Home

FMECA Volume 4: Mechanical Components

image

Contents

1. OO de amp f MP HP port O R OPRV omen O port oa Uy o C P A Injector 1 Qe O lt i Injector 2 W al E a UY D o He Umbilical 9 5 mm bore 02 23 02 6 Pressure 6 bar P Pressure 8 bar P above ambient above ambient Fig 4 42 Gas Supply Schematics following review and decision to separate the two injectors for the umbilical diving configuration FMECA_OR_V4_140831 doc Rev B11 Page 98 of 104 Open Publication rear view front view Fig 4 43 Breathing Loop Schematic for both the commercial rebreather configuration The expedition eCCR is the same except the hoses exit from the top of the counterlungs the same as for the single scrubber configuration FMECA_OR_V4_140831 doc Rev B11 Page 99 of 104 Open Publication Make up gas O C Reg FF Exhale CL Inhale CL Oxygen Injector 1 Water dump Water dump Fig 4 44 Breathing Loop Schematic for both the Multi role professional and commercial rebreather configuration Note the flow is right to left Camera Right Light Right Umbilical Pressure Sensor Bailout Right Pressure Sensor Umbilical FMECA_OR_V4_140831 doc Rev B11 Page 100 of 104 Open Publication Fig 4 45 Umbilical Terminator connections and hose routing with cover over back of rebreather removed 4 40 2
2. Failure of motor or Hall sensor in prototypes or failure of laser or sensing array in production models This failure is fail to safe 4 28 3 Failure Mode Analysis The risks appear to be managed within the framework tested by the verification report except that there is concern over the method of clearing a blocked port If the unit is used at great depth and the port opens to the maximum opening on pure oxygen and were to fail at that TE i a aioe ae Fig 4 37 Oxygen Dosing Valve During field trials failures with the dosing valve occurred namely 1 Small changes in orifice size resulted in unstable flow rates This was traced to use of an angle shutter to block the flow it was replaced by a self centering pin 2 The button to stick on when gas is first applied This was traced to salt crystalising on the piston and resolved by moving the seal to the outer surface 3 The button had a slight spring to it when full depressed in some cases This was remedied by reducing the spring that returns the orifice shutter thereby increasing the tactile feedback to the user when gas is supplied FMECA_OR_V4_140831 doc Rev B11 Page 82 of 104 Open Publication These issues are described in detail in a supplement to this FMECA FMECA_Supplemental_02 Dosing_080810 pdf All causes for failure were addressed and resolved 4 29 Battery Housings 4 29 1 Design Decision Review The batteries in the rebreath
3. Different connectors are used for different applications to prevent one connector being plugged into a port reserved for another and also to keep connector space and costs to the minimum commensurate with meeting the design intent The various connectors used are shown in Fig 4 10 and 4 11 except for the USB port and charger socket these use an industry defined connector and a Nokia power socket respectively which is shown in exploded form in Fig 4 10 Commercially available marine connectors are both very expensive and large Low cost connectors are used instead after testing to understand their limits in a marine environment All connectors are designed for dry mating only If disconnected underwater the connector should be washed in clean water as soon as possible and dried hard gold finish is used so that short term wet exposure does not damage the contact Greg Scull and Stewart Barlow Underwater Mateable Connections for Flexible Offshore Installations of Renewable Energy Devices Ocean Design Inc EnergyOcean 2004 FMECA_OR_V4_140831 doc Rev B11 Page 87 of 104 Open Publication AN Fig 4 38 CAD image of the different connectors Fig 4 39 Realisation of each of the connectors used in the SCR From left to right this is the shown in the CAD image to the left pressure gauge connector to the SCR the other end of the port the other end shown connected to a pressure sensor the Multi role professio
4. 4 29 2 Compliance IMCA AOCD 35 requires battery packs to have built in current limiting The battery housing is not a replaceable battery pack so is not subject to this restriction but for reasons of safety the current is limited by suitable PCB traces on the PCB that forms the penetrator from the battery pack to the electronics chamber 4 29 3 Risk Assessment The following risks from the battery housing were identified 1 Leaking The seals could leak This is unlikely and does not have any catastrophic effect on the equipment the failure of the cell is detected 2 Mechanical damage is unlikely given the small diameter of the tubes and the relatively thick walls or the protected cell in the case of the rebreather monitors A more likely failure is in the case of a heavy drop onto the battery compartment may break away from the rebreather This would damage the rebreather electronics The battery compartments are protected from this risk by being mated closely with the rebreather walls so stress is not focused on one point and the rebreather cover should prevent the compartments from suffering impact while in service 3 Corrosion The material chosen to protect the cells is a marine grade stainless steel SS320 with good corrosion characteristics It is extremely improbable that corrosion would penetrate 1 5mm of this stainless steel between service intervals unless the unit is exposed to strong acids FMECA_OR_V4_140831 doc R
5. 5 The use of counterlung covers can trap grit and the seams can create a rubbing spot in one location The covers also increase the work of breathing 4 21 3 Failure Mode Analysis The failure mode of the counterlung covers not being fixed down results in a large increase in the Work Of Breathing Webbing able to maintain a one ton tensile load was used to prevent the counterlung covers failing in this manner The failure mode of the counterlung cover being punctured gives risk to a risk of the counterlung being punctured The counterlung material appears to be more resistant to puncture than the covers in tests even for ballistic nylon and Cordura covers The risks of separation grit entrapement and increased work of breathing means that the counterlung covers will not be used in back mounted counterlung configurations of the rebreathers However they are used in hydrostatic tests to give a worst case and the option for the project to adopt these in applications where grit is not an issue such as in HAZMAT rebreathers 4 22 Scrubber Housing 4 22 1 Design Decision Review There are two scrubber housings samples of which were submitted as part of this review shown in Fig 4 8 and 4 9 below The two scrubber designs are very similar the main difference is one uses a twin scrubber with internal gas return tube while the other is a single scrubber The scrubbers use Micropore ExtendAir Cartridges EACs Detailed flow modelling for
6. First Stage 02 Pressure Pressure Gauge Regulator Gauge j C C R Trimix Nitrox Pressure Gauge Fig 3 4 1 Apocalpse Sports iCCR in Nitrox and Trimix configuration using all cylinder options FMECA_OR_V4_140831 doc Rev B11 Page 16 of 104 Open Publication 4 FAILURE MODE ANALYSIS The failure mode analysis starts at the inhale hose from and proceeds in the direction of gas flow around the rebreather Components are considered running in the same direction as the breathing gas that is inhale on left exhale on right starting with the gas leaving the scrubber 4 1 Tanks All tanks that will be supplied with the equipment shall be certified to comply with the relevant standard for diving tanks 4 2 Cylinder Valves Four brands of cylinder valve were evaluated for this project and none found to be entirely satisfactory Accordingly a specially designed cylinder valve was created A separate FMECA has been carried out for the cylinder valves developed for this project and this is reported in the Technical File for those valves The valve is being tested to ISO 10297 2006 e by BAM Until the custom valves are certified Poseidon cylinder valves will be used these are CE certified though are available only with an M25 cylinder thread so this will restrict use to tanks with M25 threads until the custom valve is approved 4 3 First Stage Regulators 4 3 1 Design Decision Review Five different types of regu
7. in a fire situation 2 Over pressure from a compensated valve with reduction in ambient pressure In the worst case of an uncontrolled ascent from 100msw to the surface in 1 minute a line containing 100cc at 10 bar relative intermediate pressure will be over pressurised by 10 bar This is not a significant over pressure and all components should withstand this easily However for correct operation the 10 bar should be relieved This can be achieved within a few minutes by a 0 5 to 1 litre per minute flow 3 Over pressure from first stage regulator valve seat leakage or creep The primary requirement is to signal the diver that the first stage is faulty The over pressure relief device should therefore give off a loud noise when it relieves pressure The amount of leakage that it is reasonable to relieve is 1 litre per minute this is based on ten times the volume of gas that is normally in the line being relieved so a 100cc volume relieving 1 litre of gas per minute 4 Itis recognised that a large obstruction to the valve seat will cause a very large gas pulse which will likely burst the first stage diaphragm Large obstructions should be avoided by fitting sintered filters on the inlets of first stage regulators and where there is a possibility of a negative pressure reverse pressure being applied then an outlet filter should be fitted to the first stage regulator or the system it connects to this is mostly an issue for commercial di
8. 6 15 EN14143 2003 Section 6 5 4 Inhalation and exhalation valves A negative pressure of 60 mbar shall be applied to each valve for a maximum period of 10 s The design meets these requirements It is not possible to assemble the valve incorrectly with the moulded webs because the webs are different diameters preventing the left and right webs being swapped and the webs have a ridge to prevent the flapper being inserted from the wrong side All parts are colour coded matching the hose clip covers The Deep Life OSEL flapper webs cannot be swapped they are different length and outside dimensions The rebreathers do operate in both directions of flow but cracking pressure of the the ALV is increased in the reverse direction when a separate ALV is used i e not the ALVBOV 4 14 3 Risk Analysis The risks presented by the flapper valves that have been identified are 1 Chemical Damage The Deep Life and OSEL flapper valves are manufactured from silicone without any plastisicer Silicone is highly resistant to chemicals occurring in the dive environment including oil The valve seat the web is injection moulded in a metal replacement plastic a polyaramid type plastic with good chemical resistance Valves were procured from other companies and tested these use Butyl Rubber and NBR both of which age and deform under exposure to strong bases which may be present in a rebreather from the scrubber TPU is unsuitable because it forms
9. Open Publication 4 27 6 1 Inlet Protection Figure 4 1 Inlet filter comprising a sintered filter and a hydrophobic membrane filter fitted to the connector providing gas into the injector The filter with the hydrophobic membrane was tested for flows to 400 Ipm without damage 4 27 6 2 Back Flow Protection To avoid injector failures in the event of the oxygen being switched off at depth followed by decompression which has the effect of sucking water and detritus into the injector a filter is fitted to the injector outlet This filter comprises both a sintered filter and a membrane Images of the filter are shown overleaf Figure 4 2 Outlet filter the injector system each rebreather supplies gas into a connection shown on the right above The gas passes through a sintered filter to disperse the gas flow and then out of a hydrophobic membrane bright white in the above image The membrane has a large area secured to a frame FMECA_OR_V4_140831 doc Rev B11 Page 79 of 104 Open Publication Mumetal magnetic screen CMOS sensor array Sapphire window Ruby orifices Sapphire window separating laser from gas VCSEL L ser High copper bronze body _ alegar eampanble O rings are static for reliability Fig 4 36 Direct orifice position sensing using laser and CMOS imaging array The laser and imaging array is isolated from the oxygen using sapphire windows The laser po
10. Publication 4 41 Gas Flow of SCUBA configurrations ccsscccscsssscssscsscssccssecssccseesssccscessscescesssccseessscccesessooses 103 5 CONFIRMATION OF CLOSURE ON SAFETY ACTIONG ccccssseeeeeeeeeesseeeeeees 103 5 1 Eail re Mode Analysis E sic dd e afd salutes das UE ai E E A adi aaa 103 FMECA_OR_V4_140831 doc Rev B11 Page 7 of 104 Open Publication 1 PURPOSE AND SCOPE This is Volume 4 of the FMECA of the Deep Life Open Revolution Submission Project ORECCR1 This document covers the safety risk and failure analysis of the mechanical components in the rebreather on a bottom up basis that is considering the mechanical system component by component The rebreather can be configured as single or dual scrubber for surface supplied or self contained applications All tests carried out in this report were performed by the Baltic Assessment Institute an independent legal entity from Deep Life Ltd 2 STANDARDS Many standards and advisory groups have considered the issues of rebreather safety and issued documents setting minimum requirements needed from the system to address the issues they identified The relevant documents identified by the Review Team are 1 EN14143 2003 and 2013 8 DNV OS E402 2004 2 EN13555 2008 9 CE RoHS Directive 3 EN61508 Parts 1 to 3 10 CE EMC Directive 4 NORSOK U 100 2006 11 CE Low Voltage Directive 5 NORSOK U 101 1999 12 CE Machinery Directives 6 NO
11. a second stage regulator that will lift if there is a gradual over pressure A sudden over pressure will blow the first stage diaphragm This is mitigated by using filters before and after the valves to prevent detritus getting underneath the valve seat Failure where the valve leaks gas is an unwanted failure and the dive would have to be aborted 4 5 Pressure sensors 4 5 1 Design Decision Review All self contained pressure gauges are CE certified This does not consider saturation diving use so additional assessment was made in respect to helium environments The problem of helium ingress and damage to pressure sensors is well known During the design process each main type of pressure sensor was assessed for helium damage by exposure to pure helium at 141bar for a month No piezo electric or piezo resistive sensor worked after such exposure recovery times lasted days in some instances This left strain gauges and capacitive pressure sensors as the basis for the present design Thelma Norway have reported a helium tolerant pressure sensor by filling the rear of the sensor with silicone oil which is the pressurised such as by a screw with an O ring The method described by Thelma was reproduced and found not to be effective The reasons for the failure were explored and it was concluded that the mechanism by which helium invades the reference chamber of a pressure sensor is that it penetrates stress lines that is materials which ar
12. a set a shape memory Sticking If the valve is contaminated the valve can stick In a very humid environment within the rebreather this sticking action is unlikely but can occur if for example the diver vomits into the breathing hoses and this dries during storage It is essential the valves are tested as part of the pre dive checks Leaking During testing several mechanisms were identified by which leaking can occur The first is the valve rippling and the edge moving to the wrong side of the web This occurs where there are insufficient fingers on the web A series of tests were carried out to determine the limits of this characteristic and for the 35mm diameter silicone flapper the limit where this could be reproduced was four fingers in the web It occurs easily with three fingers and rarely with four fingers The risk is avoided by using six fingers The other mechanisms that can cause leakage are contamination i e detritus wedged between the flapper and the web This risk is managed by detecting the tidal volume in the electronic versions of the rebreathers signaling it to the topside and recommending the diver to bail out if vomiting underwater The valve has been tested using a porridge slop and does not block if FMECA_OR_V4_140831 doc Rev B11 Page 46 of 104 Open Publication there is gas forcing the porridge through the valve larger particles are stopped by the web 4 Tearing The silicone was tested for te
13. activity progressed The issue of heating is now a critical path activity for the overall project Trelleborg and other interested parties would be kept informed of progress the suit heater and the gas heater should be identical to avoid unnecessary development A complete suit heater and a gas heater was designed Tests carried out and formal modelling by Thelma show the heater function is SIL 0 i e not a safety function when a dry suit is used with a rebreather FMECA_OR_V4_140831 doc Rev B11 Page 96 of 104 Open Publication 4 40 Gas Circuit in Umbilical Supplied Configuration 4 40 1 Design Decision Review There are two gas circuits one for Multi role professional use and one for surface supplied umbilical diving where there is a multiplexer and power unit Umbilical Terminator on top of the rebreather The gas routing for the Multi role professional diver is simple The gas routing for the umbilical supplied diver is more complex and shown in the two figures below FMECA_OR_V4_140831 doc Rev B11 Page 97 of 104 Open Publication HELMET SIDE BLOCK fy One way ADV port Y valve V rhs O Main gas supply O HELMET ADV O C Reg FF One way valve Filter eS wee SUIT 100 O2 Umbilical l Pressure 10 bar l P One way valve LI above ambient ECHA Fi Filter Orifice Orifice 0 5 mm 20 5 mm One way One way Tank valve valve ressure Filter Filter
14. clamped to secure the hose to the port in a very robust manner This has the lowest hose cost at around one Euro per hose Extrusion produces continuous convoluted hose such as for ventilation and construction purposes The cost is around one Euro per hose Standard extruded hoses available are very thin wall and tear easily Some include a metal spiral the end of which reduces the strength of the connector The use of continuous hose requires plastic clamps at each end to connect to the port which can be omitted accidentally by the user following a strip down FMECA_OR_V4_140831 doc Rev B11 Page 30 of 104 Open Publication of the unit or can be incorrectly positioned resulting a very weak connection between the hose and the port For this reason extruded hose is not used in the project Dip forming is used for continuous hose This creates a problem in attaching the hose to the ports it requires a moulding with concentric rings Users can accidentally malposition or omit one or both of these rings giving a hose that will pass positive and negative pressure checks but will fail very easily in service The material choice available for dip formed hoses is also limited generally butyl rubbers are used or PU The cost of dip formed hoses is around four times that of injection moulded hoses Thermo reforming produces hoses with a smooth cuff and either parallel or spiral convolutions The strength of the hose is less than that for i
15. connector This is a gross failure and would be detected during pre dive checks the unit will not pass positive or negative pressure checks in this state In tests of the weakest form of the clamp that of cable ties creep of less than 1mm was seen with the cable tie tightened as far as possible and in the failure test of the hose the hose failed before the cable tie showed any significant creepage Failures from UV chemical and mechanical hazards are managed in the design by using a tie cover Failure from the user misassembling the connection is avoided by using a very simple form of connection with minimal parts other than the tie cover 4 13 O rings and X rings O rings are used in most subassemblies in the design This analysis covers all places in the design where O rings are used 4 13 1 Design Decision Review There are several materials in common use for oxygen compatible O rings The only materials without known health issues that are not liable to failure in either UV or ozone are EPDM and heavily carbon loaded silicone EPDM has better dynamic wear properties so is used for all O rings The EPDM O ring is not readily available in any other colour except black so all O rings in the unit are black FMECA_OR_V4_140831 doc Rev B11 Page 38 of 104 Open Publication A HAZOP on the O rings was carried out HAZOP report O rings 070216 pdf During the HAZOP each of the following O ring positions was revie
16. failure Mode ii A ias 58 4 16 3 5 Connector failure MOJES ooooconooconononconccnononononcnnnoconnccnonocnonnnnon nn cnn nrcnn nn ron r anar nena nr rn nnrannnninss 58 4 17 Automatic Loop Volume device ALV ccssscssssssssssccsesssccssessssccescsscscessscccsscsscsesssscssesesccseeess 59 4 17 1 Design Decision RevieW oooooonooccnoncncoonccooncnnoncncnnncnnncnnononcnnn nono rencor nr ron nr rn n nr nan rn ron nn non n rr nanrnrannnnons 59 4172 RISKASSESSMEN dai td ii AAA dE AS TA AAA 60 4 17 3 Failure Mode Anal ysis cuidado 60 4 18 Hose UA rosses sies sei Seress assos e soosoo e Sosis sonsos tbose So sos Sess so ososi ooo soo 62 4 18 1 Design Decision Revi EW enone ienn da deta ade E a a TG 62 4 18 2 GINA 62 418 3 Failure Mod Analysis iia A a A Ei 63 4 19 Peripheral Field Display PFD sssccssssssscsssssccssscscecsssccceecssccscscsssescesessccsescssccssessscesseess 63 FMECA_OR_V4_140831 doc Rev B11 Page 4 of 104 Open Publication 4 19 1 Design Decision Rev Wei onnie ei a i R E E TE AA E RE Aa a aS 63 4 19 27 Risk Anal TS a a a a etch E E E a a odas 63 4 19 3 Failure Mod Analysis 7 ita i E AA E ARA A aloes 63 4 20 C ounterl ngSss ON TN 64 4 20 AsDesign Decision ReVIeW dirt aid e e E A E etude EE E A ir RE 64 ADO COMPA A did 67 420 3 Risk Analysis az 67 420 4 Failure Mod Analysis iia o E E A Peet dees oases R 68 4 21 Counterlung Covers ccsisccssscecscscsensesevssscsecasesensonacssesscsov
17. hose 4 12 2 Risk Assessment The risks presented by the hoses terminations that have been identified are UV damage to the cable tie This is avoided by a silicone cover 2 Mechanical damage to the cable tie This is avoided by a silicone cover Chemical damage to the cable tie The ties are compatible with the environment and resist chemicals that may occur in that environment including oil and ozone 4 Aging of the cable tie material This is avoided by using a marine grade stainless steel For the Multi role professional unit the cable ties are a moulding that is required to be checked on annual service 5 Incorrect assembly All extraneous parts are eliminated from the design the termination comprises just the port the hose the two cable ties or Jubilee clip and the clip cover The cable ties should be replaced on annual servicing There are no screw threads to damage or trap contamination 6 Off gassing The cable ties are replaced by stainless steel strapping on the commercial unit where off gassing into a saturation dive habitat would pose a risk to health 7 Loose connection If the connection is not sufficiently tight the hose will creep out from under the ties or clip The hose should be inspected by applying 25kg of tensile force whenever the cable ties or clip is replaced or adjusted creep should be much less than 0 5mm 4 12 3 Failure Mode Analysis The failure mode for the hose connection is the hose comes off the
18. mouthpiece opening and introducing a second seal would create too much friction FMECA_OR_V4_140831 doc Rev B11 Page 39 of 104 Open Publication Some penetrators where there is insufficient space and the O ring is entirely static The single O ring fitted to the high pressure sensing port of the first stage regulators this is an industry standard design of port that the present design has no influence over 5 The risk from O ring failure is mitigated by using two O rings in series in all locations where O rings occur in which leakage would cause a significant detriment to health or safety such as isolation of the breathing loop from the surrounding sea water 6 Mechanical damage to the mating face The use of twin piston type O rings mitigates this risk The O rings are set as deep into the mating parts as practicable to reduce the probability of both failing simultaneously The tolerance around O rings has been reduced to reduce the effect of any O ring failure to a non critical event A risk was identified during HAZOP reviews where if the scrubber canister end is damaged it can act as a cutting tool on the canister O ring This hazard should be mitigated by inspection procedures and training 7 Cutting the O ring on the edge of the mating barrel this is avoided by use of a 15 degree lead in on all surfaces with plain O rings and use of a rolled edge where an X ring is used 8 Omission of an O ring If both
19. of breathing The design supports the largest mouthpieces that could be identified The Work Of Breathing of the mouthpiece itself is half that of other mouthpieces tested from the market leading Multi role professional products by sales volume Draeger Dolphin Buddy Inspiration original and around half that of two state of the art mouthpieces CCRB Ouroboros JJ CCR BOV In the review of accidents where CO2 retention was implicated the standards were deemed inadequate and the target should be as low as possible Work Of Breathing from the mouthpiece this requires the opening to match that of the mouth which is equivalent to a circle of diameter 32mm The hoses are 36mm bore the flapper and web as an equivalent area of a 32mm opening and the opening in the mouthpiece was changed to 32mm equivalent area The slot type mouthpiece was passed by review only for diving to a depth not exceeding 200msw whereas the 32mm equivalent bore mouthpiece should not be limited Freeflow Extensive computer modelling was carried out developing a venturi system for preventing freeflow The venturi creates a vortex of water around the purge button in strong FMECA_OR_V4_140831 doc Rev B11 Page 49 of 104 Open Publication currents which tends to balance out the pressure on the front of the purge button Some of the flow and pressure simulations are reproduced below Water traps around the flapper valves Flapper valves tend to collect a pudd
20. of use per injector using a dirty oil and water laden paint spray compressor as the gas source and no failure occurred 4 27 5 Leakage and Fail Open Risk Mitigation The Fail Fixed failure mode has a Safe Failure Fraction of 0 5 of infinite dive durations are considered it drops to a Safe Failure Fraction Fail that is more than 0 99 only when the diver aborts the dive Moreover the Fail Open mode has been observed to occur with greater frequency than expected in the original design documents To increase the Safe Failure Fraction to 1 0 a series Normally Open valve was fitted this is presently a solenoid value suitable for dive use but action is underway to replace this with a variable orifice valve of a different type to the main injector a needle valve with a flow sensor in order to raise the SIL level from SIL 3 to SIL 4 in 2011 During a review in March 2009 concern was noted over the method of clearing a blocked port If the unit is used at great depth and the port opens to the maximum opening on pure oxygen and were to fail at that exact instant then a very large volume of oxygen would be injected The series shut off valve described above would limit the rise in PPO2 to safe levels even under those conditions Additionally an electronic limit was added to ensure the extent the valve can open to a flow of four times that from the existing opening This change was implemented in firmware and Design Verification report is published on
