1. The active scheduler is normally used as part of a hardware kernel Many hardware kernels 20 include task management mechanisms such as task sleep control and interrupt activated tasks Thus task controls can also be sourced from hardware circuits In such cases a software RTOS has limited functionality and cannot foresee every switching point The hardware kernel instead decides task switching and an active scheduler becomes essential The scheduler architectures implemented in this 16 paper are mainly designed to support the active mode but can also be modified to support passive mode 4 2 Scheduler Architecture Schedule SCHD INFO aber BRAM cheduler System call tstatus read Task status Task status Reg Exceptions RTOS Schedule tinfo wr RTOS tstatus rd wr info Switch confirm Interrupts Dedicated contigurable Y Generic task scheduler i Next TID controls Scheduler controls j switch Time I Core Scheduler Current Task Sanies i control entry Run TID Interrupts Hard Task ae araware wake ask sleep i Sleep Task Queue imer array gt System clock System Clock and System clock Tick Generator Figure 4 1 Hardware Scheduler Architecture Figure 4 1 illustrates a simplified hardware kernel that mainly addresses the scheduling op
2. P Network LIN CAN communication 10ms 5 T7 AP Sync Event triggered task 4 execution stages lms 12 T8 BG Background Task N A 0 3 Table 6 8 Processor Utilization Performance Case No Job Number Total Task Utilization Scheduler Cost RATIO Case 1 1500 55 5 max 3 37 6 1 Case 2 3000 48 5 max 4 4 9 1 Case 3 5000 41 3 max 5 77 14 0 Case 4 1650 52 5 96 11 5 Case 5 3050 37 8 78 23 7 The experimental results Table 6 8 show that software scheduler consumes a large portion of the processor utilization For case 1 3 maximum utilization available for tasks is tested Above the value deadline miss will occur in the system Case 5 also reaches its highest performance bound It is found that practical task set utilization is much lower than ideal utilization bound and degrades greatly as system s task switch rates grows higher more jobs released each second The RATIO column calculates the portion between scheduler and task set utilization This shows the scheduler portion is large ranging from 6 1 to 23 7 The hardware scheduler can diminish this utilization cost 7 Conclusion The hardware scheduler operates in parallel to the processor and requires no system tick ISR when compared to a software scheduler Thus it accelerates system s real time performance Due to its nature the hardware scheduler introduces more resource cost but is acceptable as shown in abo
3. reach maximum performance for the applied application 8 References 1 A S John and R Rajkumar Real Time Operating Systems Real Time Systems vol V28 pp 237 253 2004 2 T N B Anh and T Su Lim Real Time Operating Systems for Small Microcontrollers IEEE Micro vol 29 pp 30 45 2009 3 L Jaehwan V J Mooney IHI A Daleby K Ingstrom T Klevin and L Lindh A comparison of the RTU hardware RTOS with a hardware software RTOS in Proceedings of the 2003 Asia and South Pacific Design Automation Conference Kitakyushu Japan 2003 pp 683 688 4 M Sindhwani T Oliver D L Maskell and T Srikanthan RTOS Acceleration Techniques Review and Challenges in 6th RTL Workshop 2004 5 R P Dick G Lakshminarayana A Raghunathan and N K Jha Analysis of power dissipation in embedded systems using real time operating systems IEEE Transactions on Computer Aided Design of Integrated Circuits and Systems vol 22 pp 615 627 2003 6 G C Buttazzo Hard Real time Computing Systems Predictable Scheduling Algorithms and Applications 2nd ed Springer 2005 7 W S W L Jane Real Time Systems Prentice Hall PTR 2000 8 W Stallings Operating Systems Internals and Design Principles 7th ed Prentice Hall 2012 9 A J Massa Embedded Software Development with eCos Prentice Hall 2003 10 C B Giorgio Rate monotonic vs EDF judgment day Real Time Systems vol 29 pp 5 26
4. are connected to a PMUX which decides the Q head This ensures only ready task is output for task switching 4 Hardware Scheduler Architecture This section introduces a configurable scheduler architecture that supports both priority and deadline scheduling algorithms It also describes its interface with the RTOS 4 1 Passive vs Active Scheduler When cooperating with a software kernel the hardware scheduler can behave either actively or passively For a passive scheduler it does not inform the RTOS that a task switching is due The scheduling process in the system is fully controlled by software kernel It issues scheduling control or read scheduler register only when it considers switching might happen In contrast an active scheduler decides task switching in the system It notifies the RTOS usually through ane interrupt when a switching is due The RTOS will quickly respond to the interrupt and performs task switching provided it is not in a critical section Many hardware schedulers found in the literature are passive schedulers The hardware scheduler normally operates with a very low runtime overhead In a traditional computing system all task controls are issued by the software kernel thus RTOS knows that a possible task switching will happen It then stalls the processor for a few clock cycles and controls the passive scheduler to output a result The system response time depends on how often the RTOS queries the scheduler
5. calculates task priorities at runtime 5 1 1 Multi level Feedback Queue Scheduling Qhead Empty List OTTON 1 0 PSEL oo p level ie on 7 Suspend BSR FIFOn i TID m TID E TID E TID E Task a controls Queue BSR FIFO2 i l tiD el Tswitch Next TiD Controller gt TID E TID E TID E X Detector switch BSR FIFO1 i sp TID E TIDE TID E BSR FIFOO On Run task Run TID TID E TID E TID E Node i Dequeue Figure 5 1 MLFQ Scheduler Some systems allow many tasks to share the same priority level Such a task set can be scheduled with a Multi Level Feedback Queue MLFQ architecture This architecture only stores ready tasks and scheduling outputs the task with highest priority If a number of tasks share the same priority their schedule follows FIFO order Figure 5 1 shows a diagram of the MLFQ scheduler Each priority level is built up with a BSR FIFO Queue and the queue head is positioned at the right end of the queue The Queue Controller dispatches new task and queue controls according to the priority information PID stored in task control commands or SCHD INFO BRAM refer to Figure 3 4 Once a task is activated an enqueue control is dispatched to the task queue with given PID If it is blocked the queue controller broadcasts a
6. of the system depends not only on the correct values of system outputs but also on those outputs being produced in a timely manner A Real Time Operating System RTOS assists in the operation of real time software systems by providing basic support for concurrent real time software tasks such as scheduling resource management synchronization and inter process communications 1 The use of an RTOS is now common in many real time software applications and even small scale embedded system could benefit from using an RTOS 2 However an RTOS brings along cost in terms of computational overhead and response time unpredictability Recent advances in Field Programmable Gate Array FPGA technology provide the possibility to implement all components of a complex softcore processor based digital system on a single FPGA chip This implementation adds flexibility in design and provides a quicker time to market However 2 a softcore processor has poorer performance when compared to a hardcore processor Running an RTOS on such a system can significantly degrade the system s real time performance The flexibility of an FPGA based system provides the possibility to explore new computing architectures to accelerate a system s real time performance 3 It also enables designers to fully embrace the FPGA s flexibility to customize the system for individual applications Hardware acceleration for operating systems has a long history Variou
7. output of the device depends both on the input and the intermediate signal Cay G T i 0 1 N D 6 1 Oi li Ci i 0 1 us N T1 6 2 The priority selector is a primitive circuit which can be used to build a priority encoder and priority multiplexer PMUX There are various approaches to implement the priority selector either optimized for speed or for logic resource use As the current project is prototyped on an FPGA the intermediate signal is implemented based on propagation chain or carry chain 27 of the device A PMUX is constructed by combining a multiplexer with a priority selector As illustrated in Figure 3 7 it has N data ports and each data input comes with a separate select line Similar to a priority encoder the select lines imply a priority order The PMUX outputs the data port enabled with the highest priority 14 Advanced SR Task Queue The Advanced SR ASR task queue is based on the BSR task queue and is optimized specifically for priority queues in deadline scheduling As we can see in the BSR model the most time costly operation in the sorted task queue is the queue search process incurred by the enqueue control The Advanced SR task queue introduces two new queue control clauses and incorporates not only ready tasks but also blocked tasks With this approach synchronization related task controls task activation and blocking will not cause tasks to enter and leave the queue frequently Thus
