Home
        User Manual VB
         Contents
1.       Username   mdi                RAKA                                                                         Password     Retype Password  pss  Name  Marco  Surname  Dijk  Cell Number   083 394 8627  Office Number  012 440 6064                                                       Postal Address  278 Mears Street  Muckleneuk     sind 0002                      AssignUserRole 2               M             Figure 5  System Users    5  Read Only View    Users will the lowest clearance level will only be able to view the database without  being able to make any changes to current records  deleting records or adding new  records  For the prototype s demonstration purposes it was only necessary to    complete some of the read only menus        Ze  Read Main Menu TEE    AB Main Menu    ance   Read Only     View Hydraulic  Results                      Hydraulic   Perform                    View Pipeline  View Data Nodes System          78 university or setora Industrial  amp  Systems Engineering Department B 4  Ted TUNI zm TA ERELOGRLE    en n arg Bron    Tega Fir Cece    6  Hydraulic Main Menu    The Hydraulic Performance Information System allows users the following options     e Maintain Pipeline Owners     Add  change or delete pipeline owners  Owners can    also be assigned to pipelines     e Maintain Pipeline Systems     Add  change or delete pipeline systems     e Maintain Pipeline Sections   Add  change or delete pipeline sections on a pipeline    system     e Maintain Pip
2.    F        Type  Control Valve Ivi X Co EERE    Secondary Loss  Y Co  1021564545  Upgrade Date  2008 10 14 2021545455    lil    N  w       Additional Details   Leaking Photos  Drawings       Type  Ivi X Co    Y Co  Z Col   b         Secondary Loss           Figure 17  Pipeline Component History    dd  78 versi oF prevor    Industrial  amp  Systems Engineering Department B 13  a    Recommendations    e  he adding of a new pipeline component and viewing of current pipeline  component should be in a tab structure  but due to limitations of MS Access this  was not possible  the list box feature becomes inactive     e The display of a pipeline component s history should be done automatically  without first having to enter it in the textbox  This was a design limitation  regarding MS Access    e  t would be desirable to first have a list of pipeline systems and by selecting a  system  the pipeline sections are then displayed  This will avoid a long list of all  pipeline sections being displayed when one just want to look at specific sections    of a pipeline system and its accompanying components     11  Pump Stations    The pump station main menu  figure 18  allows the user to add new pump station     view current pump stations and assign pump stations to pipeline systems        Close    Figure 18  Pump Station Main Menu  11 1 New Pump Station    The new pump station screen  figure 19  makes use of the current date feature and  drop down boxes to make it user friendly  Attachment
3.   amp  Systems Engineering Department B 11  VER EE    Ee  Components main  E X       Components Menu       New Components    View Components  Close    Figure 14  Pipeline Components Main Menu    10 1 New Pipeline Components    The new pipeline components screen  figure 15  allows the user to enter a new  pipeline section component  Drop down boxes as well as the current date function     date   makes the process of entering a new component user friendly     Ea  New Pipeline Component 2 UEM    New Pipeline Component       Pipeline Section  m  Component Type  ivl  Secondary Loss  e    1  X Coordinate   o    e Photos   Y Coordinate   I                          Z Coordinate  Fe ed  Installation Date  Drawings     Additional Details        Figure 15  New Pipeline Component    ai  78 university or setora Industrial  amp  Systems Engineering Department B 12  we    usum  n ung gar Turks    10 2 View Pipeline Section Components    The pipeline section components screen  figure 16  displays the current pipeline  sections  Selecting a pipeline section from the list displays the components on that  section of pipe  Entering the component ID in the textbox will display the components    history details  figure 17      Es  Pipeline Components                  Pipeline Sections Pipeline Components    pipeline section ID  WM2002  WM2002    Enter Pipeline Component     Display Component  History    New  Component       Figure 16  View Pipeline Components    cs  Pipeline Component History  ax 
