Home
RAIMONDI - Pentair Valves & Controls
Contents
1. covered with stainless steel inlets 6 The ring 6 and the four pieces of the segment ring 5 must be assembled over the gasket 7 The segment ring has to be put into the body groove The segment ring has to be fixed by the safety ring Ensure that the segment ring is in the correct position al 7 The bonnet must be brought into position with the necessary bolts and nuts For the necessary torque see Table 2 8 Install the ground ring 13 the packing of pure graphite and two rings to the stuffing room see fig 2 The operator MUST wear gloves 9 The packing shall be compressed by the gland 15 and the gland flange 16 with the cut ring 19 inside Screw the nuts to the bolts with the torque indicated in Table I 10 Install the indicator 25 on the stem 11 Assemble the yokenut 21 the two bearings 22 and the two O rings 32 to the yoke with the lubrication nipple then the gear actuator connection flange with the bolts 12 Assemble the handwheel the gear or the actuator to the valve Disassembly 1 For a correct disassembly it is necessary to follow in reverse the assembly instructions 2 Follow this special remark to disassemble the seat ring in the upper part of the body in the area of the segment ring there are some holes to drive out two parts of the segment ring by using a pin and a hammer Cautions First drive out the two parts of the segment ring as indicated in fig 3 then the remaining two par
2. gt PENTAIR RAIMONDI YN NS NSE VAS Ot G IN X AREER Sa VON PARSE SG ee AA P ld 4 Yy Ed N KAAS Ta ANJ a a ZS Sn SoS L L ANNYI ESN J vow Sa ENNYI KN y C OO OOOO J BAW E NE 7 Z www pentair com valves Raisteam Globe Valves Installation and Maintenance Instructions Forged Steel Pressure Seal Globe Valves T Y and angle pattern Buttwelded or Flanged Ends 1 Valve Storage 1 1 1 Preparation and Preservation for Shipment 1 1 2 Handling Requirements 1 1 3 Storage and Preservation before Installation 2 2 Installation 3 251 Preparation before Installation 3 2 2 Installation Instructions 3 2 3 Valve Verification before Start Up 4 2 4 Periodic Valve Verification during Service 4 Table Bolt Torque for Packing Bolts 4 Table Il Bolt Torque for Bonnet Bolts 4 Troubleshooting Guide D 255 Adjustment of Electric Actuators D 3 Operation and maintenance instructions 6 Material Specifications Globe Valves 7 4 Valve Removal 8 5 Lubricants and Special Tools 8 TA Lubricants 8 52 Special Tools 8 Table Ill Grease and Lubricant List 8 6 Operational Safety Instructions 0 S I in accordance with PED requirements 8 Section 1 Valve Storage 1 1 Preparation and Preservation for Shipment All valves are
3. properly packed in order to protect the parts that are subject to deterioration during transportation and storage on site In particular the following precautions should be taken 1 The valves must be packed with the plug in the closed position Ja Buttwelding end valves weld ends surface shall be protected with suitable protective like Deoxaluminite The ends shall be closed with plywood or plastic discs fixed at the edge by strips 1b Flanged end valves the flange sealing surfaces raised faces of the valves shall be protected with suitable protective grease The end faces of the valve must be protected with plastic or wooden discs fixed with straps 2 All actuated valves must be securely palleted or crated with particular attention in order to ensure that parts of actuator do not extend beyond the packing size 3 The type of packing must be defined in the Customer s order and shall be appropriate to ensure safe transportation to final destination and eventual conservation before installation 1 2 Handling Requirements A Packed Valves Pallets Lifting and handling of the packed valves in pallets will be carried out by a fork lift truck by means of the appropriate fork hitches Cases The lifting of packed valves in cases will be carried out in the lifting points and at the center of gravity position which have been marked The transportation of all packed material must be carried out safely and following the local safety regulati
