        tender and contracting documents for the flood prevention project of
         Contents
1.                                                       mener enne nnne S 7 1 91  9 4   Managementin Site    ncn eite teet desa Rda Areta          S 7 1 92  9 5 Operation of Movable Crane    emen S 7 1 93  9 60  temporary WOTK  do MR HE S 7 1 94  9 7     Earthwork Piling WOTKS eei ni xe nene be DOG da dentate S 7 1 94  9 8     Concrete Wok              aia S 7 1 95  9 8  ROJA         atada a ani dape S 7 1 96    S 7 1 ii    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    1     1 1     1      2      3     GENERAL    Project Description    Background    The Kingdom of Thailand suffered unprecedented big flood to wreak havoc in more than 61  provinces throughout country because the heavy rainfall estimated such as more than 100  year probability continued intermittently since J uly  2011    According to the Government of Thailand s official announcement made in November 5   2011  some 1 200 000 households  3 200 000 people  were left inundated  446 persons  were killed and some 17 000km2 of farmlands got inundated in 25 provinces inside Chao  Phraya River Basin    Bangkok metropolitan area  Phra Nakhon Si Ayutthaya province that owns a collection and  distribution center of industrial products  urban areas in Nonthaburi and Pathum Thani  provinces located at north of Bangkok  suffered extensively serious flood damage    Kha Mao canal  which is located upstream Han Tra and K
2.                                  S 7 1 16  2 9 Maintenance and Protection of                                eme S  7 1 17  2 10  Trafficability for the Heavy                                                    S 7 1 17  2 11 Water Control and                                          meme S 7 1 17  2 12 Prevention of Water                                      memes S 7 1 19   3  EARTH WORKS    ettet tt imet fied           S 7 1 19  31 Site Clearing and Top Soil                                                S 7 1 19  3 2    Temporary Gofferdamls sii e He e P EG RA ER VR EORR RT ER S 7 1 20  3 3   EXCaVallOnis a S 7 1 21  3 4    Embankmentand Backfill  sissisota dra S 7 1 24   4  ROAD WORKS  ine erri e nr re deren      Rr DEDI E RA Kr EO E S 7 1 31  4 1    Base Coli atit ven d E UR Ee era e S 7 1 31  4 2     Concrete Pavement ath nde adi 5 7 1 33   du  CONCRETE WORKS            e eid        S 7 1 34  cM dii EH S 7 1 34  A A E eb                         5 7 1 63  5 3  Water Stops AE 5 7 1 66  5 4  ont daa cantina      S 7 1 68   6  PRECAST CONCRETE WORKS  cui o the e          E A S 7 1 69  6 1     GONG ral visi aint eee tei oath                 ea ea S 7 1 69  6 2    Precast Concrete  Pile    us                  tete D rn e Tha EE REB a e i S 7 1 69  6 3 Prestressed Concrete  PC  Corrugated   5                                                               S 7 1 75  6 4 Reinforced Concrete Pile sessista              nN INN EAN 5 7 1 76    S  7 1 i    Volume I  Section 7 Specificat
3.                          eene S  2 8  Evaluation of Tender      Pee a re e E eren S 2 8  Clarification or Alteration of                                     emm S 2 9  Process to be Confidential    enne S 2 9  Contactwith the  Client  cei ec t rte akt EHE DEEP PE RENE S 2 9  Notification of Award                                 S 2 9  Signing of CorltracE aia idiotas 5 2 9  Performance SEU ioc Eee          Hh ena edie S 2 10  Notification of the Result of Tender10    S  2 i    Volume I  Section 2 The Flood Prevention P roject of East Side of the  Instruction to Tenderers Pasak River in Ayutthaya in the Kingdom of Thailand    Chapter 6  Common Conditions                                                             S 2 10  T   Safety Procedure eret      S 2 10  2  Quality   55                         a aTa a a RR RA T ER XR AR Rd E ERR ra a d S 2 11  3  Protection of the                                                                     S 2 11    S 2 ii    The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers    INSTRUCTION TO TENDERERS    Chapter 1  Introduction    1     2     3     4     The Purpose of Tender     1     For the purpose of contributing to the execution of the Flood Prevention P roject of  East Side of the Pasak River in Ayutthaya  hereinafter referred to as  the Project    by the Government of the Kingdom of Thailand  J apan International Cooperation  Agency  hereinafter
4.                  Under coat  3   underwater  1 100  Under coat  4  Epoxy resin paint under coat 1 100   underwater   Total 5 375  Gate guides   SS  SM First primer Non organic zinc rich primer 1 15  SUS Pickling Oxidizing solution      Telpher SS  SM Surface preparation Blasting ISO Sa2 1 2      rails  Under coat  1  Non organic zinc rich paint 1 75  Lifting Epoxy resin paint under coat  SEBITIS              160g m    Thinner 80g m  1    Weak solvent type modified  Under coat  2  epoxy resin paint under coat 1 80   air exposed   Weak solvent type modified  Under coat  3  epoxy resin paint under coat 1 80   air exposed   Weak solvent type  Intermediate coat intermediate coat for 1 40  fluoropolymer paint  Top coat Weak solvent type 1 30  fluoropolymer paint top coat  Total 6 305  SUS Pickling Oxidizing solution       3  Gate for drainage channel at Kra Mang Floodgate  No of Film  Components   Materials Process Names of paint nan thickness  painting  um   Gate leaves    SS  SM First primer Non organic zinc rich primer 1 15  Gate guides   sus Pickling Oxidizing solution      Hoists SS  SM Surface preparation   Blast cleaning ISO Sa2 1 2      Under coat  1  Non organic zinc rich paint 1 75  Epoxy resin paint under coat     Mist coat 160g m    Thinner 80g m  1  Weak solvent type modified  Under coat  2  epoxy resin paint under coat 1 80   air exposed   Weak solvent type modified  Under coat  3  epoxy resin paint under coat 1 80   air exposed   Weak solvent type  Intermediate coat 
5.                 S 7 2 42  3 4 4 Main ALATE E         ettet etit ete teeth ent ete ete eres S 7 2 42  3 4 5 SideWheels         tote eT cin             dl a e S 7 2 43  3 4 6        PK S 7 2 43  3 4 7 sheave Assembly  zit dae Rat le Aine S 7 2 43  3 4 8 TOleranees        icem netten men eerie iust ecd a S 7 2 43  3 5 Detail of Gate Guides                              menm nnns S 7 2 44  3 5 1 A                  ATA S 7 2 44  3 5 2 SII Beats    iet e eee cree reo cette e eter Da ve eo E aa S 7 2 44  3 5 3 Wheel Rail and Wheel Track                      sese S 7 2 44  3 5 4 Side Wheel Track  oie edet ti          cr gue S 7 2 44  3 5 5 lintel Bealms    eee Ded ete eee ete teer dee ee S 7 2 44  3 5 6 TOTES  a a io S 7 2 44  3 6        AA S 7 2 45  3 6 1 Generale        LL P    E E Eo Por S 7 2 45  3 6 2 FOISIS           DUI UE PW S 7 2 45  3 7 Wiring and Control Panels     oooccnnnococ  nococcccnononcnncnonnnnnnnanonnnnnnnannn enn S 7 2 46  3 7 1 CA A CO S 7 2 46  3 7 2 WIND ista      tees S 7 2 46  3 7 3 Control Panels  ii Nee a ASS Sa Se th aa aa EN Me a S 7 2 46    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications    Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works  3 8 Shop Assembly and TeSt vinin painia aeaa aa reki karine S 7 2 48  3 8 1 Gates and Gate                                                        S 7 2 48  3 8 2 Hoists  and  Gontrols ii pai ia estes ROO RUE S 7 2 49  3 9 Erection  Installation and Tests 
6.               5 3  8    SUPPLY GUARANTEE CERTIFICATE BY MANUFACTURER S  AS  SUBCONTRACTOR FOR DRAINAGE PUMP VEHICLES  Form G                         5 3 10    CERTIFICATE OF AFTER SALES SERVICES BY MANUFACTURER S AS  SUBCONTRACTOR FOR HYDRAULIC GATE WORKS  Form                               S 3  11    CERTIFICATE OF AFTER SALES SERVICES BY MANUFACTURER S AS  SUBCONTRACTOR FOR DRAINAGE PUMP VEHICLES  Form 1                             3  13    CERTIFICATE OF AFTER SALES SERVICES BY LOCAL AGENT FOR  HYDRAULIC GATE WORKS  Form                                                rete            5 3  14    CERTIFICATE OF AFTER SALES SERVICES BY LOCAL AGENT FOR  DRAINAGE  PUMP VEHICLES  Form     ao 5 3 15    CERTIFICATE OF COUNTRY OF ORIGIN FOR  HYDRAULIC GATE WORKS  Form L  sarta a   3  16    CERTIFICATE OF COUNTRY OF ORIGIN FOR    DRAINAGE PUMP VEHICLES  Form M    aen uad eire E e      5 351   SPECIFICATION SHEETS OF DRAINAGE PUMP VEHICLE  Form N                       3  18  POWER OF ATTORNEY  For reference only                                         5 3   22  CERTIFICATE OF SIGNATURE  For reference Only                                               5 3   23    5 3        The Flood Prevention Project of Volume 1  Section 3  East Side of the P asak River in Ayutthaya Form of Tender     Form A   FORM OF TENDER    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya    Dear Sir     1  Having c
7.               eese nee S 7 2 33  2 12 6 Power Distribution Boards and Panels                                                         S 7 2 34  2 12 7                                5          A coe S 7 2 34  2 12 8 AOB  EEE          S 7 2 34  2 12 9 Convenience  Outlets ic ia       ds S 7 2 34  2 12 10 Limit  SWwitcli6S idet di      Na dake S 7 2 34  2 12 11                              3 5  c A ao S 7 2 34  2 12 12 Lighting Fixtures Em S 7 2 35  2 12 13 Electrical  Relays    nud Ete debe             S 7 2 35  2 12 14 Terminal Strips  ect dee Eti aa teed RR ERE S 7 2 35  2 12 15 Indicating                          rrt ETE S 7 2 35  2 12 16 Equipment Wiring and Wiring                                                                           S 7 2 36  3  FIXED WHEEL  ROLLER  GATES AND           5                                       S 7 2 37  3 1 General ti    EM     S 7 2 37  3 2 Design  Str  sSeS iii bed S 7 2 37  3 3 Design Data    eem d gern                                            HERR ainia S 7 2 37  3 3 1 GeneralData a de         I red        os d te CU      S 7 2 38  3 3 2 Design Loads  for Gales citan pter S 7 2 41  3 3 3 Design Loads for Gate Guides                                                     S 7 2 41  3 3 4 Design Loads for Hoist                                     eee S 7 2 41  3 4 Details of  38l658 EE ee Ae ELA eL ae S 7 2 42  3 4 1 A E S 7 2 42  3 4 2 SKIN  Plates EAI PE denuo eo A        ta S 7 2 42  3 4 3 Main Bears tt o      e e LL                  
8.              sseeeeeme S 7 2 2  Working Specifications  Detailed Design Calculations  Shop Drawings and   Work Schedule to be Submitted                        sseeeee S 7 2 2  Operational Rule of the                                                                                      S 7 2 3  Erection  Installation  Tests  Inspection  Commissioning and Training           S 7 2 4  Name Plates and St ckers    eee i eo PER Eres S 7 2 4  Packing and Shipment                  sessssssssseeeeeene eene nnne S 7 2 5   A SUTANGE LR  S 7 2 6  Import Charges  ie cte tient etr ee edet Red amne eek ipn     S 7 2 7  Maintenance Tools           eicere A ii S 7 2 7  Spare         tdt              S 7 2 7  Tests  Inspection  Adjustment  Commissioning and Training                         S 7 2 8  Warranty and After Sales ServiC8S    oooococcononicicnnooccncononanncnnnnarcnnnnnnrnncnnnnnnnno S 7 2 9  DESIGN CRITERIA AND PARTICULARS                                                   S 7 2 10  Design  Loads  irre ete ti t Lo ee ce eei re er ds S 7 2 10  A nnd Nadal e siete etes S 7 2 10  Gate Leaf  Gate Guide and 5                                                                         S 7 2 10  ul                              S 7 2 11  A                                     S 7 2 12  Materials                                   S 7 2 12  AAA A              S 7 2 12  Materials to Be Used    cinere erectae eet            S 7 2 12             ae S 7 2 14  A O S 7 2 14  Standard for Steel Plates  Bars 
9.             Rolled steel for general or welded structure 5 5 8 7  Carbon steel forgings 5 5 8 7  Carbon steel for machine structure use 5 5 8 7  Corrosion resisting steel 5 5 8 7  Carbon steel castings 5 5 8 7  Gray iron casting 10 3 5 17  Bronze castings 8 8 10       Note     S 7 2 24    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    Unit stress shall in no case exceed ninety  90  percent of the minimum yield point strength or  proofing strength of the material used whichever is the least under the load resulting from the  breakdown or locked rotor torque of the hoist motor  whichever is greater     2 4 8 Second Stage Concrete and Non Shrinkage Mortar   1  Second stage concrete  The standard of second stage concrete used in the Hydraulic Gate Works shall be the    same as that of the first stage concrete     The allowable stresses and standards of the second stage concrete in 28 day aging to be  adopted for the detailed design of the Hydraulic Gate Works are as follows       Design strength 21 N mm      Allowable compressive stress 5 1 N mm      Allowable shear stress 0 4 N mm      Allowable bending tensile stress 0 3 N mm      Allowable bearing stress 5 9 N mm      Max size of coarse aggregate 25 mm     Slump 8 2 5 cm     Air content 4 1 5 96     Total chloride content 0 3 kgf m  or less    Water tightness between the first stage and second stage concrete s
10.        Airless spray painting shall be applied       Painting specifications of the instruments  purchased and electronic goods shall be the  manufacturer s standards       Painting color shall be determined in consultation with the Client  and     n principle  the manufacturer of Paints shall be the same from under coat to top coat     Surface preparation ahead of the painting shall be as classified as below     S 7 2 16    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Volume 1  Section 7 Specifications  7 2 Hydraulic Gate Works     a  ISO Sa2 1 2  Very through blast cleaning    When viewed without magnification  the surface must be free from visible oil  grease  and dirt and from most of the mill scale  rust  varnish coating and foreign matter  Any  remaining traces of contamination shall show only as light stains in the form of spots or  stripes      b  150 S13  Very thorough hand and power tool cleaning    When viewed without magnification  the surface must be free from visible oil  grease  and dirt and from poorly adhering mill scale  rust  varnish coating and foreign matter   The surface must appear very thoroughly treated to give a metallic sheen arising from  the steel surface     2 3 2    Painting at Shops    Painting specification at shops shall be tabulated as below      1  Main gates of Kra Mang and Han Tra Floodgates                                                                            Film  Componen
11.        Japan side    Cofferdam work           Foundation work       Earth work       Concrete work A       Construction Work    Design and manufacture of hydraulic gate structures       Transportation and customs clearance of hydraulic gate structures       Installation of hydraulic gate structures       Bank protection work       Removal of cofferdam       Adjustment  commissioning test  O amp M training  inspection and handover       Demobilization       Environment monitoring A                  Land acquisition at Kra Mang and Han Tra sites A A A          Relocation of communication lines of SRT at Kra Mang site                 Relocation of water supply pipes at Han Tra site BENI       Relocation of low voltage incoming lines at Kra Mang and Han Tra sites HNENNENNENNEMNENI          Thailand side    Installation of distribution lines and transformers at Kra Mang and Han Tra sites Seepage To be continued till May  2016          Environment monitoring BEBE eRe OA             Drainage Pump Vehicle          Design  manufacture  transportation  customs clearance and installation          Procurement  Process    Adjustment  commissioning test  O amp M training  inspection and handover                                                                                        S 6 1    SECTION 7    SPECIFICATIONS    1  CIVIL WORKS    2  HYDROMECANICAL WORKS  3  DRAINAGE PUMP VECHICLE    SECTION 7 1    CIVIL WORKS    The Flood Prevention Project of East Side of the Volume I  Section 7 S
12.        Outline of the Project    1  Name of Country     2  Name of the Project     3  Date of the Grant Agreement     4  Name of the Executing Organization     2  General Situation  how the facilities and the vehicles are used in general     3  Detailed Explanation                   Facilities       How they are being used        In case they haven t been used as planned         and vehicles  Reason for it  Measures to be taken to redress the situation    Please specify the reason such as budgetary  problems and problems in employing    appropriate staffs etc      4  Photos  please attach photos of the facilities and the vehicles     
13.        SCHEDULE OF MAJ OR CONSTRUCTION PLANTS    To  Director General  Royal Irrigation Department    Kingdom of Thailand    Date    th day of       2013    The Tenderer shall list up and describe as below major construction plants to mobilize to    the work sites of the Project        Names    Brands    Capacity    Quantity   PresentLocations   Mobilization Time                            Specimen Signature   Name of Signer   Title of Signer     Name of Tenderer     5 3 7     Signature        Volume     Section 3 The Flood Prevention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya     Form F   SUPPLY GUARANTEE CERTIFICATE BY  MANUFACTURER S  AS SUBCONTRACTOR FOR  HYDRAULIC GATE WORKS    Date    th day of        2013  To  Director General  Royal Irrigation Department  Kingdom of Thailand  The Flood Prevention Project of East Side of the Pasak River in Ayutthaya  Dear Sir   We   Name of Manufacturer s   as Subcontractor   a  manufacturer s  dully organized and    existing under the law of J apan and having its principal place s  of business at  Address of    Manufacturer s    hereby agree that we will supply and install to  Name of Tenderer  the  following proposed in this Tender for the captioned Project     Full set of Hydraulic Gate Works composed of       Stainless steel fixed wheel gate leaves 3 sets each for Kra Mang and Han Tra      Stainless steel fixed wheel gate guides   ditto      Motorized wire rope winched gate hoists    ditto      Steel main
14.      Moreover  along the bank slope of the prefectural road  the exposed water distribution pipe  of PVC made Dia 100mm  which is branched from the steel made Dia 200mm pipe attached  on the said road bridge  is running to the north     The above mentioned PVC made water distribution pipes have been agreed for relocation  to due places so as not to be affected by the Work between Thetsaban Nakhon Phra  Nakhon Si Ayutthaya Waterworks and the Client at the cost of the Client     On the other hand  no water pipe is served atthe Site of Kra Mang Floodgate      3  Low voltage wires    Single phase 220V incoming wires are aerially installed at both the Sites of Kra Mang and  Han Tra  including the Bank Protection  Floodgates    These wires have been agreed have been agreed for relocation to due places so as not to  be affected by the Work between Provincial Electricity Authority in Ayutthaya and the Client  atthe cost of the Client      4  Communication wires of SRT    The communication wires of State Railway of Thailand  SRT  are aerially installed crossing  Kra Mang Canal between Kra Mang Floodgate and the railway bridge  The communication  wires shall be temporally detoured during the Work at the cost of the Client so as not to be  affected by the Work  and such agreement has been made between the Client and SRT     Supply of Electricity    One  1  unit of 3 phase transformer of 22kV 400V 230V x 50Hz x 250kVA  inclusive of 22kV  wires and concrete poles  shall be installed newly
15.      e      3     by the Consultant and the Contractor or their representatives     The As Built Drawings shall be made on high quality reproducible paper so that clearly  readable copies can be made  The finished set of As Built Drawings must be submitted  to the Consultant for his review and approval atthe time of completion of the works     Other Drawings    Drawings other than those mentioned above  which are of general nature such as  proposed construction methods  schematic diagrams outlines of how various types of  work are to be performed  etc  shall be submitted to the Consultant for his review and or  approval     Submittal and Review or Approval of Contractor s Drawings    It is to the Contractors advantage to prepare his drawings and submit them to the  Consultant at the earliest possible time in order to avoid delaying the field work because  of no availability of the reviewed or approved drawings in hand by the construction crews     The Contractor shall submit his Shop drawings to the Consultant for approval or review  as the case may be at least thirty  30  calendar days prior to the commencement of  construction of any particular item of work  Shop Drawings for a particular item  such as  the steel gates  which has to be fabricated outside of the Site and transported to the Site  must be submitted early enough  earlier than that specified above  to allow adequate time  of review  approval  fabrication  transporting and receiving at the Site     Three  3  copi
16.     150   of the quantity of lubricating oil    S 7 2 72    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works      Other necessary accessories of the manufacturer s standards     4  Engine generator control panels details    The control Panels for the engine generator control shall consist of one  1  diesel engine  and one  1  generator control Panel     The control panels shall be of indoor type  and self standing for generator panel and skid  base mount for diesel engine control Panel  Equipment and devices to be mounted on the  panel shall include  but not limited to the following      a  Diesel engine control panel      One  1  starter switch     One  1  battery switch     One  1  speed controller     One  1  cooling water temperature gauge    One  1  lubricating oil temperature gauge    One  1  fuel oil level gauge     One  1  oil pressure gauge     b  Generator control panel      One  1  380 V circuit breaker with interlocking mechanism with another  generating unit for each main and sub generators      One  1  AC ammeter with selective switch      One  1  AC voltmeter with selective switch     One  1  frequency meter     One  1  regulating switch for governor motor     One  1  group annunciater     One  1  lot of single phase  dry type potential transformers     Three  3  single phase  dry type current transformers of 100 5 A     One  1  set of cable termina
17.     6      7     Concrete    a  Concrete for all types of precast members shall conform to the provision of Clause 5   except where noted or shown on the approved construction drawings     b  The maximum size of coarse aggregate shall not exceed 3 4      c  The slump of concrete  after the concrete has been deposited but before it has been  consolidated  shall not exceed 2 2      d  The percentage of entire air in the concrete  as discharged from the mixer  shall be 3  to 5 percent by volume of concrete     Casting    Precast concrete units shall be cast in individual forms  Each unit is to be cast in one  continuous operation and no construction joints will be permitted     Vibration    Unless otherwise approved by the Consultant shutter vibrators or vibrating tables used to  achieve optimum compaction  Care shall be taken to avoid over vibration     Marking    Precast concrete units shall not be marked or branded in any position can be seen in the  finished work or against which any concrete is to be placed   The lifting points shall be marked on two opposite faces of the elements     Removal of Forms    The sides of moulds shall be struck in such a sequence and after such period as is  necessary to ensure that precast unit is not subjected to damage  distortion or overload     Handling    Precast concrete units shall be handled  transported and stored in such a manner as to  avoid damage to the unit  The Contractor shall be responsible for provision of suitable  lifting de
18.     a     Mixer performance test shall be in accordance with USBR Concrete Manual  7 the Edition   Designation 26 or Equivalent     d  Maintenance    The mixers shall be maintained in good operating condition and mixer drums shall be kept  free of hardened mortar  The mixing blades of the part mixers shall be maintained to the  tolerances specified by the manufacturer and shall be replaced when exceeding the  tolerance limits  Should any mixer  at any time  produce unsatisfactory results  or cause  wastage of materials  its use shall be promptly discontinued until it is repaired     The Contractor shall take out of service any pan or drum mixer which has excessively  worn blades  excessive build up of mortar or is leaking prior to change of mix or type of  cement or after the mixer has been out of use for 30 minutes or more than pan drum shall  be thoroughly cleaned     Rejected Concrete    When more than one and a half hour have elapsed between the start of mixing operation  and the actual placing of the concrete  the Consultant shall have the right to reject the  concrete     The Consultant has the right to specify shorter times if hot weather or other conditions  cause quick stiffening of the concrete      The concrete rejected by the Consultant shall not be utilized in any part of the Permanent  Works     The re tampering of concrete which has partially hardened  that is remixing with or without  additional cement  aggregate or water  will not be permitted     Precautions
19.    5  Scaffolding  Scaffoldings is necessary at the place where the height of structure exceeds 2 0m   Scaffoldings shall be designed for workers not to fall down  and the Contractor shall make  known maximum loads of them to workers  Prior to the commencement of the works  where the scaffolding is necessary  the Contractor shall prepare the detailed drawings for  the scaffoldings     The Contractor shall maintain the handrail or safety rope during the erection or  dismantling of scaffolding     In addition  the countermeasure against the ground settlement shall be taken by using  timber board beneath the scaffoldings      6  Safety Approach  The Contractor shall install safety approaches at the area which leads to work places or at  work places  Safety ladders shall be installed at the place where the height or depth  exceeds 1 5m     7  Temporary Closure  The Contractor shall review the Drawings of temporary closures from a view point of  safety from living watercourses and their water levels   After the temporary closure  the Contractor shall conduct the monitoring of displacement  periodically    9 7 Earthwork Piling Works   1  Grasp of the Geography and Geology    The Contractor shall grasp the conditions of the geography and geology  and shall check on the    S 7 1 94    The Flood Prevention P roject of East Side of the Volume 1  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    gradient of excavation slope in earthwork    
20.    Bodies of non agitating trucks shall be smooth water tight metal containers equipped with  gates that will permit control and ready discharge of the concrete     S 7 1 50    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     e      f      9      14             Chutes and Drop Pipes    Chutes and pipes shall be of such design that segregation will not occur in the concrete   The chutes shall have a smooth  mortar tight metal lining and sufficiently high sides to  prevent the concrete from spilling over  A vertical drop at the end of chutes and pipes shall  be provided  preferably in the form of metal drop chutes  to prevent segregation  Drop  pipes and chutes shall be protected from direct exposure to sun and rain  and shall be  less than 10 meters in total length  Chutes and pipes shall have grades not steeper than 1  to 2     Belt Conveyors    Belt conveyors used for the transportation or pouring of concrete  shall have a shape  size  and speed able to prevent the loss of the concrete transported  and their slops shall be  such as to avoid segregation  At the terminal  the belts shall be furnished with scraper  blades  to remove the mortar from the belt     Segregation at transfer points and ends shall be avoided by the use of suitable hoppers  and drop chutes  The conveyers shall be protected from direct sunrays and rain     The maximum transport distance shall not 
21.    Clear span  5  Sealing span  5  Distance between sealing and wheel track face  1  Distance between centers of main wheel tracks  5  Height of gate guides  5  Distance between centers of side wheel tracks  5  Flatness of seal plate surface  0 5 m  Straightness of seal plates  1  Flatness of main wheel track surface  0 5 m  Straightness of main wheel tracks  1  Flatness of guide plate surface  0 5 m  Straightness of guide plates  1       The tolerances not specified herein shall be determined by the Contractor  subject to approval  by the Consultant     5 6 Hoist    The hoist for the fixed wheel gate to be supplied under this Contract shall be of steering wheel   operated manual racked hoist  The racked hoist shall be pin racked or rack geared of stainless  steel SUS 304 single stem with 40kN of hoisting capacity  The gate leaf shall fall with its own  weight by releasing self rock system  The falling speed of the gate leaf shall be controlled by  the centrifugal brake and the suspension thereof in the course shall be made fastening clutch by  manipulation of the lever  Gate position indicator shall be equipped to indicate the opening  height of the gate leaf  Center guide shall be provided on the curtain wall to fasten the position  of the hoisting stem     5 7 Erection  Installation and Tests at Site  5 7 1 Erection and Installation   1  Gate Guide    The gate guide shall be assembled in the blockouts in accordance with the    Approved  drawings  and the approved installat
22.    IO    INSTRUCTION TO TENDERERS    TABLE OF CONTENTS                   T ETT 5 2 1  The Purpose of Tender             sssssssssseeeee nenne mener nnne nnne S 2 1  Qualification of Tenderers             sse nnn S 2 1  Description of the  Project re eee pred Eon de               S 2 1  Scope of WOVI iiie corti                           ERES E D TECH PE FE a us S 2 1  Japan s GrantAid   6                                  enne S 2 2                                tente e RR ER RR nie avai ROG ERR RR SURE CO Ve ea S 2 2  Period of Execution of the Work    meme S 2 2  Acquaintance with Local                                    meme S 2 2  Eligible Source Countries ooo    eect ere nmn S 2 3                          n eee em basti        S 2 3  Composition of Tender                                          eme menn S 2 3  Responsibility of Tender iii erret t n x Pris S 2 4  Clarification of Tender Documents                       memes S 2 4  Addenda of Tender                                     eene S 2 4  Preparation and Submission of                                 meme 5 2 5  Pr  paration  of Tender  ace eer a eben bep E ands S 2 5  TOPS ta te eo ee a di S 2 6  Term of Validity of                                2 nennen S 2 6  SUBMISSION O Td S 2 6  Interpretation Of Tender vimos Dra S 2 7  Opening of Tender cce te epe d de ER iin RR ERE ain S 2 7  Insee S 2 7  Tender Opening Procedures                                 nennen nennen S 2 7  Evaluation of Tender and Award of        
23.    On condition of On condition of  93  lt   l r   80  lt   l r    10 000 000  10 000 000    6 700    I r     5 000    I r     where  I  buckling length of member  mm     r  radius of gyration of gross sectional area of member  mm   Compressive splice member 120 N mm  160 N mm     Bending stress at tensile side 120 N mm  160 N mm    for net sectional area     Bending stress at compressive side      condition of On condition of   for gross sectional area   l b   lt   9 K    I b   lt   8 K    120 N mm  160 N mm   On condition of On condition of   9 K      I b   lt  30   8 K   lt   1 b  x 30   120     1 1  Kl b      9  160     1 6  Kl b      8   where     distance between fixed points of compressive flange  mm   b  width of compressive flange  mm   K  3  AN  2        Aw  gross sectional area of web plate  mm     AC  gross sectional area of compressive flange  mm    In case of  Aw Ac     2  K is taken as 2     On condition that compressive 120 N mm  160 N mm   flange is directly welded to skin   plate  etc    Shear stress 70 N mm  90 N mm      for net sectional area     Bearing stress 180 N mm  210 N mm     S 7 2 21    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Notes    1     In case the thickness exceeds 40 mm  the allowable stresses for normal loading  condition of the structural steel members shall be adjusted that the stress is 0 92 time  that of the allo
24.    Sheep foot or Tamping Foot Roller  The rollers of the sheep foot or tamping foot type shall consist of drum 1 50 m in diameter  and at least 1 50 m in length  The drums shall be so ballasted to reach a weight not less  than ten  10  metric tons   The rollers shall be provided with cleaning bars designed and placed so as to prevent the    accumulation of material between the tampers  The tampers shall have a net length of  approximately 20 cm and their net head area shall be between 100 and 200 cm      S 7 1 27    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     c      d      e      f      9    a     The rollers shall be self propelled or towed by a prime mover of sufficient capacity to tow  the roller at a speed of approximately 2 5 km h when at work   The contractor may submit to the Consultant s approval other types of rollers     Rubber Tired Roller    Rubber tired rollers shall have a minimum of four wheels equipped with pneumatic tires   The tires shall be of such size and ply as required to maintain tire pressure between 5 5  and 7 0 kilograms per square centimeter for 11 500 kilogram wheel load during rolling  operations  The wheels shall be located abreast and so designed that each one will carry  approximately an equal load in traversing uneven ground  The spacing of the wheels shall  be such that the distance between the nearest edges of adjacent tires will
25.    l  General    The Work means the construction and procurement for the Flood Prevention Project of East  Side of the Pasak River in Ayutthaya in the Kingdom of Thailand     The Conditions of Contract stipulate the specific conditions on the Contract required to the  execution of the Work     2  Liquidation or Settlement of Fiscal Levies  Duties  Taxes and Other Similar Charges     1  The Client will assume all duties and related fiscal charges which may be imposed in  the Kingdom of Thailand on J apanese nationals with respect to the importation of the  products and or services supplied under the Contracts      2  The Client will assume all fiscal levies and taxes imposed in the Kingdom of Thailand  on Japanese nationals with respect to the payment carried out for the income  accruing from the supply of the products and or services under the Contracts      3 In connection with sub paragraphs  1  and  2  above  the Client will be responsible  for the prompt liquidation or settlement of such fiscal levies  duties  taxes and other  similar charges      4  The Consultant will issue certification to the Client regarding the temporary imported  plant  materials and other goods which will be needed for the Work     3  Visa    The Client shall provide Entry Visa to the expatriate staff of the Contractor  including his  Subcontractors prequalified in the prequalification  with such assistance as may be  necessary for the entry of his staff into the Kingdom of Thailand  and Multiple 
26.   2      3      4      5      6      7     9 8   1      2      3     Plan for Safety   The contractor shall make a plan of the procedure of excavation  the arrangement of  equipments and workers  and the way of transportation of soil and equipments to insure  safety in construction    Watching of Slope Face   The Contractor shall watch the condition of slope face to avoid accident due to collapse of  slope  If there is some possibility of collapse  the Contractor shall report to the Consultant  and shall cope with the issue appropriately    Gradient of Excavation of Slope   The Contractor shall keep the safe gradient of excavation slope based on the actual soil  condition    Temporary Storage Space   In storage of excavated soil at the top of slope  the Contractor shall take care of the  collapse of slope and the fall of soil    Machinery Excavation  The Contractor shall take care of an operation area of equipments  and shall forbid some  workers to enter the area  and shall not place the equipment beside the top of slope    The Works Adjacent to Railway and Roadway  The Contractor shall not carry outthe piling works near railway during the operation hour   The Contractor shall choose the method to avoid the displacement of railway  The  Contractor shall carry out the monitoring of railway   The Contractor shall arrange the traffic guards during the piling works near existing public  roads  Traffic flow shall be temporarily stopped at the time of turn and setting of piles by 
27.   Before using such bench marks and  reference points other than the basic bench mark for setting out the Works  the  Contractor shall carry out a check survey therefore and satisfy himself as to their  accuracy  The Consultant shall not bear any responsibility for the accuracy of such  other bench marks and reference points     The Contractor may establish additional temporary bench marks for his own convenience  but each temporary bench mark so established shall be of a design and in a location  approved by the Consultant  and shall be accurately related to the bench marks  established by the Consultant     Setting Alignment of Pipes and Demarcation of Right of Way    S 7 1 9    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     3      4     The Contractor shall be responsible for setting of alignment of pipes and demarcation of  right of way on the ground in accordance with the Drawings and information supplied by  the Consultant  Points to be staked on the ground shall be all the intersection points   center line points at 50 m intervals on an average  and the beginning  intermediate and  end points of curvatures  All costs incurred by the Contractor in complying with the  requirements of this sub clause shall not be paid separately and shall be deemed to be  included in the Contract Price     Original Surface Levels for Use of Measurement    The ground surface and ri
28.   Han Tra Floodgate     1  Quantities to be procured    Volume 1  Section 7 Specifications  7 2 Hydraulic Gate Works    EL  2 5 m MSL  EL  3 5 m MSL    EL   6 5 m MSL   EL   3 5 m MSL   0 3 m min at ordinary time   1 5 m min at emergency closing  5 0m at ordinary time   6 5m at maintenance and emergency  Local    380V x 3 phase x 4 wire x 50Hz    Weather proof 380V x 3 phase x 50Hz  squirrel cage induction motors  not less than 2 2kW    220V x single phase x 50Hz  Helical or type approved by the Consultant    Electromagnetic motor brakes     Electro hydraulic thruster brakes or  Self lock built in speed reducer    SUS304 6 x 37 SB or equivalent    Gate leaves  3 sets   Gate guides  3 sets   Hoists  3 sets   Control and wiring  1 lot    2  Gate   Type  Plate girder structure stainless steel fixed wheel gate  Clear span  6 0      Effective height  7 1 m    Water levels at upstream    S 7 2 39    Volume     Section 7 Specifications  7 2 Hydraulic Gate Works    High Water Level  HWL    Low Water Level  LWL    Water levels at downstream  Height Water Level  HWL    Low Water Level  LWL    Sill elevation   Design head    Downstream Water Level     Upstream water level     Sealing method   Sedimentation     Ground subsidence      3  Hoist    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    EL  43 5 m MSL  EL    0 5 m MSL    EL    6 0 m MSL  EL    0 5 m MSL  EL   2 5 m MSL    EL    6 0    MSL  High Water Level  HWL   EL    0 5 m 
29.   Hoist system of the hydraulic gates shall work in 380V x 3 phase x 50Hz while the lighting  facilities work in 230V x single phase x 50Hz     Power supply system from diesel engine generator    Two  2  units of 20 kVA Diesel Engine Generator for the gate operation and the lighting  facilities  during the time of power failure of the commercial power supply  shall be procured  for Han Tra and Kra Man Floodgates respectively      3  All electrical cabling wiring and necessary attachment     Local Distribution Panels  General    The following items shall be designed and provided under this Contract as work items in  this Clause       Two  2  complete sets of local distribution panel for the Hydraulic Gate Works for Han  Tra Floodgate and Kra Man Floodgate     Panels        Panel shall be made of as specified in Sub clause 2 12 5       Out door distribution panels shall be of weatherproof type  sealed and painted       The cables and wiring shall enter from bottom side or top as approved or directed by  the Consultant       All required instruments shall be mounted on or inside the panel but shall not be limited  to all indicating lamps     Cabling and wiring    The following shall be referred in panel design      a  Materials        Various types at cables are to be applied for the work by each type of services and  functions  The Contractor shall be carefully check the Drawings and submit detailed  cable schedule showing origin and destination of cables by each type  size and
30.   f   g   h    TENDERER S SPECIFICATIONS    E  1 3     Consultant  Evaluation       0    E S    Specification Sheets of Drainage Pump Vehicle    CODE NO  EQUIPMENT  Drainage Pump Vehicle Qty  10 unit    CLIENT S SPECIFICATIONS     m  Accessories   Tool for pumps 1 set    Mooring rope for pump 1 set unit    Mooring anchor for pump 1 set unit    Float push out bar 1 no      3  Chassis with Cab   a  Country of origin   Kingdom of Thailand  b  Gross Vehicle Weight   Around 10 000 kgf or less      Necessary minimum size of Gross Vehicle Weight capable to accommodate  the required equipment and apparatus with 500kgf of allowance shall be    ealactad      Rear wheel drive    Right hand drive with power steering    20r more    Manual or automatic   E   Water cooled diesel   1  Engine emission   Euro 3 or later   Rear body  Bed    Apparatus and equipment shall be functionally arranged   on the rear body for easier operation and maintenance     Side guards shall be equipped in the lower part of the rear body     Floor material of the rear body shall be antirust     Metal fixers shall be equipped on the rear body for  fastening devices and equipment    j  Loudspeaker   Output Around 30 W   K  Accessories   Seat belt 1 set for all crew     AM FM radio 1se    Air conditioner 1 sel    Spare tire with wheel 1 no     Spare tire fitting 1 no     Floor mat 1 se     Maintenance tool 1 sel    User manual of chassis 1       in Thai or English     4  Power Generator   a  Type   Low noise with cont
31.   question  JICA will recognize a Contractor as ineligible  for a period determined by J ICA   to be awarded a contract funded by the Grant if  at any time  it determines that the  Contractor has engaged in corrupt or fraudulent practices in competing for  or in executing  any other contracts funded by the Grant or other J apanese ODA     7  Period of Execution of the Work     The Work  shall be completed on or before the day of the    day of            The period  may be extended by mutual agreement between the Government of the Kingdom of  Thailand and the Contractor if unpredicted circumstances require any extension of the  period  In order to extend the period  the Government of the Kingdom of Thailand and  the Contractor shall obtain prior consent of JICA  The extended period shall not exceed  the term of validity of the Grant as prescribed in the G A  or documents exchanged for the  purpose of extending the term described in the G A      8  Acquaintance with Local Conditions     1  The Project sites are located in both Ayutthaya city and Ayothaya town  Phra  Nakhon Si Ayutthaya District  Phra Nakhon Si Ayutthaya Provence  the Kingdom of  Thailand     512 2    The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers    9      2     On site orientation will not be held at the site of the Project  The tenderers are   however  advised to visit and to examine the Project site and its su
32.   use or machinability of the castings  Excessive segregation of impurities or alloys at  critical points in a casting will be cause for its rejection  The largest fillets compatible with the  design shall be incorporated wherever a change in section occurs     Surfaces which do not undergo machining and are exposed in the final installation shall be  dressed to provide a satisfactory appearance so that they will not require surface smoothing at  Site prior to painting     2 2 4 Forgings    The ingots from which the forging are made shall be cast in metal moulds  The workmanship  shall be first class in every respect and the forging shall be free from all defects affecting their  strength and durability  including seams  pipes  flaws  cracks  scales  fins  porosity  hard spots   excessive nonmetallic inclusions and segregation     The largest fillets compatible with the design shall be incorporated wherever a change in section  occurs  All finished surfaces of forging shall be smooth and free from tool marks     The forging shall be clearly stamped with the heat number in such location as to be readily  observed when the forging is assembled in a complete unit     2 2 5 Standard for Steel Plates  Bars and Pipes  etc    a  Steel plates for skin plate  structural JIS G 3106  SM400 B  SM490 B or JIS  main parts  except for rolled steel G 3101 SS 400 or ASTM A516 Grade  shape of gate leaves 60 70 or SNI 0552 89 A or equivalent   b  Steel plates for general structures JIS G 3101  
33.  2    51    5 2    5 3    5 4    The Contractor shall complete the Work on or before the 31st day of May   2014 unless the available period of execution under this Contract  between the Client and the Contractor is extended by mutual agreements  within the available period of the Grant stipulated in the G A  The  available period of the Grant may also be extended by mutual  agreements between the authorities concerned of the Government of the  Kingdom of Thailand and JICA within the available period of the E N     Article 5  Shipment and Packing    The Equipment procured in the Kingdom of Thailand shall be delivered to  Ayutthaya Irrigation Project Office of Royal Irrigation Department  Phra  Nakhon Si Ayutthaya District  Phra Nakhon Si Ayutthaya Provence  the  Kingdom of Thailand by the Contractor on or before the 31st day of  January  2014     The Contractor shall be responsible for the carriage of the Equipment to  Ayutthaya Irrigation Project Office of Royal Irrigation Department  Phra  Nakhon Si Ayutthaya District  Phra Nakhon Si Ayutthaya Provence  the  Kingdom of Thailand and for the coverage of the shipping charges  freight     and insurance premiums     Partial shipments are allowed     Transshipment is also allowed     The Contractor shall securely pack the Equipment so as to avoid damage    in transit     Article 6  Country Area of Origin    The origin of the Equipment in the completed shape shall be limited to the  Kingdom of Thailand     The origin of the compone
34.  Ayutthaya  Dear Sir     We   Name of Manufacturer s   as Subcontractor   a  manufacturer s  dully organized and  existing under the law of J apan and having its principal place s  of business at  Address of    Manufacturer s    hereby agree that we will supply to  Name of Tenderer  the following  Equipment proposed in this Tender for the captioned Project       Drainage P ump Vehicles  30m  min  10 sets    Spare parts As specified in the Specification    Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of S igner     Name of Manufacturer     Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of S igner     Name of Manufacturer     5 3  10    The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender     Form H   CERTIFICATE OF AFTER SALES SERVICES BY  MANUFACTURER S  AS SUBCONTRACTOR FOR  HYDRAULIC GATE WORKS    Date   th day of        2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya  Dear Sir     This is to certify that we   Name of Manufacturer s   as Subcontractor   a  manufacturer s   dully organized and existing under the law of J apan and having its principal place s  of  business at  Address of Manufacturer s    hereby accept to cooperate with  Name of  Tenderer  in providing after sales services and maintenance of the following for at least two   2  years
35.  Client s Responsibilities   Contractor s Obligations  Inspection and Delivery   Warranty against Defects  Performance Security  Advance Payment Security  Assignment and Subletting  Force Majeure  Applicable Laws  Disputes and Arbitration  Language and Measurement System  Project Modifications    Amendments and Modifications    Verification of Contract    Early Termination    Patents  Trademarks and Copyrights       DD Ui Oi B uUo Ha    N N oM NY      Ho Ho    on                                          pop  N HM Fe FP O NO NO OO     d N 01    FP W N N       CONTRACT     THIS CONTRACT  made and entered into this   th day of         2012 by  and between Royal Irrigation Department  Ministry of Agriculture and  Cooperatives  the Kingdom of Thailand  hereinafter referred to as  the Client    and  name of the contractor   duly organized and existing under the laws of  Japan  having its principal office of business at  address of the  contractor   hereinafter referred to as    the Contractor         WITNESSETH     WHEREAS  the Japan International Cooperation Agency  hereinafter  referred to as  JICA   extends a grant to the Government of the Kingdom of  Thailand on the basis of the Grant Agreement signed on the 15th day of August   2012 between the Government of the Kingdom of Thailand and JICA  concerning the Flood Prevention Project of East Side of the Pasak River in    Ayutthaya  hereinafter referred to as  the Project     and    WHEREAS  the Client  as a competent authority fo
36.  Contract  The breakdown of lump sum  price does not constitute a part of the Contract  but the Consultant is to use the  breakdown as a reference material for the following purposes such as     1  confirmation of the work amount for an interim payment  and     2  confirmation of the adjusted contract price in case of early termination     Performance Security    The successful tenderer who receives the notification of award shall provide a  performance security amounting to ten  10  96 of the total contract price within fourteen   14  days after the date of award  The Consultant shall have the custody of the  performance security     Notification of the Result of Tender    U pon the receiving the performance security from the successful tenderer  the Client shall  promptly notify the other tenderers in writing that their tenders have been unsuccessful     Chapter 6  Common Conditions    1     Safety Procedure    The Contractor shall    1  comply with all applicable safety regulations      2  take care for the safety of all persons entitled to be on the Site     S 2 10    The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers     3 use reasonable efforts to keep the Site and the Work clear of unnecessary    obstruction so as to avoid danger to these persons      4  provide fencing  lighting  guarding and watching of the Work until completion and  taking over  and     5  provide any tem
37.  Contractor in  another clause in the Specifications     3 7 3 Control Panels   1  General    The Contractor shall supply and install a local control panel for each floodgate on the hoist  deck and two  2  sets of water level detectors at up and downstream sides of the Barrage   The local control panel shall be weather proof construction of outdoor type      2  Local control panel    The following instruments  meter  switches shall be provided on or inside the local control  panel  but shall not be limited to       Earth leakage relay      Surge absorber for incoming main power source      Incoming supply molded case circuit breaker  MCCB  lockable in    OFF    position     Starter of motor      Motor protection relay      MCCBs to protect the motor and other circuits     S 7 2 46    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works      Source volt meter       Load ampere meter       Starter for motor with protection relays       220V convenience outlet       Space heater with thermostat control switch and main on off switch       Fluorescent light with door switch and main on off switch       Push button switches for     Gate open   Gate close   Gate stop   Test lamp for inspection of all indicating lamps      Indicating lamps for     Power source  De energized   Gate full opened  Gate full closed   Gate full opening  Gate full closing  Earth leakage   Motor over
38.  Contractor is subject to the approval by the  Consultant    The admixture shall have a uniform quality in the different stocks  and will be accepted on  the basis of the manufacturer s test certification proving that the products are within the  prescribed limits of acceptance  However  all consignments of admixture shall be  accompanied by certified statement showing manufacturer s name  brand and type of  admixture  date of manufacture and certificate of compliance with the specifications     Before starting the preliminary tests on concrete the Contractor shall submit the samples  of the admixture to the Consultant for the approval     Liquid or powdered admixture for concrete shall be stored under cover and protected  against deterioration  storage shall be so arranged that the materials will be used in the  same sequence of their delivery to the Site     Powdered admixtures shall be measured by weight  liquid admixture can be measured by  weight or by volume  with a tolerance not exceeding 3 percent     Admixture shall be added to the batch in solution  in a portion of the mixing water  in such  a manner that will ensure a uniform distribution of the admixture throughout the batch   during the specified mixing period     Admixture which has been in storage at the site longer than six months shall not be used  until satisfactorily tested     No admixture containing calcium chloride shall be permitted     5 7 1 38    The Flood Prevention Project of East Side of the Volume
39.  Drain Works   General    The work shall consist of the provision of concrete U shape ditches  catch basins and  drain pipes for draining rain water in Han Tra Canal as shown in the Contract Drawings     Material   U shape ditch is reinforced concrete structure with dimension of 300mmx300mm or  300mm x 400mm or 600mm x300mm  Concrete for this items shall confirm to Sub clause  5 1  Class A 1 concrete     Catch basin is the reinforced concrete tank with dimension of 840mm x 1 240mm x  1 620mm     5 7 1 86    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    Drain pipes is precast reinforced concrete pipes as specified in Clause6 4      In U shape ditches and catch basins  the Contractor can choose either precast concrete  or cast in situ concrete     The Contractor shall obtain the material approval relating to the drainage work and submit  the method statement prior to site works      3 Construction Method    Before the placing U shape ditches or drain pipes  the leveling by using bulldozer shall be  carried out to make the proper gradient towards the drain ditch  The adverse gradient of  drain ditches and drain pipe  which prevent the proper function of drain  is not allowed   The gap in construction joints for drain ditches  catch basins and drain pipes shall be  properly filled by mortar     8 9 Sodding   1  General    Sodding shall be placed on the slopes as shown in 
40.  East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     b      12     Prescriptions for Concrete below Required Strength    When test results do not comply with the specifications  the Consultant require that one or  more of the following measures be taken     a  Test the two reserve cylinder at 60 days to verify if the specified strength can be  attained     b  Extract concrete samples  cores drilled from hardened concrete from the structure for  which a compressive test  or group of compressive tests  have given unsatisfactory  results  These samples shall be tested according to ASTM C42 or equivalent     C  Perform load tests  where possible  on the structure for which the compressive tests  were found unsatisfactory     d  Perform other tests as instructed     If  after such testing  the Consultant is of the opinion that the concrete in the structure has  failed to meet the specified requirements he may instruct the Contractor  at his own  expenses  to perform any of the following    i  Change materials  proportions placing and or compaction methods     ii  Extend the curing period until such time as cores drilled from the portions of the  structure represented by the particular test cylinder and conform to ASTM C42 or  equivalent shall show  the concrete in those portion has satisfied the strength  requirements provided that in no case shall the cores be drilled out more than fifty six   56  days after
41.  HWL   EL   6 0 m MSL  Low Water Level  LWL   EL    0 5 m MSL  Sill elevation  EL   0 0 m MSL    Sealing method   Sedimentation     Ground subsidence     Type     Curtain walled four  4  sided watertight at upstream  Not considered in Kra Mang canal and drainage channel    Not considered    Manual racked hoist    Water level at opening operation    Downstream water level  EL  43 5 m MSL    Upstream water level  EL   0 0 m MSL    Water level at closing operation    Downstream water level  EL  46 5 m MSL  Upstream water level  EL    3 5 m MSL   Hoisting height  1 6m   Hoisting capacity  40 kN   Design Loads for Gates    1  Normal loading condition   Hydrostatic loads  Downstream Water Level  EL    6 0    MSL  Upstream Water Level  EL    0 5    MSL    S 7 2 61    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Dead weight of the gate leaf    Operating load of hoist   2  Overloading condition during earthquake    Wave height during earthquake at downstream    Kra Mang Floodgate  0 13m  Han Tra Floodgate 0 15 m  Dead weight    Dynamic water pressure during earthquake    Inertia force during earthquake    5 3 3 Design Loads for Gate Guides    The load on the gate guides shall be wheel loads and all other loads due to the most adverse  operation of the gate and hoist  The gate guides and anchors shall be capable of transferring  the load of the wheels  seals  side wh
42.  Height of gate guides  6  Flatness of seal plate surface  0 5     Straightness of seal plates  1  Flatness of side gate guide surface  0 5 m  Straightness of side gate guides  1  Flatness of side plate surface  1 m  Straightness of side plates  2       The tolerances not specified herein shall be defined by the Contractor  subject to approval of the  Consultant     4 6 Telpher Rail System    4 6 1 General    The telpher rail system shall consist of manual chain hoists  telpher rails  lifting beam and all  other necessary components     4 6 2 Lifting Beam   A lifting beam shall be supplied and installed to handle the stoplog leaves    The lifting beam shall consist of two  2  lifting hooks  counter weight with operation handles   linkage  sheave blocks on the linkage  side wheels and all other necessary components for  operation     The lifting beam shall be capable of catching and releasing the lifting lugs of each gate leaf  automatically by the function of counter weights     The lifting beams shall of all welded construction or of a latticed girder construction     The details of construction of the lifting beams not specified herein shall be made by the  Contractor subject to approval of the Consultant     4 6 3 Telpher Rail    The telpher rail system shall be provided at both upstream and downstream sides of the main  gates for traveling the chain hoists with the lifting beams     The telpher rail system shall consist of SS400 steel I shape rails and H shape piers     S
43.  I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     c     Definition Admixtures     i  Air Entraining   Air entraining agent is an admixture that has the purpose of entraining  air in concrete  It shall be in accordance with the general requirements ASTM Designation  C 260 or equivalent     ii  Water reducing   Water   reducing agent is an admixture that will reduce the quantity of  mixing water required to produce concrete of a given consistency  It shall be in  accordance with the general requirements of ASTM Designation C 494 or equivalent     iii  Retarding   Retarding agent is an admixture that will retard the setting of concrete  It  shall be in accordance with the general requirements of ASTM Designation C 494 or  equivalent    Aggregates  General    The Contractor shall provide all aggregates required for the Works  and shall be  responsible for the specified quality of all material used for aggregates     The Contractor can choose any sources  on condition that the aggregates conform with  the requirements of these specifications in all respects     Existing or new quarries for aggregates chosen by the Contractor shall be approved by  the Consultant  Such approval will not relieve the Contractor from his responsibility for the  selection of sources of suitable materials  and he shall be entirely responsible for all risks  arising from the selection and exploitation of such sources     Within one month of the Contracto
44.  Pipe    Excavation of pipe trench shall be done to the grade and line shown on the Shop  Drawings  The pipe shall be supported firmly through its entire length     Bedding of reinforced concrete pipes shall conform to the requirement given below for    compacted earth cradle or concrete cradle  whichever is called for on the Shop Drawings  or as instructed by the Consultant     S 7 1 76    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     c      d      e      4     If the type of bedding is not shown  concrete cradle shall be provided  under the  Consultant s direction     a  Compacted earth cradle   shall be constructed by bedding the pipe in shallow trench  cut in compacted earth layers to a depth of notless than 20cm  and shall be accurately  shaped by a template to fit the lower pipe exterior for the specified embedment    b  Concrete cradle  concrete cradle for pipe shall consist of a continuous concrete cradle  constructed of Class B concrete in conformity with the details shown on the Shop  Drawings or as instructed by the Consultant     Laying    The method of lowering the pipes into the trench and laying them in position shall be such  as to prevent dirt from entering the pipe and couplings and to prevent damage to the pipe   Before and during execution of the joints  all surfaces shall be clean and free from mud  oil  or grease    The pipe shall be aligned str
45.  Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand     4      5      6     Power Generator   a  Type   b  Number   c  Capacity     d  Engine   e  Fuel tank  Lighting Apparatus     a  Condition     b  Type   c  Lamps     d  Cable    Volume     Section 7 Specifications  7 8 Procurement of Drainage Pump Vehicle    User manual of chassis 1 no  in Thai or English    Low noise with control panel  1 unit    1 phase 220 V  3 phase 440 V x 60 Hz   125kVA or more   Power necessary to run all drainage pumps  all lighting  apparatus and control panel etc  shall be supplied     Water cooled diesel    200 liter or more    Lighting apparatus shall be provided to light up  surrounding area of the vehicle     Floodlights  High intensive discharge  HID  lamps    Cabtire cable 20 m lamp or more   with waterproof connector      e  Shrinkable and rotational device    Control Panel     a  Condition     b  Type    Manually shrinkable to up  amp  down and rotational to  right  amp  left    There shall be stored inverter devices for start and  rotation speed control of drainage pumps  and  operating control of each drainage pumps and on off of  lighting apparatus shall be possible    Power supply connectors to drainage pumps shall be  waterproof and easy to connect power cables of  drainage pumps     Outdoor weatherproof     c  Panel equipment     unit    means the number of pump      Pump start switch 1 no  unit  Pump stop switch 1 no  unit  Pump rotation control switc
46.  RID    Name of the Project    Port of disembarkation    Item number  package number in sequence  and quantity per package   Description of item    Net and gross weight and cubic measurement    Shipper s name  and Supplier s name  if Shipper is different from Supplier    Caution marks  if applicable    Other markings required by the Client      2  Shipment and Delivery     a      b      c     The Contractor shall ship and deliver all components and equipment of the Hydraulic  Gate Works to the Sites in adequate time for its preparation  erection and installation  according to the approved implementation plan     No part of the components and equipment shall be shipped and delivered to the Sites  until approval in writing by fax and or electronic mail has been obtained from the  Consultant for such delivery     Notification of such shipping and delivery shall be given to the Consultant in writing not  later than 7 days prior to the scheduled shipping date for any components and  equipment to be shipped     Shipping advice for the parts of the components and equipment imported from Japan shall  be sent by courier  electronic mail or be handed to the Consultant prior to the on board date  of the Bill of Lading  containing such information as loading and unloading port  date of  departure and arrival  name of vessel  and one  1  photocopy of the following documents     1 9    Clean On Board Ocean Bill of Lading  Signed Commercial Invoice   Packing List   Insurance Policy    Insur
47.  Side of the                                                       7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  4              Monthly Max  WL  5 91m MSL   4 in Oct 17  ad ee  ay    O    Monthly Min  WL   2 5   gt        lt  4  po   2  g xg  5   ss     2  1  0 4  1 2 3 4 5 6 7 8 9 10 11 12  Month             Month water level relation since 1990 at  S5 gauging station of Pasak River in Ayutthaya                      Annual Max  WL   n  WL     5 91m MSL  in Oct 17  2011                 Annual Mi       Water Level in m MSL                                                                             E     OO          A    Y    OR ooo                                      PD           0000 00000000000            0000 0000 0000000000    o     oc rr 5 C cC     C Q NON                           aa             Annual max  and min  water level since 1990 at  S5 gauging station of Pasak River in Ayutthaya    1 6 Erection  Installation  Tests  Inspection  Commissioning and Training    The Contractor shall submit three  3  copies of the Operation and Maintenance Manual  including individual components and equipment of the Hydraulic Gate Works     The Contractor shall assign mechanical engineers and electrical engineers to the sites for the  supervision of the field erection and installation of the components and equipment furnished  under the Contract  and for the field tests  amp  inspection  adjustment  and commissioning   acceptance tests   The number of
48.  Steering position   e  Crew    f  Transmission   g  Engine    h  Engine emission     i  Rear body  Bed      j  Loudspeaker     k  Accessories    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    1 no  unit   Attaching rope or rod 1 set unit   Casing Special lightweight material s   Casing liner Stainless steel or stainless cast steel  Impeller Stainless steel or stainless cast steel  Main shaft Stainless steel or titanium alloy   Tool for pumps 1 set    Mooring rope for pump 1 set unit  Mooring anchor for pump 1 set unit  Float push out bar 1 no     Kingdom of Thailand  Around 10 000 kgf or less    Necessary minimum size of Gross Vehicle Weight  capable to accommodate the required equipment and  apparatus with 500 kgf of allowance shall be selected     Rear wheel drive   Right hand drive with power steering  2 or more   Manual or automatic   Water cooled diesel   Euro 3 or later    Apparatus and equipment shall be functionally  arranged on the rear body for easier operation and  maintenance    Side guards shall be equipped in the lower part of the  rear body    Floor material of the rear body shall be antirust   Metal fixers shall be equipped on the rear body for  fastening devices and equipment     Output Around 30 W  Seat belt 1 set for all crew  AM FM radio 1 set   Air conditioner 1 set   Spare tire with wheel 1 no    Spare tire fitting 1 no    Floor mat 1 set  Maintenance tool 1 set    S 7 3 8    The Flood Prevention
49.  Thailand  Stainless steel fixed wheel gate leaf O Japan O Thailand  Stainless steel fixed wheel gate guide O Japan O Thailand  Manual racked gate hoist    Japan O Thailand             Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of S igner     Name of Manufacturer     Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of S igner     Name of Manufacturer       3  16    The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender       Form M     CERTIFICATE OF COUNTRY OF ORIGIN FOR  DRAINAGE PUMP VEHICLE    Date    th day of         2013  To  Director General  Royal Irrigation Department  Kingdom of Thailand  The Flood Prevention Project of East Side of the Pasak River in Ayutthaya    Dear Sir     We   Name of Manufacturer s   as Subcontractor  hereby submit to you the following list on  the country of origin for the Equipment to be supplied under the captioned Project     Please tick LJ for your choice                       Components Country of Origin  Chassis with cab Ol Thailand  Drainage pump    Japan    Thailand  Control panel    Japan    Thailand  Lighting apparatus    Japan    Thailand  Power generator O Japan O Thailand                Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of Signer     Name of Manufacturer     Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of Signer     Name of Manufact
50.  Type CV    600 volt grade cable  There shall be no splices in the wires or cables and all connections shall  be made only at terminal blocks or studs     All power and control cable conductors shall be of copper and have a minimum cross sectional  area of 2 0 square millimeters unless otherwise specifically specified in these Specifications   Single strand conductor shall not be accepted     Compression type terminal shall be used and ring number identification shall be put at both  ends of the cables     2 12 4 Motor Starters    All starters shall be suitable for direct on line starting of motors  provided with 3 phase over  current relays with manual resetting  open phase relays and reverse phase release feature   Over current relays shall be field adjustable to correspond with the rated full load currents of the  motors  Backup protection shall be provided with high rupturing capacity molded case circuit  breakers with operating handles lockable in  off  position     The magnetic contactors for motors shall have the rated current capacity more than 15096  against the rated current of motors  and have the life of switching operations more than 1 million  times in electrical and more than 10 million times in mechanical     2 12 5 Control Cabinets and Panels    Control cabinet and panels shall be of sheet steel with minimum thickness of 2 3 millimeters  of  rigid  self supporting construction and supplied with channel bases     All indicators such as meters and lights shall 
51.  Works Pasak River in Ayutthaya in the Kingdom of Thailand     2      3      4     the expense of the Contractor  All such excess excavation shall be back filled with  materials supplied and placed entirely at the expense of and by the Contractor and as  instructed by the Consultant     During the progress of the Works     but before the executions  it may be found necessary  to vary the slopes or the dimensions of the excavations from those shown on the  approved Shop Drawings by the Consultant  and the Contractor shall be entitled to no  additional payment by reason of such changes     If the material from quarries or borrow pits is in excess of that needed the surplus material  shall be stock piled in approved areas near those borrow pits until its use is authorized  So  far as practicable and as determined by the Consultant  all suitable material from required  excavations shall be used in the Permanent Works as required under these specifications   and all unsuitable and excess materials shall be disposed to designated disposal area   The Contractor shall conduct the cleaning of the public road if the condition of the road  becomes muddy due to the transportation of the excess soil to the designated disposal  area     Where practicable and as determined by the Consultant  suitable materials shall be  excavated separately from materials to be wasted suitable materials shall be segregated  by loads during excavation operations and shall be placed in the designated final lo
52.  after the Guarantee P eriod regarding the captioned P roject     Full set of Hydraulic Gate Works composed of       Stainless steel fixed wheel gate leaves     Stainless steel fixed wheel gate guides     Motorized wire rope winched gate hoists    Steel maintenance gate leaves     Stainless steel maintenance gate guides    Steel telpher rails     Manual chain hoists and lifting beams     Electric wirings and boards     Lighting facilities     Lightning arresters     Engine generators     Water level meters and data loggers     Stainless steel fixed wheel gate leaf     Stainless steel fixed wheel gate guide     Manual racked gate hoist    5 3 11    Volume I  Section 3  Form of Tender    Authorized Signature of  Manufacturer     Name of Signer   Title of Signer     Name of Manufacturer     Authorized Signature of  Manufacturer     Name of Signer   Title of Signer     Name of Manufacturer       3  12    The Flood Prevention P roject of  East Side of the Pasak River in Ayutthaya     Signature      Signature     The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender     Form I   CERTIFICATE OF AFTER SALES SERVICES BY  MANUFACTURER S  AS SUBCONTRACTOR FOR  DRAINAGE PUMP VEHICLES    Date  th day of es 2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya  Dear Sir     This is to certify that we   Name of Manufacturer s   as Subc
53.  aggregate  when  delivered to the batching plant  must not exceed the following     Percent  by Weight    Material passing No 200 screen 0 5   ASTM C 117 or equivalent    Light weight material 1 0   Clay lumps  ASTM C1142 or equivalent  0 5   Other deleterious substance 1 0    The total of deleterious substances in each potion to be delivered to the mixer must not  exceed 2  by weight  The coarse aggregates will be rejected if failing to meet with the  following requirements       Abrasion test  Los Angles type  ASTM C 131 or equivalent      if the loss  using the standard gradation  type A0  exceeds either 10  by weight for 100  revolutions or 40  by weight for 500 revolutions      if the average loss by weight  after 5 cycles of the sodium sulphate test  ASTM C88 or  equivalent  exceed 10       if the specific gravity of the material  on a surface   dry basis  is below 2 60  ASTM    C127 or equivalent     Grading    The grading of the coarse aggregate within the separated size groups shall conform to the  following requirements when delivered to the mixer     Sieve Size Percent by Weight Passing Individual Sieves  ASTM E11 or equivalent No 4 to lin 3 8 in to 2 in  2 inches  50mm    100  1  inches  37 5mm    90  100  linch  25mm  100 20  45  3 4 inch  19mm  90  100 0  10  3 8 inch  9 5mm  30  55 0 5  No 4  4 75mm  0 5      The Contractor should submit the sieve analyzing data of coarse aggregate to the  Consultant for approval     Water    Water used for mixing  jetting and
