Home
Config600 Software Configuration User Manual
Contents
1. replacing the CPU module and replacing the front panel faceplate The new CPU module provides increased processing speed increased memory additional communication ports and an enhanced operating system and represents a significant improvement from the current CPU module The new front panel faceplate provides the correct logos and identifies the S600 A This upgrade process is intended ONLY for systems which DO NOT Warning have MID approvals To upgrade a system with MID approval contact your sales representative security Plate If you have a security plate currently installed on your S600 that plate does not fit the new CPU module A new security plate part number S600 EMCPLATE is included in the upgrade kit Note Refer to the S600 technical specification S600 available from www EmersonProcess com Remote for further technical details General Procedure The procedure requires that you perform a number of steps in a specific sequence 1 Save the current configuration in the CPU module to your PC Power down the S600 and remove appropriate wiring Remove the front panel faceplate Install the printed circuit board PCB in the new faceplate Replace the front panel connector cable Reattach the front display panel to the S600 chassis Remove and safely store the old CPU module gt N E M SS P pP Unpack the new S600 CPU module from its shipping container and anti static bag 9 Set communication jumpers 10 Se
2. Bristol Inc Bristol Babcock Ltd Bristol Canada BBI SA de CV and the Flow Computer Division are wholly owned subsidiaries of Emerson Electric Co doing business as Remote Automation Solutions RAS a division of Emerson Process Management FloBoss ROCLINK Bristol Bristol Babcock ControlWave TeleFlow and Helicoid are trademarks of RAS AMS PlantWeb and the PlantWeb logo are marks of Emerson Electric Co The Emerson logo is a trademark and service mark of the Emerson Electric Co All other trademarks are property of their respective owners The contents of this publication are presented for informational purposes only While every effort has been made to ensure informational accuracy they are not to be construed as warranties or guarantees express or implied regarding the products or services described herein or their use or applicability RAS reserves the right to modify or improve the designs or specifications of such products at any time without notice All sales are governed by RAS terms and conditions which are available upon request RAS does not assume responsibility for the selection use or maintenance of any product Responsibility for proper selection use and maintenance of any RAS product remains solely with the purchaser and end user ji Revised Feb 11 S600 Field Upgrade Guide Overview This guide describes the processes required to upgrade your FloBoss S600 to a FloBoss S600 Two general processes are involved
3. Jumpers 8 Revised Feb 11 S600 Field Upgrade Guide Jumpers P10 P11 and P12 set the communication mode RS 422 or RS 485 Jumpers P7 P8 and P9 provide the termination resistor required for RS 422 or RS 485 communications Comm 5 TB2 Jumpers P7 and P10 work together Mode For RS 422 full mode place the top four jumpers on P10 onto the left most pair of pins For RS 485 half mode place the top four jumpers on P10 onto the right most pair of pins Note The bottom jumper on P10 must always be on the right most pair of pins Termination To enable termination place the two jumpers on P7 onto the left most pair of pins 1 2 To disable termination place the two jumpers on P7 onto the right most pair of pins 2 3 Comm 6 TB3 Jumpers P8 and P11 work together Mode For RS 422 full mode place the top four jumpers on P11 onto the left most pair of pins For RS 485 half mode place the top four jumpers on P11 onto the right most pair of pins Note The bottom jumper on P11 must always be on the right most pair of pins Termination To enable termination place the two jumpers on P8 onto the left most pair of pins To disable termination place the two jumpers on P8 onto the right most pair of pins Comm 7 TB4 Jumpers P9 and P12 work together Mode For RS 422 full mode place the top four jumpers on P12 onto the left most pair of pins For RS 485 half