4. the weather or directly to the sun e Check the packaging every two months Storage in an open area for a limited period can be considered only in case the valves have appropriate packing packed in cases lined with tarred paper and contents well protected with barrier sacks Caution For valve handling and or lifting the lifting equipment fasteners hooks etc must be sized and selected while taking into account the valve weight indicated in the packing list and or delivery note Lifting and handling must be made only by qualified personnel Do not use the lifting points located on the actuator if any to lift the valve These lifting points are for the actuator only Caution must be taken during the handling to avoid that this equipment passes over the workers or over any other place where a possible fall could cause damage In any case the local safety regulations must be respected Pentair reserves the right to change the contents without notice Raisteam Globe Valves Installation and Maintenance Instructions Section 2 Installation 2 1 Preparation before Installation 1 Carefully remove the valve from the shipping package box or pallet avoiding any damage to the valve or in case of automated valves to the electric or pneumatic hydraulic actuator or instrumentation 2 The valves are shipped with the ends protected with caps and a thin layer of protective grease Before installing the valve remove the caps an
5. C 650 C A105 C22 8 LF2 TT5 F1 15Mo3 F12 13CrMo44 F22 10CrMo910 F91 P91 F316 X6CrNiNb1810 1 0460 1 0411 1 5415 1 7335 1 7380 1 4903 1 4550 1 Body A105 C22 8 LFZ 115 F1 15Mo3 F12 13CrMo44 F22 10CrMo910 F91 F316 X6CrNiNb1810 1 1 Body A105 C228 EZ TIS F1 15Mo3 F12 13CrMo44 F22 10CrMo910 frail F316 X6CrNiNb1810 2 Bonnet A105 C22 8 LF2 TT5 F1 15Mo3 F12 13CrMo44 F22 10CrMo910 F91 F316 X6CrNiNb1810 3 Yoke A105 A105 A105 A105 A105 A105 A105 4 Safety Ring A105 A105 A105 A105 A105 A105 A105 5 Segment Ring A105 C2723 L2 TIS F1 15Mo3 F12 13CrMo44 F22 10CrMo910 Po F316 X6CrNiNb1810 6 Ring A105 C22 8 LEZ TTS F1 15Mo3 F12 13CrMo44 F22 10CrMo910 F91 F316 X6CrNiNb1810 7 Gasket Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite 8 Bolts A193 B7 A193 B7 A193 B7 A193 B7 A193 B7 A193 B7 A193 B7 9 Nuts A194 2H A194 2H A194 2H A194 2H A194 2H A194 2H A194 2H 10 Plate A194 2H A194 2H A194 2H A194 2H A194 2H A194 2H A194 2H 11 Screw A193 B7 A193 B7 A193 B7 A193 B7 A193 B7 A193 B7 A193 B7 13 Ground Ring 17Cr 1 4122 17Cr 1 4122 17Cr 1 4122 17Cr 1 4122 17Cr 1 4122 17Cr 1 4122 17Cr 1 4122 14 Packing Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite 15 Gland F6 F6 F6 F6 F6 F6 F6 16 Gland Flange A105 A105 A105 A105 A105 A105 A105 17 Gland Nuts A194 2H A194 2H A194 2H A194 2H A194 2H A194 2H A194 8 18 Bolts A193 B7 A193 B7 A193 B7 A193 B8 A193 B8 A193 B8 A193 B8 19 Cut Ring Pure Grap
6. Check the operation of the valve by stroking it to full open and full close If piping system is pressurized with water for testing and in case the piping system has been shut down after testing for a long time the following recommendations should be adopted a Use corrosion inhibitor with water to pressurize the piping system b After testing the piping system should be depressurized and the test water completely drained 3 Should the valve be equipped with electric actuator please refer to paragraph 2 5 for actuator adjustment instruction 2 4 Periodic Valve Verification during Service A Normal Checks 1 Verify every month that there is no leakage from packing or in the body bonnet area If the leakage has been detected from the packing tighten the gland nuts fig 4 pos 17 slowly and evenly until the leakage stops as indicated in Table If the leakage has been detected from the body bonnet tighten the nuts fig 4 pos 10 as indicated in Table Il If the leakage does not stop it is necessary to replace the body bonnet gasket or to replace the packing 2 Every 3 6 months depending on operating frequency verify the greasing of bearings and the stem thread 3 For actuated valves in addition to above please refer also to the warnings in the actuator manual B Preventive Actions 1 Every 3 months verify the tightness of gland bolts 2 Every 6 months on motorized valves and every 8 months on hand op