21. support a Work Of Breathing which is effectively zero e that is less than that through the diver s mouth by enlarging the bore of the mouthpiece to more than 700sqmm This was done for the commercial diver a SCUBA mouthpiece causes jaw ache if opened up more than 8mm at the diver s teeth Action The PFD Windows should be fixed using Loctite thread fixing to prevent a user unscrewing the PFD window All other screws are Loctite sealed already in production Action The PFD windows should be replaced by clear Grilamid 3L plastic injection moulded Action To mould a silicone shroud around the bottom of the scrubber and preferably the top as well to prevent damage from a mechanical impact equivalent to a 3m drop onto a hard surface Action Add a sintered filter to the path such that the outside face is flush Use a stainless steel version of the same filter that is used for the gas paths to the injector Action DL to measure the amount of energy lost at the maximum operating depth we are designing to 600m This will involve using the rebreather at 61bar with the breathing machine and heating the gas from the breathing machine with known energy and measuring the gas coming back to the machine The sea water will be 4C Action Set the maximum operating depth for the present at the point at which the gas heating would have to move from a SIL 0 project to a higher SIL level or the U101 and EN14143 2003 WOB limits whichever is the l
22. test due to an interruption to the ALV supply it was concluded by Deep Life that this was caused by a deformed gas supply hose in the test fixture or by sticking of the regulator or valve the fault self remedied This fault has only occurred once ever and is neither repeatable nor explainable as an equipment fault In the test set up where the fault occurred no gas was supplied to the ALVBOV but only to the ALV In a dive situation gas would be supplied to both An intermediate hose kink has never been witnessed on any manned dive A Nautec cylinder valve has had a stuck seat fault which could produce this fault The fault was raised with Nautec and their Notified Body and remedial action taken to prevent a recurrence It is possible conceptually for a first stage regulator to stick but again this has not been witnessed in any test The resulting fault is the same as for a The manifestation of this fault demonstrated that the rebreather withstands a 2 bar negative pressure without damage or leaking 4 16 3 2 Failure to actuate The electronic actuator may fail All actuators may fail and a failure was observed during testing on three occasions under exceptional conditions This fault is mitigated by diver training and instructions in the user manuals to operate the ALVBOV manually whenever a bail out condition applies The ALVBOV has a knob to enable the diver to force the ALVBOV into either open or closed position The function of
23. that water or vapour cannot remain around the cell membrane there is no well around the membrane 6 Fitting of inappropriate or unapproved cells The cells are tested automatically by the apparatus No person has so far succeeded into tricking the system to use an incorrect cell 4 30 3 Failure Mode Analysis The failure modes are engineered to cause the cells to fail low This is not possible in three cases where physical detachment of the anode occurs within the cell or where the electrolyte has leaked or where the load resistor has become open circuit or high impedance The last of these faults is detected automatically by the apparatus and the cell is screened out An O2 Cell Fusion algorithm detects and screens out the other two remaining faults when used in conjunction with automatic cell test which involves injecting a charge periodically into the cell and measuring the relaxation time 4 31 Electronics Chamber 4 31 1 Design Decision Review The electronics is in the rebreather head separate from the breathing loop by a stainless steel plate secured with a circlip around its periphery and two O rings in series performing the seal The electronics chamber is filled with silicone oil An expansion chamber is in the breathing loop using a stainless steel tube and a piston This means the electronics are at ambient pressure This also means the walls of the chamber are not under stress so helium should not migrate
24. the EAC seam towards the back for the first dive so it will be towards the front after the second dive so must be discarded This is in addition to the usual recommendation to log scrubber time on duct tape applied to the scrubber cap as a waterproof label 4 22 3 Failure Mode Analysis If the canister is breached then water will ingress into the system The system will fail positive and negative pressure pre dive checks In service the water will build up in the scrubber and if not drained to the exhale counterlung and dumped will cause the EAC overpressure flood warning to be activated The case of damage to the electronics chamber at the end of the scrubber is considered separately 4 23 Scrubber attachment 4 23 1 Design Decision Review The scrubbers in the eCCR configuraitons are attached using triangulated suspension mounts to absorb the peak shocks to prevent damage to the oxygen sensors in a working environment The suspensions mounts are fixed by screws to the rebreather housing in an area where the plastic is thickest The iCCR is a dump canister and there is no material safety hazard from fitting it upside down however the clamping arrangement enforces the thinner of the two caps to be upright the larger cap would interfere with the trim weights 4 23 2 Risk Assessment The triangulated mounts make it impossible to fit the eCCR scrubbers upside down this is important for the eCCR because the flow through the scru
25. this knob has been checked with the ALVBOV completely froxen to 20C after being immersed in water and water allowed to run off and at 70C using a gloved hand in each case 4 16 3 3 Free Flow Divers do not want ALV devices freeflowing This is a very strong diver requirement As a result of this requirement divers commonly fit shut off valves to ALVs and these have been implicated in multiple fatal accidents To avoid this risk the O R rebreathers give the divers what they want an ALVBOV with a very high cracking pressure but to meet CE requirements a second ALV is fitted set to the CE limit but which can be adjusted to offer higher pressures or shut off its function The ALVBOV is set to 55mbar cracking pressure the diver facing downward can crack it easily but it is above CE limits of 40m bar At 55mbar the ALVBOV will never freeflow as the radius of the circle from the ALVBOV to any point of the counterlung is more than 55mbar To meet CE requirements an ALV fitted to the exhale counterlung or breathing manifold at the junction with the exhale counterlung and the other is the ALVBOV set to 35mbar cracking pressure This cracking pressure is easily adjustable by the diver but the CE position is marked using a white on black spot The user manuals state that it is not user FMECA_OR_V4_140831 doc Rev B11 Page 57 of 104 Open Publication adjustable but the method of adjustment will be known to users who exami
26. through them into the oil helium migration occurs when materials are under strain All components have been tested for helium susceptibility by exposing them to pure helium at 1400msw for a minimum of 21 days Components that fail this test have been eliminated from the design except for the pressure sensor considered separately The isolation of the electronics from the breathing loop prevents any component from off gassing into the breathing loop The electronics is connected to sensors via a DIN 41612 connector These are known to be highly reliable with a hard gold plated bifuricated contact onto a hard gold plated brass pin The contacts are kept away from moisture by mounting them in the CO2 sampling area water molecules comprise 9 atoms compared to 3 atoms for CO2 allowing water to be kept out while CO2 passes through the membrane to the sensors The sensor area is also slightly warmer than other areas because it has a thermally conductive path to the scrubber and to an infra red source 4 31 2 Risk Assessment The following risks from the electronics chamber have been identified 1 Incorrect assembly This can occur if the user removes the circlip around the stainless steel plate The circlip is not obvious and is clearly not meant to be removed by a user Removing the circlip will cause a flood of food grade silicone oil into the scrubber head 2 Mechanical failure This can come from several different sources FMECA_OR
27. user 7 Water on the face of the connector the prevalence of this caused a change to wet mateable connectors only for all external connectors 4 33 3 Failure Mode Analysis Failures include loss of electrical and optical connections This is detected by the electronics and warnings flagged on either the Top Side Unit commercial dive system or on the handset Failures include water ingress with destruction of the electronics This is a gradual failure and should be observed by the user as the thermal expansion piston moving to one end of its stroke 4 34 Gas Port Mechanical Reliability 4 34 1 Design Decision Review The gas port is as small as the design team could make it while connecting to a regular hose Oxygen hoses should be in solid stainless steel but the connector allows for flexible hose for Multi role professional diving applications The port includes a 15 micron sintered bronze filter 4 34 2 Risk Assessment The following risks have been identified in relation to the gas connector 1 Mechanical damage The gas port projects from the side of the unit and if the scrubber is allowed to drop onto a hard surface from 3m or more the gas port can cut through the scrubber housing The result will generally fail pre dive positive and negative pressure checks but it is plausible that it may pass depending on how the damage occurs and fail during a dive Such a failure would lead to flooding of the scrubber housing which wo
28. valve seat use of low drop out one way valves on the outlet of the regulators post filter fitting of an over pressure valve manifold can withstand 300 bar cracking pressure of over pressure valve is bar bar above normal injector FMECA_OR_V4_140831 doc Rev B11 Page 101 of 104 Open Publication operating pressure and 5 bar above normal intermediate pressure Injector pressure limit is 140 bar two injectors provided on isolated circuits A KMDS One circle one way valve prevents flow of bail out gas FO2 23 into the diver s helmet The ALV and BOV have been merged into one The BOV provides gas direct into helmet The currents used in welding and burning operations can be so great that chrome is stripped from the brass of KMDS Mk17 helmets Ensure the Umbilical Terminator box is shielded and tested in these extreme current densities Magnetic effects may be dominant The original plastic chosen was Kynar which is a liquid crystal acting as a good electrolyte This provide further protection from high current densities by forming a Faraday cage around the electronics providing a good solution fitting the ALARP principle but the shrinkage and mechanical properties proved to be too problematic during moulding A change was made to a special formulation of PP which is free of plasticiser and softeners but has non toxic additives to provide the required characteristics However PP is also difficult to mould in complex sectio
29. 00 Cordura or from oil and cut resistant two ply commercial dry suit material depending on the application The cover is closed with Velcro 4 11 2 Compliance EN14143 2003 Section 5 8 8 Breathing hose The breathing hose shall be flexible and non kinking The meaning of non kinking in the standard is understood to be when the hose is bent 180 degrees it does not flatten and close off the gas passage completely or near completely The DL hoses do not kink However during negative pressure tests it is highly desirable that the hose can be deformed into an axial kink and retain that position subject to negative pres sure being maintained the hose does this and releases the kink automatically when negat ive pressure is removed To check this understanding hoses from other units carrying a CE marking were checked The Buddy Inspiration hose was tested with a 180 degree bend and the hose kinked redu 1 Neither the Draeger Dolphin nor the Buddy Inspiration are certified to EN14143 but use a historic PPE Directive compliance based on specifications each company has written in house to describe its own product However as both claim to meet the PPE Directive then these shall be used as reference points FMECA_OR_V4_140831 doc Rev B11 Page 31 of 104 Open Publication cing the bore to near zero The Draeger Dolphin hose reduced in bore by 90 but did not kink however the hazard of such hose that is nearly
30. 2003 To meet the existing standard of EN14143 2003 the hose cover should be attached to the hose ends with an easily removable clip which the user should be advised to remove The bottom of the counterlung should not be fixed down and the user advised to fix it down This meets the requirements in the standard as the cover then limits movement to 25 and the flexibility of the counterlung provides the head movement Action The mouthpiece direction arrow should be moulded more prominently FMECA_OR_V4_140831 doc Rev B11 Page 103 of 104 Open Publication Action After consideration of fatal accident reports and multiple incident reports then applying the ALARP principle this review rejects the whole concept of a mouthpiece as meeting EN61508 and SIL 3 levels and requires that the project introduce a Bail Out Valve BOV into the mouthpiece as standard The ALV should be the same valve as the BOV to ensure that any failure of the valve is detected before there is an emergency requiring bail out This was done the ALVBOV was introduced to the design Action After consideration of fatal accident reports and multiple incident reports in light that the mouthpiece opening determines the overall Work Of Breathing the hoses and scrubber have a Work Of Breathing less than that through the diver s mouth the review also rejects the mouthpiece as complying with EN61508 at SIL 3 level Applying the ALARP principle the project could
31. 6 Oct 2008 updated water dump decision based on feedback from training managers B6 on 14 Feb 2009 updating ALVBOV B7 22 May 2009 Intermediate pressure over pressure effects considered in more detail and section on Over pressure valves added B8 23 Aug 2009 Updated with ALVBOV seal failures manual oxygen dosing unit failures and flapper web failures B9 5 Dec 2009 Material MSDS references updated B10 31 Jul 2010 Sections 4 4 4 10 4 16 and 4 27 Updated Sections 4 17 and4 30 added Clarification of flapper valve reverse pressure requirement B11 21 Aug 2014 Added further detail to flapper valves and also new water dump design Sections 4 10 and 4 14 Changes in 2013 Version of EN 14143 considered no change found to be required other than as minor update to Section 2 FMECA_OR_V4_140831 doc Rev B11 Page 2 of 104 Open Publication Table of Contents PURPOSE AND SCOPE iiie aea ec 8 2 3TANDARDS 0 A A A A 8 3 DESIGN OVERVIEW oi a 8 3 1 Surface Supplied eCCRo ooconocccoonnnonnnnconanoonaccnnanconanconanconanconanconancnoncconccconaccoono poest conc sissoo sios ccorccccna conos 10 3 2 Multi role professional CCCR sscccsssscccsscsscssscssecssccceessscccesssccsesssscsescsscccsesscccesesccsssssscssesssseseees 11 3 3 Sports Pure 02 Rebreather and iCCR ssessssessssoesssoeessoessssoesssoesssoesssoosessoesssocsssoesssoesssoesssocesssoeses 14 4 FAILURE MODE ANALYSIS ooooooocccccccccnncccnnncococ
32. Amallysis ccccccscccsssseessecessceeesseeesnecesceesseeeseeesseeeseseeeeeeecaeessaeeeseeessseeeeeeenseeess 86 4 33 Connector reliability scsssscicssssccesscsessdscvencscosssoscocdcosvscssnscedessssoseesesscoasecssassedenasecsubeasssssensessansesdonssecess 87 4 33 1 Design Decision REVICW cccccccsscessseeseseeesseeeseeceseecnsueceeseeceaseeeseeeseaeeceseeesaeeenaeeesseeeenneeseeeess 87 433 2 RISKASSESSMENE 4 232 552 cso teats oinetocweh tapsbs teed ia E EEEE EEE ube oll ee veh Tides is 89 4 33 35 Fail re MOde ANAL YSIS irano r e a saveeeouscoc atbasslecsaadesses A a TA e Ea 90 4 34 Gas Port Mechanical Reliability oooooommmmmmmms 90 4 34 1 Design Decision REVIEW si id A EA E A a E a E 90 4 34 2 INIA 90 4 34 3 Failure Mod Analysis nirna E datan 91 4 35 Scrubber Stick scccssscsssscsssscsssecssssssessssscsssscsssscssscsssscsssssssssssssscssssssssscssssscssssssscsssssssssoossooess 91 4 391 Design Decision Revie Weereens A a Ad ads 91 A NS TS xg 91 4 35 3 Failure Mode AnalySiS oooooccononccnonccooonccoonncnoncnnnnnoconnnnnnnr nono nn rnan rn nan rra nr n nan nn naar nr non nn nan rn nana nannnnnos 92 4 36 CO2 sensor and WindOW ococomoconnconnnonnnnconanonanaconanonnncconancnonccnonanconccconanonnacooaccona conc ncora nooo nconancnnns 92 4 36 1 Design Decision RevieW ooooocnooccnononcoonncoonnnnoncnconnncnoncnnon on cono nono nrnnon nr ran nr rn nn rnan nn cnn nano n rr nanrncannnnons 92 4362 Risk Assessme
33. Fest RS 22 ALB 6 Barltire M Ode vicsec cease ies a A daa 22 4 9 Breathing NS erosoen osoensis esae esor seneese esene osese o rsi oaos 24 4 9 1 Design Decision REV Wo A RA A E agin aE 24 4 92 Risk Assessm nt os naa E a T Maisie eee E E E ees RAS 24 4 9 3 Failure Mode Alicia ais a A a E r a 27 4 10 Water DUMPS sescscscssciasscconssscsssescesecsssseceas oesassaicasesssscesaosssaesssdseSesesensssoseseesssooesssoebedestsaesesesenssososees 27 4 10 1 Design Decision REVIEW nenicd gteors iii td Couns be acti 27 FMECA_OR_V4_140831 doc Rev B11 Page 3 of 104 Open Publication 410 2 A A OR O EN 28 4 10 3 Failure Mode Amallysis ccccccscccsssesssecesseeceseessneecscecsseeeeeecesseeseseeeseeecaeeseeeesseeesseeeeneeeneeeens 28 AAA O 30 4 11 1 Design Decision RevieW oooooonoocccoocncoonccooncnnoncncnnnncnoncnnononcnnn nono n rn non rr ran nr rn nnrnan nn cnn n anno n rr nanrnnannnnins 30 4 11 1 1 Flexible Only versus Flex with Rigid Secti0DS o ooooooooonnonconoocncnoncnooncncnonocnononcnnncnnononcnn nono 30 A A o SE TA 30 4 11 1 3 Manutfacturme Method ica nn a ii ia bees 30 4 11 1 4 Overall ASS Md AA AA is 31 AMERICA PM deba 31 ATUSRISK AssEsS Met Ad A 34 4 114 Failure Mode Analysis conil di di in ati 35 4 115 Tr ming Requirements cid a e dan tddi 36 4 12 Breathing Hose Connectiions ccsscccsscsscsscssccssccsecssccscecsccccsesssccsscsscccscssccssssscssessssssesssceseeess 36 4 12 1 Design Decision Revie Wars A di
34. IGHER PRESSURE MAY CAUSE DAMAGE OR PERSONAL INJURY CE 4 8 2 Kink test Both hoses are non kinking with reference to the kink tests in EN 15333 2008 which references EN 14593 1 2005 6 11 4 8 3 MSDS The hose has a TPU inner and TPU sheath which does not carry any known allergenic or off gassing risks separated by a nylon braid The PEX hose has a polymerising polyester outersheath nylon braid and PEX inner hose None carry any known allergenic or off gassing risks PEX is chosen for suitability with low pressure oxygen it does not carry any pressurised gas but provides oxygen at ambient pressure to the scrubber or injector FMECA_OR_V4_140831 doc Rev B11 Page 21 of 104 Open Publication 4 8 4 Kink test The PEX and TPU hose is non kinking with reference to the kink tests in EN 15333 2008 which references EN 14593 1 2005 6 11 4 8 5 Test Pressures Samples of both hose has been tested hydrostatically and withstands 120 bar for two minutes All production hoses will be tested at this pressure for one minute The reusable fittings and the hose has a burst pressure exceeding 120 bar The 120 bar is the design target because it is ten times the highest working pressure for a second stage regulator 4 8 6 Failure Mode During burst pressure testing a failure mode was identified for the fittings whereby if 1 The end of the fitting is sharp instead of rounded AND 2 No oxygen compatible grease i
35. LVBOV withstands a drop from 3m Being a rigid hollow plastic volume it will crush if run over for example but this damage should be immediately apparent to the user 4 Accidental disassembly underwater This risk is addressed by removing all screw fittings are removed from the mouthpiece hoses are clamped The PFD is isolated from the breathing loop 5 User failing to close mouthpiece when out of the user s mouth this will normally cause water to flood into the exhale counterlung where it will be removed The port size on the exhale water dump is larger than that of the mouthpiece but if not corrected quickly the unit will flood with reduction of buoyancy These issues were a factor in reaching the Action below to use the ALVBOV with automatic loop shut off 6 Users failing to bail out This is a real risk implicated in numerous fatal accidents The design team was unable to justify a mouthpiece with manual shut off in the context of a system designed to achieve EN61508 SIL 3 the standard covers the system end to end After consideration of fatal accident reports and multiple incident reports this review rejects the whole concept of a simple DSV mouthpiece as meeting EN61508 and SIL 3 levels and requires that the project introduce a Bail Out Valve into the mouthpiece as standard for sport diving applicatins i e the ALVBOV mouthpiece This was designed as part of this FMECA Revision C Alternative mechanisms should be present for co
36. O rings are omitted the rebreather will still operate other than the scrubber canister O ring but will leak slowly The unit will not pass either positive or negative pressure tests in this state which are enforced by the system when it is powered up and not in the water 9 Replacement with unsuitable material This has a similar failure mode as the omission of O rings 10 Replacement with the wrong size In most cases the part will not mate if the O ring is the wrong size If a thinner O ring is fitted the failure is similar to that of omission of an O ring 11 Wear The O rings should all be replaced on annual service The O rings can support considerable wear ports have been tested dry free of oxygen compatible grease with many more matings than is likely to occur in a lifetime of service without failure In the worst case the failure is similar to that of omission of an O ring 4 13 3 Failure Mode Analysis The failure mode for O rings is that gas blows past the ring The tolerance around O rings has been set such that this is not a catastrophic failure other than for the scrubber canister The scrubber canister is subject to special consideration later Scrubber O Rings A test was performed on the effect of omission of the scrubber O ring and determine the survivability of such a complete ring failure The onus was to either prove the O ring is not critical by showing that if it is omitted then the water ingress is low enou
37. OB J L Flapper Flapper Hose Connector Flapper Flapper Flapper active resilience Flapper Mouthpiece RMV inner active area area per 2mm holder di bit opening 75lpm diameter diameter diameter oath cai diameter sq mm sq mm Flapper ameter area depth Rebreather mm mm Sm Sma edge mm Mh sq mm 40msw Sm Ss stroke air More is More is Less is More is More is i 3 More is More is Less is better better More is better better better better better More is better better better Buddy Inspira tion Year 2000 30 26 8 DSV ISC Megalodon Number 177 30 26 8 DSV mera gt Open Safety ALVBOV Oct 2008 The DSV or BOV has a linear effect on the Work of Breathing so reductions in the WOB of the DSV or BOV has an almost linear reduction of the WOB as tabulated overleaf Page 61 of 104 FMECA_OR_V4_140831 doc Rev B10 Open Publication yy o 5 NS Work of Breathing at 75l min RMV at a depth of e a 40msw depth on air y y D gt re WV 4 gt a o y 0 A Y y 3 y v e gt w H v 2 y oY D ES f i 0 amp D e 5 g A S So N S D S A S S E pe gt e dl gt A SS gt gt D N o Q x N Re S Y p O Oo N N S A S Sl Ss ES of Se s s PO cy oe Se ye SF RG Ox S Xo Ki ES D ON o R qa oe SR S Y O o Y lt K S C gt O O Q O S A S gt oe SS IS SS Y y o gt e S e a O e O gt g we o are units measured by Deep Life Ltd A
38. Open Publication DEEP LIFE OPEN REVOLUTION FAMILY OF REBREATHERS FAILURE MODE EFFECT AND CRITICALITY ANALYSIS VOLUME 4 Mechanical Failure Mode Analysis DOCUMENT FMECA_OR_V4_140831 doc NUMBER Filename CONTRIBUTORS Dr Alex Deas Dr Bob Davidov Marat Evtukov Alexei Bogatchov Dr Vladimir Komarov Dr Oleg Zabgreblenny Dr Alexander Kudriashov and client review teams DEPARTMENT Engineering LAST REVISED 21 August 2014 REVISION B11 APPROVALS AD 21st Aug 2014 Project Manager Date KB 21 Aug 2014 Quality Officer Date Classified Document H Controlled H Document DO NOT COPY Copyright 2006 2007 2008 2009 2010 Deep Life Group All patents patent applications design and topographical rights reserved No circuit may be reproduced without a licence for the topographical rights contained therein from Deep Life Ltd This document does not constitute a licence to use any patent patent application or topographical right of Deep Life Group FMECA_OR_V4_140831 doc Rev B11 Page 1 of 104 Open Publication Revision History Description 11 Nov 2006 Document assembled from other files B6 14 Feb 2009 3 Jan 2007Update based on test results Clarified Method B2 Results from HAZOP reviews held in Jan 07 added 16 Feb 2007 B3 is addition of only in Feb 2007 B4 on 28 May added consideration of water dumps and review of all previous actions following manned trials B5 on 2
39. RSOK S 002 13 IMCA AODC 035 7 NORSOK S 005 The design has been verified against the relevant sections of each one of the above standards or advisory documents with 5 units of each type as required by NORSOK U101 Reference is made to these standards in this FMECA to ensure proper consideration has been given to failure modes and minimum performance targets Compliance matrices have been produced for each of these standards with supporting test data of which this is a part for NORSOK U101 EN61508 and EN14143 This document does not replace the clause by clause compliance verification documents 3 DESIGN OVERVIEW The project forms a technology base that is realised in several formats specific to the application The four formats considered by this review are Surface supplied umbilical divers eCCR eSCR dual scrubber with umbilical comms video lighting heating and real time monitoring topside Model Umbilical Diver s eCCR Multi role professional eCCR single scrubber and through water comms SCUBA rebreather Model Incursion eCCR sports iCCR single scrubber with monitoring Model Apocalpyse Type IV iCCR FMECA_OR_V4_140831 doc Rev B11 Page 8 of 104 Open Publication sports O2 CCR single scrubber Model Apocalpyse Type IV O2 CCR Each of these configuratons are described separately in detail by Green Book engineering descriptions These documents describe the design and in their realis