54.  all other necessary components  The gate leaf shall properly be divided into several blocks  by vertical and horizontal joints to meet the limits of transportation  The blocks shall be  assembled into a few horizontal sections at erection site or field shop by welding or high tensile  strength reamer bolt connection     Seal weld shall be made at the vertical joints of skin plate  Each horizontal section shall be  connected by hinge pins at end beam and vertical girders to form one gate leaf assembly  The  horizontal joint of skin plate shall be sealed by means of welding or O type rubber seals or other  type of seals to complete water tight  The gates shall be of all continuous welded construction  except the horizontal joints between each horizontal unit and high tensile strength reamer bolt  connection     All cuttings  chamfering and other necessary preparations of each part for field connection  purpose shall be done at the Contractor s workshop     The centralized lubrication system shall be provided so as to lubricate all bearings from each  grease nipple mounted on the top of gate leaf by means of grease gun     Adequate temporary jigs and steel frame works shall be provided to hold the gates rigidly in  proper positions during field erection     The details of construction of the gates  not specified herein  shall be made by the Contractor  upon approval of the Consultant     3 4 2 Skin Plate    The skin plate shall be at the upstream side of the gate  The skin plat
55.  and their certificates shall be  submitted by the Contractor to the Consultant before shipment and delivery     If the components and equipment fail to conform to the Specifications as a result of  such inspections  the Consultant may reject them and the Contractor shall either  replace the rejected components and equipment  or make all alterations necessary to  meet the requirements      b  Adjustment    The components and equipment shall be brought into suitable conditions by the  Contractor and or his Subcontractor for giving the specified performance at site  The  Contractor and or his Subcontractor shall make proper adjustment to settle the  components and equipment into specified conditions for performance  All works must  be done to the satisfaction of the Client  and the Contractor and or his Subcontractor  shall carry out his work in a neat and proper workmanlike manner  The adjustment  shall be planned and carried out in no way to damage the components and equipment        tools  fuel  materials  labors  logistics etc  shall be provided by the Contractor and or  his Subcontractor      c  Commissioning  Acceptance Tests     The Contractor and or his Subcontractor shall check all components and equipment to  ensure that their conditions are good and adequate for giving the specified function   Commissioning  acceptance tests  at sites shall be required in order to check the  function of the Hydraulic Gates in the presence of the Client and the Consultant before  fina
56.  at both the Sites of Kra Mang and Han  Tra Floodgates respectively at the cost of the Client     The electric power required for the hoists  lighting apparatus and water level gauges of the  Floodgates shall be supplied from the above said transformers     Entrusting or Subcontracting as a Whole    The Contractor shall not be entitled to entrust or subcontract the entire Work or a major part  thereof to any third party except for the Subcontractors prequalified in the prequalification     Assignment  etc  of Rights and Obligations     1  Neither party to the Contract shall assign to any third party or let him succeed to his  rights or obligations arising from the Contract      2 Neither party to the Contract shall assign or lend to any third party  or place for    mortgage or any other security  any part of the Work or approved construction  materials thereof     Consultant     1  The Consultant shall act on behalf of the Client as specified below  When any  different provision is made  the Client shall notify the Contractor in writing thereof     S 5 5    14     a  Check and approve the implementation program and schedule and other related  documents submitted by the Contractor     b  Check and approve shop drawings  samples  catalogues  etc  prepared and or  submitted by the Contractor     C  Give instructions and attend to the execution of the Work in general   d  Approve construction materials and working method  and attend to tests     e  Approve the performance based d
57.  be one  1  hour for each set of the Drainage Pump    S 7 3 5    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 8 Procurement of Drainage Pump Vehicle Pasak River in Ayutthaya in the Kingdom of Thailand    Vehicle     The Contractor shall submit the commissioning plan and result report to the Client  through the Consultant s approval thereof     The Equipment shall be required to test at site designated by the Client for all sets  to hand over     All tools  fuel  materials  labors  logistics etc  shall be provided by the Contractor  and or his Subcontractor   After completion of the commissioning with satisfactory results  the Client shall  issue the receipt of the Equipment to the Contractor  and then one  1  year  warranty period will starts      d  Operational and Maintenance Training    The Contractor shall provide operational and maintenance training work with a  target to the concerning personnel of the Client in order to transfer the technical  knowledge on operation and maintenance of the Equipment     The period for the operational and maintenance training shall total five  5  days  including the commissioning     The program and materials thereof shall be prepared in Thai or English and  provided by the Contractor with approval by the Consultant  All tools  fuel   materials  labors  logistics etc  shall be provided by the Contractor and or his  Subcontractor     1 10 Warranty and After Sales Services    The Contractor shall 
58.  be performed immediately before placing  the following lift     The operation shall be continued until all unsatisfactory concrete  and all laitance  coatings   stains  debris  and other foreign materials are removed     When jetting is used  the air pressure shall be not less than 6 kg cm     and water pressure  Shall be just sufficient to bring the water into the effective influence of the air pressure     In case of vertical construction joints  the Contractor shall carry out the chipping after  stripping the formwork to ensure the rough surface of joints     Fine Mortar Layer  A layer of Mortar with a thickness of about 3 cm  shall be placed over horizontal  construction joints before pouring operation start  Accumulations or puddles of mortar shall  not be allowed to settle in depressions     Mortar shall be placed within a quarter hour after mixing  and shall be covered with the  class of concrete specified before the mortar begins to set     Any portion of the mortar layer that begins setting before the coarse concrete is placed  upon it shall be removed at Contractor s expense     Where itis impracticable to apply such a mortar coating or considered unnecessary by the    S 7 1 58    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     c      20    a      b      c     Consultant  special precautions shall be taken to insure that the new concrete is brought  into int
59.  casting of the concrete concerned  The Contractor shall repair and  make good at his own expense the portions of structures from which cores have been  taken     iii  In the event that the results of tests on cores as specified in  ii  above indicate that  despite the additional curing  the concrete has not satisfied the specified strength  requirements  the Contractor shall  if instructed by the Consultant  perform full scale  load tests on the portions of the structure represented by the test cylinder  The tests  shall be of such a nature and duration and the behavior of the structure under load  shall be such as to satisfy the Consultant that the design loads can be carried with a  load factor of two  2  and without undue cracking of large deflections  When load tests  are impracticable or where the portions of the structure subjected to such tests fail in  the opinion of the Consultant  the Contractor shall either strengthen or replace those  portions of the structure concerned at his own expense     Batching Plant    The Contractor can choose either the commercial batching plant or on site batching plant  set by him  and he shall submit a full documentation covering and describing the details  for the approval by the Consultant     Batching plants shall be of recent construction  in good working order and capable of  ensuring a steady production of uniform quality concrete  in agreement with the  requirements of the Specifications  The equipment shall be such to determi
60.  concrete surfaces shall be performed  Each repair  after being finished   shall be moistened and coated with sealing compound in accordance with the foregoing  requirements     Equipment for applying sealing compound and the method of application shall be in  accordance with the provisions of Chapter VI of the latest edition for the Concrete Manual  USBR or equivalent  Traffic and other operations by the Contractor shall be such as to  avoid damage to applied sealing compound for a period of not less than twenty one  21   days  Scaling compound will be accepted on the manufacturers certification of  compliance with specification but permission to ship on certification shall in no way relieve  the Contractor of the responsibility for supplying a compound meeting the specification  requirements  Sealing compounds shall be sampled and tested  The Contractor shall  provide  without charge to the Consultant  such facilities and assistance as may be  necessary for procurement of samples  Sampling will be in accordance with Designation  38 of the least edition of the Bureau of Reclamation Concrete manual  JIS  TIS or  equivalent     Any sealing members that is damaged or that peels from concrete surfaces within  fourteen  14  days after application shall be repaired without delay and in an approved  manner     Protection    After casting  all freshly placed concrete shall be protected from direct exposure to the sun  for a period of at least seventy two  72  hours or the minimum ti
61.  curing concrete and or processing concrete aggregates   shall be clean and free from oil  salt  alkali  silt  organic matter or other deleterious  substance  clay and mud  and shall be as cool as is practicably obtainable  The water  turbidity shall not exceed 2 000 parts per million     Coarse and fine aggregates moisture content shall be taken into account when  determining the volume of mixing water  ASTM C70 or equivalent standards will apply in  establishing the aggregates moisture content     The water sulphate content shall not exceed 0 3  by weight provide that the aggregates  are free of sulfates  If the aggregates contain sulphate the maximum permissible sulphate    S 7 1 43    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     9    a      b     content in the water shall be reduced as directed by the Consultant having regard to the  total sulphate content of the combined concrete ingredients     If water  from local natural sources should contain quantities of impurities in exceed of  allowable limits  the Contractor will be required to make arrangements for ensuring its  purity before use     The Contractor shall submit the water quality testing results to the Consultant for approval   Classification and Requirements for Acceptance of Concrete   Mix Design   General   The mix designs necessary to produce concrete of the required compressive strengths  after 2
62.  execution of the Work     9 5    9 6    9 7    9 8    10 1    10 2    The Client shall cooperate with the resident representative of the  Contractor in the negotiations and procedures with the various  authorities concerned and public and private organizations for the    execution of the Work     The Client shall provide data and information necessary for the    execution of the Work     The Client shall bear the following commissions to the Bank for the  banking services based upon the Banking Arrangement     Advising Commission of Authorization to Pay      Payment Commission    If the Contractor suffers damage as a result of a default by the Client in  the execution of its obligations under the Contract  the Contractor shall  discuss the solution with the Consultant  give a written notice to the  Client and send its copy immediately to JICA  Then the Client and the  Contractor shall consult mutually to settle such matters  The Contractor  shall properly inform JICA of its progress  If the Parties can not reach  agreement within thirty  30  days from the date of the notice  the Parties  shall comply with the dispute settlement process stipulated in Article 18    hereof     Article 10  Contractor s Obligations    The Contractor shall perform the Work in accordance with the Contract    Documents     The Contractor shall prepare shop drawings  progress schedules  and    other technical documents required by the Consultant      10     10 3    10 4    10 5    10 6    10 7    10 
63.  flumes shall be typically made galvanized iron sheets  supported by the  wooded frames and trestles and made watertight  The Contractor shall be responsible for  their maintenance and removal and according to the satisfaction of the Consultant     2 12 Prevention of Water Pollution    The Countermeasure such as installation of silt fence against the water pollution in water  course due to construction activities shall be properly taken by the Contractor     3  EARTH WORKS  3 1 Site Clearing and Top Soil Removal   1  General    This Clause covers all work required for the clearing  grubbing and stripping the areas  utilized for the construction of the Permanent Works       2 Clearing    The Contractor shall remove all obstructions above ground surface  including trees   stumps  down timber  snags  brush  logs  fencing and similar debris     No trees shall be cut outside the areas mentioned above without specific approval and all  trees designated by the Consultant shall be protected from damage by the Contractor s  construction operations      3 Grubbing    Grubbing shall consist of the total removal of tree stumps  jungle growth  brush  roots   buried timber and other objectionable material below the clearing zone  within the  foundation limits of all permanent construction  and from borrow areas  quarry areas   stockpile sites and elsewhere as instructed by the Consultant  Except in areas to be  excavated stump holes and other holes shall be backfilled with suitable materia
64.  in Hot weather    In hot weather the Contractor shall take precautions to ensure that the temperature of the  mixing water  aggregates and cement is kept as low as possible  and that the temperature  of freshly placed concrete is less than 35         If the method used by the Contractor involves spraying of coarse aggregates  then steps  shall be taken to prevent excessive variation in the moisture content of the stock pile  A  sufficient number of moisture content tests shall be carried out to ensure that the weight of  water for each batch is in accordance with the prescribed Water Cement ratio     Precautions in Wet Weather  In wet weather the Contractor shall take necessary precaution to prevent the seepage of  water into storage or weighing hoppers  the contamination of any of the materials and  excessive variation in the moisture content of aggregates   Transportation  General  Concrete shall be conveyed from the mixer to the place of final deposit  to be poured as  rapidly as practicable  by approved methods  which will prevent segregation  loss of  ingredients or damage by exposure to the weather  Concrete shall be conveyed either by    buckets  pneumatic tired buggies  agitator trucks  concrete pumps  conveyors  shutes or in  case of short hauls by approved dump trucks  Conveying equipment shall be of such size     S 7 1 49    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom 
65.  in the Kingdom of Thailand Conditions of Contract  7          Annual Max  WL  5 91m MSL  6 Aandal Mi WE in Oct17  2011                Water Level in m MSL  W                                                                      1990  1991  1992  1993  1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011             Annual max  and min  water level since 1990 at  S5 gauging station of Pasak River in Ayutthaya    The Cofferdams shall be raised up  by piling up soil bags on the tops for instance  as per  augmentation of the water levels in order to protect the industrial and residential zones  situated to the east against direct floodwater intrusion to the cabals of Han Tra and Kra  Mang      2  Dewatering work    The dewatering work shall be required to drain the stormwater into Pasak River from the  local catchment area enclosed by the existing floodgates and the cofferdams for the  Work     The existing Suan Plu floodgate  which is managed by Ayothaya town  has the  operational rule to be closed when the water level at Supachai Pumping station  which is  also managed by Ayothaya town  reaches  2 6 m MSL      As for existing Khao Mao flood gate managed by RID  the upstream side thereof  which  means Rojana Industrial Park side  keeps not exceeding  3 5 m MSL by controlling the  opening of the three gate leaves     The local catchment area dominated inside Han Tra floodgate  Kra Mang floodgate  Khao  Mao floodgate  and Suan 
66.  ingredients and admixtures specified  in Clause 12 have been met     Truck mixers and agitators shall be capable of discharging the concrete with a satisfactory  degree of uniformity as indicated in Clause 12 3 above     When concrete is mixed completely in a stationary mixer  and truck mixer or agitators are  used for transporting the concrete to the placing point  the concrete shall be mixed in  accordance with Clause 12 3 above  and mixing during transport shall be in accordance  with the manufacturer s instructions     The mixers and agitators shall be operated within the limits of capacity indicated by the  manufacturers of the equipment     Bottom Dump Buckets    The buckets shall be capable of prompt discharge of low slump lean mix concrete  The  dumping mechanism shall be capable of controlling the discharge at a slow rate  and of  discharging a relatively small portion of concrete in one place  Dumping of buckets on the  swing  or in any manners which result in separation of ingredients or disturbances of  previously concrete will not be permitted     Truck   The conveying of concrete by truck without agitation equipment  will be permitted provided  the time elapsed between mixing of the concrete and its placing in the final position does  not exceed the limits indicated in Clause 12 4 above     Trucks used for transporting concrete  shall be of a type specially designed for such duty   unless the trucks are used for conveying concrete in approved concrete buckets  
67.  is employed  the Contractor shall ensure that no  contamination by foreign material occurs and that moisture is excluded     Bulk cement shall be unloaded by the Contractor from primary carried directly into weather  tight hoppers at the batching plant  or into storage silos     Storage    Immediately upon arrival at Site the cement shall be stored  All storage facilities shall be  subject to the approval of the Consultant and shall be so arranged as to permit easy  access for inspection and identification     Any cement which has been stored at the Site for more than 120 days may be sampled by  the Consultant and if test results are not satisfactory  the cement will be rejected     The Contractor shall endeavor to obtain all cement supplies from the same factory  He  shall always have at his disposal on the site a stock of cement sufficient for two  2  weeks  normal work  Cement transported in bags shall be stored in solidly constructed  weatherproof sheds  of sufficient capacity  provided with damp proof floors at least 40 cm  above ground level and covered by tarpaulins  The cement bags shall be closely stacked  to a height not exceeding twelve  12  bags and shall not be packed against outside walls     5 7 1 37    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     b     Tile stacking arrangement shall be such that the cement is used in the order in which it is  recei
68.  is in writing  However  any approval given to the Contractor as above  does not relieve the Contractor from any of his responsibilities under the Contract     Project Representative and Engineer in Charge  etc     The Contractor shall inform the Consultant in writing the names of the engineers responsible  for the Work both on Site and in J              The qualifications required for the engineers of the Contractor and his Subcontractors    5 5 6    The Flood Prevention Project of East Side of the Volume I  Section 5  Pasak River in Ayutthaya in the Kingdom of Thailand Conditions of Contract    prequalified in the P requalification are listed hereunder     e Project Manager  Be qualified as FirstClass Civil Engineering Works Execution Managing  Engineer in J apan or its equivalent    e Other Engineering staff  Be qualified as due license and or working experience holders     15  Disagreement between the Consultant and the Contractor     1     The Consultant or his representative may request the Contractor to take necessary  measures for replacement of any of the Contractors employees including his  subcontractors assigned on the Project by clarifying the reason in writing     If the Contractor deems measures requested by the assistant of the Consultants  representative to be extremely unreasonable  he may require the Consultant to take  necessary measures by clarifying the reason in writing  The Consultant shall clarify  the matter without delay upon the receipt of such req
69.  lamp holders in accordance with the local standards     Special care shall be exercised on selection of fixtures so that illumination of the lamp is not  obstructed by accumulation of insects and dust     2 12 13 Electrical Relays    Electrical relays for controls and alarm purposes and auxiliary relays for protection circuits shall  be of the plug in type and the plug in connections shall be made and broken by pressure  contacts  Alternatively  the Consultant may approve the use of plug in trays containing groups  of relays     Relays shall be provided with non flammable dust and moisture proof cases     Relay contacts shall be adequately rated for the service conditions  Relay coils shall be  continuously rated whether the control scheme requires them to be continuously energized or  not  The relays shall have the life of switching operations more than 1 million times in electrical  and more than 10 million times in mechanical     At least one spare normally open contact and one spare normally closed contact shall be  provided on each relay in addition to the contacts required by the control scheme     2 12 14 Terminal Strips    Terminal strips shall be of double stud and 2 hole solid link design with the studs molded into an  insulating base  Pinch type terminal blocks and slotted links are not acceptable  Studs shall be  of brass and 6 millimeters diameter except that studs of 4 7 millimeters diameter in corrosion   resisting steel or phosphor bronze may be approved     
70.  landowners for the due relocations of the lands and properties  and  make due compensation to the affected landowners in conformity with the applicable  laws in the Kingdom of Thailand     To obtain construction approval from the authorities concerned for the construction  work     To cut and uproot trees to clear the construction areas of the flood gates and bank  protection and also to take necessary measures to recover the vegetation in  consultation with due experts and agencies concerned     To relocate existing utilities such as electric power lines  railway telecommunication  cables  and water supply pipes  etc  that otherwise might be affected during the  construction works of the captioned project  To be also responsible for damages to  the above utilities except those caused by negligence of the contractor     To extend the electric power lines and install the transformers with the necessary  capacity for the floodgates of Han Tra and Kra Mang  and also relevant temporary  stockyards     To obtain permission for the use of frequency band for the telemetry system for well  operation     To provide land for the temporary stockyards and access way for setting up the site  offices and storage of construction materials and equipment during the construction  work     To conduct environmental and social impact monitoring in conformity with the  ENVIRONMENTAL MONITORING CHECKLIST instructed by the Royal Irrigation  Department of the Kingdom of Thailand and advised by J apa
71.  netu S 7 2 56  4 5 2 SII et aa E ice endete ike E            MERE fr poor e eta Rao sc Read E      S 7 2 56  4 5 3 Side  Gate Guide                    datos S 7 2 56  4 5 4 telo  SR A E E    ence aee eterne         S 7 2 56  4 5 5 AA                               k          S 7 2 57  4 6 T elpher  Rall  St ista ada S 7 2 57  4 6 1 General  ien eeu I abite a aa  S 7 2 57  4 6 2 Lifting Beam           S 7 2 57  4 6 3 Ieri EE S 7 2 57  4 7 Shop Assembly and                               eene S 7 2 58  4 7 1 Stoplogs and Gate Guides     coooocccccnoocccccononccnnonancnnononnnncnnnnnnncncnnnn mene S 7 2 58  4 7 2 Lifting  Beam  icut o eor he Le e d Re ra t ds S 7 2 58  4 8 Erection  Installation and Tests at Site                                                         S 7 2 58  4 8 1 Erection and Installation          oooonnnnnnnicccccccnnnnonncononncccnncnnnncnnan nc cnn nn noncnnnnnnnos S 7 2 58  4 8 2 Field Tests and                                                               S 7 2 59  4 9 Commissioning  Acceptance Tests                                                              S 7 2 59  5  FIXED WHEEL GATE AND HOISTS FOR DRAINAGE CHANNEL             S 7 2 60  5 1                ET UP PEE S 7 2 60  5 2 Design SUESSOS m S 7 2 60  5 3 Design Dat    entes Rn S 7 2 60  5 3 1 General Data    eoe sie S 7 2 60  5 3 2 Design Loads for                                                                S 7 2 61  5 3 3 Design Loads for Gate Guides                       ssssse S 7 2 62  
72.  not be  permitted     Tests on Concrete    Test    S 7 1 45    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    Concrete which is being placed in the Works will be sampled  cured and tested by the  Consultant in accordance with the appropriate ASTM or other equivalent standards  as  required     The Contractor shall however conduct independent tests to ensure that the minimum  strength and quality control requirements are being met     The number of required samples and tests will be established by the Consultant  As a  guide they will be made according to the following                       ae Testing Age  7 day 14 day 28 day    First test of each mix design 12 4 4 4    For each concrete pouring   From 0 to 50m 8 3 0 3  From 50 to 100 m  8 3 0 3  Every additional 100 m  or 8 3 0 3  part thereof       However the Consultant shall be entitled to test the compressive strength of concrete from  every individual concreting operation and from as many batches as required  and the  concrete so used will not be included in any measurements for payment purposes  The  workability shall also be testes at different intervals during a concreting operation to  ensure that the requirements of Clause 10 are met  The Contractor shall provide the  necessary sampling facilities required by the Consultant     The method used in sampling  making curing and testing of concrete cylinders  eit
73.  not be greater  than 50 percent of the tire width of a single tire at the operating pressure for a 11 500  kilogram wheel load  The roller shall have a rigid steel frame provided with a body suitable  for ballast loading such that the load per wheel may be varied  as instructed by the  Consultant  from 8 000 to 11 500 kilograms  The roller shall be towed or self propelled at  working speeds not exceeding 15 kilometers per hour  The Contractor may propose to the  Consultant for his approval other types of rubber tired rollers     Vibrating Roller    The vibrating roller shall be equivalent to a 10 ton static roller  It shall be self propelled or  towed  at working speed not above 2 5 km h     The Contractor shall submit the manufacturer s specifications  for the approval of the roller  type by the Consultant     Special Compactors    Compaction of material in areas where itis impracticable to use a roller as provided above  shall be performed by tamping compactors of the heavy duty power driven type  They  shall be capable of producing densities at least equal to those produced by the equipment  specified in this Clause  All such equipment will be subject to approval by the Consultant   Compactors which do not obtain the required density with a reasonable amount of  coverage of each layer and at a production rate consistent with the adjacent embankment   shall not be used in the work  Compacted layer thickness by this equipment will be subject  to approval     Water Spraying 
74.  of Country Area of Origin of Proposed Equipments and Materials  Quality Assurance Certificate of Procured Equipments and Materials  Report on Performance   Shop Test of Procured Equipments  Request for Inspection of Procured Equipments and Materials  Request for Work Inspection   Quality Inspection R eport   Diagram of Contractor s Site Organization for Safety   Record of Concrete Quality Assurance Tests     Mixture     Material Features     Result of Concrete Quality Assurance Tests   Report on Commissioning Tests    Report on Operational and Maintenance Trainings    As built Drawings  Others as instructed by the Consultant      5 12    SECTION 6    TENTATIVE IMPLEMENTATION SCHEDULE    TENTATIVE IMPLEMENTATION SCHEDULE  Flood Prevention Project of East Side of the Pasak River in Ayutthaya       Calendar Year 2012 2013 2014       Japanese Fiscal Year 2012 2013 2014       Month 415167 819 10 1112 1 2 3  4       Exchange of Notes  E N  v       Grant Agreement G A  v             Contract    Contract for the Project             Manufacture and transportation of materials and equipment       Preparatory and temporary work  a       Kra Mang Floodgate       Cofferdam work           Foundation work a       Earth work       Concrete work       Design and manufacture of hydraulic gate structures       Transportation and customs clearance of hydraulic gate structures       Installation of hydraulic gate structures          Removal of cofferdam and demobilization       Han Tra Floodgate
75.  of East Side of the    7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  Helicoids of spindle 0 2  Helicoids of worm gear at starting 0 06 to 0 10  Helicoids of worm gear in operation 0 03 to 0 06    Friction surface between cast iron and cast iron cast steel for    brake in dry condition          26  Friction surface between cast iron and cast iron cast steel for          0 08 to 0 12  brake in wet condition  Friction surface between steel plate and cast iron cast steel for 0 15 to 0 20  brake in dry condition      Friction surface between steel plate and cast iron cast steel for       0 10 to 0 20  brake in wet condition  Friction surface between bronze and cast iron cast steel for 0 10 to 0 20    brake in wet dry condition       2 10 Mechanical Efficiency    For the purpose of designing the gates hoists  the mechanical efficiency shall not be more than  the following value         Pans Mechanical Efficiency _  Sheave with plain bearing 0 95  Sheave with rolling bearing 0 98  Drum with plain bearing 0 95  Drum with rolling bearing 0 98  Spur or Bevel gear with plain bearing per set  open type  0 95  Spur or Bevel gear with plain bearing per set  oilbath type  0 97  Cyclo speed reducer     1 stage reduction ratio 1 59   1 11 0 80 to 0 85     1 stage reduction ratio 1 121     1 87 0 65 to 0 75  Worm speed reducer     1 stage reduction 0 37 to 0 59     2 stage reduction 0 35 to 0 57     3 stage reduction 0 34 to 0 56  Helical speed reducer     3 st
76.  of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works      Existence of abnormal noise and vibration during operation of hoist     Check of looseness and loss of bolts and nuts      Temperature rise of bearings  motor and speed reducer      Measurement of rising and lowering speeds of gates      Check of voltage and current of hoist motor      Check of water level detectors  transmitter and data loggers      Check of appearance and on off of lighting fixtures  and     Check of manual operating of hoist     Acceptance criteria of the radiographic testing shall be in conformity with 2  class or higher  stipulated in JIS Z 3104 and 3106 or equivalent such as ISO  EN  BSI and ASTM approved by  the Consultant     Any defects or improper operation discovered during the test shall be corrected and the entire  test shall be repeated to the satisfaction of the Consultant     3 10 Commissioning  Acceptance Tests     After the tests at site have been completed and approved by the Consultant and relevant  structures under other contracts are fully erected and installed  the following inspection shall be  conducted by the Contractor for assessment of their performance as commissioning   acceptance tests  in the presence of the Client     Commissioning shall be conducted launching the completed shape of the civil works and the  hydraulic gate works into water of the canals      1  Discharging tests    Measurement of vibrat
77.  of the Work    In case of Force Majeure or other unavoidable and justifiable causes  the Contractor may  request the Client to extend Period of Execution of the Work  clearly stating the reason  therefore  The number of days for extension shall be determined by negotiation among the  Client  the Consultant and the Contractor and verified by J ICA     Client s Rightto Suspend Work or Terminate Contract    The Client may  when necessary  suspend the Work within thirty  30  days of the issue of  written notice to the Contractor and terminate the Contract in any of the following cases  and    949 9    in such cases the Client may demand of the Contractor compensation for damages of which  the Client suffered     a  Ifthe Contractor fails  without justifiable reason  to commence the Work after the  elapse of the date of commencement     b   f the Contractor violates the provision of Clause 18 of this Conditions of  Contract     C  If the Contractor violates the Contract in any way and if the objective of the  Contract is deemed not attainable because of such violation     27  Contractor s Rightto Suspend Work or Terminate Contract     1     The Contractor may  when necessary  suspend the Work within thirty  30  days of the  issue of written notice to the Client and terminate the Contract in any of the following  cases in accordance with the Article 23 Early Termination of the Form of Contract     a  If the Client fails  without justifiable reason  to comply with the Contractor s 
78.  of the bigger bar for deformed bars and 40 times of diameters of the  bigger bar for plain round bar     Welded Splices    Welding of reinforcement bars in lieu of overlapping shall not be permitted unless  approved by the Consultant     If approved by the Consultant  all welding shall conform to  REINFORCED STEEL  WELDING CODE  of AWS  American Welding Society  D12 1  JIS and other equivalent  standards     All welders employed shall show proof of their welding qualifications to the Consultant  All  welding shall be done using metal arc welding or pressure gas welding  Electrodes shall  be acceptable to the Consultant  Coverings of low hydrogen electrodes must be  thoroughly dry when used  The surfaces to be welded shall be clean and free from rust  and dirt  All welds shall develop the full strength of the bar or of the smaller bar where two  different sizes are welded  Tests will be required on not more than 5 percent of the welds     Mechanical Splices    The use of Mechanical Splices Coupler will be subject to the approval from the consultant   The torque wrench shall be used to test the moment of force     Dowels    The contractor shall furnish and place the dowels as shown on the approved Shop  Drawings or as instructed by the Consultant     The dowels shall be smooth round bars  unless otherwise specified     Dowels will be inspected for compliance with requirements as to size  shape  length   position and quantity after they have been placed     Before the dowels ar
79.  piping materials with valves and cocks     A Air suction strainer       Expansion of flexible joint for exhaust pipe       Special maintenance tools for repairs     A test pump with a pressure gauge for fuel injection valve     150   of the quantity of lubricating oil required     Two  2  drum cans  180 litter per drum can  of light diesel oil for fuel     Silencer and exhaust pipe with thermal insulation to atmosphere    Rating plate     Two  2  Fire extinguishers      Any additional accessories of manufacturer s standard  Generator details    The generator shall be of 3 phase  4 wires  revolving field type brush less with damper  winding  self excited  a self ventilated open type single wiring synchronous alternator  The  rating of the generator shall be continuous output 400 230 V  50 Hz  0 8 lagging and shall  be directly connected to the engine     Insulation shall be Class  B  of IEC 85     The automatic voltage regulator shall be provided for the excitation system  which shall be  capable to control voltage within   2   from no load to full load     The neutral point of armature winding shall be connected to neutral bus of the main  distribution board  and solidly grounded     The maximum temperature rise of the generator shall not exceed the following       The stator winding  by thermometer    60  C    Rotor field winding  by resistance    75        Iron core and other parts  by thermometer        75  C    The following accessories shall be supplied     Rating plate
80.  pumps    b  Type   Outdoor weatherproof   c  Panel equipment     unit    means the number of pump      Pump start switch 1 no  unit    Pump stop switch 1 no  unit    Pump rotation control switch 1 no  unit    Emergency stop button 1 no     Display recovery button 1 no     Voltmeter 1 no     Ammeter 1 no  unit    Frequency meter 1 no     Tachometer 1 no  unit    Hour meter 1 no  unit    Others needed   d  Display language   Thai or English   7  Paint Color   To be specified by the Client   8  Accessories   Grounding electrode 1 set    Test and inspection record in Thai or English 1 no     User manual in Thai or English 2 nos     Parts list in Thai or English 1 no     Shop drawings  Overall installation diagram  Component  installation diagram  Wiring diagram etc   in Thai or English  2 nos     The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender     For reference only   POWER OF ATTORNEY  Date    th day of         2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    Dear Sir     I  the undersigned  hereby constitute and appoint  Name and Title   whose specimen  signature appears at the lower left corner of this document  to sign the tender and all other  related documents thereof which are subject of the Invitation to Tender for the Flood  Prevention Project of East Side of the Pasak River in Ayutthaya  on behalf of the  undersigned     This Power of Attorney shall remain in force until the 
81.  referred to as    J ICA   will extend a grant to the Government of  the Kingdom of Thailand in accordance with the Grant Agreement  hereinafter  referred to as  G A    signed on the 15th of August  2012     On behalf of the Government of the Kingdom of Thailand  as the Client  the  executing agency  Royal Irrigation Department  Ministry of Agriculture and  Cooperatives  will invite the eligible tenderers provided in Clause 2 of this Chapter  to the tendering for the Project     Qualification of Tenderers    Eligible tenderers shall be J apanese nationals who satisfy the following requirements     The term Japanese nationals whenever used in these tender documents means    J apanese physical persons       apanese juridical persons who are controlled by J apanese    physical persons  Any firms  who fall under any of the items of Article 26  paragraph 1 of    the Foreign Exchange and Foreign Trade Act  Gaikokukawase oyobi G aikokuboeki Ho     Law No 228 of 1949  J apan   shall not be regarded as being controlled by J apanese    physical persons     Eligible tenderers shall be the ones who have been pre qualified prior to the tendering     Description of the Project     1      2     The executing agency  Royal Irrigation Department  Ministry of Agriculture and  Cooperatives  takes overall responsibility for implementing the Project  with the  consultation services by CTI Engineering International Co   Ltd    hereinafter  referred to as the Consultant      The Project will contri
82.  removed     Form Ties and Bolts    The design of from ties shall be such that no metal shall be within 2 cm of any exposed  surface  Wire ties will be permitted only where Finish F1 and F2 is specified   refer to 21 2  Classification of Surface Finish  provided that the wire is cutback to a depth of 2 cm from  the concrete surface after stripping of formwork  and the holes dressed with mortar     S ufficient form ties and bolts shall be used on both sides and within a few centimeters of  construction joints so that the forms fit snugly against the concrete previously placed  and  remain in tight contact during pouring     The ties shall be constructed so that removal of the end fasteners can be accomplished  without causing appreciable spalling of the concrete face     After completion of the concreting the Contractor shall withdraw the bolts and securely fill  up the holes with cement mortar     Possible damage to the concrete due to the aforementioned operations shall be repaired  in accordance with the contents of Clause 23  Repair of Concrete Surface      Chamfer Strips    Chamfer strips shall be placed in corners of the forms so as to produce beveled edges on  permanently exposed concrete surfaces and exposed joints except where specifically  indicated by the Consultant  Re entrant comers will not require beveling  unless such  requirement is indicated on the Drawings  Unless otherwise specified  chamfering strips  for exterior beveled corners shall be from 2 to 5 centi
83.  request for solving issues arising out of the execution of the Work  seriously  affecting the Contractor s progress of the Work     b  Ifthe execution of the Work is impossible because of the failure of the Client to  give the possession of the Site as mentioned in Clause 7 of this Conditions of  Contract or elsewhere in the Contract Documents  or because of the nature or  state of the Site of the Work having been changed by Force Majeure     C  Suspension of the Work or Termination of this Contract under this Clause shall  be subject to the approval of the competent authorities of the Client and  approval of  ICA     28  Completion and Inspection     1     On completion of the Work  the Contractor shall request the Consultant for final  inspection  and the Consultant shall promptly comply in the presence of the  Contractor  And if the work are found in all respects in accordance with the Contract   the certificate of completion stating the date on which the Work were completed in  accordance with the Contract shall be issued by the Consultant     If the Work fails to pass  the Contractor shall repair  reconstruct or remanufacture the  Work and or the Equipment within Time for Completion or within such time as may be  designated by the Consultant  and shall have the said Work re inspected by the  Consultant     The Contractor shall  in compliance with the Consultants instructions  remove  temporary construction facilities  clean up the Site  borrow area and others  and  perf
84.  sequence but also the time allowances necessary for the  preparation and approval of drawings and samples procurement and shipping of  materials and equipment  installation of special items  possible delays caused by floods  or inclement weather conditions  religious holidays  etc     The schedule shall be prepared so that all the works are to be completed in compliance  with the Payment Conditions stated in the FORM OF CONTRACT AND ANNEXTURES   The construction time schedule submitted shall be subject to due modifications and  changes as necessary  and approved by the Consultant within a reasonable time  This  revised time schedule agreed and signed by the Consultant and the Contractor shall be  deemed to be an authorized construction time schedule and become part of the Contract  Documents     The authorized time schedule shall be closely monitored and kept current  and it shall be  formally updated by the Contractor once every two  2  months  or as directed by the  Consultant  and submitted to the Consultant for his review and approval     If during the course of construction of the Works  the rate of progress of the Works falls  behind the schedule agreed in the opinion of the Consultant  and the Contractor shall not  be able to complete any one section of the Works by the time agreed  then the  Consultant will instruct the Contractor to increase his work force or supplement the  Constructional Plant on Site to expedite the rate of progress in that section     Progress R
85.  service  to the Consultant for approval              Contractor shall responsible for wiring  laying and furnishing of control and power  cables and power cables and or wires which are necessary for the required operation       All wiring in the control panel shall be of PVC insulated stranded copper conductor     formed neatly into groups and properly supported  There shall be no splices in the  wires or cables and all connections shall be made only at terminal blocks or studs     S 7 2 68    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works       o         All external wiring between the control cubicles  motor  limit  switches  etc   shall be  with multicore copper cross linked polyethylene insulated  PVC sheathed  type CV    600 V grade cable     All wiring shall be carry out 1 accordance with wiring diagrams so that arrangement of  the wiring is consistent through out the equipment and identical for those parts of the  equipment performing the same duties     Wiring diagrams shall be drawn as seen from the back  i e   wiring side  of the Panel   except for front connected equipment  and shall show all terminals on selector  switches  relays  contractors  terminal blocks  etc   in their correct relative positions     Terminal blocks shall be arranged to run in numerical order from top to the bottom     Wiring shall be neatly and securely bunched or cleat  and 
86.  side shoes shall be made of stainless steel     Each side shoe shall be designed to withstand the rated hoisting capacity of the chain hoist     4 4 6 Lifting Lug    Each gate leaf shall be fitted with two  2  lifting lugs on the top of it  The lugs shall be designed  to ensure that the hooks of the lifting beam can catch and release the lifting lugs smoothly     4 4 7 Tolerances    Each gate leaf shall be accurately fabricated and installed with the following tolerances     S 7 2 55    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the          7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  Point to be Measured Tolerances  mm   Stoplog width  6  Stoplog height  4  Stoplog depth  3  Diagonal length difference  6  Distance between side wheel treads  6  Distance between bearing plates  6  Distance between lifting lug  6  Distance between side seal rubbers  6  Flatness of top sealing plate  0 5 m       The tolerances not specified herein shall be defined by the Contractor  subject to approval of the  Consultant     4 5 Details of Gate Guides    4 5 1 General    Each gate guide shall consist of the sill beams  sealing plates  side gate guides  guide plate   and all other necessary components     The details of construction of the gate guides not specified herein shall be designed by the  Contractor subject to approval of the Consultant     4 5 2 Sill Beam    The sill beams shall be embedded in the bottom of the mai
87.  sites  not to cause accidents     Taking Measures against Bad Weather   The Contractor shall take necessary measures against bad weather  collecting of  information  notifying to workers  checking sites  managing to prevent from damage and  if  necessary  stopping the works     Taking Measures against Fire    The Contractor shall appoint a person in charge of fire protection  and shall check a site  office  rest houses and other facilities at fixed interval     Hazardous Material Management  The Contractor shall appoint a person in charge of hazardous material management   Protection of Existing Houses and Utilities  The Contractor shall carry out the necessary protection works against the possible  damage to existing houses and utilities  roads and railways  In addition  the Contractor  shall carry out the monitoring such as measurement of crack  displacement  and  settlement during the construction activities   Management in Site  Notification of a Construction Plan and Chain of Command     The Contractor shall notify a construction plan and chain of command to workers early on     Emergency Treatment    S 7 1 92    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     3      4      5      6      7     9 5   1      2      3      4     The Contractor shall notify an information network in an emergency and methods to treat  the problems     Underground Installation  The Co
88.  station competent flagmen whose sole duties shall consist in directing the movement of  traffic through or around the work     In addition to the requirements of the paragraphs above  the Contractor shall furnish and  erect  within or in the vicinity of the project area  such warning and guide signs as may be  instructed by the Consultant     2 9 Maintenance and Protection of Traffic    It is the intent of Sections 2 7  2 8 and 2 9 wholly or in part  that the Contractor shall keep  open to traffic any existing road during the performance of the works  provided that when  approved by the Consultant the Contractor may bypass traffic over a detour     The Contractor shall take necessary care at all times to ensure the convenience and  safety of residents along and adjacent to the road     The cost of the maintenance and protection of traffic provided under the Contract shall  not be paid separately and shall be deemed to be included in Contract P rice     2 10 Trafficability for the Heavy Equipment    Where the heavy equipment or dump truck is used on soft ground after the dewatering in  canal  the Contractor shall carry out the necessary countermeasure such as soil  replacement  use of steel plate  to keep the trafficability     2 11 Water Control and Dewatering     1      2     General    This Clause covers all the work to be performed by the Contractor during the Execution  of the Works to ensure that the Works will be carried out in dry condition     The Contractor shall fu
89.  steel pins and  self lubricating metal bushing with lubricating system and location washers  If the wheels are  flanged to restrain the gate from moving in watercourse direction  bushings inserted in the  wheels shall have an integral thrust shoulder to transmit the resulting load     Each wheel and pin shall be designed to the load of ten  10  percent of the gate weight and  shall withstand the imposed load due to the gate becoming jammed in the gate frame     3 4 6 Seals    The gate seals shall be of the flat bar shapes clamped to the upstream surface of the skin plate  using stainless steel bars  bolts  nuts and washers  The P type  or J type  rubber seals shall be  provided on the downstream surface of the gate leaf so as to minimize water leakage while  water level at the downstream is higher than the one at upstream  The seals shall be spliced at  the corners to provide a single continuous seal  The tensile strength of all splices shall not be  less than fifty  50  percent of tensile strength of the unspliced material     3 4 7 Sheave Assembly    The sheave assembly comprising a corrosion resisting steel pins  Vee grooved sheave and self   lubricating bearings with lubricating system shall be furnished on top of the gate leaf  The  attachments shall be provided to ensure that the wire ropes cannot detach from the sheave  grooves in case that the wire rope goes slack     3 4 8 Tolerances    The gate leaf shall be accurately fabricated and installed with the following to
90.  the  surface of concrete  both formed and unformed  shall be smooth and shall not present  abrupt or gradual irregularities outside the surface finish tolerances herein described   Abrupt irregularity is defined as a change in a surface that takes place without any  transition whatsoever  gradual irregularity is defined as a change that takes place over a  transition distance     b  Classification of Surface Finish    Surface finish shall be governed by the nature of formwork materials by the finishing tools  employed in uniformed surfaces  and by the maximum allowable irregularities  Surface  finish shall be classified as follows     Fl  as produced by sawn timber form work  or finished by wood trowel with abrupt  irregularities up to 2 cm and gradual irregularities up to lover 100  This finish is for  surfaces against which backfill or further concrete will be placed     F2  as produced by dressed timber formwork  or finished by wood trowel  with abrupt  irregularities up to   cm and gradual irregularities up to lover 100  This finish is for  surfaces which are permanently exposed to view generally for canal lining canal  structures  wall and slab of building  unless otherwise noted on the construction  drawing     F    UJ      as produced by plywood formwork  or finished by steel trowel with abrupt irregularities  up to 0 3 cm and gradual irregularities up to lover 250  This finished is for surfaces  which will be in contact with water flowing at high velocity  and for su
91.  the approval from the Consultant     Pile Driving    Precast concrete piles shall be driven in such manner as notto subject them to excessive  and undue abuse  producing serious injuries as crushing and spalling of the concrete   Manipulation of piles to force them in the proper position  considered to be excessive by  the Consultant  will not be permitted     Each pile shall be driven without interruption until the specific penetration is obtained  The  use of water jet to assist in driving the piles will not be permitted     Pulling and pushing the pile cap to the required position by any means will not be  permitted     Construction Tolerance for Precast Concrete Pile  The tolerance in each pile top shall be as follows    a  EL  cut off level    50mm   b  Eccentricity within 100mm    c  Inclination within 3 degree    The Contractor shall submit the drawings and records which indicates the actual EL   eccentricity  and inclination of all piles to the Consultant     If the welding for joints is necessary  the welding shall be done by the eligible skilled  welders  After the completion of welding  the Contractor shall request the Consultant to  conduct the visual inspection and penetrant inspection     Piles Incorrectly Driven   Precast concrete piles incorrectly driven or damaged in driving to such an extent as to  unsuitable  as determined by the Consultant  or whenever the eccentricity of pile top  exceeds 10 centimeters from the designed location shall be corrected at th
92.  the operation of the system from time to time  if it is deemed necessary in  the opinion of the Consultant     Sanitary Arrangement and Clearing of Site    The Contractor shall keep the Site in a clean and sanitary condition and shall provide and  maintain sanitary convenience for the use of persons employed in the Works to the  extent and in the manner and at such places as approved by the Consultant and by any  local or other authorities concerned  and all persons connected with the Works shall be  obliged to use these conveniences     The Contractor shall also post notices and take such other precautions as may be  necessary to keep the Site clean     Explosives and Fuels    The Contractor shall make arrangements to transport  store and handle explosives  if any   and fuels in a safe manner for protecting the public in accordance with the laws and  security regulations in force     The Contractor shall obtain all necessary licenses and shall pay all fees and charges in  respect of the same as may be necessary for the purpose of moving explosives and fuels  from place to place and storing the same  and shall carry out all applications to obtain the  approvals from the concerned authorities of the Government of the Kingdom of Thailand     The Contractor shall supply and install an efficient warning system so that adequate  warning may be given for all persons that may be endangered when explosive charges or  group of charges are to be fired     The Contractor shall ensure  
93.  the subgrade without segregation of sizes  followed by placing thereon layers  of the other materials to such loose thickness and proportions that  when mixed together  and compacted  the finished layer will conform to the specified gradation  liquid limit   plasticity index  and designated thickness  Alternate placement of aggregates and binder  materials in windrows shall also be permitted  The material shall then be spread in a layer  of uniform thickness  The material shall be mixed with mechanical mixers  blade graders   harrows  disks  or other approved equipment  in such manner as not to disturb or mix  material from the underlying subgrade into the overlying layer  Initial mixing shall continue  until the mixture is uniform throughout  adding water to the extent necessary to prevent  segregation during mixing by the sprinkling equipment specified above  Mixing shall  continue until the water is uniformly distributed throughout  as determined by the  Consultant  Following this mixing procedure the approved mixture shall be leveled to the  required contour and grades with blade graders  Unsatisfactory areas shall be removed  and replaced with satisfactory materials  or the material shall be re mixed in the area  as  instructed     Placement of Shoulders    Where shown on the approved Shop Drawings  the shoulders be constructed  The  material shall conform to the requirements of subgrade material  The shoulders shall be  carried out on a previous subgrade in a way that 
94.  the supervisory engineers and their assignment periods are  necessary for Consultant s approval     The Contractor shall also be responsible for the training on the operation  amp  maintenance to the  concerning personnel of the Client during their supervisory period     1 7 Name Plates and Stickers     1  Name Plates    S 7 2 4    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    1 8     1     Each components and equipment  hoist motors  speed reducers  brakes  racked hoists   chain hoists  lifting beams  control panels  switchboards  distribution boards  lighting  fixtures  etc   shall have a standard name plates securely affixed thereto in a conspicuous  place  showing the name  type and model of equipment  production serial number  date of  manufacture  the manufacturers name and all other necessary information to complete  identification  in English or Thai     Stickers    The Contractor shall provide stickers as shown below for each component of the  Equipment  except for small parts and materials  The stickers shall be made of aluminum   It should be an adequate size considering the dimension of each product  The design   material and dimensions of the stickers shall be submitted to the Consultant for prior  approval     Type of font  Futura Bold  Component of color  DIC156  red   black  white    From  the People of Japan       Packing and Shipment  Pack
95.  to request any extension of Time for Completion  or compensation  for it     Prevention of Damage and Accident     1  The Contractor  including his Subcontractors prequalified in the Prequalification  shall   at his own expense  take necessary and adequate measures on the work  in  accordance with the Contract Documents and relevant laws  ordinances and  regulations in the Kingdom of Thailand  in order to prevent damages to the work   construction and manufacturing materials  adjacent structures or to any third party   from the commencement of his field work to the completion and delivery of the Work      2 The Contractor shall  whenever he considers it especially necessary for the    5 5 8    The Flood Prevention Project of East Side of the Volume I  Section 5  Pasak River in Ayutthaya in the Kingdom of Thailand Conditions of Contract    22     23     24     25     26     prevention of accidents  take appropriate measures  asking in advance for the opinion  of the Consultant      3  Whenever the Consultant considers it necessary to take measures for the prevention  of accident and has requested the Contractor to do so  the Contractor shall comply  therewith     Damage to Third Party    If any damage has been caused to a third party by the execution of the Work  the Contractor  shall compensate the third party for such damage     The Contractor shall provide insurance adequately to cover damages to the third party  under the name of the Contractor and the Client     Insuranc
96.  used where shown on the drawings or as instructed by the  Consultant  for the installation of machinery  equipment  anchor blocks second stage filling    and similar works     The non shrink filling shall be prepared with Embeco type compound produced by Master  Builders Co   or equivalent compound approved by the Consultant     The Contractor may use both a pre mixed grout compound and a job mixed compound  In  the latter ease the cement and the sand shall comply with the requirement set forth in the  Specifications     The non shrink mortar shall be composed of sand  cement  non shrink compound and  water     Proportioning and Tests    The Contractor shall proportion the mixtures so as to guarantee a design compressive  strength of not less than 270 kg cm  after 28 days and an absolute non shrinkage     The mixtures  the compressive strength tests and non shrink tests shall be submitted to  the Consultant for approval 30 days before using the filling     S 7 1 85    Volume I  Section 7 Specifications The Flood Prevention Project of EastSide of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     3     8 7     1      2      3     8 8   1      2     The quality of the mixtures will be checked as provided for concrete except for the  compressive strength tests  Non shrink tests shall be carried out according to the  instructions supplied by the manufacturer of the non shrink compound    Mixing and Placing   Mixing and placing operations including trans
97.  using vibratory hammer   Concrete Work   Notification of Dangerous Place   In case of concrete placing with a bucket using a crane  the Contractor shall take care for  workers not to enter under the moving bucket    Reinforcing Work  A long bar shall be carried at least by two workers  While carrying  workers shall take care  not to touch other workers    Form Work    Numbers of J oint of a pipe support shall not exceed 2  A joint shall be fixed tightly with 4 or  more bolts  or specific clasps  Materials used for forms shall be standard products  and the  Contractor shall check these materials    The Contractor shall check on the hardness of form and support structures before    5 7 1 95    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     4     9 8   1      2      3      4     concrete placing   The Contractor shall dismantle the forms safely and shall take off nails immediately from  forms     Concrete Placing  The Contractor shall allocate a pump truck with outriggers stretched to avoid the turnover  of a truck and the swing of a hose   The Contractor shall check the forms and supports before concrete placing   The ways of sending signals between a pump truck operator  a director and workers shall  be made clear before concrete placing   The Contractor shall place concrete uniformly and gradually not to happen eccentric  pressures on the forms   Road Work  Investiga
98.  while the origin of the chassis of the  Equipment shall be limited to the Kingdom of Thailand     All the Equipment and services shall conform to the following standards wherever  applicable     e Thai Industrial Standards  TIS    e Japanese Industrial Standards  JIS    e International Electrotechnical Commission  IEC    e Japan Electrical Manufacturers    Association  JEM    e Japanese Electrotechnical Committee  JEC    e International Organization for Standardization  ISO  9001    S 7 3 1    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 8 Procurement of Drainage Pump Vehicle Pasak River in Ayutthaya in the Kingdom of Thailand    1 4    1 5    e Other relevant and applicable codes and standards of Thailand and Japan    Other internationally prevailing standards such as EN  BSI  ANSI and DIN are  accepted for the Equipment  unless otherwise indicated  All dimensions and  performance of the Equipment shall be generally in metric system  unless otherwise  specified in these Specifications     General Requirements  Detailed Specifications    Minimum requirements of the Equipment are described in Clause 2  The Equipment  to be procured under this Contract shall be brand new and unused  and each identical  item shall be in equal quality and performance     Installation Work    Installation work of the components onto the chassis of the Equipment shall be made  in conformity with the Specifications  The installation work shall be done at d
99. 2  Specifications            baii S 7 3 7  2 3                Pans ita actina S 7 3 10    S 7 9 i    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 8 Procurement of Drainage Pump Vehicle    7 3    1 1    1 2    1 3    PROCUREMENT OF DRAINAGE PUMP VEHICLE    GENERAL    Scope of Works    The Equipment to be procured shall be as follows   e Drainage Pump Vehicle  30m  min  10 sets    The works to be done under this Contract shall include  1  manufacture of the  Equipment   2  transportation of the Equipment to the designated location   3   adjustment and commissioning  acceptance tests  of the Equipment  and operational  and maintenance training to the concerning personnel of the Client  and  4  after sales  services     Location of Delivery    The Equipment in the completed shape and ready to work shall be delivered to  Ayutthaya Irrigation Project Office of Royal Irrigation Department  Phra Nakhon Si  Ayutthaya District  Phra Nakhon Si Ayutthaya Province  the Kingdom of Thailand     The delivery of the Equipment shall be made under full responsibility of the Contractor  in accordance with the Project Implementation Schedule     Country of Origin and Standards    The origin of the Equipment in the completed shape shall be limited to the Kingdom of  Thailand    The origin of the components  except for the chassis  of the Equipment shall be limited  to Japan and or the Kingdom of Thailand
100. 3452 SGP or JIS G 3454 STPG  or equivalent    JIS G 5501  FC 200 or ASTM A 48   class 30 or SNI 0813 89 A or equivalent    JIS G 5101  SC450 or ASTM A27 A  to  be fully annealed   U   60   30 or SNI  1812 90 A or equivalent    JIS G 5111  SCMnCr 3B or ASTM A  148 A and 148 M or equivalent    JIS    5111         or ASTM B 584  C  90500 or equivalent    JIS H 5113  PBC2 or ASTM B 505  C  90700 or equivalent    JIS G 5121  SCS13 or ASTM A 743 A  CA 15 or equivalent    JIS G 5102  SCW 410 or ASTM A  216 A216 M 93 or equivalent    JIS G 3201  SF490A or ASTM A 668   Class E 50 or SNI 1855 90 A or  equivalent    Seals shall be designed and mounted in such a manner that they are adjustable  water tight and  shall be readily removed and replaced  Seals shall be molded  Extruded seals will not be  permitted  Where seals are installed curved  they shall be clamped in a jig which will form them  to the proper radius before the holes are laid out and drilled  and the ends trimmed  Holes in  related parts of the seal assemblies shall be carefully drilled  using a template  to assure proper  matching when the seal units are assembled  The seals shall be spliced at the corners to  provide effective continuity of sealing of the gates  The tensile strength of all splices shall not  be less than 50 percent of tensile strength of the un spliced material     S 7 2 15    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ay
101. 5 3 4 Design Loads for Hoist    oooooonoccccnnnocccccononancnnnonancncnnnnnnncnnnnn no nora nn nn nana cnn S 7 2 62  5 4 Details of Gate    eiiim t                           S 7 2 62  5 4 1 erc                                       S 7 2 62  5 4 2 Skin  Plate sse ende S 7 2 63  5 4 3 Maint Bealms iii                        es ened Taea eee eee S 7 2 63  5 4 4 Wheel Assemblie8       2 4              pont          fe a nena S 7 2 63  5 4 5 Side Wheels      A S 7 2 63  5 4 6 MILI                                                 S 7 2 63  5 4 7 Jue                                       S 7 2 63  5 5 Detail of Gate Guide           eere tnr Fleet          S 7 2 64    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the    7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  5 5 1 General latido m E Mir                 TEAT S 7 2 64  5 5 2 ed BEAM 2                               do ot      S 7 2 64  5 5 3 Wheel Rail and Wheel Track                      eese enn S 7 2 64  5 5 4 Side Wheel Track     5             E                 conan S 7 2 64  5 5 5 EmtelGuide Plates    iste    S 7 2 65  5 5 6 Folerantes  A AE EE rl ees    S 7 2 65  5 6 mls   eee EH DREAM MAE S 7 2 65  5 7 Erection  Installation and Tests at Site                                                         S 7 2 65  5 7 1 Erection and Installation        oo   nnnnnnnnnnnanicaninnonnnnnnnnona nn S 7 2 65  5 7 2 Field Tests and Inspection                         sese
102. 8    10 9    10 10    The Contractor shall submit to the Consultant the list of country area of  origin of the equipment and materials which the Contractor proposes to    purchase for the Work     The Contractor shall be responsible for the implementation means   methods  techniques  sequences or procedures  and safety control in    connection with the Work     The Contractor shall be responsible for the acts or omissions of the  Contractor s subcontractors  or any of Contractor s agents or employees     or any other persons performing any part of the Work for the Contractor     The Contractor shall furnish one  1  resident representative with    sufficient faculty to execute the Work at the Project Site     The Contractor shall bear the handling charges  customs clearance  charges  storage charges  and transportation expenses related to the    importation of the equipment and materials for the Work     The Contractor shall  at his own expense  take necessary measures in  accordance with the Contract Documents and relevant laws  ordinances  and regulations to prevent damage to the Work  construction materials   adjacent structures  or the Third Parties  until the completion and    delivery of the Work   The Contractor shall carry out a necessary inspection and testing of the  Equipment prior to the shipment in order to ensure that the Equipment    has been manufactured in accordance with the Contract Documents     If the Client suffers damage as a result of a default by the C
103. 8 days shall be the responsibility of the Contractor  and shall be submitted to the  Consultant    In order to approve the mix designs prior to beginning the concreting operation  the  Consultant shall conduct trial mix to confirm compressive strength tests on the different    classes of concrete     The tests shall be made on materials to be used in the works  the Contractor  before  starting concreting operations  shall furnish to the following materials     1  Rock for aggregate or natural aggregates  cement  and admixtures required by  Consultant    2  Crushed fine and coarse aggregates  and water    3  Batches of each class of concrete produced by the mixing plants to be used at Site     No concreting will be permitted until the results of these tests are available  and allowance  shall be made for the curing of the test cylinders prior to crushing after 28 days     After successfully completing the tests  the Consultant will approve the mix design  proposed for the different concrete classes  The Contractor shall be completely  responsible to produce and maintain a quality of concrete with compressive strength not  inferior to that specified unless different instructions are given by the Consultant     The net water content of all concrete mixtures shall be the minimum necessary to obtain  required slump     Mixing water shall include all water present that is in surface moisture in the aggregates   and the water added in the mix     Surface moisture content in the aggr
104. A Thailand Office    For    THE GOVERNMENT OF  THE KINGDOM OF THAILAND       Lertviroj Kowattana    Director General   Royal Irrigation Department  Ministry of Agriculture and  Cooperatives    Record of Discussions    With reference to the Grant Agreement between the Japan International Cooperation Agency   hereinafter referred to as    JICA     and the Government of the Kingdom of Thailand dated  August 15  2012 concerning the Japan s grant assistance for the Flood Prevention Project of  East Side of the Pasak River in Ayutthaya  the representative of JICA and of the Government  of the Kingdom of Thailand wish to record the following     1  With regard to the Article 10  1  f  and  2  of the said Grant Agreement  the  representative of JICA stated that the Government of the Kingdom of Thailand will submit to  JICA annual reports on the use of the facilities constructed and the vehicles procured under  the said grant each year by filling in the form attached hereto     2  The representative of the Government of the Kingdom of Thailand stated that the    Government of the Kingdom of Thailand has no objection to the statement by the    representative of JICA referred to above     Bangkok  August 15  2012                                   Kazuhiro Yoneda ertviroj Kowattana  Chief Representative Director General  JICA Thailand Office Royal Irrigation Department    Ministry of Agriculture and Cooperatives    Annual Report on the Use of Japan s Grant Assistance  submitted      000 
105. Ayutthaya in the Kingdom of Thailand    The gate leaves  gate guides and hoists shall be designed by the Contractor for the following  design conditions     3 3 1 General Data    Kra Mang Floodgate     1  Quantities to be procured    Gate leaves  3 sets   Gate guides  3 sets   Hoists  3 sets   Control and wiring  1 lot    2  Gate   Type  Plate girder structure stainless steel fixed wheel gate  Clear span  6 0m   Effective height  5 1m    Water levels at upstream  High Water Level  HWL   EL   3 5 m MSL  Low Water Level  LWL   EL   0 5 m MSL    Water levels at downstream    High Water Level  HWL   EL   6 0 m MSL   Low Water Level  LWL   EL   0 5 m MSL  Sill elevation  EL   0 5 m MSL  Design head   Downstream water level  EL   6 0 m MSL    High Water Level  HWL   Upstream water level  EL   0 5 m MSL  Low Water Level  LWL     Sealing method  Curtain walled four  4  sided watertight at upstream  Sedimentation  Not considered in Kra Mang canal  Ground subsidence  Not considered   3  Hoist  Type  Wire rope winched 1 motor 2 drum type hoist    S 7 2 38    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Water level at opening operation  Downstream water level   Upstream water level    Water level at closing operation  Downstream water level   Upstream water level     Hoisting speed     Hoisting height     Operation method     Power source   Motors     Controls and lightings   Speed reducer     Brakes  2 systems      Wire rope   
106. E PUMP VEHICLE    2 1 Composition    The Drainage Pump Vehicle is mainly composed of chassis with cab  drainage pumps   control panel  generator and lighting apparatus     2 2 Specifications  The following specifications shall be applied to each set of the Drainage Pump Vehicle    1  Working Condition   a  Drainage operating time 48 hours or more in continuous operating time   b  Temperature 5 to 40   C   c  Atmospheric pressure 980 hPa or more   d  Relative humidity 85 96 or less   2  Drainage Pumps     unit    means the number of pump       a  Total drainage discharge 30 m  min  at 10 m of total head      b  Model Submergible motor driving pump   c  Number 6 units or less  Same specifications for all units    d  Bore 200 mm   e  Unit weight of pump 40 kgf unit or less   f  Type of motor Dry type submergible synchronous motor   g  Power source 3 phase x 440 V x 60 Hz   h  Cable Cabtire cable 40 m unit or more   with waterproof connector   Cable band 1 set unit   i  Drainage hose Diameter 200 mm x Length 25 m    x 3  discharge side   unit  Pressure tight 0 2 MPa or more     j  Configuration Drainage pump shall be controllable of rotation speed  in each unit   Each drainage pump shall be equipped with metal  fixers for attaching float     S 7 3 7    Volume     Section 7 Specifications  7 8 Procurement of Drainage Pump Vehicle     K  Pump float     I  Major materials     m  Accessories     3  Chassis with Cab   a  Country of origin     b  Gross Vehicle Weight     c  Drive    d 
