29" Cryopump Vacuum Chamber - Senior Project -

image

Contents

1. 100 l i Roughing Pump Off Roughing Pump Off Valve Closed Y Valve Closed LI lt H m 780seconds S Roughing Pump On Valve Closed Roughing Pump On Valve Open A Y Ben B5 N P 1 S m op 4 2 Qj io N 8 10 12 o ET Roughing Pump Or B bk Valve Closed L x 04 4 10 seconds K Roughing Pump On l le Valve Open gt re S I 5 minutes 0 01 as Time minutes Figure 25 The Martin Victor Cycle Cryopump Compressor Procedures Once the cryopump roughing procedures have been complete the cryopump compressor is ready to be used The cryopump compressor is used to cool off the cryopump from atmospheric temperature to below 25 K after several hours of operation Start by turning on 30 the water coolant by opening the water valve 180 shown in Figure 26 Verify that free flowing water is running through the hose the compressor and then out the clear nylon pipe into the floor drain With the cryopump at 150 microns turn on the cryopump compressor power switch located on the compressor The pressure and temperature of the cryopump should be monitored using the Varian TC 1 gauge Figure 20 and the Cryogenic Temperature Indicator in Figure 21 The pressure MUST remain at or below 150 microns to prevent water condensation inside the cryopump If the pressure in the cryopump rises above 150 microns turn on the roughing pump and the
2. Pneumatic Valves After initial testing of the roughing pump work was done to install the compressor for cryopump use Operation of the cryopump requires a fore vacuum therefore valve use is required Since the valves for the vacuum chamber are actuated with pressure lines having 60 85 psig the valves were inoperable until pressure connections were made from the local pressure tap provided by Dan Powell to the chamber connection A description of the pneumatic connection is shown in the Apparatus section To test the valves the power for 22 the system was turned on and a hissing sound corresponding with switching of the valves was made This indicated correct functioning of the pneumatically actuated valves Compressor To install the water cooled compressor the use of a 600 volt power cable with an SO 4 conductor and neoprene jacket for the main power and a 14 guage wire for the cryopump cold head connection were required A certified electrician Dan Powell connected the power conductors for three phase hookups to terminals X Y and Z of the compressor Water lines were attached to the compressor for cooling during operation Table 1 describes the water requirements for the compressor Table 1 Water Requirements for Compressor Cooling Water Requirements Optimum Temperature 85 F Minimum Input Pressure 2 psig pH value 6 0 8 0 Municipal drinking water is acceptable for the compresso
3. Indicator are set to 280 K and 25 K respectively Turn on Granville Phillips Series 275 Vacuum Gauge Calibrate GP Series 275 set point 1 to 100 microns and 2 to 600 microns Verify a Helium pressure of near or above 250 psi in the Cryopump Compressor Unit 0 Verify that the Cryopump Compressor power settings are placed on 208V and 60Hz SE Roughing Procedure eier el Oy E Initialization procedures complete Turn on roughing pump switch Turn on the cryopump roughing valve switch Monitor thermocouple 1 TC 1 on the Varian vacuum gauge controller for pressure in the cryopump When pressure reads 150 microns proceed to Cryopump Compressor Procedures If the pressure never reaches 150 micros or decreases at an extremely slow rate use the Martin Victor Cycling Process Martin Victor Cycling Procedure Only to be used when pressure ceases to decrease to the required vacuum or decrease at an extremely slow rate when using the roughing pump Dyn T Up rs Close the roughing valve Immediately turn off the roughing pump Wait 30 seconds Turn on the roughing pump Wait 10 seconds Open back up the roughing valve The pios sure will initially raise but then lower below your previous threshold Repeat the process as necessary to achieve the required vacuum ee a Compressor Procedure 3 Cryopump roughing procedures complete Turn on cold water supply to the compressor unit by opening the water valve 180 Ver
4. cryopump roughing valve switch to lower the pressure back below 150 microns The water coolant temperature should be monitored occasionally throughout the process and should never become more than lukewarm The water flow rate should be increased if the temperature becomes too high F Rotate 180 Figure 26 Water Coolant Valve Turning 180 31 Experiment Loading Procedures The experiment can be loaded into the chamber at any time before a vacuum is placed on the bell jar but it is recommended that the cyropump compressor be on for cooling of the cold head This is a more efficient use of time since you will be able to accomplish two things at once To load the experiment the initialization process should be complete and the chamber vent valve needs to be turned on When the chamber pressure shown on the GP Series 275 Digital Vacuum Gauge shown in Figure 22 is at or above atmospheric pressure 760 torr the bell jar can be raised with the forklift or the future bell jar hoist Once the experiment has been loaded on the platen and all of the test leads are connected the bell jar can then be lowered back onto the chamber surface and the chamber vent valve can be switched closed Chamber Roughing Procedure The chamber can begin to be roughed out once the experiment has been successfully loaded into the chamber The roughing pump should be turned on and the chamber roughing valve should be opened 15 second valve delay The chamber p