4.  Section Mergers         New Pipeline Sections    ORG044  ORG045       SMBOOS    New Section  SMB005  Merger Date   2008 10 08    Pipeline Sections Merged  SMBOO1  SMBOO2   SMBO003                                          Close       Figure 39  Pipeline Section Mergers    18  Reports  The reports main menu  figure 40  allows the user to select which type of report they    would like to display namely  Data Node Maintenance  Hydraulic Results  Pipeline    Owners  Split Pipeline Sections and Merged Pipeline Sections     Es  Hydraulic Reports T ees        Data Node Split Pipeline  Maintenance     Sections  Hydraulic Results En  Pipeline Owners    Figure 40  Reports Main Menu    ES  a un  vers  r   or prerosia Industrial  amp  Systems Engineering Department B 28    So e s ERD    a  Leon    18 1 Data Node Maintenance Report    The data maintenance report  figure 41  displays all the upcoming data nodes that  require service  The date and description of the service is given  It displays on which  pipeline section the node lies     id Data Node maintenance Report    Tm   E A MET  Mp du ae       ModelD Pipeline Section Maintenance Date Maintenance Type Additional Notes     2 SMB002 2010 02 09 Instrument replacement  3 GRTOO3 2009 12 12 Battery replacement  1 GRTOO3 2008 12 12 Battery replacement  1 GRTOO3 2008 10 29 Battery replacement Old Battery used      Fa Tu ON ON d RM ad On AE ET MR ad va EE ve ef MOT ELE en cR mn Er E as ee EE   al       Figure 41  Upcoming Data Node Maintenan
5. 1  Introduction    The following user manual explains how the hydraulic performance information  system operates  Even though this is just a prototype the fundamental functioning is  conveyed to the user and limitations and constraints for the different sections are    mentioned     2  Database Access    The database has been encrypted with a password to protect it from unauthorized  personnel entering the system  This is the first level of security  whereby authorized  users will login via a password screen  figure 1   The password has been set as     hydraulic  for the prototype        Password Required    Enter database password   a i ci EREE    ee    Figure 1  First Level Security       The user is then requested to activate the content of the database as Microsoft    deactivated this for security purposes  figure 2      T Security Warning Certain content in the database has been disabled Options    Microsoft Office Security Options 263        Security Alert    VBA Macro  Access has disabled potentaly harmful content in thes database   Tf you trust the contents of fis database and would ikr to enable it for this session  only  did Enable ths content    Warning  It is not possible to determine that this content came from a   trustworthy source  Vou should leave this content disabled unless the   content provides critical functionality and you trust its source    More informaton   Fie Pain  C    tsWwarsitristudes Year 4 Gemester TWP  420 Database Y C02  7 accdb  O Help prot
6. 6  Wallmannsthal1  Wallmannsthal2  Wallmannsthal3      Pipeline Section Status   13001    213004       Enter the Pipeline Section         13001       Figure 12  View Pipeline Sections    E  78 uiiversity or eeeroria Industrial  amp  Systems Engineering Department B 10  vor EE    Mura RAT rna   acusa    Es  Pipeline Section History EIER           Shape     Liner  X Coordinate    1021547744    Size  m   Y Coordinate   2021212212 1212158254       Material   Steel Z Coordinate   3031464133 031234421      lt      oj  3  Lue    oak  rm  Lm         CT  E  cO    Upgrade Date  2008 10 14      Start Point End Point       Shape  Round Ir Start Point End Point  Liner   Bitumen Rm X Coordinate  N  Size  m   Y Coordinate   Material   Steel     ZCoordinate   Upgrade Date   Shape   Round m    Start Point End Point       Figure 13  Pipeline Section History    Recommendations     e  he adding of a new pipeline section and viewing of current pipeline sections  should be in a tab structure  but due to limitations of MS Access this was not  possible  the list box feature becomes inactive     e The display of a pipeline section   s history should be done automatically without  first having to enter it in the textbox  This was a design limitation regarding MS  Access     10  Pipeline Components    The pipeline components main menu  figure 14  allows the user to add new  components to a pipeline section or view the components on a specific pipeline  section     3M  78 uuiveesiiy or retori Industrial