7. d clean carefully then de grease both surfaces with a solvent Clean the inside of the valve with a clean cloth 3 Confirm that the materials of construction listed on the valve nameplates service and temperature are appropriate for the service intended and are as specified 4 Define the preferred mounting orientation with respect to the system pressure If any see arrow on the body identify the upstream side and downstream side Warning See the actuator user manual for the actuator preparation 2 2 Installation Instructions Globe valves are normally installed in horizontal pipe with vertical stem These valves can also be installed in vertical or horizontal pipe with stem other than vertical but the maintenance is much more difficult Globe valves are usually installed on horizontal pipe with the same flow direction of the arrow stamped on the body For operating temperatures above 200 C 392 F a thermal insulation of the valve body Is recommended Warning Before lifting or handling the valve or the valve actuator assembly make sure you have no limitation to do it Check if there are some safety messages attached to the lifting points of the valve or to the actuator RED RIGID LABEL and if any find the proper document in the user manual which describes how you can operate under safety conditions Handling and lifting of the valves during installation MUST be performed following the same criteria and instruction descr
8. e 8
9. erated valves grease the stem and the bearings 3 Every 4 years disassemble the critical service valves and or actuated valves verify the seat surfaces and lap them again when necessary Replace the bonnet gasket and the packing clean the stem 4 For the actuator proceed as indicated in its maintenance manual Table l Bolt Torque for Packing Bolts Table II Bolt Torque for Bonnet Bolts Stem Bolt Diameter Torque Diameter Diameter Torque in mm Nm in mm mm Nm 3 8 M10 30 1 25 4 M16 14 1 2 M12 70 p25 S75 M16 14 5 8 M16 140 1 375 34 92 M20 18 3 4 M20 260 15 44 45 M20 18 1 M24 580 2 50 8 M24 20 11 8 M27 760 229 57 15 M24 20 1 1 4 M30 1350 2 5 63 5 M27 23 25 69 85 M27 23 3 76 2 M27 23 3 25 62 55 M30 28 3 75 95 25 M33 35 Pentair reserves the right to change the contents without notice Raisteam Globe Valves Installation and Maintenance Instructions Troubleshooting Guide Symptom Possible Cause Solution Stem packing leaking 1 Gland flange nuts too loose 1 Tighten gland flange nuts Check the given torque 2 Packing damaged 2 Replace packing Body Bonnet leaking 1 Gasket bolting loose 1 Tighten bolting fig 4 pos 10 fig 4 pos 10 2 Gasket damage 2 Replace the gasket Valve leaking 1 Valve not fully closed 1 Close the valve 2 Debris trapped in valve 2 Cycle and flush with valve open 3 Sealing surface damaged to remove debris 3 Recondition the seat surface Jerky operation 1 Pack
10. hite Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite Pure Graphite 21 Yoke Nut Bronze B 148 Bronze B 148 Bronze B 148 Bronze B 148 Bronze B 148 Bronze B 148 Bronze B 148 gr B or gr B or gr B or gr B or gr B or gr B or gr B or Ni resist D2 Ni resist D2 Ni resist D2 Ni resist D2 Ni resist D2 Ni resist D2 Ni resist D2 22 Bearings Steel Steel Steel Steel Steel Steel Steel 25 Indicator A105 A105 A105 A105 A105 A105 F316 28 Plug F6 F6 F6 F6 F6 F6 F6 30 Plug Nut F6 F6 F6 F6 F6 F6 F6 32 O ring Viton Viton Viton Viton Viton Viton Viton 33 Handwheel Steel Steel Steel Steel Steel Steel Steel Pentair reserves the right to change the contents without notice Raisteam Globe Valves Installation and Maintenance Instructions Section 4 Valve Removal To remove a valve from the line it is necessary to operate as follows 1 Obtain permission to work N Warning Depressurize the line before starting any operation with the valve in open position Then close the valve 2 During the valve cutting operation proceed with care in order to prevent any damage to the seats 3 After the removal clean carefully the valve and close the ends with plastic or wooden discs Section 5 Lubricants and Special Tools 5 1 Lubricants It is recommended to lubricate the yoke nut if any through the yoke nut lubricator every 2 months by using the following products e The bearings are lubricated with usual lubricati
