Home
        SolarLake 10000TL-17000TL-Product Manual-V5-3_EN
         Contents
1.                              r       Under voltage of grid stage 2    Over voltage protection  U gt     the range is 1 00 1 30Un   protection time is  T gt   0 02 5 0s     Over voltage protection  U gt  gt     the range is 1 00 1 30Un   protection time is  T gt  gt   0 02 5 0s     Under voltage protection  U lt     the range is 1 00 1 30Un   protection time is  T lt   0 02 5 0s     Under voltage protection  U lt  lt     the range is 1 00 1 30Un   protection time is  T lt  lt   0 02 5 0s        42    Communication and monitoring       Continued        Over frequency protection  F gt     the range is 50 00 52 00 Hz   protection time is  T gt   0 02 5 0s                                                            p                                                                                                             Over frequency protection  F gt  gt     the range is 50 00 52 00 Hz   protection time is  T gt  gt   0 02 5 0s     is    Under frequency protection  F lt     the range is 47 00 50 00 Hz   protection time is  T lt   0 02 5 0s     is    Under frequency protection  F lt  lt     the range is 47 00 50 00 Hz   protection time is  T lt  lt   0 02 5 0s     is    Over voltage of start   Re connection                                                           p                                                                                                             Under voltage of start   Re connection    Over frequency of grid stage 1    Lower limit of start voltage  th
2.                        Output    Figure 11 Multi string input connection  Left  and common string input connection  Right     Installation       Note  Make sure to select the right PV string connection setting while commissioning  Please refer to  parts 5 3 and 6 2 for details     Please use good quality PV modules with Samil Power Inverters  Ensure that the open circuit voltage of  array is less than the Max  Input DC input voltage of the inverter  Also the operating voltage should be  within the MPPT range of the inverter     Table 3 DC Voltage Limits of SolarLake inverters    SolarLake   SolarLake   SolarLake   SolarLake       Hoca 10000TL   12000TL    15000TL   17000TL  MPPT voltage range   3204800 Vdc   3804800 Vdc   380 800 Vdc   430 800 Vdc  Max DC voltage   1000 Vdc       Please use standard PV cable to connect modules to inverter  Use fast action string fuses meeting Country  regulations  Suggest the inverter is installed close PV module in order to reduce PV cables as well as  reduce DC side losses     Note     D   Please don t connect the PV panel positive or negative to ground except for thin  film panels     4 6 3 Assembly steps of DC connectors    4 6 3 1 Procedure    Step 1  Open the connector        Step 2  Strip about 8mm length of insulation from the string cables  and then insert the bare wire core  into core tube of connectors and crimp the connection using crimping tool       Il  I   _  CT ee    Step 3  Insert the cable with the tube core into the fasteni
3.      e Inverter is not exposed to direct sunlight    e Not likely to be flooded or snowed in    e Good ventilation     e Not exposed to steam  vapor  or water    e Not close to television antenna or antenna cable     If the installation does not meet the above conditions  the product warranty may become void   Please provide the clearance shown in the drawing below as a minimum  Minimum clearance is essential  for servicing product warranty              3 Position Min  Size  Side 50cm  soem socm Top 50cm  Bottom   50cm    Front 50cm  Minimum space clearance needed Table 2 Minimum free space    Choose inverter installation position   e Inverter must be installed on a solid surface which bears the weight of the inverter   e Tilted degree should not exceed 15 degree  as figure 8     e Terminals of inverter must be face down     e Cannot be installed horizontally   Figure 8 Incorrect installation             Installation       4 4 Preparation    Following tools may be needed for correct inverter installation                                                           Figure 9 Tools necessary for Installation    Tools  Crimping pliers  Screw drivers and Manual wrench and drill machine  and rubber hammer     4 5 Installation steps    Step1  Drill holes on the wall using 8mm drill bit to match the size of bracket  Five holes matching the bracket  are necessary for properly mounting the inverter  Insert the expansion pipe into the holes drilled   use rubber hammer to tap the pipe into 
4.     34 Figure 50    Operation          Pm  Slope  o  Hz     Fstart Fstop F Hz     Figure 51    G  Active power derating settings  as the following picture  Fill in the ratio of the active power and rated  active power  the range is 0  100   and the default is 100      Power Reducer    Active Power In        D    10096     Figure 52  Po         100 Pn  al 100      50 Pn      El  El  L   0     Figure 53    35    Operation       Step 3  Inverter safety parameters setting  as the following picture  Before setting  click    Read    to refresh  current data then set parameters  click    save    at last  The following picture shows default parameters of                   CEI 0 21   Parameters  Over voltage of grid stage 1  1 1 3Un  1 15 Disconnection time 0 02 55   0 30    Over voltage of grid stage 2  1 1 35Un  1 21 Disconnection time D 02 55   0 10    Under voltage of grid stage 1  0 1 1Un  10 85 Disconnection time 0 02 55   0 10    Under voltage of grid stage 2  D 1Un  10 40 Disconnection time 0 02 55   i0    Over frequency of grid stage 1  S0 56Hz  SLS0   Disconnection time   02 5s   0 90    Over frequency of grid stage 2  50 57Hz   52 00 Disconnection time 0 02 55   020   000    Under frequency of grid stage 1  44 S0Hz  47 50 Disconnection time 0 02 55   3 90    Under frequency of grid stage 2  43 50Hz  47 00 Disconnection time 0 02 5S   0 20  0 00        Over voltage of Start   Re connection  1 1 2  11 10       Under voltage of Start   Re conmection  0 8 1Un  0 85  Over freque
5.    EN SAMIL POWER  NY    Expert for PV Grid tied Inverters          SolarLake Grid Connected Inverter    Product Manual    SP SL V5 3 EN    2 NV  5 MIN    Copyright Declaration    The copyright of this manual belongs to Samil Power Co   Ltd  Any Corporation or individual should not    plagiarize  partially copy or fully copy this document  including software   This document should not be  reproduced or distributed in any form or means  All rights reserved     Samil Power reserves the right of final interpretation  This manual is subject to change according to user or  customer feedback  hence please check website www samilpower com for the latest version     01    02    Contents    L Basic safety IMtoOrmatioNn        ena A Ee ee eee 7  Ld  PROTA LS tn A E A O ae gpa 7   1 2 General Intormaton  pi ii A 7   Lo Sare by INSUNUCUION EE 7   L5 Pre TS alatom C NES iski aaia a E EPA O 8   Lo Transport aa paa a are eae cenis 8   LO Electric connect ON  AAAs a a a 8   1 7 ae M 8   9 Malntenanee and TEPA ne ee ee 9   1 9 EMC 7 noise Jevelor inverter patos RAN A RP I   9   4 Prod  ct description    E e 10  2l  UNC ON A A A AI A PEA 10   2 2   Elec Gal  DOCK agr a eere A A AA 10   2 9  JIDINmIEPISIOI   AS RRA O A A AS 11   220 Product  abel    A A PO A ANS SAA 11   3 PrOTecti  n devices    a 12  Du AWO SAUNA a A E RA ES A O e 12   3 2  Additional protection devices E POS 12   4 Installati  n     gt   nr A S 12  dol  PACKING WSU hi LLLLLALLL  L LLL MM  ct iia PEO 12  4 2 Sale MSH cOn m MET
6.  0s                                                            p                                                                                                             Under frequency protection  F lt  lt     the range is 47 00 50 00 Hz   protection time is  T lt  lt   0 02 5 0s                                                            p                                                                                                             Over voltage of start   Re connection                                                           p                                                                                                             Under voltage of start   Re connection    Over voltage of grid stage 1    Lower limit of start voltage  the range is 0 85 1 00Un       36    Operation       Continued        Over frequency of start   Re connection    a    Under frequency of start   Re connection                                                           41                                                                                                             Upper limit of start frequency  the range is 49 00 51 00Hz       Start time Count down of start  the range is 0 900s  Re connection time    Count down of fault  the range is 0 900s  6 5 BDEW    The followings items can be set by Solar Browser      Fixed cosphi setting  Set cosphi to a fixed value      Fixed reactive power setting  Set reactive power to a fixed value      Cosphi f P   Cosphi as a function 
7.  13   9 TECOS a al A e 14   AA ESPOLI A RR A RA O REA E ARS 15   AS INS talon Ste per A E A O NO OS 15   4 5 Connecting PV array LO INES a RO AD RA EA RA RES 16  AL c  Qus A A O 16   AZ  Panay CONNEC On TDU DOS eebestgestesausae RA A E teres era 16   di   ASS Sues  OF DC COMIC CLOS ton cag are a eat tee SER 17   4GA Assembly steps of AC COMMS COR a ae 19   Ai OO 2 RA E a M A AA 20   2 7 Safety inspection before CNMI IS SIO NINO   A a Geeta 20   5 Commissioning OF inverter     A aS RRS ASE 21  F A N a a E aa ge ia 21   9 2 Check country setting and Py array connection type   aes recesses AS 21  Decal  CHEERING COUNTY SELING  2 A 21    242 Programming PV array connection ty  esa in iaa 23   Ame  2    a gt  1  ee a A meade ne ni 24  6 L Control and display Panel     O e eutin 24   6 2  ECD Settings  unu MM DUUM emg esek aes 25  6 2 1 Standard InterfacE vestir no ra 25   G22  MAN MENU LEE 25   6 2 3 JnstepDtaDeOll5 data eerie pd aE 25   6 2 4 Historical data              m mm  mmMmmMMMMMMMMMeeMMeeev 25   6 2 5 Event list            m noo 26   6 2 6 Restore factory settings               ooo ono nono ninio 26   6 3 LCD function                                                   eisena deini ee 30   6 4 CEIO 21   M m m nec nnn enc nen nce nc ene en neces 30   6 5 BDEW eo ee   A A ate ce teen A rn an ca ute eetedeesd 37    7 Communication and monitoring MM  7 1 Communication interface             m on nro nin nce ncn ne enn eene eene een nennen  7 2 Communication mode                
