1. DIMMs ensure all channels are populated o DGEMM test fails check scaled performance vs that of the certified system 2 66 GHz Xeon 5550 to determine if this is an actual failure o HDParm test fails swap out the failing hard drives and rerun the test e Network Failures o IB A typical failure is that one or more of the Infiniband links is non functional Determine which nodes have failing links by examining the all to all output Reseat the Infiniband cables on those nodes The Rocks 5 1 installation procedure automatically checks the IB firmware and updates it if needed Note however that the Mellanox 2 6 0 rev SUPERMICR June 2009 firmware or later is required If they continue to fail reset the IB switch module If they continue to fail swap out the board Note that performance failures may be reasonable and expected A different processor may not pass the DGEMM test so scaling the result in the xml file to the actual processor frequency is needed Similarly the Stream test can fail if for example the user specified a cluster where not all memory channels are populated HDParm failures are very common Different drive model or RAID configurations will give different performance This is expected The reseller must examine the xml out and determine if the measured performance is reasonable for the given configuration Power and Cooling Requirements The cluster configuration described in the BOM was measured as consum
2. F motherboards are ICR certified with Clustercorp Rocks 5 1 Bill Of Materials Software The software bill of materials outlined in Table 2 below consists of two DVDs The first is the Clustercorp Rocks 5 1 Jumbo DVD In order to build and deploy ICR certified clusters with Rocks a software and support license must be purchased from Clustercorp This can be obtained in multiple ways as described at http www clustercorp com hardware supermicro html During the certification process an LG External Super Multi DVD Rewriter USB DVD drive model GSA E60N was used The second DVD was a RedHat Enterprise Linux 5 3 distro DVD Distributed By Description File Name or Location 1 Cluster Corp packs E Jumbo 5 1 Distribution Red Hat RedHatEL 5 3 5 3 Table 2 1U Twin Cluster Bill of Software Materials Bill Of Materials Intel Cluster Ready License The system vendor is reguired to run the Intel Cluster Checker tool both before it leaves the factory and after installation at the end user site The Cluster Checker tool requires a license file to be installed on the cluster The license file can be obtained free of charge directly from Intel at http www intel com go cluster registration required if desired Alternatively the reseller can use Supermicro s pass through license included in the download bundle from the Supermicro web site along with this recipe Bill Of Materials Download Bundle The system vendor is required to run the
3. Intel Cluster Checker tool both before it leaves the factory and after installation at the end user site see Section 4 below The Cluster Checker tool requires several files which are bundled together as a single download from the Supermicro web site along with this recipe The bundle includes fingerprint files XML Config amp Output files Supermicro ICR license file COM _ the cluster certification certificate a copy of this recipe document and a README file 2 Firmware and BIOS Settings Once the hardware and software system components have been obtained and the servers have been assembled and racked you can begin the system configuration Refer to the 1U Twin SS 6016TT System User Manual for details on the server assembly procedure SUPERMICR June 2009 Connect a keyboard mouse and monitor to each server in turn and configure the BIOS as follows Enter the BIOS setup as described in the system User Manual First ensure that the BIOS rev is 1 1 b01 or dated 623 09 or later If not download the latest BIOS from the Supermicro web site and update the BIOS as described on the BIOS download web page Next go to the far right tab on the main menu and enter Load optimized defaults Then set each BIOS parameter as follows where indicates a submenu in the BIOS setup e Advanced Processor amp ClockOptions SimultaneousMultithreading Disabled e Advanced Processor amp ClockOptions Intel EIST Technology Disa
