InfiniBand Perform this task as if it were a new cluster installation for all network new switches added to the existing cluster Adding servers and a subnet to an Perform this task as if it were a new cluster installation for all existing InfiniBand network new servers and HCAs and switches added to t
376. ttr El ibO egrep mtu super The mtu returned should be 65532 b Now you may check the interfaces for the HCA devices ibx and ml0 using netstat in grep v link awk print 1 2 The results should look like the following where the MTU value is in the second column Name Mtu en2 1500 ib0 65532 ibl 65532 ib2 65532 ib3 65532 ib4 65532 ib5 65532 ib6 65532 ib7 65532 ml0 65532 100 16896 100 16896 c Ifyou are running a host based Subnet Manager to check multicast group creation on the Fabric Management Server run sbin saquery o mcmember h HCA p HCA port Each interface will produce an entry like the following Note the 4K MTU and 20g rate GID Oxff12601bffff0000 0x0000000000000016 PortGid O0xfe80000000000000 0002550070010 00 MLID 0xc004 PKey Oxffff Mtu 4096 Rate 20g PktLifeTime 2147 ms QKey 0x00000000 SL 0 FlowLabel 0x00000 HophLimit Oxff TClass 0x00 Note You can check for misconfigured interfaces using something like the following which looks for any Mtu that is not 4096 or rate is 10g sbin saquery o mcmember h HCA p port egrep B 3 A 1 Mtu 0 3 Rate 10g d Ifyou are running an embedded Subnet Manager to check multicast group creation run the following on each switch with a master Subnet Manager If you have set it up you may use dsh from the CSM MS to the switches see Remote Command Execution setup on page 117 If you use dsh do not forget the Copy
377. ture and how to go about reading it This document provides planning and installation information to help guide you through the process of installing a cluster fabric that incorporates InfiniBand switches Information about how to manage and service a cluster using InfiniBand hardware is also included This document is intended to serve as a navigation aid through the publications required to install the hardware units firmware operating system software or applications publications produced by IBM or other vendors It will recommend configuration settings and an order of installation as well as be a launch point for typical service and management procedures In some cases this document will provide detailed procedures instead of referencing procedures that are so generic that their use within the context of a cluster is not readily apparent This document is not intended to replace existing guides for the various hardware units firmware operating system software or applications publications produced by IBM or other vendors Therefore most detailed procedures that already exist in other documents will not be duplicated here Instead those other documents will be referenced by this document The document sections are roughly in the order in which you will need them The following table gives you a high level outline of the document Not all sub sections are covered in the table Table 1 Content Highlights Content Description
378. u can better coordinate all of the installers activities e Install switches e Set up the service VLAN IP and attach switches to the service VLAN e Cable the InfiniBand network e Verify switch operation via status and LED queries 3 7 3 Install responsibilities by units and devices It is possible that contracted agreement may alter the basic installation responsibilities for particular devices Installation Responsibilities for Servers Unless otherwise contracted the use of a server in a cluster with an InfiniBand network does not change the normal install and service responsibilities for it There are some servers which are installed by IBM and others that are installed by the Customer See the specific server literature to determine who is responsible for the installation Installation Responsibilities for HMCs The type of servers attached to the HMCs dictate who installs them See the HMC documentation to determine who is responsible for the install This is usually the customer or IBM service Installation Responsibilities for CSM CSM is the recommended systems management tools It can also be used as a centralized source for device discovery in the cluster The customer is responsible for CSM installation and customization Installation Responsibilities for InfiniBand Switches The switch manufacturer or its designee business partner or another contracted organization is responsible for installing the switches Installat