8.  A fixed cosphi    fixed reactive power in Var          Figure 57    A  Fixed cosphi setting  as the following figure  Click on the drop down menu  select Overexcited or  Underexcited  fill in the cosphi value which range from 0 9 to 1     A fixed cosphi    Cosphi 1  9 9 2             Figure 58    38    Operation       B  Fixed reactive power settings  as the following figure  Click on the drop down menu  select Overexcited  or Underexcited  fill in the reactive power which unit is Var     A fixed reactive power in ar    Figure 59    C  cosphi f P   as the following figure  Click on the drop down menu  select Overexcited or Underexcited   fill in cosphi value  ratio of P and Pn     ooo eI oe RR RR RR RR  gom OR RR RR rreme e m e        91      Overexcited v Overexcited      Overexcited J Underexcited      Cosphi    m CNET Cosphi 1   Q0   Cosphi   0 95 mo  1   P1 no   P2 0 2   os P4  i    0 00   1 00        Figure 60    Cos phi    0 95       Figure 61    D  Q f V   as the following picture  Parameters displayed are default parameters      Reactive Power Drop Mode    as the following figure  Click on the drop down menu  select Overexcited or  Underexcited     Symmetrical Limit For Maximum Reactive Power is to limit the reactive power        Adjustment Time For Charact  Curve Operating Poir    specifies the corresponding time of the voltage  set point step to the time at which the reactive power reaches the set point      Specified Voltage UQO  is the fundamental voltage when th
9.  AutoTest is finished  the results    data can be sent to a PC through the RS 232 port  between the inverter and PC  a  txt  format report can be automatically created  The detailed operation  procedures are as follows     28  Open the  Enel exe  file shown in figure 31 in PC User can request  Enel exe  application software at  info samilpower com   a  Report  folder will created in the same  Enel exe  file directory  and each  txt   report generated will be stored into the  Report  folder  as shown in Figure 32     Operation          Figure 32    Enel E ini  Enel ort  TODO  Company n       Figure 33       29  Select the corresponding models and communication port  PC and the inverter connection port  com1    com9   as shown in figure 34 and figure 35        Figure 34 Figure 35    30  By clicking  OK  button  the  software Enel exe  automatically reads the inverter s LATEST test data   and generates a  txt  format report  as shown in figure 36 and figure 37        Figure 36    29    Operation          Figure 37    31  If you click    OK    button  a warning message as shown in figure 38 appears  please check the RS 232  communication connection between the Inverter and PC     inimum voltage check       Figure 38    In figure 38  press any arrow key to move the cursor to the  System Info  and then press  OK   you will  see the machine serial number  software version and so on  Press  ESC  and will return to the superior  interface progressively     6 3 LCD Function    LCD show
10.  Turn on AC switch     When the solar arrays generate adequate power  the inverter will startup automatically  Display showing   normal  indicates correct operation  If the display shows error message  permanent   press key  ESC   key to go to main menu  and go to  Event list   and press  OK   It shows fault code  inv 44  the phase  sequence of AC grid is wrong  Following action should be taken to correct the fault    1 Turn off AC and DC switches    2 Wait for 5 minutes    3 Disconnect AC line cables and connect back in the correct order     4 Turn on AC and DC switches     If the inverter indicates any other fault  please refer to part 8      error messages for help     D Note   If the inverter shows faults  please refer to part 8      error messages     5 2 Check country setting and PV array connection type    It is essential to ensure that the inverter is set to the correct Country Regulations and String layout as  explained below     5 2 1 Checking Country setting  Inverter should enter standard interface automatically after startup  If not   press  ESC  to go to standard  interface  shown in figure 17     Standard 11 04 03 10 12 17  Today    1 6 kwh  5 hours 1 minutes    2 7 kwh  5 hours       Figure 17 Standard interface display    2i    Commissioning of inverter       In the standard interface display press    ESC    button to enter the main menu shown in figure 18     Main Menu 11 04 03 10 14 12       Figure 18 Main menu    Press the    down arrow key    to move the 
11.  eememmmnememem nennen een cece ene e nennen nennen een n nennen sene eene seen enne nnne   7 241  RS232 communication for single Inverter   3  meecsaseseese eie iiaee  12 2  R9485 COMUNICA ON  serena io pai  7 2 9 Ethemet  communication e ni id    8 Troubleshooting cscs cee A beeee  Sil 2  010 1025  0 9 0  6 a entend  8 2 Daily maintenance          m m m mI Mmmm      MIT Iulul  ibiu                           9 1 Decommissioning steps       2 Paaa aa A AAA A  3  Songs  ns A A A A DA IA  9 4 Disposal 77 MM    10 Technical data mm mme  10 1 Input  DO  ee ee aaah a a gk i btinds  10 2 Output  AC       cece cence ccc cece ec Mmmm MM    MMeeeeMmMee  Jo FS EMcENCYy  Safety and aa gO  tE Cuon    A a  104 General data ca 4 OUMEEL DULL LLLIUL ULL 0LLGLLGI    oO00 e AE    11 Manufacturer s warranty and liability clauses  o    04    Notes on this Manual   This manual is an integral part of the inverter  Please read the manual carefully before installation  operation  or maintenance  Keep this product manual for future reference  Please note that all pictures are edited by  Samil Power     Scope of Validity  This product manual describes the assembly  installation  commissioning  and maintenance of the following  Samil Power SolarLake Series inverters   SolarLake 10000TL SolarLake 12000TL  SolarLake 15000TL SolarLake 17000TL  Keep this manual where it shall be accessible at all times     Target Group  This manual is for qualified persons installing and operating the inverters  The tasks 
12.  grid T F min test is over  the LCD will show the result and   Esc  to exit   The inverter will  reconnect automatically     27  The autotest function is considered successful once all the previous 12 tests have been performed   When LCD shows   Esc  to exit   press ESC button to exit from  New Autotest        Note  If an unexpected grid disconnection occurs during the autotest  the autotest is interrupted  The  LCD will show  AutoTest break   OK  to exit   Press OK button or ESC button to exit from  New Autotest    Disconnect the AC breaker from all 3 phases and prevent it from being reactivated  disconnect the DC  switch for 5 minutes and connect it again  The inverter is now initializing and the autotest procedure can  be restarted    Note  If user exits from  New Autotest  when any of the previous 12 tests haven t been performed yet   the inverter will not record any of the test results    Procedure of viewing AutoTest results from the inverter s LCD   Enter Main Menu  then enter Settings sub menu  select  AutoTest    then select  Last Results    press OK  button  the LCD will show the latest results  time in terms of a list  The latest result shows on the top   Press DOWN or UP button to select a result and press OK to view the detail  When entering the detail  screen  test results of grid R are shown  press RIGHT or LEFT button to view other phases  results  Press  ESC button to exit from detail screen    Procedure of viewing AutoTest results from PC   Note  After a new
13.  m O   Liphaseovervoltage              E 1 Li phase under voltage                 T 2    L2 phase over voltage                 E 3 i L2 phase under voltage     5       4 L3 phase over voltage l  Cee B    Prshasenpdomvclage pp      D Check whether AC grid  A od CM             m voltage and frequency are  MK 6   Over frequency          within permitted limits   Grid            7 i Under frequency                2  Check whether the AC  E 8       DC component of L1 phase is too large  connection is correct   ES 9 DC component of L2 phase is too large        9 Contact installer for help   i10 i  DC component of L3 phase is too large      11    L1 phase over  frequency                 12   Lt phase under  frequency              qe 13    L2phase over  frequency            q 14    L2phase under  frequency                 15     L3 phase over  frequency  16   L3 phase under  frequency  Table7 Error codes for DC side faults  Group   Code   Fault description Suggestions or tips  0 DC side PV1 over voltage   input mode  Multi String   1 DC side PV2 over voltage   input mode  Multi String   DC side under voltage     input mode  Common String     Check whether the  aan Ge tenute  e dis OUE voltage or PV array  3 DC side over voltage is in the essential range    input mode  Common String   ee cc i C UE p Va inciilation moedancaerror   4  2  Check whether the      LAU TR coe csl RAE insulation of PV cable is  PV 5 PV2 insulation impedance error good   Insulation impedance protects  3  Inspe