4. SS6016TT IBOF 2 24 port Layer 3 1 10 Gigabit Supermicro Ethernet Switch SSE G24 TG4 1 Gigabit Ethernet Switch Supermicro MCC4L30 001 Stacking Cable 2 Gigabit Ethernet CX4 Supermicro AOM SSE X2C Stacking Module 1 36 port InfiniBand Switch Mellanox MTS3600 32 InfiniBand Cable 1m QSFP Mellanox MCC4Q30C 001 64 Intel Xeon Processor Intel Corp Intel Xeon Processor X5550 Nehalem 192 2GB DDR 3 1066 ECC Registered Memory Hynix HMT125R7AFP4C G7TB 32 3 5 SATA 250GB Hard Disk Drive Seagate Barracuda ES 2 ST3250310NS Table 1 1U Twin Cluster Bill of Hardware Materials SUPERMICR June 2009 This recipe provides a template that resellers and end users can customize for their application specific needs In addition to the hardware items in Table 1 the following are either required or useful during the installation process USB keyboard and mouse USB DVD ROM drive USB 4 port hub two Ethernet cables and a laptop or desktop computer capable of running a web browser Microsoft Internet Explorer 7 7 0 6000 16681 was used while developing this recipe Please refer to the SS6016TT IBQF User Manual for instructions on assembling the unit Although the BOM specifies the 1UTwin system the 2U Twin uses the same server motherboard BIOS and Firmware and thus qualifies as materially identical under the rules of the ICR program Therefore both 1U Twin and 2U Twin based clusters using the X8DTT IBQF and X8DTT IBX
5. SUPERMICR June 2009 Supermicro ICR Recipe For 1U Twin Department Cluster with Clustercorp Rocks 5 1 Version 1 3 6 25 2009 w A0 Sw Wa Ya At ang Me F MW i i i ou ze f dd g E bw 5 SUPERMICR June 2009 Table of Contents t System COMME UN UO UD O Gig AGOS RG UR OD GO dU na 3 Bill OT Materials Hardware EY O O RR RE RR EEF FFY ANFODD NET 3 Bill Of Materials Gohtwarel ec ceeccceecceeccceecceusccescccuseceescceusceussceusesseseseuecesseceuseseuseseueceeeuces 4 Bill Of Materials Intel Cluster Ready Ucensel LL YLGLLLLGG LL CGG LL LL LLC EA LLA FFI FL FLeueu 4 Bill Of Materials Download Bundle 4 2 Firmware and NO SC CEN a CY ED OY CHI AU OND 4 SNE O EE 5 Cluster Head Node Installati n EE 5 Cluster Compute Node Installatloh ei aia CN FM DEU Endin AiE dd BA YNO NN iS 6 4 Verify a Correct Cluster le EE 7 Responsibilities of TEEN 7 Cluster Validation WILT et EE 7 Power and Cooling Requirements LLY ILL GLLLLLLLLLLLLL CGG CCG LL LLLL CGG CGG LLL LLA LL FL LLiiouu 9 Permissible Configuration Variant 9 EE 9 EEN le 10 SUPERMICR June 2009 1 System Configuration Bill Of Materials Hardware The primary bill of materials orderable from Supermicro s distributors is shown in Table 1 The BOM in Table 1 corresponds to that used for the cluster certification Ouantity Item Manufacturer Model 16 SuperServer 1U Twin with Supermicro QDR InfiniBand Eege HT
6. bled e Advanced IDE SATA FloppyOptions ConfigureSATA AHCI e Advanced PCI PnPConfiguration Load Onboard LAN 1 Option ROM Enabled e Advanced ACPIConfiguration ACPIVersionFeatures ACPI2 0 e Advanced IPMIConfiguration LAN Configuration IPAddress IPAddrSource Static e Boot BootDevicePriority 1stBootDevice Network IBA GE Slot On the head node only e Advanced PCI PnPConfiguration Load Onboard LAN 1 Option ROM Disabled Power off each server after the BIOS update has completed The next step is to install RHEL 5 3 and Rocks 5 1 on the cluster head node 3 Software Installation Cluster Head Node Installation Connect the keyboard monitor and mouse to the cluster head node along with a USB DVD drive Insert the Rocks 5 1 Jumbo DVD into the drive and power on the head node Refer to the Rocks Installation Guide and User Guide on the DVD for details on the procedures outlined below It may be useful to have a 2 copy of the DVD available in the laptop or desktop mentioned above so these guides are readily available e When the Rocks splash screen comes up type frontend and enter e f you see CDROM not found select OK and hit enter e Enable IPv4 Manual and disable IPv6 Use the following 192 168 10 5 255 255 255 0 192 168 10 1 192 168 10 5 e At CDROM not found cdrom ks cfg select OK and enter e Tab to CD DVD based roll amp hit enter o Select all rolls using either the mouse or keyboa
7. er shipping loose cables for example The cluster checker tests are not burdensome They could typically be incorporated into the reseller s system burn in procedure for example Cluster Validation with ICR You are now ready to validate extended cluster functionality with the ICR Cluster Checker Refer to the ICR documentation and Cluster Checker manual for details on the procedures outlined below The ICR documents can be found at http www intel com go cluster Begin the cluster validation process as follows e Login to the head node as root open a terminal window and hit return three times to generate SSH keys if so prompted e Enter the command su icr and cd which will take you to the preinstalled ICR account amp home directory All the required environment variables should now be set e Open a web browser and access Roll Docs The home page should default to the Rocks documentation already installed on the head node If it does not come up select localhost as the URL which will bring up the Clustercorp Rocks 5 1 documentation Go to the Roll Docs submenu from there e Inthe terminal window copy the Download Bundle from the Bill of Materials above in Section 1 to the icr account home directory The Download Bundle should be extracted from the WinZip archive before copying to the head node e Copy the fingerprint files to tmp These files are named compute 0 0 list and x8twin list e Next make a subdirec