11. hout notice Raisteam Globe Valves Installation and Maintenance Instructions Section 3 Operation and maintenance instructions Raisteam valves do not require special care to work properly The following instruction will help provide a satisfactory and long life service Cautions e Ensure to perform periodic valve verification as described in paragraph 2 4 e n case of actuated valves always follow the specific instruction given by the actuator s manufacturer e Never change the setting of torque and or limit switches which have been carefully set during the final test at our workshop e To ensure tightness of pressure seal gasket pull up bolts must be tightened when the valve is under fully hydrostatic pressure test or twenty four hours in operation e Yearly checking of bolt torque is recommended 3 1 Operation and Maintenance Instructions Please refer to fig 4 Assembly 1 All the parts must be cleaned It is necessary a visual examination to ensure that there are no foreign parts inside 2 The internal seat surface 1 3 must be carefully lapped in order to avoid any defect The surfaces of the plug seat 28 1 must be lapped in order to avoid any defect 4 Assemble the plug 28 with the plug nut 30 and screw to the stem 20 Insert now this unit into the body 5 Insert the bonnet 2 into the body Take care that the operator wears gloves in order to ensure a careful assembly of the pure graphite gasket 7
12. ibed in previous points 1 2 Handling Requirements and 1 3 Storage and Preservation before installation Warning Verify that the direction of the flow of the line corresponds to the arrow indicated on the valve body Valves without the arrow are bi directional A Buttweld Valves 1 Open the valve 2 Position the valve and check for alignment with the pipe then proceed with welding in accordance with the applicable welding procedure Warning Before welding make sure the valve is completely open B Flanged Valves 1 Position the valve between the two flanges of the pipe and put the seal gasket between valve flange and pipe flange Ensure that it is correctly positioned 2 Assemble the valve to the pipe by means of bolts which shall be tightened by using the crossover method 3 Progressively reach the requested torque It is recommended to perform piping flushing before installation of valve If this is not possible the valves must be set with the plug in full open position before starting with flushing Pentair reserves the right to change the contents without notice Raisteam Globe Valves Installation and Maintenance Instructions 2 3 Valve Verification before Start Up 1 Tighten the packing just enough to prevent stem leakage Over tightening will decrease packing life and increase the operating torque The bolt torque figures for the packing bolts can be calculated as indicated in Table I 2
13. ing is too tight 1 Loosen gland nuts cycle the valve retighten Back seat leaking 1 Back seat damage 1 Recondition the back seat surface 2 5 Adjustment of electric actuators 1 For each valve equipped with actuator a torque calculation has been made The size of the actuator is selected on the base of the calculation 2 The calculated torque is adjusted in the open and close direction on the actuator This torque is calculated to suit the valve 3 Before assembling an actuator to a valve it is necessary to check e the technical data of the actuator e the correct adjustment torque e the operation instruction 4 Adjustment of the actuator for GLOBE valves Warning e n the open direction only the stop has to be set with the limit switch In case the limit switch is not adjusted the backseat will be destroyed by the high torque e In the close direction the torque switch shall be set e The adjustment of the limit switches has to be handled when the actuator is assembled to the valve according to the operation instructions For this reason note that e the calculated torque must be adjusted e the closing time must not be too short because the energy in the close blocked position depends on the actuator speed e the test performed without pressure under the piston must be avoided because the actuator runs with full speed into the seat without any reaction Pentair reserves the right to change the contents wit