8. pre emption rate and allow better processor utilization 10 Formal deadline scheduling algorithms require a kernel to provide task level time and deadline management Currently most software EDF schedulers are research oriented and do not support effective deadline management for all tasks Some RTOS implement EDF using Dynamic Priority allocation on top of a priority based scheduler This scheme however can introduce a large worst case computation overhead compared to RM schedulers Another natural approach implements a ready queue sorted based on task s absolute deadline This method will be further studied in section 3 LST is even more difficult to implement because it 4 requires the scheduler to continuously calculate the slack time for all tasks The Laxity tie problem is another disadvantage which prevents it being used in common RTOS It defines the situation when two or more tasks have same laxities and task switch happens continuously until the tie breaks The advantage of software schedulers is that they are simpler more flexible and scalable They also fit a software RTOS naturally thus designers can implement algorithms in different ways without worrying about the hardware architecture signal synchronization resource usage and other complex issues found in hardware design However complex algorithms make the scheduling process less predictable and introduce more computation overhead Researchers have found that task sch
9. queue management and task pre emption detection which compares the priority between queue head and the running task 3 1 1 Task Queue Implemented in Software Scheduler Thread_Ready_chain Thread Control struct Thread Control struct Chain Control Chain Node Chain Node next next previous previous Figure 3 1 The RTEMS Ready Queue 26 Figure 3 1 shows a FIFO ready thread queue implemented in RTEMS 26 A thread is considered the same as a task in this paper In this software model queue nodes are linked together through software pointers Each queue node represents a particular thread except the first node which is a control field of the thread queue The first node contains two pointers that map the Q head and Q tail With these two pointers a scheduler can easily locate the Q head to perform dequeue and Q tail to enqueue a new task Other nodes also maintain pointers that connect the adjacent nodes In each thread structure it has one field that records the node address of the assigned kernel queue Normally a thread can only exist in one kernel queue thus this field will be updated when its state is changed With that the scheduler can easily locate the thread node and perform the remove control During node removal the scheduler only needs to reset the pointers in two adjacent nodes 3 1 2 Task Queue Implemented in Hardware Scheduler The Shift Register
10. reduces the occurrence of the queue search process TID Bus Queue Controller parallel entry Block Block Block Block a a ja lt a Qhead TID is f 7 schden schden schden schden Figure 3 7 Advanced SR Task Queue Model A tid flags enque deque ee he io remove 3 a tong Ct Reg lS enq_found loaies t a M Mi que_act blk ino Fill shift dir Data from Data from left cell I A O right cell parallel data Figure 3 8 Advanced SR Task Queue Block To distinguish between ready tasks and blocked tasks a schden flag is introduced Two extra queue control clauses que_act and que_blk are applied to control the schden flag Similar to the remove control each SR block checks the parallel entry when activate or block control is issued If the TID matches its schden flag will be set or cleared These two control clauses take only one cycle for the 15 scheduler to process This scheme reduces the occurrence of enqueue operations when compared to BSR task queue Other control clauses are similar to the priority queue in the BSR model But the Q head in this model is different from the one in BSR model Here Q head is assigned to the ready task block with smallest SCHD INFO highest priority thus its physical position is volatile The queue blocks schden flags
11. release control for periodic tasks are named as p_init p_cmpt and p_rels while the ones for aperiodic tasks are named as ap_init ap_cmpt and ap_rels For a periodic task enqueue happens immediately after the p_cmpt control and p_init The p_rels is regarded the same as the task activate control For an 22 aperiodic task enqueue happens only after ap_rels is issued The ap_cmpt control removes the executing task from the Core Scheduler and ap_init performs no action rlv_ddl pompt ap_cmpt BRAM p_init rlv_ddl p_cmpt ap_rels Enqueue abs_dal abs_ddl Generator BRAM Tswitch dequeue Detector Next TID l aar l TID abs_ddl switch 7 activate block suspend Runtask Qhead Run TID exit gs ASR Task Queue os Node Figure 5 3 EDF Scheduler with ASR Task Queue Figure 5 3 illustrates the architecture of the EDF scheduler The enqueue generator processes enqueue related task controls and issues enqueue controls to the queue controller in the ASR queue It also calculates the abs_ddl and stores them in the abs_ddl BRAM In this model two memory blocks are used The rlv_ddl of a task is configured by the software kernel during task initialization and stays constant In contrast the abs_ddl is used as SCHD INFO and is constantly accessed by the ASR queue controller Similar to the MLFQ scheduler the Tswitch Detector is used to identify task switching But in this scheduler the run
12. scheduler and a hardware EDF scheduler One critical performance metric for a real time system is how quickly the system can respond to an external event In many applications events are signalled using interrupts The relevant ISR then issues a signal to a task to perform a certain action This paper studies a metric called the event trigger latency which measures the worst case latency from the arrival of an interrupt until a high priority aperiodic task is triggered to run This metric similar to interrupt latency represents a fundamental operation of the system and is found to be only affected by the number of tasks in the system The hardware scheduler can greatly reduce event trigger latency For a system having 8 periodic tasks the software RTOS is measured to have an event trigger latency of 8518 clock cycles The hardware scheduler has a reduced scheduling overhead of 1424 cycles When a hardware kernel includes mechanisms to implement time services and directly signal tasks without using an ISR 20 the event trigger latency is further reduced to 1169 cycles The latency jitter is also reduced from 4657 to 849 cycles Besides response time system workload usually measured as processor utilization is another critical metric Theoretically 10 for a system having 8 periodic tasks an EDF scheduler allows a higher processor utilization bound 100 than a normal RM based priority scheduler 72 4 30 However for practical sy
13. software and hardware schedulers Besides the ready queue in the task scheduler a task queue is also used to construct other kernel queues 8 like the sleep queue or semaphore queue 3 1 Task Queue Basics A task queue data structure is a linked list in which each list node stores a task pointer Tasks in the queue are linked serially in a particular order This identifies three types of task queue In the FIFO and LIFO queue tasks are arranged by their arrival order The priority queue on the other hand arranges tasks based on the priority SCHD INFO If tasks share equal priority then they follow the FIFO order Two nodes in the queue are of special interest Q head and Q tail Q head marks the head of the queue while Q tail marks the last occupied node in the queue This data structure includes three essential control operations The enqueue control inserts a new task entry to the correct position of the queue The dequeue control issued by the queue controller when a task switch is due shifts out the task in Q head and Q head is updated The remove control deletes a task of any position in the queue Apart from that kernel can also peek at the data stored in Q head without removing it Many RTOS use the ready task queue to implement task scheduling In such cases the scheduler translates input task controls into queue controls and only the tasks ready for execution are added to the ready queue The scheduling processes include ready
14. software data structures to implement scheduling algorithms which is similar to the coprocessor kernel approach and this scheme is referred to as the serial hardware approach Another category implements dedicated hardware data structures and applies special hardware techniques like pipeline or parallel processing to facilitate the scheduling process These are referred to as the dedicated hardware scheduler approach Most work on the latter approach is inspired by the success of hardware packet schedulers in network communications 18 This includes simple priority encoder comparator tree 5 and various hardware task queue models such as a FIFO priority queue PQ Shift Register PQ and Systolic Array PQ Because architectures in this approach are specially optimized for scheduling they always achieve a much shorter scheduling delay than the serial hardware approach Hardware circuits also enjoy good reliability and runtime predictability This paper focuses on the dedicated hardware scheduler approach The FIFO PQ model firstly introduced as a hardware scheduler in the RTU projects 19 uses a few FIFO queues plus a priority encoder to implement a hardware ready queue Another similar approach is found in the Hthreads project 20 This model is easy to implement and its performance solely depends on the priority encoder The critical problem however is the resource usage If dynamic priority allocation is allowed in the system the sched