4. at the back of the S600 chassis Note Removing this plate may require you to detach wire seals placed in accordance with measurement requirements such as NM1 Ensure that you follow the appropriate procedures to replace these seals 3 Unscrew the retaining screws and remove the cover plate at the back of the CPU module 4 Using the attached lifters detach and slide the CPU module out of the chassis Store it in an anti static bag for safekeeping Proceed to the next step 8 Unpack New CPU Module Revised Feb 1 1 The new S600 CPU module P152 Rev 5 or above is factory packed in an anti static bag Carefully remove it from the bag observing all cautions including personal grounding to prevent accidental static discharge which might damage the CPU module Place the module flat on a static safe surface so that the communication connectors face up as shown in Figure 7 S600 Field Upgrade Guide Hep ue E gtd hie le ee ee Eg Sie Communica P7 through P15 P17 and P18 AE saan T eo Figure 7 S600 CPU Module Jumpers Proceed to the next step 9 Set Communcations Jumpers Use the communication jumpers to configure comm port settings An explanatory diagram printed on the CPU module helps you determine what settings to choose see Figure 8 pain RS 422 FULL RESIS RS 485 HALF IN OUT ate E l H kid d Lad a oe eo a 3 Figure 8 CPU Module Communication
5. mode place the top four jumpers on P12 onto the right most pair of pins pair of pins Termination To enable termination place the two jumpers on P8 onto the left most pair of pins Revised Feb 1 1 9 5600 Field Upgrade Guide To disable termination place the two jumpers on P9 onto the right most pair of pins Comm 9 TB5 Jumper P14 manages pins 1 and 2 of Comm 9 TBS RS 485 mode is always active for Comm 9 Place jumpers on the lowermost pair of pins to enable termination or the uppermost pair of pins to disable termination Comm 10 TB5 Jumper P13 manages pins 3 and 4 of Comm 10 TBS RS 485 mode is always active for Comm 10 Place jumpers on the lowermost pair of pins to enable termination or the uppermost pair of pins to disable termination Comm 11 TB5 Jumper P18 manages pins 1 and 2 of Comm 11 TBS RS 485 mode is always active for Comm 11 Place jumpers on the lowermost pair of pins to enable termination or the uppermost pair of pins to disable termination Comm 12 TB6 Jumper P15 manages pins 1 and 2 of Comm 12 TB6 It is active only if you select RS 485 mode for Comm 12 Place jumpers on the lowermost pair of pins to enable termination or the uppermost pair of pins to disable termination Jumper P17 Jumper P17 sets the functionality of TB6 enabling it to act either as TB6 an RS 485 comm port or a digital input port Place jumpers on the leftmost upper and lower set of pins to activate
6. 33 Peny m Send 16 Bit Mode Quit Help Figure 13 Config Transfer Screen 3 On the Transfer tab verify that the TCP IP address in the Hostname field corresponds to the TCP IP address you assigned the S600 Select the Send tab and select a configuration to download to the S600 5 Click Send A Select Target Folder dialog displays gt Note The S600 can store up to 20 configurations and automatically sets the last configuration downloaded as the default configuration Use the Config Selector option on the Cold Start menu to select a different default configuration O Highlight the target folder slot for this configuration Press V to display a sequence of all available slots Note The S600 lists any configurations already loaded 7 Click OK The utility displays a dialog monitoring the transfer Transferring 12 Transferring s600cont chg Figure 14 Transfer Monitor 14 Revised Feb 1 1 S600 Field Upgrade Guide When the message Transfer completed successfully displays in this dialog the process has finished 8 Click OK to close the dialog and redisplay the Config Transfer Send tab 9 You can download additional configs repeating steps 4 8 or click Quit to exit the utility Proceed to the next step 17 Cold Start the S600 Revised Feb 1 1 The final step is to complete the cold start for your S600 the Cold Start menu see Figure 11 should still be displa