107. Equipment   Spraying equipment shall consist of tank trucks  pressure distributors  or other equipment  designed to apply water uniformly and in controlled quantities to variable widths of surface   Tank trucks shall be equipped with shut off valves so that no leakage will result from the  nozzles when equipment is not operating  Leakage shall be repaired immediately and any  material rendered too wet because of faulty equipment shall have to be removed or  reconditioned    Compaction   Compaction of Embankment   Backfill Material    After spreading  and when moisture content is within the allowable limit the fill material  shall be compacted     5 7 1 28    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     b      c     All layers shall be compacted before the next layer is spread  the area of compaction  during construction shall be maintained at a uniform level  The material shall be spread  and compacted in layers covering as great an area as possible     Each compaction pass shall overlap the adjacent one by at least 40 cm  Before spreading  a new layer on a compacted one  the compacted layer shall be scarified by approved  means to a depth of 10 cm  in order to achieve optimum layer adherence     The embankment material shall be normally spread in layers 30 centimeters thick after  compaction in order to obtain a uniform density throughout the full depth of the com
108. KINGDOM OF THAILAND  ROYAL IRRIGATION DEPARTMENT  MINISTRY OF AGRICULTURE AND COOPERATIVES       TENDER AND CONTRACTING DOCUMENTS  FOR  THE FLOOD PREVENTION PROJECT OF  EAST SIDE OF THE PASAK RIVER IN AYUTTHAYA    VOLUME I    TENDER AND CONTRACTING REQUIREMENTS    SECTION 1  INVITATION TO TENDER   SECTION 2  INSTRUCTION TO TENDERERS   SECTION 3  FORM OF TENDER   SECTION 4  FORM OF CONTRACT   SECTION 5  CONDITIONS OF CONTRACT   SECTION 6  TENTATIVE IMPLEMENTATION SCHEDULE  SECTION 7  SPECIFICATIONS   APPENDICES    OCTOBER 2012          CTI ENGINEERING INTERNATIONAL CO   LTD        TOKYO  JAPAN    SECTION 1    INVITATION TO TENDER    The Flood Prevention Project of East Side of the Volume     Section 1  Pasak River in Ayutthaya in the Kingdom of Thailand Invitation to Tender    INVITATION TO TENDER    Royal Irrigation Department  Ministry of Agriculture and Cooperatives  acting on behalf of the  Government of the Kingdom of Thailand hereby invites the prequalified J apanese Tenderers to  tender for the Flood Prevention Project of East Side of the Pasak River in Ayutthaya  hereinafter  referred to as  the Project   in accordance with the Tender and Contracting Documents     The Project will be financed by a grant extended by J apan International Cooperation Agency   hereinafter referred to as    JICA     based upon the Grant Agreement signed between the  Government of the Kingdom of Thailand and J ICA on the 15th day of August  2012 for the P roject     The Tender Documents are 
109. MSL  Low Water Level  LWL     Curtain walled four  4  sided watertight at upstream  Not considered in Han Tra canal    Not considered    Type  Wire rope winched 1 motor 2 drum type hoist    Water level at opening operation  Downstream water level   Upstream water level    Water level at closing operation  Downstream water level   Upstream water level     Hoisting speed     Hoisting height     Operation method     Power source   Motors     Controls and lightings     EL  2 5 m MSL  EL  3 5 m MSL    EL   6 5 m MSL   EL   3 5 m MSL   0 3 m min at ordinary time   1 5 m min at emergency closing  7 0m at ordinary time   8 5m at maintenance and emergency  Local    380V x 3 phase x 4 wire x 50Hz    Weather proof 380V x 3 phase x 50Hz  squirrel cage induction motors  not less than 3 0kW    220V x single phase x 50Hz    S 7 2 40    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications    Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works  Speed reducer  Helical or type approved by the Consultant  Brakes  2 systems   Electromagnetic motor brakes     Electro hydraulic thruster brakes or  Self lock built in speed reducer    Wire rope  SUS304 6 x 37 SB or equivalent  3 3 2 Design Loads for Gates   1  Normal loading condition    Hydrostatic loads  Downstream Water Level  EL    6 0 m MSL  Upstream Water Level  EL    0 5 m MSL  Dead weight of the gate leaves    Operating load of hoist   2  Overloading condition during earthquake    Wave 
110. PAN AND THE KINGDOM OF THAILAND    2014       Example 3  Inscription Plate with the National Flags    THE FLOOD PREVENTION PROJECT OF  EAST SIDE OF THE PASAK RIVER IN AYUTTHAYA  GRANT AID FROM  THE PEOPLE OF J APAN  AS A TOKEN OF FRIENDSHIP AND  COOPERATION BETWEEN  JAPAN AND THE pcd OF THAILAND   14     The same text of the above shall be put in this  place translated in Thai language         5 7 1 13    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    2  TEMPORARY WORKS  2 1 General    All Temporary Works shall be provided  installed  operated  maintained and subsequently  removed by the Contractor  except as otherwise provided in the Contract     The Contractor shall submit to the Consultant for approval  within thirty  30  days after the  Contract becomes valid  the details including scale  capacity  layout  installation program  and schedule and foundations for the Temporary Works except insofar as provided for in  respective sub clauses  The Consultant shall have the right to direct to the Contractor  to modify or change the Contractor s proposals if it is deemed necessary in the opinion of  the Consultant  Such direction of the Consultant shall not relieve the Contractor of his  obligations and responsibilities under the Contract     If the Contractor intends to locate some of the Temporary works outside the Site shown  on the drawings  such proposal shall be opti
111. Plu floodgate is estimated to be 6 9km      Of this catchment size  Han Tra floodgate and Kra Mang floodgate  which are situated  downstream the canals  dominate the following catchment size respectively       Han Tra floodgate 3 7km     Kra Man flood gate 3 2km     Total 6 9km     The following table shows the monthly average rainfall in Ayutthaya city    5 5 3                            300  250  E 200   E        150       0 a     100  50    0 all T T T T i    1 2 3 4 5 6 7 8 9 10 11 12  Month             Monthly average rainfall in Ayutthaya city    When the water levels of the work sites exceed  4m MSL at Pasak River side and  3 5m  MSL at Canal side respectively  the Consultant shall request the Client to temporally  suspend the Work for the safety of the Contractor in conformity with Section 4  FORM OF  CONTRACT     Article 16   Force Majeure        For further solution on the resume of the Work  the Consultant shall technically intermediate  among the Client  J ICA and the Contractor     Possession of Sites    The Client shall expropriate and make available the Sites directly occupied by the structures  of the Kra Man and Han Tra Floodgates and the Bank Protection of Han Tra Canal which  are respectively specified in the Tender Drawings on or before the date s  when the Sites  are deemed to become necessary for the execution of the Work     Should there be any delay of the possession of the Sites caused by the Client  this may  constitute a justifiable reason for the e
112. Ropes  Drums and Sheaves                                                   S 7 2 30  GOUPIINGS iinet                          M S 7 2 30  Beans entradas fees S 7 2 30    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the    7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  2 11 5 Keys  and Key WI Siesta ite ui eti tne tias S 7 2 31  2 11 6           2         A ns tote ote ts rl       S 7 2 31  2 11 7 Manual Operating Devices                                                      S 7 2 31  2 11 8 Structural Base Frames of HOiSt      oooccccconcccncnnncccnnnoncnnnnnanannn ene S 7 2 31  2 11 9 Torque  Shiafts           5  Ln EET        S 7 2 31  2 11 10 Hoist opindlesss i oio diran      e S 7 2 31  2 11 11 Spindle Supports         eret ici S 7 2 31  2 11 12 Mechanical Position Indicators                         eee S 7 2 31  2 11 13 Floor and Cover                                                                     S 7 2 32  2 12 Electrical Equipment and Parts                                                           S 7 2 32  2 12 1 Electric Motors for                                                            S 7 2 32  2 12 2 Brakes for Wire Rope Winched Hoists                                                       S 7 2 32  2 12 3 Electric Cables and Wiring         cooooccccnnnoncconnonoconononannnnonnnnnnnnnnnn R NiE S 7 2 33  2 12 4 Motor Starters         A      S 7 2 33  2 12 5 Control Cabinets and Panels         
113. SF440A SC450 S45C SCS13   1  Axial tensile stress 110 170 90   2  Axial compressive stress 110 170 90   3  Bending stress 110 170 90   4  Shear stress 65 95 50   5  Bearing stress 165 255 135   Note     When steel material other than those mentioned in the above table is used  its allowable tensile  stress for normal loading condition shall not exceed 50 percent of the minimum yield point    strength or proofing strength of the steel material used  whichever is the least     All other    allowable stresses shall proportionally be computed according to the above table based on the    allowable tensile stresses                           d  Brinell hardness of stainless steel   HB  Brinell hardness  HV  Vickers hardness  Steel type 505304 505316 50530432 50532971 505329741   Design HB 150 150 200 220 230  JIS spec  HB 187 or less 187 or less 248 or less 271 or less 302 or less  Steel type 505410 5056305 SUS630H900 SUS630H1025   SUS630H1075  Design HB N A N A N A N A N A  JIS spec  HB 201 or less 363 or less 375 or more 331 or more 302 or more  Steel type SUS630H1150 5056315 505631 RH950 505631 TH1050  Design HB N A N A N A N A  JIS spec  HB 277 or more HV 200 or less HV 392 or more HV 345 or more  2 4 2 Machine Parts    The allowable design stresses of all mechanical parts of the hoists shall have the following  factors of safety  FS  against the ultimate strength of the steel material for the rated hoist    capacity in normal loading condition           Material Tu pm de stress
114. SS400 or ASTM A 36 or  SNI 0552 89 A or equivalent    c  Steel shapes JIS G 3192 and JIS G 3101 SS400 or  ASTM A 6 or SNI 0945 89 A or  equivalent    d  Steel bolts  nuts and washers JIS B 1180  B 1181 and B 1256 or    S 7 2 14    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand     e  High strength steel hexagon bolts   hexagon nuts and plain washers     f   Corrosion resisting steel bolts  nuts  and washers     g  Corrosion resisting steel plates  bars  etc      h  Corrosion resisting clad steel plates   i  Spring lock washers       Steel pipe for air and water piping   galvanized     2 2 6 Standard for Castings     a  Gray iron castings     b  Steel castings     c  High tensile strength carbon steel  castings and low alloy steel castings     d  Bronze castings   e  Phosphor bronze castings   f   Corrosion resisting cast steels for    general applications   g  Steel castings for welded structures    2 2 7 Standard for Forgings     a  Carbon steel forgings    2 2 8 Rubber Seals for Gates    Volume 1  Section 7 Specifications  7 2 Hydraulic Gate Works    ASTM A 633 and A 675 or SNI 0541   89 A or equivalent    JIS B 1186 or ASTM A 325 or SNI  0541 89 A or equivalent    JIS G 4303  4304  4305  4306 and G  4307 or ASTM A 276  Type 316 or  equivalent    JIS G 4303  4304  4305  4306 and G  4307 or ASTM A 167 or equivalent    JIS G 3601 or ASTM A 264 Type 304 or  equivalent    JIS B 1251 or SNI 0571 89 A or  equivalent    JIS G 
115. Stoplogs    4 4 1 General   The stoplogs shall consist of skin plate  main horizontal beams  vertical members  bearing  plates  side shoes  seals  sealing plate  lifting lugs and all other necessary components  The  stoplogs shall be of the slide gate type and of welded constructions     All stoplogs leaves shall be identical in their design  construction and strength  and shall be  interchangeable     The details of construction of the stoplogs not specified herein will be left to the Contractor   subject to the approval of the Consultant     4 4 2 Skin Plate    The skin plate shall be at the non pressure side of the stoplogs  No corrosion allowance of the  skin plate may be considered  The skin plate shall be of steel SM400 and welded to the main  beams  vertical girders  end beams  etc   by continuous welding     4 4 3 Main Beams    The horizontal main beams shall be of built up girder      4 4 4 Seals    The seals shall be of the music note and flat bar shapes clamped to the downstream surface of  the stoplogs by means of steel bars and corrosion resisting steel bolts  nuts and washers  The  seals shall be spliced at the corners by shop vulcanizing to provide a single continuous seal   The tensile strength of all shop splices shall not be less than fifty  50  percent of the tensile  strength of the unspliced materials     4 4 5 Side Shoes    Side shoes shall be provided on both longer side of each gate leaf to limit movement of four  4   lateral sides of the stoplogs  The
116. Terminal strips shall be arranged in vertical rows not less than 225 millimeters above floor level   Sufficient terminals shall be provided on each item of equipment to permit the connection of all  incoming cable cores plus 10 percent spare terminals     Removable transparent insulating covers shall be provided over all terminals  An insulating  barrier shall be provided between adjacent pairs of studs     2 12 15 Indicating Instruments    All instruments and meters shall have approximately 110 millimeters dial and shall be heavy   duty  dust proof  industrial type suitable for extreme shock and severe vibration applications     Instruments on cabinets shall be flush mounted and provided with narrow bezels  The bezels  shall have a uniform high grade finish     All instruments scales shall be of wide angle type clearly printed in black figures and divisions  on white background  The figures and units shall be clearly marked on the instrument dial in  black capital letters  The names or marks of the instrument s manufacturer and other printing  which may interfere with the clear observation of the reading shall not be printed on dials   Initials or similar markings may however be acceptable in case they are indicated unobtrusively  on dial plates  subject to approval of the Consultant     S 7 2 35    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Unless other
117. The pipe diameter to be used in each location is on the approved Shop  Drawings or shall be as specified by the class of reinforced concrete pipes shall be as  indicated in the approved Shop Drawings     Materials    The materials used in the manufacture of reinforced concrete pipes conform to the  following requirements     a  Cement  In accordance with Sub Clause 5 1   b  Water  In accordance with Sub clause 5 1   c  Additives  All concrete used for the manufacture of pipes shall contain an entrainment  of not more than 2 5 percent  96  of air  by volume  in the concrete as discharged from  the mixer  Calcium chloride shall not be used except when approved by the Consultant    d  Aggregates  Fine and coarse aggregates for concrete shall be in accordance with Sub   clause 5 1  except that other grading may be used  The maximum size of coarse  aggregate for each size of pipe shall be the largest size compatible with satisfactory  placing of the concrete    e  Reinforcement Steel In accordance with Sub clause 5 2     Pipe Installation   General   During manufacturing  transporting  storing  and laying of concrete pipes  the pipes shall  not be dropped or handled in a way that might crack the wall or otherwise cause damage   The pipes shall not be moved until after the specified curing period  Any length of pipe that   in the opinion of the Consultant is damaged beyond repair shall be removed from the site  of the work and replaced by the Contractor at his expense    Bedding of
118. Visa for the  stay therein and leave there from for the performance of the Work under the verified  Contract     4  Identification Cards for Employees    The Contractor shall ensure that all of his employees carry their respective identification  cards at all times during the period of the construction and procurement     5  Lump Sum Price    The total price quoted in the Tender for the Work shall be fixed lump sum price for the period  of the Contract  This shall be held fixed and firm from the award of the Contractuntil the end  of the Contract     Price escalation of local or imported materials and manpower shall not be considered as a  claim in the Contract price     6  Implementation Program and Schedule    The Contractor shall submit a detailed implementation program for the approval of the  Consultant  within thirty  30  days after the date of signing the Contract  in such form and    S 5 1    detail as the Consultant reasonably prescribes  for the execution of the Work  inclusive of  detailed schedule on cost estimate of his own     If at any time it should appear to the Consultant that the actual progress of the Work does  not conform to the program to which approval has been given  the Contractor shall produce   at the request of the Consultant  a revised program showing the modification to such  program necessary to ensure completion of the Work within Time for Completion     Safety Measurement against Flood and Stormwater Damage    The Contractor shall design and 
119. age   a constant period not less  than 30min    Unloading or reloading steps   a constant period  not less than 2min   Unloading to zero load   a constant period not  less than 15min             Rate of loading          Holding time for each loading step                   Standard sampling periods and intervals       Data samplings are conducted at 0 1 2 5 10  and 15min from the start of load holding for  New Loading steps each new holding step  Data samplings are  repeated at 15 min intervals after the elapsed  time of 15 min    Data samplings are conducted at 0 and 2 min  from the start of load holding for each new  unloading or reloading step  and at a time just  before proceeding the next step    Data samplings are conducted at 0 5 and  15min  from the start of loading holding at zero  load  Data samplings are repeated at 15min  intervals after the elapsed time of 15min        Unloading or reloading steps       Unloading to zero load                After the completion of test piles  the Contractor shall submit the report of test piles   The report shall include the following items       The purpose of the test     The test site conditions  and soil profile     The test procedure     The pile dimensions and the test pile installation method    The test equipment     The loading and measuring methods     The test results    The following relationships shall be graphed     Load Time relationship      Displacement Time relationship    S 7 1 74    The Flood Prevention P rojec
120. age reduction 0 82 to 0 96     4 stage reduction 0 80 to 0 94     5 stage reduction 0 77 to 0 93  Sprocket by chain driving 0 95  Rack and pinion gear 0 90    S 7 2 28    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    Total mechanical efficiency of sheaves shall be calculated by the following formula    a  In case that the number of sheaves is odd    k    _4   n 4 1  x k  x  k     1     Ef          n A   n 1 xEf     b  Incase that the number of sheaves is even    T k   1  nxk  x     1        __    nxEf  where    Ef   total mechanical efficiency of sheaves  no  number of sheaves       1      e   mechanical efficiency of each sheave  Q 5 design hoisting load  KN    T   winding load of wire rope  kN     2 141 Mechanical Equipment and Parts    The mechanical equipment and parts for the Hydraulic Gate Works shall conform to the  following requirements unless otherwise specifically mentioned     2 11 1 Gearing    All gears shall be machine cut by hobbing  from solid blanks and  wherever possible  they shall  be a forced fit on their shafts  The minimum requirements for materials are as follows     Wheels Rolled or forged steel  Pinions Rolled or forged steel  Worm Wheels Steel with bronze rims  Worms Steel or forged steel    Where worm gearing is used as a first motion drive  it shall be designed to have the same load  and time rating as the driving motor and to ha
121. ai nationals        a  products and services necessary for the construction of floodgates  hereinafter  referred to as    the Facilities                b  vehicles and services necessary for the procurement and   or the installation    thereof      c  services necessary for the transportation of the products referred to in  a  and  b   above to ports in the Kingdom of Thailand and those for internal transportation    therein  and     d  services necessary for the guidance in managing the Facilities      2  Notwithstanding the provisions of sub paragraph  1  above  when JICA and the  Authority deem it necessary  the Grant may be used for the purchase of the products  of the kind referred to in  a  and  b  of sub paragraph  1  above  which are products of  countries other than Japan or the Kingdom of Thailand and the services of the kind  referred to in  a    b    c  and  d  of sub paragraph  1  above  which are services of  nationals of countries other than Japan or the Kingdom of Thailand     Article 4 Procurement Guidelines   The Authority shall ensure that the products and   or the services referred to in Article 3  are procured in accordance with JICA s Procurement Guidelines of the Japanese Grant  Aid  Type I G   hereinafter referred to as         Procurement Guidelines       Article 5 Verification of Contracts   The Authority shall enter into contracts in Japanese Yen with Japanese nationals for the  purchase of the products and services referred to in Article 3  Such co
122. aight with ends squared  and the joining of pipe section shall  be such as to produce watertight joints     Joints and Collars and Pipe Bend J oint    oint  Pipe joints shall conform to the type as shown on the approved Shop Drawing   Cement mortar shall be used in jointing     Collar and Pipe Bend   oint  The collar and pipe bend joints shall be constructed where shown on the approved Shop  Drawings      Water Testing    Where required by the Consultant  sections of pipeline shall be tested for leakage before  backfilling     Backfill    As each unit of pipe is laid  sufficient backfill material shall be tamped about the pipe to  hold it rigidly in place until the joints are completed  After the have been completed  the  backfilling shall be proceeded as specified in Sub clause 3 4  Design loading of AASH H   20 or equivalent will not be permitted to travel over pipes until backfill and embankment  material have been placed to a thickness of at least 0 50 m  over the top of the pipe  This  minimum requirement is not always adequate during construction when equipment  heavier design traffic loads is routed over or close to the installed culverts  The Contractor  shall be responsible for providing the additional cover necessary to avoid damage the  pipes due to such loads     7 METAL WORKS    7 1    General    The work covered by this Section shall include  but shall not be limited to  the supply of  material  fabrication  installation and painting or hotdip galvanizing of ite
123. all be described in details in this Section according to the frequency or  occurrence of load and probability of their coincidence     The loads specified herein shall be considered as minimum and essential requirements and the  loads and their combinations other than the specified shall be examined by the Contractor in the  detailed design of the Hydraulic Gate Works     2 1 2 Gate Leaf  Gate Guide and Stoplogs    The gate leaves  gate guides and stoplogs  or maintenance gates  shall be designed for the  combination of the following loads      1  Hydrostatic load    The components and equipment of the Hydraulic Gate Works shall be designed to function  against hydrostatic load due to the water level difference between upstream and  downstream sides of the gates      2  Sedimentary pressure load    Sedimentary pressure load is not considered      3  Wave height during earthquake    S 7 2 10    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    Wave height during earthquake is calculated by Dam facility technical standards in Japan  Page 52                                2n  where   he   Wave height  m   Kh  Horizontal seismic intensity in Ayutthaya 0 1  T   Earthquake period 1 0  sec   H   From sill elevation to design water level  m   Kra Mang   kh      0 1x1 0   he   JgxH   9 8     6 0     0 5     0 13m   ac NO ogg 619991605608   Han Tra             kh x    0 1
124. all be provided to stationary type gate hoists  The operation  force on the manual operating device shall be less than 100 N under normal design condition     The diameter of the handle shall be 600 millimeters in maximum which shall be located at  approximately 0 90 meter in height from the operation deck     2 11 8 Structural Base Frames of Hoist    The structural base frame of hoist shall be of all welded steel construction using rolled structural  shapes and plates  Necessary anchor bolts and nuts for the base frames shall be supplied by  the Contractor     2 11 9 Torque Shafts    The torque shafts shall be finished commercial steel shafting  The diameter of the shafts shall  not be less than 50 millimeters  The distortion angle shall not exceed 0 25 deg  m for the rated  design torque     2 11 10 Hoist Spindles    The spindles shall have a round shape with minimum diameter of 50 mm or rack shape and  shall be made of corrosion resisting steel which shall be machine cut with square or trapezoidal  thread or rack gear shape or welded with pin rack shape at the necessary length  Spindle  covers shall be provided to protect spindles from dust  dirt and rain     2 11 11 Spindle Supports    The spindle supports for each hoist mechanism shall be provided at proper position s  to avoid  the buckling of spindle due to over lowering force of hoists under the gate jammed in fully  closed position  The support shall be removable to permit drawing out the gate from hoist deck  openin
125. all be worked with suitable equipment  until the concrete is  consolidated to the maximum practicable density  is free of pockets of coarse aggregate   and fits tightly against all form surfaces and embedded materials     Equipment used for spreading  vibrating or other operation must absolutely not spill fuel oil  or grease on the concrete     Placing in Reinforced Structures    When concrete has to be dropped through reinforcement  care shall be taken that no  segregation of concrete or displacement of bars occurs  Closed chutes  trunks or tremies  shall be used to place concrete in deep forms  around reinforcement  or other places not  readily accessible for direct placing     Placing around Embedded Parts    Before placing concrete  care shall be taken to determine that all ducts  recesses  rebates   holes and any other embedded items are firmly secured in their correct location as  indicated on the Shop Drawings or as required by the Consultant  Anchor bolts and anchor  plates shall be precisely located and molded into the concrete where specified  All  embedded items shall be thoroughly clean and free of oil and other foreign matter such as  loose coating of rust  paint and scale  and encrustations of grout or mortar     Extreme care shall be exercised when placing concrete around the various embedded  parts  to ensure that unbalanced loading and impact from placing concrete  will not cause  distortion or dislocation of the parts  Both during and after placing  careful 
126. am   Telpher rails    Chain hoists   Stoplog  Maintenance gate     Type   Clear span   Effective height   Design head  Downstream water level   Upstream water level   Water level on the sill   Sill elevation   Sealing method   Sedimentation     Ground subsidence     The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    2 sets  2 sets    2 sets    Plate girder structure steel slide gate  6 0m  1 0mx5    EL    2 0    MSL  EL    2 0    MSL    EL   2 5 m MSL  Water depth   0m     EL   2 5 m MSL    Three  3  sided watertight at non pressure side    Not considered in Han Tra canal    Not considered    Telpher rail  Rail    shaped steel 450mm x 175mm x 13mm x 26mm  Length  8 5 m  8 0   x 2   8 5 m   33 0 m side  Pier  H shaped steel 250mm x 250mm x 9mm x 14mm  Height  6 153m x 2   Chain hoist  Type  Manual geared trolley    Hoisting height     Hoisting load     Design Loads for Stoplogs  Hydrostatic loads  Normal Water level     Dead weight of the gate leaves    Design Loads for Gate Guides    14m    5 ton    EL    2 0 m MSL    S 7 2 54    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    The gate guides shall conform to those specified in Clause 3 2 of this section     4 3 4 Design Loads for Lifting Beam    The lifting beam shall be designed to withstand the rated hoisting capacity of the chain hoist   4 4 Details of 
127. ance    All components and equipment of the Hydraulic Gate Works to be supplied under the Contract  shall be fully insured against loss or damage incidental to manufacture or acquisition   transportation  storage and delivery     The insurance shall cover the full period of shipment and transportation from Japan to the  Project sites until the Client approves the Certificate of Completion of the Work to the Contractor     S 7 2 6    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    1 10 Import Charges    The Contractor shall bear import charges from Japan to the Kingdom of Thailand such as  shipping charge  customs clearance charge  terminal handling charge  port charge  crane  charge  storage charge  ocean freight and inland transportation etc  except for internal taxes   such as customs duty and value added tax  imposed in the Kingdom of Thailand     All taxes and duties imposed outside the Kingdom of Thailand shall be born by the Contractor  if  any   1 11 Maintenance Tools    One  1  set of maintenance tools such as the following required for the installation  overhauling  and assembly of the equipment in this Contract shall be furnished by the Contractor       Open end wrenches 1 set    Screw drivers 1 set    Hex keys 1 set    Pliers 1 no     Socket wrench and sockets 1 no     Adjustable wrench 1 no     Hand hammer 1 no     Flat file 1 no     Round file 1 n
128. ance with the normal practice in respect of  such examinations and tests if the same may be carried out by the Contractor with his  staff and equipment available at the Site       Otherwise  the tests shall be made at another laboratory approved by the Consultant  atthe cost of the Contractor     The Consultant shall be at liberty to reject any materials which do not comply with the  requirements of the Contract notwithstanding any previous approval thereof     The Contractor shall not be entitled to any extra payment or extension of time for  completion of the Works on account of the rejection of materials due to their non   compliance with the requirements of the Contract or of the waiting time reasonably  required for carrying out the examinations and tests     The Contractor shall furnish test samples as requested and shall provide reasonable    assistance and cooperation as necessary to permit tests to be performed on materials or  work in place including reasonable stoppage of Work during testing     5 7 1 5    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     3     14     1      2     Tests and Testing Laboratory    The Consultant will supervise such testing in the Contractor s laboratory as testing of  concrete aggregate  soil  etc  for the purpose of adequate and sufficient quality control of  the Works during the execution of the Works  The Contractor shall pro
129. ances must not exceed 596 by weight     S 7 1 41    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Volume I  Section 7 Specifications  7 1 Civil Works    Sand will be rejected if       it contains impurities  ASTM C40 or equivalent     it has a specific gravity   on the basis of weight of saturated surface dry basis  below  2 60  ASTM C128 or equivalent     when  submitted to 5 cycles of tests of resistance to the sodium sulfate action  ASTM   C88 or equivalent  the part retained by sieve NO 50 has suffered a loss greater than  10  in weight     Grading    The sand used for concrete mixes shall be graded according to ASTM C136 or equivalent   and shall conform to the following requirements as delivered to the mixers        Material finer than No 200 sieve  0 075mm     No 4  4 75mm    No 8  2 36mm  95 10100   No 16  1 18mm  80 to 90   No 30  0 6mm  60 to 80   No 50  0 3mm  30 to 60   No 100  0 15mm  E  0 to 3             The sand fineness modulus must be comprised between 2 3 and 3 2  as determined  considering sieves Nos  4  8  16  30  50 and 100     The grading of the sand shall also be controlled so that the fineness modulus  in not less  than nine out of ten J est samples  shall not vary more than 0 20 from the average fineness    modulus of all samples previously taken  If the fineness modulus for the sand varies more  than 0 2  the Contractor shall modify concrete mix design     Sands may be separated into two or 
130. and Pipes                                                    S 7 2 14  Standard                                                 Per edd tcs S 7 2 15  Standard for Forgings        ii esa deren dd S 7 2 15  Rubber Seals for          e                                               S 7 2 15  Miscellaneous Materials   nito ete tem ttt cad eere ve rege S 7 2 16                                              S 7 2 16  erac ia S 7 2 16  Painting at STD  t aeter tite oe tol efie ae iia S 7 2 17  Painting for Joint Areas Welded at Sites                                                      S 7 2 19  Design StrOSS S coi a S 7 2 20  Gate Leaves  Gate Guides and Other Steel Structures                               S 7 2 20  Machine Parts miis S 7 2 24  Second Stage Concrete and Non Shrinkage Mortar                                    S 7 2 25  Combined Allowable Stress and Overloading Condition                              S 7 2 26  Minimum                                                    S 7 2 26  Critical Slenderness Ratio                      senem S 7 2 27  Maximum                                                                           S 7 2 27                                                   aa Ae Eaa Ea        S 7 2 27  Coefficient of Friction    itr iiri RR EE Ra aran S 7 2 27  Mechanical EfficiGney aene ie etie te bip S 7 2 28  Mechanical Equipment and                                                                     S 7 2 29  COM E                               S 7 2 29  Wire 
131. and as  specified herein     The Project will consist of the following work items to be carried out by the Contractor  under this Contract but are not limited to       Construction of Kra Mang Floodgate 1 site    Construction of Han Tra Floodgate 1 site    Construction of Bank Protection of Han Tra Canal 484m    Procurement of Drainage Pump Vehicle 10 sets    Works to be Carried Out by the Client    The assistance of the Government of the Kingdom of Thailand is to be extended on the  following matters prior to and during the execution of the Works     a  To take necessary measures to ensure prompt unloading and Customs clearance    upon entry into the Kingdom of Thailand and transportation inside the Kingdom of  Thailand for the goods procured for the implementation of the Project     5 7 1 1    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the    7 1 Civil Works    Pasak River in Ayutthaya in the Kingdom of Thailand    To take necessary measures to exempt the contractor and the consultant from  Customs duties  internal taxes and other fiscal levies imposed in the Kingdom of  Thailand for their supply of goods  services  and equipment     To open an account in a designated bank in J apan for the Banking Arrangement   B A   and issue the Authorization to Pay  A P   bear the advising commission of the  A P and the payment commissions to the bank     To secure the necessary lands for the construction work and execute necessary  negotiations with
132. and completing time  for minor structures shall also be kept     The maximum and minimum daily temperatures  when placing concrete shall be recorded     All the above records shall be available at any time during the progress of this work for  inspection by the Consultant  For the duration of the Contract  a copy of all the records  shall be delivered weekly to the Consultant     Composition    The concrete shall be composed of fine and coarse aggregate  water  cement and  possible admixtures     The mix will be designed by the Contractor to obtain a workable mass  suitable for the  specific conditions of placement and a product which  after proper curing and adequate  hardening time will have a durability  impermeability and strength in accordance with the  requirements of these specifications     Contractor s Plant  Equipment and Construction Procedures    Prior to the installation of the Contractor s plant and equipment for processing  handing   blending  transporting  storing and proportioning concrete ingredients  and for mixing   transporting and placing concrete  the contractor shall submit drawings  for approval by  the Consultant  showing the proposed general plant arrangement  together with a  description of the equipment he proposes to use in sufficient detail so that an adequate  review can be accomplished  The approved Shop Drawings and descriptions of plant  equipment shall be submitted at least thirty  30  days before plant erection  After erection  at site  th
133. and shall confirm the stability of beam and the safety of person  and facilities when the crane swirls around with a signal    Sling Work    The Contractor shall compute the weight that a sling hangs on  and shall check the safety  of ropes and sling facilities     Correspondence to Bad Weather  The Contractor shall prepare the operation stop baseline depending on the conditions of    bad weather like big wing  heavy rainfall and heavy snow and shall submit it to the  Consultant     S  121 03    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    9 6 Temporary Work    1  Grasp of Surrounding Environment  The Contractor shall grasp the conditions such as site  construction requirements   surroundings environment and buried objects  underground installations  to reflect on a  temporary work plan     2  Qualities of Materials  The Contractor shall check the qualities of materials using for the temporary works     3  Berm  In case of excavation exceeding the height of 5 0 m  the Contractor shall make a berm of  1 0 m width to resist earth pressures and prevent collapse of slope  If the Contractor found  some abnormalities while working including excavating  he shall evacuate all workers  nearby to outside immediately     4  After Bad Weather    The Contractor shall check the face of slope after bad weather  and shall restart the  construction works after verifying the safety   
134. are found unsatisfactory for utilization in the structure shall be either  removed or cut off below the footing ground line  as instructed by the Consultant     Calibration tests for driving equipment may be required by the Consultant  If deemed  necessary for completeness and better performance of driving procedures     The Contractor shall keep records of all test piles as specified in Clause 13 5 hereinabove   including all additional data the Consultant may be required     Method of Test Piles    The method for static axial compressive load test shall be carried out in accordance with  JGS 1811 The J apanese Geotechnical Society  or otherwise approved by the Consultant     S 7 1 73    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    The pile load test shall be commenced after the friction force is recovered   The minimum curing period for the recovery of friction force is 5days for sandy soil and  14days for cohesive soil  respectively     The maximum testing load is twice of design load   The reaction force shall be selected from  a  reaction piles  b  ground anchors  c   kentledge and  d  a combination of the above devices     Standard load step sequence       Number of steps 10 steps   Number of cycles not less than 4 cycles   During loading      planned maximum load number of steps   min  During unloading     Twice the rate used for loading stage   New loading st
135. arefully examined the Tender Documents consisting of Instruction to  Tenderers  Form of Tender  Form of Contract  Conditions of Contract  Tentative  Implementation Schedule  Specifications  Appendices  Tender Drawings and other  documents relevant to the execution of the above mentioned Project  and agreeing to  the provisions therein  we  the undersigned  offer to execute and complete the whole of  the Work in the required period  and remedy defects  if any  strict inconformity with the  Specifications for the following fixed lump sum amount of    REE billion A million       thousand J apanese Yen  J PY           000      2  We undertake  if our Tender is accepted  to commence the Work within fourteen  14   calendar days from the date of the receipt of the Notice of the Commencement issued  by the Consultant and to complete the whole of the Work comprised in the Contract  within the date stipulated in the Instruction to Tenderers     3  We provide  if our Tender accepted  a Performance Security in accordance with the  requirements in the Tender Documents     4  We agree to be bound by this Tender for a period of sixty  60  calendar days from the  date of Tender Opening  and this Tender shall remain binding upon us and may be  accepted by you at any time before the expiration of the period     5  Unless and until a formal Contract is prepared and executed  this Tender  together with  your written acceptance thereof  shall constitute a binding contract between us     6  We und
136. arliest possible time  but the  Contractor shall submit them for review and or approval not less than thirty  30  calendar  days prior to the time he plans to start construction of any particular item of the Works     After the Contractor s drawings have been reviewed and or approved by the Consultant   they will become part of the Contract Documents     Shop Drawings    The Contractor shall use the Contract Drawings as a basis for preparation of Shop  Drawings  Shop drawings shall be made for all items of permanent work  and where  applicable  shall show concrete outlines  reinforcement bars arrangement including  bending cutting schedules and layout and bar list  types of material to be used  grades   exact dimensions  etc  Further  such drawings shall present the full details of items not  to be incorporated into the permanent work such as timber or steel forms  steel  scaffolding  etc  All construction drawings must be approved by the Consultant prior to  the time the Contractor plans to perform the work     Drawings for the Temporary Works    Within thirty  30  days after the contract has become valid  the Contractor shall submit to  the Consultant for his review and approval three  3  sets of drawings which show the  features of the Temporary Works     These drawings shall show the locations and other pertinent details of the principal  components of the constructional plants  offices  storage buildings  housing facilities   storage areas access and intra roads and drai
137. arp to provide a complete  watertight with the gate rubber seal  The lintel beams shall be 1 or H shape of steel with  stainless steel guide plate     3 5 6 Tolerances    S 7 2 44    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    The gate guide shall be accurately fabricated and installed within the following tolerances           Points to be measured Tolerances  mm   Clear span  5  Sealing span  5  Distance between sealing and wheel track face  1  Distance between centers of main wheel tracks  5  Height of gate guides  5  Distance between centers of side wheel tracks  5  Flatness of seal plate surface  0 5 m  Straightness of seal plates  1  Flatness of main wheel track surface  0 5 m  Straightness of main wheel tracks  1  Flatness of guide plate surface  0 5 m  Straightness of guide plates  1       The tolerances not specified herein shall be determined by the Contractor  subject to approval  by the Consultant     3 6 Hoists    3 6 1 General    The hoist shall be of the 1 drum and 2 motor of wire rope lift stationary type suitably mounted on  the hoist base frames at the floodway structure  to raise  lower and hold the floodgate     3 6 2 Hoists    The hoist shall consist of steel base framework and steel housing  mechanical equipment  i e    stainless steel wire ropes  rope sheaves  rope ends with detecting devices  a hoist drum  open  speed reduction gear 
138. at Site                                                         S 7 2 49  3 9 1 Erection and Installation          ooonnnnnnnniccnccccnnnnnnnconcnnccconcncnncnnnnrnc cnn no noncnnnnnnnos S 7 2 49  3 9 2 Field Tests and     5  6                                                     S 7 2 50  3 10 Commissioning  Acceptance                                                                           S 7 2 51  4  STOPLOGS  MAINTENANCE GATES  AND HOISTS                                S 7 2 52  4 1 Gener  al       iiu edid eee tere ainsi e                ced deu UE S 7 2 52  4 2 Design Stresses        1  aac e a cia S 7 2 52  4 3 A                                            deba iti e tete S 7 2 52  4 3 1 General Data    edipi                             S 7 2 52  4 3 2 Design Eoads for Stoplogs           er ep e et teta S 7 2 b4  4 3 3 Design Loads for Gate Guides                                                    S 7 2 54  4 3 4 Design Loads for Lifting Beam                      sse S 7 2 55  4 4 PT S 7 2 55  4 4 1 General    cte cede eO EE ia S 7 2 55  4 4 2 Skin PIatex tese itte e    ein en tto etu S 7 2 55  4 4 3 Main Beams             2  iia l   S 7 2 55  4 4 4 A O adden S 7 2 55  4 4 5 A   eoi edente leto cde eei aue tue ee es S 7 2 55  4 4 6 A em S 7 2 55  4 4 7 TOletangc8s  i  ond rei iH eR E               S 7 2 55  4 5 Details of Gate Guides      oooonoccccnnnocccnnnonacncnnnnnanccnnnnnnnnnnnnnnn nn nn rare n nan nana nenas S 7 2 56  4 5 1 Generdli  uc tette ete te ed nte eene
139. at shift shall be terminated  If the strength of cylinder  is less than that required  the elements concerned shall be cured for a longer period  as  directed by the Consultant     Tolerances  The dimension of the finished precast elements shall be within the following limits  at the  time of placement of these units in the structure  unless otherwise shown on the approved  Shop Drawings     The following tolerances will apply to precast units     Cross Section in any Direction Dimension Tolerance  Up to 50cm   6        50 cm  75 cm  9mm   Straightness or Deviation from Intended Line Up to 3m  Up to 3m  6mm  3 m 6m  9mm  Over 6m  12mm    The visual inspection for the piles to check defects shall be conducted by the Consultant  upon carrying in the site by the Contractor     Precast Concrete Piles for Structural Foundation   The Contractor shall supply precast reinforced concrete or prestressed concrete piles   where indicated  of sufficient section and length to provide the design load capacity   Calculations showing the adequacy of plies will be based on use of Hiley s Formula for  bearing of soil but shall be confirmed by pile load test at the commencement of the piling  work as prescribed in Sub clause 13 6 unless otherwise decided by the Consultant     Before the commencement of piling works  the contractor shall submit the method  statement for the piling works including pile load test to the Consultant     Subsurface Soil Conditions    Logs of boring are available for t
140. ate guide SUS304  Gate Wheel rail 55400  guide Sill beam 55400  Seal plate SUS304  Guide plate SUS304  Side guide 505304       S 7 2 13             Volume     Section 7 Specifications The Flood Prevention Project of East Side of the          7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand   Main wheel track SUS304  Bolt  nut and washer SUS304   Others As approved by the Consultant    Rack bar 505304  Hoists Rack bar coupling SUS304  Center guide SUS304   Others As approved by the Consultant                   2 2 8 Castings    All castings weighing 226 8 kilograms  500 pounds  or more shall have test coupons attached  from which test specimens may be prepared  The number  size and location of the test  coupons shall be to the approval of the Consultant  Faulty material or materials found to be  inferior to that specified shall be rejected and removed at once  and shall not be used in any  part of the Hydraulic Gate Works     All castings shall be dense  sound and true to pattern  of workmanlike finish and of uniform  quality and condition  free from blowholes  porosity  hard spots  shrinkage  cracks or other  injurious defects  and shall be satisfactorily cleaned for their intended purpose  All castings  shall be checked for defects before final machining     Casting shall not be repaired  plugged  or welded without permission of the Consultant  Such  permission will be given only when the defects are small and do not adversely affect the  strength
141. ation on the following       structure to which the pile belongs      pile identification number  type and dimensions      date of casting and date of driving      driving equipment data  type  weight of hammer and drop height or efficiency and  frequency of blows  etc        depth driven and tip elevation       pile top elevation immediately after driving      penetration for the last 10 blows and rebounds or whenever required by the Consultant      details of any interruption of driving  details on re driving and any other information which  may be useful for pile behavior knowledge      period of welding    testing of welding joints  if necessary     Test Piles    Test piles may be required by the Consultant  whenever more detailed information is  needed on foundation pile behavior in difficult subsoil condition  to select pile dimension  and length    Test Piles  Han Tra   one pile  Kra Mang   one pile  shall be chosen from the foundation  piles by the Contractor     Test piles shall generally be driven with the same equipment to be used for the foundation  piles to be built  Pile top elevation will be 0 5m to 1 0m above the ground level to ease the  subsequent preparation works  Exact location  pile type and possible driving procedure  shall be provided to the Contractor by the Consultant     Test piles which conform to the foundation piles requirements as specified by and with the  approval of the Consultant may be cut off and be used for structure     Test piles which 
142. available at CTI Engineering International Co   Ltd  who has been  appointed as the Consultant for the executing agency of the Project  at the following address at the  non refundable cost of J apanese Yen 60 000     CTI Engineering International Co   Ltd   Tachibana Annex Building 2 25 14  Kameido Koto ku  Tokyo  136 071  J apan  Tel  03 3638 2585    All inquiries relative to this tender shall be directed to the Consultant s office at the address written  above as specified and stipulated in the Instruction to Tenderers     The tender and all accompanying documents shall be prepared in accordance with Tender  Documents and shall be delivered by hand to the Consultants office at the above mentioned  address at      on the  th day of             J          Standard Time  J ST  in sealed envelopes  as  specified in the Instructions to Tenderers     The tender shall be opened at the same place immediately after the closing time on   th day of            and all tenderers shall be requested to be present at this time     Royal Irrigation Department  Ministry of Agriculture and Cooperatives  The Kingdom of Thailand    5 1 1    SECTION 2    INSTRUCTION TO TENDERERS    The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers    Chapter 1   1     Cor b OX  XT op  nego ona    9   Chapter 2   1   2   3   4   Chapter 3   1   2   3   4   5   Chapter 4   1   2   Chapter 5   1     Co         O        
143. aximum Deflection    The ratio of deflection against the supporting span of each component of the Hydraulic Gate  Works shall not exceed the following value under the normal design condition     Component Max  deflection       Main horizontal beams of gate leaves 1 800  Main horizontal beams of maintenance gate leaves 1 600  Frame for hoisting equipment 1 2 000  Telpher rails 1 1 000  Other beam materials such as inspection stages  etc  1 600    2 8 Corrosion Allowance    The corrosion allowance for the equipment and structures shall be as follows     Equipment Structure Corrosion Allowance  mm     Stainless steel Gates      skin plate 0 0     all other gate leaf members 0 0  Stoplogs     skin plate 1 0     all other gate leaf members 1 0    2 9 Coefficient of Friction    For the purpose of designing the Hydraulic Gate Works  the coefficient of friction shall not be  less than the following value           Item Friction confident   Rolling friction of wheel at support part 1 0mm  Sliding friction of plain bearing at support part 0 2  Rolling friction of rolling bearing at support part 0 01  Sliding friction between water tight rubber and stainless steel 07   plate in wet condition   Sliding friction between water tight rubber and stainless steel 12   plate in dry condition   Sliding friction between steels at water tight part or support part 0 4  Sliding friction between steel and sediment mud 0 4    S 7 2 27    Volume     Section 7 Specifications The Flood Prevention Project
144. ay be specified in the G A   hereinafter respectively referred to as  the Products  and  the Services       4  The Government of the Kingdom of Thailand or its designated authority  shall enter into contracts in Japanese Yen with Japanese nationals for the  purchase of the Products and the Services  Such contracts will be verified by  JICA to be eligible for the Grant  The term  Japanese nationals  whenever  used in the present understanding means Japanese physical persons or  Japanese juridical persons controlled by Japanese physical persons       9  The Grant will be executed by JICA  in accordance with the provisions of  the G A  by making payments in Japanese Yen to an account to be opened in  the name of the Government of the Kingdom of Thailand at a bank in Japan  designated by the Government of the Kingdom of Thailand or its designated  authority     6   1  The Government of the Kingdom of Thailand shall take necessary  measures      a  to secure lots of land necessary for the implementation of the  Project and to clearthe sites      b  to provide facilities for distribution of electricity  water supply and  drainage and other incidental facilities necessary for the implementation of  the Project outside the sites referred to in  a  above      c  to ensure prompt unloading and customs clearance at ports of  disembarkation in the Kingdom of Thailand and to assist internal  transportation therein of the Products      d  to ensure that customs duties  internal taxes and o
145. b  change of the Project Site     c  change of major structure and or strength of the building or facilities        d  change of dimensions of the building or facilities      18     20 2    20 3     e  change in quality or quantity of major equipment     f  change of the period of execution of the Work     g  change of terms and or amount of the Contract Price     h  change that requires amendment of the verified contract  and    i  other changes for which JICA requires the Client to obtain its prior    consent     In addition to the changes mentioned above  modifications can be made  on an ex post fact report to JICA within the criteria of minor    modifications set by JICA     Proposal by the Contractor   In case the Contractor considers any modifications of the Work necessary   the Contractor shall discuss the solution with the Consultant  and the  Contractor can propose the modifications to the Client  This proposal    may include the changes from  a  to  i  mentioned in Sub Paragraph 20 1   Procedures   Modifications shall be agreed upon by the Parties and JICA s consent  shall be obtained for the modifications  Details of the procedures for  such modifications are advised by JICA     Article 21  Amendments and Modifications    Any amendments and or modifications  if necessary  may be negotiated    between the Parties hereto and shall be agreed by a written document signed by    the Parties  The Consultant shall support the process of the amendments    and or modificatio
146. bankment     Moisture Content  General  The moisture content of the fill material prior to and during compaction in the embankment  shall be in accordance with this Clause  As far as practicable  the material shall be  condition to the correct moisture content at the borrow pit  excavation site or stockpiles   Embankment Material  The moisture content shall range from 2 percent below to 2 percent above optimum   The  optimum  moisture content is to permit the achievement of the maximum apparent    dry density as defined by the Standard Compaction Test ASTM D 698 Method A or other  equivalent standards     S 7 1 26    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     c      7      8            b     As far as practicable  the materials shall be delivered and spread on the embankment  within the required moisture range  Only such moisture control as needed for minor  adjustment of changes caused by evaporation during handing and placement or from rain  fall shall be accomplished on embankments     Humidifying after tipping and spreading shall be carried out by Spraying  to ensure a  greater uniformity on the distribution of the water  After spraying  the layer shall be mixed  scarifying with disc harrows or the equipment approved by the Consultant     The amount of water to be added to each layer of the embankment shall be carefully  controlled to avoid excessive moisture 
147. basis  with any portion  of the Work remaining uncompleted  unless the damage fall within the category as  described in the previous paragraph as exceptions     After the date of completion of the Work  the Work shall be delivered to the Client with the  period of guarantee for twelve  12  months commencing from the date of handing over of  the Project  Usual type of care and maintenance work in this period  however  shall rest  upon the Client in accordance with the Grant Agreement between the Government of the  Kingdom of Thailand and J ICA     Should any defects in the Work were found during the period of guarantee as they are  derived from the use of materials or workmanship not in accordance with the Contract  or  due to negligence or failure on the part of the Contractor to comply with any obligation   expressed or implied under the Contract  the resulting costs for repair  replacing  making  good or reconstruction shall be borne by the Contractor     Work not in Compliance with the Contract    Any part of the Work found during the period of construction and manufacturing not to be in  compliance with the Drawings or Specifications  either in its workmanship  construction and  manufacturing materials or methods  shall be promptly reconstructed and or remanufactured  by the Contractor  including his Subcontractors prequalified in the Prequalification  at his  own expense in accordance with the instructions of the Consultant  In such cases  the  Contractor is not entitled
148. be included in the  Contract Prices     If the completed filling under embedded pipes or opening does not result the Contractor  shall fill the void with mortar in an approved manner     Placing on Slopes    The low slump concrete for slope slabs shall be placed starting from the bottom   and proceeding upwards  The concrete will be spread and completed by mean of an  appropriate straightedge resting on wooden guides that shall be removed before final  setting of the concrete     Placing under Rain    Outdoor concreting shall not be started during rainfalls unless the concrete is protected   as approved by the Consultant  against the harmful effects of such exposure  If concreting  is under way  it shall be suspended if the rain is sufficiently heavy or prolonged to wash  mortar from the coarse aggregate     Placing under Water    No concreting shall be carried out under water  unless authorization has been obtained  from the Consultant     Any such proposal made by the Contractor shall have due regard for the following  requirements and shall be modified as necessary to meetthe approval of the Consultant     The method of depositing concrete under water shall prevent the washing out of cement   segregation of the mix  or the formation of a honeycombed structure     Where a tremie is used the pipe shall be smooth bored and water tight  The pipe shall  extend from above the water level to slightly below the surface of the fresh concrete  in  which the pipe shall remain immerse
149. be visible from outside without opening the doors  and or windows which shall have integral lock and master key  Cabinets and panels shall be  completely enclosed and shall be of weather  dust and vermin proof construction for outdoor  use  while dust and vermin proof construction for indoor use     The cables and wiring shall enter from bottom side of cabinets and panels  Removable gland  plates shall be supplied and located to provide adequate working clearance for the termination  of cables  Under no circumstances the floor roof plate shall be used as a gland plate     Space heating elements with thermostatic control switch shall be included in each cabinet panel     The instrument and control wiring including all electrical interlocks and interconnecting wiring  between sections  shall be completely installed and connected to terminal blocks by the  Contractor     S 7 2 33    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    The arrangement of control and protection devices on the cabinets panels and the exterior finish  of the panels shall be subject to the approval of the Consultant     2 12 6 Power Distribution Boards and Panels    Power distribution boards and panel shall be of sheet steel with minimum thickness of 2 3  millimeters  of rigid  self supporting or wall mounted construction     The board panel shall be completely enclosed and shall be of wea
150. bends shall be  avoided wherever possible     Rope drums shall be cast steel or fabricated steel with machined grooves  Paired rope drums  shall have the same diameter to the bottom of the groove  The peak edges of grooves shall be  rounded and the surface of groove shall be smooth machined with an adequate depth  Drums  shall have sufficient width to wrap the full length of rope  and have approximately one  1  groove  spare when the gate is in the highest possible position  and three  3  dead wraps when the gate  is in fully closed position     The rope end shall be secured to the outside of the drum by means of a clamp or other  approved means  The fastening shall be easily accessible to facilitate rope removal or  replacement     The minimum pitch circle diameter of rope drums and sheaves shall be 19D and 17D for 6 x 37  construction rope  respectively  where D is the diameter of the rope  The minimum pitch  diameter of equalizer sheave shall be not less than 10D  Number of wound layer of the hoisting  rope on drum shall not exceed two  2   Fleet angles for grooved rope drums and sheaves shall  not exceed four  4  degrees for first wound layer and two  2  degrees for multiple wound layers     Rope sheaves shall be Vee grooved with an included angle of fifty two  52  degrees and groove  depth equal to 1 5 times the rope diameter  The groove diameter shall be slightly in excess of  the rope diameter to prevent pinching     Spring and striker type slack rope detecting switche
151. bined stress shall be examined by the following formula as developed by Mises   Hencky and Huber     fg   J  fx   3 x fg            fg    fx    fy      fx x fy  3 x fq      Where   fg  Combined stress  N mm    fx  Direct stress  tension is considered as positive   N mm    fy  Direct stress acting perpendicular to axis of fx   tension is considered as positive   N mm    fq  Shearing stress  N mm      The allowable stresses for the combined stresses of biaxial or triaxial principal stresses shall not  exceed 110 percent of the allowable axial tensile stress for normal loading condition     2 5 Minimum Thickness    The thickness of the major structural members shall not be less than the following value  inclusive of corrosion allowance  unless otherwise particularly specified herein     Parts Min  thickness mm     Gate leaves   Steel plate 6 0   Shaped steel 5 0    Gate guides   Steel plate 6 0   Shaped steel 5 0    Embedded and fixed parts   Steel plate 6 0   Shaped steel 5 0    Skin plates 8 0    Cover and protection plates for hoist equipments and panels 2 0    S 7 2 26    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    2 6 Critical Slenderness Ratio    The critical slenderness ratio for major compression members shall be less than 120  and 150  for secondary members  The said ratio for tension members may be increased up to 200 and  240 respectively     2 7 M
152. ble changes as in the opinion of the Consultant are necessary or  desirable     The Contractor shall not be entitled to raise claims against such unavoidable changes   adjustment on or deviation from the original     1 3 Standard and Testing     1      2     Standards    All materials to be furnished under the Contract shall conform to J IS   J apanese Industrial  Standards   so far as applicable  Other national or international standards may be  accepted provided that the requirements therein are equivalent to the current issue of the  said Standards  JIS  The Contractor shall request the Consultant s approval for any  items of materials that he wishes to bring in to the Site  based on standards other than  JIS  In this case  however  the Consultant s approval may be based on condition that  some sort of testing will have to be made on the material in the Kingdom of Thailand  and  in this case all the costs and expenses accruing there from shall be borne by the  Contractor  irrespective of the results of testing     Test of Materials at the Site    Not withstanding any previous inspections and tests  all materials delivered to the Site  shall be subject to examinations and tests  if so requested by the Consultant  Should  such test be desired by Consultant or the Client  the Contractor will be advised in  sufficient time to permit such testing       All such examinations and tests shall be carried out by the Contractor at his cost in  the presence of the Consultant in accord
153. bute to reduce flood damage atthe left bank  East side  of the  Pasak River in Ayutthaya and the industrial estates located in the left bank of the  Chao Phraya River through construction of floodgates  amp  bank protection  and  provision of drainage pump vehicles     Scope of Work    The scope of works covered by this tendering  hereinafter referred to as  the Work   of    5 2 1    Volume I  Section 2 The Flood Prevention P roject of East Side of the  Instruction to Tenderers Pasak River in Ayutthaya in the Kingdom of Thailand    the Project consists of the followings    1  Construction of the facilities      Kra Mang Floodgate 1 site    Han Tra Floodgate 1 site    Bank Protection of Han Tra Canal 484m     2  Procurement of the Equipment      Drainage Pump Vehicle  30m  min  10 sets    Details of the Work shall be stipulated in due conformity with the Specifications of the  Tender Documents     5  Japan s Grant Aid Scheme    Since the Project will be implemented with the use of J apan s Grant Aid  the tenderers  should be well aware of and conform to the procedures practiced in the J apan s Grant Aid  Scheme     6  Misprocurement    JICA requires that  under contracts funded by the Grant  tenderers and Contractors  observe the highest standard of ethics during the procurement and execution of such  contracts  In this regard  JICA will not verify the contract if it determines that the  Contractor has engaged in corrupt or fraudulent practices in competing for the contract in
154. cal Equipment and Parts  and 2 12  Electrical Equipment and Parts      The details of construction of the hoists  not specified herein  shall be made by the Contractor  upon approval of the Consultant     3 7 Wiring and Control Panels    3 7 1 General    Each hoist for the gate shall be operated through a local control panel  The hoist shall be  capable of raising  lowering and holding the gate by the corresponding push button switches on  the control cabinet  A safety interlock system shall be considered by the Contractor to limit the  gate operation to condition only a gate can be started while another gate is running    The following limit switches shall be provided on each hoist for proper operation of the gate         Fully Opened  and    Fully Closed  limit switches to stop the gate at the respective  restricted positions          Over torque  limit switch to stop the hoist if the torque exceed the rated torque in  opening and closing operation       Manual operation  interlocking limit switch to de energize the electric control circuit     Wire rope slag    limit switches to stop the gate    3 7 2 Wiring    The power and control cables and or wires with all necessary conduits and accessories from the  main distribution panel in the control house to the respective electrical equipment  which are  necessary for the required proper operation of the gates  shall be supplied and installed by the  Contractor  The main distribution panel shall be supplied and installed by the
155. cations  directly from the excavation or shall be placed in temporary stockpiles  and later placed in  final location  if approved or directed by the Consultant     Classification of Material    The Contractor shall not simply decide the excavation method based on the boring data  provided by the Consultant     The Contractor shall draw his own conclusions from the investigation such as boring or  trial excavation  etc as to which excavation methods will be required for the removal of  material to be excavated     Excavation Requirement    Excavations shall be based on the approved construction drawings and or as instructed by  the Consultant    Excavations shall be those carried out from the natural ground level to the require lines  and levels  Excavation of embankments for trenches  structures and foundations shall not  be considered for payment  should the Contractor elect to construct the embankments  before constructing the structures affecting the embankments themselves  The procedure  contemplated in this Contract shall be to proceed with the construction of structures first  and then follow with the embankments     The Contractor shall remove from the entire areas to be excavated all topsoil and other  objectionable material as determined by the Consultant and in accordance with Sub   clause 3 1    Trench Excavation    Trench excavation shall include excavation for laying precast reinforced concrete pipes  U shape ditch  etc     The trench shall be of sufficient widt
156. ceptance tests  in the presence of the Client     Commissioning shall be conducted launching the completed shape of the civil works and the  hydraulic gate works into water of the canals      1  Discharging tests      Measurement of vibration on the piers  columns  operation deck and wing walls      Measurement of noise around the stoplog leaves    S 7 2 59    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand     2  Water tightness tests      Leakage measurement through stoplog seals in wet conditions by filling with water the  room between the stoplog leaves and the main gate leaves    Leakage volume exceeding 0 1liter meter of sealing second shall not de accepted      3  Setting tests      Inserting and removing of the maintenance gate leaves      Hoisting and travelling of chain hoists with lifting beam and maintenance gate leaf     Any defects or improper operation discovered at the commissioning shall be corrected by the  Contractor and the entire tests shall be repeated to the satisfaction of the Client and the  Consultant     5  FIXED WHEEL GATE AND HOISTS FOR DRAINAGE CHANNEL    5 1 General    One  1  complete set of plate girder structure stainless steel fixed wheel  roller  gate leaf   stainless steel gate guide  manual racked gate hoist and appurtenant parts complete with all the  necessary accessories shall be designed  manufactured  transported  erecte
157. cessories   3  SPECIFICATIONS   The following shall be applied to each set of the Drainage Pump Vehicle     1  Working Condition   a  Drainage operating time   Drainage operating time 48 hours or more in continuous operating time   b  Temperature   Temperature 5 to 40  C   c  Atmospheric pressure   Atmospheric pressure 980 hPa or more   d  Relative humidity   Relative humidity 85   or less                   2  Drainage Pumps     unit    means the number of pump     Total drainage discharge   30 m  min  at 10 m of total head    Model   Submergible motor driving pump   Number   6 units or less  Same specifications for all units                Bore   200 mm                     a   b   c   d   e    Unit weight of pump   40 kgf unit or less  Type of motor   Dry type submergible synchronous motor  Power source   8 phase x 440 V x 60 Hz  Cable   Cabtire cable 40 m unit or more  with waterproof connector     Cable band 1 set unit   i  Drainage hose   Diameter 200 mm x Length 25 m x 3  discharge side   unit    Pressure tight 0 2 MPa or more   j  Configuration   Drainage pump shall be controllable of rotation speed in each unit     Each drainage pump shall be equipped with metal fixers for attaching float    k  Pump float   1 no  unit    Attaching rope or rod 1 set unit   I  Major materials   Casing Special lightweight material s     Casing liner Stainless steel or stainless cast steel    Impeller Stainless steel or stainless cast steel    Main shaft Stainless steel or titanium allo   
158. checked  This procedure will continue until the  drawings have been finally approved     If any revisions have been made to a drawing with the Consultants approval  the  Contractor shall resubmit three  3  prints to the Consultant for further approval  The  Consultant shall have the right to make requests for any additional details and to ask the  Contractor to make any changes in the drawings which are necessary to conform to the  provisions and intent of the Specifications  without additional cost     Any work done prior to the Consultant s approval of drawings shall be at the Contractor s    risk  Approval by the Consultant of the Contractors drawings shall not relieve the  Contractor of any of his obligations in complying with the Specifications  the responsibility    S 7 1 4    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     4     for the correctness of the Contractor s drawings  the responsibility for the adequacy of the  method of construction  etc     Right to Change Design and Drawings    When additional information regarding foundation  or other conditions becomes available  as result of excavation work  further testing or otherwise  and if it may be found desirable  to make changes in the alignment  cross sections  dimensions or design of the canal or  appurtenant structures to conform to such conditions  the Client reserves the right to  make such unavoida