15. task which controls ignition and fuel injection It is event triggered by the engine crank position interrupt and has the highest priority in the system Due to the limitation of system performance this task is simplified to have a minimum period of 1ms rpm 1000 and 4 execution stages It sleeps for a specified time after it completes one stage Table 6 6 Case 4 Task Set Characteristics CASE4 Name Task Description Period Utilization T1 P 2ms Simple periodic task 2ms 3 T2 P Monitor Simple periodic task task deadline check 10ms 1 exception handling error mode control T3 P Compute Task activated by input task 10ms 10 T4 P Network LIN CAN communication 10ms 10 T5 P Service diagnostic services UDS CCP remote key 20ms 6 T6 P Input performs 16 A D channel sampling and input 5ms 10 filtering T7 P Output implements 16 channel software PWM outputs 10ms 10 T8 AP PWM Aperiodic tasks PWM input capture amp decode 2ms 2 triggered by timer interrupt 31 Table 6 7 Case 5 Task Set Characteristics CASE5 Name Task Characteristics Period Utilization T1 P Ims Simple periodic task lms 5 T2 P 2ms Simple periodic task 2ms 2 T3 P Sms Simple periodic task 5ms 4 T4 P 10ms Simple periodic task 10ms 8 T5 P Monitor Simple periodic task similar to case 4 10ms 1 T6
16. the next stage This requires two cycles to process a stage In the new algorithm next stage s middle block is pre fetched before a subset queue decision is made And the middle block for next stage has only two possible positions Through that two possibilities for the middle block s SCHD INFO are known at the start of a new stage And the true value is 25 already computed in previous stage With that pipeline architecture the worst case process time for binary search can be reduced to ceiling log2 N 1 5 4 Deadline Miss Management Unlike software approaches deadline miss management in the proposed hardware scheduler is fairly simple For the EDF scheduler all tasks assigned absolute deadlines are placed within the ASR task queue Thus we only need to check the queue node with smallest absolute deadline which is always the physical head of the task queue Unlike Q head the physical queue node could hold either ready or blocked tasks This makes sure that scheduler is aware of the deadlines for all released jobs in tasks For the LST scheduler the slack time can be used to foresee whether a task will finish within its deadline and system can apply special mechanism to prevent deadline miss or transient overload 10 Since ASR queue uses tmval as its SCHD INFO the actual slack time needs to be calculated together with the system clock 6 Performance Evaluation This section discusses the speed performance of the implemen
17. to support a certain scheduling algorithm and behave either actively or passively Other complex algorithm can be supported so long as the algorithm can be mapped onto a task queue model 5 Core Scheduler Implementation This section discusses the hardware implementation of several scheduling algorithms It starts with fixed priority scheduling for RM algorithm in which each task s SCHD INFO is constant through its lifetime Two varieties of priority scheduler are implemented They are the standard algorithms used in software RTOS Then two deadline based schedulers are presented They are more complex algorithms since SCHD INFO becomes variable Tasks SCHD INFO in EDF changes every task job while that of LST changes every system tick These require a more complex architecture for the scheduler 18 5 1 Priority Scheduling Priority based scheduling is widely adopted in real time systems 2 Designers use the RM algorithm to decide a task s priority and this will stay constant during the task s lifetime Some deadline scheduling algorithms are also mapped to the priority based scheduler 10 which uses a mechanism called dynamic priority allocation The priority scheduler discussed in this section cannot independently process such algorithms Nevertheless the schedulers are constructed based on the BSR queue thus supports online change of task priority It only requires the kernel to implement a top level software scheduler that
18. 20 In the EDF algorithm a task s SCHD INFO absolute deadline is calculated based on its job release time which changes every task job The simple definition of task job is a single round of task execution f A Running complete P X P4 suspend pam N 4 N Done run Preempt Blocked Block x J S N a release Activate y Ready initiate exit A exit a p A pe N gt Uninitialized NL we Figure 5 2 Extended Task State Transition Model for Deadline Scheduling To describe this process an extended task state transition model is introduced Different from common task state model two extra control clauses release and complete are used to mark that a task job is released or completed The added task state Done represents the state that a task job has finished and waiting for another to be released In EDF scheduling once a new job is released the scheduler will calculate its SCHD INFO based on the relative deadline pre known and current system time LST Scheduling is more complex as tasks SCHD INFO slack time or laxity may vary during execution This will be discussed later in section 5 2 2 5 2 1 EDF Scheduler A scheduler with the EDF algorithm dispatches the task with the earliest deadline One design option is to construct a ready task queue with the BSR queue that sorts task based on its absolute deadline The scheduler pick
19. 2005 33 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 V Melissa O Luciano A M M Cesar R Carlos and H Fabiano RTOS Scheduler Implementation in Hardware and Software for Real Time Applications in Proceedings of the Seventeenth IEEE International Workshop on Rapid System Prototyping 2006 pp 163 168 P Kuacharoen M A Shalan and V J Mooney III A configurable hardware scheduler for real time systems in International Conference on Engineering of Reconfigurable Systems and Algorithms ERSA 03 Las Vegas NV USA 2003 pp 95 101 J A Stankovic and K Ramamritham The Spring kernel A new paradigm for real time systems IEEE Software vol 8 pp 62 72 1991 C Matjazc V Domen G Roman and A H Wolfgang Implementation of Hard Real Time Embedded Control Systems Real Time Systems vol V14 pp 293 310 1998 M Varela R Cayssials E Ferro and E Boemo Real time scheduling coprocessor for NIOS II processor in 2012 VIII Southern Conference on Programmable Logic SPL 2012 pp 1 6 W A Halang State of the art and open research topics in embedded hard real time systems design Journal of Computing and Information Technology CIT vol 8 pp 167 180 2000 N Gupta S K Mandal J Malave A Mandal and R N Mahapatra A Hardware Scheduler for Real Time Multiprocessor System on Chip in 23rd I
20. Basic SR BSR task queue model has been developed based on the Shift Register PQ model It adds a remove control clause and is resource sensitive As shown in Figure 3 4 the model has a similar task block array architecture with serial and parallel entries However each node contains an extra parallel TID only used in priority queue and an empty flag propagation line Similarly to the 11 Shift Register PQ each block in the BSR queue has its own logic cell and performs distributed control based on parallel entry and its stored TID The Q head in this model represents one physical end of the queue and the dequeue control outputs the Q head whose TID becomes the new running task in the system This primitive architecture natively records tasks based on their arrival order and completes all task controls within two clock cycles It can be used to implement FIFO LIFO and priority queues in a hardware scheduler A tid REG TID Fill shift dir a Data from Data from left cell A A A right cell remove logic t Empty flag lt lt C Reg empt Empty From parallel data previous block Figure 3 5 BSR Task Queue Block Unlike its predecessor a task block in the BSR queue only contains some simple logic and registers for the TID field and an empty flag The queue controller performs centralized enqueue control thus the SCHD INFO and relative comparator are no longer imple
21. PQ has been implemented as the ready task queue in 12 as shown in Figure 3 2 It is an array of shift register blocks that is self sorted based on the priority of queue blocks Besides the priority a queue block also stores an address field which is the task identifier TID if implemented as a task queue Nodes in the queue have two parallel entries The new_entry_bus is used to enter queue data while another input issues control commands read and write Besides that each block is connected with other blocks next to it and the stored data could be shifted left or right by command Tasks in the queue are sorted based on their priority and the 0 block holds the current highest priority task read lt 7 j 7 write t 1 1 t il holding Shift py Shift Shift 7 Shift register Reg Reg Reg Reg Address Priority C Block eee Block Block Block highest priority t entry SES m N gt 3 E j t 4 4 t 4 new entry Invalid Address Priority comparator logic Entry new_entry_bus SS zi mE LOWER PRIORITY HIGHER PRIORITY i compare read compare result result write from right block new_entry_bus Figure 3 2 Shift Register Priority Queue and Shift Register Block 18 This model only supports the dequeue read and enqueue write controls Based on the controls the queue block has three operational modes keep current task shift left right and latch the new task On an enqueue operation a new task and its pr