7. Hydraulic    Performance  DE v 1       User Manual   Version 1 0     eh    a    Hydra                                     Table of Contents    hs MATROGUCGHON RE E EE OIE B 1  2  Database Access        ee ER EE EE ER ER RE Re RE ER Re Re RR ee ee B 1  3  USER LOG c ea ae B 2  A PROMISE RATION  zes ea B 2  4 1 Maintain System Users       se esse ee Ee ER EER Ee ER Ee ER ee ee ee ee ee ee B 3  5  Read Only VIEW    se ee ee EE RE EE ER ER ER Re EE Re nne B 4  6  Hydraulic Main Menu       eie esse ee es se ee ee ee ee ee ee ee ee ee ee B 5  7  Pipeline Owners       EE EE EE ER EE EER ER EE ER EE ER ER EE Re ee ee ee ee B 6  8  PIDEIINE SYSIEMS esses es RE EE SR ER ER N RE Ge RE B 7  9  Pipelini   CCION ss es EERS een B 8  9 1 New Pipeline Sections               ccc ccc cece cece e eee ER RE Re ER ee Re Ee ee B 9  9 2 View Pipeline Sections             c ee EE ER EE RR ER EE Re ER RR ee ee ee ee ee B 10  10  Pipeline Components        Ee EE EE EE ER EE ER ee ee ee B 1 1  10 1 New Pipeline Components                          esses B 12  10 2 View Pipeline Components                cccececeeeeeeeaeeneeeaeenaeeaees B 13  TI AP UMB SIAUONS ses SES DE EE OE DE ED DEI B 14  Hi  NEW PUMDS ONS EE EE GR ie EE GE B 14  11 2 View Pump SIatiONS eu  osse ke bert opu EE EG EE GED DE mex Ex cens B 15  11 9 ASSI PUMP StaONS susse een B 16  12  Reservoirs       EE ER RE EE EE RR ER EE ER Re eee nnns B 16  Ted NEW IRCGCIVOWS ige RE De ran B 17  12 2 View IOSOEIVOIES sogni  ae ae nee Ee er tu Ge ee 
8. ader Surname  Hillerman  iran MN  Cell Number  0834533025    Province   Kwazulu Natal sv   Nearest Town  Winterburg             Notes              Save Changes Add Crew             Figure 30  IS Maintenance Crew Details    IT VAN PRETORIA      university or ereton Industrial  amp  Systems Engineering Department B 22  ae RR    ring  Mr       Es  Maintenance Crew       X    ka IS Maintenance Crew  ee EE    IS Maintenance Crew Details   Crew Assignment    Currently Assigned Pipelines                 Monitoring Status    Assignment Date    2008 12 12  Active 2008 10 14       Record  4 dof1    gt  hM ps   KI    Save Changes Delete Assignment       Figure 31  IS Maintenance Crew Assignment    15  Hydraulic Results  The hydraulic results screen  figure 32  displays a list of pipeline sections and by  selecting a section the hydraulic results are displayed  These records include the    pipe roughness values as well as accompanying graphs and reports       Hydraulic Results Se    W  Hydraulic Resu Hydraulic Results    DE           Pipeline Section   C16004         Pipeline System   GaanRT54    Pipeline Section          2000 12 20 2     2008 10 08 2  2008 10 14 6    Figure 33  Hydraulic Results    ww ot ereto Industrial  amp  Systems Engineering Department B 23  THI TA PRETOR    usw n Lacing Bron    CIRpxquok Fir Dheri    Recommendations   e A list of pipeline systems must first be displayed  By selecting a specific system    all the sections must be displayed  The section can then be 
9. ce Report    18 2 Hydraulic Results Report    The input screen  figure 42  allows the user to input the pipeline section for which the  hydraulic report must be displayed       Enter Parameter Value    Please Enter The Pipeline Section    Figure 42  Enter Pipeline Section Screen       The hydraulic report  figure 43  displays the pipe roughness calculated by five  different methods and the accompanying graphs for a specific pipeline section     Industrial  amp  Systems Engineering Department B 29    Hydraulic Results Repor    bts    Result Date C WEs    2000 12 20    2008 10 08    2008 10 14    raulic Results    K P Ks    2 2 787    Barrs Ks    H W C Value       Pipeline Section  GRTOO3    Mn n Value    2 35 2    Page 1 of 1    Figure 43  Hydraulic Results Report    18 3 Pipeline Owners Report       Pressure Drop Flow Rate Graphs    The pipeline owner report  figure 44  displays all the pipeline owners and their    essential contact details  The project team uses these details to keep in contact with    the owners        Pipeline Owner Report    neon m    Email     Owner   Contact Number     Fax Number     Contact Person     Owner   Contact Number     Fax Number     Contact Person     Umgeni Water    0333411111  0333411167    Mr  Alan Kockott  a kockott umgeni co za    Rand Water  0861010221    0114525555    Mr  Phillip Basson    Postal Address     Physical Address     Email     Postal Address     Physical Address     p basson randwater co za    Figure 44  Pipeline Owners Rep