40. Risk Analysis The current hose routing shown in the figures below was considered a reasonable compromise The sheer number of hoses and connectors is a challenge A safety analysis has been carried out to determine the risk of the PPO2 being outside acceptable limits if all power is lost and the injector is jammed The silicone oil compartments had been completely separated in the twin scrubber SCR configuration so that destruction of one compartment does not affect all electronics The Umbilical Terminator box left SCR and right SCR have separate compartments each with their own silicone oil temperature compensation piston Commercial divers reported in HAZOP reviews that using the two pane water heated visor on the KMDS Mk17s 27s etc sometimes caused silt to build up such it was like a shutter closing the helmet from the bottom during grit blasting and fettling operations and raised a concern grit could block the port from the Umbilical Terminator silicone oil temperature compensation piston A sintered filter to the path such that the outside face is flush Use a stainless steel version of the same filter that is used for the gas paths to the injector A HAZOP was carried out on the Umbilical Terminator A HAZOP was carried out on the gas manifold and the following risks identified Over pressure of first stage regulators mitigated by use of sintered filters before and after each stage to prevent foreign material being swept under the
41. The sealing ring is shown in Fig 4 7 below with the CNC version of the connector the injected version has the undercut moved to the connector nut instead of behind the thread of the connector body for reason of the differences in the manufacturing requirements between the two fabrication technologies FMECA_OR_V4_140831 doc Rev B10 Page 64 of 104 Open Publication Exhale counterlung Inhale counterlung Fig 4 28 Examples counterlung construction showing water dumps gas access spring reinforcement rings on ports and OPV on the inhale counterlung shown on the right FMECA_OR_V4_140831 doc Rev B10 Page 65 of 104 Open Publication P connector body RR Welded joint SERIA KS SN S lt e ge Fig 4 29 Counterlung port reinforcement and mating to prevent counterlungs pulling out from the port FMECA_OR_V4_140831 doc Rev B10 Page 66 of 104 Open Publication Fig 4 30 Test of counterlung port reinforcement and mating with maximum force to pull the hose from the bare counterlung using thinner counterlung TPU to increase the stretch the production TPU is 600 micron thick and not easily stretched Even under these conditions hose was retained The example above uses the thinnest counterlung material The above test was configured specifically using counterlung material that would manifest the failure if the failure mode existed This test
42. _V4_140831 doc Rev B11 Page 85 of 104 Open Publication The seal on the thermal expansion piston can fail This seal is from EPDM and should be replaced annually Impact or dropping the unit it invariably falls on the electronics end of the scrubber as this is heavier than the other end Penetrators and connectors into the electronics chamber These risks are considered separately below 4 31 3 Failure Mode Analysis The chamber itself forms an external surface of the rebreather and can be ruptured if the rebreather is dropped onto this surface from a few feet This is the primary failure mode and results in water ingress and loss of all electronics When this occurs the piston on the thermal compensation chamber moves to the bottom end of its travel this should be apparent to the user on fitting the scrubber cartridge for the dive but may not be 4 32 Connector penetrators 4 32 1 Design Decision Review Penetrators are used for electrical and optical signals entering the electronics chamber The quality of penetrators used and their general design is sufficient for decompression chambers for human habitation There are two types of penetrator one is a shaft with O rings to insulate the shaft from a stainless steel barrel and the other is a circuit board potted into the penetrator These have been tested to 500msw and are being tested to 1400msw in pure helium for month long periods All hoses entering the electronic
43. a the elasticity in the material allows it to flow around the Knife instead of catching and cutting Single ply CLs are adopted as a result of these tests 4 21 2 Risk Analysis 1 UV The counterlungs will be exposed to intensive UV on the decks of dive vessels Both counterlung cover materials have excellent UV resistance The material in black has significantly higher UV resistance than the material in any other colour 2 Chemical The counterlungs may be exposed to chemical contaminants The counterlung cover materials are highly resistant to oil and other common contaminants The commercial dive counterlung covers are easily washable having a smooth surface 3 Puncture There is a risk that the counterlung cover will be punctured especially if the equipment is used in an overhead environment or with underwater cutting tools The use of 1000gm Cordura appears sufficient for recreational divers but the commercial diver presents a concern even with the two ply cover a commercial diver can shred a dive suit on a single dive It was found that the counterlung material itself is in fact more resistant to cutting than 1000gm Cordura 4 Separation from harness A fatal accident has occurred where a Multi role professional rebreather diver failed to fix down the counterlungs properly and they floated above the diver s head during the dive The increased Work Of Breathing caused CO2 retention resulting in the diver losing consciousness
44. a heliox rebreather Clearance diving nitrox and intermediate range trimix are also supported One configuration is shown in the diagram below Fig 3 3 1 Multi role professional eCCR configuration with both side tanks mounted rear cover is off as are the cylinder covers FMECA_OR_V4_140831 doc Rev B11 Page 11 of 104 Open Publication ALVBOV PFD Ke Flow Path PFD Cable Main Electronics Exhale Inhale Counterlung Counterlung Make up Gas 02 Supply Cylinder h Cylinder First Stage Regulator so 02 Pressure Gauge Make up Gas On Off Valve Make up Gas C02 Absorbent 02 0n 0ff First Stage Pressure Gauge Canister Valve Regulator Incursion eCCR Fig 3 3 2 Multi role professional eCCR Incursion CAD images are used for clarity images of the physical realisations are shown in the appropriate sections of this report in the Design Verification Reports and in the Green Book documents FMECA_OR_V4_140831 doc Rev B11 Page 12 of 104 Open Publication Fig 3 3 2 CAD image of the ALVBOV components in the breathing other than the scrubber and bags Fig 3 3 Pre production head CAD image Fig 3 4 Multi role professional eCCR head physical realisation In Fig 3 2 and 3 3 the dual redundant variable orifice injector can be seen with four O2 sensors and the scrubber stick showing differential pressure sensor at top temperature sensors along its axis Connec
45. a locking channel that is significantly deeper and wider than ports in common use for a very positive click A further change was made to add a white line to the button s such that it is visible only when properly engaged This gives clear visible feedback to the user that the port is engaged properly 5 The ports in common use could be disconnected by pulling hard enough on the hose This risk was addressed by increasing the depth of the wire retainer groove and increasing the diameter of the clip wire by 50 over that of ports in common use 6 The P Ports in common use could be pulled through the counterlung if the counterlung material was under tension This risk is considered under the counterlung assembly but required specific design features to be incorporated into the port to enable a secure seal and to retain the port onto a lip on the counterlung 7 There were several reports on the internet and from other companies using Press Click connectors that these had disengaged accidentally One company Narkedat90 had resorted to drilling a hole through the button and added a locking wire to prevent the button being pressed From this feedback it was concluded that what is apparently two actions to disengage the connector Press a button then pull is in fact one action because the pull can occur during differences in pressure between the loop and ambient This problem was identified late on in the design cycle all the other improvem
46. alistic and tests the clamping of the hose to the port as well as the hose The question is raised on what is the likely maximum load if a diver catches a hose loop on a vessel the pull could be 100kg The complete failure was considered a satisfactory result as it is very clear to the diver and the dive operator that the unit is not working tidal volume will be zero on the monitor and it will not pass any positive or negative pressure checks EPDM is a strong material and better than butyl neoprene silicone and most other hose materials an exception PTFE is stronger but carries health hazards preventing its use in diving systems Crushing The hoses withstand 100kg weight without apparent damage Blockage In ice dives hoses have blocked and even burst due to water condensing in the hose This risk is mitigated in this design by using a spiral hose The spiral hose also allows water to drain out reducing the risk from minor leaks Chemical Damage EPDM has been chosen as this has good chemical resistance including to oil and to ozone a hazard in a welding environment UV Damage EPDM has good UV resistance properties The hose is covered with a black protective cover which shields it from UV Bacteria The bore of the hose is very smooth and the corrugations are spiral so the wetting of the surface using the sterilisation procedure is very good The susceptibility of the hose contamination by bacterial growth especially Pseu
47. aring and it was found that the cause of this would have to be user mishandling To mitigate against this risk the silicone valve was positioned in the mouthpiece such that it cannot be touched by the user without complete disassembly of the hoses 5 Blockage This risk is similar to that of leaking Large particles are blocked by the web small particles move through the web The silicone flapper was chosen to follow the shape of the valve surface very easily unlike valves cut from less flexible material so when the web blocks the valve still operates with the remaining open fingers of the web 6 Incorrect assembly The hazard that users may assembly the flappers on the wrong side of the web after a complete strip down was mitigated by adding to the reverse side of the web long stalks to prevent the user doing this The flappers are colour coded in bright red and green and the hoses are similarly colour coded using highly visible hose clip covers The colours red and green do appear very similar in black and white so a dive supervisor may not see this on a camera but it will be immediately apparent to those in the dive environment if any cross over has been made the unit should not be stripped down in saturation environments but passed to a technician to do this There is a risk a person with Red Green colour blindness would make a similar mistake but the colours do follow the normal marine convention of port and starboard markin
48. ation in accordance with QP 05 and QP 20 in the ISO 9001 quality system operated by Deep Life Ltd No attempt will be made here to cover the detail that is in the Green Books other than a general overview as each component is considered and the following general description to enable the reader to follow the points arising from the review Conversely there is inevitably some repetition of material from the Green Books in this review because Failure Mode Analysis preceded design work and continued in parallel with the design as required by Quality Process QP 20 The realisations of all major subassemblies have been tested according to a formal Test Plan and the results are described in respective Design Verification Reports FMECA_OR_V4_140831 doc Rev B11 Page 9 of 104 Open Publication 3 1 Surface Supplied eCCR The surface supplied diving form of the rebreather is shown below with two scrubbers and a multiplexer Umbilical Terminator box with the cables and hoses to the umbilical camera lighting suit heater voice comms etc Fig 3 2 1 Configuration for Commercial Surface Supplied Diving rear cover removed FMECA_OR_V4_140831 doc Rev B11 Page 10 of 104 Open Publication 3 2 Multi role professional eCCR The Multi role professional eCCR is a military rebreather covering everything from Very Shallow diving operations configured as a pure O2 rebreather to Extremely deep rescue and recovery as
49. ation to the user that the thread is properly engaged the user stops turning the nut when resistance is felt this may be due to thread damage There is considerable operational experience of using screw connection ports but the hazards associated with them are intrinsic to their design 2 Bayonet type ports These depend on the pins which can be damaged easily The bayonet generally has a sequence of actions which can occur by accident push rotate pull the push and pull can be a byproduct of the difference in pressure inside the loop and externally during pre dive checks There is little operational experience of using bayonet ports 3 Press Click Ports These are the most widely used ports for Multi role professional rebreathers exemplified by the Draeger P Port by virtue of the large sales volume from Draeger Dolphin and Ray rebreathers and the use of similar Press Click ports on rebreathers from other OEMs The design is a Press Click type port developed after testing ports in common use a HAZOP study and then a development project to address all of the limitations identified during either testing or from the HAZOP The use of a Press Click connector as the basis for this development appears to be the optimal decision 4 9 2 Risk Assessment The risks presented by the Press Click Ports in common use are 1 The bore of the Draeger P Port is just 22mm 24mm This presents significant breathing resistance it is more tha
50. ave been identified that are associated with the CO2 sensor and window are as follows 1 Leakage Gas will leak past the O ring sealing the sapphire window and helium will leak through the window The rate at this occurs is low but long term tests are still underway simulating a saturation diving environment where the equipment operates under pressure in helium for long periods 2 Incorrect assembly The CO2 sensor assembly is not user serviceable The risk of incorrect assembly is very low 4 36 3 Failure Mode Analysis The early failures of the CO2 sensor that occur will be due to gas leaking past the sapphire window and pressurizing the CO2 sensor Action The early failure rate of CO2 sensors will require careful monitoring if the failure rate becomes unacceptable then the CO2 sensor will have to be sealed in a 1 ATA chamber at a significantly higher cost using UV setting epoxy 4 37 Sensor Bell Membrane 4 37 1 Design Decision Review The purpose of the membrane is to prevent water vapour from invading the sensor bell containing the CO2 CO HC He and temperature sensors The membrane must pass CO2 and Hydrocarbons but stop water vapour The chemical composition of the water vapour molecule is H603 so is a large molecule compared to CO2 CO or He The molecular size of hydrocarbons depends on which hydrocarbon is involved This issue of resolving hydrocarbons is particularly acute because some have only mild anesthet
51. barrel and the front ring the tolerance of which is hard to control sufficiently for a reliable O ring seal Custom lip seals are used instead including 3D seals Toxicity All materials are non toxic in normal use and have no significant allergenic reaction no latex or rubber is used FMECA_OR_V4_140831 doc Rev B11 Page 55 of 104 Open Publication 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Weight the overall weight was reduced to the lowest level consistent with achieving neutral buoyancy in sea water The user manual contains warnings not to fold the hoses back so the ALVBOV can strike the diver Accidental activation the status of the valve is immediately apparent to the diver as the front is marked and shows in the diver s viewing field when in Open Circuit mode Open Circuit is a fail safe condition unit fails to fail safe The activation trigger is positioned such that it is not activated accidentally Flush access the purge button on the front of the valve acts as a combined flush and purge Hose failure three hoses on a conventional rebreather are combined into one the manual make up gas inject the ALV function and the bail out function The failure rate is therefore reduced by 3 cube Every hose is been tested at twelve times the normal supply pressure i e at 120 bar Water collection The ALVBOV has a water drain the function acts simi
52. bber to the sensors must be in the designed direction The iCCR scrubber is attached using a folded plate The plate has a radius of more than 1mm on all edges so does not present a cutting risk to the counterlungs in normal use the bracket does not touch the counterlungs but can do if the scrubber is removed 4 23 3 Failure Modes Sufficient mechanical shock will pull the mounts from the plastic housing The shock required is very high more than a 3m fall The failure will be apparent to the user who should return the entire rebreather for a factory check and service as such a shock may damage electrical components or create stress fractures in critical components FMECA_OR_V4_140831 doc Rev B11 Page 72 of 104 Open Publication 4 24 Scrubber Seal 4 24 1 Design Decision Review The Micropore EAC seals were examined and tested at length The standard seal loses around 10 of the active area of the scrubber and is liable to be damaged as well as having poor intolerant for EAC damage A new seal was developed which is similar to a divers dry suit wrist or neck seal in its operation This is highly tolerant of scrubber damage A joint review was carried out with Micropore on this particular solution with a consideration of the commercial implications using the ALARP principle Micropore are now recommending this solution to other customers 4 24 2 Risk Assessment The following risks have been identified in connection
53. between 1kg and 1 5kg to actuate it so it will not trigger automatically An extended review of the water dumps considered whether these should be single or double valve design With a single dump pulling the dump opens the breathing loop With a double valve water ingress to the loop is prevented by use of a second flapper valve but then in the event the water dump is pulled the diver would suffer water ingress when FMECA_OR_V4_140831 doc Rev B11 Page 27 of 104 Open Publication inverted the period of time between the dump being pulled or entrapped and the loss of gas would then make the cause of the water ingress to become unrelated for the diver making its rectification much less likely The design used on all O R rebreather models uses a twin valve combining a pull dump and a one way valve to prevent water ingress The pull dump has a different knob than that for BCDs that can be distinguished by feel even though thick gloves The pull dump has a tube over the pull cord to prevent the pull cord entangling with cylinder valves 4 10 2 Risk Assessment The manual dump could be pulled accidentally resulting in a complete loss of the breathing loop The manual dump cord could fail The manual dump could pull away from the counterlung This is mitigated or eliminated by the use of an injection moulded port reinforcing ring that is welded to the counterlung 4 10 3 Failure Mode Analysis The failure mod
54. both scrubbers has been carried out FMECA_OR_V4_140831 doc Rev B10 Page 69 of 104 Open Publication The breathing resistance for both scrubbers has been measured and these show the resistance through the cartridge with an EAC fitted is one third that of the ports into and out of the canister these ports have an internal diameter of 36mm The CO2 breakthrough characteristics of the scrubber are the subject of a separate report Tests were carried out on granular scrubber materials none of these would meet the requirements of EN61508 at SIL 2 or 3 level because of multiple faults including a four fold rise in breathing resistance when wet risk of caustic cocktail to the diver dust hazards tunnelling hazards in particular orientations in any of the axial designs that were considered and inability to control sufficiently the user s placement of the scrims For this reason granular scrubbers are not supported the canister will only accept EAC scrubbers SS ES AU t m Fig 4 31 Commercial diving scrubber canister assembly showing viewing ports and buddy status lights FMECA_OR_V4_140831 doc Rev B10 Page 70 of 104 Open Publication HUM LU Fig 4 32 Multi role professional eCCR configuration showing the scrubber viewing port the same scrubber barrel is used on all units and all contain the scrubber viewing port 4 22 2 Risk Assessment UV The scrubber housing may be exposed to intens
55. breather breathing loop makes the active heating less of a critical issue that for currently used equipment at moderate depths and it could be argued for extreme depths This issue should not be allowed to impact on the current testing as the system is fitted for active heating which will need to be demonstrated as part of the Norsok verification beyond 150m The question is raised of whether it really becomes a SIL 3 4 system or will the rebreather loop avoid this thermal shocking of the divers respiratory system at extreme depths Formal safety reviews recognised the problems with suit heating identified in SafetyRep_Carbon_heaters_061225 pdf and noted that moving to carbon based self limiting materials did not affect the safety The review meetings minuted reports that 3 degree burns had occurred to divers using the previous generation of suit heaters and nothing seems to have changed just by moving to the EXO2 heaters the causes are still present Alex Deas described a meeting with Robin Caird Technical Director of EXO2 and inventor of their material where both parties agreed the cause of the problems and actions to remedy these DL had put a design engineer onto the proposed solution which was described in detail to the meeting EXO2 were very helpful and are supporting fully these safety improvements The meeting agreed this route forward for all heaters suit and gas heating seemed to be sound and awaited further information as the
56. button may also stick if grit or contaminants invade its sliding surfaces this results in the white line not being visible when engaged which is a fail safe failure The O rings require preventative maintenance in the form of cleaning if contaminated with grit or oil and annual replacement The O ring material is EPDM which has excellent U V resistance and good resistance to ozone which occurs in a welding environment unlike Viton or butyl EPDM has good dynamic wear properties EPDM is a synthetic plastic and does not carry the allergenic risks of latex based rubbers There are no plausible failure modes identified that do not result in the port failing positive or negative pressure tests or a cursory visible inspection by the user The plastics manufacture has confirmed the plastic granules contain no plasticizer Toxic chemicals include formaldehyde are generated when the plastic is burnt but this requires temperatures of over 200C 4 10 Water Dumps 4 10 1 Design Decision Review The water dumps have been the subject of considerable ergonomic testing to find the best type and location Automatic water dumps were found both by formal modelling and in manned trials to be unusable because the pressure differential needed to actuate them fights the pressure differential to trigger the Over Pressure Valve Manual dumps were concluded located at the bottom of each of the counterlungs The water dump is a 30mm diameter and requires
57. by shortenng the cable to remove all slack in June 2010 amp Fig 4 8 Improved water dump where the stopped uses piston to prevent sideways movement The valve is fitted with an umbrella one way valve purple compoennt on right and a contoured seal purple component on left The piston itself is shown in the foreground the spring is welded and potted into the well around the piston preventing it coming out under even extreme conditions of use The cracking pressure of the pressure relief and the flow cross sections are unchanged from the original The thread on the cap of the new valve is very large to avoid the risk of a user cross threading it FMECA_OR_V4_140831 doc Rev B11 Page 29 of 104 Open Publication As well as the two water dumps one at the bottom of each counterlung a third water dump is provided in the ALVBOV to prevent water collecting in hoses This uses a one way valve and a manual press button to activate The ALVBOV water dump has the one way valve on the outside of the ALVBOV and the button on the inside path the opposite to that used for the counterlungs 4 11 Breathing Hoses 4 11 1 Design Decision Review The design decision tree involved in selection the hose was to determine the whether to use a mix of solid or flexible hose or flexible only the method of manufacture spiral or parallel convoluted and the end attachment 4 11 1 1 Flexible Only versus Flex with Rigid Sections R
58. cic sisiscitic chsh asedicesideetadavesdosedurs li aia 83 429 2 COMPMANCEs tt a a Lactose 83 FMECA_OR_V4_140831 doc Rev B11 Page 5 of 104 Open Publication ADORA a Oia 83 4 29 4 Failure Mode AnalySiS ooonooccnonccconcnooonocoonccnononononocnonnrnnnrnonn nro nan rr nan r rro nr r ran nr naar rr nn nn nan rnnannnnnanannos 84 4 30 Oxygen Cells and Cell Holders ssccssssssccsssssccssscssccssccscesesccccesssccccecssccssescsscessssccesssscseseeess 84 4 30 1 Design Decision REVICW cccccccssceesseeseseeeseceseecesaeensueceeseecesceessaeessaeecnseeesaeeeeaeeeeaeeeeseeeneeens 84 430 2 Risk ASSESSMENT AR AA dei 84 4 30 3 Fail re Mode Analysis norne iia da idas 85 4 31 Electronics Chambet ccssccssscsssscsssscsssssssssscsscecsssscssssssessscsssessssscsssscsssssssssecsssscsesscssesssesseonees 85 4 31 1 Design Decision ROI Wii e A e ETa 85 4 31 2 Risk ASSESSMEMNE s c2selelascacascuduhevs yaiusicberscqentcebunsegatesusnaseneceuncevanssgudesgoateagecesabensudecnadeenneesdaueues 85 431 3 Failure Mode A nal ysi vii 23c0051 ee avian A A A Mesa cl Goes 86 4 32 Connector Pemetrators ccsccscccsscccccsccssccsccseccsscccccsccecsscccsecsssscessccsssssccsesssccssssscesssssccssesssesseeses 86 432 1 Design Decision REVICW iceri e E hates Ancien E E ress E UeeeateesadeeasQevesTibebets SE 86 432 2 Risk ASSESSING sic cscs E EE ead GE cca tesa bees casual copa she dad Ceactheuene Pott das 86 4 32 3 Failure Mode
59. cision RevieW oooocnooccconcncoonncooncnnoncncnnncnnncnnononcnnn nono E nan nr ron nr rn nn rnan nn nan nano n nr nanrrnannnnns 75 4 26 2 Risk Assessment 2x A A E R E A EAEE T5 46 3 Failure Mod Analysis cinsten a Td tias 76 4 27 Electronic G s In jectOrisessceciscsicssescsssscesesvccsesecscoceveasessevossassonessssssnaasestedess sseoeesessensessssensadesoesscssses 76 4 2 7 1 Design Decision RV Wi tico iii Ed A da EE AAA levees a 76 A SI E OO OESTE 76 4 27 3 Failure Mode Anal ysis iii talar 76 4227 4 Reliability TESSA A a DL LAA 77 4 27 5 Leakage and Fail Open Risk Mitigation ccccccccccssscessseeseeceeseceseeesseecsseeesseeeeseessseeeneeeneneees 77 4 27 6 Contamination Risk Mitigation cccccccsccccsseecesseceseceeseeeeeeeceeeesseeeceaeecseeeeseeeseseseseeeeteeessneeees 78 427 26 1 Inlet PTOS Ed Gti e E Wine aes een 79 4 27 6 2 Backs Flow PrOteCt OIDs 3scccieectausccedtvevesves aa ae e e e e eerie atia ES aS 79 4 28 Passive Addition and Manual Oxygen Dosing valVve essseoessssoessssocosssocesssocosssoecsessoesessoesssssosese 80 428 1 Design Decisi n Re VIeW dd ir Att a acaso 80 4 28 2 Risk Assessment ii leona 81 4 28 3 Failure Mode Anal ysisv cscccetecasae cevseesetsssauacevendadaduveiuis d and ica E aa e a Te a ENE E dic 82 4 29 Battery HOUSINGS ccccsscssesessssessnsccssdsesonssssesebessccecascsonosseostesssecseceessinesedebassssesadesenasessaaacesonsasasTabeseaces 83 4 29 1 Design Decision REVIEW n
