Home
Mai Tai® and Mai Tai DeepSee - Spectra
Contents
1. S Spectra Physics A Newport Compan Pre Installation Guide For Mai Tal Spectra Physics Inc 3635 Peterson Way Santa Clara CA 95054 July 2014 Experience Solutions S Spectra PhysIcs Table of Contents MOCO HOT aras E E ee eee eee 3 1 When the System Arrives cccccccccsececsececceecsceecesceeecceeescencescuececeeescceaesceaeesceessceeesceeresoes 4 LA ISOC CHON a E E E E EE E E E A E 4 1 2 Review Instruction Manuals cccccecccecccseccscecececececececeeeneeesseeueeenseeneeeteeeneeenes 4 1 3 Laser Safety Considerations ccc cceecccceececeeeeceeeeceeeeseeeeeceueessaeeeseeeessueesseeeesaases 4 TA DONO U e E E 4 2 Pre Installation CONSIDErAatiONS ccccecccceecccceeeeceeeeeaeeeeseececeeeeeseueeseeeeesaueeseeeetseeeseeetseeeeas 5 2 OC ANION and ENVIONME 1 siete pene arenes ete none teens ete tone siete neneaehe tne met neneneie dune amituene mens 5 2 2 Physical DESCIIDHOM viwinssinivenietdiminaeininsnietdininseinintniictdininssinininverdininsminininiimdininseiwinn 6 2 3 Utility REQUIFEMENTS ccccceccceececseecceeeceucecseeceuceceueeseecsuseseeessueesuesseeessusensess 6 2 4 Computer Requirements ccccceecccececeeeeeceecessueeeseceseeeeeseeeeseaeeeseeeseueessaeeesens 7 Pre nstalation CSCI SU siete cele cheese care ae nc eee paceman EEREN 8 4 Maintenance Agreement ccccccecccsccceccseeecececeeeceeeceeeceeecseesseeseeeseeeseeeseeesseeteeesee
2. A non standard system will require special consideration To have other published specifications demonstrated consult with your Service Engineer to determine whether additional diagnostic equipment will be required S Spectra PhysIcs A Newport Company Pre Installation Considerations 2 1 Location and Environment The location of the system and environment of your lab should have the following features A B C D G A safe location that meets all applicable building codes Easy access with adequate clearance around the instrument An optical table that will meet the space requirement of the instruments to be installed Proper air conditioning could be critical for the performance of the laser For certain applications ambient room temperature changes may be an important factor for the laser system s performance Air ducts should not blow directly on laser or optical path To ensure stable day to day operation the recommended minimum and maximum operating room temperatures are 20 25 C Room temperature should ideally be 22 C and should not fluctuate 1 C during any two hour period See specifications in Table 1 1 and table 1 3 in the User s Manual In some applications vibration isolation may be required for your system Structural integrity of the flooring could play an important role Please note that the laser head is very heavy and requires a sturdy and stable optical table Consider room req
3. USB port s are used USB to serial adaptor s are also available P N 90033116 S Spectra PhysIcs A Newport Company Before the arrival of your Spectra Physics Service Engineer please review the following pre installation requirements When all the requirements have been met initial the boxes and fax a signed copy to the Spectra Physics Service department at 408 980 6921 Pre Installation Checklist Physical Location LI A location with adequate clearance around system to conduct service and accessible by Spectra Physics personnel LJ A temperature controlled room LJ Utility services have been installed Q Local building and safety codes are in compliance and have been verified When Your System Arrives LJ Check crates for damage If damaged file a claim with the carrier and notify Spectra Physics Q Uncrate and place the system on your work surface Two or more people may be required to lift some equipment LJ Compare the packing list with your quotation Call your Spectra Physics office about any discrepancies Q Check that all manuals were received Q Save all packing and shipping material until the installation has been completed Q Obtain the correct safety glasses and a power meter S Spectra Physics A Newport Company To maintain a valid warranty on your Spectra Physics system it is necessary for the customer to assume the responsibility and perform the routine maintenance program Failure
4. al carrier usually within 30 days Notify the originating Spectra Physics office of any shipping damage Shipping damage is not covered by Spectra Physics Your packing list will show all items that you have ordered Open all the packages and check each item for possible damage during shipping Check the items against your packing list Some items may have been installed at the factory Each system comes with a manual verify that you have received this item Please report any missing or damaged items to Spectra Physics or you may contact your Spectra Physics Sales Engineer 1 2 Review Instruction Manuals Please read the manual to get vital information about your system Familiarize yourself with the system You are encouraged to spend as much time as possible reviewing the system components before your Spectra Physics Service Engineer arrives for the installation and training 1 3 Laser Safety Considerations In addition to reviewing the sections in the manual regarding laser safety be sure to have the proper safety glasses available for ALL lab personnel present during the installation and testing of your system For more information please call Spectra Physics at 1 800 456 2552 1 4 Diagnostics During the course of installation power measurements will be demonstrated on all of the appropriate wavelengths Your Service Engineer can identify which specifications will be demonstrated and the equipment necessary to conduct such tests
5. at 1 800 456 2552
6. e clean You should also monitor the laser tower temperature to make sure cooling is within specifications The small mesh screen strainer should be replaced or cleaned when the 10 micron filter is replaced or cleaned If the laser is not going to be used for an extended period of time turn off the laser and drain the water or cooling solution Regularly inspect the condenser filter on the power supply for a buildup of dust and debris If dirty remove the filter and wash it in clean water The rate at which the filter becomes more restrictive is mainly dependent on the cleanliness of the environment S Spectra PhysIcs A Newport Company NOTE to restrict the growth of algae in the reservoir it is recommended that the reservoir cover be kept in place and that all circulation lines be opaque This will eliminate the entrance of light that is required for the growth of most common algae 4 3 Chiller Fluid The chiller fluid level should be appropriate for the model laser and must meet Spectra Physics specification requirements Insufficient cooling could result in a decrease of performance or damage to the laser system 4 4 General Procedures The chiller operation of the laser system should be checked once a week The power output and the mode locking of the system should also be checked once a week by verifying the output values If any of the output characteristics have changed please call Spectra Physics Technical Support