22. This is a copy of the accepted version of the paper held on our institutional server consistent with IEEE policy Yi Tang Bergmann N W A Hardware Scheduler Based on Task Queues for FPGA Based Embedded Real Time Systems in Computers IEEE Transactions on vol 64 no 5 pp 1254 1267 May 1 2015 doi 10 1109 TC 2014 2315637 URL http ieeexplore ieee org stamp stamp jsp tp amp arnumber 67 86007 amp isnumber 7 079452 B COPYRIGHT NOTICE In any electronic posting permitted by this Section 8 1 9 the following copyright notice must be displayed on the initial screen displaying IEEE copyrighted material 2015 IEEE Personal use of this material is permitted Permission from IEEE must be obtained for all other uses in any current or future media including reprinting republishing this material for advertising or promotional purposes creating new collective works for resale or redistribution to servers or lists or reuse of any copyrighted component of this work in other works C PERSONAL SERVERS Authors and or their employers shall have the right to post the accepted version of IEEE copyrighted articles on their own personal servers or the servers of their institutions or employers without permission from IEEE provided that the posted version includes a prominently displayed IEEE copyright notice as shown in 8 1 9 B above and when published a full citation to the original IEEE publication including a Digital Obj
23. a for the Core scheduler The section enclosed by the dashed line in Figure 4 1 is the configurable region The actual circuits there depend on the scheduling algorithm implemented The Scheduler Control Entry module is responsible for checking and translating generic task controls from the RTOS into dedicated controls for specific scheduler architectures such as block priority level or dequeue It also updates internal task states based on control commands The most important module the Core Scheduler implements dedicated hardware scheduler circuits based on the task queue model It computes the next to run task from initiated tasks and outputs it to the Current Task node 4 3 Scheduler Interface In this paper the hardware scheduler is linked on the processor on chip bus to minimize communication delay With the Leon3 processor selected the scheduler module is connected on the AMBA AHB bus The scheduling result can be passed to RTOS either actively or passively If active scheduler model applied the switch signal will drive an interrupt that triggers task dispatching Otherwise it sets a switching due flag sampled by RTOS after a task control system call The switch_confirm signal is used to synchronize between scheduler and RTOS since RTOS response can be delayed when system or an application enters a critical section The above scheduler architecture has a clear control interface Since programmed in VHDL it can be easily configured
24. ad will be fetched and the whole queue will be shifted left Similarly a LIFO queue is also easily implemented with BSR queue model except that its enqueue dequeue controls and data are addressed through Q head Priority Task Queue The BSR Task Queue could also be used to construct a priority task queue like the one in the example scheduler architecture in Figure 3 4 The priority task queue is sorted based on a task s SCHD INFO which could be either priority or deadline Unlike the Shift Register PQ model the SCHD INFO in BSR queue is stored externally in a dedicated memory and can be accessed by the queue controller using the index TID Moreover enqueue sorting is processed using centralized computing through the queue controller During the enqueue operation the queue controller needs to search the queue to find the right position to insert the new task In the queue search process it goes through the queue with a certain search algorithm The queue controller reads the TID field in the selected queue node and uses it to fetch the SCHD INFO which is compared with the new task s SCHD INFO This search can use either a linear or binary search 28 as discussed in section 5 3 When queue search is performed the queue controller reads the TID field of all occupied task blocks through a TID bus Once the enqueue destination is found a target node is selected to latch the new task Thus an engu_found signal is broadcast along with tar
25. al value All other tasks tmval remain static as time progress As gclock is same for all tasks the tmval can be used as SCHD INFO instead of slack time This simplifies the scheduling process in which scheduler only needs to update the executing task on every system tick p_cmpt rlv_ddl ap_cmpt _ suspend BRAM Hi switch_enque p_ini rlv_ddl i p_cmpt y Tswitch l En tmval tmval Ae o eae gt tmval BRAM je Detector Generator Seaton 6 bs i dequeue Next TID activate gi r a block suspend Q Runtask head untas ee ASR Task Queue rl Node iun TE p Figure 5 4 LST Scheduler constructed with ASR Task Queue Similar to the EDF scheduler the ASR task queue is used to implement circuits for the LST algorithm One major difference is that the running task is not in the ASR queue but is placed in the Run task node and a counter is attached to it Therefore the SCHD INFO of the running task gets increased every system tick For non running tasks their relative priorities or SCHD INFO stay constant after job start thus their positions in the ASR queue remain constant As normal the Q head holds executable task with the smallest mval During scheduling the Tswitch Detector compares the Run task node s tmval with that of Q head to detect task pre emption Both task pre emption and suspension can cause a task switch Task pre emption happens in the following proce
26. del as discussed in section 2 When used for dynamic priority allocation algorithms both its priority level and queue depth are required to increase along with task number thus the resource cost will increase significantly For a fixed priority scheduler RM scheduling the number of possible tasks in one priority level is usually pre known In such cases the scheduler s resource usage increases linearly as priority number increases Table 6 5 Resource Usage for Hardware Schedulers of total available 29 Module Name LUT4 Registers RAMB32 Leon3 on chip system 6834 9 9 2760 4 0 N A MLFQ 887 1 3 602 0 9 0 task queue depth 8 priority level 8 MLFQ 1520 2 2 1181 1 7 0 task queue depth 16 priority level 8 MLFQ 3103 4 4 2054 3 0 0 queue depth 16 priority level 16 MLFQ 3065 4 4 2087 3 0 0 task queue depth 32 priority level 8 MLFQ 1202 1 7 690 1 0 0 task queue depth 16 priority level 4 EDF task queue depth 16 729 1 1 480 0 7 2 1 4 32 SCHD INFO bits EDF task queue depth 32 1142 1 7 654 0 9 2 1 4 32 SCHD INFO bits EDF task queue depth 64 2170 3 1 1158 1 7 2 1 4 32 SCHD INFO bits LST task queue depth 32 1634 2 4 685 1 0 2 1 4 System Benefit To better illustrate the benefit of the hardware scheduler this section compares the performance between a software MLEQ
27. e depth of 32 28 Resource Usage Table 6 4 illustrates the resource scaling for various task queue models The Shift Register PQ is implemented based on the architecture discussed in section 3 1 2 It shows that the SR PQ will cost much more logic resources than the BSR and ASR queue In a typical task queue with 32 queue depth and 32 bits SCHD INFO the resource cost in the SR PQ model is three times of the ASR PQ and four times of the BSR PQ Especially SR PQ s resource cost increases greatly when the SCHD INFO bits increases In contrast the resource usage in BSR and ASR models only increase slightly with the SCHDINFO bit Table 6 4 Task Queue Resourc Cost Queue SCHDINFO Shift Register PQ BSR PQ ASR PQ Depth Bit Number LUT Register LUT Register LUT Register 32 16 1377 768 485 327 802 404 32 32 2404 1280 501 343 818 420 32 64 4452 2304 533 375 850 452 16 32 1184 624 240 181 431 260 64 32 4811 2560 1123 700 1782 846 Table 6 5 shows the resource usage for different implementations of the hardware scheduler The resource cost for deadline based schedulers solely depends on the task queue depth The SCHD INFO bits on the other hand does not affect resource cost except two individual BRAMs This approach saves register cost which is more useful for other hardware modules The MLFQ scheduler on the BSR model still holds the same resource problem seen on the FIFO PQ mo
28. ect Identifier DOI Authors shall not post the final published versions of their articles A Hardware Scheduler for FPGA based Embedded Real Time Systems Yi Tang Neil W Bergmann School of ITEE The University of Queensland Australia Email yi tang uq edu au Abstract A hardware scheduler is developed to improve real time performance of soft core processor based computing systems Since it is implemented on an FPGA the hardware scheduler overcomes the design inflexibility found in previous accelerators and provides a configurable architecture to support different scheduling algorithms A new task queue architecture is designed to better support practical task controls and maintain good resource scaling Based on this the scheduler supports a time sliced priority scheduler and two deadline based schedulers Earliest Deadline First and Least Slack Time The hardware scheduler reduces scheduling overhead by more than 1000 clock cycles and allows up to 23 7 more application execution time Scheduling jitter is reduced from hundreds of clock cycles in software to just two or three cycles for most operations The main disadvantage for the hardware scheduler is the extra resource cost A typical EDF scheduler developed for small scale embedded system increases circuit area of a soft core system by 17 Keywords FPGA task queue priority scheduling EDF and LST scheduling 1 Introduction A real time system is one where correct operation