10. ect me from unknown content  recommended        Enahle ths content    Quen the Trust Center  Lx    aa              Figure 2  Enable Content  af     g university or setora Industrial  amp  Systems Engineering Department B 1     hend YUNIBESITHI TA PRETORIA    3  User Login    The system user is then requested to login with a username and password  figure 3    This security feature allows for three types of users to access the database namely   Administrator  Full Access and Read Only  The login screen validated the user s    password and displays an error message if the wrong password is entered     cs  User Login   FAR       Hydraulic   e     Performance  DB v  1                Username  pvlynch Iv        Enter Password        oe  Microsoft Office Access       e  1   Wrong Password           Figure 3  User Login Screen and Validation    Depending on the user clearance  the login screen will then take the user to one of  the three main menus namely  Administration Main Menu  figure 4   Read Only Main  Menu  figure 6  and the Hydraulic Main Menu  figure 7   As a default setting  if no  password is entered the Read Only Main Menu appears  Table 1 contains the    usernames and passwords for login     Table 1  Usernames and Passwords      Password     X Open J            pvlynch Administrator Main Menu      mvdik   pipe   Hydraulic Main Menu  Read Only Main Menu       4  Administration    This is the highest clearance level for a user which will allow them to perform  administrati
11. ed on the right hand side of the screen  Typical buttons such as    add  save and delete are present     E  78 moves or ereton Industrial  amp  Systems Engineering Department B 6  Tena Lu l H A E t    UE    Es  Pipeline Owner EET    eline Owner Details       Pipeline Owners        m     Organisation   Umgeni Water  Umgeni Water     Sete anges    Rand Water work number   033 341 1111      Bloem Water   wner  Magalies  Vater Fax number   033 341 1167    email address  jinfo umageni co za    Delete Owner    physical address     postal address   PO Box 9  Fietermaritzburg   KwaZulu Natal  3200    contact person  Mr  Alan Kockott    contact email   a kockott umgeni co za       Figure 8  Pipeline Owners    8  Pipeline Systems    The pipeline system screen  figure 9  displays a lit of current pipeline systems in the  database  Attachments of photos and drawing of the pipeline systems can be added   Add  save and delete buttons are present to simplify record maintenance  There is a  field called short name which is a three letter abbreviation of the pipeline system   This short name is used to name pipeline sections  There is a link to the GIS in order  to see where the pipeline lies and the surrounding area  this link is currently not  active as the GIS must be installed on the computer   The  Operating Life  field  contains a formula which calculates the age of the pipeline based on the commission    date     a  78 Uviversivy or prevon    Industrial  amp  Systems Engineering Depart
12. eline Components     Add  change or delete pipeline components on a    pipeline section     e Maintain Pump Stations     Add  change or delete pump stations on pipeline    systems     e Maintain Reservoirs     Add  change or delete reservoirs on a pipeline system     e Maintain Data Nodes     Add  change or delete data nodes  data loggers and    instruments  along the pipeline systems     e Maintain Information System Maintenance Crews     Add  change or delete  maintenance crews that will service the data loggers and data recorders on the    various pipeline systems     e Maintain Pipeline Splits     View and add pipeline sections which break up into    more sections     e Maintain Pipeline Mergers     View and add pipeline sections which merge into a    pipeline section     e View Hydraulic Results     Access the output results of pipeline sections    pipe    roughness values and accompanying graphs and reports     e Reports     View and print reports regarding the information system     3i     g sniveesiiy of preton Industrial  amp  Systems Engineering Department B 5    YUNIBESITHI YA PRETO    Ex  Full Main Menu ZEN    Hydraulic            Pipeline Section  Reservoirs  Merge    _ Data Nodes    Hydraulic  Results          Figure 7  Hydraulic Performance Main Menu    7  Pipeline Owners    The pipeline owner screen  figure 8  allows a user to enter pipeline owner details   The screen displays a list of current pipeline owners and by selecting an owner the  details are display
13. he merger as well as saving    information about the  new  merged pipeline section     Es  New Pipeline Section Merger UTERE      Please Enter New Pipeline Section First and  COPY SECTION ID FOR MERGE ID    MERGEID   O OOS S    Merger Date  2008 10 12    Pipeline Sections Merged     Change Merged Change Data Nodes Change Components  Sections STATUS to To Mew Section To New Section  MERGED        Change Component  Change To Merged n Location       Figure 38  New Pipeline Section Merger    Due to the complex nature of merging pipeline sections and all the changes that have  to be made  the process could not be completed automatically by queries  e g  multi   valued fields were used which cannot be used in queries   The layout of the screen  follows a logical sequence in order to make the changes  Pipeline section mergers do    not occur often so it is not such a great concern that the process takes time     Recommendations     e The screen must be redesigned to make it more user friendly and automated     TEIT VAN PRETORIA       ivy or eeeroria Industrial  amp  Systems Engineering Department B 27    Dee  ETE       mm  mss  Was        EET    17 2 View Merged Pipeline Sections    The merged pipeline section screen  figure 39  displays a list of all the    new    pipeline  sections that have been merged from existing sections  By selecting a section the    right hand side of the screen displays the details of which sections were merged to    form the  new  section     tg  Pipeline