159. checks shall be  made by the Contractor to see that all the embedded parts requiring accurate setting have  not been displaced     5 7 1 54    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     e      f      g     The lifts of concrete shall be limited to the depth shown on the approved Method  Statement  A minimum of seventy two  72  hours shall elapse between the placing of each  successive lift  Any placing restriction deemed necessary by the Consultant to maintain  alignment of the embedded parts  shall be promptly complied with by the Contractor  Lifts  may be terminated at any time  to allow the adoption of any remedial action necessary to  maintain the accuracy requirements  Any air or water lines or other materials embedded in  structures used as construction expedients authorized by the Consultant  shall conform to  the above requirements and upon completion of their use be stoppered with concrete or  grout as directed     Mechanical vibrators shall not be used for placing concrete around movable embedded  parts  except as approved by the Consultant  in this case concrete shall be consolidated  thoroughly by tamping     Opening in floors and walls shall be formed before the concrete is placed  Blockouts might  be necessary to provide for installations of handrail posts  batch frames  permanent  equipment and other metalwork  and the cost for the blockouts shall 
160. ckling Oxidizing solution      Hoists SS  SM Surface preparation   Power tool cleaning ISO St3      Under coat  1  Non organic zinc rich paint 1 75  Weak solvent type modified  Under coat  2  epoxy resin paint under coat 1 80   air exposed   Weak solvent type modified  Under coat  3  epoxy resin paint under coat 1 80   air exposed   Weak solvent type  Intermediate coat intermediate coat for 1 40  fluoropolymer paint  Weak solvent type  Top Cont fluoropolymer paint top coat   39  Total 5 305  SUS Pickling Oxidizing solution                          2 4 Design Stresses    2 4 1    Gate Leaves  Gate Guides and Other Steel Structures    The working stresses for structural steel members shall not exceed the allowable design stress  as shown in the following table under normal loading condition     S 7 2 20          The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works            Steel materials  with a plate thickness of 40 mm or less     Steel material SS 400 and SM 400 SM 490  Thickness  lt  40 mm Thickness  lt  40 mm  Axial tensile stress 120 N mm  160 N mm      for net sectional area     Axial compressive stress On condition of On condition of   for gross sectional area   l r   lt  20   Vr      15   120 N mm  160 N mm   Compressive members On condition of On condition of  20  lt   l r  s 93  15  lt   l r   lt  80   120     0 75   I r  160     1 12   I r       20      15
161. cks     5 4 5 Side Wheels    Two  2  side wheels shall be provided on each end beam to limit the lateral movement of the  gate  The side wheels shall be SUS 304 and provided with corrosion resisting steel pins and  self lubricating metal bushing  If the wheels are flanged to restrain the gate from moving in  watercourse direction  bushings inserted in the wheels shall have an integral thrust shoulder to  transmit the resulting load     Each wheel and pin shall be designed to the load of ten  10  percent of the gate weight and  shall withstand the imposed load due to the gate becoming jammed in the gate frame     5 4 6 Seals    The gate seals shall be of the L and flat bar shapes clamped to the upstream surface of the skin  plate using stainless steel bars  bolts  nuts and washers  The P type  or J type  rubber seals  shall be provided on the downstream surface of the gate leaf so as to minimize water leakage  while water level at the downstream is higher than the one at upstream  The seals shall be  spliced at the corners to provide a single continuous seal  The tensile strength of all splices shall  not be less than fifty  50  percent of tensile strength of the unspliced material     5 4 7 Tolerances    The gate leaf shall be accurately fabricated and installed with the following tolerances        Points to be measured Tolerances  mm        S 7 2 63    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the       7 2 Hydraulic Gate Works Pasak Ri
162. complete with all accessories shall be assembled and  installed in accordance with the  Approved drawings  and approved installation procedures     S 7 2 58    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    The rails of telpher rail shall be fixed with J shaped anchor bolts of M20  in suspension  to  the reinforced concrete cantilevers with which are provided the operation deck  The joint  surface of the rail shall be enough grooved and butt welded throughout the perimeter  The  joint shall be made under the cantilevers where the rails of telpher rail are fixed  After  welded  upper and lower surface of the bottom flange  which are travelling surface for the  wheels  shall be finished with sander  The travelling surface of the beams shall not be  allowed to paint     The piers of telpher rail shall be fixed with L shaped anchor bolts of M24  through the  welded base plates of 22mm in the bottom  to the reinforced concrete foundation  The rail  shall be fixed to the piers  with F10T class high tension bolt of M20  through the H shape  beam which is installed on the top of two  2  piers     The telpher rails shall be coated to be anticorrosive in conformity with Clause 2 3  Painting      4 8 2 Field Tests and Inspection    After completion of erection and installation work at the site  the Contractor shall perform the  tests to prove satisfactory erection and i
163. completion of afore mentioned  purpose      Signature      Name of Signer     Title of Signer     Name of Tenderer     Adaress of Tenderer   Designated Person     Signature      Name of Signer    Title of Signer     S 3   22    Volume I  Section 3 The Flood Prevention Project of  Form of Tender East Side of the Pasak River in Ayutthaya     For reference only   CERTIFICATE OF SIGNATURE    Date    th day of         2013    We hereby certify that the signature of the under mentioned person  affixed to  the accompanying documents  is genuine and authentic     Name of Person  Title    Name of the Company    THE TOKYO CHAMEN BER OF COMERECE  amp  INDUSTRY    S 3   23    SECTION 4    FORM OF CONTRACT                        BETWEEN    ROYAL IRRIGATION DEPARTMENT  MINISTRY OF AGRICULTURE AND COOPERATIVES    THE KINGDOM OF THAILAND    AND   NAME OF THE CONTRACTOR   JAPAN    FOR    THE FLOOD PREVENTION PROJECT OF  EAST SIDE OF THE PASAK RIVER IN AYUTTHAYA    Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article  Article    NNN NN NY PB BB                                                         amp                                                   als                       5    Definitions    Scope of Work    Period of Execution of Work    Shipment and Packing  Country  Area of Origin    Remuneration    Payment 
164. construct temporary cofferdams  and also design and  arrange dewatering work in the Canals of Han Tra and Kra Mang for assuring the work  safety against both floodwater from Pasak River and stormwater of the Canal side  Deign  of the cofferdams and dewatering work shall be verified by the Consultant     The top elevations of the cofferdams for two  2  floodgates shall not be lower than the  following       PasakRiver side  44m MSL    Canal side   3 5m MSL    The drainage pumps for the dewatering work during wet season shall be the following  Capacity       Capacity of drainage pumps  Not lower than 1m  sec in total     1  Cofferdams    The following tables show the water levels recorded at RID S5 gauging station of Pasak  River in Ayutthaya since 1990 just after the completion of Pasak Dam  In October 17   2011  the S5 gauging station recorded  5 91m MSL which is the overwhelmingly highest  since the start of level gauging in 1950     The water levels exceeding  4m MSL at S5 gauging station have been ever recorded in  September to November of 1995  1996  2002  2006  2010 and 2011 since 1990           6        Monthly Max  WL  5 91m MSL Se   hly Min  WL in Oct17  2011                 Water Level in m MSL                                                       6 7  Month       Month water level relation since 1990 at   5 gauging station of Pasak River in Ayutthaya    94952    The Flood Prevention Project of East Side of the Volume I  Section 5             Pasak River in Ayutthaya
165. courses of material are not mixed with  base course and finished surface shall be such that water drains away from the  pavement freely and evenly     Compaction    Each layer of the base course shall be compacted by an approved roller  Water shall be  maintained during the compacting procedure at optimum value or at the percentage  specified by the Consultant  The Compaction shall continue until each layer is compacted  through the depth to at least 95  of the maximum dry density determined by D 1557  Method D or equivalent  The Compaction shall be carried out from edges towards the  center of the layer being compacted     The Contractor shall make such adjustment in rolling of procedures as may be instructed  by the Consultant to obtain the true grade  minimize segregation and degradation  to  reduce or accelerate loss or of water  and to insure a satisfactory base course  Any  materials found be unsatisfactory shall be removed and replaced with satisfactory material  or reworked to produce a satisfactory material     5 7 1 32    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     8      9     4 2     1      2      3      4     Accuracy   The elevations of the finished base course shall be within plus or minus 1 cm of the  elevation shown on the approved Shop Drawings  Any deviation in excess of this amount  shall be corrected by the Contractor by removing material and r
166. ct  means the Flood Prevention Project of East Side of the Pasak  River in Ayutthaya in conformity with the G  A and to be implemented by the  Government of the Kingdom of Thailand  The Project sites are located in  both Ayutthaya city and Ayothaya town  Phra Nakhon Si Ayutthaya District   Phra Nakhon Si Ayutthaya Provence  the Kingdom of Thailand  hereinafter    referred to as  the Project Site        The Client  means Royal Irrigation Department  Ministry of Agriculture  and Cooperatives  the Kingdom of Thailand  The Client shall include any    person or persons authorized by the Client      The Consultant  means CTI Engineering International Co   Ltd   having  its principal office at Tachibana Annex Building  2 25 14 Kameido  Koto ku   Tokyo 136 0071  Japan  which shall be appointed by the Client for the execution  of this Contract  shall provide professional services for design  assistance of  tendering and supervision of the progress of the Project under the Agreement  with the Client  The Consultant shall include any person or persons    authorized by the Consultant        The Contractor  means  name of the contractor   The Contractor shall    include any person or persons authorized by the Contractor        JICA    means an agency which was established based on the Japanese Act  on Incorporated Administrative Agency   Japan International Cooperation  Agency promulgated in 2002  JICA makes the Grant available for the Project  based on the E N and the G A      The Work  
167. ct Price  The negatives of the photographs shall be the property of the Client  and no print from these negatives shall be supplied to any person or persons unless so  authorized by the Client     Completion Report    The completion report shall be submitted within twenty one  21  calendar days after  completion of the Work  The report shall contain  but not limited to  the total work  volume completed and the activities in the construction period  The completion  photographs shall have brief descriptions together with the dates they were taken  The  completion report shall also include the List of supplied Equipment  indicating name of  Equipment  quantities  manufacturers    name  model and type  and delivery date and site    Record of inspections and performance test of the Equipment  Record of training and the  certificate  including dates and name of trainees  signed by the Client  and List of  supplied manuals for Equipment  indicating the locations where they are placed  for the  Procurement of Equipment     1 5 Materials and Plant to be Furnished by the Contractor     1      2      3     General    The Contractor shall furnish all plant and materials required for the completion of the  Works  Unless otherwise specified  all plant and materials which form part of the  permanent Works shall be new and shall conform to the standard provided in the  Specifications or Standards     When he proposes to supply plant and materials not conforming to such standards as  above me
168. customs duty  in case of importation from limited to J apan  for the sole purpose of the Work   In order to facilitate prompt mobilization by the Contractor and expedite the progress of the  Work  the Client shall assist the Contractor where required in procuring any necessary  government consent to import such materials  plants and equipments     Ownership and Copyright    The drawings  specifications and other documents  as instruments of service  are the  property of the Consultant and shall not be used other than the Work without prior written  approval of the Consultant  The copyright of all drawings  specifications and other  documents prepared by the Consultant in connection with this Agreement rests with the  Consultant     Reporting    In order to approve  verify and certify that the Contractor  including his Subcontractors  prequalified in the prequalification  performs the Work in conformity with the Specifications   Drawing  Contract and other documents regarding the Work  the Contractor shall prepare  and submit reports as shown below to the Consultant at each stage of the progress     Overall Implementation Plan   Report on Detailed Design of the Hydraulic Gate  Notice of Completion of Piecework   Notice of Completion   Notice of Delivery   Report on Output Record for Use of Construction Plant  Accident R eport   Detailed Work Schedule   Shop Drawings         CO              UNA    5 5 11    22     24     Monthly Report   Daily Report   Minutes of Meeting   List
169. d  installed and  tested in the drainage channel at Kra Mang Floodgate by the Contractor under this Contract     The fixed wheel gate is used for the purpose of avoiding floodwater to enter the drainage  channel which is coming to the canal at the right bank just downstream Kra Mang floodgate     The general data for the design of the fixed wheel gate for drainage channel are given in Sub   clause 5 3 herein and those data shall be fixed and may not be altered     The arrangement of the fixed wheel gate  gate guide and hoist shall be as shown on the  attached Drawings     5 2 Design Stresses    The design stresses shall conform to those specified in Clause 2  Design Criteria and  Particulars  of the specifications     5 3 Design Data    The gate leaf  gate guide and hoist shall be designed by the Contractor for the following design  conditions     5 3 1 General Data     1  Quantities to be procured    Gate leaf  1 set  Gate guide  1 set  Hoist  1 set    S 7 2 60    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works     2  Gate     3  Hoist    5 3 2    Type   Clear span     Effective height     Plate girder structure stainless steel fixed wheel gate  2 0m  1 5m    Water levels at upstream  Drainage channel side     High Water Level  HWL   EL    3 5    MSL    Low Water Level  LWL   EL   0 0 m MSL    Water levels at downstream  Kra Mang canal side     High Water Level 
170. d  then filled and stamped  with 10 cm thick bed sand         Cables shall be laid down on the bed sand and must not be subject to stress              shall be filled thereafter up to 10 cm above the largest cables        Onthe sand level above location at each cable  concrete tiles shall be placed  continuously along the direction of the cable          steps of excavation  filling sand  laying down cables and final filling shall be  inspected by the Consultant and approved prior to proceeding subsequent step      ii  When an underground connection is unavoidable and approved by Consultant  a  jointing box using 3 m cast resin should be applied  Above ground a sign stating  MOF  KABEL  shall be placed in a manner directed by the Consultant      iii  Cables crossing under the road  if occurs  shall be installed in a manner shown on the  drawings or on the approved shop drawings     Diesel Engine Generator  General    Two  2  complete sets of diesel engine generator sets for new floodgates shall be provided  with other necessary equipment  The generator set with necessary accessories shall be  designed  supplied and installed in Diesel Generator House of the new spillway gates by  the Contractor     The diesel engine generator shall be neatly arranged and mounted on a common skid base  with vibration absorber  The capacity of a diesel engine generator set shall be of 20 kVA     The required capacity of diesel engine generator shall be made by the Contractor subject to  review a
171. d after approval by  the Consultant     Second stage concrete shall be placed  packed and compacted to ensure satisfactory  bond with the installed equipment or metalwork and shall be free of voids  The exposed  surfaces of concrete shall be smoothly finished     Concrete or mortar to be placed in blockouts shall be of the same strength as the concrete  of the structure where the blockouts are located     J oints   Construction J oints   Wherever concrete is to be bonded to other concrete which has completed its initial  setting the surface of contact between the sections shall be considered as a construction  joint  Construction joints shall be such that the last concrete bonds firmly to the concrete    cast previously  The Contractor shall submit the drawings which indicate all construction  joints  i e  horizontal  vertical joints  to the Consultant and obtain the written approval from    5 7 1 57    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     b     the Consultant prior to start the concrete works  The Contractor shall consider the  following to determine the location of construction joints       To avoid the location where the shear strength is big     To avoid the inclined construction joints    To limit the area or legth of concrete casting to avoid big crack due to thermal stress or  Shrinkage Max  area of Base slab  approx 15mx15m  Max  length of Wall  appr
172. d during the placing  being raised in increments  corresponding to the rising concrete surface  The concrete shall be fed into pipe by means  of a hopper or other approved means and a full column of fresh concrete shall be  maintained in the pipe as the concrete is flowing out of the bottom     When commencing the operation the bottom of the pipe shall be sealed with an    expendable watertight plug  fixed in such a manner that the weight of concrete filling the  pipe  placed in the dry  will break the seal as the pipe is lifted slowly from the formation to    5 7 1 55    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     16      17     be concreted  Tremie pipes and hoppers must be so equipped that they can be rapidly  raised and lowered     The surface of the construction joints shall be jetted free from silt or any other material  immediately prior to placing any subsequent concrete     Concrete shall neither be placed in running water nor be exposed to action off the same  before it is sufficiently set     Concrete Temperature    The Contractor shall make the necessary provisions in the concrete materials storage   handling and batching facilities  to comply with hot weather concreting requirements     Hot weather conditions shall be considered to be in effect when the temperature of  concrete is near 30     and is expected to rise     During hot weather  the temperat
173. de square and true so that the ends will butt or come together for the  full circumference thereof     All steel conduit shall be cut square and all joints shall butt together tightly in order to  ensure maximum electrical continuity     Conduit and accessories shall be kept clean during construction  Clogged conduit shall  be replaced     Pull box    Pull boxes shall be installed at the locations as necessary and as shown on the shop  drawings and at such additional points as ordered by the Consultant  The Contractor  may install  at his own expense  such additional boxed as may be desired to facilitate  the work  All pull boxes shall be marked with checkered plate cover painted     Cable tray    Cable tray shall be made of steel angle  bar and strips hot dip galvanized and shall be  installed at along concrete girders     Hanger and supports shall be properly fixed to ensure that the tray can carry the load  without causing any deformation     Cables on tray shall be clamped at 2 0 m intervals with 3 strip plates using special  straps for this purpose     S 7 2 70    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works     g  Underground cables    6 3     i  Underground cable installation shall be carried out in compliance with the regulations  at the local authorities and in a manner prescribed below        Atrench of          m deep and 50 cm wide shall be prepare
174. diameter of the rod  but not less than 6 5 cm   see ACI 318 Standards    Bending and Cutting   Bar reinforcement shall be bent to the shapes shown on the approved Shop Drawings        bars shall be bent cold without applying heat  Cutting and bending of reinforcement bars  may be done in a shop or at the job site  All bending shall be in accordance with standard  practice and by approved machine methods  No bar partially embedded in concrete shall  be bent in place without the express approval of the Consultant  Bar reduced in section or  with kink or twist will not be accepted     The inside radius of the bend shall be as specified in American Concrete Institute Building  Code for Reinforced Concrete ACI 318 Section 7 1 2    Splices  General  No splice shall be situated at points of highest bending moment of the structures     The splices shall be overlapped or welded  in accordance with the approved Shop  Drawings or as instructed by the Consultant     Overlapping Splices  The length of overlap for tension lap splices with standard hook shall be at least 30 times    of diameters of the bigger bar for deformed bar and 50 time of diameters of bigger bar for  plain round bar     S 7 1 64    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     c      d      e      11     The minimum overlap length for compression lap splices with standard hook shall be 20  times of diameters
175. ding of concrete structures     testing and control     mixing to the required composition     5 7 1 34    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     2       form work      transporting  placing and vibrating      preparation of joints      curing of concrete      repair of damages      finishing of exposed and formed surfaces     clean up of working areas    and all any other operations incidental and auxiliary to the works on concreting  The  insertion of water stops and joint seal fillers shall be in accordance with the appropriate  Clause of these Specifications     The workmanship for all structural concrete shall generally be in accordance with the  latest issue of the American Concrete Institute Building Code for Reinforced Concrete  ACI  318  and  other equivalent standards     The concrete to be produced and placed according to these specifications shall be of  required quality and uniformity  The Contractor in all phases of his operations will be  subject to strict inspection to assure concrete of the required quality  Special emphasis will  be placed on the uniformity of the concrete aggregates  water cement ratio  consistency   air content and the temperature control of the concrete at the time of placement in the  formwork  as well as on density and finishing when placed     Type of Concrete    Following three  3  types of concrete shall be used for t
176. done immediately after placing     Finishing shall be done through 3 stages   1  making rough surface with a finisher or by  workforce with template tampers   2  making flat surface with a surface finisher or by  workforce with floats  and  3  making rough surface with equipment or by workforce with  brooms and brushes     Surface Texture  Surface textures shall be made during construction by dragging various materials or tools  across the fresh concrete before hardening  and shall be the type that can reduce skidding  and hydroplaning accidents caused by wet or frozen weather  The Contractor shall submit  the texture patterns to the Consultant  and the making of surface texture shall be done  after the Consultant   s approval     Curing   Curing for concrete slab shall be required until the strength of test cores at hardening  period reaches 3 4 MPa  35 kgf cm     or until 2 weeks passed over since placing  A variety  of curing methods like with wet burlap sheets and wet blankets shall be available to  maintain temperature and moisture of the concrete     Tolerance    Allowable tolerances in concrete pavement from given dimensions shall be as follows                          Level of surface         Thickness of layer   7mm  Width   25mm   6mm Parallel to the centerline  james  6mm Perpendicular to the centerline          5  CONCRETE WORKS  5 1 Concrete   1  General  amp  Type of Concrete    This Clause covers all requirements for     the supply of all materials for the buil
177. e  staff quarters  stores  workshops  labor camps and other  temporary buildings necessary for the execution of the Works and remove them upon the  completion of the work  The Contractor shall submit site plans and general particulars  of the temporary and permanent buildings to the Consultant for his approval within the  prescribed period  The construction of the buildings shall not be started until his  proposals have been finally approved by the Consultant     The Contractor s staff quarters and labor camps shall be provided with all necessary  services for drainage  lighting  roads  paths  parking places  fencing  sanitation   cookhouses  fire prevention and firefighting equipment     The Contractor shall also provide a heating system  an adequate water supply system  and make arrangement for electric power supply and maintenance to the Contractor s  Office  Client s Consultant s field office  staff quarters  labor camps  workshops and other  places of the Work on the Site     The Consultant s field office shall be heated in winter and provided with the suitable  furniture and office equipment listed in the table below     Requirements for Consultant s Field Office       Furniture e Meeting table with 6 chairs   1 set  Desk with chair   5 sets   Filing cabinet   5 units   White board   2 unit          Equipment Desktop computer   2 units   Specifications     Processor  Intel Core i5 or more     Hard disk  500GB or more     RAM  8GB or more     Optical drive  Super multi d
178. e Consultant  give a written notice to the  Client and send its copy immediately to JICA  Then the Client and the  Contractor shall consult mutually to settle such matters  The Contractor  shall properly inform JICA of its progress  If the Parties can not reach  agreement within thirty  30  days from the date of the notice  the Parties  shall comply with the dispute settlement process stipulated in Article 18     16     hereof     Article 17  Applicable Laws    This Contract shall be governed by and interpreted in accordance with the    laws of Japan     18 1    18 2    18 3    18 4    Article 18  Disputes and Arbitration    This Contract shall be executed by the Parties hereto in good faith  and in  case any doubtful point is raised or any dispute occurs concerning the  interpretation or performance of this Contract  such matters shall be  settled through consultation of the Parties and the Consultant  Unless  the Contract has already been abandoned  repudiated or terminated in  accordance with Article 23 hereof  the Contractor shall continue to  perform the Work in accordance with this Contract  If the Parties can  not reach agreement within thirty  30  days from the date of the notice  informing the occurrence of such matters  JICA will offer its suggestion    for the settlement of the matter    In the event that an amicable settlement cannot be reached through  consultation referred to in the Sub Paragraph 18 1 above  the matter shall  be referred to arbitration  The arbi
179. e areas in large structures shall be  performed in a continuous manner so that the time elapsed since the excavation of the  last 20 cm until the placement of the protection shall not be greater than two  2  hours and  so that the finished surfaces without cover be exposed to the air the least possible time   not exceeding twenty  20  minutes  provided that during this time they shall be maintained  damp     S 7 1 23    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     9     3 4   1      2      3     In no case Shall a surface be left covered for a period exceeding twenty  20  days   Slides    If slides occur in the excavation before final acceptance of the work  and the responsibility  for such occurrence rests with the Contractor due to improper work practices  then the  Contractor shall remove the material from the affected area and shall reconstruct that part  of the excavation at his own expense    Embankment and Backfill  General    This Clause contains the Technical Specifications governing the execution for all the  operations of forming and compacting embankment for the platform  roads and foundation  surfaces and backfills around structures  etc     Embankments shall be constructed in accordance with the alignments  slopes and cross  section shown on the approved construction drawings  or as instructed by the Consultant     Embankments shall be carried out so t
180. e damage by the heavy equipment to the tie rod     The dimension of tie rod shall keep right angles to the alignment of PC corrugated sheet  piles     7 7 Column  Roof for Operation Rooms    8     The columns and the roof structure shall be made by various steel shapes as shown in  Contract Drawings     The Contractor shall submit to the Consultant the documents for material   shop drawings   and the method statement for approval     The Contractor shall consider the following in his planning       The casting of mortar between base plate of column and floor slab of operation room  shall be proceeded after the confirmation of proper elevation and verticality of columns      The all connection for the columns and roof structures shall be carried out by the welding      The colors of painting shall be finally confirmed by the Client      The method statement shall include the plan for the installation procedure of fiber  cement corrugated roof sheet and also the scaffolding     MISCELLANEOUS WORKS    8 1 Gabion Mattress     1                      The gabion mattress shall be used for the protection of erosion      the bed of existing  canal      2 Dimensions of gabion mattress  Dimensions    2 00 m  length x 1 00 m  width x 0 50 m  height  Mesh type   80 mm  x 120 mm   Wire Galvanized steel wire x 2 7 mm  diameter BS  443 1969 or equivalent  Bending wire   2 1 to 23 mm  diameter wire  Selvage wire   3 4   3 5 mm  diameter wire    S 7 1 81    Volume I  Section 7 Specifications T
181. e embedded in concrete  the dowel surfaces shall be cleaned of all  dirt  grease  or other foreign substances which  in the opinion of the Consultant  are  objectionable     The dowels shall be secured in position so that they will not be displaced during the  placing of the concrete     Placing    Before the reinforcement is placed  the surfaces of the bars and the surfaces of any metal  bar supports shall be cleaned of heavy  flaky rust  loose scale  dirt  mud  grease or other  foreign substances which  in the opinion of the Consultant  are objectionable  After being  placed  the reinforcement bars shall be maintained in a clean condition until completely  embedded in the concrete     The bars shall be placed and fixed in such a manner that they cannot move out of place  during the pouring process  In the event of reinforcing bars being bent or distorted in any  way while concreting is taking place  these bars shall be straightened and reinstalled  properly  before placing the next lift of concrete  The Contractor shall use spacing devices  or other methods approved by the Consultant to maintain the reinforcement bars in the  proper position     S 7 1 65    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     12      13      14     5 3   1      2     Reinforcement exposed for future concreting shall be protected from corrosion or other  damage in an approved manner  The p
182. e expenses of  and by the Contractor using the approved method by the Consultant    Piles found to have heaved shall be re driven to the established elevation    Piles driven below the elevation specified in the Construction drawing shall be corrected at  the expenses of and by the Contractor using a method subject to the satisfaction of the  Consultant    Pile Head Preparation  Where necessary  pile heads shall be extended by using concrete prepared with high    early strength cement  after the reinforcement cages have been jointed by arc welding   Welding of reinforcement shall comply with the prescription of Sub clause 5 2     S 7 1 72    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     f      9             The heads of precast concrete piles to be incorporated in the foundation of concrete  structures shall be demolished by means of compressed air equipment  exposing the  reinforcement for a length as shown in the approved Shop Drawings or instructed by the  Consultant    The Concrete debris occurred by the demolition shall be disposed to the designated  disposal area     Pile Records    The Contractor shall keep records of all piles driven  including test piles  and a copy of the  record shall be given to the Consultant within two days after piling works at each structure     The record form to be used shall be approved by the Consultant and shall give full  inform
183. e for double bar hand railing and posts shall be standard 50 millimeter   2 inch   nominal size stainless steel pipe    The necessary height of hand railing shall be 1 100mm    Impervious Steel Sheet Pile    Impervious Steel Sheet Pile  which is use for permanent works  shall be provided under  the structural foundation for both Han Tra and Kra Mang Flood gate     Materials  which shall confirm to TIS1390 or JIS A5528 or equivalent  are type III sheet  pile  Grade SY 295  as shown on the contract drawings     The detailed method statement for the installation of sheet pile shall be provided by the    Contractor for approval   The tolerance for the installation of sheet pile is as follows     5 7 1 79    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    a  EL  Top level     50      b  Eccentricity Alignment    within 100mm  c  Embedment Depth   Not less than the dimension shown in the Contract Drawings    If the sheet pile can not be installed due to unexpected soil condition  sheet pile length will  be adjusted by cutting subjectto the approval by the Consultant     The Contractor shall comply with the following condition on the installation of sheet pile   a  The use of guide beam to keep the proper alignment and verticality of sheet pile    b  The use of prefabricated corner sheet pile at the corners   C  The gap between sheet piles or lap joints of sheet piles is not a
184. e of the Consultant when the Contractor  including his Subcontractors prequalified in the P requalification executes any work under  ground or water  or any other work invisible after completion     18  Doubts as to Drawings and Specifications    5 5 7    19     20     21     The Contractor shall notify the Consultant as for doubts and discrepancies in the Tender and  Contracting Documents including Tender Drawings     U pon receipt of such notification as mentioned above  the Consultant shall give clarification  to the Contractor without delay     Care of the Work    From the commencement of the Contractor s  including his Subcontractors prequalified in  the Prequalification  field work on the Site and shop work to the date of completion for the  whole of the Work  the Contractor shall take full responsibility for the proper care for the  Work  For damage caused on the Work in this period  except those due to the Force  Majeure as stipulated in Article 16 of the Form of Contract  usual tear and wear and other  minor damage that do not affect the function of the existing road seriously  the Contractor  shall repair  replace  make good or reconstruct all of these damage at his own cost  with the  extension of time of completion not to be allowed for  unless otherwise approved by the  Client and verified by J ICA     The Contractor shall also be held responsible for the damage caused after the issue of  completion certificate  if the certificate is issued on partial completion 
185. e of the Work    Without limiting his obligations and responsibilities under Clause 18 of this Conditions of  Contract  the Contractor  including his Subcontractors prequalified in the Prequalification   shall insure against all loss or damage from whatever cause arising  other than the excepted  risks during the period of construction and manufacturing for      1  The works to the full value of such work executed from time to time      2  The materials  equipments  construction plant and other things brought on the Site  and or workshop s  by the Contractor to the full value thereof     Such insurance shall be effect with an insurer and in terms approved by the Client  which  approval shall not be unreasonably withheld  and the Contractor shall  whenever required   provide the policy or policies of insurance and the receipts for payment of the current  premiums to the Consultant or the Consultant s representative     The insurer shall be a J apanese or Philippines Insurance Company   Insurance against Accident or Injury to Workmen    The Contractor before starting the work shall secure and maintain such insurance from an  insurance company approved by the Client as will protect himself  his Subcontractors  his  local contractors and the Consultant from claims for bodily injury  death or property damage  which may arise from operations under this Contract  Bodily injury and death insurance shall  provide coverage for all persons of any age     Extension of Period of Execution
186. e plant and equipment shall again be subjected to the approval of the Consultant   Where these provisions require specific types of equipment to be used or specific  procedures to be followed  the Contractor may propose alternative types of equipment or  procedure if he can demonstrate to the satisfaction of the Consultant that equal results will  be obtained by the use of such alternatives  Approval of plant and equipment or of any  construction procedure shall not waive or modify the requirement contained in these  specifications governing the quality of the materials or finished work     Notice of Intention to Place Concrete  The Contractor shall give the Consultant notice at least twenty four  24  hours in advance  of his intention to place concrete in a particular section of the works  and to allow a  reasonable time for inspection before placing begins  Concrete placing shall not be started  until all formwork  reinforcement  installation of embedded parts  and preparation of the  surfaces  and inspected by the Consultant    Tests and Controls    All tests and controls on component materials and mixed concrete will be made by the  Contractor     The Consultant will be entitled to witness all the tests carried out by the Contractor     5 7 1 36    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     8    a     The requirements for  and the methods of  taking samples a
187. e position indicator    Any defects or improper operation discovered at the commissioning shall be corrected by the  Contractor and the entire tests shall be repeated to the satisfaction of the Client and the  Consultant     6  ELECTRIC POWER SUPPLY SYSTEM    6 1 General    This Clause shall be included the following electrical items works and all other electrical works  relevant to gate operation will be included to Hydraulic Gate Works  In design of electrical  works  the Contractor shall also refer to Sub clause 2 12     The design  manufactures  materials  inspection and performance of electrical and  electromechanical equipment shall be made according to the following standards and  regulations     a  Provincial Electricity Authority  PEA   b  Thai Industrial Standards  TIS   c  International Electrotechnical Commission  IEC     c  JIS or other standards approved by the Consultant     1  Power supply system at the Project sites    S 7 2 67    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    6 2     3     The power distribution lines  with 22kV x 3 phase x 50Hz  at the area of the Project are  being managed by Provincial Electricity Authority in Ayutthaya     Two  2  units of Low Voltage Transformer with a capacity of 22kV 400 230V x 3 phase x 4  wire x 50Hz x 250kVA shall be installed at kra Mang and Han Tra sites respectively at the  cost of the Client   
188. e protective steel pipe     The paperless data logger with memory card shall be housed in one  1  of the local control  panel     The water levels detected by the water level detectors shall be indicated by  EL  m MSL   with the paperless data logger and its data shall be saved in the memory card  The data  logger shall be capable of reading the exact water level by 1 0 cm with an accuracy of plus  or minus 1 0 cm against full range     The water level detectors shall have the following requirements           Floodgates X Particular MES Roc pube   Kra Mang Upstream side  0 5 to  6 5 100 mm  Downstream side  0 5 to   6 5 100 mm   Han Tra Upstream side  2 5 to 46 5 100 mm  Downstream side  2 5 to 46 5 100 mm       3 8    Alarm Equipment    One  1  set of alarm equipment consisting of buzzer and reset button  etc  shall be provided  on the local control panel  so that due warning could be given to the gate operators  when  the following relays or limit switches  etc  are actuated       Electrical control de energized     Earth leakage relay     Motor protection relay     Motor over torque limit switches     Over raised and over lowered limit switches      Slack rope limit switch     Sediment trap water level     Water levels over EL   6 0 m MSL at downstream and over EL  43 5 m MSL at  upstream    The setting water levels for giving buzzer alarm shall readily be adjustable from the front  face of water level indicator and the setting water levels shall be indicated on the front 
189. e shall be of stainless steel  SUS 304 and welded to the main beams  vertical girders  end beams  etc   by continuous  welding     3 4 3 Main Beams  The main horizontal beams shall be of shape steel or built up plate girder construction     Provision shall be made to drain water from the main beams     3 4 4 Main Wheels  Each wheel assembly shall be of saddle support construction and consist of wheel  shaft     bearing and other necessary components  The wheel shall be stainless steel SUS 630 or other  approved materials by the Consultant     S 7 2 42    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    The contact surface of wheel shall be slightly crowned to accommodate gate deflection under  loading condition  The wheels shall be machine finished and have the hardness value rather  lower than that of the main track plate surface of the gate guides     The wheel shaft shall be stainless steel SUS 304 or other approved materials by the Consultant  with lubricating system  The shaft shall have an eccentricity of 3 0 millimeters to allow easy  adjustment of wheel alignment at the site to ensure that all wheel treads bear the hydraulic  loads equally on the wheel tracks     3 4 5 Side Wheels    Two  2  side wheels shall be provided on each end beam to limit the lateral movement of the  gate  The side wheels shall be of SUS 304 and provided with corrosion resisting
190. ealing surface of the sill beams shall be connected to the side guide plates at the bottom  corners to form a continuous seal with the seal rubbers of gate leaf  The seal weld shall be  made for the seal plates at the corners and shall be ground finish     3 5 3 Wheel Rail and Wheel Track    The wheel rails shall be provided at the upstream side of the gate slots to transfer the wheel  loads to the concrete structures  The wheel rails shall be provided with the wheel tracks made  of stainless steel  and its surfaces shall be machine finished to true flat  The wheel rails shall be    or H shape steel or built up plate girder construction     The wheel tracks shall have the hardness rather higher than that of the contact surface of main  wheels of the gate to prevent excessive wear     3 5 4 Side Wheel Track    The side wheel tracks  which are otherwise as the guide plates  shall be provided at the  downstream side of the gate slots to transfer the wheel loads of the side wheels to the concrete  structures     The side wheel tracks shall have ample strength to resist the load from the side wheels of the  gates  The assembled side wheel track shall be straight over their entire length and no offset  shall exist at joints  The side wheel tracks shall be square shape and made of stainless steel  SUS304     3 5 5 Lintel Beams    The lintel beams shall be embedded in the second stage concrete made on the curtain wall   The lintel beams shall be true to form and free from twist and w
191. ect  Therefore  the tenderers shall submit two sets  ORIGINAL and  COPY  of Envelope A and Envelope B respectively      2  The tender shall be submitted to the address specified in the Invitation to Tender  hereof  not later than the closing time for submission of tender specified in the  same      3  The tender shall be submitted in person  The tenders through other means such as  telex  telegraph  facsimile  e mail or mail shall not be accepted      4  Anytender received after the closing time shall be returned unopened    5  Alternative tender shall not be allowed      6  The tenderer is neither allowed to modify nor withdraw his tender after the closing  time     The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers    5  Interpretation of Tender     1     Should there be any discrepancy between the  ORIGINAL  and the                 the   ORIGINAL  shall prevail  In case there is a difference between the figures entered  in words and in numerals in the tender  the figures entered in words shall prevail     Should there be any discrepancy between the Tender Price Schedule and the  Tender Price  the Tender P rice shall prevail     Chapter 4  Opening of Tender    1  Introduction     1     All tender shall be opened on the date  time and place specified in the Invitation to  Tender hereof  immediately after the closing time  in the presence of the Client  the  Consultant and the tend
192. ed and when applicable sealed by the  passage of rubber tired equipment     In order to reduce the effect of rain  the surface of embankments shall have a cross fall of  approximately 4   In case of work interruption  the surface of the embankment shall be  sealed to protect it from the effects of rain  by transit of pneumatic tired rollers     Backfill    Fill around structures and excavation refill designated as  Backfill  shall be placed where  shown on the approved Shop Drawing or as instructed by the Consultant     Material designated as  pervious backfill  shall be coarse sand or a free draining mixture  of sand and broken rock wastes  The material designated as  backfill  shall be similar to  that used in the embankments and shall be compacted in accordance with the provisions  of Clause 8 1 above  Backfill materials shall be reasonably well graded  free from organic  matter and when placed against walls or over drains shall not contain stones or rock  greater than 5 cm in maximum dimension  In so far as practicable  backfill material shall  be obtained from structure excavations  but when sufficient suitable material is not  available from this source additional material shall be obtained from borrow pits prepared  by the Contractor     The material shall be placed in approximately horizontal layers not more than 0 2 m in  thickness  Care shall be taken to avoid damage to any concrete structures adjacent to the  backfill     No backfill or other load  shall be placed 
193. ed as necessary to secure close and perfect connection    All exposed bolts  projecting beyond the nut  shall be penned    Welding of Steel    Welded work shall be in accordance with the requirements of AWS  JIS or other equivalent  standards     Painting   Miscellaneous metal work to be painted shall be treated as indicated in the Specifications  hereafter  except that parts which are continuously or occasionally submerged or partly  submerged    Hot dip Galvanizing   Metalwork to be galvanized shall receive an adherent  smooth and continuous zinc  coating  free from bubbles  porosities or other irregularities that may affect the soundness  of the protective layer  The thickness of the zinc layer shall be such that the rate of  deposited metal corresponds to a minimum of 600 gm m     Installation and Erection    General    The work shall include all cutting  fitting and drilling required for proper installation  and to  make all the required connection with adjoining work     S 7 1 78    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     b     7 2    7 3    7 4    All anchors sockets  pipe sleeves and expansion bolts required for securing the metalwork  to the construction shall be furnished by the Contractor except where specifically stated  otherwise     Embedded Metal    All embedded metal shall be accurately set in place before the concrete is poured or   subject to 
194. ed from an elastomeric plastic compound  the basic resin of  which shall be polyvinyl chloride  PVC   The compound contain those additional resins   plasticizers  stabilizers  or other material needed ensure that when the material is  compounded  it is durable and resistant decomposition     The water stop material shall meet the following main requirement           Requirements Method of Test  a  Tensile strength  not less than 120 kg cm  ASTM D 412 or equivalent  b  Ultimate elongation  not less than 33  ASTM D 412 or equivalent  c  Stiffness in flexure  6 mm  span   not less ASTM D 747 or equivalent  than 28 kg cm   d  Specific density  not less than 1 30 gm cm  ASTM D 792 or equivalent                S 7 1 66    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     3      4      5     The Contractor shall supply water stop samples and certificate of physical properties for  Consultant s approval  He shall also perform required laboratory tests on specimens  sampled on site to verify that the material supplied meets the requirements specified     Each manufacturing batch lot or every 100 m  of water stop certified by the manufacturer  and the lot marked with the batch number     The extruded PVC shall be dense  homogeneous  and free from holes  scratches and  other imperfections  The cross section of water stops shall be along its length and shall be    transversely symme
195. ed primers  2 enamel finish   Wood  2 undercoats  2 enamel finish   Concrete Outdoor  1 masonry filler  2 catalyzed epoxy fixatives  Plaster  amp  Concrete Indoor  2 paint finish of ordinary and waterproof paint    Each coat will have a minimum thickness of 100 microns     The miscellaneous metalwork to be painted will leave the fabricating shop fully painted or  protected at least with a coat of primer paint     After erection the Contractor shall thoroughly clean the damaged areas of shop painted  surfaces and shall touch up the paint     Steel which is to be embedded in concrete and metal surfaces against which concrete is  to be placed will not be painted but shall be perfectly cleaned prior to embedding     Paint Application    S 7 1 89    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    9   9 1     1      2      3     9 2   1      2      3     Except if otherwise specified herein  all paint shall be applied in accordance with the paint  manufacturer s recommendations and also client s confirmation  Paint shall not be applied  over a previous coat until the surface is dry and hard  and has been approved by the  Consultant  All coats shall be applied in such a manner as to produce an even film of  uniform thickness completely coating corners and crevices  Each coat of different type of  paint shall have a variation in color to identify it from the preceding coat  Pai
196. ed which  in the opinion of the Consultant  render it  impracticable to dewater the foundation before placing the footing  the Consultant may  require the construction of a concrete foundation seal of such dimension as he may  consider necessary and of such thickness as to resist any possible uplift    The concrete for such seal shall be placed as directed by the Consultant  The foundation  shall then be dewatered and the footing placed    Protection of Concrete and Masonry   Cofferdam shall be constructed so as to protect green concrete or masonry against  damage from sudden rising of the stream and to prevent damage to the foundation by  erosion  No timer or bracing shall be left in cofferdams or cribs in such a way as to extend  into sub structure masonry without written permission from the Consultant    Removal of Cofferdam or Crib   Unless otherwise provided  cofferdams or cribs  with all sheeting and bracing involved  therewith  shall completely be moved by the Contractor after the completion of the sub  structure built at the area protected by the cofferdam or crib  Removal shall be effected in  such manner as notto disturb or mar finished work   Excavation   General    This Clause covers all excavation works required in connection with the Contract and  shown in the shop drawings based on the Contract Drawings and or instructed by the  Consultant     Excavation shall be carried out as indicated in this Clause  by suitable means  selected by  the Contractor and in a ma
197. eels of the gate to the concrete structure     5 3 4 Design Loads for Hoist    The hoist shall be designed to raise  lower and hold the gate in any position between fully  closed position and fully raised position     The rated capacity of the hoist shall be adequate to raise and lower the gate at the specified  speed under the following combination of loads    Dead weight of the gate   Frictional force of main wheel if any   Friction force of rubber seals   Down pull force acting on the gate bottom   Buoyancy    5 4 Details of Gate    5 4 1 General    The gate shall consist of skin plate  main beams  main wheels  side wheels  seals  pin and all  other necessary components  The gate leaf shall properly be divided into several blocks by  vertical and horizontal joints to meet the limits of transportation  The blocks shall be assembled  into a few horizontal sections at erection site or field shop by welding or high tensile strength  reamer bolt connection     Seal weld shall be made at the vertical joints of skin plate  Each horizontal section shall be  connected by hinge pins at end beam and vertical girders to form one gate leaf assembly  The  horizontal joint of skin plate shall be sealed by means of welding or O type rubber seals or other  type of seals to complete water tight  The gates shall be of all continuous welded construction  except the horizontal joints between each horizontal unit and high tensile strength reamer bolt  connection     S 7 2 62    The Flood Preven
198. eet the requirements of the specifications     Storage  Steel bars shall rest on timbers  away from the ground and shall be protected from rusting     damage or contamination  Bars of different diameter and or grade of steel are to be kept  separate     S 7 1 63    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     6      7      8      9      10            b     Preparation of Reinforcement Drawings    The Contractor will prepare all construction reinforcement drawings or sheets  unless  otherwise specified       Spacing details between form work and reinforcing bar     Cutting and bending schedules of the reinforcement system     Checks and Measurements    Unless otherwise indicated  the distance between bars is measured between the center  lines     After the steel has been placed the Consultant shall check spacing  quantity  diameters   shape  length and overlaps     Hooks    Hook shall be required for the round bar and for the deformed bar as specified in the Shop  Drawing or as instructed by the Consultant     All smooth reinforcement rods shall terminate with a hook at both ends  unless otherwise  shown on the approved Shop Drawings or as indicated by the Consultant     Hooks shall be doubled over 180    with an internal bend diameter of between 6 to 8 times  the diameter of the rod  the curve terminating in a straight piece of length equal to at least  4 times the 
199. egates shall be determined in accordance with  ASTM C70 or equivalent     The water cement ratio shall be determined by the requirements for specific compressive  strength  durability  plasticity and impermeability     Once the proportion of a mix  including its W C ratio  has been determined and specified  for use in a structure  it shall be maintained constant during the placing     Changes in Proportions or Materials    5 7 1 44    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     c      10      11      a     If the tests or the Contractor s own tests show that the requirements of Clause 9 1 are not  being met  the Contractor shall make such changes in materials or proportions as may be  necessary  in the opinion of the Consultant  to meet these requirements     If at any time the Contractor desires to use other materials or proportions than those  originally approved  he shall provide evidence to the satisfaction of the Consultant that  such changes will produce concrete meeting the requirements of Clause 9 1 and will not  cause objectionable changes in the appearance or other characteristics of the concrete   before such changes can be approved     Changes in Requirements    The Consultant shall at any time have the right to change of the requirements specified in  the table of Clause 9 1     Consistency and Slump    Concrete shall be of a consistency and workabili
200. egotiation for the contract  This procedure will be followed until the  Client reaches agreement with a tenderer     512 7    Volume I  Section 2 The Flood Prevention P roject of East Side of the  Instruction to Tenderers Pasak River in Ayutthaya in the Kingdom of Thailand     5     In the event that all tender prices offered exceed the ceiling price  the tenderers are  requested to submit the prices again immediately after the first tender opening  In  this case  tenderers shall be requested to submit the Form of Tender only  The  Form of Tender will be prepared by the Client and distributed to each of tenderers  before the second tender  The representative of each of tenderer who attends the  tender opening shall  therefore  be duly authorized by his firm or company to submit  the tenders for these second offers  as provided in Chapter 4 Clause1 2      In the second tendering  the tenderer who submits the lowest tender price within the  ceiling price set forth by the Client shall be designated as the prioritized negotiator  for the contract  In the event that the prioritized negotiator is rejected as a result of  the evaluation of the tender  the Client will invite the next lowest tenderer to enter  into negotiation for the contract  This procedure will be followed until the Client  reaches agreement with a tenderer     If the tender prices in the second tendering are exceeding the ceiling price  the  tenderer submitting the lowest price on the second tender will be asked t
201. ely in place  Cut out areas shall be thoroughly cleaned     The holes left by the removal of tie rods and or cones shall be thoroughly moistened and  filled with dry patching mortar  thoroughly tamped into place  The color of replacement  concrete and patching mortar shall match that of the surrounding concrete     Concrete and mortar used for patching and repairs  shall be cured in the same manner  specified for general concrete work  Where specifically authorized by the Consultant  bulges may be removed by grinding procedures  Other methods to be used in such repair  work shall be those detailed in Chapter VII of the Concrete Manual USBR  latest Edition or  equivalent     5 7 1 62    The Flood Prevention Project of East Side of the Volume 1  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     24     5 2     1      2      3      4      5     Water retaining concrete structures shall be watertight up to the full design head of water  and  the Contractor shall repair at his own expense all leaks that may develop prior to or  during the Guarantee P eriod     Precast Alternatives to Cast in situ Concrete  The Contractor may elect to precast some type of structures that are shown as cast in situ  in the Shop Drawings or as directed by the Consultant  This will be acceptable provided  the following conditions are met    a  The general dimensions and shape of the structures are not altered    b  If the Contractor alters the concrete str
202. emporary access roads including  associated drainage and stream crossing facilities necessary for the execution of the  Works  Demolition and removal of this temporary work shall be subject to the approval  of the Consultant     The existing roads to be used as access roads shall for his own convenience be  rehabilitated  improved  and maintained by the Contractor     Not less than thirty  30  days before the Contractor intends to commence construction of  any part of the temporary access roads the Contractor shall submit to the Consultant for  his approval a detailed construction for access roads including       Design of the temporary access roads including associated drainage and  stream crossing facilities   The gradient of temporary access road shall not exceed 1096 for the safety      Construction method and Construction time schedule of such temporary access  roads     The Contractor shall not commence the construction of any temporary access road until  the Consultants approval thereto has been obtained  However  such approval shall not  relieve the Contractor of any of his duties or responsibilities under the Contract     The Contractor shall construct such temporary access roads in accordance with the  approved drawings and construction program  The Contractor shall be responsible for  and repair at his own expense any drainage to the access roads including the existing  roads on the access routes caused by traffic of heavy equipment and trucks used by the  Contract
203. enclosed in ducts  or  conduits or supported on trays and run in the most efficient manner from points to point   The bunching of wiring shall be kept in bunched condition by means of strips of special  plastic ribbon material at suitable intervals  Lacing or wire bunches with textile or   plastic cord or metal buckle type clips will not be accepted     All power and control cable conductor shall be of copper and have minimum cross  sectional area of 2 0 mm   Single strand conductor shall not be accepted except for  lighting indoor installation     Compression type terminal shall be used and ring number identification shall be put at  both ends of the cables     All cables except  BC  listed bellow shall have evidence of approval by LMK  SPLN or  SII clearly labeled on insulation surface of cables  Following list shows the general  description of cables to be used for the work     Type Description   NYY   0 6 1 kV  copper  for indoor and outdoor installation in  wet or dry location  In case of underground installation   the proper protection shall be adopted     NYA   1000 V  copper  single core  for indoor installation for  lighting  BC   Bore Copper conductor for grounding and lightning  protection connection  with minimum cross sectional area  50mm   Installation    Cables and wires shall be run into conduit pipe  installed in cable tray and trench   embedded underground and exposed or specified  in a manner specified herein     No cable connection shall be permitted in co
204. ength  the structure thickness and or the  reinforcing steel with respect to the contract drawings  the revised design and shop  drawings shall be submitted to the approval of the Consultant    Reinforcing Steel   General  The Contractor shall furnish  cut  bend and place all steel reinforcement including bars  and fabric necessary for the completion of the Works as indicated on the shop drawings or  as instructed by the Consultant   The cutting  bending and placing of the steel reinforcement shall be in compliance with  ACI 318 Standards  except when otherwise provided by the approved construction  drawing     Reinforcement bars shall be embedded in the concrete as shown in the Shop Drawings or  as instructed     Materials    The quality of the reinforcement steel shall comply with TIS 20 for round bars  TIS 24 for  deformed bars  ASTM A416 for uncoated seven wire stress and J IS or equivalent     Delivery   Steel bars shall be delivered in bundles firmly secured and tagged or marked in  accordance with the applicable standards  Reinforcing bar mats shall be delivered flat and  not in rolls  Welded wire fabric when delivered in rolls shall lay out flat from the roll   Reinforcing steel shall not be bent or straightened in a manner that will injure the material   Any use of such injured reinforcing steel will not be permitted    Test Certificates    Manufacturer s test certificates shall be provided as confirmation that the materials have  been tested in accordance with and m
205. ent of the Work or according to the progress of the Work    To provide cleared  embanked and leveled land for the Project prior to  the commencement of the Work    To provide land for a temporary site office  warehouse and stock yard  near the Project Site during the implementation period    To prepare the graded access road to the construction site    To provide electric power    To provide the telephone lines to the main terminal board    To provide city water to the main terminal point at the Project Site    To provide a disposal area for the surplus soil during the construction  period    To obtain right of way  if necessary  for construction works  and   To control traffic and pedestrians during inland transportation of the    equipment and materials for the Project  if necessary     The Client shall accord the Contractor such facilities as may be necessary  for their entry into the Kingdom of Thailand and their stay therein for  the Work     The Client shall in conformity with the G A take necessary measures to  exempt the Contractor from customs duties  internal taxes and other  fiscal levies which may be imposed in the Kingdom of Thailand with  respect to the supply of the products  services  and equipment necessary  for the Work     The Client shall take necessary measures to ensure prompt unloading  and customs clearance at the points of disembarkation in the Kingdom of  Thailand and internal transportation therein of the equipment and    materials purchased for the
206. eplacing with new material   or by reworking existing material and compacting  as directed    Maintenance of Subgrade  The elevation of the finished subgrade shall be maintained until the Base course has been  placed thereon  On paved roads the surface of the Base course shall be maintained until  the surface course has been placed thereon  Any damage to either course shall be  restored to a condition suitable for receiving the following course or application   Concrete Pavement    The Concrete Pavement shall be carried out on the base course as indicated in the  approved Shop Drawings     Quality of Plain Concrete Slab    Properties of concrete slab with wire mesh shall be as follows                 Allowable bending strength 4 4 MPa  45kgf cm      Maximum size of coarse aggregate 20 mm  Slump 2 5 cm             Under the conditions that the dairy average temperature is exceeding 25 C  the  Contractor shall apply summer concreting  To avoid initial crack after concrete casting  the  Contractor shall consider the countermeasure to control concrete temperature below 35       during the pavement     Expansion J oints  Shrinkage J oints    Expansion Joints in transversal direction shall be set up at an interval of 40m in  longitudinal direction to make a separation of slabs  And these shall be composed of joints  with a width of 20mm and shall be installed dowel bar assemblies through joints and also  be filled with joint fillers and joint sealing compounds in them  Expansion jo
207. eport  The Contractor shall  before the tenth  10th  day of the each month or at any time    designated by the Consultant  submit five  5  copies of a monthly progress report in a  form acceptable to the Consultant detailing the progress of the Works during the    S 7 1 6    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     3      4     preceding month  The report shall contain the following but is not limited to       The total overall percentage of work completed up to the reporting month as well as  total overall scheduled percentage by the CPM method  or other method previously  approved by the Consultant  as of the end of the reporting period with appropriate  comments on progress       The actual percentage of each main work item completed as well as the scheduled  percentage for them with appropriate comments on their progress       The schedule of activities to be started within the succeeding two  2  months with  forecast starting and completion dates       Alistoflocal manpower by trade and expatriate personnel by position employed  during the reporting period       Alistof constructional plant  equipment and materials on Site used in the execution  of the Works including those arrived at and removed from the Site       The total work quantities to be incorporated into the permanent Works but not limited  to       The main items of Temporary Works performed du
208. equivalent to the metric system sizes after approval of the  Consultant  with respect to permissible variation in average openings     The Contractor will test the aggregate and if they are found to be unsuitable  the    Contractor shall make at his expense such changes or additions to his processing plant as  the Consultant instructs     Fine Aggregates  Sand   Definition    The term fine aggregate is used to indicate that part of the aggregates having as  maximum dimensions 3 16  4 8 mm      The contractor shall exercise every possible precaution in the transporting  washing and  screening operations to prevent the contamination of the sand particles  The fine  aggregate shall conform to the following specific requirements     Quality    The sand shall be clean  strong  hard  compact  unalterable  without flaky fragments of  rock  and shall be free from coating  clay  loam  alkali  organic material or other unwanted  substances     The sand shall meet the current requirements of ASTM C33 or equivalent  except as  directly specified herein     The maximum quantity of deleterious substance in the sand  at the time of its discharge  into the mixing plant  must not exceed the following values     Percent  by Weight  Material Passing No  200    Screen  ASTM C117 or equivalent  3  Light Weight Material 1  Clay lumps  ASTM C142 or equivalent  1  Total of other deleterious substance 2     Such as alkali  mica  soft  flaky particle and silt     The total of all the deleterious subst
209. erers     Atleastone  1  authorized person with Power of Attorney of tenderer who submitted  the tender documents shall attend the tender opening     2  Tender Opening Procedures     1      2     All participants in the tender opening shall register their signatures in an attendant  list prepared by the Client before the tender opening     The Client shall confirm the validity of each  Power of Attorney  of the tenderers  In  case the document is incomplete or inappropriate  the tenderer shall forfeit his right  to participate in the tender opening any further and the tender shall be returned  unopened     Envelope A will be opened and availability of the documents in Envelope A required  in Chapter 3 Clause 1  2  shall be examined  In case the document is incomplete  or inappropriate  the tenderer shall forfeit his right to participate in the tender  opening any further and Envelope B shall be returned unopened  The  appropriateness of each document shall be examined carefully and thoroughly  afterwards in the stage of tender evaluation     Envelope B will be opened and the tender price offered by each tenderer shall be  read aloud and recorded  The tenderer who submits the lowest tender price within  the ceiling price set forth by the Client shall be designated as the prioritized  negotiator for the contract  In the event that the prioritized negotiator is rejected as a  result of the evaluation of the tender  the Client will invite the next lowest tenderer to  enter into n
210. eriod  to the public on the project content including finance source  purpose of the project and  brief content of the works    The billboard shall face to the public road and or to the public area written in both English  and the Kingdom of Thailand    The location and content of the billboards shall be approved by the Consultant before  installation     1 9 Sticker and Inscription Plates    Sticker and Inscription plates in both English and the Kingdom of Thailand shall be  provided by the Contractor in adequate sizes  Examples of the plates are shown as  illustrated in the following figures for reference  The Contractor shall design the plates  based on these examples and submit the design drawing to the Consultant  The final  specifications of the plates shall be approved by the Consultant  The places to install  the plates shall be as decided by the Consultant     The Contractor shall take photographs showing the sticker and inscription plates on  permanent work for submission to the Consultant at completion of the Work     S 7 1 12    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    Example 1  Sticker of the National Flag of J apan    From  the People of J apan       Example 2  Inscription Plate    THE FLOOD PREVENTION PROJECT OF  EAST SIDE OF THE PASAK RIVER IN AYUTTHAYA    GRANT AID FROM  THE PEOPLE OF JAPAN  AS A TOKEN OF FRIENDSHIP AND  COOPERATION BETWEEN  J A
211. eriod regarding the captioned Project     Drainage Pump Vehicles  30m  min     Authorized Signature of    Local Agent   Signature     Name of Signer   Title of Signer     Name of Local Agent     5 3 15    Volume     Section 3 The Flood Prevention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya     Form L   CERTIFICATE OF COUNTRY OF ORIGIN FOR  HYDRAULIC GATE WORKS    Date    th day of         2013  To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya  Dear Sir     We   Name of Manufacturer s   as Subcontractor  hereby submit to you the following list on  the country of origin for the components to be supplied under the captioned P roject   Please tick LJ for your choice                                                        Components Country of Origin  Stainless steel fixed wheel gate leaves    Japan    Thailand  Stainless steel fixed wheel gate guides    Japan    Thailand  Motorized wire rope winched gate hoists    Japan    Thailand  Steel maintenance gate leaves    Japan    Thailand  Stainless steel maintenance gate guides    Japan    Thailand  Steel telpher rails    Japan    Thailand  Manual chain hoists and lifting beams    Japan    Thailand  Electric wirings and boards O Japan O Thailand  Lighting facilities    Japan    Thailand  Lightning arresters    Japan    Thailand  Engine generators    Japan    Thailand  Water level meters and data loggers O Japan O
212. ers to  fasten rubber seals    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand  1 set for one  1  hoist system  1 set for one  1  hoist system  1 set    1 set for five  5  gate leaves  1 set for five  5  gate leaves    10096 of actual number   10096 of actual number   1 piece per type   1 piece per type   1 set for one  1  local control panel  1 set for one  1  gate leaf           set for one  1  gate leaf    set for one  1  hoist system  set for one  1  hoist system  set for one  1  hoist system    A  gt  c 4    set           set for three  3  gate leaves           set for three  3  gate leaves    1 set for one  1  gate leaf  1 set for one  1  gate leaf    1 13 Tests  Inspection  Adjustment  Commissioning and Training    The following works on the tests  inspection  adjustment  commissioning and training shall    include in the Contract      a  Shop Tests and Inspection    The components and equipment of the Hydraulic Gate Works shall be tested and    S 7 2 8    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    inspected by the Contractor and or his Subcontractor s  prior to their shipment and  delivery  Shop inspection shall be required in the presence of the Consultant and also  the Client when it deemed necessary by him and is conducted in the Kingdom of  Thailand  Manufacturers    shop inspection results