5. is poured into the intake port The exhaust port should be opened and the pump should be operated for about a minute Again the pump should be stopped and the oil drained forcing out all residue as before Based on the extent of contamination and color of the oil this process should be repeated After the pump has been thoroughly flushed refill the pump with new DuoSeal oil Further operations necessary for roughing pump maintenance are described in the DuoSeal Vacuum Pump Owners Manual Cryopump Maintenance The only scheduled maintenance for the cryopump is the replacement of the compressor unit adsorber after 12 months of operation The adsorber functions to filter oil vapor from the system Adsorber Replacement A replacement adsorber can be obtained from CTI Cryogenics 1 800 FOR GUTS Adsorber replacement begins with removing all the couplings and power lines from the unit Once the grills are removed the adsorber is disconnected from the base of the compressor unit Once the self sealing couplings on the rear panel and absorber inlet are disconnected 36 the adsorber can be removed The replacement adsorber is connected by following the previous steps in reverse order The supply pressure gauge should read 245 250 psig Adding Helium Gas To add helium gas the helium should be at least 99 999 pure First the flare cap from the gas charge fitting on the rear of the compressor unit is removed A helium bottle should be
6. place the belljar back onto the chamber An MH 302 hoist that will be installed will greatly reduce the time required to lift and lower the belljar Once the hoist is installed operation for the HVEC vacuum chamber 10 torr will be efficient and experiment testing on a daily basis will be possible To obtain 10 pressure replacement of the cryopump and pneumatic seals throughout the system is necessary Reaching this high vacuum is only possible under optimum conditions Resistojet Testing The primary purpose of the HVEC vacuum chamber is to test components inside a vacuum and simulate the conditions of space on components It is often necessary to space qualify components to ensure out gassing effects and zero pressure conditions are not harmful Vacuum conditions are required for electric propulsion testing Testing of a resistojet an electrothermal type of electric propulsion is possible in atmospheric conditions however accurate comparable results can be achieved in a vacuum chamber A resistojet previously built by Cal Poly aerospace engineering students will be tested inside the chamber The resistojet has a variable current capability with a thrust measuring unit Atmospheric air with 38 a variable flow rate will be used as propellant for the resistojet Figure 28 displays the resistojet setup on the platen Figure 28 Resistojet Setup on Platen The resistojet operates by heating up the propellant through resistor coi
7. the maintenance procedures for the roughing pump and cryopump in the HVEC system Roughing Pump Maintenance For the roughing pump to operate at maximum efficiency the pump must be free from leakage contamination and unusual outgassing Cleanliness is the most important factor for correct roughing pump operation To test the mechanical pump a pressure gage can be connected directly to the pump and the pump is operated until the ultimate pressure capability is reached If this pressure is unusually higher than the pressure documented in the manual on the order of 10 to 10 torr then the pump may be badly contaminated low on oil or malfunctioning If the pressure is only slightly higher an oil change may be all that is needed The most common cause of inefficiency is oil contamination since oil contamination can impair the sealing and lubrication qualities of the oil The vented exhaust system molecular sieve is helpful for removing vapors especially water but not all foreign substances are removed Periodic oil changes are necessary to maintain efficient operation of the system 35 Oil Change To drain the oil obtain a container large enough for the oil in the pump and open the drain valve Tip the pump slightly to drain all the oil into the container Hand rotating the pump pulley will force out the small residue remaining After all the oil has been removed the drain should be closed and four ounces of clean DuoSeal oil
8. when the pressure in the chamber shown on the GP Series 275 Digital Vacuum Gauge in Figure 22 is at atmospheric pressure 760 torr The remainder of the vacuum chamber components can then be shut down Close the water valve turn off all of the switches on the control panel and turn off the pressure and temperature gauges The air pressure main and power main can then be turned off 33 Dimensional Testing Requirements For a component to be tested inside the vacuum chamber the component must fit the dimensional restraints of the belljar The dimensions for the HVEC system are shown below Platen Belljar Eos W I K AR 34 Figure 27 Dimensions for the HVEC Vacuum Chamber The component to be tested is placed on the platen shown above Although the platen has a radius of 18 the component can rest outside the platen but it must use the platen as a base Since the thickness of the shroud is 4 and the diameter of the belljar is 33 the component must fit into a cylinder with a 29 diameter The component can be rotated in any direction as cabling permits if required The height of the component must not exceed the top of the shroud which is located 2 above the platen If the component fulfills these requirements it should fit inside the belljar for testing 34 MAINTENANCE Maintenance for the HVEC Vacuum Chamber System is important to maximize the lifetime of the components The following describe