60. ck 7 26 cm 2 E Inspiration spider 3 90 cm 2 AN VV x6 webs 2 mm thick 6 46 cm 2 ATA LV x6 webs 1 mm thick 7 19 cm 2 x 4 4 webs 2 mm thick 6 61 cm 2 v D o 9 oO oO O O 3 3 8 55 cm 2 IN oxy x5 webs 2 mm thick 6 71 cm 2 A E x5 webs 1 mm thick 7 31 cm 2 x 3 3 webs 2 mm thick 6 93 cm 2 Fig 4 18 Each of the flapper valves tested are shown above with an APD Buddy Inspiration original web shown in the top mid centre for comparison purposes The design finally adopted the 8 web 6 95sqcm design with 1mm thick fingers 4 14 2 Compliance EN14143 2003 Section 5 6 2 Inhalation and exhalation valves FMECA_OR_V4_140831 doc Rev B11 Page 45 of 104 Open Publication The facepiece shall include inhalation and exhalation valves to reduce dead space and ensure gas circula tion through the apparatus Valve assemblies shall be designed so as to be easily assembled and main tained Means to check the correct assembly of the valves shall be described in the information supplied by the manufacturer Where necessary to ensure the safe working of the apparatus it shall not be possible to reverse the breath ing circuit Where the apparatus design permits this the apparatus shall be tested in both directions of flow The valve s shall not leak or be permanently deformed when tested in accordance with 6 5 4 Testing shall be done in accordance with 6 2 and
61. closed is the same as for a kink The DL hose did not kink and the bore did not reduce to less than 35mm in diameter it was the only safe hose of the three hose types tested EN14143 2003 Section 5 8 8 Breathing hose The breathing hose shall permit free head movement and shall not restrict or close off the gas supply under chin or arm pressure during practical performance tests Testing shall be done in accordance with 6 15 Three hose samples were used and all pass this test The DL hoses are much shorter than hoses on other rebreathers with provision to adjust the effective length EN14143 2003 Section 5 8 8 Breathing hose The hose shall not collapse and the elongation shall be at least 10 and not greater than 30 Testing shall be done in accordance with 6 8 5 EN14143 2003 Section 6 8 5 Flexibility of breathing hoses Suspend the breathing hose assembly for testing elongation Measure the hose length without couplings Afterwards apply a force of 10 N to the hose assembly for a period of 5 min and measure and record the length of the hose Calculate the elongation The DL hoses meet the requirement that the hose does not collapse It is not clear why there is a limit of 30 on elongation in fact it creates a safety hazard because much longer hose lengths are required to allow sufficient head movement than are required in an optimal design and a non kinking hose requires much more than a 30 stretch otherwise it will bloc
62. connectors are oriented 180 degrees away from the diver It is impossible to breathe from the rebreather in this position while wearing it The clip that secures the connectors fails in an obvious manner when over stressed The clip does not yield but simply snaps into multiple pieces preventing it being used This cannot occur when the clip is fitted unless by deliberate and very willful damage using tools The flapper valves cannot be inserted from the wrong side because only one side of each valve is available to the diver the spiders are welding into place One customer in the USA for the ALVBOV appears to have tried to remove the exhale flapper and destroyed it in the process Notice is now being sent with ALVBOVs sold separately not to remove the spiders The failure is obvious and the ALVBOV fails all flow tests because the exhale flapper valve cannot be fitted when the spider is destroyed 4 17 Automatic Loop Volume device ALV 4 17 1 Design Decision Review The design had the following objectives 1 To provide an adjustable ALV that is as close to the lung centroid as possible to provide adequate loop volume with a 40mbar cracking pressure measured at the lung centroid 2 To provide a design reasonably immune to freeflow This was achieved using the device shown in the following figure which uses the same valve parts as for the ALVBOV but with a variable spring pressure so it may be adjusted to either the CE limit or any othe
63. da aN AES 36 AV2 2 Risk Assessment x 22 53 iaa 38 412 3 Failure Mode Analysis nonae cesies cdi it ia 38 4 13 O rings ANA X LINGS sss50 sce sccsvescossscovacesesevensesesassesswsadoosnsadsesassassoessdsesnessscobassocsesadoesecaasosessacsedncassccee 38 4 13 1 Design Decision REVIEW 2c2i05 12 2o sede li da ii 38 Aa O Risk Analy SiS RA A rie ieee tt A A ad tdo 39 413 3 Failure Mode Analysis norne n iii 40 4 13 4 Traming Requirement sri en ni ridad di 41 EN A ON 41 4 14 1 Design Decision Rev Westin ia bd Si 41 ANA E ee a aE E doves idausddedateatiacailed terion aae dc daha ues AS 45 4143 Risk Atal licor LR A An A AN 46 4 14 4 Failure Mode AnallySsis ccccscccssssccesccsssrsconssessececesncesenacsesecssensceeseeseauscseneeseneeesacseseneseeneseesneess 47 4 15 Mouthpiece plain DSV Version cscccccscsssscsscssecssscsesssscccscsscssscesscsscsssccscssssccsessssccssessoseseesee 49 4 15 1 Design Decision RV Wii a al 49 ALO 2 COMPHANCS id A dd tata 51 AVS ANI A O NT 51 4 1 5 4 Failure Mode Analysis ibi ri tai iaa aiii 51 4 16 Mouthpiece ALVBOV Version essseesssoessssessssessssoesssoosssoossssoesssosessoessssosessesssoossssossssoesssoessssoessso 52 4 16 1 Design Decision Rev Wi a tastes teases 52 4 16 2 RISK ASSESSMENT di 54 4 16 3 Failure M deAnalysig sann ian A as 57 4 16 3 1 Failure to Operation 57 IA AA AAA A Jungactavegpesiaaenedededacdestsabedcestesspalastacteesse 57 AlO EREE ld ta cia 57 4 16 3 4 Seal
64. domonas aeruginosa shall be checked by SINTEF Health Research FMECA_OR_V4_140831 doc Rev B11 Page 34 of 104 Open Publication 4 11 4 Failure Mode Analysis None of the hose components are stressed within 10 of their yield point in normal use This means that stress failure should be extremely low The hose has double the strength required for EN14143 2003 The failure mode identified is a complete cut of the hose which occurs of a tensile load of 50kg is applied This is due to the cuts made by the forming tool creating a stress point on each hose corrugation This may be eliminated in future by using an injection moulded hose The injection moulded hose could incorporate a mesh to prevent cracks propagating Fig 4 9 Hose failure on a 50kg load on a sample of the thermal re formed hose Note hose is still attached to port the test was carried from port to mouthpiece The cable clamps have not yielded and the creep is less than 1mm Tests were carried out with both plastic clamps and stainless steel Jubilee clip clamps that are used to attach the hose in production in case a diver replaces the Jubilee clip with a cable tie in the field Microscopic examination of the failure shows it to start at the point where the forming tool has grabbed the hose during its manufacturing process there is a 0 3mm deep cut on every ring of the hose where this failure can start The hose material was subsequently improved and the thic
65. e DSW above 4 16 1 Design Decision Review The design had the following objectives 1 RA ON as ae 1 11 12 13 14 15 16 17 18 19 20 21 Work of Breathing the same as for the DSV so there is no effect on the loop when the DSV is upgraded to the ALVBOV The internal gas flow profile is identical between the two valves DSV and ALVBOV Two modes and only two modes no intermediate modes Open Circuit and Closed Circuit Neutral buoyancy in sea water Manual bail out to Open Circuit meeting EN250 levels of performance CCR DSV with a WOB under 0 6 J L at 40msw with a 75 Ipm RMV using air Avoidance of water trap around flapper valves Means to remove water that collects in the mouthpiece Automatic bail out on removing the ALVBOV from the diver s mouth Automatic bail out able to be activated electronically Peripheral Field Display attachment provides voice and visual annunciation for divers including those who are colour blind or sighted in only one eye Secure sealing that allows positive and negative pressure checks to be made out of the water Adjustable hose length Flapper valves are designed not to be swappable Breathing tube attachment not to use a clip attachment instead of a thread to ensure the tubes cannot be partially attached Anti free flow on the front diaphragm withstanding a fire hose directed at the front of the ALVBOV Regulator uses a standard Apeks second sta
66. e UV on the deck of dive vessels or where arc welding is carried out To mitigate this risk all hard plastic parts are made from UV tolerant materials Kynar Black PU Black ASA or a custom formulated PP depending on the application All these materials have good UV characteristics Chemical Damage All plastics used have good chemical resistance to the chemicals the equipment is likely to be exposed to including oil Bacterial contamination The canisters have smooth internal surfaces that are cleaned easily The external surface is overmoulded for applications where ease of decontamination is important Mechanical Damage to canister The canister is liable to damage from crushing The pressure at which this occurs in excess of 200kg in each case If there is a sudden shock load such as a large person jumping on the canister when outside its caps the canister shatters this has been confirmed in tests The canister has been tested with repeated drops from a height of 3m without damage Mechanical Damage to EAC The EAC should be inspected for mechanical damage before insertion In a recreational dive environment this may be difficult to enforce Failure is detected by CO2 breakthrough The first sample submitted for review shown in Fig 4 8 had a very large seal area on the bottom of the scrubber with three parts sealing together this was rejected as it could be damaged easily in service A replacement design sample was submitted with the
67. e identified in relation to the scrubber housing seal 1 UV Damage The part should not be exposed to intense UV but this is likely if the scrubber canister is left open on the deck of a dive vessel or where arc welding is carried out The EPDM seal has good to excellent resistance to UV 2 Mechanical Damage The seal can be damaged in service The EPDM seal has the best mechanical properties of any of the common seal materials 3 Incorrect assembly The seal can be omitted by the user 4 25 3 Failure Mode Analysis Mechanical failure of the canister seal can not occur in service only while the canister is open Any damage to the seal is detected by positive and negative pressure checks that are enforced by the electronics as part of the pre dive checks Omission of a seal results in failure of pre dive positive and negative pressure checks The seal is made from EPDM to provide the correct compliance that it also tough and unlikely to be cut 4 26 Flow Cones 4 26 1 Design Decision Review The flow cones are the result of extensive computer flow modeling through the scrubber to achieve an even flow despite obstructions and asymmetric ports into and out of the scrubber and verified during scrubber endurance tests 4 26 2 Risk Assessment The following risks have been identified in relation to the flow cones 1 UV or Chemical Damage The flow cones are manufactured from Kynar or Black ASA Both are highly resistant to UV and ch
68. e not under strain do not allow helium to pass through other than at an extremely low rate of diffusion but materials under strain allow helium to pass four orders of magnitude or more faster This phenomenon can be demonstrated using a helium party balloon Such a balloon will lose enough helium to lose its buoyancy in air in around four days If the balloon after being filled with helium is then sprayed with a thin layer of lacquer it remains afloat for a month FMECA_OR_V4_140831 doc Rev B11 Page 19 of 104 Open Publication the lacquer is under strain only from thermal expansion and contraction but the much thicker balloon rubber is under considerable strain This phenomenon means the Thelma sensor does not suffer helium ingress at the pressure at which the silicone oil is maintained at but at other pressures will suffer ingress To address this problem the design takes the following approach 1 Gas cylinder contents sensors are permitted to drift The 8 bar drift caused by helium at 140msw over a month is not significant if the sensor is considered as simply generally indicative of whether the bail out cylinder is full or not The electronics should deduct 8 bar from the reading to ensure the operator is not misled the cylinder overpressure of 8 bar does not present a significant safety hazard as it is less than the effect of thermal expansion of the gas 2 The depth sensor is a sealed sensor in the silicone oil
69. e pre dive FMECA_OR_V4_140831 doc Rev B11 Page 42 of 104 Open Publication checks but this feature allows the diver to verify the function of the flapper valves throughout the dive The cross section of the web supporting the flapper valve was tested in combination of 8 6 5 4 5 4 3 5 and 3 fingers the 0 5 fingers are short fingers these options and their gas cross section are shown in Fig 4 8 Also tested were 1mm wide fingers and 1 6mm wide Use of less than 6 fingers was found to cause the flat flapper to ripple shown in Fig 4 7 allowing gas to leak past it after being subject to rapid air blasts a user can do the same by blowing the mouthpiece in the same manner as a brass wind instrument The use of half fingers was rejected because the flapper can catch on the finger if enough force is used on exhalation this is shown in Fig 4 6 The 6 finger web was therefore adopted with 1mm fingers and a wide seating area to ensure the design is one step the safe side of the borderline case 5 fingers where no failure was produced and 4 fingers where failure was produced As all combinations were tested this design appears to be optimal The gas cross section of the web was chosen such that the sum of the entire rebreather loop with both flapper valves match the mouthpiece of the largest oro nasal mask opening that could be created using Comex oro nasal masks The end result is the breathing resistance of two flapper
70. e used on ROVs but they are assembled in laboratory conditions and are not disconnected afterwards This is completely different to a connector on a rebreather which is FMECA_OR_V4_140831 doc Rev B11 Page 88 of 104 Open Publication mated and disconnected several times a day in dirty conditions Optical connectors caused very many failures during trials and were removed from the project being replaced by electrical connectors 3 Dry connect IP68 connectors such as Lemo Fischer and suchlike connectors are not suitable for rebreathers Water ingress causes shorts between signal and power lines and just a drop of water on the connector when it is disconnected causes the whole connector to gradually become unreliable 4 All small connectors are fragile To resolve these issues only full wet mateable connectors are used for external lines These are Birns connectors compatible with Seacons and others of the same type USB connector an industry standard connector is used to charge all battery powered equipment other than the commercial diving rebreather This connector is robust in service so long as the environment is dry Handset power and data connector Handset and monitor connectors were found to be fragile in service divers would catch the handset in benching and then stand up or stand on the connector bending it After trials all data connectors were removed from the project and UHF RF was used instead The
71. ed by Micropore by increasing the bore size and reducing the core support thickness 4 38 2 Risk Assessment Detailed information on the EACs performance in various system fault conditions was provided by Micropore Inc and this data was verified by Deep Life Ltd This data confirms the EAC can withstand flooding for up to 30 minutes and up to 5 minutes while remaining operational after clearing the flood and that the solution has a pH that does not form a hazard to health MSDS have been provided which indicate no off gassing from the plastic used FMECA_OR_V4_140831 doc Rev B11 Page 94 of 104 Open Publication The risks remaining with the Micropore EACs are 1 Replacement with an expired cartridge To mitigate this risk the scrubber canister is designed such that the user must visibly damage the scrubber cartridge to remove it after use During use the EAC swells and binds to the scrubber stick and the cartridge wall The method to remove the spent cartridge in the instruction manual is to use two corkscrews supplied with the equipment to screw into the open face of the cartridge and pull it out This leaves obvious damage to the scrubber so the user should not replace a spent cartridge with the same As a further monitoring measure CO2 levels are monitored electronically as is the scrubber thermal characteristics as a function of gas flow and gas density to signal a scrubber is outside specification 2 Mechanical Dama
72. emicals including strong bases to which they are exposed close to the scrubber 2 Incorrect assembly This risk is avoided by using a index line to ensure the flow cones fit into place if not in place it is obvious they are not in place 3 Mechanical damage The cones are hard to damage and damage is apparent to the user on fitting a new scrubber EAC They are moulded from a contrasting colour to the bottom caps Orange to make any damage evident and also to make it evident if the bottom scrubber locating pin is missing FMECA_OR_V4_140831 doc Rev B11 Page 75 of 104 Open Publication 4 26 3 Failure Mode Analysis No failure mode specific to the flow cones has been identified provided they are welded into place When the cones are clipped in place it was found that users could snap off the locating pins users feel the slight movement of the flow cone and assume that it rotates It does not rotate because it modifies the gas flow asymmetrically to achieve an even flow through the scrubber This failure mode is being addressed by adding additional tags to the cone and the end cap moulding Unfortunately it is not possible to make the tabs thicker without affecting the flow detrimentally 4 27 Electronic Gas Injector The electronic gas injector is used for adding oxygen to the breathing loop in eCCR and eSCR configurations only 4 27 1 Design Decision Review The Gas Injector is described in detail by a Design Veri
73. ents had been implemented built and tested before this issue was properly identified The port prior to the change is shown in Fig 4 1 alongside the Draeger P port for reference and the change to address this Accidental Disconnect risk is shown in Fig 4 2 a second button was added such that both have to be depressed FMECA_OR_V4_140831 doc Rev B11 Page 25 of 104 Open Publication sia Perc ES zair e s 5 Fig 4 5 Four of the first generation Press Click connectors used for the project with a Draeger P Port for comparison In the review of the project it was concluded that this solution does not meet the safety requirement two distinct actions are required The SCR is pressurised during ascent so the pull action happens automatically due to the pressure difference This meant only one action remains to prevent the port releasing Checks on other P Port users found two reports of a P Port releasing accidentally The design was changed in light of this information to that shown below The mating part of the connector can be seen in Fig 3 9 gt a Fig 4 6 Press Click Port modified to have a further action using two balanced buttons The commercial rebreather has a stab plate that prevents hoses being connected in reverse The single scrubber rebreathers are connected to a mouthpiece such that if the hoses are reversed it is not possible to breathe from the unit the mouthpiece is upside down and faces out
74. er controllers are housed outside the rebreather in stainless steel pressure vessels designed to withstand 1400msw and the vapourisation of the battery The vessels are small stainless steel tubes clearly visible in Figs 3 1 3 7 and 4 8 The batteries used for rebreather controllers are from Valence Saphion Safe Lithium range including the IFR18650e and IFR18650p These are a Lithium phosphate chemistry which are guaranteed not to explode or catch fire These require a custom charger because they have a nominal voltage of 3 7V charging at 4 2V instead of the usual 3 2V nominal and 3 65V charging this was designed and verified A full characterisation of the cells was carried out and the report published on the Deep Life web site see www deeplife co uk or_dv php The helium susceptibility of the Valence batteries was tested and found to pass with pressurisation to 1400msw in pure helium soak for three weeks and rapid depressurisation in under one second Three cycles were carried out A full pressure stress analysis has been carried out and was reviewed The penetrator from the battery pack to the electronics chamber has been tested and withstands 1400msw of pure helium For monitor applications the alternative approach was taken of using thin cells of a Lithium Mixed oxide chemistry which rupture without explosion sufficient to breach the monitor housing The compartment with the cells is separate from the breathing loop and gas tight
75. es of the water dump are Stuck open The two Training Managers Paul Haynes and Gregg Stanton indicated that a double valve dump was strongly preferred and that the isolation of the causal event and the manifestation of the failure should the dump be pulled is less of an issue than water ingress to the loop All water dump valves are double valves Stuck shut This can be caused by breakage of the pull cord or the pull cord coming away from the pull toggle The hazard is mitigated by their protected location and the use of two water dumps only one of which need operate Slow leak This is a subset of stuck open The valve seat on all BCD dump valves that were tested carry a risk of not seating correctly because the spring places an uneven force on the valve stopper A total redesign and retooling of the valve was carried out to move the stopped as a piston so it is unable to move sideways This change involved total retooling of 7 parts it was carried out as the improved design is safer Entanglement This is mitigated by their protected location and the choice of pull dumps that are of a low snag design a pear shape instead of a ring or hoop A further mitigation made in May 2010 onwards was the use of a rigid tube over the pull cord to prevent it entangling in cylinder valves subsequently changed to shorted the cord such that there is no free cord that may tangle The version of the water dump that is installed in all counterlu
76. esssssbesdscosescessvacscoebsseosendssscbossasevacscosusacesensesesse 68 4 21 Design Decision REVIEW nienti IA Nati E in IA 68 A DVD Risk Adi O A de A Ii da 69 421 3 Failure Mode Analysis cios 69 4 22 Serubber Housings ooie sereset a neess oieee ss esios see E oon esses 69 4 22 1 Design Decision REVICW ccccccessceesseeseseeesneceseeceseeensaeceeseeceasesesaeeeseeesseeesaeesesecenseeseeneeeeaeeens 69 4222 RISKS ASSESSMENT Ba ve ae A as oy ao can bone ca slaw ta tesa ces 71 422 3 Fail re Mode Aral iii iia a Tdi seh bes 72 4 23 Scrubber attach mMenl ccccccssscsssssssscssssscsssscssecsssscssssssessscsssecssssesssscsssssssssscsssscssscssssssossonees 72 4 23 1 Design Decision ROI Wii ie A a A 72 4 23 2 RISK Assessment oeie na 72 4 23 3 Hallure MOS tit a in E a A A e tee Wadeinee tasted a 72 4 24 Scrubber Seall cscccssscssscssscsssscssssessssccsssscsssscssscssssessssscessscssssssssscssscssssssessscsssssssssosssssssssoooess 73 4 24 1 Design Decision REVIEW moetn ieii cue spaces datada da adi Aid 73 A DAD Risk ASSESSMENE si 2 css0s 05 cases a aa a ses dl 73 4 24 3 Failure Mode A mal ysis ii Ai ta 73 Ra AAA s osseosseseeos sosser ea enssi raees os eosta eS esio so s DSi 75 4 25 1 Design Decision REVICW ccccccesssceesseeseseeesnecesneecesceeesaeceeaaeceaaeeeseeeesaeecssaeenaeeseaeeenseeeeeaeeesaeeees 75 4 25 2 RISK ASSESSIMENE iroto ieee o a RA E A A 75 425 3 Failtite Mode A iii 75 A A NN 75 4 26 1 Design De
77. ev B11 Page 83 of 104 Open Publication 4 Snag points On the twin scrubber package the batteries from a local snag point for monofilament line It is important that a cover is used over the rebreather to avoid this risk 4 29 4 Failure Mode Analysis The failure modes are of leaking or mechanical damage Leaks will cause early failure of the batteries in that compartment but no other detrimental effects The compartment may warm up if the leak is a conductive liquid such as sea water The effect of mechanical damage is mitigated by reducing local stresses to the minimum 4 30 Oxygen Cells and Cell Holders 4 30 1 Design Decision Review Extensive risk and failure analysis was carried out on galvanic oxygen cells and is reported in DV_O2_cell_study_RevE_090722 pdf A diverse method of measuring O2 was developed using sol gels this work is continuing as it is a requirement for the system to move from SIL 3 to SIL 4 certification This sol gel sensor has not had sufficient test for it to be considered an available technology under ALARP at this time so galvanic cells only are used All user manuals included detailed information instructions and warnings on the care and use of oxygen cells that is in conformance with the findings in the O2 cell study All electronic modules using O2 cells have self test of the cells using charge injection capacitance and resistance methods and have a software utility to enable the diver to chec
78. f the hose Calculate the permanent axial deformation The hose passes this test EN14143 2003 Section 5 8 8 Breathing hose The connections at the ends of the breathing hose shall withstand an axial tensile strength of 250 N for 10 s Testing shall be done in accordance of 6 8 1 The HAZOP team in January 2006 considered that for NORSOK U 101 purposes the hose should withstand the weight of an average diver 100kg This is four times the 250N 25kg load requirement in EN14143 2003 but it can be met The hoses were remanufactured us ing a thicker EPDM to meet this requirement and tested The thicker hose passes a 1000N load 25kg load The question of whether it might be possible for the 400 stretch hoses to extend fully on over pressure thus adding to the overall loop volume was raised as a result of a HAZOP review and considered carefully by the Deep Life team The conclusion is as follows FMECA_OR_V4_140831 doc Rev B11 Page 33 of 104 Open Publication a Increases in loop volume are potentially hazardous as it may allow the PPOZ2 to fall due to a fall in internal pressure The hoses stretch 150mm on each side with 36mm bore This is a total of O 3litres The dead volume of the rebreather is 6 litres so if the counterlungs are empty and the diver s lungs are empty then the reduction in PPO2 is 5 This means if the PPO2 is borderline at 0 209 then it can fall to 0 199 This does not represent any health
