INSTALLATION - Makoko Waterless Toilet

image

Contents

1. pipes and secure wind turbine on adaptor with screws supplied Fit end of ventilation pipe over ventilation opening on toilet and secure with screws supplied PLEASE NOTE if an electric fan was supplied with the toilet a small slot has to be cut into the bottom of the ventilation pipe to prevent the pipe from pinching the electrical wires that are used for main power connection to the fan After installation seal the slot with silicon sealant Secure ventilation pipes with supplied bracket to structure toilet hut or outside wall of home Hook waste bag onto hooks at rear end of toilet Please ensure that the bag fits snugly under the exit of the helical screw conveyor to prevent waste from falling outside the bag The toilet is now ready for operation Thoroughly test the toilet and check that 1 The lid can be operated smoothly 2 The helical screw conveyor is turning properly 3 No foreign objects have been left inside the toilet bowl that can block the exit hole 4 The lid is in place and has been fixed with the supplied screws Indoor installation For installation inspection and maintenance purposes it is necessary to make a hole in the wall behind the toilet bowl The section should be large enough to allow work on the linkages from the outside The wall where bricks have been taken out should be supported by inserting a suitable lintel during construction See picture on next page i L m T T
2. HREE AIR VENTILATION BE i OPTIONS ARE mu A C Fan Solar powered D C Fan ip Az 630 mm Wind turbine BENI B 1700 mm mum C 1200 mm D 800mm lt can also be installed above ground level where underground excavations are almost impossible due to rock formation or high water tables Installation pictures Trench width 800 mm
3. INSTALLATION Assembly If the toilet has not already been assembled please see User Manual for assembly instructions Excavation 400 mm Width of hole 800 mm 600 mm pe i Level SEU M 630 mm 600 mm 1120 mm CONCRETE 1800 mm 1200 mm Blue physical toilet measurements Black measurements for hole Prepare installation trench as per diagram Measurements are 2500 mm 8 2 ft long 800 mm 2 5 ft wide and 630 mm 2 4 ft deep At the rear end of the toilet the trench should be dug deeper to accommodate the catchment drum The measurement for this section is 800 mm 2 5 ft wide and 1200 mm 4 ft deep Pour concrete layer 100 mm 4 inches thick to support the long section that houses the helical screw conveyor In high water table areas also pour concrete into the bottom section where the catchment drum is Once the toilet is installed concrete must be poured into the area around the catchment drum as well This will prevent that the toilet pops up after installation Fit toilet into excavation level and do backfilling CAUTION Take care not to compact soil around the toilet When backfilling make sure that the ventilation pipe connector and waste collection inspection section are sufficiently above the ground level to ensure that water will not be able to enter the system once normal gardening has been completed by the owner Assemble ventilation

Download Pdf Manuals

image

Related Search

Related Contents

Gitzo G1077M User's Manual  JVC KW-XR810 User's Manual  Bulletin n° 21  Manuel - eBook Reader Pyrus mini  DATA-MANSHRT_T1954_ITL_Rev A.p65  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.