9. 275 Digital Vacuum Gauge When the pressure lowers to 100 microns the chamber rough valve will automatically close If the pressure never reaches 100 micros or decreases at an extremely slow rate use the Martin Victor Cycling Process Cryopump Procedure The cryopump is ready to be used when the cryopump temperature is below 25 K and the chamber pressure is below 100 microns 1 Close the roughing valve switches 2 Turn off the roughing pump off 3 4 When the chamber pressure reads 0 micros on the GP Series 275 Digital Vacuum Open the chamber high vacuum valve switch Gauge turn on the Varian Ionization Gauge IG 1 While the system is under high vacuum renew roughing trap by turning on the trap switch The trap will cycle based on a timer in the P C unit Chamber pressure should decrease to below 10 torr in approximately 1 hour 43 Vacuum Release Procedure This process is to be complete at the end of the experimental process under high vacuum 1 DN pA bius po Shut off the ionization gauge filament Close the high vacuum valve switch Turn off the cryopump compressor power Turn on the chamber vent valve switch Raise the bell jar when the chamber pressure is at atmospheric pressure 760 torr Remove Experiment Shut Down Procedure 1 PU po T9 Close water valve Turn off all switches Turn off all pressure and temperature gauges Turn off air pressure main Turn off power main 44
10. 29 Cryopump Vacuum Chamber California Polytechnic State University San Luis Obispo HIGH VACUUM EQUIPMENT CORP HINGHAM MASSACHUSETTS Senior Project Operation of the HVEC Cyropump Vacuum Chamber and Resistojet Testing Allen L Victor Oliver B Martin California Polytechnic State University San Luis Obispo Submission to Aerospace Engineering Department Robert E Kennedy Library June 12 2001 Statement of Disclaimer Since this project is a result of a class assignment is has been graded and accepted as fulfillment of the course requirements Acceptance does not imply technical accuracy or reliability Any use of information in this report is done at the risk of the user These risks may include catastrophic failure of the device or infringement of patent or copyright laws California Polytechnic Sate University at San Luis Obispo and its staff cannot be held liable for any use or misuse of the project iii TABLE OF CONTENTS TABLE OF FIGURES iv TABLE OF FIGURES Figure 15 Figure 20 vi vii ACKNOWLEDGEMENTS We would like to thank Dan Powell whose tremendous effort is greatly appreciated Dan Powell helped install a pressure tap for the valve actuators lifted and lowered the belljar with a forklift when needed and welded a broken pipe Also Dan Powell provided the power connections for the compressor and vacuum chamber and he set up the resistojet power connections for futur
11. ENSING RARAY ISK CRYO ADSORBING ARRAY RADIATIOM SHIELD VACUUM VESSEL COLD HEAD CYLINDER DRIVE UNIT DOISPLACER ASSEMBLY Figure 4 Cryopump Architecture Figure 4 displays the cryopump architecture The cryopump operates by use of a compressor which supplies helium to the cold head The helium undergoes a refrigeration cycle to cool specifically designed surfaces to 80K and 15K The 80K surface condenses water vapor the bulk of the gas load whereas the 15K surface condenses the majority of the remaining gases When the gases are condensed to a solid the vapor pressure falls below 10 torr Non condensable gasses such as helium hydrogen and neon are simultaneously adsorbed to 15K by a bed of charcoal granules The capturing and freezing out of gas molecules is similar to how a refrigerator works Helium the refrigerant is compressed cooled and allowed to expand The expansion occurs due to heat exchange from the condensation of air molecules to the helium gas Hydrogen neon and helium from the chamber are non condensable and therefore require the 15K cryo adsorbing array for adsorption There is an enormous surface area available for the non condensing gases to accumulate within The capacity of hydrogen the cryo adsorbing array can handle determines the regeneration cycle for the cryopump When the pump is saturated with hydrogen the pressure will rise again and the captured gas must be remov
12. ation cycle and lowers the 16 cryopump temperature The helium supply must maintain a static pressure of 245 255 psig and an operational pressure of 270 290 psig These conditions can be monitored on the gauge mounted to the compressor The compressor weights 140 Ibs and is powered by a 3 phase 208 Vac 60Hz source The compressor is manually operated but should only be used when the cryopump is at or below 150 microns and the water coolant is turned on as described in the operating procedures CI CRYOGENICS Hite OAS CDNFGR at s Figure 12 CTI Cryogenics 8200 Compressor Unit Varian Air Actuated Valves The HVEC Cryopump Vacuum Chamber system uses four Varian air actuated forged brass body bellow sealed valves to maintain the pressure differentials The four different valves are shown in the pneumatic diagram in Figure 13 as well as the vacuum chamber layout in Figure 6 The chamber vent valve and the cryopump roughing valve are both Model 1252 17 and the chamber rough valve and high vacuum valve are Model 1253 These valves incorporate a normally closed air opening spring closing design so the valve will automatically close during a power failure or loss of actuating air The required actuating air pressure is between 65 psig and 80 psig Air Supply Main Pressurized Air Supply em i i Chamber Vent Valve A Le LI T ie Hi
13. ces the pressure to approximately 150 mtorr while the cryopump continues to reduce the pressure to 6 7 utorr Roughing Pump The DuoSeal 2 stage roughing pump reduces pressure by steadily and consistently removing a portion of the original volume of gas contained in an enclosed vessel The action of the rotating elements in the pump allow for the expansion and contraction of a given space Figure 3 shows a schematic diagram of the roughing vacuum system em 4 Y Le SE 1 Expansion Compression Cer f Space i 23 Pneumatically Sealed Vanes st ie eon i E 4 Inlet Port JU E d NV Ke e d D E PES 7 5 Exhaust Part 6 Vacuum Chamber 1 Figure 3 Schematic Diagram of the Vacuum System for the Roughing Pump This expansion compression space shaded area is vacuum tight As the shaft spins the volume increases due to the outside radial geometry The pressure in this space consequently decreases below that of the chamber therefore the gas travels through the inlet connection from the chamber into the expansion compression space As the shaft spins further the expansion compression volume decreases and the air is compressed The air pressure exceeds atmospheric pressure and escapes the system through the exhaust port After the shaft has rotated 180 the pneumatically sealed vanes switch sides allowing for the pressure reduction described above to occur twice during once cycle As the pres