79. failure would be to collect water in the exhale counterlung where it would be exhausted to the environment via the OPV The probability of a massive rupture is extremely low but plausible The effect of a massive rupture would be for water to invade the scrubber canister where the flood would be detected by the electronics from the increase in pressure across the scrubber and the Auto Shut Off Valve operate This prevents the effect of a massive failure of the counterlungs from endangering the diver Any failure of the counterlung is detected by the positive and negative pressure tests during dive preparation 4 21 Counterlung Covers 4 21 1 Design Decision Review For the breathing bags tests were carried out using two ply dry suit material this is a laminated fabric that has a supporting structure of 1000D or 1100 Cordura laminated with 5 mil of PU on both sides this is extremely tear and abrasion resistant and easy to clean The counterlung covers have stainless steel vents to enable water to drain from them and for air to escape at the start of a dive These vents are on the inside surface to provide the maximum protection from sharp objects FMECA_OR_V4_140831 doc Rev B10 Page 68 of 104 Open Publication The tests found that the breathing resistance of the two ply counterlungs was higher than for single ply and that a single ply 600 to 800 micron thick PU would withstand both abrasiona dn knife attack better then the Cordur
80. fication Report available from Deep Life Ltd document filename DV_O2_injector_061225 pdf and the change for laser orifice monitoring is in DV_02_Injector_090512 pdf Extensive failure analysis and reliability testing has been carried out reported in GreenB_PPO2_Control_100731 pdf 4 27 2 Risk Assessment The risks are addressed by a verification regime in the above reports These are Oxygen compatibility Overpressure of intermediate gas Underpressure of intermediate gas Blockage Mechanical shock Gas shock Thermal expansion Failure of motor or Hall sensor BOF SOOT AS SR gt a Leakage of injector a Wear causing hysteresis pa pa Other wear mechanisms N Contamination by use of unsuitable gas supplies W Accidental diving when rebreather is in no dive mode with injectors open 4 27 3 Failure Mode Analysis The risks appear to be managed within the framework tested by the design control document GreenB_PPO2_Control_100731 pdf and the verification report This concludes that the failure mode is Fail Fixed and Fail Open FMECA_OR_V4_140831 doc Rev B11 Page 76 of 104 Open Publication 4 27 4 Reliability Testing The reliability tests for the injector are described in detail in GreenB_PPO2_Control_100731 doc this is the primary design control document for the injector in accord with Quality Procedure QP 20 The reliability tests covering the equivalent of 6 400 hours
81. figure was deliberately below the 12 litre per minute minimum established through formal modelling of ascents to allow metabolic rates to be monitored These confirmed earlier findings from metabolic studies by DL that a diver s metabolic rate is around 1 4 litres per minute in gentle swimming but typically 50 higher in the first few minutes of the dive At this rate the 4 litres per minute flow was a quarter of that needed for safe use particularly on ascent The pressure on the valve button was adjusted the first valve had a 3kg pressure which gave cramp in cold water to some divers especially with the 4 litre per minute manual flow rate The pressure was reduced to 1kg The high flow rates that were tested are very controllable for experienced divers but a novice may inject too much gas There is no control of the amount of gas injected when the rate is 90 litres per minute whereas a lower rate allows a diver to determine mentally how long they need to press the button for Where there are twin hoses divers will swap these accidentally A single concentric hose was adopted to prevent this with a special thin bore to limit flow in the event of a hose failure A swivel was built into the valve The valve length was made long enough for a full hand grip and positioned just above a diver s crotch so that all divers can find it obese divers posed a particular challenge Over the shoulder mounting was a problem with many divers particu
82. g valve bypass The entire batch was rejected To prevent this fault passing to a rebreather issued for diving the manufacturing inspection for these valves comprises taking samples from different bags from a batch and checking there is no flash on the outside rim Fig 4 19 Flat flapper valve with flash on sealing edge rejected The edge requires a lip on the web supporting the valve This is shown on the figure overleaf Considerable attention was given to the problem of water collecting around the flapper valve The webs have been designed not to trap water and the sealing edge has been designed to be as thin as possible to minimise the noise of the valves If the lip is not present the valves withstand a reverse flow differential pressure of 80mbar meeting the safety requirement identified in FMECA V6 With the lip the valve withstands a reverse differential pressure of 300mbar meeting fully the design intent Subsequently the valve design was modified to allow the valve to pass a reverse pressure when it exceeds 40mbar all production valves have that improvement it was implemented prior to release The ALVBOV has a water drain to drain off water that condenses in the breathing tubes and falls to flapper valves then moves into the ALVBOV to be discharged via an umbrella shaped flapper valve lt Remainder of this page intentionally blank gt FMECA_OR_V4_140831 doc Rev B11 Page 48 of 104 Open Publicat
83. g on the hose so boat skippers can tell immediately whether a SCUBA diver on the surface is swimming away or towards them as they close in to pick up the diver Swapping over the gas flow direction is not a critical failure except that it will reduce scrubber duration by 10 to 20 7 Omission The audible feedback from the valve closing should alert a diver to a missing valve but the main reliance is on a pre dive check to test the flappers The tidal volume monitoring in the electronics will also detect the omission of one or more flapper valves The CO2 monitor on exhale gas will also detect the flapper valve failure 8 Failure analysis at a system level identified a fault whereby if the reverse pressure resistance is too high that may cause injury to the diver For example if the exhale path is blocked by a foreign object or a mechanical failure within the scrubber then the diver will not be able to exhale and pressure will build up in the breathing loop To remove that hazard the reverse resistance of the flapper valve should be reduced to 40mbar this will then let any excess pressure vent via the OPV regardess of where the blockage is in the breathing loop 4 14 4 Failure Mode Analysis The flapper valve has very good wear characteristics It does not need annual replacement it should last the life of the equipment However in annual servicing the unit will be stripped down so two replacement flappers should be provided The tear
84. ge components for ease of servicing Cracking pressure adjusts automatically between Open Circuit and Closed Circuit modes Rebreather loop is shut and sealed fully when the valve is in Open Circuit mode Freedom of movement required by EN14143 2003 Vision not obstructed hoses are below the diver s field of vision Hose connections that cannot be cross threaded or come apart accidentally The design meets these objectives Images of the ALVBOV are in Section 4 15 with figures below showing the PFD FMECA_OR_V4_140831 doc Rev B11 Page 52 of 104 Open Publication Fig 4 23 General view of ALVBOV with PFD View from the rear Fig 4 24 General view of ALVBOV with PFD View from the rear upper with straps removed FMECA_OR_V4_140831 doc Rev B11 Page 53 of 104 Open Publication Fig 4 25 General view of ALVBOV side showing the head strap and pull cord 4 16 2 Risk Assessment The following risks were identified and mitigated L Thermal respiratory shock Cold gas striking diver Addressed by warnings in the manual for cold diving conditions Commercial diving uses heated gas Diver fails to bail out when loop is outside safe limits Powered bail out provided 3 Actuator failure Activator that has just one moving part for reliability No connectors are used The valve has a manual over ride All materials have very low corrosion in salt water User instructions are that diver sh
85. ge in transit This generally damages the end of the cartridge The failure should be detected by the CO2 monitor and the scrubber health monitor 3 Flooding After being flooded for more than 30 minutes the pH rises to a level that starts to present a caustic cocktail to the diver Such a flood is detected by the electronic monitoring due to the rise in pressure across the scrubber 4 38 3 Failure Mode Analysis The failure mode of the EAC is CO2 breakthrough The failure is managed within the system by monitoring CO2 levels using a CO2 sensor by monitoring scrubber characteristics and comparing them with a template compensated for gas density and flow and by user training 4 39 Breathing Gas Heating Adjustable breathing gas heating is likely to become a requirement in NORSOK U 100 Hitherto the exothermic reaction from the scrubber g and the high humidity was put forward as compliance with NORSOK U 100 Rev 1 Aug 1999 7 7 1 which states The temperature control for divers in the water and the atmosphere of chambers bells and habitats shall be sufficiently accurate to ensure thermal balance and comfort for the divers occupants at all times and Active breathing gas heaters are to be used when diving deeper than 150msw U 100 Rev 2 unpublished as of Feb 2007 has added the sentence The gas temperature shall be adjustable Norsok U 10185 9 gives actual maximum temperatures for the breathing gas Giving an upper limi
86. gh that the dump valves can discharge it or remedy it by fitting a second O ring The O ring on the bottom cap is not critical when the scrubber is a good fit the EAC skirt sealing ring prevents water ingress However with this O ring omitted the unit does not hold positive or negative pressure and water enters the loop by channeling alongside the EAC and slowly into the top cap The dump valves can discharge this flow When the O ring in the top cap is omitted the loop floods immediately This O ring should be mated only rarely There is insufficient space for a double O ring in this location and it would affect the ability of the technician to rotate the top cap easily FMECA_OR_V4_140831 doc Rev B11 Page 40 of 104 Open Publication Breathing manifold O rings lt was noticed that the top O ring just sits on the manifold rather than penetrate the manifold The top O ring keeps grit and sand out of the manifold when it does this but it does leave just one O ring for the seal of the breathing hoses The manifold connection was modified to ensure both O rings provided a seal there was no requirement for a grit seal 4 13 4 Training Requirement The technician or user should inspect the end of the canister every time it is inserted to ensure it is clean smooth and not able to cut the canister seal O ring Itis very important that the rebreather does positive and negative pre dive checks to identify any sources
87. harp instrument dropped by the user when changing the scrubber cartridge This should be apparent to the user If the user refits the membrane using the wrong material it may not pass CO2 or other gases and complacency where the diver waits for CO2 to rise before finishing a dive could have lethal consequences This should be addressed by training 4 38 Scrubber Cartridge 4 38 1 Design Decision Review As reported for the FMECA assessment of the scrubber housing in Section 4 22 tests were carried out on granular scrubber materials none of these would meet the requirements of EN61508 at SIL 3 level because of multiple faults including a four fold rise in breathing resistance when wet risk of caustic cocktail to the diver dust hazards tunnelling hazards in particular orientations in any of the axial designs that were considered and inability to control sufficiently the user s placement of the scrims The design therefore adopts the Micropore ExtendAir Cartridges EACs which do not carry any of these problems other than as set out below The design team tested the EACs and found them to perform well but the seal took 10 of the scrubber volume and was prone to leak if the EAC was damaged The seal design was replaced The design team found the original EACs were very difficult to monitor due to a thick small bore central winding tube EAC monitoring through that tube was also prone to damage of the sensors These problems were address
88. hasised by brightly coloured warning markers that only clean gases are to be used with the rebreather During an independent test a fitting was machined and used to connect air to the bail out connectors This fitting was not cleaned thoroughly after manufacture resulting in machine oil being blown into the gas manifold of the OR_Umbilical rebreather under test Two rebreathers were affected Both resulted in oil contamination of the manifold and this carbonised when oxygen was switched on there was no visible external sign because all parts are highly oxygen compatible but the injector sensor detected a marked reduction in signal strength when the oxygen was switched on resulting in it eventually going into a dive abort failure mode where the orifice is open A software check for the contamination was subsequently added to eCCR rebreather models using the reduction in light output as the sensing element Filters were fitted to the injector itself that use a membrane that blocks liquids including oils and smoke particles that may interfere with the injector A further fault mode was observed during the same series of tests where the oxygen runs out at depth then the rebreather is brought to the surface This results in water droplets being sucked into the injector To prevent this fault a second filter was added after the injector again using both sintered and membrane filter elements FMECA_OR_V4_140831 doc Rev B11 Page 78 of 104
89. hazard b The amount of hose stretch is constant between the different hoses That is the diver needs to move his head by 150mm so there is 150mm of hose that needs to be expanded When the hose is long with a 30 stretch with a 10N 1kg load then it provides 150mm of extra volume When the hose is short with a 400 stretch to provide 150mm of extra volume the increase in loop volume is the same Therefore there is no safety hazard from increasing the stretch in the hoses 4 11 3 Risk Assessment The risks presented by flexible breathing hoses that have been identified are 1 Puncture This can occur from overhead environments from poor storage or from use of cutting tools underwater The effect of a puncture is to cause water ingress into the counterlungs The exhale counterlung is a fitted with flushing valves acting as over pressure valve and this can remove water from moderate sized punctures Water getting into the scrubber will trigger the flood alarm and a bail out Tearing EN14143 2003 requires the hoses to withstand a 25kg tensile load The hose was then tested to find the failure load and it failed with 50kg The failure was a complete separation of the hose starting with the cut made by the forming tool then running immediately around the hose The tests were carried out with the hose connected to a hose port whereas according to the standard the hose can be tested free of the port The inclusion of the port is more re
90. hazardous material to use within a breathing loop due to its high toxicity to avian life and at high temperature FMECA_OR_V4_140831 doc Rev B11 Page 93 of 104 Open Publication to human tissues To avoid this risk a non PTFE membrane is used this is fabricated from a nylon material 3 Puncturing The membrane is a very thin material with similar handling properties as drafting polymer paper Puncturing the membrane can occur if the user drops a sharp instrument onto the membrane when changing a scrubber Such a puncture should be apparent to the user and the membrane replaced Inspection of the membrane is included in the annual service 4 Incorrect assembly The membrane is not a user serviceable item but incorrect assembly could occur if the wrong thickness of membrane material is supplied To avoid this risk an incoming inspection of membrane material should be applied in manufacturing by measuring the membrane thickness and comparing with a sample with which the sensor response time has been measured 4 37 3 Failure Mode Analysis Dust or chemical contamination is the only plausible failure mode that should occur if guidelines are followed The effect of dust or chemical contamination is an increase in the response time of the CO2 CO HC and Helium sensors Such contamination can be detected by the user by the change in colour of the membrane A further failure mode exists where the membrane is punctured by a s
91. hed length 40cm 25kg load length 60cm stretch 50 Draeger Dolphin Breathing Hose Unstretched length 45 5cm 25kg load length 100cm stretch 119 The conclusion from these tests was that only Draeger Dolphin meets this part of the specification for stretch but both Draeger and Buddy Inspiration hoses kinked or reduced in volume equivalent to a kink The greater stretch is a fundamental requirement to meet the non kinking requirement so the EN14143 2003 standard contradicts itself with these two provisions Obviously the more important provision is that the hose does not kink The issue arose whether to ignore this hose stretch provision or to withhold the product from the market The conclusion was that the equipment must comply in total if marked as CE compliant which it must be to be sold To meet EN14143 2003 the problem was put to the CEN SC7 committee and the response is in Appendix A giving an exemption to this maximum stretch requirement in this instance it appears to be a recognized error in the standard EN14143 2003 Section 5 8 8 Breathing hose The permanent deformation of the hose shall not be more than 10 Testing shall be done in accord ance with 6 8 6 EN14143 2003 Section 6 8 6 Permanent axial deformation of breathing hoses Immediately after the test of 6 8 5 submit the corrugated hose to a force of 10 N for 48 h after which the force is removed After a recovery period of 6 h measure and record the length o
92. hen it should have at least 2 hours to aclimatise before use Technicians and divers should be trained to check the hoses for blockage tears or other degradation as part of their predive checks 4 12 Breathing Hose Connections 4 12 1 Design Decision Review The following methods were identified as being in common use for clamping breathing hoses to their ports FMECA_OR_V4_140831 doc Rev B11 Page 36 of 104 Open Publication 1 Clamping nut where the hose has a nut over it which presses onto the hose as it is tightened either directly or using two semi circular ribbed mouldings This method has the weakness that the mouldings can be omitted accidentally after a user strip down of the unit and involves a thread which can be cross threaded by the user Often special tools are used 2 Jubilee clip that is a stainless steel band 3 Cable ties There are many different types of cable tie the most appropriate are non reusable thick PU ties A dual cable tie design was progressed but during safety reviews it was rejected as they were liable to be replaced by the user who may not put sufficient tension on them with the result the hose creeps out from under the tie 4 Reusable plastic clamps These tend to be larger than cable ties and if they break in the field are not replaced easily The design uses a single 9mm wide marine stainless steel clip This was tested to destruction by tightening the clamp until it eithe
93. his failure can also occur if the scrubber stick is crushed such as under the wheels of a vehicle It is unreasonable to protect the stick from such levels of abuse The consequential electronics failure is detected by the electronics and the equipment must be returned to factory for repair in reality if such damage is observed the entire scrubber cap and cap electronics should be replaced 4 36 CO2 sensor and window 4 36 1 Design Decision Review The CO2 sensor has four windows Pressure on the windows causes a change in sensor characteristics then with increasing pressure permanent failure of the sensor The sensor is protected from this by a sapphire window 14mm in diameter Full stress and deformation analysis has been carried out on the window the results being reported in the document CO2_Window Stress_051230 pdf Model name GLASS Study name Stu Plot type Static nodal stress Plot Deformation scale 202 27 von Mises Nim 2 1 801e 007 1 376e 007 9 511e 006 de Fig 4 41 Stress on the sapphire window protecting the CO2 sensor The window is modelled as a glass with the glass characteristics set to those of pure sapphire as per the preceding table Analysis of the deflection and for other pressures is contained in the report CO2_ Window Stress_051230 pdf available from Deep Life Ltd FMECA_OR_V4_140831 doc Rev B11 Page 92 of 104 Open Publication 4 36 2 Risk Assessment The risks that h
94. ic effects similar to argon while others are highly toxic and carcinogenic In the environment where HC contamination is likely to occur the hydrocarbons occur in mixture so detecting one hydrocarbon is deemed sufficient to detect that some hydrocarbon contamination has occurred On this basis propane is used as the calibration gas for hydrocarbons The approach to detecting CO2 CO and HC is the same these gases all absorb infra red gas albeit at different frequencies A wide band infra red source is used in combination with a detector with four filter windows to pick out the absorption frequencies for CO2 CO and HC along with a reference window to compensate for fluctuations in the IR output of the IR emitter The membrane material is Zitex A105 This is the same material as used for oxygen sensor hydrophobic membranes Alternative membranes from GE have been tested 4 37 2 Risk Assessment The risks associated with the hydrophobic membrane have been assessed as follows 1 Chemical contamination The membrane can be blocked by chemical contamination or even dust it is a microfilter in surface mode To mitigate this risk the filter material is brilliant white in colour so contamination can be seen from the change in membrane colour The membrane should last the seven year service life of the equipment before major overhaul is required including replacement of the membrane 2 Off gassing Many membranes use PTFE which is considered a
95. igid stainless steel hoses are used around dive helmet These still require a flexible section which is then behind the diver The degree of flexing is much greater than for a system without the rigid stainless steel hose and the failure is not apparent to the diver For these reasons the project has not adopted this mix of rigid and flexible hosing and chosen flexible only hose for connection to the mouthpiece The intermediary connections from the scrubber to the counterlungs have been be eliminated in the single scrubber configurations and the counterlungs plug directly onto the scrubber For the dual scrubber configurations a breathing manifold is used 4 11 1 2 Material Experiments with composite hoses reinforced with Kevlar or PTFE produced a hose which was too inflexible Silicone liners were prone to tearing and would not bond with any other material The optimum material for this application appears to be EPDM for its hard wearing properties resistance to oil and U V and non allergenic 4 11 1 3 Manufacturing Method The methods of manufacture for rebreather hoses are in common use are as follows Injection Moulded Extrusion Dip formed Thermo reforming of seamless hose IT Hand Laid Hosing then autoclaved Injection moulding produces hoses that generally have a slight surface roughness which can trap bacteria The main advantage of injection moulding is the end of the hose can have a lip which can be
96. ing of the flapper requires substantial force more than 8kg on a very small component for the flat flapper design and over 15kg for the umbrella design The failure occurs along the injection mould line on flat samples tested to destruction and on the edge of the valve in the umbrella samples The failure where the mushroom folds under the seat has been handled above This self rectifies when there are six or more fingers on the web following the application of excessive reverse pressure A competitor visiting an exhibition reported that they could cause these flapper valve to catch by supplying sufficient negative pressure This was traced to experimental sloping shelf FMECA_OR_V4_140831 doc Rev B11 Page 47 of 104 Open Publication webs having been fitted to that unit it was a technique being tested to reduce acoustic noise but unsuccessful However subsequently it was found that it is desirable for the valve to pass a reverse pressure above 40mbar to avoid damage to the diver s lungs in the case where the exhale hose is totally blocked the valve restores normal operation on the first breath in the normal direction after the reverse pressure is removed During testing a further failure mode was found where flash develops in the mould tooling as it was used a batch of 2000 pieces were made The flappers at the start of the batch had no flash but by the end of the batch the flash intersected with the sealing surface causin
97. ion gt Fig 4 20 Lip required around the inhale and exhale webs to ensure the valve seals when a high reverse differential pressure is applied The webs have a profile to prevent the flappers being inserted from the wrong side and each web has a different diameter to avoid them being swapped Additionally inhale and exhale flappers are different colours 4 15 Mouthpiece plain DSV version The plain DSV was used until the DSV was rejected in favour of an ALVBOV described separately This section of the FMECA is retained to capture the design process on the DSV in the event of the ALVBOV being modified in the future 4 15 1 Design Decision Review The review used a comparison with two mouthpieces in common use that of the Draeger Dolphin and the Buddy Inspiration original mouthpiece as well as against the identified risks Clearing water from mouthpiece A water drain channel is included in the mouthpiece Ease of rotation Lip seals are used which require a low force for rotation Minimum dead volume The dead volume is higher than for small bore designs but less than that for some other designs in widespread use The dead space is comparable to that of the diver s mouth from teeth to throat This would increase the natural dead volume by around 30 This was considered acceptable and a good tradeoff with Work Of Breathing Minimum parts The valve has minimal parts Work Of Breathing Considerable attention was given to work