14.  through Internet        Figure 73 Ethernet communication    Hardware Requirements  Support only Windows operating system including XP Vista Win7    Network interface for inverter  COMI    Monitor mode  LAN and WAN    LAN  In this mode  a router can be used    If a router is used  upto 254 inverters can be monitored    Parameter setting for router    Step 1  As the step Standard     Main Menu   Settings     Communication  will enter communication interface   Step 2  On   Communication  press  OK   to enter IP settings interface  as shown in figure 74     Communication 11 04 03 14 19 06    IP Address  Subnet Mask    Gateway  DNS Server       Figure 74 IP Settings interface    44    Troubleshooting       Step 3  Select   Auto IP   Inverter will reboot   If a router is not used only one inverter can be monitored  Ethernet cable is to be used to connect inverter  with PC     Parameter setting for direct connection to PC    Step 1  Go to communication interface and select Static IP    Step 2  Enter IP Address  192 168 000 002  Subnet Mask  255 255 255 000  and leave the rest as shown  in figure 75  Press    OK    after modifying  Display will Reboot     Communication 11 04 03 14 19 29    IP Address 192 168 000 002  Subnet Mask 255 255 255 000    Gateway  010100101001010 01010   DNS Server 000 000 000 000       Figure 75 Static IP settings interface    Parameter set for PC   On the PC  from Control Panel set Manual IP address as 192 168 000 001  and set Subnet mask as  255 255 255 
15. 000     Note    D Need to install SolarLake Inverter Monitoring software Solar Power Browser on  D   the PC when using RS232 or Ethernet communication      2  Can t using RS232  RS485 and Ethernet communication mode at the same time   3  The default setting is  Auto IP      4  In WAN mode  router is necessary and auto IP mode should be selected     5  WAN is not available currently    8 Troubleshooting  8 1 Troubleshooting    This section contains information and procedures for solving possible problems with the SolarLake series  inverters  and provides user with troubleshooting tips to identify and solve most problems that could occur     In case of problem with inverter  check the following tips   e Check the warning fault messages or Fault codes on the inverter information panel  Record it before doing  anything further   e Attempt the solution indicated in Tables 6  7 8 9 and 10   e If inverter information panel is not displaying any Fault  check the following to make sure that the installation  allows proper operation of the unit     Is the inverter located in a clean  dry  adequately ventilated place     Have the DC input breakers switched on     Are the cables adequately sized and short enough     Are the input and output connections and wiring in good condition     Are the configuration settings correct for the particular installation     Are the display panel and the communications cable properly connected and undamaged     If necessary  contact Samil Power Customer 
16. 1   7 Product manual il   8 Warranty card      9 Quality certificate   1       39 2 mm    152 mm       407 2 mm                       Figure 7 SolarLake 10000TL   17000TL Inverter Backboard    4 2 Safety instruction    Danger    N DC voltage can be as high as 1000V  three phase AC voltage can be up to 400 V   Ensure AC DC side are turned off before installing or maintaining the inverter     13    Installation       4 3    14    Must strictly observe the following standard and specifications when installing  operating and maintaining  SolarLake inverter     1  Get permission from the local electricity supplier before connecting inverter to the grid    2  All installation work must comply with local installation standards and regulations    3  High voltage will be present when the inverter is working  Switch off AC DC power and wait for at least 5  minutes before undertaking any maintenance work    4  Some areas of the inverter could be very hot even after turning the inverter off     Warning   Pay attention to the rated voltage and current when design the system     Precaution    Before starting installation please check the site to ensure the following     e Temperature at the site is likely to be within permitted range of  20  C to  60  C    e Site altitude is less than 2 000m above sea level    e Inverter not likely to be exposed to by sea water    e Inverter is not close to corrosive gas or liquid  for example  avoid locations where chemicals are processed  or poultry farm
17. 4   O3       Figure 29 Date and time settings    Check boot settings information   LCD will display the settings information  Please check the settings information  If settings is wrong   please press the    ESC    key to reset  If all the information is correct  please press    OK    to confirm  the  inverter will save all the settings  As shown in figure 30     Commissioning End 11 04 03 10 04 51       Figure 30 Check boot settings information    Operation       6 2 7 Autotest procedure   Italy only    This function is available only when ITALY is selected as country set     Settings 11 04 03 10 16 10       Figure 31 Autotest selection for Italy only    Operate a new AutoTest according to   GUIDA PER LE CONNESSIONI ALLA RETE ELETTRICA DI  ENEL DISTRIBUZIONE  Ed  2 2  Dicembre 2011     1  Before performing the AutoTest  confirm that the country setting  Italy  and that the inverter is running  in normal state     2  On the display Main Menu find Settings     AutoTest Ita  as per fig 35 and press OK  Then select  New  Autotest   press OK  and after few seconds  you can see   OK  to start Grid R V max  on the LCD     3  Press OK button to start grid R V max test  or press ESC button to exit from    New Autotest     If there  is no button operation within 5 seconds  the test will start automatically  If the test has started  key  operation is invalid until test is over     4  After grid RV max test is over  the LCD will show the result and   OK  to start V min   The inverter wi
18. 50 50 50    0 9leading        0 9leading          0 9leading        0 9leading         ij Teeter  gt   0 9lagging 0 9lagging   0 9lagging 0 9lagging  Total harmonic distortion  lt 3   lt 3   lt 3   lt 3      THD        51    Technical data       10 3 Efficiency  Safety and Protection          Model SolarLake SolarLake   SolarLake SolarLake  10000TL 12000TL   15000TL 17000TL  Max  efficiency 97 9  97 9      98 096 98 0   Euro  efficiency 97 4  97 4    97 6  97 6   MPPT efficiency 99 9  99 9    99 9  99 9   Overvoltage   Undervoltage Yes ee   Yes T  protection    DC isolation impedance Veg ves   ee Ves  monitoring    Ground fault protection Yes Yes   Yes Yes  Grid monitoring Yes Yes   Yes Yes  Ground fault current Wee Vae   vee Vee  monitoring    DC injection monitoring   Yes   Yes   Yes   Yes  10 4 General Data  Model SolarLake SolarLake SolarLake SolarLake  10000TL 12000TL 15000TL 17000TL  Dimension  W H D   mm  520 716 250 520 716 230 520 716 230 520 716 230  Weight  kg  40 40 40 40  Cooling concept Fan  Noise emission  typical   dB    47  Operating temperature          PRA ee  range    C  20   C    60  Derating at 45   C   Degree of protection IP65  Pollution Degree II  Topology Transformerless  Internal consumption  night      5    oPD   o  A eee ee ee aM  LCD display 3 5Inch  TFT LCD  Communication interfaces Ethernet  RS232  RS485  Standard warranty Year    5       52    Manufacturer   s warranty and liability clauses       11 Manufacturer   s warranty and liability clau
19. 678 Tel   86 527 88754666  E mail service samilpower com Fax   86 527 84453877    http   www samilpower com    
20. C represents the quality characters of electrical equipment     e The inherent noise immune character  immunity to internal electrical noise   e External noise immunity  immunity to electromagnetic noise in external system   e Noise emission level  influence of electromagnetic emission upon environment     Warning     Electromagnetic radiation from inverter may be harmful to health   e Please do not stay close to the inverter for long periods when operating     Keep minimum distance of 20 cm     09    Product description       2 Product description  2 1 Function    The SolarLake Series PV inverters converts the DC power of a PV generator to grid compatible AC power  and feed it into the public grid     ce PH DE                 PV Modules Grid tied Inverter Grid    Figure 1 Grid tied Solar PV system    SolarLake inverters are manufactured using the latest technology and under strict safety standards  Even  then in correct installation or operation will cause property destruction and personal injury     The SolarLake series inverters are not designed for mobile application     The SolarLake series inverters should not be used for anyother purpose than grid tied PV systems  The  manufacturer supplier does not take any responsibility if used for any other purpose     2 2 Electrical block diagram    10    e Electrical block diagram    SolarLake inverter s internal function process diagram is presented in Figure 2  The DC power generated by  the PV array is filtered through the Inp
21. Click the serial number  the interface is shown as following figure  set the safety parameters of this  inverter  Detailed settings refer to step 3        Cypr ation mode Veget     Total operation hour  h              Pv input Power ow   Output power QW   ternal temp 318  C  OP put Power OW Energy ieda   i0kwWh   eats temp sona  C    Pvt volage 459v   Energy total LOWA   Reduced CO2 0 000 ey    Pl arent O00 ks pas   Reduced Cal 0 0 kg    P2 carent au A      2572 wv   Reduced Coal GGG Kg     Grid current DOA      Grid hoguey 6 11 Mt   Figure 40    31    Operation       Setp 2  Click  CEIO 21 A70  on the top of navigation bar  configure parameters conforming to standard of  CEI 0 21       Overview   aR  105  oew cet o 21 470    A fixed cosphi A fixed reactive power in Var        ReactivePower  O          a m     JI Cosphi 0 95   0 9  1              paan    Lock in Voltage  105   1 00   1 10   LedeoutVoltage L00   0 90   1 00                       Figure 41    A  Fixed cosphi setting  as the following figure  Click on the drop down menu  select Overexcited or  Underexcited  fill in the cosphi value which range from 0 9 to 1     A fixed cosphi    Cverexcited v      A    Cosphi  1      0 9 1     Figure 42    B  Fixed reactive power settings  as the following figure  Click on the drop down menu  select Overexcited  or Underexcited  fill in the reactive power which unit is Var     A fixed reactive power in Var    Figure 43    32    Operation       C  cosphi f P   as the following fi