14. connected to the gas charge fitting by attaching a charging line between from the helium pressure regulator to the 4 inch male flare fitting on the helium charge valve The regulator should be two stage having a delivery pressure in the range of 10 300 psig The pressure regulator should be set to 10 to 25 psig bleeding helium through the charging line for 30 seconds The charging line of air is completely purged when the flare nut at the end of charging line is tightened Then the pressure regulator is reset to 300 psig The helium charge valve should be slowly opened until the supply gauge rises to 245 250 when the compressor is not running Once the charge valve is tightly closed the pressure regulator and helium bottle can be shut off and the charge line from the male flare fitting can be removed Once the flare clap is reinstalled the compressor is ready for use again Further maintenance procedures such as decontamination procedures and cryopump cleaning and servicing are described in the Cryo Torr 8 High Vacuum Pump manual 37 CONCLUSION With ready operation of the HVEC vacuum chamber much future work is possible on improving the operation of the vacuum chamber as well as testing components inside the chamber To aid in efficient operation of the vacuum chamber a hoist system to lift the belljar would greatly decrease the time of setup for the components Currently the HVEC vacuum chamber requires a forklift to lift the belljar and
15. e testing As can be seen without the help of Dan Powell this senior project would not be possible We would also like to thank Dr Dianne DeTurris for providing moral and financial support to further the installation of the vacuum chamber ABSTRACT The High Vacuum Equipment Corporation HVEC Vacuum Chamber donated from Stanford University was installed into the Thermodynamics Laboratory of the Aerospace Engineering Department at Cal Poly San Luis Obispo Installation and operating procedures are described and diagrams of the system are included The HVEC Vacuum Chamber uses a roughing pump and CryoTorr cyropump to achieve high vacuum limit pressure of 6 7 x 10 torr The vacuum chamber can hold components up to 29 inches in length and 2 feet in height The shroud and platen allow for thermal cooling capability to simulate space conditions by running nitrogen around the belljar and at base of the test stand Included guidelines on maintenance for the HVEC describe the optimum operating conditions for the components A resistojet engine was placed inside the vacuum chamber for electric propulsion testing and a hoist for the belljar of the vacuum chamber will be installed in the near future INTRODUCTION The HVEC Vacuum Chamber was donated from the Aeronautics and Astronautics Department of Stanford University A compressor for the vacuum chamber required for running the cryopump was not included and the major components of the s
16. echnology Corporation Allred David Vacuum Technology 13 June 2001 http www physics byu edu allred vacuum j Cryo Torr 8 High Vacuum Pump Installation Operation and Servicing Instructions CTI Cryogenics Waltham Massachusetts Helix Technology Corporation 1984 Duo Seal Vacuum Pumps Owner s Manual Sargent Welch Scientific Company Skokie Illinois Sargent Welch Scientific Company 1975 Gould Midicon Micro 84 Programmable Controller User s Manual Gould Electronics Andover Massachusetts Gould Inc 1984 Operating Instructions for RCA Bell Jar High Vacuum Equipment Corp Hingham Massachusetts High Vacuum Equipment Corp 1984 Series 275 Digital Convectron Vacuum Gauges Instruction Manual Granville Phillips Co Boulder Colorado Granville Phillips Co 1984 Varian 844 845 Digital Ionization Gauge Control Varian Lexington Massachusetts Varian Varian Hand Operated and Air Operated Forged Brass Body Bellows Sealed Valves Installation Operating and Maintenance Instructions Varian Mountain View California 41 APPENDIX A OPERATING PROCEDURES Initialization Procedure Quen P eg ES Turn off all control panel switches Turn on 240Vac power main Turn on the pressurized air main Turn on the Varian Digital Ionization Gauge Control Turn on the Cryogenic Temperature Indicator Verify set if necessary the high and low set points on the Cryogenic Temperature
17. ed Regeneration refers to the heating of the components to remove all the non condensable gases To regenerate the cryopump the compressor is turned off and the atmospheric heat automatically warms the cyropump back to room temperature within two hours APPARATUS The HVEC Cryopump Vacuum Chamber shown in Figure 5 is located in the Aerospace Thermodynamics Lab of the Cal Poly Engineering Building Building 13 Room 125 is capable of generating a vacuum of 6 7 10 torr to a test chamber 25 inches in diameter and 24 inches high This is Cal Poly s largest and most versatile vacuum chamber with its six 41 pin ITT Cannon electric test connectors 6 RG58 708 connectors 6 RG58 859D connectors 40 thermocouple leads and variable flow rate fuel feed through The chamber also has thermal cycling capabilities with an aluminum platen and vertical shroud Figure 5 HVEC Cyropump Vacuum System The HVEC Cryopump vacuum system operates in the same manner as most high vacuum systems like oil and mercury vapor diffusion pumps getters ion pumps and getter ion pumps These systems consist of a roughing pump and a high vacuum pump with a series of 10 valves as shown in Figure 6 Each of these valves is actuated one at a time The roughing pump is first used to displace the majority of the air in the cyropump and in the test chamber to pressures around 100 microns The cryopump requires a compressor unit that is used to lower the cyropump t