14. ons B Unpacked Valves 1 The lifting and the handling of these valves have to be carried out by using appropriate means and by respecting the carrying limits The handling must be carried out on pallets protecting the machined surfaces to avoid any damage 2 With large dimensions valves the sling and the hooking of the load must be carried out by using the appropriate tools brackets hooks fasteners ropes and load balancing tools in order to prevent them from falling or moving during the lifting and the handling Pentair reserves the right to change the contents without notice RAILT 0003 EN 1306 Raisteam Globe Valves Installation and Maintenance Instructions Valve slinging Globe valves Y type globe valves Figure no 1 1 3 Storage and Preservation before Installation In case the valves have to be stored before installation the storage has to be carried out in a controlled way and has to be performed in accordance with the following criteria 1 The valves have to be stocked in a closed clean and dry storage room 2 The plug must be in the closed position and the end faces must be protected with plastic or wooden discs fixed with straps If possible keep the original protection 3 Periodical checks have to be carried out in the storage area to verify that the above mentioned conditions are maintained e Do not place consignment packages directly on the ground e Do not expose consignment packages to
15. ons for bearings e Smear the stem threads with Molykote e All other bolts and nuts are assembled with usual lubricator or Molykote 5 2 Special Tools No special tool is required for the maintenance operations described in this manual Table Ill Grease and Lubricant List Manufacturer Grease AGIP GRMUEP2 API PGX BP GREASE LTX2 ESSO BEACON 2 FINA FINAGREASE HP FINAGREASE EPL2 MOBIL MOBILUX EP2 O8 REMBRANDT EP2 SHELE ALVANIA R2 SUPERGREASE A TEXACO MULTIFAK EP2 GREASE L2 TOTAL MULTIS EPZ MWUETIS 2 VISCOL SIGNAL ROLSFER 2 STATOIL UHIWAYLI LI G2 Section 6 Operational Safety Instructions 0 S I in accordance with PED requirements According to PED ESR par 3 3 and related the service pressure and temperature are indicated on the nameplate fixed on the valve see Fig 5 The Operation Safety Instructions internal document TD PED 0020 are indicated in the attached document when applicable TYPE BODY STEM Pmax Pmax O PED CATEG SHELL TEST PRESS PO N TAG S N CE 0496 Fig 5 CLASS NPS DN FAB Y M SEAT OBTURATOR SEAL END TO END bar AT Tmin C FIRE SAFE bar AT Tmax C NACE C FLUID O Bar _ DOUBLE B 8B _ DOUBLE P _ SELF REL MANUFACTURER TYCO VALVES amp CONTROLS ITALIA Srl RAIMONDI MFG PLANT RESCALDINA M ITALY TYCO Fov contol raimondi Example of General Nameplate Pentair reserves the right to change the contents without notice pag
16. ts Recommended Spare Parts Please refer to figure no 4 e Gasket 7 e Yoke nut 21 e Ground ring 13 e Bearings 22 e Packing 14 e Stem 20 e Globe plug 28 with the plug nut 30 Pentair reserves the right to change the contents without notice NNNNA NANNAN NANAY a 3 NRS HHE SSSI SSS t 1 Wired pure graphite 2 3 to 4 pure graphite rings with a density of 1 8 g cm 3 Wired pure graphite 4 Ground ring Figure no 2 Figure no 3 Figure 6022 to 6025 Fig Class PN 6022 900 09 160 6023 1500 15 250 6024 2500 25 500 6025 4500 45 720 Body Plug Seat Seating Surface Surface Stem Item 1 3 28 1 20 1 13 Cr 13 Cr 13 Cr 5 Stellite Stellite 13 Cr 1 Gr 8 Stellite 13 Cr 13 Cr lz F316 Stellite F316 Stellite F316 or 17 4 PH below 450 C over 450 C Raisteam Globe Valves Installation and Maintenance Instructions Ni A LIX NY INT WY ZAR A A SS A ee f Th ZZ 7 Globe Valves Accessory 18 H WE m ANa z wwe AA N RS 17 NH NUL 14 N O 13 YT Ad a i yE tila SET NS Nk i Noa e AHA Alden Ba Rel PAN NAY S K C 1 NN NSSAW LA NN NED on mu D aaa NY sA LANNS Figure no 4 Material Specifications 21 22 23 24 25 26 28 Item 20 C 425 C 46 C 425 C 200 C 540 C 250 C 550 C 400 C 575 C 500 C 650 C 130
Download Pdf Manuals