379. umber of NOTICE messages is greater than 10 then the user is probably rebooting nodes or re powering switches and causing links to go down Check the IBM Clusters with the InfiniBand Switch web sitefor any updates to this suggestion The configuration setting planned here should be recorded in QLogic Fabric Management worksheets on page 79 Planning for Fabric Management and Fabric Viewer ends here 3 5 2 2 Planning Fast Fabric Toolset The Fast Fabric Toolset is highly recommended by IBM Even with only one subnet it provides reporting and health check tools that are very important for managing and monitoring the fabric Most details are available in the Fast Fabric Toolset Users Guide available from QLogic This section highlights important information from a cluster perspective The key things to remember when setting up the Fast Fabric Toolset in an IBM System p HPC Cluster are The Fast Fabric Toolset requires you to install the QLogic InfiniServ host stack which is part of the Fast Fabric Toolset bundle Install the Fast Fabric Toolset on each Fabric Management Server including backups See also Planning for Fabric Management Server on page 55 The Fast Fabric tools that rely on the InfiniBand interfaces to collect report data can only work with subnets to which their server is attached Therefore if you require more than one primary Fabric Management Server because you have more than 4 subnets then at any given time you wi
380. urce and Information Centers If this installation is for a cluster expansion or addition of hardware to a cluster before proceeding review Server installation and configuration information for expansion below 4 5 1 Server installation and configuration information for expansion If this is a new installation skip this section If you are adding or expanding InfiniBand network capabilities to an existing cluster by adding servers to the cluster then you may need to approach the Server installation and configuration a little differently than with a new cluster flow The flow for Server installation and configuration is based on a new cluster installation but it will indicate where there are variances for expansion scenarios The following table outlines how the new cluster installation is affected altered by expansion scenarios Scenario Effects e Configure the LPARs to use the HCAs Adding InfiniBand hard t Soy ee a e Configure HCAs for switch partitioning existing cluster switches and HCAs e Perform this procedureas if it were a new cluster Adding new servers to an existing installation InfiniBand network e Perform this procedure as if it were a new cluster Adding HCAs to an existing InfiniBand installation network e Configure the LPARs to use the new HCA ports e Configure the newly cabled HCA ports for switch partitioning Adding a subnet to an existing InfiniBand network e Perfo
381. ure that everything is connected as it should be e You will need a map to identify the location of IBM HCA GUIDs attached to switch ports See Mapping fabric devices on page 177 for instructions on how to do this mapping v If anything is not connected correctly fix it and re run the baseline check 2 Do the following to verify the cluster s InfiniBand fabric operation a Verify that the HCAs are available to the operating system in each LPAR You can use dsh from the CSM MS to issue commands to multiple LPARs simultaneously i For partitions running AIX check the HCA status by running the Isdev C grep ib An example of good results for verifying a GX HCA is iba0 Available InfiniBand host channel adapter ii For partitions running Linux refer to the documentation provided with SUSE Linux Enterprise Server 10 SP2 with IBMInfiniBand GX HCA driver and OpenIB Gen3 Stack Refer to the instructions in the eHCAD install file contained within the download from SourceForge web site http sourceforge net projects ibmehcad Copyright IBM Corp 2008 7 22 08 137 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware b Verify that there are no problems with the fabric i Inspect the CSM MS var log csm errors CSM MS hostname log for Subnet Manager and switch log entries For details on how to read the log see Interpreting switch vendor log formats on page 188 If a problem is encountered see Cluster se
382. urn the switch port end of the cable to the original switch port e Ifthere is a known good HCA port available for use swap between the failing HCA port cable end to the known good HCA port Then do the following Otherwise proceed to the next step i Use the procedure in Verifying link FRU replacements on page 217 Copyright IBM Corp 2008 7 22 08 192 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware ii Ifthe problem was fixed replace the HCA using the Repair and Verify procedures for the server and HCA Once the HCA is replaced go to step 16 iii Ifthe problem was not fixed the problem is the cable Engage QLogic for repair Once the repair has been made go to stop 16 f If there is not a known good HCA port available for use and the problem has been determined to be the HCA or the cable replace the FRUs is the following order i Engage QLogic to replace the cable and verify the fix using the procedure in Verifying link FRU replacements on page 217 If the problem is fixed go to step 16 Note Before replacing the cable check the manufacturer and part number to assure that it is an approved cable Approved cables are available in the JBM Clusters with the InfiniBand Switch web site its URL is found in Table 2 General Cluster Information Resources on page 15 ii Ifthe cable does not fix the problem replace the HCA and verify the fix using the procedure in Verifying link FRU