18. emperature to below 25 K through a helium refrigeration cycle Under the proper conditions the high vacuum valve can be opened to lower the test chamber to pressure to around 10 torr The chamber vent value allows air to return back into the test chamber at a low and safe burst rate Cryopump Vacuum Chamber Test Chamber Chamber Roughing Valve 5 High Vacuum Valve x DEE Roughing Pump Cryopump ZN Compressor Figure 6 Cryopump Vacuum Chamber System Layout 11 HVEC Vacuum Chamber Control Panel The control panel switches that are used to electrically control the two pumps and four valves are shown in Figure 7 There are only seven switches on this control panel that are used to operate the entire vacuum chamber without thermal control These switches are all located across the bottom of the panel and include the roughing pump switch cryopump switch chamber rough valve switch cryopump rough valve switch and the high vacuum valve switch in order from right to left The last two are on the bottom left corner of the control panel and include the chamber vent valve switch and the trap switch that will be discussed more in the operating procedures The cryopump compressor is a separate unit and requires manual operation Figure 7 Cryopump Vacuum Chamber Control Panel 12 Gould Micro 84 Programmable Controller All of the switches are wired through the Gould Micro 84 Programmable Controller shown in Figure 8 in order t
19. g Testing E D ooo Compressor Operation E 0 0001 4 0 00001 4 S 0 000001 i r r 0 0 1 2 3 4 5 6 Time hours Figure 17 Cryopump Vacuum Chamber Operation Sequence 26 Initialization Process The Cryopump Vacuum Chamber requires a few initialization procedures consisting of a bootstrap sequence and gauge calibration before use Most calibrations only need to be done once but should be verified each time Begin by turning all of control panel switches and gauge power switches to the off position Then turn on the 240Vac power main and open the pressurized air valve shown in Figure 18 and 19 Proceed to turn on the gauge controllers starting with the Varian Digital Ionization Gauge Control and the Cryogenic Temperature Indicator in Figure 20 and 21 Verify or set the high and low set points on the Cryogenic Temperature Indicator to 280 K and 25 K respectively Turn on the Granville Phillips Series 275 Vacuum Gauge Figure 22 and verify or calibrate set point 1 to 100 microns and 2 to 600 microns Also verify that the Cryopump Compressor Unit helium pressure shown in Figure 23 is at least 250 psig and the power settings are placed on 208V and 60Hz 21 Figure 19 Power Main Figure 19 Air pressure valve Figure 20 Varian Digital Ionization Fipure 21 Cryosenie Temperature Gauge Control Indicator Figure 22 Granville Phillips Series 275 Figure 23 Cryopump Compressor Unit Vacuum Gauge Helium Pressu
20. gh Vacuum Valve Figure 13 Pneumatic Diagram of Varian Valves 18 Actuating air must first be pressurized in order to control the valves This can be done by turning the pressure main valve shown in Figure 13 90 counter clockwise Each valve can then be individually controlled from the switches on the control panel Remember that the Gould Micro 84 Programmable Controller decides which valves can be opened under the current pressure and temperature conditions Follow the operating procedures in Appendix A to determine when to open and close each valve Electrical System The electrical system for the HVEC vacuum chamber is shown in Figure 14 below 208 Vac CT Phase Temperature Gages Figure 14 Electrical Diagram of Major Components in HVEC Vacuum Chamber 19 The control panel connects with the power control unit for controlling operations with the roughing pump valve actuators and pressure and temperature gages The compressor on the other hand is currently connected to an independent power source During operation it is therefore necessary to manually turn on the compressor The compressor power should be connected through the power control unit for the control panel to show compressor operation through the lights on the valve diagram Currently however the compressor has a separate power source 20 ASSEMBLY The first operation for assembly of the HVEC Vacuum Chamber was to connect the power suppl
21. ify free flowing water passing through the compressor and exiting into the water drain 42 vie With the cryopump at 150 microns turn on the cryopump compressor power Monitor the cryopump pressure at the Varian TC 1 gauge and the temperature on the Cryogenic Temperature Indicator The pressure MUST remain at or below 150 microns and the temperature will slowly drop to below 25 K after a several hours If the pressure in the cryopump rises above 150 microns turn on the roughing pump and the cryopump roughing valve switch to lower the pressure back below 150 microns The water output temperature should never become more than luke warm Experiment Loading Procedure This process can be conducted at any time but is recommended during the 2 hour period while the compressor is cooling the cryopump to minimized experiment setup time l 2 3 SE E dee Initialization process complete Turn on chamber vent valve switch Monitor the chamber pressure on GP Series 275 Digital Vacuum Gauge and raise above atmospheric pressure 760 torr Raise bell jar forklift or future bell jar hoist system Load experiment on platen and connect all necessary test leads Lower bell jar back onto the chamber surface Close chamber vent valve switch Chamber Roughing Procedure De O Experiment loading procedures complete Turn on roughing pump Turn on chamber roughing switch 15 second delay Monitor the chamber pressure on GP Series