22. OK  to confirm selection    ESC  to exit current screen or selection   Up  to move up or increase value   DOWN  to move down or decrease value    RIGHT  to move right or increase the backlight    LEFT  to move cursor left or decrease the backlight     11 04 03 10 12 17    Today  kwh  inutes  Total             Figure 26 Display and keys  There are two LEDS on the front panel of the inverter to indicate inverter operation status     Table 5 LED statutes    LED ON   FLASHING   OFF       GREEN LED   Normal operation Waiting or Checking state     or starting up     Possible fault    RED LED   Fault   Possible recoverable fault   Normal       24    Operation       Wait State  Inverter is waiting to Check State at the end of reconnection time  In this state  the PV voltage  is more than 250V and grid voltage value is between the max and min limits  If not  Inverter will go to Fault  State or Permanent State     Check State  Inverter is checking isolation resistor  relays  and other safety requirements  It also does  self test to ensure inverter software and hardware are functional  Inverter will go to Fault State or Permanent  State if any error or fault occurs     Normal State  Inverter is feeding power to the grid     Fault State  Inverter has encountered recoverable error  It should recover if the errors disappear  If Fault  State coninues check the inverter according error code in table 6 7 8  and 9     Permanent State  Inverter has encountered unrecoverable error  It will stay 
23. Remove inverter from the mounting carefully to avoid ingury  Please note that the SolarLake inverters  weight over 50 kgs     9 2 Package    If possible  please pack the inverter in the original packaging  If original packing it is not available  use an  equivalent carton suitable for loads more than 50 kg  has handle and can be closed fully     9 3 Storage  Store the inverter in a dry place where ambient temperature is between  25 and    70   C     9 4 Disposal    At the end of its life  dispose inverters and packing materials at locations that can handle and or recyle  electric equipment safely     50    Technical data       10 Technical data  10 1 Input  DC           SolarLake SolarLake SolarLake SolarLake  Model 10000TL 12000TL 15000TL 17000TL  An PEGI RES DS Powe A480 12500 15600 17700  Max DC voltage  V  1000 1000 1000 1000  Total max  input Current  A    PV 1 16 PV2 16 PV1 16 PV2 PV1 20 PV2 20   PV1 20 PV2 20  Number of MPP trackers    strings per MPP tracker 2 2 2 2 2 2 2 2  MPPT voltage range   at full power   V  320 800 380 800 380 800 430 800  Min  DC voltage    start voltage  V  160 210 160 210 160 210 160 210  10 2 Output  AC   Model   SolarLake SolarLake SolarLake SolarLake  nos      10000TL 12000TL 15000TL 17000TL  AC nominal power  W    10000 12000 15000 17000  Max  AC power  W    10000 12000 15000 17000  Max  AC current  A    16 19 2 24 25       S NJPE  3 N PE  3 N PE  3 N PE   Nominal eve votage LY    230 400 230 400 230 400 230 400  AC grid freq   Hz    50 
24. Service for further assistance  Please be prepared to describe  details of the system and provide the model and serial number of the unit     To view recorded problems if any follow the steps below   Press  ESC  to enter the main menu in the normal interface  In the interface screen select  Event List   then  press  OK  to enter events list like figure 76     45    Troubleshooting       Event List 11 06 24 09 11 11    46 Inverter 09 05 29 ON  45 Inverter O HOSA NO DN  44 Inverter  019 HOSA NEG D  7 Grid 09 05 29 ON  16 Grid 09 05 29 ON  14 Grid 09 05 29 ON  12 Grid 09 05 29 ON  41 Inverter 09 05 29 ON  Inverter  RH EO     1 5       Figure 76 Typical events list    When SolarLake Inverter is at fault  the fault information is composed of    group code     There are three  kinds of faults related to grid  PV or inverter  The fault code indicates a like  Grid 3  indicates under voltage  L2 phase     The events list also displays the type of event  code  occurring time and current status   Use the right  left  up or down to move through the list and press OK to view the selected even as shown  in Figure 77     Event Details 11 06 24 09 11 20    Start time       Figure 77 Event details    The event details show event type  code  occurring time and rectification hints   If further help is needed please contact Samil Power technical help line     46    Troubleshooting       Table 6 Error codes for AC supply related faults             Group Code Fault description Suggestions or tips 
25. User   5   Clean up the production records   meray eo  6 Clean up event record  7 Restore factory settings  8  Modify the LCD brightness                   9   Modified the LCD time      amp                 10   Modified the network Settings  Table 10 Other possible errors  Group   Code   Description   Suggestions or tips  Other error  0   LCD displays waiting at all times AOK Tor ne p ir faut present       after rebooting       Note     Without any remedy    means that the event is not an error  or inverter will resume working automatically     49    Decommissioning       8 2 Daily maintenance  Inverters generally do not need any daily or routine maintenance  Cooling fan should not be blocked by dust  or any other items     e Inverter cleaning   Please use hand blower  soft dry cloth or brush to clean inverters  Water  corrosive chemical substances or  intense cleaning agent should not be used for cleaning the cooling fan or inverter  Switch off AC and DC  power supply to inverter before undertaking any cleaning activity     e Cooling fin cleaning   For long and correct inverter performance the heat emitters on the inverter need adequate clearance  cooling fans should not be covered with dust or snow  Only use hand blower  soft cloth or brush to clean  cooling fins     9 Decommissioning    9 1 Decommissioning steps    1 Switch off the AC grid   2 Switch Off the DC switch   3 Wait for 5 minutes   4 Release the DC connectors   5 Release the AC terminals using screw drivers     
26. V rage oreo 250   950V C  m us 250   950V  Plage de tension de fonctionnement Pla pha Bs in   sio  Na fonctionnement n de fonctionnement Plage de tension de fonctionnement  MPP voltage ee MPP vol orage range MPP voltage rant  C URGED ereich MPP   SEN me EA eicl MPP   Spannungs she ereich ee E s ien  DC Sampo darse pr 320   800V DC campo dans eP 380   800V DC cmo atenens or 380   800V DCZ rem it 430   800V  Plage de oni ion MPP Bian Pu lension  MEP ES lage de ten  Ee  Nominal operating voltage Nominal operating voltage  Nem   Betriel bsspannung  D nom 650V 650V 650V  216A 2 16A 2 20A  Courant d entr  e  Maximum total PV array short circuit current Maximum total PV arr  rt circuit current  Maximale PV Kurzschlu   strom Maximal le PV f Kurz sch a e Maximale CAM ch sim  om  D Massimo fotovoltaico corrente di corto circuito 251 8A D Massimo iaa ente yai corto circuito 2 4 8A IO simo fotovolt  ente di corto circuito 2 22N  Maximum PV courant de court circuit Maximum PV coi TERR seat circuit Ma laximum e MES com circuit  Nominal operating voltage Nominal  inn Betriebsspannung Nenn Bt S   3 400 V 3 400 V Ao 3 400 V  Tension de foi  Max  put ci t  Max  iu Seu E isstort M PORTS tol    Sal 6A 3 1 9 2A AC Corrente massima du uscita 3 24A AC  gt  lt  n PUE cita 3 25A  C Courant de sortie Max  rant de sortie Max   TET Nominal oper  pum Icy  ER sfrequei er uenz Neni ron c  AC Frequenza nomin  Ser 50Hz AC     Ez due cd nominis 50Hz no Fre le 50Hz AC Fre m 50Hz  Fr  quence de fonctionnement n
27. al injury can be caused if the inverter is installed or operated wrongly  The inverter  must be installed and maintained by qualified and trained engineers and must meet all regulations in the  Country     Samil Power Co   Ltd does not take any responsibility for the property destruction and or personal injury  because of incorrect use of inverters     1 3 Safety instruction    Danger   Danger to life due to high voltages in the inverter     e All work on the inverter must be carried out by qualified person only    e The appliance is not to be used by children or persons with reduced physical   sensory or mental capabilities  or lack of experience and knowledge    e Children should be supervised to ensure that they do not play with the appliance     Caution   Danger of burn injuries due to hot parts     During inverter operation  should only touch the display and keys on the inverter     Attention   PV array should be connected to the ground in accordance with requirements  of local regulations    To protect system and avoid personnel injury  Samil Power suggests that PV array  frame and inverter should be properly grounded     Warning     Ensure that the input DC voltage is less than the Max DC voltage rating of the  inverter under all operating conditions  Over voltage may cause permanent damage  to the inverter or lead to other losses  which are not covered by product warranty      gt     E E    07    Basic safety information       Warning     Disconnect both AC and DC pow
