Home
WIND TURBINE TOWER KIT
Contents
1. 4 6 m and in a circle around the tower base e Make sure there are no obstructions along the circumference e Make sure there is sufficient room to tilt the tower into position and install the wind generator 4 Drive the four tower base earth spikes into the ground toward the center of the base as illustrated below Arrowhead earth anchors 1 Position the first earth anchor on the ground along the tower tilt axis 15 ft 4 6 m from the tower base 2 Place the second earth anchor along the tower tilt axis 15 ft 4 6m from the tower base in the opposite direction e With the tower base in the center 4 places 21 2 ft 6 6 m the first and second earth anchors should form a straight line 30 ft 9 2 m along the tower tilt axis 3 Place the third earth anchor 15 ft 4 6 from the tower base 4 Place the fourth earth anchor 15 ft 4 6 m from the tower base e With the tower base in the center the third and fourth earth anchors should form a line perpendicular to the line formed by the first two earth anchors 5 Check the position of the earth anchors to ensure that they are within approximately 6 in 15 cm of their ideal position e Each earth anchor should be 15 ft 4 6 m from the tower base 6 Insert the beveled end of the earth anchor driving rod into the arrowhead earth anchor as illustrated below 7 Drive the earth anchor up with force You will notice the earth anchor pulling out of the ground into the ground using the
2. obstructions Keep the following in mind when considering siting e A tower immediately downwind of a building should be at least 20 ft 6 0 m above the height of the building e The tower should be 20 ft 6 0 m higher than any barrier within a 500 ft 152 4 m radius Wind Speed Your wind generator will produce energy when there is wind A Photovoltaic PV solar panel will produce energy when the solar is plentiful This is typical of seasonal changes When it is sunny it is calm when it is cloudy it is windy For your wind generator to produce energy average wind speed at your site should be at least 6mph 6 miles hour 2 68 meters second If winds in your area are less than 6 mph you might look to install a Photovoltaic PV system next to your wind generator creating a hybrid renewable energy system Topography If your location is basically flat topography is not in issue when deciding where to place your wind generator There are circumstances where the highest land available may not be the best place for your wind generator Highest land nearby may be awkward to get to may be too far away from where you need the power or may expose your wind generator to potentially damaging turbulent conditions Time spent considering topography is vital prior to installation Barriers Barriers buildings trees etc that impede flow of wind produce wakes that may extend far downwind of the barrier and to a height considerably above the bar
3. slightly This will lock the earth anchor in the ground earth anchor driving rod and a 10 kg hammer Note No more than 12 inches 30 cm of earth anchor cable should be out of the ground once it has been locked into place e Notice the angle at which the earth anchor is being driven This angle is important for maximum pull strength The angle should be in line with the angle of the guy wire i e the angle should be pointing towards the tower base Important Earth anchors must be installed in soil that has been undisturbed 8 Drive the earth anchor into the ground until 6 inches 15 cm of cable remains above ground gt 9 Then insert the earth anchor driving rod through the cable eye and pull 10 Finish installing the remaining three earth anchors as described above 4 Anchor Distance from Tower Base to anchor id places 15 4 6 mi 15 ft 4 6 mi Dislance behween anchoa d places 74 2 TL 16 6 mi Tower 1 NA Important Although the earth anchor is designed to break through small rocks if there is a rock or obstruction that is too large remove and relocate the anchor The depth of the anchor Is critical to its effectiveness Tower Assembly The tower is assembled in several easy steps If this is a permanent installation first dig a trench from the base of the tower to where the battery is housed This will assist in the laying of wire from your turbine to batte
4. WIND TURBINE TOWER KIT User s Manual Congratulations on your purchase of the XUNZEL Products Wind Turbine Tower Kit Designed specifically for your XUNZEL Products Wind Turbine This guy wire supported tower utilizes lightweight tubing while providing safety and strength Two people can easily erect this tower in about an hour Because the wind generator and tower are lightweight no winches or vehicles are required for installation The tower includes a simple yet effective tower base and anchoring system which eliminates the need for a concrete base pad Depending on your soil conditions cement may be necessary for proper anchoring It is important to read this manual first and understand your soil conditions before you begin construction Read this manual thoroughly before beginning assembly XUNZEL Products Inc assumes no responsibility for inaccuracies or omissions The user of this information and product assumes full responsibility and risk All specifications are subject to change without notice If you have any questions on siting proper installation or operation please contact XUNZEL Products Inc or your dealer before installation Important Safety Instructions Read these instructions in their entirety before installing your tower 1 This manual contains important instructions that must be followed during installation and maintenance 2 Read understand and respect all warnings 3 Obtain all required permits and engineering