22. ional speed of 510 rpm This two stage pump has a vacuum pump oil capacity of 1 25 quarts and a net weight of 218 Ibs CTI Cryogenics Cryo Torr 8 Cryopump The CTI Cryogenics Cyro Torr 8 High Vacuum Cryopump shown in Figure 10 provides fast clean pumping of all gases between 10 and 10 torr It operates by condensing and holding gases at extremely low temperatures below 25 K and producing very low vapor pressures So far this cryopump has created a vacuum of 6 7 10 torr inside the test chamber Figure 10 Cryo Torr 8 High Vacuum Cryopump 15 The cryopump itself weighs 45 Ibs and is powered through the cold head power and helium supply lines that are connected to the compressor and shown in Figure 11 Since the cryopump traps and holds the gases it has a finite capacity of 1000 liters of condensable gases and 3 liters of hydrogen gas The cryopump is operated through the cryopump switch located on the control panel and is activated via the high vacuum valve switch The cryopump can handle a maximum gas burst of 150 torr liters but 100 is recommended Air Printers TEE pai Niogan AU RC rail Figure 11 CTI Cryogenics Cryopump and Compressor Assembly CTI Cryogenics 8200 Compressor Unit The 8200 Compressor Unit shown in Figure 12 was purchased from CTI Cryogenics during winter quarter of 2001 The compressor is water cooled and used to supply a source of compressed helium to the cryopump that powers a refriger
23. ls The propellant gas expands inside the tank and is expelled through a small nozzle The exiting velocity of the gas offers a momentum exchange therefore thrust is produced on the engine as a reactive force Actual resistojet engines typically have exit velocities of 3500 m s and thrusts of 0 3 N when operating at a power level of 750 W Since resistojets have low power requirements as compared with other types of electric propulsion in the kilowatt range they are attractive to GEO satellites which tend to have excess power available Resistojets have been employed on spacecraft for north south station keeping purposes The first use of resistojets was on the INTELSAT V series in 1980 39 For resistojet operation inside the vacuum chamber the resistojet requires four connections The resistojet must have a fuel connection atmospheric air to the aft side of the resistojet A rotometer with a variable flow rate has been attached to the platen of the vacuum chamber allowing for variable input of the fuel flow rate Also to measure the force the engine provides two test leads are required from the engine to an external current measuring device Finally the heater of the resistojet requires an electrical power connection to heat the propellant These 4 connections are currently being installed 40 BIBLIOGRAPHY 8200 Compressor Installation Operation and Service Instructions CTI Cryogenics Mansfield Massachusetts Helix T
24. nary testing for out gassing and pneumatic sealing can be done The chamber is also good for materials testing as well Advanced space propulsion such as electric propulsion requires the use of a vacuum to attain accurate results since this best simulates the environment electric propulsion engines operate in resistojet engine is the first electric thruster to be tested inside the HVEC vacuum chamber Figure 2 displays the Resistojet Engine in the setup to be put inside the chamber Resistojets are an electrothermal type of electric propulsion They are primarily used for orbit maintenance on large spacecraft The engine incorporates a heater to increase the pressure of the air within the engine As the current to the engine is increased the temperature of the 4 heater inside the engine increases and subsequently the pressure increases A nozzle at the end of the engine releases the pressure and forms thrust for the resistojet Figure 2 Resistojet Engine Built by Cal Poly Aerospace Engineering Students Successfully testing the resistojet validates the capability of the HVEC Vacuum Chamber to test electric propulsion engines under space simulated conditions HVEC VACUUM CHAMBER THEORY To achieve a high vacuum 10 torr in the chamber two stages of pressure reduction are involved First a roughing pump is used as a fore pump to produce the necessary fore vacuum for which the cryopump can operate in The roughing pump redu
25. o prevent delinquent component operation This controller only allows one valve to be open at a time with a 15 second delay on the chamber roughing valve It also prevents the cryopump from turning on and the high vacuum valve from opening if the proper pressures and temperatures do not exist in cryopump and the test chamber The cryopump compressor unit is operated manually so extra care must taken to be used only at the appropriate times If the compressor is turned on while the pressure inside the cryopump is too high condensation will occur and damage the cryopump Follow the operating procedures in Appendix A to avoid these problems I Figure 8 Gould Micro 84 Programmable Controller A 13 DuoSeal Model 1374 Roughing Pump The HVEC Cryopump Vacuum System utilizes a DuoSeal Model 1374 roughing pump that is shown in Figure 9 This roughing pump operates under molecule displacement theory using a rotating piston and oil sealant and is capable of creating vacuums in the low millitorr range 95 99 of the air The roughing pump is used to lower the pressure in the cryopump to 150 microns and 100 microns in the test chamber and is operated using the roughing pump switch on the control panel Figure 9 DuoSeal Model 1374 Roughing Pump The DuoSeal Model 1374 roughing pump is capable of 23 cubic feet per minute of free air displacement driven by a 3 phase 200Vac motor producing 1 5 horsepower at 1725 rpm and 14 a pump rotat