7. 4 5 Replace and gently tighten the four central screws A Do not over tighten the four central screws This can cause the rubber Caution keypad to bind and affect the functioning of the S600 Proceed to the next step 5 Replace the Front Panel Connector Cable 1 Unscrew the two hex screws on the metal panel protecting the connector cable see Figure 5 and remove the metal plate Revised Feb 11 Revised Feb 1 1 S600 Field Upgrade Guide Hex nuts POPOV VV Hee Figure 5 Protective Plate Carefully pull the connector cable free from its connection in the chassis Note the orientation of the cable connector Select the longer connector cable from the upgrade kit and plug it into the connection in the S600 chassis Replace the metal protective plate and the two hex screws Select the ferrite EMC clamp from the upgrade kit and peel the protective coating from its adhesive backing Place the top of the ferrite clamp 6 cm below the bottom of the protective plate Position the clamp so that it opens to the left and press the clamp so that it adheres to the chassis Note This positioning ensures that the clamp does not interfere with components on the PCB Thread the connector cable through the ferrite clamp and close the clamp See Figure 6 S600 Field Upgrade Guide Figure 6 Installed Ferrite Clamp Proceed to the next step 6 Reattach the Front Panel 1 Connect the ribbon cable to the front p
8. FIG SELECTION FACTORY SETUP Figure 11 Cold Start Menu 5 Select Network Setup gt Network I F 1 The TCP IP Menu displays see Figure 12 Note Ensure that your Ethernet cable is connected into the NTWK 1 port on the CPU module TCP IP ADDRESS 1 GATEWAY ADDRESS 1 SUBNET MASK 1 TCP IP MODE GO BACK Figure 12 TCP IP Menu 6 Select TCP IP Address 1 provide a valid TCP IP address and press the enter key located at the lower right corner of the keypad 7 Repeat the process to define a valid gateway address and a valid subnet mask 8 Select Go Back gt Go Back to return to the Cold Start menu Proceed to the next step 16 Download Configuration Once you have configured communications load one or more configurations to your S600 using the Config Transfer utility Revised Feb 1 1 13 S600 Field Upgrade Guide Note Only version 3 0 and greater of Config600 supports the enhanced functionality of the new CPU module 1 Start Config600 2 Select Tools gt Transfer from the PCSetup main menu The Config Transfer screen displays see Figure 13 Config600 Config Transfer Transter Send Receive Logging Transfer Send Receive Logging Connection Details Seral Port Settings Available Configurations S600 ID i imwa Refresh List Baud Rate resh 5600 master meter CON Data Bits Sampler config Connections COM E Cake Stop Bits Stream_Gas_DP Hostname 155 177 78 2
9. Form Number A6299 Part Number D301668X412 February 2011 FloBoss 600 Field Upgrade Guide A EMER Process una ON FloBoss S600 i VIEW ALARM ACCEPT Remote Automation Solutions EMERSON Process Management FloBoss S600 Field Upgrade Guide Revision Tracking Sheet February 2011 This manual may be revised periodically to incorporate new or updated information The revision date of each page appears at the bottom of the page opposite the page number A change in revision date to any page also changes the date of the manual that appears on the front cover Listed below is the revision date of each page if applicable Page Revision Entire manual Feb 11 Initial Issue Dec 10 2010 2011 Remote Automation Solutions division of Emerson Process Management All rights reserved NOTICE Remote Automation Solutions RAS division of Emerson Process Management shall not be liable for technical or editorial errors in this manual or omissions from this manual RAS MAKES NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE WITH RESPECT TO THIS MANUAL AND IN NO EVENT SHALL RAS BE LIABLE FOR ANY INCIDENTAL PUNITIVE SPECIAL OR CONSEQUENTIAL DAMAGES INCLUDING BUT NOT LIMITED TO LOSS OF PRODUCTION LOSS OF PROFITS LOSS OF REVENUE OR USE AND COSTS INCURRED INCLUDING WITHOUT LIMITATION FOR CAPITAL FUEL AND POWER AND CLAIMS OF THIRD PARTIES