28. ct whether the  6 power source auxiliary installation is correct and as  l   Input current is not balanced  aM IL ne  7  input mode  Common String   4  If fault continues  please  cM AME MM E ask installer for help   Leakage current error  9 30 mA jumping error  10 60 mA jumping error  11 150 mA jumping error  12 Leakage current more than 300 mA       47    Troubleshooting       Table 8 Error codes for inverter faults    Group   Code   Fault description   Suggestions or tips  0   Start working  1 Electrify communication board  A E E AREA Without any remedy  2 Electrify control board  3 Blackout of control board  4 Read communication board error    o a a e eee oaa il ll al ie a a a aaa iei eed dms      En aaa A y la dvds esu er ee      6   Read communication board EEPROM error   Ask for help if still at fault after  7 Write communication board EEPROM error rebooting   8 Communication error between control board    and communication board    9 29  30 Communication error between main control  board and subordinate control board  31 Main control board and  Subordinate control board error  32 Auxiliary power source error  33 High temperature protection  34 Phase locking error  Inverter   35    Bus under voltage    pip in ion sisse E A E east idiom tissus   Without any remedy    36   Bus over voltage    37 Bus voltage unbalanced  38 Bus Hardware over voltage protection   restore   39 Output hardware over current protection   restore   40 Boost hardware over current protection  41 O
29. ction system to avoid  any possible island operation     Attention     To learn details on possible malfunction of the inverter  please refer to section 8 of  this manual     3 2 Additional protection devices    SolarLake inverters are equipped with additional protection devices to ensure equipment and personal safety  in case of problems  These protection features include     e Continues monitoring of grid voltage and frequency to ensure that these are within the national regulation  limits    e Limit the power output of the inverter automatically based on the internal temperature so as to avoid  overheating    e Automatically measure the following parameters to ensure safe operation   4 DC voltage of PV array   4 Grid supply frequency across all the phases of three phase supply   4 Internal temperature of inverter I Input and output currents Output power of the inverter     4 Installation  4 1 Packing list    Please ensure that the box contains all the materials mentioned in the packing list  If any item is missing  or damaged please contact supplier immediately     12    Installation          t    e        Figure 6 List of materials in the SolarLake box    Table 1 Packing list       No    Description QTY Remark   1    Solarlake inverter dd  A LL Back panel         i  3    inputDC connector     1      4           4   RJ45   3    o a aidamuunn eo tieaiectad  Screw package  2 M4 screws   IN sd screw package                too 5   6 screws  5 expansion screws   6 Packing list 
30. cursor to Settings and press    OK    key to enter setup interface   shown in figure 19     Settings 11 04 03 10 16 10       Figure 19 Setup interface display    Click on   Country  and OK to enter the local country setting interface shown in figure 20     Commissioning Country    Current Germany    P 2d       Figure 20 Local country setting interface    Select the correct Country setting and OK it  The inverter may ask for a password which is 000111  Enter  the password and press  OK  to confirm the selection  The display should return to standard interface     E Note     When setting Country  PV array connection type and Factory reset   please use  password 000111        22    Commissioning of inverter       5 2 2 Programming PV array connection type    Enter setup interface as explained earlier and select Input     Standard 11 04 03 10 12 17  Today    kwh  hours minutes    kwh       Figure 21 Standard interface    Main Menu 11 04 03 10 14 12       Figure 22 Main menu    Settings 11 04 03 10 16 10       Figure 23 Setup interface    Select   Input  and opt Multi String  As shown in figure 24     Commissioning Input    Current         Figure 24 Type of PV array connection    23    Operation       Please refer to section 4 6 2  PV array connection types   for information on PV array connection options     6 Operation  6 1 Control and display panel    LCD Buttons       Figure 25 Display and control panel    There are 6 buttons next to the display for programming the inverter   
31. described in this manual  must only be performed by qualified persons     Symbols Used   This manual provides safety and operation information and uses symbols in order to ensure personal  and property security and efficient operation of inverters  User must understand and observe instructions  in the manual to avoid personal injury and property loss  Please read and understand the following  symbols which are used in this manual     Danger    Danger indicates a hazardous situation which  if not avoided  will result in death  or serious injury     Warning    Warning indicates a hazardous situation which  if not avoided  could result in  death or serious injury     Caution    Caution indicates a hazardous situation  if not avoided  could result in minor or  moderate injury     Note  Note provides tips that are valuable for the optimal operation of the product     Attention    Attention indicates potential risks  if ignored prevent may lead to equipment  malfunction or damage      gt        Be PB    05    06    e Symbols on the Inverter    These are some symbols which are related to safety and security  Please read and fully understand  these symbols before installing the equipment     Symbol   Explaination  i   There will be residual voltage in the inverter  Ensure that AC and DC    l   sides are not charged before installation or maintenance  Capacitors  L J 30 min in the inverter are likely to be charged  hence it is necessary to wait   gt     for about 30 minutes before ope
32. e range is 0 85 1 00Un       7 Communication and monitoring  7 1 Communication interface    The standard interface on SolaLake inverter are RS485  and Ethernet  RS232 interface is optional     Performance information like output voltage  current  frequency  fault details etc can be delivered to a PC  or hardware storage devices or other monitoring equipment via the communication interface     7 2 Communication mode  We offer 3 types of communications modes   7 2 1 RS232 Communication for single inverter    RS232 is an optional communication interface which can transmit data between PC and one single SolarLake  inverter  figure 71         S max  12 m    Figure 71 RS232 Communication Diagram    Only one inverter can communicate with a PC through RS232 port  Hence this is normally used for service  requirements like software update and checking the inverter performance     7 2 2 RS232 Communication    RS485 port can be used for communicating upto 32 inverters at the same time  The total length of the  communication cable needs to be less than 1200m  One can also use the RS485 port for communicating  with SolarLog  Please refer to SolarLog manual for more information on using SolarLog     43    Communication and monitoring       7  p     Internet  m           Figure 72 SolarLog communication diagram    7 2 3 Ethernet communication    The Ethernet port can be used to connect the inverter to a Router   router can be any brand in the market    which will allow performance monitoring
33. e reactive power is zero      Reactive Power Gradient  and  Voltage Spread  must be combined together to determine the gradient of  Reactive Power  In other words  The figure of  Voltage Spread  corresponds to the figure of  Reactive Power  gradient      39    Operation       Make an example as following figure     A reactive power  voltage characteristic QU        Reactive Power Gardent 10  s  D D   10 096   Symmetrical Limit For Maximum Reactive Power    0 0   50 096     Adjustment Time For Charact  Curve Operating Poir 2        2s   60s   Specified Voltage UQO    BD   12096     vam sr i o 200      Figure 62    QUe     48         UQO 100   A Q0 00      Figure 63    E  Low voltage ride through setting  as the following picture  Parameters displayed are default parameters    U Uc and T are 4 points of LVRT     LVRT  s    uuc   30       uue  UjUc 96   90 uuc     oo 0 1009   T1 ms  Ta ms   600       T3  ms   2000       r   ms   2000      Figure 64    40    Operation       100     50     0        T s     Figure 65    F  P f F   as the following picture  Slope range is 2  5   the default slope is 5    P fF     Slope 96  2    59     Figure 66        Slope 40 4 Hz     50 2 51 5 F Hz   Figure 67    G  Active power derating settings  as the following picture  Fill in the ratio of the active power and rated  active power  the range is 0  100   and the default is 100      Power Reducer    Active Power In        D    10096     Figure 68    41    Operation       0     100 Pn  50  Pn    F
34. er from the inverter before opening the inverter  All  maintenance work should only be carried out by qualified and trained Electrical  Engineers     1 4 Pre installation checks    Mount the inverter vertically on appropriate load bearing areas like walls or frames  Ensure that the location  selected for installing inverter has good air circulation  adequate room for undertaking maintenance tasks  and proper fire exit facilities     1 5 Transport    1 6    All SolarLake inverters leaving the factory are thoroughly are tested and inspected to ensure the high  quality of our products  Our products are packed safely to ensure that these are not damage during  transportation  However  damage in transport do happen and in such cases the responsibility lies with the  transportation company     While taking delivery of the goods  please check inverter and if packing or transit damages are found   please inform transportation company immediately  If you need assistance please contact your supplier  or Samil Power Co  Ltd     If the inverter is to be returned the original packing materials or suitable alternative must be used to avoid  damage during transport     Electric connection    Please comply with all the local electrical regulations to prevent accident and damage     Danger     Before making electrical connection  use opaque materials to cover the PV modules  or disconnect PV panel DC switch  Beware that PV modules produce dangerously  high voltages when exposed to sun     War