26. ons Power Helium Gag Hein Gas Supply Water Out Water In Figure 16 CIT Cryogenics 8200 Compressor and Major Connections 24 The compressor should only be operated when the cryopump has reached 150 microns of pressure To test the system the cryopump pressure was roughed until approximately 200 microns was reached To further reduce the pressure the Martin Victor cycle was employed described in the Procedure section until the pressure was 150 microns The compressor and water supply to the unit was turned on and after several minutes the temperature indicator for the cryopump revealed a temperature decrease The compressor was working properly To measure pressures below the micron range ion gages use the conductivity of the almost fully vacuumed air between a cathode and anode to measure pressure An ion gage was connected to the cryopump to measure the same pressure as the thermocouple model Since the two were in approximate agreement the ion gages were assumed to be working properly With all the parts connected an initial test run of the entire setup was done First the cyropump was roughed to a pressure of 150 microns The compressor was turned on and the temperature of the cryopump decreased to approximately 15 K after 30 minutes The chamber pressure was then roughed to 100 microns and the roughing valve automatically closed as documented in the HVEC manual The chamber high vacuum valve was opened man
27. r Water is not required for the compressor when it is turned off A description of finding the optimum flow rate for the compressor can be found in 8200 Compressor Installation Operation and Service Instructions To check for obstruction water was discharged through the compressor while the unit was turned off Unfortunately a leak was detected when a small puddle of water 23 formed at the base of the compressor To fix the problem a rubber o ring used on most garden hoses was affixed to the end of the nozzle providing a hydraulically sealed connection between the discharge hose and the compressor The voltage range for the compressor was switched to match the operating voltage range After the main power cable and water were connected to the compressor the helium gas return and supply lines were connected to the cryopump The pressure in the compressor of the helium was seen to be between 245 250 psig matching the helium requirements Helium acts as a coolant for the cryopump to decrease the temperature between 10 20 K The compressor contains a helium tank with a gage on the front of the unit showing the internal pressure If the pressure is not near 250 psig then it is not ready for use with the HVEC Vacuum Chamber Once the cold head power cable was connected from the rear panel of the compressor to the high vacuum pump cold head the compressor was ready for operation Figure 16 displays the compressor face with the cable connecti
28. re Gauge 28 Cryopump Roughing Procedures Once the initialization procedures have been complete roughing the cryopump can begin This process should take about 30 minutes Turn on the roughing pump switch located in the control panel shown in Figure 24 Then engage the cryopump roughing valve switch and monitor the pressure on the TC 1 Thermocouple 1 digital readout on the Varian vacuum gauge controller that was shown in Figure 20 When pressure reads 150 microns the cryopump compressor unit is ready to be used If the pressure never reaches 150 micros or decreases at an extremely slow rate use the Martin Victor Cycling Procedure Figure 24 Control Panel Switch Board The Martin Victor Cycling Procedure The Martin Victor cycling procedure is shown in Figure 25 and should only be used when the air pressure ceases to decrease to the required vacuum or decrease at an extremely slow 29 rate when using the roughing pump It can be used when roughing either the cryopump or the chamber Begin by switching off the roughing valve and immediately turning off the roughing pump Wait thirty seconds and then turn the roughing pump back on Then wait ten seconds before opening back up the roughing valve The pressure will initially raise as much as one magnitude but will then decrease lower than the previous threshold The process can be repeated as necessary to achieve the proper vacuum The Martin Victor Cycle
29. ressure can be monitored on the GP Series 275 Digital Vacuum Gauge shown in Figure 22 When the pressure drops to 100 microns the chamber rough valve will automatically close If the chamber pressure never reaches 100 micros or decreases at an extremely slow rate use the Martin Victor Cycling Procedure 32 Cryopump Procedure The cryopump is ready to be used when the cryopump temperature is below 25 K and the chamber pressure is below 100 microns Close all roughing valve switches and turn off the roughing pump Then open the high vacuum valve switch This will briefly make a lot of noise and the pressure inside the chamber will drop dramatically When the chamber pressure reads 0 micros on the GP Series 275 Digital Vacuum Gauge turn on the Varian Ionization Gauge IG 1 While the system is under high vacuum renew roughing trap by turning on the trap switch The trap will cycle based on a timer in the P C unit The chamber pressure should decrease to below 10 torr in approximately 1 hour before the experiment can be conducted Shut Down Procedures Once the experiment is complete the following procedures should be followed in sequence to successfully remove the experiment without damaging the apparatus or any of the vacuum chamber components Shut off the ionization gauge filament and close the high vacuum valve Then turn the cryopump compressor power switch to the off position Turn on the chamber vent valve on and raise the bell jar