29. eduling can be faster and more predictable if it is separated out of the central processor The obvious benefits are reduced runtime overhead and event response time due to smaller critical sections 4 11 It also saves the system from frequently servicing the system tick Interrupt Service Routine ISR 12 which improves scheduling predictability and increases processor utilization Further some advanced features like time slicing and deadline management can be easily implemented The separate scheduling module is achieved either through the co processor kernel approach or hardware scheduler approach The co processor kernel approach uses either a separate full feature processor or a similar architecture to run a software kernel program Early projects include the Spring Co processor 13 and Kernel Processor 14 With the advance in multi processor technology more implementations can be expected 15 The main drawback for this approach is the communication and synchronization problem between two individual systems as stated in 11 Further this approach is costly in resources and power and a dedicated coprocessor interface is required on the CPU For safety critical applications the testing and verification process for software is much more complex than for hardware 16 The hardware scheduler approach uses customized circuits to further improve the real time performance of the scheduler Some projects 17 use state machines and common
30. eration This architecture replaces the system tick ISR and software time services with the hardware timer array and Sleep Task Queue which can be easily constructed with the BSR task queue Without these two modules the pure hardware scheduler can also be interfaced with a normal software RTOS However removing the system tick ISR can help to maximize the performance gain of using a hardware scheduler Some other hardware kernel circuits can further enhance system performance when combined with a hardware scheduler but they are not the focus of this paper In the above model the software RTOS still implements a Task Control Block TCB and governs task management The hardware scheduler maintains task status and performs scheduling based on task controls from the RTOS The scheduler requires a direct input of system clock because some scheduling algorithms such as EDF and LST need a system clock to calculate the SCHD INFO for different tasks The hardware scheduler also includes memory modules storing SCHD INFO and task states the Current Task node exporting the scheduling result the Scheduler Control Entry that translates task controls and the Core Scheduler that performs core scheduling functions Because our application is based on a Xilinx FPGA the on chip block memory BRAM 27 is used to implement the SCHD 17 INFO memory Each BRAM has two ports thus one is used by the RTOS to configure SCHD INFO and the other provides dat
31. get node s current TID This lets the queue to reorder and prepare an empty node for the new task In the next cycle of engu_found the new task TID is stored With the centralized enqueue control the SCHD INFO comparator logic is moved to the queue controller Because the SCHD INFO is stored in a dedicated memory block it is possible for a task 13 to have SCHD INFO with a large index range such as 32bits This fits the requirements of the deadline scheduling Otherwise having SCHD INFO register and comparator logics in each queue block will lead to high resource cost 3 4 Advanced SR Task Queue Priority Selector amp Priority Multiplexer A hardware circuit can be used to filter a number of inputs and output the active one with highest priority A priority selector PSEL has N data inputs and N data outputs Its input lines follow a priority order and the input having the highest priority will take precedence while other inputs get filtered Table 3 1 shows an example of a 4 bit priority selector Table 3 1 4 bits Priority Selector 13 12 1 I0 O3 O02 O1 OO el ol oo o xi ol o o x KL olo xxj emejl o ol o o o o l ol o o ol oj o gt o o olol O rR The logic equation for the priority selector is listed below The N bit priority selector has inputs Z and outputs O Ciis an intermediate signal that propagates from the input with highest priority The
32. iority are broadcast to all the blocks via the parallel entry Priority of the new task is compared with that of the local task through the comparator and each block makes a local decision In the end only one block will latch the new task The other blocks will either stay still or do a shift operation to latch their right neighbour s data This leads to a net effect that forces the queue to automatically re order itself When a dequeue control is issued the data in 0 block is read and all other blocks are shifted to their right This approach utilizes distributed control to process queue controls which reduces the overhead of the enqueue operation Both priority and deadline based scheduler can be constructed with this circuit The bus loading problem is not critical if the scheduler is applied to small scale embedded systems However some other defects stop it from being widely accepted as will be discussed in section 3 2 This paper modifies this circuit and presents a new approach that utilizes centralized control to process enqueue control and distributed control to manage other queue controls 3 1 3 Scheduling based on Ready Task Queue The ready queue model can be applied to many scheduling algorithms Its main idea is to let all ready tasks be prioritized in a queue in advance When task switching is due the scheduler only needs to output the queue head Its core function is the enqueue operation which inserts a task into a proper
33. late absolute deadline job release time is acquired differently For a periodic task its release time is pre known thus scheduler can update its absolute deadline abs_ddl before a new job is released For an aperiodic task its release time is unknown thus its abs_ddl cannot be decided until a new job arrives In such cases different control commands are applied to task controls complete and release used in periodic and aperiodic tasks This can optimize the scheduling overhead as will be shown in the results section For a periodic task it gets dequeued from the task queue once it completes its current job The scheduler then calculates its next abs_ddl and immediately adds it back to the task queue With this method if the task s new job holds a shortest abs_ddl the release operation simply set the schden flag in ASR queue and the switching overhead could be reduced to a minimum In contrast an aperiodic task remains outside the task queue from the time it completes the current job until the next job is released The release enqueue covers the overhead for the scheduler to calculate the new abs_ddl and insert it into the right position of the task queue If the aperiodic task holds a shortest abs_ddl the switching overhead will be large In the proposed EDF scheduler task init job release and complete controls for periodic and aperiodic tasks are treated differently and enqueue occurs at different times The init complete and
34. ling real time systems with hard and soft tasks in Proceedings of the XIIth conference on Integrated circuits and systems design Natal RN Brazil 1999 pp 78 81 T F Oliver S Mohammed N M Krishna and D L Maskell Accelerating an embedded RTOS in a SoPC platform in Proceedings of the annual technical conference of the IEEE Region 10 TENCON 2004 vol D pp 415 418 M Molnar The EDF scheduler implementation in RTEMS Operating System Diploma thesis Czech Technical University in Prague 2006 Xilinx 2010 Virtex 5 FPGA User Guide Online Available http www xilinx com T H Cormen C E Leiserson R L Rivest and C Stein Introduction to algorithms 3rd ed The MIT Press 2009 J Gaisler S Habinc and E Catovic 2006 GRLIB IP Library User s Manual Online Available http www gaisler com 34
35. ly a low frequency system tick is routed into the hardware scheduler to provide a time slice switch signal Besides task suspend and task pre emption this signal can also trigger a dequeue operation In some systems one time slice can be configured for a number of system ticks and this number is called the time slice quota When pre emption happens in the middle of a system tick scheduler designer can apply the scheme either to let new task inherit the old task s quota or process a background task Time slicing generally introduces more task switching to the system but this problem can be relieved with a hardware acceleration technique called task pre loading In time slicing the time point of most task switching is pre known to the system and so the system can pre load the new task s context to reduce task switching overhead if such a mechanism is available in the processor The scheduler can use a P load node similar to run task node to provide the preload TID Unlike the run task node which gets refreshed only when switching is due the P load node will be consistent with the Q head of the highest priority queue 5 2 Deadline Scheduling In a fixed priority scheduler a task holds constant SCHD INFO priority at all times However for deadline scheduling tasks may have different SCHD INFO at different times Thus tasks frequently enter and leave the ready task queue Additionally their SCHD INFO may require a large index range
36. m may require the scheduler to constantly access tasks SCHD INFO while the packet queue is not accessible except through dequeue control 2 A task queue could have a small queue length less than 32 in small scale embedded systems while a network packet queue normally requires a large queue length 3 Network queues need to consider peak arrival rates while task controls normally arrive at a fairly low rate 4 A task s SCHD INFO may have a wide index range deadline scheduling while a network queue only uses a small number of priority bits Another important difference is resource constraints In network communication scheduling could be performed on dedicated hardware without considering its cost and power usage In an embedded SOC system however designers need to restrict the circuit resource use which then leads to lower cost and power usage In an FPGA based platform one additional requirement is to better exploit on chip resources Thus some memory primitives normally implemented using registers shall be transferred to BRAM 27 3 3 Basic SR Task Queue queue_ctris enqu_found Queue Controller enqu_tound a TID i mI Mm parallel entry FD Ovi SSS pe jig tri v t t 2 task queue SR 8 6 SR SR SR task queue Left O Block Block Block Block right vo Q head A empty 4 empty A empty empty Figure 3 4 Basic SR Task Queue The