213. erstand that you are not bound to accept the lowest Tender or any Tender you  may receive     7  We acknowledge that all appendices hereto form part of this Tender     Dated this   th day of eee  20   at       S 3 1    Volume     Section 3    The Flood Prevention P roject of  Form of Tender    East Side of the Pasak River in Ayutthaya    Name      Printed in Capital Letters   Signature     In the capacity of   Official Designation   Duly authorized to sign this Tender for and on behalf of      Name of Contractor Submitting Tender Printed in Capital Letter     Address     S 3  2    The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender     Form B     TENDER PRICE SCHEDULE    Date    th day of       2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya    Item Total Amount    apanese Yen  in Numerals  A  Civil and Hydraulic Gate Works  A l Direct Construction Cost  1  Civil Work of Kra Mang Floodgate  2  Civil Work of Han Tra Floodgate    3  Civil Work of Bank Protection of Han Tra Canal    Notes  prices of the above include temporary works such as cofferdams  accesses and  shoring     4  Procurement and Installation of Hydraulic Gates of Kra Mang Floodgate    5  Procurement and Installation of Hydraulic Gates of Han Tra Floodgate    Notes  prices of the above include packing  transportation  insurance  temporary works   co
214. es of clearly readable blue print copies of each drawing shall be submitted  to the Consultant by means of a standard transmittal sheet  The format of the  transmittal sheet shall be approved by the Consultant  Within twenty  20  working days  after the receipt of the prints of the drawing s  submitted by the Contractor  the  Consultant will return one copy marked and signed with his intention and comments  hereon depending upon whether the drawing must be  approved  or  reviewed      Upon receipt of any approved drawing  the Contractor will be authorized to proceed with  the work covered by such drawings  subject to making any correction s  if indicated  thereon by the Consultant  however  he shall first submit by logged transmittal sheet four   4  blueprints of each drawing  with corrections if any  to the Consultant  All approved  and reviewed drawings shall be maintained at the Contractor s site office in proper order     When the revision is requested on the Contractor s submitted drawings  the Contractor  shall make the necessary corrections and or revisions to the drawings in a timely manner  and shall resubmit them to the Consultant in the same manner as for a new drawing  i e   three  3  copies  When the returned drawings have been re submitted for approval  the  Consultant will try to complete his review and or approval of the drawing within ten  10   working days  however  this will depend on the number and complexity of the  corrections revisions which have to be 
215. esign  manufacturing methods  shop  amp  field  tests and the O amp M training of the Hydraulic Gate Work in conformity with the  requirement in the Specifications     f    Approve the performance based design  manufacturing methods  shop  amp  field  tests and the O amp M training of the Equipment in conformity with the requirement  in the Specifications     g  Inspect the progress of the Work and make inspection of the Work in conformity  with the Contract Documents  and attend at the acceptance of the Work     h  Technically check applications for interim payments submitted by the Contractor  as to their compliance with the actual work done  and    i  Technically check applications for extension of Time for Completion  if any  required     The Consultant shall respond to requests made by the Contractor as for negotiation   instruction  inspection  checking  attendance  opinion  or approval  without  unreasonable delay     All communications of technical nature in respect of the Work between the two parties   namely the Client and the Contractor  shall be made through the Consultant     The Consultant shall inform the Contractor of the name of his representative in writing   after the approval of the Client     When the Consultant appoints his assistants for the inspection and attendance  the  Consultant shall inform the Contractor of the names of such assistants in writing     The instruction or approval given by the Consultant to the Contractor shall be  effective when it
216. etion in accordance with the approved test procedure  but  shall not confined to     Insulation resistance tests   Grounding resistance tests   High voltage test   Stator winding and 400 V bus line to earth  AC 500 V for 1 minute  Starting test   Operation test   Governor test    S 7 2 74    SECTION 7 3    PROCUREMENT OF DRAINAGE PUMP VEHICLE    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 8 Procurement of Drainage Pump Vehicle    7 3 PROCUREMENT OF DRAINAGE PUMP VEHICLE    TABLE OF CONTENTS    de                                   ara S 7 3 1  ET  Scope Ot  WOKS eet ciere recep eet rn eis aia ode ru es S 7 3 1  1 2  Location of Delivery ici eee dee eie ae ae S 7 3 1  1 3 Country of Origin and                                                                     S 7 3 1  1 4 General                                                                     S 7 3 2  1 5                                           coria                   S 7 3 2  1 6 Packing and Shipment  ni esiin u enne nnne nennen S 7 3 3  A                                     EU intei S 7 3 4  1 8    Import Charges  eet de S 7 3 4  1 9 Tests  Inspection  Adjustment  Commissioning and Training                             S 7 3 5  1 40 Warranty and After Sales Services                                                           S 7 3 6  2  Drainage Pump Vehicle    enne nennen S 7 3 7  24  COMPOSITION  Citas Pe          S 7 3 7  2 
217. exceed 50 meters   Concrete Pumping Equipment    Concrete pumps can be used for the transportation and pouring of concrete with a slump  of 4  or more  The structures and equipment necessary for the operation of the pumps  shall be constructed independently from the scaffolding and formwork  so as not to  transmit vibrations to the same  and cause alterations in concrete already place     The equipment shall be located as close as practicable to the point of placing and the  discharge nozzle shall be horizontal or titled upwards  The operation of the pump shall be  such that a continuous flow of concrete without air pockets is produced  high velocity  discharge resulting      separation of aggregates will not be permitted  When pumping is  completed  and the concrete remaining in pipe line is to be used  it shall be ejected in  such manner that contamination of concrete or segregation will not occur  and the  equipment shall be thoroughly washed and cleaned     It shall not be permitted to add water to the mixture after discharge from the mixer  neither  at the loading of the pump  nor at the discharge point    The joints between the various pipe elements shall be perfectly tight  to avoid water  leakage and loss of fines     Discharge outlets shall be arranged to provide sufficient delivery points  so that concrete  Shall be uniformly placed in the formwork     Formwork  General    Formwork shall be used whenever necessary to confine the concrete and shape it to  required li
218. f vehicle load     c  Handrail 2 5 kN m  horizontal thrust    2 2 Materials    2 2 1 General         materials to be used for the Hydraulic Gate Works covered in this Clause shall be new and of  high quality  selected particularly to meet the duties required for the proper operation of the  Hydraulic Gate Works  and indicated fully in the Contractor s detailed drawings for approval     The materials shall meet with the requirements in the latest Japanese Industrial Standards  JIS    American Society for Testing and Materials  ASTM   Thailand Industrial Standards  TIS  listed  herein or equivalent and or better in quality or as approved in advance by the Consultant  unless  otherwise specified     2 2 2 Materials to Be Used    Materials to be used for the Hydraulic Gate Works shall be equivalent or superior to those  tabulated below      1  Main gates of Kra Mang and Han Tra Floodgates                      Components Parts used Names of material  symbols   Skin plate SUS304  Gate Girder SUS304  leaves Main wheel SUS630 or other SUSs with HB of 250 or more  Main wheel shaft SUS304  Main wheel bearing Oil less metal  Side wheel 505304  Sheave SCS13  Seal rubber Synthetic rubber  Seal clamp bar SUS304  Bolt  nut and washer SUS304  Others As approved by the Consultant  Removable gate guide 505304           Wheel rail SM400  guides Sill beam SM400  Lintel beam SM400  Seal plate SUS304  Guide plate SUS304  Main wheel track SUS630  Bolt  nut and washer SUS304  Others As approved by t
219. face  with digital figures     Shop Assembly and Tests    3 8 1 Gates and Gate Guides    S 7 2 48    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    Each gate including wheels  flap gate  seals  sheaves and side wheels  etc  shall be assembled  at the shop in the approximate position that it will have after installation at the site  While  assembled  the gates shall be checked for dimension  tolerances and accuracy of alignment   Any error and misalignment discovered shall be promptly corrected     The main wheel tracks  sill beams  guide plates  side wheel tracks and removable gate guides  with saddles shall be assembled at the shop and all dimensions  flatness  straightness  etc   of  the gate guides shall be checked and any error and misalignment discovered shall be corrected    promptly   3 8 2 Hoists and Controls    Each hoist shall be completely shop assembled and test for smooth and proper performance   All units shall be tested at the normal operating speed with the rated load  and closely checked  to ensure that all necessary clearance and tolerance have been provided and that no binding  occurs in any moving part     All bearing shall be carefully checked up to their saturated temperature rise under the normal  loading condition  All equipment facilities including temporary wire ropes  power cables   lubricating grease and oil required for the perfor
220. faces  journals  grease and oil grooves shall be carefully  cleaned and lubricated with an approved oil or grease  After assembly  the lubricating  system shall be filled with the approved lubricant furnished by the Contractor     The hoist  completes with all accessories  shall be assembled and installed in accordance  with the  Approved drawings  within the tolerances specified  The hoisting stem shall be  located and adjusted so that it is in true alignment     5 7 2 Field Tests and Inspection    After completion of erection and installation work at the site  the Contractor shall perform the  tests to prove satisfactory erection and installation works  in accordance with the approved test  procedures  The test and inspection shall include  but not be limited to       Visual inspection of position and assembly sequence of parts  edge preparation  size   length and location of welds  and overall finishing       Inspection of satisfactory installation of all components       Inspection of welds by radiographic testing for detecting inner flaws and defects of  welded parts including gate leaf  gate guide and hoist       Inspection by feeler gauge measurement of satisfactory sealing of all seals     Check of performance of self rock system of hoist      Check of appearance and movement of hoisting stem      Existence of abnormal noise and vibration during operation of hoist  and      Check of looseness and loss of bolts and nuts     Acceptance criteria of the radiographic testi
221. fficient  clearance  for the construction and the inspection works  and to permit pumping outside  of the forms  Cofferdams or cribs  which are tilted or moved laterally during pumping and  excavation operations shall be righted or enlarged so as to provide the necessary  clearance     Notwithstanding the approval for the temporary cofferdam by the Consultant  nothing shall  relieve the Contractor from full responsibility on temporary works     No separate payment will be made to the works described in this Clause  The Contractor  shall include the cost in the unit prices for excavation or lump sum price of the related  works     Design of Temporary Cofferdams   Prior to the commencement of site works  the Contractor shall submit the design of  temporary cofferdam  i e  design drawings  calculation  etc    The Contractor shall consider the appropriate methods for the temporary cofferdam to  minimize the displacement of the cofferdam and the adjacent existing ground for the  avoidance of the damage of the existing houses     Monitoring of Temporary Cofferdams    S 7 1 20    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     4      5      6     3 3     1     In addition to the design of temporary cofferdam  the Contractor shall submit the detailed  monitoring plan of temporary cofferdam to the Consultant for the approval     Placing of Seals   When conditions are encounter
222. g  Corrosion resisting steel bolts  nuts and washers shall be used for fixture of the  support     2 11 12 Mechanical Position Indicators    The mechanical type position indicators  except where otherwise noted  shall be mounted on  each hoist mechanism  and shall be of an easily readable dial type to rotate about 300 degrees  for full travel  The dial plate shall be of stainless steel or brass with engraved graduation  and  main parts of the indicators shall be made of anti corrosive materials which shall be housed in a  dust tight and weather proof enclosure  The indicators shall be capable of reading accurate  vertical height of the equipment opening by 1 0 cm  The mechanical position indicators    S 7 2 31    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    equipped on the hoist shall be of the two pointers type for the gate with its hoisting height more  than 6 5 meters     The rope end shall be secured to the outside of the drum by means of a clamp or other     2 11 13 Floor and Cover Plate    Floor and cover plate shall be of an approved raised pattern  All edges of plate shall be planed  and joints shall be cut so as to maintain continuity of pattern     2 12 Electrical Equipment and Parts    The electrical equipment and parts for the Hydraulic Gate Works shall conform to the  requirements herein unless otherwise specifically mentioned     2 12 1 Electr
223. ggregate Processing Plant    Should the Contractor produce its own aggregates  a modem and dependable plant   capable of producing satisfactory concrete aggregates in sufficient quantity  and at the rate  necessary to meet the construction schedule  shall be furnished  installed  operated and  maintained at a location approved by the Consultant  Complete facilities shall be provided  for proper crushing  scrubbing  screening  washing  classifying  storing  reclaiming  and  delivering the aggregate to the mixing plant     The plant shall include facilities for washing aggregates after separation into the various  size groups  to remove any fine material and organic matter before delivery to the  concrete mixing plant  Before procuring the equipment for processing aggregate  the  Contractor shall submit to the approval of the Consultant a description and drawings in  sufficient detail to indicate layout  type and capacity of the components    The description shall show rates of flow of material at the various crushing and separation  points  as well as the volumes of stock piles and the type of equipment to be used in  moving the aggregates from the aggregate plant to the mixing plant     Rescreening facilities for the coarse aggregate prior to delivery to the mixing plant shall be  provided  The rescreen installation shall be located  arranged and operated in a manner  that will assure delivery to the mixers of coarse aggregate meeting the specified grading   Rock ladders shal
224. ght of way  in the strip between the toe of  embankments and the limit of the easement  and leveled by bulldozer blade     Where this strip of the right of way is to be used for excavation borrow material for  embankments  then the Contractor shall stockpile the top soil on the land adjacent to the  right of way  and then push it back into the borrow pits  All arrangements with the owners  or users of the land outside the right of way utilized for stockpiling the top soil and the  borrow areas shall be care of the Contractor  and all relevant cost shall be borne by the  Contractor and cover by the Unit Price     Extent    The detailed limits and extent of the areas to be cleared and stripped shall be determined  case by case  by the instruction of the Consultant     Measurement and Payment    The Works relating to site clearing and top soil removal shall be considered to be  included in the Contract Prices     3 2 Temporary Cofferdams     1      2      3     General    Suitable and practically watertight cofferdam shall be used wherever water bearing strata  are encountered or wherever the maximum water level in the stream or canal shall be  above the elevation of the bottom of excavation  Cofferdam or cribs to be placed for  foundation  canal or drain protection construction shall  in general  be carried well below  the bottom of the footings and shall be well braced and as nearly watertight as  practicable  In general  the dimension of cofferdams shall be such as to give su
225. gregate         0 5   10 25   20 40   40 60   65 80 100                                        b      c     8 6   1      2     Subsurface Preparation    Areas on which filter layers are to be placed shall be trimmed and dressed to conform to  cross sections shown on the drawings within an allowable tolerance of plus or minus 5 cm   from the theoretical lines and grades     Areas that are below the allowable minus tolerance limit shall be brought to grade by filling  with material similar to the adjacent material and well compacted and no additional  payment will be made for any material thus required  Immediately prior to placing the filter  material the prepared subsurface will be inspected by the Consultant and no material shall  be placed thereon without his approval  Material of the grading or in accordance with the  above Table may be produced by screening and processing river gravel or by blending  gravel with crushed rock     Placement    Filter material shall be spread uniformly on the prepared base  to the lines and grades  indicated on the drawings or as instructed  P lacing of filtering material by methods  which  tend to segregate particle sizes  will not be permitted  Any damage to the subsurface  caused during placing of the filter shall be repaired before proceeding with the work   Compaction of the filter layers will not be required  but the top surface shall be finished  free from mounds or windrows     Non Shrink Mortar   General   Non shrink mortar shall be
226. h 1 no  unit  Emergency stop button 1 no   Display recovery button 1 no   Voltmeter 1 no     S 7 3 9    Volume     Section 7 Specifications    7 8 Procurement of Drainage Pump Vehicle     7    8     2 3     d  Display language  Paint Color    Accessories    Spare Parts     a  Drainage pump     b  Drainage hose    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Ammeter 1 no  unit  Frequency meter 1 no    Tachometer 1 no  unit  Hour meter 1 no  unit    Others needed  Thai or English    To be specified by the Client    Grounding electrode 1 set  Test and inspection record in Thai or English 1 no   User manual in Thai or English 2 nos   Parts list in Thai or English 1 no     Shop drawings  Overall installation diagram   Component mounting diagram  Wiring diagram etc   in  Thai or English 2 nos     The following shall be applied to each set of the Drainage Pump Vehicle     1 unit    Diameter 200 mm x Length 25 m x 3    S 7 3 10    APPENDICES    1  EXCHANGE OF NOTES  2  GRANT AGREEMENT    Embassy A    Sapan    EC PM     Bangkok  July 5  2012    Sir       have the honour to refer to the recent discussions held between the  representatives of the Government of Japan and of the Government of the  Kingdom of Thailand concerning Japanese economic cooperation to be  extended with a view to strengthening friendly and cooperative relations  between the two countries  and to propose on behalf of the Government of  Japan the following 
227. h the  certificate of completion of the Construction Work issued by the    Consultant and approved by the Client     In case any amendments and or modifications of the Construction  Price are necessary in accordance with Article 20  the payment shall be    adjusted accordingly     8 2 2 Payment for the Procurement Work  Payment for the Equipment procured in the Kingdom of Thailand    million         thousand         Japanese Yen  JPY              which  corresponds to one hundred percent  100   of the Equipment Price for the  Equipment procured in the Kingdom of Thailand  shall be paid upon  delivery to the Client and the inspection by the Consultant of the said  Equipment under this Contract   The request for this payment shall be submitted together with the  following delivery documents of the said Equipment     Signed Commercial  Inolce   sous deae A in triplicate      Receipt of the Equipment issued by the Client                   one original    When the said Equipment is delivered in more than one delivery  a partial    payment is acceptable for each delivery     In case any amendments and or modifications of the Equipment Price for  the Equipment procured in the Kingdom of Thailand are necessary in    accordance with Article 20  the payment shall be adjusted accordingly     9 1    92    9 3    94    1     2     3  4         gI                7     8   9     Article 9  Client s Responsibilities    The Client shall carry out the following works in time for the  commencem
228. h to permit the placing of pipes to the full length  shown in the Shop Drawing     S 7 1 22    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     5      6      7      8     Excavation from Borrow Areas Prepared and Provided by the Contractor    All material required for fill in the Works  which is not available from the required  excavation for the Works shall be obtained from designated borrow areas prepared by  the Contractors expenses  There are each two borrow area in both Lopburi province and  Nakhonnayok province   The Contractor need to arrange the joint sampling with the Consultant at the borrow area  and submit the subsequent laboratory test results for the sampling material to the  Consultant for the approval     Construction site shall be cleared and grubbed as stated in Sub clause 3 1    Material suitable for topsoil shall he selected during stripping operations and stockpiled  adjacent to the areas for future use  Unsuitable material shall be disposed under the  Consultant s instruction     If at any location in the borrow pits  before or during excavation operations  excessively  moist material is found  steps shall be taken to reduce the moisture by selective  excavation  by constructing drainage ditches  by allowing adequate time for drying  or by  any other methods     Borrow operation shall be carried out and determined so as to  borrow suitable and  un
229. hall be secured      2  Non shrinkage mortar    Non shrinkage mortar shall be used to avoid deformation  amp  shrinkage of the bases of the  equipment of hoists that is caused by the loads from them and assure the installation  accuracy of the equipment on them     Mix design of standard type non shrinkage mortar shall be as follows              Materials and unit weight  kg   Produced  Cement type mixture  non shrinkage Sand Water  liter   grout agent  20 20 7 2 21                      The standards of non shrinkage mortar shall be as shown below or equivalent approved by  the Consultant           Test Item Standard  Setting time Start time   1 hour or more  Finish time   10 hours or less    S 7 2 25    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the       7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  Bleeding 2 hours later after mixing  296 or less  Liquidity by J14 funnel test 8 2 second  Compressive stress 3day aging   25 N mm  or more  28day aging   45 N mm       more  Bond stress 28day aging    3 N mm  or more  Shrinkage Not allowed at 7 day aging  2 4 4 Combined Allowable Stress and Overloading Condition    The allowable stresses in case of overloading condition may be increased by 50 percent than  those for normal loading condition  In no case  however  shall any stress exceed 90 percent of  the minimum yield point strength or proofing strength of the material used  whichever is the least     The com
230. hat variations in dimensions  alignment and grades  of any finished surface from the dimensions  locations and grade as shown on the  approved construction drawings  or required by the dimensions  locations and be within  the tolerances specified in the following table     The lines for fill and backfill shown on the approved Shop Drawings shall not be  interpreted as indicating with accuracy the actual lines of embankment and backfill     The Consultant may require that the Contractor repair or remove at Contractor s own  expense items that exceed the limits above specified     The Contractor shall remove embankment material placed outside the prescribed profiles  if as instructed by the Consultant     The Contractor shall remove from the embankment any material which in the opinion of  the Consultant is unsuitable  and shall transport it to a prescribed disposal area  as  instructed     Definitions   The term  backfill  as used in these Specifications defines excavation refill and the  material that will be placed around or near structures when a certain time has elapsed  after their completion     The term  foundation surfaces  as used in these Specifications is defined as the earthfill  surfaces prepared for placing structures of all kind     The term  embankment  as used in these Specifications is defined as the earthfill portions  of the platform around structures  roads  etc  above the original ground elevation   Compacted embankment includes all fill deposited in laye
231. he Consultant       S 7 2 12       The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Volume 1  Section 7 Specifications  7 2 Hydraulic Gate Works       Hoists          Drum   Drum gear  Pinion gear  Sheave   Shaft   Machine frame  Wire rope  Others       SM490   SCM435   SCM440   FC250   S45C   55400  SM400   505304   As approved by the Consultant        2  Stoplogs  maintenance gates  of Kra Mang and Han Tra Floodgates                               Components Parts used Names of material  symbols   G Skin plate SM400    ale Girder SM400  caves Seal rubber Synthetic rubber  Seal clamp bar SUS304  Bolt  nut and washer SUS304  Others As approved by the Consultant  Sill beam SM400  Gate Seal plate SUS304  guides Side gate guide SUS304  Side plate SUS304  Bolt  nut and washer SUS304  Others As approved by the Consultant  m Girder SM400  Lifting Shaft S45C  beams Others As approved by the Consultant  Telpher Girder 55400  rails Bolt and nut 55400  Chain            hoists Load chain Anti corrosive special alloy        3  Gate for drainage channel at Kra Mang Floodgate                      Components Parts used Names of material  symbols   Skin plate SUS304  Gate Girder SUS304  leaf Main wheel SUS304  Main wheel shaft SUS304  Main wheel bearing Oil less metal  Side wheel 505304               505304  Seal rubber Synthetic rubber  Seal clamp bar SUS304  Bolt  nut and washer SUS304  Others As approved by the Consultant  Removable g
232. he Contractor     Ministry of Agriculture and Cooperatives  Kingdom of Thailand    uds    SECTION 5    CONDITIONS OF CONTRACT    The Flood Prevention Project of East Side of the Volume I  Section 5  Pasak River in Ayutthaya in the Kingdom of Thailand Conditions of Contract     Or 09 Sn er Scene                                                                          NPP rH HH                n                                                                             gt          RO    CONDITIONS OF CONTRACT    TABLE OF CONTENTS    Page  A Rt MU arie fie coded Oe bate tes fe        S 5 1  Liquidation or Settlement of Fiscal Levies  Duties  Taxes and Other Similar Charges    S 5 1       td MENU TE E S 5 1  Identification Cards for Employees                                                       S 5 1  LUMP  SUM Prce usa secre n i E ERE DER             S 5 1  Implementation Program and 5                                         mmm S 5 1  Safety Measurement against Flood and Stormwater                                                    5 5 2  POSSESSION OF SItes  i tie teni er hte basi                  S 5 4  Relocation           iii eerta lata Lea ER S 5 4  Supply of Electriciby   asse Wis o prete Fc e EUER YR RR ER RA RR ER Ear RR S 5 5  Entrusting or Subcontracting as a                            mmm   5 5  Assignment  etc  of Rights and Obligations         eee reer emm   5 5  OMS UNA it lI   5 5  Project Representative and Engineer in Charge  etc    5 5     Disagreement betwee
233. he Flood Prevention Project of East Side of the    7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand  Weight E 14 6 kg in approximate   3  Installation Manner     a      b      c      d      e     Assembly    Prior to assembly  the gabion material shall be opened out flat on the ground and  stretched to remove all kinks and bends     The gabion boxes shall then be assembled individually  by raising the sides  ends and  diaphragms  ensuring that all creases are in the correct position and that the tops of all  four sides are even     The four corners of the gabion boxes shall be laced first  followed by the edges of internal  diaphragms to the sides     In all cases  lacing shall commence at the top of the box by twisting the end of the lacing  wire around the selvage  It shall then be passed round the two edges being joined   through each mesh in turn and securely tied off atthe bottom  The ends of all lacing wires  shall be turned to the inside of box on completion of each lacing operation     Erection   Only assembled boxes  or groups of boxes  shall be positioned in the structure  The side   or end  from which work is to proceed  shall be secured either to completed work or by  rods or stakes driven into the ground at the corners  These must be secured and reached  at least on the top of the gabion box     Further gabion boxes shall then be positioned in the structure as required  each being  securely laced to the proceeding one at all comers and diaphrag
234. he commencement of site works  the Contractor shall submit the necessary  information on the material and also the detailed method statement for the installation of  PC corrugated sheet piles to the Consultant for the approval     The Contractor shall consider the following point in his planning  The Contractor shall  consider the adequate installation method such as the use of vibratory hammer  silent piler  and water jet  etc       Installation of PC corrugated sheet pile and subsequent works for the revetment of    canal shall be completed during the dry season       Where the Contractor use the PC corrugated sheet pile as earth retaining member    without using temporary sheet pile due to space constraint  the Contractor shall  examine the construction methods to minimize the displacement       The special care shall be taken in case the sheet piles will drive beside existing houses     railway  public road and utilities to avoid the damage or accident       The Contractor shall consider the necessary protection or keep out for the residents    In case of the works beside railway  the Contractor shall check the train schedule in    advance and avoid the site works in operation hours       Elastic vinyl Chloride sealing materials can be used in the gap between sheet piles to    ensure the water tightness       The Contractor shall use the guide beam to keep the proper alignment and verticality of    PC corrugated sheet piles       In case that the standard precast sheet pi
235. he concreting structures in this  project              Allowable Max  Maximum  Compressiv Diameter of Water   Type e Strength Aggregates Cement SERPENS    N mm    mm  Ratio  A 1 21 25 0 60 Reinforced Concrete  A 2 21 38 0 60 Mass Concrete  Concrete pavement with  wire mesh  B 18 25 0 60  Lean Leveling  concrete  under structure  Leveling  concrete with wire mesh                         Refer to the pre stress concrete in factory  the allowable compressive strength shall be  used in the Standard allowable compressive strength under the Department of Highway as  follows     The 28 days minimum ultimate compressive strength based on 15 x 15 cm  Cube samples   of 40 N mm   and maximum slump of 8 cm  for the concrete of Multi beam     Superintendency    During the whole of the time that concrete is being placed the concreting operation shall  be under the direct control of a qualities superintendent acceptable to the Consultant     5 7 1 35    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     3      4      5      6      7     Records    A complete daily record shall  be kept of all concrete work for the structures  which shall  cover the class and quantity of concrete  the placing of reinforcing steel  if any  the  stripping of forms and the curing of the concrete  The position of all construction joints not  shown on the Shop Drawings shall be recorded  A record of starting 
236. he contractor s information However  the Consultant does  not guarantee the accuracy of the information to be used     Pile Driving and Preparation  Driving Equipment    Precast concrete piles shall be driven to the required depth accurately to the vertical by  means of appropriate rigs and pile driving hammers of an approved type     Hammers shall be either of gravity  single acting steam or pneumatic type   Gravity hammers shall not weight less than 6096 of the combined weight of the pile and  driving head and that weight shall not be less than 2 000 kg  The fall shall be adjusted so    as to avoid injury to the pile and shall in no case exceed 2 0 m unless otherwise specified  or approved by the Consultant     S 7 1 71    Volume I  Section 7 Specifications The Flood Prevention Project of EastSide of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     b      c      d      e     The plant and equipment used for steam hammers shall have sufficient capacity to  maintain  under working conditions  the pressure at the hammer as specified by the  manufacturer  The boiler pressure tank and the hammer intake shall be equipped with  accurate pressure gages     Piles while being driven shall be supported in line and position appropriate leads  Pile  driving leads shall insure rigid lateral to the pile well free movement of the hammer for  both vertical and batter pile leads shall be of sufficient length  The use of follower for the  pile driving is subject to
237. height during earthquake at downstream    Kra Mang Floodgate  0 13 m  Han Tra Floodgate 0 15 m  Dead weight    Dynamic water pressure during earthquake    Inertia force during earthquake    3 3 3 Design Loads for Gate Guides  The load on the gate guides shall be wheel loads and all other loads due to the most adverse    operation of the gate and hoist  The gate guides and anchors shall be capable of transferring  the load of the wheels  seals  side wheels of the gate to the concrete structure     3 3 4 Design Loads for Hoist    The hoist shall be designed to raise  lower and hold the gate in any position between fully  closed position and fully raised position     The rated capacity of the hoist shall be adequate to raise and lower the gate at the specified  speed under the following combination of loads      1  Normal loading conditions    Dead weight of the gate    Frictional force of main wheel if any    S 7 2 41    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  Friction force of rubber seals  Down pull force acting on the gate bottom  Buoyancy     2  Overloading conditions    The load resulting from the breakdown or locked rotor torque of the hoist motor  or resulting  from the manual operation on the operating handle     3 4 Details of Gates    3 4 1 General    The gates shall consist of skin plate  main beams  main wheels  side wheels  seals  sheaves  and
238. her in  the field or in the laboratory will be in accordance with the appropriate ASTM or equivalent  standards and will include  but not necessarily be restricted to the following ASTM or  equivalent standards     ASTM C172 Method of Sampling Fresh Concrete    ASTM C31 Method of Making and Curing Concrete Compression  and Flexure Test Specimens in the Field    ASTM C192 Method of Making and Curing Concrete Compression  and Flexure Test Specimens in the Laboratory    ASTM C39 Method of Test for Compressive Strength of Molded    Concrete Cylinders     Except for samples taken to check uniformity from the mixing plant  all samples taken in  the field will be made from concrete taken from the form     For any mix a correlation between 7 day  and 28 day strengths may be made in laboratory   Soon after a job starts  a similar correlation will evolve for concrete samples taken from  the form  After such correlation has been established  the results of the 7  day tests may  be used as an indicator of the compressive strengths which could be expected after 28  days     If the compressive strength of 7 day old test cylinder indicate that the 28  day strength  may not satisfy the minimum strength requirement  the Contractor will be directed to  remove the concrete concerned at his own expense and to suspend work on the particular  section  or he may continue concreting at his own risk while waiting for the results of the  28 days tests     5 7 1 46       The Flood Prevention Project of
239. his operations whether in  the possession of the Client or any other person  and shall indemnify the Client against  all losses and claims for such damage and injuries     2 3 Mobilization and Demobilization    Mobilization shall be understood to mean transportation of Constructional Plants and  equipment  based on the construction schedule to be submitted  from the original areas  of possession of them to the sites where they are to be used  Mobilization of the  proposed supervisory personnel  labors  office staff  etc   according to the schedule  submitted  is also included under the mobilization     The Contractor may  always subject to the authorization of the Consultant  at any time  during the works  make any alternation  reduction and or improvements to the  constructional plant and personnel     Demobilization shall include the removal of constructional plants from the site and    S 7 1 14    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    departure of personnel who have completed their work     All costs incurred by the Contractor in complying with the requirements of this sub clause  shall not be paid separately and shall be deemed to be included in Contract P rice     2 4 Contractor s Office  Client s Consultant s Field Office  etc     The Contractor shall provide  maintain  and operate such buildings as Contractor s office   Client s Consultant s field offic
240. ic Motors for Hoists    All motors for hoists shall be of 380V x 3 phase x 50Hz horizontal shaft  high starting torque   low starting current  squirrel cage  induction type  designed for full voltage starting  weather   proof and totally enclosed  Wound rotor motors will be accepted only if a squirrel cage type  would not be satisfactory for the duty     The insulation for the motors shall be decided by the capacity in accordance with JIS C 4210 or  other equivalent standard  and its rating shall be continuous for stationary hoist  including gantry  crane and minimum thirty  30  minutes for the others at 40 degrees Celsius ambient  temperature  The cable terminal boxes shall be provided with stud type connectors     The capacity of motor shall be examined with the following equation  and the rated motor  capacity shall be more than 100 percent of that calculated based on the maximum hoisting  loads  which will occur during starting  raising and lowering operation of the gate or equipment   The starting torque of the motor shall be 20096 or more of its rated torque while the maximum  torque thereof shall be 300   or less of its rated torque        _ xV  60 0 xn  where   Pm   Output of motor  kW    W   Maximum hoisting load  KN   selected under the most adverse combination  of loads which shall be calculated with the given friction coefficients and  operating conditions            Hoisting speed  m min    T  Total efficiency of hoist    Windings and connections shall be suitabl
241. icles  Form K     12  Certificate of Country of origin for Hydraulic Gate Works  Form L   13  Certificate of Country of origin for Drainage Pump Vehicles  Form M     5 2 5    Volume I  Section 2 The Flood Prevention Project of East Side of the  Instruction to Tenderers Pasak River in Ayutthaya in the Kingdom of Thailand    14  Specification Sheets of Drainage Pump Vehicle  Form N   15  Catalogues Brochures of Hydraulic Gate Works and Drainage Pump Vehicles     Envelop B     16  Form of Tender  Form A   17  Tender Price Schedule  Form B      3  All entries in the tender including attachment shall be written in English  All units in  the tender shall be in the metric system unless otherwise specified in the  Specifications or Drawings      4  Incomplete  vague or conditional tenders will not be considered     2  Tender Prices   1  All prices shall be quoted in J apanese Yen without exception  The tender price shall    be stated on the basis of lump sum price      2  Tender prices shall be firm and final  and not subject to escalation     3  Term of Validity of Tender    The tender shall remain valid and irrevocable for a period of 60 days on and after the day  of the tender opening     4  Submission of Tender     1  The tenderers shall prepare one  1  original and one  1  copy of their tender  The  tenderers shall submit the tender in the envelopes that are properly sealed and duly  marked as  Envelope A  or  B    ORIGINAL  or  COPY   the name of tenderer  and  the name of Proj
242. ied in the shop prior to delivery of  fabricated items to site of erection or installation   Field Painting   Field Painting  as referred to herein covers the application of coats of paint at the  construction site  Field painting shall be normally accomplished after erection  except for  those surfaces which will be inaccessible after erection   Touch up Painting   Touch up painting  refers to the application of paint to small areas of painted surfaces to  repair mars or scratches  and restore the coating to an unbroken condition   Requirements  Work in connection with painting shall include the following   a  Surface preparation   b  Cleaning and touch up of shop applied paint damaged during shipment or installations   c  Painting of permanent equipment and miscellaneous metalwork   d  Painting of exposed concrete and wood surfaces  where required   Cleaning and Preparation of Surfaces  All surfaces shall be cleaned free of rust  grease  dirt and other substances that would  prevent adhesion of the paint coating to be applied   Metal Surfaces    Weld spatter  burrs or other objectionable surface irregularities shall be carefully removed  or repaired before cleaning  Any grit or dust shall be brushed or blown off  All oil grease    5 7 1 88    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     b      c      5    a      b      c      6     and dirt shall be removed from 
243. iform material  The material shall be hauled in equipment  which will not unduly damage  service road and will not cause segregation of material     Disposal of Excess and Unsuitable Material    Excavated materials that are unsuitable for  or are in excess of  permanent construction  requirements shall be disposed by dump filling to the designated disposal area  This  material shall not be compacted but trimmed by dozer blade     Re handling Excavated Material from Stockpiles    Stockpiling and re use of excavated material shall not be permitted unless authorized by  the Consultant     Stockpiled materials shall be reloaded and placed in embankments as soon as practicable   After completion of re handling operations  the stockpile areas shall be made neat and  clean to the satisfaction of the Consultant     Protection of Excavation Surfaces    If contact surfaces are formed of materials which on exposure suffer alternation  loosening   cracking or any other form of disintegration  or where it may be necessary in the  Consultant s opinion  the excavation shall not be taken beyond 0 20 m from the final line  and the remaining 0 20 m of material shall not be removed until immediately before the  placing of the embankment fill or the revetment     The bottom and side slopes of excavation shall be protected from cracking or weathering  with such material as jute mats  plastic sheets or others methods approved by the  Consultant    The operation of excavation and protecting in thes
244. imate contact with the surface of the joint by carefully compacting the concrete by  means of suitable tools     Expansion and Contraction J oints    All joints that allow possible displacement of a concrete structure  with respect to an  adjacent one  due to expansion  shrinkage and differential setting of the respective  foundation  are to be considered expansion or contraction joints     Joints shall be provided at the locations indicated on the approved Shop Drawings or as  otherwise directed or approved by the Consultant and shall be in accordance with the  details shown  In no case shall any metal fixture embedded in the concrete be continuous  through an expansion or contraction joint  except as shown on the Shop Drawings  or  instructed by the Consultant  The opposite faces which from the joint shall be completely  separate     The Contractor shall undertake the pouring of the second surface  only after the first one  is thoroughly hardened     When so prescribed by the drawings or instructed by the Consultant  expansion or  contraction joint shall be coated with an approved bond breaking compound to prevent  bonding or approved filler materials may be inserted  The surface of contraction joints  shall be cleaned thoroughly of accretions of concrete or other foreign matter by scraping   chipping or other means satisfactory to the Consultant before any fresh concrete is placed  against such a joint     Curing of Concrete  General    The following provisions shall be ap
245. implementation of the Project  and     h  to give due environmental and social consideration in the implementation of the    Project      2  Upon the request of JICA  the Government of the Kingdom of Thailand shall  provide JICA with necessary information on the Project      3  With regard to the shipping and marine insurance of the products referred to in  Article 3  the Government of the Kingdom of Thailand shall refrain from imposing  any restrictions that may hinder fair and free competition among the shipping and    marine insurance companies      4  The products referred to in Article 3 shall not be exported or re exported from the  Kingdom of Thailand      5  The Government of the Kingdom of Thailand shall ensure that any official of the  Government of the Kingdom of Thailand does not undertake any part of the Japanese  nationals    work on the purchase of the products and the services referred to in Article  5     Article 11 Applicable Laws  The validity  interpretation and performance of the G A shall be governed by the  relevant laws and regulations of Japan     Article 12 Amendments   The G A may be amended within the scope of the E N by written agreement between  JICA and the Government of the Kingdom of Thailand  The amendment to the G A shall  enter into force on the date of signature of such written agreement by JICA and the  Government of the Kingdom of Thailand            Article 13 Consultation  JICA and the Government of the Kingdom of Thailand shall consul
246. in Article 8 hereof      20     24 1    24 2    25 1    25 2    Article 24  Patents  Trademarks and Copyrights    The Equipment may bear patent numbers  trademarks  or trade names of  the manufacturers thereof  Nothing contained herein shall be construed  as transferring any patent or trademark right or copyright for such  Equipment and all such rights are hereby expressly reserved to the true    and lawful owners thereof     The Contractor shall defend the Client and hold the Client harmless from  patent liability or claim of patent infringement of any nature or kind   including costs and expenses for  or on account of  any patent or  unpatented invention made or used in such Equipment  including the    costs and expenses of litigation  if any     Article 25  Interpretation    AII general language or requirements embodied in the specifications are  intended to amplify  explain and implement the requirements of this  Contract  However  in the event that any language or requirements so  embodied permit an interpretation inconsistent with any provisions of  this Contract  then in each and every such event  the applicable    provisions of this Contract shall prevail and govern     The specifications and drawings are also intended to explain each other   and anything shown on the drawings and not stipulated in the  specifications or vice versa shall be deemed and considered as if  embodied in both  In the event of conflict between the specifications    and drawings  the specifica
247. ing    The components and equipment of the Hydraulic Gate Works imported from Japan to the  Kingdom of Thailand shall be packed as per the following during ocean and inland freight     Contents of each shipping package for the parts of the components and equipment shall be  itemized on a detailed list showing the exact weight and extreme outside dimensions   length  width and height       a  One  1  copy of the detailed packing list shall be enclosed in each package  There shall    also be enclosed in one  1  package a master packing list summarizing and identifying  each individual package      b  The box number in which the master packing list is contained should be shown on each    packing list      c  All parts shipped must be legibly identified by tags  labels or inscription in indelible ink     strictly in accordance with the reference mark or parts number of the components and  equipment or the assembly drawings     S 7 2 5    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand     d  On wood  plywood  veneer cases  barrels or kegs  all marks shall be applied by stencil with  waterproof inks or oil paints and these marks shall be protected against weathering by  clear water resistant varnish     Marking on each package shall consist of the following information     Consignee  The Contractor and or his Subcontractor s    Final user  Royal Irrigation Department 
248. ing  as indicated on the approval construction drawing should  be considered the minimum thickness     Repair of Concrete Surface    Immediately after the removal of the formwork  the Contractor shall inspect the concrete  and shall report all defects to the Consultant    Any irregularity outside the specified tolerance  or any voids  honeycombs or other  damage shall be repaired       repairs of such defects shall be performed only by skilled  workman and at the expense of the Contractor  The Contractor will inform the Consultant  before starting the repair work  Materials  procedures and operations used in the repair of  concrete shall be done subject to the approval from the Consultant     All repairs shall be immediately after removal of the forms and never longer than twenty   four  24  hours after exposure  Concrete damaged from any cause and concrete that is  honeycombed  fractured or otherwise defective  and concrete which  because of excessive  surface depressions must be cut back and rebuilt  shall be replaced with mortar or  concrete as hereinafter specified or as otherwise instructed by the Consultant     The defective concrete shall be cut down to sound concrete  and at least down to a depth  behind the reinforcement steel sufficient to provide complete bonding of the reinforcement  steel to the concrete replacement  Voids to be filled shall be provided with anchors  keys   welded wire mesh  or dovetail slots  whenever necessary  to attach the new material  secur
249. intermediate coat for 1 40  fluoropolymer paint  Weak solvent type  TOP cont fluoropolymer paint top coat   30            6 305  SUS Pickling Oxidizing solution                          S 7 2 18          The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    2 3 3    Volume 1  Section 7 Specifications    Painting for Joint Areas Welded at Sites    Painting specification for joint aeas welded at sites shall be tabulated as below      1  Main gates of Kra Mang and Han Tra Floodgates    7 2 Hydraulic Gate Works                                                                                                 Film  Components   Materials Process Names of paint No of thickness  painting  um   Gate leaves    SS  SM First primer Non organic zinc rich primer 1 15  Gate guides   sus Pickling Oxidizing solution      Hoists SS  SM   Surface preparation   Power tool cleaning ISO St3      Under coat  1  Organic zinc rich paint 1 75  Weak solvent type modified  Under coat  2  epoxy resin paint under coat 1 80   air exposed   Weak solvent type modified  Under coat  3  epoxy resin paint under coat 1 80   air exposed   Weak solvent type  Intermediate coat intermediate coat for 1 40  fluoropolymer paint  Weak solvent type  Topcoat fluoropolymer paint top coat   of  Total 5 305  SUS Pickling Oxidizing solution        2  Stoplogs  maintenance gates  of Kra Mang and Han Tra Floodgates  No of Film  Components   Materials Process Names of paint    thic
250. ints shall be a  type of isolation joint that separate the pavement from each slab  and allow independent  movement of the concrete slabs that would cause damage    In addition  Shrinkage joints in transversal direction  in which the concrete slab is  continuous  shall be set up at an interval of 8m in longitudinal directions    In this joint  the dowel bar assemblies shall be installed and joint sealing compound shall  be filled atthe 40m depth     JointFiller  J oint Filler shall be of elastic plate with a thickness of 20 mm     Joint Sealing Compound  Properties of joint sealing compounds for joints filling shall be as follows                       Construction Method Hot construction method  Type Low elasticity type  Penetration Less than 6mm  Expansion at tension More than 3mm   Flow Less than 5mm             5 7 1 33    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     5      6      a      b      c      7     Wire Mesh  The wire mesh is a type as shown on the approved Shop Drawings   Construction    Concrete slabs shall be constructed carefully so that the requirements for qualities and  shapes are obtained    Spread  Compacting and Finishing     Spread of concrete shall be done by workforce uniformly with a shoot after unloading  from an agitator truck      Compacting shall be done by workforce or a finisher installing with vibrators inside  concrete and shall be 
251. ion on the piers  columns  operation deck and wing walls    Measurement of noise around the gate leaves     2  Water tightness tests      Leakage measurement through gate seals in wet conditions by filling with water the room  between the maintenance gate leaves and the main gate leaves    Leakage volume exceeding 0 1liter meter of sealing second shall not de accepted      3  Operation and control tests    Free opening  closure and stop of gates in any position    Total closing from totally open position    Functioning of hand drive mechanism    Functioning of limit switches  wire rope slack detectors  overload detecting devices  gate  position indicators and control equipment    Functioning of water level detectors  transmitter and data loggers    Check of voltage and current of hoist motors at the time gate operation tests     4  Back up power source tests    S 7 2 51    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Following item shall be tested when the power supply changes over to the engine generator     Free opening  closure and stop of gates in any position     Total closing from totally open position     Functioning of water level detectors  transmitter and data loggers     Check of voltage and current of hoist motors at the time gate operation tests    Any defects or improper operation discovered at the commissioning shall be corrected by the  Cont
252. ion procedures  and brought to line and grade within  the tolerances specified and firmly fastened in place     S 7 2 65    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Necessary devices shall be used to install the gate guide at corresponding accurate  position  Connection between gate guide  anchor materials and the alignment devices shall  be adjustable and firmly tightened to hold the gate guide securely in position while concrete  is being placed in the blockouts  Additional bracing shall be provided where necessary to  ensure the required alignment     Extreme care shall be taken to ensure that the wheel paths and sealing surfaces lie in a  true plate within the tolerances specified for their entire length  Placement of concrete in  the blockouts shall not proceed until the gate guide has been completely assembled and  secured  During and after concrete placing  alignment and tolerances shall be checked and  remedial action taken if readings indicate that displacement has occurred     Gate    The gate complete with seals shall be assembled and erected in accordance with the   Approved drawings  within the tolerances specified  Joints shall be water tight where  required  The rubber seals shall be fixed on each gate leaf and adjusted to have effective  water tightness on the sealing frames of the gate guide     Hoist    Before assembly  all bearing sur
253. ions The Flood Prevention Project of East Side of the    7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand  7 METAL WORKS so MR Pad tret rr cedere tee          es iae S  7 1 77  A    PLE CEDE S 7 1 77  1222  StepLadders ss etse vertus ident    E d e ERR S  7 1 79  7 3 Stainless Steel Pipe Hand                              meme S  7 1 79  7 4 Impervious Steel 5                                                             S  7 1 79  15  Anchor ls da a S 7 1 80  T6    R OOS                                                     S 7 1 80  7   Column  Roof for Operation ROOMS    cece                  S 7 1 81  8  MISCELLANEOUS WORKS    cer rer ne                          S 7 1 81  Gel SG ADION             es      ores M I                       S 7 1 81  8 2    Geotextile Sheena odia Fr DEPO Pod S 7 1 83  8 3  imber           is 5 7 1 83  8 4 Stone Masonry  Wet Masonry     eene nnne nnns S 7 1 84  8 5 Filters and Stone                                                    S 7 1 84  8 6     Non SArINK M Oneida teat        a Doi ed co be i ri OP TERR S 7 1 85  8 7  Gravel S          aida a E e      S 7 1 86  6 9             a a a S 7 1 86  O S 7 1 87  8 102  Weephol8s a rri Rb UP          S  7 1 87  8 11                           OE e eda IR ER ERR RR ROS ERR RU CIR AREA      S 7 1 88  9  SAFETY AND HEALTH MANAGEMENT            eseemm meme S 7 1 90  9 Tz sGeneralaxsd emt n temet RN S  7 1 90  9 2     REGIMEN peti et tt ue pan E ia o bri e Cer bh ras S 7 1 90  9 3 General  
254. it all details to the Consultant for approval   Repair of damaged elements will not be permitted except damage and repair  in the  opinion of the Consultant  will not impair the function or appearance of the elements   6 2 Precast Concrete Pile   1  Materials   a  Reinforcement  The requirements of Sub clause 5 2  Reinforcing Steel shall apply to specifications of the  reinforcement   Reinforcement shall not be assembled in the moulds  Main bars shall be securely tied to  hoops  stirrups or binders to give rigidity  and temporary stiffening or bracing shall be  provided during handling and placing necessary to ensure that correct spacing of all bars  are maintained  Cages are to be fixed straight and parallel to the moulds and spacer  blocks concrete shall be used to ensure that specified cover is maintain throughout  The  ends of all tie wire or clips shall be turned into the body of the concrete    b  Formwork and Finish    All precast units shall be manufactured under conditions which will ensure that     a  The formwork is not subjected to remove  displacement or differential settlement  during and after concreting     b  The concrete is protested from the direct rays of the sun  rain or drying winds     c  The finish shall be that indicated in the approved Shop Drawings     S 7 1 69    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     c      2      3      4      5  
255. itable for easy adjustment and protection from vandalism  and for rigidly  locking in position after being adjusted  They shall be of heavy duty rating and shall have  corrosion resisting steel rotating parts and permanently lubricated bearings  They shall allow  the arm to be fully deflected by the operator without damage to the switch     The limit switches shall have the life of switching operations more than 0 5 million times in  electrical and more than 5 million times in mechanical     2 12 11 Indicating Lamps    All indicating lamps shall be of light emitting diode  LED  with square shape colored plastic  lenses type for long life and service under conditions of shock  vibration and rough handling  All  indicating lamps on outdoor cubicles shall be visible under daylight  The name plates shall be  indicated on the colored plastic lenses with transparent plastic films     The indicating lamps shall be grouped into normal  trouble and other status indications and  neatly be arranged on the panels     S 7 2 34    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    2 12 12 Lighting Fixtures    Fluorescent lighting fixtures with complete fittings for A C  230 volt  50 Hz sources and a ballast  or ballasts of high power factor shall be provided within the control and distribution panels other  than wall mounted panels     Incandescent lighting fixtures shall have
256. ites are located as follows     S 7 2 1    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand      Han Tra Floodgate    Ayothaya town  Phra Nakhon Si Ayutthaya District  Phra Nakhon Si Ayutthaya  Provence       Kra Mang Floodgate    Ayutthaya city  Phra Nakhon Si Ayutthaya District  Phra Nakhon Si Ayutthaya  Provence    1 3 Country of Origin and Standards    The components of the Hydraulic Gate Works to be procured under this Contract shall be the  products of Japan and or Thailand  The manufacturer s  as Subcontractor s   for the Hydraulic  Gate Works  of the Contractor assuming the whole Work shall be limited to Japanese juridical  persons who are prequalified in the prequalification     Hereafter  the Contractor shall include his Subcontractor s  who shall manufacture and install  the components and equipment of the Hydraulic Gate Works     All the components or equipment of the Hydraulic Gate Works shall conform to the following  standards wherever applicable     e Thai Industrial Standards  TIS    e Japanese Industrial Standards  JIS    e Japan Association of Dam  amp  Weir Equipment Engineering   e International Electrotechnical Commission  IEC    e Japan Electrical Manufacturers    Association  JEM    e Japanese Electrotechnical Committee  JEC    e International Organization for Standardization  ISO  9001   e Other relevant and applicable codes and standards 
257. kness  painting  um   Gate leaves SS SM   Surface preparation Power tool cleaning ISO St3      Under coat  1  Non organic zinc rich paint 1 75  Under coat  2  Epoxy resin paint under coat 1 100   underwater   Under coat  3  Epoxy resin paint under coat 1 100   underwater   Under coat  4  Epoxy resin paint under coat 1 100   underwater   Total 4 375  Gate guides   SS  SM First primer Non organic zinc rich primer 1 15  SUS Pickling Oxidizing solution       Telpher SS  SM Surface preparation Cleaning ISO St3      rails       ic zinc ri   1 7  Lifting Under coat  1  Non organic zinc rich paint 5  beams Weak solvent type modified  Under coat  2  epoxy resin paint under coat 1 80   air exposed   Weak solvent type modified  Under coat  3  epoxy resin paint under coat 1 80              air exposed              S 7 2 19          Volume     Section 7 Specifications  7 2 Hydraulic Gate Works    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand                                                                         Weak solvent type  Intermediate coat intermediate coat for 1 40  fluoropolymer paint  Weak solvent type  Top Cod fluoropolymer paint top coat 1 9    Total 5 305  SUS Pickling Oxidizing solution       3  Gate for drainage channel at Kra Mang Floodgate  No of      Components   Materials Process Names of paint Ner thickness  painting  um   Gate leaves    SS  SM First primer Non organic zinc rich primer 1 15  Gate guides   sus Pi
258. l      4  Stripping of Top Soil    Top soil is any layer of soil within a depth of 30 cm  or as instructed by the Consultant at  the existing surface on the Site  which contains and or is discolored by the roots of  vegetation or any other organic material     Top soil which in the opinion of the Consultant should be stripped is to be removed from  the area concerned before any excavation or filling is commenced  In general  stripping  shall be limited to a depth of 30 cm  but the Consultant may require deeper stripping in  points of penetration of roots or other objectionable material  No payment above the Unit  Price shall be made for the occasional stripping over the 30 cm  depth      5  Demolition of Hard Obstacles    The Contractor shall totally demolish and remove from the Works all eventual hard  obstacles  including plain or reinforced concrete  stonemasonry  brickwork and the like   The demolition can be accomplished by means of giant breaker  compressed air tools   etc as the circumstance will allow  All debris shall be removed and dumped in areas  designated by the Consultant     S 7 1 19    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     6      7      8     Disposal of Material    The material removed in clearing operations shall be disposed to the designated disposal  site  as approved by the Consultant     The stripped top soil shall be disposed in the ri
259. l authorities in the Kingdom of Thailand     The Contractor shall appoint a Safety Officer and hold periodical safety meetings with the  Consultant and with his own supervisor and foremen  The Contractor shall report  promptly to the Consultant all accidents involving the death of or serious injury to any  person on the Site  resulting from the Contractor s operations     5 7 1 11    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     6     Protection of Existing Structures and Utilities    The Contractor shall assume full responsibility for the protection of all buildings   structures and utilities  public or private including poles  signs  services to buildings   utilities in the street  water pipes  hydrants  drains and electric and telephone ducts and  conduits  whether or not they are shown on the drawings     The Contractor shall carefully support and protect all such structures and utilities from  injury of any kind  Any damage resulting from the Contractor s operations shall be  repaired at his own expense     The Contractor shall bear full responsibility for obtaining all locations of underground  structures and utilities  Services to buildings shall be maintained and any costs or  charges resulting from damages there to shall be paid by the Contractor     18 Project Billboards    The Contactor shall install and maintain billboards through the whole construction p
260. l be provided in handling the two coarse size groups of coarse  aggregates where the drop exceeds 3 meters  Aggregates  as delivered to the mixers   Shall consist of clean  hard and uncoated particles     The aggregate plant shall be installed and tested sufficiently in advance of the dates set    for first placement of concrete  to permit the taking of samples and the making of the  necessary tests  as required in Clause 7 above     Testing of Aggregates    All sampling of fine and coarse aggregate shall conform to the appropriate requirements of  Section 12 of ASTM C 33 or equivalent  Unless otherwise specified all samples shall be    S 7 1 40    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     d     taken under the supervision of the Consultant to permit adequate testing and evaluation of  results sufficiently in advance of their use in concrete     The contractor shall provide such facilities as the Consultant may consider necessary for  the ready procurement of representative samples     The methods and procedures for testing aggregates will include but not necessarily be  restricted to those prescribed in the following standards     Grading ASTM C136 or equivalent  Organic impurities ASTM C40 or equivalent  Soundness  sulphate test  ASTM C88 or equivalent    Sieves used in making the tests  for undersize and oversize shall conform to ASTM  Designation E2l or the 
261. l for  those parts of the equipment performing the same duties     Wiring diagrams shall be drawn viewing from the wiring side of the cabinet and shall show all  terminals on selector switches  relays  contactors  terminal blocks  etc   in their correct relative  positions  Terminal blocks shall be arranged to show in vertical rows and all wiring to those  blocks shall be arranged to run in numerical order from top to bottom     Wiring shall be neatly and securely bunched or cleated  and enclosed in ducts  or conduits or  supported on trays and run in the most efficient manner from point to point  The bunching of  wiring shall be kept in bunched condition by means of strips of special plastic ribbon material at  suitable intervals  Lacing or wire bunches with textile plastic cord or metal buckle type clips will  not be accepted  Wherever wiring is cleated to metal surfaces  it shall be insulated from the  metal surface and shall be cleated by means of insulated straps  All wiring shall be left  sufficiently long and neatly looped to allow a fresh termination to be made in case of original  termination device being broken off     Circuit of similar nature shall be grouped together and terminal block terminals in A C  circuit  shall be segregated and fully shrouded to prevent accidental contact with live parts     All secondary wiring shall employ conductors having a minimum cross sectional area of 2 0  mm  and consisting of tinned copper wire  Internal wiring of miniaturized a
262. l make the splices in such a manner as to insure that the splices have  a tensile strength not less than 80 percent of the unspliced material     Installation  Care shall be taken to ensure that the water stops are correctly positioned during  installation  Adequate provisions must be made to support the water stops during the    installation and to ensure their proper embedding in the concrete  The symmetrical halves  of the strip shall be equally divided between the adjacent concrete structures     5 7 1 67    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     6     5 4     1      2      3    a      b     Maximum density and imperviousness of the concrete shall be ensured thorough vibration  of the concrete in the vicinity of the seal     Suitable guards shall be provided to protect exposed projecting edges the ends of partially  embedded water stops from mechanical damage  Water stops shall be thoroughly  cleaned of all foreign material before concrete is placed     Alternatives of Water Stops    In case of the change from PVC to rubber type on water stop  Contractor should submit  following data for the Consultant approval       Manufacturer s catalogue with technical specification     Laboratory testing results by the manufacturer     Sample of water stop     Joint  Lapping  details and fixing method of water stop    J oint Fillers  General    The Contractor shall su
263. lerances           Points to be measured Tolerances  mm   Gate width  5  Gate height  5  Gate depth  3  Diagonal length difference 10  Distance between side wheel treads  5  Distance between main wheel centers  5  Distance between sheave centers  5  Distance between seal rubbers  5  Position of side wheels  5  Distance between lifting pins  5    S 7 2 43    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Flatness of skin plate bottom edge  2       The tolerances not specified herein shall be determined by the Contractor  subject to approval  by the Consultant     3 5 Detail of Gate Guides    3 5 1 General    The gate guide shall consist of wheel rails  wheel tracks  sealing plates  sill beams  side wheel  tracks  guide plates and all other necessary components for satisfactory operation of the gates   The stainless steel plates shall be attached to all exposed surfaces of the gate guide to avoid  excessive wear thereof  The gate guides shall be provided up to the position at elevation as  shown on the Drawings     The details of construction of the gate guides  not specified herein  shall be made by the  Contractor upon approval of the Consultant     3 5 2 Sill Beams    The sill beams shall be straight and true flat for providing a close fit with the bottom of the gate  leaf  The sill beams shall consist of H shape beam and stainless steel seal plate     The s
264. les cannot be used due to insufficient space     cast in situ concrete shall be used to fill the gap       The Contractor shall consider the monitoring plan such as displacement of top of sheet    pile  crack of adjacent ground     The tolerance on the installation of PC corrugated sheet piles shall be as follows     S 7 1 75    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    6 4   1      2      3    a      b     a  Top EL  50mm   b  Displacement atthe top of sheet piles  L x 396   L  self standing height above ground level    c  Embedment Length  not less than design length    Where the PC corrugated sheet piles cannot be driven due to unexpected hard soil  condition  the Contractor shall cut the sheet pile at the design level by using concrete  cutter after obtaining the approval from the Consultant     Reinforced Concrete Pile  General    The Contractor shall supply and lay precast concrete pipes and materials  including pipe  jointing material  in those structures where the installation of R C  pipes is shown on the  Shop Drawing or as instructed by the Consultant  The pipes shall be reinforced concrete  low head pressure pipe to be furnished and laid in accordance with Thai Industrial  Standard 128  class of Reinforced concrete pipes  Class 2 and Class 3  which conform to  reinforced concrete pipes Class IV A and Class Ill A of ASTM Designation C76 or  equivalent  
265. ll be subject to prior  approval of the Consultant    Care of the Upstream of the Construction Area    The Contractor shall ensure the necessary protection measure against the flood  i e    prevention of the flood from Pasak River during the construction in the both construction  area and its upstream area      Canal or Drain Diaphragms    To accommodate the requirement of the irrigation program  the Contractor may be  required not to excavate certain sections of canal or drain in this manner creating  protective diaphragms  which will be typically 30 m  wide at natural ground level  This will  apply anywhere along the canals or drain as instructed by the Consultant     The diaphragms will be excavated during a second stage of the excavation  and this  work will have  if necessary  to be partially conducted underwater  The Contractor shall  supply the appropriate equipment to excavate the diaphragms  obtaining the required  lines and grades     Temporary Flume or Pump  Where the canals or drains will cross existing irrigation or drainage ditches or other small  watercourses whose flow cannot in the opinion of the Consultant be interrupted but for    short lengths of time the Contractor shall supply the materials for and erect temporary  flumes or temporary pumps that have appropriate capacity     5 7 1 18    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    The temporary