98. is addressed both by fixing the counterlung cover to the harness securely and by ensuring the counterlungs are fixed inside the counterlung cover The counterlung are fixed down by a bracket at one end to prevent it floating up if the rebreather is dived with the rear cover off and by a P Port at the other end The counterlungs contain large diameter 36mm internal bore stainless steel springs to ensure gas paths remain open regardless of the orientation of the diver Considerable attention was given to address the modes by which counterlungs fail particularly from cuts from seam failure and from the counterlung stretching and pulling out from underneath the port connections The ideal material for the counterlung is custom manufactured PU that can be cleaned easily and is particularly resistant to cuts The cut resistance of the PU material was compared with Cordura 1100 and Ballistic Nylon and found to be superior the material moves around the knife unless the knife has a very sharp point that catches the material All seams are RF welded The outline of the counterlung bag is computer cut so is highly reproducible and with tight tolerance The problem of the ports pulling out from the counterlung is addressed by spacing the counterlung ports 1cm further apart than their corresponding holes in the counterlung cover which is made from a non stretchable material and by welding in place sealing rings which mate firmly with the port
99. iver s head and cause injury This is avoided by removing the weights 2 If insufficient weight is present the diver s neck is under strain to hold the mouthpiece down This is avoided by suitable weighting of the PFD which is fixed to the FMECA_OR_V4_140831 doc Rev B10 Page 62 of 104 Open Publication mouthpiece In the BOV the assembly is designed for slightly negative buoyancy by using a stainless steel ball to balance the hoses 4 18 3 Failure Mode Analysis No failure of hose weights could be identified other than their omission which is not a critical failure and their risk of falling onto the diver s head when lifting the hose behind the diver this is a significant risk The mouthpiece has a neoprene retainer which also acts to cushion the mouthpiece should it strike the diver 4 19 Peripheral Field Display PFD The PFD is an indicator device visible in front of the dive as well as to the diver himself The PFD is an important safety device 4 19 1 Design Decision Review The PFD is part of the ALVBOV The mating surface is used to conduct voice annunciation messages from a Mylar moving coil speaker in the PFD to the mouthpiece so is a large surface providing secure mechanical fixing The PFD is routed from the right of the diver It is not possible to change it from right to left routing The LED annunciators are visible from all directions in front of above and below the diver For the surface s
100. k the cells before every dive The user manuals carry recommendations to test the cells every three months to at least a PPO2 of 2 35 atm The cells use SMB sockets exclusively holding the cells off the circuit board in compliance with safety requirements on the Deep Life Mantis system for tracking safety requirements The cells are held in cell holders designed to prevent water or vapour being trapped around the cells 4 30 2 Risk Assessment The failure modes of the cells are handled in the O2 Sensor Fusion algorithm other than the following mechanically related failures 1 Leaking The cells may leak caustic liquids This risk is mitigated by care instructions and warnings in the user manuals 2 The cells may be physically damaged by puncture of the front membrane by being dropped by exposure to freezing conditions by exposure to temperatures in excess fo 50C These risks are mitigated by care instructions and warnings in the user manuals 3 The cells may develop gas bubbles if decompressed quickly This risks are mitigated by care instructions and warnings in the user manuals The cells have vent holes in the PCB behind the cell 4 Cells are unreliable At least three cells are fitted to each system and checked before and during the dive automartically FMECA_OR_V4_140831 doc Rev B11 Page 84 of 104 Open Publication 5 A water or vapour trap may develop around the front membrane The cell holder is designed such
101. k off the gas pass for example the Draeger Dolphin hose blocked 90 of the flow diameter in the kink test The standard relates to over the head type hose designs and has been unduly influenced by these The optimum hose design stretches 400 on a 25kg load without permanent deformation and this allows the length of the hose to be reduced by a factor of 3 8 compared to a hose that only stretches by 30 considerably reducing the area exposed to puncture and also reducing the weight of the unit reduced dead gas space Several contemporary hoses from other CE marked rebreathers were tested to see how other companies comply with this strange requirement The results using the 10N 1kg load here were Hose manufacturer Material Hose bore Free hose Hose length Elongation Construction OD ID mm length under 10 N mm mm DL Large Bore EPDM 54 36 150 400 260 Thermoformed for application DL Small Bore EPDM 48 31 150 Thermoformed for application Draeger LAR5 EPDM 45 30 500 Injection moulded for application Draeger EPDM 47 34 Injection FMECA_OR_V4_140831 doc Rev B11 Page 32 of 104 Open Publication Buddy Inspiration Not marked and not EPDM appears to be Butyl Rubber off the shelf continuous extruded hose With a load of 25kg the results were Deep Life Large Bore Hose Unstretched length 150mm stretched length 600mm stretch 400 Buddy Inspiration Breathing Hose Unstretc
102. kness increased the new hose withstands a 100kg pull FMECA_OR_V4_140831 doc Rev B11 Page 35 of 104 Open Publication Fig 4 10 Hose under tension showing cracks caused by forming tool during manufacture from which failures extend around the hose Manufacturer agreed to address this by much more frequent cleaning of the forming tool than for non critical applications New hoses withstand a 100kg pull test A further failure mode identified is punctures of the hose These can occur in a working environment The hose covers should be smooth to allow any such puncture damage to be seen on visual inspection The hose cover is believed to be strong enough to prevent such damage it is a two ply commercial dry suit material Failure due to bacterial contamination is managed by the sterilisation procedure stated in the equipment documentation and by use of a spiral corrugation so that water drains rather than providing as a breading ground for bacteria The inside of the hose is smooth The hose is supplied with a neoprene hose cover that is easily removed to allow the hose to be inspected The sleeve should be compressed so the hose remains protected when it is stretched on the commercial diving configurations 4 11 5 Training Requirement Untrained persons should not be permitted to handle the equipment Access to the equipment should be limited If the equipment is stored outside its operating temperature of 4C to 30C t
103. l parts in contact with O2 in the valve are bronze The flow rate to the valve is limited to prevent adiabatic compression Overpressure of intermediate gas a 16 bar intermediate pressure is used and the valve has been tested with 300 bar gas modifications were carried out to prototypes the first prototypes withstood only 140 bar FMECA_OR_V4_140831 doc Rev B11 Page 81 of 104 Open Publication 3 ai O 11 Users changing the first stage to a compensated stage or with a lower intermediate pressure this will not affect the valve flow rate dramatically because it is sonically limited however at shallower depths there would be less flow but still sufficient Underpressure of intermediate gas This is indicated by the tactile feedback and PPO2 monitoring Blockage of the O2 line addressed using the self cleaning orifice described above Sticking of the button addressed as described above Sand or grit in the button addressed using clearance ports Mechanical shock addressed by adding cushion O rings to the body and testing with 20 drops onto a hard surface from 3m Gas shock addressed in the oxygen compatibility test Thermal expansion checked by cooling the valve in a freezer to 18C and operating the valve and heating it to 60C and checking it again for flow rate and ease of use Below freezing if there is water under the button it cannot be operated The expected range of temperatures is 4C to 34C
104. larly those with impaired vision The blockage risk on the O2 line was managed by the valve orifice expanding to the 16 Ipm flow when the manual button is pressed it is not a fixed orifice with a bypass as it is on all other valves that were examined This process makes the orifice self cleaning A 15 micron filter prior to the valve prevents cylinder debris from blocking the orifice at these large orifice sizes and the large size allows corrosion products from the filter to pass through the valve In one version of the valve the tactile feedback was increased but it was found the valve button would stick on if uneven pressure was applied when grit was in the button This was examined in detail and resolved by design changes Sand and grit in the button barrel was a particular problem examined in detail The Hydrogom valve has many grit vents but in very extreme circumstances such as when the valve drags along a silty bottom it could still block through ingress through those same vents The approach was taken to avoid grit vents and keep tolerances tight to avoid grit getting into the valve This problem is very difficult to resolve entirely but the combination of tight tolerance and water pressure pushing out grit in the barrel each time the valve is pressed appears to be the best solution Risk Assessment The risks are addressed by a verification regime of the valve These are 1 Oxygen compatibility the seat is sapphire and al
105. larly to a diver blowing his nose If the diver presses both sides of his nose and exhales then water is drained out via the open circuit exhale valve Freeflow due to diaphragm folding found to be a problem during unmanned and manned tests with some types of open circuit diaphragm causing slight over supply of gas Custom diaphragm moulded to avoid this which do not fold Freezing the second stage valve has the same warming fins as on Apeks ice regulators The valve is further warmed by being in the rebreather loop Incorrect cracking pressure the valve has only a single adjustment point for open circuit cracking pressure using the same method as used for Apeks high performance diving second stages The increase in cracking pressure for rebreather use as an ALV requires the spring in the valve to be within a range that is tightly controlled The cracking pressure of every valve is measured in production using a breathing machine Diver inattention if the diver does not request his PPO2 within sufficient intervals to keep the maximum deviation of the PPO2 that could occur to be less than 0 05 atm regardless of whether this actually occurred then the diver is warned If the deviation exceeds 0 5 atm the diver is bailed out The diver is also bailed out if the rebreather loop does not contain a safe gas PPO2 outside safe limits Exhaled PPCO2 PPN2 gt EAD of 40msw or loop flooded Partially sighted diver divers with a sigh
106. lator are used depending on configuration 1 Poseidon XStream on commercial diving rebreathers for bail out gas This complies with EN250 and are oxygen clean 2 Apeks DS1 and DS4 valves on CCRs where external tanks are fitted These comply with EN250 and are oxygen clean 3 Apeks TEK 3 regulators for use on external tanks as an option where the Apollo regulator service technicians are not available This is an EN250 certified regulator that is supplied oxygen clean 4 Open Safety Integrated Oxygen Regulator This is a dedicated low flow oxygen regulator using a fixed intermediate pressure of 16 bar and is of a capped diaphragm type design 5 Apollo TFA 61 O2 regulator with oxygen compatible seat These are all EN250 compliant regulators that are oxygen clean The first three regulators are CE certified to EN 250 and oxygen surge tested The last two regulators are supplied for markets outside Europe but are in the process of CE testing and certification and after has been done and the certificates supplied to the Notified Body then will be fitted in equipment for the European Economic Area also The Technical Files are being supplied to BAM Germany who are performing oxygen surge and other specific tests FMECA_OR_V4_140831 doc Rev B11 Page 17 of 104 Open Publication 4 3 2 Risk Assessment The use of certified valves means the valves are assessed for safety in accord with EN 250 supplemented by oxyge
107. le of water which causes a plopping sound Attention was given to minimise these by providing drains and balancing ports Mouthpiece falling out of the diver s mouth on LOC This is not possible with the DSV as it must be fitted to a dive helmet Fig 4 21 3D Fluid flow simulation around ALV diaphragm on diaphragm cover showing effect of a fire hose Fig 4 22 Fluid flow simulation on ALV diaphragm showing no free flow because of venturi vents FMECA_OR_V4_140831 doc Rev B11 Page 50 of 104 Open Publication 4 15 2 Compliance There is no requirement for mouthpieces in EN14143 2003 NORSOK U100 or DNV standards other than straps for fixing the mouthpiece to the face if fitted shall withstand a 15kg pull and the general work of breathing requirements 4 15 3 Risk Assessment The risks identified by the project relating to mouthpieces are 1 Misassembly after user strip down The parts are designed such that this cannot occur other than through the omission of a major component This is a higher risk with the ALVBOV than with the standard DSV because of the increased complexity 2 A corrective action was taken from HAZOP review the mouthpiece direction arrow should be moulded more prominently even though it is not possible for the diver to breathe from the mouthpiece if it is reversed 3 Mechanical damage The DSV mouthpiece survived a drop from a tall building without any apparent mechanical damage the A
108. ll others are units measured by ANSTI Ltd NEDU or Micropore Ltd Deep Life Ltd use an approximately 50 exhausted scrubber for the test measured in elapsed time to scrubber exhaustion other results generally use a fresh scrubber Any company wishing to dispute these figures is may supply a unit and witness a test or invite a DL engineer to witness the calibration and test at another facility The Open Revolution rebreathers in this list include the O R Apocalypse and the O R Bell Diver s eCCR There is no measureable difference between the WOB in the O R Apocalypse Sport iCCR and the Incursion multi role professional rebreather Since the above tests were carried out the WOB of Open Revolution rebreathers increased by 0 06 J L and the rEvo has introduced a new model Rev 3 reported at 2 1 J L This comparison affirms that ALARP has been applied rigorously to reduce the WOB to the lowest practically achievable level 4 18 Hose weights 4 18 1 Design Decision Review No hose weights are used the mouthpiece is weighted to balance the hoses The hoses are highly flexible so are much shorter than those in common use a quarter of the length of the most popular hoses This reduces the dead volume and the need for hose weights 4 18 2 Risk Assessment The following risks were identified with hose weights of they were to be fitted 1 In lifting the hose over the diver s head it could fall or spring back and the weight hit the middle of the d
109. long seal removed and this was accepted The scrubber seal was designed to accommodate up to 7mm of damage to the sealing end of the cartridge and generally accommodates 10mm of damage Incorrect threading A very wide bayonet thread is used that is difficult to cross thread However it can be cross threaded so the inner part of the barrel is being printed in a highlight colour red to make it obvious to the user of this is happening FMECA_OR_V4_140831 doc Rev B10 Page 71 of 104 Open Publication Difficulty to release Some scrubber designs are difficult to separate causing users to damage the mating surfaces using instruments to prise apart the scrubber This risk is avoided by using a bayonet fitting that forces the ends apart when it is rotated Accidental disassembly The commercial dive unit has two canisters which must rotate in opposite directions simultaneously to release the scrubber end The simultaneous action is reinforced using Velcro as a gear between the two scrubbers The single scrubber unit has the end caps plugging directly into the counterlungs and this prevents the end caps from moving Failure to fit the scrubber A scrubber viewing port is on every scrubber barrel this shows clearly whether or not a scrubber is fitted To prevent divers doing too many dives on a scrubber divers doing dives of less than 2 hours duration are instructed to rotate the scrubber on its axis by 180 degrees between dives with
110. mmercial and military diving systems After consideration of fatal accident reports and multiple incident reports in light that the mouthpiece opening determines a large part of the overall Work Of Breathing the hoses and scrubber have a Work Of Breathing less than that through the diver s mouth the review also rejects narrow bore mouthpieces as complying with EN61508 at SIL 3 level The project should support a Work Of Breathing which as close as practicable to zero that is less than that that through the diver s mouth by enlarging the bore of the mouthpiece to more than 700sqmm 4 15 4 Failure Mode Analysis O ring failure was the only failure mode identified in the plain DSV This is not a catastrophic failure water ingress is slow with the three O rings removed in both DSV and ALVBOV The ALVBOV has other failure modes including increases in cracking pressure if not properly serviced electronic failure seizure and diaphragm tearing but ALARP has been FMECA_OR_V4_140831 doc Rev B11 Page 51 of 104 Open Publication applied in taking on these risks whilst providing better protection to the user from the macro risks of hypoxia and loop flooding than the DSV 4 16 Mouthpiece ALVBOV Version The ALVBOV provides a bail out gas in the event of a detectable rebreather failure and shuts off the breathing loop when the diver is either bailed out or has the mouthpiece out of his mouth The ALVBOV has replaced th
111. n surge testing This is deemed to embody best practice The FMECA V6 lists risks associated with Insufficiency of supply excessive supply pressure relief valves oxygen fire Outside the scope of the valve is monitoring or indicators to ensure the user is aware of failure This is detected by the electronics but should also be apparent to the user in the eCCR In the iCCR and O2 CCR the oxygen injector button has a highly tactile feedback so the diver knows as soon as they inject gas there is no gas pressure The make up gas has a pressure indicator attached to the first stage regulator that can be read by the diver or supervisor at any time 4 3 3 Failure Mode Analysis Failure mode analysis is considered in FMECA Volume 6 for the first stage regulator and in the consideration of the over pressure valves below 44 Intermediate Pressure Relief Valves 4 4 1 Design Decision Review Pressure relief valves have to be fitted to comply with EN 14143 2003 and to address the following risks on lines that do not have a second stage regulator attached such regulators open relieving pressure if there is an intermediate pressure creep There are four requirements that were considered 1 Thermal rise in the temperature of an intermediate pressure line The line volume is under 100cc including regulators line of up to 6mm internal bore and 1m maximum length A bleed rate of 100cc per minute from the pressure relief valve is sufficient even
112. n that of an oro nasal mask and more than the flapper valves in common designs The bore presents a risk of CO2 retention due to increased Work Of Breathing This risk was addressed within the project by establishing a minimum bore of 36mm giving a 10 17cm gas cross section compared to 3 8cm for the P Port FMECA_OR_V4_140831 doc Rev B11 Page 24 of 104 Open Publication The reason for choosing 36mm is that the sum of all the port obstructions then becomes equal to the resistance of the flapper valve after optimisation 2 The Press Click Ports that were examined were found to fall apart readily pressing the plastic around the port on two opposite sides just behind the button was sufficient in most cases This risk was overcome by increasing the thickness of the plastic and screwing the parts together from behind instead of relying on clip fit assembly 3 The Press Click Ports generally have a single O ring and as the ports act in series it would mean that if any one O ring failed then the loop failed This risk was addressed by designing in double O rings Both act in piston mode as this is the most reliable form of moving O ring seal in practice The O ring pressure was also increased such that if a ring is lost there is less space for water to ingress through 4 The Press Click Ports that were tested did not mate securely it was not clear if the ports were fully engaged or not This risk was addressed by using
113. n the open circuit mode 3 The water dump valve For the diver demand valve the design adopts a custom moulded silicone disc flapper shown below This is marked with Sl material reuse marking and a date code FMECA_OR_V4_140831 doc Rev B11 Page 41 of 104 Open Publication Fig 4 12 CAD representation of the 35mm diameter silicone flat valve Fig 4 13 Flat flapper valves produced using the injection mould tooling showing the colour coding matching the hose caps The top left valve and bottom right valve has sealed to the smooth granite surface under its own weight For the Open Circuit exhaust and for the water dump an umbrella shaped valve was adopted Fig 4 14 CAD representation of the 35mm diameter silicone umbrella valve The actual valve can be seen fitted to the water dump in Section 4 10 it is material and durometer colour coded purple Batches of flapper valves in different durometer silicone were moulded and tested Special attention was paid to materials and the rim of the valve to produce a distinct click every time the valve closes Umbrella shaped valves as compared to flat valves give a louder acoustic click this can be obtrusive to the diver in a rebreather application The flat valves and the web holding them were acoustically engineered to give audible feedback albeit soft and unobtrusive that the mushroom is in fact fitted and is working Checking the flapper valves is part of th
114. n the stick for the stick to operate correctly Plastic materials did not provide the strength required without much thicker walls 4 35 2 Risk Assessment The risks identified that relate to the mechanical functions of the scrubber stick are 11 UV exposure If the scrubber is left open on deck of a dive vessel or exposed near where arch welding is carried out the scrubber stick can receive a large UV exposure Carbon has excellent resistance to UV it is added to other plastics to provide UV resistance 12 Chemical contamination The carbon fibre tube has good resistance to oils acids and strong caustic solutions but solutions can penetrate to the circuit board through the sensing holes To mitigate this risk the holes must be filled with a hard setting resin during manufacturing 13 Mechanical Damage None in a test group were able to damage the 22mm O D carbon tube used for the scrubber stick after drilling 14 Wear Each time the scrubber cartridge is removed the scrubber core slides over the scrubber stick This will lead to a small amount of wear The stick is very strong and wears much more slowly than the EAC cores The life is more than 10 000 EAC exchanges FMECA_OR_V4_140831 doc Rev B11 Page 91 of 104 Open Publication 4 35 3 Failure Mode Analysis The failure mode of the scrubber stick is fracturing or breakage of the base when the open scrubber cap is dropped onto the scrubber stick end onto a hard surface T
115. nal rebreather manual water dumb connector and the combined optical and electrical connector cy Fig 4 40 Exploded image of the power and comms connector showing waterproof cap body USB connector and Nokia connector Two O rings are fitted to each O ring grove to keep the space taken by seals to the minimum The PCB is potted into the plastic housing The connector types and the issues identified with each are as follows Stereo jack plugs 3 5mm for pressure sensors and in four pin form for the PFD These are very widely used for MP3 players etc and in that context seem reliable Unfortunately the first batch that was procured was of Chinese origin and the rings on the jacks were free to rotate that is there is a secondary connection inside the jack there were exceptionally unreliable even on the test bench The jacks must be inspect to check that they are indeed hard gold plated on brass not soft gold and the rings are welded to the wire inside Female jack connectors 3 5mm were also unreliable with a single wiping leaf contact Connectors from Green Tweede were sourced and found to provide reliable connection A similar design was created for the 3 5mm jacks and these are subject to a separate verification study External connectors such as to the commercial diving umbilical have been a major problem throughout the project resolved only recently The following lessons are noted 2 Optical connectors ar
116. nation The connectors can be contaminated with oil In this case there is a loss of electrical function from the connector The effect of this is considered in the electrical MTBCF and electrical FMECA reviews Contamination of the optical connector with opaque material will cause loss of the optical connection 3 Off gassing _ The connectors are not in the breathing loop except for the DIN 41612 connector Action The manufacturer should supply complete plastics disclosure Some of these connectors use PVC but most use a glass loaded nylon It is important that only glass filled nylon is used 4 Leakage through the connector can occur if the O rings are missing or damaged The rate of the leak will be very low but gradually the silicone oil thermal expansion piston will move to the bottom of its stroke and the user must be alert to this If the user is not alert there is a risk of electronics failure from water ingress FMECA_OR_V4_140831 doc Rev B11 Page 89 of 104 Open Publication 5 Leakage of water onto the connector face can occur if O rings are missing or damaged This will short out electrical traces but should have no other deleterious effect short term Long term it would cause electrolysis of the contacts 6 Incorrect assembly This can have the same effect as leakage due to omission of the O ring The connectors and penetrators are not user serviceable items and are not accessible for removal or adjustment by the
117. nd gearbox in the injector with a direct drive using a voice coil motor and measuring the orifice position directly with a laser and CMOS imaging array sensor The response time of the injector from fully open to fully closed was also improved from 3 seconds to 20ms so that if there is a major failure such that the controller has to drop back to a binary operating mode with bang bang control it can do this effectively without demanding a lot of power The injector requires no power to hold the orifice in a static position Further consideration of the failure modes of the injector determined that a means to prevent the PPO2 rising above safe limits was needed in case the rebreather detects a serious fault on the surface and opens the injectors then is passed through an interlock and used at great depth the oxygen flow under those conditions would be hazardous A normally open solenoid that was assessed and tested for diving applications was fitted upstream of the injector to shut off the gas supply should this occur To prevent this solenoid creating an hypoxia risk it is a normally open solenoid tested to 36G acceleration forces and when it closes it operates in a mode that maintains the PPOZ2 to a set point 0 2 atm higher than the normal target set point using a proportional linear feedback system that is totally independent of the main injector 4 27 6 Contamination Risk Mitigation All user manuals contain specific instructions emp