8. ib xml This test should complete within a few minutes e Either of the above procedures may fail Screen output from the cluster check tool is saved into a file out Detailed output from the cluster check run is saved in a corresponding xml file If the cluster check tool flags an error for any of the above commands the output must be examined and fixed in order to certify the cluster as compliant Some failures are expected amp normal They do not imply that the cluster has failed certification Check the corresponding out file in the temp directory for similar errors If a matching type of error is found in the temp out file it may be safely ignored If a matching type of error is not found in the temp out file it must be fixed to certify the cluster as compliant If the error occurs during the compliance checks it is often easiest to start by re installing the compute nodes This is easily done under Rocks as root rocks set host pxeboot compute 0 0 action install followed by ssh compute 0 0 shutdown r now Repeat for each compute node in turn compute 0 1 compute 0 2 etc If the errors persist after re install contact Supermicro support If the cluster installation is flagged as functionally incorrect or failing subsystem performance then examine the cluster checker output to determine which subsystem s is failing Some typical failures might include e Node Failures o Stream test fails reseat
9. ing 11 kW at 208V AC running Linpack on each node This is expected to be highly configuration dependant for example depending on the CPU power rating number of DIMMs installed and so on Therefore this measurement should be used only as a reference point Permissible Configuration Variants The pass through cluster certification is valid for certain variations on the configuration detailed in this recipe Different processor types memory manufacturer density and number of DIMMs disk drive manufacturer capacity and count are permitted Different models of server motherboard and Rocks software stack are not permitted In that case the reseller may complete the full certification procedure themselves and apply to the ICR program web site for certification certificate Important minimum configurations limits include e Memory 1 GB per processor core e Disk the head node must have 65GB of available storage Available storage is formatted capacity minus swap 5 Contacts The reseller is responsible for first level product support with the end user A comprehensive 2 3 level support package for the reseller is available as follows e Initial support requests can be made through the Supermicro support center via phone email or web It is essential to have the unit serial number on hand in order to process the request The Supermicro support center can be found at http www supermicro com support Resellers may use the SuperServer su
10. pport hotline e The Supermicro support center will make a determination as to whether the problem is hardware or software related Hardware related issues will be handled by the Supermicro support center in the usual fashion e Software related issues will be redirected to Clustercorp It is essential to have purchased Rocks from Clustercorp to be licensed to use the software and receive support SUPERMICR June 2009 6 Release Notes e When creating user accounts in order for the auto mounter to work correctly the home directory must be specified as export home After the user account is created on the head node issue the command rocks sync users to replicate across the compute nodes 10
11. rd tab amp space e Tab to next and hit enter e Tab to CD DVD based roll amp hit enter o Insert the RHEL5 3 DVD in the drive amp hit continue o Select the RHELS 3 roll amp hit enter e Set the FQDN to x8twin supermicro com or your preferred FQDN e Set the cluster name to x8twin or consistent with the FODN e Config ethO as 10 1 1 1 255 0 0 0 leave eth1 as already configured above e Select manual disk partition delete any partitions on the disk dev sda o Tab to new hit enter and use the following mount point is file system is ext3 size is 50000 tab to ok and hit enter the recommended minimum size is 15000 SUPERMICR June 2009 o Tab to new hit enter and use the following tab to file system type down arrow to swap and enter size is 8000 tab to ok and hit enter the recommended minimum size is 4000 o Tab to new hit enter and use the following mount point is export file system is ext3 size is fill to maximum allowable tab to ok and hit enter e Insert DVD media as prompted set Linux config parameters when prompted The system will install and boot to Linux e Login as root open a terminal window hit return three times to generate ssh keys e Enter the command rocks sync users e Start the web browser go to Roll Docs intel icr 5 0 open section 3 1 and follow the directions to install the icr license obtained above in the Bill of Materials section e Open section 5 1 and follow the directions to se