266. ll be the product of J apan or the Kingdom of Thailand     Chapter 2  Tender Documents    1     Composition of Tender Documents    The tender and contracting documents are composed of the followings     1  Volume   Tender and Contracting Requirements    Section 1 Invitation to Tender  Section2 Instruction to Tenderers  Section3 Form of Tender  Section4 Form of Contract  Section5 Conditions of Contract    5 2 3    Volume I  Section 2 The Flood Prevention P roject of East Side of the  Instruction to Tenderers Pasak River in Ayutthaya in the Kingdom of Thailand    Section6 Tentative Implementation Schedule  Section 7 Specifications  Appendices    2  Volume ll Tender Drawings    The documents are to be taken as mutually explanatory of one another  If an ambiguity  or discrepancy is found in the documents  the interpretation shall be done in accordance  with the above mentioned sequence of the priority     2  Responsibility of Tenderers     1  Tenderers shall examine carefully the Tender Documents to understand fully the  content of the Work including the amounts  and the difficulties and restrictions  affecting the execution and completion of the Work      2  Tenderers shall be liable to any failure or negligence to obtain reliable and  necessary information for successful execution or completion of the Work     3  Clarification of Tender Documents     1  Any inquiries of the Tender Documents or any doubts as to interpretation shall be  written in attached form in English and sen
267. llation of tie rods for the approval by the Consultant     In the Shop Drawings  the Contractor shall show the connection details between PC  corrugated sheet piles and tie rods  and also the details between anchor piles and tie rods     S 7 1 80    The Flood Prevention Project of East Side of the Volume 1  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    Forthe connection with PC corrugated sheet piles  the bearing plate at the edge of tie rod  system shall be fixed into the coping concrete at the back of PC corrugated sheet piles   The penetration of tie rods to the canal side and fixing by the walling  H beam  is not  allowed from the point of landscape     For the connection with anchor pile  tie rods can be connected through the use of  prefabricated T plate or Nut  The T plate is inserted through a slot cut on a pile flange and  the tie rods can be connected with this T plate by the use of a pin  Alternatively  the  penetration hole can be made for the insertion of tie rods and connection by the use of nut   In case of nut  enough thread cutting length of tie rod bar shall be kept     The adjustment for the length of tie rods shall be carried out properly by rotating the  turnbuckle to avoid the sagging on the tie rod assembly     The welding or heating of the tie rod is not allowed without the approval by the Consultant     The Contractor shall keep the minimum cover for the tie rods during the embankment not  to cause th
268. llowed     7 5 Anchor Piles    To avoid the big displacement of PC corrugated sheet piles which may be occurred by the  future scouring of canal  the anchor piles connected to PC corrugated sheet pile through  tie rods shall be provided at two meter intervals     Materials of anchor piles are steel shapes H 400x400x13x21  Prior to the start of site  works  the Contractor shall submit the method statement for the installation of anchor piles  for consultant s approval     During the installation works  the Contractor shall keep proper position  alignment   elevation and verticality of anchor piles so that tie rods can be kept in proper position and  direction     The tolerance for anchor piles is as follows   a  EL  top level   450mm    b  Eccentricity at the center point  within 100mm  c  Embedment depth  not less than the dimension shown      the Contract Drawings    7 6 TieRods     1      2     Material    Material for Tie Rods for the connection between PC corrugated sheet piles and anchor  piles shall conform to BS 5950 or equivalent  and comply with the following limits     Grade of bar  Grade355 or equivalent    Diameter   notless than 50mm    a   b   C  Yield Strength   not less than 295N mm2  d        Ultimate Tensile Strength  notless than 450N mm2  e  Elongation  notless than 1796  The Contractor shall submit the documents for material approval to the Consultant     Installation    The Contractor shall submit the method statement and the Shop Drawings for the  insta
269. lly handing over to the Client     The Contractor shall submit the commissioning plan and result report to the Client  through the Consultant s approval thereof          tools  fuel  materials  labors  logistics etc  shall be provided by the Contractor and or  his Subcontractor     After completion of the commissioning with satisfactory results  the Client shall approve  the Certificate of Completion of the Contractor  and then one  1  year warranty period  will starts      d  Operational and Maintenance Training  The Contractor shall provide operational and maintenance training work with a target to    the concerning personnel of the Client in order to transfer the technical knowledge on  operation and maintenance of the Hydraulic Gates     The period for the operational and maintenance training shall total five  5  days  including the commissioning     The program and materials thereof shall be prepared in Thai or English and provided by the  Contractor with approval by the Consultant  All tools  fuel  materials  labors  logistics etc  shall  be provided by the Contractor and or his Subcontractor     1 14 Warranty and After Sales Services    S 7 2 9    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    The Contractor shall make necessary arrangement with eligible agent s  who have sufficient  stock of spare parts and after sales service facilities     In order 
270. load  Motor over torque  Rope slack indication      Other necessary MCCBs  relays  magnetic contactors  switches and miscellaneous  wiring components     All indicators such as meters and lamps shall be visible from outside without opening the  keyed doors or windows      3  Gate    position indicators    One  1  electric gate position indicator shall be provided as following table on each gate  hoist in order to read the gate opening respectively     Quantity 1 set per gate hoist   Opening detection method by detecting the rotation of hoist   Type Synchro transmitter   Display in receiver Analog   Measurement range Gate sill elevation to gate maintenance elevation  Accuracy  5 cm or higher   Power source 220V x single phase x 50Hz    The synchro transmitter and receiver shall be housed in a weather proof enclosure     S 7 2 47    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand     4     Water level detectors and paperless data logger with memory card    Two  2  sets of pressure type water level detectors with connector terminal and hollow  cable  and one  1  set of paperless data logger with memory card shall be provided for Kra  Mang and Han Tra Floodgates respectively     The connector terminal shall be housed in a steel made box against vandalism     The pressure type water level detector and its hollow cable shall be installed in the  corrosion resisting wav
271. ls  back wiring  terminal boards and name plates    One  1  set of test terminals      One  1  under voltage relay      Three  3  over current relays One  1  set of alarm and automatic shut down  devices with fault indication of       Excessive temperature rise of cooling water    Pressure drop of lubricating oil    Over speed      One  1  set of AC exciter with automatic voltage regulator and necessary  accessories     5  Shop test   a  Combine tests    The following tests combined the generator and engine shall be carried out before    S 7 2 73    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand     b     delivery at manufacturer s shop     Operation test  starting and stop tests       Load test including temperature rise and fuel and lubrication oil consumption  measurement      Governor test    Over speed test  120 percent 1 minute     Test for generator    The following tests of generator only shall be carried out at manufacturer s shop     Plotting of characteristics    Wave form test    Temperature rise test    High voltage test    Stator coil 1500 V for 1 min       Rotor coil 10 X voltage of exciter  min  1500 V  for 1 min     Test of the Panel and cubicle including relay test and metering calibration check    Test on completion    After completion of installation work at the Site  the following tests shall be performed by  the Contractor as Tests on Compl
272. m points     Stretching    Final stretching of the gabion boxes shall be carried out using a wire strainer or winch of at  least one ton capacity  firmly secured to the free end of the assembled gabion boxes     Whilst under tension the gabion boxes shall be securely laced along all edges   top   bottom and sides  and at diaphragm points  to all adjacent boxes  Tightness of mesh  well  packed filling and secure lacing is essential in all structures    Filling   Filling will be carried out by using excavator     Filling material shall not be less than 100 mm  or larger than 250 mm  and shall be so  placed to produce a neat face and line  with a minimum of voids     Final Wiring    Closing and wiring down of lids shall proceed as soon as practicable after filling operations  and certainly in the likelihood of storms or floods during construction     Lids shall be stretched tight over the filling with bars and wired down securely through  each mesh along all edges  ends and diaphragms  The ends all tying and bracing wires  shall be turned into the gabion box on completion of all lacing operations  Tightness of  mesh  well packed filling and secure lacing is essential in all structures     5 7 1 82    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     f     8 2   1      2     8 3   1      2     Cutting and Folding Mesh    Where shown on the drawings or otherwise directed by 
273. make necessary arrangement with eligible agent s  who have  sufficient stock of spare parts and after sales service facilities     In order to provide satisfactory maintenance service even after one  1  year warranty  period  the Contractor shall keep a close contact with his Subcontractor and submit a  list of the maintenance service agent s  for the following services      a  The Contractor through his Subcontractor s  shall remedy  at his own expense   any defects against which the Work is warranted  by making all necessary  repairs or replacements except in the case that such defects result from the  Client   s negligence or failure during the one  1  year warranty period      b  The Contractor shall guarantee to supply the spare parts of the Equipment  through the agent s  upon request by the Client at cost basis for a period of two   2  years after the one  1  year warranty period      c  In case of major breakage  which is hard to repair by the local agent s   the  Contractor shall send his Subcontractor or manufacturer s engineer s  to the    S 7 3 6    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 8 Procurement of Drainage Pump Vehicle    site designated by the Client within one  1  week after the request by the Client  to repair such breakage at cost basis  Such services shall be guaranteed for a  period of two  2  years after the one  1  year warranty period     2  DRAINAG
274. man or mechanician to avoid the damage to the permanent structure  or temporary structure due to the stop of dewatering system     The Contractor shall not interfere nor interrupt the flow of natural canal or of existing  irrigation or drain ditches  Where necessary  temporary flumes temporary drainage pump  Shall be installed by the Contractor     The Contractor shall ensure 30m  min of the minimum discharge capacity to Pasak River  in both Han Tra Canal and Kra Mang Canal during the construction period     Care of Surface Waters    At any location where the control of surface water is required  the Contractor shall  provide for the construction of ditches  weirs  sumps  dikes and other protective works to  ensure that surface waters of any origin be kept away from the site of construction of  Permanent Works  Appropriate and adequate pumping equipment shall be installed at  the sumps  and the pumped water shall be channeled away from the Works     Care of Sub Surface Waters    The subsurface waters that may affect the construction of the Permanent Works  with  special regard to structures and structure foundations shall be controlled by means of  area dewatering systems of the wellpoint type or similar  At any site where control of sub   surface waters is required  the Contractor shall install a sufficient number of wellpoints   operate and maintain them during execution of the Works and provide for their removal  after construction  This equipment and dewatering system sha
275. mance test shall be furnished by the Contractor   The Contractor shall prepare temporary test tower and dummy loads for such test     The following items  at least  shall be checked under the rated hoisting load during operation  test of the hoists       Raising and lowering speeds      Voltage and current of electric motor     Temperature rise of bearings  motor  and gear reducer     Gear tooth contact      Existence of abnormal noise and vibration      Manual operation of hoist      Operation of limit switches      Accuracy of gate position indicator  and     Insulation resistance of control panels     Any defect  or improper operation discovered shall be corrected and the entire test shall be  repeated to the satisfaction of the Consultant     In case that the Contractor fabricates the hoist and control panels in different country  tests of  hoists and control panels may be conducted separately     3 9 Erection  Installation and Tests at Site  3 9 1 Erection and Installation   1  Gate Guides    The gate guides shall be assembled in the blockouts in accordance with the    Approved  drawings  and the approved installation procedures  and brought to line and grade within    S 7 2 49    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  the tolerances specified and firmly fastened in place     Necessary devices shall be used to install the gate guides at correspondi
276. material shall conform to the requirements of ASTM D170  ASTM 0171  JIS and other  equivalent Standards     All joint surfaces to be filled shall be clean  dry and fully cured     5 7 1 68    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications    Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works  6  PRECAST CONCRETE WORKS  6 1 General  The Contractor shall furnish and erect precast reinforced concrete member for installation  in those parts of the works as shown on the approved Shop drawings and or instructed by  the Consultant   Precast concrete units shall include prestressed concrete  P C  piles  prestressed concrete   PC  corrugated sheet piles  and or similar items   They shall be made with concrete mixed  placed and curved accordance with the  provisions set forth in the Clause 5  Concrete Works  as the specific provisions of the  following Clauses   No element in precast concrete may be handled and transported before it reaches the  strength necessary to prevent cracking   Precast concrete units may be supplied by a manufacturer approved by the Consultant or  may be manufactured by the Contractor ata location approved by the Consultant   Thirty days before commencing manufacture of the precast concrete the Contractor shall  submit to the approval of the Consultant all details of the methods to be used in  manufacture  curing and handling  transport  storage and erection of the precast elements  the Contractor shall subm
277. me interval between the  lifts whichever is the longer  Adequate protection in the period between casting and  commencing of curing is especially important     Concrete shall be protected against abrasion  vibrations  or any other damages during the    curing period  by independently supported walkways  on an effective cover of sand  or  other types of covering     S 7 1 60    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     21      a      b      c     Where it is impossible to avoid traffic over surfaces coated with sealing compound  the  members shall be protected by a covering of sand or earth or by other effective means   The protective covering shall not be placed until the sealing membrane is completely dry     Surface Finishes  General    The surface of the finished concrete shall be smooth  uniform in colour and texture  free  from projections  irregularities  holes  honeycomb and encrustation     Unless instructed otherwise by the Consultant  the surface finish of concrete shall conform  to the following Specifications     The Shop Drawings and Technical Specifications indicate the type of concrete surface  finish required for the formed and unformed surface in the major structure  through the use  of the symbols F1  F2  and F3     Classification of Surface Finish  a  General    Except for the construction tolerances  covered by the prescriptions of Clause 22 
278. means the construction and procurement for the Project to be    rendered by the Contractor as described in Article 3 of this Contract      The Construction Work  means the construction works for the Project to    be rendered by the Contractor as described in Article 3 of this Contract      The Procurement Work  means the procurement works of the equipment    for the Project as described in Article 3 of this Contract        The Equipment  means all the equipment and materials to be procured  for the Project  which shall be manufactured  equipped and completed in    accordance with the provisions of the Contract Documents  except for    construction materials        The Contract  means this contract concluded between the Client and the    Contractor      Ihe Contract Documents  means the documents consisting of the  following and are incorporated in and made part of this Contract  as though  fully written out and set forth herein      Contractor s Proposed Tender     General Conditions of Contract    Specifications     Drawings     Schedule     Instruction to Tenderer     Addenda     The Party  means the Client or the Contractor  as the case may be  and       the Parties  means both of them      Ihe Third Party  means any natural person or legal entity or    unincorporated entity other than the Client or the Contractor      Ihe Contract Price  means the price defined in Article 7 hereof and    includes adjustments in accordance with the Article 8 hereof     Words importing the 
279. ment shall be such that the  embankment is free from dense and agglomerations and so that the layers of material do  not differ substantially in texture and grading from adjacent material within the same area     If in the opinion of the Consultant the embankment surface is too dry to permit proper  adherence with the next layer  the dried surface material shall scarified to the Consultant   adequately dampened and compacted in accordance with the applicable specification in  order to provide a satisfactory bonding surface  before the next layer of fill material is  placed     Material shall be dumped in rows parallel to the center line of the embankment  or as  instructed by the Consultant     Materials of different characteristics shall be placed in such manner that contamination is  avoided     If hauled by dump truck  the material after tipping shall be spread over the area of the  embankment by means of bulldozers and graders  or other approved means in  approximately horizontal layers of uniform thickness    Concentration of over sized material will not be permitted  If in the opinion of the  Consultant any stone or lump interfere with good compaction such stone or lump shall be  removed from the layer  Stones or lumps with their major dimension greater than 15 cm  Shall not be allowed or be crushed     The surface of the embankment shall  in the course of construction be maintained in such  a condition that the construction equipment can travel over the whole of the em
280. ment side a way from the canal and  on the slope beside U shaped gutter as shown on the Contract drawing or as instructed by  the Consultant     8 10 Weepholes  The Contractor shall provide P V C  weepholes at the locations shown on the construction    drawings or as instructed by the Consultant  All weepholes shall be placed and held  accurately in position prior to placing of concrete     S 7 1 87    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    8 11     1      2      a      b      c      4      3      4      a     Care shall be taken to avoid clogging the weepholes during the progress of the work and  should any weep hole become clogged or obstructed from any cause before the final  acceptance of the Works  it shall be cleaned out in an approved manner or replaced by  and atthe expense of the Contractor     Painting  General  This Clause covers all work in connection with the preparation of surfaces and the  application of paint in the structure   No painting shall be applied to stainless steel  copper  bronze  chromium  nickel or brass  surface  unless specified or directed by the Consultant   Definitions  Paint  The term  Paint   as used herein  includes emulsions  enamels  stains  varnishes  sealers  and organic protective coating  including all of prime  intermediate  and finishing coats   Shop Painting     Shop painting  refers to the coats of paint to be appl
281. meter Minimum Tip    Length of Pile from Butt  cm  Diameter  cm   Notless than 3m Min  15   Max  18 15    Piles shall be measured for diameter in peeled condition  When the pile is not exactly  rounding  the average of three measurements shall be used  For any structure  the butt  diameter of piles having the same length shall be as uniform as possible  Square piles  Shall have the dimensions shown on the Drawings     Installation    Timber piles will be installed by using excavator or other approved equipment    Driving equipment that damages the piling shall not be used  Piles driven materially out  of line and position as indicated on the Shop Drawings shall be pulled and replaced   Deviations in excess of 8 inches out of position shall be rejected     Cutting off and trimming of timber piles shall be done at the designated elevations   Splicing of timber piles shall not be permitted except by written permission of the  Consultant  Piles inaccurately cut off shall be replaced  The sawed heads of all treated  piles which are not embedded in concrete shall be brush coated with 3 applications of hot  creosote and covered with hot roofing pitch  The sawed heads of all treated piles to be  encased in concrete need not be treated further     Stone Masonry  Wet Masonry     The Contractor shall construct stone walls  headwalls  protections and similar work where  shown in the drawings or as instructed by the Consultant  Material for stone masonry shall  be sound  durable rock spli
282. meters  side measurement     Stripping of Formwork    The removal of formwork shall be carried out when the concrete has reached a sufficient  strength  so that no damage can be caused to concrete  No forms shall be stripped before  24 hours after concrete placing has elapsed     The minimum compressive strength of concrete between the completion of pouring and  the stripping of forms shall be as follows     Formwork of footing  3 5N mm   Formwork of column  wall  side of beam  5 0N mm   Formwork of slab  bottom of beam  14 0N mm     After authorization for removal  the forms shall be stripped as soon as practicable  to avoid  delay in curing of concrete  and also to enable the earliest practicable repair to surface  imperfections  Method of form removal likely to cause overstressing of the concrete  or  injury to the concrete surface  shall not be used  Forms and their supports shall be  removed in such a manner to allow the concrete to take the stresses due to its own weight  uniformly and gradually  Provision shall be made by means of suitable wedges  sand  boxes or oilier devices  for the gradual relaxation of the support given by false work and  struts      15  Concrete Placing    S 7 1 53    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     a      b      c      d     General    All concrete placing equipment and methods shall be subject to the approval of the  Cons
283. mmissioning test  O amp M training and drainage gate  for Kra Man      A 2 Indirect Construction Cost    Notes  price of the above includes site office  stock yards  and land letting for temporary  works     A 3 Overhead  TOTAL OF A    5 3 3    Volume     Section 3 The Flood Prevention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya  B  Procurement of Drainage Pump Vehicles  B l Price of Drainage Pump Vehicles   Notes  price of the above includes packing  transportation and insurance of the parts   B 2 Commissioning test and O amp M training  B 3 Overhead   TOTAL OF B    TOTAL TENDER PRICE OF            Specimen Signature   Signature   Name of Signer   Title of Signer     Name of Tenderer     S 3 4    The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender       Form C     IMPLEMENTATION SCHEDULE    Date    th day of         2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Tenderer shall complete the spaces of the following table in a form of bar chart to  propose implementation schedule regarding the major works of the Project     Calendar Y   2012    Work Item       1  Preparatory work       2  Kra Mang Floodgate  2 1 Temporary work  2 2 Civil work  2 3 Design and manufacture of hydraulic gates       2 4 Transportation of hydraulic gates       2 5 Installation of hydraulic gates   2 6 Commissioning test and O amp M training    Han Tra Floodgate   3 1 Temporary wo
284. more sizes of classifications but the resulting  combined sand shall be of uniform grading within the limits specified above     The Contractor should submit the sieve analyzing data of fine aggregate to the Consultant  for approval      e  Coarse Aggregates  Definition    The term  coarse aggregate  refers to aggregates with a minimum dimension of 3 16    4 75 mm  and maximum dimension of 1 2     37 5 mm      Coarse aggregate shall be reasonably well graded within the nominal size ranges  hereinafter specified  Coarse aggregates shall consist of crushed rock  gravel or a mixture  of both     Crushed coarse aggregates containing more than 15 percent elongated or flat particles    shall not be used  An elongated or flat particle is defined as a particle having a maximum  average dimension of more than 5 times its minimum average dimension     Quality    The coarse aggregates shall consist of hard  strong  clean  compact  unalterable  not flaky  rock  free of foreign matters     S 7 1 42    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     f     It shall have no adherent coating  and shall be free of lumps of clay  loan  roots  sticks and  other organic matter  alkali or other deleterious substances  and except for gradation  shall  meet the current requirement of ASTM C 33 or other equivalent standards     The percentage of deleterious substances in each portion of coarse
285. ms of  miscellaneous metal work such as    anchorages  ladders  flanges  pipe hand railing   frames  supports  pipes  drainage outlets  sliding door  steel sheet pile and any other items  not included in this Clause     S 7 1 77    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     1      2            b      c      d      3    a     Materials    Materials shall conform to TIS  ASTM  J IS or equivalent  the following ASTM Designations  are for reference                       Material and Products ASTM Designation  Steel shapes A 283  A 306 and A 36 or TIS 107 and 116  Hot rolled steel bars A 575 and A 576 or TIS 55  Cold finished steel bars A 108  Steel pipes  black or galvanized A 120 or TIS 26  High strength bolts and nuts A 325  Standard bolts and nuts A 307  Galvanizing A 123 orA 153  Steel plate A 283  Anchor bolts A 307  Welding electrodes A 233 or TIS 49  Steel sheet pile A 328   Fabrication    General   Fabrication of metalwork shall be in accordance with the best modern practice in the  manufacture and fabrication of materials of the type covered by this Specification  and in  accordance with the approved Shop Drawings  Built up metalwork shall be completely  assembled in the shop and matched for correct field erection  All frames shall be suitably  braced as required  to maintain alignment during shipment and erection  All joints shall be  filed  milled or machin
286. n International  Cooperation Agency     1 12 Drawings     1  Contract Drawings    The  part    Drawings attached to the Tender and Contracting Documents accompany and form  of the Contract Documents after the Contract Agreement has been signed  In    addition to the attached Drawings  the design drawings showing additional information  about the Works may be delivered by the Consultant to the Contractor and during the  progress of work  further drawings will be issued by the Consultant as necessity arises to  supplement  supersede or further set forth details shown on the Drawings here  such  drawings shall thereupon become part of the Contract Documents      2  Drawings to be furnished by the Contractor    5 7 1 2    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     a      b      c      d     General    All of such various types of drawings as stated hereunder shall be prepared in a form  approved by the Consultant and shall be submitted far enough in advance so that the  Consultant can review and or approve them without any delay being caused to the field  work  The Contractor shall provide sufficient number of qualified engineers and  draftsmen for producing all drawings required  All costs incurred by the Contractor in  complying with the requirements of this clause shall be born by the Contractor  It is to  the Contractor s advantage to submit all drawings at the e
287. n Work   In making a claim under the advance payment security  the Client shall    notify the Japanese financial institution in writing  stating the nature of    the default and the amount of damages in respect of the claim      14     145  Theamount to be paid under the claim shall be the amount of the actual  damage incurred  and in no case shall it exceed the amount of the    advance payment security     Article 15  Assignment and Subletting    Neither of the Parties hereto shall assign this Contract or any part thereof to  any Third Party without prior written consent of the other Party  The  Contractor shall not sublet the whole of the Work or a major part of the Work to  any Third Party together with its responsibility     Article 16  Force Majeure    16 1 Definitions  Neither Party shall be deemed to be in default or in breach of this  Contract if he is unable to perform his obligations under this Contract  owing to the circumstances beyond his reasonable control  Such  circumstances  hereinafter referred to as  Force Majeure   shall include     but shall not be limited to  the following     a  acts of God  including extreme weather phenomena  earthquake   flood  or any other such operation of the forces of nature that the    Party affected could not reasonably foresee or provide against     b  war  declared or undeclared   hostilities  invasion  act of any foreign  enemy  threat of or preparation for war  terrorism  riot  insurrection   civil commotion  rebellion  rev
288. n systems thereof  etc  which the  Contractor proposes to construct at the Site or other authorized areas  In addition  the  drawings shall show the unloading facilities for the materials and equipment and the  capacity of each major plant which the Contractor proposes to use atthe Site     If any change is made concerning the above mentioned items during erection or after the  items become operational  the Contractor shall submit revised drawings showing such  changes to the Consultant for his review and approval     Two  2  sets of the reviewed Drawings for the Temporary Works will be retained by the  Consultant and one  1  set will be returned to the Contractor     As Built Drawings    Throughout the period of construction  the Contractor shall maintain and up to date set of  As Built Drawings for the various items of work which have been completed  Such  drawings shall show any authorized changes which may have been made to the Contract  Drawings  to the extent that they correctly portray the true  as built  condition of each  item of the permanent Works  The format of the As Built Drawings shall be as approved  by the Consultant     The whole part of the permanent work delineated on each Contract Drawing is completed   the pertinent As Built Drawings  after approval by the Consultant shall be mutually signed    S 7 1 3    Volume I  Section 7 Specifications The Flood Prevention Project of EastSide of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand
289. n the Consultant and the                                                                 S 5 7  Construction Materials and Equipment    emen S 5 7  Attenidancerat        teat inde RR OR ERR RA ERN UR              TA ER Rd S 5 7  Doubts as to Drawings and Specifications                 sssssses mmm S 5 7  Care ofthe      oat aia                           S 5 8  Work not in Compliance with the                                    emm S 5 8  Prevention of Damage and                                            eem S 5 8  Damage to Third  Party iia a m rre De a re RA e dg   5 9  Insurance of                            Pr P      Rt ca S 5 9  Insurance against Accident or Injury to                                    mmm S 5 9  Extension of Period of Execution of the                           emm S 5 9  Clients Right to Suspend Work or Terminate                                                                   S 5 9  Contractor s Right to Suspend Work or Terminate                                                          S 5 10  Completion and       5                      cea dines S 5 10            Ut A             5 5 11  SUPPIEMENtary  PrOVISIONS   testa een the                   e Er a dvd eR TNR S 5 11  Import and Re export of Plant    mener nnns S 5 11  Ownership and Copyright    nennen nennen nnne nnne S 5 11  A        5 5 11    S 5 1    The Flood Prevention Project of East Side of the Volume I  Section 5  Pasak River in Ayutthaya in the Kingdom of Thailand Conditions of Contract 
290. nd approval of the Consultant     Diesel engine details    The diesel engine shall be of the full compression ignition vertical cylinder  single acting  4  cycle  1500rpm  solid injection and provided with a radiator type cooler  Engine cylinder  liners shall be of the full length replaceable type     The diesel engine and generator shall be mounted on a common skid base  Proposed  continuous output of diesel engine generator set shall be guaranteed under the conditions  at the Site     The diesel engine shall be designed to use light diesel oil for fuel  The diesel engine shall  be mounted the sealed type DC batteries have ample capacity for diesel engine starting   Starting method of diesel engine shall be of DC motor starter by key switch and stopped  automatically when fault occurs     In addition to the above  the following items shall be provided for the diesel engine         Radiator for engine cooling water with flexible type radiator hood and louver to  atmosphere     S 7 2 71    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand           The forced lubricant system shall cover main bearings  crank pin bearings  piston pins   timing gears  camshaft bearings  valve locker mechanism and governor       A Filter for fuel oil and lubricating oil     Lubricating oil cooler                  skid base  foundation bolts and nuts       Reamer bolts with nuts     All
291. nd solid state  equipment may use flexible conductors having a minimum size of 50 0 18 mm where wiring is  made off clamping type terminals and 30 0 18 mm where the termination is made by soldering     Current transformer secondary circuits shall be run with the conductor route length as short as  possible  The burden of the leads associated with current transformers and protective relays  shall be sufficiently low to ensure correct operation of the protection under all conditions and this  may require a cross section of conductor greater than 2 0 mm      The standard phase arrangement when facing the front of the panel shall be R S T N  and R N   S from left to right  from top to bottom  and front to back for A C  three phase and single phase  circuits and N P from left to right  P N from top to bottom and front to back for D C  polarity  All  relays  instruments  other devices  buses and equipment involving three phase circuit shall be  arranged and connected in accordance with the standard phase arrangement where possible     S 7 2 36    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    All wires shall be colored as follows in order to identify phase and polarity     Phase and Polarity Description Color  Three phase 4 wire First phase Red  Second phase Black  Third phase Blue  Neutral phase White  Single phase 2 wire First phase Red  Grounding side second pha
292. nd testing all constituents and  finished concrete  shall be in compliance with technical standard herein indicated or  in the  absence of these  in compliance with standards indicated by the Consultant     The laboratory of the Contractor will     conduct preliminary tests and investigation to determine suitability of materials to be  used in concrete     conduct tests  during the progress of the work  to determine the continuing suitability of  materials     determine by tests  as the work progresses  that concrete of the required strength and  uniformity is being obtained     Slump tests shall be made daily at every agitator truck when concrete placement is in  progress  The first slump test shall be made before concreting is commenced on any  section     Materials    Cement    Types    Unless otherwise specified the cement shall be Normal Portland Cement complying with  ASTM C150 or TIS 15 2547 Type   or other equivalent standards     The blending of cements will not be permitted     Delivery    The cement is to be obtained from approved manufacturers  For each consignment  the  Contractor shall provide one copy of the invoice stating the quantity delivered for each  type  the number of bags or other units  if any together with the address of the  manufacturer and the manufacturer s certificate of tests performed by him on the batch or  batches     Transport of cement to the site may be either in bulk or in multi wall paper bags  When  bulk transport and storage of cement
293. nduit and the jointing fixtures shall be  suitable to accommodate the cables     Phase and color of cables    The standard phase arrangement when facing the front of the panel shall be R  S T N  and R N  S from the left to right  from top to bottom and front to back for AC three  3   phase and single phase circuits and N P from left to right  P N from top to bottom and  front to back for DC polarity     The following colored ferrules shall be provided on each wire in order to identify phase  and polarity     S 7 2 69    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the    7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand  Phase and Polarity Description Color  Three phase 4 wire First phase Red  Second phase Black  Third phase Blue  Neutral phase White  Single phase 2 wire First phase Red  Grounding side second phase White  or Neutral phase  Non grounding second phase Black  Ground conductor Green  or yellow green  Direct current Positive Red  Negative Blue     d      e     Sample of the secondary wiring  terminations and terminal blocks shall be submitted by  the Contractor for approval before commencement of the works  if requested by the  Consultant     Conduit    Rigid steel conduit shall be galvanized inside and outside  It shall be of a minimum  thickness of 2 3mm and have a minimum inside diameter of 16mm     The end of all conduits shall be well reamed to remove burrs and rough edges  Field  cuts shall be ma
294. ne and control  accurately the prescribed amounts of the various components  including admixtures     The amounts of bulk cement  fine and coarse aggregates shall be determined by separate    weighing and the amounts of water and admixtures shall be determined by separate  weight or volume measurements     S 7 1 47    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     a     Bins  hoppers and conduits shall be constructed so as to prevent the unwanted infiltration  of rain waters and the spillage of concrete components     Accuracy Limits    Delivery of materials from the batching equipment shall be within the following limits of  accuracy     Material By Weight    Cement 196    Aggregates of sizes up to 1 1   2     Water 196  or by volume    Admixtures  Liquid  396  or by Volume   a  General    Mixers shall be mechanically operated stationary mixers  of either the tilting or non tilting  type  and shall be generally in accordance with ASTM C94 and other equivalent standards     Mixers shall not be charged in excess of the capacity recommended by the manufacturer   the Consultant may instruct a reduction in batch size when mixer performance tests  indicate the necessity to do so  Mixers shall be capable of combining the materials into a  uniform mixture  without segregation     b  Mixing Time  The mixing time  starting when all solid material are in the mixer drum  and pro
295. nes  grades and dimensions shown on the drawings  Formwork shall have  sufficient strength to withstand the pressure resulting from placement and vibration of the  concrete  shall be maintained rigidly in position  and shall provide concrete surfaces  conforming to the requirements of the Construction Tolerance specified in Clause 22 and  to the finished specified in Clause 21 hereafter  Forms shall be sufficiently tight to prevent    S 7 1 51    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     b      c      d     the loss of fines from the concrete  Where re usable forms are adopts  the original  strength  rigidity tightness and surface smoothness of the forms shall be maintained  throughout their use    The Contractor shall submit to the Consultant  for approval prior to the start of any  concrete construction  the detailed design  i e  drawings and calculation he proposes to  adopt for formwork and support  but approval of the drawings shall not relieve the  Contractor of his responsibility for their adequacy     Surface of the formworks which is in contact with the concrete shall be treated or  protected to avoid chemical reactions or discoloring of the concrete surface     The use of forms with bruises  irregularities and incrustations shall not be permitted  and  should an element show signs of deformation during pouring  it shall immediately be  straightened and 
296. ng accurate  position  Connection between gate guides  anchor materials and the alignment devices  shall be adjustable and firmly tightened to hold the gate guides securely in position while  concrete is being placed in the blockouts  Additional bracing shall be provided where  necessary to ensure the required alignment     Extreme care shall be taken to ensure that the wheel paths and sealing surfaces lie in a  true plate within the tolerances specified for their entire length  Placement of concrete in  the blockouts shall not proceed until the gate guides have been completely assembled and  secured  During and after concrete placing  alignment and tolerances shall be checked and  remedial action taken if readings indicate that displacement has occurred      2  Gates    The gate complete with seals shall be assembled and erected in accordance with the   Approved drawings  within the tolerances specified  Joints shall be water tight where  required  The rubber seals shall be fixed on each gate leaf and adjusted to have effective  water tightness on the sealing frames of the gate guide      3  Hoists and Control    Before assembly  all bearing surfaces  journals  grease and oil grooves shall be carefully  cleaned and lubricated with an approved oil or grease  After assembly  each lubricating  system shall be filled with the approved lubricant furnished by the Contractor     Each hoist  completes with all accessories  shall be assembled and installed in accordance  with the  Ap
297. ng segregation  and tending to bring laitance to the surface   shall be avoided     The vibrators used shall be of an approval make and of a type best suited for the class of  work  Standby equipment is to be provided at the concreting site to ensure that operations  are not interrupted due to break downs  Vibration shall be carries out by competent  operators     Necessary traffic over fresh concrete shall be through independently supported timber  walkways  so that concrete is not disturbed     The evaluation of the satisfactory degree of vibration of the concrete shall be based on the  criteria outlined in Section 112 of the Concrete Manual USBR  latest Edition or equivalent     Second Stage Concrete    Concrete in blockouts the Contractor shall construct blockouts in concrete structures for  installation of Permanent Equipment and other equipment shown on the approved  construction drawings and or as directed by the Consultant     The blockouts shall be filled by the Contractor with concrete or mortar after the equipment  has been installed     Prior to filling concrete or mortar in blockouts  the concrete surface of large blockouts shall  be roughened by chipping or other methods and shall be in such condition as to ensure a  good bond between the existing and the second stage concrete or mortar  The roughened  surface of concrete shall be clean and the surface shall be dampened after the cleaning  before filling with concrete or mortar  Filling of blockouts shall procee
298. ng shall be in conformity with 2    class or higher  stipulated in JIS Z 3104 and 3106 or equivalent such as ISO  EN  BSI and ASTM approved by  the Consultant     Any defects or improper operation discovered during the test shall be corrected and the entire  test shall be repeated to the satisfaction of the Consultant     S 7 2 66    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    5 8 Commissioning  Acceptance Tests     After the tests at site have been completed and approved by the Consultant and relevant  structures under other contracts are fully erected and installed  the following inspection shall be  conducted by the Contractor for assessment of their performance as commissioning   acceptance tests  in the presence of the Client     Commissioning shall be conducted launching the completed shape of the civil works and the  hydraulic gate works into water of the canals      1  Discharging tests      Measurement of vibration on the piers  columns and operation deck of the drainage gate    Measurement of noise around the gate leaf     2  Water tightness tests      Leakage measurement through gate seals in wet condition  Leakage volume exceeding 0 1liter meter of sealing second shall not de accepted      3  Operation and control tests      Free opening  closure and stop of gates in any position    Total closure from totally open position    Functioning of gat
299. nner approved by the Consultant     The work includes  but is not limited to  the following  excavation for structures and  structure foundations  revetment and trenches for pipe laying  U shape girder     The Contractor shall notify in advance the Consultant of the commencement date for any  excavation  so that cross sections and measurements may be taken of the undisturbed  ground surface  The natural ground adjacent to the proposed excavation shall not be  disturbed without the consent of the Consultant  Where the foundation material is soft or  mucky or otherwise unsuitable  in the opinion of the Consultant  the Contractor shall  remove the unsuitable materials and replace it as specified     Excavation shall be performed as far as practicable and where required in the dry  For this  purpose the Contractor shall take  according to the needs and after approval of the  Consultant  the measures contemplated in these Specifications and any other necessary  step to avoid excavations being carried out in wet conditions     Excavation shall be carried out so that the final dimensions of the excavations  lines   slopes and grades  conform to those shown in the approved Shop Drawings and or those  established by the Consultant  All excess excavation for the convenience of the Contractor  for any purpose or reason  except as may be approved by the Consultant and shall be at    5 7 1 21    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil
300. ns     Article 22  Verification of Contract     19     This Contract and any amendments or modifications shall be verified by    JICA to be eligible for the Grant in accordance with the G  A     Article 23  Early Termination    23 1 Should either Party default in the execution of his obligations under this  Contract  the other Party shall give the defaulting Party notice in writing  to remedy such default promptly     232 Failure of the defaulting Party  to take corrective measures as required by  the other Party within thirty  30  days of the receipt of such notice  shall    constitute a sufficient cause for the other Party to terminate this Contract     23 3 Either Party may terminate this Contract without prejudice  should the  performance of his obligations under this Contract not be resumed within  a cumulative period of one hundred and twenty  120  days of suspension    due to Force Majeure stipulated in Article 16 hereof     23 4 The early termination of this Contract under this Article shall be subject  to the approval of the competent authorities of the Client and the  approval of JICA     23 5 In the event of early termination for reasons stated in Sub Paragraphs  23 2 and 23 3  the Contractor shall  with the approval of JICA  be paid by  the Client  within the Grant  a fair and reasonable proportion of the  Contract Price that is calculated on the basis of the Contractor s works  carried out up to the termination date  instead of the payment schedule    stipulated 
301. nstallation works  in accordance with the approved test  procedures  The test and inspection shall include  but not be limited to       Visual inspection of position and assembly sequence of parts  edge preparation  size   length and location of welds  and overall finishing       Inspection of satisfactory installation of all components       Inspection of welds by radiographic testing for detecting inner flaws and defects of  welded parts including stoplog leaves  gate guides and telpher rails       Inspection by feeler gauge measurement of satisfactory sealing of all seals     Inspection by feeler gauge measurement of satisfactory sealing of all seals     Check of looseness and loss of bolts and nuts  and      Existence of abnormal noise and vibration during hoisting and travelling of chain  hoists     Acceptance criteria of the radiographic testing shall be in conformity with 2    class or higher  stipulated in JIS Z 3104 and 3106 or equivalent such as ISO  EN  BSI and ASTM approved by  the Consultant     Any defects or improper operation discovered during the test shall be corrected and the entire  test shall be repeated to the satisfaction of the Consultant     4 9 Commissioning  Acceptance Tests     After the tests at site have been completed and approved by the Consultant and relevant  structures under other contracts are fully erected and installed  the following inspection shall be  conducted by the Contractor for assessment of their performance as commissioning   ac
302. nsultant shall take at least two samples for each day of work and for each layer  compacted in the day     In the event that the degree of compaction is not satisfactory  the Consultant shall require  additional compaction     The Finishing of Subgrade    After the finishing of subgrade by using motor grader and tire roller  the Contractor shall  conduct the field dry density test and also proof rolling test  In case of subgrade  embankment  which is 1m thickness below the pavement  in situ dry density test shall  equal or exceed 9096 of optimum dry density  The proof rolling test shall be conducted by  using 10t dump truck fully loaded with soil or equivalent  In the proof rolling test  the  deflection shall be less than 1 inch  25mm   If the deflection exceeds 1 inch  25mm   the  Contractor shall remove the soft subgrade material to the area and depth determined by  the Consultant and replace with suitable material     The tolerance of the finishing of subgrade is as follows     S 7 1 29    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     10      11      12      13       Elevation   50        Width    25mm    Protection of Embankments    The Contractor shall carry out normal protection and maintenance works to keep the  embankments in a Satisfactory condition until completion     In the case of impending rain the surface of the embankment shall be smoothened   compact
303. nt shall be  spread evenly and flow on smoothly without runs  sags  brush marks  or skips  Paints shall  also be thoroughly stirred  strained  and kept at a uniform consistency during application   The first coat on surfaces shall be applied by brush  Subsequent coats may be applied by  spray or brush  In no case shall any surface be painted upon which moisture condensation  is evident     All exposed concrete surfaces to be painted shall be treated first by brushing with a  solution made from a mixture of three  3  pounds zinc sulfate crystals to one  1  gallon of  water  After the surface has dried  excess crystal deposits shall be brushed off   SAFETY AND HEALTH MANAGEMENT   General   Purpose of Safety and Health Management   This specification covers all requirements to achieve safety works which might protect  health and lives of workers  and might preserve site materials  equipments and social  properties of residents around the site  Such safety management must eventually proceed  with project as scheduled    Preliminary Survey   The Contractor shall investigate preliminarily all factors which affect the safety of  construction inside and outside of site and shall submit it to the Consultant and the Client   these factors would be the geography  discursion  traffic  surrounding environment   meteorological phenomenon and some other factors    Safety Management Plan   Safety Management Plan shall consist of a result of preliminary survey  a regime in an  association of 
304. ntenance gate leaves  The sill  beams shall consist of H shape beam and stainless steel seal plate     The sealing surface of the sill beams shall be connected to the side gate guides at the bottom  corners to form a continuous seal with the rubber seals of the gate leaves  The seal weld shall  be made for the seal plates at the corners and shall be ground finish     4 5 3 Side Gate Guide    The side gate guides shall be provided to both pressure and non pressure sides to be capable  of transmitting the hydraulic loads from the side shoes of the stoplog leaf to the concrete  structures     The side gate guides shall be stainless steel channels and shall have ample strength to resist  the load from the side shoes of the stoplog leaf     Top of the side gate guides shall be chamfered so as to facilitate the stoplog to insert with the  lifting beam     4 5 4 Side Plate    The side plates shall have ample strength to resist the perpendicular load from the side shoes of  the stoplog leaf     The side plates shall be of stainless steel     S 7 2 56    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    4 5 5 Tolerances    The gate guides shall be accurately fabricated and installed with the following tolerances           Point to be Measured Tolerances  mm    Clear span  6  Sealing span  6  Distance between centers of side gate guides  6  Distance between side rails  6 
305. ntioned  the Contractor shall inform the Consultant of his intention and shall  obtain the Consultant s written approval of such other standards     Constructional Plant   The Contractor shall supply necessary constructional plant required for the sufficient  execution and completion of the Works  All plant and equipment to be furnished by the  Contractor shall be complete with all spare parts and the Contractor shall maintain  sufficient stock of such spare parts for their Plant and equipment to ensure the sufficient  execution of the Works    Substitute Materials    The Contractor shall make diligent efforts to procure the specified materials  but when the  materials specified are unavailable for reason beyond the control of the Contractor     S 7 1 8    The Flood Prevention P roject of East Side of the Volume 1  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     4      5      6     substitute materials may be used  provided that no substitute materials shall be used  without prior written approval of the Consultant     Inspection of Plant and Materials    Plant and materials furnished by the Contractor shall be subject to inspection in  accordance with the Contract at any one or more of the following locations as determined  by the Consultant     a  the place of production or manufacture  b  the shipping point  c  the Site    The Contractor shall submit to the Consultant any information covering plant and  materials required b
306. ntractor  for the following design conditions     4 3 1 General Data    Kra Man Floodgate   1  Quantities to be procured    Gate leaves  3 sets x 2  upstream and downstream sides     S 7 2 52    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Gate guides   Lifting beam   Telpher rails     Chain hoists    2  Stoplog  Maintenance gate     Type   Clear span   Effective height   Design head  Downstream water level   Upstream water level   Water level on the sill   Sill elevation   Sealing method   Sedimentation     Ground subsidence    3  Telpher rail    Rail   Length   Pier     Height    4  Chain hoist    Type   Hoisting height   Hoisting load     Han Tra Floodgate   1  Quantities to be procured    Gate leaves     Gate guides     Volume 1  Section 7 Specifications  7 2 Hydraulic Gate Works    6 sets  2 sets  2 sets    2 sets    Plate girder structure steel slide gate  6 0m  1 0mx3    EL    2 0 m MSL   EL   2 0 m MSL   EL   0 50 m MSL  Water depth   0m    EL   0 50 m MSL   Three  3  sided watertight at non pressure side  Not considered in Kra Mang canal    Not considered      shaped steel 450mm x 175mm x 13mm x 26mm  8 m x 3   8 5      32 5 m side  H shaped steel 250mm x 250mm x 9mm x 14mm    4 153m x 2    Manual geared trolley  10m    5 ton    5 sets x 2  upstream and downstream sides     6 sets    S 7 2 53    Volume     Section 7 Specifications  7 2 Hydraulic Gate Works     2      3      4     4 3 2    4 3 3    Lifting be
307. ntractor shall grasp the accurate information about underground installations to  achieve safety excavation and shall make sure of a profile of a new pipeline  The  underground installations shall be protected from excavating    Equipment  The Contractor shall use cautions for workers to work in operation of equipments     Unloading and Loading of Large Equipments    The Contractor shall select a flat  hard and wide area for unloading and loading of large  equipments from a board to avoid accident due to turnover     Transportation   The Contractor shall fix large equipments tightly on a carrier to avoid tumbling down while  passing by rough roads    The Contractor shall check the road conditions and areas along the roads  and shall set  up sign boards necessary for the safety at transportation in and out of the site    Setting Up of Lighting Facility  The Contractor shall set up sufficient lighting facilities in night work   Operation of Movable Crane   Selection of Movable Crane  The Contractor shall select a movable crane carefully with a performance chart  and  operate the crane after checking the bearing capacity of ground or the deformation of a  temporary bridge based on  The movable crane shall be set flatly and its outriggers shall  be stretched at the maximum range  The plate underneath the outriggers shall be set to  avoid falling down    Signal  The Contractor shall appoint a person in charge of signal  He shall check the weights of all  hanging tools and a beam  
308. ntracts shall be  verified by JICA to be eligible for the Grant     Article6 Payments   JICA shall execute the Grant by making payments in Japanese Yen to cover the  obligations incurred by the Authority under the contracts verified in accordance with  Article 5  hereinafter referred to as    the Verified Contracts     to an account to be opened  in the name of the Government of the Kingdom of Thailand at a bank in Japan  designated by the Authority  hereinafter referred to as    the Bank         Article7 Banking Arrangement  The sole purpose of the account referred to in Article 6 is to receive the payments in  Japanese Yen from JICA and to pay to the Japanese nationals who are parties to the       Verified Contracts  The procedural details concerning the credit to and debit from the  account referred to in Article 6 will be agreed upon through consultation between the  Bank and the Authority     Article 8 Authorization to Pay  The payments referred to in Article 6 shall be made when payment requests are  presented by the Bank to JICA under an authorization to pay issued by the Authority     Article9 Modification of the Project  When the plan and   or design of the Project is to be modified  the Authority shall have a  prior consultation with and obtain the consent to the modification of JICA  in    accordance with the Procurement Guidelines     Article 10 Obligations of the Government of the Kingdom of Thailand   1  The Government of the Kingdom of Thailand shall take neces
309. nts  except for the chassis  of the Equipment shall  be limited to Japan and or the Kingdom of Thailand while the origin of the  chassis of the Equipment shall be limited to the Kingdom of Thailand     Article 7  Remuneration    The Client shall remunerate the Contractor from the Grant with a total  amount of          million          thousand          Japanese Yen  JPY              as the Contract Price for the Work  in accordance with the payment schedule    stated in Article 8  8 2 of this Contract     The breakdown of the Contract Price is shown as follows    1  The Construction Price    million           thousand           Japanese Yen     JP KKK KKK T      2  The Equipment Price  dee eee million dee thousand dee    Japanese Yen     JPY    KKK TH     Article 8  Payment    8 1 Terms of Payment  In accordance with the G A  the Client shall make a Banking Arrangement   B A  with a bank in Japan  hereinafter referred to as  the Bank   to  authorize the Bank to pay the Contract Price to the Contractor under this    Contract  The payment to the Contractor under this Contract shall be    made in Japanese Yen through the Bank under      irrevocable  Authorization to Pay  A P   which shall be issued by the Client to the  Bank     8 2 Payment schedule    8 2 1 Payment for the Construction Work     1     Advance Payment   PRE million            thousand Japanese Yen  JPY        000   which  corresponds to forty percent  40   of the Construction Price  shall be paid  upon verificati
310. o     Flat chisel 1 no     Grease gun 1 no     Oilcan 1 no     Others necessary     Tool box to house the above 1 no     1 12 Spare Parts    Spare parts listed below  which are necessary for repair  shall be supplied stowing in the long   life spare parts box  Furthermore  electronic parts shall be put in a moisture proof box      1  Han Tra Floodgate    Main gate    Indicating lamps 100  of actual number    Control circuit fuses 10096 of actual number    Auxiliary relays 1 piece per type    Breakers and contactors 1 piece per type    Space heater 1 set for one  1  local control panel    Rubber seals 1 set for one  1  gate leaf    Bolts  nuts and washers to 1 set for one  1  gate leaf    fasten rubber seals  Wire ropes 1 set for one  1  hoist system    S 7 2 7    Volume     Section 7 Specifications  7 2 Hydraulic Gate Works      Hoist motor with electromagnetic brake    Grease nipples and cups    Spare parts box    Stoplog  maintenance gate      Rubber seals    Bolts  nuts and washers to  fasten rubber seals     2  Kra Mang Floodgate    Main gate    Indicating lamps  Control circuit fuses    Auxiliary relays  Breakers and contactors    Space heater    Rubber seals    Bolts  nuts and washers to  fasten rubber seals    Wire ropes    Hoist motor with electromagnetic brake  Grease nipples and cups  Spare parts box    Stoplog  maintenance gate      Rubber seals    Bolts  nuts and washers to  fasten rubber seals    Gate for drainage channel      Rubber seals    Bolts  nuts and wash
311. o enter into  price negotiation in the stage of the tender evaluation for price reduction into the  ceiling price     In case the negotiation with the lowest tenderer is not successful  the Client will  invite the next lowest tenderer to enter into price negotiation  This procedure will  be followed until the Client reaches agreement with a tenderer  When no tenderer  reaches agreement in this procedure  re tendering may be considered     In case there are two or more tenders at the same price within the ceiling price  a  prioritized tender shall be determined by drawing lots     Chapter 5  Evaluation of Tender and Award of Contract    1     Evaluation of Tender     1     The Client will ascertain  examine and evaluate the tenders that     mn      computations are free of material errors     2  the submitted documents are substantially responsive to the Tender  Documents     3  the required certificates have been provided   4  the required securities have been provided   5  documents have been properly signed  and    6  the tenders are otherwise generally in order     S 2 8    The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers     2 If a tender does not substantially conform to the Specifications  or contains  inadmissible reservation or otherwise not substantially responsive to the Tender  Documents  it shall be rejected      3  Ifthe tender of the prioritized tenderer is incomple
312. of Thailand     b      c      d     design and condition to ensure a practically continuous supply of concrete at the point of  placement  and the placing of concrete in approximately horizontal layers while the  previous layer is still soft  The maximum height from which the concrete shall be dropped  Shall not exceed one and a half meters  except where the use of suitable equipment  to  confine and control the concrete being discharged  is specifically authorized by the  Consultant     All conveying equipment shall be supported independently of the formwork  The  conveying equipment shall be kept free from hardened concrete and foreign materials   and shall be cleaned at frequent intervals     Should the concrete show signs of segregation when it reaches the placing point  and  provided the maximum permissible time has not elapsed  it shall be remixed by  mechanical means in the vicinity of the placing  otherwise it shall be rejected     In particular  the Contractor shall take appropriate measures to avoid excessive loss of  moisture by evaporation  during the transportation and placing of the concrete  Increases  in the water content of the mixture to make up for the evaporation losses shall not be  permitted     Truck Mixers and Agitators    Truck mixers may be used for mixing  agitating and transporting concrete  and agitators  may be used for transporting ready mixed concrete to the point of delivery  provided that  provision for the batching and mixing of all concrete
313. of Thailand and Japan    Other internationally prevailing standards such as EN  BS  ANSI and DIN are accepted for the  components or equipment  unless otherwise indicated  All dimensions and performance of the  components or equipment shall be generally in metric system  unless otherwise specified in  these Specifications     1 4 Working Specifications  Detailed Design Calculations  Shop Drawings and Work  Schedule to be Submitted    Before commencement of manufacturing the component or equipment of the Hydraulic Gate  Works  the Contractor shall submit three  3  copies of the documents including the Working  Specifications  Detailed Design Calculations  Shop Drawings  Work Schedule  and other  necessary information for approval of the Consultant     These documents shall be permitted correction and or modification to be made  if such are  deemed to be necessary and  or are instructed by the Consultant  without delay of the  completion of the Work     The components or equipment of the Hydraulic Gate Works to be furnished under this  Specification shall be essentially the standard products in regular works by the Contractor     S 7 2 2    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    1 5 Operational Rule of the Floodgates   1  Tentative idea of operational rule    Water levels of the Canals upstream Han Tra and Kra Man Floodgates shall be respectively  contr
314. of a sealing compound which forms a water   retaining membrane on the surface of the concrete curing compound shall conform to  ASTM C309 or equivalent  The compound shall be of uniform consistency and quality  within each container and from shipment to shipment     The compound shall be sprayed on the concrete surfaces to provide a continuous  uniform  coating overall areas  Coverage shall not exceed four  4  square meters per liter and on  rough surfaces coverage shall be decreased as necessary to obtain the required  continuous membrane     Mortar encrustation and fine on surfaces designated as surface finish F3 shall be removed  prior to application of sealing compound  The repair of all other surface imperfections shall  be made before application of sealing compound  unless the repair work cannot be  completed within 4 hours from the stripping of formwork  in which case the repairs shall be  executed as indicated here below     When sealing compound is to be used on formed concrete surfaces  the surfaces shall be  moistened with a light spray of water immediately after stripping of forms and shall be kept  wet until the surface will not absorb more moisture  As soon as the surface film of moisture  disappears but while the surface is still damp  the sealing compound shall be applied   Special care shall be taken to insure good compound coverage at the edges and after  application of the sealing compound has been completed and the coating is touch dry  required repair of
315. of hard  durable  gravel or crushed stone and binder  free from soft particles and excess clay      3 Properties      Base course material shall be graded in accordance with the following table               RS ME           Percent Passing by Weight  pre 100  T 70 100  3 4  50 85  No 4 30 60  No  40 10 30  No  200 0 12               Clay content  0 596    Minimum dry density  shall be 9596 of the maximum    5 7 1 31    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     4      5      6      7     Dry density as determined by ASTM D 1557  Method  D or equivalent     Liquid limit  not greater than 25     Plasticity index  not greater than 6     Material passing The No  200 sieve shall not be more than one half of the fractions  passing the No  40 sieve     Preparation of the Subgrade    Prior to constructing the base course  the previously  constructed subgrade shall be  cleaned for adequate compaction and accuracy  ruts or soft  yielding spots that may  appear in subgrade areas having inadequate compaction  and deviations of the surface  from the requirements set forth therein shall be corrected to line and grade and to all  Specifications requirements     Placement of Base Course    The coarse aggregates and binder materials shall be spread in layers of uniform thickness  from spreader boxes or moving vehicles  Aggregates shall be placed in a layer of uniform  thickness on
316. oject     Full set of Hydraulic Gate Works composed of     Stainless steel fixed wheel gate leaves    Stainless steel fixed wheel gate guides    Motorized wire rope winched gate hoists    Steel maintenance gate leaves    Stainless maintenance gate guides    Steel telpher rails    Manual chain hoists and lifting beams    Electric wirings and boards    Lighting facilities    Lightning arresters    Engine generators    Water level meters and data loggers    Stainless steel fixed wheel gate leaf    Stainless steel fixed wheel gate guide    Manual racked gate hoist    Authorized Signature of    Local Agent   Signature     Name of Signer   Title of Signer     Name of Local Agent     S 3  14    The Flood Prevention Project of Volume 1  Section 3  East Side of the Pasak River in Ayutthaya Form of Tender     Form K      Letterhead of Local Agent  gt     CERTIFICATE OF AFTER SALES SERVICES BY  LOCAL AGENT FOR DRAINAGE PUMP VEHICLES    Date   th day         2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya  Dear Sir     This is to certify that we   Name of Local Agent   dully organized and existing under the law  of the Kingdom of Thailand with its principal place of business at  Address of Local Agent    hereby accept to cooperate with  Name of Tenderer  in undertaking after sales services and  maintenance of the following Equipment for at least two  2  years after the Guarantee  P
317. olled not to exceed  3 5m MSL as HWL     The gate openings of Han Tra and Kra Man Floodgates will be proposed to maneuver as  following tentative idea     Full close at  2 6m MSL in rising stage        Partial open and close not to exceed  3 5m  MSL     gt  Full open at  2 6m MSL in descending stage    The operational rule of Han Tra and Kra Man Floodgates and Drainage Pump Vehicles  procured under this Contract  linking with the existing Suan Plu Gate and Supachai  Pumping Station  shall be discussed and established involving the officers of Phra Nakhon  Si Ayutthaya District in the Management Guidance of the Consulting Services under the  Project     2  Design water levels    The design water levels for Han Tra and Kra Mang Floodgates are as follows     Water levels at upstream  Canal side     High Water Level  HWL   EL  43 5 m MSL   Low Water Level  LWL   EL    0 5 m MSL  Water levels at downstream  Pasak River side    Height Water Level  HWL   EL    6 0 m MSL   Low Water Level  LWL   EL    0 5 m MSL  Sill elevation   Han Tra Floodgate  EL   2 5 m MSL   Kra Mang Floodgate  EL   0 5 m MSL    The following tables show the water levels recorded at RID S5 gauging station of Pasak  River in Ayutthaya since 1990 just after the completion of Pasak Dam  In October 17  2011   the S5 gauging station recorded  5 91   MSL which is the overwhelmingly highest since  the start of level gauging in 1950     S 7 2 3    Volume     Section 7 Specifications The Flood Prevention Project of East
318. olution  usurped power  civil war  and  labor troubles or other industrial troubles  strikes  embargoes     blockades  and sabotage of labor     s    16 2    16 3    16 4    16 5    16 6    Monetary Obligations   Notwithstanding the foregoing  the occurrence of Force Majeure shall  not prejudice nor otherwise affect either Party s liability to pay  remuneration or reimbursement of expenses to which the other Party is    entitled on or before the date of occurrence     Notice  The Party affected by Force Majeure shall give the other Party a written  detailed account of the circumstances of Force Majeure as soon as    practicable  but not later than fourteen  14  days from the occurrence     Expatriate Staff   In the event that Force Majeure is likely to endanger the safety of any  expatriate staff members of the Contractor  they shall be allowed to leave  the Project site and or office  giving notice to a staff member of the    Client responsible for the management of the Project as soon as possible     Suspension   Upon occurrence of Force Majeure  the Party affected may be allowed to  temporarily suspend the performance of his duties under this Contract  for so long a period as Force Majeure continues and as his performance is  prevented thereby  In such instance  he shall make all reasonable    efforts to mitigate the effect of Force Majeure upon his duties     Damage   If the Contractor suffers damage due to Force Majeure  the Contractor  shall discuss the solution with th