118. ne it or via training 4 16 3 4 Seal failure modes The seals have been reviewed to ensure they are within safe engineering limits Custom seals have been moulded where the tolerances of the machining or plastic may cause the seal to be outside those limits using standard parts Where the barrel valves fail the effect is the diver s inhale is from the rebreather and exhale is to the Open Circuit exhaust valve This is very apparent to the diver This has occurred with seals in one batch which did not match the design profile shown in the image below The same failure occurs if the seal is damaged or wears Diameter to be sealed 3D model shape Fig 4 26 Barrel seal profile designed and profile in a rejected batch of seals The flapper valve failure mechanisms have examined and reported separately in this FMECA The valve does require correct adjustment this can be performed easily by any dive technician familiar with Apeks second stage valves All other seal failure modes are a limitation of the mitigating factors listed above 4 16 3 5 Connector failure modes The connections into the ALVBOV cannot be swapped left for right due to a different clip offset in each case FMECA_OR_V4_140831 doc Rev B11 Page 58 of 104 Open Publication The connectors are not screw connections The connectors cannot be removed when the diver is breathing from the rebreather a clip is used that can be removed only when the
119. ngs has an umbrella valve one way valve fitted to prevent water ingress Test diver reported in May 2010 that in a pre dive check a slow leak was seen from a water dump due to the cord entangling Like any other fault that is reported this was treated in accordance with Deep Life s QP 20 functional safety processes an entry was made on to the Mantis tracking system it was reviewed and a mitigation was found by fitting a Bowden cable this involves placing a semi rigid small bore pneumatic tube to cover the pull dump cord This was reviewed and changed to shorten the cord such that there is no spare cord the pull stop is held against the case One customer reported that it is possible for the stopped to partially seal this is a known failure mode of all BCD dump valves The fault rectifies itself if the valve is pulled again and FMECA_OR_V4_140831 doc Rev B11 Page 28 of 104 Open Publication released Twelve different types of BCD dump was tested and all could exhibit the fault However in the review process it was concluded that a better design was feasible using a captive piston to prevent sideways movement This eliminates this fault mode Such a design was then carried out and tooled Images of the result are shown below original and improved Fig 4 7 Original water dumps using one way valve and dump valve Short toggle shaped to avoid snagging the dump The cord is a Bowden cable in May 2010 improved further
120. njection moulding samples failed in pull tests with around 50kg load The failure is a complete breakage of the hose because there is a small cut in the hose on each convolution where the tool has grabbed the hose during manufacture When a stress crack extends from the outer surface to the inner it travels almost immediately around the circumference of the hose Special attention to ensure that these cuts are minimised needs to be given Other than this the raw material in thermo reformed hoses is very smooth and uniform The hoses can stretch 400 twice that of hoses manufactured using other processes The hose cost is three times that of injection moulded hoses Hand laid hosing produces hoses around a mandrel The layer process is of a concern as it can trap gas even after autoclaving which could expand during decompression in a saturation diving environment The process appears to be a low volume alternative to a moulded hose with the benefit that stress cracks are unlikely to penetrate from layer to layer The cost of these hoses is typically 30 times higher than that for injection moulded hose 4 11 1 4 Overall Assessment Thermo reformed EPDM hoses have been selected for the project but this may become injection moulded later using a very smooth mould core The design uses a spiral convolution to enable water to drain easily from the hose The hoses have a strong protective cover to prevent accidental damage manufactured from 10
121. nnnannnnnncnonnnnannnnnnrnnrnnnnnnnnnnrrrrennannnnnnnns 17 NA O 17 ASIA sosssessseesore essor soes tastes s sesso s esoe roseis no aose E S aSa r Sesso ssor eroso seS 17 4 3 First Stage Regulators sccscecssscccsssscssesdecsossseccesasseccnaastosutdencesssoesassescaassssteccsensssesetoaasesencescesvacsessescssooses 17 4 3 1 Design Decision ROVICW ccccccsssccesscesseeseeeesneeeseececeesenecenseeceaeeceseesesaeessaeensaeeeeaaeseeeeesaesenseeess 17 4 3 2 Risk Assessment sector ciseitetas a A edad tans Ce ei RE EA 18 4 3 3 Failure Mode Analysis iii set teats td E ts 18 4 4 Intermediate Pressure Relief Valves ccsssscccsssssseccscscseccssscsccsscesceesssescessssccsseessccsseessssseesees 18 4 4 1 Design Decision ReyieW sacerdocio at ada dnde 18 AAD Risk A SE Md A a dando 19 4 4 3 Eallur Mode Analysis ai 19 AS AAA RT 19 45 1 Design Decision Rei Wisin A A da iesaeneey 19 4 5 2 Risk ASS MEL dd it 20 4 5 3 Eall re Mode Analia a a id A a e 20 A 6 High Pressure HOSS sscssiscstiesccisaiccccsiessocndscsesessssdsccstescsnsedsdoasssesdevoanaccestsssosveassesweassesecasesesenssocecessssooens 20 4 7 Rigid Medium Pressure hoseb scsssssscsscsssccscsseccsccscsssscscecssccesssccssssssccesesscssscssccsssssccsssssccsorens 21 4 8 Flexible Medium Pressure hoses csccscccssssscssccsscssscsscsscccecsscscesscscesscccssssccssecsscssessscsesessoeseess 21 ASMA Ai 21 SI A RR ORO 21 AMS A lolo e de 21 ASS ATK Medir A A dela 22 4825
122. ns and it was found the plastic age hardened rapidly causing failures This led to black ASA being used Neither PP nor ASA have the electrolytic properties of Kynar so all EMC tests were performed using PP and ASA 4 40 3 Failure Mode Analysis The entire FMECA Volume 6 applies The gas manifold has been the subject of a dedicated HAZOP study identifying risks and mitigating factors as listed above FMECA_OR_V4_140831 doc Rev B11 Page 102 of 104 Open Publication 4 41 Gas Flow of SCUBA configurations i 00001 DONA oxvaen tez Fig 4 46 Breathing Loop Schematic for both the Multi role professional and commercial rebreather configuration Twin scrubber is shown as a single unit i e it has the same flow 5 CONFIRMATION OF CLOSURE ON SAFETY ACTIONS 5 1 1 Failure Mode Analysis The entire FMECA Volume 6 applies All FMECA V6 actions are tracked using Mantis issue tracking software as requirements and closed out The following actions are required to meet the design intent under failure conditions Action The connections from the scrubber to the counterlungs can be eliminated in most configurations and should do so by plugging the counterlung directly onto the scrubber this is possible with the existing counterlung design When this is not possible a super tough hose should be used such as rigid stainless steel hose Representation is being made to correct the hose stretch requirement in EN14143
123. nt di id as ati 93 4 36 3 Fail re Mode A nal siii A a diia 93 4 37 Sensor Bell MembraNe oococoonnoonnncoonanconenonnancnonacinnacononaccnnacconncconnnncona conoce coornnconacoconenconc conoce ccnnancnnos 93 4 37 1 Design Decisi n RV Wii da at bib 93 437 2 ASIS E A saat epuinasanceueuensobesseuevaebedadsses 93 4 37 3 Earlure Mode Adal VIS A A die 94 4 38 Scrubber Cartridge ressens aeeoea seora areoso aa aoaaa Diaes araso ses Ees Sopa kenaan tops Seassa 94 4 38 1 Design Decisions REVIEW misice eire cus e rere cunts E a e e e a e ie 94 4 38 2 Risk ASSE S A a a st bende a rea a Ne nee Ena NEEE 94 4 38 3 Failure Mode AnalySiS ooonocccnonccnoncccoonocoonocnoncnnnnnoconnnronnrn non nn rnan rn nan rra nr r nan rn naar nr non rn nan rn naar nnannnnns 95 4 39 Breathing Gas Heatings cccccssessssesssevsescssvversccdenssesacsasvesseacsovessasesessossoesseassoessssssoosness ressesie soas 95 4 39 1 Design Decision REVICW ccccccesssceeseeeeeseeeseeeeseecesaeeesaeceeaeeceaaeseseeensaeecnsaeesaeeseseceneeeeeeeeenseeens 96 4392 R1SK ASSESSMENT AA AAA A AA 96 4 39 3 Failute Mode Ar aa a ias 96 4 40 Gas Circuit in Umbilical Supplied Configuration sscccssssssssscsseccsccsesssccsesssscsesssssseeees 97 40 1 Design Decisi n REVIEW ins lt caiaises sees atinente bea da 97 4 40 27 RiSK ADT a edad 101 4 40 3 Failure Mode AnalyS IS inicia cada a ita scales ande ciedad iia 102 FMECA_OR_V4_140831 doc Rev B11 Page 6 of 104 Open
124. of leakage from O ring failure Include in operational procedure a requirement to check physical presence of the O rings when disassembled Itis very important that only approved O2 compatible grease is used to prevent releasing potentially anesthetic or toxic chemicals into the breathing loop HAZOP reviews underlined a strong necessity of proper training for all personal working with the RB when considering O ring safety 4 14 Flapper valves 4 14 1 Design Decision Review During the design flapper valves from other rebreathers were examined There are three basic designs in use 1 Elastometric flat flapper valves These have a very low cracking pressure and can be acoustically quiet These are the most suitable for rebreather diver demand valves 2 Elastometric umbrella shaped flapper valves These have a distinct cracking pressure and are acoustically noisy These are most suitable for open circuit exhaust valves and for water dumps where the cracking pressure is of advantage 3 Rigid valves these are used only on the IDA rebreathers These can have an extremely low work of breathing but are expensive and involve precise engineering The valves are easily damaged as they involve a hard disc mica or plastic being held by a spring onto a hard orifice the soft offifice tends to stick There are three applications for flapper valves in the rebreather 1 The one way valves in the diver demand valve 2 The exhaust valve i
125. of the electronics chamber Silicone oil is a liquid so cannot be under strain It equalises the pressure in the electronics chamber with the ambient meaning that the walls of the electronics chamber should not be under strain therefore should not permeate helium This means the silicone oil should be free of helium and a sealed sensor in that oil should not drift This is confirmed by trials 3 There is a differential sensor on the scrubber stick This was changed from two absolute sensors to one differential capacitive sensor to overcome this helium drift issue Bourdon tube type pressure gauges are fitted to all gas supplies from dive tanks In the case of the SCUBA configuration of the equipment the make up gas and bail out gauges are visible to the diver during the dive There is no gauge on the oxygen supply visible to the diver but it is highly visible during pre dive checks If there is an unexpected loss of oxygen this is apparent to the diver using tactile feedback whereupon bail out gas is supplied and for the iCCR and eCCRs there are additional electronic warnings 4 5 2 Risk Assessment The following risks have been identified in relation to the pressure sensors 1 Complete failure This is detected by the electronics but should also be apparent to the user 2 Blockage of the diffusion sensor port 4 5 3 Failure Mode Analysis The failure mode is a loss of pressure sensor data or resolution Small bourdon tube type ga
126. orifice ports Contamination of the breathing gas with substances harmful to health Mechanical damage resulting in water ingress into the breathing loop None of these failures should occur in service all are detected by the electronics during pre dive checks though detecting contamination depends on what the contaminant is Each of these failure modes are handled by the electronics should they occur 4 35 Scrubber Stick 4 35 1 Design Decision Review The scrubber stick can be seen clearly in Fig 3 2 3 2 and Fig 3 7 as the rod in the centre of the scrubber cap The rod measures the temperature of the scrubber in twelve locations and measures the pressure across the scrubber The structure at the base of the stick holds the gas contamination monitors CO2 CO and HC The scrubber stick is the result of several iterations from design build test and improvement Earlier scrubber sticks were much thinner than the present design but were damaged easily A decision was taken to re engineer the stick such that it could not be damaged under any plausible circumstances other than falling from a height of several metres directly onto the stick in which the stick base breaks Since that re engineering no stick failures have occurred even with deliberate attempts to damage the stick The stick material is wound carbon fibre this gives adequate thermal insulating properties combined with very high strength Metals conduct heat too well dow
127. ould bail out manually and not rely on automatic operation these are emphasised by warning signs in bright colours in the user manual Corrosion causing jamming the actuator is formed almost entirely of plastic and a nickel titanium wire The main body and internal parts are plastic other than the second stage valve which is of a proven design an Apeks ATX40 stage proven in use over decades Partial bail out valve has only two modes and cannot remain in any partial state Switch over Sticking The auto shut off mechanism is simple and can be manually operated Guilotine action where the barrel cuts across the axis of the valve then if the diver s tongue is poked into the mouthpiece it would be guillotined if the valve closes To eliminate this risk the barrel rotates on the axis from mouthpiece to purge button so nothing wipes across the mouthpiece to trap or cut the diver s tongue FMECA_OR_V4_140831 doc Rev B11 Page 54 of 104 Open Publication 8 10 11 12 13 14 15 16 17 18 Volume Weighted Average Inspired CO2 The VWAI CO2 has been measured using an AMIS 2000 respiratory mass spectrometer and determined to be 0 7 SEV at 0 atm this is not depth dependent Seals leaking due to foreign material or thermal expansion of the housing All barrel and front seals are custom moulded lip seals which provide the widest range of tolerances Every valve is tested in production wi
128. ower Action HAZOP will be carried out on the Umbilical Terminator at the next joint safety meeting this was carried out Action Consider merging ALV and BOV into one carried out with the ALVBOV Action BOV should be freeflow direct into helmet both OSEL options provide this Action The scrubber cartridge seal was subject ot a separate review and found to be optimal Action A joint safety review should be carried out of this particular solution with a consideration of the commercial implications using the ALARP principle All these actions have been implemented as of Rev B7 of this document FMECA_OR_V4_140831 doc Rev B11 Page 104 of 104
129. properties other than the cartridge seal which is red and the scrubber seal which is orange for ease of user inspection During the HAZOP on the O rings a detailed MSDS for Black EPDM was considered and on further enquiry was found to contain Thiram as a softener a toxic substance A specially formulated EPDM was procured to eliminate Thiram and all other softeners or plasticizers 4 13 2 Risk Analysis The risks presented by the O rings that have been identified are 1 UV damage There is risk of UV damage if a hose is left on deck disconnected from a port or disconnected in an environment where arc welding is being carried out The material chosen for all the O rings is EPDM or silicone both of which have good resistance to UV 2 Chemical damage Silicone and EPDM is compatible with the environment and resist chemicals that may occur in that environment including oil and ozone Silicone O rings swell in the presence of silicone oil this is considered separately 3 Contamination If non O2 compatible grease is used toxic VOCs are likely to be introduced into the breathing loop It is important that only approved O2 compatible grease is used anywhere in the rebreather 4 Mechanical damage This is most likely to occur from sand or grit on the mating surface or damage to the mating surface All O rings are piston type that is slide into a cylinder except for The half mask mouthpiece where a sliding O ring is used around the
130. r if the hose is not crimped properly For this reason only the reusable fitting is used The risks identified for the medium pressure hoses are FMECA_OR_V4_140831 doc Rev B11 Page 23 of 104 Open Publication 1 Bursting The equipment has a working pressure of under 20 bar normally 6 bar to 16 bar The equipment is pressure tested for one minute at 120 bar in its manufacturing process and as evidence by the results given herein for the pressure test 2 Blockage The equipment is a uniform hose free of items that may detach and form an obstruction The bore of the equipment is greater than 3mm Kinking This is tested in compliance with the relevant harmonised standards 4 Oxygen fire The equipment is subject to low pressure oxygen and is therefore outside the requirements in EN 14143 2003 for oxygen surge testing Toxicity The equipment does not contain any substance known to have any significant toxicity A MSDS is provided with this Technical File for each material used in the equipment 4 9 Breathing Hose Ports 4 9 1 Design Decision Review The ports connect the breathing hoses to the mouthpiece Counterlungs and scrubber There are three types of port in common use 1 Screw connection ports These carry risks of cross threading no matter how large the thread is the thread is invariably external on one part of the port with risk of thread damage the thread traps contaminants and there is no clear indic
131. r limit very easily Detailed consideration was given to how divers use ALVs in particular the practice of fitting stop valves to these in the aftermarket to eliminate freeflow The stop valves have been implicated in multiple fatal accidents so a method was required to eliminate free flow so securely as to completely oblivate the need or design to fit such valves The ALV is fitted to the exhale counterlung to ensure oxygen added to the loop is swept towards the diver instead of away from the diver when the ALV fires On most rebreathers the ALV is fitted to the inhale side of the breathing loop but this can cause oxygen added to the loop through an injector to be swept out of an exhaust valve which is commonly on the exhale counterlung in such rebreathers creating a hazard if the diver is using an hypoxic make up gas FMECA_OR_V4_140831 doc Rev B11 Page 59 of 104 Open Publication Fig 4 27 Sectional view of ALV showing the very simple construction The diaphragm and most valve parts are common to the ALVBOV 4 17 2 Risk Assessment The following risks were identified and mitigated 1 Freeflow 2 Failure to operate 4 17 3 Failure Mode Analysis The failure modes are failures to operate and free flow Both are treated in the same manner as these risks under ALVBOV FMECA_OR_V4_140831 doc Rev B11 Page 60 of 104 Open Publication Table 1 Comparative Mouthpiece dimensions resilience and WOB W
132. r stripped its thread or crushed the port The failure was the thread was stripped but there was no damage to the port or to the hose see the figure below Fig 4 11 Hose with jubilee clip after tensioning the clip until the grub screw failed then tensioning the hose until the hose failed Hose failure point is at the same point observed in the tests reported in the previous section The hose is attached using a Jubilee clip identical to the one shown at both ends in all configurations of the rebreathers A risk was identified during early HAZID reviews of lines catching on the clamp To avoid this and also to avoid any damage to the cable tie or clip from impacts the tie or clip is covered by a custom silicone rubber moulding The moulding also provides protection from UV to the plastic tie and colour coding of the loop to avoid the user connecting hoses in the wrong direction The cover can be seen in Fig 3 9 and the twin cable ties on the hose in Fig 4 3 The clip cover is made from silicone not EPDM a batch of EPDM samples in 60 and 70 durometer material was fabricated but found to yield immediately then stretch This meant the cover would sit loosely on the clip rather than grip it tightly FMECA_OR_V4_140831 doc Rev B11 Page 37 of 104 Open Publication There is no lip on the end of the hose this is considered desirable but the manufacturer could not achieve this using the thermal reforming method used for the
133. re is a 100dB loss in water after just one metre so this approach works even for non mag systems The O2 monitor CO2 monitor and PFD communicate by RF with a very high received signal power due to the air space between them and the dive computer communicates with a low received power 7dBm transmitted power 110dBm sensitivity on the receiver Sensors to Main Electronics On the eCCR heads a sensor board is connected using a DIN 41612 connector with hard gold finish on nickel over phosphor bronze female and brass male The connector is protected from moisture and critical paths use multiple connector pins in parallel The only failures that have occurred have been when the pins have been contaminated by epoxy during assembly 4 33 2 Risk Assessment The risks identified that are related to the connectors are 1 Mechanical damage If the scrubber assembly is dropped the unit tends to land on one of the connectors The worst case is where the connector is capped when the hose is connected the hose acts as a shock absorber If dropped from sufficient height the connector can punch through the scrubber housing causing complete failure This failure must be avoided by use of the rebreather cover but may occur when a new scrubber cartridge is being fitted Action It may be possible to further mitigate this risk by moulding a soft elastomer cover instead of the stainless steel covers This possibility should be investigated 2 Contami
134. s are fitted to the exhale counterlung to prevent this The OPV vents before the bags will rupture and is of a high flow design Water dumps provide a further gas exit port in an overpressure situation The same test as applied in EN1809 for BCDs was applied to the counterlungs but with the ALV on purge to inject gas Joint Seal failure Attention was given to the joints which on many development samples could be peeled if enough force was applied There is one location where there are three layers of counterlung material welded at the same time this may not weld reliably so all counterlungs are pressure tested to one bar above ambient for one hour FMECA_OR_V4_140831 doc Rev B10 Page 67 of 104 Open Publication and in production a 25 cycle test is applied at one bar positive to minus one bar near vacuum for one minute per cycle Note For each batch of counterlungs a sample will be tested for peel strength to ensure it can withstand 25kg of force on a corner applied at 90 degrees to the bag in a peeling action Separation from the ports This was found to be a problem on all the contemporary counterlungs that were examined unless the port was welded to the bag There are internet reports that a wider spacing between the port on the counterlung and the port on the counterlung cover has not eliminated entirely these failures The design avoids this risk by welding a ring to the bag which mates very securely
135. s chamber do so through a pressure proof penetrator 4 32 2 Risk Assessment The following risks have been identified in relation to the penetrators 1 Mechanical damage If the rebreather is dropped from a height of several metres onto a penetrator the penetrator concentrates the stress and can punch through the wall of the electronics chamber causing its total failure In the twin scrubber unit there are two electronics chambers and either one can drive the entire rebreather and provide adequate monitoring but on the single scrubber rebreathers loss of the electronics area is a critical failure This can occur during servicing but no plausible conditions were identified where it occurs during a dive as the whole area of the connectors is covered by a protective cover The wall of the electronics chamber is particularly thick at 6mm to prevent stress from flexing the hoses connected to a penetrator from rupturing the wall of the electronics chamber 2 Excess Pressure As the test pressure is much more than the deepest dive a human can do the record being 701msw this risk is avoided 4 32 3 Failure Mode Analysis The failure mode identified is of mechanical stress causing the penetrator to break through the wall of the electronics chamber leading to total loss of the electronics for that scrubber FMECA_OR_V4_140831 doc Rev B11 Page 86 of 104 Open Publication 4 33 Connector reliability 4 33 1 Design Decision Review
136. s in the counterlungs to heat the diver s gas to meet the NORSOK safety requirements and to maximise scrubber life The results of trials on how breathing gas heating can be achieved in a rebreather are described in the document DV_Breathing_gas_thermal_ctrl_061228b pdf The heater used a carbon self limiting material produced by EXO2 A Safety Analysis of the EXO2 heating material is contained in document SafetyRep_Carbon_heaters_061225 pdf A redesign using a nichrome heater in the hose immediately before the mouthpiece was adopted in its place 4 39 2 Risk Assessment A very detailed analysis of the diver s thermal balance was considered This was based on a draft report from Thelma as part of this project of the diver s thermal balance in 4C water and 4C sea water In manned trials in over 400msw the diver could not get back to the bell and up the bell ladder which was only 2m away when gas and suit heating was switched off At these depths the heat just pours out of the diver s lungs due to the density of the gas The water temperature involved was much warmer than the extreme cold conditions considered by Thelma 4 39 3 Failure Mode Analysis The meeting fully accepted that at extreme depths gas heating becomes a critical safety element Careful consideration needs to be given to what point this moves from a SIL 0 upwards as there is no requirement for active gas heating shallower than 150 m Norsok U 100 The very nature of the re
137. s used when the fitting is assembled then the fitting can cut into the inner wall reducing the burst pressure from gt 120 bar to 90 bar In theory the burst pressure could reduce to near zero Gas travels up the Kevlar sheath and causes a hose failure that may be away from the end fitting Fig 3 4 1 Section through hose that fails with a test pressure of 90 bar showing how the reusable inner fitting has cut through the inner hose allowing gas to leak into the sheath FMECA_OR_V4_140831 doc Rev B11 Page 22 of 104 Open Publication Fig 3 4 1 Hose with fitting where fitting is sharp and has cut the inner hose showing failure with burst pressure of 90 bar Fig 3 4 1 Crimp and reuseable fittings compared inner core It is essential that the end of the fitting is rounded to prevent the fitting cutting into the inner hose All incoming material shall be inspected to ensure the fitting end is rounded free of burrs and oxygen compatible grease shall be used on the end of the fitting when it is inserted into the hose to avoid it cutting the hose With appropriate manufacturing inspection the TPU hose can be regarded as a 120 bar burst pressure hose for purposes of the safety case the hose withstands a test pressure of 120 bar for one minute If the pressure of 120 bar is maintained for a long period the hose creeps out of the fitting but this may take a day or more to cause failure Another failure may occu