30. sure in the vessel is decreased with successive cycles the amount of gas put into the volume 1 also steadily diminishes Since the gas must be compressed back to atmospheric pressure to be released through the exhaust valve a pressure somewhat greater than atmospheric pressure is required to open the exhaust valve The pump can only remove a small fraction of the remaining gas in the chamber so it is impossible for all the gas to be removed Also many of the components of the system such as the vacuum pump the vacuum chamber and the necessary connections between contain a minute amount of leakage that is impossible to seal Therefore a state of equilibrium is eventually reached such that the leakage balances the amount of gas expelled by the pump This is known as the blank off or ultimate pressure of the pump The ultimate pressure for the roughing pump was experimentally found to be approximately 100 mtorr Since further pressure reduction is required to achieve a high vacuum in the torr range a cryopump operates to further reduce pressure Cryopump After the roughing pump has lowered the pressure to 150 mtorr the cryopump continues to reduce pressure several orders of magnitude Cryopumps as the name implies freeze gases into solids therefore reducing the vapor pressure resulting in a high vacuum Gas Flow From User s Vacuum System into Inlet of Cryopump jl inc MOUNTING FLANGE 80K CONDENSING ARRAY a i COND
31. ually and a loud noise from the sudden rush of air occurred Immediately the chamber pressure decreased to below 1 micron Since the thermocouple pressure gage resolution was higher than the chamber pressure the ion gages were used to measure sub micron pressure The setup was left for several hours and the lowest pressure reached was 6 7x10 torr The cryopump asymptotically reached this pressure A detailed standard procedure composed from the manual and results from the initial test is given in the following section 25 OPERATION PROCEDURES The following operation procedures for the Cyropump Vacuum Chamber should be conducted in order to assure a successful experiment in high vacuum conditions An operating sequence with an approximate timeline is shown in Figure 17 These procedures should be followed in the sequence listed with the exception of loading the experiment into the chamber that can be done at any time before a vacuum is placed on the bell jar Not following these operating procedures may result in damage to vacuum chamber components and the experimental apparatus A simplified version of the procedures that can be used during operation is located in Appendix A CryoPump Operation Timeline 1000 Cryopump Pressure 300 Chamber Pressure 10 Cryopump Temperature 250 Chamber Temperature T 200 x g 014 o lt gt S a 021 Ge 3 lt Experiement gt 150 d E oughin
32. y to an outlet Dan Powell created a socket for the chamber which required a 3 phase 208 V connection When the power was turned on the valve lights located on the panel did not light up Since the pressure gage for the chamber read 770 torr corresponding with atmospheric pressure it was assumed the gages worked in almost proper condition An initial inspection of the HVEC system revealed a broken copper pipe between the cyropump and the cryo roughing valve but this was fixed through welding done by Dan Powell Roughing Pump At first just the roughing pump was connected to the vacuum chamber to test its operation capability The roughing pump was connected to the vacuum chamber through vacuum rubber tubing A power cable from the chamber which matched the port of the roughing pump was connected accordingly The molecular sieve was connected to the exhaust of the roughing pump This exhaust filter collects oil vapor consisting of particles larger than 0 1 micron Finally the belljar was checked for open ports and possible leakage of air 21 Figure 15 Roughing Pump Connected to Vacuum Chamber The roughing pump switch was turned on and roughing pump operation started The pressure gage rapidly decreased below one torr and the millitorr range was achieved as indicated with the mtorr LED light display The vacuum chamber pressure was decreased to approximately 200 mtorr indicating correct functioning of the roughing pump
33. ystem were not assembled Installation of the Vacuum Chamber began in October of 2000 inside the Thermodynamics Lab of the Aerospace Engineering Department at Cal Poly The Vacuum Chamber s last use was in 1997 therefore it was possible that components were not in working condition when received from Stanford University Installation of the HVEC Vacuum Chamber was completed in March of 2001 Figure 1 shows the HVEC Vacuum Chamber System Figure 1 HVEC Vacuum Chamber Setup with Compressor shown without belljar The Vacuum Chamber works through the use of two pumps the roughing pump and the CryoTorr cryopump The roughing pump brings the pressure of the vacuum chamber to 150 mtorr while the cryopump continues to decrease the pressure to 6 7 uTorr Operation of the roughing pump lasts for approximately 30 40 minutes The length of time necessary for the roughing pump to reach the required pressure can be decreased through Martin Victor cycling Martin Victor cycling is a custom procedure to decrease the pressure limit by partially re pressurizing the chamber and running the roughing pump to achieve a lower limit The cryopump on the other hand can require up to 6 hours to reach its highest vacuum state Vacuum chambers are valuable to Aerospace Engineering research to simulate the conditions of low earth orbit space Although the pressure of space is several orders of magnitude less than what the HVEC Vacuum Chamber can achieve prelimi

Download Pdf Manuals

image

Related Search

Related Contents

Ricatech RR100    Uso e manutenzione Emploi et entretien Gebrauch und  NOVA System - TC Electronic  Magic Chef MCD775RW1 User's Manual  Conceptronic Wired Travel Mouse  StarTech.com IDE3510U2 storage enclosure  Tracking Software Interface User`s Manual - Themis  TG3 Electronics CK103S  Télécharger la fiche technique  

Copyright © All rights reserved.
Failed to retrieve file