14. ineering Department B 19  VER EE    1 n Leng gar Eri    13  Data Nodes    The data node main menu  figure 26  allows the user to add new data nodes on a    existing pipeline section as well as viewing current data nodes     Es  Data Node Main MEME      Data Node Menu       Mew Data  Mode    Modes    Figure 26  Data Node Main Menu  13 1 New Data Node    The new data node screen  figure 27  makes use of drop down boxes and current  date feature to make the data entering process user friendly     Es  New Data Node TR    3   New Data Node i       Pipeline Section     X Coordinate   Y Coordinate   Z Coordinate   Installation Date  2008 10 14    Temperature Meter     Flow Meter   Water Quality Meter     Presure Meter           Maintenance Type        Maintenance Date   Number Of Channels   Additional Notes    Y    E     Figure 27  New Data Node  3    UNIVERSI  UNIVERS  TYUNIBESI    usum  n ung    EIT VAN PRETORIA  TY OF PRETORIA  THI TA PRETORIA    1     Industrial  amp  Systems Engineering Department B 20    13 2 View Data Nodes    The data node screen  figure 28  displays a list of pipeline sections  By selecting a  section  all the data nodes on the section are displayed  The user can then enter a  node ID in the text box to display the nodes history records of all the changes that the  node has undergone  figure 29      Es  Data Nodes      Data Nodes    Select Pipeline Section   ine System GaanRT154    e Section GRT003       Figure 28  View Data Nodes    E3  Data Node History Q
15. k LA ERE 1o l LA    
16. mani  GSSTRR3     Waterloo Pump Station       Pipeline System  ZwartkopjesC13  ZwartkopjesC16    al    Lesaka Booster Pump 1       Figure 21  Pump Station Assignment  Recommendations    e The GIS must be active on the final system and by clicking on the button must  open the exact position of the pump station    e A tab structure should be used to display the display the three screens mentioned  above  but due to MS Access limitations this was not possible  list boxes became    inactive    12  Reservoirs    The reservoir main menu  figure 22  allows the user to add new reservoirs  view    current reservoirs and assign reservoirs to pipeline systems     ai  78 un  versim or pretoria Industrial  amp  Systems Engineering Department B 16  EA niens    acing Mr    Es  Reservior Main            Reservoir Menu    Assign  Reservoirs    Reservoirs    Figure 22  Reservoir Main Menu  12 1 New Reservoirs    The new reservoirs screen  figure 23  makes use of the current date feature and  drop down boxes to make it user friendly to complete the reservoir details   Attachments of the reservoir s drawings and photos can be added     Es  New Reservoir     x       New Reservoir    Date     Reservoir  Photos  7 Drawings       Figure 23  New Reservoir       IT VAN PRETORIA    ai  78 university or ereton Industrial  amp  Systems Engineering Department B 17  WP Dre eee tede    IT HI  grad n Laer Mn DX i    12 2 View Reservoirs    The reservoirs screen  figure 24  allows the user to view a list of c
17. ment B 7  SLIDE    a  Leon    Es  Pipeline System EF       Pipeline Systems         Add new pipeline owners before entering new pipeline details  Pipelines   oweerlineB 7    Welbedacht Pipeline Short Name  LEU  Lesaka Pipeline  Leuwkop Pipeline a  Ndwedwe Bulk Water     Pipeline Profile     warlkopesC3 Commission Date   1989 04 01  ZwartkopjesC 13   vp     ZwartkopjesC 16 Operating Life  Y    Wallmannsthalt Additional Notes  Single Line  Wallmannsthal2     Wallmannsthal3      Save Changes     Add Pipeline bied  Photos     Delete Pipeline Gls x ma       Pipeline Name   Leuwkop Pipeline    Pipeline Owner   Bloem Water    Figure 9  Pipeline Systems    Recommendation  e The GIS must be activated on the final system and by clicking on the button  must  open the exact position of the pipeline using the X  Y and Z Coordinates     9  Pipeline Sections    The pipeline section main menu  figure 10  gives the user the following options  new    pipeline section and view existing pipeline sections     cs  Pipeline Section Main     X    New Pipeline  Section    View Pipeline  Sections       Figure 10  Pipeline Section Main Menu    IT VAN PRETORIA    AMAN SPATO Industrial  amp  Systems Engineering Department BA    HI TA PRETORI    Mura RAT rna  Lacs    9 1 New Pipeline Section    The new pipeline section screen  figure 11  allows the user to enter a new pipeline  section on an existing pipeline system  This is needed as the entire pipeline will not  necessarily be monitored or the pipeline 