5. certifications for your tower and tower location 4 Soil and wind conditions vary Towers and tower foundations must be designed for your specific location 5 Locate tower so as not to fall on occupied buildings neighbors property or power lines 6 Do not attempt to climb the tower Tower climbing is very dangerous 7 Locate the tower mounting mast well away from occupied buildings and power lines A minimum of 300 ft 100 m is recommended 8 If the wind generator sounds or appears loose or if the tower is making an unusual sound correct the condition immediately A loose wind generator or component will incur further damage and or may fall from the tower 9 Never stand in line with operating blades 10 High voltage systems represent a dangerous shock hazard All high voltage systems should be wired and maintained by a qualified and licensed electrician 11 Use protective gloves when handling guy wires 12 Use protective gloves and safety glasses when working around batteries Safe Installation lt is very important to remember that any wind generator has high speed spinning parts and can be very dangerous Be sure that all bolted connections are tight and guy wire anchors are suitable for your soil conditions 1 Two people must be present when the tower is raised Have at least two people available during assembly and erection of tower 2 Always wear closed toe shoes 3 Always wear safety glasses 4 Always wear protect
6. e clamps to the third guy wire 8 Place two cable thimbles on the fourth earth anchor DO NOT connect the guy wires at this time 9 The fourth set of guy wires are used to help tilt the tower into position Secure these guy wires only after the tower IS upright It is important to remember during installation that guy wires must not become twisted please take time to ensure all wires are as straight as possible Raising the Tower XUNZEL Products Inc highly recommends first tilting the tower into position without the wind generator attached to verify proper installation and operation of the tower 1 Before raising the tower have another person ready to assist with installation 2 One person should push the tower up into position The other person should pull by the unattached upper guy wire With the tower off the ground a few feet make sure that all the wires are coming up cleanly Adjusting the Guy Wires If the guy wires are too tight they may cause the tower to bow as it is raised If this happens lower the tower to the ground and reduce the tension on the guy wires e Check to see which wire s are too tight the wires act in pairs e Release the tension on one of the wires by loosening the 2 cable clamps until the cable can be slid through them e Let out some cable until there is no tension in the wire 3 Retighten the cable clamps before raising the tower 4 Once the tower is raised to vertical attach the last guy wires to
7. ive gloves when handling cable 5 Choose a calm day to install your tower XUNZEL Wind Turbine Tower Kit components Images Not Shown to Scale Tower Base Lower Guy Cable Wire 21 ft 6 4 m Upper Guy Cable Wire 30 ft 9 1 m Guy Wire Attachment Plates Bg Cable Clamps 16 Cable Thimbles 8 Arrowhead Earth Anchor Tower Base Earth Spikes Earth Anchor Driving Rod Tower Tubes 1 42 in 1 0 m 1 48 in 1 2 m 4 72 in 1 8 m Selecting your site The information in this section gives specifics about the ideal sitting of the Wind Turbine Tower if your area does not have an ideal location find the best location possible Remember correct sitting will increase both efficiency and safety Small increases in average wind speeds result in dramatic increases in energy output of the wind generator For example an increase in wind speed of 10 9 mph 10 mph 4 m s 4 5 m s results in approximately a 30 increase in the power available from the wind Therefore the better the location the better the performance As a rule the wind generator should be mounted as high and as far away from obstructions as possible This will create a clear wind channel Two basic requirements for a good wind generator site e Good average wind speed e Low wind turbulence The lower the turbulence the less stress your wind generator will sustain the longer it will last and the more energy it will produce Turbulence is created by
8. n Wires should be free of slack but not overly taut e Check all bolts for tightness e Check cable clamps and pivot bolt e Check any unusual noises or vibrations Investigate and correct as necessary Warranty This product is covered under a one year limited warranty XUNZEL Products Inc Warrants to the original purchaser that this product is free from defects in materials and workmanship for the period of one year from date of purchase To obtain warranty service please contact XUNZEL Products for further instructions at email info xunzel com please note that proof of purchase including date and expiration of complaint is required for warranty service For more information or technical support Pour plus d information ou support technique Para m s informaci n o soporte t cnico www XUNZEL com info XUNZEL com MADE IN CHINA FABRIQUE EN CHINE HECHO EN CHINA Tower2140121