383. using InfiniBand Hardware For LMC 2 SM_X_Ime 2 For MTU use the value planned in Planning MTU on page 42 SM_X_def mc_mtu 0x5 0x4 2 Ox5 4K g For MTU rate use the value planned in Planning MTU on page 42 SM_X_def_mc_rate 0x6_ 0x3 for SDR 0x6 for DDR h For GID prefix SM_X_gidprefix lt GID prefix value gt mh i For node appearance disappearance threshold 10 SM_x_node_appearance_msg_thresh 10 Cable the Fabric Management Server to the InfiniBand fabric Note The switches must have been installed as in InfiniBand switch installation and configuration for vendor switches on page 129 IF7 M2 It is recommended that you use a static IP address for the cluster VLAN for the Fabric Management Servers Assign and configure this address now This is required for remote logging to and remote command execution from the CSM MS IF8 M3 Cable the Fabric Management Server to the cluster VLAN It must be on the same VLAN with the switches Before proceeding assure that the Fabric Management Server is cabled to the InfiniBand fabric and the switches are powered on F9 M4 Final Fabric Management Server Configuration and Verification a If you are using a host based SM make sure that the embedded Subnet Managers are not running unless you plan to use both i cmdall C smControl status ii If one or more ESM is running stop it cmdall C smControl stop iii Assure tha
384. ver Further management subsystem considerations are Review the beginning of Management subsystem installation and configuration on page 95 through Figure 10 Management Subsystem Installation Tasks on page 97 This is especially important for helping assign tasks in Installation Coordination Worksheet on page 65 Planning CSM as your Systems Management Application on page 46 Planning for QLogic Fabric Management Applications on page 47 Planning for Fabric Management Server on page 55 Planning Event Monitoring with QLogic and CSM on page 56 Planning Remote Command Execution with QLogic from the CSM MS on page 57 3 5 1 Planning CSM as your Systems Management Application If you must use Cluster Ready Hardware Server CRHS with CSM the CSM Management Server CSM MS is typically the DHCP server for the service VLAN If the cluster VLAN is public or local site network then it is possible that another server may be setup as the DHCP server It is strongly recommended that the CSM Management Server be a stand alone server If you use one of the compute or I O servers in the cluster for CSM the CSM operation might degrade performance for user applications and it will complicate the installation process with respect to server setup and discovery on the service VLAN It is highly recommended that CSM event management be leveraged in a cluster In order to do this you need to plan for the following The type of syslogd that
385. vertent changes by comparing the latest health check results to the baseline health check results o To save history during queries sbin all_analysis s o Ifthe configuration is changed this includes part serial numbers a new baseline is required sbin all_analyis b The following are important setup files for Fast Fabric Health Check Details on how to set them up are found in the Fast Fabric Toolset Users Guide These are also referenced in Fabric Management Server Installation on page 103 Note These must be modified on each Fabric Management Server etc sysconfig fastfabric conf basic setup file etc sysconfig iba chassis list of switch chassis etc sysconfig iba esm_chassis list of switch chassis running embedded SM etc sysconfig iba ports list of ports on Fabric MS format hca port and space delimited 5 5 1 Setting up periodic fabric health checks It is advisable to set up periodic fabric health checks to assure that nothing has changed in the fabric that may affect performance The following is based on setting up a health check of no less than once per day Copyright IBM Corp 2008 7 22 08 151 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware When setting up a regular health check period it is important to set up the error thresholds properly in relation to the frequency at which health checks will be performed Most default threshold will not be touched by this p
386. w Appendix Notices on page 236 Important notices Copyright IBM Corp 2008 7 22 08 13 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware 2 0 Clustering systems using InfiniBand hardware A variety of IBM server hardware supports clustering through InfiniBand host channel adapters HCAs and switches This guide provides planning and installation information to help guide you through the process of installing a cluster fabric that incorporates InfiniBand switches Information about how to manage and service a cluster using InfiniBand hardware is also included The following illustration shows servers that are connected in a cluster configuration with InfiniBand switch networks fabric The servers in these networks can be connected through switches with IBM GX HCAs In System p Blade servers the HCAs are PCI e based Note 1 In this information switch refers to the InfiniBand technology switch unless otherwise noted 2 Not all configurations support the following network configuration Refer to your IBM sales information for supported configurations CPU CPU CPU CPU Mem Management Console BD Pa WSS SS Host HCA CPU cpu CPU CPU IPHC4500 0 Figure 1 An InfiniBand network with four switches and four servers connected 2 1 Information resources The following tables indicate important documentation for the cluster where to ge