18. might have variations along its length which    could to be monitored individually     Es  New Pipeline Section C              New Pi Ei Suction    Pipeline System  EE  section ID   Status     section Shape   section Material     Liner     section Size  mm      Date  2008 10 14    Start Point End Point  X Coordinate     YCoordinate   JLo     Z Coordinate       0 0 0 0 0 0    Figure 11  New Pipeline Section    The screen makes use of the current date as a default value for the monitoring date   Drop down boxes are used to enter details  making the system user friendly  The  section ID is entered using the short name of the pipeline and three numbers  e g   ORG and 004   This allows the user to see which pipeline system the section  belongs to     Recommendations   e The final system must make use of the short name  but must be an auto number    feature     3x    unversiny or ereroria Industrial  amp  Systems Engineering Department B 9  VER EE      Lcsrsg    9 2 View Pipeline Sections    The pipeline sections screen  figure 12  lists the current pipeline systems  By  selecting a pipeline system all the pipeline sections are displayed  The pipeline  section can then be entered in the textbox below to view its history records   Figure 13         Es  Pipeline Sections _   x                   Pipeline Sections    Pipelines   Oranges1  GaanRT54  oweerlinaB    Welbedacht Pipeline  Lesaka Pipeline  Leuwkop Pipeline  Ndwedwe Bulk Water 5  ZwartkopjesC 3  ZwartkopjesC 13  ZWartkopjesC 1
19. oe be B 18  12 3 ASSIN RESEIOIS us een B 19  ESE icio  EE EE OE EE N EN B 20  13 1  NEW Dale NOUS seen ees EE EE EE E T EE AE B 20  132 VIEW Data oo on aeg B 21  14  IS Maintenance Crew        Ee EE Re EE Re ee ER ee ee ee ee B 22    3i       university or eeeroeik Industrial  amp  Systems Engineering Department B i  a FUN LES S  ze LA PRE CUEN    15  Hydraulic Results              0  cece cece ee Ee ee ee ER ee ee ee ee ee ee B 23    16  Pipeline Section Split                           Lsseeeeeuueeuuees B 24  16 1 New Pipeline Section Split                         seseeeseeee Re Ee ee B 24  16 2 View Pipeline Section Split        ee ee ee ee cece ER EE eee EE ee Re ee B 25  17  Pipeline Section Merger          EE EE EE Ee ER EE Re ee ee ee B 26  17 1 New Pipeline Section Merger                         RE ER RR EE ER ee Ee ee B 27  17 2 View Pipeline Section Merger          ie see se ee ee ER RE Re ER ee ee ee B 28  16  RODO O Se EE ana EE ee B 28  18 1 Data Node Maintenance Report          ie ee ee ee ER ee kk ee Re ees B 29  18 2 Hydraulic Results Report           sis es ese ee es ee ee ee ee ee ee ee ee eed B 29  18 3 Pipeline Owners Report          ie se se ER EE RE ER ER ER EE ER ee Re ee ee ee B 30  18 4 Split Pipeline Sections Report          ie ie ee cece eee ER Re Re en B 31  18 5 Merged Pipeline Sections Report                  cceeeeeeeee eee ek ee Re B 31  g sniveesiiy of ercros  a Industrial  amp  Systems Engineering Department B ii    YUNIBESITHI YA PRETORIA    
20. onal duties for the information system  The user also has full access to    the information system via the hydraulic main menu button     g uiiversity or eeeroria Industrial  amp  Systems Engineering Department B 2      TORIA   nnd YUNIBESITHI TA PRETORIA     e  Admin Main Menu Z BI M    Hydraulic Main Back Up Clear  Menu Data Packages       Figure 4  Administration Main Menu  The Administration Main Menu allows the following actions     e Maintain Users     Add  change and delete system users and their security  capacity  figure 5     e Hydraulic Main Menu     Go to the actual system main menu  figure 7     e Back Up Hydraulic Results     Archive the hydraulic results in a separate database  for back up purposes  This is an append query    e Back Up and Clear Data Packages   Archive the hydraulic data in a separate  database and delete the old data in the current database  This consists of an  append and delete query    e View Hydraulic Data     Allows the administrator to view the hydraulic data which    rest of users will not be allowed to perform   4 1 Maintain System Users    The user can add  change and delete system users  The user clearance is also set  via the user role combo box  The screen has a password validation rule that checks if    the password is typed in correctly  i e  retype password feature     EL  78 wuveesioreeerons Industrial  amp  Systems Engineering Department B 3    X unitur FREE        User Details ee           u System Users                      