10. RS 485 mode Place the jumpers on the rightmost upper and lower set of pins to enable TB6 to act as a digital input port Note This is new functionality with the 600 CPU module Proceed to the next step 10 Set Security Jumper Jumper P3 see Figure 7 enables or disables system security When the CPU module is delivered from the factory P3 does not contain a jumper This disables system security and requires you to supply a password to change S600 settings Install a jumper on P3 to enable this security feature Proceed to the next step 11 Set Cold Start Jumper Jumper P2 see Figure 7 enables automatic warm start As delivered from the factory P2 does not contain a jumper Place a jumper on P2 to disable automatic warm start allowing you to bypass the password needed to access the cold start menu Proceed to the next step 10 Revised Feb 11 S600 Field Upgrade Guide 12 Install New CPU Module Once you have set all jumpers slide the CPU module into the S600 chassis ensuring that the module fits between the metal glides Press the module firmly to secure the module s connector to the backplane and tighten the retaining screws Security Plate The old security plate does not fit the new CPU module Use the y p security plate included in the upgrade kit Follow any site required processes to re attach wire seals Proceed to the next step 13 Wire New CPU Module Refer to any notes or wiring diagrams yo
11. anel Note how the connector fits into the keyway You must insert the ribbon cable correctly Do not force the connector into the keyway Caution 2 Place the top of the front panel over the retaining groove on the top boss and slide the front panel downwards 3 Secure the front panel by placing the hex cap screw into its recess in the bottom centre of the front panel 4 Using a 2 5 mm Allen key tighten the screw finger tight Turn an additional 180 degrees to complete the installation Do not over tighten the screw Over tightening will damage the panel Note Ifa cap protected the hex screw replace the cap Proceed to the next step 6 Revised Feb 11 S600 Field Upgrade Guide 7 Remove Current CPU Module Before you can remove the current CPU module you may have to open the case for the S600 Depending on how the S600 1s installed at your site you may first have to remove a security plate that prevents easy access to the modules 1 Disconnect all wiring to the CPU and any other installed modules Note The power wiring to the new CPU module is identical to the old CPU module However other wiring is very similar TB2 on the old CPU module has 13 pins Pin 13 1s not supported Pins 5 13 are a single 5 pin connector block If you use these swap this 5 pin connector for a 4 pin connector Detail the current wiring structure so you can replicate it with the new CPU module 2 Remove the aluminium security plate
12. new CPU modules However ensure that you have completed all other wiring before you apply power to the new CPU module Once you apply power the S600 completes a startup sequence and displays the main menu see Figure 10 1 FLOW RATES 2x TOTALS 3 OPERATOR 4 PLANT I O 5 SYSTEM SETTINGS 6 TECH ENGINEER 8 CALCULATIONS Figure 10 S600 Main Menu Proceed to the next step 15 Set TCP IP Communications Parameters When shipped from the factory the CPU module contains default TCP IP settings Before you can download a configuration to the 5600 you need to redefine these settings to your site s specific TCP IP values Do this through the cold start menu on the S600 s front panel display Alternately if you do not know the password you can temporarily fit the cold start jumper and cycle power Note In addition to the TCP IP connection you can also connect serially with the S600 using the RJ 45 port at the base of the S600 faceplate To access the cold start menu 1 Select System Settings gt System Status 2 Press CHNG 12 Revised Feb 11 S600 Field Upgrade Guide 3 Enter the default access code 1111 Note Change this default value to your site s chosen value as soon as possible to prevent unauthorised access to the system 4 Select Cold St and confirm your selection The system restarts and displays the Cold Start menu WARM START COLD START NETWORK SETUP REFLASH FIRMWARE CON