9. rier These wakes are areas of decreased wind speed and can cause potentially damaging turbulence Barriers near the wind generator will affect its performance Tower Base amp Earth Anchor Layout Remember your Wind Turbine Tower Kit should be installed by two people Tower Layout The tower is assembled on the ground then and only then tilted into position The tower base supports the tower on the ground and serves as the pivot point to raise and lower the tower Two sets of guy wires an upper and lower set with four wires per set secure the tower vertically e The upper set of guy wires secure the tower at a height of approximately 26 ft 8 0 m e The lower set of guy wires secure the tower at a height of approximately 15 ft 4 6 m Four arrowhead earth anchors located approximately 15 ft 4 6 m from the tower base at 90 intervals secure the guy wires to the ground One upper guy wire and one lower guy wire attach to each earth anchor Tower Assembly Hillside If possible position the tower to tilt along the incline of the hill with the top of the tower uphill from the tower base This will add to the stability of the tower Tower Base 1 Locate the area where you will install the tower Place the tower base on the ground and orientate in the direction the tower will be tilted towards 2 Have one person stand at the tower base holding a measuring tape 3 The second person takes the measuring tape end and walks out 15 ft
10. ry bank Tower Tube Layout 1 Lay out the six tower tubes on the ground as shown Leave approximately 6 inches 15 cm between each tube 42 Top Tower Tube PO D gt Location for 30f guy lt wire attachment plate 7 v gt os z e t Fo o o lt a Guy at z Wire 7 zs As i attac hment i T Plate gt R 72 Tower Tubes o Four 72 tubes between a 42 fop and bottom tower tubes Mo D e 2 8 ru cation for 21 y by l ocat on fos 2 ft guy 72 gt re attachment plate j v u anos 172 I Z 72 72 48 A x O 48 Bottom Tower Tube 2 With the tubes laid out as shown on the preceding page slide the guy wire attachment plates over the corresponding tower tubes e Slide the 30 ft 9 1 m guy wire attachment plate over the top tower tube e Slide the 21 ft 6 4 m guy wire attachment plate over the fourth tower tube from the bottom 3 Align the guy wire attachment plate so that each guy wire is in line with the anchors 4 With all guy wire attachment plates in position electrical wire can be run through the tower tubes Leave sufficient wire protruding at the top of the tower to connect the wind generator e Electrical wire can also be pulled through with a wire snake after the tower tubes are assembled 5 Join the tower tubes together using a soft faced mallet or hammer Use a piece of wood between
11. the tube and the mallet to protect the end of the tube e The expanded end of the tube prevents the guy wire attachment plate from sliding down the tube and positions the guy wire attachment plate at the correct height 6 Secure the lower tube to the tower base with the M10 bolt and nyloc nut Tighten the nut until it just contacts the tower base Attaching the Guy Wires 1 Orientate guy wire attachment plates with their corners pointing towards the anchor If they are not pointing towards the anchor adjust them before continuing 2 Uncoil each guy wire bundle and extend them to their respective anchoring point The fourth anchor point is directly under the tower 3 Begin attaching the guy wires to the earth anchors at the sides of the tower e Insert two cable thimbles in each earth anchor eyelet e Thread an upper guy wire and lower guy wire around its own cable thimble e Loosely attach two cable clamps to each guy wire 4 Leave about 6 inches 15 cm of slack in the guy wires and tighten the cable clamps Note The guy wire to the tower should contact the saddle side of the cable clamp On level ground there will be approximately 5 ft 1 5 m of extra cable 5 Attach two cable thimbles to the third earth anchor located directly below the tower 6 Measure the length of the upper and lower guy wires on the side earth anchors Use the same length for the guy wires on the third earth anchor 7 Secure the cabl
12. their anchor 5 Walk a short distance from the tower and look to see that it is straight A visual check is vital throughout the installation process and can often speed up the process by adjusting as you go 6 Focus on the angle of the tower Adjust the cables until the tower is straight up and down Use a carpenter s level held against the tower for this check 7 To adjust the angle of the tower relax one guy wire and tighten the guy wire opposite to it Repeat this process until the tower is straight 8 When the tower is straight make sure that all cable clamps are tight 9 After all the adjustments have been made lower the tower Important When the tower is lowered to install the wind generator undo only the pull side cables When adjusting the cables NEVER loosen both sets of guy wires at the same time When the tower is re erected only those pullside cables will need to be readjusted Installing your XUNZEL Products Wind Turbine Please refer to your XUNZEL Products Wind Turbine manual for assembly instructions Maintenance There are no moving parts in the tower so maintenance is minimal However as part of your annual maintenance XUNZEL Products Inc recommends that several areas are inspected to ensure long term integrity of your Wind Turbine Tower Kit e Check guy wire condition Inspect for wear and fraying at the guy wire to earth anchor connection points e Check guy wire tension Guy wires should have uniform tensio
Download Pdf Manuals
Related Search
Related Contents
REPUBLIQUE FRANCAISE MINISTERE DE L Kathrein 370/S User's Manual Analyses de laboratoire - pharmacie & toxicologie Hama 00122224 cable splitter or combiner QNAP TS-653 Pro WP275DS - Industrial Tool and Machinery Sales Copyright © All rights reserved.
Failed to retrieve file