Home
        Instructions for filing application - Warehousing & Logistics Policy
         Contents
1. 10     11     12     13     Instruction for filing online application  Under  M  P  Warehousing And Logistic Policy 2012    In browser type http   www mpwlp2012 com     Alternatively In browser type http   www mpwarehousing com  then Click  on link Online Application     Download User   s Manual from download link   Enable pop ups in browser setting     Register you as organization individual to use application  as described in  Chapter 2 of user manual     Login as described in Chapter 3 of user manual     User can file multiple application for different location or for same  location from one registration  You need not to register again for  different locations or for same location     User has option to SAVE application for subsequent changes or directly  SUBMIT application  APPLICATION ONCE SUBMITTED CAN NOT  BE EDITED     Submit application after filling requisite details as described in Chapter 4 of  user manual  Please ensure you have clicked on submit button  If you  have clicked on save button then application is pending at your end for  submission so  gt Relogin gt  Select radio button Edit  gt  If you wish  you  can make changes also  gt  Click on Submit button     On submission you will receive a confirmation mail with date time  stamping  Quote the application number for all future  correspondence     After Submission of application make payment of requisite fees within 5  working days  as described in Chapter 5 of user manual  MPWLC will not  be responsible for 
2. any delay in the payment     If application has been rejected due to non payment within stipulated date  applicant can apply afresh till last date of application filing     On receipt of e mail for acceptance of application  submit duly signed hard  copies of all the documents as mentioned in the e mail  Please update the  status of submission of documents on the website     14     15     16     I7     18     Once documents are submitted these will be verified by district level  committee and any shortcomings in the documents shall be notified through  mail     If documents are found ok then you will receive a mail for site inspection  mentioning date and time  Arrange for site inspection on the designated date     If site is found to be satisfactory along with document verification an  acceptance letter shall be issued  You will be required to sign an agreement  with the district level committee within stipulated period     You will be required to start construction after signing agreement and  complete within 12 or 18 months depending on capacity of warehouse from  the date of signing agreement     Once the construction of warehouse is over  you will need to update status  on website so that inspection could be done and subsidy under the policy  could be released     Please_read_the M  P  Warehousing And Logistic Policy 2012    carefully  Above instructions have been_given_ in brief to facilitate    submission of online application only     
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Video Camera Recorder  Instrucciones para firma de una solicitud:  Operating Instructions    F1DL102U - UK User Manual    Copyright © All rights reserved. 
   Failed to retrieve file