7. eseeeneeenes 10 Be le INGICO IWMIDUUICS nisitheriuigiuinintshoriuagiehpinaebenniaapienpiadehunnidapiunninaehunnidapiuniaaehunnida eines 10 Bi NPN Ol r casi eeiNaanin aver eeiiuaanea cua a eiNaaneareeaoeedannarsaanieetanseas 10 AS Cala FUNG rE A A E N 11 AG General POCE dU CS aa E 11 S Spectra PhysIcs Introduction Congratulations on your purchase of a Spectra Physics system This guide describes pre installation information for your laser system Some preliminary planning is essential to avoid unnecessary delays during installation and to ensure easy operation and access to your system You are requested to carefully consider your operating environment prior to installation Proper water power and room temperature are required for each system A checklist of pre installation considerations is provided in this guide You are responsible for meeting these requirements prior to installation with due consideration given to all applicable building and safety codes We at Spectra Physics intend to provide you with responsive support so that you can derive great satisfaction and value in using our systems for your applications We are available to you at 1 800 456 2552 S Spectra PhysIcs A Newport Company When the system Arrives 1 1 Inspection When the system arrives any sign of damage to the shipping crates should be brought to the attention of the delivering freight company A claim must be filed with that commerci
8. information on the control software refer to the User s Manual B Serial commands that can be sent to the Model J40 J80 power supply from the user s host system For system that include the DeeoSee accessory either a wired hand held controller with simple commands can be used for local control OR DeepSee GUI software can be sued to control the DeepSee accessory To control the system remotely with user written software refer to the Mai Tai command language described in Commands and Queries on page 6 12 For connector information refer to Using the RS 232 Serial Port on page 6 10 In order to maintain CDRH safety requirements run only the GUI software on the control computer during laser operation i e do not run other software at the same time To use the Mai Tai and DeepSee GUI control programs the Windows XP 32 bit or Windows 7 32 bit based host computer must meet these minimum requirements e Pentium processor or newer 1 GHz or higher e 1 GB RAM e 30 MB available disk space for installation e a mouse or other Windows compatible pointing device e A video display with 800 x 600 1024 x 768 1280 x 768 1280 x 800 1280 x 1024 1600 x 1200 or 1680 x 1050 e An available USB or RS 232 serial port or converting adapter for standard Mai Tai systems A serial cable is provided with the system P N 90009851 For DeepSee systems a second USB or serial port is required along with a 9 to high density15 pin adaptor If
9. to do so may result in the warranty being voided 4 1 Nalco Mixtures The Nalco Cleaner P N 1607 0547 is used to flush your system clean of ferrous metals and copper alloys as a result of corrosion It is recommended as a maintenance procedure that the chiller critical cooling loop in each piece of equipment be cleaned and treated 1x per year The laser does not have to be lasing The cleaner should be circulated for a minimum of 8 hours the longer the better if time permits in order to assure thorough cleaning The Nalco Solution P N 1607 0546 is a premixed liquid corrosion inhibitor designed for use in closed loop cooling systems It can be added directly to a closed cooling system used in place of water resulting in a proper treatment without dilution for up to 6 months even if the pink tracer turns clear This solution is a complete inhibitor that protects ferrous metals and copper alloys from corrosion It is nitrite free and minimizes the challenge of bacteria control depending on environment and usage 4 2 Filters The Purge Filter P N 90035539 should be replaced when the active filtering material section turns a pink or violet in color or humidity lt 10 This filter has an average lifetime greater than one year depending on the relative humidity and the temperature of the operating environment The 10 Micron Particle Filter P N 2604 0490 should be inspected every 3 months and changed when dirty or no longer able to ris
10. uirements for future maintenance and upgrades by your Spectra Physics Field Service Engineer S Spectra Physics A Newport Company 2 2 Physical Description 23 44 x 13 79 x 59 54 x 35 03 x 5 78 14 68 70 00 32 00 Laser Head Scientific 19 50 x 13 79 x 49 50 x 33 70 x Laser Head OEM 5 48 13 90 65 00 29 50 Laser Head DeepSee seit 3 ea X ar A X 106 00 48 00 17 90 x 19 00 x 45 50 x 48 30 x 6 90 17 50 Umbilical Length 10 feet 3 meters 21 00 x 19 00 x 53 34 x 48 26 x 7 00 17 78 Thermorack 2 3 Utility Rrequirements Water The Mai Tai HP DS is closed loop water cooled system and requires no utility water services The hoses are 3 6M 12ft long Fill the chiller reservoir with filtered tap water or distilled water Do not use deionized water and do not place the chiller above the laser Should the unit not be installed properly and a leak develops dripping water may damage the laser The chiller must always be on when the power supply is on even 1f the diode lasers are not on Power Requirements Electrical Type J 80 Single Phase Voltage 100 240 VAC 50 60 Hz Current 10A Thermorack Universal Input 120 VAC 4 10 7 amps max S Spectra PhysIcs A Newport Company 2 4 Computer Requirements Two modes of control are offered for the standard Mai Tai system A Mai Tai graphical user interface GUI control software for use on a Windows XP 32 bit or Window 7 32 bit based computer For more
Download Pdf Manuals
Related Search
Related Contents
BLANC LIQ - Gestiotech Vantec LPC-401 User's Manual Copyright © All rights reserved.
Failed to retrieve file