13. t security jumper 11 Set cold start jumper 12 Install the new CPU module in the chassis 13 Wire the new CPU module 14 Apply power 15 Set TCP IP communications parameters 16 Download configuration 17 Perform a cold start The following pages discuss each of these steps in detail Revised Feb 11 1 S600 Field Upgrade Guide 5600 Upgrade Kit Before you begin open the upgrade kit and verify that you have all the components you need to complete this process CPU module P152 R5 part number 7381520 in an anti static bag New S600 front panel faceplate Front panel connector cable with ferrite clamp filter Modified security plate 1 Save Configuration The Config600 software installed on your PC maintains copies of all configurations you have defined storing them in the folder C Program Files Config600 X X Configs where X X represents the current installed version of the Config600 software Note This is the system default folder for configurations your site may have changed this location If you have not recently modified any of your configurations you may not need to re save them As a precaution you might review and save the most recently used configurations or use the Config Transfer utility to upload the active configuration refer to the Config600 Configuration Software User Manual A6169 Proceed to the next step 2 Power Down S600 Before powering down the S600 ensure
14. that any processes it may control are themselves shut down or otherwise controlled Once you are sure of this disconnect power from the S600 by removing the power wire terminal block Proceed to the next step 3 Remove the Front Panel Faceplate 1 Using a 2 5 mm Allen key remove the hex cap screw from the bottom centre of the front panel Figure 1 Removing the Hex Cap Screw 2 Revised Feb 11 S600 Field Upgrade Guide Note A security cap may cover this hex screw 2 Carefully slide the front panel up 4 mm to allow it to clear the retaining groove at the top of the case and then allow the panel to come forward to clear the case completely Figure 2 Lifted Front Panel 3 Disconnect the ribbon cable from the back of the front panel at the blue connector Disconnect Here Figure 3 Ribbon Cable Proceed to the next step 4 install the Printed Circuit Board PCB 1 Place the front panel faceplate button side down on a flat surface 2 Remove the eight screws that secure the printed circuit board PCB to the faceplate see Figure 4 Revised Feb 1 1 3 S600 Field Upgrade Guide Screw Screws Screw Daniel Europe Ltd Spectra 00 Front Pane ga Dariga MORUSO UPFINMAM ES AE Screws Figure 4 Securing Screws 3 Lift the PCB from the old faceplate and place the PCB in the new faceplate 4 Replace and secure the two top most screws and the two bottom most screws see Figure
15. u made for step 3 The new CPU module removes some of the communication ports present on the old CPU module Remote I O and relocates others COM 1 2 is now on the bottom of the faceplate Refer to Figure 9 for a mapping diagram cPu T ive il The Wg ake Le Hia ile lle jd ed dl be r Ethernet port moved COM 1 2 removed TE E Optional second use port on front i g Ethernet port panel l G Remote I O E M port removed Four additional Hele RS485 ports 9 L 10 11 amp 12 jf S iG x A i Ground removed Bit 6 lt USB port La asa Figure 9 Comm Port Mappings on New CPU Module Revised Feb 1 1 11 5600 Field Upgrade Guide Note Typically the ground tag shield of wire from the communications cable connects to ground at only one point This may be the field end or within the cubicle to a ground or very rarely to the S600 itself The previous CPU module provided a 13th pin the last pin after Comm 7 for this purpose If you need to ground the communications cable on the S600 you can use any ground tag If you want to specifically connect to the CPU module use the final communications port the A connector on comm port 12 which you must define as a digital input This process takes the very last pin direct to ground and mimics the original CPU 14 Apply Power As mentioned in step 6 and shown in Figure 7 the power connector remains unchanged between the old and
16. yed on your S600 Select Cold Start gt Reset Totals The S600 restarts and displays the main menu associated with your selected configuration This completes the process of upgrading your S600 5600 Field Upgrade Guide This page is intentionally left blank 16 Revised Feb 1 1
Download Pdf Manuals
Related Search
Related Contents
Bedienungsanleitung Bedienungsanleitung Epson PowerLite 1830 Multimedia Projector Operation Guide Belkin SURF N300 MS 300 SERIES METER Life Fitness 93Xe Home Gym User Manual Samsung 460DRN-A Manuel de l'utilisateur Instrucciones para la Instalacion y Modo de empleo. Speed Queen W001C User's Manual Copyright © All rights reserved.
Failed to retrieve file