35. gure  Click on the drop down menu  select Overexcited or Underexcited   fill in cosphi value  ratio of P and Pn  Lock in Voltage  Lock out Voltage correspond to the voltage value of    the reactive power production or not   Cosphi f P     w   Overexcited  Underexcited      cen e E a E  pi  o  r   o   P3 P4  i   0 00   1 00      1 00   1 10      Lock out Voltage   1 00   p 90   1 00        Lock in Voltage   1 05    Figure 44    Cos phi    0 95       Figure 45    D  Q f V   as the following picture  Parameters displayed are default parameters  U1s  U2s  Uli  U2i are  the settable four points of Q value which range from 0 90 1 10  Lock in Power  Lock out Power correspond  to the active power value of the reactive power production or not  Mode A and mode B refer to the following    figures   Qzf V   Vis L08  0 90  110  V1i D 92     0 90  1 10  Lock in Power  0 20   0 10   1 00      0 90   1 10  Lock out Power O 05        0 00   1 00        vas  110       0 90   1 10  v2i  0 90        Swe      Figure 46    33    Operation          Figure 47    E  Low voltage ride through setting  as the following picture  Parameters displayed are default parameters  U Uc and T are 4 points of LVRT        UJUc 96  40   uue   40   U Uc 36  UAK     85   O  100    Ti ms   200       Ta ms   200       Tams   300   Tams     e  emr    Figure 48    100     50     0        Figure 49    F  P f F   as the following picture  Slope range is 2  5   the default slope is 2 4    P fiF   Slope 24     2    5    Sae  
36. id T V_max test  Alternatively press ESC button to exit from    New Autotest      If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     20  After grid T V max test is over  the LCD will show the result and   OK  to start V min  The inverter  will reconnect automatically     21  Press OK button to start grid T V min test  Alternatively press ESC button to exit from  New Autotest      If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     22  After grid T V min test is over  the LCD will show the result and   OK  to start F max  The inverter  will reconnect automatically     23  Press OK button to start grid T F max test  Alternatively press ESC button to exit from  New Autotest    If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     24  After grid T F max test is over  the LCD will show the result and   OK  to start F min   The inverter  will reconnect automatically     25  Press OK button to start grid T F min test  Alternatively press ESC button to exit from  New Autotest      If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     26  After
37. igure 69    Setp 3  Inverter safety parameters setting  as the following picture  Before setting  click    Read    to refresh  current data then set parameters  click    save    at last  The following picture shows default parameters of    BDEW     Parameters    Over voltage of grid stage 1  1 1 3Un   Over voltage of grid stage 2  1 1 35Un     Under voltage of grid stage 1  0 1 1Un     Disconnection time D  02 55           1 30   Disconnection time D 02 55  0 10    0 90 Disconnection time D 02 55  2 40         Under voltage of grid stage 2  0 1Un  0 45   Disconnectontime D 02 5S   0 30     Over frequency of grid stage 1  50 56Hz  5150   Disconnection time 0 02 55   0 10     Over frequency of grid stage 2  50 57Hz  52 00   Disconnection time 0 02 55   0 10    0 00    Under frequency of grid stage 1  44 50Hz  4750   Disconnection time 0 02 55  0 10    Linder frequency of grid stage 2  43 50Hz   Over voltage of Start   Re connection  1 1 2Un   Under voltage of Start   Re connection  D 8 1Un     Over frequency of Start   Re connection  49 56Hz     Under frequency of Start   Re connection  44 51Hz   47                 Start time  0 9005   Re connection time  D 90058     Parameters explanation     Name       45 00   Disconnection time 0 02 55  10   000    110     0 94   em EM   o    Explanation       Over voltage of grid stage 1                                                           r                                                              r                                 
38. in the Permenent State till  corrective action is taken     6 2 LCD settings    6 2 1 Standard interface    Standard interface is shown in figure 27     Standard 11 04 03 10 12 17  Today    14 6 kwh  5 hours 1 minutes    2 7 kwh  5 hours       Figure 27 Standard interface    6 2 2 Main menu    In the standard interface press  ESC  button to enter the main menu shown in figure 28     Main Menu 11 04 03 10 14 12       Figure 28 Main menu    6 2 3 Instantaneous data    Enter   Instantaneous  to see input and output voltages  current  power  temperature  and other real time  information     6 2 4 Historical data    Enter   History  to see the power generation histogram of every hour  By pressing the left or right arrow  one can see the DC input power curve  the AC output power curve  daily energy production for a month  and also total output data     25    Operation       6 2 5 Event list    6 2 6    26    Enter   Event List  to see the list of events recorded by the inverter  Up to 100 recent events recorded  can be viewed by pressing    OK    one can see detailed information  including the occurrence time and error  code     Restore factory settings    It is possible to reset the inverter to factory set if that is necessary  A password will be required for this  Operation   Date and time settings    Date and time settings interface as shown in figure 29  set according to the local date and time  Then   press    OK    key to enter the next step     Commissioning Time    2911   O
39. ll  reconnect automatically     5  Press OK button to start grid R V min test  Alternatively press ESC button to exit from  New Autotest    If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid until test is over     6  After grid R V min test is over  the LCD will show the result and   OK  to start F max   The inverter  will reconnect automatically     7  Press OK button to start grid R F max test  Alternatively press ESC button to exit from  New Autotest    If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     8  After grid R F max test is over  the LCD will show the result and   OK  to start F min   The inverter  will reconnect automatically     9  Press OK button to start grid R F min test  Alternatively press ESC button to exit from  New Autotest      If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over    10  After grid R F min test is over  the LCD will show the result and     OK  to start Grid S V max  The  inverter will reconnect automatically    11  Press OK button to start grid S V max test  Alternatively press ESC button to exit from  New Autotest    If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key opera
40. ncy of Start   Re cormection  49 56Hz   50 10      Under frequency of Start   Re connection  44 51Hz  149 90          Start time  0 9005  30  Re connection time  D 90058  300 f  Figure 54  Parameters explanation   Name   Explanation       Over voltage protection  U gt     the range is 1 00 1 30Un   protection time is  T gt   0 02 5 0s     ii    Over voltage protection  U gt  gt     the range is 1 00 1 30Un   protection time is  T gt  gt   0 02 5 0s                                                            p                                                                                                             Under voltage protection  U lt     the range is 1 00 1 30Un   protection time is  T lt   0 02 5 0s                                                            p                                                                                                             Under voltage protection  U lt  lt     the range is 1 00 1 30Un   protection time is  T lt  lt   0 02 5 0s                                                            p                                                                                                             Over frequency protection  F gt     the range is 50 00 52 00 Hz   protection time is  T gt   0 02 5 0s     ii    Over frequency protection  F gt  gt     the range is 50 00 52 00 Hz   protection time is  T gt  gt   0 02 5 0s     ii    Under frequency protection  F lt     the range is 47 00 50 00 Hz   protection time is  T lt   0 02 5
41. nection only  Voltage across phase can  be 230 20   but these need to be set to Country regulations  Typical grid frequency is 50Hz        Figure 13 AC terminal block with facility for 5 wire connection    Table 4 Suggested Cable and Circuit Breaker Specifications       Model SolarLake   SolarLake   SolarLake   SolarLake  iol 10000TL    12000TL     15000TL     17000TL  Cable  Cu    24mm    24mm    26mm    26mm     Micro Breaker   25A   25A   32A   32A       Note  For safety reasons  suitable cables should be used  Unsuitable cable may lead to cable getting  heated which could result in fire and serious risks     Steps for AC output wiring    Step1  Open the cover on the AC connection terminal    Step2  The 5 terminals are PE  N  L3 T   L2 S   L1 R   Route the 5 wire AC cable through the house  tunnel  and connect to the correct terminal  The AC phase sequency need to be maintained correct for the  inverter to work    Step 3  Fix the terminal cover back    RCMU breaker should be installed between inverter and grid  and its rated fault current need to be 100  mAxIfnx300 mA  0 1S  No load should not be connected to the inverter directly        Figure 14 Example of incorrect load connections which should not be done    19    Installation                                           3    1 4mm   em  6mm   1 8mm  27    em      14  0 5  LAA  0  0 10 20 30 40 50 60 70 80 90 100  Length m   Figure 15 AC Cable Loss  4 6 5 Grounding  Attention   As SolarLake inverters are Transformer less 