37. may occur On the other hand activate and suspend controls in the MLFQ scheduler are found to be time consuming Table 6 1 Worst case Control Overhead clock cycles Command scheduler HW MLFQ HW EDF HW LST SW EDF SW MLFQ Block exit 3 2 2 273 273 Activate 3 3 3 1427 1735 Suspend 3 3 3 649 1511 Aperiodic task release N A 3 D 3 D 1079 N A Periodic task release N A 3 3 1079 N A Aperiodic task complete N A 3 3 118 N A Periodic task complete N A 2 D 2 D 118 N A Table 6 2 Absolute Scheduling Jitter clock cycles Command scheduler HW MLFQ HW EDF HW LST SW EDF SW MLFQ Block exit 1 1 1 2 5 Activate 1 1 1 1016 1336 Suspend 1 1 1 378 783 Aperiodic task release N A 1 D 1 D 539 N A Periodic task release N A 1 1 539 N A Aperiodic task complete N A 1 1 2 N A Periodic task complete N A D D 2 N A The hardware scheduler generally takes one cycle to decode the control commands Except enqueue the internal queue controls are normally processed within two cycles Simple queue controls completes in one cycle while the remove control and controls that incur task switching require another cycle to reorder the queue and set the flags for example task suspend and activate controls in MLFQ scheduler The MLFQ scheduler is constructed by FIFO BSR queues thus the enqueue process only takes one cycle to complete Meanwhile the EDF a
38. mented in the task block The empty register which marks a node empty is connected to a propagation chain and generates the empty flag They are added to facilitate remove control and mark the Q tail node Generally a node identifies itself as a Q tail when it is empty but receives a non empty flag from its right block The new control clause remove control is processed in two cycles In the first cycle each task block will compare its REG TID field with the parallel TID input If the target task is found the block will set its empty register which also causes its empty flag raised and propagates the left end of the queue In this case if one block in the middle of filled blocks is removed all its left blocks will output the empty flags In the second cycle the queue automatically reorders itself All SR blocks with empty flag raised will copy their left block at the same time This operation then fills the deleted block in the queue 12 FIFO based Task Queue enqueue Newtask entry Q tail Runtask SR Task Queue m ede Figure 3 6 FIFO Task Queue For the FIFO queue a task is inserted to the queue through the parallel entry During the process the enqueue control is asserted and new task TID broadcast to all queue blocks The current Q tail block will record the new task TID It also clears the empty flag thus its right neighbour block becomes the new Q tail block With the dequeue control the queue he
39. nd LST schedulers adopt a priority queue model thus larger control overhead is found during the enqueue process For the ASR task queue synchronization related task controls do not trigger enqueue and are executed within three cycles On the other hand the job release control causes a task s absolute deadline to be updated and will always lead to an enqueue process For periodic tasks their job release time can be predicted thus deadline calculation and task enqueue process is shifted to the time when task completes Thus task release costs three cycles while task complete takes a maximum of 2 D cycles D represents the depth of task queue with the linear search If binary search implemented D will be replaced with log D 1 Note that this long control does not halt the processor and has no effect on performance 2 For aperiodic tasks the job release time cannot be predicted Thus the enqueue process follows a job release control It costs user 3 D cycles to complete The job complete control is shortened to three cycles The job release time control affects system s event response time Table 6 2 shows that hardware scheduler also minimize the absolute scheduling jitter related to each task control Maximum Clock Frequency The additional circuitry of a hardware scheduler can potentially introduce a new critical path in the system which could degrade system s operating frequency Table 6 3 shows the maximum clock frequencies f
40. ning task is not shifted out of the queue during execution Instead Q head directly points to the task due to run and Run task node copies the Q head info Dequeue control is issued when a task completes its current job and its abs_ddl becomes invalid 5 2 2 LST Scheduler Software implementation of the LST algorithm is more complex than EDF In EDF task deadlines stay constant once assigned Therefore EDF does not require the RTOS to perform scheduling until a new task job arrives In LST however every task s slack time changes with time and pre emption can occur anytime In common design a system tick ISR is required for the software scheduler to update all ready tasks slack time and perform scheduling at each system tick This leads to a huge scheduling overhead However the LST algorithm can be simplified to ease the implementation tslack da t c da c t tmval gclock 6 3 In the equation above gclock or t represents the system s real time clock It increases with every system tick There are two fields in tmval The task s absolute deadline da stays constant once the 23 job is released c is the remaining computation time for a task When a task gets initiated c is assigned with Cmax which refers to the worst case task execution time The c becomes variable only when the task is executing and it decreases every system tick then For a task set only the running task increases its mv
41. nternational Conference on VLSI Design 2010 VLSID 10 2010 pp 264 269 M Sung Whan J Rexford and K G Shin Scalable hardware priority queue architectures for high speed packet switches JEEE Transactions on Computers vol 49 pp 1215 1227 2000 J Adomat J Furunas L Lindh and J Starner Real time kernel in hardware RTU a step towards deterministic and high performance real time systems L Aquila Italy 1996 pp 164 168 D Andrews W Peck J Agron K Preston E Komp M Finley and R Sass hthreads a hardware software co designed multithreaded RTOS kernel in 70th IEEE International Conference on Emerging Technologies and Factory Automation Catania Italy 2005 pp 331 338 S Saez J Vila A Crespo and A Garcia A hardware scheduler for complex real time systems in Proceedings of the IEEE International Symposium on Industrial Electronics 1999 vol 1 pp 43 48 G Bloom G Parmer B Narahari and R Simha Shared hardware data structures for hard real time systems in Proceedings of the tenth ACM international conference on Embedded software Tampere Finland 2012 pp 133 142 J Hildebrandt F Golatowski and D Timmermann Scheduling coprocessor for enhanced least laxity first scheduling in hard real time systems in Real Time Systems 1999 Proceedings of the 11th Euromicro Conference on 1999 pp 208 215 A Garcia S S ez J Vila and A Crespo A binary tree architecture for schedu
42. ntrols into queue controls and processing each queue control When a task is activated its priority is stored in the SCHD INFO memory and the task is inserted into the ready queue In this model the RTOS fully controls the scheduling process When a task control is raised it retrieves the Q head information and decides whether task pre emption is needed 3 2 Task Queue vs Packet Queue The Shift Register PQ model discussed in 18 was originally developed for packet scheduling in computer networking Its design prerequisites are quite different from that of task management in an embedded RTOS In packet scheduling the control operations for the hardware queue can simply be data insert or enqueue and dequeue In contrast the remove control is necessary for a task queue In a practical task scheduler the remove control contributes to various functions Firstly a system monitor task or an ISR can use it to block a ready task that has malfunctioned Meanwhile some RTOS features require tasks SCHD INFO to be dynamic for example the dynamic priority allocation in EDF and priority inheritance scheme The remove control can facilitate the modification 10 of SCHD INFO online Moreover remove control is useful when a task queue is implemented in other formats such as a sleep queue or semaphore queue Besides the queue control issue there are other design considerations that vary between these two applications 1 A complex algorith
43. o implement a hardware scheduler 23 24 Different from approaches based on the task queue model tasks in this model are implemented as parallel Finite State Machines FSMs The parallel outputs of task status are linked to a comparator tree to compute the scheduling result This model costs even more logic resources than the task queue models The simple priority encoder model is only applicable for the bitmap scheduler 25 It provides limited functionality and little performance gain when compared to its software counterpart Most hardware approaches for task scheduling originate from the packet scheduler However packet and task scheduling are two different application scenarios and should have different implementation focuses Generally a task scheduler deals with a more complex control model and requires a larger scale on scheduling priority This issue will be further discussed in section 3 2 In the different hardware scheduler models discussed above the SR task queue model provides a balanced solution between processing speed and resource cost This research modifies the SR task queue model and implements a new task queue model that overcomes the defects When applied on small scale embedded systems the number of tasks is limited which relieves the scalability problems of hardware schedulers 3 Hardware Task Queues As discussed above the task queue model can serve as a basic primitive in task scheduling and is adopted in both