319. on of this Contract by JICA    The request for the advance payment shall be submitted together with a  photocopy of the certificate of verification of this Contract by JICA and  with an original of the certificate of the receipt of the advance payment    security of this Contract issued by the Consultant     First Interim Payment           million         thousand Japanese Yen  JPY        000   which  corresponds to thirty percent  30   of the Construction Price  shall be paid  upon completion of fifty percent  50   or more of the Construction Work   The request for the first interim payment shall be submitted together with  the certificate of completion of the above mentioned works issued by the    Consultant and approved by the Client     Second Interim Payment           million         thousand Japanese Yen  JPY        000   which  corresponds to twenty percent  20   of the Construction Price  shall be  paid upon completion of eighty five percent  85   or more of the  Construction Work    The request for the second interim payment shall be submitted together  with the certificate of completion of the above mentioned works issued by    the Consultant and approved by the Client      4  Final Payment  see million          thousand         Japanese Yen  JPY             which  corresponds to ten percent  1076  of the Construction Price  shall be paid  upon completion of the Construction Work under this Contract   The request for the final payment shall be submitted together wit
320. on or against concrete surfaces before expiration  of one day after the removal of formwork of concrete  Rollers will not be permitted to  operate within 1 0 meter of structure walls  Within this restricted area  and other areas  where rollers cannot be used  the backfill shall be compacted by means of tamping  rammer or plate compactor     When a structure is constructed before the adjacent roadway is completed the Consultant  reserves the right to limit the amount of compacted backfill to be placed against the  structure above the original ground surface to the minimum that is determined to be  necessary for proper protection of the structure and to require the remaining fill to be  placed as roadway embankment     Tests   In order to properly check and follow construction of the embankment  the Consultant  during the course of the work shall execute tests to check grading  moisture content  in   situ dry density  relative density and any other test or measurement as required     The Contractor shall provide the necessary test equipment and personnel to conduct  these tests  as required by the Consultant     Slides    S 7 1 30    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    If slides occur in the embankment protection before the final acceptance of the Work  the  Contractor shall remove the material from the area affected and shall re construct that part  of the p
321. on the surface during or after compaction     Should be the addition of water to the embankment increase the moisture content to levels  greater than acceptable and the material become too damp to achieve good compaction   all work shall stop in that section of the embankment until the moisture content has been  reduced to the required value    Material which is too wet shall be removed or spread over the embankment and allowed to  dry  working it with disc harrows or scarifies until the moisture content is reduced within  the specified limits    Material for Filters  There are no limitations for the moisture content of this material    Subgrade Material  The following laboratory tests shall be carried out for the subgrade material       Standard compaction test ASTM D698 Method A or other equivalent   CBR test ASTM D1883    The CBR value of the subgrade material imported from borrow pit shall be notless than 3   Compacting Equipment  General  The compacting equipment shall comply with the following requirements  its use shall be  in accordance with the Specifications specified in the following and or as determined and  instructed by the Consultant as a result of the tests conducted during construction of the  embankment   The type and operation of the rollers shall be submitted to the approval of the Consultant  who shall be entitled at all time during the progress of the Works to instruct repairs  minor  alterations or variations which may be necessary for better compaction
322. onal but all costs required for doing so   including right of way  rent of land and like  shall be borne by the Contractor and shall be  deemed to be included in the Contract Price  Any delay or restriction caused by such  matters shall not relieve the Contractor of his obligation to meet the requirements of the  Contract  No extension of time shall be allowed for any delay caused thereby     Except otherwise provided for in the Bill of Quantities  no separate payment will be made  for complying with the provisions of this Clause and all costs shall not be paid separately  and shall be deemed to be included in the Contract Price     22 The Site    The Site as shown on the Drawings shall be the land or space to be used for the  execution of the Works  The Contractor shall as far as practical layout the Temporary  Works on such land or spaces so designated on the Drawings or directed by the  Consultant     The Contractor shall limit the movement of his crews and equipment on the right of way  including access routes approved by the Consultant so as to minimize damage to crops  and property  and shall endeavor to avoid marrying the land  Ruts and scars shall be  obliterated and damage to land shall be corrected  Before acceptance of the Works by  the Client the land shall be restored as nearly as practicable to its original conditions     The Contractor shall be responsible directly to the Client for any excessive or  unnecessary damage or injury to crops or land resulting from 
323. onsideration to working environments for workers so as to be  far from bad ventilation  big noise  operation of equipment in small space  lack of oxygen  and working in danger area     Temporary Fencing    S 7 1 91    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     4      5      6      7      8      9      10      11     9 4     1      2     The Contractor shall check on the preventive measures from neighborhood residents  and  passengers  invasion of the site by setting up temporary fencings and sign boards which  can make clear a construction area with temporary construction yards  A height of  temporary fence shall be higher than 1 8m    Gateway    The Contractor shall employ gate keepers to keep safety at entrances and exits from  vehicles passing through     Allocation of Watchers and Traffic Guides  The Contractor shall allocate the watchers to watch out for work conditions and the traffic  guides to draw on vehicles in the sites in correspondence with the progress and the  condition of construction works    Prevention of Fall Accident  The Contractor shall set up nets  sheets and pipes to prevent fall accidents of workers and  tools from heights  In case of working in heights the workers shall strap in safety belts with  ropes fixed to safety facilities    Clearing up of Site    The Contractor shall tidy up materials  tools and equipments with zoning for them in
324. ontract Drawings and requirements specified herein  or as instructed by the Consultant     Materials    The kind of timber for piling shall be as shown on the Drawings  All timber piling shall be  cut from the trunks of sound live trees  and shall be close grained  solid  free from such  defects as ring shakes  large and loose knots  decay  infestation  and other deformities  likely to diminish its strength  Sound knots will be permitted provided the diameter of  such knots does not exceed 10 centimeters  or 1 3 the diameter of the pile where the knot  occurs  Round piles shall be cut above the ground swell and shall taper from butt to tip   A line drawn from the center of the tip to the center of the butt shall not fall outside of the  cross sectional center of the pile at any point more than 1 per centum of the length of the  pile  In short bends  the distance from the center of the pile to a line stretched from the  center of pile above the bend to the center of pile below the bend shall not exceed 4 per  centum of the length of bend  and in no case exceeding 6 1 2 centimeters  All piles shall  be peeled of all rough and inner bark  All knots shall be trimmed close to the body of the    S 7 1 83    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     3     8 4    8 5   1      2     a     pile  Pile dimensions shall conform to the following requirements     Diameter at 1 
325. ontractor   a  manufacturer s   dully organized and existing under the law of J apan and having its principal place s  of    business at  Address of Manufacturer s    hereby accept to cooperate with  Name of  Tenderer  in providing after sales services and maintenance of the following Equipment for  at least two  2  years after the Guarantee Period regarding the captioned Project     Drainage P ump Vehicles  30m  min     Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of S igner     Name of Manufacturer     Authorized Signature of    Manufacturer   Signature     Name of Signer   Title of Signer     Name of Manufacturer     5 3 13    Volume     Section 3 The Flood P revention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya     FormJ      Letterhead of Local Agent  gt     CERTIFICATE OF AFTER SALES SERVICES BY  LOCAL AGENT FOR HYDRAULIC GATE WORKS    Date    th day of         2013  To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya  Dear Sir     This is to certify that we   Name of Local Agent   dully organized and existing under the law  of the Kingdom of Thailand with its principal place of business at  Address of Local Agent    hereby accept to cooperate with  Name of Tenderer  in undertaking after sales services and  maintenance of the following for at least two  2  years after the Guarantee P eriod regarding  the captioned Pr
326. ontractor in    the execution of its obligations under the Contract  the Client shall     11     111    11 2    11 3    121    discuss the solution with the Consultant  give a written notice to the  Contractor and send its copy immediately to JICA  Then the Client and  the Contractor shall consult mutually to settle such matters  The Client  shall properly inform JICA of its progress  If the Parties can not reach  agreement within thirty  30  days from the date of the notice  the Parties  shall comply with the dispute settlement process stipulated in Article 18    hereof     Article 11  Inspection and Delivery    Upon completion of the Construction Work for each interim payment   the Contractor shall request an inspection by the Consultant for each    interim payment     Upon completion of the Construction Work  the Contractor shall request  a final inspection for the Construction Work by the Consultant    When the Construction Work has passed the final inspection of the  Consultant with the certificate of completion of the Construction Work  issued by the Consultant and approved by the Client  the Construction  Work shall be delivered to the Client     When the certificate of receipt of the Equipment is issued by the Client or  issued by the Consultant and approved by the Client  after passing all  the required inspections  the Equipment shall be delivered to the Client     Article 12  Warranty against Defects    The Contractor shall warrant the Construction Work to be execu
327. or for the execution of the Works       the completion of the Works  such  temporary access roads shall be removed and left in the original condition to the  satisfaction of the Consultant  Especially  in bank protection work of Han Tra Canal  the  aggregate for temporary access road shall be completely removed before the  commencement of embankment     The Cost of the construction  maintenance and removal of the temporary access roads  provided under the Contract shall not be paid separately and shall be deemed to be  included in Contract P rice    2 7 Temporary Traffic Ramps Roads and Detour  In cases where it is necessary or required by the Consultant  the Contractor shall  construct and maintain  and remove temporary traffic ramps roads and detour through or  around the Works  and shall furnish all the labor and materials required therefor     2 8 Temporary Traffic Control    5 7 1 16    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    In order to facilitate traffic through or around the Works  or wherever instructed by the  Consultant  the Contractor shall erect and maintain at prescribed points on the work and  atthe approaches to the work  traffic signs  lights  flares  barricades and other facilities as  required by the Consultant for the direction and control of traffic     Where required  or where instructed by the Consultant  the Contractor shall furnish and 
328. orm other tasks within Time for Completion or within such time as may be  designated by the Consultant     If  in case of unreasonable delay in taking the measures mentioned in the preceding      5 10    The Flood Prevention Project of East Side of the Volume I  Section 5  Pasak River in Ayutthaya in the Kingdom of Thailand Conditions of Contract    29     30     31     32     33     paragraph  3   the Contractor fails without justifiable reason take such measures in  spite of the Clients notices to do so  the Client may take measures in lieu of the  Contractor and charge the expenses thereof to the Contractor     Partial Use     1  The Client may use parts of the Work or the Equipment during the progress of the  execution of the Work and or manufacturing upon obtaining the written consent of the  Contractor  In such case  the Client shall be responsible for custody of such parts      2 If any damage has been caused to the Contractor due to partial use mentioned in the  preceding paragraph  1   the Contractor may demand indemnification to the Client     Supplementary Provisions    Any and all matters not provided for in the Contract Documents shall be determined by  negotiation among the Client  the Consultant and the Contractor whenever necessities  arise     Import and Re export of Plant    The Contractor  including his Subcontractors prequalified in the Prequalification  shall be  allowed to import construction  amp  manufacturing materials  plants and equipments free of  
329. owed  disked or otherwise broken up  pulverized  moistened or  aerated as necessary  and thoroughly mixed and compacted  with the top fifteen  15   centimeters having a dry density of ninety five percent  9096  of the maximum dry density     If  during compaction of the first layers of fill  settlement occurs  which may indicated the    presence of unstable soils below foundation level  this area shall be excavated to remove  the loose material and backfilled with sand or fill similar to adjacent natural soils  and    5 7 1 25    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     5      6    a      b     compacted in layers not exceeding 20 cm  Removal  backfilling and compaction of visually  observed soft spots shall also be performed     Placing of Material for the Embankments    No material shall be placed until the foundation have been inspected and approved   before placing a layer  the compaction of the proceeding one shall have been completed  and its surface prepared  as instructed by the Consultant  with the object of increasing  adherence     Unless otherwise ordered  the whole of an embankment under construction shall be kept  at the same level along its length during the entire construction time  Material shall be  placed in such a way that free and easy drainage of surface water will be possible     The grading and distribution of material in compacted embank
330. ox  15m    To limit the height of wall  less than 4m height    Whenever work is suspended on any section for more than two hour  concrete surfaces  shall be considered as a construction joint  In such a case  the contractor is not allowed to  continue the concrete casting to avoid cold joints     Construction joints shall be arranged so as to reduce to a minimum the effects of  shrinkage in the concrete after placing  and shall be located in the most advantageous  positions with regard to stresses in the structure  Feather edges of concrete at joints shall  be avoided     The intersections of horizontal construction joints and the exposed faces of concrete shall  appear as straight lines  In the initial stage of setting  but before the final setting of the  concrete  the surface of the joint shall be washed with water and compressed air jets  with  the purpose of eliminating the mortar from the surface  removing loose parts  and laying  bare the coarse aggregates  without however removing them  After the proper time  interval has elapsed and prior to pouring of the following lift  the joint shall be cleaned  again with air and water jetting     If the surface of a lift is congested with reinforcement steel  and is relatively inaccessible   or if  for any other reason  it is considered undesirable to disturb the surface of a lift before  it is hardened  surface cutting by means of air water jets will not be permitted and the use  of wet sandblasting will be required  and shall
331. pacted  embankment     The Contractor shall consider the particular care in case of the following conditions     The embankment or backfill around pipe or small structure shall be proceeded from  both sides to avoid the uneven pressure      n case of the embankment above the original ground exceeding a gradient of 1 in 4   the bench cut of the existing slope shall be carried outto avoid the slippage      n case of the embankment beside concrete structure or the narrow area  small  equipment for the compaction such as tamping rammer shall be used     Dry Density Test    The dry unit weight of the compacted material shall be tested by means of samples  obtained from each layer  10096 of the samples shall equal or exceed 9596 of the   optimum dry density  for the material placed in the embankment     The  optimum  dry density is taken to be the maximum reached in the Test ASTM D 698  Method A or the equivalent  applying the correction for the presence of particles retained  on the No 4 sieve in accordance with the USBR Earth Manual  Chapter 1  Article 14 or the  equivalent     For tests necessary to determine the optimum dry density  the contractor shall conduct the  joint sampling with the Consultant at the designated disposal area  The sampling shall be  conducted in any case wherever is apparent change in the soil characteristics     The laboratory and subsequent tests on compacted embankment shall be carried out by  the Contractor in the presence of the Consultant     The Co
332. pecifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    7 1 CIVIL WORKS    TABLE OF CONTENTS    ES Ciz  124 RA e odie odiar          S 7 1 1  LT  Project DESCANSADO FER Y NEN NAR        S 7 1 1  1 2    DT WINS                                                                  5 7 1 2  1 3  Standard and  Tesung zio erem e ee onec i fade bet iota es S 7 1 5  1 4 Implementation Program and Reports   0    cece meme S 7 1 6  15 Materials and Plant to be Furnished by the                                                                S 7 1 8  1 6 Survey and Measurement of the          5            meme S 7 1 9  1 7   Security and Health  Cono ecos etri i Gee er tai S 7 1 10  1 8   Project                   ore rc tee                 ropa S 7 1 12  19 Sticker and Inscription                          mmm S 7 1 12   2  TEMPORARY WORKS cuales S 7 1 14  2 15 A                   ruere pet n eure ERR HER e Tha nF katie      S 7 1 14  PAD NS  EIE S 7 1 14  2 3 Mobilization and             1                                  mme S 7 1 14  2 4 Contractor s Office  Client s Consultant s Field Office                                             S 7 1 15  2 5  Temporary Renca aa S 7 1 15  2 6 Temporary Access         5                                                non cnn rre nennen nnne nnn nne S 7 1 16  2 7 Temporary Traffic Ramps Roads and                                                                     S 7 1 16  2 8 Temporary Traffic                             
333. ph  2  of paragraph 1 of the E N     Article 1 Amount and Purpose of the Grant   For the purpose of contributing to the implementation of the Project  JICA shall extend  a grant of the amount up to two billion five hundred and fifty million Japanese Yen     2 550 000 000   hereinafter referred to as    the Grant   to the Government of the  Kingdom of Thailand in accordance with the relevant laws and regulations of Japan and  within the scope of the E N     Article2 Availability of the Grant   The Grant shall be made available by concluding the present grant agreement   hereinafter referred to as    the G A   during the period between the date of entry into  force of the G A and April 30  2015  unless the period is extended by mutual consent  between JICA and the Government of the Kingdom of Thailand or the designated    authority  hereinafter referred to collectively as    the Authority       Article 3 Use of the Grant    1  The Grant shall be used by the Government of the Kingdom of Thailand properly  and exclusively for the purchase of such products of Japan or the Kingdom of  Thailand and such services of Japanese or Thai nationals necessary for the  implementation of the Project as listed below  The term    nationals    whenever used in  the G A means Japanese physical persons or Japanese juridical persons controlled by  Japanese physical persons in the case of Japanese nationals and Thai physical or  juridical persons controlled by Thai physical persons in the case of Th
334. plied so that     concrete does not lose moisture during the early stages of hardening     concrete is not cracked or damaged by high temperature or rapid changes in  temperature     surface of concrete are not damaged by traffic  nor discolored by chemical agents     All equipment needed for adequate curing and protection of a concrete pour shall be  ready to install before actual concrete placement begins     Curing shall commence as soon as concrete has set  and shall be continued for a  minimum period of seven  7  days after casting  on unformed surfaces or on surfaces  where the forms are removed before the end of the curing period    The method of curing shall be approved by the Consultant    Water Curing   Concrete  if water cured  shall be kept wet by covering with an approved water saturated  material  or by a system of perforates pipes  mechanical sprinkles or porous hose  or by  any other approved method which will keep all surfaces to be cured continuously wet   Water used for curing shall be supplied by the Contractor and shall not obtain substances  harmful to concrete     Membrane Curing    S 7 1 59    Volume I  Section 7 Specifications The Flood Prevention Project of EastSide of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     d     Concrete and precast concrete members may be membrane cured with an approved  pigmented curing compound in lieu of water cured  if so approved by the Consultant   Membrane curing shall be by application 
335. porary works  including roadways  footways  guard and fences   which may be necessary  because of the execution of the Work  for the use and  protection of the public and of owners and occupiers of adjacent land     2  Quality Assurance     1  The Contractor shall institute a quality assurance system to demonstrate  compliance with the requirements of the Contract  The system shall be in  accordance with the details stated in the Contract      2  Compliance with the quality assurance system shall not relieve the Contractor of  any of his duties  obligations or responsibilities under the Contract     3  Protection of the Environment    The Contractor shall take all reasonable steps to protect the environment  both on and off  the Site  and to limit damage and nuisance to people and property resulting from pollution   noise and other result of his operations     5 2 11    SECTION 3    FORM OF TENDER    The Flood Prevention Project of East Side of the Volume     Section 3  Pasak River in Ayutthaya in the Kingdom of Thailand Form of Tender    FORM OF TENDER    TABLE OF CONTENTS    FORM OF TENDER  FOIT   siii eee t tea eet o Pod      5 3 1  TENDER PRICE SCHEDULE  Form B  aro as 5 3 3  IMPLEMENTATION SCHEDULE  Form C   retreat 5 3 5  PERSONNEL DISPATCH SCHEDULE  Form Didi ecos S 3  6  SCHEDULE OF MAJOR CONSTRUCTION PLANTS  Form                                   5 3 7    SUPPLY GUARANTEE CERTIFICATE BY MANUFACTURER S  AS  SUBCONTRACTOR FOR HYDRAULIC GATE WORKS  Form F               
336. port  preparation of surfaces  forms  finishing  and curing  shall be in accordance with both the general prescriptions in the Specifications  of this Volume and the instructions supplied by the manufacturer of the non shrink  compound under the Consultant s approval   Gravel Surfacing   Description  The Work under this item shall consist of gravel surfacing placed on the prepared surface  for concrete structures and other areas as shown on the Shop Drawings or instructed by  the Consultant    Materials   Gravel shall be crushed stone  crushed slag  or crushed or natural gravel   The surfacing material shall be free from flat and elongated particles  and generally   particles of the material shall be spherical or cubical in shape  Unless otherwise specified   the maximum size of the material shall be 50 millimeters    Requirement    The areas where the gravel surfacing to be applied shall be compacted and completed  and be subjectto the approval to proceed the work by the Consultant     The gravel surfacing when thoroughly compacted shall conform to the grades and  dimensions shown on the Contract Drawings or otherwise established  After the material  has been spread  it shall be adjusted in the water content to attain optimum moisture  content    Rolling of the material shall be performed with suitable compaction equipment which shall  be subject to the approval of the Consultant  The material shall be compacted to a density  of notless than 9096 of the maximum dry density  
337. pply and install joint filler at the locations and of the thickness  shown on the approved shop drawings or as instructed by the Consultant     J oint Filler    Where joints are shown on the approved Shop Drawings as having elastic joint filler  or  Celotex with coal tar  the joint shall be filled with preformed joint filler and sealed with joint  sealer  The Contractor shall cut the material to cover the entire contact surface of the  joints  and to the fit around the opening  The exposed edges of joint filler sheet placed on  a joint shall be at least One  1  centimeter back from the finished surface of concrete  to  allow joint sealer material to seal the gap     Materials   Preformed J oint Filler   Shall consist of a bituminous  asphalt or tar  mastic composition  The mastic shall  comprise mineral filler and reinforcing fibers  formed and encased between two layers of    bituminous impregnated felt     When the filler has to be placed against vertical concrete surfaces  it shall be glued on the  contraction joint by means of coal tar or asphalt material     J oint Sealer   Shall consist of a mixture of fifty  50  parts by weight of bituminous binder and 50 parts by  weight of sand  Mixture will become sufficiently fluid when heated to approximately 150     200  C  so as to flow freely without mechanical manipulation  Application of the mixture  Shall be done whilst hot  For vertical joints a proprietary brand of sealer may be used if  approved by the Consultant     The 
338. prior to discharging an explosive  that the area to be blasted  in clear of all residents  pedestrians and vehicular traffic  In addition he shall post  flagmen on each of the roads entering to the said area so as to stop and prevent any  traffic from entering into that area until the  all clear  notification is given     The locations of explosive magazines shall be approved by the Consultant  Above   ground gasoline and liquefied petroleum gas storage tanks shall not be located within the  limits of the camp site or closer than 100 meters to any building in the Site  The  contractor shall not make use of any explosives without the written approval of the  Consultant  Approval by the Consultant shall not relieve the Contractor of his  obligations and responsibilities for all blasting operations  if any     Precautions for Safety    The Contractor shall take all necessary precautions against risks of loss of life or of injury  to any person employed on the Works or to employees of the Client and the Consultant  or to visitors or to persons having good and sufficient reasons to be about the Works  and  to this end shall properly safeguard the Works to the satisfaction of the Consultant     The Contractor shall furthermore take all necessary precautions against damage to the  property of the Client or of others located at or adjacentto the Site  The Contractor shall  at all times comply with any accident prevention regulations and any safety regulations of  any local or nationa
339. proved drawings  within the tolerances specified  The hoist drums shall be  located and adjusted so that they are in true alignment with the gate sheaves and lifting  lugs of the gate     Control panels shall be installed in accordance with the  Approved drawings      3 9 2 Field Tests and Inspection    After completion of erection and installation work at the site  the Contractor shall perform the  tests to prove satisfactory erection and installation works  in accordance with the approved test  procedures  The test and inspection shall include  but not be limited to       Visual inspection of position and assembly sequence of parts  edge preparation  size   length and location of welds  and overall finishing       Inspection of satisfactory installation of all components       Inspection of welds by radiographic testing for detecting inner flaws and defects of  welded parts including gate leaves  gate guides and hoists       Inspection by feeler gauge measurement of satisfactory sealing of all seals     Insulation resistance tests of all wiring and electrical connections made at site     Insulation resistance tests of lightning arresters       Check of limit switches  wire rope slack detectors  overload detecting devices  gate  position indicators and control equipment       Check of gear tooth contact     Check of appearance and performance of brakes for hoists       Check of appearance and arrangement of wire ropes     S 7 2 50    The Flood Prevention Project of East Side
340. r for all sets to  procure     If the Equipment including the major and important parts fails to conform to the  Specifications as a result of such inspections  the Consultant may reject them and  the Contractor shall either replace the rejected Equipment  including the major and  important parts  or make all alterations necessary to meet the requirements      b  Adjustment     c     The Equipment shall be brought into suitable conditions by the Contractor and or  his Subcontractor for giving the specified performance at site  The Contractor  and or his Subcontractor shall make proper adjustment to settle the Equipment  into specified conditions for performance  All works must be done to the  satisfaction of the Client  and the Contractor and or his Subcontractor shall carry  out his work in a neat and proper workmanlike manner  The adjustment shall be  planned and carried out in no way to damage the Equipment  All tools  fuel   materials  labors  logistics etc  shall be provided by the Contractor and or his  Subcontractor     Commissioning  Acceptance Tests     The Contractor and or his Subcontractor shall check all components of the  Equipment to ensure that their conditions are good and adequate for giving the  specified function  Commissioning  acceptance tests  at site shall be required in  order to check the function of the Equipment in the presence of the Client and the  Consultant before finaly handing over to the Client  Time to spend the  commissioning is assumed to
341. r shall provide a performance security issued by a  Japanese financial institution  which secures the proper execution of all  the Contractor s obligations during the period from the date of signing of    this Contract to the date of issue of certificate of completion of the Work    Pis    13 2    13 3    14 1    14 2    14 3    14 4    of this Contract  The Consultant shall have the custody of the    performance security     The amount of the performance security shall be ten percent  1076  of the    Contract Price     The performance security shall be released immediately after the issue of  the certificate of completion of the Work by the Consultant with the  approval by the Client     Article 14  Advance Payment Security    The Contractor shall provide an advance payment security issued by a  Japanese financial institution  which secures the repayment of any sum  advanced by the Client upon the Contractor s defaults from the date of  the advance payment to the date of the issue of certificate of completion    of the Construction Work     The amount of the advance payment security shall cover the amount to    be paid as the advance payment for the Construction Work     Prior to requesting the advance payment  the Contractor shall provide  the advance payment security and the Consultant shall have the custody  of the advance payment security  Such security shall be returned to the  Contractor immediately after the issue of the certificate of completion of    the Constructio
342. r the Project  is desirous    of having the works for the Project carried out by the Contractor  and    WHEREAS  the Contractor is willing to execute the works on the terms and    conditions as set forth in this Contract     NOW  THEREFORE  in consideration of the mutual covenants hereinafter    contained  the parties agree as follows     Article1  Definitions    In interpreting or construing this Contract  the following expressions shall  have the meanings hereby assigned to them except where the context otherwise    requires      Ihe Exchange of Notes  means the notes exchanged between the  Government of the Kingdom of Thailand and the Government of Japan on the  5th day of July  2012  hereinafter referred to as  the E N   in connection with  the Grant Aid from the Government of Japan concerning the Flood Prevention    Project of East Side of the Pasak River in Ayutthaya      Ihe Grant Aid  means a scheme of Japanese official development    assistance      Ihe Grant  means the amount for the implementation of the Flood  Prevention Project of East Side of the Pasak River in Ayutthaya  which is  stipulated in the Grant Agreement      The Grant Agreement  means the agreement signed on the 15th day of  August  2012 between the Government of the Kingdom of Thailand and JICA   hereinafter referred to as  the G A     in connection with the execution of the  Grant for the implementation of the Flood Prevention Project of East Side of the    Pasak River in Ayutthaya        The Proje
343. ra Mang canals connecting to  Pasak River  is used to function as drainage channel to lead drainage water to the Pasak  River from lowland area at the left bank of the Pasak River  During year 2011 flood  the  gate leaves of Kha Mao floodgate were closed because the flood water from the Pasak  River came to enter into both Han Tra and Kra Mang canals  The existing gate height was  not enough against the river side flood water level at the floodgate location  Then  the  floodgate came to be hazardous to the destruction and then the gate leaves of the  floodgate were judged to open  The flood water flowed upstream Kha Mao canal and  overtopped extensively the dikes  Finally  the southern area of Kha Mao canal including  lots of industrial estates came to be inundated    In above mentioned background  the Government of J apan decided to carry out the Food  Prevention Project of East Side of the Pasak River in Ayutthaya in order to assist the  Government of Thailand to take measures for preventing recurrence of the same  magnitude of flood damage for the safety of dwellers in this area and industrial parks  located downstream     Scope of Contract    The works to be carried out under the Contract shall  unless otherwise stated in the  Contract  include furnishing all materials  labor  equipment  constructional plant   transportation and others  for execution  completion  commissioning and maintenance of  Works in strict accordance with the Contract  as required by the Consultant 
344. ractor and the entire tests shall be repeated to the satisfaction of the Client and the  Consultant     4  STOPLOGS  MAINTENANCE GATES  AND HOISTS    4 1 General    Telpher rails  plate girder structure steel slide gate leaves  stainless steel gate guides  lifting  beams  chain hoists and appurtenant equipment with all the necessary accessories  shall be  designed  manufactured  transported  erected  installed and tested at Han Tra and Kra Mang  Floodgates by the Contractor under this Contract     The stoplogs  or otherwise maintenance gates  are used for the purpose of inspection   maintenance and repair of the main gates  amp  equipments and the stoplogs shall be usually  stored in place designated by the Client     The stoplogs shall be mounted by the manual type chain hoist through a lifting beam     The general data for the design of the stoplogs are given in Sub clause 4 3 herein and those  data shall be fixed and may not be altered     The Contractor shall take special care in the design of the stoplogs to avoid any water leakage  in due mounted position     The arrangement of the telpher rails  stoplogs  gate guides and chain hoists for Kra Mang and  Han Tra floodgates shall be as shown on the attached Drawings     4 2 Design Stresses    The design stresses shall conform to those specified in Clause 2  Design Criteria and  Particulars  of the specifications     4 3 Design Data    The gate leaves  gate guides  lifting beams and telpher rails shall be designed by the Co
345. rea     Bending stress at compressive side   for gross sectional area     100 N mm   100 N mm    On condition of   1 6   lt   10 K    100 N mm     On condition of   I b  gt   10 K      100  0 9   Kl b      10     90 N mm     90 N mm     On condition of   I b  s  10 K    90 N mm     On condition of   I b  gt   10 K    90     0 70   Kl b      10     where     distance between fixed points of compressive flange  mm     b  width of compressive flange  mm   Aw  2        Aw  gross sectional area of web plate  mm    Ac  gross sectional area of compressive flange  mm    In case of  Aw Ac     2  K is taken as 2            3         On condition that compressive 100 N mm  90 N mm   flange is directly welded to skin   plate  etc    Shear stress 60 N mm  30 N mm    for net sectional area    Bearing stress 150 N mm  135 N mm     S 7 2 23    Volume     Section 7 Specifications  7 2 Hydraulic Gate Works    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Note When stainless steel material other than those mentioned in the above table is used  its  allowable tensile stress for normal loading condition shall not exceed 50 percent of the yield  point strength or proofing strength of the steel material used whichever is the least  All other  allowable stresses shall proportionally be computed according to the above table based on  the allowable tensile stresses     c  Steel casting and forging    unit of stresses  N mm    Allowable Stress 
346. removed from the surface of contact with  masonry or concrete  The excavation shall be in accordance with the dimensions  levels  and grades shown on the approved Shop Drawings  Where called for on the approved  Shop Drawings or by the Consultant  the surface of foundations excavation shall be  adequately protected  Any depression in the excavation shall be filled with random fill  material  as instructed by the Consultant  The fill shall be placed in layers  moistened and  compacted in accordance with Clause 8 hereafter    Material which cannot be compacted by rollers because of inadequate clearances shall be  spread in layer of 20 cm and compacted with power tampers to a density equal to that  specified for compaction with roller  After filling of depression and immediately prior to  concreting  the entire surface of the foundation shall be compacted as instructed by the  Consultant     Foundation for Drain Structures    The areas which drains are to be placed shall be trimmed and made smooth to agree with  the lines and grades shown on the approved Shop Drawings or as instructed by the  Consultant and shall be compacted as specified hereafter     The drain material shall be placed directly on the excavated surface  Immediately prior to  placing such material  the prepared surface must be inspected and approved by the  Consultant     Foundation for Embankment    After clearing  grubbing and stripping in accordance with Sub clause 3 1  ground surfaces  shall be scarified  pl
347. reparation of Tender     1     The tender shall be prepared and submitted by filling out the forms and documents  provided on the Forms of Tender  Each of the forms shall be completely filled in  indelible ink or typewritten or computer printouts       interlinings  erasures  or  crossing out   addition  or alteration may be allowed  If the documents submitted by  the tenderer do not meet the requirements mentioned above  the tenderer may be  disqualified     The tenderer shall submit the followings     1  PowerofAttorney  duly signed by the legal representative of the tenderers     2  Certificate of Signature of the issuer of the said Power of Attorney   authenticated by the Chamber of Commerce and Industry in J apan      Envelop A     3  Implementation Schedule  Form C   4  Personnel Dispatch Schedule  Form D   5  Schedule of Major Construction Plants  Form E     6  Supply Guarantee Certificate by Manufacturer s  as Subcontractor for  Hydraulic Gate Works  Form F     7  Supply Guarantee Certificate by Manufacturer s  as Subcontractor for  Drainage Pump Vehicles  Form G     8  Certificate of After Sales Services by Manufacturer s  as Subcontractor for  Hydraulic Gate Works  Form H     9  Certificate of After Sales Services by Manufacturer s  as Subcontractor for  Drainage Pump Vehicles  Form 1     10           Certificate of After Sales Services by Local Agent for Hydraulic Gate Works   Form J      11  Certificate of After Sales Services by Local Agent for Drainage Pump  Veh
348. rfaces prominently  exposed to view where good appearance is of special importance  unless otherwise  shown on the construction drawing     Approval of Finishes  The degree of surface finish of the concrete shall be inspected and approved by the    Consultant for each day s work or immediately after stripping the formwork  Any necessary  correction will be carried out immediately     S 7 1 61    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     22      23     Construction Tolerance    The variation in dimensions  alignment  and grades  or any concrete from the dimensions   locations and grades shown on the Shop Drawings  or required by the Consultant  shall be  within the tolerance specified in the following table     No confusion shall however be made between the irregularities described in the Clause 14  above and those which are the object of this Clause           Structure Tolerance in millimeters  a  All structures except as specified in c  and d   20  b  Floor and wall openings  20  c  Exposed columns  thin walls  sluice ways  10  d  Structure with guides or which will be in  5    contact with items of the Permanent  Equipment having close tolerances  e  Lining  5                The Consultant may require that the Contractor repair  or remove and replace at his own  expense  any concrete work that exceeds the limits specified above     The thickness of concrete lin
349. ring the reporting period     The environmental monitoring results    The activities and events relating to the safety and health management      Any other matters which may be required under the Contract or statement  concerning the matter arisen from or relating to the execution of the works during the  reporting month     Daily  Weekly and Monthly Schedules    The Contractor shall submit two  2  copies of a weekly schedule in a form approved by  the Consultant at the end of each week for the succeeding week  The schedule shall  contain  but not be limited to  the following items  earthwork  concrete work  and other  construction work related to the execution of the Works  procurement of materials   transportation of materials and equipment  and other schedules required by the  Consultant     The Contractor shall submit two  2  copies of a written daily working schedule and  progress in a form approved by the Consultant everyday for the succeeding day  The  schedule shall contain  but shall not be limited to  earthwork  concrete work  and other  activities related to the execution of the Works     The Contractor shall prepare a monthly bar chart type schedule at the end of each month  for the succeeding month  This schedule shall show the time span from the start to the  end by each main activity with the anticipated work quantities  The schedule shall be  submitted to the Consultant by the 3rd day of each month for his review and comments   The submission to and approval b
350. rive or equivalent    Monitor  21 5 inch class liquid crystal monitor  Software in English version to be provided     Microsoft Windows 7 Professional 64bit     Microsoft Office P rofessional latest version     Virus protection program latest version     Adobe Acrobat   32V liquid crystal TV set  1 no    Air conditioner 6 3 kW class  1 no    Cool and hot water server   1 no    Refrigerator 200 liter class   1 no              The cost of the construction  maintenance and subsequent removal of the Contractor s  office  Client s Consultant s field office  Stores  Workshops  Labor Camps provided under  the Contract shall not be paid separately and shall be deemed to be included in Contract  Price     2 5 Temporary Fencing    5 7 1 15    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    If required  the Contractor shall erect and maintain at his own expense suitable and  approved temporary fencing to enclose such area of the Works to be carried out and all  areas of land occupied as may be necessary to implement his obligations and to the  satisfaction of the Consultant     The cost of the erection  maintenance and subsequent removal incurred by the  Contractor in complying with the obligations under this sub clause shall not be paid  separately and shall be deemed to be included in Contract P rice     2 6 Temporary Access Roads    The Contractor shall construct and maintain t
351. rk   3 2 Civil work       3 3 Design and manufacture of hydraulic gates       3 4 Transportation of hydraulic gates       3 5 Installation of hydraulic gates  3 6 Commissioning test and O amp M training         Bank Protection of Han Tra Canal  4 1 Temporary work  4 2 Civil work         Demobilization     Procurement of Drainage Pump Vehicles  6 1 Design  manufacture and transportation  6 2 Commissioning test and O amp M training                               Specimen Signature   Signature   Name of Signer   Title of Signer     Name of Tenderer       3 5    Volume     Section 3 The Flood Prevention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya     Form D   PERSONNEL DISPATCH SCHEDULE    Date    th day of        2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Tenderer shall provide the following details concerning the key staff members to be  employed for assuming the Work of the Project     Assignment   1  Project Manager   2  Civil Engineer   3  Hydromechanical Engineer    4  Electrical Engineer    5  Others  Description     Proposed Period of Services at Site     Name     Nationality  m Age     Education     Qualification     Relevant Experience in Major Projects     Employment History    Specimen Signature   Signature   Name of Signer   Title of Signer     Name of Tenderer     5 3 6    The Flood Prevention Project of    East Side of the Pasak River in Ayutthaya    Volume    Section 3  Form of Tender       Form E
352. rnish  install  operate and maintain all the necessary pumps   wellpoints and other equipment as may be necessary to ensure the removal of surface  and subsurface water from the various parts of the Works  After having served their  purpose  all pumping equipment or any other temporary dike  ditch  discharge or  protective weir shall be removed and the grounds shall be restored to their original or  required lines and levels     Nothing in this Clause shall relieve the Contractor from full responsibility for the  adequacy of the Temporary Works or equipment to be provided for water control and  dewatering     The type of dewatering plant  the design  drawings and calculation  and arrangement of  dewatering and protective works shall be subject to the approval of the Consultant     Method of Water Control  The Contractor shall choose the appropriate protective works e g  earth dikes or double    sheet pile cofferdam  etc   judging from the existing soil condition or existence of existing  utilities  etc     S 7 1 17    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     3      4      5      6      7     Especially  in Kra Mang canal  the Contractor shall ensure the minimum clearance 5m  from the existing oil pipe  which is located between the road bridge and railway bridge     The Contractor shall ensure the proper maintenance of dewatering system by the  provision of watch
353. rol panel   b  Number   1 unit   c  Capacity   1 phase 220 V   3 phase 440 V x 60 Hz  125kVA or more    Power necessary to run all drainage pumps  all lighting  apparatus and control panel etc  shall be supplied    d  Engine   Water cooled diesel   e  Fuel tank   200 liter or more                           S SPECIFICATIONS       E  2 3   Consultant  Evaluation    Ic     S    Specification Sheets of Drainage Pump Vehicle    E  3 3   CODE NO  EQUIPMENT  Drainage Pump Vehicle    EQUIPMENT  Drainage Pump Vehicle    Pump Vehicle   Qty  10 unit     Qty  10 unit   10 unit PY Constant  CLIENT S SPECIFICATIONS NN      S SPECIFICATIONS Evaluation       4  SPARE PARTS    The following shall be applied to each set of the Drainage Pump Vehicle    1  Working Condition    a  Drainage pump   1 unit    b  Drainage hose   Diameter 200 mm x Length 25 m x 3    Lighting Apparatus  Condition   Lighting apparatus shall be provided to light up surrounding area of the vehicle     Floodlights    High intensive discharge  HID  lamps    Cabtire cable 20 m lamp or more  with waterproof connector     Manually shrinkable to up  amp  down and rotational to right  amp  left   6  Control Panel   a  Condition   There shall be stored inverter devices for start and rotation speed  control of drainage pumps  and operating control of each drainage  pumps and on off of lighting apparatus shall be possible     Power supply connectors to drainage pumps shall be waterproof and  easy to connect power cables of drainage
354. rotection at his own expense     4  ROADWORKS  4 1 Base Course   1  General    Base course for road pavement shall be constructed in accordance with the details shown  on the approved shop Drawing or as instructed by the Consultant      2 Samples  Tests and Materials   a  Samples    Samples of Pavement  Base course materials shall be furnished free of charge by the  Contractor in the quantities required by the Consultant  The samples shall be submitted  for approval sixty days prior to start the work on pavement construction  and thereafter at  regular interval during construction  if required by the Consultant  These samples shall be  obtained at the source from test pits borings  stockpiles  or from other locations  designated by the Consultant     Samples for grading  liquid limit determination  plasticity index and wear tests shall comply  with ASTM Designation D75 or Equivalent  Standard Method of sampling stone  slag   sand   Samples for density tests shall be taken after the material has been placed and  compacted  as specified in AASHTO T147 or equivalent   Standard Method of Test for  Field Determination of Density of Soil in Place   Extraction of samples will be supervised  by the Consultant      b  Tests    Test on the laterite pavement  sub base and base course materials will be performed by  the Contractor and testing results shall submit to the Consultant for approval      c  Materials    Material for base course shall consist of a natural or artificial mixture 
355. rotection shall be of such nature that the  reinforcement can be thoroughly cleaned without difficulty prior to subsequent easement  in concrete     Concrete Protection for Reinforcement   The reinforcement shall be covered by the thickness of concrete indicated on the  approved Shop Drawings  Where not shown  the clear concrete cover shall be as follows    a  All stair slabs and landings  use 2 5 cm    b  At underside of bridge slabs exposed to weather  use 2 5 cm    c  Structures exposed to weather or backfill or submerged  use 5 cm    d  Face of concrete exposed to scour  use 6 cm  for fresh water    e  Concrete placed directly against earth or rock or surface subjected to corrosive liquid    use 8 to 10 cm   Tolerances  a  Tolerance in the thickness of concrete covering   0 6 cm  if the concrete cover is less  than 10 cm  0 to 2 cm  if the concrete cover is more than 10 cm   b  Tolerance in the spacing between bars provided this is not systematic    10  of  Spacing    Approval of Reinforcement  The Contractor shall obtain the approval of the Consultant for the reinforcement when  placed and before any concrete is deposited in the forms   Water Stops   General  This Clause covers the supply and installation of the water stops used water seals in  construction joints of concrete structures   Water stops shall be placed in joints of the structures where shown on construction  drawings and elsewhere as instructed by the Consultant    Material    The water stop shall be extrud
356. rroundings and to  obtain for themselves  on their own responsibilities and expenses  all information  that may be necessary for preparing the tender  if any     To the extent which is practicable  taking into account of cost and time   the  tenderers shall be deemed to have obtained all necessary information as to risks   contingencies and other circumstances which may influence or affect the tender or  the Work  To the same extent  the tenderers shall be deemed to have inspected  and examined the Project site  its surroundings  the above data and other available  information  and to have been satisfied before submitting the tender as to all  relevant matters  including  without limitation      mn      the form and nature of the Project site  including sub surface conditions     NA      the hydrological and climatic conditions    3  the extent and nature of the Work and goods necessary for the execution and  completion of the Work and remedying of any defects    4  the laws  procedures and labor practices of the country  and   5  the Contractor s requirements for access  accommodation  facilities   personnel  power  transport  water and other services    No claim whatsoever shall be made as a result of ignorance of local conditions on    the part of the tenderers and such ignorance shall be a responsibility of the  tenderers     Eligible Source Countries    The Equipment to be supplied under this tendering  See the list of the Equipment in the    Specification attached   sha
357. rs and consolidated by rolling or  tamping     Source of Embankment Material    5 7 1 24    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     4    a      b      c      d     Materials for compacted embankment in platform  roads  and for compacted backfill of  structure excavations shall be obtained from the excavation of the Works and or from  borrow areas prepared by the Contractor under the approval of the Consultant     Preparation of Foundation Surfaces  General    Before commencing the placing of any fill  masonry or concrete  the surface of the  excavation shall be properly trimmed  cleaned and treated or compacted as hereinafter  specified     Commencement of placing of fill  masonry and or concrete on such surfaces shall be  subject to the approval of the Consultant  All excavations made for subsurface  investigations and all other existing cavities found within the area to be covered by  embankments shall be restored with compacted fill material as specified in Clause 8  hereafter and or as instructed by the Consultant  The surface of each portion of the  foundation  immediately prior to placing the fill masonry or concrete  shall have all water  removed from depressions  shall be properly cleaned or where necessary moistened to  obtain a good bond with the fill     Foundation for Masonry and Concrete Structures    Loose materials and organic residues shall be 
358. rs request to use any quarry the Consultant will  approve or reject such request  The Consultant will reject a quarry proposed by the  Contractor unless the Contractor has drilled a sufficient number of holes and made other  investigations and a complete range of laboratory tests on the materials has been made   The tests of aggregates shall include specific gravity  absorption  abrasion test  soundness  by sodium sulfate  petrographic analyses  alkali aggregate reaction  organic impurities and  any other tests which may be necessary to demonstrate that concrete of acceptable  quality can be produced from the materials proposed     Approval of a source of aggregate shall not be construed as approval of all materials  obtained from the source and the Consultant can at any time withdraw approval if  laboratory tests establish that the material is no longer suitable     When crushed and uncrushed aggregates are mixed  they shall be blended uniformly and  the crushing and blending operations as well as the amount of crushed material blended  shall at all times be subject to the approval of the Consultant     The Contractor shall carefully clear  at the Contractor s expense  the area of the quarry or  deposit from which the aggregates are to be produced     Preparation of quarry area shall be performed in accordance with Sub clause 3 1     Developing Alluvial Aggregate Deposit    The Contractor shall carefully clear the area from which aggregates are to be procured  of  trees  roo
359. s and shall be ground finish     5 5 3 Wheel Rail and Wheel Track    The wheel rails shall be provided at the drainage channel side of the gate slots to transfer the  wheel loads to the concrete structures  The wheel rails shall be provided with the wheel tracks  made of stainless steel  and its surfaces shall be machine finished to true flat  The wheel rails  shall be   or H shape steel     The wheel tracks shall be of stainless steel SUS 304     5 5 4 Side Wheel Track    The side wheel tracks  which are otherwise as the guide plates  shall be provided at the canal  side of the gate slots to transfer the wheel loads of the side wheels to the concrete structures     The side wheel tracks shall have ample strength to resist the load from the side wheels of the  gates  The assembled side wheel track shall be straight over their entire length and no offset    S 7 2 64    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    shall exist at joints  The side wheel tracks shall be square shape and made of stainless steel  SUS304     5 5 5 Lintel Guide Plate    The lintel guide plate shall be provided on the second stage concrete made on the curtain wall   The lintel guide plate shall be of stainless steel SUS 304     5 5 6 Tolerances    The gate guide shall be accurately fabricated and installed within the following tolerances           Points to be measured Tolerances  mm
360. s shall be provided for each wire rope end of  all stationary type hoists  including gantry crane     Drums of hoists shall be completely covered by steel or other metal guards  unless effectively  guarded by adjacent structures for safety     2 11 3 Couplings    Flexible chain or gear type couplings with means for field adjustment shall be provided where  drive shafts are required to be connected     2 11 4 Bearings    Bronze bushed bearings shall be used for all low speed shafts  and high speed ball or wheel  bearings shall be used for all other locations     Shafts and bearings shall be proportioned so that the length does not exceed one and one half    times the shaft diameter for bronze bearings not so as to exceed an allowable bearing stress at  the projected area     S 7 2 30    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    2 11 5 Keys and Keyways    Keys and keyways shall be designed in accordance with the relevant standards  Where taper  keys are used  they shall be provided with a gig head or other suitable provisions to facilitate  withdrawal  Feather keys shall be secured in position by means of counter sunk screws through  the key     2 11 6 Dowels    Gear boxes and bearings which have to align accurately shall be retained in position by means  of fitted dowels during assembly     2 11 7 Manual Operating Devices    The manual operation device sh
361. sary measures      a  to secure lots of land necessary for the implementation of the Project and to clear    the sites      b  to provide facilities for distribution of electricity  water supply and drainage and  other incidental facilities necessary for the implementation of the Project outside    the sites referred to in  a  above      c  to ensure prompt unloading and customs clearance of the products referred to in  Article 3 at ports of disembarkation in the Kingdom of Thailand and to assist  internal transportation of the products referred to in Article 3 therein      d  to ensure that customs duties  internal taxes and other fiscal levies which may be  imposed in the Kingdom of Thailand with respect to the purchase of the products  and the services referred to in Article 3 be exempted      e  to accord Japanese nationals and   or nationals of third countries whose services  may be required in connection with the supply of the products and the services  referred to in Article 3 such facilities as may be necessary for their entry into the  Kingdom of Thailand and stay therein for the performance of their work  the term     nationals of third countries  means physical or juridical persons                countries        f  to ensure that the Facilities and the products referred to in Article 3 be maintained  and used properly and effectively for the implementation of the Project      g  to bear all the expenses  other than those covered by the Grant  necessary for the    
362. se  which cost shall not be  paid separately and shall be deemed to be included in the Contract Price     17 Security and Health Control     1      2                      All security and health controls necessary for the execution of the Works such as but not  limited to  sanitary arrangement  land clearing of Site  explosives and fuel  temporary  fencing  safety precautions and fire prevention  shall be established and maintained by  the Contractor at his own expense  The Contractor shall make himself responsible for  all security and health controls and shall submit to the Consultant for his approval the  organization and the regulations for these purposes     Security Control System   The Contractor shall establish the security control system and its organization for the  Works and submit the program to the Consultant for his approval  The security control  system shall have a sufficient capacity of equipment  facilities and persons to avoid  accidents and damages to the persons and properties concerned    The security control system shall be operated in accordance with the approved program  which shall be established on the basis of the Kingdom of Thailand n laws and  regulations     The Consultant or the Consultants Representative shall have the right to instruct the    S 7 1 10    The Flood Prevention P roject of East Side of the Volume 1  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     3      4      5     Contractor in
363. se White  or Neutral phase  Non grounding second phase Black  Ground conductor Green  or yellow green  Direct current Positive Red  Negative Blue  Item Description Color  Main circuit Yellow and black  Control circuit A C  Yellow  D C  Yellow  Voltage transformer Yellow  Current transformer Yellow  Ground conductor Green    3  FIXED WHEEL  ROLLER  GATES AND HOISTS    3 1 General    Three  3  complete sets of plate girder structure stainless steel fixed wheel  roller  gate leaves   stainless steel gate guides  motorized gate hoists  controls and appurtenant equipment  complete with all the necessary accessories shall be designed  manufactured  transported   erected  installed and tested in the Canals of Han Tra and Kra Mang by the Contractor under  this Contract     The new floodgates shall be used for preventing the reverse flow from the Pasak River during  flood season while these gates keep opened during non flood season     The general data for the design of the fixed wheel gates are given in Sub clause 3 3  Design  Data  herein and these data shall be fixed and may not be altered     The overall arrangement of the floodgates shall be as shown on the attached Drawings     3 2 Design Stresses    The design stresses shall conform to those specified in Clause 2  Design Criteria and  Particulars  of the specifications     3 3 Design Data    S 7 2 37    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in 
364. sets  speed reducer  bearings  torque shafts  couplings  supporting  brackets  manual operating device  mechanical position indicator  central lubrication system   and electrical equipment such as electromagnetic brake mounted motor  limit switches  and all  other necessary components for safe  proper and efficient operation of the gate     Hoist drum and open gears shall be enclosed in the steel plate housing to protect operator from  the danger  Provision shall be made on the steel housing for supply of lubricant and for visual  inspection without removal of the steel plate housing     The closed speed reducer shall be of helical gear reducer or other type  approved by the  Consultant  which is rationally arranged on the operation deck and gives the performance set for  in these Specifications  The electric motor shall be provided with electro magnetic brake     The frame works shall of all welded construction using rolled structural shapes or built up  shapes  and rigidly be fixed to the anchors set by other contractor in primary concrete on the  hoist deck     The hoist shall be designed to withstand the maximum hoisting load at the specified allowable  unit stresses and the factor of safety     S 7 2 45    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    The mechanical and electrical components shall conform to those specified in Sub clauses 2 11   Mechani
365. singular only also include the plural and vice versa    where the context requires  Words indicating one gender include all genders     Article 2  Basis of Contract    Any and all stipulations of this Contract shall be consistent with the content    of the G A  Should any of the stipulations of this Contract be in conflict with  the G A  such stipulations shall be rectified to be consistent with the G  A     Article 3  Scope of Work    3 1 The Contractor   s works to be rendered under this Contract shall consist  of the following items specified in the Contract Documents   3 11 Construction Work      Kra Mang Floodgate 1 site    Han Tra Floodgate 1 site    Bank Protection of Han Tra Canal 484m    3 1 2 Procurement Work    Drainage Pump Vehicle  30m   min  10 sets    3 2 The scope of the Work prescribed in Sub Paragraph 3 1 above shall  include site survey  design and supply for temporary works  permanent  installation of the equipment and materials  performance test   transportation  insurance and all other things required in and for the    Project implementation in due conformity with the Contract Documents     3 3 The scope of the Work prescribed in Sub Paragraph 3 1 may be amended  and modified pursuant to mutual agreement in writing under this    Contract   Article 4  Period of Execution of Work  41        Contractor shall commence the Work within fourteen  14  days from    the date of receipt of the notice of the commencement of the Work issued    by the Consultant     4
366. snn m S 7 2 66  5 8 Commissioning  Acceptance                                                                         S 7 2 67  6  ELECTRIC POWER SUPPLY SYSTEM                                                      S 7 2 67  6 1 Generali             e tts      S 7 2 67  6 2 Local Distribution Panels                                            nennen S 7 2 68  6 3 Diesel Engine Generator                                              S 7 2 71    S 7 2 iv    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    1  GENERAL    1 1 Scope of Works    The Scope of Works to be done under this Contract shall consist of the detailed design   manufacture  anti corrosive protection  shop tests and inspection  packing  ocean  amp  inland  freight  customs clearance  site storing  field erection and installation  field tests and inspection   adjustment  commissioning  acceptance tests   operational  amp  maintenance training  defect  remedy during warranty period  defect inspection  and after sales services of the Hydraulic  Gates to be provided in the Project     The Hydraulic Gate Works for the new construction of Kra Mang and Han Tra Floodgates  consist of the following components       Stainless steel fixed wheel gate leaves 3 sets each for Kra Mang and Han Tra    Stainless steel fixed wheel gate guides   ditto       Motorized wire rope winched gate hoists   ditto       Steel main
367. stiffened     If formwork displacement occurs when pouring concrete  with consequent modification of  the structure  as compared with the lines shown in the construction drawings  the  prescriptions set forth in the following clauses 22  Construction Tolerance  and 23  Repair  of concrete Surface  shall be applied     Forms shall be placed so that the joint marks on concrete surfaces are  as much as  possible  in alignment both horizontally and vertically     Materials for Formwork    The formwork materials shall be such as to give the concrete surface the appropriate  finish  as specified in Clause 21 hereafter     The lumber used in formwork shall be free from warp  and the boards shall be of uniform  thickness and width  free from knots  decay  or other defect  Steel formwork shall be  defined as a steel plate of approved thickness supported by structural steel shapes  Steel  lining shall be defined as thin steel sheets  supported by a backing of wood boards     Forms for Curved Surfaces    Forms for curved surfaces and transition sections shall be constructed to conform  accurately to the required curvatures  Dimensions from horizontal and vertical base lines  will be given at several sections throughout the length of the curved or transition section   The Contractor shall interpolate intermediate sections as necessary for the type of form  construction being used  and shall construct and erect the forms so that the curvature will  be continues between sections  Erection 
368. t of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works      Load Displacement relationship     Load  Elastic Rebound relationship     Load Residual Displacement relationship     Others     Characteristic values of the vertical bearing capacity such as the first limit  resistance  the second limit resistance  vertical stiffness     Diagrams for the distributions of the axial strains and axial forces      The characteristics of the frictional resistance on the pile surface     12  Alternative to Cast in Situ Concrete    6 3    The Contractor may elect to construct some type of structures that are as cast in situ in  the approved shop drawings  This will be acceptable provided that the following  conditions are met     a  The general dimensions and shape of the structures are not altered    b  If the Contractor alters the concrete strength  the structure thickness  and or the  reinforcing steel with respect to the Construction Drawing  the revised design and  drawings shall be submitted to the Consultant for the approval        The general conditions of this Clause 6 are complied with     Prestressed Concrete  PC  Corrugated Sheet Piles    Prestressed concrete  PC  corrugated sheet pile shall be used for the revetment of canal   retaining wall for access road  platform to both Han Tra and Kra Mang flood gate    The Material shall conform to J IS 5334 or other equivalent approved by the Consultant   Prior to t
369. t to true size with parallel  reasonably flat faces   the stones  Shall be accurately laid covered and bound by means of a 3  1 sand to cement mortar or  concrete  B   The mortar shall be struck  cleaned of surplus mortar and smoothed by steel  trowel or other approved tool  Prior to laying  the stones shall be wetted and cleaned of  surfaces dust     Filters and Stone Masonry   General  The contractor shall furnish and place stone masonry and material to the prescribed lines  and thickness as shown on the Shop Drawings for the protection of the Works and or  elsewhere if required by the Consultant     Stone masonry and filter material shall be durable stone  gravel and sand  Gypsum   anhydrite  chert  shale and soft or weathered rock will not be acceptable     Filter   Material  Filter underneath weepholes shall be a continuous layer of gravel and shall be placed in  separate layers  The gravel shall be composed of tough durable particles  shall be    reasonably free from thin  flat and elongated pieces  and shall contain no organic matter or  soft  friable particles     S 7 1 84    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works    Gravel or crushed stone and sand shall be in accordance with the table below     Gradation of Filter Materials       No  No  No  No  No  NO  No     n n 1 2    200  100  50   30   16   8 4   38    34    1    Filter Materials          Coarse Ag
370. t with each other in    respect of any matter that may arise from or in connection with the G A     Article 14 Effectiveness and Termination   1  The G A shall enter into force on the date of signature by JICA and the  Government of the Kingdom of Thailand  provided that the E N is in force      2  When JICA recognizes any of the following situations  JICA may  by notification  to the Government of the Kingdom of Thailand  suspend in whole or in part the rights  of the Government of the Kingdom of Thailand and   or require the Government of the  Kingdom of Thailand to remedy the situation  When the Government of the Kingdom  of Thailand will not remedy the situation within the period of thirty  30  days from the  date of receipt of such notification  JICA may  with the consent of the Government of  Japan  terminate the G A      a  default of the Government of the Kingdom of Thailand in fulfillment of any  obligations or in compliance with the terms and conditions under the E N or the  G A      b  a fundamental change of circumstances relating to the Authority which has  occurred with regard to those existing at the time of the entry into force of the  G A  and     c  any emergency  unforeseen circumstances or force majeure  such as war  civil war   earthquake and flood which cause serious difficulties in implementing the Project         Joi       Bangkok  August 15  2012    For    JAPAN INTERNATIONAL  COOPERATION AGENCY    2  CL c    Kazuhiro Yoneda  Chief Representative  JIC