138. t for both dry and fully humidified breathing gas It is then open to interpretation as to if the narrow temperature band below 150m applies to dry breathing gas only in Norsok U 101 Rev 1 6 3 10 This project has proceeded so far on the basis that it is just dry breathing gas but now there is a requirement for adjustable heating this position becomes more tenuous The automatic adjustment to different metabolic rates from the scrubber reaction is the opposite of what is required the amount of heating per breath is the same because the exothermic reaction in the scrubber reacts with the same amount of CO2 per breath so when the breathing rate increases so does the exothermic reaction Unfortunately when the metabolic rate increases the diver s own exothermic processes are also generating more heat In view of the pending change to U 100 the project has included a safe gas heating element was developed that could be used to address this requirement in the standard for extremely deep diving The electronics meets SIL 3 requirements when implemented on inhale and exhale breathing gas The cross section of the breathing gas heater maintains equivalency with a 36mm tube so there is no impact on breathing resistance or WOB this is achieved using a 42mm I D tube with a flat heating element of 50 sq cm FMECA_OR_V4_140831 doc Rev B11 Page 95 of 104 Open Publication 4 39 1 Design Decision Review The design uses heating element
139. t impediment in one eye can chose left or right sided viewing from the PFD One one side of the PFD is active Selection is by a USB utility Hose fittings and connections withstand a 100kg load Hose fittings cannot come off while the ALVBOV is in use it comprises a clip that can obly be removed when the hoses are in the opposite direction to the mouthpiece this cannot occur when the diver is using the ALVBOV Colour blind diver pulse duration and colours are chosen to enable common colour blindness conditions to be tolerated Voice annunciation is used in addition PPO2 reporting Accuracy safety studies found that divers often do not look at handsets with sufficient frequency so all data is from the PFD Voice annunciation provides the PPO2 within a 0 01 atm resolution and the PFD provides 0 05 atm resolution Accident investigation log errors The PFD contains 4GB of storage recording all parameters it measures or receives by telemetry each second and can store one year of dive data FMECA_OR_V4_140831 doc Rev B11 Page 56 of 104 Open Publication 4 16 3 Failure Mode Analysis The failure modes are failures to operate failure to actuate free flow failures of seals and connections 4 16 3 1 Failure to operate No ALV or ALVBOV has failed to operate on any test carried out by Deep Life by BAI or on any dive However an independent test house did have a 2 bar negative pressure on the rebreather during a
140. th near vacuum and one bar over pressure to verify the integrity of those seals Flooding on removal from diver s mouth mouthpiece retainer is integral with the hoses hose spring effect pulls the mouthpiece into the diver s mouth and a retainer cord triggers the shut off to close the breathing loop when it is pulled away from the diver s mouth Excessive WOB the WOB is the same as for the DSV Both the DSV and the ALVBOV apply ALARP to achieve within 0 06 J L of the lowest practical WOB at 40msw 75lpm RMV using air around half that of contemporary rebreather mouthpieces The mouthpiece is angled downwards to capture the natural gas flow vector from the diver s mouth Divers teeth obstruct gas flow a custom mouthpiece was designed for the ALVBOV that keeps the diver s teeth open The custom mouthpiece bite provides the largest mouth opening that can be used without the diver suffering mouth cramp 8mm at the front of the bite reducing to 6 2mm at the rear of the bite Turbulence into diver s mouth The ALVBOV is angled downwards to take the gas flow to the diver in the arc that is formed by the space between the diver s tongue and roof of the mouth Flow reversal The flapper valve webs are polarised so cannot be swapped from left to right if the diver attempts this the tubes either side of the mouthpiece cannot be fitted Moreover the flappers do not fit the webs of the flapper valve if the flapper is attempted to be fi
141. the Deep Life web site www deeplife co uk or_dv php A special procedure is needed to detect the leakage of the injector before diving There are several possible reasons for leaks a serious leak that was not detected on the surface could cause hyperoxia at the depth due to uncontrolled PPO2 increase The possible reasons for leaks from the injector are 1 Sealing ring failure The leakage caused by this reason is assessed as minute 2 The orifices are not fully closed when the drive of valve is in the end position The possible reason is deformation of the valve driving plate or wrong dimensions of the Crank Driving Plate Valve subassembly To prevent this failure the driving plate was made more robust compared with the first prototypes Oxy gen Out we Ae AA j j Oxygen Fig 4 35 Gas cross section through the injector FMECA_OR_V4_140831 doc Rev B11 Page 77 of 104 Open Publication During testing a further failure mode was found whereby wear would cause an increase in the hysteresis of the drive system or the orifices in their holders The result was that the current consumption would increase by orders of magnitude because the orifice would hunt for its correct position overshooting each time Instead of a few steps every ten seconds the orifice would be driven continuously The PPO2 control would wander by up to 0 1 atm during this time This failure mode was eliminated by replacing the stepper motor a
142. tors are from top left running anti clockwise O2 supply under O2 supply but not visible in picture is the handset connector next visible is the USB FMECA_OR_V4_140831 doc Rev B11 Page 13 of 104 Open Publication and charging PFD battery housing 1 hose port to inhale counterlung battery housing 2 PFD port can just be seen under hose port 3 3 Sports Pure O2 Rebreather and CCR Fig 3 4 1 Sports Pure O2 and iCCR configuration with monitors and side tanks fitted FMECA_OR_V4_140831 doc Rev B11 Page 14 of 104 Open Publication ALVBOV X s Flow Path Exhale Counterlung Inhale Make up Gas Counterlung Bail Out Oxygen Cylinder 02 Supply Cylinder First Stage Regulator Overpressure Valve 02 Pressure Gauge N C02 Absorbent Canister Make up Gas 02 On Off Valve On Off Valve First Stage Regulator Make up Gas Pressure Gauge Manual 02 Injector Oxygen Rebreather Fig 3 4 1 Apocalypse Sports O2 CCR with side tanks fitted FMECA_OR_V4_140831 doc Rev B11 Page 15 of 104 Open Publication ALVBOV PFD Gas Flow Path C02 Monitor ed Inhale Counterlung Exhale Counterlung Trimix Nitrox C02 Absorbent Supply Cylinder Make up Gas Cylinder Overpressure Valve Make up Gas Trimlx Nitrox On Off Val alve On Off Valve First Stage Regulator Firat Sage Regulator Manual Injector Make up Gas
143. tted from the reverse side The design positions the hoses so the diver cannot use the valve upside down upside down The hoses are too short to allow the hoses to be swapped left and right that is the hose from the ALVBOV that plugs into the rebreather cannot be plugged into the incorrect port and the ALVBOV remain the correct way up if the ALVBOV is attempted to be installed upside down then the supply hose is not long enough and the valve obstructs the diver s face so it cannot be used accidentally the ALVBOV is on a 35 degree angle from the diver s mouth Screw threads on hoses not fully screwed home no screw threads are used other than Jubilee type clamps on the actual hose itself The hose is attached so firmly to the rebreather end of the attachment tubes by stretching the hose using a special tool even with the Jubilee clips undone the hose attachment meets the EN14143 2003 pull requirement of 250N Jubilee clips are essential on the mouthpiece side to enable the user to adjust the hose length Obstruction of vision The hose run is under the diver s chin Hoses are very short so cannot float up around the divers ears or mask In the critical area around the hose is a solid hose which improves the diver s field of vision compared to a standard rebreather DSV Leaks Custom seals were designed that are optimal for the application standard O rings were found to be a source of failure during trials for 3D seals such as the
144. ubber In the event of a large amount of bypass this should be detected by the CO2 sensor and the dive aborted If the seal is omitted the change in scrubber characteristics are sufficient for the scrubber health monitor to flag a warning as the thermal profile will not match that for the dive time gas composition and flow rate this is fitted to all eCCRs FMECA_OR_V4_140831 doc Rev B11 Page 73 of 104 Open Publication Fig 4 33 EAC seal after three days of immersion in silicone oil showing swelling but otherwise still functional The seal is tolerant of all other common chemicals and of strong bases caustic compounds Fig 4 34 EAC seal moulded in red contrasts well with both black and yellow flow cones allowing the diver to inspect the seal easily each time and EAC is fitted FMECA_OR_V4_140831 doc Rev B11 Page 74 of 104 Open Publication 4 25 Scrubber Housing Seal 4 25 1 Design Decision Review The design team chose to adopt an existing proven design rather than create a new seal The seal is the same as Micropore have used for five years with replacement scrubbers and in Optima Azimuth and Draeger canister designs except that the seal is changed to EPDM for improved chemical resistance The twin scrubber configuration has an additional seal of the same type at the end of the stainless steel breathing tube that returns through the scrubber 4 25 2 Risk Assessment The following risks wer
145. uges can cause the face plate to pop out during rapid decompression after exposure to helium environments The gauges are chosen so as not to release any significant quantity of gas when this occurs 4 6 High pressure hoses There are no high pressure hoses other than to the pressure gauge which is a CE certified gauge and hose supplied as a pair In the commercial rebreather there is high pressure pipework in Tungum pipe with a 0 8mm internal bore and 3 8mm external diameter that is rated to 600 bar with a working pressure of 300 bar Tungum is oxygen compatible FMECA_OR_V4_140831 doc Rev B11 Page 20 of 104 Open Publication 4 7 Rigid Medium Pressure hoses In the commercial rebreather and professional rebreather the oxygen hose is pressurised as it feeds an electronic variable orifice injector that hose is solid Tungum tube 4 8 Flexible Medium Pressure hoses A PEX and a TPU hose is use The TPU hose is used for supply to the ALVBOV because it is highly flexible and PEX hose is used for oxygen supply Both hoses are marked in the same manner Neither hose has a braided cover for ease of inspection and decontamination Fig 3 4 1 TPU Hose with crimp top and reuseable bottom left fittings The PEX hose looks the same but is matt black 4 8 1 Marking The hoses are each marked in White letters 5mm high continuously along its length OPEN SAFETY WARNING DO NOT EXCEED 20 BAR 290 psi H
146. uld be detected by the electronics due to the increased pressure across the scrubber and signal bail out 2 Incorrect Assembly The port is not a user serviceable item However it is possible for the user to remove the 15 micron filter This would increase considerably the risk of the orifices being blocked by debris from the gas cylinder or line No satisfactory solution has been found to this other than labeling the port using silk screening 3 Omission of filter This is considered under Incorrect assembly above 4 Clogging of filter If the gas cylinders have been allowed to empty underwater during ascent they will suck in water causing very rapid corrosion The sintered bronze filter will turn a green colour with corrosion and clog 5 Breakup of filter If the filter is very severely corroded it can break up leading to clogging of the orifices 6 Contamination If contaminants are allowed to enter the port there is a risk of oxygen ignition or of blockage or of contaminants entering the breathing gas This situation should not occur in a dive system but it is plausible that it can occur if for example an FMECA_OR_V4_140831 doc Rev B11 Page 90 of 104 Open Publication untrained person uses a general grease or silicone grease on the port The hydrocarbon sensor in the unit will likely pick up use of incompatible greases 4 34 3 Failure Mode Analysis The failure modes that can occur are Blocking of
147. upplied diving system the second scrubber PFD is routed to LEDs on the back of the scrubber housing to enable ROVs to monitor the PFD signals from any angle Some divers are visually impaired in one eye The PFD lights are on fibreoptic whiskers which can be routed to be seen by the left or the right eye using clips The PFD hose was found to restrict the diver s head movement in ergonomic trials so the PFD is self powered communicating by RF with the diver safety monitors using a fail safe architecture 4 19 2 Risk Analysis The mechanics of the PFD can be destroyed and the only effect is the loss of the PFD function The PFD has been dropped from a tall building without causing a leak The depth at which the PFD implodes is greater than 1400msw The PFD materials other than the polycarbonate have good UV resistance 4 19 3 Failure Mode Analysis The failure from chemical exposure has already been considered Failure from the user unscrewing the windows has been considered The failure mode of the PFD is from severe mechanical overload such as crushing The PFD contains no dead air space so will not implode at depth All electronics is isolated from the breathing loop The batteries used in the PFD may produce considerable heat if shorted out This will cause failure outside the breathing loop the cells face away from the loop The risk of explosion of the cells was considered and mitigated by using very thin cells so the energy on r
148. upture is as low as practicable given the space available FMECA_OR_V4_140831 doc Rev B10 Page 63 of 104 Open Publication 4 20 Counterlungs 4 20 1 Design Decision Review The design uses polyurethane counterlungs of between 4 5 and 6 litres tidal volume These provide two full breathes for a large diver to enable the diver to use the loop volume to optimise buoyancy and to donate gas to the commercial diver s helmet volume in the event of a loss of the umbilical in a descent The counterlung design is an unusual box construction designed to create a few milli bar of negative pressure when the diver is on his back to offset hydrostatic imbalance Particular attention was given in the counterlung design to minimise the work of breathing and optimise the scrubber endurance by minimising the time the exhaled gas spends in the exhale counterlung As part of the work of breathing studies to ensure the diver can obtain a full breath of gas in any orientation a large 36mm diameter stainless steel or titanium spring is fitted to the inside of each counterlung The springs differ between inhale and exhale counterlungs to optimise the scrubber endurance and minimise work of breathing The counterlungs have are fixed at each end using the P ports and water dumps This design feature arises from a fatal accident review where a diver died from allowing the counterlung bag on another rebreather to float above his head This failure
149. valves in series has the same breathing resistance as a 32mm diameter tube 1cm long The flapper valve cross section is therefore mathematically optimal reducing the Work Of Breathing and hence risk of CO2 retention to the lowest possible level SS Fig 4 15 Example of flapper valve failure with half finger alternatives rejected A plain DSV was used for these tests FMECA_OR_V4_140831 doc Rev B11 Page 43 of 104 Open Publication Fig 4 16 Example of flapper failure with four finger alternative The valve does correct itself immediately when breathed but as four fingers can leak five fingers was regarded as the borderline case and the design was set to the web with six fingers The face of the web seen here is being moulded with projections to prevent the flapper being inserted on the top surface and the web colour matching the flapper component Fig 4 17 3D Visualation of the webs showing the ridge around centre to prevent flapper being inserted from the wrong side and different sizing of the webs to prevent left and right webs being swapped by the user thereby accidentally reversing the flow lt Remainder of page intetionally blank gt FMECA_OR_V4_140831 doc Rev B11 Page 44 of 104 Open Publication Y o KO S CNC milled spider 5 14 cm 2 SA LY x8 webs 2 mm thick 5 99 cm 2 SIA XD x8 webs 1 mm thick 6 95 cm 2 CY IA ES x 4 4 webs 1 mm thi
150. ving gas manifolds Overall the pressure relief device should relieve at least 1 litre per minute with a 50 over pressure Extensive characterisation was carried out reported in DV_OPRV_100720_A4 pdf FMECA_OR_V4_140831 doc Rev B11 Page 18 of 104 Open Publication From June 2010 only one type of valve is used on all BOMs ORT 6520 N1 Ed2 4 4 2 Risk Assessment The risks and their assessment are listed above The conclusion is the pressure relief valve should lift within a 50 increase of over pressure providing at least a 1 litre per minute flow rate and a load noise The valves used lift within 2 bar of their over pressure setting providing a hundred times the minimum identified The noise generated is so loud the diver would turn off the cylinder if it were in use and switch to another gas source The maximum flow rate of over 500 Ipm presents the hazard of a rapid loss of all the gas in the cylinder a 2 litre cylinder containing 100 bar will take 20 seconds to discharge This is mitigated by the cylinder shut off would normally be carried out by the diver within 10 seconds 4 4 3 Failure Mode Analysis The failure mode is a loss of pressure or a failure to prevent a rise in pressure Failure to open is unlikely to cause any significant safety issue because the hose has a burst pressure more than twelve times the normal operating pressure and there is a relief means in the hose either an open orifice or
151. wards FMECA_OR_V4_140831 doc Rev B11 Page 26 of 104 Open Publication The CO2 monitor will warn of low CO2 and fail to calibrate hence say NO DIVE if the hoses are connected in reverse and the user breathes into the mouthpiece by standing in front of the unit the unit cannot be dived in this reverse state due to the mouthpiece facing outwards 4 9 3 Failure Mode Analysis None of the components are stressed within 10 of their yield point they are static with almost no loading This means that stress failure should not occur All sharp internal angles are radiused in the injection mould tool design with a 0 5mm radius The material chosen for the port is a black metal replacement plastic a polyaramid similar to Kevlar This has excellent tensile strength and resistance to fracture The entire port assembly prototype was been fabricated from a weaker material than used for production name from Delrin instead of polyaramid and dropped from a ten story building onto concrete and no damage affecting the function of the connector was apparent The entire assembly has also been run over on a hard surface by a saloon car and the port was still fully functional The materials are not subject to any significant corrosion from salt water from oil or from U V radiation Errors in assembly or from wear are apparent to the user in that the white line on the buttons is not visible when engaged this is a fail safe failure The
152. was repeated with a 50kg and 100kg weight without any failure of the hose clamp hose port or port from the counterlung Test indicates that the reinforcement ring is effective at achieving its designed function namely to prevent the failure where the port pulls free of the counterlung 4 20 2 Compliance There are no specific requirements for counterlungs in EN14143 2003 No specific requirements could be found in NORSOK or in DNV regulations 4 20 3 Risk Analysis The following risks were identified with hose weights Cutting or puncture The counterlung can be cut from either the counterlung bag being punctured and the penetrator extending into the counterlung or from sharp objects inside the counterlung bag or counterlung itself To mitigate this risk all sharp surfaces are removed the seams inside the counterlung bag are taped and sealed in a similar manner as a dry suit and the connector put has radiused edges The counterlung cover is made from a highly cut resistant material The overall risk of counterlungs being cut was judged to be similar to that of a BCD bag being cut this appears to be a very low risk The greatest risk of damage appears to be from hidden wear so no counterlung cover is used this keeps sand from remaining in intimate contact with the counterlung and allows the state of the counterlungs to be determined readily by visual inspection E lt fRupture This can occur from over pressure Over Pressure Valve
153. wed 1 Hoses Breathing Dual O Rings Ambient to Surface to Ambient pressure Hoses Electrical Dual O Rings Ambient to Surface pressure Hoses Gas Intermediate Pressure Dual Ambient to Surface to Ambient 10 bar Scrubber canister seal Single thick Ambient to Ambient Scrubber cartridge seal Dual sleeve type seal Ambient to Ambient Thermal expansion oil piston seals single Ambient to Ambient 2 3 4 5 6 Pressure sensors Gas contents single Ambient to High Pressure 7 8 Gas injector dual Ambient to Surface pressure 9 Counter Lung retaining ring single seal rings Ambient to Ambient 10 Mouthpiece X rings Ambient to Ambient The reliability of O rings was reviewed with comparison to hydraulic pistons such as on excavators Excavator hydraulic ram seals provides years of life in very poor conditions The shape of these is designed for high pressure to ambient only The wear of round seals in the rebreather should be minimal under all plausible operating conditions It was noted that the dual Ambient to Ambient seals provide Ambient to Surface and Surface to Ambient so the sealing pressure is high as well as reliable The HAZOP discussion on the scrubber canister seal concurred with the design decision that one thick O ring was safer than two thin O Rings in this application The O Rings are all black EPDM which has good chemical resistance good UV and ozone resistance and is strong mechanically with good wear
154. wer is 0 5mW too low to cause any significant gas heating A Green laser is used with ruby orifices and a red laser is used with black zirconia orifices The choice of orifice material is determined by the maximum flow rate required eSCRs require the black zirconia orifice while eCCR require a lower flow rate so a ruby orifice is used 4 28 Passive Addition and Manual Oxygen Dosing valve This dosing valve is fitted only to sports rebreather models the Apocalypse O2 CCR and iCCR 4 28 1 Design Decision Review The dosing valve commenced with a HAZID using existing O2 dosing valves as a reference The best design and engineered valve on the market is the Hydrogom valve particularly the Mark Il and the initial HAZID had a special consideration of that valve The DL valve was built and subject to a range of manned and unmanned tests The improvements were 1 The DL valves have a tactile feedback to the diver when gas is supplied so the diver knows immediately if the gas is turned off FMECA_OR_V4_140831 doc Rev B11 Page 80 of 104 Open Publication 2 10 11 4 28 2 The first version of the DL valve was fitted to the first stage regulator to ensure it is easy to find However very larger divers may have difficulty reaching this Manual flow rates from 4 litres per minute to 90 litres per minute were assessed by a series of test dives the bleed flow rate was always 0 7 litres per minute The 4 litre per minute
155. with the port as well as providing the seal This design improvement shown in was injection moulded and tested as shown in 10118 lt Chemical resistance The PU material as well as the silicone material is highly resistant to oil acids caustic materials and solvents s lt fUV Extensive field tests were carried out using white PU to highlight any UV degradation There is rapid surface degradation in UV but it seems to stabilise after an hour in a tropical environment and the counterlung remains serviceable The black PU contains carbon black which is an effective UV block and protective agent and no significant degradation was observed Bacterial growth The counterlung is a smooth gloss black surface allowing for inspection to ensure nothing is growing in the bag The material has a smooth inner surface aided sterilisation The susceptibility of both counterlung materials PU and silicone to contamination from bacteria especially by Pseudomonas aeruginosa was be checked researches from SINTEF Health Research with reference to earlier work they had carried out using cell cultures Yea Unwanted movement The counterlungs are fixed down at each end 4 20 4 Failure Mode Analysis The failure mode of the counterlung is opening to the water allowing water to invade the breathing loop The probability of failure given the measures taken to mitigate risk is very low but probable The effect of a small
156. with the scrubber seal 1 Omission The seal has been moulded in bright red so it is readily apparent to the diver The user manual requires the user to inspect the integrity of the seal when fitting new cartridges Omission will be detected using the CO2 detector and by the scrubber health monitor 2 Memory effect If a used scrubber is left in the canister for a long period the seal can develop a set which will reduce the integrity of the seal though still block CO2 This risk is managed by the same measures to mitigate omission The set seems to fall out rapidly when the cartridge is used 3 Chemical damage The seal is made from silicone which is highly resistant to most common chemicals The exception is silicone oil and silicone based lubricants which cause the seal to swell The swelling increases the susceptibility for the seal to develop a memory effect until the silicone oil dries off 4 Mechanical damage The seal is tough and is not likely to suffer mechanical damage in normal use Any mechanical damage should be detected by the user from inspection but in any case will be detected by the increased CO2 bypass using the CO2 detector The commercial dive unit has a 1 5mm thick stainless steel cover over the scrubber cylinders to protect them from sharp penetration if the rebreather is placed hard onto a metal surface 4 24 3 Failure Mode Analysis In the event the scrubber EAC seal is compromised gas will flow past the scr

Download Pdf Manuals

image

Related Search

Related Contents

VS mini J7 MANUEL D`UTILISATION - Support  スターリングターボ  Audiovox ANT111R television antenna    ORANS-SANITARIO INTELIGENTE OLS 0702 update  Klipsch X11i  Installationsanleitung Secruity  ref. SS-7195 manual de instrucciones / instructions for  IBM 69Y1909 network switch  LS 135/150 Examination Light  

Copyright © All rights reserved.
Failed to retrieve file