42. ng nut   Step 4  Insert the core tube into slot of connection until clicked into place   Step 5  Tight the nuts to complete the connection     Installation       i  RE     ee    4 6 3 2 Electrical connections of DC side    Use string fuses and external DC switches on the string cables as per Country regulations     Step 1  Check DC open circuit voltage of the strings to make sure that the voltages are within the  inverter range  Do note that the voltage is subject to solar radiation   Step 2  Connect the positive and negative string cables to the DC connectors on the inverter        Step 3  Connect all the strings the same way                      Figure 12 Use of Multimeter or other suitable meter to  ensure polarity and open circuit voltage    Note  There are 4 pairs of DC terminals on SolarLake inverters  Left two are DC input terminals for  MPPT 1 and marked PV1  The two on the right DC input terminals for MPPT 2 and marked PV2  Grounding  of PV1 and PV2 should not be connected together  failure will result in fault message  Check the string  cable polarity and voltage range before connection     Warning    DC string voltage is likely to be very high  Avoid contact with live cables and  comply with all electric safety rules    If any problem or concern is found with the String power  those need to be  sorted out before connecting to the Inverter     Installation       4 6 4 Assembly steps of AC connector    SolarLake series inverters are designed for three phases grid con
43. ning     All installation work must be done only professional electrical engineer   e Must be trained   e Read and understand the User manual     Attention     If necessary obtain prior permission from the local energy supplier before connecting  the inverter to the grid      gt   gt  D    1 7 Operation    08    Attention     Some internal components will be very hot when the inverter is working  Please  wear protective gloves      gt     Basic safety information       Danger     Touching the power grid or electrical terminals may lead to electric shock or fire and  may lead to death or serious injury   e Don   t touch the terminals or conductor When live     1 8 Maintenance and repair    Danger      N Disconnect the PV array and electricity grid before undertaking any work on the  inverter     Wait about 5 minutes after turning off AC and DC switches to discharge capacitors  before opening the inverter cover     Attention     In case of any problem with the inverter  please contact your local authorized  service center     Attention     There are no user serviceable parts inside the inverters  hence do not open the inverter   Samil Power Co   Ltd does not take any responsibility if this advice is ignored      gt   gt     1 9 EMC   noise level of inverter    Electromagnetic compatibility  EMC  ensures that electrical equipment function without electromagnetically  interfering with other electrical equipment as well as not imposing unacceptable effect upon the environment   EM
44. ning the inverter cover       Symbol of European Community    Inverter meets CE safety certification standard        In the event of any property destruction or personal injury due to failure to follow instructions in this  manual  Samil Power Co   Ltd does not take any responsibility for the same     Basic safety information       1 Basic safety information    Note     D   If you have any questions or concerns when reading this manual  please contact Samil  Power Co   Ltd     1 1 Preface    Installation of SolarLake inverter must completely meet with national and local grid connection standards  and regulations     e Please contact Samil Power authorized repair center if you have any maintenance or repair services for  the inverter  Your dealer should be able to provide details of your nearest authorized service centre   Please do not attempt any maintenance yourself as it may cause property destruction and personal injury     e Read and understand the instruction in this manual and familiarize with the relevant safety symbols before  installing or maintaining the equipment     e National and State regulations may require prior approval before connecting on site power generation systems  to the local grid     e Before installing or maintaining the inverter  PV array and grid supply must be disconnected to avoid injury     1 2 General information    When the inverter is operating  some of the parts will be electrically charged and or very hot  Property  destruction and person
45. of active power generated by the inverter      Q f V   Reactive power as a function of the grid voltage measured by the inverter      P f F   Active power as a function of the frequency measured by the inverter      LVRT  Low voltage ride through enabled and low voltage ride through parameter setting     Active power derating settings   8  Safety parameters setting    NO UN DB WN FE    Steps of the settings are as followings     Step 1  Connect your laptop to the 485 port of inverter with an Ethernet cable and run Solar Power Browser   V2 04 or higher   If the connection is successful  the serial number of the inverter will be displayed in the  left navigation bar     A  Click    Inverters     interface is shown as the following figure  You can configure parameters conforming to  standard BDEW all the inverters which connected to Solar Browser  Detailed settings refer to step 2     overview   aano  soew   cero 21 000     EA A          Uc  z    Figure 55    B  Click the serial number  the interface is shown as following figure  set the safety parameters of this  inverter  Detailed settings refer to step 3     34    Operation                      Pt volte a5 v DOW   reduced COP 0 000 kg  PV2 volte 470v edad 502 0 000 kg  Pil carent DIES   Bacca Cul adig  Pl current nA    252v     Reduced Coal GOOG Kg  oga    45 11 He       Figure 56  Setp 2  Click  BDEW  on the top of navigation bar  configure parameters conforming to standard of BDEW    Overview  AR4105 BOEW   cer 0 21 470    
46. ominale Fr  que  once de fonctionnement nominale Fr  quence de fonctionnemen it nominal le Fre pue s ES a inement nominale  Nominal output power Nominal oi Eu d er Nominal output power  Nenn Ausgangsleistung Nenn Ausgangsleistung Nenn Ai leisti  AC Ee ae nza nominale usd i 10000W AC Eo otenza nominale e uscita 12000W AC 5 E a cala 15000W AC E EET 17000W  issance de inale uissance de sortie nominale Puissance de sortie nominale Pu ce de minale  JOWE   Nex args tr Max Atanas Max  Agost   NG ae   10000W  Neo cH 12000W AC era ana 15000W 17000W  Pui EX sortie BE  Puissance de taa es de dem dl  Ingress protection  Eintrittsschutz intrittsscl utz  IP65 IP65 Grado protezione IP65 S opro  otez   one IP65  protection de entr  es entr  es  Operating temperature range Hee rating temperature range  Betriebstemperaturbereich Betriebstei atu er a   20  60  C  20  60  C Temperatura di funzionamento  20  60  C Temper UTEE oa ETS  20  60  C  it  emp  rature de fonctionnement t ture de m  e class  Class I Class I Class I Class    EO de Erol a Classe de nee    otectio       Figure 5 Labels on SolarLake 10000TL  12000TL  15000TL and 17000TL inverter    3 Protection Devices  3 1 Auto shut down    SolarLake Inverters will be disconnected within a fraction of a second if grid power is lost or switched off to  protect any person working on the grid supply  This facility corresponds with current national standards and  regulations  SolarLake inverter is also equipped with automatic disconnection prote
47. s the information that most user are interested in  When the inverter operates normally  pressing  any button will light up the display and show the standard interface    If no key is operated for 60 seconds  the backlight will be turned off    Note  After factory reset LCD background light will not shut down automatically     6 4 CEI 0 21    The followings items can be set by Solar Browser     Fixed cosphi setting  Set cosphi to a fixed value      Fixed reactive power setting  Set reactive power to a fixed value      Cosphi f P  Cosphi as a function of active power generated by the inverter      Q f V   Reactive power as a function of the grid voltage measured by the inverter     P f F   Active power as a function of the frequency measured by the inverter     Ul BR WN LEA    30    Operation       6  LVRT  Low voltage ride through enabled and low voltage ride through parameter setting   7  Active power derating settings  8  Safety parameters setting    Steps of the settings are as followings     Step 1  Connect your laptop to the 485 port of inverter with an Ethernet cable and run Solar Power Browser   V2 10 0 0 or higher   If the connection is successful  the serial number of the inverter will be displayed in  the left navigation bar     A  Click    Inverters     interface is shown as the following figure  You can configure parameters conforming to  standard CEI 0 21 all the inverters which connected to Solar Browser  Detailed settings refer to step 2        Figure 39    B  