371. te  the Client will negotiate for the  contract with the next lowest price tenderer and this procedures will be followed until  the Client reaches agreement with a tenderer     2  Clarification or Alteration of Tender    In the examination  evaluation and comparison of the tenders  the Client may  at his  discretion  ask any tenderer for a clarification of his tender  All responses to the requests  for clarification shall be in writing  and no change in the total price or the substance of the  tender shall be offered or permitted     3  Process to be Confidential    Information relating to the examination  clarification  and evaluation of tenders  and  recommendations for the award of the Contract shall not be disclosed to tenderers or any  other persons who are not officially concerned with such process until the notification of  award defined in Chapter 5 Clause 5     4  Contact with the Client     1  Except for the clarification of the tender as provided in this Chapter Clause 2  no  tenderer shall contact with the Client on any matter related to the tender  from the  time of the tender opening to the time of the Contract awarding      2  Any effort by a tenderer to influence the Client   s processing of tendering or award  decisions may result in the disqualification of the tenderer     5  Notification of Award     1  The tenderer whose offer substantially conforms to the Specifications and other  conditions of the Tender Documents  and who offers the lowest price within 
372. ted in  accordance with the Contract Documents for a period of one  1  year    from the date of issue of the certificate of completion of the Construction       AX    12 2    12 3    12 4    12 5    13 1    Work     The Contractor shall warrant the Installation Work to be executed in  accordance with the Contract Documents for a period of one  1  year  from the date of issue of the certificate of completion of the Installation  Work     Warranty period for the Equipment is twelve  12  months from the date  of issue of the certificate of receipt of the Equipment  Details of    warranty for the Equipment are defined in the Contract Documents     The Client shall notify the Contractor in writing  as stipulated in Article  27 hereof  of any defects for which a claim is made under this warranty  as promptly as possible after discovery thereof    The Client s written notice shall describe the nature and extent of the  defects  The Contractor shall have no obligation for any defects  discovered subsequent to the expiry date of the said one  1  year period   unless notice of such defects is received by the Contractor not later than    twenty one  21  days after such expiry date     The Contractor shall remedy  at his own expense  any defects against  which the Work is warranted under this Article  by making all necessary  repairs or replacements except in the case that such defects result from    the Client s negligence or failure     Article 13  Performance Security    The Contracto
373. templates shall be used on all curved framework  where necessary to meet requirements for curvature  The form sheathing shall be built up  of laminate spline cut to make tight  smooth form surface after the forms have been  constructed  all surface imperfection shall be corrected  and any roughness and all angles  on the surface of the forms caused by matching the form material shall be dressed to the  required curvatures     Cleaning and Lubricating    At the time of concrete placing  the inner surface of the forms and the contacts and  connections shall be free of any incrustation  mortar  grout or other foreign matter that  would contaminate the concrete  Prior to placing  the surface of the forms shall coated  with a bond breaking compound such as emulsified oil  or with refined mineral paraffin oil   designed to prevent sticking of concrete on the form  The treatment of the forms shall not  cause harmful effects  or stains  on the concrete surface  or on the reinforcement system   Bond breaking compounds shall be applied before reinforcement is placed     S 7 1 52    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     e      f      9     Oil treatment shall be made in such a manner to avoid spillage on previously placed  concrete       excess oil on the form surfaces  and any oil on the concrete  metal or other  parts to be embedded in the concrete  shall be carefully
374. tenance gate leaves 3 leaves x 2 for Kra Mang    5 leaves x 2 for Han Tra    Stainless steel maintenance gate guides 6 sets each for Kra Mang and Han Tra      Steel telpher rails 2 sets each for Kra Mang and Han Tra    Manual chain hoists and lifting beams   ditto       Electric wirings and boards 1 set each for Kra Mang and Han Tra    Lighting facilities   ditto       Lightning arresters   ditto       Engine generators   ditto       Water level gauges and data loggers 2 sets each for Kra Mang and Han Tra    Stainless steel fixed wheel gate leaf 1 set for drainage channel at Kra Mang    Stainless steel fixed wheel gate guide   ditto       Manual racked gate hoist   ditto       Spare parts As specified in this Specifications    The components or equipment of the hydraulic gates shall be designed to endure long periods  of operation without substantial repair or replacement of the parts  Hence  the components or  equipment of the hydraulic gates shall be products of the manufacturer s  that have professional  engineers  workshops and successful experiences in the business     It shall be understood that all works associated with the Hydraulic Gate Works which are not  particularly prescribed or specified on the Tender Drawings or Specifications herein  but which  are reasonably inferred as necessary or indispensable for the complete  safe  and satisfactory  operation thereof in the Project  shall be included in the Contract     1 2 Location of the Project Sites    The Project s
375. tenance gate leaves 3 leaves x 2 for Kra Mang    5 leaves x2 for Han Tra    Stainless steel maintenance gate guides 6 sets each for Kra Mang and Han Tra      Steel telpher rails 2 sets each for Kra Mang and Han Tra    Manual chain hoists and lifting beams   ditto       Electric wirings and boards 1 set each for Kra Mang and Han Tra    Lighting facilities   ditto       Lightning arresters   ditto       Engine generators   ditto       Water level meters and data loggers 2 sets each for Kra Mang and Han Tra    Stainless steel fixed wheel gate leaf 1 set for drainage channel at Kra Mang    Stainless steel fixed wheel gate guide   ditto       Manual racked gate hoist   ditto       Spare parts As specified in the Specifications    5 3 8    The Flood Prevention Project of  East Side of the P asak River in Ayutthaya    Authorized Signature of  Manufacturer     Name of Signer   Title of S igner     Name of Manufacturer     Authorized Signature of  Manufacturer     Name of Signer   Title of S igner     Name of Manufacturer     5 3 9    Volume    Section 3  Form of Tender     Signature      Signature     Volume     Section 3 The Flood Prevention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya     Form G   SUPPLY GUARANTEE CERTIFICATE BY  MANUFACTURER S  AS SUBCONTRACTOR FOR  DRAINAGE PUMP VEHICLES    Date    th day of     2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in
376. the  ceiling price  shall be designated as the successful tenderer      2  After completion of evaluation of the tender  the Client shall issue a notification of  award to the successful tenderer within the period of validity of tenders stated in  Chapter 3 Clause 3 hereof by facsimile or registered letter     6  Signing of Contract     1  Atthe same time that the Client notifies the successful tenderer that his tender has  been accepted  the Client will send the tenderer the Forms of Contract provided in  the Tender Documents  incorporating all arrangements between the parties     S 2 9    Volume I  Section 2 The Flood Prevention Project of East Side of the  Instruction to Tenderers Pasak River in Ayutthaya in the Kingdom of Thailand    7     8      2  The following documents shall be considered as the integral part of the Contract     1  ContractAgreement   2  Tender of the successful tenderer  3  Particular Conditions of Contract  4  General Conditions of Contract  5  Specifications   6  Drawings   7  Schedule    8  Instruction to Tenderer and such other documents intended to form the  Contract    The documents of the Contract are to be taken as mutually explanatory of one another  If  an ambiguity or discrepancy is found in the documents  the interpretation shall be done in  accordance with the above mentioned sequence of the priority    The successful tenderer shall submit the breakdown of lump sum price to the Consultant  within        9 days after the conclusion of the
377. the Contractor and the authorities concerned  and safety practices in each  construction works to avoid accident   Regime   Information Network in an Emergency   The Contractor shall set up an information network in an emergency  which includes a  chain of order  related parties and related persons with their names  addresses on mobile    or fixed line telephones  and mobiles or emails of offices and homes     Expedient Measures    If anticipated the danger  the Contractor shall stop the works  shall evacuate the workers   shall contact with related organizations and shall take necessary measures for safety     Safety Activity    S afety activities required for the Contractor to implement on daily and monthly basis shall    5 7 1 90    The Flood Prevention P roject of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     a      b      c      d     9 3   1      2      3     be as follows   Morning Assembly    The Contractor shall explain the work descriptions to workers on the day before starting of  works at 8 o clock and call attention to carry on the work safely     Safety Meeting    The Contractor shall strive to promote the safety management and shall have a meeting  for calling attention of safety with not only the Contractor s employees and workers but  also the Consultant and the Client s related persons once in every month     Patrol by a Director and Safety duty Persons    The contractor  the Cons
378. the approval of the Consultant  recesses may be left in the concrete and the  metal work placed  anchored and blocked in place after the concrete of the structure has  set     Where itis impracticable to place anchors or anchor bolts required for the installation of  step ladders  stairways  frames  or other miscellaneous metal work before concrete is built   holes shall be drilled in the structures and expansion bolts shall be installed     Step Ladders    Step Ladders shall be pre fabricated material in accordance with the Shop Drawings and  the provisions of these Specifications     The ladder is hole in anchor type  which is installed at 300mm interval after the completion  of concrete structure  The holes for anchoring will be made by using hard drill     The material of ladders is SWCH12R  Steels for Machine Structural Use    The dimensions of ladders are as follows     Diameter  19mm   Width   400mm   Length from Concrete Surface  180mm  Embedment Length  80mm    The Contractor shall obtain the material approval from the Consultant   Stainless Steel Pipe Hand Railing    The Contractor shall furnish and install all pipe hand railing and posts as shown on the  approved Shop Drawings or as instructed by the Consultant  The Contractor shall furnish  and install all brackets  wall flanges  nuts  bolts and expansion anchors required for  installation  Hand railing sections shall be installed to true line and level to the satisfaction  of the Consultant     The galvanized pip
379. the consultant  the gabion mesh  shall be cut  folded and wired together to form miter joints  angles  curves or slopes which  are not possible to obtain in the structures with the standard rectangular gabions  The  mesh must be cleanly cut  and the surplus mesh cut completely out  or folded back or on  to  and neatly wired to an adjacent gabion face  The cut edges of the mesh shall be  securely laced together with binding wire in the manner specified under assembly above     Geotextile Sheet  General    For the protection of scoring of canal  the geotextile shall be fixed under gabion mattress  on the sand clay ground surface     Technical Specifications    Thickness ASTM D 1777 2 9 mm   Tensile strength ASTM D 4595 24 kN m  Elongation ASTMD 4595 80   4096  Grab tensile ASTMD 4632 1400 N   CBR puncture DIN 54307 3850 N  Vertical water flow in 2 kPa 117 1 sq m  s  Horizontal water flow in 2 kPa 27 1sq m  s    or equivalent  approved by the Consultant     Before the installation or sheeting of geotextile on the ground surface  the inspection shall  be carried out by the Consultant   Splicing of geotextile sheet is necessary with 15cm width by using stapler     Sharp stone or crashed cobble stone should be taking out at the ground surface by the  Contractor before the inspection     Timber Pile  Description    This work shall consist of furnishing  driving and trimming timber piles under the  foundation of structures or gabion mattress in accordance with details shown on the  C
380. the drawings or as instructed by the  Consultant  The slope surface shall be lined with square blocks or cuttings of dense grass  growth of species approved by the Consultant  The system of sodding required shall be as  specified here below     The sod shall be handled carefully during transportation and placing so that a minimum  amount of soil shall be lost from the root mass  The time interval between cutting of sods  and placing shall be kept to the practical minimum  and sods shall not be allowed to dry  out     Placement of sod shall begin from the lower portion of the slope and continue upwards     Immediately after placing  the sodded surface shall be wetted thoroughly and then  watered until the grass growth has been reestablished     Sodding shall be carried out immediately after the finishing of slopes to avoid the erosion  by a rainfall  Areas where grass growth will not be reestablished through lack of proper  watering on part of that area shall be stripped and new sod will be placed and nursed as  described above      2  Strip Sodding for Canal Works    The square blocks  with sides of approximately 30 cm  or the strips  approximately 30 cm  wide  shall be placed side by side in horizontal rows on the embankments  having a 20 cm  free space between rows  This space shall be filled with top soil free of roots  stones or  other objectionable matter  the top soil being carefully tamped in place  Strip sodding shall  be adopted only on the wider canals on the embank
381. the surfaces by the use of clean mineral spirits  xylol or  white gasoline     Wood Surfaces    Wood surfaces shall be thoroughly dry  smoothed  and sanded prior to painting  Filling of  holes  cracks  and imperfections shall be performed after the first application of undercoat     Concrete and Plaster Surfaces   All concrete and plaster surfaces for which painting is required shall be cleaned of all dirt   efflorescence  oil  grease and stains  or other foreign substances by means of wire  brushing and or other approved means to provide good adhesion of paint  New concrete  surfaces receiving a base coating should be allowed to age for a minimum of 30 days  before being painted    Materials   General   All paints  supplies  and articles furnished shall be the standard products of recognized  reputable manufacturers  All constituent materials shall conform to the applicable  provisions of ASTM  JIS and other equivalent    The Contractor shall submit to the Consultant for approval the brand  type and quality  certificates of all materials which he proposes to use  Samples of the various materials  shall be supplied to the Consultant as requested before materials are delivered to the  project    Colors    All colors shall be factory mixed pigments which are non fading  non bleeding and finely  ground  Selection of colors shall be as determined by the Consultant     Coats    Paints shall be applied in accordance with the following number of prime and finish coats     Steel  2 r
382. ther  dust and vermin proof  construction for outdoor use  while dust and vermin proof construction for indoor use  The  cables and wiring shall enter from bottom side of the board panel     Space heating elements with thermostatic control switch shall be included in each board panel     The distribution boards panels shall contain the molded case circuit breakers adequate in  capacity and in numbers required for the equipment  including spares     The source pilot lights shall be provided and visible from outside without opening the doors  and or windows which shall have integral lock and master key     2 12 7 Electrical Conduits    Steel rigid and or flexible conduits shall be used for the cable wiring between the control panels  and electrical equipment  The steel rigid conduits shall be galvanized inside and outside and of  a minimum thickness of 2 3 millimeters and have a minimum inside diameter of 16 millimeters     2 12 8 Enclosures    Motor enclosures shall be weatherproof and totally enclosed  Enclosures for all other  equipment shall dust proof  weatherproof and vermin proof     2 12 9 Convenience Outlets    Convenience outlets shall be of 2 pin with scraping earth or 3 pin type rated for 15 amps at 230  volts  suitable for American pattern plug  Outlets shall be in weatherproof enclosure or suitably  protected from weather     2 12 10 Limit Switches    The limit switches shall be of arm deflection detecting type with weatherproof enclosures and  shall be mounted su
383. ther fiscal levies  which may be imposed in the Kingdom of Thailand with respect to the  purchase of the Products and the Services be exempted      e  to accord Japanese nationals and or nationals of third countries   whose services may be required in connection with the supply of the  Products and the Services such facilities as may be necessary for their  entry into the Kingdom of Thailand and stay therein for the performance of  their work  the term  nationals of third countries  means physical or juridical  persons of third countries               f  to ensure that the facilities constructed   rehabilitated under the Grant  and the Products be maintained and used properly and effectively for the         RAN                       implementation of the Project         g  to bear all the expenses  other than those covered by the Grant   necessary for the implementation of the Project  and     h  to give due environmental and social consideration in the  implementation of the Project      2  Upon request  the Government of the Kingdom of Thailand shall  provide the Government of Japan with necessary information on the Project      3  With regard to the shipping and marine insurance of the Products  the  Government of the Kingdom of Thailand shall refrain from imposing any  restrictions that may hinder fair and free competition among the shipping and  marine insurance companies      4  The Products shall not be exported or re exported from the Kingdom of  Thailand     7  The t
384. tion Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    All cuttings  chamfering and other necessary preparations of each part for field connection  purpose shall be done at the Contractor s workshop     The details of construction of the gates  not specified herein  shall be made by the Contractor  upon approval of the Consultant     5 4 2 Skin Plate    The skin plate shall be at the drainage channel side of the gate  The skin plate shall be of  stainless steel SUS 304 and welded to the main beams  vertical girders  end beams  etc   by  continuous welding     5 4 8 Main Beams  The main horizontal beams shall be of shape steel     Provision shall be made to drain water from the main beams     5 4 4 Wheel Assemblies    Each wheel assembly shall be of saddle support construction and consist of wheel  shaft   bearing and other necessary components  The wheel shall be stainless steel SUS 304     The contact surface of wheel shall be slightly crowned to accommodate gate deflection under  loading condition  The wheels shall be machine finished and have the hardness value rather  lower than that of the main track plate surface of the gate guides     The wheel shaft shall be stainless steel SUS 304  The shaft shall have an eccentricity of 3 0  millimeters to allow easy adjustment of wheel alignment at the site to ensure that all wheel  treads bear the hydraulic loads equally on the wheel tra
385. tion of Environment  The Contractor shall investigate 4 items and shall report to the Consultant before road  works  traffic  an environment  a carry in route and a storage place of materials   Allocation of Guards and Traffic Guides  The Contractor shall allocate the guards to protect workers and pedestrians from traffic  accident  and the traffic guide to draw on vehicles in the sites   The Contractor shall set up information signs to well know the construction works and  area to passengers before starting of works  and road traffic signs to draw on vehicles   The Contractor shall set up security lightings along the road or the related area  which has  a height of some 1 m atan interval of some 2 m   Off Limit Display Sign  The Contractor shall set up off limit display signs for passengers not to enter the working  area in pavement work   Safety Vest    Workers shall wear safety vests in night work     5 7 1 96    SECTION 7 2    HYDRAULIC GATE WORKS    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works             ob    l                                        Ron       PO PP PPP    AH           Pona ROM         7 2 HYDRAULIC GATE WORKS    TABLE OF CONTENTS    GENERA M                                                  ee S 7 2 1  SCOPE OL  WOIKS x  ice eia icc td i a dei iia S 7 2 1  Location of the Project Sites    S 7 2 1  Country of Origin and Standards         
386. tions shall prevail and govern     Article 26  Entire Agreement    zT    This Contract sets forth the entire agreement between the Parties in respect  of the subject matter hereof and supersedes and cancels any and all previous  agreements  negotiations  commitments  and writings in respect of the subject    matter thereof     Article 27  Notice         notices pertaining to this Contract between the Client and the  Contractor shall be sent in writing by registered airmail  facsimile  electronic  mail or shall be handed to the addresses so stated herein  Such notices shall  take effect from the date of receipt by the other Party  In case either Party    hereto changes the address  the Party concerned shall give such notice to the    other Party beforehand   The Client   Name  Royal Irrigation Department  Ministry of Agriculture and  Cooperatives  Address   Samsen Road Dusit  Bangkok 10300  Kingdom of  Thailand  Telephone     66 2 241 2688  Facsimile     66 2 241 2688    E mail address      The Contractor     Name  Address    Telephone    Facsimile          E mail address            e    IN WITNESS WHERECF  the Parties hereto have caused this Contract to  be signed  as of the day and year first above written  in their respective names    in duplicate  each Party retaining one  1  copy thereof     The Client The Contractor   Signature    Signature      Name of the signer   Name of the signer    Status of the signer   Status of the signer   Royal Irrigation Department  Name of t
387. to provide satisfactory maintenance service even after one  1  year warranty period  the  Contractor shall keep a close contact with his Subcontractor and submit a list of the  maintenance service agent s  for the following services      a  The Contractor through his Subcontractor s  shall remedy  at his own expense  any  defects against which the Work is warranted  by making all necessary repairs or  replacements except in the case that such defects result from the Client s negligence or  failure during the one  1  year warranty period      b  The Contractor shall guarantee to supply the spare parts of the components and  equipment used for the Hydraulic Gates Works under the Contract through the agent s   upon request by the Client at cost basis for a period of two  2  years after the one  1   year warranty period      c  In case of major breakage  which is hard to repair by the local agent s   the Contractor  shall send his Subcontractor or manufacturer s engineer s  to the site designated by the  Client within one  1  week after the request by the Client to repair such breakage at cost  basis  Such services shall be guaranteed for a period of two  2  years after the one  1   year warranty period     2  DESIGN CRITERIA AND PARTICULARS  2 1 Design Loads    2 1 1 General    The Hydraulic Gate Works shall be designed with the worst possible combinations of the acting  loads  The combination of loads for each equipment and structure under normal and over  loading conditions sh
388. toppers to prevent overrun of the chain hoist shall be provided at both ends of the rails     S 7 2 57    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    4 7 Shop Assembly and Tests    4 7 1 Stoplogs and Gate Guides    Each complete stoplog leaf including seals and side shoes shall be assembled at the shop in  the approximate position that they will have after installation at the site  While assembled  each  leaf shall be checked for dimensions  tolerances and accuracy of alignment  Any error and  misalignment discovered shall be corrected promptly     The side gate guides  sill beams  seal plates  and side plates composing the gate guide of the  stoplog leaves shall be assembled at the shop and all dimensions  flatness  straightness  etc   of  the gate guide shall be checked and any error and misalignment shall be corrected promptly     Parts shall be clearly match marked before disassembly for transportation     4 7 2 Lifting Beam    The lifting beam shall be completely shop assembled and tested for smooth and proper  performance  If any defect or improper operation is discovered  it shall be corrected and the  entire test shall be repeated to the satisfaction of the Consultant     4 8 Erection  Installation and Tests at Site  4 8 1 Erection and Installation   1  Gate Guides    The gate guides shall be assembled in the blockouts in accordance with the  Appro
389. tractor shall bear import charges from Japan to the Kingdom of Thailand such  as shipping charge  customs clearance charge  terminal handling charge  port charge   crane charge  storage charge  ocean freight and inland transportation etc  except for    S 7 3 4    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications    Pasak River in Ayutthaya in the Kingdom of Thailand    1 9    7 8 Procurement of Drainage Pump Vehicle    internal taxes  such as customs duty and value added tax  imposed in the Kingdom of  Thailand    All taxes and duties imposed outside the Kingdom of Thailand shall be born by the  Contractor  if any     Tests  Inspection  Adjustment  Commissioning and Training    The following works on the tests  inspection  adjustment  commissioning and training  shall include in the Contract      a  Shop Tests and Inspection    The Equipment including the major and important parts shall be tested and  inspected by the Contractor and or his Subcontractor s  prior to their shipment and  delivery  Shop inspection shall be required in the presence of the Consultant and  also the Client when it deemed necessary by him and is conducted in the Kingdom  of Thailand  Manufacturers    shop inspection results and their certificates shall be  submitted by the Contractor to the Consultant before shipment and delivery     The Equipment in the completed shape shall be required to inspect at due  workshop designated by the Contractor and or his Subcontracto
390. tration shall be conducted in  accordance with the Rules of Arbitration of the International Chamber of  Commerce     The arbitration shall be conducted in English     The place of arbitration shall be Tokyo  Japan      17     18 5    18 6    19 1    19 2    20 1    The arbitral award shall be final and binding upon the Parties hereto and  the Parties shall comply in good faith with the decision  Judgment  upon the award may be entered in any court having jurisdiction or  application may be made to such court for juridical acceptance of the    award or order of enforcement as the case may be     As for fees for all proceedings for arbitration  each Party shall bear the  costs of his own arbitrator s service and an equal share of the costs for  the third arbitrator     Article 19  Language and Measurement System    All correspondence between the Parties including notices  requests   consents  offers  and demands shall be made in English       drawings   specifications  reports  and other documents shall also be prepared in  English          documents made under this Contract shall adopt the metric system    and the Gregorian calendar day     Article 20  Project Modifications    In case the Client considers any modifications of the Work necessary  the  Client shall discuss the solution with the Consultant  and the  modifications can be made subject to the prior consent by JICA  Each  modification may include     a  obvious change in appearance of the building or facilities     
391. trical so that the thickness at given distance from either edge of the  band is uniform     Type    The water stops required shall be of the central hollow bulb type as follows           Type Width  cm  Central hollow bulb  A 20 23 Yes  B 15 Yes  C 15 No  D 10 Yes                   The Contractor shall protect the central hollow bulb from concrete intrusion  so that the  function of the flexible seal shall be preserved  The water stop which will remain exposed  for more than ten  10  days shall be protected from the sun     Splices    Splices in the run length or at the intersection of runs of water stops shall be performed by  heatsealing adjacent surfaces in accordance with the suppliers recommendations  A  thermostatically controlled electric source of heat shall be used to make all splices  The  correct temperature at which splices should be made will differ with the seal material  and  shall be sufficient to melt but not char the plastic  All splices shall be neat with the edges  of the joined materials in true alignment     All intersection splices shall be prefabricated by the manufacturer or by the Contractor in  the field shop     A milter box and a proper saw shall be used to cut the ends to be joined to ensure good  alignment and contact between joined surfaces     The number of splices in the water stops shall be kept to a minimum  The equipment used  for making splices in PVC sealing and splicing method shall be approved by the  Consultant     The Contractor shal
392. ts   Materials Process Names of paint      0 thickness  painting  um   Gate leaves    SS  SM First primer Non organic zinc rich primer 1 15  Gate guides   sus Pickling Oxidizing solution      Hoists SS  SM Surface preparation   Blast cleaning ISO Sa2 1 2      Under coat  1  Non organic zinc rich paint 1 75  Epoxy resin paint under coat _  Mis eod 160g m    Thinner 80g m     Weak solvent type modified  Under coat  2  epoxy resin paint under coat 1 80   air exposed   Weak solvent type modified  Under coat  3  epoxy resin paint under coat 1 80   air exposed   Weak solvent type  Intermediate coat intermediate coat for 1 40  fluoropolymer paint  Weak solvent type  Top Coa  fluoropolymer paint top coat   29  Total 6 305  SUS Pickling Oxidizing solution       2  Stoplogs  Maintenance gates  of Kra Mang and Han Tra Floodgates  No of Film  Components   Materials Process Names of paint mes thickness  painting  um   Gate leaves SS SM   Surface preparation Blast cleaning ISO Sa2 1 2      Under coat  1  Non organic zinc rich paint 1 75  Epoxy resin paint under coat _          160g m    Thinner 80g m     Under coat  2  Epoxy resin paint under coat 1 100              underwater              S 7 2 17          Volume     Section 7 Specifications  7 2 Hydraulic Gate Works    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand       Epoxy resin paint under coat                                                                                      
393. ts  brush  sod  soil  unsuitable sand  gravel and other objectionable matter  The  deposit shall be exploited without causing damage to any adjacent property  or  endangering the safety of third parties  If necessary  the Consultant may instruct the    5 7 1 39    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand    fencing of the pit  Waste materials removed from aggregate borrow areas shall be  disposed of in approved locations     Particle Shape    The shape of the particles in the fine and coarse aggregate shall be generally spherical or  cubical     Storage of Aggregates    Fine and coarse aggregates shall be stored separately at the site of the work  in such a  way to prevent inclusion of foreign matter  or the   intermixing of various sizes     Sufficient aggregate shall be maintained at the site at all times  to permit continuous  placement and completion of any part of the works once started  avoiding unnecessary  construction joints     Methods of stockpiling  which permit the aggregate to roll down the slope as it is added to  the pile  or which permit hauling equipment to operate over one area at the same level  repeatedly  or which permits the free fall of material from a stacker  allowing fine material  to be blown away from coarse material  will not be allowed  Stackers  if used  shall have  an adjustable discharge height so that high drops are prevented     A
394. tto the Consultant by mail or facsimile on  or before       on the    day of            apan Standard Time  J ST       2 The Consultant shall respond in writing to the inquiry and or doubt as to the  interpretation stated above  The responses will be sent by facsimile to all  prospective tenderers who purchased the Tender Documents on or before the     day of             J apan Standard Time  J ST       3 All the prospective tenderers shall send a facsimile to the Consultant for the  confirmation of the receipt      4  The responses shall constitute a part of the Tender Documents provided in Chapter  2 Clause 1     4  Addenda of Tender Documents     1  The Client may  for any reason  whether at his own initiative or in response to a  clarification requested by prospective tenderers  modify the Tender Documents      2 The Consultant will notify the addenda indicating the modification by facsimile to all  prospective tenderers on or before the    day of         in English  at least 7  calendar days before the day of tender opening      3  The prospective tenderers shall send the confirmation of receiving the addenda    5 2 4    The Flood Prevention Project of East Side of the Volume I  Section 2  Pasak River in Ayutthaya in the Kingdom of Thailand Instruction to Tenderers     4     stated above to the Consultant by facsimile     The addenda shall constitute a part of the Tender Documents provided in Chapter 2  Clause 1     Chapter 3  Preparation and Submission of Tender    l  P
395. ty suitable for the conditions on the Works   For most concrete a  plastic  mix is required  which will not crumble  but will flow  sluggishly when vibrated  without segregation     The concrete shall be of such consistency and composition that it can be readily worked  into the corners of forms and around reinforcement without segregation or bleeding  using  such compaction methods as specified in Clause 17    Whenever  in the opinion of the Consultant  the consistency of the concrete is such that  excessive bleeding or segregation occurs in the concrete  the Consultant may instruct the  preparation of trial mixes to determine new mix proportions such that excessive bleeding  or segregation does not occur     The slump test is a practical test to determine the consistency of concrete  and it shall be  used and made in accordance with ASTM Designation C 143 or the equivalent standards     Concrete  as delivered for placing  except when instructed otherwise by the Consultant   shall have the following working slump limits     Type of Concrete Slump  cm  Reinforced Concrete 1022 5  Pavement Concrete 7 52 5  Leveling Concrete 7 532 5    The Consultant has the right to require a lesser slump wherever such stiffer concrete can  be poured and consolidated readily in place by means of vibration     If those tolerances for working limits are exceeded  the concrete shall be rejected and  disposed of     Addition of water to compensate for stiffening of the concrete before placing will
396. ue  workshop s  in the Kingdom of Thailand under full responsibility of the Contractor  and or his Subcontractor s   Hereafter  Subcontractor s  mean s  Japanese juridical  person s  who shall manufacture the Equipment and prequalified      the  Prequalification ahead of the Tender     Import of Parts    If the parts of the Equipment are not available in the market of the Kingdom of  Thailand  the Contractor and or his Subcontractor s  shall be required to import the  necessary parts of the Equipment from Japan to the Kingdom of Thailand in  compliance with due trade laws enforced by the respective government     Working Condition    The Equipment shall be suitable under ambient temperature  humidity and climates in  the Kingdom of Thailand in anticipated conditions     Name Plates and Stickers   a  Name Plates    All the Equipment shall be equipped with name plates described as shown below  in English or Thai on a suitable place of the Equipment  Descriptions and notes  shall be in English     e Equipment Name   e Type and Model   e Manufacturers Name   e Production Serial Number    e Date of Production    S 7 3 2    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 8 Procurement of Drainage Pump Vehicle     b  Stickers    The Contractor shall provide stickers as shown below for each component of the  Equipment  except for small parts and materials  The stickers shall be made of  alumin
397. uest from the Contractor     16  Construction Materials and Equipment     1     The Contractor  including his Subcontractors prequalified in the P requalification  shall  use the construction and manufacturing materials which have passed the due  inspections and or tests attended by the Consultant  or those which bear authoritative  manufacturers certificate as required in the Tender and Contracting Documents   However  in the latter case  the Consultant retains the right to request the Tender and  to have any of the materials tested if necessary  with required expenses to be borne  by the Contractor     Expenses directly needed for the inspections or tests mentioned in the preceding  paragraph  1  shall be borne by the Contractor  However the expenses needed for  those inspections or tests in addition to  1  above  which are not specified in the  Contract Documents and other exceptional expenses  shall be borne by the Client     The Contractor shall remove the materials from the Site when rejected by the  Consultant     When the quality of construction materials is not specified  such materials shall be  first class quality     If the Consultant deems construction equipment to be improper  he is entitled to direct  the Contractor to replace it     Construction material or equipment delivered to the Site for the Work shall not be  removed from the Site without the prior written approval of the Consultant     17  Attendance at Work    The Contractor shall request the attendanc
398. ultant     Method of Placing    The concrete shall be deposited generally in horizontal layers  in such a manner as to  maintain  until completion of a unit  a plastic surface approximately horizontal  The  thickness of each layer shall range from 30 to 50 cm  and the placement shall be carried  out at such a rate that      concrete surface can reach an initial set  before additional  concrete is placed thereon     The Contractor shall  however  obtain the Consultant s prior approval for lift heights and  time intervals between lifts before commencing to place concrete  Concrete shall be  deposited  as practicable  in its final position  flowing of concrete with vibrators  or by other  means will not be permitted  For locations where direct placement is not possible or in  narrow forms  then hoppers and trunks must be provided  Once commenced  concreting  shall be done in a continuous operation except if an emergency occurs and interruption is  unavoidable  The Contractor shall have readily available suitable prefabricated forms as  stop ends to form emergency vertical construction joints and in the event of such an  interruption occurring  the concrete already placed shall be properly finished up to the stop  end to a horizontal surface as instructed by the Consultant     Concrete that is of excessive slump  segregated  partially hardened  or unworkable shall  not be placed in forms  or if placed  shall be removed as instructed by the Consultant     Each layer of concrete sh
399. ultant and the Client shall make a tour together once in 2 weeks   and inspect sites  shall check on works and shall have meetings for the safety progress of  the works  And if the Consultant saw a person working under anti safety activities like with  no helmet or no shoe  shall report it to the Contractor immediately and urge him to  improve it  Depending on the situation  the Consultant may issue a site instruction to the  Contractor to ensure the implementation of innovation     Safety Training    The Contractor shall select one of all practice items as shown below  shall allocate a half  day for safety training and shall practice this item every month       Visual education on safety activities     Notification of law in connection with safety     Notification of details of construction works     Obtaining of methods for safety activities     Review and evaluation of safety and health activities on last month    Notification of works and goal on present month and instruction    Training for disaster in site     Measures against accidents     Check of equipments before starting of works     Safety process meeting     Supervising in site     Preparation of works on next day     Cleaning up of site     Reporting after works    General Requirement  Working Outfit    Every worker shall wear a helmet  working uniform and glove  Cuffs of working uniform  and hems of trouser shall be fastened up while at work     Consideration of Environment at Work   The Contractor shall give c
400. um  It should be an adequate size considering the dimension of each  product  The design  material and dimensions of the stickers shall be submitted  to the Consultant for prior approval     Type of font  Futura Bold  Component of color  DIC156  red   black  white    From  the People of Japan       1 6 Packing and Shipment   1  Packing    The parts of the Equipment imported from Japan to the Kingdom of Thailand shall be  packed as per the following during ocean and inland freight     Contents of each shipping package for the parts of the Equipment shall be itemized on  a detailed list showing the exact weight and extreme outside dimensions  length  width  and height       a  One  1  copy of the detailed packing list shall be enclosed in each package   There shall also be enclosed in one  1  package a master packing list  summarizing and identifying each individual package      b  The box number in which the master packing list is contained should be shown  on each packing list      c  All parts shipped must be legibly identified by tags  labels or inscription in  indelible ink  strictly in accordance with the reference mark or parts number of  the Equipment or the assembly drawings     S 7 3 3    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 8 Procurement of Drainage Pump Vehicle Pasak River in Ayutthaya in the Kingdom of Thailand     2     1 7    1 8     d  On wood  plywood  veneer cases  barrels or kegs  all marks shall be applied b
401. understanding     1   1  For the purpose of contributing to the implementation of the Flood  Prevention Project of East Side of the Pasak River in Ayutthaya  hereinafter  referred to as  the Project   by the Government of the Kingdom of Thailand  the  Government of Japan has decided that a grant up to two billion five hundred and  fifty million Japanese Yen    2 550 000 000   hereinafter referred to as  the  Grant     will be extended to the Government of the Kingdom of Thailand  in  accordance with the relevant laws and regulations of Japan      2  The Grant will be made available by concluding a grant agreement between  the Government of the Kingdom of Thailand or its designated authority and the  Japan International Cooperation Agency  JICA   hereinafter referred to as  the  G A          3  The terms and conditions of the Grant as well as the procedures for its  utilization will be governed by the G A within the scope of the present  understanding     2  The Grant will be available during such period as may be specified in the  G A  provided that the period will be between the date of entry into force of the  G A and February 28  2016     Mr  Piroon Laismit   Director General   Thailand International Development Cooperation Agency  Ministry of Foreign Affairs   BANGKOK          3  Ihe Grant shall be used by the Government of the Kingdom of Thailand  properly and exclusively for the purchase of such products and services  necessary for the implementation of the Project as m
402. ure of fresh concrete shall not exceed 35  C  when  placed in the formwork  To meet these requirements  the Contractor shall prepare to  undertake any  or all  of the following steps     i supply cool mixing water  or add ice to the concrete during mixing    ii  cool fine and coarse aggregates before mixing    iii  spray the coarse aggregate stockpile with cool water    iv  prevent exposure of batching  mixing and conveying equipment to direct sunlight     Should the Contractor elect to use ice in the mixing water or to replace the latter with ice  entirely  the mixing time shall be extended as approved by the Consultant to allow  complete ice melting before mixing is completed  All methods adopted by the Contractor  shall be subject to the prior approval of the Consultant     The application of iced water to the fine aggregate will not be permitted     Refrigerating units and cooling plants  if used  shall be dimensioned so as to secure  continuity of concreting     Temperature readings of the freshly placed concrete shall be made at regular intervals by  the Contractor to be approved by the Consultant     Vibration and Compaction    Concrete shall be compacted with mechanical vibrating equipment  supplemented by  hand spading and tamping to a maximum practicable density  so that it is in complete  contact with form work  reinforcement and other embedded parts     The vibration shall be carried out by means of immersion type high frequency vibrators  of  the electrically dri
403. urer     5 3 17    Volume     Section 3 The Flood Prevention P roject of  Form of Tender East Side of the Pasak River in Ayutthaya     Form N     SPECIFICATION SHEETS OF DRAINAGE PUMP VEHICLE    Date   th day of        2013    To  Director General  Royal Irrigation Department  Kingdom of Thailand    The Flood Prevention Project of East Side of the Pasak River in Ayutthaya    Dear Sir     We   Name of Manufacturer s   as Subcontractor  hereby state and submit to you the  technical specifications of the following Equipment to be supplied under the captioned  Project     Drainage Pump Vehicles  30m  min     Authorized Signature of  Manufacturer   Signature     Name of Signer   Title of Signer     Name of Manufacturer     Authorized Signature of  Manufacturer   Signature   Name of Signer     Title of Signer     Name of Manufacturer     5 3 18    6L         Specification Sheets of Drainage Pump Vehicle    CODE NO  EQUIPMENT  Drainage Pump Vehicle Qty  10 unit  CLIENT S SPECIFICATIONS  1  SPECIAL CONDITION      Country of Origin Manufacturer  The origin of the Equipment in the completed shape shall be limited to the Kingdom of  Thailand   The origin of the components  except for the chassis  of the Equipment shall be limited to   Model  Japan and or the Kingdom of Thailand while the origin of the chassis of the Equipment  shall be limited to the Kingdom of Thailand     2  MAIN COMPONENTS  Drainage Pumps  Chassis with Cab  Power Generator  Control Panel  Lighting Apparatus  Other Ac
404. utthaya in the Kingdom of Thailand    All adjusting setting screws  bolts and washers for securing the seals and seal assembly in  place shall be of corrosion resisting steel     Seals shall be made of natural or synthetic rubber suitable for the temperature ranges and  conditions at the Site and shall be of a material that has proven successful in similar  applications  Seal materials shall have the following physical properties as determined by tests  made in accordance with the relevant standards     Property Limits    Tensile strength 14 7 N mm  minimum    Ultimate elongation 300 percent minimum    Durometer hardness  Shore  Type A  40 to 80    Specific gravity 1 1 to 1 3    Water absorption  70 C  for 48 hour  5 percent maximum by weight    Compression set  as a percent 30 percent maximum    of total original deflection     Tensile strength after oxygen 80 percent minimum  bomb aging  70 C  for 48 hours     of tensile before aging    2 2 9 Miscellaneous Materials   a  Self lubricating bearing JIS    5102  HBsC4 high strength brass casting   incorporated with the solid lubricant or ASTM B 22   Alloy E  Min  HB 210 with solid lubricant   b  Stainless wire rope JIS G 3557  Stainless steel wire ropes for general  purposes   c  Steel conduit for electric IS C 8305 or ANSI C 80 1 or equivalent    wiring  galvanized     2 3 Painting    2 3 1 General    Painting to prevent the corrosion of the components and equipment of the Hydraulic Gates  Works shall be premised as followings
405. ve oil tight removable housings with lubrication oil  plug  drain cock  vapor outlet and oil level indicator  The temperature rise of the oil bath  when  measured by thermometer  shall not exceed 40 degrees Celsius     All gear wheels and pinions shall be completely covered by steel or other metal guards  unless  effectively guarded by adjacent structures for safety     S 7 2 29    Volume     Section 7 Specifications The Flood Prevention Project of East Side of the  7 2 Hydraulic Gate Works Pasak River in Ayutthaya in the Kingdom of Thailand    Keys in gear trains shall be so fitted and secured that they cannot work loose     2 11 2 Wire Ropes  Drums and Sheaves    The hoisting wire rope  except where otherwise noted  shall be of stainless steel S304  flexible  and JIS G 3557 6 x 37 SB or equivalent     The hoisting wire rope shall be processed with pretension stretching  In the pretension process   the wire ropes shall be retained by 40  of the breaking strength during 30 minutes and this  process shall be repeated twice     The factor of safety of the hoisting wire ropes to the rated hoisting load of stationary hoist   including gantry crane  and commercial telpher hoist shall be not be less than eight  8  and five   5  respectively in normal loading conditions  The hoisting rope shall withstand the load due to  maximum hoist motor torque  without exceeding ninety  90  percent of the breaking strength   The rope systems shall be equalized and arrangements entailing reverse 
406. ved  Under no circumstances shall defective or set cement be used  Cement in bags  if transported to Site in truck or other vehicles  shall be properly covered during transit with  tarpaulins or other effective waterproof coverings  No concreting of the Permanent Works  shall commence until the Consultant is satisfied that the above mentioned requirements  are complied with  Storage of cement in bags on the ground will not be permitted under  any circumstance  and will be sufficient reason for rejection     Once a bag or container has been opened  tile cement is to be completely used and no  cementis to be stored in open bags or containers     No split or loose unused cement lying on floors or hard standings areas shall be used in  the Works     Bulk cement will be kept in airtight silos which will be emptied for cleaning at regular  intervals not exceeding four months or as otherwise directed by the Consultant     Cement of tile different quality shall be stored in separate section of the store  or in  separate silos  according to its origin or type     The cement shall neither contain lumps nor present alterations at the moment of use   Cement which has become stale  or otherwise unsuitable through absorption of moisture  from the atmosphere or otherwise  shall be rejected and immediately removed     Admixture  General    This Article covers materials for use as chemical admixtures to be added to concrete  during the mixing stage     The use of admixtures in concrete by the
407. ved  drawing  and approved installation procedures  brought to line and grade within the  tolerances specified and firmly secured in place     Alignment bolts or other necessary devices shall be used to install the gate guides at  corresponding accurate position  Connections between gate guide and anchor materials  and the alignment devices shall be adjustable and firmly tightened to hold the gate guides  securely in position while concrete is being placed in the blockouts  Additional bracing shall  be provided where necessary to ensure the required alignment     Extreme care shall be taken to ensure that the bearing and sealing surfaces lie in a true  plane within the tolerances specified for their entire length  Placement of concrete in the  blockouts shall not proceed until the gate guides have been completely assembled and  secured  During and after concrete placing  alignment and tolerances shall be checked and  remedial action taken if readings indicate that displacement has occurred      2  Stoplogs    Each gate leaf complete with seals  wheels and bearing plates shall be assembled and  erected in accordance with the  Approved drawings  and approved installation procedures     Joints shall be watertight where required  The rubber seals shall be so fixed to each g leaf  and adjusted that the stoplog  when set in the guide slots  have effective water tightness on  the sealing frames of the gate guides      3  Telpher rail and Lifting Beam    The Telpher and lifting beam 
408. ven or compressed air types  or by means of engine driven vibrators  For  the consolidation of concrete where immersion vibrators would prove impracticable   vibrators rigidly attached to the forms shall be adopted subject to the approval of the  Consultant     The size and number of vibrators  at each pour  shall be sufficient to thoroughly compact  concrete  at the rate and conditions of placement     When vibrating a layer of fresh concrete  the vibrator shall be held in a near vertical  position  The immersion of the vibrator shall be sufficient to vibrate the entire depth of the    S 7 1 56    The Flood Prevention P roject of East Side of the Volume 1  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     18      19    a     concrete layer  the vibration should penetrate several centimeters into the layer below  to  ensure thorough union of the layers     No new layer of concrete shall be placed before the underlying one has been thoroughly  vibrated  The vibrator s immersion points shall be adequately spaced  to make sure that  every part of the concrete has been properly vibrated  Care shall be taken to prevent  contact of vibrators against reinforcement steel  especially when initial set of concrete has  begun in the underlying layer of concrete  Vibrators shall not be allowed to come in  contact with the formwork    Care shall be taken to ensure a good adhesion of concrete with the water stops     Excessive vibration  causi
409. ver bed levels shown on the Contract Drawings shall be  deemed to be correct under the Contract  If  however the Contractor is in doubt of the  correctness of such levels the Contractor shall  at least thirty  30  days before starting the  Works  notify the Consultant in writing of his intent to confirm and perform re survey of  such levels  In all cases before commencing the earthworks and dredging  the  Contractor shall survey and take levels over the areas to be occupied by the Works using  the bench marks or reference points approved by the Consultant in the presence of the  Consultant s Representative  The ground surface or river bed levels so determined shall  be subject to the Consultant s approval     Assistance to Consultant s Staff for Survey    The Contractor shall cooperate with the Consultant in checking the setting out and in  performing the measurement surveys for record and payment purposes  The Contractor  shall render all necessary assistance to the Consultant and shall provide  as required by  and for the sole use of the Consultant  sufficient quantities of pegs  poles  straight edges   staging  moulds  templates  profiles and all other requisite items for checking the  Contractor s setting out and measurement of the Works     The cost of all labor and materials required by the Consultant for said purposes shall be  borne by the Contractor  No payment shall be made for the costs incurred by the  Contractor in complying with the requirements of this sub clau
410. ver in Ayutthaya in the Kingdom of Thailand  Gate width  5  Gate height  5  Gate depth  3  Diagonal length difference 10  Distance between side wheel treads  5  Distance between main wheel centers  5  Distance between seal rubbers  5  Position of side wheels  5  Distance between lifting pins  5  Flatness of skin plate bottom edge  2       The tolerances not specified herein shall be determined by the Contractor  subject to approval  by the Consultant     5 5 Detail of Gate Guide    5 5 1 General    The gate guide shall consist of wheel rails  wheel tracks  sealing plates  sill beams  side wheel  tracks  guide plates  side plate and all other necessary components for satisfactory operation of  the gates  The stainless steel plates shall be attached to all exposed surfaces of the gate guide  to avoid excessive wear thereof  The gate guide shall be provided up to the position at  elevation as shown on the Drawings     The details of construction of the gate guide  not specified herein  shall be made by the  Contractor upon approval of the Consultant     5 5 2 Sill Beam    The sill beam shall be straight and true flat for providing a close fit with the bottom of the gate  leaf  The sill beam shall consist of H shape beam and stainless steel sealing plate     The sealing surface of the sill beam shall be connected to the side plates at the bottom corners  to form a continuous seal with the seal rubbers of gate leaf  The seal weld shall be made for the  sealing plates at the corner
411. vices  The handling devices and procedures proposed by the Contractor shall be  compatible with the design of the precast elements     Particular care shall be taken to prevent surface abrasion or other damage during  handling and transport to place of installation     Precast units shall be adequately braced and protected during transportation and such  further bracing or supports provided during installation ensure proper alignment until the  work is completed     Curing    The members shall be cured by water or by membrane methods as instructed by the  Consultant or as hereinafter specified and or as provided in Clause 5     The members shall be cured until concrete test cylinders  made and cured with the  members  have attained a compressive strength of at least 75  of required strength  At  the start of manufacture  at least six cylinders will be made cured with each member   These cylinders will be tested in pairs  at appropriate intervals during the curing period  to    5 7 1 70    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     8      9      10      11      a     establish the time necessary to produce minimum strength required  After the curing  method and period have been established  two cylinders obtained from each work shift will  be tested at the end the curing period and  if they meet the specified minimum strength   curing of elements produced during th
412. vide a laboratory  with necessary testing apparatus in his construction site  The Contractor shall provide  the sufficient number of volume of testing sample and perform the testing in accordance  with the Standards and Specifications  and shall furnish qualified staff and sufficient  numbers of laboratory assistants  capable of carrying out required tests specified in the  Contract     The Contractor shall carry out any field tests  such as field compaction test  concrete  workability test  etc  in accordance with a manner and frequency prescribed in the  Specifications and shall provide testing equipment and apparatus  and all testing staff   labor and consumables necessary for carrying out his field testing  The Contractor shall  prepare schedules of his field testing and supply of testing samples to the Consultant for  the laboratory tests taking into account the work progress schedules     All costs incurred by the Contractor in complying with the requirements of this sub clause  shall be deemed to be included in Contract Price     Implementation Program and Reports    Implementation Program    Within ten  10  days after the contract has become valid  the Contractor shall submit to  the Consultant the Implementation  construction  time schedule detailed for the whole of  the Works and Temporary Works to be carried out under the Contract by means of CPM  network or another approved method  Activities shown on the schedule shall consist of  not only the actual construction
413. vided that    all of the mixing water be introduced before one fourth of the mixing time has elapsed   shall be as follows     Capacity of Mixer       Min  Mixing Time  1orless 1 12  minutes  from 1 to 2 2 minutes  from 2 to 3 2 12  minutes    The mixing time will be increased when necessary to ensure the required uniformity and  consistency of the concrete of when test samples of concrete taken from front  center and  back of the mixer show a difference of more than 10 percent in sand cement or water  cement ratio  Excessive over mixing  requiring addition of water will not be permitted     c  Mixing Efficiency    The Consultant will perform mixer efficiency tests for each class of concrete  and for each  mixer to be utilized in the Contract  At the end of the prescribed mixing period  three  samples of concrete shall be taken  one at each one quarter point of the batch     These samples shall conform to the following units of uniformity     variation from the average of air content shall not exceed 0 5 percent     variation from the average of the water cement ratio shall not exceed 10 percent     variation from the average of the unit weights shall not exceed 0 8 percent     variation in the weights of coarse aggregate retained on the number four screen shall  notexceed 5 percent     S 7 1 48    The Flood Prevention Project of East Side of the Volume I  Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 1 Civil Works     b      c      d      13
414. wable stress as mentioned above in the case of steel materials SS 400  and SM 400  and 0 94 time for steel material SM 490     When steel material other than those mentioned in the above table is used  its  allowable tensile stress for normal loading condition shall not exceed 50 percent of the  yield point strength or proofing strength of the steel material used whichever is the least   All other allowable stresses shall proportionally be computed according to the above  table based on the allowable tensile stresses     S 7 2 22    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand     b  Stainless steel materials  Stainless steel material  1  Axial tensile stress   for net sectional area   2  Axial compressive stress     for gross sectional area     Compressive members    where     SUS 304    100 N mm     On condition of   I r     19   100 N mm     On condition of  19  lt   l r   lt  96   100  0 53   I r       19 0     On condition of  96     I r    980 000    7 200    I r       I  buckling length of member  mm     Volume 1  Section 7 Specifications  7 2 Hydraulic Gate Works    SUS 304L    90 N mm     On condition of   Vr   lt  21   90 N mm     On condition of  21  lt   l r  s 104   90     0 47   I r       21 0     On condition of  104  lt   l r    980 000    8 400    I r       r  radius of gyration of gross sectional area of member  mm     Compressive splice member    3  Bending stress at tensile side   for net sectional a
415. wise specified or approved  all instruments shall have circular scales with a total  deflection of not less than 240 degrees     Normal working indication shall be at a point corresponding to approximately 75 percent of full  scale deflection  Scales shall be provided with red colored marks at points corresponding to the  normal working values  or full load current of the equipment in case of ammeters  and as  approved     The scales for ammeters in motor circuits shall be suppressed so that 20 percent of full scale  deflection  F S D   occurs at about 40 percent full load current  F L C   and 90 percent of F S D   at about 120 percent F L C  The scale shall be approximately linear in the range 40 percent to  120 percent and compressed above 90 percent F S D  to indicate 6 times F L C  at 100 percent  F S D     Devices for routine checking  zero adjustment and re calibration shall be easily accessible from  the front of the cabinets  Where such devices are not included in the instrument case they shall  be flush mounted on the cabinets adjacent to the associated instruments  so that adjustments  can be made conveniently while watching the indicator     2 12 16 Equipment Wiring and Wiring Accessories    All connections within equipment enclosures and all inter cabinet wiring voltages shall not  greater than 600 V nominal  All wiring shall be carried out in accordance with wiring diagrams  so that the arrangement of the wiring is consistent throughout the equipment and identica
416. wo Governments shall consult with each other in respect of any  matter that may arise from or in connection with the present understanding       have further the honour to propose that this Note and Your Note in reply  confirming on behalf of the Government of the Kingdom of Thailand the  foregoing understanding shall constitute an agreement between the two  Governments  which shall enter into force on the date of your Note in reply       avail myself of this opportunity to extend to you the assurance of my high    consideration          Seiji Kojima    Ambassador Extraordinary  and Plenipotentiary  Embassy of Japan             Grant Agreement No 1161660    GRANT AGREEMENT    For    THE FLOOD PREVENTION PROJECT OF EAST SIDE OF THE  PASAK RIVER IN AYUTTHAYA    Between    JAPAN INTERNATIONAL COOPERATION AGENCY    THE GOVERNMENT OF THE KINGDOM OF THAILAND    Dated August 15  2012         the basis of the Exchange of Notes between the Government of Japan and the  Government of the Kingdom of Thailand dated July 5  2012  hereinafter referred to as     the E N     concerning the Japanese grant assistance for the Flood Prevention Project of  East Side of the Pasak River in Ayutthaya  hereinafter referred to as         Project   by  the Government of the Kingdom of Thailand  the Japan International Cooperation  Agency  hereinafter referred to as    JICA     and the Government of the Kingdom of  Thailand have agreed to conclude the following grant agreement referred to in  sub paragra
417. x1 0  he   Jon   9 8x 16 0        2 5     0 15m  2   v9         PAR d    Wind load    The wind load shall be at the basic wind pressure of 1 5 kN m   150kgf m   for a vertical  projected area with its multiplication shape factors as below       For plane surface  1 2    For a cylindrical surface  0 7    For lattice member  at front side  1 6    For lattice member  at rear side  1 2    2 1 3 Hoist    The stationary type hoist shall be designed for the combination of the following loads      a  Dead weight of the gate leaf and ballast weight  if any   b  Friction force due to rotating and or sliding parts    c  Friction force due to rubber seals    d  Friction force due to sediment if any    e  Buoyancy    f  Uplift force and down pull force     g  Allloads imposed by gate jammed condition during raising operation    S 7 2 11    Volume     Section 7 Specifications  7 2 Hydraulic Gate Works    The Flood Prevention Project of East Side of the  Pasak River in Ayutthaya in the Kingdom of Thailand    Closing force of all gates except for those operated by spindle type hoist shall have an  allowance of more than 25 percent against all upward forces such as friction forces and  buoyancy  etc   in any gate openings under any water level  If there is a lack of the closing force   the ballast may be provided to the leaf  The ballast shall be made of the steel or other approved  materials by the Consultant     2 1 4 Loadings     a  Staircase 3 5 kN m  crowd load   b  Service load   T 14 t
418. xtension of the period of execution of the Work  stipulated in Article 16 of the Form of Contract     As for sites for the temporary works  including a temporary site office  warehouse  stock  yard and temporary access  proposed and required by the Contractor  the Contractor  himself shall be required to negotiate with the landowners for letting during the Construction  Work in total assistance of the Client  The rents for such letting shall be born by the  Contactor himself     Relocation of Utilities     1  Oil pipeline    High pressured oil pipeline of PTT Public Company Limited is buried crossing Kra Man  Canal between the railway bridge and the prefectural road bridge  where the pipeline is 5m  away off the road bridge  situated just downstream Kra Man Floodgate  There  no  relocation of the pipeline will be required  However  the Contractor shall be requested to  pay special attention for not giving any damage to the oil pipeline when a temporary  cofferdam is constructed      2  Water distribution pipes  Downstream Han Tra Floodgate  PVC made water distribution pipe of Dia 100 80mm is    5 5 4    The Flood Prevention Project of East Side of the Volume I  Section 5  Pasak River in Ayutthaya in the Kingdom of Thailand Conditions of Contract    10     11     12     13     buried down the right bank of the canal to the last house standing atthe canal mouth  The  pipe is coming down from the PVC made Dia 100mm water distribution pipe attached on the  prefectural road bridge
419. y  stencil with waterproof inks or oil paints and these marks shall be protected  against weathering by clear water resistant varnish     Marking on each package shall consist of the following information   e  Consignee  The Contractor and or his Subcontractor s   e Final user  Royal Irrigation Department  RID   e Name of the Project   e Port of disembarkation   e Item number  package number in sequence  and quantity per package   e Description of item   e Net and gross weight and cubic measurement     e Shippers name  and Suppliers name  if Shipper is different from  Supplier    e Caution marks  if applicable     e Other markings required by the Client   Shipment    Shipping advice for the parts of the Equipment imported from Japan shall be sent by  courier  electronic mail or be handed to the Consultant prior to the on board date of the  Bill of Lading  containing such information as loading and unloading port  date of  departure and arrival  name of vessel  and one  1  photocopy of the following  documents     e Clean On Board Ocean Bill of Lading  e Signed Commercial Invoice   e Packing List   e Insurance Policy    Insurance until Delivery    The Equipment  including the parts to be installed and mounted onto the chassis at  workshop s   shall be fully insured  until the Client issues the Receipt of the Equipment  to the Contractor  against loss or damage incidental to manufacture  installation   mounting  transportation  storage and delivery     Import Charges    The Con
420. y impregnated to render them moisture proof  non   hygroscopic and unaffected by conducting dust     All motor bearings shall be of the ball or wheel type with an inner grease seal to prevent grease  from entering the winding  Bearing housings shall be fitted with a  ball in head  grease fitting  and a removable plug for the escape of grease     2 12 2 Brakes for Wire Rope Winched Hoists     S 7 2 32    The Flood Prevention Project of East Side of the Volume     Section 7 Specifications  Pasak River in Ayutthaya in the Kingdom of Thailand 7 2 Hydraulic Gate Works    Two  2  systems of brake shall be provided for all wire rope winched hoists     Electromagnetic brakes shall be mounted on all hoisting motors  The braking torque shall not  be less than 150 percent of the rated torque of the motor  The brakes shall actuate  automatically when the power supply is cut off and shall allow hand liberation upon power failure   The brake enclosure shall be weather proof with convenient access for maintenance     Electro hydraulic thruster brakes shall be provided for all hoists in addition to the motor brakes  unless the self lock speed reducers are incorporated into the hoists  The electro hydraulic  thruster brakes shall be housed within a dust rain proof steel box     2 12 3 Electric Cables and Wiring    All cables wiring between the distribution panel  control cubicles  motors  limit switches etc    shall be with multi core copper  cross linked polyethylene insulated  PVC sheathed 
421. y the Consultant for the purpose of inspection which shall in no way  relieve the Contractor of his responsibility for furnishing plant and materials complying  with the Specifications     Programs and Notices of Transportation    Concurrently with submitting a construction schedule  the Contractor shall furnish the  Consultant with a complete transportation program for plant  materials  and the  constructional plant  showing in detail the sequence of transportation and delivery on Site  to comply with his proposed construction schedule     The Contractor shall keep the Consultant informed of the arrival of plant  materials and  the Constructional Plant at the Site     Specifications  Pamphlets and Data to be Supplied by the Contractor   The Contractor shall submit to the Consultant for approval three  3  sets of complete  specifications  pamphlets and data for materials and plant to be supplied under the  Contract prior to the work commencement     The approval of such specifications  pamphlets and data  however  shall not relieve the  Contractor of any responsibilities in connection with the Contract     1 6 Survey and Measurement of the Works     1      2     Bench Mark    The basic bench marks for the P roject will be shown on the Reference Drawings  which  will be supplied by the Consultant after the contract has become valid  together with their  locations and elevations of these bench marks  The other bench marks and reference  points will be also shown on the Drawings
422. y the Consultant of such program or schedule or  furnishing of any particulars thereof shall not relieve the Contractor of any of his  obligations or responsibilities under the Contract     J oint Meeting to Discuss Progress    5 7 1 7    Volume I  Section 7 Specifications The Flood Prevention Project of East Side of the  7 1 Civil Works Pasak River in Ayutthaya in the Kingdom of Thailand     5      6     A regular meeting between the key personnel of the Consultant and the Contractor shall  be held once per week at a time agreed to by both parties  The purpose of this meeting  will be to discuss the progress being made  the work proposed for the forthcoming week  and any problems having a direct bearing on the immediate to near term work activities     Progress Photos    The Contractor shall furnish to the Consultant color photographs  not less than 8 cm x 12  cm  of the work in progress  at locations directed by the Consultant throughout the  Contract period  The photographs shall be taken at the start and completion of each  major component of the work and at other times as instructed by the Consultant  The  photographs to be furnished to the Consultant shall be attached to the applicable monthly  progress report specified in Clause  2  hereinabove and shall be in five  5  prints for each  photograph  A brief description and date of each photograph will be included  The cost  of such photographs shall not be paid separately and shall be deemed to be included in  the Contra
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Mode d`emploi  Especificaciones  詳しくはこちらをご覧ください。  Construction of a Genetic Linkage Map in Man Using Restriction  MICRÓFONO DE CONDENSADOR PARA ESTUDIO  Sistema de revestimiento de fachadas ventiladas mediante bandejas  GM Service Insights  Manual de usuario de Kioscos Deportivos  istruzioni di installazione    Copyright © All rights reserved. 