387. well as a Fabric Management Server 2 Servers in the cluster 3 switches 4 Switch cable install By breaking down the installation by major subsystem you can see how to install the units in parallel or how you might be able to perform some install tasks for on site units while waiting for other units to be delivered It is important that you recognize the key points in the installationwhere you cannot proceed with one subsystem s install task before completing the installation tasks in the other subsystem These are called Merge points and are illustrated using the following symbol Some key merge points are 1 The Management Consoles must be installed and configured before starting to cable the service VLAN This will allow proper DHCP management of the P addressing on the service VLAN Otherwise the addressing may be compromised This is not as critical for the Fabric Management Server However it should be up and running before the switches are brought up on the network 2 You must power on the InfiniBand switches and configure their IP addressing before connecting them to the service VLAN If you don t do this then you must power them on individually and change their addresses by logging into them using their default address 3 Ifyou have 12x HCAs connected to 4x switches you must power on switches and cable to their ports and configure the 12x groupings before attaching cables to HCAs in servers that have been powered on to S
388. will be performing the following tasks which are illustrated in Figure 10 Management Subsystem Installation Tasks on page 97 While many of the tasks within the procedures can be performed simultaneously pay close attention to where they converge and where one task may be a prerequisite for another task as indicated by this symbol V 1 Physically place units on the floor 2 Install and configuring service and cluster VLAN devices using the procedure in Install and configure Service VLAN devices on page 99 Install HMCs using the procedure in HMC Installation on page 100 4 Install the CSM Management Server using the procedure in CSM Management Server Installation on page 101 U 5 Install the Operating System install servers using the procedure in Operating System Install Servers Installation on page 102 6 Install the Fabric Management Server Fabric MS using the procedure Fabric Management Server Installation on page 103 7 Perform server installation and configuration with management consoles using the procedure in Installing and configuring the cluster server hardware on page 121 8 Configure remote logging from switches and Fabric Management Servers to the CSM MS using the procedure in Setup Remote Logging on page 108 9 Configure remote command execution capability from the CSM MS to the switches and Fabric Management Servers using the procedure in Remote Command Execution setup on page 117 Tasks have two
389. witch logs and Subnet Manager logs So this table could be used for switch logs and Subnet Manager logs too For details on how to interpret the logs see Interpreting switch vendor log formats on page 188 Before performing procedures in any of these tables please be sure to familiarize yourself with the information provided in the previous section in this chapter Cluster service because itis general information on diagnosing problems as well as the service subsystem Table 17 CSM MS Fabric Event Management Log Table of symptoms Symptom Procedure Reference Switch Chassis Management Logs Has CHASSIS string in entry Switch chassis log entry See Switch Users Manual and contact QLogic Subnet Manager Logs Have SM string in the entry Link down See Diagnosing link errors on page 191 Link Integrity Symbol Errors on See Diagnosing link errors on page 191 HCA or switch ports Switch disappearance See Switch Users Guide and contact switch service provider Switch port disappearance See Diagnosing link errors on page 191 logical switch disappearance See Diagnosing link errors on page 191 logical HCA disappearance See Diagnosing link errors on page 191 Fabric Initialization Errors on a See Diagnosing link errors on page 191 HCA or switch port Fabric Initialization Errors on a See Switch Users Manual and contact switch service provider sean Then use Diagnosing and repairing switch component problems on p
390. with querying the HCA device from the operating system For AIX the adapter is called ibaX where X is a number 0 through 3 For Linux the adapter is call ehcaX where X is a number 0 through 3 For example a log entry like the following is reported with the Logical HCA being reported Here the Logical HCA information is underlined and in bold Note the Node type in italics it is an HCA Apr 15 09 25 23 c924hsm ppd pok ibm com local6 notice c924hsm iview_sm 26012 c924 hsm MSG NOTICE SM c924hsm port 1 COND 4 Disappearance from fabric NODE IBM G2 Log ical HCA port 1 0x00025500103a7200 DETAIL Node type hca The following procedure will find the physical switch connection and node and HCA port and location The above log will be used as an example and example results from any queries will also be provided 1 Get the Logical HCA GUID and note which logical HCA it is in the HCA also note the port gt GUID 0x00025500103a7200 port 1 2 Logon to the On Fabric Management Server 3 Find the Logical HCAGUID and port This query will return the logical HCA side of a link as the first port of the link and the logical switch port as the second port in the link Copyright IBM Corp 2008 7 22 08 181 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware a If the baseline health check has been run use the following command If it has not been run use step b grep A 1 0g GUID port var opt