44. or the implemented hardware schedulers The MLFQ scheduler is only affected by the priority level with smaller priority level having better operating frequency Meanwhile the depth of BSR task queue is found not to impact the clock frequency In the new task queue model the SCHD INFO is not stored in queue cell thus task queue s parallel entry gets smaller These alleviate the bus loading problem found in the original Shift Register PQ model Table 6 3 Maximum Clock Frequency of Hardware Scheduler Scheduler Configuration Minimum Clock Maximum Clock Period ns Frequency MHz MLFQ priority level 8 5 574 179 404 MLFQ priority level 4 3 856 259 336 EDF task queue depth 16 5 088 196 541 EDF task queue depth 32 5 834 171 402 EDF task queue depth 64 6 122 163 345 LST task queue depth 32 5 116 195 465 Nevertheless the queue depth affects the ASR task queue through the PMUX module In the PMUX both PSEL and the multiplexer circuit can be affected PSEL is implemented using carry chain on FPGA The queue depth influences the propagation delay Despite that all schedulers maximum frequencies are faster than the clock frequency of the Leon3 processor which runs at a maximum 129 MHz This result argues that the implemented hardware scheduler does not degrade the overall system clock frequency Since the paper targets small scale embedded systems a typical scheduler is regarded to have a queu
45. position in the queue For FIFO and LIFO queues the enqueue process is straight forward and the scheduler simply updates the pointers that reference Q head and Q tail nodes For a priority queue the enqueue operation is more complicated and different approaches can be used to accelerate this process The architecture of traditional hardware queues makes it difficult to implement the remove control A software queue implements a virtual queue in which task nodes are connected through pointers The scheduler can easily identify a task node in the queue and process a remove control In contrast a hardware queue implements a queue in real circuits Task shifts caused by queue controls are not visible to the controller This makes it hard to identify the actual position of a task in the queue Thus the remove control is not feasible in such an architecture Next task TID Ready Task Queue Task Queue TID controls Queue Task controls lq Controller RTOS f Task priority SCHD INFO Task proirty e memory Figure 3 3 Hardware Scheduler built with Task Queue Figure 3 3 shows a simple functional model of a priority based hardware scheduler The Ready Task Queue implements a priority queue that is sorted based on task priority Thus the scheduler generates a result by simply fetching the head of the Ready Task Queue The Queue controller is responsible for translating task co
46. remove control with its TID and the BSR queue removes the task automatically When the Tswitch Detector identifies task switching it sends back a dequeue signal with PID to shift out the Q head in the selected task queue The Q head of each task queue outputs its empty flag to the Queue Empty List which then passes a PSEL to select a non empty queue with the highest priority level The Tswitch Detector maintains 19 one register to store the current PSEL output priority level and a Run task node that stores information for run task PID and TID When task activation happens the Tswitch Detector compares two PID values to monitor task pre emption Task switching may also occur when the Run task node receives a task suspend control If switching is detected a dequeue control is issued to the selected task queue The Q head TID then replaces TID in Run task node and outputs its scheduling results Meanwhile the old run task TID is fed back to the task queue of its priority level if not blocked This operation is also known as queue rotate 5 1 2 Time Sliced MLFQ Time slicing allocates equal execution time to eligible tasks of the highest priority It is only meaningful for algorithms that allow tasks sharing the same scheduling priority Popular scheduling algorithms that support time slicing are Round Robin Scheduling and time sliced MLFQ For the time sliced MLFQ ready tasks on the same priority would be executed in turn Normal
47. s acceleration techniques such as caches DMA and memory management have now been widely accepted in modern computer systems The first example of a hardware accelerated RTOS was probably in early 1990s when the well known RTU project 4 proposed a hardware kernel covering key RTOS functions Hardware acceleration techniques for RTOS functions have been proved to reduce computation overhead and improve system predictability 3 4 They can also lower the system requirements such as CPU frequency and system memory and thus reduce cost and power consumption 5 Scheduling is one of the key factors that affects the behaviour of real time systems 6 The scheduler decides which task to run next in order to best meet the system s real time constraints Commercial RTOS generally use a simple priority based scheduler 2 to implement Rate Monotonic RM Scheduling since this is easy to build and has a relatively low overhead Compared to RM deadline based algorithms such as Earliest Deadline First EDF and Least Slack Time LST can potentially provide better decisions RM requires the designer to include a large safety margin to account for sub optimal scheduling decisions in worst case situations As a result it can lead to low average system utilisation Another critical problem is the task starvation problem when a running task misbehaves On the other hand deadline based scheduling has been shown to be optimal in terms of meeting real time cons
48. s approach the queue controller polls every block in the task queue For a task queue with length N the worst case process time for the controller to walk through the queue is N Considering SCHD INFO stored in BRAM whose access time is two cycle the worst case process time is N 2 system cycles Binary Search Binary search can greatly improve the worst case process time of the enqueue operation At each stage of the algorithm the queue of current stage will be divided into two subset queues that are half in size The controller then compares enqueue task s SCHD INFO with that of the middle block of the queue Based on the result it then decides which subset queue will be used as the queue for next stage Such operations are repeated till a position found for the enqueue task The worst case process time for this algorithm is ceiling log2 V steps However we need to consider that the BRAM access time is two cycles Thus the time complexity is increased to O 2 ceiling log2 N To minimize the processing time the queue architecture and algorithm needs to be slightly modified to adopt a pipelined architecture The BRAM storing SCHD INFO should be duplicated to create a three port memory block Thus the controller can access two blocks SCHD INFO at a time In the original algorithm the subset for next stage will only be judged after the middle block s SCHD INFO is fetched and compared Then the controller knows the middle block for
49. s the next executable task from the queue head With this model the main overhead comes from the enqueue control In the worst case inserting a task into a sorted task queue requires N steps where N is the length of task queue There are two ways to accelerate this process One is to use a search algorithm to optimize the queue search process as to be discussed in section 5 3 The other way is to reduce the situations that incur an enqueue related queue sorting 21 For tasks in the above scheduler model the enqueue process happens in two situations One comes with the job release of a task and is called release enqueue The other one referred as synchronization enqueue occurs when a task reactivates from the blocked state Release enqueue updates a task s SCHD INFO and inevitably leads to a queue sorting The synchronization enqueue however doesn t change a task s SCHD INFO Its relative scheduling priority is maintained until the current job completes In that case queue resorting can be prevented The proposed EDF scheduler is constructed with the ASR task queue that holds all tasks released either blocked or ready to execute Thus a synchronization related task controls will not cause the queue to re order itself To further accelerate scheduling tasks are differentiated between periodic and aperodic tasks For all tasks they have a consistent relative deadline r v_ddl since initialization The other factor to calcu