48. ses    Samil Power Co   Ltd offers 5 years product warranty for SolarLake inverters from date of installation   However the warranty period can   t exceed 66 months from the date of delivery of the inverter     During the warranty period  Samil Power Co   Ltd guarantees normal operation of the SolarLake inverter   In case of faults falling within manufacturers responsibility  Samil Power Co   Ltd will provide service and    maintenance free of any charge  If during the warranty period  the inverter develops fault  please contact  your installation contractor or supplier     Samil Power warranty does not cover damage due to factors outside manufacturers responsibility which include     Use of SolarLake inverters for any other purpose than intended    Faulty system design or installation    Improper operation    Use wrong protection settings on the inverter    Carry out unauthorized modification on the inverter    Damage because of external factors or the majeure force  such as lightning  over voltage  bad weather   fire  earthquake  tsunami etc     Poor ventilation    Do not comply with relevant safety regulations    4 Transportation damage     L C   LAA    ELE    53    SAMIL POWER CO   LTD        Marketing  amp  Sales Office Factory  Add  No 52 Huigu Innovation Park  Huishan District  Add  No 66 Taihangshan Road    Wuxi Jiangsu Province P R China 214174 Suyu Economic Development Zone  Sugian City   Tel     86 510 83593131 Jiangsu Province  P R China 223800  Fax   86 510 81819
49. the wall completely  Fix the bracket using screws and  mount inverter as shown on diagrams below    Step2  Mount the inverter on the narrow vertical section of the bracket    Step3  Make sure the bracket and the inverter side screw holes are in line and match  Fix the side screws  to keep inverter firm in place    Step4  If necessary the inverter can be locked   lock not provided  to the bracket        Figure 10 Inverter mounting steps    Installation       4 6 Connecting PV array to inveter    4 6 1 Notes    Warning     Ensure that the DC side is not powered at the time of connecting  Note that the  Capacitors could be charged even after turning the inverter off  hence wait at least  5 minutes before opening the inverter lid     Attention     Only qualified and trained electrical engineers should install inverters      gt  p    e PV string input connection    Danger     Before the electrical connection  make sure to use opaque material to cover the  PV array or disconnect PV panels  While exposed to sun light  PV array will produce  dangerous voltage     Note     There are 2 independent MPP trackers in Solar Lake inverters  PV arrays connected  to each MPP tracker must be of the same make and model and receive the same  solar radiation at all times        D    4 6 2 PV array connection types    There are 2 independent MPP trackers in the SolarLake inverters  While common string or multi strings  input connections can be used we suggest multi strings to harvest max  PV energy
50. tion is invalid untill this test is over    12  After grid S V max test is over  the LCD will show the result and   OK  to start V min   The inverter  will reconnect automatically    13  Press OK button to start grid S V min test  Alternatively press ESC button to exit from  New Autotest    If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over    14  After grid S V min test is over  the LCD will show the result and   OK  to start F max   The inverter  will reconnect automatically    15  Press OK button to start grid S F max test  Alternatively press ESC button to exit from  New Autotest      If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     27    Operation       28    16  After grid S F max test is over  the LCD will show the result and     OK  to start F min   The inverter  will reconnect automatically     17  Press OK button to start grid S F_min test  Alternatively press ESC button to exit from    New Autotest      If there is no button operation within 5 seconds  the test will start automatically  If the test has started   key operation is invalid untill this test is over     18  After grid S F_min test is over  the LCD will show the result and     OK  to start Grid T V_max     The  inverter will reconnect automatically    19  Press OK button to start gr
51. units  DC Positive or Negative terminals    should be grounded  Failure will result in inverter damage     All non current carrying metal parts should be connected to the earth     PV String    Inverter AC Switchboard       XXX X       PE m  200000    PV module frame    Figure 16 Grounding of the System    e For details of communication system wiring  refer to Part 7 2 2    4 7 Safety inspection before commissioning    PV array   Measure the Open circuit voltage of the each PV array to ensure that it is within the acceptable range of  the inverter      Check and ensure polarity of the string cables     Connection of string cables to inverter  Make sure that the DC Isolators are turned off before connecting string cables to inverter     Connection grid power to inverter   Make sure that the AC Isolator is turned off before connecting grid supply to the inverter  Ensure that the  AC voltage between the three phases and neutral are with in acceptable range and the cables are wired  in in the correct order     20    Commissioning of inverter       5 Commissioning of inverter    5 1 Start inverter    Attention   Ensure that DC and AC voltages are within the range permitted by the inverter     Step 1  Turn on all DC switch one after the other    Step 2  If inverter is being switched on first time  the country setting and PV array connection type will  need to be set as explained in part 5 3   The default setting of PV array connection type  Multi string  input connection    Step 3 
52. ut Board and the DC voltage gets boosted by the Boster Board  I  Insulation impedance detection  auxiliary power and input DC voltage   current detection are performed by  the Input Board  The Internal MPP tracker in the inverter ensures that the inverter produce maximum  output power  The DC input is changed into AC power by the Inverter   s full bridge circuit Board  The Control  Board provides all the controls and monitors the performance parameters of the inverter  The inbuilt LCD  Board and display various parameters including any fault information  The Control Board can also trigger  internal relays so as to protect the internal components in case of any problem  Control Board also does  functions like residual current detection  output DC voltage   current detection and EMC functions     Communication Interface    Control Board    Board    Solar input  Output to grid    Input I Boost   Inverter Output  Board       Figure 2 Electrical block diagram of SolarLake inverter  DC switch is optional     Product description       e Terminals of SolarLake PV inverter    Ethernet RS 485 RS 232                AC Output DC Switch DC Input    Figure 3 Terminals of SolarLake PV inverter 10 to17 KW  DC switch is optional     Note  For safety reasons  use of a DC switch is recommended between the PV modules and the inverter s  power modules  DC switch  when opted  is built into the SolarLake inverters     2 3 Dimension  e Dimension for SolarLake 10000TL  12000TL  15000TL and 17000TL in
53. ver current of output RMS       Check whether the string  42    Choose input mode error   connection and setting on the      inverter     Ask for help if still at fault after  43 Self  checking error     lee    rebooting   44 Phase of output error Check AC phase connections  45    AD port used to gather output voltage    has error  E a ee h IUS   Ask for help if fault present  46 AD port used to gatheroutput current   after rebooting     has error  47   AD port used to gather DCI has error       48    Troubleshooting                   Continued     l   Ask for help if fault present  4   AD h FCI    8   port using to gathering GFCI error   after rebooting  49 IAC RMS Unbalance Without any remedy  The output hardware over current  50  protection fault  51 Bus hardware over voltage protection   not resume   52 Boost 1 over current protection fault  ES  m   Ask for help if fault present  NN ce en poc Ia E  Inverter   54    Output over current fault  55 Relay can t be disconnect  56 Relay can t be closed  57 Unrecover IAC RMS imbalance  58 Fan 1 error    59   Fan 2 error   Inspect fan and if needed  cun aio eee eae replace     60   Fan 3 error    61   Control board EEPROM read and write error   nectar ne Irae presni    _ after rebooting  Table 9 Error codes for Operational faults  Group   Code   Description   Suggestions or tips  0   Start serial upgrade program  1 Modify the language  2 Modify the time  3 Modify the country  4 Modify the input method  dI ED LED a a US   Without  
54. verters     716mm     lt                                       520mm     230mm      Figure 4 SolarLake inverter dimensions       Note  The AC output terminal projects out the most in these inverters  hence care should be taken to avoid  any damage to the terminal  Avoid resting the inverter on the floor with the terminal touching the floor     2 4 Product label    Product label attached to the right side of the inverter provides basic information about the inverter  Pay  attention to the inverter model and other important specifications     11    Protection devices       SolarLake  10000TL    PV Netz Wechselrichter  PV Grid Inverter    AE input ay oltage       SolarLake  12000TL    PV Netz Wechselrichter  PV Grid Inverter    Maximum d c  Hm aM  oltage       SolarLake  15000TL    PV Netz Wechselrichter  PV Grid Inverter    Maximum d c  input voltage           SolarLake  17000TL    PV Netz Wechselrichter  PV Grid Inverter                M d c  input volt   DC  Max  DC spannun Do Max  DC span DC Max  DC spannung DCS  re  Massima tensione d di ingresso cc 1 000V Massima t  tensions VT ingresso cc 1l 000V Massima i si 1 000V sione di IER resso cc 1 000V  Maximal de t  d entr  e DC Maximal de tension d entr  e DC Maximal de te Maximal I de tension d entr  e DC  Operating v je range Operating v yon d bue Operating voltage range Operating voltage ran  Betriebsspannung sbereich Betri E ded ws sbereich D Betriebsspannung sbereich Betrieb  ed ich  DC sree tenor 250   950V DC z 250   950
    