391. y 2 1 2 1 Backup Switch Priority Backup Switch Priority Backup Switch Priority Fast Fabric Toolset Planning Host based or embedded SM _ Host based for FF ALL_ ANALYSIS List of switch chassis 10 1 1 16 10 1 1 17 10 1 1 18 10 1 1 19 List of switches running embedded SM if applicable N A Subnet connectivity planning is in Subnet Management Planning above Chassis list files _AllSwitches list all switches Host list files AIIFM list all Fabric MS Notes Copyright IBM Corp 2008 7 22 08 90 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware Fabric Management Server worksheet one per server 2 of 2 Server Name _egf11fm02 Server IP address on cluster VLAN _10 1 1 15 Server Model SystemX 3550 or 3650 3650____ Frame 11 Number of PCI slots 2 Number of HCAs 2 Primary Backup NA HSM Primary subnet 2 amp 4 backup subnet 1 amp 3 Primary data collection point yes yes no Local syslogd is syslog syslog ng or other _ syslog ng CSM Server Address es for remote logging _10 1 1 1 Using tcp or udp for remote logging _ udp NTP server 10 1 1 1 Subnet Management Plannin Subnet Subnet Subnet Subnet Subnet Subnet Subnet Subnet 1 2 3 4 5 6 7 8 HCA number 1 1 2 2 HCA port 1 2 1 2 GID prefix 00 01 02 03 all start w fe 80 00 00 00 00 00 Broadcast MTU 5 4096 5 4096
392. y 1 BM 2 device 1 BM 2 port 1 BM _2 priority 1 FE 2 device 1 FE 2 port 1 FE 2 priority 1 Instance 3 SM_3 _device 1 SM_3_port 2 SM_3 priority 1 SM X Imc 2 MTU 4K SM_X_def_mc_mtu 0x5 rate is DDR SM_3 def _mc_rate 0x6 SM_3_gidprefix 0xfe80000000000004 SM_3_node_appearance_msg _ thresh 10 PM 3 device 1 PM_3_port 2 PM_3 priority 1 BM_3_device 1 BM _ 3 _port 2 BM_3 _priority 1 FE 3 device 1 FE 3 port 2 FE _3_priority 1 Plan for remote logging of Fabric Manager events Plan to update etc syslog conf or the equivalent syslogd configuration file on your Fabric Management Server to point syslog entries to the Systems Management server This requires knowledge of the Systems Management Server s IP address It is best to limit these syslog entries to those that are created by the Subnet Manager However some syslogd applications generally do not allow such finely tuned forwarding Copyright IBM Corp 2008 7 22 08 53 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware o For the embedded Subnet Manager the forwarding of log entries is achieved via a command on the switch CLI or via the Chassis Viewer Note that you will be required to set a NOTICE message threshold for each Subnet Manager instance This is used to limit the number of NOTICE or higher messages logged by the Subnet Manager on any given sweep of the network The suggested limit is 10 Generally if the n
393. y that the Subnet Manager is stopped by running ps flgrep iview b Restart the fabric managers on all Fabric Management Servers etc init d iview_fm start 9 This procedure ends here 6 25 Diagnosing application crashes Diagnosing application crashes with respect to the cluster fabric is similar to diagnosing performance problems as in Diagnosing performance problems on page 200 However if you know the endpoints involved in the application crash you can check the state of the routes between the two points to see if there might be an issue You do this with Fast Fabric s command iba_report o route D lt destination gt S lt source gt There are many ways to format the destination and route query Only a few examples will be shown here The Fast Fabric Users Guide has more details For a particular HCA port to HCA port route query it is suggested that you use the NodeGUIDs iba_report o route D nodeguid lt destination NodeGUID gt S nodeguid lt source NodeGUID gt Copyright IBM Corp 2008 7 22 08 201 of 238 IBM System p HPC Clusters Fabric Guide using InfiniBand Hardware You can find the node GUIDs using the procedure in General mapping of IBM HCA GUIDs to physical HCAs on page 178 Instead of doing as instructed and grepping for only the first 7 bytes of a node GUID you should consider recording all 8 bytes You can use iba_stat n for HCAs in AIX LPARs and ibv_devinfo v for HCAs in Linux LPARs If you have a

Download Pdf Manuals

image

Related Search

Related Contents

改正建築基準法に関する「24時間(常時)換気設計」を  User Manual  Jack LaLanne's PJEB Use and Care Manual  Kensington Pro Fit® Mid-Size Wireless Mouse - Sapphire Blue  DELL PowerEdge R320  MANUAL DE INSTALACIÓN Y OPERACIÓN  design makes objects timeless, fashion corrupts them  Word Pro - MTLz11ITA1.lwp    Samsung S19A300N Priručnik za korisnike  

Copyright © All rights reserved.
Failed to retrieve file