12. t up Infiniband with IPoIB required Enter the commands in section 5 1 of the Roll Docs at a command prompt as root The steps are given approximately as o Enter the command rocks add host interface hostname s ip 172 30 0 0 subnet ipoib name hostname s ib o Enter the command ifup ibO to ensure that the ib interface is up o Enter the command ifconfig ibO and check that the ib interface is active o Start the ib subnet manager Enter the command chkconfig opensmd on Enter the command service opensmd start Enter the command ibstat and verify status is active o Enter the command rocks list network and verify Private 10 0 0 0 Public 192 168 10 0 PolB 172 30 0 0 o Enter the command insert ethers select compute and hit ok e You are now ready to begin installing the compute nodes Cluster Compute Node Installation Attach the monitor and keyboard to the first compute node and then power the node up Verify that it begins to PXE boot and install Rocks Move the monitor and keyboard back to the head node and verify that the insert ethers utility GUI shows found appliance compute 0 0 Wait 10 seconds and power up the second compute node Continue as above until all the compute nodes have started their install The install will take about 30 minutes After all the compute nodes have finished installing enter F8 at the insert ethers GUI to exit and save cluster state Fix e
13. tc resolv conf on the compute nodes as follows e On the head node open etc resolv conf in an editor and remove supermicro com save and exit e Enter the command scp p etc resolv conf compute 0 0 etc resolv conf e Copy resolv conf to each compute node in turn The copy commands may take awhile to execute Please be patient as the above modification to resolv conf will fix that For large clusters the scp command is easily scripted Reboot the compute nodes and verify minimal functionality as follows SUPERMICR June 2009 e Enter the command tentakel shutdown r now from a root terminal window on the head node e After the compute nodes have rebooted enter the command tentakel uptime This should finish within a second or two If it does not verify the resolv conf on each compute node by entering tentakel cat etc resolv conf 4 Verify a Correct Cluster Build Responsibilities of Reseller Under the terms of the pass through certification clause of the ICR program agreement between Supermicro and Intel the reseller shall run the cluster checker tool against the fingerprint files amp XML configuration file provided by Supermicro along with this recipe The cluster must pass the tests listed below before it leaves the reseller s factory In addition the reseller must make provisions to re run the tests once the cluster is installed at the end user site This helps ensure that the system is functional aft
14. tory temp in the icr account home directory Move all of the out and xml files to that subdirectory These are saved here for later reference e Next copy temp icr_config_ib xml to the icr account home directory e You are now ready to verify that the cluster configuration is compliant functional and performant The detailed procedure can be found in the Roll Docs Section 6 1 Running the Cluster Checker There are however some SUPERMICR June 2009 important differences There is no need to generate the fingerprint files The fingerprint files from the download bundled copied to tmp will be used instead This will ensure that the installed packages and rolls match those certified by Supermicro For the convenience of the reseller the key commands are given below e Inthe icr account window run the command cluster check certification 1 1 icr_config_ib xml This will verify that the cluster installation is compliant with the ICR specification Note that the dashes in the command are double dashes This check will take quite a bit of time 30 minutes 1 hour to complete as it checks each compute node s CPU memory network and disk drive subsystems for correctness and performance It also runs the HPCC benchmark as an application level test e Next open another terminal as root on the head node In the root account cd to the icr account home directory Run the following commands cluster check compliance 1 1 icr_config

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書 [PDF形式]  User Manual - TENVIS IP Camera Software/Firmware/Tools    User Manual for the IU Information Visualization Repository  IR DOME CAMERA USER MANUAL  Host Command Reference Rev I  Samsung S710 User Manual  Manuel d`utilisation du DVR avec connexion Réseau - Click-cam  XBOX 360 User's Manual    

Copyright © All rights reserved.
Failed to retrieve file