21. ort    3  UNIVERSITEIT VAN PRETORIA  UNIVERSITY OF PRETORIA  end TYUNIBESI RETORIA    THI TA P  vg Munch    Dew    D  ficit    info umgeni co za    PO Box 9   Pietermaritzburg   KwaZulu Natal  3200    310 Burger Street   Pietermaritzburg  3201    r water randwater co za    PO Box 1127   Johannesburg   2000    522 Impala Road   Glenvista   2058    Industrial  amp  Systems Engineering Department     gt     m          B 30    18 4 Split Pipeline Sections Report    The split pipeline sections report  figure 45  displays all the  new  pipeline sections  that have been split from existing pipeline sections     Pipeline Section Split Report             239 Pipeline Section Spli    New Pipeline Section Split Pipeline Section Split Date  ORGO067 ORGO002 2008 10 08  ORGO66 ORGO02 2008 10 08  ORG999 ORGO006 1999 12 12  ORG098 ORGO006 1999 12 12   4  Page 1 of 1       Figure 45  Pipeline Section Splits Report    18 5 Merged Pipeline Sections Report    The merged pipeline sections report  figure 46  displays all the    new    pipeline  sections that have originated from merged pipeline sections        Pipeline Section Merger Report u   i S       ipeline Section    New Pipeline Section Merged Pipeline Sections Merger Date    ORG044 ORG002  ORG003 2008 12 12  ORG045 ORG004  ORG005 2008 10 08  SMB005 SMB001  SMB002  2008 10 08  SMB003  3  Page    of         Figure 46  Pipeline Section Mergers Report    a    versi or prevor  Industrial  amp  Systems Engineering Department B 31  T LUN IBESIT u
22. rder to make the  changes  Pipeline section splits do not occur often so it is not such a great concern    that the process takes time   Recommendations     e The screen must be redesigned to make it more user friendly and automated     16 2 View Pipeline Section Splits    The pipeline section split screen  figure 36  displays a list of all the pipeline sections    that have been split  By selecting a section the right hand side displays the    new    sections that have originated from the split     a  78 un  versim or pretoria Industrial  amp  Systems Engineering Department B 25  Voels vi PRES    acing Mr       Cs  Pipeline Section Split        TLL Pipeline Section Splits    Split Pipeline Sections     ORG001 Split Pipeline Section        oxen Status   ORGO007  SMBOO4 Ej New SplitSectionID    SplitDate      1999 12 12  1999 12 12          Figure 36  Pipeline Section Splits    17  Pipeline Section Merger    The pipeline section merger main menu  figure 37  allows the user to add new  pipeline section mergers as well as view merged pipeline sections     Es  Pipeline Merge Main EX          Figure 37  Pipeline Section Mergers Main Menu    IT VAN PRETORIA    iv or ereton Industrial  amp  Systems Engineering Department B 26  ER    17 1 New Pipeline Section Merger    The new pipeline section merger screen  figure 38  allows the user to take existing  pipeline sections and combine then into larger sections  This allows the existing  information to be kept about the sections before t
23. s of a pump station drawings    and photos can be added to records       university or ertion Industrial  amp  Systems Engineering Department B 14    Es  New Pump Station iem     gt  New Pump Station       Pump Station Name                    Date    X Coordinate  fl   Y Coordinate   ss   Z Coordinate  a    Pump Station Type  ls     Drawings        Photos         Figure 19  New Pump Station    11 2 View Pump Stations    The pump station screen  figure 20  allows the user to view a list of current pump  station  By selecting a pump station  details are displayed  The screen has a link to  the GIS in order to view the location of the pump station and the details of the    surrounding area         Pump Station Timeline           Pump Stations  Baviaanspoort  GSSTRR3   Kaiatia 1   Lesaka Booster Pump 1  MyPump   Ndewdew   Umat Booster1       Pump Station Configuration Upgrade Date Photos Drawings Notes  Two in Parallel    2008 10 14 m3          Wallman1       Waterloo Pump Station                                     Delete Pump Station  New Pump Station    78 viiversivy or pretoria Industrial  amp  Systems Engineering Department B 15  Ted TERI EES  cut tA PRETORIA    RAT or    er Hir Ceres    11 3 Assign Pump Stations    The pump station assignment screen  figure 21  allows the user to assign pump    stations to pipeline systems     Es  Pump Station Assignment a       Pump Stations   rem Pump Station   Baviaanspoort   Ndewdew   Kaiatia 1 NP  MyPump Assigned Pipeline Systems  Wall