50. sk schedulers are developed based on the task queue model 7 8 in which tasks waiting for execution are stored in a ready queue When the processor becomes available the scheduler fetches the next task from the ready queue and dispatches it to the processor for execution When scheduling is implemented in software RM and EDF are two commonly used algorithms RM is a static priority algorithm which means a task maintains its priority throughout the system s lifetime In contrast EDF is a dynamic priority algorithm in which a task s priority changes based on the absolute deadline of the current job Commercial RTOS generally uses a static priority scheduler to implement RM scheduling The simpler approach Bitmap Scheduler 9 implements a bit value priority queue but has the limitation that each priority only holds one task The multilevel feedback queue model 7 allows each priority level to hold multiple tasks Its implementation splits the ready queue into several FIFO queues which increases complexity and runtime overhead if the number of priority levels supported is high EDF and LST are two well known deadline based algorithms They are both dynamic priority algorithms and have been proved to be optimal i e if a feasible schedule is available these algorithms will find it 7 Compared to RM scheduling dynamic priority schemes are more difficult to implement 7 10 but they have the advantages that such systems have lower task
51. ss Initially the Run task node holds the smallest tmval in the task set As time progress its tmval gets increased until it is greater than the one in Q head Then task pre emption occurs it initiates a dequeue control followed by an enqueue control The original Q head is shifted to the Run task node and the running task is added back to the task queue In such a situation a laxity tie happens as these two tasks hold the same or similar slack time Then these two tasks will run in turn till one of them completes its current job There are two common approaches to alleviate the laxity tie problem The simple one is to introduce a laxity tie quota Qn When scheduler compares the run task with Q head pre emption will not happen unless mval Run task gt tmval Qi Q head If a laxity tie happens the tied tasks will get 24 executed in turn with a time slice Qr Another approach is to implement the Enhanced LST algorithm 23 which can be one direction of future research 5 3 Enqueue Search for sorted Task Queue As discussed in the previous sections the enqueue control for the task queue inserts a task into a sorted priority queue Because this process is managed by the queue controller with the centralized control model complex search algorithms can be applied In this paper only linear search and binary search are examined Linear Search Linear search or serial search is the easiest way to go through a sorted queue In thi
52. stems having high task switch rates the actual utilization available is much smaller due to scheduling and context switch overheads The hardware scheduler as analysed in previous sections can remove most of the scheduling overhead providing more computing cycles for applications In this paper five task set cases are studied to find the scheduler s influence on processor utilization Generally all task sets have 8 artificial tasks which run with specified characteristics The soft core processor has a clock rate of 1OOMHz and system runs for a total period of 1 second The first three task set are almost identical and include only periodic tasks with random generated execution time and task period range from 500 us to 10 ms deadline equal to period The difference is how many jobs are released in one second Two other cases are used which are drawn from real world applications Case 4 tasks described in Table 6 6 resemble a car body electronics application It has two special periodic tasks Input and Output tasks which deal with I O for 16 channels After processing one channel the task will sleep for a specified time till the next channel is ready One aperiodic task is used to sample and process PWM signals Case 5 simulates a car engine controller with tasks as shown in Table 6 7 It requires strict real time behaviour thus many small threads are grouped into Ims 3ms 5ms and 10ms tasks Another special feature is the Sync
53. ted hardware schedulers It includes control overhead of operations in the hardware scheduler and the operating frequency The computing system is based on the Leon3 soft core processor 29 and is implemented on Xilinx Virtex 5 series FPGA XUPV5 LX110T To maximize system predictability the Leon3 processor is configured to have no data and instruction cache and 8 register windows Both data and instructions are stored in on chip memory blocks access time 2 clock cycles Without a hardware scheduler the system can operate at a maximum frequency of 129MHz Scheduling Overhead and Jitter Table 6 1 illustrates the control process overhead in different schedulers To compare the performance a custom software EDF scheduler was developed based on the eCos kernel which also follows the sorted ready queue model and task control model in Figure 5 2 Together with the eCos MLEQ scheduler the software scheduler based systems are tested with an on chip hardware timer to measure task control overheads In the tests the software platform runs a task set of 16 periodic synthetic tasks with random parameters Each data in the table represents the worst case result recorded in 2048 samples The Modelsim simulator from Mentor Graphics is used to retrieve 26 hardware scheduler results For the software EDF scheduler large overhead is found in task release maximum 1079 cycles and task activate maximum 1427 cycles controls in which queue insertion
54. traints but incurs a high runtime overhead 7 Besides that it also requires the system to establish a system clock and dynamically update a task s scheduling priority at each job release Further the scheduler should provide a mechanism to monitor task execution time since explicit deadline information is introduced These issues mean that a software deadline based scheduler has a large overhead which reduces its benefits A hardware scheduler moves the scheduling function from software into hardware which runs in parallel with the software tasks Thus algorithms that require frequent scheduling activity and time awareness can be implemented without preempting running tasks The disadvantage of a hardware scheduler is increased hardware usage and algorithm inflexibility However a small scale embedded system has a limited number of tasks and predefined functions An FPGA based soft core system 3 makes it possible to customize the hardware scheduler on an application by application basis This makes a hardware scheduler a feasible scheme for FPGA based applications The remainder of the paper is structured as follows In section 2 the basic theory of real time scheduling is introduced In section 3 previous research results in hardware scheduling are reviewed In section 4 a new hardware scheduling architecture is presented and in chapter 5 its performance is analysed and compared to software schedulers 2 Related Works Many ta
55. uler s resource can scale quadratically with the worst case that all tasks occupy a single priority but each queue is made large enough to hold all tasks The architecture also has the disadvantage that it doesn t allow tasks to be easily removed from the queue The Shift Register SR PQ model is used in 12 The design has a configurable architecture which can perform simple priority EDF or direct RM scheduling Each node in the SR queue implements comparison and decision logic to support node removal and en queue operation Since a new entry needs to be broadcast to each node it creates bus loading problems and limits the scalability of the architecture Also the implementation is greatly affected by the size of scheduling information SCHD INFO N If N is large the comparator s time complexity and resource usage will grow significantly However many practical systems require both fine time granularity and long system lifetime These issues lead to a large SCHD INFO and make the Shift Register PQ model not applicable Another similar approach the Systolic Array PQ is implemented in 21 This circuit removes the parallel input to avoid the bus loading problem However this modification increases task enqueue overhead and the resource problem remains Another important project develops a real time mechanism to circumvent the size and sharing limitation of the hardware task queue 22 The comparator tree model is one unique approach t
56. ve results This paper proposes a new task queue architecture to implement hardware schedulers for various scheduling algorithms Compared to traditional Shift Register task queue the proposed task queues have the following advantages 32 Enable remove control to support system monitoring and SCHD INFO change Maintain a good balance between processing overhead and resource cost Allow an external controller to access each task s SCHD INFO to implement complex algorithm The main defect for this queue model is its operating frequency degrades quickly as queue depth increases Since it is designed for task scheduler a queue depth of 64 is enough for small scale real time systems which does not affect system s operating frequency The new task queue model helps to build more practical schedulers It enables dynamic priority change and time slicing in the MLFQ scheduler When constructing EDF LST scheduler it brings along important features including small overhead high time resolution deadline monitoring and long system lifetime They also have good speed performance and the resource cost scale well for large SCHD INFO bits Besides that this research introduces a configurable scheduler architecture that fits various scheduling algorithms The scheduler supports the configuration of task number priority levels and RTOS interface type This enables designers to utilize resource more efficiently and tune the scheduler to

Download Pdf Manuals

image

Related Search

Related Contents

HERMA File labels A4 61x297 mm white paper matt opaque 75 pcs.  Operator`s Manual - Whaley Food Service  Pcr2213 Manual  NEC PD78052(A) Network Card User Manual  取扱説明書等  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.