24. selected to display its    timeline of hydraulic results     16  Pipeline Section Split    The pipeline section split menu  figure 34  allows the user to enter a new section split    or view all the pipeline sections that hare currently split     Es  Pipeline Section Split Main EL 3       Display Pipeline         Section Splits    Close    Figure 34  Pipeline Section Split Main Menu  16 1 New Pipeline Section Split    The new pipeline section split screen  figure 35  allows the user to take an existing  pipeline section and sub divided it into smaller sections  This allows the existing  information to be kept about the section before the split as well as saving information    about the  new  split pipeline sections       moves of scros  a Industrial  amp  Systems Engineering Department B 24    TOR    Es  New Pipeline Section Split num         Please Enter New Pipeline Section First and  COPY SECTION ID FOR SPLIT ID DEE          Mew Pipeline  Original Pipeline Section   Split Date   2008 10 12    Change Split Sections Change Data Modes Change Components  STATUS to SPLIT To Mew Sections To Mew Sections      Change Component          Figure 35  New Pipeline Section Split    Due to the complex nature of splitting a pipeline section and all the changes that  have to be made  the process could not be completed automatically by queries as  problems arise  e g  which new section does the data node and components lie on     Thus the layout of the screen follows a logical sequence in o
25. uery mx       Upgrade Date     n  c  co  co             e       4A    Maintenance Type  X Co   0212454778          General                      eas       Temperature Meter  Yes   xi Y Co  0125195642  FN i   Maintenance Date   Yes     2009 12 12 Z Co  5405645654 E  Water Quality Meter   No    Additional Notes   Pressure Meter   2 vi  Data LoggerChannels  6 Iv       Upgrade Date   2008 10 14    Maintenance Type  X Co     v            i c7     i    Temperature Meter     E    AA  eei m     P a         Figure 29  Data Node History  J     UNIVERSI  UNIVERS  end TYUNIBESI    usum  n ung    EIT VAN PRETORIA  TY OF PRETORIA  THI TA PRETORIA    sa    Industrial  amp  Systems Engineering Department B 21    Recommendations     e The adding of a new data nodes and viewing of current nodes should be in a tab  structure  but due to limitations of MS Access this was not possible  the list box  feature becomes inactive     e The display of a data node s history should be done automatically without first  having to enter it in the textbox  This was a design limitation regarding MS    Access     14  Maintenance Crew    The maintenance crew screen  figure 30 and figure 31  allows the system user to  enter maintenance crew details and assign the crews to pipeline systems via a tab    structure  Drop down boxes we used to make the data entering process user friendly       ES  Maintenance Crew 2e X                 Company   BSS    BSS Hillerman     Rand Water Fourie Leader Name   Gary    De Wall Le
26. urrent reservoirs   By selecting a specific reservoir  details are displayed  The screen has a link to the  GIS in order to view the location of the reservoir and the details of the surrounding    area         View Reservoirs m    hes 3       N _ Reservoir History RR       Reserviors    usak Reservoir Reservior Name   Lusak Reservoil       Magalies Mid tank  Zwartkopjes 1  Zwartkopjes 2    Reservoir Description Upgrade Date Drawings Photos X Coo    Tower Type   2008 10 14 E 0015  ra      2008 10 14           Delete Reservoir       Figure 24  Reservoir History    A  78 university or setora Industrial  amp  Systems Engineering Department B 18  ed TYUNIBESIT H TA EHE 1o RIA    Dorm n Lancing DX Fir  Cii    12 3 Assign Reservoirs    The reservoir assignment screen  figure 25  allows the user to assign reservoirs to  pipeline systems     zal Reservoir Assignment TEM          Reservoir Ass     Reserviors    Lusak Reservoir   TE  Magalies 1 Reservior Name     M d galies Mid tank  Zwartkapjes 1  Zwartkopjes 2       Pipeline System  Wallmannsthall              Close       Figure 25  Reservoir Assignment    Recommendations    e The GIS must be active on the final system and by clicking on the button must  open the exact position of the pump station    e A tab structure should be used to display the display the three screens mentioned  above  but due to MS Access limitations this was not possible  List boxes became  inactive     3M  78 university or eeevoria Industrial  amp  Systems Eng
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Lanart SAFSI4X6 Use and Care Manual  Installer manual NIBE™ F750  Intermec PD43  ふれあい  学びあい  教えあい  支えあい   6月6日(水)10時~11時半  DK2 DESCRIPCION PROPIEDADES  HP 37717C User's Manual  R&S®SITLine ETH: Securing rail control networks  AB-Plot V. 1.x Software Manual    Copyright © All rights reserved. 
   Failed to retrieve file